{"title":"Available project-level DPWH GAA stated-length rate series","years":[2016,2017,2018,2019,2020,2021,2022,2023,2024,2025,2026],"comparatorYear":2027,"records":[{"year":2016,"category":"Mixed roads / bridges","project":"Nagtahan Bridge Service Road  -  Chainage 0  -  Chainage 502","amountPesos":10090000,"lengthMeters":502.0,"ratePesosPerMeter":20099.6015936255,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014200014"},{"year":2016,"category":"Mixed roads / bridges","project":"Construction of New Mompeller Bridge along Argao - Moalboal Road, Argao, Cebu, K0071+689  -  K0071+697","amountPesos":9050000,"lengthMeters":8.0,"ratePesosPerMeter":1131250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003016400035"},{"year":2016,"category":"Mixed roads / bridges","project":"Kabasalan Bridge (B00493MN) and Approaches along Lanao - Pagadian City - Zamboanga City Road (Completion), Km 1781+760 to Km 1782+000, Kabasalan, Zamboanga Sibugay","amountPesos":15500000,"lengthMeters":240.0,"ratePesosPerMeter":64583.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003016400043"},{"year":2016,"category":"Mixed roads / bridges","project":"Construction of Kimao Bridge along Mulondo - Wao Road (Phase II), Sta. 1601+804  -  Sta. 1602+834, Lanao del Sur 1st LD","amountPesos":30000000,"lengthMeters":1030.0,"ratePesosPerMeter":29126.21359223301,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050200261"},{"year":2016,"category":"Mixed roads / bridges","project":"Lanao - Davao/Lanao Road (Quirino Bridge - Torres Section), Km 1854+670  -  Km1856+670, Sultan Kudarat, Maguindanao 1st LD","amountPesos":30000000,"lengthMeters":2000.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303999"},{"year":2016,"category":"Mixed roads / bridges","project":"Construction of RCDG Bridge and Approaches along Lamisahan Road, Sta. 0+000  -  Sta. 2+800, Barangay Lamisahan, Zamboanga City 2nd LD","amountPesos":45000000,"lengthMeters":2800.0,"ratePesosPerMeter":16071.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050400445"},{"year":2016,"category":"Mixed roads / bridges","project":"Construction of Binalbagan River Bank Slope Protection, Sta. 0+032  -  Sta. 000+336, (Upstream of Binalbagan Bridge) along Bacolod South Road, Negros Occidental 5th LD","amountPesos":25000000,"lengthMeters":304.0,"ratePesosPerMeter":82236.84210526316,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 292003020401163"},{"year":2016,"category":"Bridges","project":"Rehabilitation of Libuganon River (Downstream) Maniki Jumbo Bridge, Kapalong, Sta. 8+254 - Sta. 8+360, Davao del Norte 1st LD","amountPesos":19526000,"lengthMeters":106.0,"ratePesosPerMeter":184207.54716981133,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 292003020401402"},{"year":2016,"category":"Roads","project":"Widening of Manila North Road, Pangasinan 5th LD, K0172+850  -  K0173+250, Villasis Section, including RROW","amountPesos":12000000,"lengthMeters":400.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165002000500013"},{"year":2016,"category":"Roads","project":"Manila East Road (Rosario  -  Cainta Road)  -  Chainage 362  -  Chainage 823","amountPesos":8269000,"lengthMeters":461.0,"ratePesosPerMeter":17937.09327548807,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003013800006"},{"year":2016,"category":"Roads","project":"C - 5 Road  -  Chainage 87  -  Chainage 361","amountPesos":3618000,"lengthMeters":274.0,"ratePesosPerMeter":13204.379562043796,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003013900004"},{"year":2016,"category":"Roads","project":"Camiling  -  Wawa  -  Bayambang  -  Malasiqui  -  Sta. Barbara Road  -   K0178+000  -  K0179+585","amountPesos":10900000,"lengthMeters":1585.0,"ratePesosPerMeter":6876.971608832808,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003013900027"},{"year":2016,"category":"Roads","project":"Dauis - Panglao Road  -  K0004+065  -  K0005+230","amountPesos":7596000,"lengthMeters":1165.0,"ratePesosPerMeter":6520.171673819743,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003013900089"},{"year":2016,"category":"Roads","project":"Roxas Blvd East Service Road  -  Chainage 000  -  Chainage 489","amountPesos":50000000,"lengthMeters":489.0,"ratePesosPerMeter":102249.48875255624,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014000002"},{"year":2016,"category":"Roads","project":"Magsaysay Ave. (Trinidad Rd) West Service Road  -  Chainage 0  -  Chainage 91, Chainage 184  -  Chainage 234","amountPesos":1495000,"lengthMeters":141.0,"ratePesosPerMeter":10602.836879432623,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014000035"},{"year":2016,"category":"Roads","project":"Liloy  -  Ipil Road  -  K1965+173.42  -  K1966+980, K1971+000  -  K1972+506.93, K1973+480  -  K1975+704.87, K1978+000  -  K1978+646.32, K1984+215  -  K1984+841.96, K1986+519  -  K1986+936, K1987+140  -  K1987+340","amountPesos":144840000,"lengthMeters":7428.66,"ratePesosPerMeter":19497.459837978462,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014100057"},{"year":2016,"category":"Roads","project":"Oroquieta City - Plaridel - Calamba - Sapang Dalaga Road  -  K1745+047  -  K1746+300, K1765+800  -  K1767+225,K1785+543  -  K1785+800","amountPesos":99191000,"lengthMeters":2935.0,"ratePesosPerMeter":33795.911413969334,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014100064"},{"year":2016,"category":"Roads","project":"Daang Maharlika (Agusan - Davao Road)  -  K1250+400  -  K1251+542, Agusan del Sur","amountPesos":90000000,"lengthMeters":1142.0,"ratePesosPerMeter":78809.10683012259,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014100079"},{"year":2016,"category":"Roads","project":"C - 2 Road  -  Chainage 537  -  Chainage 1344.2","amountPesos":8000000,"lengthMeters":807.2,"ratePesosPerMeter":9910.802775024777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014200010"},{"year":2016,"category":"Roads","project":"M. Roxas Service Road  -  Chainage 0  -  Chainage 224","amountPesos":2211000,"lengthMeters":224.0,"ratePesosPerMeter":9870.535714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014200015"},{"year":2016,"category":"Roads","project":"M. Roxas Service Road  -  Chainage 224  -  Chainage 448","amountPesos":6874000,"lengthMeters":224.0,"ratePesosPerMeter":30687.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014200017"},{"year":2016,"category":"Roads","project":"Pulilan  -  Calumpit Road -  K0044+000  -  K0045+000","amountPesos":10000000,"lengthMeters":1000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014200039"},{"year":2016,"category":"Roads","project":"Vito Port Road  -  K0093+000 -  K0093+495","amountPesos":14998000,"lengthMeters":495.0,"ratePesosPerMeter":30298.989898989897,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014200104"},{"year":2016,"category":"Roads","project":"Bacolod South Rd (Old Road)  -  Chainage 000  -  Chainage 260","amountPesos":8112000,"lengthMeters":260.0,"ratePesosPerMeter":31200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014200105"},{"year":2016,"category":"Roads","project":"Tagbilaran North Road  -  K0008+360  -  K0008+603, K0009+824  -  K0010+169, K0012+600  -  K0013+000, K0013+400  -  K0013+656, K0013+667  -  K0013+800, K0014+610  -  K0015+500, K0018+350  -  K0019+000, K0021+760  -  K0022+060, K0024+000  -  K0024+542","amountPesos":61859000,"lengthMeters":3759.0,"ratePesosPerMeter":16456.238361266292,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014200108"},{"year":2016,"category":"Roads","project":"Salcedo  -  Del Pilar Road K0361+2774 - K0361+3834","amountPesos":30000000,"lengthMeters":1060.0,"ratePesosPerMeter":28301.88679245283,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014300029"},{"year":2016,"category":"Roads","project":"Abra  -  Cervantes Road  -  K0439+300  -  K0441+000","amountPesos":20000000,"lengthMeters":1700.0,"ratePesosPerMeter":11764.70588235294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014300033"},{"year":2016,"category":"Roads","project":"Cavinti - Caliraya Road  -  K0108+000  -  K0112+000","amountPesos":5974000,"lengthMeters":4000.0,"ratePesosPerMeter":1493.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014300076"},{"year":2016,"category":"Roads","project":"Tigwi - Dampulan - Lipata - Yook - Buenavista Road, K0096+833  -  K0097+040","amountPesos":5500000,"lengthMeters":207.0,"ratePesosPerMeter":26570.048309178743,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014300082"},{"year":2016,"category":"Roads","project":"Comun  -  Inarado  -  Peñafrancia Road  -  K0529+229  -  K0531+375","amountPesos":15000000,"lengthMeters":2146.0,"ratePesosPerMeter":6989.748369058714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014300099"},{"year":2016,"category":"Roads","project":"Bacolod South Road (Old Road)  -  K0019+634  -  K0020+115","amountPesos":14902000,"lengthMeters":481.0,"ratePesosPerMeter":30981.28898128898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014300152"},{"year":2016,"category":"Roads","project":"Jct. (TNR) Maribojoc  -  Antequera  -  Catagbacan (Loon) Road  -  K0012+864  -  K0012+882, K0013+072  -  K0013+150, K0013+220  -  K0013+250, K0013+380  -  K0013+400","amountPesos":2409000,"lengthMeters":146.0,"ratePesosPerMeter":16500.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014300161"},{"year":2016,"category":"Roads","project":"Tagbilaran City  -  Corella  -  Sikatuna Road  -  K0011+530  -  K0011+560, K0014+150  -  K0014+200, K0015+180  -  K0015+200","amountPesos":1650000,"lengthMeters":100.0,"ratePesosPerMeter":16500.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014300162"},{"year":2016,"category":"Roads","project":"Tagbilaran  -  East Road  -  K0254+290  -  K0254+405","amountPesos":1898000,"lengthMeters":115.0,"ratePesosPerMeter":16504.347826086956,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014300163"},{"year":2016,"category":"Roads","project":"Jct. (LIR) Carmen - Sagbayan - Bacane Road  -  K0067+760  -  K0067+874.70, K0067+882.50  -  K0067+960","amountPesos":12510000,"lengthMeters":192.2,"ratePesosPerMeter":65088.449531738755,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014300165"},{"year":2016,"category":"Roads","project":"Arteche - Jipapad - Las Navas - Rawis Road  -  Chainage 9418  -  Chainage 9552","amountPesos":4545000,"lengthMeters":134.0,"ratePesosPerMeter":33917.91044776119,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014300192"},{"year":2016,"category":"Roads","project":"Overton  -  Abaga Bdry. Road  -  K1531+180 - K1531+300","amountPesos":2550000,"lengthMeters":120.0,"ratePesosPerMeter":21250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014300206"},{"year":2016,"category":"Roads","project":"Jct. Taft - Oras - San Policarpo - Arteche Road  -  K0928+321  -  K0928+537.6, K0959+650  -  K0959+811","amountPesos":30000000,"lengthMeters":377.6,"ratePesosPerMeter":79449.15254237778,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014500082"},{"year":2016,"category":"Roads","project":"Calbayog  -  Catarman Road  -  K0785+600  -  K0785+750","amountPesos":30000000,"lengthMeters":150.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014500092"},{"year":2016,"category":"Roads","project":"Calbayog  -  Catarman Road  -  K0791+210  -  K0791+300.4, K0792+000  -  K0792+080","amountPesos":30000000,"lengthMeters":170.4,"ratePesosPerMeter":176056.33802814496,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014500093"},{"year":2016,"category":"Roads","project":"Nabunturan - Maragusan Road  -  K1439+500  -  K1439+530","amountPesos":10000000,"lengthMeters":30.0,"ratePesosPerMeter":333333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014500106"},{"year":2016,"category":"Roads","project":"Balatoc Road  -  K0248+940  -  K0249+096","amountPesos":6000000,"lengthMeters":156.0,"ratePesosPerMeter":38461.53846153846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014600013"},{"year":2016,"category":"Roads","project":"Leyte - Samar - Inter Provincial Road  -  K0906+792  -  K0906+892","amountPesos":4000000,"lengthMeters":100.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014600089"},{"year":2016,"category":"Roads","project":"Sta. Felomina - Bonbonon - Digkilaan - Rogongon Road  -  K1553+800  -  K1554+806","amountPesos":9470000,"lengthMeters":1006.0,"ratePesosPerMeter":9413.51888667992,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014600114"},{"year":2016,"category":"Roads","project":"Sta Felomina - Bonbonon - Digkilaan - Rogongon Road  -  K1555+440  -  K1555+540","amountPesos":20000000,"lengthMeters":100.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014600115"},{"year":2016,"category":"Roads","project":"Noveleta - Rosario - Diversion Road  -  K0026+338  -  K0029+109, K0029+109  -  K0030+838, Gen. Trias, Cavite 6th LD","amountPesos":10000000,"lengthMeters":4500.0,"ratePesosPerMeter":2222.222222222222,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014700023"},{"year":2016,"category":"Roads","project":"Payatas Road  -  K0024+552  -  K0027+559","amountPesos":49950000,"lengthMeters":3007.0,"ratePesosPerMeter":16611.240438975725,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003014900008"},{"year":2016,"category":"Roads","project":"Manila North Road  -  K0562+133  -  K0562+183, K0562+227.9  -  K0562+262.2","amountPesos":1370000,"lengthMeters":84.3,"ratePesosPerMeter":16251.48279953897,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015000009"},{"year":2016,"category":"Roads","project":"Manila North Road  -  K0452+680  -  K0455+678","amountPesos":60424000,"lengthMeters":2998.0,"ratePesosPerMeter":20154.769846564377,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015000117"},{"year":2016,"category":"Roads","project":"Ormoc  -  Baybay  -  Southern Leyte Road  -  K1056+323  -  K1058+323","amountPesos":30000000,"lengthMeters":2000.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015000152"},{"year":2016,"category":"Roads","project":"Dipolog - Polanco - Piñan Jct. Road -  K1827+848  -  K1828+757","amountPesos":31465000,"lengthMeters":909.0,"ratePesosPerMeter":34614.96149614961,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015000155"},{"year":2016,"category":"Roads","project":"Dipolog - Sindangan - Liloy Road, K1893+880  -  K1894+503, K1890+123  -  K1891+000","amountPesos":50000000,"lengthMeters":1500.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015000156"},{"year":2016,"category":"Roads","project":"Dipolog - Oroquieta National Road  -  K1830+240  -  K1831+660","amountPesos":50000000,"lengthMeters":1420.0,"ratePesosPerMeter":35211.2676056338,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015000157"},{"year":2016,"category":"Roads","project":"Linamon  -  Zamboanga Road  -  K1580+687 to K1586+920","amountPesos":100000000,"lengthMeters":6233.0,"ratePesosPerMeter":16043.638697256538,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015000179"},{"year":2016,"category":"Roads","project":"Noveleta  -  Naic Tagaytay Road K0040+770  -  K0042+624","amountPesos":50000000,"lengthMeters":1854.0,"ratePesosPerMeter":26968.71628910464,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015100041"},{"year":2016,"category":"Roads","project":"Tagaytay  -  Nasugbu Road  -  K0085+000  -  K0085+942","amountPesos":20000000,"lengthMeters":942.0,"ratePesosPerMeter":21231.422505307855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015100044"},{"year":2016,"category":"Roads","project":"Tagaytay - Nasugbu Road  -  K082+000  - K082+500","amountPesos":15000000,"lengthMeters":500.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015100045"},{"year":2016,"category":"Roads","project":"Palico  -  Balayan  -  Batangas Road  -  K0120+137  -  K0121+096","amountPesos":20000000,"lengthMeters":959.0,"ratePesosPerMeter":20855.057351407715,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015100046"},{"year":2016,"category":"Roads","project":"Tagaytay - Nasugbu Road  -  K0090+000  - K0091+303","amountPesos":20000000,"lengthMeters":1303.0,"ratePesosPerMeter":15349.194167306216,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015100047"},{"year":2016,"category":"Roads","project":"Cainta - Kaytickling - Antipolo - Teresa - Morong Road  -  K0027+631  -  K0027+845, K0028+045  -  K0029+000, K0030+000  -  K0030+079","amountPesos":38850000,"lengthMeters":1248.0,"ratePesosPerMeter":31129.80769230769,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015100067"},{"year":2016,"category":"Roads","project":"Marikina - Infanta Road  -  K0029+637  -  K0030+000, K0036+499  -  K0036+748","amountPesos":28050000,"lengthMeters":612.0,"ratePesosPerMeter":45833.333333333336,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015100068"},{"year":2016,"category":"Roads","project":"Sorsogon Diversion Road  -  K0577+760  -  K0578+000, K0581+000  -  K0582+231","amountPesos":68261000,"lengthMeters":1471.0,"ratePesosPerMeter":46404.48674371176,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015100076"},{"year":2016,"category":"Roads","project":"Toledo  -  Tabuelan  -  San Remegio Road  -  K0047+000  -  K0047+487","amountPesos":20000000,"lengthMeters":487.0,"ratePesosPerMeter":41067.76180698152,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015100113"},{"year":2016,"category":"Roads","project":"Midsayap  -  Marbel Road (S00275MN)  -  K1772 +639  -  K1774+354","amountPesos":100000000,"lengthMeters":1715.0,"ratePesosPerMeter":58309.03790087464,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015100141"},{"year":2016,"category":"Roads","project":"Talisay  -  Laurel  -  Agoncillo  -  Lemery Road  -  K0122+306  -  K0122+352, K0122+358.5  -  K0122+954","amountPesos":20000000,"lengthMeters":641.5,"ratePesosPerMeter":31176.92907248636,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015200042"},{"year":2016,"category":"Roads","project":"Rosario  -  San Juan Road  -   K0123+800  -  K0125+400","amountPesos":45000000,"lengthMeters":1600.0,"ratePesosPerMeter":28125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015200045"},{"year":2016,"category":"Roads","project":"Roxas City Circumferential Road including slope protection, Sta. 129+821 - Sta. 133+837","amountPesos":150000000,"lengthMeters":4016.0,"ratePesosPerMeter":37350.59760956175,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015300049"},{"year":2016,"category":"Roads","project":"Eastern Interior Road Section (Jct. BCIR /Sayre Highway Brgy Gusa), Region X K2 + 250.00  -  K4 + 588 w/ exception","amountPesos":110000000,"lengthMeters":2338.0,"ratePesosPerMeter":47048.75962360992,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015300072"},{"year":2016,"category":"Roads","project":"Apayao - Ilocos Norte Road (Kabugao, Apayao - Solsona, Ilocos Norte  Road), K0728+576  -  K0729+801, Apayao 2nd LD","amountPesos":49000000,"lengthMeters":1225.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015400052"},{"year":2016,"category":"Roads","project":"Muelle Loney Road Extension, Sta. 0+000  -  Sta. 0+222","amountPesos":15000000,"lengthMeters":222.0,"ratePesosPerMeter":67567.56756756757,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015400063"},{"year":2016,"category":"Roads","project":"Sindangan - Bayog - Lakewood Road  (Talinga - Dagohoy - Tinaplan - Titik), K26+340  -  K29+270, Zamboanga del Norte 2nd LD","amountPesos":150000000,"lengthMeters":2930.0,"ratePesosPerMeter":51194.53924914676,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015400068"},{"year":2016,"category":"Roads","project":"Sta Felomina - Bonbonon - Digkilaan - Rogongon Road, incl. ROW, Iligan City LD, K1578+800 - K1581+051.04","amountPesos":125000000,"lengthMeters":2251.04,"ratePesosPerMeter":55529.88840713534,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015400072"},{"year":2016,"category":"Roads","project":"Kapalong - Talaingod - Valencia (Bukidnon) Road  -  K1555+000  -  K1558+000","amountPesos":40000000,"lengthMeters":3000.0,"ratePesosPerMeter":13333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015600144"},{"year":2016,"category":"Roads","project":"Davao - Sarangani Coastal Road (Malalag - Malita - JAS - G)  -  K1610+600  -  K1611+850","amountPesos":20000000,"lengthMeters":1250.0,"ratePesosPerMeter":16000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015600154"},{"year":2016,"category":"Roads","project":"Ilagan - Delfin Albano - Mallig Road  -  K0446+890  -  K0448+000","amountPesos":33030000,"lengthMeters":1110.0,"ratePesosPerMeter":29756.756756756757,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015600169"},{"year":2016,"category":"Roads","project":"Mainit - San Miguel - Santol Road  -  K0943+677   -   K0944+077, K0944+097  -  K0944+361","amountPesos":1500000,"lengthMeters":664.0,"ratePesosPerMeter":2259.0361445783133,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015600233"},{"year":2016,"category":"Roads","project":"Tigbao - Pulak - Sta. Fe Road  -  K0914+307  -   K0914+607","amountPesos":3000000,"lengthMeters":300.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015600234"},{"year":2016,"category":"Roads","project":"San Isidro - Daja Road  -  K1018 + 000  -  K1019+ 200","amountPesos":12990000,"lengthMeters":1200.0,"ratePesosPerMeter":10825.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015600245"},{"year":2016,"category":"Roads","project":"Arteche - Jipapad - Las Navas - Rawis Road  -  Chainage 2768  -  Chainage 4803, Chainage 6768  -  Chainage 8803","amountPesos":40000000,"lengthMeters":4070.0,"ratePesosPerMeter":9828.009828009826,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015600247"},{"year":2016,"category":"Roads","project":"Calbayog Diversion Road  -  Chainage 30  -  Chainage 2520","amountPesos":24500000,"lengthMeters":2490.0,"ratePesosPerMeter":9839.357429718875,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015600250"},{"year":2016,"category":"Roads","project":"Puerto Princesa North Road  -  K0217+000  -  K0217+560","amountPesos":18500000,"lengthMeters":560.0,"ratePesosPerMeter":33035.71428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015700051"},{"year":2016,"category":"Roads","project":"Zamboanga West Coastal Road, K1994+770  -  K1995+520, K1996+060  -  K1998+270, K2003+240  -  K2003+415","amountPesos":106575000,"lengthMeters":3135.0,"ratePesosPerMeter":33995.21531100479,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015700082"},{"year":2016,"category":"Roads","project":"Zamboanga West Coastal Road, K2008+884  -  K2009+430","amountPesos":18782000,"lengthMeters":546.0,"ratePesosPerMeter":34399.2673992674,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015700085"},{"year":2016,"category":"Roads","project":"Nabunturan - Maragusan Road  -  K1460+398  -  K1462+082, K1463+186  -  K1465+225","amountPesos":150000000,"lengthMeters":3723.0,"ratePesosPerMeter":40290.088638195004,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015700112"},{"year":2016,"category":"Roads","project":"Nabunturan - Maragusan Road  -  K1465+225  -  K1466+527, K1466+552  -  K1469+935","amountPesos":150000000,"lengthMeters":4685.0,"ratePesosPerMeter":32017.075773745997,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015700113"},{"year":2016,"category":"Roads","project":"Nabunturan - Maragusan Road  -  K1469 +935  -  K1471 + 500, K1472 +373  -  K1472 +520","amountPesos":58330000,"lengthMeters":1712.0,"ratePesosPerMeter":34071.26168224299,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015700114"},{"year":2016,"category":"Roads","project":"Asuncion - San Isidro - Laak - Veruela Road  -  K1490+937  -  K1491+050","amountPesos":4000000,"lengthMeters":113.0,"ratePesosPerMeter":35398.23008849558,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015700117"},{"year":2016,"category":"Roads","project":"Road 8/Ilocos Sur  -  Chainage 000.000 to Chainage 000.1000","amountPesos":20000000,"lengthMeters":0.1,"ratePesosPerMeter":200000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015800003"},{"year":2016,"category":"Roads","project":"Bulo Natl Road (Agbannawag - Bulo - Callagdao Sect)  -  K0503+400  -  K0507+921","amountPesos":137618000,"lengthMeters":4521.0,"ratePesosPerMeter":30439.725724397256,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015800027"},{"year":2016,"category":"Roads","project":"Ubao - Taang Road  -  K0399+280  -  K0399+390, K0400+849  -  K0401+083, K0404+908  -  K0408+314","amountPesos":150000000,"lengthMeters":3750.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015800057"},{"year":2016,"category":"Roads","project":"Ubao - Taang Road  -  K0408+314  -  K0412+064","amountPesos":150000000,"lengthMeters":3750.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015800058"},{"year":2016,"category":"Roads","project":"Ubao - Taang Road  -  K0412+064  -  K0413+756","amountPesos":67680000,"lengthMeters":1692.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015800059"},{"year":2016,"category":"Roads","project":"Ubao - Taang Road  -  K0413+797  -  K0415+942","amountPesos":85800000,"lengthMeters":2145.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015800060"},{"year":2016,"category":"Roads","project":"Jct Gattaran - Cumao - Capissayan - Sta Margarita - Bolos Point Road  -  K0577+600  -  K0578+154, K0579+274  -  K0579+423, K0579+447  -  K0579+938, K0580+308  -  K0580+385, K0580+650  -  K0580+760, K0589+761  -  K0591+614","amountPesos":75559000,"lengthMeters":3234.0,"ratePesosPerMeter":23363.94557823129,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015800080"},{"year":2016,"category":"Roads","project":"Jct Gattaran - Cumao - Capissayan - Sta Margarita - Bolos Point Road  -  K0591+614  -  K0593+410, K0594+532  -  K0595+000","amountPesos":57445000,"lengthMeters":2264.0,"ratePesosPerMeter":25373.2332155477,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015800081"},{"year":2016,"category":"Roads","project":"Jct Natl Road - Bitnong - Blance - N Vizcaya Bdry Rd  -  K0278+684  -  K0278+926","amountPesos":7260000,"lengthMeters":242.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015800094"},{"year":2016,"category":"Roads","project":"Sto. Tomas - Minalin Road (Minalin - Macabebe Sect)  -  K0068+240  -  K0068+766","amountPesos":13150000,"lengthMeters":526.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015800101"},{"year":2016,"category":"Roads","project":"Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road  -  Chainage 21157  -  Chainage 23157","amountPesos":56000000,"lengthMeters":2000.0,"ratePesosPerMeter":28000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015800208"},{"year":2016,"category":"Roads","project":"Zamboanga Del Sur Coastal Road  -  Chainage 25061  -  Chainage 25314, Chainage 25336  -  Chainage 28510","amountPesos":89429000,"lengthMeters":3427.0,"ratePesosPerMeter":26095.418733586226,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015800210"},{"year":2016,"category":"Roads","project":"Zamboanga Del Sur Coastal Road  -  Chainage 16653  -  Chainage 21615","amountPesos":126333000,"lengthMeters":4962.0,"ratePesosPerMeter":25460.096735187424,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015800213"},{"year":2016,"category":"Roads","project":"Polanco - Macleodes Road, K1843+285  -  K1846+885.7","amountPesos":76680000,"lengthMeters":3600.7,"ratePesosPerMeter":21295.859138501124,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015800217"},{"year":2016,"category":"Roads","project":"Tubod - Ganassi Road  -  K1611+874  -  K1612+421","amountPesos":21920000,"lengthMeters":547.0,"ratePesosPerMeter":40073.126142595975,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015800257"},{"year":2016,"category":"Roads","project":"Dahican - Lawigan Road  -  K1716+523  -  K1716+681","amountPesos":3950000,"lengthMeters":158.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003015800272"},{"year":2016,"category":"Roads","project":"Subic - Cawag - Balaybay Road, K0000+700 - K0001+900, K0005+900 - K0007+068 with exception, Subic, Zambales 1st LD","amountPesos":50000000,"lengthMeters":2368.0,"ratePesosPerMeter":21114.864864864863,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003030700006"},{"year":2016,"category":"Roads","project":"Construction of Road leading to Lipata Port, Sta. 00+000  -  Sta. 00+550, Brgy. Caridad, Culasi, Antique","amountPesos":8000000,"lengthMeters":550.0,"ratePesosPerMeter":14545.454545454546,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165003030700030"},{"year":2016,"category":"Roads","project":"Construction / Improvement of Basilan Circumferential Road, Tumahubong - Limbo Cadiis Section, Sta. 64+000  -  Sta. 78+200, Basilan (Contract Package 3B - 1a)","amountPesos":115000000,"lengthMeters":14200.0,"ratePesosPerMeter":8098.591549295775,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050100245"},{"year":2016,"category":"Roads","project":"Construction / Improvement of Basilan Circumferential Road, Isabela - Lamitan Section, Sta. 0+000  -  Sta. 27+300, Basilan (Contract Package 3A - Na)","amountPesos":250000000,"lengthMeters":27300.0,"ratePesosPerMeter":9157.509157509157,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050100247"},{"year":2016,"category":"Roads","project":"Construction / Improvement of Basilan Circumferential Road, Canas - Maluso - Isabela Section, Sta. 88+203.36  -  Sta. 132+000, Basilan (Contract Package 3B - Na)","amountPesos":260000000,"lengthMeters":43796.64,"ratePesosPerMeter":5936.528464284018,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050100248"},{"year":2016,"category":"Roads","project":"Concreting of Cabanatuan - Papaya Road, Phase I, Sta. 0+000  -  Sta. 1+841.20, Brgy. San Pedro, Gen. Tinio, Nueva Ecija","amountPesos":20000000,"lengthMeters":1841.2,"ratePesosPerMeter":10862.480990658267,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050100251"},{"year":2016,"category":"Roads","project":"Construction of Romandier Camp Andres National Road, Km 50+000  -  Km 50+700, Km 51+000  -  Km 51+700, Km 53+000  -  Km 53+700, Km 48+000  -  Km 48+700, Sulu 2nd LD","amountPesos":75000000,"lengthMeters":2800.0,"ratePesosPerMeter":26785.714285714286,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050100252"},{"year":2016,"category":"Roads","project":"Improvement/Upgrading/Rehabilitation of Jct. Timbangan - Romandier Road, K0018+000  -  K0018+800, Talipao, Sulu 1st LD","amountPesos":20000000,"lengthMeters":800.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050100255"},{"year":2016,"category":"Roads","project":"Improvement/Upgrading/Rehabilitation of Jct. Timbangan - Romandier Road, K0019+503  -  K0021+283 (with exception), Talipao, Sulu 1st LD","amountPesos":20000000,"lengthMeters":1780.0,"ratePesosPerMeter":11235.955056179775,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050100256"},{"year":2016,"category":"Roads","project":"Improvement/Upgrading/Rehabilitation of Romandier - Camp Andres Road, K0022+740  -  K0024+300, Talipao, Sulu 1st LD","amountPesos":40000000,"lengthMeters":1560.0,"ratePesosPerMeter":25641.02564102564,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050100257"},{"year":2016,"category":"Roads","project":"Improvement/Upgrading/Rehabilitation of Romandier - Camp Andres Road, K0024+392  -  K0025+932 (with exception), Talipao, Sulu 1st LD","amountPesos":20000000,"lengthMeters":1540.0,"ratePesosPerMeter":12987.012987012988,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050100258"},{"year":2016,"category":"Roads","project":"Widening of Seit Tayungan National Road, Km 43+300  -  Km 44+000, Km 40+700  -  Km 41+300, Km 38+000  -  Km 38+700, Km 39+000  -  Km 39+700, Sulu 2nd LD","amountPesos":75000000,"lengthMeters":2700.0,"ratePesosPerMeter":27777.777777777777,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050100260"},{"year":2016,"category":"Roads","project":"Rerouting and Concreting of Road at Guilinan Section, Tungawan along Lanao - Pagadian - Zamboanga City Road, K1843+140  -  K1843+370","amountPesos":27000000,"lengthMeters":230.0,"ratePesosPerMeter":117391.30434782608,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050100261"},{"year":2016,"category":"Roads","project":"Construction of Missing Gaps along Mulondo - Wao Road, Maguing Section  -  Sta. 1600+564.9  -  Sta. 1602+000, Lanao del Sur 1st LD","amountPesos":60000000,"lengthMeters":1435.1,"ratePesosPerMeter":41808.93317538576,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050100265"},{"year":2016,"category":"Roads","project":"Road Upgrading (gravel to paved) along Mulondo - Wao Road, Bumbaran Section  -  Sta. 1631+424.2  -  Sta. 1638+124, Lanao del Sur 1st LD","amountPesos":150000000,"lengthMeters":6699.8,"ratePesosPerMeter":22388.728021731837,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050100266"},{"year":2016,"category":"Roads","project":"Repair/Rehabilitation of Juban - Magallanes Road  -  K0627+000 - K0625+500 w/ exception","amountPesos":20000000,"lengthMeters":1500.0,"ratePesosPerMeter":13333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050100279"},{"year":2016,"category":"Roads","project":"Repair/Rehabilitation of Bacon - Sawanga - Pto Diaz Road K0593+673 - K0595+000 w/ exception","amountPesos":15500000,"lengthMeters":1327.0,"ratePesosPerMeter":11680.482290881688,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050100280"},{"year":2016,"category":"Roads","project":"Rehabilitation/Improvement of Main Road (National Highway) along Brgy. Tibungco, Bunawan District, Davao City. Project length 2,500m, Davao City 2nd LD","amountPesos":50000000,"lengthMeters":2500.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050100286"},{"year":2016,"category":"Roads","project":"Concreting of Maimbung - Parang Road (Phase III), Maimbung/Parang Km 26+600  -  Km 34+800, Sulu 1st LD","amountPesos":164000000,"lengthMeters":8200.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303358"},{"year":2016,"category":"Roads","project":"Repair/Rehabilitation of San Fernando - San Juan By - Pass Road K0270+000 to K0274+800","amountPesos":40000000,"lengthMeters":4800.0,"ratePesosPerMeter":8333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303466"},{"year":2016,"category":"Roads","project":"Rehabilitation of Brgy. Road, Sta. 0+000  -  Sta. 1+500, Maugat, San Antonio, Nueva Ecija","amountPesos":10000000,"lengthMeters":1500.0,"ratePesosPerMeter":6666.666666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303526"},{"year":2016,"category":"Roads","project":"Rehabilitation/Construction of Sitio Sumalaysay - Sitio Canaman Road, K020+700  -  K021+200, Igsoro, Bugasong, Antique","amountPesos":15000000,"lengthMeters":500.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303602"},{"year":2016,"category":"Roads","project":"Rehabilitation/Construction of Sitio Marcelo - Sitio Pangkol Road, K019+140  -  K019+660, Igsoro, Bugasong, Antique","amountPesos":20000000,"lengthMeters":520.0,"ratePesosPerMeter":38461.53846153846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303603"},{"year":2016,"category":"Roads","project":"Concreting of Ulbujan - Camias - Canguha to Sampoangan Road, Calape leading to San Isidro, Calape, Bohol, Sta. 000+000  -  001+915","amountPesos":30000000,"lengthMeters":1915.0,"ratePesosPerMeter":15665.796344647519,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303623"},{"year":2016,"category":"Roads","project":"Concreting of Basdio - Mocpoc Sur - Ubujan - Sondol Road, Loon, Bohol, Sta. 000+000  -  000+120","amountPesos":20000000,"lengthMeters":120.0,"ratePesosPerMeter":166666.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303624"},{"year":2016,"category":"Roads","project":"Concreting of Nagtuang - Tuboan - Bongco - Cansubayon Road, Loon, Bohol, Sta. 000+000  -  001+118","amountPesos":20000000,"lengthMeters":1118.0,"ratePesosPerMeter":17889.08765652952,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303625"},{"year":2016,"category":"Roads","project":"Concreting of Pondol - Panangguilon - Bagacay Road, Loon, Bohol, Sta. 000+000  -  001+915","amountPesos":20000000,"lengthMeters":1915.0,"ratePesosPerMeter":10443.864229765013,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303626"},{"year":2016,"category":"Roads","project":"Concreting of Road Shoulder along Siquijor Circumferential Road including Sidewalk, K0013+000  -  K0017+000","amountPesos":40000000,"lengthMeters":4000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303660"},{"year":2016,"category":"Roads","project":"Concreting of Road Shoulder along Siquijor Circumferential Road including Sidewalk, K0047+000  -  K0051+000","amountPesos":40000000,"lengthMeters":4000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303661"},{"year":2016,"category":"Roads","project":"Concreting of Road Shoulder along Siquijor Circumferential Road including Sidewalk, K0055+000  -  K0058+000","amountPesos":30000000,"lengthMeters":3000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303662"},{"year":2016,"category":"Roads","project":"Concreting of Road Shoulder along Siquijor Circumferential Road including Sidewalk, K0067+000  -  K0071+000","amountPesos":40000000,"lengthMeters":4000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303663"},{"year":2016,"category":"Roads","project":"Construction of Gandara - Matuguinao Road, Sta. 0+000  -  Sta. 22+000, Samar 1st LD","amountPesos":100000000,"lengthMeters":22000.0,"ratePesosPerMeter":4545.454545454545,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303665"},{"year":2016,"category":"Roads","project":"Construction / Opening of Road, 33km road traversing Matuguinao proper - Mahanud - Angyap - Deit - Libertad - Mahayag - Rizal - Inubod - Carolina - San Roque - Ligaya - Del Rosario (Matuguinao) - Poponton (Las Navas), Samar (Western Samar)","amountPesos":100000000,"lengthMeters":33000.0,"ratePesosPerMeter":3030.3030303030305,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303668"},{"year":2016,"category":"Roads","project":"Poblacion Allen - Cabacungan Road, K0705+562  -  K0707+000, Northern Samar","amountPesos":10000000,"lengthMeters":1438.0,"ratePesosPerMeter":6954.102920723227,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303680"},{"year":2016,"category":"Roads","project":"Construction and Relocation of Access Road from National Highway leading to DOH Philippine Institute of Traditional Alternative Health Care Building (including of Construction of Slope Protection) Brgy. Cabalawan, Tacloban City (Length = 219.56m, Thickness = 0.23m, Width = 6.10m)","amountPesos":5243000,"lengthMeters":219.56,"ratePesosPerMeter":23879.577336491166,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303690"},{"year":2016,"category":"Roads","project":"Concreting of Tagbak -  - Bud Daho Road, Indanan Km 4+800  -  Km 6+800, Sulu 1st LD","amountPesos":20000000,"lengthMeters":2000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303774"},{"year":2016,"category":"Roads","project":"Concreting of Tugas - Maligay Road, Patikul Km 2+500  -  Km 7+500, Sulu 1st LD","amountPesos":100000000,"lengthMeters":5000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303788"},{"year":2016,"category":"Roads","project":"Jolo Island Circumferential Roads, Concreting of Maimbung - Talipao - Panglima Estino Road (Phase III), Km 45+276  -  Km 51+950, Sulu 1st LD","amountPesos":146300000,"lengthMeters":6674.0,"ratePesosPerMeter":21920.8870242733,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303794"},{"year":2016,"category":"Roads","project":"Concreting of Maimbung - Ipil - Bilaan Road (Phase II), Maimbung, Talipao, Km 19+400  -  Km 28+400, Sulu 1st LD","amountPesos":140000000,"lengthMeters":9000.0,"ratePesosPerMeter":15555.555555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303797"},{"year":2016,"category":"Roads","project":"Concreting of Silangkan  -  Indanan Road, Indanan,                  K19+000  -  K21+000, Sulu 1st LD","amountPesos":40000000,"lengthMeters":2000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303798"},{"year":2016,"category":"Roads","project":"Concreting of Jolo - Indanan - Parang - Silangkan Road, Km 1+700  -  Km 6+700, Sulu 1st LD","amountPesos":135000000,"lengthMeters":5000.0,"ratePesosPerMeter":27000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303799"},{"year":2016,"category":"Roads","project":"Concreting of Junction Timbangan - Poblacion, Indanan Road, Km 6+684  -  Km 11+290, Sulu 1st LD","amountPesos":125000000,"lengthMeters":4606.0,"ratePesosPerMeter":27138.51498046027,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303800"},{"year":2016,"category":"Roads","project":"Rehabilitation of Malabang - Lanao del Norte Road, Balabagan - Malabang Section, Km 1926+000  -  Km 1931+000 (with exception), Lanao del Sur 2nd LD","amountPesos":100000000,"lengthMeters":5000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303913"},{"year":2016,"category":"Roads","project":"Rehabilitation of Marawi - Malabang Road, Tugaya Section, Km 1582+000  -  Km 1587+000 (with exception), Lanao del Sur 2nd LD","amountPesos":50000000,"lengthMeters":5000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303914"},{"year":2016,"category":"Roads","project":"Repair/Rehabilitation of Marawi - Masiu Road, K1572+431.80  -  K1573+233.95, K1574+541.10 - K1574+725.02, K1575+941.90 - K1577+114.77, Lanao del Sur 1st LD","amountPesos":75000000,"lengthMeters":2158.94,"ratePesosPerMeter":34739.27019741259,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303916"},{"year":2016,"category":"Roads","project":"Road Upgrading (Gravel to Paved), Kapai - Tagoloan (Tagoloan Section), K1587+664  -  K1593+664, Lanao del Sur 1st LD","amountPesos":75000000,"lengthMeters":6000.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303919"},{"year":2016,"category":"Roads","project":"Construction of Local Roads from Barangays Mibayao Macaguiling  -  Lumba Bayabao (Sta. 0+000  -  Sta. 0+643.50), Lanao del Sur","amountPesos":10000000,"lengthMeters":643.5,"ratePesosPerMeter":15540.01554001554,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303920"},{"year":2016,"category":"Roads","project":"Construction / Rehabilitation of Sapang Dalaga - Conception - Mansawan - Don Victoriano Road, Sta. 0+000  -  Sta. 40+700, Misamis Occidental 1st LD","amountPesos":50000000,"lengthMeters":40700.0,"ratePesosPerMeter":1228.5012285012285,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303931"},{"year":2016,"category":"Roads","project":"Construction of Oroquieta City - Sebucal - Mansawan - Don Victoriano Road, Sta. 0+000  -  Sta. 40+700, Misamis Occidental 1st LD","amountPesos":50000000,"lengthMeters":40700.0,"ratePesosPerMeter":1228.5012285012285,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303932"},{"year":2016,"category":"Roads","project":"Concreting of 7.5 km brgy roads connecting Poblacion Dalican - Dados - Kakar - Ambolodto, DOS, Maguindanao 1st LD","amountPesos":67500000,"lengthMeters":7500.0,"ratePesosPerMeter":9000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303960"},{"year":2016,"category":"Roads","project":"Concreting of 4 km Barira  -  Pindulunan Road, Barira, Maguindanao 1st LD","amountPesos":48000000,"lengthMeters":4000.0,"ratePesosPerMeter":12000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303971"},{"year":2016,"category":"Roads","project":"Concreting of 6.5 km brgy roads connecting Kurintem - Ambolodto - Sapalan - Bugawas, DOS, Maguindanao 1st LD","amountPesos":40500000,"lengthMeters":6500.0,"ratePesosPerMeter":6230.7692307692305,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303972"},{"year":2016,"category":"Roads","project":"Concreting of 8 km brgy roads connecting Darugao - Margues - Bayabas, Upi, Maguindanao 1st LD","amountPesos":45000000,"lengthMeters":8000.0,"ratePesosPerMeter":5625.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303973"},{"year":2016,"category":"Roads","project":"Concreting of Conrazon - Poblacion Prov'l Road (1 km.), Barangay Conrazon and Poblacion, Bansud, Oriental Mindoro 2nd LD","amountPesos":2000000,"lengthMeters":1000.0,"ratePesosPerMeter":2000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050305231"},{"year":2016,"category":"Roads","project":"Concreting/Road Upgrading of Municipal Road, Barangay Poblacion, Sta. 00+000 - Sta.00+600","amountPesos":5700000,"lengthMeters":600.0,"ratePesosPerMeter":9500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050305590"},{"year":2016,"category":"Roads","project":"Concreting of Fatima Road, Sta. 0+000 - Sta. 0+286, Brgy. Poblacion, Malita, Davao Occidental Lone District","amountPesos":4290000,"lengthMeters":286.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050306148"},{"year":2016,"category":"Roads","project":"Concreting of Junction National Higway to Marwasa Road, Sta. 0+000 - Sta. 0+537, Brgy. Poblacion, Malita, Davao Occidental Lone District","amountPesos":8055000,"lengthMeters":537.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050306149"},{"year":2016,"category":"Roads","project":"Concreting of Kolo Road, Sta. 0+000 - Sta. 0+272, Brgy. Poblacion, Malita, Davao Occidental Lone District","amountPesos":4080000,"lengthMeters":272.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050306150"},{"year":2016,"category":"Roads","project":"Concreting of Samtalika -  Dumoy Road, Sta. 0+000 - Sta. 0+668, Brgy. Poblacion, Malita, Davao Occidental Lone District","amountPesos":10000000,"lengthMeters":668.0,"ratePesosPerMeter":14970.059880239522,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050306151"},{"year":2016,"category":"Roads","project":"Concreting of Tambakan Road, Sta. 0+000 - Sta. 0+342, Brgy. Poblacion, Malita, Davao Occidental Lone District","amountPesos":5100000,"lengthMeters":342.0,"ratePesosPerMeter":14912.280701754386,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050306153"},{"year":2016,"category":"Roads","project":"Construction of slope protection along Tablas Circumferential Road, K0066+000 - K0070+000, Brgy. Bachawan, San Agustin, Romblon","amountPesos":39160000,"lengthMeters":4000.0,"ratePesosPerMeter":9790.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 292003020401007"},{"year":2016,"category":"Roads","project":"Construction od slope protection along Romblon - Cogon - Sablayan Road, K0011+444 - K0011+560, K0013+750 - K0013+793, K0013+852 - K0013+915, Brgy. Ilauran, Romblon, Romblon","amountPesos":27160000,"lengthMeters":222.0,"ratePesosPerMeter":122342.34234234234,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 292003020401009"},{"year":2016,"category":"Roads","project":"Construction / Rehabilitation of Gabawan River Control along Tablas Circumferential Road, Sta. 0+081  -  Sta. 0+500 (right side) and Sta. 0+180  -  Sta. 0+500 (left side), Brgy. Gabawan, Odiongan, Romblon","amountPesos":49767000,"lengthMeters":419.0,"ratePesosPerMeter":118775.65632458233,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 292003020401011"},{"year":2016,"category":"Roads","project":"Construction /  Upgrading of Slope Protections along Iloilo - Capiz Road, K0108+400 - K0109+000 (New Route), Capiz 1st LD","amountPesos":12500000,"lengthMeters":600.0,"ratePesosPerMeter":20833.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 292003020401131"},{"year":2016,"category":"Roads","project":"Construction /  Upgrading of Slope Protections along Iloilo - Coast - Capiz Road, K0168+000 - K0171+773, Both Sides, Capiz 1st LD","amountPesos":15000000,"lengthMeters":3773.0,"ratePesosPerMeter":3975.6162205141795,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 292003020401133"},{"year":2016,"category":"Roads","project":"Construction /  Upgrading of Slope Protections along Iloilo - Coast - Capiz Road, K0155+000 - K0164+000, Both Sides, Capiz 1st LD","amountPesos":15000000,"lengthMeters":9000.0,"ratePesosPerMeter":1666.6666666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 292003020401134"},{"year":2016,"category":"Roads","project":"Construction /  Upgrading of Slope Protections along Iloilo - Coast - Capiz Road, K0119+000 - K0123+000, Both Sides, Capiz 1st LD","amountPesos":15000000,"lengthMeters":4000.0,"ratePesosPerMeter":3750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 292003020401135"},{"year":2016,"category":"Roads","project":"Construction /  Upgrading of Slope Protections along Jct. National Road Mianay - Duyoc - Calaan - Panitan Road, K0106+600 - K0107+250, Both Sides, Capiz 1st LD","amountPesos":5000000,"lengthMeters":650.0,"ratePesosPerMeter":7692.307692307692,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 292003020401136"},{"year":2016,"category":"Roads","project":"Construction /  Upgrading of Slope Protections along Jct. National Road Mianay - Duyoc - Calaan - Panitan Road, K0105+600 - K0106+100, Both Sides, Capiz 1st LD","amountPesos":5000000,"lengthMeters":500.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 292003020401137"},{"year":2016,"category":"Roads","project":"Construction /  Upgrading of Slope Protections along Maayon Jct. - Bailan Road, K0126+000  -  K0126+180, Left Side, Capiz 1st LD","amountPesos":4500000,"lengthMeters":180.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 292003020401138"},{"year":2016,"category":"Roads","project":"Construction /  Upgrading of Slope Protections along Maayon Jct. - Bailan Road, K0128+000  -  K0129+000, Left Side, Capiz 1st LD","amountPesos":13000000,"lengthMeters":1000.0,"ratePesosPerMeter":13000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 292003020401139"},{"year":2016,"category":"Roads","project":"Repair of Slope Protection (Road Slip) along Loay Interior Road, Km 189+160 to Km 189+451, Bahian, Loboc, Bohol","amountPesos":7256000,"lengthMeters":291.0,"ratePesosPerMeter":24934.70790378007,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 292003020401187"},{"year":2016,"category":"Roads","project":"Construction of Lined Canal along Tagbilaran East Road, Garcia - Hernandez Section, K0211+515.60  -  K0213+060 (with exception) and Dimiao Section, K0222+640  -  K0224+380 (with exception)","amountPesos":2000000,"lengthMeters":3284.4,"ratePesosPerMeter":608.9392278650602,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 292003020401188"},{"year":2016,"category":"Roads","project":"Repair/ Improvement of Bantayan River Control along Catarman - Rawis Road, Bantayan - San Roque Section, K0768+165.20  -  K0768+394.00, San Roque, Northern Samar","amountPesos":45000000,"lengthMeters":228.8,"ratePesosPerMeter":196678.32167828165,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 292003020401295"},{"year":2017,"category":"Bridges","project":"M Roxas Jr Bridge - Chainage 326 - Chainage 560, Chainage 609 - Chainage 1241, Chainage 000 - Chainage 139, Chainage 713 - Chainage 1250","amountPesos":7000000,"lengthMeters":1014.0,"ratePesosPerMeter":6903.353057199211,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014200191"},{"year":2017,"category":"Mixed roads / bridges","project":"Magsidel Port-Calayan Poblacion-Sibang Cove Road, Calayan, Cagayan leading to Sibang Cove, Cararangatan Cave, Sibang Cave, Cababaan Cave. including bridge, Bataraw Fall, Calayan, Cagayan 2nd LD - Sta. 6 + 400 - Sta. 7 + 244","amountPesos":50000000,"lengthMeters":844.0,"ratePesosPerMeter":59241.70616113744,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003030800328"},{"year":2017,"category":"Mixed roads / bridges","project":"Improvement of Bridge Approach Causeway along National Road, Simunul Circumferential National Road, Tawi-Tawi (Km 14+844 - Km 15+162)","amountPesos":40000000,"lengthMeters":318.0,"ratePesosPerMeter":125786.16352201258,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100320"},{"year":2017,"category":"Mixed roads / bridges","project":"Improvement of Bridge Approach Causeway along National Road, Simunul Circumferential National Road, Tawi-Tawi (Km 15+204 - Km 15+460)","amountPesos":30000000,"lengthMeters":256.0,"ratePesosPerMeter":117187.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100321"},{"year":2017,"category":"Mixed roads / bridges","project":"Reconstruction/Rehabilitation of C-6 Road from M.L. Quezon to Napindan Bridge, Taguig City (Sta. 0+000 - Sta. 6+940), Left Side Only","amountPesos":168000000,"lengthMeters":6940.0,"ratePesosPerMeter":24207.492795389047,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306291"},{"year":2017,"category":"Bridges","project":"Construction of Rio Chico Bridge leading to Sitio Pantay and Bignay, Rio Chico, General Tinio, Nueva Ecija, Sta. 0+000 - Sta. 0+422.80","amountPesos":89883000,"lengthMeters":422.8,"ratePesosPerMeter":212589.8770104068,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050400583"},{"year":2017,"category":"Mixed roads / bridges","project":"Construction/Replacement of Masiu Bridge including Approaches along Lake Lanao Circumferential Road, Sta. 1597+330 - 1597+450","amountPesos":161000000,"lengthMeters":120.0,"ratePesosPerMeter":1341666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050400584"},{"year":2017,"category":"Mixed roads / bridges","project":"Improvement of Paranaque River North, Sheetpiling Improvement (East side) from Sto. Niño Bridge towards MIA Road, Sta. 0+225 - Sta. 0+600 and Sta. 0+842 - 2+100, Parañaque City","amountPesos":84000000,"lengthMeters":1633.0,"ratePesosPerMeter":51439.06919779547,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 292003020401597"},{"year":2017,"category":"Roads","project":"Pangasinan-Nueva Vizcaya Road - K0172 + 000 - K0173 + 195","amountPesos":19864000,"lengthMeters":1195.0,"ratePesosPerMeter":16622.594142259415,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003013800081"},{"year":2017,"category":"Roads","project":"C-3 Road - Chainage 167 - Chainage 187, Chainage 201 - Chainage 228, Chainage 314 - Chainage 337, Chainage 383 - Chainage 391, Chainage 432 - Chainage 455, Chainage 455 - Chainage 489, Chainage 489 - Chainage 595, Chainage 595 - Chainage 645","amountPesos":5000000,"lengthMeters":291.0,"ratePesosPerMeter":17182.13058419244,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003013900124"},{"year":2017,"category":"Roads","project":"C-5 Road - K0015 + 406 - K0016 + 128","amountPesos":8000000,"lengthMeters":722.0,"ratePesosPerMeter":11080.3324099723,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014000130"},{"year":2017,"category":"Roads","project":"Jct Tacloban-Baybay South Rd-Government Center Road Network - K0918 + (-170) - K0918 + 338.5","amountPesos":5085000,"lengthMeters":508.5,"ratePesosPerMeter":10000.000000000002,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014000190"},{"year":2017,"category":"Roads","project":"Caibaan Road -K0913 + -653 - K0913 + 515","amountPesos":9316000,"lengthMeters":1168.0,"ratePesosPerMeter":7976.027397260274,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014000203"},{"year":2017,"category":"Roads","project":"Manila-Cavite Road  - K0028 + 195 - K0028 + 611, K0029 + 000 - K0030 + 198","amountPesos":49456000,"lengthMeters":1614.0,"ratePesosPerMeter":30641.88351920694,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014100136"},{"year":2017,"category":"Roads","project":"Digos-Makar Road K1623 + 397 - K1625 + 125","amountPesos":49862000,"lengthMeters":1728.0,"ratePesosPerMeter":28855.324074074073,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014100163"},{"year":2017,"category":"Roads","project":"C-3 Road - K0010+867 - K0010+910, K0010+964 - K0011+074","amountPesos":3698000,"lengthMeters":153.0,"ratePesosPerMeter":24169.934640522875,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014200186"},{"year":2017,"category":"Roads","project":"C-2 Road - Chainage 537 - Chainage 1344.20","amountPesos":30000000,"lengthMeters":807.2,"ratePesosPerMeter":37165.51040634291,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014200189"},{"year":2017,"category":"Roads","project":"Sarangani-Davao del Sur Coastal Road K1678 + 195 - K1679 + 117,  K1682 + 625 - K1683 + 481","amountPesos":34866000,"lengthMeters":1778.0,"ratePesosPerMeter":19609.673790776153,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014200315"},{"year":2017,"category":"Roads","project":"Balbalan-Pinukpuk Road - Chainage 11070 - Chainage 11575, Chainage 27650 - Chainage 27687, Chainage 27705 - Chainage 27737","amountPesos":15127000,"lengthMeters":574.0,"ratePesosPerMeter":26353.658536585364,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014300272"},{"year":2017,"category":"Roads","project":"Jct Natl Road-Bitnong-Blance-N Vizcaya Bdry Rd - K0264 + 830 - K0265 + 397, K0271 + 191 - K0272 + 133","amountPesos":43079000,"lengthMeters":1509.0,"ratePesosPerMeter":28548.0450629556,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014300284"},{"year":2017,"category":"Roads","project":"Bangad-Fort Magsaysay Road - K0132+026.10 - K0134+964, K0134+982 - K0135+160.76","amountPesos":45746000,"lengthMeters":3116.66,"ratePesosPerMeter":14677.892359128024,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014300304"},{"year":2017,"category":"Roads","project":"Manila-Cavite Road  - Chainage 0 - Chainage 442","amountPesos":13544000,"lengthMeters":442.0,"ratePesosPerMeter":30642.533936651584,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014300322"},{"year":2017,"category":"Roads","project":"Bacolod South Rd (Old Road) - K0023+348 - K0023+964","amountPesos":18425000,"lengthMeters":616.0,"ratePesosPerMeter":29910.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014300369"},{"year":2017,"category":"Roads","project":"Catarman Diversion Road I - K0742 + (-699) - K0742 +  (-030), K0743 + 100 - K0743 + 261","amountPesos":25000000,"lengthMeters":830.0,"ratePesosPerMeter":30120.481927710844,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014300401"},{"year":2017,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1265 + 642 - K1265 + 720, K1265 + 757 - K1265 + 789","amountPesos":30821000,"lengthMeters":110.0,"ratePesosPerMeter":280190.9090909091,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014400093"},{"year":2017,"category":"Roads","project":"Baguio - Bontoc Road - K0390 + 270 - K0390 + 320","amountPesos":3587000,"lengthMeters":50.0,"ratePesosPerMeter":71740.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014500163"},{"year":2017,"category":"Roads","project":"Sarangani-Davao del Sur Coastal Road K1739 + 825 - K1739 + 950, K1742 + 190 - 1742 + 232, K1745 + 211.5 - K1745 + 251.5, K1749 + 220 - K1749 + 260","amountPesos":36973000,"lengthMeters":247.0,"ratePesosPerMeter":149688.25910931174,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014500261"},{"year":2017,"category":"Roads","project":"Ubao-Taang Road - K0399+045 - K0399+145, K0399+168 - K0399+252, K0399+382 - K0399+437, K0399+382 - K0399+482, K0399+460 - K0399+480","amountPesos":10733000,"lengthMeters":284.0,"ratePesosPerMeter":37792.25352112676,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014600152"},{"year":2017,"category":"Roads","project":"Mt. Province-Ifugao Road (Kiling-Paracelis Section) - K0460 + 060 - K0460 + 130","amountPesos":4925000,"lengthMeters":70.0,"ratePesosPerMeter":70357.14285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014600157"},{"year":2017,"category":"Roads","project":"Jct Natl Road-Bitnong-Blance-N Vizcaya Bdry Rd - K0258+197.2 - K0258+237.2","amountPesos":1044000,"lengthMeters":40.0,"ratePesosPerMeter":26100.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014600172"},{"year":2017,"category":"Roads","project":"Jct. Tubod-Lakewood Road, K1712+177 - K1712+327","amountPesos":18073000,"lengthMeters":150.0,"ratePesosPerMeter":120486.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014600248"},{"year":2017,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) Butuan Doctor's Hospital - GSIS - K1241 + 900 - K1243 + 270","amountPesos":150000000,"lengthMeters":1370.0,"ratePesosPerMeter":109489.05109489051,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014700052"},{"year":2017,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) GSIS - Libertad - Bonbon creek - K1243 + 270 - K1244 + 302","amountPesos":150000000,"lengthMeters":1032.0,"ratePesosPerMeter":145348.83720930232,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014700053"},{"year":2017,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) Jct Ochoa Ave. - Butuan Doctor's Hospital - K1240 + 360 - K1241 + 900","amountPesos":150000000,"lengthMeters":1540.0,"ratePesosPerMeter":97402.5974025974,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014700054"},{"year":2017,"category":"Roads","project":"Daang-Maharlika Road - K1508+722 - K1509+180","amountPesos":20700000,"lengthMeters":458.0,"ratePesosPerMeter":45196.50655021834,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014700115"},{"year":2017,"category":"Roads","project":"Davao Cotabato Road (Davao City-Jct. Digos Section) - K1518 + 930 - K1518 + 954","amountPesos":30000000,"lengthMeters":24.0,"ratePesosPerMeter":1250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014700116"},{"year":2017,"category":"Roads","project":"Surigao - Davao Coastal Road including RROW - K1824 + 527 - K1825 + 200","amountPesos":27073000,"lengthMeters":673.0,"ratePesosPerMeter":40227.34026745914,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014700118"},{"year":2017,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1266 + 000 - K1266 + 963","amountPesos":10000000,"lengthMeters":963.0,"ratePesosPerMeter":10384.215991692627,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014700120"},{"year":2017,"category":"Roads","project":"Davao City Diversion Road - K1511+900 - K1512+000","amountPesos":30897000,"lengthMeters":100.0,"ratePesosPerMeter":308970.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003014800190"},{"year":2017,"category":"Roads","project":"Tagum - Panabo Circum Road - K1511+982 - K1516+100","amountPesos":73791000,"lengthMeters":4118.0,"ratePesosPerMeter":17919.1355026712,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015100237"},{"year":2017,"category":"Roads","project":"Picas San Jose DZR Airport Road-K0910 + -926 - K0910 + -545","amountPesos":15150000,"lengthMeters":381.0,"ratePesosPerMeter":39763.779527559054,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015100307"},{"year":2017,"category":"Roads","project":"Carmen - Dapecol Compound Road - K1476 + 392 - K1477 + 680","amountPesos":26000000,"lengthMeters":1288.0,"ratePesosPerMeter":20186.33540372671,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015100324"},{"year":2017,"category":"Roads","project":"Binalonan-Asingan-Santa Maria Road - K0190 + (-247) - K0190 + (-117), K0190 + 607 - K0190 + 707","amountPesos":10528000,"lengthMeters":230.0,"ratePesosPerMeter":45773.913043478264,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015200144"},{"year":2017,"category":"Roads","project":"Eastern Bobongan-Sominot-Midsalip-Dumingag Road, (S01325MN), Chainage 27063 - Chainage 28409","amountPesos":30000000,"lengthMeters":1346.0,"ratePesosPerMeter":22288.261515601782,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015200201"},{"year":2017,"category":"Roads","project":"Ipil-Magdaup Wharf Road, Ipil, Zamboanga Sibugay 2nd LD, K2014 + 800 - K2015 + 297","amountPesos":17790000,"lengthMeters":497.0,"ratePesosPerMeter":35794.76861167002,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015200204"},{"year":2017,"category":"Roads","project":"Jct. Manikling  Gov. Generoso Road - K1770+239 - K1772+596","amountPesos":49000000,"lengthMeters":2357.0,"ratePesosPerMeter":20789.13873568095,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015200210"},{"year":2017,"category":"Roads","project":"Surallah-T'boli-San Jose Road (Gen.Santos City), Brgy T'boli-Brgy Maan Section, Road Component, Package 1 - Sta. 3+620-Sta. 5+240","amountPesos":150000000,"lengthMeters":1620.0,"ratePesosPerMeter":92592.5925925926,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015400210"},{"year":2017,"category":"Roads","project":"Surallah-T'boli-San Jose Road (Gen.Santos City), Brgy T'boli-Brgy Maan Section, Road Component, Package 2 - Sta. 5+240-Sta. 6+700","amountPesos":150000000,"lengthMeters":1460.0,"ratePesosPerMeter":102739.72602739726,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015400211"},{"year":2017,"category":"Roads","project":"Surallah-T'boli-San Jose Road (Gen.Santos City), Brgy T'boli-Brgy Maan Section, Road Component, Package 3 - Sta. 6+700-Sta. 7+600","amountPesos":150000000,"lengthMeters":900.0,"ratePesosPerMeter":166666.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015400212"},{"year":2017,"category":"Roads","project":"Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Road -  K1978+(-072)-K1980+080","amountPesos":150000000,"lengthMeters":2152.0,"ratePesosPerMeter":69702.60223048327,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015700151"},{"year":2017,"category":"Roads","project":"Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Road - K1980+080-K1982+299","amountPesos":150000000,"lengthMeters":2219.0,"ratePesosPerMeter":67598.017124831,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015700152"},{"year":2017,"category":"Roads","project":"Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Road - K1982+299-K1983+999","amountPesos":150000000,"lengthMeters":1700.0,"ratePesosPerMeter":88235.29411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015700153"},{"year":2017,"category":"Roads","project":"Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Road - K1983+999-1985+000,  K1990+717-K1992+809","amountPesos":150000000,"lengthMeters":3093.0,"ratePesosPerMeter":48496.60523763337,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015700154"},{"year":2017,"category":"Roads","project":"Liloy-Siocon Road, K2027+000 -   K2030+750","amountPesos":150000000,"lengthMeters":3750.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015700171"},{"year":2017,"category":"Roads","project":"Liloy-Siocon Road, K2030+750 -   K2032+090, K2032+500 - K2034+770","amountPesos":150000000,"lengthMeters":3610.0,"ratePesosPerMeter":41551.246537396124,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015700172"},{"year":2017,"category":"Roads","project":"Paco-Roxas-Arakan Valley Road  K1681 + 158 - K1681 + 948,   K1685 + 355 - K1685 + 480","amountPesos":51000000,"lengthMeters":915.0,"ratePesosPerMeter":55737.70491803279,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015700177"},{"year":2017,"category":"Roads","project":"SNA-Lebak-Kalamansig Road - K1857+700-K1859+000, K1859+973-K1862+230","amountPesos":150000000,"lengthMeters":3557.0,"ratePesosPerMeter":42170.368287883044,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015700196"},{"year":2017,"category":"Roads","project":"SNA-Lebak-Kalamansig Road - K1862+230-K1864+471","amountPesos":150000000,"lengthMeters":2241.0,"ratePesosPerMeter":66934.40428380188,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015700197"},{"year":2017,"category":"Roads","project":"SNA-Lebak-Kalamansig Road - K1864+471-K1866+182","amountPesos":150000000,"lengthMeters":1711.0,"ratePesosPerMeter":87668.03039158387,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015700198"},{"year":2017,"category":"Roads","project":"SNA-Lebak-Kalamansig Road - K1866+182-K1868+352","amountPesos":150000000,"lengthMeters":2170.0,"ratePesosPerMeter":69124.42396313364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015700199"},{"year":2017,"category":"Roads","project":"SNA-Lebak-Kalamansig Road - K1868+352-K1870+651","amountPesos":150000000,"lengthMeters":2299.0,"ratePesosPerMeter":65245.759025663334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015700200"},{"year":2017,"category":"Roads","project":"SNA-Lebak-Kalamansig Road - K1870+651-K1872+794, K1872+803-K1873+200","amountPesos":150000000,"lengthMeters":2540.0,"ratePesosPerMeter":59055.11811023622,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015700201"},{"year":2017,"category":"Roads","project":"SNA-Lebak-Kalamansig Road - K1873+200-K1874+689","amountPesos":90000000,"lengthMeters":1489.0,"ratePesosPerMeter":60443.25050369375,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015700202"},{"year":2017,"category":"Roads","project":"Liloy-Siocon Road, K2057+522 -   K2058+022","amountPesos":16000000,"lengthMeters":500.0,"ratePesosPerMeter":32000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015700217"},{"year":2017,"category":"Roads","project":"Asuncion-San Isidro-Laak-Veruela Road - K1518+040 - K1518+731","amountPesos":19348000,"lengthMeters":691.0,"ratePesosPerMeter":28000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015700220"},{"year":2017,"category":"Roads","project":"Magpet-Nowa-Doroluman-Greenfield Road K1639 + 720 - K1639 + 1046,  K0141 + (-814) - K0141 + (-704),  K0141 + (-318) - K0141 + (-138),  K1655 + 658 - K1658 + 084,  K1665 + 123 - K1665 + 908.56","amountPesos":150000000,"lengthMeters":3827.56,"ratePesosPerMeter":39189.45751340222,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015800367"},{"year":2017,"category":"Roads","project":"Bambang-Kasibu-Solano Road (S06065LZ) - K0323 + 656 - K0324 + 127.2","amountPesos":26557000,"lengthMeters":471.2,"ratePesosPerMeter":56360.35653650115,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015800424"},{"year":2017,"category":"Roads","project":"Tibanban-Lavigan Road - K1804+312 - K1804+450, K1804+182.267 - K1804+330.201, K1804+420 - K1804+446.393, K1804+449.898 - K1804+493.121, K1805+031 - K1805+100","amountPesos":4140000,"lengthMeters":379.854,"ratePesosPerMeter":10898.924323554449,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015800461"},{"year":2017,"category":"Roads","project":"Marbel-Allah Valley-Cotabato Road - K1763+(-672)-K1763+010, K1764+634-1767+318,  K1771+300-K1772+815, K1768+(-499)-K1770+851","amountPesos":175087000,"lengthMeters":8231.0,"ratePesosPerMeter":21271.65593488033,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003016500100"},{"year":2017,"category":"Roads","project":"Marbel-Allah Valley-Cotabato Road - K1763+(-672)-K1763+010, K1764+634-1767+318,  K1771+300-K1772+815, K1768+(-499)-K1770+851","amountPesos":150000000,"lengthMeters":8231.0,"ratePesosPerMeter":18223.788118090146,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003016500111"},{"year":2017,"category":"Roads","project":"Pagadian City-Zamboanga City Road, K1681+892 - K1684+271","amountPesos":71000000,"lengthMeters":2379.0,"ratePesosPerMeter":29844.472467423286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003016500117"},{"year":2017,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1269 + 343 - K1272 + 000, K1274 + 000 - K1274 + 734","amountPesos":103566000,"lengthMeters":3391.0,"ratePesosPerMeter":30541.433205544086,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003016600023"},{"year":2017,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1274 + 734 - K1278 + 425","amountPesos":156434000,"lengthMeters":3691.0,"ratePesosPerMeter":42382.55215388784,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003016600024"},{"year":2017,"category":"Roads","project":"Davao-Cotabato Road (Jct Digos-Cotabato Sect) K1626 + 684 - K1630 + 345","amountPesos":89735000,"lengthMeters":3661.0,"ratePesosPerMeter":24511.062551215517,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003016600039"},{"year":2017,"category":"Roads","project":"Davao-Cotabato Road (Jct Digos-Cotabato Sect)  K1630 + 345 - K1631 + 031,  K1633 + 393 - K1635 + 025","amountPesos":55600000,"lengthMeters":2318.0,"ratePesosPerMeter":23986.194995685935,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003016600040"},{"year":2017,"category":"Roads","project":"Davao-Cotabato Road (Jct. Digos-Cotabato Sect.) K1666 + (-067) - 1666 + 609, K1670 + 961 - K1671 + 129, K1671 + 221 - K1671 + 352, K1671+478 - K1671+621, K1674 + 274 - K1676 + 280, K1676 + 570 - K1677 + 200, K1677 + 300 - K1678 + 571.57","amountPesos":103255000,"lengthMeters":5025.57,"ratePesosPerMeter":20545.928123575766,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003016600042"},{"year":2017,"category":"Roads","project":"Davao-Cotabato Road (Jct. Digos-Cotabato Sect.) K1678 + 571.57 - K1680 + 970,  K1681 + 137 - K1681 + 472, K1681 + 598 - K1681 + 934, K1682 + 043 - K1682 + 107.08","amountPesos":93456000,"lengthMeters":3133.51,"ratePesosPerMeter":29824.701373220356,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003016600043"},{"year":2017,"category":"Roads","project":"Dipolog-Oroquieta National Road including RROW - K1826 + 588 - K1829 + 543","amountPesos":100650000,"lengthMeters":2955.0,"ratePesosPerMeter":34060.91370558376,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003016600050"},{"year":2017,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1233 + -088 - K1237 + 105","amountPesos":97520000,"lengthMeters":4193.0,"ratePesosPerMeter":23257.81063677558,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003016700001"},{"year":2017,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1244 + 340 - K1246 + 633, K1246 + 633 - K1249 + 461","amountPesos":116348000,"lengthMeters":5121.0,"ratePesosPerMeter":22719.781292716267,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003016700002"},{"year":2017,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1250 + -542 - K1253 + 125, K1254 + 000 - K1254 + 857, K1254 + 869 - K1254 + 900","amountPesos":51700000,"lengthMeters":4555.0,"ratePesosPerMeter":11350.164654226126,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003016700003"},{"year":2017,"category":"Roads","project":"Pangasinan-Nueva Ecija Road - K0186 + 003 - K0186 + 496","amountPesos":10167000,"lengthMeters":493.0,"ratePesosPerMeter":20622.718052738335,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003016700013"},{"year":2017,"category":"Roads","project":"Davao-Cotabato Road including RROW - Chainage 1712 - Chainage 2060, Chainage 257 - Chainage 1165","amountPesos":27000000,"lengthMeters":1256.0,"ratePesosPerMeter":21496.815286624205,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003016700059"},{"year":2017,"category":"Roads","project":"Jct. Manikling-Gov. Generoso Road - K1748+547 - K1748+914.51, K1748+914.51 - K1749+399.27, K1749+399.27 - K1749+770","amountPesos":8649000,"lengthMeters":1223.0,"ratePesosPerMeter":7071.954210956664,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003016900136"},{"year":2017,"category":"Roads","project":"Concreting of Marawi-Kapai-Tagoloan Road, Tagoloan Section, Lanao del Sur, K1590+250 - K1596+000","amountPesos":75000000,"lengthMeters":5750.0,"ratePesosPerMeter":13043.478260869566,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100293"},{"year":2017,"category":"Roads","project":"Concreting of Romandier-Camp. Andres National Road, Km 44+000 - Km 47+000, Sulu","amountPesos":75000000,"lengthMeters":3000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100294"},{"year":2017,"category":"Roads","project":"Construction of Tawi-Tawi Mainland Circumferential Road, Buan-Parangan Section, Panglima Sugala, Tawi-Tawi  (km 8+800 - km 10+940)","amountPesos":75000000,"lengthMeters":2140.0,"ratePesosPerMeter":35046.72897196261,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100295"},{"year":2017,"category":"Roads","project":"Construction of Tawi-Tawi Mainland Circumferential Road, Lapid-Lapid - Sumangat - Tarawakan Section, Bongao, Tawi-Tawi (km 8+858 - km 10+998)","amountPesos":75000000,"lengthMeters":2140.0,"ratePesosPerMeter":35046.72897196261,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100296"},{"year":2017,"category":"Roads","project":"Construction of Tawi-Tawi Mainland Circumferential Road, Tarawakan-Marang-Marang Section, Panglima Sugala, Tawi-Tawi  (km 10+840 - km 12+700)","amountPesos":65000000,"lengthMeters":1860.0,"ratePesosPerMeter":34946.23655913978,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100297"},{"year":2017,"category":"Roads","project":"Construction of Tubod-Ganassi Road, Uyaan Madamba Section, K1607+540 - K1615+890, Lanao del Sur","amountPesos":150000000,"lengthMeters":8350.0,"ratePesosPerMeter":17964.071856287424,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100298"},{"year":2017,"category":"Roads","project":"Rehabilitation/ Improvement of Marawi-Puga-an National Road, Marawi Section, Lanao del Sur, K1564+240 - K1566+450","amountPesos":75000000,"lengthMeters":2210.0,"ratePesosPerMeter":33936.65158371041,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100299"},{"year":2017,"category":"Roads","project":"Repair/ Rehabilitation/ Improvement of Marawi-Malabang National Road (Calanogas Section), K1608+400 - K1608+940, K1610+300 - K1611+184, K1621+784 - K1622+384, K1614+780 - K1618+333, Lanao del Sur","amountPesos":150000000,"lengthMeters":5577.0,"ratePesosPerMeter":26896.18074233459,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100300"},{"year":2017,"category":"Roads","project":"Widening of Jolo Taglibi-Tiptipon Road, K005+000 - K007+500","amountPesos":90000000,"lengthMeters":2500.0,"ratePesosPerMeter":36000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100311"},{"year":2017,"category":"Roads","project":"Widening of Jolo-Indanan-Parang-Silangkan Road, K009+000 - K013+200","amountPesos":150000000,"lengthMeters":4200.0,"ratePesosPerMeter":35714.28571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100312"},{"year":2017,"category":"Roads","project":"Widening of Jolo-Indanan-Parang-Silangkan Road, K021+000 - K023+500","amountPesos":90000000,"lengthMeters":2500.0,"ratePesosPerMeter":36000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100313"},{"year":2017,"category":"Roads","project":"Widening of Junct. Timbangan-Romandier Road, K006+684 - K010+084","amountPesos":120000000,"lengthMeters":3400.0,"ratePesosPerMeter":35294.117647058825,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100314"},{"year":2017,"category":"Roads","project":"Widening of National Roads, Isabela-Lamitan Road, Lamitan City, Basilan, K09+000 - K13+500","amountPesos":135000000,"lengthMeters":4500.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100315"},{"year":2017,"category":"Roads","project":"Widening of Romandier-Camp. Andres National Road, Km 47+000 - Km 49+008, Sulu","amountPesos":75000000,"lengthMeters":2008.0,"ratePesosPerMeter":37350.59760956175,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100316"},{"year":2017,"category":"Roads","project":"Widening of Romandier-Camp. Andres National Road, Km 53+000 - Km 55+008, Sulu","amountPesos":75000000,"lengthMeters":2008.0,"ratePesosPerMeter":37350.59760956175,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100317"},{"year":2017,"category":"Roads","project":"Concrete Paving of Banaran-Lookan National Road, Sapa-Sapa, Tawi-Tawi (km 2+000 - km 3+140)","amountPesos":40000000,"lengthMeters":1140.0,"ratePesosPerMeter":35087.71929824561,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100318"},{"year":2017,"category":"Roads","project":"Concreting of Simunul Circumferential National Road, Km 16+062 - Km 17+062, Tonggusong-Tubig, Indangan Road Section, Tawi-Tawi","amountPesos":25000000,"lengthMeters":1000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100319"},{"year":2017,"category":"Roads","project":"Restoration/Improvement of Lupa Pula-Umus Mataha National Road, Mapun, Tawi-Tawi  (km 0+200 - km 1+630)","amountPesos":50000000,"lengthMeters":1430.0,"ratePesosPerMeter":34965.03496503497,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100322"},{"year":2017,"category":"Roads","project":"Widening of Romandier-Camp. Andres National Road, Km 45+000 - Km 46+390, Sulu","amountPesos":50000000,"lengthMeters":1390.0,"ratePesosPerMeter":35971.22302158274,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100323"},{"year":2017,"category":"Roads","project":"Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Lamitan Rd., Lamitan City, Basilan, K21+300-K22+050","amountPesos":37500000,"lengthMeters":750.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100324"},{"year":2017,"category":"Roads","project":"Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Lamitan Rd., Lamitan City, Basilan, K35+100-K35+850","amountPesos":37500000,"lengthMeters":750.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100325"},{"year":2017,"category":"Roads","project":"Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Maluso Rd.,Isabela City, Basilan, K05+150-K05+950","amountPesos":40000000,"lengthMeters":800.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100326"},{"year":2017,"category":"Roads","project":"Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Maluso Rd.,Isabela City, Basilan, K09+000-K09+800","amountPesos":40000000,"lengthMeters":800.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100327"},{"year":2017,"category":"Roads","project":"Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Maluso Rd.,Isabela City, Basilan, K13+800 - K14+600","amountPesos":40000000,"lengthMeters":800.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100328"},{"year":2017,"category":"Roads","project":"Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Maluso, Maluso, Basilan, K18+000-K18+600","amountPesos":30000000,"lengthMeters":600.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100329"},{"year":2017,"category":"Roads","project":"Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Maluso, Maluso, Basilan, K21+600-K22+500","amountPesos":45000000,"lengthMeters":900.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100330"},{"year":2017,"category":"Roads","project":"Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Maluso, Maluso, Basilan, K25+500-K26+400","amountPesos":45000000,"lengthMeters":900.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100331"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement (Asphalt Overlay of Calamba - Sta. Cruz - Famy Jct. Road) (Primary) K0086+322 - K0088+916, Laguna","amountPesos":45000000,"lengthMeters":2594.0,"ratePesosPerMeter":17347.725520431766,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100339"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement (Asphalt Overlay of Calamba - Sta. Cruz - Famy Jct. Road) (Secondary) K0092+-366 - K0092+995 and K0093+997 - K0095+620, Laguna","amountPesos":45000000,"lengthMeters":2984.0,"ratePesosPerMeter":15080.428954423593,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100340"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement/Preventive Maintenance of National Road along Tanay Sampaloc K0057+(-685) -K0074+900, Tanay, Rizal","amountPesos":50000000,"lengthMeters":18585.0,"ratePesosPerMeter":2690.341673392521,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100342"},{"year":2017,"category":"Roads","project":"Road Opening of the Missing Gaps at Dr. Damian Reyes Road (Boac Side) K00027+645 - K00031+645","amountPesos":100000000,"lengthMeters":4000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100343"},{"year":2017,"category":"Roads","project":"Legazpi City - Punta De Jesus Road, K0529+-131 - K0533+000","amountPesos":50000000,"lengthMeters":4131.0,"ratePesosPerMeter":12103.606874848705,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100347"},{"year":2017,"category":"Roads","project":"Widening of Iloilo - Antique Road K0222+000 - K0223+1054, Antique","amountPesos":50000000,"lengthMeters":2054.0,"ratePesosPerMeter":24342.745861733205,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100351"},{"year":2017,"category":"Roads","project":"Widening of Iloilo - Antique Road K0171+000 - K0171+1000, Antique","amountPesos":25000000,"lengthMeters":1000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100352"},{"year":2017,"category":"Roads","project":"Widening of Iloilo - Antique Road K0162+400 - K0163+597, Antique","amountPesos":35250000,"lengthMeters":1197.0,"ratePesosPerMeter":29448.62155388471,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100353"},{"year":2017,"category":"Roads","project":"Widening of Iloilo - Antique Road K0136+584 - K0137+800, Antique","amountPesos":25000000,"lengthMeters":1216.0,"ratePesosPerMeter":20559.21052631579,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100354"},{"year":2017,"category":"Roads","project":"Widening of Iloilo - Antique Road K0110+000 - K0111+996, Antique","amountPesos":50000000,"lengthMeters":1996.0,"ratePesosPerMeter":25050.1002004008,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100355"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Iloilo Antique Road  K0072+248-K0099+168.9  with exception, Hamtic , Antique","amountPesos":8000000,"lengthMeters":26920.9,"ratePesosPerMeter":297.1668852081469,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100357"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Iloilo Antique Road  K0099+185-K0122+060.80 with exception,  Antique","amountPesos":9000000,"lengthMeters":22875.8,"ratePesosPerMeter":393.428863690013,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100358"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Iloilo Antique Road  K0123+020-K0227+184.90 with exception,  Antique","amountPesos":8500000,"lengthMeters":104164.9,"ratePesosPerMeter":81.60138395947196,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100359"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Inini-y-T. Fornier-Hamtic Road K0075+154-K0100+108   with exception,  Antique","amountPesos":9000000,"lengthMeters":24954.0,"ratePesosPerMeter":360.66362106275545,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100360"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement of Iloilo-Antique Road, K0083+800-K0085+600, Hamtic, Antique","amountPesos":15000000,"lengthMeters":1800.0,"ratePesosPerMeter":8333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100361"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement of Iloilo-Antique Road, K0085+600-K0087+300, Hamtic, Antique","amountPesos":16000000,"lengthMeters":1700.0,"ratePesosPerMeter":9411.764705882353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100362"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement of Iloilo-Antique Road, K0087+600-K0089+200 Hamtic, Antique","amountPesos":15000000,"lengthMeters":1600.0,"ratePesosPerMeter":9375.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100363"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Iloilo-Antique Road, K0208+000-K0228+406, with exception, Antique","amountPesos":13000000,"lengthMeters":20406.0,"ratePesosPerMeter":637.0675291580908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100364"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Bugasong-Valderama Road,  K0136+894-K0147+171,  Antique","amountPesos":7500000,"lengthMeters":10277.0,"ratePesosPerMeter":729.784956699426,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100365"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement of Iloilo-Antique Road, K0089+120-K0089+600,  Hamtic, Antique","amountPesos":12000000,"lengthMeters":480.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100367"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement of Iloilo-Antique Road, K0113+000-K0114+000, Belison, Antique","amountPesos":9000000,"lengthMeters":1000.0,"ratePesosPerMeter":9000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100368"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement of Iloilo-Antique Road, K0091+000-K0092+000, Hamtic, Antique","amountPesos":12500000,"lengthMeters":1000.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100369"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Bantayan-San Pedro-Cubay Road, K0098+100-K0098+700, San Jose , Antique","amountPesos":9500000,"lengthMeters":600.0,"ratePesosPerMeter":15833.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100371"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Bantayan-San Pedro-Cubay Road, K0097+416-K0108+808, San Jose , Antique","amountPesos":2800000,"lengthMeters":11392.0,"ratePesosPerMeter":245.7865168539326,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100372"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Anini-y-T, Fornier-Hamtic Road K0075+962-K0115+394, Hamtic,Antique","amountPesos":9500000,"lengthMeters":39432.0,"ratePesosPerMeter":240.92107932643538,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100373"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Pandan,-Libertad-Aklan Boudnary Road, K0223+882-K0249+397,Antique","amountPesos":6200000,"lengthMeters":25515.0,"ratePesosPerMeter":242.99431706839115,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100374"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Odiong-Sibalom-San Remegio-Leon Road K0104+473-K0134+000, Antique","amountPesos":6500000,"lengthMeters":29527.0,"ratePesosPerMeter":220.13750127002405,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100375"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Anini-y-T. Fornier-Hamtic Road K0105+580-K0113+658.40 (with exception), Hamtic, Antique","amountPesos":10000000,"lengthMeters":8078.4,"ratePesosPerMeter":1237.8688849277091,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100376"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement of Iloilo-Antique Road, K0079+000-K0081+000, Hamtic, Antique","amountPesos":17500000,"lengthMeters":2000.0,"ratePesosPerMeter":8750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100377"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement of Iloilo- Antique Road K0081+000-K0082+900, Hamtic, Antique","amountPesos":16000000,"lengthMeters":1900.0,"ratePesosPerMeter":8421.052631578947,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100378"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Iloilo-East Coast Capiz Road K141+000-K144+000 , Roxas City, Capiz","amountPesos":2000000,"lengthMeters":3000.0,"ratePesosPerMeter":666.6666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100379"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Roxas City-Cagay Sibaguan-Balijuagan-Cudian-Ivisan Road K0107+000-K0108+000, Roxas City , Capiz","amountPesos":13000000,"lengthMeters":1000.0,"ratePesosPerMeter":13000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100383"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Iloilo Capiz Road (New Route) K0111+000-K0112+000, Roxas City, Capiz","amountPesos":13000000,"lengthMeters":1000.0,"ratePesosPerMeter":13000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100384"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Iloilo East Coast Capiz Road K0124+103-K0125+103, Panay, Capiz","amountPesos":13000000,"lengthMeters":1000.0,"ratePesosPerMeter":13000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100385"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Lanot-Loctugan Panitan Boundary Road, Roxas City , K0108+162-K0109+162, Roxas City , Capiz","amountPesos":13000000,"lengthMeters":1000.0,"ratePesosPerMeter":13000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100386"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Iloilo East Coast , Capiz Road K0118+000-K0119+000, Roxas City, Capiz","amountPesos":13000000,"lengthMeters":1000.0,"ratePesosPerMeter":13000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100387"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Bacolod South Road (Kabankalan-Hinoba-an Section) K0170+200-K0182+000 with exception, Kabankalan, Negros Occidental","amountPesos":10000000,"lengthMeters":11800.0,"ratePesosPerMeter":847.457627118644,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100389"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Dancalan-Candoni-Damutan Valey Road, K0119+300-K0124+500 with exception, Kabankalan, Negros Occidental","amountPesos":10000000,"lengthMeters":5200.0,"ratePesosPerMeter":1923.076923076923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100390"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Tigbao-Pulak Sta. Fe Road K0910+350-K0910+875,K0911+800-K0911+900,K0912+850-0913+150, Leyte","amountPesos":10000000,"lengthMeters":925.0,"ratePesosPerMeter":10810.81081081081,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100398"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Tanauan-Dagami Road, K0921+950-K0922+050,K0923+800-K0923+950, K0924+000-0924+800, K0925+000-K0925+136, K0926+800-K0926+950, K0927+500-0927+750, K0928+950-K0929+030, Leyte","amountPesos":10000000,"lengthMeters":1666.0,"ratePesosPerMeter":6002.400960384153,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100399"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Sambulawan-Calaguise-Calubian Road K0990+424-K1003+914 with exception, Leyte and Calubian, Leyte","amountPesos":10000000,"lengthMeters":13490.0,"ratePesosPerMeter":741.2898443291327,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100400"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along Calubian-San Isidro-Tabango-Villaba-Palompon Road, K1005+(-346)-K1017+000 With exception, Leyte","amountPesos":10000000,"lengthMeters":12346.0,"ratePesosPerMeter":809.9789405475458,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100401"},{"year":2017,"category":"Roads","project":"Road widening of Leyte-Samar Road (via Guintigui-an) (S00001LT), Tacloban City, Leyte (K0903+110 - K0904+264)","amountPesos":7000000,"lengthMeters":1154.0,"ratePesosPerMeter":6065.857885615252,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100412"},{"year":2017,"category":"Roads","project":"Road widening of Leyte-Samar Road (via Guintigui-an) (S00001LT), Tacloban City, Leyte (K0903+226 - K0904+676)","amountPesos":43000000,"lengthMeters":1450.0,"ratePesosPerMeter":29655.172413793105,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100413"},{"year":2017,"category":"Roads","project":"Repair/Rehabilitation/Improvement along SDCR Lingig Road Road Sec K 1478+000-K1483+000 (intermittent) Lingig, SDS, Butuan , Agusan Del Norte","amountPesos":5000000,"lengthMeters":5000.0,"ratePesosPerMeter":1000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100424"},{"year":2017,"category":"Roads","project":"Slope Protection along Jct. Del Carmen-Sta. Monica-San Isidro Road, K0025+000-K0068+000","amountPesos":20000000,"lengthMeters":43000.0,"ratePesosPerMeter":465.1162790697674,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050100426"},{"year":2017,"category":"Roads","project":"Construction of Jct. Marbel-Makar to Lutayan Boundary Road, South Cotabato - STA. 0+000 - STA. 1+957.40, STA. 2+082.30 - STA. 2+648","amountPesos":54000000,"lengthMeters":2523.1,"ratePesosPerMeter":21402.243272165193,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306275"},{"year":2017,"category":"Roads","project":"Construction/Improvement of Junction Linan-Miasong Road, Sta. 0+000 - Sta. 2+385, Tupi, South Cotabato","amountPesos":70000000,"lengthMeters":2385.0,"ratePesosPerMeter":29350.104821802935,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306284"},{"year":2017,"category":"Roads","project":"Reconstruction/Upgrading of Molundo-Taraka-Tamparan-Poona Bayabao Section along Lake Lanao Circumferential Road, Sta. 1584+716.69 - Sta. 1592+963.50","amountPesos":150000000,"lengthMeters":8246.81,"ratePesosPerMeter":18188.851204283714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306292"},{"year":2017,"category":"Roads","project":"Construction (Completion) of Tambac-Tebeng Road, K00+780 - K00+2122.70, Dagupan City, Pangasinan","amountPesos":36000000,"lengthMeters":1342.7,"ratePesosPerMeter":26811.648171594552,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306386"},{"year":2017,"category":"Roads","project":"Rehabilitation/Completion of Mesalipit-Talba Road, Bacolor, Pampanga Sta. 0+310 - Sta. 1+850  (R.A. 9506-Bacolor Rehabilitation Act)","amountPesos":30900000,"lengthMeters":1540.0,"ratePesosPerMeter":20064.935064935064,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306469"},{"year":2017,"category":"Roads","project":"Concreting of Road, K000+000 - K001+008, Barangay San Nicolas 3, Bacoor City, Cavite","amountPesos":10000000,"lengthMeters":1008.0,"ratePesosPerMeter":9920.63492063492,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306482"},{"year":2017,"category":"Roads","project":"Construction/Rehabilitation of Road leading to Evacuation Center, Sta. 0+000 - Sta. 0+570, Barangay Magsaysay, San Pedro City, Laguna","amountPesos":10000000,"lengthMeters":570.0,"ratePesosPerMeter":17543.859649122805,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306566"},{"year":2017,"category":"Roads","project":"Construction/Rehabilitation of Road leading to Evacuation Center, Sta. 0+000 - Sta. 0+575, Barangay Caingin, Sta. Rosa City, Laguna","amountPesos":10000000,"lengthMeters":575.0,"ratePesosPerMeter":17391.304347826088,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306567"},{"year":2017,"category":"Roads","project":"Concreting of General Esco-Tagumpay Road, Sta. 0+000 - Sta. 4+521, Naujan, Oriental Mindoro","amountPesos":30000000,"lengthMeters":4521.0,"ratePesosPerMeter":6635.700066357001,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306584"},{"year":2017,"category":"Roads","project":"Construction of Bike lanes along Local Road in Brgy. Taal, Sta. 0+000 - Sta. 0+400, Iloilo City","amountPesos":2500000,"lengthMeters":400.0,"ratePesosPerMeter":6250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306628"},{"year":2017,"category":"Roads","project":"Concreting of Road from Junction Tagbilaran City-Corella Sikatuna Loboc Rd to Proposed Government Multi-purpose Training Center, Teacher's Village, Sta. 00+000 - Sta. 00+400, Sta. 00+400 - Sta. 01+080, Sta. 01+080 - Sta. 02+080, San Isidro, Tagbilaran City, Bohol","amountPesos":35000000,"lengthMeters":2080.0,"ratePesosPerMeter":16826.923076923078,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306638"},{"year":2017,"category":"Roads","project":"Concreting of Cayare-Canap Barugo Road, Chainage 0 - Chainage 500, Leyte 1st LD","amountPesos":15000000,"lengthMeters":500.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306654"},{"year":2017,"category":"Roads","project":"Concreting of Santol - Caray-Caray Road, Chainage 0 - Chainage 1300, Leyte","amountPesos":15000000,"lengthMeters":1300.0,"ratePesosPerMeter":11538.461538461539,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306656"},{"year":2017,"category":"Roads","project":"Bululawan - Datagan - Upper Conacon Road Opening with Concreting (PCCP), Chainage 15400 - Chainage 16580","amountPesos":30000000,"lengthMeters":1180.0,"ratePesosPerMeter":25423.728813559323,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306677"},{"year":2017,"category":"Roads","project":"Concreting of Road leading to Cathedral Falls from National Road junction, K1606+320 - K1608+620, Brgy. Cathedral, Kapatagan, Lanao del Norte","amountPesos":50000000,"lengthMeters":2300.0,"ratePesosPerMeter":21739.130434782608,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306681"},{"year":2017,"category":"Roads","project":"Construction/Rehabilitation of Sapang Dalaga-Conception-Mansawan-Don Victoriano Road, Sta. 0+000 - Sta. 40+700, Misamis Occidental Phase II","amountPesos":50000000,"lengthMeters":40700.0,"ratePesosPerMeter":1228.5012285012285,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306683"},{"year":2017,"category":"Roads","project":"Concreting of Road (0.30km), San Nicolas Street, Poblacion Boston, Davao Oriental","amountPesos":3000000,"lengthMeters":300.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306694"},{"year":2017,"category":"Roads","project":"Construction (Concreting) of Bandera Centro, Sitio Trinidad Road, Sta. 0+000 - Sta. 2+698, Kaputian, Island Garden City of Samal, Davao del Norte","amountPesos":35000000,"lengthMeters":2698.0,"ratePesosPerMeter":12972.572275759821,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306704"},{"year":2017,"category":"Roads","project":"Construction/Improvement of Junction Provincial Road to Bololmala Elementary School, Sta. 0+000 - Sta. 1+700, Tupi, South Cotabato","amountPesos":17000000,"lengthMeters":1700.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306710"},{"year":2017,"category":"Roads","project":"Construction/Rehabilitation/Improvement of Crossing Rubber-Bololmala-Cebuano Road, Sta. 0+000 - Sta. 1+370, Tupi, South Cotabato","amountPesos":40000000,"lengthMeters":1370.0,"ratePesosPerMeter":29197.080291970804,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306711"},{"year":2017,"category":"Roads","project":"Construction/Rehabilitation/Improvement of Makar-Marbel Road National Highway Jct. Silway 7, Klinan 6, Sta. 0+100 - Sta. 1+009, Polomolok, South Cotabato","amountPesos":10000000,"lengthMeters":909.0,"ratePesosPerMeter":11001.100110011,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306712"},{"year":2017,"category":"Roads","project":"Construction/Improvement of Road, Sta. 0+000 - Sta. 1+900, Tupi, South Cotabato","amountPesos":19000000,"lengthMeters":1900.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306715"},{"year":2017,"category":"Roads","project":"Construction of Barangay Road from Datu Balong to Brgy. Dacudao (length 4.5km), San Isidro, Davao Del Norte","amountPesos":53000000,"lengthMeters":4500.0,"ratePesosPerMeter":11777.777777777777,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306732"},{"year":2017,"category":"Roads","project":"Rehabilitation of Purok 2B via Sitio Sta Felomina, Igangon-Purok 6, Sabangan Road (length 4.4km), San Isidro, Davao Del Norte","amountPesos":51800000,"lengthMeters":4400.0,"ratePesosPerMeter":11772.727272727272,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306733"},{"year":2017,"category":"Roads","project":"3.5Km Local Road in Barangay Inosloban, Lipa City, Barangay Inosloban, Lipa City, Batangas","amountPesos":3000000,"lengthMeters":3500.0,"ratePesosPerMeter":857.1428571428571,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050307597"},{"year":2017,"category":"Roads","project":"Widening of Sorsogon Diversion Road, K0582+376-K0583+000, with Exceptions Sorsogon City","amountPesos":10000000,"lengthMeters":624.0,"ratePesosPerMeter":16025.641025641025,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050307960"},{"year":2017,"category":"Roads","project":"Rehabilitation of Brgy. Road connecting Prk 8, 10, 13, 2-A, Barangay Sampao (Length: 2km), Kapalong, Davao Del Norte","amountPesos":24000000,"lengthMeters":2000.0,"ratePesosPerMeter":12000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050308527"},{"year":2017,"category":"Roads","project":"Rehabilitation of Brgy. Road from Pamacuan - Sitio Lasang - Capungagan, (Length: 2km), Kapalong, Davao Del Norte","amountPesos":24000000,"lengthMeters":2000.0,"ratePesosPerMeter":12000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050308528"},{"year":2017,"category":"Roads","project":"Rehabilitation of Brgy. Road from Brgy. San Miguel to Owayon (length 1km), San Isidro, Davao Del Norte","amountPesos":15000000,"lengthMeters":1000.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050308531"},{"year":2017,"category":"Roads","project":"Installation of Slope Protection (Pagudpud, Ilocos Norte Road Slope Stabilization),  Pagudpod, Ilocos Norte, K0577+770-K0578+170,  K0578+197-K0578+360,  K0578+433-K0578+460, K0585+460-K0585+532, K0587+060-K0587+235,  K0587+280-K0587+360, K0587+680-K0587+750,  K0588+332-K0588+600,","amountPesos":80000000,"lengthMeters":1255.0,"ratePesosPerMeter":63745.01992031872,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 292003020401600"},{"year":2017,"category":"Roads","project":"Construction of Carcarabasa River Control along Jct. Santiago-Banayoyo-Lidlidda-San Emilio-Quirino Road, Sta 0+160 - Sta. 0+630, Lidlidda, Ilocos Sur","amountPesos":20487000,"lengthMeters":470.0,"ratePesosPerMeter":43589.36170212766,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 292003020402125"},{"year":2017,"category":"Roads","project":"Rehabilitation of Slope Protection along Romblon-Cogon-Sablayan Road (k0002+000-k0005+000), Li-o, Romblon","amountPesos":32000000,"lengthMeters":3000.0,"ratePesosPerMeter":10666.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 292003020402906"},{"year":2017,"category":"Roads","project":"Rehabilitation of Slope Protection along Sibuyan Circumferential Road (k0083+000-k0085+000), Marigondon, Cajidiocan, Romblon","amountPesos":26000000,"lengthMeters":2000.0,"ratePesosPerMeter":13000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 292003020402907"},{"year":2017,"category":"Roads","project":"Rehabilitation of Slope Protection along Tablas Circumferential Road (k0080+000-k0082+000), Concepcion Sur, Sta. Maria, Romblon","amountPesos":35000000,"lengthMeters":2000.0,"ratePesosPerMeter":17500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 292003020402908"},{"year":2017,"category":"Roads","project":"Construction of Binalbagan River Bank Slope Protection, Sta.000+236 - Sta. 000+985 at Brgy. San Jose, along Binalbagan - Isabela Road, Binalbagan, Negros Occidental","amountPesos":50000000,"lengthMeters":749.0,"ratePesosPerMeter":66755.67423230974,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 292003020403098"},{"year":2017,"category":"Roads","project":"Rehabilitation/Reconstruction of proposed slope protection project along Sta. Felomina - Bonbonon - Digkilaan - Rogongon Road K1526+000 - K1526+200 R/S, Lanao del Norte, Iligan City","amountPesos":35000000,"lengthMeters":200.0,"ratePesosPerMeter":175000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 292003020403367"},{"year":2017,"category":"Roads","project":"Construction of Mangalcal Bank Protection along Carmen-Dapecol Compound Road, K1474+297 - K1475+447.40, Carmen, Davao del Norte","amountPesos":30000000,"lengthMeters":1150.4,"ratePesosPerMeter":26077.885952714212,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 292003020403402"},{"year":2017,"category":"Roads","project":"Improvement of Bank Protection along Butuan City-Malaybalay Road (Dankias Section), K1269+197.20 - K1269+223 & K1269+280.60 - K1269+300, Tungao, Agusan del Norte","amountPesos":40000000,"lengthMeters":45.2,"ratePesosPerMeter":884955.7522133011,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 292003020403479"},{"year":2018,"category":"Bridges","project":"McArthur Bridge - K0002 + -236 - K0002 + 126, (S02346LZ) Chainage 234 - Chainage 368","amountPesos":14703000,"lengthMeters":496.0,"ratePesosPerMeter":29643.145161290322,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310102100054000"},{"year":2018,"category":"Mixed roads / bridges","project":"Nagtahan Bridge Service Road - (S02352LZ) Chainage 000 - Chainage 270","amountPesos":5307000,"lengthMeters":270.0,"ratePesosPerMeter":19655.555555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310102100055000"},{"year":2018,"category":"Bridges","project":"Nagtahan Bridge / Fly-Over - (S02413LZ) Chainage 647.60 - Chainage 1138.60","amountPesos":6964000,"lengthMeters":491.0,"ratePesosPerMeter":14183.29938900204,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310105100057000"},{"year":2018,"category":"Bridges","project":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 2 and 3 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge), Sta. 14+100 to Sta. 15+450, Left Bank, Marikina City","amountPesos":80000000,"lengthMeters":1350.0,"ratePesosPerMeter":59259.25925925926,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320101100253000"},{"year":2018,"category":"Bridges","project":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 5 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge), Sta. 16+050 to Sta. 17+450, Left Bank, Marikina City","amountPesos":80000000,"lengthMeters":1400.0,"ratePesosPerMeter":57142.857142857145,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320101100254000"},{"year":2018,"category":"Bridges","project":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 6 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge), Sta. 17+450 to Sta. 18+130, Left Bank and Rights Bank, Marikina City","amountPesos":80000000,"lengthMeters":680.0,"ratePesosPerMeter":117647.05882352941,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320101100255000"},{"year":2018,"category":"Bridges","project":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 8 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge), Sta. 18+650 to Sta. 19+350, Left Bank, Marikina City","amountPesos":80000000,"lengthMeters":700.0,"ratePesosPerMeter":114285.71428571429,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320101100256000"},{"year":2018,"category":"Bridges","project":"Construction/Sealing of Riverwall along Santulan River (Sta. 1+611 to Sta. 1+927), from Santulan Bridge (Upstream), Malabon City","amountPesos":50000000,"lengthMeters":316.0,"ratePesosPerMeter":158227.84810126582,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320101100371000"},{"year":2018,"category":"Mixed roads / bridges","project":"Construction of Binalbagan River Bank Slope Protection, Sta. 0+000 - Sta. 0+382 (Downstream of Alicante Bridge) along Jct. Bagonawa - La Castellana - Isabela Road, Negros Occidental","amountPesos":45000000,"lengthMeters":382.0,"ratePesosPerMeter":117801.04712041885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320101101824000"},{"year":2018,"category":"Mixed roads / bridges","project":"Construction of Binalbagan River Bank Slope Protection, Sta. 0+291.80 - Sta. 0+606.80 (Upstream of Binalbagan Bridge) along Bacolod South Road, Negros Occidental","amountPesos":50000000,"lengthMeters":315.0,"ratePesosPerMeter":158730.15873015876,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320101101825000"},{"year":2018,"category":"Mixed roads / bridges","project":"Construction of Guintubhan River Bank Slope Protection, Sta. 0+000 to Sta. 0+382 (Upstream of Guintubhan Bridge) along Binalbagan-Isabela Road, Negros Occidental","amountPesos":45000000,"lengthMeters":382.0,"ratePesosPerMeter":117801.04712041885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320101101826000"},{"year":2018,"category":"Bridges","project":"Construction of Slope Protection along Lasang River, Pañalum Section, Protecting Pañalum Bridge (Sta. 38+798 - Sta. 39+290), Left Bank, Davao City","amountPesos":50000000,"lengthMeters":492.0,"ratePesosPerMeter":101626.0162601626,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320101102288000"},{"year":2018,"category":"Bridges","project":"Construction of Slope Protection along Lasang River, Pañalum Section, Protecting Pañalum Bridge (Sta. 38+798 - Sta. 39+293), Right Bank, Davao City","amountPesos":50000000,"lengthMeters":495.0,"ratePesosPerMeter":101010.101010101,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320101102289000"},{"year":2018,"category":"Bridges","project":"Installation of Gabions and Mattressess along Lasang River, Pañalum Section, Protecting Pañalum Bridge (Sta. 38+288 - Sta. 38+788), Right Bank, Davao City","amountPesos":50000000,"lengthMeters":500.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320101102294000"},{"year":2018,"category":"Bridges","project":"Installation of Gabions and Mattressess along Lasang River, Pañalum Section, Protecting Pañalum Bridge (Sta. 38+292 - Sta. 38+788), Left Bank, Davao City","amountPesos":50000000,"lengthMeters":496.0,"ratePesosPerMeter":100806.45161290323,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320101102295000"},{"year":2018,"category":"Bridges","project":"Installation of Gabions and Mattressess along Davao River (F. Torres Bridge Section), Sta. 9+640 - Sta. 10+140, Right Bank, Davao City","amountPesos":45000000,"lengthMeters":500.0,"ratePesosPerMeter":90000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320102100552000"},{"year":2018,"category":"Bridges","project":"Construction of Bank protection along Makar River (Upstream  of Makar Bridge I ), Sta 0+000 to Sta 0+100, Sta. 0+ 150 - Sta. 0+340 Brgy. Labangal, General Santos City, South Cotabato","amountPesos":39000000,"lengthMeters":290.0,"ratePesosPerMeter":134482.75862068965,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320102100568000"},{"year":2018,"category":"Mixed roads / bridges","project":"Regionwide/Nationwide - Roads and Bridges - Conduct of Feasibility Studies/ Preliminary and Detailed Engineering/ Economic Analysis/ Technical Studies/ Traffic Impact Assessment - Region VII - Toledo - Balamban Bypass Road & Toledo Circumferential Bypass Road (Poblacion - Media Once) w/ Exception Sta 0+00 - Sta 8+200","amountPesos":7800000,"lengthMeters":8200.0,"ratePesosPerMeter":951.219512195122,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 200000100240000"},{"year":2018,"category":"Roads","project":"Road widening along Basilan Circumferential Road (BCR) Isabela-Maluso Road, Isabela City, Basilan including road Right of Way (ROW) K0002+000-K0005+000","amountPesos":120000000,"lengthMeters":3000.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200002000"},{"year":2018,"category":"Roads","project":"Road widening along Basilan Circumferential Road (BCR) Isabela-Maluso Road, Isabela City, Basilan including road Right of Way (ROW) K0008+000-K0011+500","amountPesos":120000000,"lengthMeters":3500.0,"ratePesosPerMeter":34285.71428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200003000"},{"year":2018,"category":"Roads","project":"Improvement/Reblocking of Bongao-Nalil National Road; Bongao km. 0+ 000 - km. 7+700, 7.7 kms","amountPesos":350000000,"lengthMeters":7700.0,"ratePesosPerMeter":45454.545454545456,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200005000"},{"year":2018,"category":"Roads","project":"Improvement/Reblocking of Bato-Bato - Tarawakan National Road; Panglima Sugala-Bonga km. 0+ 500 - km. 3+500, 3 kms","amountPesos":90000000,"lengthMeters":3000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200006000"},{"year":2018,"category":"Roads","project":"Improvement/Reblocking of Laum Sicubong - Licud Sicubong National Road; Sapa-Sapa km. 2+ 000 - km. 3+500;  1.5 kms","amountPesos":25000000,"lengthMeters":1500.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200007000"},{"year":2018,"category":"Roads","project":"Construction of Romandier - Camp Andres National Road - Junction Sucuban, Km 51 + 125 - Km 52 + 125, Luuk, Sulu","amountPesos":30000000,"lengthMeters":1000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200008000"},{"year":2018,"category":"Roads","project":"Construction of Romandier - Camp Andres National Road, Km 40 + 530 - Km 42 + 300, Panamo, Sulu","amountPesos":53100000,"lengthMeters":1770.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200009000"},{"year":2018,"category":"Roads","project":"Construction of Romandier - Camp Andres National Road, Km 47 + 000 - Km 48 + 000, K. Caluang, Sulu","amountPesos":30000000,"lengthMeters":1000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200010000"},{"year":2018,"category":"Roads","project":"Construction of Romandier - Camp Andres National Road, Km 48 + 700 - Km 50 + 000, Luuk, Sulu","amountPesos":39000000,"lengthMeters":1300.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200011000"},{"year":2018,"category":"Roads","project":"Construction of Romandier - Camp Andres National Road, Km 50 + 700 - Km 54 + 830 (with exception), Luuk, Sulu","amountPesos":45300000,"lengthMeters":4130.0,"ratePesosPerMeter":10968.523002421307,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200012000"},{"year":2018,"category":"Roads","project":"Construction of Romandier - Camp Andres National Road, Km 43 + 030 - Km 44 + 000, Panamao, Sulu","amountPesos":29100000,"lengthMeters":970.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200013000"},{"year":2018,"category":"Roads","project":"Widening of Seit Tayungan - Camp Andres National Road, Km 36 + 000 - Km 38 + 000, Panamao, Sulu","amountPesos":60000000,"lengthMeters":2000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200014000"},{"year":2018,"category":"Roads","project":"Widening of Seit Tayungan - Camp Andres National Road, Km 38 + 700 - Km 40 + 700 (with exception), Panamao, Sulu","amountPesos":39000000,"lengthMeters":2000.0,"ratePesosPerMeter":19500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200015000"},{"year":2018,"category":"Roads","project":"Widening of Seit Tayungan - Camp Andres National Road, Km 44 + 000 - Km 46 + 600, Luuk, Sulu","amountPesos":78000000,"lengthMeters":2600.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200016000"},{"year":2018,"category":"Roads","project":"Widening of Seit Tayungan - Camp Andres National Road, Km 41 + 300 - Km 43 + 300, Luuk, Sulu","amountPesos":60000000,"lengthMeters":2000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200017000"},{"year":2018,"category":"Roads","project":"Widening of Romandier - Camp Andres National Road, Km 50 + 000 - Km 53 + 000, Luuk, Sulu","amountPesos":90000000,"lengthMeters":3000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200018000"},{"year":2018,"category":"Roads","project":"Widening of Romandier - Camp Andres National Road, Km 42 + 620 - Km 45 + 000, Luuk, Sulu","amountPesos":71500000,"lengthMeters":2380.0,"ratePesosPerMeter":30042.016806722688,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200019000"},{"year":2018,"category":"Roads","project":"Rehabilitation/Improvement of Mulondo-Wao Road (Mulondo-Maguing Section) Lanao del Sur, Km 1654 + 680 - Km 1657 + 000","amountPesos":50000000,"lengthMeters":2320.0,"ratePesosPerMeter":21551.724137931036,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200024000"},{"year":2018,"category":"Roads","project":"Construction along Tubod - Ganassi Road, K1611 + 000 - K1616 + 1000 Lanao del Sur","amountPesos":100000000,"lengthMeters":6000.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200034000"},{"year":2018,"category":"Roads","project":"Concreting of Shoulder with Concrete Line Canal, Junction Road Bato-Baras Km 12+000 to Km 20+000, Catanduanes","amountPesos":20000000,"lengthMeters":8000.0,"ratePesosPerMeter":2500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300111200036000"},{"year":2018,"category":"Roads","project":"Improvement/Widening of San Jose-Manlurip-McArthur Park Road, K0913+000 - K0914+056, Tacloban City","amountPesos":37000000,"lengthMeters":1056.0,"ratePesosPerMeter":35037.878787878784,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300112200024000"},{"year":2018,"category":"Roads","project":"Maintenance (Intermittent Sections) along Davao-Cotabato Road (JCT Digos-Cotabato Road), K1613+781-K1615+309,  Makilala, North Cotabato","amountPesos":49939000,"lengthMeters":1528.0,"ratePesosPerMeter":32682.59162303665,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300112200025000"},{"year":2018,"category":"Roads","project":"Concreting of Road Maganay-La Dicha Road, Maganay, Buug, Zamboanga Sibugay, Sta. 00+000 to Sta. 01+800","amountPesos":20000000,"lengthMeters":1800.0,"ratePesosPerMeter":11111.111111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200019000"},{"year":2018,"category":"Roads","project":"Concreting of Barangay Sahud Ulan Tres Cruses Road, Km 41+236.29 - Km 43+660, Tanza, Cavite","amountPesos":100000000,"lengthMeters":2423.71,"ratePesosPerMeter":41259.06152138665,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200051000"},{"year":2018,"category":"Roads","project":"Concreting of Catalina-Camarubo-an - Lulugayan San Fernando Road, Jiabong, Samar Sta. 0+000-Sta. 5+800","amountPesos":58000000,"lengthMeters":5800.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200052000"},{"year":2018,"category":"Roads","project":"Construction of San Roque-Bacayao Road, Guimba Bypass, Sta. 0+000 - Sta. 3+000","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200075000"},{"year":2018,"category":"Roads","project":"Improvement/Widening of Daang Hari Road, Bacoor, Cavite - Chainage 3960 - Chainage 9028","amountPesos":100000000,"lengthMeters":5068.0,"ratePesosPerMeter":19731.64956590371,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200091000"},{"year":2018,"category":"Roads","project":"Opening of Road, Barangay Tumagabok, Sta 39+150 - Sta 39+750, Torrijos, Marinduque","amountPesos":100000000,"lengthMeters":600.0,"ratePesosPerMeter":166666.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200165000"},{"year":2018,"category":"Roads","project":"Concreting of Parangan-Balimbing Road Panglima Sugala km3+000 - km. 7+000, 4kms","amountPesos":80000000,"lengthMeters":4000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200188000"},{"year":2018,"category":"Roads","project":"Concreting of Balimbing - Buan Road, Panglima Sugala km 8+000 - km 12+000","amountPesos":80000000,"lengthMeters":4000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200189000"},{"year":2018,"category":"Roads","project":"Construction of Access Road from Letre to Gov. Pascual Cities of Malabon and Navotas, Sta. 0+000 - Sta. 1+055","amountPesos":50000000,"lengthMeters":1055.0,"ratePesosPerMeter":47393.364928909956,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200243000"},{"year":2018,"category":"Roads","project":"Concreting of Lullutan to Quirino Road, Sta.0+000 - Sta. 3+451, City of Ilagan, Isabela","amountPesos":30230000,"lengthMeters":3451.0,"ratePesosPerMeter":8759.779773978556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200518000"},{"year":2018,"category":"Roads","project":"Construction of Protection Works of Eroded Shoulder at Brgy. Simanu Sur Road, Sta. 0+000 - Sta. 0+200, San Pablo, Isabela","amountPesos":4966000,"lengthMeters":200.0,"ratePesosPerMeter":24830.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200519000"},{"year":2018,"category":"Roads","project":"Road Concreting of Cabisera 22-Cabisera 10,  Sta. 0+000 - Sta.2+000,  City of Ilagan, Isabela","amountPesos":10320000,"lengthMeters":2000.0,"ratePesosPerMeter":5160.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200522000"},{"year":2018,"category":"Roads","project":"Concreting/Improvement of Roads along Barangay Cruz Tabe and Tiaong leading to Plaridel By-pass, Guiguinto Section (Phase III), Guiguinto, Bulacan, Sta. 1+114 - Sta. 2+805","amountPesos":20000000,"lengthMeters":1691.0,"ratePesosPerMeter":11827.321111768184,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200571000"},{"year":2018,"category":"Roads","project":"Rehabilitation and Improvement of Meycauayan Service Road (North Bound), K0000+000 - K0001+676, City of Meycauayan, Bulacan","amountPesos":50000000,"lengthMeters":1676.0,"ratePesosPerMeter":29832.935560859187,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200602000"},{"year":2018,"category":"Roads","project":"Rehabilitation and Improvement of Meycauayan Service Road (South Bound), K0000+000 - K0001+676, City of Meycauayan, Bulacan","amountPesos":50000000,"lengthMeters":1676.0,"ratePesosPerMeter":29832.935560859187,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200603000"},{"year":2018,"category":"Roads","project":"Concreting of Barangay Road, Barangay San Jose Mitla - Mitla Proper, Sta. 0+000 - Sta. 4+500, Porac, Pampanga","amountPesos":43491000,"lengthMeters":4500.0,"ratePesosPerMeter":9664.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200683000"},{"year":2018,"category":"Roads","project":"Concreting of Provincial Road of Brgy. Sta. Maria, Camiling, Tarlac (Sta. 0+000 - 1+104.000 with exception)","amountPesos":7000000,"lengthMeters":1104.0,"ratePesosPerMeter":6340.579710144928,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200720000"},{"year":2018,"category":"Roads","project":"Construction of Pinagbayanan-Guinhawa Road, K000+000 - K000+484, Taysan, Batangas","amountPesos":10000000,"lengthMeters":484.0,"ratePesosPerMeter":20661.15702479339,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200756000"},{"year":2018,"category":"Roads","project":"Construction of Road Escribano-Sapangan, K000+000 - K000+626, San Juan, Batangas","amountPesos":15000000,"lengthMeters":626.0,"ratePesosPerMeter":23961.661341853036,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200757000"},{"year":2018,"category":"Roads","project":"Construction of Road Matamis-Palakpak Road, K000+000 - K000+624,  Rosario, Batangas","amountPesos":10000000,"lengthMeters":624.0,"ratePesosPerMeter":16025.641025641025,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200758000"},{"year":2018,"category":"Roads","project":"Concreting of 2.5 km. Bangwayin-Pakaskasan road, Barangay Bangwayin, Torrijos, Marinduque","amountPesos":12500000,"lengthMeters":2500.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200867000"},{"year":2018,"category":"Roads","project":"Concreting of 5 km. Maranlig-Bangwayin road, Barangay Bangwayin, Torrijos, Marinduque","amountPesos":25000000,"lengthMeters":5000.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200868000"},{"year":2018,"category":"Roads","project":"Concreting of 3.0 km. Buangan-Bayakbakin road, Barangay Bayakbakin, Torrijos, Marinduque","amountPesos":15000000,"lengthMeters":3000.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200869000"},{"year":2018,"category":"Roads","project":"Concreting of 2.0 km Bolo to Pulang Lupa road, Barangay Bolo, Torrijos, Marinduque","amountPesos":10000000,"lengthMeters":2000.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200870000"},{"year":2018,"category":"Roads","project":"Concreting of 1.5 km. Tibyayong-Aplaya road, Barangay Buangan, Torrijos, Marinduque","amountPesos":7500000,"lengthMeters":1500.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200871000"},{"year":2018,"category":"Roads","project":"Concreting of 2.0 km. Bayanan to Pilihan road, Barangay Cabuyo, Torrijos, Marinduque","amountPesos":10000000,"lengthMeters":2000.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200873000"},{"year":2018,"category":"Roads","project":"Concreting of 1.8 km. Kay Duke-Albon road, Barangay Kay Duke, Torrijos, Marinduque","amountPesos":9000000,"lengthMeters":1800.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200877000"},{"year":2018,"category":"Roads","project":"Concreting of 2 km. Malibago-Masilig road, Barangay Malibago, Torrijos, Marinduque","amountPesos":10000000,"lengthMeters":2000.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200880000"},{"year":2018,"category":"Roads","project":"Concreting of 3 km. Malibago-Sinambaan road, Barangay Malibago, Torrijos, Marinduque","amountPesos":15000000,"lengthMeters":3000.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200881000"},{"year":2018,"category":"Roads","project":"Concreting of 1.1 km. Makawayan to Purok Star. Ana road, Barangay Makawayan, Torrijos, Marinduque","amountPesos":5500000,"lengthMeters":1100.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200882000"},{"year":2018,"category":"Roads","project":"Concreting of 1.2 km. Makawayan to Purok Postal road, Barangay Makawayan, Torrijos, Marinduque","amountPesos":6000000,"lengthMeters":1200.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200883000"},{"year":2018,"category":"Roads","project":"Concreting of 1.5 km. Makawayan to Gumamela road, Barangay Makawayan, Torrijos, Marinduque","amountPesos":7500000,"lengthMeters":1500.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200884000"},{"year":2018,"category":"Roads","project":"Concreting of 1 km. Maranlig to Bangwayin road, Barangay Maranlig, Torrijos, Marinduque","amountPesos":5000000,"lengthMeters":1000.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200885000"},{"year":2018,"category":"Roads","project":"Concreting of 1 km. Maranlig to Nangka road, Barangay Maranlig, Torrijos, Marinduque","amountPesos":5000000,"lengthMeters":1000.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200886000"},{"year":2018,"category":"Roads","project":"Concreting of 2 km. Bayanan to Sampalukan road, Barangay Marlangga, Torrijos, Marinduque","amountPesos":10000000,"lengthMeters":2000.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200889000"},{"year":2018,"category":"Roads","project":"Concreting of 2 km. Malinao to Purok Mirasol road, Barangay Malinao, Torrijos, Marinduque","amountPesos":10000000,"lengthMeters":2000.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200891000"},{"year":2018,"category":"Roads","project":"Concreting of 1.5 km. Pakaskasan-Bangwayin road, Barangay Pakaskasan, Torrijos, Marinduque","amountPesos":7500000,"lengthMeters":1500.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200892000"},{"year":2018,"category":"Roads","project":"Concreting of 3 km. Bayakbakin to Payanas road, Barangay Payanas, Torrijos, Marinduque","amountPesos":15000000,"lengthMeters":3000.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200893000"},{"year":2018,"category":"Roads","project":"Concreting of 1 km. Sibuyao to Sitio Dando road at Sitio Danao, Barangay Sibuyao, Torrijos, Marinduque","amountPesos":5000000,"lengthMeters":1000.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200896000"},{"year":2018,"category":"Roads","project":"Concreting of 1.5 km. Malamig-Ilaya road, Barangay Tigwi, Torrijos, Marinduque","amountPesos":7500000,"lengthMeters":1500.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200897000"},{"year":2018,"category":"Roads","project":"Road Opening of Taisan-Pinagwarasan Road, Barangays Taisan and Pinagwarasan, K000+000 - K003+000, Basud, Camarines Norte","amountPesos":50000000,"lengthMeters":3000.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200949000"},{"year":2018,"category":"Roads","project":"Road Upgrading of Buhi Circumferential Road leading to Lake Buhi Sanctuary of Smallest Fish (Sinarapan) Poblacion Tambo Section, Buhi, Camarines Sur, Sta. 0+000 - Sta. 4+175","amountPesos":50000000,"lengthMeters":4175.0,"ratePesosPerMeter":11976.047904191617,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200956000"},{"year":2018,"category":"Roads","project":"Construction of Antipolo-Nasuje Road, Sta. 0+000 - Sta. 2+000, Bulan, Sorsogon","amountPesos":10000000,"lengthMeters":2000.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200968000"},{"year":2018,"category":"Roads","project":"Construction of Bagsangan-Monbon Road, Sta. 0+000 - Sta. 0+700, Irosin, Sorsogon","amountPesos":7500000,"lengthMeters":700.0,"ratePesosPerMeter":10714.285714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200969000"},{"year":2018,"category":"Roads","project":"Construction of Benguin-San Juan Daan Road, Sta. 0+000 - Sta. 3+700, Bulan, Sorsogon","amountPesos":10000000,"lengthMeters":3700.0,"ratePesosPerMeter":2702.7027027027025,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200970000"},{"year":2018,"category":"Roads","project":"Construction of Cadandanan-Cocok-Cabitan Road, Sta. 0+000 - Sta. 2+500 with exception, Bulan, Sorsogon","amountPesos":15000000,"lengthMeters":2500.0,"ratePesosPerMeter":6000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200971000"},{"year":2018,"category":"Roads","project":"Construction of Calomagon-Inararan Road, Sta. 0+000 - Sta. 3+000 with exception, Bulan, Sorsogon","amountPesos":15000000,"lengthMeters":3000.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200972000"},{"year":2018,"category":"Roads","project":"Construction of Calomagon-Namo Road, Sta. 0+000 - Sta. 5+000 with exception, Bulan, Sorsogon","amountPesos":10000000,"lengthMeters":5000.0,"ratePesosPerMeter":2000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200973000"},{"year":2018,"category":"Roads","project":"Construction of Calomagon-Quirino Road, Sta. 0+000 - Sta. 2+400 with exception, Bulan, Sorsogon","amountPesos":10000000,"lengthMeters":2400.0,"ratePesosPerMeter":4166.666666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200974000"},{"year":2018,"category":"Roads","project":"Construction of Calomagon-Recto Road, Sta. 0+000 - Sta. 3+700 with exception, Bulan, Sorsogon","amountPesos":10000000,"lengthMeters":3700.0,"ratePesosPerMeter":2702.7027027027025,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200975000"},{"year":2018,"category":"Roads","project":"Construction of Calpi-Dolos Road, Sta. 0+000 - Sta. 3+000 with exception, Bulan, Sorsogon","amountPesos":15000000,"lengthMeters":3000.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200976000"},{"year":2018,"category":"Roads","project":"Construction of Fabrica-Otavi Road, Sta. 0+000 - Sta. 3+500 with exception, Bulan, Sorsogon","amountPesos":10000000,"lengthMeters":3500.0,"ratePesosPerMeter":2857.1428571428573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200977000"},{"year":2018,"category":"Roads","project":"Construction of Fabrica-San Rafael Road, Sta. 0+000 - Sta. 3+500 with exception, Bulan, Sorsogon","amountPesos":10000000,"lengthMeters":3500.0,"ratePesosPerMeter":2857.1428571428573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200978000"},{"year":2018,"category":"Roads","project":"Construction of M. Roxas-Bical Road, Sta. 0+000 - Sta. 2+000 with exception, Bulan, Sorsogon","amountPesos":15000000,"lengthMeters":2000.0,"ratePesosPerMeter":7500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200979000"},{"year":2018,"category":"Roads","project":"Construction of Mapaso-Cabarbuhan Road, Sta. 0+000 - Sta. 0+790, Irosin, Sorsogon","amountPesos":7500000,"lengthMeters":790.0,"ratePesosPerMeter":9493.67088607595,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200980000"},{"year":2018,"category":"Roads","project":"Construction of Mapaso-Talistison Road, Sta. 0+000 - Sta. 0+980, Irosin, Sorsogon","amountPesos":10500000,"lengthMeters":980.0,"ratePesosPerMeter":10714.285714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200981000"},{"year":2018,"category":"Roads","project":"Construction of Monbon-Bagsangan Road, Sta. 0+000 - Sta. 2+000, Irosin, Sorsogon","amountPesos":15000000,"lengthMeters":2000.0,"ratePesosPerMeter":7500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200982000"},{"year":2018,"category":"Roads","project":"Construction of N. Roque-Magsaysay Road, Sta. 0+000-Sta. 1+800 with exception, Bulan, Sorsogon","amountPesos":10000000,"lengthMeters":1800.0,"ratePesosPerMeter":5555.555555555556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200983000"},{"year":2018,"category":"Roads","project":"Construction of San Francisco-Jamorawon Road, Sta. 0+000 - Sta. 1+500 with exception, Bulan, Sorsogon","amountPesos":10000000,"lengthMeters":1500.0,"ratePesosPerMeter":6666.666666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200984000"},{"year":2018,"category":"Roads","project":"Construction of San Isidro-Padre Diaz Road, Sta. 0+000 - Sta. 4+500 with exception, Bulan, Sorsogon","amountPesos":10000000,"lengthMeters":4500.0,"ratePesosPerMeter":2222.222222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200985000"},{"year":2018,"category":"Roads","project":"Construction of San Juan bag-o-Abad Santos-San Juan Road, Sta. 0+000 - Sta. 3+500 with exception, Bulan, Sorsogon","amountPesos":10000000,"lengthMeters":3500.0,"ratePesosPerMeter":2857.1428571428573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200986000"},{"year":2018,"category":"Roads","project":"Construction of San Juan-San Julian Road, Sta. 0+000 - Sta. 0+450, Irosin, Sorsogon","amountPesos":6000000,"lengthMeters":450.0,"ratePesosPerMeter":13333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200987000"},{"year":2018,"category":"Roads","project":"Construction of Taromata Road, Sta. 0+000 - Sta. 3+000 with exception, Bulan, Sorsogon","amountPesos":10000000,"lengthMeters":3000.0,"ratePesosPerMeter":3333.3333333333335,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200988000"},{"year":2018,"category":"Roads","project":"Construction of Escalante City Circumferential Road, Escalante City, Negros Occidental, (Sta. 01+288.81 - Sta. 05+158.47)","amountPesos":30000000,"lengthMeters":3869.66,"ratePesosPerMeter":7752.619093150302,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116201048000"},{"year":2018,"category":"Roads","project":"Concreting of Jct. San Isidro - Binayran - Dampas Road, Sta. 00+000 - Sta. 03+061, Tagbilaran City","amountPesos":25000000,"lengthMeters":3061.0,"ratePesosPerMeter":8167.265599477295,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116201049000"},{"year":2018,"category":"Roads","project":"Concreting of Road from Baang-Liboron Road, Sta. 00+000 - Sta. 03+500, Catigbian, Bohol,","amountPesos":35000000,"lengthMeters":3500.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116201051000"},{"year":2018,"category":"Roads","project":"Concreting of Road from Triple Union-Maitum-Cang-iras Road, Sta. 00+000 - Sta. 05+000, Catigbian, Bohol,","amountPesos":50000000,"lengthMeters":5000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116201052000"},{"year":2018,"category":"Roads","project":"Road Concreting(1 KM) at Brgy. San Isidro, Maribojoc, Bohol","amountPesos":10000000,"lengthMeters":1000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116201058000"},{"year":2018,"category":"Roads","project":"Road Concreting(1 KM) at Brgy. Tipatlong, Maribojoc, Bohol","amountPesos":10000000,"lengthMeters":1000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116201059000"},{"year":2018,"category":"Roads","project":"Road Concreting(1 KM) at Brgy. Poblacion, Maribojoc, Bohol","amountPesos":10000000,"lengthMeters":1000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116201060000"},{"year":2018,"category":"Roads","project":"Road Concreting(1 KM) at Brgy. Guiwanon, Maribojoc, Bohol","amountPesos":10000000,"lengthMeters":1000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116201061000"},{"year":2018,"category":"Roads","project":"Road Concreting Brgy. Handig(1 KM), Maribojoc, Bohol","amountPesos":10000000,"lengthMeters":1000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116201062000"},{"year":2018,"category":"Roads","project":"Road Concreting Brgy. Anislag(1 KM), Maribojoc, Bohol","amountPesos":10000000,"lengthMeters":1000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116201063000"},{"year":2018,"category":"Roads","project":"Concreting of Roads with Slope Protection Structure at Sudlon II, Cebu City, Chainage 000 - Chainage 1500","amountPesos":30000000,"lengthMeters":1500.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116201080000"},{"year":2018,"category":"Roads","project":"Improvement/Construction/Concreting of Labasan - Camaga Road, Siay, Zamboanga Sibugay (Phase II) K3+111.00 - K4+711.00","amountPesos":30000000,"lengthMeters":1600.0,"ratePesosPerMeter":18750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116201168000"},{"year":2018,"category":"Roads","project":"Concreting/Road Rehabilitation Along Jct. Sayre Highway leading to Mambatangan NBI NEMRO Drug Rehabilitation Center,  K0+000 - K0+950.52, Manolo Fortich, Bukidnon","amountPesos":11530000,"lengthMeters":950.52,"ratePesosPerMeter":12130.202415519927,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116201179000"},{"year":2018,"category":"Roads","project":"Concreting of Roads, Barangay Ilian to Barangay Dimarao, Sultan Naga Dimaporo, Lanao del Norte, Sta. 0+000 - Sta. 1+000)","amountPesos":20000000,"lengthMeters":1000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116201186000"},{"year":2018,"category":"Roads","project":"Construction of Access Roads leading to Tambo-Cadayonan Elementary School, Sta. 0+000 - Sta. 2+300,  Pantar, Lanao del Norte","amountPesos":7450000,"lengthMeters":2300.0,"ratePesosPerMeter":3239.1304347826085,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116201187000"},{"year":2018,"category":"Roads","project":"Construction of Concrete Access Road leading to Topocon ES, Sta. 0+000 - Sta. 3+768, Sultan Naga Dimaporo, Lanao del Norte","amountPesos":38630000,"lengthMeters":3768.0,"ratePesosPerMeter":10252.123142250532,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116201188000"},{"year":2018,"category":"Roads","project":"Concreting of Road, Sta. 0+000 - Sta. 0+208.6, Tagum City, Davao del Norte","amountPesos":3500000,"lengthMeters":208.6,"ratePesosPerMeter":16778.523489932886,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116201237000"},{"year":2018,"category":"Roads","project":"Concreting of Cagbo-Awasian Road, Sta. 0+000 - Sta. 2+000, Tandag City, Surigao del Sur","amountPesos":20000000,"lengthMeters":2000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116201296000"},{"year":2018,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads, Albay West Coast Slope Protection, Talin Talin, Libon, Albay KO 516+916-517+081","amountPesos":30000000,"lengthMeters":165.0,"ratePesosPerMeter":181818.18181818182,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200019000"},{"year":2018,"category":"Roads","project":"Concreting of Calambeg - Maruaya Road (5KM), Piddig, Ilocos Norte","amountPesos":39000000,"lengthMeters":5000.0,"ratePesosPerMeter":7800.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200158000"},{"year":2018,"category":"Roads","project":"Concreting of Gayamat - Dupitac Road(3KM), Piddig, Ilocos Norte","amountPesos":23500000,"lengthMeters":3000.0,"ratePesosPerMeter":7833.333333333333,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200159000"},{"year":2018,"category":"Roads","project":"Concreting of Sta Maria - San Antonio-Carassi Road (5KM), Piddig and Carassi, Ilocos Norte","amountPesos":39000000,"lengthMeters":5000.0,"ratePesosPerMeter":7800.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200244000"},{"year":2018,"category":"Roads","project":"Concreting of Provincial Road at Brgy. Sta. Maria, Camiling, Tarlac 1+104.00 to 1+ 374.00","amountPesos":2000000,"lengthMeters":270.0,"ratePesosPerMeter":7407.407407407408,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200927000"},{"year":2018,"category":"Roads","project":"Concrete Reblocking of Albay West Coast Road, K0532+802-K0533+488, Cagmanaba Section, Oas, Albay","amountPesos":10000000,"lengthMeters":686.0,"ratePesosPerMeter":14577.25947521866,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201333000"},{"year":2018,"category":"Roads","project":"Rehabilitation of Albay West Coast Road, Badian/Catbuwaran Section OAS and Ligao City, K0537+055 - K0537+330, Catburawan, Ligao City","amountPesos":5000000,"lengthMeters":275.0,"ratePesosPerMeter":18181.81818181818,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201339000"},{"year":2018,"category":"Roads","project":"Concreting of Roads Junction National Road - Sitio Tacdugan, Bagahanglad (Sta. 0+000 - Sta. 1+350), Brgy. Bagahanglad, San Jacinto, Masbate","amountPesos":50000000,"lengthMeters":1350.0,"ratePesosPerMeter":37037.03703703704,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201459000"},{"year":2018,"category":"Roads","project":"Concreting of Roads Junction National Road - Sitio Tacdugan, Bagahanglad (Sta. 1+350 - Sta. 1+890), Brgy. Bagahanglad, San Jacinto, Masbate","amountPesos":20000000,"lengthMeters":540.0,"ratePesosPerMeter":37037.03703703704,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201460000"},{"year":2018,"category":"Roads","project":"Concreting of Lapa Road, Maimbung, KM 0+00 to KM 1+00, Maimbung, Sulu","amountPesos":15000000,"lengthMeters":1000.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201952000"},{"year":2018,"category":"Roads","project":"Concreting/Widening of Pagsalipangan Maimbung Road, Municipality of Maimbung, km7+600-km9+100, Sulu","amountPesos":20000000,"lengthMeters":1500.0,"ratePesosPerMeter":13333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201954000"},{"year":2018,"category":"Roads","project":"Concreting/Widening of Road Section from Laum Road, Maimbung to Higad Road, KM 15+00 - KM 16+00, Maimbung, Sulu","amountPesos":35000000,"lengthMeters":1000.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201955000"},{"year":2018,"category":"Roads","project":"Asphalt Overlay along Jct Polo to Dapitan Park Road, Dapitan City - Km 1829+008 to Km 1829+539, Km1827+998 to Km 1828+427","amountPesos":20000000,"lengthMeters":960.0,"ratePesosPerMeter":20833.333333333332,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117202006000"},{"year":2018,"category":"Roads","project":"Repair/Rehabilitation/Improvement of Road(Asphalt Overlay) along Daang Maharlika Road, Malinawon-New Sibonga Section, K1432+515.60-K1437+234","amountPesos":50000000,"lengthMeters":4718.4,"ratePesosPerMeter":10596.812478806583,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310101100036000"},{"year":2018,"category":"Roads","project":"Asphalt Overlay with Thermoplastic Pavement Markings along Ormoc-Baybay-So, Leyte Bdry. Road K1025+519 - K1031+246","amountPesos":100000000,"lengthMeters":5727.0,"ratePesosPerMeter":17461.14894360049,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310101100040000"},{"year":2018,"category":"Roads","project":"Asphalt Overlay with Thermoplastic Pavement Markings along Palo-Carigara-Ormoc Road K0994+850 - K0999+000","amountPesos":100000000,"lengthMeters":4150.0,"ratePesosPerMeter":24096.385542168675,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310101100041000"},{"year":2018,"category":"Roads","project":"Repair/ Rehab, Asphalt Overlay Butuan City-Cagayan de Oro-Iligan Road, Km1243+046 to Km 1244+192 Agusan del Norte","amountPesos":100000000,"lengthMeters":1146.0,"ratePesosPerMeter":87260.03490401396,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310101100042000"},{"year":2018,"category":"Roads","project":"Repair/Rehab, Asphalt Overlay, Butuan City-Cagayan de Oro-Iligan Road, Km 1247+000 to Km 1249+461, Agusan del Norte","amountPesos":100000000,"lengthMeters":2461.0,"ratePesosPerMeter":40633.888663145066,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310101100043000"},{"year":2018,"category":"Roads","project":"Preventive Maintenance of Dr. Damian Reyes Road (Boac Side) Asphalt overlay with correction K0006+000-K0007+409, K0007+424-k0011+043","amountPesos":68000000,"lengthMeters":5028.0,"ratePesosPerMeter":13524.264120922831,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310101100044000"},{"year":2018,"category":"Roads","project":"Preventive Maintenance of Mogpog-Balanacan Port Road (Asphalt Overlay with correction) K0008+(-181)-k0008+(-147). K0010+196-K0011+000, K0011+400-K0013+000","amountPesos":25000000,"lengthMeters":2438.0,"ratePesosPerMeter":10254.306808859721,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310101100045000"},{"year":2018,"category":"Roads","project":"C-5 Road - K0019 + 196 - K0019 + 376","amountPesos":5526000,"lengthMeters":180.0,"ratePesosPerMeter":30700.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310101100049000"},{"year":2018,"category":"Roads","project":"Palico-Balayan-Batangas Road - K0135 + (-213) - K0136 + 998, K0137 + 672 - K0139 + 282","amountPesos":62020000,"lengthMeters":3821.0,"ratePesosPerMeter":16231.353048940067,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310102100021000"},{"year":2018,"category":"Roads","project":"Asphalt Overlay along Alaminos-Bolinao Road K0329+250-K0332+675","amountPesos":40000000,"lengthMeters":3425.0,"ratePesosPerMeter":11678.83211678832,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310102100032000"},{"year":2018,"category":"Roads","project":"Asphalt Overlay with Thermoplastic Pavement Markings along Palompon-Isabel-Merida-Ormoc Road K1097+399 - K1108+414","amountPesos":100000000,"lengthMeters":11015.0,"ratePesosPerMeter":9078.529278256923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310102100033000"},{"year":2018,"category":"Roads","project":"Asphalt Overlay with Thermoplastic Pavement Markings along Palompon-Isabel-Merida-Ormoc Road K1112+000 - K11123+707","amountPesos":100000000,"lengthMeters":10011707.0,"ratePesosPerMeter":9.988306689358767,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310102100034000"},{"year":2018,"category":"Roads","project":"C-5 Road - Chainage 052 - Chainage 420","amountPesos":5655000,"lengthMeters":368.0,"ratePesosPerMeter":15366.847826086956,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310102100047000"},{"year":2018,"category":"Roads","project":"NAIA Rd (MIA Road) - Chainage 000 - Chainage 551","amountPesos":15459000,"lengthMeters":551.0,"ratePesosPerMeter":28056.261343012706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310102100050000"},{"year":2018,"category":"Roads","project":"Asphalt Overlay along Junction Imelda-Alicia Road, K1762+410-K1763+549","amountPesos":31250000,"lengthMeters":1139.0,"ratePesosPerMeter":27436.34767339772,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310103100028000"},{"year":2018,"category":"Roads","project":"Asphalt Overlay along Junction Imelda-Alicia Road, K1765+222.50-K1766+525","amountPesos":35250000,"lengthMeters":1302.5,"ratePesosPerMeter":27063.33973128599,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310103100029000"},{"year":2018,"category":"Roads","project":"Repair/Rehabilitation/Improvement of Road(Asphalt Overlay) along Montevista-Compostela-New Bataan-Maragusan Bdry. Road, K1436+339.20-K1441+000","amountPesos":50000000,"lengthMeters":4660.8,"ratePesosPerMeter":10727.77205629924,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310103100030000"},{"year":2018,"category":"Roads","project":"Taguig Diversion Road - K0018 + 665 - K0019 + 539","amountPesos":9083000,"lengthMeters":874.0,"ratePesosPerMeter":10392.448512585812,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310103100045000"},{"year":2018,"category":"Roads","project":"Mandurriao-Pakiad Road - K0006 + 668 - K0007 + 473","amountPesos":14962000,"lengthMeters":805.0,"ratePesosPerMeter":18586.33540372671,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310103100182000"},{"year":2018,"category":"Roads","project":"Jct Tacloban-Baybay South Rd-Government Center Road Network - K0918 + 338.50 - K0918 + 510","amountPesos":1736000,"lengthMeters":171.5,"ratePesosPerMeter":10122.448979591836,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310103100196000"},{"year":2018,"category":"Roads","project":"C-5 Road - K0020 + -374 - K0020 + -195, K0019 + -118 - K0019 + 103, K0018 + 613 - K0018 + 120, K0017 + -393 - K0017 + -262","amountPesos":121103000,"lengthMeters":1024.0,"ratePesosPerMeter":118264.6484375,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310104100007000"},{"year":2018,"category":"Roads","project":"Bauang-Baguio Road - K0266 + 270 - K0268 + 000","amountPesos":26000000,"lengthMeters":1730.0,"ratePesosPerMeter":15028.901734104047,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310104100045000"},{"year":2018,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1266 + 222 - K1266 + 543, K1272 + 914 - K1273 + 000, K1273 + 000 - K1273 + 287, K1273 + 411 - K1274 + 000, K1275 + 157 -K1275 + 446","amountPesos":32835000,"lengthMeters":1572.0,"ratePesosPerMeter":20887.40458015267,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310104100080000"},{"year":2018,"category":"Roads","project":"R-10 Road - K0007 + 98 - K0007 + 351, K0007 + 412 - K0007 + 424","amountPesos":16893000,"lengthMeters":265.0,"ratePesosPerMeter":63747.16981132075,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310105100053000"},{"year":2018,"category":"Roads","project":"C-2 Road - (S02319LZ) Chainage 749 - Chainage 960","amountPesos":8397000,"lengthMeters":211.0,"ratePesosPerMeter":39796.208530805685,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310105100054000"},{"year":2018,"category":"Roads","project":"Villasis - Malasiqui - San Carlos Road, Pangasinan - K0183 + (-280) - K0183 + (-100)","amountPesos":3947000,"lengthMeters":180.0,"ratePesosPerMeter":21927.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310105100072000"},{"year":2018,"category":"Roads","project":"Calapan South Road - K0169+040 - K0169+121, K0171+000 - K0171+845, K0172+092 - K0172+700","amountPesos":40000000,"lengthMeters":1534.0,"ratePesosPerMeter":26075.61929595828,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310105100110000"},{"year":2018,"category":"Roads","project":"Pasolo-Rincon Road - K0015 + -321 - K0015 + -308, K0015 + 157 - K0015 + 345","amountPesos":8820000,"lengthMeters":201.0,"ratePesosPerMeter":43880.59701492537,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310106100058000"},{"year":2018,"category":"Roads","project":"Paco Park Road - Chainage 000 - Chainage 306","amountPesos":12000000,"lengthMeters":306.0,"ratePesosPerMeter":39215.686274509804,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310106100077000"},{"year":2018,"category":"Roads","project":"San Juan-San Gabriel Road - K0278 + 804 - K0279 + 800","amountPesos":20660000,"lengthMeters":996.0,"ratePesosPerMeter":20742.9718875502,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310106100084000"},{"year":2018,"category":"Roads","project":"Pangasinan-Nueva Vizcaya Road - K0176 + (-126) - K0179 + 990","amountPesos":48022000,"lengthMeters":4116.0,"ratePesosPerMeter":11667.15257531584,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310106100086000"},{"year":2018,"category":"Roads","project":"Apo Rotonda Road - (S04203LZ) Chainage 0 - Chainage 70","amountPesos":4005000,"lengthMeters":70.0,"ratePesosPerMeter":57214.28571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310106100127000"},{"year":2018,"category":"Roads","project":"Mandurriao-Pakiad Road - K0006 + (-099) - K0006 + 668","amountPesos":14100000,"lengthMeters":767.0,"ratePesosPerMeter":18383.311603650585,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310106100170000"},{"year":2018,"category":"Roads","project":"Butuan-Cagayan de Oro-Iligan Road (Agusan-Misamis Or Rd) incl. ROW - K1265 + 527 - K1265 + 642, K1279 + 400 - K1279 + 500","amountPesos":39000000,"lengthMeters":215.0,"ratePesosPerMeter":181395.3488372093,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310107100060000"},{"year":2018,"category":"Roads","project":"Marikina-Infanta Road - K0122 + 685 - K0123 + 045","amountPesos":100000000,"lengthMeters":360.0,"ratePesosPerMeter":277777.77777777775,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310108100030000"},{"year":2018,"category":"Roads","project":"Biliran Circumferential Road, K1046 + 050 - K1046 + 300","amountPesos":50000000,"lengthMeters":250.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310108100055000"},{"year":2018,"category":"Roads","project":"Biliran Circumferential Road, K1072+400-K1072+461 and K1075+400-K1075+462","amountPesos":50000000,"lengthMeters":123.0,"ratePesosPerMeter":406504.0650406504,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310108100056000"},{"year":2018,"category":"Roads","project":"Jct Natl Road-Bitnong-Blance-N Vizcaya Bdry Rd -  K0259 + 360 - K0259 + 440.70, K0261 + 412 - K0261 + 443.40, K0261 + 950 - K0262 + 000, K0263 + 541 - K0263 + 571, K0263 + 811 - K0263 + 830, K0263 + 953.50 - K0264 + 010, K0265 + 527 - K0265 + 561.50, K0265 + 634 - K0265 + 659.20, K0269 + 020 - K0269 + 055, K0270 + 027 - K0270 + 104, K0272 + 200 - K0272 + 254","amountPesos":35049000,"lengthMeters":493.3,"ratePesosPerMeter":71050.0709507374,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310109100060000"},{"year":2018,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1233 + 584 - K1235 + 130","amountPesos":75397000,"lengthMeters":1546.0,"ratePesosPerMeter":48769.08150064683,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310110100001000"},{"year":2018,"category":"Roads","project":"Catarman Cadre Road - (S00052SM) Chainage 000 - Chainage 312","amountPesos":5616000,"lengthMeters":312.0,"ratePesosPerMeter":18000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310111100064000"},{"year":2018,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1266 + 140 - K1268 + 852, K1268 + 876 - K1269 + 122, K1272 + 000 - K1272 + 753, K1272 + 767 - K1273 + 214","amountPesos":168219000,"lengthMeters":4158.0,"ratePesosPerMeter":40456.70995670996,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310201100027000"},{"year":2018,"category":"Roads","project":"Dumaguete North Road (Dumaguete-Jct Bais-Kabankalan) incl. ROW-K0045+600-K0046+148","amountPesos":27660000,"lengthMeters":548.0,"ratePesosPerMeter":50474.45255474452,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310201100256000"},{"year":2018,"category":"Roads","project":"Airport Road incl. ROW - (S01208MN) - Chainage 000 - Chainage 493, Chainage 000 - 493","amountPesos":93190000,"lengthMeters":493.0,"ratePesosPerMeter":189026.369168357,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310202100001000"},{"year":2018,"category":"Roads","project":"Calapan South Road - K0072+026 - K0072+178, K0072+191 - K0072+443, K0072+822 - K0075+252, K0075+283 - K0076+849, K0077+348 - K0078+269, K0078+466 - K0079+745","amountPesos":160000000,"lengthMeters":6600.0,"ratePesosPerMeter":24242.424242424244,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310202100029000"},{"year":2018,"category":"Roads","project":"Calapan South Road - K0093+610 - K0094+191, K0094+200 - K0096+968","amountPesos":100000000,"lengthMeters":3349.0,"ratePesosPerMeter":29859.65959988056,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310202100030000"},{"year":2018,"category":"Roads","project":"Calapan South Road - K0096+1014 - K0098+150, K0098+166 - K0100+309","amountPesos":100000000,"lengthMeters":3279.0,"ratePesosPerMeter":30497.10277523635,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310202100031000"},{"year":2018,"category":"Roads","project":"Iloilo East Coast - Capiz Road K0163+551 - K0165+379","amountPesos":50000000,"lengthMeters":1828.0,"ratePesosPerMeter":27352.297592997813,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310202100212000"},{"year":2018,"category":"Roads","project":"Dahican-Lawigan Road - K1712 + 400 - K1716 + 600","amountPesos":100000000,"lengthMeters":4200.0,"ratePesosPerMeter":23809.52380952381,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310203100022000"},{"year":2018,"category":"Roads","project":"Jct Aurora-Monte Alegre-Labangan Jct. Road - K1640+400 - K1641+400","amountPesos":26000000,"lengthMeters":1000.0,"ratePesosPerMeter":26000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310203100126000"},{"year":2018,"category":"Roads","project":"Cervantes - Quirino Road - K0402 + 802 - K0403 + 020, K0405 + 020 - K0405 + 260, K0405 + 660 - K0405 + 760, K0406 + 080 - K0406 + 160, K0406 + 340 - K0407 + 907, K0407 + 108 - K0407 + 303, K0408 + 817 - K0408 + 850, K0409 + 706 - K0409 + 794","amountPesos":6700000,"lengthMeters":2326.0,"ratePesosPerMeter":2880.481513327601,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310209100027000"},{"year":2018,"category":"Roads","project":"Tanauan - Dagami Road - K0934+378 - K0935+773","amountPesos":16746000,"lengthMeters":1395.0,"ratePesosPerMeter":12004.301075268817,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310209100088000"},{"year":2018,"category":"Roads","project":"Mayorga - La Paz Road - K0947+794 - K0948+580, K0949+367 - K0950+000","amountPesos":33254000,"lengthMeters":1419.0,"ratePesosPerMeter":23434.813248766735,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310209100093000"},{"year":2018,"category":"Roads","project":"Construction of Coloong Pumping Stations and Access Road, Sta. 0+000 to Sta. 0+164.605, Brgy. Coloong, Valenzuela City","amountPesos":100000000,"lengthMeters":164.605,"ratePesosPerMeter":607514.9600558914,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320101100043000"},{"year":2018,"category":"Roads","project":"Installation of Gabions and Mattresses along Bunawan River Protecting Daang Maharlika Road, Sta. 1+887-Sta. 2+487, Left Bank, Davao City","amountPesos":50000000,"lengthMeters":600.0,"ratePesosPerMeter":83333.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320101102290000"},{"year":2018,"category":"Roads","project":"Construction of  Gokotan Road Slope along Maridagao River, Km. 0+000 - Km. 0+207.89, Batulawan-Nunguan, Gokotan Road, Pikit, Cotabato","amountPesos":30000000,"lengthMeters":207.89,"ratePesosPerMeter":144307.08547789697,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320101102376000"},{"year":2018,"category":"Roads","project":"Rehabilitation of River Bank Protection along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Road-K2019+380-K2019+558, Sultan Kudarat","amountPesos":5700000,"lengthMeters":178.0,"ratePesosPerMeter":32022.47191011236,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320101102443000"},{"year":2018,"category":"Roads","project":"Construction of Bayugan River Bank Protection including River Training along NRJ Bayugan-Esperanza Road Phase II, Bayugan City, Agusan Del Sur, K 0+120 - K 0+330","amountPesos":20000000,"lengthMeters":210.0,"ratePesosPerMeter":95238.09523809524,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320101102451000"},{"year":2018,"category":"Roads","project":"Construction of Bank protection along Upper Silway River with road slope protection on Upper Silway Br. Approaches, Sta 0+000 to Sta 0+355, Brgy. Mabuhay, General Santos City, South Cotabato","amountPesos":48000000,"lengthMeters":355.0,"ratePesosPerMeter":135211.2676056338,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320102100570000"},{"year":2019,"category":"Roads","project":"Construction of Seawall along Tablas Circumferential Road (Km 33+520 - Km 34+450), Romblon","amountPesos":50000000,"lengthMeters":930.0,"ratePesosPerMeter":53763.44086021505,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300106200213000, pp. [1087]"},{"year":2019,"category":"Bridges","project":"Construction of slope protection/bank improvement along Iloilo River, Right Bank (from Jalandoni Bridge to Forbes Bridge), (Esplanade 6), STA. 0+820 - STA.1+660, Iloilo City","amountPesos":10000000,"lengthMeters":840.0,"ratePesosPerMeter":11904.761904761905,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300107200544000, pp. [1109]"},{"year":2019,"category":"Bridges","project":"Construction of slope protection/bank improvement along Iloilo River, Right Bank (from B.S. Aquino Jr. Avenue to Jalandoni Bridge), (Esplanade 4), STA.0+000-STA. 0+820, Iloilo City","amountPesos":20000000,"lengthMeters":820.0,"ratePesosPerMeter":24390.243902439026,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300107200545000, pp. [1109]"},{"year":2019,"category":"Roads","project":"Construction of Rockfall Protection System (Soil Protection) along Rizal - Dakak - Dapitan Coastal Loop Road at KM 1853 + 000 - KM1853 + 300, Zamboanga del Norte","amountPesos":30000000,"lengthMeters":300.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300107200596000, pp. [1112]"},{"year":2019,"category":"Roads","project":"Construction of Romandier - Camp Andres National Road, KM 31+600 - KM 39+800 (with exemption), Panamao, Sulu","amountPesos":115500000,"lengthMeters":8200.0,"ratePesosPerMeter":14085.365853658537,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300111200041000, pp. [1140]"},{"year":2019,"category":"Roads","project":"Construction/Concreting/Upgrading of Missing Gap Molundo-Wao Road including Drainage, K1634+860 - K1637+900","amountPesos":100000000,"lengthMeters":3040.0,"ratePesosPerMeter":32894.73684210526,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300111200045000, pp. [1141]"},{"year":2019,"category":"Roads","project":"Rehabilitation of Marawi-Masiu Circumferential Road, Mulondo Section, K1580 + 101.476 - 1580 + 580, K1580 + 752 - K1584 + 665.884","amountPesos":100000000,"lengthMeters":4392.408,"ratePesosPerMeter":22766.55538374367,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300111200050000, pp. [1141]"},{"year":2019,"category":"Roads","project":"Repair/Rehabilitation/Improvement (Asphalt Overlay) along Montevista-Compostela-New Bataan-Maragusan-Mati Bdry Road, K1490+000 - K1497+560 Compostela Valley","amountPesos":100000000,"lengthMeters":7560.0,"ratePesosPerMeter":13227.513227513227,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300111200052000, pp. [1141]"},{"year":2019,"category":"Roads","project":"Widening of Jolo - Taglibi - Tiptipon National Road, KM 22+000 - KM 25+000, Panamao, Sulu","amountPesos":104500000,"lengthMeters":3000.0,"ratePesosPerMeter":34833.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300111200063000, pp. [1142]"},{"year":2019,"category":"Roads","project":"Widening of Romandier - Camp Andres - Tandu Bato National Road, KM 26+000 - KM 28+000, Panglima Estino, Sulu","amountPesos":70000000,"lengthMeters":2000.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300111200064000, pp. [1142]"},{"year":2019,"category":"Roads","project":"Widening of Romandier - Camp Andres - Tandu Bato National Road, KM 28+000 - KM 30+000, Panglima Estino, Sulu","amountPesos":70000000,"lengthMeters":2000.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300111200065000, pp. [1142]"},{"year":2019,"category":"Roads","project":"Widening of Romandier - Camp Andres - Tandu Bato National Road, KM 30+000 - KM 32+000, Panglima Estino, Sulu","amountPesos":70000000,"lengthMeters":2000.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300111200066000, pp. [1142]"},{"year":2019,"category":"Roads","project":"Widening of Romandier - Camp Andres - Tandu Bato National Road, KM 32+000 - KM 34+000, Panamao, Sulu","amountPesos":70000000,"lengthMeters":2000.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300111200067000, pp. [1142]"},{"year":2019,"category":"Roads","project":"Rehabilitation/Improvement of Masbate-Cataingan- Placer Road K0049+500 – K0053 +100, Masbate","amountPesos":50000000,"lengthMeters":3600.0,"ratePesosPerMeter":13888.888888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300111200075000, pp. [1143]"},{"year":2019,"category":"Roads","project":"Coloong Road S02067LZ, K0021+(-490) - K0020+160","amountPesos":25000000,"lengthMeters":350.0,"ratePesosPerMeter":71428.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300111200076000, pp. [1143]"},{"year":2019,"category":"Roads","project":"Road Widening Jose Abad Santos Avenue (JASA) K0093+000 - K0093+400, Lubao, Pampanga","amountPesos":30000000,"lengthMeters":400.0,"ratePesosPerMeter":75000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300111200083000, pp. [1144]"},{"year":2019,"category":"Roads","project":"Repair/ Rehabilitation of Damaged Paved Road (Asphalt Overlay) along Rosario - San Juan Road K0128+454 - K0137+116","amountPesos":40000000,"lengthMeters":8662.0,"ratePesosPerMeter":4617.871161394597,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300111200085000, pp. [1144]"},{"year":2019,"category":"Roads","project":"Rehabilitation/Improvement (Asphalt Overlay) along Calamba-Sta. Cruz-Famy Jct. Road (primary) K0098+584 to K0100+643, Laguna","amountPesos":40000000,"lengthMeters":2059.0,"ratePesosPerMeter":19426.90626517727,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300111200088000, pp. [1144]"},{"year":2019,"category":"Roads","project":"Improvement of Road - Sen. Benigno Aquino, Jr. Avenue, K0009+571 - K0011+993, Pavia, Iloilo","amountPesos":25000000,"lengthMeters":2422.0,"ratePesosPerMeter":10322.04789430223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300111200090000, pp. [1144]"},{"year":2019,"category":"Roads","project":"Repair/Rehabilitation of Damaged Paved Roads along Calubian-San Isidro-Tabango-Villaba-Palompon Rd., K1025+100 - K1025+150, K1037+100 - K1037+150, and Tabing-Kawayan-Sta. Rosa-Lawis-Tabango Road, K1033+220 - K1033+282, Tabango, Leyte","amountPesos":20000000,"lengthMeters":162.0,"ratePesosPerMeter":123456.79012345678,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300111200091000, pp. [1144]"},{"year":2019,"category":"Roads","project":"Construction of San Jose, Tarlac-Palauig, Zambales Road (Tarlac Section Phase 4), San Jose, Tarlac Sta. 11+120 to Sta. 13+120, San Jose, Tarlac","amountPesos":100000000,"lengthMeters":2000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200028000, pp. [1145]"},{"year":2019,"category":"Roads","project":"Construction of San Jose, Tarlac-Palauig, Zambales Road (Tarlac Section Phase 5), San Jose, Tarlac Sta.13+120 to Sta. 15+120, San Jose, Tarlac","amountPesos":100000000,"lengthMeters":2000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200029000, pp. [1145]"},{"year":2019,"category":"Roads","project":"Rehabilitation/Improvement (Asphalt Overlay) of Pililla Junction Jalajala Road K0062+000 to K0068+000 Pililla, Rizal","amountPesos":100000000,"lengthMeters":6000.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200035000, pp. [1146]"},{"year":2019,"category":"Roads","project":"Rehabilitation/Improvement (Asphalt Overlay) of Tanay Sampaloc Road K0057+(-685) to K0060+000 K0064+200 to K0065+400 K0071+000 to K0072+000 Tanay, Rizal","amountPesos":90000000,"lengthMeters":5885.0,"ratePesosPerMeter":15293.118096856415,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200036000, pp. [1146]"},{"year":2019,"category":"Roads","project":"Rehabilitation/Improvement (Asphalt Overlay) of Marikina-Infanta Road Tanay Rizal K0060+000 - K0064+000 and K0069+000-K0072+000","amountPesos":90000000,"lengthMeters":7000.0,"ratePesosPerMeter":12857.142857142857,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200038000, pp. [1146]"},{"year":2019,"category":"Roads","project":"Road Widening-Iloilo-Capiz Rd (Old Route) K0089+926 - K0095+916, Capiz","amountPesos":200000000,"lengthMeters":5990.0,"ratePesosPerMeter":33388.9816360601,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200058000, pp. [1148]"},{"year":2019,"category":"Roads","project":"Road Upgrading along Asuncion-San Isidro-Laak-Veruela Road, K1549+600-K1553+760, Veruela, Agusan del Sur","amountPesos":200000000,"lengthMeters":4160.0,"ratePesosPerMeter":48076.92307692308,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200062000, pp. [1148]"},{"year":2019,"category":"Bridges","project":"Repair/Rehabilitation of MNDR Flyover (Chainage 0 to Chainage 485.00), Quezon City","amountPesos":8000000,"lengthMeters":485.0,"ratePesosPerMeter":16494.845360824744,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200064000, pp. [1148]"},{"year":2019,"category":"Roads","project":"Asphalt Overlay along Pangasinan - Zambales Road K0293 + 000 - K0296 + 000 with exceptions","amountPesos":50000000,"lengthMeters":3000.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200065000, pp. [1149]"},{"year":2019,"category":"Roads","project":"Asphalt Overlay along Eastern Bulacan Road, K0066+(-068) - K0066+719, K0083+413 - K0085+000, Angat & DRT, Bulacan","amountPesos":30000000,"lengthMeters":2374.0,"ratePesosPerMeter":12636.899747262005,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200067000, pp. [1149]"},{"year":2019,"category":"Roads","project":"Asphalting overlay of Silang bypass road K0041+000 to K0045+000 with exception, Silang, Cavite","amountPesos":30000000,"lengthMeters":4000.0,"ratePesosPerMeter":7500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200068000, pp. [1149]"},{"year":2019,"category":"Roads","project":"Asphalt Overlay of Cavite-Batangas Road K0039+000 to K0040+500 with exception, Silang, Cavite","amountPesos":30000000,"lengthMeters":1500.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200069000, pp. [1149]"},{"year":2019,"category":"Roads","project":"Asphalt Overlay of Dasmarinas - Carmona Road K0049+000 to K0050+500 Carmona, Cavite","amountPesos":30000000,"lengthMeters":1500.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200070000, pp. [1149]"},{"year":2019,"category":"Roads","project":"Asphalt Overlay of Dasmarinas - Carmona Road K0039+500 to K0041+000 GMA and Carmona, Cavite","amountPesos":30000000,"lengthMeters":1500.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200071000, pp. [1149]"},{"year":2019,"category":"Roads","project":"Tanza-TMC-Indang Road K0037+185 to K0037+251, K0037+755 to K0037+916, K0037+916 to K0038+485, K0038+945 to K0039+000, K0040+000 to K0040+416, K0040+416 to K0040+428.50","amountPesos":20000000,"lengthMeters":1279.5,"ratePesosPerMeter":15631.105900742477,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200074000, pp. [1149]"},{"year":2019,"category":"Roads","project":"Tanza-TMC-Indang Road K0040+428.50 to K0040+594, K0040+651 to K0040+774, K0040+774-K0040+879, K0042+000 to K0042+200, K0042+200 to K0042+482.50","amountPesos":20000000,"lengthMeters":876.0,"ratePesosPerMeter":22831.0502283105,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200075000, pp. [1149]"},{"year":2019,"category":"Roads","project":"Tejero-Gen. Trias-Amadeo-Tagaytay Road, K0035+000 to K0035+176, K0035+176 to K0035+349, K0044+641 to K0045+000, K0045+643 to K0045+827","amountPesos":10000000,"lengthMeters":892.0,"ratePesosPerMeter":11210.762331838565,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200076000, pp. [1149]"},{"year":2019,"category":"Roads","project":"Repair/Rehabilitation/Improvement (Asphalt Overlay) Along Pila Poblacion Road K0080+-896 to K0080+ 495","amountPesos":22000000,"lengthMeters":1391.0,"ratePesosPerMeter":15815.959741193386,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200077000, pp. [1149]"},{"year":2019,"category":"Roads","project":"Repair/Rehabilitation/Improvement (Asphalt Overlay) Along Calamba -Sta.Cruz-Famy Jct. Road (primary) K0111+000 to K0112+ 030","amountPesos":19000000,"lengthMeters":1030.0,"ratePesosPerMeter":18446.601941747573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200078000, pp. [1150]"},{"year":2019,"category":"Roads","project":"Reconstruction of Asphalt Pavement along Calamba-Sta.Cruz-Famy Jct. Road (S01714LZ) K0074+975- K0076+564 at Victoria, Laguna","amountPesos":20000000,"lengthMeters":1589.0,"ratePesosPerMeter":12586.532410320957,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200081000, pp. [1150]"},{"year":2019,"category":"Roads","project":"Reconstruction of Asphalt Pavement along Calamba-Sta. Cruz-Famy Junction Road: Sta. K0074+(-733) – K0074+975","amountPesos":43500000,"lengthMeters":1708.0,"ratePesosPerMeter":25468.384074941452,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200082000, pp. [1150]"},{"year":2019,"category":"Roads","project":"Rehabilitation of Asphalt Pavement along San Pablo - Dolores Road (S01686LZ) K0087+(-1736) to K0087+(-020), Barangay Dolores, San Pablo City, Laguna","amountPesos":15000000,"lengthMeters":1716.0,"ratePesosPerMeter":8741.258741258742,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200083000, pp. [1150]"},{"year":2019,"category":"Roads","project":"Widening along Iloilo-Capiz Road (Old Route), K0088+390 - K0089+200, Barangay Poblacion, Dumalag, Capiz","amountPesos":45000000,"lengthMeters":810.0,"ratePesosPerMeter":55555.555555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200085000, pp. [1150]"},{"year":2019,"category":"Roads","project":"Road Widening along Iloilo-Capiz Rd (Old Route) K0086 + 685 - K0088 + 080","amountPesos":50000000,"lengthMeters":1395.0,"ratePesosPerMeter":35842.29390681004,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200086000, pp. [1150]"},{"year":2019,"category":"Roads","project":"Road Widening along Sogod-Tabuelan Road including ROW Acquisition K0122+265 - K0123+000","amountPesos":30000000,"lengthMeters":735.0,"ratePesosPerMeter":40816.32653061225,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200088000, pp. [1150]"},{"year":2019,"category":"Roads","project":"Widening along Daang Maharlika (SM) (San Juanico-San Isidro Road), K0861+200 - K0862+000","amountPesos":50000000,"lengthMeters":800.0,"ratePesosPerMeter":62500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200090000, pp. [1150]"},{"year":2019,"category":"Roads","project":"Asphalt Overlay Along Sarangani-Sultan-Coastal Road, K1708+000-K1706+372, K1710+073-K1715+770, Maasim, Sarangani","amountPesos":30000000,"lengthMeters":7325.0,"ratePesosPerMeter":4095.563139931741,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200092000, pp. [1151]"},{"year":2019,"category":"Roads","project":"Asphalt Overlay Along Sarangani-Sultan-Coastal Road, K1686+474-K1693+300 Maasim, Sarangani","amountPesos":30000000,"lengthMeters":6826.0,"ratePesosPerMeter":4394.960445355991,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200093000, pp. [1151]"},{"year":2019,"category":"Roads","project":"Asphalt Overlay Along Sarangani-Sultan-Coastal Road, K1724+847-K1727+000, K1734+879-K1737+879, Kiamba, Sarangani","amountPesos":30000000,"lengthMeters":5153.0,"ratePesosPerMeter":5821.851348728896,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200094000, pp. [1151]"},{"year":2019,"category":"Roads","project":"Asphalt Overlay of Marbel-Makar Road, K1686+000 to K1688+500, Gen. Santos City","amountPesos":30000000,"lengthMeters":2500.0,"ratePesosPerMeter":12000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200095000, pp. [1151]"},{"year":2019,"category":"Roads","project":"Asphalt Overlay of Marbel-Makar Road, K1668+000 to K1670+000, Gen. Santos City","amountPesos":30000000,"lengthMeters":2000.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300112200096000, pp. [1151]"},{"year":2019,"category":"Mixed roads / bridges","project":"Construction (Completion) of Bansayan Bridge along Marawi - Masiu Road (Poona Bayabao Section) K1593+500 - K1593+534, Lanao del Sur","amountPesos":20000000,"lengthMeters":34.0,"ratePesosPerMeter":588235.2941176471,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300113200004000, pp. [1151]"},{"year":2019,"category":"Mixed roads / bridges","project":"Construction (Completion) of Borocot Bridge I along Mulondo - Wao Road, K1600+267.50 - K1600+292.50, Lanao del Sur","amountPesos":20000000,"lengthMeters":25.0,"ratePesosPerMeter":800000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300113200005000, pp. [1152]"},{"year":2019,"category":"Mixed roads / bridges","project":"Construction (Completion) of Borocot Bridge II along Mulondo - Wao Road, K1599+765 - K1599+795, Lanao del Sur","amountPesos":35000000,"lengthMeters":30.0,"ratePesosPerMeter":1166666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300113200006000, pp. [1152]"},{"year":2019,"category":"Mixed roads / bridges","project":"Construction (Completion) of Gata Bridge II along Marawi - Masiu Road (Poona Bayabao Section), K1592+368.75 - K1592+404.75, Lanao del Sur","amountPesos":10000000,"lengthMeters":36.0,"ratePesosPerMeter":277777.77777777775,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300113200007000, pp. [1152]"},{"year":2019,"category":"Mixed roads / bridges","project":"Construction (Completion) of Kodun Bridge along Mulondo - Wao Road, K1596+430 - K1596+470, Lanao del Sur","amountPesos":25000000,"lengthMeters":40.0,"ratePesosPerMeter":625000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300113200008000, pp. [1152]"},{"year":2019,"category":"Mixed roads / bridges","project":"Construction (Completion) of Maypangi Bridge along Mulondo - Wao Road, K1598+900 - K1598+960, Lanao del Sur","amountPesos":45000000,"lengthMeters":60.0,"ratePesosPerMeter":750000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300113200009000, pp. [1152]"},{"year":2019,"category":"Roads","project":"Construction/Improvement of Causeway along Tablas Circumferential Road (Km 34+900 to Km 35+600), Romblon","amountPesos":50000000,"lengthMeters":700.0,"ratePesosPerMeter":71428.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300116201829000, pp. [1188]"},{"year":2019,"category":"Roads","project":"Construction of Calubian-Jubay-Daja Road, Sta. 13+653 - Sta. 16+653, Calubian and San Isidro, Leyte","amountPesos":30000000,"lengthMeters":3000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300116201978000, pp. [1197]"},{"year":2019,"category":"Roads","project":"Construction of Sto. Rosario-Villaba Diversion Road, Sta. 0+000 - Sta. 1+900, leading to Hibulangan Small Reservoir Irrigation, Villaba, Leyte","amountPesos":30000000,"lengthMeters":1900.0,"ratePesosPerMeter":15789.473684210527,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300116201982000, pp. [1198]"},{"year":2019,"category":"Roads","project":"Upgrading of Calawag -Junction National Road (JNR) - Laste Rd, KM 0+000 to KM 5+000 in the Municipality of Magsaysay, Occidental Mindoro","amountPesos":20000000,"lengthMeters":5000.0,"ratePesosPerMeter":4000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300117203771000, pp. [1300]"},{"year":2019,"category":"Roads","project":"Upgrading of Mindoro East Coast Road (MECR) Sibalat Road, KM 0+000 to KM 2+500 in the Municipality of Magsaysay, Occidental Mindoro","amountPesos":20000000,"lengthMeters":2500.0,"ratePesosPerMeter":8000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300117203773000, pp. [1300]"},{"year":2019,"category":"Roads","project":"Concreting of Local Roads, Junction National Road to Sitio Tacdugan, Barangay Bagahanglad, San Jacinto, Masbate (Sta. 1+890 - Sta. 2+610)","amountPesos":35000000,"lengthMeters":720.0,"ratePesosPerMeter":48611.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300117204041000, pp. [1316]"},{"year":2019,"category":"Roads","project":"Construction od Batuan - Bongsanglay Mangrove Road Development, Brgy. Royroy, Batuan, Masbate (Sta. 1+200 - Sta. 1+930)","amountPesos":30000000,"lengthMeters":730.0,"ratePesosPerMeter":41095.890410958906,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300117204043000, pp. [1316]"},{"year":2019,"category":"Roads","project":"Concreting of Road, Junction National Road to Sitio Tacdugan, Bagahanglad, San Jacinto, Masbate (Sta. 2+310 - Sta. 3+610)","amountPesos":50000000,"lengthMeters":1300.0,"ratePesosPerMeter":38461.53846153846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300117204046000, pp. [1317]"},{"year":2019,"category":"Roads","project":"Construction/Reblocking of Camp Andres-Romandier National Road (w/ exception) Km 26+000 - KM 56+100","amountPesos":40000000,"lengthMeters":30100.0,"ratePesosPerMeter":1328.9036544850499,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300117204891000, pp. [1366]"},{"year":2019,"category":"Roads","project":"Construction of National Road Junction to Sultan Naga Ali Dimaporo Beach Resort (Sta. 0+000.00 to Sta. 1+200.00), Brgy. Bauyan, Sultan Naga Dimaporo, Lanao Del Norte","amountPesos":20000000,"lengthMeters":1200.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300117205031000, pp. [1374]"},{"year":2019,"category":"Bridges","project":"Construction of Pedestrian Overpass along Taytay Diversion Road and Manila East Road (near Chowking and Club Manila East), K0023+670 - K0023+690, Brgy. San Juan, Taytay, Rizal","amountPesos":20000000,"lengthMeters":20.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300119200220000, pp. [1405]"},{"year":2019,"category":"Bridges","project":"Construction of Pedestrian Overpass along Taytay Diversion Road going to Manila East Road (near Jollibee and Mcdonald), K0023+550 - K0023+570, Brgy. San Juan, Taytay, Rizal","amountPesos":33500000,"lengthMeters":20.0,"ratePesosPerMeter":1675000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300119200221000, pp. [1405]"},{"year":2019,"category":"Bridges","project":"Construction/Improvement of Pedestrian Overpass Manila East Road (near Rosario Ocampo ES), K0021+497 - K0021+507, Brgy. San Juan, Taytay, Rizal","amountPesos":17500000,"lengthMeters":10.0,"ratePesosPerMeter":1750000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 300119200222000, pp. [1406]"},{"year":2019,"category":"Roads","project":"C-5 Road - K0013+096 - K0013+496","amountPesos":19746000,"lengthMeters":400.0,"ratePesosPerMeter":49365.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310101100129000, pp. [61]"},{"year":2019,"category":"Roads","project":"C-5 Road - K0018 + 000 - K0018 + 120, K0018 + 613 - K0018 + 746, K0018 + 877 - K0017 + 000, K0018 + 000 - K0018 + 080","amountPesos":9100000,"lengthMeters":1877.0,"ratePesosPerMeter":4848.161960575386,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310101100189000, pp. [66]"},{"year":2019,"category":"Roads","project":"NAIA Rd (MIA Road) - (S03317LZ) Chainage 0 - Chainage 541","amountPesos":9531000,"lengthMeters":541.0,"ratePesosPerMeter":17617.375231053604,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310102100249000, pp. [73]"},{"year":2019,"category":"Roads","project":"C-5 Road - K0015 + -1060 - K0015+ 184","amountPesos":16721000,"lengthMeters":1244.0,"ratePesosPerMeter":13441.318327974277,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310102100259000, pp. [73]"},{"year":2019,"category":"Roads","project":"Bacolod South Rd (Old Road) - K0021 + 844 - K0023 + 212","amountPesos":25586000,"lengthMeters":1368.0,"ratePesosPerMeter":18703.216374269006,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310103100364000, pp. [90]"},{"year":2019,"category":"Roads","project":"Naga-Naga Anibong Road (S00015LT) K0906+(-033) - K0906+1400","amountPesos":35000000,"lengthMeters":1433.0,"ratePesosPerMeter":24424.284717376133,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310103100396000, pp. [92]"},{"year":2019,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1265 + 884 - K1266 + 222 , K1266 + 562 - K1267 + 000, K1269 + 004.5 - K1269 + 117, K1269 + 352 - K1270 + 612, K1271 + 000 - K1272 + 172","amountPesos":110000000,"lengthMeters":3320.5,"ratePesosPerMeter":33127.54103297696,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310104100115000, pp. [97]"},{"year":2019,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1265 + 240.5 - K1265 + 884","amountPesos":13717000,"lengthMeters":643.5,"ratePesosPerMeter":21316.239316239316,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310104100172000, pp. [100]"},{"year":2019,"category":"Roads","project":"Daang Maharlika Road (Surigao-Agusan Section) - K1219 + 292 - K1219 + 392, K1219 + 410 - K1219 + 625, K1219 + 643 - K1219 + 743","amountPesos":25000000,"lengthMeters":415.0,"ratePesosPerMeter":60240.96385542169,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310104100173000, pp. [100]"},{"year":2019,"category":"Roads","project":"C-3 Road - K0011 + -035 - K0011 + 681","amountPesos":43000000,"lengthMeters":716.0,"ratePesosPerMeter":60055.86592178771,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310105100210000, pp. [104]"},{"year":2019,"category":"Roads","project":"NAIA Rd (MIA Road) - K0008 + 701 - K0009 + 216","amountPesos":10366000,"lengthMeters":515.0,"ratePesosPerMeter":20128.155339805824,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310105100218000, pp. [105]"},{"year":2019,"category":"Roads","project":"Guiuan-Sulangan Peninsula Road - (S00188SM) - Chainage 127 - Chainage 1117","amountPesos":26523000,"lengthMeters":990.0,"ratePesosPerMeter":26790.909090909092,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310105100303000, pp. [111]"},{"year":2019,"category":"Roads","project":"Tacloban-Baybay South Road (S00244LT) K0912+1026 - K0913+000","amountPesos":14172000,"lengthMeters":26.0,"ratePesosPerMeter":545076.9230769231,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310105100314000, pp. [112]"},{"year":2019,"category":"Roads","project":"Sta. Maria ByPass Road - K0032 + 568 - K0033 + 078","amountPesos":37346000,"lengthMeters":510.0,"ratePesosPerMeter":73227.45098039215,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310106100277000, pp. [116]"},{"year":2019,"category":"Roads","project":"Gapan - Fort Magsaysay Road - K0108+191 - K0109+960, K0113+000 - K0113+909, K0116+000 - K0117+464","amountPesos":49284000,"lengthMeters":4142.0,"ratePesosPerMeter":11898.599710284887,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310106100281000, pp. [116]"},{"year":2019,"category":"Roads","project":"San Fernando-Lubao Road - K0085+ 676 - K0085+ 1076","amountPesos":25000000,"lengthMeters":400.0,"ratePesosPerMeter":62500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310106100283000, pp. [116]"},{"year":2019,"category":"Roads","project":"Tigwi-Dampulan-Lipata-Yook-Buenavista Road - K0081 + 502 - K0082 + 000, K0093 + 250 - K0094 + 000","amountPesos":30000000,"lengthMeters":1248.0,"ratePesosPerMeter":24038.46153846154,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310106100298000, pp. [117]"},{"year":2019,"category":"Roads","project":"Aramaywan-Berong-Puerto Princesa Road - K0220+506 - K0220+607, K0220+683 - K0220+743, K0220+948 - K0221+150, K0221+239 - K0221+413, K0221+672 - K0221+829, K0221+880 - K0221+950, K0222+304 - K0222+456, K0222+667 - K0222+748, K0222+941 - K0223+131, K0223+418 - K0223+549","amountPesos":45848000,"lengthMeters":1318.0,"ratePesosPerMeter":34786.039453717756,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310106100305000, pp. [118]"},{"year":2019,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1263 + 317 - K1263 + 600","amountPesos":55000000,"lengthMeters":283.0,"ratePesosPerMeter":194346.2897526502,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310107100073000, pp. [124]"},{"year":2019,"category":"Roads","project":"Manila-Batangas Road - K0079+721 - K0080+037","amountPesos":5500000,"lengthMeters":316.0,"ratePesosPerMeter":17405.063291139242,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310110100074000, pp. [146]"},{"year":2019,"category":"Roads","project":"C-3 Road - K0009 + 617 - K0010 + 182","amountPesos":9350000,"lengthMeters":565.0,"ratePesosPerMeter":16548.672566371682,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310111100085000, pp. [148]"},{"year":2019,"category":"Roads","project":"Leganes-Sta. Barbara Road - K0016 + 237 - K0017 + 000","amountPesos":10709000,"lengthMeters":763.0,"ratePesosPerMeter":14035.386631716907,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310111100124000, pp. [150]"},{"year":2019,"category":"Roads","project":"Deparo Bagumbong Road - K0020 + -270 - K0020 + 616","amountPesos":23027000,"lengthMeters":886.0,"ratePesosPerMeter":25989.841986455984,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310112100071000, pp. [152]"},{"year":2019,"category":"Roads","project":"NCR/Bulacan Bdry - Bigte - Ipo Dam Road - K0039 + 000 - K0039 + 453","amountPesos":8672000,"lengthMeters":453.0,"ratePesosPerMeter":19143.487858719647,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310112100087000, pp. [153]"},{"year":2019,"category":"Roads","project":"Sta. Rosa - Ft. Magsaysay Road - K0108+(-881) - K0108+(-520)","amountPesos":8188000,"lengthMeters":361.0,"ratePesosPerMeter":22681.440443213298,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310112100092000, pp. [153]"},{"year":2019,"category":"Roads","project":"Bacolod South Rd (Old Road) - K0020 + 000 - K0020 + 420, K0020 + 437 - K0020 + 832, K0020 + 845 - K0021 + 655","amountPesos":23808000,"lengthMeters":1625.0,"ratePesosPerMeter":14651.076923076924,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310112100119000, pp. [155]"},{"year":2019,"category":"Roads","project":"Pagadian City - Zamboanga City Road - K1865+097.03 - K1866+000, K1866+080 - K1866+940, K1867+040 - K1867+700","amountPesos":112600000,"lengthMeters":2422.97,"ratePesosPerMeter":46471.89193427954,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310201100323000, pp. [159]"},{"year":2019,"category":"Roads","project":"Road Widening (2-4 lanes) along Surigao del Sur Bdry-Davao Or. Coastal Road K1562+000 - K1565+000","amountPesos":77000000,"lengthMeters":3000.0,"ratePesosPerMeter":25666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310201100352000, pp. [161]"},{"year":2019,"category":"Roads","project":"Surigao-Davao Coastal Road- K1786+154-K1787+640 K1788 +420-K1788 + 819","amountPesos":65000000,"lengthMeters":1885.0,"ratePesosPerMeter":34482.75862068965,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310201100354000, pp. [161]"},{"year":2019,"category":"Roads","project":"Jct. Aurora-Ozamis City Road (S01085MN), K1630 + (-771) - K1630 + 955, Zamboanga Del Sur","amountPesos":50000000,"lengthMeters":1726.0,"ratePesosPerMeter":28968.713789107762,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310201100408000, pp. [164]"},{"year":2019,"category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Road (Calanan-Pinukpuk Section) - K0496 + (-700) - K0497 + 313","amountPesos":62319000,"lengthMeters":2013.0,"ratePesosPerMeter":30958.27123695976,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310202100261000, pp. [166]"},{"year":2019,"category":"Roads","project":"Nabunturan - Maragusan Road, New Bataan K1440 + 757 - K1443 + 220","amountPesos":88705000,"lengthMeters":2463.0,"ratePesosPerMeter":36015.02233049127,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310202100336000, pp. [171]"},{"year":2019,"category":"Roads","project":"Nabunturan-Maragusan Road - K1443 + 220 - K1445 + 135","amountPesos":60510000,"lengthMeters":1915.0,"ratePesosPerMeter":31597.911227154047,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310202100337000, pp. [171]"},{"year":2019,"category":"Roads","project":"Nasugbu-Lian-Calatagan Road K0118+000 - K0119+000","amountPesos":30000000,"lengthMeters":1000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310202100390000, pp. [174]"},{"year":2019,"category":"Roads","project":"Leyte-Samar Road (via Guintigui-an) K0900+177 - K0900+476, K0900+856 - K0901+214","amountPesos":34150000,"lengthMeters":657.0,"ratePesosPerMeter":51978.69101978691,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310203100236000, pp. [184]"},{"year":2019,"category":"Roads","project":"Leyte-Samar Road (via Guintigui-an) K0904+167 - K0904+676","amountPesos":17400000,"lengthMeters":509.0,"ratePesosPerMeter":34184.67583497053,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310203100237000, pp. [184]"},{"year":2019,"category":"Roads","project":"Jct. Aurora-Monte Alegre-Jct. Labangan Road, K1652 + 000 - K1654 + 000, Zamboanga Del Sur","amountPesos":50000000,"lengthMeters":2000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310203100239000, pp. [184]"},{"year":2019,"category":"Roads","project":"Daang Maharlika Road (LZ) - K0078 + 540 - K0079+ 620","amountPesos":50050000,"lengthMeters":1080.0,"ratePesosPerMeter":46342.59259259259,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310207100042000, pp. [214]"},{"year":2019,"category":"Roads","project":"Jct. Aurora-Ozamis City Road - K1636+073 - K1636+788","amountPesos":25000000,"lengthMeters":715.0,"ratePesosPerMeter":34965.03496503497,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310210100003000, pp. [227]"},{"year":2019,"category":"Roads","project":"Balbalan-Pinukpuk Road - (S00536LZ) Chainage 9339 - Chainage 10126, Chainage 10473 - Chainage 10502","amountPesos":39340000,"lengthMeters":816.0,"ratePesosPerMeter":48210.78431372549,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 310212100100000, pp. [230]"},{"year":2019,"category":"Bridges","project":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 2 and 3 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge), Sta. 14+100 to Sta. 15+450, Left Bank, Marikina City","amountPesos":200000000,"lengthMeters":1350.0,"ratePesosPerMeter":148148.14814814815,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320101100253000, pp. [288]"},{"year":2019,"category":"Bridges","project":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 5 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge), Sta. 16+050 to Sta. 17+450, Left Bank, Marikina City","amountPesos":185000000,"lengthMeters":1400.0,"ratePesosPerMeter":132142.85714285713,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320101100254000, pp. [288]"},{"year":2019,"category":"Bridges","project":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 8 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge), Sta. 18+650 to Sta. 19+350, Left Bank, Marikina City","amountPesos":200000000,"lengthMeters":700.0,"ratePesosPerMeter":285714.28571428574,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320101100256000, pp. [288]"},{"year":2019,"category":"Bridges","project":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 6 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge), Sta. 17+450 to Sta. 18+130, Left and Right Banks, Marikina City","amountPesos":200000000,"lengthMeters":680.0,"ratePesosPerMeter":294117.64705882355,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320101102556000, pp. [298]"},{"year":2019,"category":"Bridges","project":"Rehabilitation of Existing Dike along Bangut River, (Sta. Lucia Section Right Side), Downstream of Bangut Bridge,Sta. 0+000 to Sta. 1+082.80, Capas, Tarlac","amountPesos":100000000,"lengthMeters":1082.8,"ratePesosPerMeter":92353.15847801995,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320101102604000, pp. [301]"},{"year":2019,"category":"Roads","project":"Construction (Completion) of Storm Surge Protection: Heightened Road and Tide Embankment, , Section 5, Phase 13A, Sta 6+100 to Sta 6+221, Tanauan, Leyte","amountPesos":80000000,"lengthMeters":121.0,"ratePesosPerMeter":661157.0247933884,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320101102687000, pp. [307]"},{"year":2019,"category":"Roads","project":"Construction (Completion) of Storm Surge Protection: Heightened Road and Tide Embankment, Subsection 4.1B Sta 1+180 to Sta 2+360, Tacloban City, Leyte","amountPesos":112000000,"lengthMeters":1180.0,"ratePesosPerMeter":94915.25423728813,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320101102688000, pp. [308]"},{"year":2019,"category":"Roads","project":"Construction (Completion) of Storm Surge Protection: Heightened Road and Tide Embankment, Subsection 4.2B Sta 3+050 to Sta 3+740,Tacloban City, Leyte","amountPesos":125000000,"lengthMeters":690.0,"ratePesosPerMeter":181159.42028985507,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320101102689000, pp. [308]"},{"year":2019,"category":"Roads","project":"Construction of Storm Surge Protection: Road Heightening and Tide Embankment, Section 5, Phase 10A, Sta 3+180 to Sta 3+480, Brgy. San Joaquin, Palo, Leyte","amountPesos":101000000,"lengthMeters":300.0,"ratePesosPerMeter":336666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320101102702000, pp. [309]"},{"year":2019,"category":"Roads","project":"Construction of Storm Surge Protection: Road Heightening and Tide Embankment, Section 5, Phase 10B, Sta 3+480 to Sta 3+700, Brgy. San Joaquin, Palo, Leyte","amountPesos":90000000,"lengthMeters":220.0,"ratePesosPerMeter":409090.9090909091,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320101102703000, pp. [309]"},{"year":2019,"category":"Roads","project":"Ala River Road Dike, Phase 1-Package A, Sta. 1+100-Sta. 1+472, Lambayong, Sultan Kudarat t","amountPesos":110000000,"lengthMeters":372.0,"ratePesosPerMeter":295698.9247311828,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320101102736000, pp. [311]"},{"year":2019,"category":"Roads","project":"Ala River Road Dike, Phase 1-Package B, Sta. 21+635-Sta. 21+910, Lambayong, Sultan Kudarat","amountPesos":110000000,"lengthMeters":275.0,"ratePesosPerMeter":400000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320101102737000, pp. [312]"},{"year":2019,"category":"Bridges","project":"Rehabilitation/Improvement of Existing Dike along Bangut River (Left Bank, Downstream of Bangut Bridge),Sta.1+587.40 to Sta. 1+937.80, Capas, Tarlac","amountPesos":30000000,"lengthMeters":350.4,"ratePesosPerMeter":85616.43835616442,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320101103319000, pp. [353]"},{"year":2019,"category":"Bridges","project":"Rehabilitation/Improvement of Lidong Flood Control Dike (Upstream of Basud Bridge) Sta. 0+000 - Sta. 0+610, Sto. Domingo, Albay","amountPesos":20000000,"lengthMeters":610.0,"ratePesosPerMeter":32786.88524590164,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320101103556000, pp. [370]"},{"year":2019,"category":"Mixed roads / bridges","project":"Construction of Revetment/River Control on Steel Sheet Pile along Malabang-Dobleston-Tukuran Road, Karomatan Bridge (Sta. K1989+449 - K1989+484) Phase 2, Brgy. Poblacion, Sultan Naga Dimaporo, Lanao del Norte","amountPesos":50000000,"lengthMeters":35.0,"ratePesosPerMeter":1428571.4285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320101103925000, pp. [395]"},{"year":2019,"category":"Mixed roads / bridges","project":"Rehabilitation of damaged flood control structure along Sarangani-Sultan Kudarat Coastal Road, K1719+283-K1719+313, Maglangit Bridge (upstream), Kiamba, Sarangani","amountPesos":5218000,"lengthMeters":30.0,"ratePesosPerMeter":173933.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320101103992000, pp. [400]"},{"year":2019,"category":"Bridges","project":"Construction/Rehabilitation of Flood Mitigation Facilities at Upper Makar Bridge , along Makar River Sta. 0+000 - Sta. 0+390(Downstream), General Santos City, South Cotabato 1st LD","amountPesos":50000000,"lengthMeters":390.0,"ratePesosPerMeter":128205.1282051282,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320101103994000, pp. [400]"},{"year":2019,"category":"Bridges","project":"River Improvement Works along Cagayan River, Buntun Bridge, Tuguegarao and Solana at Sta. 3+950 to Sta. 5+800 and Slope Protection Works for Buntun Bridge, Right Bank, Sta. -0+042 to Sta. 0+410,Tuguegarao City, Cagayan","amountPesos":200000000,"lengthMeters":2218.0,"ratePesosPerMeter":90171.32551848512,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320102100621000, pp. [409]"},{"year":2019,"category":"Bridges","project":"Rehabilitation of Flood Control Structure (Bridge Abutment) along Sibuguey River, Sta. 0+000 to Sta. 0+658, Barangay Paradise, Diplahan, Zamboanga Sibugay","amountPesos":82791000,"lengthMeters":658.0,"ratePesosPerMeter":125822.18844984802,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320102100666000, pp. [412]"},{"year":2019,"category":"Roads","project":"Bunawan River protecting Daang Maharlika Road, Sta. 2+520-Sta. 2+900, Sta. 3+040-Sta. 3+150, Sta. 3+200-Sta. 3+520, Sta. 3+850 - Sta. 4+440, East Side, (Left Bank), Davao City","amountPesos":92550000,"lengthMeters":1400.0,"ratePesosPerMeter":66107.14285714286,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320102100683000, pp. [414]"},{"year":2019,"category":"Roads","project":"Construction of Flood Control along Lanao-Pagadian-Zamboanga City Road, Part of Sibuguey River, (0+000 - 0+120.00), (Upstream), Brgy. Balugo, Imelda, Zamboanga Sibugay","amountPesos":10000000,"lengthMeters":120.0,"ratePesosPerMeter":83333.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320102100942000, pp. [433]"},{"year":2019,"category":"Bridges","project":"Davao River, Bolton Bridge Downstream Section, Sta. 0+512 - Sta. 0+775, Left Bank, Brgy.76, Davao City","amountPesos":50000000,"lengthMeters":263.0,"ratePesosPerMeter":190114.06844106465,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320102100964000, pp. [434]"},{"year":2019,"category":"Bridges","project":"Davao River, Bolton Bridge Upstream Section, Sta. 1+567 - Sta. 1+830, Right Bank, Brgy. 76, Davao City","amountPesos":50000000,"lengthMeters":263.0,"ratePesosPerMeter":190114.06844106465,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320102100965000, pp. [434]"},{"year":2019,"category":"Bridges","project":"Davao River, Generoso Bridge Section, Sta. 2+550 - Sta. 2+687, Sta. 2+782 - Sta. 2+912, Left Bank, Brgy. 5-A, Davao City","amountPesos":50000000,"lengthMeters":267.0,"ratePesosPerMeter":187265.91760299625,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320102100969000, pp. [435]"},{"year":2019,"category":"Bridges","project":"Davao River, Generoso Bridge Section, Sta. 2+912 - Sta. 3+176, Left Bank, Brgy. 5-A, Davao City","amountPesos":50000000,"lengthMeters":264.0,"ratePesosPerMeter":189393.9393939394,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320102100970000, pp. [435]"},{"year":2019,"category":"Roads","project":"Construction of Flood Mitigaton Structures along Marbel-Makar Road (Pagalungan Section), (Apopong-Silway-Sinawal River Basin), Sta 0+000 to Sta 0+233, Pagalungan, Polomolok, South Cotabato","amountPesos":25000000,"lengthMeters":233.0,"ratePesosPerMeter":107296.1373390558,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320102100987000, pp. [436]"},{"year":2019,"category":"Bridges","project":"Construction/Rehabilitation of Flood Mitigation Facilities at Makar Bridge - I, along Makar River Sta. 0+000 - Sta. 0+444 (Leftside River Bank,Upstream), General Santos City, South Cotabato","amountPesos":50000000,"lengthMeters":444.0,"ratePesosPerMeter":112612.61261261262,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2019 DBM technical DPWH GAA · UACS 320102100990000, pp. [436]"},{"year":2020,"category":"Mixed roads / bridges","project":"Regionwide/Nationwide - Parcellary Survey for the Construction of Various Roads and Bridges - Widening of N. Bacalso Ave. (Cebu South Road), K0075+300 - K0119+000 and K0123+000 - K0140+000, Cebu","amountPesos":19967000,"lengthMeters":60700.0,"ratePesosPerMeter":328.9456342668863,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 463728"},{"year":2020,"category":"Mixed roads / bridges","project":"Regionwide/Nationwide - Parcellary Survey for the Construction of Various Roads and Bridges - Construction of Lahug-Guadalupe, and Construction of Access Road leading to the New Cebu International Container Port, Tayud, Consolacion, Sta. 0+000 - Sta.1+778.52, Cebu","amountPesos":1499000,"lengthMeters":1778.52,"ratePesosPerMeter":842.8356161302656,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 463729"},{"year":2020,"category":"Mixed roads / bridges","project":"Regionwide/Nationwide - Parcellary Survey for the Construction of Various Roads and Bridges - Construction of Missing Links/New Roads, Argao-Moalboal, Sta. 0+000 - Sta. 15+000 and Construction of Bypass and Diversion Roads, Moalboal Bypass Road, Sta. 0+000 - Sta. 5+000, Cebu","amountPesos":7021000,"lengthMeters":15000.0,"ratePesosPerMeter":468.06666666666666,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 463727"},{"year":2020,"category":"Roads","project":"Construction of Multi-purpose Building at Purok 3 Km 4 Asin Road near health center, Asin Road, Baguio City","amountPesos":2000000,"lengthMeters":3000.0,"ratePesosPerMeter":666.6666666666666,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 481319"},{"year":2020,"category":"Roads","project":"Calapan North Road (S00008MR), K0043+600 to K0043+950","amountPesos":95000000,"lengthMeters":350.0,"ratePesosPerMeter":271428.5714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489265"},{"year":2020,"category":"Roads","project":"Calapan North Road (S00008MR), K0057+800 to K0058+300","amountPesos":98000000,"lengthMeters":500.0,"ratePesosPerMeter":196000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489266"},{"year":2020,"category":"Bridges","project":"Construction of Flood Control, Downstream of San Miguel Bridge, San Miguel Section (Sta. 0+506 - Sta. 0+806, right side), Nabua, Camarines Sur","amountPesos":50000000,"lengthMeters":300.0,"ratePesosPerMeter":166666.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 488014"},{"year":2020,"category":"Bridges","project":"Rehabilitation at Barit River, Upstream, Mampuag Bridge (Sta. 0+500 - Sta. 0+800, right side), Santiago Old, Nabua, Camarines Sur","amountPesos":50000000,"lengthMeters":300.0,"ratePesosPerMeter":166666.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 488015"},{"year":2020,"category":"Bridges","project":"Construction of Flood Control, Upstream of Cresini Bridge, San Francisco Section (Sta. 0+358 - Sta. 0+558, right side), Iriga City, Camarines Sur","amountPesos":50000000,"lengthMeters":200.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 488016"},{"year":2020,"category":"Bridges","project":"Rehabilitation of Flood Control Structure at Pulid Bridge K0794+818 - K0794+825, Brgy. Quezon, Calbayog City, Samar","amountPesos":50000000,"lengthMeters":7.0,"ratePesosPerMeter":7142857.142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 488058"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection of Road Leading to Mt. Tapulao Sta 008+800 - Sta 009+382, Zambales","amountPesos":45000000,"lengthMeters":582.0,"ratePesosPerMeter":77319.58762886598,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 488336"},{"year":2020,"category":"Roads","project":"Abra - Ilocos Norte Road, K0431+570 - K0431+920","amountPesos":149975000,"lengthMeters":350.0,"ratePesosPerMeter":428500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489253"},{"year":2020,"category":"Roads","project":"Abra - Ilocos Norte Road, K0433+440 - K0433+740","amountPesos":91895000,"lengthMeters":300.0,"ratePesosPerMeter":306316.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489254"},{"year":2020,"category":"Roads","project":"Abra - Ilocos Norte Road, K0434+600 - K0434+870","amountPesos":117050000,"lengthMeters":270.0,"ratePesosPerMeter":433518.51851851854,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489255"},{"year":2020,"category":"Roads","project":"Abra - Ilocos Norte Road, K0446+615- K0446+840","amountPesos":125075000,"lengthMeters":225.0,"ratePesosPerMeter":555888.8888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489256"},{"year":2020,"category":"Roads","project":"Abra - Ilocos Norte Road, K0447+540- K0447+700","amountPesos":111360000,"lengthMeters":160.0,"ratePesosPerMeter":696000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489257"},{"year":2020,"category":"Roads","project":"Calapan North Road (S00008MR), K0022+500 to K0023+100","amountPesos":97000000,"lengthMeters":600.0,"ratePesosPerMeter":161666.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489260"},{"year":2020,"category":"Roads","project":"Calapan North Road (S00008MR), K0024+300 to K0024+700","amountPesos":95000000,"lengthMeters":400.0,"ratePesosPerMeter":237500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489261"},{"year":2020,"category":"Roads","project":"Calapan North Road (S00008MR), K0036+400 to K0036+900","amountPesos":97000000,"lengthMeters":500.0,"ratePesosPerMeter":194000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489262"},{"year":2020,"category":"Roads","project":"Calapan North Road (S00008MR), K0037+300 to K0037+800","amountPesos":98000000,"lengthMeters":500.0,"ratePesosPerMeter":196000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489263"},{"year":2020,"category":"Roads","project":"Calapan North Road (S00008MR), K0039+500 to K0040+000","amountPesos":98000000,"lengthMeters":500.0,"ratePesosPerMeter":196000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489264"},{"year":2020,"category":"Roads","project":"Construction of Road Slope Protection Structure along Davao-Sarangani Coastal Road (Malalag-Malita-JAS-Glan) K1665+338-K1665+758(S00209MN)","amountPesos":85000000,"lengthMeters":420.0,"ratePesosPerMeter":202380.95238095237,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489271"},{"year":2020,"category":"Roads","project":"Construction of Road Slope Protection Structure along Davao-Sarangani Coastal Road (Malalag-Malita-JAS-Glan), K1663+225-K1663+595 (S00209MN)","amountPesos":85000000,"lengthMeters":370.0,"ratePesosPerMeter":229729.72972972973,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489272"},{"year":2020,"category":"Roads","project":"Construction of Road Slope Protection Structure along Demoloc-Little Baguio-Alabel Road, K1649+720-K1650+090(S00203MN)","amountPesos":85000000,"lengthMeters":370.0,"ratePesosPerMeter":229729.72972972973,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489273"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection Along Baler-Casiguran Road (Dinadiawan-Casiguran Section) K0295+100 - K0301+850, Casigura, Aurora","amountPesos":55000000,"lengthMeters":6750.0,"ratePesosPerMeter":8148.148148148148,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489274"},{"year":2020,"category":"Roads","project":"Construction of slope protection along Camp Andres Romandier National Road KM 29+000-KM 34+000 [with exemption], Sulu","amountPesos":150000000,"lengthMeters":5000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489275"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection Along Seit-Tayungan National Road Km 38+000 - 41+000 (with exemption), Sulu","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489276"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection Works along Pangasinan-Nueva Viscaya Road K0211+215 - K0211+320, K0224+560 - K0224+680, San Nicolas Pangasinan","amountPesos":55000000,"lengthMeters":225.0,"ratePesosPerMeter":244444.44444444444,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489277"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection Works along Pangasinan-Nueva Viscaya Road K0214+720 - K0214+920, K0217+215 - K0217+280, San Nicolas, Pangasinan","amountPesos":55000000,"lengthMeters":265.0,"ratePesosPerMeter":207547.16981132075,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489278"},{"year":2020,"category":"Roads","project":"Kalinga - Abra Road, K0470+890 - K0471+(-005)","amountPesos":100000000,"lengthMeters":105.0,"ratePesosPerMeter":952380.9523809524,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489282"},{"year":2020,"category":"Roads","project":"Kalinga - Abra Road, K0495+455 - K0495+675","amountPesos":100000000,"lengthMeters":220.0,"ratePesosPerMeter":454545.45454545453,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489283"},{"year":2020,"category":"Roads","project":"Mt. Province Boundary - Calanan - Pinukpuk - Abbut Road, K0488+165 - K0488+291","amountPesos":100000000,"lengthMeters":126.0,"ratePesosPerMeter":793650.7936507936,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489285"},{"year":2020,"category":"Roads","project":"Mt. Province Boundary - Calanan - Pinukpuk - Abbut Road, K0488+291 - K0488+416","amountPesos":100000000,"lengthMeters":125.0,"ratePesosPerMeter":800000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489286"},{"year":2020,"category":"Roads","project":"Mt. Province Boundary - Calanan - Pinukpuk - Abbut Road, K0488+416 - K0488+541","amountPesos":100000000,"lengthMeters":125.0,"ratePesosPerMeter":800000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489287"},{"year":2020,"category":"Roads","project":"Paco - Roxas - Arakan Valley - Jct Davao - Bukidnon Road (S00701MN) K1640+100 - K1640+341","amountPesos":164800000,"lengthMeters":241.0,"ratePesosPerMeter":683817.4273858921,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489288"},{"year":2020,"category":"Roads","project":"Preventive Maintenance  - Primary Roads, MSR Diversion Rd - K0127+149 - K0127+315, K0127+347 - K0128+219, K0128+251 - K0128+345","amountPesos":100000000,"lengthMeters":1132.0,"ratePesosPerMeter":88339.22261484098,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489289"},{"year":2020,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay Quezon-Punta Baja K0146+(-187.00) - K0150+465.00, Palawan","amountPesos":55000000,"lengthMeters":4652.0,"ratePesosPerMeter":11822.871883061049,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489296"},{"year":2020,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads (Asphalt to Concrete) along Davao-Bukidnon Rd - K1699 + 583 - K1699 + 764, K1699 + 764 - K1701 + 708","amountPesos":90000000,"lengthMeters":2125.0,"ratePesosPerMeter":42352.94117647059,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489297"},{"year":2020,"category":"Roads","project":"Rehabilitation / Reconstruction of National Roads with Slip, Slope Collapse and Landslide along BCIR K1264+900 - K1266+000, Agusan Del Norte","amountPesos":55000000,"lengthMeters":1100.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489298"},{"year":2020,"category":"Roads","project":"Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide Secondary Roads - Dinagat - Loreto Road - K0001 + (-126)  - K0001 + 129, Dinagat","amountPesos":55000000,"lengthMeters":255.0,"ratePesosPerMeter":215686.27450980392,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489306"},{"year":2020,"category":"Roads","project":"Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Manila North Road - K0557 + 900 - K0557 + 960, Pagudpud, Ilocos Norte","amountPesos":75000000,"lengthMeters":60.0,"ratePesosPerMeter":1250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489307"},{"year":2020,"category":"Roads","project":"Rehabilitation / Reconstrustion of National Roads with Slips, Slope Collapse and Landslide Daang Maharlika Road, Lipata-Surigao Section, K1116+142 - K1116+268.50, Brgy. Lipata, Surigao City","amountPesos":90864000,"lengthMeters":126.5,"ratePesosPerMeter":718292.490118577,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489308"},{"year":2020,"category":"Roads","project":"Rehabilitation of  Slope Protection Structure along Tablas Circumferential Road - K0043+870.00 -  K0044+220.00, Tablas, Romblon","amountPesos":55000000,"lengthMeters":350.0,"ratePesosPerMeter":157142.85714285713,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489309"},{"year":2020,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay PPSR Jct. (Abo-Abo) - Quezon K0138+550.00 - K0142+730.00, Palawan","amountPesos":40000000,"lengthMeters":4180.0,"ratePesosPerMeter":9569.377990430621,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489404"},{"year":2020,"category":"Roads","project":"Rehabilitation of Roads with Slips, Slope Collapse and Landslide along Surigao-Agusan West Coastal Road - K1134+735 - K1134+905, Surigao Del Norte","amountPesos":55000000,"lengthMeters":170.0,"ratePesosPerMeter":323529.4117647059,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489310"},{"year":2020,"category":"Roads","project":"Rehabilitation of Roads with Slips/Slope Collapse and Landslide along Daang Maharlika (Surigao-Agusan Sect) K1239+700 - K1240+000, Butuan City","amountPesos":55000000,"lengthMeters":300.0,"ratePesosPerMeter":183333.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489311"},{"year":2020,"category":"Roads","project":"Rehabilitation of Slope Protection Structure Along Tablas Circumferential Road -  K0044+221.00 - K0044+571.00, Tablas, Romblon","amountPesos":55000000,"lengthMeters":350.0,"ratePesosPerMeter":157142.85714285713,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489312"},{"year":2020,"category":"Roads","project":"Rehabilitation of Slope Protection Structure along Tablas Circumferential Road - K0043+500.00 - K0043+870.00, Tablas, Romblon","amountPesos":55000000,"lengthMeters":370.0,"ratePesosPerMeter":148648.64864864864,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489313"},{"year":2020,"category":"Roads","project":"Rehabilitation/ Reconstruction/Upgrading of Damaged Paved Roads along Tigbao - Sta. Fe - San Miguel Road - K0907+400 - K0908+900","amountPesos":190000000,"lengthMeters":1500.0,"ratePesosPerMeter":126666.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489314"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide  Secondary Road - Abra - Kalinga Road - K0444+417 - K0444+468, Barangay Lingas, Licuan-Baay, Abra","amountPesos":64000000,"lengthMeters":51.0,"ratePesosPerMeter":1254901.9607843137,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489317"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide Along Abra-Kalinga Road K0474+100 - K0474+350","amountPesos":55000000,"lengthMeters":250.0,"ratePesosPerMeter":220000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489318"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Ilocos Norte-Abra Rd - K0529+000 - K0529+600","amountPesos":150000000,"lengthMeters":600.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489319"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Ilocos Norte-Abra Rd - K0530+450 - K0530+825","amountPesos":148000000,"lengthMeters":375.0,"ratePesosPerMeter":394666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489320"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Ilocos Norte-Abra Rd - K0530+900 - K0531+200","amountPesos":148000000,"lengthMeters":300.0,"ratePesosPerMeter":493333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489321"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Ilocos Norte-Abra Rd - K0538+178 - K0539+038","amountPesos":150000000,"lengthMeters":860.0,"ratePesosPerMeter":174418.60465116278,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489322"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Ilocos Norte-Abra Rd - K0539+116 - K0539+645","amountPesos":150000000,"lengthMeters":529.0,"ratePesosPerMeter":283553.8752362949,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489323"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips/Slope Collapse and Landslide Along Abra-Kalinga Road K0453+200 - K0453+450","amountPesos":55000000,"lengthMeters":250.0,"ratePesosPerMeter":220000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489324"},{"year":2020,"category":"Roads","project":"Road Widening & Construction of Drainage along Daang Maharlika (MN) - K1507+223 - K1507+324 (L/S), K1507+369 - K1507+464 (R/S), K1507+475 - K1507+518 (L/S), K1507+518 - K1508+000","amountPesos":100000000,"lengthMeters":721.0,"ratePesosPerMeter":138696.25520110957,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489325"},{"year":2020,"category":"Roads","project":"Road Widening of Lobo-Malabrigo-San Juan Rd (K0161+736 - K0163+626), Batangas","amountPesos":90000000,"lengthMeters":1890.0,"ratePesosPerMeter":47619.04761904762,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489326"},{"year":2020,"category":"Roads","project":"Road Widening of Mandurriao - San Miguel - Alimodian - Maasin - Cabatuan Rd. K0019 + 062 - K0020+694, San Miguel, Iloilo","amountPesos":69050000,"lengthMeters":1632.0,"ratePesosPerMeter":42310.049019607846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489327"},{"year":2020,"category":"Roads","project":"Widening of Road, Palawan Circumferential Road (S00063PW) K0265+000 - K0269+820, Palawan","amountPesos":100000000,"lengthMeters":4820.0,"ratePesosPerMeter":20746.887966804978,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489334"},{"year":2020,"category":"Roads","project":"Reconstruction/ Upgrading of Damaged Paved Roads along Jolo - Indanan - Parang - Silangkan Road K 10+000 - K 12+000","amountPesos":51500000,"lengthMeters":2000.0,"ratePesosPerMeter":25750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489340"},{"year":2020,"category":"Roads","project":"Reconstruction/ Upgrading of Damaged Paved Roads along Jolo - Taglibi - Tiptipon Road K 5+000 - K 8+000","amountPesos":90000000,"lengthMeters":3000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489341"},{"year":2020,"category":"Roads","project":"Reconstruction/ Upgrading of Damaged Paved Roads along Jolo Port - Bud Daho - Romandier Road K 0+000 - K 2+750","amountPesos":85000000,"lengthMeters":2750.0,"ratePesosPerMeter":30909.090909090908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489342"},{"year":2020,"category":"Roads","project":"Reconstruction/ Upgrading of Damaged Paved Roads along Jolo Port - Bud Daho - Romandier Road K 5+150 - K 7+800","amountPesos":80000000,"lengthMeters":2650.0,"ratePesosPerMeter":30188.67924528302,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489343"},{"year":2020,"category":"Roads","project":"Road Widening along Iloilo East Coast-Capiz Road, K0154+173 - K0155+173","amountPesos":20000000,"lengthMeters":1000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489413"},{"year":2020,"category":"Roads","project":"Road Widening including Drainage along Basilan Circumferential Road (Tumahubong-Sumisip-Maluso Road Section) Sta. 72+000 - Sta. 73+100","amountPesos":55000000,"lengthMeters":1100.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489353"},{"year":2020,"category":"Roads","project":"Road Widening including Drainage along Basilan Circumferential Road (Tumahubong-Sumisip-Maluso Road Section) Sta. 73+400 - Sta. 74+900","amountPesos":75000000,"lengthMeters":1500.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489354"},{"year":2020,"category":"Roads","project":"Road Widening including Drainage along Basilan Circumferential Road (Tumahubong-Sumisip-Maluso Road Section) Sta. 75+100 - Sta. 76+440","amountPesos":65000000,"lengthMeters":1340.0,"ratePesosPerMeter":48507.46268656717,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489355"},{"year":2020,"category":"Roads","project":"Road Widening including Drainage along Basilan Circumferential Road (Tumahubong-Sumisip-Maluso Road Section) Sta. 76+740 - Sta. 78+620","amountPesos":70000000,"lengthMeters":1880.0,"ratePesosPerMeter":37234.04255319149,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489356"},{"year":2020,"category":"Roads","project":"Abra - Ilocos Norte Road, K0432+1026 - K0433+070","amountPesos":48550000,"lengthMeters":44.0,"ratePesosPerMeter":1103409.0909090908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489361"},{"year":2020,"category":"Roads","project":"Abra - Ilocos Norte Road, K0447+335- K0447+460","amountPesos":49500000,"lengthMeters":125.0,"ratePesosPerMeter":396000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489362"},{"year":2020,"category":"Roads","project":"Abra - Ilocos Norte Road, K0447+935 - K0448+055","amountPesos":48850000,"lengthMeters":120.0,"ratePesosPerMeter":407083.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489363"},{"year":2020,"category":"Roads","project":"Abra - Ilocos Norte Road, K0448+140 - K0448+260","amountPesos":49990000,"lengthMeters":120.0,"ratePesosPerMeter":416583.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489364"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Road Slips, Slope Collapse and Landslide, Abra - Ilocos Norte Road, K0431+500 - K0431+700, Abra","amountPesos":45000000,"lengthMeters":200.0,"ratePesosPerMeter":225000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489365"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Road Slips, Slope Collapse and Landslide, Abra - Ilocos Norte Road, K0433+010 - K0433+400, Abra","amountPesos":45000000,"lengthMeters":390.0,"ratePesosPerMeter":115384.61538461539,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489366"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection  Along Madela-Dinadiawan Road (K0409+300 - K0419+700), Aurora","amountPesos":45000000,"lengthMeters":10400.0,"ratePesosPerMeter":4326.923076923077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489367"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection Along A. Castaneda - Ma. Aurora San Luis Road (K0198+090 - K0204+580), Aurora","amountPesos":45000000,"lengthMeters":6490.0,"ratePesosPerMeter":6933.744221879815,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489368"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection Along A. Castaneda - Ma. Aurora San Luis Road (K0209+425 - K0213+030), Aurora","amountPesos":45000000,"lengthMeters":3605.0,"ratePesosPerMeter":12482.662968099861,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489369"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection Along Baler-Casiguran Road (Baler - Dinadiawan Section) K0259+600 - K0277+706, Casiguran, Aurora","amountPesos":45000000,"lengthMeters":18106.0,"ratePesosPerMeter":2485.363967745499,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489370"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection Along Baler-Casiguran Road (Dinadiawan-Casiguran Section) K0292+778 - K0294+621, Aurora","amountPesos":45000000,"lengthMeters":1843.0,"ratePesosPerMeter":24416.711882799784,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489371"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection Along Baler-Casiguran Road (Dinadiawan-Casiguran Section) K0295+100 - K0302+620, Casiguran, Aurora","amountPesos":45000000,"lengthMeters":7520.0,"ratePesosPerMeter":5984.04255319149,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489372"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection along Nueva Ecija - Aurora Road (K0171+150 - K0174+050), Aurora","amountPesos":40000000,"lengthMeters":2900.0,"ratePesosPerMeter":13793.103448275862,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489373"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection Along Nueva Ecija- Aurora Road (K0204+800 - K0214+520), Aurora","amountPesos":45000000,"lengthMeters":9720.0,"ratePesosPerMeter":4629.62962962963,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489374"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection Along Nueva Ecija-Aurora Road (K0195+450 - K0201+440), Aurora","amountPesos":45000000,"lengthMeters":5990.0,"ratePesosPerMeter":7512.520868113523,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489375"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection Along Nueva Ecija-Aurora Road (K0201+600 - K0204+500), Aurora","amountPesos":45000000,"lengthMeters":2900.0,"ratePesosPerMeter":15517.241379310344,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489376"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection Along Olongapo  Bugallon  Road Salaza Section K0222+000 - K0222+582, Olongapo City","amountPesos":40000000,"lengthMeters":582.0,"ratePesosPerMeter":68728.52233676976,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489377"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection Along Olongapo Bugallon road, Botolan Section K0189+000 - K0189+776, Olongapo City","amountPesos":45000000,"lengthMeters":776.0,"ratePesosPerMeter":57989.69072164949,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489378"},{"year":2020,"category":"Roads","project":"Marikina - Infanta Road (Package A), Infanta, Quezon, K0116+102 - K0116+293","amountPesos":48500000,"lengthMeters":191.0,"ratePesosPerMeter":253926.70157068063,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489381"},{"year":2020,"category":"Roads","project":"Marikina - Infanta Road (Package B), Infanta, Quezon, K0116+642 - K0116+950","amountPesos":48900000,"lengthMeters":308.0,"ratePesosPerMeter":158766.23376623375,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489382"},{"year":2020,"category":"Roads","project":"Marikina - Infanta Road (Package C), Infanta, Quezon, K0117+308 - K0117+680","amountPesos":49780000,"lengthMeters":372.0,"ratePesosPerMeter":133817.20430107528,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489383"},{"year":2020,"category":"Roads","project":"Marikina - Infanta Road (Package D), Infanta, Quezon, K0118+230 - K0118+500","amountPesos":49550000,"lengthMeters":270.0,"ratePesosPerMeter":183518.5185185185,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489384"},{"year":2020,"category":"Roads","project":"Marikina - Infanta Road (Package E), Infanta, Quezon, K0119+050 - K0119+715","amountPesos":49970000,"lengthMeters":665.0,"ratePesosPerMeter":75142.85714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489385"},{"year":2020,"category":"Roads","project":"Marikina - Infanta Road (Package F), Infanta, Quezon, K0120+030 - K0120+950","amountPesos":49990000,"lengthMeters":920.0,"ratePesosPerMeter":54336.95652173913,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489386"},{"year":2020,"category":"Roads","project":"Marikina - Infanta Road (Package G), Infanta, Quezon, K0122+410 - K0122+596","amountPesos":49500000,"lengthMeters":186.0,"ratePesosPerMeter":266129.03225806454,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489387"},{"year":2020,"category":"Roads","project":"Marikina - Infanta Road (Package H), Infanta, Quezon, K0122+700 - K0122+980","amountPesos":48790000,"lengthMeters":280.0,"ratePesosPerMeter":174250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489388"},{"year":2020,"category":"Roads","project":"Marikina - Infanta Road (Package I), Infanta, Quezon, K0123+061 - K0123+360","amountPesos":49450000,"lengthMeters":299.0,"ratePesosPerMeter":165384.61538461538,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489389"},{"year":2020,"category":"Roads","project":"Marikina - Infanta Road (Package J), Infanta, Quezon, K0123+724 - K0123+876","amountPesos":49980000,"lengthMeters":152.0,"ratePesosPerMeter":328815.7894736842,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489390"},{"year":2020,"category":"Roads","project":"Preventive Maintenance - Primary Roads, Daang Maharlika (LZ) K0118+224 - K0118+672, K0118+814 - K0119+010, K0119+023-K0119+825","amountPesos":50000000,"lengthMeters":1446.0,"ratePesosPerMeter":34578.14661134163,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489391"},{"year":2020,"category":"Roads","project":"Rehabilitation/Improvement of Manila South Road (Old Route) - K0130+614 - K0131+359, Lucena City, Quezon","amountPesos":50000000,"lengthMeters":745.0,"ratePesosPerMeter":67114.09395973154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489392"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection along MSR, New Diversion Zigzag Road, K0155+100 - K0155+200 Brgy. Malicboy, Atimonan, Quezon","amountPesos":40000000,"lengthMeters":100.0,"ratePesosPerMeter":400000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489394"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection along MSR, New Diversion Zigzag Road, K0174+050 - K0174+150 Brgy. Angeles, Atimonan, Quezon","amountPesos":30000000,"lengthMeters":100.0,"ratePesosPerMeter":300000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489395"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection along Old Zigzag Road, K0153+450 - K0153+600, Brgy. Malicboy, Pagbilao, Quezon","amountPesos":30000000,"lengthMeters":150.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489396"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection along Old Zigzag Road, K0154+150 - K0154+300, Brgy Malicboy, Pagbilao, Quezon","amountPesos":30000000,"lengthMeters":150.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489397"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection along Old Zigzag Road, K0156+650 - K0156+800, Brgy. Amlinao Ilaya, Atimonan, Quezon","amountPesos":30000000,"lengthMeters":150.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489398"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection along Old Zigzag Road, K0157+050 - K0157+150, Brgy. Malinao Ilaya, Atimonan, Quezon","amountPesos":30000000,"lengthMeters":100.0,"ratePesosPerMeter":300000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489399"},{"year":2020,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay of Aramaywan - Berong K0176+000.00 - K0176+1061.00, K0176+1185.00 - K0181+630.00, K0182+000.00 - K0183+506.00, Palawan","amountPesos":50000000,"lengthMeters":7012.0,"ratePesosPerMeter":7130.633200228181,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489400"},{"year":2020,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay of Quezon - Aramaywan K0146+(-150.00) - K0150+289.00, Palawan","amountPesos":50000000,"lengthMeters":4439.0,"ratePesosPerMeter":11263.798152737103,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489401"},{"year":2020,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay of Quezon - Aramaywan K0159+000 - K0172+635, Palawan","amountPesos":50000000,"lengthMeters":13635.0,"ratePesosPerMeter":3667.033370003667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489402"},{"year":2020,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay PPSR Jct. (Abo-Abo) - Quezon K0129+500.00 - K0133+397.00, Palawan","amountPesos":40000000,"lengthMeters":3897.0,"ratePesosPerMeter":10264.305876315115,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489403"},{"year":2020,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay Quezon- Punta Baja K0157+000.00 - K0160+060.00, K0162+471.00 - K0163+701.00, Palawan","amountPesos":50000000,"lengthMeters":4290.0,"ratePesosPerMeter":11655.011655011655,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489405"},{"year":2020,"category":"Roads","project":"Rehabilitation of Slope Protection Structure along Tablas Circumferential Road - K0042+980.00 - K0043+220.00, Tablas, Romblon","amountPesos":45000000,"lengthMeters":240.0,"ratePesosPerMeter":187500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489406"},{"year":2020,"category":"Roads","project":"Rehabilitation of Slope Protection Structure Along Tablas Circumferential Road - K0044+571.00 - K0044+921.00, Tablas, Romblon","amountPesos":50000000,"lengthMeters":350.0,"ratePesosPerMeter":142857.14285714287,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489407"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection Along Calapan South Road, Brgy. Hagan, Bongabong, Oriental Mindoro K0119+000 - K0119+360, Bongabong, Oriental Mindoro","amountPesos":30000000,"lengthMeters":360.0,"ratePesosPerMeter":83333.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489408"},{"year":2020,"category":"Roads","project":"Rehabilitation of Roads Slips, Slope Collapse And Landslide, San Fernando-Talisay Rd Brgy Progresso, San Fernando, Masbate (K0003+377 - K0003+530)","amountPesos":50000000,"lengthMeters":153.0,"ratePesosPerMeter":326797.38562091504,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489409"},{"year":2020,"category":"Roads","project":"Rehabilitation of Roads Slips, Slope Collapse And Landslide, San Fernando-Talisay Rd Brgy Progresso, San Fernando, Masbate, (K0002+790 - K0002+927)","amountPesos":50000000,"lengthMeters":137.0,"ratePesosPerMeter":364963.503649635,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489410"},{"year":2020,"category":"Roads","project":"Rehabilitation of Roads Slips, Slope Collapse And Landslide, San Fernando-Talisay Rd, Brgy Progresso, San Fernando, Masbate (K0002+927 - K0003+065)","amountPesos":50000000,"lengthMeters":138.0,"ratePesosPerMeter":362318.84057971014,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489411"},{"year":2020,"category":"Roads","project":"Road Widening along Iloilo East Coast-Capiz Road, K0161+300 - K0162+362","amountPesos":20000000,"lengthMeters":1062.0,"ratePesosPerMeter":18832.391713747646,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489414"},{"year":2020,"category":"Roads","project":"Road Widening along Roxas City Boundary Panitan-Bailan Road, K0112+(-251) - K0112+500","amountPesos":15000000,"lengthMeters":751.0,"ratePesosPerMeter":19973.36884154461,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489415"},{"year":2020,"category":"Roads","project":"Road Widening, Tertiary Roads, Sigma-Mambusao - Jamindan Rd - K0093+064 - K0094+792, Dumalag, Capiz","amountPesos":50000000,"lengthMeters":1728.0,"ratePesosPerMeter":28935.185185185186,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489416"},{"year":2020,"category":"Roads","project":"Road Widening of Iloilo Capiz Rd (Old Route) K0017 + 708 - K0019+316, Sta. Barbara, Iloilo","amountPesos":30950000,"lengthMeters":1608.0,"ratePesosPerMeter":19247.512437810947,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489417"},{"year":2020,"category":"Roads","project":"Preventive Maintenance-Asphalt Overlay, Palo-Carigara-Ormoc Road, K0984+(-753) - K0984+869, K0984+884-K0987+477, K0987+560-K0988+007, K0988+066-K0989+000, Leyte","amountPesos":50000000,"lengthMeters":5596.0,"ratePesosPerMeter":8934.953538241602,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489423"},{"year":2020,"category":"Roads","project":"Road Widening - Palompon-Isabel-Merida-Ormoc Road, K1101+416 - K1104+714, Leyte","amountPesos":45000000,"lengthMeters":3298.0,"ratePesosPerMeter":13644.633110976349,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489424"},{"year":2020,"category":"Roads","project":"Preventive Maintenance along Bdry So. Leyte-Maasin-Macrohon-Sogod-Jct Daang Maharlika Road K1199+200 - K1204+500, Southern Leyte","amountPesos":45000000,"lengthMeters":5300.0,"ratePesosPerMeter":8490.566037735849,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489426"},{"year":2020,"category":"Roads","project":"Preventive Maintenance along Bdry. So. Leyte-Maasin-Macrohon-Sogod-Jct. Daang Maharlika Road K1189+000 - K1194+000, Southern Leyte","amountPesos":40000000,"lengthMeters":5000.0,"ratePesosPerMeter":8000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489429"},{"year":2020,"category":"Roads","project":"Construction of Missing Links - Banaran - Tonggusong National Road k 1+920 - k 2+920","amountPesos":35000000,"lengthMeters":1000.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489431"},{"year":2020,"category":"Roads","project":"Construction of Missing Links - Marang marang - Bakung Road k 56+000 - k 60+000","amountPesos":50000000,"lengthMeters":4000.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489432"},{"year":2020,"category":"Roads","project":"Reconstruction/ Upgrading of Damaged Paved Roads along Jolo - Indanan - Parang - Silangkan Road K 0+666 - K 1+666","amountPesos":30000000,"lengthMeters":1000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489434"},{"year":2020,"category":"Roads","project":"Reconstruction/ Upgrading of Damaged Paved Roads along Jolo - Taglibi - Tiptipon Road K 0+850 - K 2+000","amountPesos":35000000,"lengthMeters":1150.0,"ratePesosPerMeter":30434.782608695652,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489435"},{"year":2020,"category":"Roads","project":"Reconstruction/ Upgrading of Damaged Paved Roads along Jolo - Taglibi - Tiptipon Road K 16+000 - K 17+000","amountPesos":30000000,"lengthMeters":1000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489436"},{"year":2020,"category":"Roads","project":"Road Widening - Pagasinan - Karungdung Road k 187+700 - k 191+700","amountPesos":50000000,"lengthMeters":4000.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489441"},{"year":2020,"category":"Roads","project":"Rehabilitation/Upgrading of Damaged Paved Roads (Reblocking) along Basilan Circumferential Road (Lamitan - Tipo-Tipo - Tumahubong Road Section) Sta. 35+500 - Sta. 36+100","amountPesos":15000000,"lengthMeters":600.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489444"},{"year":2020,"category":"Roads","project":"Rehabilitation/Upgrading of Damaged Paved Roads (Reblocking) along Basilan Circumferential Road (Lamitan - Tipo-Tipo - Tumahubong Road Section) Sta. 52+925 - Sta. 53+675","amountPesos":20000000,"lengthMeters":750.0,"ratePesosPerMeter":26666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489445"},{"year":2020,"category":"Roads","project":"Road Widening including Drainage along Basilan Circumferential Road (Tuburan - Lamitan Section) Sta. 34+000 - Sta. 35+000","amountPesos":50000000,"lengthMeters":1000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489446"},{"year":2020,"category":"Roads","project":"Road Widening including Drainage along Basilan Circumferential Road (Tumahubong-Sumisip-Maluso Road Section) Sta. 65+000 - Sta. 66+050","amountPesos":50000000,"lengthMeters":1050.0,"ratePesosPerMeter":47619.04761904762,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489447"},{"year":2020,"category":"Roads","project":"Road Widening including Drainage along Basilan Circumferential Road (Tumahubong-Sumisip-Maluso Road Section) Sta. 66+315 - Sta. 67+320","amountPesos":50000000,"lengthMeters":1005.0,"ratePesosPerMeter":49751.243781094534,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489448"},{"year":2020,"category":"Roads","project":"Road Widening including Drainage along Basilan Circumferential Road (Tumahubong-Sumisip-Maluso Road Section) Sta. 70+000 - Sta. 71+000","amountPesos":50000000,"lengthMeters":1000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489449"},{"year":2020,"category":"Roads","project":"Road Widening along Butuan City-Cagayan De Oro City - Iligan City Rd. -  K1314 + 680 - K1315 + 000, K1316 + 000 - K1316 + 412, K1316 +000 - K1316 + 412, K1316 + 542 - K1317 + 490, Misamis Oriental","amountPesos":30000000,"lengthMeters":1680.0,"ratePesosPerMeter":17857.14285714286,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489458"},{"year":2020,"category":"Roads","project":"Road Widening along Butuan City-Cagayan De Oro City - Iligan City Rd. -  K1340 + 000 - K1314 + 190, Misamis Oriental","amountPesos":30000000,"lengthMeters":25810.0,"ratePesosPerMeter":1162.340178225494,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489459"},{"year":2020,"category":"Roads","project":"Road Widening along Davao - Cotabato Old Rd - K1522 + 678 - K1522 + 808 (L/S), K1522 + 826 - K1522 + 968 (L/S)","amountPesos":11219000,"lengthMeters":272.0,"ratePesosPerMeter":41246.32352941176,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489469"},{"year":2020,"category":"Roads","project":"Road Widening along Davao - Cotabato Rd. (Davao City - Jct. Digos Sect) - K1521 + 052 - K1521 + 200","amountPesos":10656000,"lengthMeters":148.0,"ratePesosPerMeter":72000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489470"},{"year":2020,"category":"Roads","project":"Road Widening along Davao City Div Rd - K1513 + 386 - K1513 + 520 (R/S), K1513 + 722 - K1513 + 775, K1513 + 875 - K1514 + 020","amountPesos":41753000,"lengthMeters":332.0,"ratePesosPerMeter":125762.04819277108,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489471"},{"year":2020,"category":"Roads","project":"Road Widening along Quezon Blvd. (MN) - K1510 + 401 - K1510 + 791 (R/S)","amountPesos":14000000,"lengthMeters":390.0,"ratePesosPerMeter":35897.4358974359,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489472"},{"year":2020,"category":"Mixed roads / bridges","project":"Arakan - Puntian Road (Approach \"B\" of Sabang Steel Bridge) 3+200 - 3+300","amountPesos":49950000,"lengthMeters":100.0,"ratePesosPerMeter":499500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489474"},{"year":2020,"category":"Roads","project":"Kidapawan - Ilomavis Tourist Road (S00697MN) K1636+760 - K1636+835","amountPesos":49950000,"lengthMeters":75.0,"ratePesosPerMeter":666000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489475"},{"year":2020,"category":"Roads","project":"Magpet - Nowa - Doroluman - Greenfield Road (S00712MN) K1640+633 - K1640+733","amountPesos":49950000,"lengthMeters":100.0,"ratePesosPerMeter":499500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489476"},{"year":2020,"category":"Roads","project":"Magpet - Nowa - Doruluman - Greenfield Road (S00711MN) K1633+100 - K1633+175","amountPesos":49950000,"lengthMeters":75.0,"ratePesosPerMeter":666000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489477"},{"year":2020,"category":"Roads","project":"Magpet - Nowa - Doruluman - Greenfield Road (S00712MN) K1640+733 - K1640+833","amountPesos":49950000,"lengthMeters":100.0,"ratePesosPerMeter":499500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489478"},{"year":2020,"category":"Roads","project":"Paco - Roxas - Arakan Valley - Jct Davao - Bukidnon Road (S00701MN) K1642+(-080) - K1642+150","amountPesos":49950000,"lengthMeters":230.0,"ratePesosPerMeter":217173.91304347827,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489479"},{"year":2020,"category":"Roads","project":"Paco - Roxas - Arakan Valley - Jct Davao - Bukidnon Road (S00702MN) K1684+500 - K1684+600","amountPesos":35500000,"lengthMeters":100.0,"ratePesosPerMeter":355000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489480"},{"year":2020,"category":"Roads","project":"Concreting of Cotabato  Lanao Road (Sultan Mastura & Parang Section, km 1869+850 - km 1875+000)","amountPesos":50000000,"lengthMeters":5150.0,"ratePesosPerMeter":9708.73786407767,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489481"},{"year":2020,"category":"Roads","project":"Reconstruction of Awang - Upi -Lebak Road with exception (km 1845+215 - km 1882+362)","amountPesos":50000000,"lengthMeters":37147.0,"ratePesosPerMeter":1346.0037149702532,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489482"},{"year":2020,"category":"Roads","project":"Widening of Awang - Upi -Lebak Road (km 1845+215 - km 1882+362)","amountPesos":50000000,"lengthMeters":37147.0,"ratePesosPerMeter":1346.0037149702532,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489483"},{"year":2020,"category":"Roads","project":"Widening of Cotabato  Lanao Road with exception (km 1854+902 - km 1905+988.40)","amountPesos":50000000,"lengthMeters":51086.4,"ratePesosPerMeter":978.7340662094039,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489484"},{"year":2020,"category":"Roads","project":"Widening of Davao - Cotabato Road with exception (km 1716+050 - km 1724+803.20)","amountPesos":50000000,"lengthMeters":8753.2,"ratePesosPerMeter":5712.196682356197,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489485"},{"year":2020,"category":"Roads","project":"Widening of Lamsan - Simuay Junction Road (km 1862+9760 - km 1863+736)","amountPesos":25636000,"lengthMeters":8024.0,"ratePesosPerMeter":3194.9152542372885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489486"},{"year":2020,"category":"Roads","project":"Widening of Marbel - Ala -Cotabato Road with exception (km 1821+108.41 - km 1847+478.09)","amountPesos":50000000,"lengthMeters":26369.68,"ratePesosPerMeter":1896.1170556487482,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489487"},{"year":2020,"category":"Roads","project":"Widening of Simuay - Landasan - Parang Road with exception (km 1865+553.40 - km 1878+7442)","amountPesos":50000000,"lengthMeters":19888.6,"ratePesosPerMeter":2514.0029966915604,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489488"},{"year":2020,"category":"Roads","project":"Road Widening - Secondary Roads - Surigao Davao Coastal Rd. K1403+020 - K1406+420, Hinatuan, Surigao del Sur","amountPesos":45000000,"lengthMeters":3400.0,"ratePesosPerMeter":13235.29411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489489"},{"year":2020,"category":"Roads","project":"Asphalt Overlay Along Sarangani-Sultan Kudarat Coastal Road K1762+000-K1764+000 Maitum, Sarangani","amountPesos":100000000,"lengthMeters":2000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489593"},{"year":2020,"category":"Roads","project":"Asphalt Overlay Along Sarangani-Davao del Sur Coastal Road K1675+420-K1679+120 Malapatan, Sarangani","amountPesos":100000000,"lengthMeters":3700.0,"ratePesosPerMeter":27027.027027027027,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489594"},{"year":2020,"category":"Roads","project":"Road Widening including Drainage along Sarangani-Sultan Kudarat K1688+630-K1692+000,Maasim, Sarangani","amountPesos":100000000,"lengthMeters":3370.0,"ratePesosPerMeter":29673.59050445104,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489595"},{"year":2020,"category":"Roads","project":"Road Widening including Drainage along Sarangani-Sultan Kudarat Coastal Road, K1701+343-K1704+727,Maasim, Sarangani","amountPesos":100000000,"lengthMeters":3384.0,"ratePesosPerMeter":29550.827423167848,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489596"},{"year":2020,"category":"Roads","project":"Rehabilitation of roads with slips, slope collapse and landslide (primary roads), Daang Maharlika K0284+560- K0284+700, Kinacao, Bagabag, Nueva Vizcaya","amountPesos":79387000,"lengthMeters":140.0,"ratePesosPerMeter":567050.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489599"},{"year":2020,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay at specific locations along Guimaras Circumferential Rd (S00028GR) K00057+942 - K0082+487, San Lorenzo/ Sibunag/ Nueva Valencia, Guimaras","amountPesos":70000000,"lengthMeters":24545.0,"ratePesosPerMeter":2851.904664901202,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489600"},{"year":2020,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay at specific locations along Central Rd, San Miguel- Constancia- Cabano- Igcawayan (S00025GR) K0051+ (-1127)- K0063+780, Jordan/ San Lorenzo, Guimaras","amountPesos":81600000,"lengthMeters":13907.0,"ratePesosPerMeter":5867.548716473718,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489601"},{"year":2020,"category":"Roads","project":"Asphalt Overlay along Olongapo-Bugallon Road K0128+450-K0148+00 w/ exceptions, Olongapo, Zambales","amountPesos":75100000,"lengthMeters":19550.0,"ratePesosPerMeter":3841.4322250639384,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489602"},{"year":2020,"category":"Roads","project":"Asphalt Overlay along Dumaguete North Road (Dumaguete-Jct. Bais-Kabankalan), K0036+500-K0041+000 Bais City, Negros Oriental","amountPesos":70000000,"lengthMeters":4500.0,"ratePesosPerMeter":15555.555555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489605"},{"year":2020,"category":"Roads","project":"Construction of Road Slope Protection along Daang Maharlika (Sm) (Sn Isidro - Sn Juanico Br.) (S00001SM) K0687+780 - K0687+850, Phase 1, San Isidro, Northern Samar","amountPesos":56170000,"lengthMeters":70.0,"ratePesosPerMeter":802428.5714285715,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489606"},{"year":2020,"category":"Roads","project":"Construction of Road Slope Protection along Daang Maharlika (Sm) (Sn Isidro - Sn Juanico Br.) (S00001SM) K0687+850 - K0687+920, Phase 2, San Isidro, Northern Samar","amountPesos":56169000,"lengthMeters":70.0,"ratePesosPerMeter":802414.2857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489607"},{"year":2020,"category":"Roads","project":"Construction of Road Slope Protection along Daang Maharlika (Sm) (Sn Isidro - Sn Juanico Br.) (S00001SM) K0687+620 - K0687+647, Phase 1, San Isidro, Northern Samar","amountPesos":58985000,"lengthMeters":27.0,"ratePesosPerMeter":2184629.6296296297,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489608"},{"year":2020,"category":"Roads","project":"Construction of Road Slope Protection along Daang Maharlika (Sm) (Sn Isidro - Sn Juanico Br.) (S00001SM) K0687+647 - K0687+674, Phase 2, San Isidro, Northern Samar","amountPesos":60500000,"lengthMeters":27.0,"ratePesosPerMeter":2240740.7407407407,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489609"},{"year":2020,"category":"Roads","project":"Construction of Road Slope Protection along Daang Maharlika (Sm) (Sn Isidro - Sn Juanico Br.) (S00001SM) K0687+674 - K0687+700, Phase 3, San Isidro, Northern Samar","amountPesos":57478000,"lengthMeters":26.0,"ratePesosPerMeter":2210692.3076923075,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489610"},{"year":2020,"category":"Roads","project":"Construction of Road Slope Protection along Daang Maharlika (Sm) (Sn Isidro - Sn Juanico Br.) (S00001SM) K0684+540 - K0684+610, Phase 1, San Isidro, Northern Samar","amountPesos":69826000,"lengthMeters":70.0,"ratePesosPerMeter":997514.2857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489611"},{"year":2020,"category":"Roads","project":"Construction of Road Slope Protection along Daang Maharlika (Sm) (Sn Isidro - Sn Juanico Br.) (S00001SM) K0684+610 - K0684+670, Phase 2, San Isidro, Northern Samar","amountPesos":55362000,"lengthMeters":60.0,"ratePesosPerMeter":922700.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489612"},{"year":2020,"category":"Roads","project":"Construction of Road Slope Protection along Daang Maharlika (Sm) (Sn Isidro - Sn Juanico Br.) (S00001SM) K0684+670 - K0684+700, K0687+560 - K0687+620, Phase 3, San Isidro, Northern Samar","amountPesos":84292000,"lengthMeters":90.0,"ratePesosPerMeter":936577.7777777778,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489613"},{"year":2020,"category":"Roads","project":"Road Widening of Daang Maharlika (LZ), S01985LZ, K0112 + 130 - K0112 + 920, K0115 + 566 - K0116 + 093","amountPesos":10000000,"lengthMeters":1317.0,"ratePesosPerMeter":7593.014426727411,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489618"},{"year":2020,"category":"Roads","project":"Construction of Rock Guard Slope Protection Along Burauen - Mahagnao Road  K0989+700 - K0989+408.70","amountPesos":100000000,"lengthMeters":291.3,"ratePesosPerMeter":343288.7058015243,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489619"},{"year":2020,"category":"Roads","project":"Construction of Rock Guard Slope Protection Along Burauen - Mahagnao Road K0989+408.70 - K990+016.70","amountPesos":100000000,"lengthMeters":608.0,"ratePesosPerMeter":164473.68421052632,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489620"},{"year":2020,"category":"Roads","project":"Construction of Rock Guard Slope Protection  Along Burauen - Mahagnao Road K990+016.70 - K0990+537.70","amountPesos":100000000,"lengthMeters":521.0,"ratePesosPerMeter":191938.57965451057,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489621"},{"year":2020,"category":"Roads","project":"Construction of Slope Protection Works along Pangasinan-Nueva Viscaya Road K0224+680 -   K0224+920,  San Nicolas, Pangasinan","amountPesos":143885000,"lengthMeters":240.0,"ratePesosPerMeter":599520.8333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489622"},{"year":2020,"category":"Roads","project":"Construction of Roads with Slip / Slope Collapse  Along Calapan North Road, Calapan Oriental Mindoro   K0022+950 - K0023+600","amountPesos":144000000,"lengthMeters":650.0,"ratePesosPerMeter":221538.46153846153,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489623"},{"year":2020,"category":"Roads","project":"Construction of Roads with Slip / Slope Collapse   Along Calapan North Road, Calapan Oriental Mindoro    K0040+400 - K0041+100","amountPesos":144500000,"lengthMeters":700.0,"ratePesosPerMeter":206428.57142857142,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489624"},{"year":2020,"category":"Roads","project":"Construction of Roads with Slip / Slope Collapse    Along Calapan North Road, Calapan Oriental Mindoro   K0042+000 - K0042+500","amountPesos":144500000,"lengthMeters":500.0,"ratePesosPerMeter":289000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489625"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide, Abra-Kalinga Road K0474+100 - K0474+600","amountPesos":144500000,"lengthMeters":500.0,"ratePesosPerMeter":289000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489627"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide, Abra-Kalinga Road K0453+200 - K0453+700","amountPesos":144500000,"lengthMeters":500.0,"ratePesosPerMeter":289000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489628"},{"year":2020,"category":"Roads","project":"Slope Protection along Nueva Ecija - Aurora Road (K0175+200 - K0183+650)","amountPesos":100000000,"lengthMeters":8450.0,"ratePesosPerMeter":11834.31952662722,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489629"},{"year":2020,"category":"Roads","project":"Slope Protection along Nueva Ecija - Aurora Road (K0184+050 - K0190+130)","amountPesos":100000000,"lengthMeters":6080.0,"ratePesosPerMeter":16447.36842105263,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489630"},{"year":2020,"category":"Roads","project":"Slope Protection along Nueva Ecija - Aurora Road (K0190+700 - K0195+160)","amountPesos":100000000,"lengthMeters":4460.0,"ratePesosPerMeter":22421.52466367713,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489631"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide - Magsaysay Ave (Trinidad Road) K0252+366 to K0252+441","amountPesos":20000000,"lengthMeters":75.0,"ratePesosPerMeter":266666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489637"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide - Kennon Road - K0242+(-088) to K0242+(-055)","amountPesos":7000000,"lengthMeters":33.0,"ratePesosPerMeter":212121.21212121213,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489638"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide - PMA Cut Off RD 1: K0252+(-687) -K0252+(-558)","amountPesos":17700000,"lengthMeters":129.0,"ratePesosPerMeter":137209.3023255814,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489639"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide - PMA RD  K0249+232 - K0249+252","amountPesos":5300000,"lengthMeters":20.0,"ratePesosPerMeter":265000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489640"},{"year":2020,"category":"Roads","project":"National Road System K0017+723 - K0019+223 (Primary Roads - Manila - Cavite), Cavite City, Cavite","amountPesos":2000000,"lengthMeters":1500.0,"ratePesosPerMeter":1333.3333333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489643"},{"year":2020,"category":"Roads","project":"Road Widening of Sn Juan-Candelaria Jct-Candelaria-Bolboc Rd, S02002lz, K0146 + 787 - K0147 + 703, Quezon","amountPesos":10000000,"lengthMeters":916.0,"ratePesosPerMeter":10917.03056768559,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489644"},{"year":2020,"category":"Roads","project":"Repair/Rehabilitation of Manila East Road K0026+640-K0027+176, K0027+199-K0028+056, Rizal","amountPesos":49500000,"lengthMeters":1393.0,"ratePesosPerMeter":35534.81694185212,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489645"},{"year":2020,"category":"Roads","project":"Rehabilitation/Improvement of San Mateo - Rodriguez Road, K0024+000 to K0027+500, San Mateo and Rodriguez,Rizal","amountPesos":100000000,"lengthMeters":3500.0,"ratePesosPerMeter":28571.428571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489647"},{"year":2020,"category":"Roads","project":"Repair/Rehab/Improvement of (Asphalt Overlay) Along Daang Maharlika Hiway Jct. Legazpi-Sto. Domingo Camarines Sur Bdry. Road. K0536+585 - K0539+054,  Legazpi, Albay","amountPesos":10000000,"lengthMeters":2469.0,"ratePesosPerMeter":4050.222762251924,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489653"},{"year":2020,"category":"Roads","project":"Asphalt Overlay - Bacolod South By-Pass Road, K0022+000-K0022+178, K0022+622-K0023+057, Bacolod City, Negros Occidental","amountPesos":10000000,"lengthMeters":613.0,"ratePesosPerMeter":16313.21370309951,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489658"},{"year":2020,"category":"Roads","project":"Asphalt Overlay - Bacolod South Old Road, K0021+844-K0022+918, Bacolod City, Negros Occidental","amountPesos":10000000,"lengthMeters":1074.0,"ratePesosPerMeter":9310.986964618249,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489659"},{"year":2020,"category":"Roads","project":"Road Widening of Iloilo-Capiz Road K0092+544 to K0097+652 Sigma and Ivisan, Capiz","amountPesos":5000000,"lengthMeters":5108.0,"ratePesosPerMeter":978.8566953797964,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489661"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of roads with slips, slope collapse and landslide  k045+877-k046+103, Junction Bancal  Leon  Antique National Road, Leon, Iloilo","amountPesos":91000000,"lengthMeters":226.0,"ratePesosPerMeter":402654.8672566372,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489662"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of roads with slips, slope collapse and landslide  k046+276-k046+433, Junction Bancal  Leon  Antique National Road, Leon, Iloilo","amountPesos":87000000,"lengthMeters":157.0,"ratePesosPerMeter":554140.1273885351,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489663"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of roads with slips, slope collapse and landslide  k046+760-k046+953, Junction Bancal  Leon  Antique National Road, Leon, Iloilo","amountPesos":94500000,"lengthMeters":193.0,"ratePesosPerMeter":489637.30569948186,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489664"},{"year":2020,"category":"Roads","project":"Asphalt Overlay - Sum-ag - Abuanan Road K0011+(-160) - K0011+050, K0011+065-K0011+200, K0011+625-K0012+000, K0012+418-K0014+325, K0014+541-K0015+030, K0017+911-K0018+426, K0019+119-K0019+399, Abuanan, Negros Occidental","amountPesos":10000000,"lengthMeters":3911.0,"ratePesosPerMeter":2556.8908207619534,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489665"},{"year":2020,"category":"Roads","project":"Asphalt Overlay - Jct San Enrique-Pontevedra By-Pass Road - K0036+203-K0036+678, K0036+724-K0037+000, K0038+000 - K0038+828, K0038+847-K0039+325, Pontevedra, Negros Occidental","amountPesos":10000000,"lengthMeters":2057.0,"ratePesosPerMeter":4861.448711716092,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489666"},{"year":2020,"category":"Roads","project":"Asphalt Overlay - Jct Pontevedra - La Castellana Road K0056+003-K0057+090, Pontevedra, Negros Occidental","amountPesos":10000000,"lengthMeters":1087.0,"ratePesosPerMeter":9199.632014719411,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489667"},{"year":2020,"category":"Roads","project":"Asphalt Overlay - Jct San Enrique - Pontevedra By-Pass Road - K0040+(-240) K0040+000, K0040+189-K0040+575, K0040+585-K0041+236, K0043+000-K0045+000, K0045+541-K0045+888, K0046+000-K0046+255, Pontevedra, Negros Occidental","amountPesos":10000000,"lengthMeters":3879.0,"ratePesosPerMeter":2577.984016499098,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489668"},{"year":2020,"category":"Roads","project":"Rehabilitation/  Reconstruction of Roads with Slips, Slope and Landslide, Cebu - Balamban Transcentral Highway  KM 7+059 - KM7+429, KM7+280 - KM7+421, Cebu City","amountPesos":50000000,"lengthMeters":370.0,"ratePesosPerMeter":135135.13513513515,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489669"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope and  Landslide, Cebu - Balamban Transcentral Highway  KM 7+421 - KM7+630, KM7+650 - KM7+684, Cebu City","amountPesos":50000000,"lengthMeters":243.0,"ratePesosPerMeter":205761.316872428,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489670"},{"year":2020,"category":"Roads","project":"Rehabilitation/ Reconstruction of Roads with Slips, Slope, Cebu - Balamban  Transcentral Highway  KM 7+684 - KM7+780, KM7+900 - KM8+012, Cebu City","amountPesos":50000000,"lengthMeters":208.0,"ratePesosPerMeter":240384.61538461538,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489671"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope and  Landslide, Cebu - Balamban Transcentral Highway KM 8+012 - KM8+140, KM10+126 - KM10+223, Cebu City","amountPesos":50000000,"lengthMeters":225.0,"ratePesosPerMeter":222222.22222222222,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489672"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope and  Landslide, Cebu - Balamban Transcentral Highway  KM 10+223 - KM10+406, KM10+450 - KM10+492, Cebu City","amountPesos":50000000,"lengthMeters":225.0,"ratePesosPerMeter":222222.22222222222,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489673"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope and  Landslide, Cebu - Balamban Transcentral Highway KM 10+492 - KM10+717, Cebu City","amountPesos":50000000,"lengthMeters":225.0,"ratePesosPerMeter":222222.22222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489674"},{"year":2020,"category":"Roads","project":"Rehabilitation/Improvement  of Slope Failure   for Rockfall Protection System Along  Calubian-San Isidro-Tabango-Villaba-Palompon Road Leyte. K1054+000 - K1054+400","amountPesos":50000000,"lengthMeters":400.0,"ratePesosPerMeter":125000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489678"},{"year":2020,"category":"Bridges","project":"Bridge Widening of Bulingbuling Bridge ( Sta. 22+957.00 to Sta. 22+964.00)","amountPesos":10000000,"lengthMeters":7.0,"ratePesosPerMeter":1428571.4285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489695"},{"year":2020,"category":"Bridges","project":"Bridge Widening of Pang II Bridge (Sta 43+968.00 to Sta 43+975.60)","amountPesos":10000000,"lengthMeters":7.6,"ratePesosPerMeter":1315789.4736844625,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489698"},{"year":2020,"category":"Bridges","project":"Bridge Widening of Sapah Biray Bridge (Sta. 35+159.00 to 36+165.00)","amountPesos":10000000,"lengthMeters":1006.0,"ratePesosPerMeter":9940.357852882704,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489699"},{"year":2020,"category":"Mixed roads / bridges","project":"Replacement of Permanent Weak Bridges - Binuang Bridge along Jolo - Taglibi - Tiptipon Road K 17+040 - K 17+051","amountPesos":14000000,"lengthMeters":11.0,"ratePesosPerMeter":1272727.2727272727,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489701"},{"year":2020,"category":"Mixed roads / bridges","project":"Replacement of Permanent Weak Bridges - Duana Bridge along Jolo - Taglibi - Tiptipon Road K 8+790 - K 8+796","amountPesos":7500000,"lengthMeters":6.0,"ratePesosPerMeter":1250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489702"},{"year":2020,"category":"Mixed roads / bridges","project":"Replacement of Permanent Weak Bridges - Kaunayan Bridge along Jolo - Taglibi - Tiptipon Road K 8+890 - K 8+897","amountPesos":9000000,"lengthMeters":7.0,"ratePesosPerMeter":1285714.2857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489703"},{"year":2020,"category":"Mixed roads / bridges","project":"Replacement of Permanent Weak Bridges - Lubluban Gadja Bridge along Jolo - Taglibi - Tiptipon Road K 15+010 - K 15+020","amountPesos":13000000,"lengthMeters":10.0,"ratePesosPerMeter":1300000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489704"},{"year":2020,"category":"Mixed roads / bridges","project":"Replacement of Permanent Weak Bridges - Lumukan Bridge along Jolo - Taglibi - Tiptipon Road K 18+110 - K 18+118","amountPesos":10000000,"lengthMeters":8.0,"ratePesosPerMeter":1250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489705"},{"year":2020,"category":"Mixed roads / bridges","project":"Replacement of Permanent Weak Bridges - Taung Bridge along Jolo - Taglibi - Tiptipon Road K 16+420 - K 16+427","amountPesos":9000000,"lengthMeters":7.0,"ratePesosPerMeter":1285714.2857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489706"},{"year":2020,"category":"Mixed roads / bridges","project":"Replacement of Permanent Weak Bridges - Tuburan Bridge along Jolo - Taglibi - Tiptipon Road K 17+340 - K 17+351","amountPesos":14000000,"lengthMeters":11.0,"ratePesosPerMeter":1272727.2727272727,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489707"},{"year":2020,"category":"Mixed roads / bridges","project":"Replacement of Permanent Weak Bridges - Tumarikin Bridge along Jolo - Taglibi - Tiptipon Road K 17+640 - K 17+648","amountPesos":10000000,"lengthMeters":8.0,"ratePesosPerMeter":1250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489708"},{"year":2020,"category":"Mixed roads / bridges","project":"Replacement of Permanent Weak Bridges - Ukilan Bridge along Jolo - Taglibi - Tiptipon Road K 19+830 - K 19+839","amountPesos":12000000,"lengthMeters":9.0,"ratePesosPerMeter":1333333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 489709"},{"year":2020,"category":"Roads","project":"Construction of Missing Links /New Road Sumbiling - Canipaan, Package A, 0+000 - 5+000, Palawan","amountPesos":55000000,"lengthMeters":5000.0,"ratePesosPerMeter":11000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 491920"},{"year":2020,"category":"Roads","project":"Construction of Missing Links/New Road Sumbiling - Canipaan, Package B, 5+000-10+000, Palawan","amountPesos":55000000,"lengthMeters":5000.0,"ratePesosPerMeter":11000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 491921"},{"year":2020,"category":"Roads","project":"Construction of Missing Links/New Road Sumbiling - Canipaan, Package D, 20+000 - 25+000, Palawan","amountPesos":55000000,"lengthMeters":5000.0,"ratePesosPerMeter":11000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 491923"},{"year":2020,"category":"Roads","project":"Construction of Sofronio Espanola - Quezon Cross Country Road (Pulot Interior - Tagusao Section), Package C (Sta. 182+000 - Sta. 188+500), Palawan","amountPesos":55000000,"lengthMeters":6500.0,"ratePesosPerMeter":8461.538461538461,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 491942"},{"year":2020,"category":"Roads","project":"Construction/Reblocking of Seit-Tayungan National Road Sulu KM38+000 - 41+000","amountPesos":80000000,"lengthMeters":3000.0,"ratePesosPerMeter":26666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 491987"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction/Upgrading of Tapaz-Jamindan-Altavas Road, K0104 + 500 - K0105 + 664, K0105 + 754 - K0107 + 060","amountPesos":87000000,"lengthMeters":2470.0,"ratePesosPerMeter":35222.672064777325,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492067"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction/Upgrading of Tapaz-Jamindan-Altavas Road, K0107 + 088 - K0108 + 076, K0108 + 106 - K0109 + 000","amountPesos":62000000,"lengthMeters":1882.0,"ratePesosPerMeter":32943.67693942614,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492068"},{"year":2020,"category":"Roads","project":"Road Widening, Jct nAt'l Road Ayuyan-Tinaytayan Road, K0092 + 000 - K0093 + 500","amountPesos":52410000,"lengthMeters":1500.0,"ratePesosPerMeter":34940.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492069"},{"year":2020,"category":"Roads","project":"Road Widening, Iloilo - Capiz Road (Old Route), K0097 + 000 - K0099 + 577","amountPesos":87500000,"lengthMeters":2577.0,"ratePesosPerMeter":33954.21032207994,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492070"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Langogan-Roxas Road Section, K0105+568 - K0105+643, K0125+035 - K0125+05, Palawan","amountPesos":30000000,"lengthMeters":105.0,"ratePesosPerMeter":285714.28571428574,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492659"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0010+700 - K0010+850, Palawan","amountPesos":40000000,"lengthMeters":150.0,"ratePesosPerMeter":266666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492660"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0012+950 - K0013+100, Palawan","amountPesos":40000000,"lengthMeters":150.0,"ratePesosPerMeter":266666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492661"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0013+170 - K0013+300, Palawan","amountPesos":40000000,"lengthMeters":130.0,"ratePesosPerMeter":307692.3076923077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492662"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0013+360 - K0013+500, Palawan","amountPesos":40000000,"lengthMeters":140.0,"ratePesosPerMeter":285714.28571428574,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492663"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0014+000 - K0014+120, K0014+200 - K0014+300, Palawan","amountPesos":45000000,"lengthMeters":220.0,"ratePesosPerMeter":204545.45454545456,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492664"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0014+510 - K0014+790, Palawan","amountPesos":45000000,"lengthMeters":280.0,"ratePesosPerMeter":160714.2857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492665"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0014+880 - K0015+00, K0015+100 - K0015+200, Palawan","amountPesos":40000000,"lengthMeters":220.0,"ratePesosPerMeter":181818.18181818182,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492666"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0015+300 - K0015+350, Palawan","amountPesos":30000000,"lengthMeters":50.0,"ratePesosPerMeter":600000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492667"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0015+550 - K0015+700, Palawan","amountPesos":45000000,"lengthMeters":150.0,"ratePesosPerMeter":300000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492668"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0015+720 - K0015+800, K0016+150 - K0016+220, Palawan","amountPesos":40000000,"lengthMeters":150.0,"ratePesosPerMeter":266666.6666666667,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492669"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0016+380 - K0016+450, Palawan","amountPesos":30000000,"lengthMeters":70.0,"ratePesosPerMeter":428571.4285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492670"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0016+500 - K0016+630 - KOO16+650, Palawan","amountPesos":40000000,"lengthMeters":130.0,"ratePesosPerMeter":307692.3076923077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492671"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0016+800 - K0016+910, Palawan","amountPesos":40000000,"lengthMeters":110.0,"ratePesosPerMeter":363636.36363636365,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492672"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0016+950 - K0017+020, K0017+700 - K0017+750, Palawan","amountPesos":40000000,"lengthMeters":120.0,"ratePesosPerMeter":333333.3333333333,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492673"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0017+910 - K0017+970, K0018+030 - K0018+120, Palawan","amountPesos":40000000,"lengthMeters":150.0,"ratePesosPerMeter":266666.6666666667,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492674"},{"year":2020,"category":"Roads","project":"Construction of Sofronio Espanola - Quezon Cross Country Road (Pulot Interior - Tagusao Section), Package A (Sta. 162+820 - Sta. 173+019), Palawan","amountPesos":50000000,"lengthMeters":10199.0,"ratePesosPerMeter":4902.441415825081,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492675"},{"year":2020,"category":"Roads","project":"Construction of Sofronio Espanola - Quezon Cross Country Road (Pulot Interior - Tagusao Section), Package B (Sta. 173+079 - Sta. 184+500), Palawan","amountPesos":50000000,"lengthMeters":11421.0,"ratePesosPerMeter":4377.900358987829,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492676"},{"year":2020,"category":"Roads","project":"Concreting of Roads Sitio Cabungan, Brgy Cadapdapan, Candijay to Brgy. Inaghuban, Sta. 0+000.00-Sta. 2+800.00, Pilar, Bohol","amountPesos":40000000,"lengthMeters":2800.0,"ratePesosPerMeter":14285.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 492792"},{"year":2020,"category":"Roads","project":"Construction / Rehabilitation of National Roads along Bdry. S. Leyte - Maasin Macrohon - Sogod - JCT Daang Maharlika Rd. (S00194LT) K1157+588 - K1167+000","amountPesos":70000000,"lengthMeters":9412.0,"ratePesosPerMeter":7437.314067148322,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 498447"},{"year":2020,"category":"Roads","project":"Rehabilitation of Road with Slips, Soil Collapse and Landslides, KM 83+000 - KM 83+402, Aloguinsan, Cebu","amountPesos":100000000,"lengthMeters":402.0,"ratePesosPerMeter":248756.21890547263,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 498476"},{"year":2020,"category":"Roads","project":"Rehabilitation of Road with Slips, Soil Collapse and Landslides, KM 87+000 - KM 87+402, Aloguinsan, Cebu","amountPesos":100000000,"lengthMeters":402.0,"ratePesosPerMeter":248756.21890547263,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 498477"},{"year":2020,"category":"Roads","project":"Concreting of SRP Back Road,Sta. 0+000 to Sta. 3 +300, Cebu City,","amountPesos":85867000,"lengthMeters":3300.0,"ratePesosPerMeter":26020.303030303032,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 498497"},{"year":2020,"category":"Roads","project":"Concreting of El Pardo St., South Road Properties, Sta. 0+000 to Sta. 1+080, Cebu City","amountPesos":88602000,"lengthMeters":1080.0,"ratePesosPerMeter":82038.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 498498"},{"year":2020,"category":"Roads","project":"Concreting/Opening of Road, JNR Tabunok to Iligay Rd., Villaba, Leyte (Sta 0+000 -Sta 1+500)","amountPesos":83000000,"lengthMeters":1500.0,"ratePesosPerMeter":55333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 498499"},{"year":2020,"category":"Roads","project":"Concreting of Road, JNR Tabunok to Iligay Rd., Villaba, Leyte (Sta 0 + 300 - Sta 1+500)","amountPesos":67000000,"lengthMeters":1200.0,"ratePesosPerMeter":55833.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 498500"},{"year":2020,"category":"Roads","project":"Construction of Road Slope Protection for Brgy. Cabalagnan, Nueva Valencia, Guimaras K0080+150-K0080+450 Both Sides)","amountPesos":89600000,"lengthMeters":300.0,"ratePesosPerMeter":298666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 498501"},{"year":2020,"category":"Roads","project":"Construction of Road Slope Protection for Brgy. Cabalagnan, Nueva Valencia, Guimaras (K0080+550-K0080+990 Both Sides)","amountPesos":94800000,"lengthMeters":440.0,"ratePesosPerMeter":215454.54545454544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 498502"},{"year":2020,"category":"Roads","project":"Construction of Road Slope Protection for Brgy. Cabalagnan, Nueva Valencia, Guimaras (K0081+100-K0081+250 Both Sides)","amountPesos":76200000,"lengthMeters":150.0,"ratePesosPerMeter":508000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 498503"},{"year":2020,"category":"Roads","project":"Construction of Road Slope Protection for Brgy. Sto. Rosario, Buenavista, Guimaras (K0020+100-K0020+600 Left Side)","amountPesos":97000000,"lengthMeters":500.0,"ratePesosPerMeter":194000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 498504"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope  Collapse and Landslide along Langogan-Roxas  Road Section, Palawan   K0098+150 - K0098+350, K099+445 - K0099+470","amountPesos":74750000,"lengthMeters":225.0,"ratePesosPerMeter":332222.22222222225,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 498505"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Langogan-Roxas Road Section, Palawan K0099+470 - K0099+525, K0099+717 - K0099+770","amountPesos":68885000,"lengthMeters":108.0,"ratePesosPerMeter":637824.074074074,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 498506"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope  Collapse and Landslide along Langogan-Roxas  Road Section, Palawan K0100+290 - K0100+430, K0101+192 - K0101+309","amountPesos":88665000,"lengthMeters":257.0,"ratePesosPerMeter":345000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 498507"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope   Collapse and Landslide along Langogan-Roxas Road Section, Palawan K0104+125 - K0104+190, K0104+600 - K0104+647, K0104+647 - K0104+720","amountPesos":95565000,"lengthMeters":185.0,"ratePesosPerMeter":516567.5675675676,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 498508"},{"year":2020,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Langogan-Roxas    Road Section, Palawan  K0104+810 - K0104+935, K0105+243 - K0105+343","amountPesos":74750000,"lengthMeters":225.0,"ratePesosPerMeter":332222.22222222225,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 498509"},{"year":2020,"category":"Roads","project":"Concreting of Katuday-Sinimbaan Road, Brgy. Bantug and Brgy. Simimbaan, Sta 0+000 to Sta 3+600, Roxas, Isabela","amountPesos":50000000,"lengthMeters":3600.0,"ratePesosPerMeter":13888.888888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 498979"},{"year":2020,"category":"Roads","project":"Rehabilitation/Improvement of Brgy. District 2 Municipal and Brgy. Road Sta 0+467.5 Sta 0+547.0, Sta 0+892.0 Sta 0+963.5, Sta 0+362.5 Sta 0+488.0, Sta 0+581.5 Sta 0+723.5, Sta 0+956.5 Sta 1+032.5, Sta 0+837.5 Sta 1+024.0, Sta 0+000.0 Sta 0+072.0,  Sta 0+000.0 Sta 0+072.0, Sta 0+360.0 Sta 0+484.0, Sta 0+089.0 Sta 0+197.0, Sta 0+000.0 Sta 0+193.0, Sta 0+000.0 Sta 0+381.0, Sta 0+000.0 Sta 0+101.0, Sta 0+132.0 Sta 0+472.0, Sta 0+000.0 Sta 0+478.5, Sta 0+002.5 Sta 0+131.0, Reblocking, Sta 0+318.5 Sta 0+467.5, Sta 0+146.5 Sta 0+359.0, Sta 0+488.0 Sta 0+560.5 San Manuel, Isabela","amountPesos":37500000,"lengthMeters":897.5,"ratePesosPerMeter":41782.72980501393,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 498981"},{"year":2020,"category":"Roads","project":"Rehabilitation of Bolo - Pulang Lupa Road, Sta 1+076 to Sta 2+076, Torrijos, Marinduque","amountPesos":80000000,"lengthMeters":1000.0,"ratePesosPerMeter":80000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499641"},{"year":2020,"category":"Roads","project":"Rehabilitation/Improvement of Sibuyao - Sabong Road, Sta. 0+000 to Sta 1+000, Torrijos, Marinduque","amountPesos":73500000,"lengthMeters":1000.0,"ratePesosPerMeter":73500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499642"},{"year":2020,"category":"Roads","project":"Rehabilitation/Improvement of Botilao - Ipil Road, Sta 0+000 to Sta 1+000, Sta. Cruz, Marinduque","amountPesos":98750000,"lengthMeters":1000.0,"ratePesosPerMeter":98750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499643"},{"year":2020,"category":"Mixed roads / bridges","project":"Construction of Umbuyan Road including Bridge, Brgy. Pitogo, Rizal, Occidental Mindoro Sta. 0+000 - Sta. 1+700","amountPesos":50000000,"lengthMeters":1700.0,"ratePesosPerMeter":29411.764705882353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499650"},{"year":2020,"category":"Mixed roads / bridges","project":"Construction of Iba Road including Bridge, Brgy. Pitogo, Rizal, Occidental Mindoro Sta. 0+000 - Sta. 1+600","amountPesos":47000000,"lengthMeters":1600.0,"ratePesosPerMeter":29375.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499651"},{"year":2020,"category":"Mixed roads / bridges","project":"Construction of Nalbu Road including Bridge, Brgy. Sto. Niño, Rizal, Occidental Mindoro Sta. 0+000 - Sta. 2+700","amountPesos":50000000,"lengthMeters":2700.0,"ratePesosPerMeter":18518.51851851852,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499652"},{"year":2020,"category":"Mixed roads / bridges","project":"Construction of road including Bridge, So. Pusog, Brgy. Burgos, Sablayan, Occidental Mindoro Sta. 0+000 - Sta. 2+500","amountPesos":50000000,"lengthMeters":2500.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499653"},{"year":2020,"category":"Roads","project":"Construction of road, So. Bagolayag, Brgy. Sta. Maria - Brgy. Mananao,Paluan, Occidental Mindoro Sta. 0+000 - Sta. 1+900","amountPesos":50000000,"lengthMeters":1900.0,"ratePesosPerMeter":26315.78947368421,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499654"},{"year":2020,"category":"Roads","project":"Construction/Opening of Mat-I Sitio Sayaw, Brgy. Canyayo Road, Sta. 0+000 to Sta. 3+701.15, Sta. Fe, Romblon","amountPesos":99000000,"lengthMeters":3701.15,"ratePesosPerMeter":26748.443051484,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499692"},{"year":2020,"category":"Roads","project":"Construction/Opening of Access Road, Brgy. Mat-I (Sta. Fe) - Brgy. Agoho (Looc), Sta. 0+000 to Sta 3+050, Sta. Fe, Romblon","amountPesos":80500000,"lengthMeters":3050.0,"ratePesosPerMeter":26393.44262295082,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499693"},{"year":2020,"category":"Roads","project":"Construction of Coastal Road along Tambuyungan leading to Dubduban, Sta 0+000 to Sta. 0+155, San Agustin, Romblon","amountPesos":98700000,"lengthMeters":155.0,"ratePesosPerMeter":636774.1935483871,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499694"},{"year":2020,"category":"Roads","project":"Construction/Improvement/Opening of Brgy. Cagbacong Road, (Sta 0+000 Sta 0+700) Legazpi City","amountPesos":100000000,"lengthMeters":700.0,"ratePesosPerMeter":142857.14285714287,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499737"},{"year":2020,"category":"Roads","project":"Construction/Improvement of Access Roads leading to  Buyo-Danao Lake, (Sta 0+000 Sta 1+700), Manito, Albay","amountPesos":100000000,"lengthMeters":1700.0,"ratePesosPerMeter":58823.529411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499738"},{"year":2020,"category":"Roads","project":"Construction/Improvement/Opening of Cagbacong Bariis Road, (Sta 0+000 Sta 0+700) Legazpi City","amountPesos":100000000,"lengthMeters":700.0,"ratePesosPerMeter":142857.14285714287,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499739"},{"year":2020,"category":"Roads","project":"Construction/Opening of Nagotgot-Sitio Inang Maharang Road, (Sta. 0+000 Sta. 1+700), Manito, Albay","amountPesos":100000000,"lengthMeters":1700.0,"ratePesosPerMeter":58823.529411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499740"},{"year":2020,"category":"Roads","project":"Construction on Bamban Road,( Sta0+000 Sta 1+700), Manito, Albay","amountPesos":100000000,"lengthMeters":1700.0,"ratePesosPerMeter":58823.529411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499741"},{"year":2020,"category":"Roads","project":"Construction/Rehabilitation/Improvement of Balasbas-Bamban Road, (Sta 0+000 Sta 1+700), Manito, Albay","amountPesos":100000000,"lengthMeters":1700.0,"ratePesosPerMeter":58823.529411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499742"},{"year":2020,"category":"Roads","project":"Road Opening of Sta. Cruz-Caima Road, Brgy. Caima, (Sta 0+000 Sta 1+500) Libmanan, Camarines Sur","amountPesos":50000000,"lengthMeters":1500.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499791"},{"year":2020,"category":"Roads","project":"Road Opening of Villa Socorro-Calabnigan Road, Brgy. Villa Socorro, (Sta 1+700 Sta 3+200)Libmanan, Camarines Sur","amountPesos":50000000,"lengthMeters":1500.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499792"},{"year":2020,"category":"Roads","project":"Road Opening of Calabnigan-Villa Socorro Road, Brgy. Calabnigan, (Sta 4+200 Sta 5+700), Libmanan, Camarines Sur","amountPesos":50000000,"lengthMeters":1500.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499793"},{"year":2020,"category":"Roads","project":"Road Opening of Alianza-Calascagas Road, Brgy. Calascagas, (Sta 1+500 Sta 3+000) San Fernando, Camarines Sur","amountPesos":50000000,"lengthMeters":1500.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499794"},{"year":2020,"category":"Roads","project":"Road Opening of Cambalidio-Tinalmud Viejo Road, Brgy. Tinalmud Viejo,(Sta 5+100 Sta 6+600) Libmanan, Camarines Sur","amountPesos":50000000,"lengthMeters":1500.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499795"},{"year":2020,"category":"Roads","project":"Road Opening of Beguito Viejo-Udoc Road, Brgy. Beguito Viejo to Brgy. Udoc. (Sta 0+350 Sta 1+850) Libmanan, Camarines Sur","amountPesos":50000000,"lengthMeters":1500.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499796"},{"year":2020,"category":"Roads","project":"Road Opening of Poblacion-San Ramon Road, Brgy. Poblacion to Brgy. San Ramon, (Sta 0+000 Sta 1+400) Pamplona, Camarines Sur","amountPesos":40000000,"lengthMeters":1400.0,"ratePesosPerMeter":28571.428571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499797"},{"year":2020,"category":"Roads","project":"Road Opening of Buenavista-Lupi Road, Brgy. Buenavista to Brgy. Lupi, (Sta 0+000 Sta 0+700) San Fernando, Camarines Sur","amountPesos":20000000,"lengthMeters":700.0,"ratePesosPerMeter":28571.428571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499798"},{"year":2020,"category":"Roads","project":"Road Opening of Del Rosario Road, Brgy. Poblacion to Brgy. Del Rosario,(Sta 0+000 Sta 0+700) Pamplona, Camarines Sur","amountPesos":20000000,"lengthMeters":700.0,"ratePesosPerMeter":28571.428571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499799"},{"year":2020,"category":"Roads","project":"Road Opening of Del Rosario Road, Brgy. Del Rosario, (Sta 0+000 Sta 0+700) Milaor, Camarines Sur","amountPesos":20000000,"lengthMeters":700.0,"ratePesosPerMeter":28571.428571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499800"},{"year":2020,"category":"Roads","project":"Construction of Road Slope Protection for Brgy. San Antonio, Nueva Valencia, Guimaras (K0067+420-K0067+595 Left Side)","amountPesos":42400000,"lengthMeters":175.0,"ratePesosPerMeter":242285.7142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 499958"},{"year":2020,"category":"Roads","project":"Concreting of roads at Brgy. Bagumbayan, (Sta 0+000-0+300), Loboc, Bohol","amountPesos":5000000,"lengthMeters":300.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 500067"},{"year":2020,"category":"Roads","project":"Concreting of roads at Brgy. Ipil, (Sta 0+000-Sta 0+250), Jagna, Bohol","amountPesos":5000000,"lengthMeters":250.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 500068"},{"year":2020,"category":"Roads","project":"Concreting of roads at Brgy. Laca, (Sta 2+653 -  Sta 2+813) Jagna, Bohol","amountPesos":5000000,"lengthMeters":160.0,"ratePesosPerMeter":31250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 500069"},{"year":2020,"category":"Roads","project":"Concreting of roads at Brgy. Subayon, (Sta 0+000- Sta 0+300) Bilar, Bohol","amountPesos":5000000,"lengthMeters":300.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 500070"},{"year":2020,"category":"Roads","project":"Concreting of roads from Purok 3 to Purok 7, Brgy. Salvador, (Sta 0+200 - Sta 0+500), Sierra Bullones, Bohol","amountPesos":5000000,"lengthMeters":300.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 500071"},{"year":2020,"category":"Roads","project":"Concreting of roads at Sitio Paglaum, (Sta 0+000-Sta 0+500), Poblacion, Sierra Bullones, Bohol","amountPesos":5000000,"lengthMeters":500.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 500072"},{"year":2020,"category":"Roads","project":"Concreting of roads at Brgy. Tamboan, (Sta 0+250 - Sta 0+520), Carmen, Bohol","amountPesos":5000000,"lengthMeters":270.0,"ratePesosPerMeter":18518.51851851852,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 500073"},{"year":2020,"category":"Roads","project":"Concreting of roads at Brgy. Montesuerte, (Sta 0+050 - Sta 0+270), Carmen, Bohol","amountPesos":5000000,"lengthMeters":220.0,"ratePesosPerMeter":22727.272727272728,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 500074"},{"year":2020,"category":"Roads","project":"Concreting of roads at Brgy. Calatrava, (Sta 0+050 - Sta 0+300), Carmen, Bohol","amountPesos":5000000,"lengthMeters":250.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 500075"},{"year":2020,"category":"Roads","project":"Concreting of roads at Brgy. Buenas Aires, (Sta 0+125 - Sta 0+395), Carmen, Bohol","amountPesos":5000000,"lengthMeters":270.0,"ratePesosPerMeter":18518.51851851852,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 500076"},{"year":2020,"category":"Roads","project":"Concreting of roads at Brgy. Villafuerte, (Sta 0+150 - Sta 0+420), Carmen, Bohol","amountPesos":5000000,"lengthMeters":270.0,"ratePesosPerMeter":18518.51851851852,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 500077"},{"year":2020,"category":"Roads","project":"Concreting of 1.5km stretch of existing gravel/dirt municipal road in Pimentel Ave., in Brgy. Tina, San Migue, Surigao del Sur","amountPesos":5000000,"lengthMeters":1500.0,"ratePesosPerMeter":3333.3333333333335,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 500697"},{"year":2020,"category":"Bridges","project":"Reconstruction of Luyos-Buliran Bridge and Approaches, Sta. 0+000 to Sta. 0+200 Across Pampanga River, San Antonio, Nueva Ecija","amountPesos":60000000,"lengthMeters":200.0,"ratePesosPerMeter":300000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 500935"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1438 + 210 - K1439 + 900","amountPesos":76462000,"lengthMeters":1690.0,"ratePesosPerMeter":45243.78698224852,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 505666"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1466 + 000 - K1467 + 136, K1468 + 882 - K1470 + 026","amountPesos":100000000,"lengthMeters":2280.0,"ratePesosPerMeter":43859.649122807015,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 505667"},{"year":2020,"category":"Roads","project":"C-5 Road - K0015 + (-2094) to K0015 + (-234)","amountPesos":24414000,"lengthMeters":1860.0,"ratePesosPerMeter":13125.806451612903,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 505676"},{"year":2020,"category":"Roads","project":"Sumulong Highway - K0022 + 430 - K0023 + 304","amountPesos":31810000,"lengthMeters":874.0,"ratePesosPerMeter":36395.88100686499,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 505728"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1500 + 444 - K1500 + 547, K1500 + 588 - K1500 + 632, K1514 + 218 - K1514 + 780","amountPesos":20000000,"lengthMeters":709.0,"ratePesosPerMeter":28208.744710860366,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 505772"},{"year":2020,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1267 + 578 - K1268 + 000","amountPesos":22556000,"lengthMeters":422.0,"ratePesosPerMeter":53450.23696682465,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 505790"},{"year":2020,"category":"Roads","project":"Quezon Blvd Service Road - Chainage 18.6 to 233","amountPesos":5000000,"lengthMeters":214.4,"ratePesosPerMeter":23320.89552238806,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 506218"},{"year":2020,"category":"Roads","project":"C-3 Road - K0008 + 486 - K0009 + 613","amountPesos":34828000,"lengthMeters":1127.0,"ratePesosPerMeter":30903.283052351377,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 506232"},{"year":2020,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0046 + 309 - K0046 + 840, K0047 + 200 - K0048 + 000","amountPesos":21500000,"lengthMeters":1331.0,"ratePesosPerMeter":16153.268219383923,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 506337"},{"year":2020,"category":"Roads","project":"Corrales Extension St. - Port Road - K1438 + (-349) - K1439 + 558","amountPesos":48639000,"lengthMeters":1907.0,"ratePesosPerMeter":25505.506030414264,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 506360"},{"year":2020,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1556 + 000 - K1556 + 689, K1565 + 778 - K1565 + 1322","amountPesos":15504000,"lengthMeters":1233.0,"ratePesosPerMeter":12574.209245742093,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 506364"},{"year":2020,"category":"Roads","project":"Gen Alejo Santos Highway - K0047+259 - K0048 + 872","amountPesos":15601000,"lengthMeters":1613.0,"ratePesosPerMeter":9672.039677619343,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 506867"},{"year":2020,"category":"Roads","project":"General Alejo Santos Highway - K0060 + 300 - K0060 + 899","amountPesos":6845000,"lengthMeters":599.0,"ratePesosPerMeter":11427.378964941568,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 506869"},{"year":2020,"category":"Roads","project":"Manila North Road (LZ) - K0037 + (-993) -  K0038 + 306, K0039 + 151 - K0041 + 048, K0041 + 400 - K0041 + 840, K0042 + 900 - K0043 + 118","amountPesos":75010000,"lengthMeters":4854.0,"ratePesosPerMeter":15453.234445817881,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 507161"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1453 + 812 - K1455 + 000, K1457 + 921 - K1458 + 305, K1459 + 919 - K1460 + 636","amountPesos":54694000,"lengthMeters":2289.0,"ratePesosPerMeter":23894.276976845784,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 507175"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1528 + 514 - K1529 + 000, K1530 + 896 - K1531 + 456, K1531 + 487 - K1533 + 000","amountPesos":53000000,"lengthMeters":2559.0,"ratePesosPerMeter":20711.215318483784,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 507176"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1534 + 860 - K1535 + 091, K1535 + 121 - K1538 + 200","amountPesos":110000000,"lengthMeters":3310.0,"ratePesosPerMeter":33232.62839879154,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 507177"},{"year":2020,"category":"Roads","project":"Daang Maharlika Road (LZ) - K0037 + 500 - K0037 + 600, K0037 + (-978) - K0037 + (-800), K0037 + (-700) - K0037 + (-500), K0037 + (-200) - K0037 + (-100), K0038 + 000 - K0038 + 027, K0038 + 100 - K0038 + 400, K0039 + (-471) - K0039 + (-435), K0052 + 461 - K0052 + 592","amountPesos":26202000,"lengthMeters":1072.0,"ratePesosPerMeter":24442.16417910448,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 507196"},{"year":2020,"category":"Roads","project":"Manila North Road (LZ) - K0029 + 000 - K0029 + 200","amountPesos":18834000,"lengthMeters":200.0,"ratePesosPerMeter":94170.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 507197"},{"year":2020,"category":"Roads","project":"Manila North Road (LZ) - K0041 + 048 - K0041 + 400, K0043 + 282 - K0043 + 492","amountPesos":13821000,"lengthMeters":562.0,"ratePesosPerMeter":24592.52669039146,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 507198"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1475 + 000 - K1475 + 425, K1482 + 000 - K1482 + 216, K1482 + 443 - K1482+786, K1493 + 750 - K1493 + 805, K1506 + 540 - K1506 + 835","amountPesos":29500000,"lengthMeters":1334.0,"ratePesosPerMeter":22113.943028485755,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 507232"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1534 + 000 - K1534 + 860","amountPesos":34000000,"lengthMeters":860.0,"ratePesosPerMeter":39534.88372093023,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 507233"},{"year":2020,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1270 + 781 - K1271 + 000, K1272 + 172 - K1272 + 653, K1274 + 000 - K1274 + 800","amountPesos":35338000,"lengthMeters":1500.0,"ratePesosPerMeter":23558.666666666668,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 507244"},{"year":2020,"category":"Roads","project":"C-3 Road - K0008 + (-320) - K0008 + 486","amountPesos":24933000,"lengthMeters":806.0,"ratePesosPerMeter":30934.24317617866,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 507595"},{"year":2020,"category":"Roads","project":"Pulilan Calumpit Road (LZ) - K0046 + 000 - K0046 + 500, K0047 + 800 - K0048 + 000, K0051 + 500 - K0051 + 050","amountPesos":17169000,"lengthMeters":1150.0,"ratePesosPerMeter":14929.565217391304,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 507620"},{"year":2020,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0045 + 725 - K0046 + 309, K0046 + 840 - K0047 + 200","amountPesos":18500000,"lengthMeters":944.0,"ratePesosPerMeter":19597.457627118645,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 507691"},{"year":2020,"category":"Roads","project":"Surigao Wharf Road - K1126 + 455 - K1126 + 515","amountPesos":4500000,"lengthMeters":60.0,"ratePesosPerMeter":75000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 507739"},{"year":2020,"category":"Roads","project":"Jct Natl Road-Bitnong-Blance-N Vizcaya Bdry Rd - K0268 + 668 - K0269 + 000, K0269 + 465 - K0269 +579","amountPesos":11031000,"lengthMeters":446.0,"ratePesosPerMeter":24733.18385650224,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 508178"},{"year":2020,"category":"Roads","project":"General Alejo Santos Highway Rd - K0054 + 400 - K0054 + 700, K0056 + 743 - K0056 + 941, K0057+000 - K0057+551","amountPesos":17312000,"lengthMeters":1049.0,"ratePesosPerMeter":16503.33651096282,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 508186"},{"year":2020,"category":"Roads","project":"Plaridel - Pulilan Diversion Road (LZ) - K0042 + (-1015) - K0042 + (-784)","amountPesos":25338000,"lengthMeters":231.0,"ratePesosPerMeter":109688.31168831169,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 508187"},{"year":2020,"category":"Roads","project":"Bacolod-Madalum Highway - K1556 + (-121) - K1556 + 047","amountPesos":11666000,"lengthMeters":168.0,"ratePesosPerMeter":69440.47619047618,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 508269"},{"year":2020,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1275 + 600 - K1277 + 000","amountPesos":200000000,"lengthMeters":1400.0,"ratePesosPerMeter":142857.14285714287,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 508427"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1466 + 650 - K1467 + 050, K1467 + 960 - K1468 + 350","amountPesos":49320000,"lengthMeters":790.0,"ratePesosPerMeter":62430.379746835446,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 508452"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1428 + 009 - K1428 + 172","amountPesos":45000000,"lengthMeters":163.0,"ratePesosPerMeter":276073.61963190185,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 508453"},{"year":2020,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0020 + 094 - K0020 + 144, K0020 + 220 - K0020 + 272, K0020 + 980 - K0021 + 014","amountPesos":58970000,"lengthMeters":136.0,"ratePesosPerMeter":433602.9411764706,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 508795"},{"year":2020,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0038 + 201 - K0038 + 430","amountPesos":100000000,"lengthMeters":229.0,"ratePesosPerMeter":436681.22270742356,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 508796"},{"year":2020,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0039 + 360 - K0039 + 545","amountPesos":100000000,"lengthMeters":185.0,"ratePesosPerMeter":540540.5405405406,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 508797"},{"year":2020,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1605 + 560 - K1605 + 675","amountPesos":82000000,"lengthMeters":115.0,"ratePesosPerMeter":713043.4782608695,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 508806"},{"year":2020,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1585 + 300 - K1585 + 450, K1588 + 350 - K1588 + 375, K1588 + 900 - K1588 + 945, K1593 + 440 - K1594 + 220, K1600 + 360 - K1600 + 868, K1601 + 873 - K1601 + 905, K1602 + 680 - K1602 + 935","amountPesos":77000000,"lengthMeters":1795.0,"ratePesosPerMeter":42896.93593314763,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 508807"},{"year":2020,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0008 + 783 - K0008 + 806","amountPesos":10000000,"lengthMeters":23.0,"ratePesosPerMeter":434782.60869565216,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 508899"},{"year":2020,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0016 + 127 - K0016 + 160, K0016 + 312 - K0016 + 342, K0016 + 460 - K0016 + 498, K0026 + 865 - K0026 + 905","amountPesos":33660000,"lengthMeters":141.0,"ratePesosPerMeter":238723.40425531915,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 508900"},{"year":2020,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1572 + 282.7 - K1572 + 315.8","amountPesos":15000000,"lengthMeters":33.1,"ratePesosPerMeter":453172.2054367914,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 508933"},{"year":2020,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1493 + 200 - K1493 + 320","amountPesos":16000000,"lengthMeters":120.0,"ratePesosPerMeter":133333.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 508927"},{"year":2020,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1572 + 410 - K1572 + 470","amountPesos":12000000,"lengthMeters":60.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 508934"},{"year":2020,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1579 + 4034 - K1579 + 4064","amountPesos":6000000,"lengthMeters":30.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 508935"},{"year":2020,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1579 + 4384.6 - K1579 + 4409.8","amountPesos":5500000,"lengthMeters":25.2,"ratePesosPerMeter":218253.96825437155,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 508936"},{"year":2020,"category":"Roads","project":"Corrales Extension St. - Port Road - K1439 + 171 - K1439 + 558","amountPesos":4014000,"lengthMeters":387.0,"ratePesosPerMeter":10372.093023255815,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 509785"},{"year":2020,"category":"Roads","project":"Ubao-Taang Road - K0400 + 702 - K0400 + 727, K0420 + 293 - K0420 + 315, K0420 + 978 - K0421 + 020, K0421 + 619 - K0421 + 636, K0421 + 963 - K0422 + 000, K0423 + 446 - K0423 + 483, K0423 + 502 - K0423 + 532, K0424 + 580 - K0424 + 995","amountPesos":39768000,"lengthMeters":625.0,"ratePesosPerMeter":63628.8,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 509273"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1533 + 000 - K1534 + 000","amountPesos":73593000,"lengthMeters":1000.0,"ratePesosPerMeter":73593.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 509491"},{"year":2020,"category":"Roads","project":"Baliuag- Candaba Road (LZ) - K0052 + (-1570) - K0052+(-920)","amountPesos":14772000,"lengthMeters":650.0,"ratePesosPerMeter":22726.153846153848,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 509512"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1535 + 125 - K1535 + 606","amountPesos":30000000,"lengthMeters":481.0,"ratePesosPerMeter":62370.06237006237,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 509536"},{"year":2020,"category":"Roads","project":"Nueva Ecija-Aurora Road - K0211+000 - K0211+989","amountPesos":4363000,"lengthMeters":989.0,"ratePesosPerMeter":4411.5267947421635,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 509963"},{"year":2020,"category":"Roads","project":"Old Cagayan Valley Road (LZ) - K0046 + 800 - K0047 + 577, K0049 + 000 - K0049 + 900","amountPesos":22731000,"lengthMeters":1677.0,"ratePesosPerMeter":13554.561717352415,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 509966"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1544 + 000 - K1545 + 335","amountPesos":55400000,"lengthMeters":1335.0,"ratePesosPerMeter":41498.12734082397,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 510502"},{"year":2020,"category":"Roads","project":"Bacolod-Madalum Highway - K1565 + 669.50 - K1566 + 124.20, K1569 + 000 - K1571 + 500","amountPesos":23439000,"lengthMeters":2954.7,"ratePesosPerMeter":7932.78505432036,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 510001"},{"year":2020,"category":"Roads","project":"Rolando A Andaya Highway - K0290 + 720 - K0292 + 465","amountPesos":150000000,"lengthMeters":1745.0,"ratePesosPerMeter":85959.88538681949,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 510458"},{"year":2020,"category":"Roads","project":"Rolando A Andaya Highway - K0300 + 000 - K0301 + 395","amountPesos":120000000,"lengthMeters":1395.0,"ratePesosPerMeter":86021.50537634408,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 510459"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1426 + 154 - K1429 + 100, K1430 + 205 - K1431 + 703","amountPesos":112000000,"lengthMeters":4444.0,"ratePesosPerMeter":25202.520252025202,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 510499"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1504 + 158 - K1505 + 371, K1506 + 155 - K1506 + 382","amountPesos":80000000,"lengthMeters":1440.0,"ratePesosPerMeter":55555.555555555555,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 510500"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1540 + (-194) - K1542 + 852","amountPesos":115000000,"lengthMeters":3046.0,"ratePesosPerMeter":37754.43204202232,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 510501"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1559 + 000 - K1561+ 500","amountPesos":88114000,"lengthMeters":2500.0,"ratePesosPerMeter":35245.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 510503"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1514 + 780 - K1515 + 205","amountPesos":18500000,"lengthMeters":425.0,"ratePesosPerMeter":43529.41176470588,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 510607"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1438 + (-226) - K1438 + (-118)","amountPesos":1951000,"lengthMeters":108.0,"ratePesosPerMeter":18064.814814814814,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 510609"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1464 + 160 - K1464 + 508, K1464 + 667 - K1464 + 820","amountPesos":9046000,"lengthMeters":501.0,"ratePesosPerMeter":18055.888223552894,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 510610"},{"year":2020,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1272 + 867 - K1274 + 000","amountPesos":50000000,"lengthMeters":1133.0,"ratePesosPerMeter":44130.6266548985,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 510639"},{"year":2020,"category":"Roads","project":"Diokno Highway - K0072 + (-995) - K0072 + (-658), K0073 + 440 - K0073 + 720","amountPesos":29735000,"lengthMeters":617.0,"ratePesosPerMeter":48192.86871961102,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 511109"},{"year":2020,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1566 + 000 - K1568 + 000, K1574 + 000 - K1575 + 000","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 511178"},{"year":2020,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1575 + 000 - K1575 + 500, K1577 + 100 - K1579 + 400","amountPesos":92800000,"lengthMeters":2800.0,"ratePesosPerMeter":33142.857142857145,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 511179"},{"year":2020,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1579 + 400 - K1579 + 774, K1579 + 794 - K1580 + 000, K1582 + 800 - K1585 + 000","amountPesos":93400000,"lengthMeters":2780.0,"ratePesosPerMeter":33597.12230215827,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 511180"},{"year":2020,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1586 + 100 - K1588 + 100","amountPesos":68000000,"lengthMeters":2000.0,"ratePesosPerMeter":34000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 511181"},{"year":2020,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1563 + 1300 - K1565 + 1322","amountPesos":70990000,"lengthMeters":2022.0,"ratePesosPerMeter":35108.80316518299,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 511184"},{"year":2020,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1608 + 000 - K1610 + 000","amountPesos":74500000,"lengthMeters":2000.0,"ratePesosPerMeter":37250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 511185"},{"year":2020,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1610 + 000 - K1612 + 500","amountPesos":93000000,"lengthMeters":2500.0,"ratePesosPerMeter":37200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 511186"},{"year":2020,"category":"Roads","project":"Bongabong - Sagana - Roxas - San Aquilino Road - K0113 + 077 - K0113 + 616","amountPesos":10073000,"lengthMeters":539.0,"ratePesosPerMeter":18688.31168831169,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 511253"},{"year":2020,"category":"Roads","project":"Bongabong - Sagana - Roxas - San Aquilino Road - K0114 + 000 - K0115 + 635","amountPesos":49950000,"lengthMeters":1635.0,"ratePesosPerMeter":30550.45871559633,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 511254"},{"year":2020,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1598 + 700 - K1600 + 000","amountPesos":46610000,"lengthMeters":1300.0,"ratePesosPerMeter":35853.846153846156,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 511311"},{"year":2020,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1604 + 000 - K1605 + 273","amountPesos":44028000,"lengthMeters":1273.0,"ratePesosPerMeter":34586.017282010995,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 511312"},{"year":2020,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1488+ 714 - K1490 + 422","amountPesos":45724000,"lengthMeters":1708.0,"ratePesosPerMeter":26770.491803278688,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 511317"},{"year":2020,"category":"Roads","project":"Sta Maria- Norzagaray Road - K0034 + 300 - K0034+768, K0036 + 435 - K0037+600","amountPesos":100000000,"lengthMeters":1633.0,"ratePesosPerMeter":61236.9871402327,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 511589"},{"year":2020,"category":"Roads","project":"Gen Alejo Santos Highway - K0065 + 000 - K0065 + 848","amountPesos":17449000,"lengthMeters":848.0,"ratePesosPerMeter":20576.650943396227,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 511655"},{"year":2020,"category":"Roads","project":"Road Widening - Tertiary Road -  Tibanban-Lavigan Rd - K1778+019 - K1778+619","amountPesos":13365000,"lengthMeters":600.0,"ratePesosPerMeter":22275.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 511721"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1545 + 558 - K1545 + 618, K1545 + 746 - K1545 + 806","amountPesos":5000000,"lengthMeters":120.0,"ratePesosPerMeter":41666.666666666664,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 513399"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1555 + 270 - K1557 + 078","amountPesos":33000000,"lengthMeters":1808.0,"ratePesosPerMeter":18252.21238938053,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 513400"},{"year":2020,"category":"Roads","project":"Sayre Highway - K1555 + 270 - K1559 + 000","amountPesos":40383000,"lengthMeters":3730.0,"ratePesosPerMeter":10826.541554959786,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 513401"},{"year":2020,"category":"Roads","project":"Bongabong - Sagana - Roxas - San Aquilino Road - K0121 + 000 - K0124 + 000","amountPesos":45690000,"lengthMeters":3000.0,"ratePesosPerMeter":15230.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 513678"},{"year":2020,"category":"Roads","project":"Corrales Extension St. - Port Road - K1438 + (-269) - K1438 + (-140), K1439 + 000 - K1439 + 558","amountPesos":9075000,"lengthMeters":687.0,"ratePesosPerMeter":13209.606986899564,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 513715"},{"year":2020,"category":"Roads","project":"Bacolod-Madalum Highway - K1569 + 000 - K1571 + 500","amountPesos":30000000,"lengthMeters":2500.0,"ratePesosPerMeter":12000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 513988"},{"year":2020,"category":"Roads","project":"Aramaywan-Berong-Puerto Princesa Road - K0181+630 - K0181+863","amountPesos":8650000,"lengthMeters":233.0,"ratePesosPerMeter":37124.46351931331,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 514072"},{"year":2020,"category":"Roads","project":"Quezon-Punta Baja Road - K0148+640 - K0148+664, K0148+755 - K0148+780, K0154+817 - K0155+375","amountPesos":22850000,"lengthMeters":607.0,"ratePesosPerMeter":37644.151565074135,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 514073"},{"year":2020,"category":"Roads","project":"Quezon-Punta Baja Road - K0200+791 - K0201+377, K0202+505 - K0203+063","amountPesos":31769000,"lengthMeters":1144.0,"ratePesosPerMeter":27770.104895104894,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 514074"},{"year":2020,"category":"Roads","project":"Jct. Maradugao-Camp Kibaritan-Dominorog Road- K1626+-579 - K1626+-139","amountPesos":18480000,"lengthMeters":440.0,"ratePesosPerMeter":42000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 514079"},{"year":2020,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1570 + 460 - K1570 + 769","amountPesos":15000000,"lengthMeters":309.0,"ratePesosPerMeter":48543.68932038835,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 514080"},{"year":2020,"category":"Roads","project":"Bacolod-Madalum Highway - K1575 + 095 - K1576 + 480, K1576 + 632 - K1577 + 550, K1577 + 869 - K1578 + 152, K1578 + 502 - K1579 + 399","amountPesos":100000000,"lengthMeters":3483.0,"ratePesosPerMeter":28710.88142405972,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 514215"},{"year":2020,"category":"Roads","project":"Bacolod-Madalum Highway - K1581 + 095 - K1583 + 415","amountPesos":86185000,"lengthMeters":2320.0,"ratePesosPerMeter":37148.706896551725,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 514216"},{"year":2020,"category":"Roads","project":"Bacolod-Madalum Highway - K1581 + (-925) - K1581 + (-404), K1581 + (-070) - K1581 + 095","amountPesos":25530000,"lengthMeters":686.0,"ratePesosPerMeter":37215.74344023324,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 514250"},{"year":2020,"category":"Bridges","project":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 2 and 3 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge), Sta. 14+100 to Sta. 15+450, Left Bank, Marikina City","amountPesos":150000000,"lengthMeters":1350.0,"ratePesosPerMeter":111111.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 517858"},{"year":2020,"category":"Bridges","project":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 5 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge), Sta. 16+050 to Sta. 17+450, Left Bank, Marikina City","amountPesos":80000000,"lengthMeters":1400.0,"ratePesosPerMeter":57142.857142857145,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 517859"},{"year":2020,"category":"Bridges","project":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 6 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge), Sta. 17+450 to Sta. 18+130, Left and Right Banks, Marikina City","amountPesos":150000000,"lengthMeters":680.0,"ratePesosPerMeter":220588.23529411765,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 521656"},{"year":2020,"category":"Bridges","project":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 8 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge), Sta. 18+650 to Sta. 19+350, Left Bank, Marikina City","amountPesos":150000000,"lengthMeters":700.0,"ratePesosPerMeter":214285.7142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 521657"},{"year":2020,"category":"Roads","project":"Construction of Flood Control Structure along Ilocos Norte-Apayao Road, K0503+034 - K0503+987, Dingras, Ilocos Norte","amountPesos":19699000,"lengthMeters":953.0,"ratePesosPerMeter":20670.514165792236,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 522106"},{"year":2020,"category":"Roads","project":"Construction of Guardwall along Basco-Mahatao-Ivana-Uyugan-Imnajbu Road (S00016BN) - K0006+510 - K0006+536, K0008+624 - K0008+754, K0008+817.40 - K0008+854, K0008+875.60 - K0008+946.50, K0016+340 - K0016+380, K0016+840 - K0017+573.30, K0024+770 - K0024+900, Batanes","amountPesos":23140000,"lengthMeters":1166.8,"ratePesosPerMeter":19832.019197805977,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 522219"},{"year":2020,"category":"Roads","project":"Construction of Seawall Along San Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Road (S00003ST) - K0017+050 - K0017+312, Batanes","amountPesos":22900000,"lengthMeters":262.0,"ratePesosPerMeter":87404.58015267176,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 522224"},{"year":2020,"category":"Bridges","project":"Construction of Reinforced Concrete Slope protection along Sapang Balen Creek upstream of San Roque Bridge Sta. 10+850 to Sta. 12+200 (Both sides) Magalang, Pampanga","amountPesos":20000000,"lengthMeters":1350.0,"ratePesosPerMeter":14814.814814814816,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 522346"},{"year":2020,"category":"Bridges","project":"Rehabilitation/Improvement of Existing Earth Dike along Rio Chico River (Lomboy Section, Right Bank), U/S of Rio Chico Bridge, Sta. 10+616 to Sta. 10+867, La Paz, Tarlac","amountPesos":43280000,"lengthMeters":251.0,"ratePesosPerMeter":172430.27888446214,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 522371"},{"year":2020,"category":"Bridges","project":"Rehabilitation/Improvement of Existing Earth Dike along Rio Chico River (Lomboy Section, Right Bank), U/S of Rio Chico Bridge, Sta. 11+144 to Sta. 11+408.40, La Paz, Tarlac","amountPesos":47915000,"lengthMeters":264.4,"ratePesosPerMeter":181221.63388804867,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 522372"},{"year":2020,"category":"Roads","project":"Construction of Flood Control Structure along Wright-Taft-Borongan Road, K0897+000-K0898+000, Brgy. San Isidro, Sulat, Eastern Samar","amountPesos":20000000,"lengthMeters":1000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 522831"},{"year":2020,"category":"Roads","project":"Construction of Flood Control Structures along Borongan-Guiuan Road, K1007+150-K1008+200, Gen. MacArthur, Eastern Samar","amountPesos":27330000,"lengthMeters":1050.0,"ratePesosPerMeter":26028.571428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 522837"},{"year":2020,"category":"Roads","project":"Construction of Flood Control Structures along Jct. Buenavista-Lawaan-Marabut Road, K0978+200-K0979+100, Brgy. Coticot, Giporlos, Eastern Samar","amountPesos":14468000,"lengthMeters":900.0,"ratePesosPerMeter":16075.555555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 522839"},{"year":2020,"category":"Roads","project":"Construction of Flood Control Structures Protecting National Road along Borongan-Guiuan Road, K0995+500-K0996+600, Brgy. Batang, Hernani, Eastern Samar","amountPesos":32611000,"lengthMeters":1100.0,"ratePesosPerMeter":29646.363636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 522842"},{"year":2020,"category":"Bridges","project":"Construction of Slope Protection along Bangon River (DapDap Bridge Upstream & Downstream) Sta. 028+090 to Sta. 028+700, Alangalang, Leyte","amountPesos":30000000,"lengthMeters":610.0,"ratePesosPerMeter":49180.32786885246,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 522847"},{"year":2020,"category":"Bridges","project":"Construction of Slope Protection along Sapiniton River (Caraycaray Bridge Downstream) Sta. 004+925 to Sta. 005+381, San Miguel, Leyte","amountPesos":30000000,"lengthMeters":456.0,"ratePesosPerMeter":65789.47368421052,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 522848"},{"year":2020,"category":"Bridges","project":"Construction of La Dicha Bridge River Control (Downstream), Sta. 00+000 - Sta. 00+421, Malangas, Zamboanga Sibugay","amountPesos":30000000,"lengthMeters":421.0,"ratePesosPerMeter":71258.90736342043,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 522956"},{"year":2020,"category":"Roads","project":"Construction of Shore Protection/Seawall along Jct. Magsaysay-Cagdianao Road, K0015+370 - K0015+707.15, Cagdianao, Dinagat Islands","amountPesos":30000000,"lengthMeters":337.15,"ratePesosPerMeter":88981.16565327016,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 523114"},{"year":2020,"category":"Bridges","project":"River Improvement Works along  Cagayan River, Buntun Bridge, Tuguegarao and Solana at Sta. 3+950 to Sta. 5+800 and Slope Protection Works for Buntun Bridge, Right Bank, Sta. -0+042 to Sta. 0+410,Tuguegarao City, Cagayan","amountPesos":100000000,"lengthMeters":2218.0,"ratePesosPerMeter":45085.66275924256,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 523765"},{"year":2020,"category":"Bridges","project":"Construction of A.Canao Bridge towards Camalog (Channeling, Embankment Dike, Revetment), along Chico River, Sta. 93+500- Sta. 94+500, Tabuk City, Kalinga","amountPesos":100000000,"lengthMeters":1000.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 524149"},{"year":2020,"category":"Bridges","project":"Rehabilitation/Improvement of Existing Dike along Parua River (Right Bank, San Antonio Section), D/S of Sta. Rita Bridge, Concepcion, Sta. 12+800 to Sta. 13+217.40","amountPesos":40056000,"lengthMeters":417.4,"ratePesosPerMeter":95965.50071873511,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 524408"},{"year":2020,"category":"Roads","project":"Construction of flood control structure along Lanao-Pagadian-Zamboanga City Road, part of Sibuguey River (Upstream), Sta. 0+171 - Sta. 0+366, Brgy. Sta. Barbara, Imelda, Zamboanga Sibugay","amountPesos":25000000,"lengthMeters":195.0,"ratePesosPerMeter":128205.1282051282,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 524500"},{"year":2020,"category":"Roads","project":"Construction of flood control structures (revetment wall) along Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road part of Sibuguey River (Upstream), Sta. 0+000 - Sta. 0+044, Brgy. Paradise, Diplahan, Zamboanga Sibugay","amountPesos":6301000,"lengthMeters":44.0,"ratePesosPerMeter":143204.54545454544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 524501"},{"year":2020,"category":"Roads","project":"Construction of flood control structures (revetment wall) along Lanao-Pagadian-Zamboanga City Road, Part of Sibuguey River (Downstream), Sta. 0+000 - Sta. 0+156, Brgy Balugo, Imelda, Zamboanga Sibugay","amountPesos":20000000,"lengthMeters":156.0,"ratePesosPerMeter":128205.1282051282,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2020 GAA parquet · row 524502"},{"year":2021,"category":"Roads","project":"Calapan North Road (S00008MR), K0037+300 to K0037+800","amountPesos":83300000,"lengthMeters":500.0,"ratePesosPerMeter":166600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424193"},{"year":2021,"category":"Roads","project":"Calapan North Road (S00008MR), K0039+500 to K0040+000","amountPesos":83300000,"lengthMeters":500.0,"ratePesosPerMeter":166600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424194"},{"year":2021,"category":"Roads","project":"Calapan North Road (S00008MR), K0043+600 to K0043+950","amountPesos":80750000,"lengthMeters":350.0,"ratePesosPerMeter":230714.2857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424195"},{"year":2021,"category":"Roads","project":"Calapan North Road (S00008MR), K0057+800 to K0058+300","amountPesos":83300000,"lengthMeters":500.0,"ratePesosPerMeter":166600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424196"},{"year":2021,"category":"Roads","project":"Abra - Ilocos Norte Road, K0448+140 - K0448+260","amountPesos":40605000,"lengthMeters":120.0,"ratePesosPerMeter":338375.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424255"},{"year":2021,"category":"Bridges","project":"Construction of Flood Control, Downstream of San Miguel Bridge, San Miguel Section (Sta. 0+506 - Sta. 0+806, right side), Nabua, Camarines Sur","amountPesos":40613000,"lengthMeters":300.0,"ratePesosPerMeter":135376.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423174"},{"year":2021,"category":"Bridges","project":"Rehabilitation at Barit River, Upstream, Mampuag Bridge (Sta. 0+500 - Sta. 0+800, right side), Santiago Old, Nabua, Camarines Sur","amountPesos":40613000,"lengthMeters":300.0,"ratePesosPerMeter":135376.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423175"},{"year":2021,"category":"Bridges","project":"Construction of Flood Control, Upstream of Cresini Bridge, San Francisco Section (Sta. 0+358 - Sta. 0+558, right side), Iriga City, Camarines Sur","amountPesos":40613000,"lengthMeters":200.0,"ratePesosPerMeter":203065.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423176"},{"year":2021,"category":"Bridges","project":"Rehabilitation of Flood Control Structure at Pulid Bridge K0794+818 - K0794+825, Brgy. Quezon, Calbayog City, Samar","amountPesos":40614000,"lengthMeters":7.0,"ratePesosPerMeter":5802000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423196"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection of Road Leading to Mt. Tapulao Sta 008+800 - Sta 009+382, Zambales","amountPesos":36552000,"lengthMeters":582.0,"ratePesosPerMeter":62804.12371134021,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423631"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Structure along Capalayan-Placer Road Sta 6+259 - Sta. 6+395, Tagana-an, Surigao del Norte","amountPesos":98000000,"lengthMeters":136.0,"ratePesosPerMeter":720588.2352941176,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423653"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Structure along Capalayan-Placer Road Sta. 6+840 - Sta. 7+070, Tagana-an, Surigao del Norte","amountPesos":100000000,"lengthMeters":230.0,"ratePesosPerMeter":434782.60869565216,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423654"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Structure along Capalayan-Placer Road Sta. 7+090 - Sta. 7+190, Placer, Surigao del Norte","amountPesos":90000000,"lengthMeters":100.0,"ratePesosPerMeter":900000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423655"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 19+090 - Sta. 19+233, San Francisco, Surigao del Norte","amountPesos":70000000,"lengthMeters":143.0,"ratePesosPerMeter":489510.4895104895,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423656"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 28+922 - Sta. 29+022, Surigao del Norte","amountPesos":85000000,"lengthMeters":100.0,"ratePesosPerMeter":850000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423657"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 35+485 - Sta. 35+855, Malimono, Surigao del Norte","amountPesos":100000000,"lengthMeters":370.0,"ratePesosPerMeter":270270.2702702703,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423658"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 39+467 - Sta. 39+735, Malimono, Surigao del Norte","amountPesos":98000000,"lengthMeters":268.0,"ratePesosPerMeter":365671.6417910448,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423659"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 39+773 - Sta. 39+953, Malimono, Surigao del Norte","amountPesos":95000000,"lengthMeters":180.0,"ratePesosPerMeter":527777.7777777778,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423660"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 40+368 - Sta. 40+505, Malimono, Surigao del Norte","amountPesos":95000000,"lengthMeters":137.0,"ratePesosPerMeter":693430.6569343066,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423661"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 40+576 - Sta. 40+830, Malimono, Surigao del Norte","amountPesos":100000000,"lengthMeters":254.0,"ratePesosPerMeter":393700.7874015748,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423662"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 36+430 - Sta. 36+748, Malimono, Surigao del Norte","amountPesos":100000000,"lengthMeters":318.0,"ratePesosPerMeter":314465.40880503145,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423663"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 42+200 - Sta. 42+320, Malimono, Surigao del Norte","amountPesos":100000000,"lengthMeters":120.0,"ratePesosPerMeter":833333.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423664"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 44+107 - Sta. 44+300, Malimono, Surigao del Norte","amountPesos":100000000,"lengthMeters":193.0,"ratePesosPerMeter":518134.71502590674,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423665"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 44+360 - Sta. 44+590, Malimono, Surigao del Norte","amountPesos":100000000,"lengthMeters":230.0,"ratePesosPerMeter":434782.60869565216,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423666"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 44+820 - Sta. 44+970, Malimono, Surigao del Norte","amountPesos":100000000,"lengthMeters":150.0,"ratePesosPerMeter":666666.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423667"},{"year":2021,"category":"Roads","project":"Construction/Upgrading of Drainage along Manila North Road, K072+590 - K0271+082, Brgy. Carlatan, San Fernando City, La Union","amountPesos":20000000,"lengthMeters":198492.0,"ratePesosPerMeter":100.75972835177237,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 423710"},{"year":2021,"category":"Roads","project":"Calapan North Road (S00008MR), K0036+400 to K0036+900","amountPesos":82450000,"lengthMeters":500.0,"ratePesosPerMeter":164900.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424192"},{"year":2021,"category":"Roads","project":"Abra - Ilocos Norte Road, K0431+570 - K0431+920","amountPesos":127479000,"lengthMeters":350.0,"ratePesosPerMeter":364225.71428571426,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424183"},{"year":2021,"category":"Roads","project":"Abra - Ilocos Norte Road, K0433+440 - K0433+740","amountPesos":78111000,"lengthMeters":300.0,"ratePesosPerMeter":260370.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424184"},{"year":2021,"category":"Roads","project":"Abra - Ilocos Norte Road, K0434+600 - K0434+870","amountPesos":99492000,"lengthMeters":270.0,"ratePesosPerMeter":368488.8888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424185"},{"year":2021,"category":"Roads","project":"Abra - Ilocos Norte Road, K0446+615- K0446+840","amountPesos":106314000,"lengthMeters":225.0,"ratePesosPerMeter":472506.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424186"},{"year":2021,"category":"Roads","project":"Abra - Ilocos Norte Road, K0447+540- K0447+700","amountPesos":94656000,"lengthMeters":160.0,"ratePesosPerMeter":591600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424187"},{"year":2021,"category":"Roads","project":"Calapan North Road (S00008MR), K0022+500 to K0023+100","amountPesos":82450000,"lengthMeters":600.0,"ratePesosPerMeter":137416.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424190"},{"year":2021,"category":"Roads","project":"Calapan North Road (S00008MR), K0024+300 to K0024+700","amountPesos":80750000,"lengthMeters":400.0,"ratePesosPerMeter":201875.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424191"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Structure along Davao-Sarangani Coastal Road (Malalag-Malita-JAS-Glan) K1665+338-K1665+758(S00209MN)","amountPesos":72250000,"lengthMeters":420.0,"ratePesosPerMeter":172023.80952380953,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424200"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Structure along Davao-Sarangani Coastal Road (Malalag-Malita-JAS-Glan), K1663+225-K1663+595 (S00209MN)","amountPesos":72250000,"lengthMeters":370.0,"ratePesosPerMeter":195270.27027027027,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424201"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Structure along Demoloc-Little Baguio-Alabel Road, K1649+720-K1650+090(S00203MN)","amountPesos":72250000,"lengthMeters":370.0,"ratePesosPerMeter":195270.27027027027,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424202"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection Along Baler-Casiguran Road (Dinadiawan-Casiguran Section) K0295+100 - K0301+850, Casigura, Aurora","amountPesos":46750000,"lengthMeters":6750.0,"ratePesosPerMeter":6925.925925925926,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424203"},{"year":2021,"category":"Roads","project":"Construction of slope protection along Camp Andres Romandier National Road KM 29+000-KM 34+000 [with exemption], Sulu","amountPesos":127500000,"lengthMeters":5000.0,"ratePesosPerMeter":25500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424204"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection Along Seit-Tayungan National Road Km 38+000 - 41+000 (with exemption), Sulu","amountPesos":85000000,"lengthMeters":3000.0,"ratePesosPerMeter":28333.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424205"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection Works along Pangasinan-Nueva Viscaya Road K0211+215 - K0211+320, K0224+560 - K0224+680, San Nicolas Pangasinan","amountPesos":46750000,"lengthMeters":225.0,"ratePesosPerMeter":207777.77777777778,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424206"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection Works along Pangasinan-Nueva Viscaya Road K0214+720 - K0214+920, K0217+215 - K0217+280, San Nicolas, Pangasinan","amountPesos":46750000,"lengthMeters":265.0,"ratePesosPerMeter":176415.09433962265,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424207"},{"year":2021,"category":"Roads","project":"Kalinga - Abra Road, K0470+890 - K0471+(-005)","amountPesos":85000000,"lengthMeters":105.0,"ratePesosPerMeter":809523.8095238095,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424210"},{"year":2021,"category":"Roads","project":"Kalinga - Abra Road, K0495+455 - K0495+675","amountPesos":85000000,"lengthMeters":220.0,"ratePesosPerMeter":386363.63636363635,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424211"},{"year":2021,"category":"Roads","project":"Mt. Province Boundary - Calanan - Pinukpuk - Abbut Road, K0488+165 - K0488+291","amountPesos":85000000,"lengthMeters":126.0,"ratePesosPerMeter":674603.1746031746,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424213"},{"year":2021,"category":"Roads","project":"Mt. Province Boundary - Calanan - Pinukpuk - Abbut Road, K0488+291 - K0488+416","amountPesos":85000000,"lengthMeters":125.0,"ratePesosPerMeter":680000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424214"},{"year":2021,"category":"Roads","project":"Mt. Province Boundary - Calanan - Pinukpuk - Abbut Road, K0488+416 - K0488+541","amountPesos":85000000,"lengthMeters":125.0,"ratePesosPerMeter":680000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424215"},{"year":2021,"category":"Roads","project":"Paco - Roxas - Arakan Valley - Jct Davao - Bukidnon Road (S00701MN) K1640+100 - K1640+341","amountPesos":140080000,"lengthMeters":241.0,"ratePesosPerMeter":581244.8132780083,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424216"},{"year":2021,"category":"Roads","project":"Preventive Maintenance - Primary Roads, MSR Diversion Rd - K0127+149 - K0127+315, K0127+347 - K0128+219, K0128+251 - K0128+345","amountPesos":85000000,"lengthMeters":1132.0,"ratePesosPerMeter":75088.33922261484,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424217"},{"year":2021,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay Quezon-Punta Baja K0146+(-187.00) - K0150+465.00, Palawan","amountPesos":46750000,"lengthMeters":4652.0,"ratePesosPerMeter":10049.44110060189,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424221"},{"year":2021,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads (Asphalt to Concrete) along Davao-Bukidnon Rd - K1699 + 583 - K1699 + 764, K1699 + 764 - K1701 + 708","amountPesos":76500000,"lengthMeters":2125.0,"ratePesosPerMeter":36000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424222"},{"year":2021,"category":"Roads","project":"Rehabilitation / Reconstruction of National Roads with Slip, Slope Collapse and Landslide along BCIR K1264+900 - K1266+000, Agusan Del Norte","amountPesos":46750000,"lengthMeters":1100.0,"ratePesosPerMeter":42500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424223"},{"year":2021,"category":"Roads","project":"Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide Secondary Roads - Dinagat - Loreto Road - K0001 + (-126) - K0001 + 129, Dinagat","amountPesos":46750000,"lengthMeters":255.0,"ratePesosPerMeter":183333.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424224"},{"year":2021,"category":"Roads","project":"Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Manila North Road - K0557 + 900 - K0557 + 960, Pagudpud, Ilocos Norte","amountPesos":63750000,"lengthMeters":60.0,"ratePesosPerMeter":1062500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424225"},{"year":2021,"category":"Roads","project":"Rehabilitation of Slope Protection Structure along Tablas Circumferential Road - K0043+870.00 - K0044+220.00, Tablas, Romblon","amountPesos":46750000,"lengthMeters":350.0,"ratePesosPerMeter":133571.42857142858,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424226"},{"year":2021,"category":"Roads","project":"Rehabilitation of Roads with Slips, Slope Collapse and Landslide along Surigao-Agusan West Coastal Road - K1134+735 - K1134+905, Surigao Del Norte","amountPesos":46750000,"lengthMeters":170.0,"ratePesosPerMeter":275000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424227"},{"year":2021,"category":"Roads","project":"Rehabilitation of Roads with Slips/Slope Collapse and Landslide along Daang Maharlika (Surigao-Agusan Sect) K1239+700 - K1240+000, Butuan City","amountPesos":46750000,"lengthMeters":300.0,"ratePesosPerMeter":155833.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424228"},{"year":2021,"category":"Roads","project":"Rehabilitation of Slope Protection Structure Along Tablas Circumferential Road - K0044+221.00 - K0044+571.00, Tablas, Romblon","amountPesos":46750000,"lengthMeters":350.0,"ratePesosPerMeter":133571.42857142858,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424229"},{"year":2021,"category":"Roads","project":"Rehabilitation of Slope Protection Structure along Tablas Circumferential Road - K0043+500.00 - K0043+870.00, Tablas, Romblon","amountPesos":46750000,"lengthMeters":370.0,"ratePesosPerMeter":126351.35135135135,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424230"},{"year":2021,"category":"Roads","project":"Rehabilitation/ Reconstruction/Upgrading of Damaged Paved Roads along Tigbao - Sta. Fe - San Miguel Road - K0907+400 - K0908+900","amountPesos":161500000,"lengthMeters":1500.0,"ratePesosPerMeter":107666.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424231"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide û Secondary Road - Abra - Kalinga Road - K0444+417 - K0444+468, Barangay Lingas, Licuan-Baay, Abra","amountPesos":54400000,"lengthMeters":51.0,"ratePesosPerMeter":1066666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424233"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide Along Abra-Kalinga Road K0474+100 - K0474+350","amountPesos":46750000,"lengthMeters":250.0,"ratePesosPerMeter":187000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424234"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips/Slope Collapse and Landslide Along Abra-Kalinga Road K0453+200 - K0453+450","amountPesos":46750000,"lengthMeters":250.0,"ratePesosPerMeter":187000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424235"},{"year":2021,"category":"Roads","project":"Road Widening & Construction of Drainage along Daang Maharlika (MN) - K1507+223 - K1507+324 (L/S), K1507+369 - K1507+464 (R/S), K1507+475 - K1507+518 (L/S), K1507+518 - K1508+000","amountPesos":85000000,"lengthMeters":721.0,"ratePesosPerMeter":117891.81692094314,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424236"},{"year":2021,"category":"Roads","project":"Road Widening of Lobo-Malabrigo-San Juan Rd (K0161+736 - K0163+626), Batangas","amountPesos":76500000,"lengthMeters":1890.0,"ratePesosPerMeter":40476.19047619047,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424237"},{"year":2021,"category":"Roads","project":"Road Widening of Mandurriao - San Miguel - Alimodian - Maasin - Cabatuan Rd. K0019 + 062 - K0020+694, San Miguel, Iloilo","amountPesos":58692000,"lengthMeters":1632.0,"ratePesosPerMeter":35963.23529411765,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424238"},{"year":2021,"category":"Roads","project":"Widening of Road, Palawan Circumferential Road (S00063PW) K0265+000 - K0269+820, Palawan","amountPesos":85000000,"lengthMeters":4820.0,"ratePesosPerMeter":17634.854771784234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424243"},{"year":2021,"category":"Roads","project":"Abra - Ilocos Norte Road, K0432+1026 - K0433+070","amountPesos":39436000,"lengthMeters":44.0,"ratePesosPerMeter":896272.7272727273,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424252"},{"year":2021,"category":"Roads","project":"Abra - Ilocos Norte Road, K0447+335- K0447+460","amountPesos":40207000,"lengthMeters":125.0,"ratePesosPerMeter":321656.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424253"},{"year":2021,"category":"Roads","project":"Abra - Ilocos Norte Road, K0447+935 - K0448+055","amountPesos":39679000,"lengthMeters":120.0,"ratePesosPerMeter":330658.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424254"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection Along Madela-Dinadiawan Road (K0409+300 - K0419+700), Aurora","amountPesos":36552000,"lengthMeters":10400.0,"ratePesosPerMeter":3514.6153846153848,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424256"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection Along A. Castaneda - Ma. Aurora San Luis Road (K0198+090 - K0204+580), Aurora","amountPesos":36552000,"lengthMeters":6490.0,"ratePesosPerMeter":5632.049306625578,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424257"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection Along A. Castaneda - Ma. Aurora San Luis Road (K0209+425 - K0213+030), Aurora","amountPesos":36552000,"lengthMeters":3605.0,"ratePesosPerMeter":10139.251040221914,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424258"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection Along Baler-Casiguran Road (Baler - Dinadiawan Section) K0259+600 - K0277+706, Casiguran, Aurora","amountPesos":36552000,"lengthMeters":18106.0,"ratePesosPerMeter":2018.7783055340772,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424259"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection Along Baler-Casiguran Road (Dinadiawan-Casiguran Section) K0292+778 - K0294+621, Aurora","amountPesos":36552000,"lengthMeters":1843.0,"ratePesosPerMeter":19832.88117200217,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424260"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection Along Baler-Casiguran Road (Dinadiawan-Casiguran Section) K0295+100 - K0302+620, Casiguran, Aurora","amountPesos":36552000,"lengthMeters":7520.0,"ratePesosPerMeter":4860.63829787234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424261"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection along Nueva Ecija - Aurora Road (K0171+150 - K0174+050), Aurora","amountPesos":32491000,"lengthMeters":2900.0,"ratePesosPerMeter":11203.793103448275,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424262"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection Along Nueva Ecija- Aurora Road (K0204+800 - K0214+520), Aurora","amountPesos":36552000,"lengthMeters":9720.0,"ratePesosPerMeter":3760.4938271604938,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424263"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection Along Nueva Ecija-Aurora Road (K0195+450 - K0201+440), Aurora","amountPesos":36552000,"lengthMeters":5990.0,"ratePesosPerMeter":6102.170283806344,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424264"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection Along Nueva Ecija-Aurora Road (K0201+600 - K0204+500), Aurora","amountPesos":36552000,"lengthMeters":2900.0,"ratePesosPerMeter":12604.137931034482,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424265"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection Along Olongapo Bugallon Road Salaza Section K0222+000 - K0222+582, Olongapo City","amountPesos":32491000,"lengthMeters":582.0,"ratePesosPerMeter":55826.46048109965,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424266"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection Along Olongapo Bugallon road, Botolan Section K0189+000 - K0189+776, Olongapo City","amountPesos":36552000,"lengthMeters":776.0,"ratePesosPerMeter":47103.092783505155,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424267"},{"year":2021,"category":"Roads","project":"Preventive Maintenance - Primary Roads, Daang Maharlika (LZ) K0118+224 - K0118+672, K0118+814 - K0119+010, K0119+023-K0119+825","amountPesos":40613000,"lengthMeters":1446.0,"ratePesosPerMeter":28086.445366528354,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424269"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection along MSR, New Diversion Zigzag Road, K0155+100 - K0155+200 Brgy. Malicboy, Atimonan, Quezon","amountPesos":32491000,"lengthMeters":100.0,"ratePesosPerMeter":324910.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424270"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection along MSR, New Diversion Zigzag Road, K0174+050 - K0174+150 Brgy. Angeles, Atimonan, Quezon","amountPesos":23100000,"lengthMeters":100.0,"ratePesosPerMeter":231000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424271"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection along Old Zigzag Road, K0153+450 - K0153+600, Brgy. Malicboy, Pagbilao, Quezon","amountPesos":23100000,"lengthMeters":150.0,"ratePesosPerMeter":154000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424272"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection along Old Zigzag Road, K0154+150 - K0154+300, Brgy Malicboy, Pagbilao, Quezon","amountPesos":23100000,"lengthMeters":150.0,"ratePesosPerMeter":154000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424273"},{"year":2021,"category":"Roads","project":"Road Widening of Iloilo Capiz Rd (Old Route) K0017 + 708 - K0019+316, Sta. Barbara, Iloilo","amountPesos":25140000,"lengthMeters":1608.0,"ratePesosPerMeter":15634.328358208955,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424293"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection along Old Zigzag Road, K0156+650 - K0156+800, Brgy. Amlinao Ilaya, Atimonan, Quezon","amountPesos":23100000,"lengthMeters":150.0,"ratePesosPerMeter":154000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424274"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection along Old Zigzag Road, K0157+050 - K0157+150, Brgy. Malinao Ilaya, Atimonan, Quezon","amountPesos":23100000,"lengthMeters":100.0,"ratePesosPerMeter":231000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424275"},{"year":2021,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay of Aramaywan - Berong K0176+000.00 - K0176+1061.00, K0176+1185.00 - K0181+630.00, K0182+000.00 - K0183+506.00, Palawan","amountPesos":40613000,"lengthMeters":7012.0,"ratePesosPerMeter":5791.928123217342,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424276"},{"year":2021,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay of Quezon - Aramaywan K0146+(-150.00) - K0150+289.00, Palawan","amountPesos":40613000,"lengthMeters":4439.0,"ratePesosPerMeter":9149.13268754224,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424277"},{"year":2021,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay of Quezon - Aramaywan K0159+000 - K0172+635, Palawan","amountPesos":40613000,"lengthMeters":13635.0,"ratePesosPerMeter":2978.5845251191786,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424278"},{"year":2021,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay PPSR Jct. (Abo-Abo) - Quezon K0129+500.00 - K0133+397.00, Palawan","amountPesos":32491000,"lengthMeters":3897.0,"ratePesosPerMeter":8337.439055683859,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424279"},{"year":2021,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay PPSR Jct. (Abo-Abo) - Quezon K0138+550.00 - K0142+730.00, Palawan","amountPesos":32491000,"lengthMeters":4180.0,"ratePesosPerMeter":7772.966507177033,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424280"},{"year":2021,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay Quezon- Punta Baja K0157+000.00 - K0160+060.00, K0162+471.00 - K0163+701.00, Palawan","amountPesos":40613000,"lengthMeters":4290.0,"ratePesosPerMeter":9466.899766899767,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424281"},{"year":2021,"category":"Roads","project":"Rehabilitation of Slope Protection Structure along Tablas Circumferential Road - K0042+980.00 - K0043+220.00, Tablas, Romblon","amountPesos":36552000,"lengthMeters":240.0,"ratePesosPerMeter":152300.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424282"},{"year":2021,"category":"Roads","project":"Rehabilitation of Slope Protection Structure Along Tablas Circumferential Road - K0044+571.00 - K0044+921.00, Tablas, Romblon","amountPesos":40613000,"lengthMeters":350.0,"ratePesosPerMeter":116037.14285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424283"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection Along Calapan South Road, Brgy. Hagan, Bongabong, Oriental Mindoro K0119+000 - K0119+360, Bongabong, Oriental Mindoro","amountPesos":23100000,"lengthMeters":360.0,"ratePesosPerMeter":64166.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424284"},{"year":2021,"category":"Roads","project":"Rehabilitation of Roads Slips, Slope Collapse And Landslide, San Fernando-Talisay Rd Brgy Progresso, San Fernando, Masbate (K0003+377 - K0003+530)","amountPesos":40613000,"lengthMeters":153.0,"ratePesosPerMeter":265444.44444444444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424285"},{"year":2021,"category":"Roads","project":"Rehabilitation of Roads Slips, Slope Collapse And Landslide, San Fernando-Talisay Rd Brgy Progresso, San Fernando, Masbate, (K0002+790 - K0002+927)","amountPesos":40613000,"lengthMeters":137.0,"ratePesosPerMeter":296445.25547445257,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424286"},{"year":2021,"category":"Roads","project":"Rehabilitation of Roads Slips, Slope Collapse And Landslide, San Fernando-Talisay Rd, Brgy Progresso, San Fernando, Masbate (K0002+927 - K0003+065)","amountPesos":40613000,"lengthMeters":138.0,"ratePesosPerMeter":294297.1014492754,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424287"},{"year":2021,"category":"Roads","project":"Road Widening along Iloilo East Coast-Capiz Road, K0154+173 - K0155+173","amountPesos":15400000,"lengthMeters":1000.0,"ratePesosPerMeter":15400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424289"},{"year":2021,"category":"Roads","project":"Road Widening along Iloilo East Coast-Capiz Road, K0161+300 - K0162+362","amountPesos":15400000,"lengthMeters":1062.0,"ratePesosPerMeter":14500.941619585687,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424290"},{"year":2021,"category":"Roads","project":"Road Widening along Roxas City Boundary Panitan-Bailan Road, K0112+(-251) - K0112+500","amountPesos":11550000,"lengthMeters":751.0,"ratePesosPerMeter":15379.494007989348,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424291"},{"year":2021,"category":"Roads","project":"Road Widening, Tertiary Roads, Sigma-Mambusao - Jamindan Rd - K0093+064 - K0094+792, Dumalag, Capiz","amountPesos":40613000,"lengthMeters":1728.0,"ratePesosPerMeter":23502.89351851852,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424292"},{"year":2021,"category":"Roads","project":"Preventive Maintenance-Asphalt Overlay, Palo-Carigara-Ormoc Road, K0984+(-753) - K0984+869, K0984+884-K0987+477, K0987+560-K0988+007, K0988+066-K0989+000, Leyte","amountPesos":40613000,"lengthMeters":5596.0,"ratePesosPerMeter":7257.505360972123,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424298"},{"year":2021,"category":"Roads","project":"Road Widening - Palompon-Isabel-Merida-Ormoc Road, K1101+416 - K1104+714, Leyte","amountPesos":36552000,"lengthMeters":3298.0,"ratePesosPerMeter":11083.080654942389,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424299"},{"year":2021,"category":"Roads","project":"Preventive Maintenance along Bdry So. Leyte-Maasin-Macrohon-Sogod-Jct Daang Maharlika Road K1199+200 - K1204+500, Southern Leyte","amountPesos":36552000,"lengthMeters":5300.0,"ratePesosPerMeter":6896.603773584906,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424301"},{"year":2021,"category":"Roads","project":"Preventive Maintenance along Bdry. So. Leyte-Maasin-Macrohon-Sogod-Jct. Daang Maharlika Road K1189+000 - K1194+000, Southern Leyte","amountPesos":32491000,"lengthMeters":5000.0,"ratePesosPerMeter":6498.2,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424304"},{"year":2021,"category":"Roads","project":"Road Widening along Butuan City-Cagayan De Oro City - Iligan City Rd. - K1314 + 680 - K1315 + 000, K1316 + 000 - K1316 + 412, K1316 +000 - K1316 + 412, K1316 + 542 - K1317 + 490, Misamis Oriental","amountPesos":23100000,"lengthMeters":1680.0,"ratePesosPerMeter":13750.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424314"},{"year":2021,"category":"Roads","project":"Road Widening along Butuan City-Cagayan De Oro City - Iligan City Rd. - K1340 + 000 - K1314 + 190, Misamis Oriental","amountPesos":23100000,"lengthMeters":25810.0,"ratePesosPerMeter":895.0019372336304,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424315"},{"year":2021,"category":"Roads","project":"Road Widening along Davao - Cotabato Old Rd - K1522 + 678 - K1522 + 808 (L/S), K1522 + 826 - K1522 + 968 (L/S)","amountPesos":8639000,"lengthMeters":272.0,"ratePesosPerMeter":31761.029411764706,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424325"},{"year":2021,"category":"Roads","project":"Road Widening along Davao - Cotabato Rd. (Davao City - Jct. Digos Sect) - K1521 + 052 - K1521 + 200","amountPesos":8205000,"lengthMeters":148.0,"ratePesosPerMeter":55439.18918918919,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424326"},{"year":2021,"category":"Roads","project":"Road Widening along Davao City Div Rd - K1513 + 386 - K1513 + 520 (R/S), K1513 + 722 - K1513 + 775, K1513 + 875 - K1514 + 020","amountPesos":33915000,"lengthMeters":332.0,"ratePesosPerMeter":102153.61445783133,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424327"},{"year":2021,"category":"Roads","project":"Road Widening along Quezon Blvd. (MN) - K1510 + 401 - K1510 + 791 (R/S)","amountPesos":10780000,"lengthMeters":390.0,"ratePesosPerMeter":27641.02564102564,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424328"},{"year":2021,"category":"Mixed roads / bridges","project":"Arakan - Puntian Road (Approach \"B\" of Sabang Steel Bridge) 3+200 - 3+300","amountPesos":40573000,"lengthMeters":100.0,"ratePesosPerMeter":405730.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424330"},{"year":2021,"category":"Roads","project":"Kidapawan - Ilomavis Tourist Road (S00697MN) K1636+760 - K1636+835","amountPesos":40573000,"lengthMeters":75.0,"ratePesosPerMeter":540973.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424331"},{"year":2021,"category":"Roads","project":"Magpet - Nowa - Doroluman - Greenfield Road (S00712MN) K1640+633 - K1640+733","amountPesos":40573000,"lengthMeters":100.0,"ratePesosPerMeter":405730.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424332"},{"year":2021,"category":"Roads","project":"Magpet - Nowa - Doruluman - Greenfield Road (S00711MN) K1633+100 - K1633+175","amountPesos":40573000,"lengthMeters":75.0,"ratePesosPerMeter":540973.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424333"},{"year":2021,"category":"Roads","project":"Magpet - Nowa - Doruluman - Greenfield Road (S00712MN) K1640+733 - K1640+833","amountPesos":40573000,"lengthMeters":100.0,"ratePesosPerMeter":405730.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424334"},{"year":2021,"category":"Roads","project":"Paco - Roxas - Arakan Valley - Jct Davao - Bukidnon Road (S00701MN) K1642+(-080) - K1642+150","amountPesos":40573000,"lengthMeters":230.0,"ratePesosPerMeter":176404.34782608695,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424335"},{"year":2021,"category":"Roads","project":"Paco - Roxas - Arakan Valley - Jct Davao - Bukidnon Road (S00702MN) K1684+500 - K1684+600","amountPesos":28836000,"lengthMeters":100.0,"ratePesosPerMeter":288360.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424336"},{"year":2021,"category":"Roads","project":"Road Widening - Secondary Roads - Surigao Davao Coastal Rd. K1403+020 - K1406+420, Hinatuan, Surigao del Sur","amountPesos":36552000,"lengthMeters":3400.0,"ratePesosPerMeter":10750.588235294117,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424337"},{"year":2021,"category":"Roads","project":"Asphalt Overlay along Marcos Highway (S00395LZ), K0270 + 000 - K0272 + 654, K0277 + 402 - K0279 + 149, Tuba Benguet","amountPesos":100000000,"lengthMeters":4401.0,"ratePesosPerMeter":22722.108611679163,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424338"},{"year":2021,"category":"Roads","project":"Asphalt Overlay along Pico - Lamtang Road (S00401LZ), K0255 + (-555) - K0259 +000, La Trinidad, Benguet","amountPesos":100000000,"lengthMeters":4555.0,"ratePesosPerMeter":21953.896816684963,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424339"},{"year":2021,"category":"Roads","project":"Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via San Vicente Road (Genorangan Section) - K00498 + 296 - K0498 + 522","amountPesos":100000000,"lengthMeters":226.0,"ratePesosPerMeter":442477.8761061947,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424350"},{"year":2021,"category":"Roads","project":"Jct. Blancia-Molave-Josefina Road, K1673 + 000 - K1677 + 000","amountPesos":100000000,"lengthMeters":4000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424354"},{"year":2021,"category":"Roads","project":"Asphalt Overlay Along Digos Makar Road, K1605+710-K1608+300, Malungon, Sarangani","amountPesos":85000000,"lengthMeters":2590.0,"ratePesosPerMeter":32818.53281853282,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424372"},{"year":2021,"category":"Roads","project":"Asphalt Overlay Along Sarangani-Sultan Kudarat Coastal Road K1762+000-K1764+000 Maitum, Sarangani","amountPesos":85000000,"lengthMeters":2000.0,"ratePesosPerMeter":42500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424373"},{"year":2021,"category":"Roads","project":"Asphalt Overlay Along Sarangani-Davao del Sur Coastal Road K1675+420-K1679+120 Malapatan, Sarangani","amountPesos":85000000,"lengthMeters":3700.0,"ratePesosPerMeter":22972.972972972973,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424374"},{"year":2021,"category":"Roads","project":"Road Widening including Drainage along Sarangani-Sultan Kudarat K1688+630-K1692+000,Maasim, Sarangani","amountPesos":85000000,"lengthMeters":3370.0,"ratePesosPerMeter":25222.55192878338,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424375"},{"year":2021,"category":"Roads","project":"Road Widening including Drainage along Sarangani-Sultan Kudarat Coastal Road, K1701+343-K1704+727,Maasim, Sarangani","amountPesos":85000000,"lengthMeters":3384.0,"ratePesosPerMeter":25118.20330969267,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424376"},{"year":2021,"category":"Roads","project":"Rehabilitation of roads with slips, slope collapse and landslide (primary roads), Daang Maharlika K0284+560- K0284+700, Kinacao, Bagabag, Nueva Vizcaya","amountPesos":67479000,"lengthMeters":140.0,"ratePesosPerMeter":481992.85714285716,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424379"},{"year":2021,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay at specific locations along Guimaras Circumferential Rd (S00028GR) K00057+942 - K0082+487, San Lorenzo/ Sibunag/ Nueva Valencia, Guimaras","amountPesos":59500000,"lengthMeters":24545.0,"ratePesosPerMeter":2424.1189651660216,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424380"},{"year":2021,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay at specific locations along Central Rd, San Miguel- Constancia- Cabano- Igcawayan (S00025GR) K0051+ (-1127)- K0063+780, Jordan/ San Lorenzo, Guimaras","amountPesos":69360000,"lengthMeters":13907.0,"ratePesosPerMeter":4987.416409002661,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424381"},{"year":2021,"category":"Roads","project":"Asphalt Overlay along Olongapo-Bugallon Road K0128+450-K0148+00 w/ exceptions, Olongapo, Zambales","amountPesos":63835000,"lengthMeters":19550.0,"ratePesosPerMeter":3265.217391304348,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424382"},{"year":2021,"category":"Roads","project":"Asphalt Overlay along Dumaguete North Road (Dumaguete-Jct. Bais-Kabankalan), K0036+500-K0041+000 Bais City, Negros Oriental","amountPesos":59500000,"lengthMeters":4500.0,"ratePesosPerMeter":13222.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424385"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection along Daang Maharlika (Sm) (Sn Isidro - Sn Juanico Br.) (S00001SM) K0687+780 - K0687+850, Phase 1, San Isidro, Northern Samar","amountPesos":47744000,"lengthMeters":70.0,"ratePesosPerMeter":682057.1428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424386"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection along Daang Maharlika (Sm) (Sn Isidro - Sn Juanico Br.) (S00001SM) K0687+850 - K0687+920, Phase 2, San Isidro, Northern Samar","amountPesos":47744000,"lengthMeters":70.0,"ratePesosPerMeter":682057.1428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424387"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection along Daang Maharlika (Sm) (Sn Isidro - Sn Juanico Br.) (S00001SM) K0687+620 - K0687+647, Phase 1, San Isidro, Northern Samar","amountPesos":50137000,"lengthMeters":27.0,"ratePesosPerMeter":1856925.9259259258,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424388"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection along Daang Maharlika (Sm) (Sn Isidro - Sn Juanico Br.) (S00001SM) K0687+647 - K0687+674, Phase 2, San Isidro, Northern Samar","amountPesos":51425000,"lengthMeters":27.0,"ratePesosPerMeter":1904629.6296296297,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424389"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection along Daang Maharlika (Sm) (Sn Isidro - Sn Juanico Br.) (S00001SM) K0687+674 - K0687+700, Phase 3, San Isidro, Northern Samar","amountPesos":48856000,"lengthMeters":26.0,"ratePesosPerMeter":1879076.923076923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424390"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection along Daang Maharlika (Sm) (Sn Isidro - Sn Juanico Br.) (S00001SM) K0684+540 - K0684+610, Phase 1, San Isidro, Northern Samar","amountPesos":59352000,"lengthMeters":70.0,"ratePesosPerMeter":847885.7142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424391"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection along Daang Maharlika (Sm) (Sn Isidro - Sn Juanico Br.) (S00001SM) K0684+610 - K0684+670, Phase 2, San Isidro, Northern Samar","amountPesos":47058000,"lengthMeters":60.0,"ratePesosPerMeter":784300.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424392"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection along Daang Maharlika (Sm) (Sn Isidro - Sn Juanico Br.) (S00001SM) K0684+670 - K0684+700, K0687+560 - K0687+620, Phase 3, San Isidro, Northern Samar","amountPesos":71648000,"lengthMeters":90.0,"ratePesosPerMeter":796088.8888888889,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424393"},{"year":2021,"category":"Roads","project":"Construction of Rock Guard Slope Protection Along Burauen - Mahagnao Road K0989+700 - K0989+408.70","amountPesos":85000000,"lengthMeters":291.3,"ratePesosPerMeter":291795.3999312956,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424397"},{"year":2021,"category":"Roads","project":"Construction of Rock Guard Slope Protection Along Burauen - Mahagnao Road K0989+408.70 - K990+016.70","amountPesos":85000000,"lengthMeters":608.0,"ratePesosPerMeter":139802.63157894736,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424398"},{"year":2021,"category":"Roads","project":"Construction of Rock Guard Slope Protection Along Burauen - Mahagnao Road K990+016.70 - K0990+537.70","amountPesos":85000000,"lengthMeters":521.0,"ratePesosPerMeter":163147.79270633397,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424399"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection Works along Pangasinan-Nueva Viscaya Road K0224+680 - K0224+920, San Nicolas, Pangasinan","amountPesos":122302000,"lengthMeters":240.0,"ratePesosPerMeter":509591.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424400"},{"year":2021,"category":"Roads","project":"Construction of Roads with Slip / Slope Collapse Along Calapan North Road, Calapan Oriental Mindoro K0022+950 - K0023+600","amountPesos":122400000,"lengthMeters":650.0,"ratePesosPerMeter":188307.6923076923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424401"},{"year":2021,"category":"Roads","project":"Construction of Roads with Slip / Slope Collapse Along Calapan North Road, Calapan Oriental Mindoro K0040+400 - K0041+100","amountPesos":122825000,"lengthMeters":700.0,"ratePesosPerMeter":175464.2857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424402"},{"year":2021,"category":"Roads","project":"Construction of Roads with Slip / Slope Collapse Along Calapan North Road, Calapan Oriental Mindoro K0042+000 - K0042+500","amountPesos":122825000,"lengthMeters":500.0,"ratePesosPerMeter":245650.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424403"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide, Abra-Kalinga Road K0474+100 - K0474+600","amountPesos":122825000,"lengthMeters":500.0,"ratePesosPerMeter":245650.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424405"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide, Abra-Kalinga Road K0453+200 - K0453+700","amountPesos":122825000,"lengthMeters":500.0,"ratePesosPerMeter":245650.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424406"},{"year":2021,"category":"Roads","project":"Slope Protection along Nueva Ecija - Aurora Road (K0175+200 - K0183+650)","amountPesos":85000000,"lengthMeters":8450.0,"ratePesosPerMeter":10059.171597633136,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424407"},{"year":2021,"category":"Roads","project":"Slope Protection along Nueva Ecija - Aurora Road (K0184+050 - K0190+130)","amountPesos":85000000,"lengthMeters":6080.0,"ratePesosPerMeter":13980.263157894737,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424408"},{"year":2021,"category":"Roads","project":"Slope Protection along Nueva Ecija - Aurora Road (K0190+700 - K0195+160)","amountPesos":85000000,"lengthMeters":4460.0,"ratePesosPerMeter":19058.295964125562,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424409"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide - Magsaysay Ave (Trinidad Road) K0252+366 to K0252+441","amountPesos":15400000,"lengthMeters":75.0,"ratePesosPerMeter":205333.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424415"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide - Kennon Road - K0242+(-088) to K0242+(-055)","amountPesos":5390000,"lengthMeters":33.0,"ratePesosPerMeter":163333.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424416"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide - PMA Cut Off RD 1: K0252+(-687) -K0252+(-558)","amountPesos":13629000,"lengthMeters":129.0,"ratePesosPerMeter":105651.16279069768,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424417"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide - PMA RD K0249+232 - K0249+252","amountPesos":4081000,"lengthMeters":20.0,"ratePesosPerMeter":204050.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424418"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation of Manila East Road K0026+640-K0027+176, K0027+199-K0028+056, Rizal","amountPesos":40207000,"lengthMeters":1393.0,"ratePesosPerMeter":28863.603732950465,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424421"},{"year":2021,"category":"Roads","project":"Rehabilitation/Improvement of San Mateo - Rodriguez Road, K0024+000 to K0027+500, San Mateo and Rodriguez,Rizal","amountPesos":85000000,"lengthMeters":3500.0,"ratePesosPerMeter":24285.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424423"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of roads with slips, slope collapse and landslide û k045+877-k046+103, Junction Bancal û Leon û Antique National Road, Leon, Iloilo","amountPesos":77350000,"lengthMeters":226.0,"ratePesosPerMeter":342256.6371681416,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424433"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of roads with slips, slope collapse and landslide û k046+276-k046+433, Junction Bancal û Leon û Antique National Road, Leon, Iloilo","amountPesos":73950000,"lengthMeters":157.0,"ratePesosPerMeter":471019.10828025476,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424434"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of roads with slips, slope collapse and landslide û k046+760-k046+953, Junction Bancal û Leon û Antique National Road, Leon, Iloilo","amountPesos":80325000,"lengthMeters":193.0,"ratePesosPerMeter":416191.7098445596,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424435"},{"year":2021,"category":"Roads","project":"Rehabilitation/ Reconstruction of Roads with Slips, Slope and Landslide, Cebu - Balamban Transcentral Highway KM 7+059 - KM7+429, KM7+280 - KM7+421, Cebu City","amountPesos":40613000,"lengthMeters":370.0,"ratePesosPerMeter":109764.86486486487,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424436"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope and Landslide, Cebu - Balamban Transcentral Highway KM 7+421 - KM7+630, KM7+650 - KM7+684, Cebu City","amountPesos":40613000,"lengthMeters":243.0,"ratePesosPerMeter":167131.68724279836,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424437"},{"year":2021,"category":"Roads","project":"Rehabilitation/ Reconstruction of Roads with Slips, Slope, Cebu - Balamban Transcentral Highway KM 7+684 - KM7+780, KM7+900 - KM8+012, Cebu City","amountPesos":40613000,"lengthMeters":208.0,"ratePesosPerMeter":195254.8076923077,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424438"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope and Landslide, Cebu - Balamban Transcentral Highway KM 8+012 - KM8+140, KM10+126 - KM10+223, Cebu City","amountPesos":40613000,"lengthMeters":225.0,"ratePesosPerMeter":180502.22222222222,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424439"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope and Landslide, Cebu - Balamban Transcentral Highway KM 10+223 - KM10+406, KM10+450 - KM10+492, Cebu City","amountPesos":40613000,"lengthMeters":225.0,"ratePesosPerMeter":180502.22222222222,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424440"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope and Landslide, Cebu - Balamban Transcentral Highway KM 10+492 - KM10+717, Cebu City","amountPesos":40613000,"lengthMeters":225.0,"ratePesosPerMeter":180502.22222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424441"},{"year":2021,"category":"Roads","project":"Rehabilitation/Improvement of Slope Failure for Rockfall Protection System Along Calubian-San Isidro-Tabango-Villaba-Palompon Road Leyte. K1054+000 - K1054+400","amountPesos":40613000,"lengthMeters":400.0,"ratePesosPerMeter":101532.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424445"},{"year":2021,"category":"Roads","project":"Reconstruction of National Roads with Slips, Slope Collapse, and Landslides along Mauban - Tignoan Road - Real Side (Package G), K0117+717.00 - K0117+771.00","amountPesos":100000000,"lengthMeters":54.0,"ratePesosPerMeter":1851851.851851852,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424446"},{"year":2021,"category":"Roads","project":"Improvement of Liloan - San Ricardo Road (S00218LT) K1056+-896 - K1070+000, Maasin City, Southern Leyte","amountPesos":60000000,"lengthMeters":14896.0,"ratePesosPerMeter":4027.9269602577874,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424450"},{"year":2021,"category":"Roads","project":"Construction/Upgrading/Rehabilitation of Drainage along Manila North Road K0270+590 to K0271+082, San Fernando City, La Union","amountPesos":25000000,"lengthMeters":492.0,"ratePesosPerMeter":50813.0081300813,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424454"},{"year":2021,"category":"Roads","project":"Rehabilitation/ Reconstruction of Roads with Skipa, Slope Collapse and Landslide km 602+430 to km 602+495, Sta. Praxedes, Cagayan Valley","amountPesos":20000000,"lengthMeters":65.0,"ratePesosPerMeter":307692.3076923077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424455"},{"year":2021,"category":"Roads","project":"Construction of Missing Links /New Road Sumbiling - Canipaan, Package A, 0+000 - 5+000, Palawan","amountPesos":46750000,"lengthMeters":5000.0,"ratePesosPerMeter":9350.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424519"},{"year":2021,"category":"Roads","project":"Construction of Missing Links/New Road Sumbiling - Canipaan, Package B, 5+000-10+000, Palawan","amountPesos":46750000,"lengthMeters":5000.0,"ratePesosPerMeter":9350.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424520"},{"year":2021,"category":"Roads","project":"Construction of Missing Links/New Road Sumbiling - Canipaan, Package D, 20+000 - 25+000, Palawan","amountPesos":46750000,"lengthMeters":5000.0,"ratePesosPerMeter":9350.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424522"},{"year":2021,"category":"Roads","project":"Construction of Sofronio Espanola - Quezon Cross Country Road (Pulot Interior - Tagusao Section), Package C (Sta. 182+000 - Sta. 188+500), Palawan","amountPesos":46750000,"lengthMeters":6500.0,"ratePesosPerMeter":7192.307692307692,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424539"},{"year":2021,"category":"Roads","project":"Construction/Reblocking of Seit-Tayungan National Road Sulu KM38+000 - 41+000","amountPesos":68000000,"lengthMeters":3000.0,"ratePesosPerMeter":22666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424579"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction/Upgrading of Tapaz-Jamindan-Altavas Road, K0104 + 500 - K0105 + 664, K0105 + 754 - K0107 + 060","amountPesos":73950000,"lengthMeters":2470.0,"ratePesosPerMeter":29939.27125506073,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424593"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction/Upgrading of Tapaz-Jamindan-Altavas Road, K0107 + 088 - K0108 + 076, K0108 + 106 - K0109 + 000","amountPesos":52700000,"lengthMeters":1882.0,"ratePesosPerMeter":28002.12539851222,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424594"},{"year":2021,"category":"Roads","project":"Road Widening, Jct nAt'l Road Ayuyan-Tinaytayan Road, K0092 + 000 - K0093 + 500","amountPesos":44548000,"lengthMeters":1500.0,"ratePesosPerMeter":29698.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424595"},{"year":2021,"category":"Roads","project":"Road Widening, Iloilo - Capiz Road (Old Route), K0097 + 000 - K0099 + 577","amountPesos":74375000,"lengthMeters":2577.0,"ratePesosPerMeter":28861.078773767946,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424596"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Langogan-Roxas Road Section, K0105+568 - K0105+643, K0125+035 - K0125+05, Palawan","amountPesos":23100000,"lengthMeters":105.0,"ratePesosPerMeter":220000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424834"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0010+700 - K0010+850, Palawan","amountPesos":32491000,"lengthMeters":150.0,"ratePesosPerMeter":216606.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424835"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0012+950 - K0013+100, Palawan","amountPesos":32491000,"lengthMeters":150.0,"ratePesosPerMeter":216606.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424836"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0013+170 - K0013+300, Palawan","amountPesos":32491000,"lengthMeters":130.0,"ratePesosPerMeter":249930.76923076922,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424837"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0013+360 - K0013+500, Palawan","amountPesos":32491000,"lengthMeters":140.0,"ratePesosPerMeter":232078.57142857142,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424838"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0014+000 - K0014+120, K0014+200 - K0014+300, Palawan","amountPesos":36552000,"lengthMeters":220.0,"ratePesosPerMeter":166145.45454545456,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424839"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0014+510 - K0014+790, Palawan","amountPesos":36552000,"lengthMeters":280.0,"ratePesosPerMeter":130542.85714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424840"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0014+880 - K0015+00, K0015+100 - K0015+200, Palawan","amountPesos":32491000,"lengthMeters":220.0,"ratePesosPerMeter":147686.36363636365,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424841"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0015+300 - K0015+350, Palawan","amountPesos":23100000,"lengthMeters":50.0,"ratePesosPerMeter":462000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424842"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0015+550 - K0015+700, Palawan","amountPesos":36552000,"lengthMeters":150.0,"ratePesosPerMeter":243680.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424843"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0015+720 - K0015+800, K0016+150 - K0016+220, Palawan","amountPesos":32491000,"lengthMeters":150.0,"ratePesosPerMeter":216606.66666666666,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424844"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0016+380 - K0016+450, Palawan","amountPesos":23100000,"lengthMeters":70.0,"ratePesosPerMeter":330000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424845"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0016+500 - K0016+630 - KOO16+650, Palawan","amountPesos":32491000,"lengthMeters":130.0,"ratePesosPerMeter":249930.76923076922,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424846"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0016+800 - K0016+910, Palawan","amountPesos":32491000,"lengthMeters":110.0,"ratePesosPerMeter":295372.7272727273,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424847"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0016+950 - K0017+020, K0017+700 - K0017+750, Palawan","amountPesos":32491000,"lengthMeters":120.0,"ratePesosPerMeter":270758.3333333333,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424848"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along San Jose - Port Barton Road Section, K0017+910 - K0017+970, K0018+030 - K0018+120, Palawan","amountPesos":32491000,"lengthMeters":150.0,"ratePesosPerMeter":216606.66666666666,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424849"},{"year":2021,"category":"Roads","project":"Construction of Sofronio Espanola - Quezon Cross Country Road (Pulot Interior - Tagusao Section), Package A (Sta. 162+820 - Sta. 173+019), Palawan","amountPesos":40614000,"lengthMeters":10199.0,"ratePesosPerMeter":3982.155113246397,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424850"},{"year":2021,"category":"Roads","project":"Construction of Sofronio Espanola - Quezon Cross Country Road (Pulot Interior - Tagusao Section), Package B (Sta. 173+079 - Sta. 184+500), Palawan","amountPesos":40614000,"lengthMeters":11421.0,"ratePesosPerMeter":3556.080903598634,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424851"},{"year":2021,"category":"Roads","project":"Concreting of Roads Sitio Cabungan, Brgy Cadapdapan, Candijay to Brgy. Inaghuban, Sta. 0+000.00-Sta. 2+800.00, Pilar, Bohol","amountPesos":32491000,"lengthMeters":2800.0,"ratePesosPerMeter":11603.92857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 424903"},{"year":2021,"category":"Roads","project":"Concreting of Brgy. Calaya to So. Casilian, Brgy. Oracon Road, Nueva Valencia And Sibunag, Guimaras (Sta. 0+000 - Sta. 4+000)","amountPesos":79400000,"lengthMeters":4000.0,"ratePesosPerMeter":19850.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425084"},{"year":2021,"category":"Roads","project":"Concreting of So. Lebas, Brgy. Sapal to Brgy. Sebario Road, San Lorenzo, Guimaras (Sta. 0+190 - Sta. 3+025, Sta. 4+595 - Sta. 4+905, Sta. 5+265 - Sta. 5+675)","amountPesos":70776000,"lengthMeters":3555.0,"ratePesosPerMeter":19908.86075949367,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425093"},{"year":2021,"category":"Roads","project":"Concreting of Dapa-Union-Gen. Luna Road (Gen. Luna - Malinao Section) Section 1, K0004 + 409 - K0005 + 925, General Luna, Surigao del Norte","amountPesos":55000000,"lengthMeters":1516.0,"ratePesosPerMeter":36279.683377308706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425162"},{"year":2021,"category":"Roads","project":"Concreting of Sapang Dalaga-Concepcion-Mansawan-Don Victoriano Road. (Misamis Occidental Hinterland Alternate National Road Netwrok) Sta. 05+175 - Sta. 08+675 (Package 1) Sapang Dalaga, Misamis Occidental","amountPesos":30000000,"lengthMeters":3500.0,"ratePesosPerMeter":8571.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425190"},{"year":2021,"category":"Roads","project":"Construction of Concrete Road, Jct. NHW (Cotabato-Marbel Rd.) - Kolambog - Dumaguil Bypass Road, Sta. 3+850 - Sta. 7+100, Norala, South Cotabato","amountPesos":80000000,"lengthMeters":3250.0,"ratePesosPerMeter":24615.384615384617,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425239"},{"year":2021,"category":"Roads","project":"Construction of Concrete Road, Jct. NHW (Cotabato-Marbel Road) - Kolambog - Dumaguil Bypass Road, Sta. 0+000 - 3+850, Norala, South Cotabato","amountPesos":102000000,"lengthMeters":3850.0,"ratePesosPerMeter":26493.506493506495,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425240"},{"year":2021,"category":"Roads","project":"Construction of Concrete Road, Jct. Surallah - Lake Sebu - Maitum Road - Luhib - Lamfugon - Tasiman Bypass Road, Sta. 0+000 - Sta. 4+140, Lake Sebu, South Cotabato","amountPesos":140000000,"lengthMeters":4140.0,"ratePesosPerMeter":33816.42512077295,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425241"},{"year":2021,"category":"Roads","project":"Construction of Concrete Road, Jct. Surallah - Lake Sebu - Maitum Road - Luhib - Lamfugon - Tasiman Bypass Road, Sta. 4+140 - Km 8+140, Lake Sebu, South Cotabato","amountPesos":97000000,"lengthMeters":4000.0,"ratePesosPerMeter":24250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425242"},{"year":2021,"category":"Roads","project":"Construction of Road, Bonga - Pamamas-An Linooban - Mararangsi-Caluyahan, Sta. 0+000 to Sta. 11+380.193, Motiong, Samar","amountPesos":215000000,"lengthMeters":11380.193,"ratePesosPerMeter":18892.473967708633,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425284"},{"year":2021,"category":"Roads","project":"Construction of Road, Km 44 +000 - Km 60+000, Binicalan, San Luis, Agusan del Sur","amountPesos":105000000,"lengthMeters":16000.0,"ratePesosPerMeter":6562.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425303"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads - Bataan Technological Park Inc. Road (BTPI) - K0175+(506) - K0177+000, K0177+388 - K0180+633, Morong, Bataan Phase I","amountPesos":50000000,"lengthMeters":4739.0,"ratePesosPerMeter":10550.749103186326,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425359"},{"year":2021,"category":"Roads","project":"Road widening including drainage along Mabuhay Road, Sta. 3+666 to Sta. 4+991, General Santos City","amountPesos":70000000,"lengthMeters":1325.0,"ratePesosPerMeter":52830.188679245286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425370"},{"year":2021,"category":"Roads","project":"Road widening including drainage along Mabuhay Road, Sta. 4+991 to Sta. 6+316, General Santos City","amountPesos":70000000,"lengthMeters":1325.0,"ratePesosPerMeter":52830.188679245286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425371"},{"year":2021,"category":"Roads","project":"Construction of Road Protection along Jct. (TER) Guindulman-Anda-Badiang-Cogtong Road, Anda, Bohol, Sta 20 + 460 - Sta 20 + 780 (Left Side)","amountPesos":56000000,"lengthMeters":320.0,"ratePesosPerMeter":175000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425378"},{"year":2021,"category":"Roads","project":"Construction/Re-blocking of Romandier Camp Andres-Tandu Bato National Road, Km 26+000 - Km 56+198 (with exception), 2nd District, Sulu","amountPesos":100000000,"lengthMeters":30198.0,"ratePesosPerMeter":3311.4775812967746,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425422"},{"year":2021,"category":"Roads","project":"Labangan-Midsalip Road, Sta. 0+000 - Sta. 4+200, (Package 2), Zamboanga del Sur","amountPesos":100000000,"lengthMeters":4200.0,"ratePesosPerMeter":23809.52380952381,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425424"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation of Abra-Ilocos Norte Road, K0416 + 000 - K0419 + 000, Benben and Vanan, La Paz, Abra","amountPesos":25000000,"lengthMeters":3000.0,"ratePesosPerMeter":8333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425658"},{"year":2021,"category":"Roads","project":"Road Slope Protection Project along Governor Bado Dangwa National Road, Mayus, Poblacion, Kibungan, Benguet, K0320 + 442 - K0320 + 542","amountPesos":50000000,"lengthMeters":100.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425663"},{"year":2021,"category":"Roads","project":"Preventive Maintenance/ Rehabilitation of Daang Hari Road, Chainage 0 - Chainage 675, Bacoor City, Cavite","amountPesos":45000000,"lengthMeters":675.0,"ratePesosPerMeter":66666.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425779"},{"year":2021,"category":"Roads","project":"Preventive Maintenance/ Rehabilitation of Daang Hari Road, Chainage 675-Chainage 1350, Bacoor City, Cavite","amountPesos":45000000,"lengthMeters":675.0,"ratePesosPerMeter":66666.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425780"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation (Asphalt Overlay) of Manila East Road, K0023+689-K0025+630, Taytay, Rizal Phase I","amountPesos":30000000,"lengthMeters":1941.0,"ratePesosPerMeter":15455.950540958269,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425829"},{"year":2021,"category":"Roads","project":"Rehabilitation/Improvement (Asphalt Overlay) at Marikina-Infanta Road, KM. 0055+400-KM 0058+400, Tanay, Rizal Phase I","amountPesos":30000000,"lengthMeters":3000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425830"},{"year":2021,"category":"Roads","project":"Repair/Restoration of Road with slips, soil collapse and landslide, Marinduque Circumferential Road- K0022+080 - K0022+140, Lamesa, Santa Cruz, Marinduque","amountPesos":20000000,"lengthMeters":60.0,"ratePesosPerMeter":333333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425834"},{"year":2021,"category":"Roads","project":"Construction of Road, Barangay Ressurreccion to Barangay Del Rosario, San Fernando, Masbate (Sta. 1+123.8 - Sta. 2+440)","amountPesos":43000000,"lengthMeters":1316.2,"ratePesosPerMeter":32669.807020209693,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425974"},{"year":2021,"category":"Roads","project":"Construction of Road, Ressurreccion to Del Rosario, San Fernando, Masbate (Sta. 2+440 - Sta. 3+540)","amountPesos":41000000,"lengthMeters":1100.0,"ratePesosPerMeter":37272.72727272727,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 425975"},{"year":2021,"category":"Roads","project":"Construction / Rehabilitation of National Roads along Bdry. S. Leyte - Maasin Macrohon - Sogod - JCT Daang Maharlika Rd. (S00194LT) K1157+588 - K1167+000","amountPesos":29400000,"lengthMeters":9412.0,"ratePesosPerMeter":3123.671908202295,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426354"},{"year":2021,"category":"Roads","project":"Rehabilitation of Road with Slips, Soil Collapse and Landslides, KM 83+000 - KM 83+402, Aloguinsan, Cebu","amountPesos":85000000,"lengthMeters":402.0,"ratePesosPerMeter":211442.78606965175,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426372"},{"year":2021,"category":"Roads","project":"Rehabilitation of Road with Slips, Soil Collapse and Landslides, KM 87+000 - KM 87+402, Aloguinsan, Cebu","amountPesos":85000000,"lengthMeters":402.0,"ratePesosPerMeter":211442.78606965175,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426373"},{"year":2021,"category":"Roads","project":"Concreting of SRP Back Road,Sta. 0+000 to Sta. 3 +300, Cebu City,","amountPesos":72987000,"lengthMeters":3300.0,"ratePesosPerMeter":22117.272727272728,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426393"},{"year":2021,"category":"Roads","project":"Concreting of El Pardo St., South Road Properties, Sta. 0+000 to Sta. 1+080, Cebu City","amountPesos":75312000,"lengthMeters":1080.0,"ratePesosPerMeter":69733.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426394"},{"year":2021,"category":"Roads","project":"Concreting/Opening of Road, JNR Tabunok to Iligay Rd., Villaba, Leyte (Sta 0+000 -Sta 1+500)","amountPesos":70550000,"lengthMeters":1500.0,"ratePesosPerMeter":47033.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426395"},{"year":2021,"category":"Roads","project":"Concreting of Road, JNR Tabunok to Iligay Rd., Villaba, Leyte (Sta 0 + 300 - Sta 1+500)","amountPesos":56950000,"lengthMeters":1200.0,"ratePesosPerMeter":47458.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426396"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection for Brgy. Cabalagnan, Nueva Valencia, Guimaras K0080+150-K0080+450 Both Sides)","amountPesos":76160000,"lengthMeters":300.0,"ratePesosPerMeter":253866.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426397"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection for Brgy. Cabalagnan, Nueva Valencia, Guimaras (K0080+550-K0080+990 Both Sides)","amountPesos":80580000,"lengthMeters":440.0,"ratePesosPerMeter":183136.36363636365,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426398"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection for Brgy. Cabalagnan, Nueva Valencia, Guimaras (K0081+100-K0081+250 Both Sides)","amountPesos":64770000,"lengthMeters":150.0,"ratePesosPerMeter":431800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426399"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection for Brgy. Sto. Rosario, Buenavista, Guimaras (K0020+100-K0020+600 Left Side)","amountPesos":82450000,"lengthMeters":500.0,"ratePesosPerMeter":164900.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426400"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Langogan-Roxas Road Section, Palawan K0098+150 - K0098+350, K099+445 - K0099+470","amountPesos":63537000,"lengthMeters":225.0,"ratePesosPerMeter":282386.6666666667,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426401"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Langogan-Roxas Road Section, Palawan K0099+470 - K0099+525, K0099+717 - K0099+770","amountPesos":58552000,"lengthMeters":108.0,"ratePesosPerMeter":542148.1481481482,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426402"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Langogan-Roxas Road Section, Palawan K0100+290 - K0100+430, K0101+192 - K0101+309","amountPesos":75365000,"lengthMeters":257.0,"ratePesosPerMeter":293249.0272373541,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426403"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Langogan-Roxas Road Section, Palawan K0104+125 - K0104+190, K0104+600 - K0104+647, K0104+647 - K0104+720","amountPesos":81230000,"lengthMeters":185.0,"ratePesosPerMeter":439081.08108108107,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426404"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Langogan-Roxas Road Section, Palawan K0104+810 - K0104+935, K0105+243 - K0105+343","amountPesos":63537000,"lengthMeters":225.0,"ratePesosPerMeter":282386.6666666667,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426405"},{"year":2021,"category":"Roads","project":"Concreting of Katuday-Sinimbaan Road, Brgy. Bantug and Brgy. Simimbaan, Sta 0+000 to Sta 3+600, Roxas, Isabela","amountPesos":40613000,"lengthMeters":3600.0,"ratePesosPerMeter":11281.388888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426521"},{"year":2021,"category":"Roads","project":"Rehabilitation/Improvement of Brgy. District 2 Municipal and Brgy. Road Sta 0+467.5 Sta 0+547.0, Sta 0+892.0 Sta 0+963.5, Sta 0+362.5 Sta 0+488.0, Sta 0+581.5 Sta 0+723.5, Sta 0+956.5 Sta 1+032.5, Sta 0+837.5 Sta 1+024.0, Sta 0+000.0 Sta 0+072.0, Sta 0+000.0 Sta 0+072.0, Sta 0+360.0 Sta 0+484.0, Sta 0+089.0 Sta 0+197.0, Sta 0+000.0 Sta 0+193.0, Sta 0+000.0 Sta 0+381.0, Sta 0+000.0 Sta 0+101.0, Sta 0+132.0 Sta 0+472.0, Sta 0+000.0 Sta 0+478.5, Sta 0+002.5 Sta 0+131.0, Reblocking, Sta 0+318.5 Sta 0+467.5, Sta 0+146.5 Sta 0+359.0, Sta 0+488.0 Sta 0+560.5 San Manuel, Isabela","amountPesos":30460000,"lengthMeters":897.5,"ratePesosPerMeter":33938.71866295265,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426523"},{"year":2021,"category":"Roads","project":"Rehabilitation of Bolo - Pulang Lupa Road, Sta 1+076 to Sta 2+076, Torrijos, Marinduque","amountPesos":68000000,"lengthMeters":1000.0,"ratePesosPerMeter":68000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426720"},{"year":2021,"category":"Roads","project":"Rehabilitation/Improvement of Sibuyao - Sabong Road, Sta. 0+000 to Sta 1+000, Torrijos, Marinduque","amountPesos":62475000,"lengthMeters":1000.0,"ratePesosPerMeter":62475.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426721"},{"year":2021,"category":"Roads","project":"Rehabilitation/Improvement of Botilao - Ipil Road, Sta 0+000 to Sta 1+000, Sta. Cruz, Marinduque","amountPesos":83937000,"lengthMeters":1000.0,"ratePesosPerMeter":83937.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426722"},{"year":2021,"category":"Mixed roads / bridges","project":"Construction of Umbuyan Road including Bridge, Brgy. Pitogo, Rizal, Occidental Mindoro Sta. 0+000 - Sta. 1+700","amountPesos":40614000,"lengthMeters":1700.0,"ratePesosPerMeter":23890.58823529412,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426726"},{"year":2021,"category":"Mixed roads / bridges","project":"Construction of Iba Road including Bridge, Brgy. Pitogo, Rizal, Occidental Mindoro Sta. 0+000 - Sta. 1+600","amountPesos":38177000,"lengthMeters":1600.0,"ratePesosPerMeter":23860.625,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426727"},{"year":2021,"category":"Mixed roads / bridges","project":"Construction of Nalbu Road including Bridge, Brgy. Sto. Ni±o, Rizal, Occidental Mindoro Sta. 0+000 - Sta. 2+700","amountPesos":40614000,"lengthMeters":2700.0,"ratePesosPerMeter":15042.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426728"},{"year":2021,"category":"Mixed roads / bridges","project":"Construction of road including Bridge, So. Pusog, Brgy. Burgos, Sablayan, Occidental Mindoro Sta. 0+000 - Sta. 2+500","amountPesos":40614000,"lengthMeters":2500.0,"ratePesosPerMeter":16245.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426729"},{"year":2021,"category":"Roads","project":"Construction of road, So. Bagolayag, Brgy. Sta. Maria - Brgy. Mananao,Paluan, Occidental Mindoro Sta. 0+000 - Sta. 1+900","amountPesos":40614000,"lengthMeters":1900.0,"ratePesosPerMeter":21375.78947368421,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426730"},{"year":2021,"category":"Roads","project":"Construction/Opening of Mat-I Sitio Sayaw, Brgy. Canyayo Road, Sta. 0+000 to Sta. 3+701.15, Sta. Fe, Romblon","amountPesos":84150000,"lengthMeters":3701.15,"ratePesosPerMeter":22736.176593761396,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426742"},{"year":2021,"category":"Roads","project":"Construction/Opening of Access Road, Brgy. Mat-I (Sta. Fe) - Brgy. Agoho (Looc), Sta. 0+000 to Sta 3+050, Sta. Fe, Romblon","amountPesos":68425000,"lengthMeters":3050.0,"ratePesosPerMeter":22434.426229508197,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426743"},{"year":2021,"category":"Roads","project":"Construction of Coastal Road along Tambuyungan leading to Dubduban, Sta 0+000 to Sta. 0+155, San Agustin, Romblon","amountPesos":83895000,"lengthMeters":155.0,"ratePesosPerMeter":541258.0645161291,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426744"},{"year":2021,"category":"Roads","project":"Construction/Improvement/Opening of Brgy. Cagbacong Road, (Sta 0+000 Sta 0+700) Legazpi City","amountPesos":85000000,"lengthMeters":700.0,"ratePesosPerMeter":121428.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426770"},{"year":2021,"category":"Roads","project":"Construction/Improvement of Access Roads leading to Buyo-Danao Lake, (Sta 0+000 Sta 1+700), Manito, Albay","amountPesos":85000000,"lengthMeters":1700.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426771"},{"year":2021,"category":"Roads","project":"Construction/Improvement/Opening of Cagbacong ûBariis Road, (Sta 0+000 Sta 0+700) Legazpi City","amountPesos":85000000,"lengthMeters":700.0,"ratePesosPerMeter":121428.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426772"},{"year":2021,"category":"Roads","project":"Construction/Opening of Nagotgot-Sitio Inang Maharang Road, (Sta. 0+000 Sta. 1+700), Manito, Albay","amountPesos":85000000,"lengthMeters":1700.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426773"},{"year":2021,"category":"Roads","project":"Construction on Bamban Road,( Sta0+000 Sta 1+700), Manito, Albay","amountPesos":85000000,"lengthMeters":1700.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426774"},{"year":2021,"category":"Roads","project":"Construction/Rehabilitation/Improvement of Balasbas-Bamban Road, (Sta 0+000 Sta 1+700), Manito, Albay","amountPesos":85000000,"lengthMeters":1700.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426775"},{"year":2021,"category":"Roads","project":"Road Opening of Sta. Cruz-Caima Road, Brgy. Caima, (Sta 0+000 Sta 1+500) Libmanan, Camarines Sur","amountPesos":40614000,"lengthMeters":1500.0,"ratePesosPerMeter":27076.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426799"},{"year":2021,"category":"Roads","project":"Road Opening of Villa Socorro-Calabnigan Road, Brgy. Villa Socorro, (Sta 1+700 Sta 3+200)Libmanan, Camarines Sur","amountPesos":40614000,"lengthMeters":1500.0,"ratePesosPerMeter":27076.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426800"},{"year":2021,"category":"Roads","project":"Road Opening of Calabnigan-Villa Socorro Road, Brgy. Calabnigan, (Sta 4+200 Sta 5+700), Libmanan, Camarines Sur","amountPesos":40614000,"lengthMeters":1500.0,"ratePesosPerMeter":27076.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426801"},{"year":2021,"category":"Roads","project":"Road Opening of Alianza-Calascagas Road, Brgy. Calascagas, (Sta 1+500 Sta 3+000) San Fernando, Camarines Sur","amountPesos":40614000,"lengthMeters":1500.0,"ratePesosPerMeter":27076.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426802"},{"year":2021,"category":"Roads","project":"Road Opening of Cambalidio-Tinalmud Viejo Road, Brgy. Tinalmud Viejo,(Sta 5+100 Sta 6+600) Libmanan, Camarines Sur","amountPesos":40614000,"lengthMeters":1500.0,"ratePesosPerMeter":27076.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426803"},{"year":2021,"category":"Roads","project":"Road Opening of Beguito Viejo-Udoc Road, Brgy. Beguito Viejo to Brgy. Udoc. (Sta 0+350 Sta 1+850) Libmanan, Camarines Sur","amountPesos":40614000,"lengthMeters":1500.0,"ratePesosPerMeter":27076.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426804"},{"year":2021,"category":"Roads","project":"Road Opening of Poblacion-San Ramon Road, Brgy. Poblacion to Brgy. San Ramon, (Sta 0+000 Sta 1+400) Pamplona, Camarines Sur","amountPesos":32491000,"lengthMeters":1400.0,"ratePesosPerMeter":23207.85714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426805"},{"year":2021,"category":"Roads","project":"Road Opening of Buenavista-Lupi Road, Brgy. Buenavista to Brgy. Lupi, (Sta 0+000 Sta 0+700) San Fernando, Camarines Sur","amountPesos":15400000,"lengthMeters":700.0,"ratePesosPerMeter":22000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426806"},{"year":2021,"category":"Roads","project":"Road Opening of Del Rosario Road, Brgy. Poblacion to Brgy. Del Rosario,(Sta 0+000 Sta 0+700) Pamplona, Camarines Sur","amountPesos":15400000,"lengthMeters":700.0,"ratePesosPerMeter":22000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426807"},{"year":2021,"category":"Roads","project":"Road Opening of Del Rosario Road, Brgy. Del Rosario, (Sta 0+000 Sta 0+700) Milaor, Camarines Sur","amountPesos":15400000,"lengthMeters":700.0,"ratePesosPerMeter":22000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426808"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection for Brgy. San Antonio, Nueva Valencia, Guimaras (K0067+420-K0067+595 Left Side)","amountPesos":34440000,"lengthMeters":175.0,"ratePesosPerMeter":196800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 426863"},{"year":2021,"category":"Roads","project":"Concreting of Road, So. Toong, Brgy. Cabalagnan to So. Iraya, Brgy. Salvacion Road, Sta. 0+400 - Sta. 3+300, Nueva Valencia, Guimaras","amountPesos":56840000,"lengthMeters":2900.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 427094"},{"year":2021,"category":"Roads","project":"Concreting of Salvacion-Lanipe-Oracon Road, Sta. 0+000 - Sta. 1+900, Sta. 3+710 - Sta. 3+805, Sta. 3+850 - Sta. 5+425, Sta. 5+650 - Sta. 5+670, Nueva Valencia, Guimaras","amountPesos":100000000,"lengthMeters":3590.0,"ratePesosPerMeter":27855.15320334262,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 427096"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection along Governor Dangwa National Road at Ambalideng, Poblacion, Kibungan, Benguet, K0315+750 - K0315+820","amountPesos":60000000,"lengthMeters":70.0,"ratePesosPerMeter":857142.8571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 427097"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Structure along Governor Bado Dangwa National Road at Ampusongan, Bakun, Benguet, K0339+574 - K0339+660","amountPesos":60000000,"lengthMeters":86.0,"ratePesosPerMeter":697674.4186046511,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 427098"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection Structure Along Palompon-Isabel-Merida-Ormoc Road, K1069+200 - 1069+400","amountPesos":120000000,"lengthMeters":200.0,"ratePesosPerMeter":600000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 427124"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection Structure Along Merida-Lundag-Puting Bato-Consolascion-Isabel Road K1117+100 - 1117+300","amountPesos":150000000,"lengthMeters":200.0,"ratePesosPerMeter":750000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 427125"},{"year":2021,"category":"Roads","project":"Construction/Improvement of Access Road leading to Calpi-Danao Lake, Phase 2 (Sta. 0+000-1+700), Manito, Albay","amountPesos":95000000,"lengthMeters":1700.0,"ratePesosPerMeter":55882.35294117647,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 427154"},{"year":2021,"category":"Roads","project":"Construction/Improvement of Cagbacong-Barilis Road, Sta. 1+480 - Sta. 2+480, Legazpi City, Albay","amountPesos":75000000,"lengthMeters":1000.0,"ratePesosPerMeter":75000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 427155"},{"year":2021,"category":"Roads","project":"Construction/Improvement of Cotmon-Comun-Maninila Road, Sta. 0+000 - Sta. 1+000), Camalig, Albay","amountPesos":95000000,"lengthMeters":1000.0,"ratePesosPerMeter":95000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 427159"},{"year":2021,"category":"Roads","project":"Construction of Road Slope Protection Project along Governor Bado Dangwa National Road at Ambalideng, Poblacion, Kibungan, Benguet, K0316+050 - K0316+150","amountPesos":40000000,"lengthMeters":100.0,"ratePesosPerMeter":400000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 427603"},{"year":2021,"category":"Roads","project":"Concreting of Road, Sta. 4+320 - Sta. 8+000, Dicamay I, Jones, Isabela","amountPesos":30000000,"lengthMeters":3680.0,"ratePesosPerMeter":8152.173913043478,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 427803"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection along Calapan South Road, Brgy. Hagan, Bongabong, Oriental Mindoro K0119+106-K0119+283.50, Bongabong, Oriental Mindoro","amountPesos":50000000,"lengthMeters":177.5,"ratePesosPerMeter":281690.1408450704,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 428657"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection along Calapan South Road K0127+803-K0127+974.50 Bongabong, Oriental Mindoro","amountPesos":50000000,"lengthMeters":171.5,"ratePesosPerMeter":291545.1895043732,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 428658"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection along Calapan South Road K0127+553.50-K0127+642.30, Bongabong, Oriental Mindoro","amountPesos":50000000,"lengthMeters":88.8,"ratePesosPerMeter":563063.0630630446,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 428659"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection along Calapan South Road K0128+(-008)-K0128+278.50, Bongabong, Oriental Mindoro","amountPesos":50000000,"lengthMeters":286.5,"ratePesosPerMeter":174520.0698080279,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 428660"},{"year":2021,"category":"Roads","project":"Construction of By-Pass Road, Barangay Carriedo-Liang-Hidhid, Irosin-Matnog, Sorsogon Sta. 2+712-Sta. 4+068","amountPesos":50000000,"lengthMeters":1356.0,"ratePesosPerMeter":36873.15634218289,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 428858"},{"year":2021,"category":"Roads","project":"Construction of By-Pass Road, Barangay Carriedo-Liang-Hidhid, Irosin-Matnog, Sorsogon Sta. 4+608-Sta. 5+424","amountPesos":50000000,"lengthMeters":816.0,"ratePesosPerMeter":61274.509803921566,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 428859"},{"year":2021,"category":"Roads","project":"Concreting of Napandong - So. Sambulawa -Tando Road, Sta. 0+520 - Sta. 0+960, Sta. 1+180 - Sta. 1+850, Sta. 2+100 - Sta. 2+300, Sta. 2+620 - Sta. 2+880, Sta. 2+990 - Sta. 3+020, Nueva Valencia, Guimaras","amountPesos":31360000,"lengthMeters":1600.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 428953"},{"year":2021,"category":"Roads","project":"Concreting of Road, Brgy. Alaguisoc to Brgy. Bugnay, Sta. 0+000 - Sta. 2+100, Jordan, Guimaras","amountPesos":41160000,"lengthMeters":2100.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 428955"},{"year":2021,"category":"Roads","project":"Construction of Slope Protection along Burauen-Mahagnao Road K0991+763 - K0993+425, Burauen, Leyte","amountPesos":50000000,"lengthMeters":1662.0,"ratePesosPerMeter":30084.235860409146,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 429337"},{"year":2021,"category":"Bridges","project":"Construction of Concrete Bridge, Sta. 0+000 - Sta. 0+025, Brgy. Iraya Sur, San Vicente, Camarines Norte","amountPesos":25000000,"lengthMeters":25.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 430106"},{"year":2021,"category":"Roads","project":"Asphalt Overlay along Alabang-Muntinlupa Road K0029+577-K0030 +000 (80mm w/ correction), Muntinlupa City","amountPesos":9645000,"lengthMeters":423.0,"ratePesosPerMeter":22801.41843971631,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432681"},{"year":2021,"category":"Roads","project":"Asphalt Overlay along Daang Maharlika Road K0028+240- K0028+590 (100mm with correction), Muntinlupa City","amountPesos":22190000,"lengthMeters":350.0,"ratePesosPerMeter":63400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432682"},{"year":2021,"category":"Roads","project":"Asphalt Overlay along International Receiver Road K0019+982- K0020+776 (80mm w/ correction), Las Pi±as City","amountPesos":47830000,"lengthMeters":794.0,"ratePesosPerMeter":60239.29471032746,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432683"},{"year":2021,"category":"Roads","project":"Asphalt Overlay along Sucat-Paranaque Road (East Bound), from KM 16+207 to KM 16+725, KM 18+694 to Km 19+156, Intermittent Section, Paranaque City, Metro Manila","amountPesos":50000000,"lengthMeters":980.0,"ratePesosPerMeter":51020.4081632653,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432685"},{"year":2021,"category":"Roads","project":"Asphalt Overlay along Sucat-Paranaque Road (East Bound), from KM 17+207 to KM 18+237, Paranaque City, Metro Manila","amountPesos":50000000,"lengthMeters":1030.0,"ratePesosPerMeter":48543.68932038835,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432686"},{"year":2021,"category":"Roads","project":"Repair/ Maintenance of Paranaque- Sucat Road (West Bound) from KM14+(-230) to KM13+(-200), District I, Paranaque City, Metro Manila","amountPesos":30000000,"lengthMeters":970.0,"ratePesosPerMeter":30927.835051546394,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432697"},{"year":2021,"category":"Roads","project":"Installation of Road Safety Devices along Manila North Road, K0469+500 to K0470+000, Batac City, Ilocos Norte","amountPesos":20000000,"lengthMeters":500.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432704"},{"year":2021,"category":"Roads","project":"Installation of Road Safety Devices along Manila North Road,K0472+200 to K0473+200, Batac City, Ilocos Norte","amountPesos":20000000,"lengthMeters":1000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432705"},{"year":2021,"category":"Roads","project":"Installation of Solar Powered Lights and Safety Devices along Pangasinan Nueva Vizcaya Road K0173+865-K0174+868","amountPesos":8000000,"lengthMeters":1003.0,"ratePesosPerMeter":7976.071784646063,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432706"},{"year":2021,"category":"Roads","project":"Installation of Solar Powered Lights and Safety Devices along PangasinanTarlac Road, K0181+375-K0182+377","amountPesos":8000000,"lengthMeters":1002.0,"ratePesosPerMeter":7984.031936127744,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432707"},{"year":2021,"category":"Roads","project":"Rehabilitation/ Improvement of Manila North Road, K0243+062- K0245+000, K0252+910-K0257+159","amountPesos":40603000,"lengthMeters":6187.0,"ratePesosPerMeter":6562.631323743332,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432709"},{"year":2021,"category":"Roads","project":"Rehabilitation/ Improvement of Manila North Road, K0277+920-K0281+106","amountPesos":34000000,"lengthMeters":3186.0,"ratePesosPerMeter":10671.688637790332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432710"},{"year":2021,"category":"Roads","project":"Installation of Solar Powered Lights and Safety Devices along Pangasinan- Zambales Road, K0368+457 - K0369+480","amountPesos":4000000,"lengthMeters":1023.0,"ratePesosPerMeter":3910.068426197459,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432711"},{"year":2021,"category":"Roads","project":"Installation of Solar-Powered Lights and Safety Devices along Sn Carlos-Calasiao Road, K0204+480 - K0205+840","amountPesos":8000000,"lengthMeters":1360.0,"ratePesosPerMeter":5882.35294117647,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432712"},{"year":2021,"category":"Roads","project":"Installation of Road Safety Devices (Solar Studs) along Abra-Ilocos Sur Road, K0387+(-957)- K0392+359","amountPesos":50000000,"lengthMeters":6316.0,"ratePesosPerMeter":7916.402786573781,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432714"},{"year":2021,"category":"Roads","project":"Preventive Maintenance of Road:Asphalt Overlay/Item 304-A (Slurry Surface Treatment 12mm) with Correction - Benguet - Nueva Vizcaya Road, K0299+000 - K0319+726","amountPesos":300000000,"lengthMeters":20726.0,"ratePesosPerMeter":14474.573000096498,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432715"},{"year":2021,"category":"Roads","project":"Installation/Application/Construction of Road Safety Devices along Abra - Ilocos Norte Road; K0412+000 - K0434+000","amountPesos":50000000,"lengthMeters":22000.0,"ratePesosPerMeter":2272.7272727272725,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432716"},{"year":2021,"category":"Roads","project":"Installation/Application/Construction of Road Safety Devices along Abra - Ilocos Norte Road; K0434+100 - K0443+000","amountPesos":50000000,"lengthMeters":8900.0,"ratePesosPerMeter":5617.9775280898875,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432717"},{"year":2021,"category":"Roads","project":"Installation/Application/Construction of Road Safety Devices along Abra - Ilocos Norte Road; K0443+100 - K0450+000","amountPesos":50000000,"lengthMeters":6900.0,"ratePesosPerMeter":7246.376811594203,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432718"},{"year":2021,"category":"Roads","project":"Installation/Application/Construction of Road Safety Devices along Abra - Cervantes Road; K0433+000 - K0445+000","amountPesos":50000000,"lengthMeters":12000.0,"ratePesosPerMeter":4166.666666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432719"},{"year":2021,"category":"Roads","project":"Installation/Application/Construction of Road Safety Devices along Abra - Cervantes Road; K0445+100 - K0457+500","amountPesos":50000000,"lengthMeters":12400.0,"ratePesosPerMeter":4032.2580645161293,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432720"},{"year":2021,"category":"Roads","project":"Installation/Application/Construction of Road Safety Devices along Abra - Cervantes Road; K0471+100 - K0478+732","amountPesos":50000000,"lengthMeters":7632.0,"ratePesosPerMeter":6551.362683438155,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432721"},{"year":2021,"category":"Roads","project":"Installation/Application/Construction of Road Safety Devices along Abra - Kalinga Road; K0410+000 - K0430+000","amountPesos":50000000,"lengthMeters":20000.0,"ratePesosPerMeter":2500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432722"},{"year":2021,"category":"Roads","project":"Installation/Application/Construction of Road Safety Devices along Abra - Kalinga Road; K0430+150 - K0444+000","amountPesos":50000000,"lengthMeters":13850.0,"ratePesosPerMeter":3610.1083032490974,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432723"},{"year":2021,"category":"Roads","project":"Installation/Application/Construction of Road Safety Devices along Abra - Kalinga Road; K0444+120 - K0460+000","amountPesos":50000000,"lengthMeters":15880.0,"ratePesosPerMeter":3148.6146095717886,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432724"},{"year":2021,"category":"Roads","project":"Installation/Application/Construction of Road Safety Devices along Abra - Kalinga Road; K0460+150 - K0480+000","amountPesos":50000000,"lengthMeters":19850.0,"ratePesosPerMeter":2518.891687657431,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432725"},{"year":2021,"category":"Roads","project":"Asset Preservation - Preventive Maintenance - Asphalt Overlay (Instapave) along Asin (KM 8) - Nangalisan - Sn Pascual, Tuba, Benguet -La Union Bdry Road - K0258+(-351) - K0282+540","amountPesos":250000000,"lengthMeters":24891.0,"ratePesosPerMeter":10043.790928448034,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432726"},{"year":2021,"category":"Roads","project":"Asset Preservation - Preventive Maintenance - Asphalt Overlay (Instapave) along Baguio - Bontoc Road K0284+969 - K0300+636","amountPesos":125000000,"lengthMeters":15667.0,"ratePesosPerMeter":7978.553647794728,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432727"},{"year":2021,"category":"Roads","project":"Asset Preservation - Preventive Maintenance - Asphalt Overlay (Instapave) along Gov Bado Dangwa National Road- K0264+050 - K0271+800","amountPesos":125000000,"lengthMeters":7750.0,"ratePesosPerMeter":16129.032258064517,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432728"},{"year":2021,"category":"Roads","project":"Preventive Maintenance- Secondary Roads- Nueva Viscaya- Ifugao- Mt. Province Bdry. Road K0312+060-K0314+000, K0321+232-K0322+374, K0323+770-K0334+500","amountPesos":20000000,"lengthMeters":13812.0,"ratePesosPerMeter":1448.0162177816392,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432729"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide along Abatan-Mankayan-Cervantes Road, K0347 + 000 - K0348 + 100","amountPesos":100000000,"lengthMeters":1100.0,"ratePesosPerMeter":90909.09090909091,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432730"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide, Claveria Calanasan Road 646+400-646+460, Apayao","amountPesos":50000000,"lengthMeters":60.0,"ratePesosPerMeter":833333.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432731"},{"year":2021,"category":"Roads","project":"Installation/ Application/ Construction of Road safety Devices along Gamu-Roxas Road K0399+000-K0418+1180 Intermittent Sections)","amountPesos":8592500,"lengthMeters":20180.0,"ratePesosPerMeter":425.792864222002,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432741"},{"year":2021,"category":"Roads","project":"Installation/ Application/ Construction of Road safety Devices in identified blackspots along Santiago-Tuguegarao Road K0365+(-1440)-K0418+457 (Intermittent Sections)","amountPesos":12200000,"lengthMeters":54897.0,"ratePesosPerMeter":222.2343661766581,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432742"},{"year":2021,"category":"Roads","project":"Installation of Road Safety Devices Along Cagayan Valley Road (K482+800-K483+200)","amountPesos":10000000,"lengthMeters":400.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432745"},{"year":2021,"category":"Roads","project":"Installation of Road Safety Devices Along Cagayan Valley Road (K484+800-K485+100)","amountPesos":10000000,"lengthMeters":300.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432746"},{"year":2021,"category":"Roads","project":"Installation of Road Safety Devices along Plaridel Bypass Road, K0035+(-602) to K0047+861, Bulacan","amountPesos":25000000,"lengthMeters":13463.0,"ratePesosPerMeter":1856.9412463789645,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432752"},{"year":2021,"category":"Roads","project":"Preventive Maintenance (Asphalt Overlay) along Jct. Layac-Balanga-Mariveles Port Road (S01272LZ), K0107+980 to K0108+750, K0111+000 to K0013+143, Orani and Samal Bataan","amountPesos":50000000,"lengthMeters":97857.0,"ratePesosPerMeter":510.9496510213884,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432753"},{"year":2021,"category":"Roads","project":"Preventive Maintenance along Gov JJ Linao Road (S04822LZ) K0141+600-K0143+147, K0143+345-K0146+000, K0148+365-K0148+820","amountPesos":100000000,"lengthMeters":4657.0,"ratePesosPerMeter":21473.051320592655,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432754"},{"year":2021,"category":"Roads","project":"Construction / Rehabilitation of Road Slips, Slope Collapse and Landslide û Bagac û Mariveles Road K0 177+020-K0177+140","amountPesos":100000000,"lengthMeters":120.0,"ratePesosPerMeter":833333.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432765"},{"year":2021,"category":"Roads","project":"Construction / Installation of Street Lights along Mabatang Vicinal Road, (S01288LZ) K0118+(-772) - K0126+991","amountPesos":100000000,"lengthMeters":9763.0,"ratePesosPerMeter":10242.753252074157,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432766"},{"year":2021,"category":"Roads","project":"Construction / Installation of Street Lights along Gov JJ Linao Road, (S01290LZ) K0159+(-232) - K0173+000","amountPesos":100000000,"lengthMeters":14232.0,"ratePesosPerMeter":7026.419336706014,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432768"},{"year":2021,"category":"Roads","project":"Asphlat Overlay along Gen. Alejo Santos highway K0068+000 - K0069+2471, Angat and Norzagaray, Bulacan","amountPesos":50000000,"lengthMeters":3471.0,"ratePesosPerMeter":14405.070584845866,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432769"},{"year":2021,"category":"Roads","project":"Asphalt Overlay along Eastern Bulacan Road K0094+000 - K0100+000, Do±a Remedios Trinidad, Bulacan","amountPesos":50000000,"lengthMeters":6000.0,"ratePesosPerMeter":8333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432770"},{"year":2021,"category":"Roads","project":"Asphalt Overlay along Manila North Road (Marilao Section), K0022+850 - K0022+1931, Marilao Bulacan","amountPesos":50000000,"lengthMeters":1081.0,"ratePesosPerMeter":46253.469010175766,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432771"},{"year":2021,"category":"Roads","project":"Asphalt Overlay along Manila North Road (Marilao Section), K0021+600 - K0022+500, Marilao Bulacan","amountPesos":50000000,"lengthMeters":900.0,"ratePesosPerMeter":55555.555555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432772"},{"year":2021,"category":"Roads","project":"Asphalt Overlay along Baliuag - Bustos Road a.km51+-103 - 51+002, b. km51+284 - 52+126","amountPesos":30000000,"lengthMeters":947.0,"ratePesosPerMeter":31678.98627243928,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432773"},{"year":2021,"category":"Roads","project":"Asphalt overlay along Old cagayan valley Road a. km km49+400 - km52+400","amountPesos":30000000,"lengthMeters":3000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432774"},{"year":2021,"category":"Roads","project":"Asphalt overlay along General Alejo Santos Highway a. km44+513 - km47+259 b. km48+872 - km49+100","amountPesos":30000000,"lengthMeters":2974.0,"ratePesosPerMeter":10087.424344317418,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432775"},{"year":2021,"category":"Roads","project":"Installation of Road Safety Devices (Safety Roller Barrier System) along Corazon C. Aquino Ave., K0029+000-K031+669 (Intermittent), Antipolo City, 2nd LD","amountPesos":25000000,"lengthMeters":2669.0,"ratePesosPerMeter":9366.804046459349,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432780"},{"year":2021,"category":"Roads","project":"Installation of Road Safety Devices along Daang Maharlika (LZ), K0093+003 - K0093+1003","amountPesos":10000000,"lengthMeters":1000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432781"},{"year":2021,"category":"Roads","project":"Repair/Rehab/Improvement (Asphalt Overlay) along Majayjay-Lucban Road K0116+076 to K0120+270","amountPesos":50000000,"lengthMeters":4194.0,"ratePesosPerMeter":11921.793037672865,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432786"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation along Calamaba - Sta Cruz - Famy Junction Road K0081 + 559 to K0082 +478 Sta. Cruz, Laguna","amountPesos":30000000,"lengthMeters":919.0,"ratePesosPerMeter":32644.17845484222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432787"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation along Juanito R. Remulla Sr Road (S06090LZ) K0045+061 - K0045+ 647, K0045+669-K0046+047, Trece Martires City","amountPesos":28637000,"lengthMeters":964.0,"ratePesosPerMeter":29706.43153526971,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432789"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation along Noveleta -Naic - Tagaytay Road (S06093LZ) K0039+215-K0042+415, Tanza, Cavite","amountPesos":94273000,"lengthMeters":3200.0,"ratePesosPerMeter":29460.3125,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432790"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation along Rizal Bdry. - Famy - Quezon Bdry. Road K0070 + 840 to K0071 + 708 Mabitac, Laguna","amountPesos":30000000,"lengthMeters":868.0,"ratePesosPerMeter":34562.21198156682,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432791"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation along Tanza - Trece Martires City - Indang Road (S06096LZ) K0036+683-K0037+883, Tanza, Cavite","amountPesos":35502000,"lengthMeters":1200.0,"ratePesosPerMeter":29585.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432792"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation along Tanza - Trece Martires City - Indang Road (S06097LZ) K0048+ (-641) - K0049+472, Trece Matrires City","amountPesos":62655000,"lengthMeters":2113.0,"ratePesosPerMeter":29652.153336488405,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432793"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation of Manila East road K0056+000 to K0064+000, Pilillia, Rizal","amountPesos":100000000,"lengthMeters":8000.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432794"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation of Marikina Infanta road K0047+000 to K0052+000 Tanay, Rizal","amountPesos":100000000,"lengthMeters":5000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432795"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation of Road along Lumban-Caliraya Road K0097 + 797 to K0098 + 500","amountPesos":16412000,"lengthMeters":703.0,"ratePesosPerMeter":23345.66145092461,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432796"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation of Road along Lumban-Caliraya Road K0101 + 790 to K0102 + 635","amountPesos":18853000,"lengthMeters":845.0,"ratePesosPerMeter":22311.242603550298,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432797"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation of Road along Majayjay-Lucban Road K0116 + 951 to K0119 + 200","amountPesos":43914000,"lengthMeters":2249.0,"ratePesosPerMeter":19526.01156069364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432798"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation of Road along Majayjay-Lucban Road K0120 + 270 to K0120 + 804","amountPesos":11259000,"lengthMeters":534.0,"ratePesosPerMeter":21084.26966292135,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432799"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation of Road along Paete-Famy-Poblacion Road K0111 + 549 to K0112 + 795","amountPesos":23659000,"lengthMeters":1246.0,"ratePesosPerMeter":18987.961476725523,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432800"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation of Road along Pagsanjan-Lucban Road K0092 + (-149) to K0092 + 1018","amountPesos":25000000,"lengthMeters":1167.0,"ratePesosPerMeter":21422.450728363325,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432801"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation of Road along Pagsanjan-Lucban Road K0098 + 536 to K0100 + 000","amountPesos":32117000,"lengthMeters":1464.0,"ratePesosPerMeter":21937.841530054644,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432802"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation of Road along Pagsanjan-Lucban Road K0104 + 647 to K0105 + 447","amountPesos":16947000,"lengthMeters":800.0,"ratePesosPerMeter":21183.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432803"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation/Improvement of Road along Calamba-Sta Cruz-Famy Junction Road K0101 + 010 to K0103 + 284, Kalayaan, Laguna","amountPesos":50000000,"lengthMeters":2274.0,"ratePesosPerMeter":21987.68689533861,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432804"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation/Improvement of Road along Cavinti - Caliraya Road K0108 + 000 to K0110 + 465, Cavinti, Laguna","amountPesos":50000000,"lengthMeters":2465.0,"ratePesosPerMeter":20283.97565922921,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432805"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation/Improvement of Road along Marikina-Infanta Road K0078 + 000 to K0080 + 405 Sta. Maria, Laguna","amountPesos":50000000,"lengthMeters":2405.0,"ratePesosPerMeter":20790.02079002079,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432806"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation/Improvement of Road along Rizal Bdry. - Famy - Quezon Bdry. Road K0073 + 000 to K0075 + 063, Mabitac, Laguna","amountPesos":50000000,"lengthMeters":2063.0,"ratePesosPerMeter":24236.54871546292,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432807"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation of San Mateo Rodriguez road, Rodriguez, Rizal K0027+500 to K0034+078","amountPesos":100000000,"lengthMeters":6578.0,"ratePesosPerMeter":15202.189115232593,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432810"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation/Improvement of Calauan-Nagcarlan Bdry. Road. K0077+(-930)-K0077+183, Calauan, Laguna section","amountPesos":50000000,"lengthMeters":1113.0,"ratePesosPerMeter":44923.62982929021,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432811"},{"year":2021,"category":"Roads","project":"Repair/Rehabilitation/Improvement of Masapang Highway K0071+932-K00073+000, Calauan, Laguna Section","amountPesos":50000000,"lengthMeters":1068.0,"ratePesosPerMeter":46816.479400749064,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432813"},{"year":2021,"category":"Roads","project":"Concrete Reblocking along PPNR Langogan-Roxas Road Section K0084+000- K0132+000 (Intermittent)(S00030PW)","amountPesos":16207500,"lengthMeters":48000.0,"ratePesosPerMeter":337.65625,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432815"},{"year":2021,"category":"Roads","project":"Asphalt Overlay along Puerto Princesa South Road, K0003+(-292)- K0006+000, PPC","amountPesos":30000000,"lengthMeters":3292.0,"ratePesosPerMeter":9113.001215066828,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432816"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Quezon Punta Baja Road, K0163+800-K0164+500 (Intermittent Section), Palawan","amountPesos":55000000,"lengthMeters":700.0,"ratePesosPerMeter":78571.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432818"},{"year":2021,"category":"Roads","project":"Rehabilitation/Improvement of (Asphalt Overlay) along Daang Maharlika Jct. Legazpi-Sto. Domingo-Tabaco-Camarines Sur Bdry. Road, K0534+000 - K0534+360, Legazpi City, Albay","amountPesos":15000000,"lengthMeters":360.0,"ratePesosPerMeter":41666.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432821"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide, Catanduanes Cir Rd K0146+850-K0146+950, Catanduanes","amountPesos":50000000,"lengthMeters":100.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432831"},{"year":2021,"category":"Roads","project":"Asphalt Overlay of Baje-Ngi-ngi-an-Bingawan Road,K0059 + 000 - K0061 + 000, K0066 + 000 - K0070 + 245, K0072 + 243 - K0072 + 539, Iloilo","amountPesos":69246000,"lengthMeters":6541.0,"ratePesosPerMeter":10586.454670539673,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432832"},{"year":2021,"category":"Roads","project":"Asphalt Overlay of Janiuay-Badiangan-Tina Road, K0034 + 792 - K0037 + 627, K0038 + 501 - K0039 + 000, K0039 + 304 - K0042 + 1000, Iloilo","amountPesos":63760000,"lengthMeters":7030.0,"ratePesosPerMeter":9069.701280227597,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432833"},{"year":2021,"category":"Roads","project":"Installation of Road Safety Devices along Jct Bagonawa - La Castellana - Isabela Rd K0065 + 018 - K0065+240, La Castellana, Negros Occidental","amountPesos":25000000,"lengthMeters":222.0,"ratePesosPerMeter":112612.61261261262,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432834"},{"year":2021,"category":"Roads","project":"Installation of Solar Streetlights along Bacolod-Murcia-Ds Benedicto-San Carlos City Road K0031+000 - K0035+260","amountPesos":30000000,"lengthMeters":4260.0,"ratePesosPerMeter":7042.2535211267605,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432838"},{"year":2021,"category":"Roads","project":"Installation of Solar Streetlights along Silay-Lantawan Road K0019+000 - K0023+000","amountPesos":20000000,"lengthMeters":4000.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432839"},{"year":2021,"category":"Roads","project":"Installation of Solar Streetlights along Bacolod South Road - K091+000 - K0106+000","amountPesos":100000000,"lengthMeters":15000.0,"ratePesosPerMeter":6666.666666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432840"},{"year":2021,"category":"Roads","project":"Installation of Road Safety Devices and Asphalt Overlay 100mm along N. Bacalso Ave (Cebu South Rd) K0010+800 - K0011+800, Talisay City to Minglanilla, Cebu","amountPesos":61000000,"lengthMeters":1000.0,"ratePesosPerMeter":61000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432841"},{"year":2021,"category":"Roads","project":"Installation of Road Safety Devices and Asphalt Overlay 100mm along N. Bacalso Ave (Cebu South Rd) K0013+470 - K0014+725, Talisay City to Minglanilla, Cebu","amountPesos":76000000,"lengthMeters":1255.0,"ratePesosPerMeter":60557.768924302785,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432842"},{"year":2021,"category":"Roads","project":"Installation of Road Safety Devices and Asphalt Overlay 100mm along N. Bacalso Ave (Cebu South Rd) K0016+750 - K0017+750, Minglanilla to City of Naga, Cebu","amountPesos":61000000,"lengthMeters":1000.0,"ratePesosPerMeter":61000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432843"},{"year":2021,"category":"Roads","project":"Installation of Solar LED Street Lightings along National Road, Balilihan-Hanopol-Butuan Road (S00045BH)- K0023+(-263)- K039+422, Balilihan, Bohol","amountPesos":30000000,"lengthMeters":16685.0,"ratePesosPerMeter":1798.0221756068324,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432844"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope, Collapse, and Landslide Cebu-Balamban Transcentral Highway KM.28+210 - KM.28+428, Cebu city","amountPesos":70000000,"lengthMeters":218.0,"ratePesosPerMeter":321100.91743119265,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432846"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope, Collapse, and Landslide - Cebu-Balamban Transcentral Highway, K0013+109 - K0013+361, K0013+700 - K0013+927, Cebu","amountPesos":50000000,"lengthMeters":479.0,"ratePesosPerMeter":104384.13361169102,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432847"},{"year":2021,"category":"Roads","project":"Construction/Installation of Solar Lights with Safety Sign and Devices in Loay Interior Road (LR), K0122+040-K0152+705 (Intermittent), Trinidad San Miguel, Dagohoy, Bohol","amountPesos":90000000,"lengthMeters":30665.0,"ratePesosPerMeter":2934.9421164193704,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432848"},{"year":2021,"category":"Roads","project":"Installation of Solar Street Lights and Safety Sign and Devices along Tagbilaran North Road Km 0039+000 - Km 0048+150 (Intermittent), Loon, Bohol","amountPesos":85000000,"lengthMeters":9150.0,"ratePesosPerMeter":9289.617486338799,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432852"},{"year":2021,"category":"Roads","project":"Installation of Street Lights along Jct. Cortes - Balilihan - Catigbian - Macaas Road, K0029+000 to K0039+000, Catigbian, Bohol","amountPesos":40000000,"lengthMeters":10000.0,"ratePesosPerMeter":4000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432854"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads withSlips, Slope, Collapse, and Landslide Cebu-Balamban Transcentral Highway K0015+795 - K0015+938, Cebu City","amountPesos":80000000,"lengthMeters":143.0,"ratePesosPerMeter":559440.5594405595,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432856"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide Cebu - Balamban Transcentral Highway, K0014+452 - K0014+574, K0022+081 - K0022+156","amountPesos":90000000,"lengthMeters":197.0,"ratePesosPerMeter":456852.7918781726,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432859"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope, Collapse, and Landslide Cebu-Balamban Transcentral Highway K0009+235 - K009+320, Cebu City","amountPesos":83900000,"lengthMeters":85.0,"ratePesosPerMeter":987058.8235294118,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432862"},{"year":2021,"category":"Roads","project":"Improvement of National Roads along Jct. Taft I-Oras-San Policarpio-Arteche Road- Installation of Solar Studs, (K0932+000-K0949+000, S00167SM)","amountPesos":20000000,"lengthMeters":17000.0,"ratePesosPerMeter":1176.4705882352941,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432863"},{"year":2021,"category":"Roads","project":"Installation of LED Solar Road Studs, Along Daang Maharlika (S00024LT), K0914 + 828 - K0916 + 911, Palo, Leyte","amountPesos":40000000,"lengthMeters":2083.0,"ratePesosPerMeter":19203.072491598658,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432864"},{"year":2021,"category":"Roads","project":"Preventive Maintenance - Primary Roads û Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0687+000 - K0688+739, K0688+998 - K0690+700, (S00002SM), Northern Samar","amountPesos":100000000,"lengthMeters":3441.0,"ratePesosPerMeter":29061.31938390003,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432871"},{"year":2021,"category":"Roads","project":"Preventive Maintenance û Secondary Roads û Allen-Catarman Rd - K0703+086 - K0704+000, K0704+000 - K705+477, K0705+489 - K706+000, K0707+000 -K0708+000, (S00005SM), Northern Samar","amountPesos":100000000,"lengthMeters":3902.0,"ratePesosPerMeter":25627.883136852895,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432872"},{"year":2021,"category":"Roads","project":"Preventive Maintenance û Secondary Roads û Allen-Catarman Rd - K0717+478 - K0717+780, K0717+804 - K0717+658, K0719+693 - K720+264, K0720+284 - K0720+460, K0720+480 - K0721+000, K0722+604 - K0722+681, K0722+751 -K0723+000, (S00005SM), Northern Samar","amountPesos":100000000,"lengthMeters":1919.0,"ratePesosPerMeter":52110.474205315266,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432873"},{"year":2021,"category":"Roads","project":"Preventive Maintenance û Secondary Roads û Allen-Catarman Rd - K0723+507 - K0725+500, K0725+500 - K0727+000, K0731+000 - K0731+301, (S00005SM),Northern Samar","amountPesos":100000000,"lengthMeters":3794.0,"ratePesosPerMeter":26357.406431207168,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432874"},{"year":2021,"category":"Roads","project":"Rehabilitation/Improvement of National Roads along Lilo-an-San Ricardo Road (S00218LT) K1058+000-K1064+000","amountPesos":45000000,"lengthMeters":6000.0,"ratePesosPerMeter":7500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432876"},{"year":2021,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide along, C3 Road, Iligan City, KM 1521+220 TO KM1521+350, Iligan City, Lanao del Norte","amountPesos":50000000,"lengthMeters":130.0,"ratePesosPerMeter":384615.3846153846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432883"},{"year":2021,"category":"Roads","project":"Road Widening, Kapalong-Talaingod-Valencia (Bukidnon) Road, K1605+580-K1607+680, Bukidnon","amountPesos":150000000,"lengthMeters":2100.0,"ratePesosPerMeter":71428.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432886"},{"year":2021,"category":"Roads","project":"Road Widening, Kapalong-Talaingod-Valencia (Bukidnon) Road, K1607+680-K1609+770, Bukidnon","amountPesos":150000000,"lengthMeters":2090.0,"ratePesosPerMeter":71770.33492822967,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432887"},{"year":2021,"category":"Roads","project":"Preventive Maintenance (Asphalt Overlay) - Davao Cotabato Road (Davao City - Jct. Digos Section), K1516+280 - K1518+155, K1518+655 - K1519+606","amountPesos":163200000,"lengthMeters":2826.0,"ratePesosPerMeter":57749.46921443737,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432896"},{"year":2021,"category":"Roads","project":"Preventive Maintenance (Asphalt Overlay) - Davao Cotabato Road (Davao City - Jct. Digos Section), K1519+606 - K1520+151","amountPesos":42060000,"lengthMeters":545.0,"ratePesosPerMeter":77174.3119266055,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432897"},{"year":2021,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay - 5th Ave - K1510+(-822) - K1510+(-512)","amountPesos":40000000,"lengthMeters":310.0,"ratePesosPerMeter":129032.25806451614,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432900"},{"year":2021,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay - Davao-Cotabato Old Rd - K1520+029 - K1522+678","amountPesos":211400000,"lengthMeters":2649.0,"ratePesosPerMeter":79803.69950924878,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432901"},{"year":2021,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay - Davao-Cotabato Old Rd - K1523+518 - K1524+489, K1524+507 - K1525+570","amountPesos":163400000,"lengthMeters":2034.0,"ratePesosPerMeter":80334.31661750247,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432902"},{"year":2021,"category":"Roads","project":"Preventive Maintenance of Road: Asphalt Overlay - Magsaysay Ave - (S01446MN) Chainage 000 - Chainage 118","amountPesos":10000000,"lengthMeters":118.0,"ratePesosPerMeter":84745.7627118644,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432903"},{"year":2021,"category":"Roads","project":"Preventive Maintenance, Along Sarangani-Sultan Kudarat Coastal Road, K1737+000-K1742+300","amountPesos":101000000,"lengthMeters":5300.0,"ratePesosPerMeter":19056.603773584906,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432907"},{"year":2021,"category":"Roads","project":"Preventive Maintenance, Along Sarangani-Sultan Kudarat Coastal Road, K1742+300-K1746+485","amountPesos":101000000,"lengthMeters":4185.0,"ratePesosPerMeter":24133.811230585423,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432908"},{"year":2021,"category":"Roads","project":"Preventive Maintenance, Along Sarangani-Sultan Kudarat Coastal Road, K1746+486-K1750+700","amountPesos":101000000,"lengthMeters":4214.0,"ratePesosPerMeter":23967.726625533935,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432909"},{"year":2021,"category":"Roads","project":"Preventive Maintenance, Along Sarangani-Sultan Kudarat Coastal Road, K1750+700-K1754+871","amountPesos":101000000,"lengthMeters":4171.0,"ratePesosPerMeter":24214.816590745624,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432910"},{"year":2021,"category":"Roads","project":"Road widening along Sarangani-Sultan Kudarat Coastal Road K1757+254 - K1761+501 Maitum, Sarangani Province","amountPesos":100000000,"lengthMeters":4247.0,"ratePesosPerMeter":23546.032493524843,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432911"},{"year":2021,"category":"Roads","project":"Road Widening including Drainage Along Sarangani-Sultan Kudarat Coastal Road, K1740+200-K1743+439","amountPesos":85000000,"lengthMeters":3239.0,"ratePesosPerMeter":26242.66748996604,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432912"},{"year":2021,"category":"Roads","project":"Road Widening including Drainage Along Sarangani-Sultan Kudarat Coastal Road, K1749+856-K1753+082","amountPesos":85000000,"lengthMeters":3226.0,"ratePesosPerMeter":26348.419094854307,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432913"},{"year":2021,"category":"Roads","project":"Road Widening with Drainage Along Mabuhay Road, Sta. 2+341 to Sta. 3+666, General Santos City","amountPesos":70000000,"lengthMeters":1325.0,"ratePesosPerMeter":52830.188679245286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432914"},{"year":2021,"category":"Roads","project":"Asphalt Overlay, Butuan City-Cagayan De Oro City - Iligan Road (Baan-Ampayon Section), K1233+(-088) - K1235+000 (S00421MN), Butuan City","amountPesos":120000000,"lengthMeters":2088.0,"ratePesosPerMeter":57471.26436781609,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432915"},{"year":2021,"category":"Roads","project":"Asphalt Overlay, Butuan City-Masao Port Road, K1242 +000-K1245+997 (S00434MN), Butuan City","amountPesos":140000000,"lengthMeters":3997.0,"ratePesosPerMeter":35026.26970227671,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432916"},{"year":2021,"category":"Roads","project":"Asphalt Overlay, Butuan City-Masao Port Road, K1245+997-K1251+144 (S00434MN), Butuan City","amountPesos":120000000,"lengthMeters":5147.0,"ratePesosPerMeter":23314.552166310474,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432917"},{"year":2021,"category":"Roads","project":"Asset Preservation - Preventive Maintenance - Tertiary Roads - Asphalt Overlay along Surigao - San Juan Coastal Road, K1116+059.00 - K119+816, Brgy. Sabang, Surigao","amountPesos":40000000,"lengthMeters":996243.0,"ratePesosPerMeter":40.150846731169004,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432920"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1438 + 210 - K1439 + 900","amountPesos":2646000,"lengthMeters":1690.0,"ratePesosPerMeter":1565.680473372781,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432946"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1466 + 000 - K1467 + 136, K1468 + 882 - K1470 + 026","amountPesos":42000000,"lengthMeters":2280.0,"ratePesosPerMeter":18421.052631578947,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432947"},{"year":2021,"category":"Roads","project":"C-5 Road - K0015 + (-2094) to K0015 + (-234)","amountPesos":2441000,"lengthMeters":1860.0,"ratePesosPerMeter":1312.3655913978494,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432955"},{"year":2021,"category":"Roads","project":"Sumulong Highway - K0022 + 430 - K0023 + 304","amountPesos":6998000,"lengthMeters":874.0,"ratePesosPerMeter":8006.864988558353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 432993"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1500 + 444 - K1500 + 547, K1500 + 588 - K1500 + 632, K1514 + 218 - K1514 + 780","amountPesos":2000000,"lengthMeters":709.0,"ratePesosPerMeter":2820.8744710860365,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433028"},{"year":2021,"category":"Roads","project":"C-5 Road - K0011 + (-001) - K0011 + 184, K0011 + (-031) - K0011 + (-001), K0011 + (-474) - K0011 + (-031), K0011 + (-975) - K0011 + (-965), K0011 + 184 - K0012 + 091, K0013 + 080 - K0013 + 096, K0013 + 496 - K0013 + 944","amountPesos":13628000,"lengthMeters":2039.0,"ratePesosPerMeter":6683.66846493379,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433066"},{"year":2021,"category":"Roads","project":"C-5 Road - K0012 + (-1286) - K0012 + (-977), K0012 + (-168) - K0012 + 000, K0012 + (-1802) - K0012 + (-1286), K0012 + (-1924) - K0012 + (-1802), K0012 + (-1957) - K0012 + (-1924), K0012 + (-428) - K0012 + (-168), K0012 + (-653) - K0012 + (-428), K0012 + (-781) - K0012 + (-653), K0012 + (-977) - K0012 + (-781), K0012 + 000 - K0012 + 142, K0012 + 1142 - K0012 + 1862, K0012 + 326 - K0012 + 414","amountPesos":21151000,"lengthMeters":2907.0,"ratePesosPerMeter":7275.885792913657,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433067"},{"year":2021,"category":"Roads","project":"Sumulong Highway - K0027 + 033 - K0027 + 034, K0027 + 424 - K0027 + 642","amountPesos":4628000,"lengthMeters":219.0,"ratePesosPerMeter":21132.420091324202,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433106"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1482 + 786 - K1483 + 000","amountPesos":5007000,"lengthMeters":214.0,"ratePesosPerMeter":23397.196261682242,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433142"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1490 + 970 - K1491 + 027, K1491 + 056 - K1491 + 175","amountPesos":6794000,"lengthMeters":176.0,"ratePesosPerMeter":38602.27272727273,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433143"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1492 + 540 - K1493 + 000","amountPesos":10533000,"lengthMeters":460.0,"ratePesosPerMeter":22897.82608695652,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433144"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1426 + (-821) - K1426 + (-676), K1426 + (-857) - K1426 + (-821), K1426 + (-928) - K1426 + (-857)","amountPesos":6483000,"lengthMeters":252.0,"ratePesosPerMeter":25726.190476190477,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433146"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1426 + 154 - K1427 + 000","amountPesos":24885000,"lengthMeters":846.0,"ratePesosPerMeter":29414.893617021276,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433147"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1427 + 721 - K1428 + 230","amountPesos":18197000,"lengthMeters":509.0,"ratePesosPerMeter":35750.49115913556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433148"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1436 + 267 - K1436 + 702","amountPesos":20464000,"lengthMeters":435.0,"ratePesosPerMeter":47043.67816091954,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433149"},{"year":2021,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0046 + 309 - K0046 + 840, K0047 + 200 - K0048 + 000","amountPesos":2150000,"lengthMeters":1331.0,"ratePesosPerMeter":1615.3268219383922,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433287"},{"year":2021,"category":"Roads","project":"Benguet (Asphalt Overlay) - Nueva Vizcaya Road K0303+000 - K0319+726","amountPesos":300000000,"lengthMeters":16726.0,"ratePesosPerMeter":17936.14731555662,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433305"},{"year":2021,"category":"Roads","project":"Calapan North Road K0019+511-K0020+000, K0022+554- K0025+468, K0026+325-K0026+1065, K0027+311-K0028+000","amountPesos":114992000,"lengthMeters":4832.0,"ratePesosPerMeter":23798.01324503311,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433313"},{"year":2021,"category":"Roads","project":"Calapan South Road K0027+548 - K0031+000","amountPesos":85008000,"lengthMeters":3452.0,"ratePesosPerMeter":24625.724217844727,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433314"},{"year":2021,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1585 + 000 - K1592 + 000","amountPesos":98031000,"lengthMeters":7000.0,"ratePesosPerMeter":14004.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433323"},{"year":2021,"category":"Bridges","project":"Nagtahan Bridge Service Rd - Chainage 0 - Chainage 53, Chainage 169 - Chainage 490, Chainage 53 - Chainage 169","amountPesos":6757000,"lengthMeters":490.0,"ratePesosPerMeter":13789.795918367347,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433345"},{"year":2021,"category":"Roads","project":"C-5 Road - K0015 + (-164) - K0015 + 1062","amountPesos":9406000,"lengthMeters":1226.0,"ratePesosPerMeter":7672.1044045677,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433354"},{"year":2021,"category":"Roads","project":"NAIA Rd (MIA Road) - K0008 + 661 - K0008 + 701, K0009 + 216 - K0009 + 463","amountPesos":11323000,"lengthMeters":287.0,"ratePesosPerMeter":39452.961672473866,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433362"},{"year":2021,"category":"Roads","project":"Guiuan-Sulangan Peninsula Road - (S00188SM) Chainage 8826 - Chainage 9826, Chainage 11826 - Chainage 11920, Chainage 9826 - Chainage 10290","amountPesos":15453000,"lengthMeters":1558.0,"ratePesosPerMeter":9918.485237483954,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433462"},{"year":2021,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1606 + 000 - K1607 + 976","amountPesos":25342000,"lengthMeters":1976.0,"ratePesosPerMeter":12824.8987854251,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433489"},{"year":2021,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1578 + 000 - K1579 + 000","amountPesos":18114000,"lengthMeters":1000.0,"ratePesosPerMeter":18114.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433511"},{"year":2021,"category":"Roads","project":"Gen Alejo Santos Highway - K0047+259 - K0048 + 872","amountPesos":1560000,"lengthMeters":1613.0,"ratePesosPerMeter":967.1419714817112,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433558"},{"year":2021,"category":"Roads","project":"General Alejo Santos Highway - K0060 + 300 - K0060 + 899","amountPesos":684000,"lengthMeters":599.0,"ratePesosPerMeter":1141.9031719532554,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433560"},{"year":2021,"category":"Roads","project":"Asphal Overlay - Bacolod South By-pass road, K0022+000-K0022+178, K0022+622-K0023+057, Bacolod City, Negros Occidental","amountPesos":1500000,"lengthMeters":613.0,"ratePesosPerMeter":2446.982055464927,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433722"},{"year":2021,"category":"Roads","project":"Bacolod South Rd (Gen Luna - Bago High School Road) - K0022 + (-489) - K0022 + 318","amountPesos":4900000,"lengthMeters":807.0,"ratePesosPerMeter":6071.87112763321,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433724"},{"year":2021,"category":"Roads","project":"Itabiak - San Vicente Road, Palawan K0166+508 - K0166+673","amountPesos":95000000,"lengthMeters":165.0,"ratePesosPerMeter":575757.5757575758,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434405"},{"year":2021,"category":"Roads","project":"Manila North Road (LZ) - K0037 + (-993) - K0038 + 306, K0039 + 151 - K0041 + 048, K0041 + 400 - K0041 + 840, K0042 + 900 - K0043 + 118","amountPesos":31504000,"lengthMeters":4854.0,"ratePesosPerMeter":6490.317264112073,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433787"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1453 + 812 - K1455 + 000, K1457 + 921 - K1458 + 305, K1459 + 919 - K1460 + 636","amountPesos":22971000,"lengthMeters":2289.0,"ratePesosPerMeter":10035.386631716907,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433795"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1528 + 514 - K1529 + 000, K1530 + 896 - K1531 + 456, K1531 + 487 - K1533 + 000","amountPesos":22260000,"lengthMeters":2559.0,"ratePesosPerMeter":8698.710433763188,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433796"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1534 + 860 - K1535 + 091, K1535 + 121 - K1538 + 200","amountPesos":58605000,"lengthMeters":3310.0,"ratePesosPerMeter":17705.438066465256,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433797"},{"year":2021,"category":"Roads","project":"Daang Maharlika Road (LZ) - K0037 + 500 - K0037 + 600, K0037 + (-978) - K0037 + (-800), K0037 + (-700) - K0037 + (-500), K0037 + (-200) - K0037 + (-100), K0038 + 000 - K0038 + 027, K0038 + 100 - K0038 + 400, K0039 + (-471) - K0039 + (-435), K0052 + 461 - K0052 + 592","amountPesos":2620000,"lengthMeters":1072.0,"ratePesosPerMeter":2444.0298507462685,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433811"},{"year":2021,"category":"Roads","project":"Manila North Road (LZ) - K0029 + 000 - K0029 + 200","amountPesos":1883000,"lengthMeters":200.0,"ratePesosPerMeter":9415.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433812"},{"year":2021,"category":"Roads","project":"Manila North Road (LZ) - K0041 + 048 - K0041 + 400, K0043 + 282 - K0043 + 492","amountPesos":1382000,"lengthMeters":562.0,"ratePesosPerMeter":2459.0747330960853,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433813"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1475 + 000 - K1475 + 425, K1482 + 000 - K1482 + 216, K1482 + 443 - K1482+786, K1493 + 750 - K1493 + 805, K1506 + 540 - K1506 + 835","amountPesos":2950000,"lengthMeters":1334.0,"ratePesosPerMeter":2211.3943028485755,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433835"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1534 + 000 - K1534 + 860","amountPesos":7480000,"lengthMeters":860.0,"ratePesosPerMeter":8697.67441860465,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433836"},{"year":2021,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1270 + 781 - K1271 + 000, K1272 + 172 - K1272 + 653, K1274 + 000 - K1274 + 800","amountPesos":7774000,"lengthMeters":1500.0,"ratePesosPerMeter":5182.666666666667,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433846"},{"year":2021,"category":"Roads","project":"National Road System along Kalinga-Abra Road(Balbalan Section), K0497+505-K0497+651, Balbalan, Kalinga","amountPesos":60000000,"lengthMeters":146.0,"ratePesosPerMeter":410958.90410958906,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433849"},{"year":2021,"category":"Roads","project":"C-5 Road - K0017 + 294 - K0017 + 496","amountPesos":6376000,"lengthMeters":202.0,"ratePesosPerMeter":31564.356435643564,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433860"},{"year":2021,"category":"Roads","project":"Manila North Road - Apalit Section K0052+(-585) - K0052+340, K0052+706 - K0053+980, K0054+400 - K0055+093, K0055+144 - K0056+000","amountPesos":50000000,"lengthMeters":3748.0,"ratePesosPerMeter":13340.448239060832,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433876"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1455 + 1003 - K1456 + 688","amountPesos":35000000,"lengthMeters":685.0,"ratePesosPerMeter":51094.890510948906,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433909"},{"year":2021,"category":"Roads","project":"Pulilan Calumpit Road (LZ) - K0046 + 000 - K0046 + 500, K0047 + 800 - K0048 + 000, K0051 + 500 - K0051 + 050","amountPesos":1717000,"lengthMeters":1150.0,"ratePesosPerMeter":1493.0434782608695,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433952"},{"year":2021,"category":"Roads","project":"C-3 Road - K0008 + (-320) - K0008 + 486","amountPesos":2493000,"lengthMeters":806.0,"ratePesosPerMeter":3093.0521091811415,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 433942"},{"year":2021,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0045 + 725 - K0046 + 309, K0046 + 840 - K0047 + 200","amountPesos":1850000,"lengthMeters":944.0,"ratePesosPerMeter":1959.7457627118645,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434003"},{"year":2021,"category":"Roads","project":"Jct Natl Road-Bitnong-Blance-N Vizcaya Bdry Rd - K0268 + 668 - K0269 + 000, K0269 + 465 - K0269 +579","amountPesos":1103000,"lengthMeters":446.0,"ratePesosPerMeter":2473.0941704035877,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434174"},{"year":2021,"category":"Roads","project":"General Alejo Santos Highway Rd - K0054 + 400 - K0054 + 700, K0056 + 743 - K0056 + 941, K0057+000 - K0057+551","amountPesos":1731000,"lengthMeters":1049.0,"ratePesosPerMeter":1650.142993326978,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434180"},{"year":2021,"category":"Roads","project":"Plaridel - Pulilan Diversion Road (LZ) - K0042 + (-1015) - K0042 + (-784)","amountPesos":2534000,"lengthMeters":231.0,"ratePesosPerMeter":10969.69696969697,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434181"},{"year":2021,"category":"Roads","project":"Bacolod-Madalum Highway - K1556 + (-121) - K1556 + 047","amountPesos":847000,"lengthMeters":168.0,"ratePesosPerMeter":5041.666666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434231"},{"year":2021,"category":"Roads","project":"Itabiak - San Vicente Road, Palawan K0166+278 - K0166+478","amountPesos":98400000,"lengthMeters":200.0,"ratePesosPerMeter":492000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434404"},{"year":2021,"category":"Roads","project":"Ubao-Taang Road - K0424 + 094 - K0424 + 346","amountPesos":2536000,"lengthMeters":252.0,"ratePesosPerMeter":10063.492063492064,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434273"},{"year":2021,"category":"Roads","project":"Jct Natl Road-Bitnong-Blance-N Vizcaya Bdry Rd - K0263 + 630 - K0263 + 967, K0265 + 543 - K0265 + 843, K0267 + 042 - K0267 + 300, K0269 + 465 - K0270 + 780, K0272 + 230 - K0272 + 698","amountPesos":50000000,"lengthMeters":2678.0,"ratePesosPerMeter":18670.649738610904,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434279"},{"year":2021,"category":"Roads","project":"Jct Natl Road-Bitnong-Blance-N Vizcaya Bdry Rd - K0269 + 579 - K0270 + 238","amountPesos":23455000,"lengthMeters":659.0,"ratePesosPerMeter":35591.805766312595,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434281"},{"year":2021,"category":"Roads","project":"Bacolod South Rd (Old Road) - Chainage 0 - Chainage 31","amountPesos":1243000,"lengthMeters":31.0,"ratePesosPerMeter":40096.77419354839,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434315"},{"year":2021,"category":"Roads","project":"Bacolod South Rd (Old Road) - Chainage 0 - Chainage 342","amountPesos":13722000,"lengthMeters":342.0,"ratePesosPerMeter":40122.80701754386,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434316"},{"year":2021,"category":"Roads","project":"Bacolod South Rd (Old Road) - K0024 + (-034) - K0024 + 012, K0024 + (-038) - K0024 + (-034), K0024 + 012 - K0024 + 287","amountPesos":13040000,"lengthMeters":325.0,"ratePesosPerMeter":40123.07692307692,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434317"},{"year":2021,"category":"Roads","project":"Bacolod-Madalum Highway - K1565 + 000 - K1565 + 605, K1565 + 817 - K1566 + 357","amountPesos":46771000,"lengthMeters":1145.0,"ratePesosPerMeter":40848.03493449782,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434334"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1466 + 650 - K1467 + 050, K1467 + 960 - K1468 + 350","amountPesos":1582000,"lengthMeters":790.0,"ratePesosPerMeter":2002.5316455696202,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434374"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1428 + 009 - K1428 + 172","amountPesos":9900000,"lengthMeters":163.0,"ratePesosPerMeter":60736.1963190184,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434375"},{"year":2021,"category":"Roads","project":"Itabiak - San Vicente Road, Palawan K0169+013 - K0169+143","amountPesos":99840000,"lengthMeters":130.0,"ratePesosPerMeter":768000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434406"},{"year":2021,"category":"Roads","project":"Itabiak - San Vicente Road, Palawan K0169+413 - K0169+538","amountPesos":78000000,"lengthMeters":125.0,"ratePesosPerMeter":624000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434407"},{"year":2021,"category":"Roads","project":"Itabiak - San Vicente Road, Palawan K0170+173 - K0170+233","amountPesos":50960000,"lengthMeters":60.0,"ratePesosPerMeter":849333.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434408"},{"year":2021,"category":"Roads","project":"Itabiak - San Vicente Road, Palawan K0170+353 - K0170+433","amountPesos":77760000,"lengthMeters":80.0,"ratePesosPerMeter":972000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434409"},{"year":2021,"category":"Roads","project":"Bais-Kabankalan Road K0058+800 - K0059+000 Bais City, Negros Oriental","amountPesos":55000000,"lengthMeters":200.0,"ratePesosPerMeter":275000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434412"},{"year":2021,"category":"Roads","project":"Bais-Kabankalan Road K0059+500 - K0059+800 Bais City, Negros Oriental","amountPesos":82500000,"lengthMeters":300.0,"ratePesosPerMeter":275000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434413"},{"year":2021,"category":"Roads","project":"Bais-Kabankalan Road K0071+000 - K0071+370 Mabinay, Negros Oriental","amountPesos":95000000,"lengthMeters":370.0,"ratePesosPerMeter":256756.75675675675,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434414"},{"year":2021,"category":"Roads","project":"Bais-Kabankalan Road K0071+500 - K0071+870 Mabinay, Negros Oriental","amountPesos":98000000,"lengthMeters":370.0,"ratePesosPerMeter":264864.86486486485,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434415"},{"year":2021,"category":"Roads","project":"Bais-Kabankalan Road K0062+600 - K0062+970 Mabinay, Negros Oriental","amountPesos":91000000,"lengthMeters":370.0,"ratePesosPerMeter":245945.94594594595,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434416"},{"year":2021,"category":"Roads","project":"Bais-Kabankalan Road K0063+680 - K0063+900 Mabinay, Negros Oriental","amountPesos":60500000,"lengthMeters":220.0,"ratePesosPerMeter":275000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434417"},{"year":2021,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1264 + 900 - K1266 + 000","amountPesos":105000000,"lengthMeters":1100.0,"ratePesosPerMeter":95454.54545454546,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434429"},{"year":2021,"category":"Roads","project":"NRJ Bayugan-Calaitan-Tandag Road, K1275+374 - K1275+592 R/S","amountPesos":100000000,"lengthMeters":218.0,"ratePesosPerMeter":458715.59633027524,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434430"},{"year":2021,"category":"Roads","project":"NRJ Bayugan-Calaitan-Tandag Road, K1273+550 - K1273+691 R/S","amountPesos":100000000,"lengthMeters":141.0,"ratePesosPerMeter":709219.8581560283,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434431"},{"year":2021,"category":"Roads","project":"Bais-Kabankalan Road K0056+300 - K0056+350 Bais City, Negros Oriental","amountPesos":13740000,"lengthMeters":50.0,"ratePesosPerMeter":274800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434452"},{"year":2021,"category":"Roads","project":"Bais-Kabankalan Road K0056+850 - K0056+950 Bais City, Negros Oriental","amountPesos":27500000,"lengthMeters":100.0,"ratePesosPerMeter":275000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434453"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1540 + (-294) - K1540 + (-244)","amountPesos":15000000,"lengthMeters":50.0,"ratePesosPerMeter":300000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434474"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1467 + 640 - K1467 + 750","amountPesos":30000000,"lengthMeters":110.0,"ratePesosPerMeter":272727.2727272727,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434475"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1427 + 839 - K1428 + 009","amountPesos":50000000,"lengthMeters":170.0,"ratePesosPerMeter":294117.64705882355,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434476"},{"year":2021,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1605 + 560 - K1605 + 675","amountPesos":34440000,"lengthMeters":115.0,"ratePesosPerMeter":299478.26086956525,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434527"},{"year":2021,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1585 + 300 - K1585 + 450, K1588 + 350 - K1588 + 375, K1588 + 900 - K1588 + 945, K1593 + 440 - K1594 + 220, K1600 + 360 - K1600 + 868, K1601 + 873 - K1601 + 905, K1602 + 680 - K1602 + 935","amountPesos":32340000,"lengthMeters":1795.0,"ratePesosPerMeter":18016.713091922007,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434528"},{"year":2021,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0008 + 783 - K0008 + 806","amountPesos":1000000,"lengthMeters":23.0,"ratePesosPerMeter":43478.260869565216,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434569"},{"year":2021,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0016 + 127 - K0016 + 160, K0016 + 312 - K0016 + 342, K0016 + 460 - K0016 + 498, K0026 + 865 - K0026 + 905","amountPesos":616000,"lengthMeters":141.0,"ratePesosPerMeter":4368.7943262411345,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434570"},{"year":2021,"category":"Roads","project":"Cebu Balamban Transcentral Highway KM.28+210-KM.28+428, Cebu City","amountPesos":100000000,"lengthMeters":218.0,"ratePesosPerMeter":458715.59633027524,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434652"},{"year":2021,"category":"Roads","project":"Cebu-Balamban Transcentral Highway, KM.15+240 - KM.15+270, KM.26+031 - KM.26+171, KM.28+646 - KM.28+710, Cebu City","amountPesos":80800000,"lengthMeters":234.0,"ratePesosPerMeter":345299.1452991453,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434653"},{"year":2021,"category":"Roads","project":"Cebu-Balamban Transcentral Highway KM.28+428 - KM.28+646, Cebu City","amountPesos":100000000,"lengthMeters":218.0,"ratePesosPerMeter":458715.59633027524,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434654"},{"year":2021,"category":"Roads","project":"Cebu-Balamban Transcentral Highway KM12+043 - KM12+159, KM14+046 - KM14+200, Cebu City","amountPesos":50000000,"lengthMeters":270.0,"ratePesosPerMeter":185185.1851851852,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434655"},{"year":2021,"category":"Roads","project":"Cebu-Balamban Transcentral Highway KM18+590 - KM18+730, Cebu City","amountPesos":70000000,"lengthMeters":140.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434657"},{"year":2021,"category":"Roads","project":"Cebu-Balamban Transcentral Highway K0018+590 - K 0018+730, Cebu City","amountPesos":70000000,"lengthMeters":140.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434658"},{"year":2021,"category":"Roads","project":"Cebu-Balamban Transcentral Highway K0020+054 - K0020+094, K0020+679 - K0020 + 752, Cebu City","amountPesos":40000000,"lengthMeters":113.0,"ratePesosPerMeter":353982.30088495574,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434659"},{"year":2021,"category":"Roads","project":"Cebu-Balamban Transcentral Highway, KM.15+240 - KM.15+270, KM.26+031 - KM.26+171, KM.28+646 - KM.28+710, Cebu City","amountPesos":80800000,"lengthMeters":234.0,"ratePesosPerMeter":345299.1452991453,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434660"},{"year":2021,"category":"Roads","project":"Cebu-Balamban Transcentral Highway KM.28+428 - KM.28+646, Cebu City","amountPesos":100000000,"lengthMeters":218.0,"ratePesosPerMeter":458715.59633027524,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434661"},{"year":2021,"category":"Roads","project":"Cebu-Balamban Transcentral Highway KM.14+574 - KM.14+750, Cebu City","amountPesos":57000000,"lengthMeters":176.0,"ratePesosPerMeter":323863.63636363635,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434662"},{"year":2021,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0018 + 450 - K0018 + 590","amountPesos":57325000,"lengthMeters":140.0,"ratePesosPerMeter":409464.28571428574,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434663"},{"year":2021,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1588 + 400 - K1588 + 418, K1589 + 200 - K1589 + 230, K1590 + 000 - K1590 + 200, K1590 + 800 - K1590 + 830, K1591 + 600 - K1591 + 650, K1592 + 050 - K1592 + 250, K1595 + 290 - K1595 + 340, K1595 + 500 - K1595 + 600","amountPesos":53000000,"lengthMeters":678.0,"ratePesosPerMeter":78171.09144542772,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434687"},{"year":2021,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0038 + 100 - K0038 + 201","amountPesos":47770000,"lengthMeters":101.0,"ratePesosPerMeter":472970.297029703,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434794"},{"year":2021,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0045 + 049 - K0045 + 280","amountPesos":50000000,"lengthMeters":231.0,"ratePesosPerMeter":216450.21645021645,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434795"},{"year":2021,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0010 + (-005) - K0010 + 126","amountPesos":40000000,"lengthMeters":131.0,"ratePesosPerMeter":305343.51145038166,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434799"},{"year":2021,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0011 + 744 - K0011 + 900, K0013 + 011 - K0013 + 109","amountPesos":50000000,"lengthMeters":254.0,"ratePesosPerMeter":196850.3937007874,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434800"},{"year":2021,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1573 + 343 - K1573 + 577","amountPesos":46600000,"lengthMeters":234.0,"ratePesosPerMeter":199145.29914529916,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434851"},{"year":2021,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1578 + 543 - K1578 + 755","amountPesos":23600000,"lengthMeters":212.0,"ratePesosPerMeter":111320.75471698113,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 434852"},{"year":2021,"category":"Roads","project":"Tawi-Tawi Mainland Circumferential Road - Sta. 0 + 000 - Sta. 0 + 600","amountPesos":150000000,"lengthMeters":600.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435002"},{"year":2021,"category":"Roads","project":"Ubao-Taang Road - K0399 + 253 - K0399 + 300, K0399 + 762 - K0399 + 779, K0402 + 350 - K0402 + 613, K0402 + 672 - K0402 + 730, K0402 + 831 - K0402 + 852, K0403 + 041 - K0403 + 154, K0404 + 000 - K0404 + 064, K0404 + 136 - K0404 + 280, K0404 + 500 - K0404 + 580, K0404 + 884 - K0404 + 898, K0405 + 092 - K0405 + 114, K0407 + 231 - K0407 + 241, K0407 + 433 - K0407 + 456, K0407 + 858 - K0407 + 912, K0408 + 094 - K0408 + 168, K0408 + 250 - K0408 + 400, K0408 + 430 - K0408 + 506, K0408 + 568 - K0408 + 793","amountPesos":30788000,"lengthMeters":1455.0,"ratePesosPerMeter":21160.137457044675,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435053"},{"year":2021,"category":"Roads","project":"Ubao-Taang Road - K0416 + 987 - K0417 + 126, K0417 + 300 - K0417 + 328, K0417 + 805 - K0417 + 870, K0418 + 276 - K0418 + 322, K0420 + 000 - K0420 + 210, K0421 + 047 - K0421 + 065, K0421 + 361 - K0421 + 478, K0421 + 572 - K0421 + 593, K0425 + 498 - K0425 + 536","amountPesos":13842000,"lengthMeters":682.0,"ratePesosPerMeter":20296.187683284457,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435054"},{"year":2021,"category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Road - K0414 + 770 - K0414 +800, K0440 + 1020 - K0440 + 1080, K0441 + 810 - K0441 + 855, K0444 + 314 - K0444 + 344, K0446 + 036 - K0446 + 046, K0446 + 190 - K0446 + 220, K0446 + 240 - K0446 + 260","amountPesos":27000000,"lengthMeters":225.0,"ratePesosPerMeter":120000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435067"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1533 + 000 - K1534 + 000","amountPesos":30909000,"lengthMeters":1000.0,"ratePesosPerMeter":30909.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435176"},{"year":2021,"category":"Roads","project":"Baliuag- Candaba Road (LZ) - K0052 + (-1570) - K0052+(-920)","amountPesos":1477000,"lengthMeters":650.0,"ratePesosPerMeter":2272.3076923076924,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435192"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1535 + 125 - K1535 + 606","amountPesos":3000000,"lengthMeters":481.0,"ratePesosPerMeter":6237.006237006237,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435208"},{"year":2021,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1233 + (-088) - K1233 + 584, K1235 + 130 - K1236 + 229","amountPesos":58000000,"lengthMeters":1771.0,"ratePesosPerMeter":32749.858836815358,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435224"},{"year":2021,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1240 + 307 - K1240 + 835","amountPesos":105000000,"lengthMeters":528.0,"ratePesosPerMeter":198863.63636363635,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435225"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1534 + 250 - K1534 + 730","amountPesos":20000000,"lengthMeters":480.0,"ratePesosPerMeter":41666.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435263"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1426 + (-928) - K1426 + (-676)","amountPesos":7800000,"lengthMeters":252.0,"ratePesosPerMeter":30952.380952380954,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435268"},{"year":2021,"category":"Roads","project":"Candon City Bypass Road- Chainage 5+345-6+145","amountPesos":10000000,"lengthMeters":800.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435342"},{"year":2021,"category":"Roads","project":"Candon City Bypass Road- Chainage 1+267-2+067","amountPesos":10000000,"lengthMeters":800.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435343"},{"year":2021,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1605 + 193 - K1605 + 276, K1606 + 000 - K1606 + 170","amountPesos":2024000,"lengthMeters":253.0,"ratePesosPerMeter":8000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435396"},{"year":2021,"category":"Roads","project":"Old Cagayan Valley Road (LZ) - K0046 + 800 - K0047 + 577, K0049 + 000 - K0049 + 900","amountPesos":2273000,"lengthMeters":1677.0,"ratePesosPerMeter":1355.3965414430531,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435424"},{"year":2021,"category":"Roads","project":"Bacolod-Madalum Highway - K1565 + 669.50 - K1566 + 124.20, K1569 + 000 - K1571 + 500","amountPesos":2344000,"lengthMeters":2954.7,"ratePesosPerMeter":793.3123498155607,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435442"},{"year":2021,"category":"Roads","project":"Rolando A Andaya Highway - K0290 + 720 - K0292 + 465","amountPesos":79915000,"lengthMeters":1745.0,"ratePesosPerMeter":45796.56160458452,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435504"},{"year":2021,"category":"Roads","project":"Rolando A Andaya Highway - K0300 + 000 - K0301 + 395","amountPesos":63932000,"lengthMeters":1395.0,"ratePesosPerMeter":45829.390681003584,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435505"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1426 + 154 - K1429 + 100, K1430 + 205 - K1431 + 703","amountPesos":59670000,"lengthMeters":4444.0,"ratePesosPerMeter":13427.092709270926,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435527"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1504 + 158 - K1505 + 371, K1506 + 155 - K1506 + 382","amountPesos":33600000,"lengthMeters":1440.0,"ratePesosPerMeter":23333.333333333332,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435528"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1540 + (-194) - K1542 + 852","amountPesos":61268000,"lengthMeters":3046.0,"ratePesosPerMeter":20114.24819435325,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435529"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1544 + 000 - K1545 + 335","amountPesos":23268000,"lengthMeters":1335.0,"ratePesosPerMeter":17429.213483146068,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435530"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1559 + 000 - K1561+ 500","amountPesos":37008000,"lengthMeters":2500.0,"ratePesosPerMeter":14803.2,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435531"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1514 + 780 - K1515 + 205","amountPesos":1850000,"lengthMeters":425.0,"ratePesosPerMeter":4352.941176470588,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435597"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1464 + 160 - K1464 + 508, K1464 + 667 - K1464 + 820","amountPesos":905000,"lengthMeters":501.0,"ratePesosPerMeter":1806.3872255489023,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435599"},{"year":2021,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1272 + 867 - K1274 + 000","amountPesos":11000000,"lengthMeters":1133.0,"ratePesosPerMeter":9708.73786407767,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435612"},{"year":2021,"category":"Roads","project":"Rolando A Andaya Highway - K0301 + 395 - K0301 + 840","amountPesos":20000000,"lengthMeters":445.0,"ratePesosPerMeter":44943.8202247191,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435635"},{"year":2021,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1268 + 000 - K1268 + 749, K1277 + 000 - K1277 + 795","amountPesos":50736000,"lengthMeters":1544.0,"ratePesosPerMeter":32860.103626943004,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435696"},{"year":2021,"category":"Roads","project":"Rolando A Andaya Highway - K0326 + 000 - K0326 + 330","amountPesos":15000000,"lengthMeters":330.0,"ratePesosPerMeter":45454.545454545456,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435743"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1543 + 000 - K1543 + 036, K1543 + 052 - K1544 + 000, K1561 + 500 - K1561 + 900","amountPesos":50000000,"lengthMeters":1384.0,"ratePesosPerMeter":36127.167630057804,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435778"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1438 + 353 - K1439 + 463","amountPesos":50000000,"lengthMeters":1110.0,"ratePesosPerMeter":45045.045045045044,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435779"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1442 + 100 - K1442 + 739","amountPesos":32577000,"lengthMeters":639.0,"ratePesosPerMeter":50981.220657276994,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435780"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1470 + 920 - K1471 + 846","amountPesos":35000000,"lengthMeters":926.0,"ratePesosPerMeter":37796.97624190065,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435781"},{"year":2021,"category":"Roads","project":"Diokno Highway - K0072 + (-995) - K0072 + (-658), K0073 + 440 - K0073 + 720","amountPesos":2973000,"lengthMeters":617.0,"ratePesosPerMeter":4818.476499189627,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435842"},{"year":2021,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1575 + 000 - K1575 + 500, K1577 + 100 - K1579 + 400","amountPesos":38976000,"lengthMeters":2800.0,"ratePesosPerMeter":13920.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435895"},{"year":2021,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1579 + 400 - K1579 + 774, K1579 + 794 - K1580 + 000, K1582 + 800 - K1585 + 000","amountPesos":39228000,"lengthMeters":2780.0,"ratePesosPerMeter":14110.791366906475,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435896"},{"year":2021,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1586 + 100 - K1588 + 100","amountPesos":1800000,"lengthMeters":2000.0,"ratePesosPerMeter":900.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435897"},{"year":2021,"category":"Roads","project":"Bongabong - Sagana - Roxas - San Aquilino Road - K0113 + 077 - K0113 + 616","amountPesos":1007000,"lengthMeters":539.0,"ratePesosPerMeter":1868.274582560297,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435935"},{"year":2021,"category":"Roads","project":"Bongabong - Sagana - Roxas - San Aquilino Road - K0114 + 000 - K0115 + 635","amountPesos":10989000,"lengthMeters":1635.0,"ratePesosPerMeter":6721.100917431193,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435936"},{"year":2021,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1488+ 714 - K1490 + 422","amountPesos":10059000,"lengthMeters":1708.0,"ratePesosPerMeter":5889.3442622950815,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 435985"},{"year":2021,"category":"Roads","project":"Diokno Highway - K0072 + 020 - K0072 + 760, K0073 + 720 - K0074 + 606","amountPesos":50000000,"lengthMeters":1626.0,"ratePesosPerMeter":30750.30750307503,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 436009"},{"year":2021,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1597 + 291 - K1599 + 291","amountPesos":95001000,"lengthMeters":2000.0,"ratePesosPerMeter":47500.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 436050"},{"year":2021,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1585 + 000 - K1586 + 100","amountPesos":36390000,"lengthMeters":1100.0,"ratePesosPerMeter":33081.818181818184,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 436218"},{"year":2021,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1560 + 878 - K1560 + 1983","amountPesos":42727000,"lengthMeters":1105.0,"ratePesosPerMeter":38666.96832579186,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 436233"},{"year":2021,"category":"Roads","project":"Gen Alejo Santos Highway - K0065 + 000 - K0065 + 848","amountPesos":1745000,"lengthMeters":848.0,"ratePesosPerMeter":2057.7830188679245,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 436307"},{"year":2021,"category":"Roads","project":"Road Widening - Tertiary Road - Tibanban-Lavigan Rd - K1778+019 - K1778+619","amountPesos":1336000,"lengthMeters":600.0,"ratePesosPerMeter":2226.6666666666665,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 436352"},{"year":2021,"category":"Roads","project":"Bacolod South Rd (Old Road) - K0019 + (-184) - K0019 + (-042)","amountPesos":2154000,"lengthMeters":142.0,"ratePesosPerMeter":15169.014084507042,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 436430"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1555 + 270 - K1559 + 000","amountPesos":8884000,"lengthMeters":3730.0,"ratePesosPerMeter":2381.769436997319,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437403"},{"year":2021,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1233 + (-088) - K1234 + 124, K1235 + 335 - K1236 + 262","amountPesos":90200000,"lengthMeters":2139.0,"ratePesosPerMeter":42169.23796166433,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437412"},{"year":2021,"category":"Roads","project":"Abanao Road (S04676LZ)- Chainage 21- Chainage 270","amountPesos":2600000,"lengthMeters":249.0,"ratePesosPerMeter":10441.767068273093,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437416"},{"year":2021,"category":"Roads","project":"Abanao Road (S04677LZ)- Chainage 120- Chainage 352","amountPesos":2600000,"lengthMeters":232.0,"ratePesosPerMeter":11206.896551724138,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437417"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1493 + 805 - K1497 + 000","amountPesos":50000000,"lengthMeters":3195.0,"ratePesosPerMeter":15649.452269170579,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437441"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1508 + 290 - K1509 + 562","amountPesos":30000000,"lengthMeters":1272.0,"ratePesosPerMeter":23584.905660377357,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437442"},{"year":2021,"category":"Roads","project":"Sayre Highway - K1555 + 270 - K1557 + 078","amountPesos":33171000,"lengthMeters":1808.0,"ratePesosPerMeter":18346.79203539823,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437443"},{"year":2021,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1242 + 275 - K1242 + 835","amountPesos":15000000,"lengthMeters":560.0,"ratePesosPerMeter":26785.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437468"},{"year":2021,"category":"Roads","project":"Bongabong - Sagana - Roxas - San Aquilino Road - K0121 + 000 - K0124 + 000","amountPesos":10052000,"lengthMeters":3000.0,"ratePesosPerMeter":3350.6666666666665,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437505"},{"year":2021,"category":"Roads","project":"Magsaysay Ave (Trinidad Road) West Service Rd - Chainage 000 - Chainage 244","amountPesos":3533000,"lengthMeters":244.0,"ratePesosPerMeter":14479.508196721312,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437548"},{"year":2021,"category":"Roads","project":"Bacolod-Madalum Highway - K1569 + 000 - K1571 + 500","amountPesos":3000000,"lengthMeters":2500.0,"ratePesosPerMeter":1200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437660"},{"year":2021,"category":"Roads","project":"General Luna Road K0251+(-846)- K0251+300","amountPesos":10000000,"lengthMeters":1146.0,"ratePesosPerMeter":8726.003490401396,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437682"},{"year":2021,"category":"Roads","project":"Ubao-Taang Road - K0415 + 998 - K0416 + 120, K0416 + 357 - K0416 + 983, K0417 + 064 - K0417 + 204, K0417 + 574 - K0417 + 620, K0418 + 038 - K0418 + 206, K0420 + 780 - K0420 + 795, K0420 + 958 - K0421 + 170, K0422 + 127 - K0423 + 447","amountPesos":15127000,"lengthMeters":2649.0,"ratePesosPerMeter":5710.45677614194,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437691"},{"year":2021,"category":"Roads","project":"Aramaywan-Berong-Puerto Princesa Road - K0181+630 - K0181+863","amountPesos":865000,"lengthMeters":233.0,"ratePesosPerMeter":3712.4463519313304,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437733"},{"year":2021,"category":"Roads","project":"Quezon-Punta Baja Road - K0148+640 - K0148+664, K0148+755 - K0148+780, K0154+817 - K0155+375","amountPesos":2285000,"lengthMeters":607.0,"ratePesosPerMeter":3764.4151565074135,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437734"},{"year":2021,"category":"Roads","project":"Quezon-Punta Baja Road - K0200+791 - K0201+377, K0202+505 - K0203+063","amountPesos":6989000,"lengthMeters":1144.0,"ratePesosPerMeter":6109.265734265734,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437735"},{"year":2021,"category":"Roads","project":"Jct. Maradugao-Camp Kibaritan-Dominorog Road- K1626+-579 - K1626+-139","amountPesos":1848000,"lengthMeters":440.0,"ratePesosPerMeter":4200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437739"},{"year":2021,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1570 + 460 - K1570 + 769","amountPesos":1500000,"lengthMeters":309.0,"ratePesosPerMeter":4854.368932038835,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437740"},{"year":2021,"category":"Roads","project":"Abra-Kalinga Road, K0470+086-K0470+613, K0470+840-K0470+873, K0471+065.70-K0471+134.90, K0471+189-K0471+293.70, K0471+389.80-K0471+437.90, K0471+550.90-K0471+582.80, K0471+687-K0471+806.90, K0471+806.90-K0471+910.40, K0472+023.60-K0472+074.80, K0472+092.50-K0472+101.70 (LS)","amountPesos":55000000,"lengthMeters":1097.7,"ratePesosPerMeter":50104.76450760363,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437743"},{"year":2021,"category":"Roads","project":"Abra-Kalinga Road, K0472+101.70-K0472+184.40, K0472+184.40-K0472+237.60 (LS), K0472+237.60-K0472+305.30, K0472+357.30-K0472+792.80, K0472+851-K0472+892, K0472+892-K0472+938.50 (LS), K0473+000-K0473+015 (LS), K0473+015-K0473+067.90, K0473+201.20-K0473+306.30 (RS), K0473+306.30-K0473+376.30, K0473+770-K0474+138.70, K0479+934-K0480+000, K0482+045.40-K0482+292, K0485+004.80-K0485+141 (RS), K0485+141-K0485+150.50, K0485+150.50-K0485+240.80 (RS)","amountPesos":75000000,"lengthMeters":1886.9,"ratePesosPerMeter":39747.734379141126,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437744"},{"year":2021,"category":"Roads","project":"Bacolod-Madalum Highway - K1581 + 095 - K1583 + 415","amountPesos":36198000,"lengthMeters":2320.0,"ratePesosPerMeter":15602.586206896553,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437763"},{"year":2021,"category":"Roads","project":"Bacolod-Madalum Highway - K1581 + (-925) - K1581 + (-404), K1581 + (-070) - K1581 + 095","amountPesos":2553000,"lengthMeters":686.0,"ratePesosPerMeter":3721.5743440233236,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437782"},{"year":2021,"category":"Roads","project":"Bacolod-Madalum Highway - K1579 + 399 - K1579 + 441, K1579 + 781 - K1579 + 933","amountPesos":5610000,"lengthMeters":194.0,"ratePesosPerMeter":28917.525773195877,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437809"},{"year":2021,"category":"Roads","project":"Bacolod-Madalum Highway - K1583 + 415 - K1584 + 093","amountPesos":16950000,"lengthMeters":678.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 437810"},{"year":2021,"category":"Bridges","project":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 2 and 3 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge), Sta. 14+100 to Sta. 15+450, Left Bank, Marikina City","amountPesos":130924000,"lengthMeters":1350.0,"ratePesosPerMeter":96980.74074074074,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 438699"},{"year":2021,"category":"Bridges","project":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 6 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge) Sta. 17+450 to Sta. 18+130, Left and Right Banks, Marikina City","amountPesos":9767000,"lengthMeters":680.0,"ratePesosPerMeter":14363.235294117647,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 438734"},{"year":2021,"category":"Roads","project":"Construction of Flood Control Structure along Ilocos Norte-Apayao Road, K0503+034 - K0503+987, Dingras, Ilocos Norte","amountPesos":1970000,"lengthMeters":953.0,"ratePesosPerMeter":2067.156348373557,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 438914"},{"year":2021,"category":"Roads","project":"Construction of Guardwall along Basco-Mahatao-Ivana-Uyugan-Imnajbu Road (S00016BN) - K0006+510 - K0006+536, K0008+624 - K0008+754, K0008+817.40 - K0008+854, K0008+875.60 - K0008+946.50, K0016+340 - K0016+380, K0016+840 - K0017+573.30, K0024+770 - K0024+900, Batanes","amountPesos":2314000,"lengthMeters":1166.8,"ratePesosPerMeter":1983.2019197805978,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 438961"},{"year":2021,"category":"Bridges","project":"Construction of Reinforced Concrete Slope protection along Sapang Balen Creek upstream of San Roque Bridge Sta. 10+850 to Sta. 12+200 (Both sides) Magalang, Pampanga","amountPesos":15400000,"lengthMeters":1350.0,"ratePesosPerMeter":11407.407407407407,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 438994"},{"year":2021,"category":"Bridges","project":"Rehabilitation/Improvement of Existing Earth Dike along Rio Chico River (Lomboy Section, Right Bank), U/S of Rio Chico Bridge, Sta. 11+144 to Sta. 11+408.40, La Paz, Tarlac","amountPesos":10541000,"lengthMeters":264.4,"ratePesosPerMeter":39867.624810892645,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 438999"},{"year":2021,"category":"Roads","project":"Construction of Flood Control Structure along Wright-Taft-Borongan Road, K0897+000-K0898+000, Brgy. San Isidro, Sulat, Eastern Samar","amountPesos":2000000,"lengthMeters":1000.0,"ratePesosPerMeter":2000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439107"},{"year":2021,"category":"Bridges","project":"Construction of La Dicha Bridge River Control (Downstream), Sta. 00+000 - Sta. 00+421, Malangas, Zamboanga Sibugay","amountPesos":3000000,"lengthMeters":421.0,"ratePesosPerMeter":7125.890736342043,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439139"},{"year":2021,"category":"Bridges","project":"Rehabilitation of Tullahan River from Mouth of Tullahan to Tenejeros Bridge, Catmon, Malabon to Bagumbayan, South Navotas, Sta.-1+000 to 4+250","amountPesos":100000000,"lengthMeters":3250.0,"ratePesosPerMeter":30769.23076923077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439243"},{"year":2021,"category":"Roads","project":"Construction of Flood Control Structures at Maguinao Creek along Daang Maharlika Highway, Sta 000+000 - Sta 000+350, Maguinao, San Rafael, Bulacan","amountPesos":54000000,"lengthMeters":350.0,"ratePesosPerMeter":154285.7142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439295"},{"year":2021,"category":"Roads","project":"Construction of Flood Control Structures,along NCR/ Bulacan Bdry. - Bigte - Ipo Dam Road Ilog Bayan River, Sta 000+000 - Sta 000+700, San Jose Del Monte City, Bulacan","amountPesos":100000000,"lengthMeters":700.0,"ratePesosPerMeter":142857.14285714287,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439300"},{"year":2021,"category":"Roads","project":"Construction of Flood Control Structures,along NCR/ Bulacan Bdry. - Bigte - Ipo Dam Road San Jose River, Sta 000+000 - Sta 000+700, San Jose Del Monte City, Bulacan","amountPesos":100000000,"lengthMeters":700.0,"ratePesosPerMeter":142857.14285714287,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439301"},{"year":2021,"category":"Roads","project":"Construction of Flood Control Structures,along NCR/ Bulacan Bdry. - Bigte - Ipo Dam Road Sto. Cristo River, Sta 000+000 - Sta 000+700, San Jose Del Monte City, Bulacan","amountPesos":100000000,"lengthMeters":700.0,"ratePesosPerMeter":142857.14285714287,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439302"},{"year":2021,"category":"Roads","project":"Construction of Coastal Protection Protecting Surigao Del Sur Bdry.-Davao Oriental Coastal Road (Cateel Section), Cateel, Davao Oriental (Sta. 0+000 - Sta. 0+540)","amountPesos":70000000,"lengthMeters":540.0,"ratePesosPerMeter":129629.62962962964,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439518"},{"year":2021,"category":"Bridges","project":"Rehabilitation / Major Repair of Flood Control Structure along Davao River, Bolton Bridge Upstream, Left Bank, Davao City (Sta. 1+570 - Sta. 1+843)","amountPesos":80000000,"lengthMeters":273.0,"ratePesosPerMeter":293040.29304029304,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439540"},{"year":2021,"category":"Bridges","project":"Revetment Along Manat River (Up- stream and Down Stream) leading to Agusan River at Prk1C, 1B, 1A, 7, 8 and Manat Bridge Poblacion Montevista, Davao De Oro (Sta. 15+900 - Sta. 17+200 LS)","amountPesos":80000000,"lengthMeters":1300.0,"ratePesosPerMeter":61538.46153846154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439543"},{"year":2021,"category":"Roads","project":"Construction of Dike with Revetment along Lake Mainit Protecting Daang Maharlika Road (1173+500 - 1174+500 w/ exception), Kitcharao, Agusan del Norte","amountPesos":100000000,"lengthMeters":1000.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439560"},{"year":2021,"category":"Roads","project":"Construction of Flood Relief along Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Road - K1326+822 - K1328+985, Agusan del Sur","amountPesos":100000000,"lengthMeters":2163.0,"ratePesosPerMeter":46232.085067036525,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439565"},{"year":2021,"category":"Bridges","project":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 8 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge) Sta. 18+650 to 18+950, Left Bank, Marikina City","amountPesos":60000000,"lengthMeters":300.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439617"},{"year":2021,"category":"Bridges","project":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 8 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge) Sta. 18+950 to Sta. 19+350, Left Bank, Marikina City","amountPesos":56794000,"lengthMeters":400.0,"ratePesosPerMeter":141985.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439618"},{"year":2021,"category":"Bridges","project":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 4A - River Improvement Works Along Upper Marikina River (Upstream of Marikina Bridge) Sta. 15+450 to Sta. 15+600, Right Bank, Marikina City","amountPesos":100000000,"lengthMeters":150.0,"ratePesosPerMeter":666666.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439619"},{"year":2021,"category":"Bridges","project":"Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 4A - River Improvement Works Along Upper Marikina River (Upstream of Marikina Bridge) Sta. 15+600 to Sta. 15+700, Right Bank, Marikina City","amountPesos":50000000,"lengthMeters":100.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439620"},{"year":2021,"category":"Roads","project":"Construction of Drainage Structure, Mangaldan-Manaoag-Binalonan Road (Package 1), K0190 + (-486) - K0190 + 220, Binalonan, Pangasinan","amountPesos":20000000,"lengthMeters":706.0,"ratePesosPerMeter":28328.611898016996,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439771"},{"year":2021,"category":"Bridges","project":"Construction of Dao-angan Bridge Flood Control Sta. 141+900 - Sta. 141+960 (B.S.), Dao-angan, Balbalan, Kalinga","amountPesos":10000000,"lengthMeters":60.0,"ratePesosPerMeter":166666.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439815"},{"year":2021,"category":"Roads","project":"Construction of Flood Mitigation Structures and Drainage Systems along Bacoor Boulevard Road (Northbound) K0017 + 427 - K0016 + (-659) with exceptions, Bacoor City, Cavite","amountPesos":30000000,"lengthMeters":2086.0,"ratePesosPerMeter":14381.591562799616,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439948"},{"year":2021,"category":"Roads","project":"Construction of Flood Mitigation Structures and Drainage Systems along Bacoor-Dasmari±as Road K0022 + 220 - K0023 + 920 with exceptions, Bacoor City, Cavite","amountPesos":30000000,"lengthMeters":1700.0,"ratePesosPerMeter":17647.058823529413,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439949"},{"year":2021,"category":"Roads","project":"Construction of Flood Mitigation Structures and Drainage Systems along Cavite-Batangas Road, K0044 + 800 - K0045 + 100 with exceptions, Silang, Cavite","amountPesos":5000000,"lengthMeters":300.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439950"},{"year":2021,"category":"Roads","project":"Construction of Flood Mitigation Structures and Drainage Systems along Cavite-Batangas Road, K0053 + 000 - K0053 + 600 with exceptions, Bacoor City, Cavite","amountPesos":12053000,"lengthMeters":600.0,"ratePesosPerMeter":20088.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439951"},{"year":2021,"category":"Roads","project":"Construction of Flood Mitigation Structures and Drainage Systems along Manila-Cavite Road, K0018 + 170 - K0018 + 994 with exceptions, Bacoor City, Cavite","amountPesos":22400000,"lengthMeters":824.0,"ratePesosPerMeter":27184.466019417476,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439952"},{"year":2021,"category":"Roads","project":"Construction of Flood Mitigation Structures and Drainage Systems along Manila-Cavite Road, K0018 + 994 - K0020 + 773 with exceptions, Bacoor City, Cavite","amountPesos":30000000,"lengthMeters":1779.0,"ratePesosPerMeter":16863.406408094434,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 439953"},{"year":2021,"category":"Roads","project":"Construction of Flood Control Structure along Palo-Carigara-Ormoc Road - K0918+757 - K0919+205, Palo, Leyte","amountPesos":50000000,"lengthMeters":448.0,"ratePesosPerMeter":111607.14285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 440233"},{"year":2021,"category":"Mixed roads / bridges","project":"Construction of Flood Control Structure at Sta. Clara Bridge along Basilan Circumferential Road (Sta. 0+000 - Sta. 0+150) (Both Sides/ Downstream)","amountPesos":48000000,"lengthMeters":150.0,"ratePesosPerMeter":320000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 440286"},{"year":2021,"category":"Roads","project":"Construction of Coastal Protection Protecting Surigao Del Sur Bdry.-Davao Oriental Coastal Road (Boston Section), Boston, Davao Oriental (Sta. 0+000 - Sta. 0+360)","amountPesos":32192000,"lengthMeters":360.0,"ratePesosPerMeter":89422.22222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 440367"},{"year":2021,"category":"Roads","project":"Construction of Coastal Protection Protecting Surigao Del Sur Bdry.-Davao Oriental Coastal Road (Tarragona Section), Caraga, Davao Oriental (Sta. 0+000 - Sta. 0+360)","amountPesos":32191000,"lengthMeters":360.0,"ratePesosPerMeter":89419.44444444444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 440368"},{"year":2021,"category":"Bridges","project":"Construction of Bank Protection of Agusan River Protecting Sta. Josefa Bridge, Sta. 0 + 000 - Sta. 0 + 150, Agusan del Sur","amountPesos":50000000,"lengthMeters":150.0,"ratePesosPerMeter":333333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 440414"},{"year":2021,"category":"Bridges","project":"River Improvement Works along Cagayan River, Buntun Bridge, Tuguegarao and Solana at Sta. 3+950 to Sta. 5+800 and Slope Protection Works for Buntun Bridge, Right Bank, Sta. -0+042 to Sta. 0+410,Tuguegarao City, Cagayan","amountPesos":100000000,"lengthMeters":2218.0,"ratePesosPerMeter":45085.66275924256,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 440453"},{"year":2021,"category":"Bridges","project":"Construction of A.Canao Bridge towards Camalog (Channeling, Embankment Dike, Revetment), along Chico River, Sta. 93+500- Sta. 94+500, Tabuk City, Kalinga","amountPesos":42000000,"lengthMeters":1000.0,"ratePesosPerMeter":42000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 440456"},{"year":2021,"category":"Bridges","project":"Rehabilitation/Improvement of Existing Dike along Parua River (Right Bank, San Antonio Section), D/S of Sta. Rita Bridge, Concepcion, Sta. 12+800 to Sta. 13+217.40","amountPesos":8812000,"lengthMeters":417.4,"ratePesosPerMeter":21111.643507426947,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 440552"},{"year":2021,"category":"Roads","project":"Construction of flood control structure along Lanao-Pagadian-Zamboanga City Road, part of Sibuguey River (Upstream), Sta. 0+171 - Sta. 0+366, Brgy. Sta. Barbara, Imelda, Zamboanga Sibugay","amountPesos":2500000,"lengthMeters":195.0,"ratePesosPerMeter":12820.51282051282,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 440578"},{"year":2021,"category":"Roads","project":"Construction of flood control structures (revetment wall) along Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road part of Sibuguey River (Upstream), Sta. 0+000 - Sta. 0+044, Brgy. Paradise, Diplahan, Zamboanga Sibugay","amountPesos":630000,"lengthMeters":44.0,"ratePesosPerMeter":14318.181818181818,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 440579"},{"year":2021,"category":"Roads","project":"Construction of flood control structures (revetment wall) along Lanao-Pagadian-Zamboanga City Road, Part of Sibuguey River (Downstream), Sta. 0+000 - Sta. 0+156, Brgy Balugo, Imelda, Zamboanga Sibugay","amountPesos":2000000,"lengthMeters":156.0,"ratePesosPerMeter":12820.51282051282,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 440580"},{"year":2021,"category":"Bridges","project":"Construction of A. Canao Bridge Towards Camalog (Channeling, Embankment Dike, Revetment), along Chico River, Sta. 92+700 - Sta. 93+500 (Right Bank), Tabuk City, Kalinga.","amountPesos":80000000,"lengthMeters":800.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 440624"},{"year":2021,"category":"Bridges","project":"Rehabilitation of Existing Dike along Rio Chico River (Macalong Section, Right Bank), U/S of Rio Chico Bridge, Sta.3+739 - Sta.4+316.20, La Paz, Tarlac","amountPesos":92740000,"lengthMeters":577.2,"ratePesosPerMeter":160672.21067221073,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 440650"},{"year":2021,"category":"Roads","project":"Construction of Flood Control Structures Along Moriones River Right Bank Including Road Component, Balanti Section (Phase V), Sta. 0+000 - Sta. 0+421, Balanti, Tarlac City, Tarlac","amountPesos":43516000,"lengthMeters":421.0,"ratePesosPerMeter":103363.42042755344,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2021 GAA parquet · row 440845"},{"year":2022,"category":"Bridges","project":"Regionwide/Nationwide - Roads and Bridges - Conduct of Feasibility Studies/ Preliminary and Detailed Engineering/ Economic Analysis/ Technical Studies/ Traffic Impact Assessment - Region V - Viaduct along Maharlika Highway (K0397+(-354) to K0398+140), Camarines Sur","amountPesos":4900000,"lengthMeters":1494.0,"ratePesosPerMeter":3279.785809906292,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 461317"},{"year":2022,"category":"Roads","project":"Preventive Maintenance along Marcos Highway Westbound, K0017 + (-009 ) - K0014 + 606, Pasig-Marikina City","amountPesos":100000000,"lengthMeters":2385.0,"ratePesosPerMeter":41928.72117400419,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520690"},{"year":2022,"category":"Roads","project":"Installation of Road Safety Devices along Asin (Km 8)-Nangalisan-Sn Pascual, Tuba Rd - K0258 + 100 - K0264 + 370, K0265 + 200 - K0281 + 920","amountPesos":80000000,"lengthMeters":22990.0,"ratePesosPerMeter":3479.7738147020445,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520697"},{"year":2022,"category":"Roads","project":"Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Kalinga-Abra Rd - K0522 + 389 - K0526 + 511, Balbalan, Kalinga","amountPesos":95000000,"lengthMeters":4122.0,"ratePesosPerMeter":23047.06453178069,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520702"},{"year":2022,"category":"Roads","project":"Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Mt Province Bdry-Calanan-Pinukpuk-Abbut - K0447 + 000 - K0469 + 916","amountPesos":96000000,"lengthMeters":22916.0,"ratePesosPerMeter":4189.21277709897,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520703"},{"year":2022,"category":"Roads","project":"Installation of Reflective Pavement Studs A Casta±eda-Ma Aurora-Sn Luis Rd - K0193 + (-307) - K0193 + 068, K0193 + 920 - K0229 + 770, Baler Airport Road - K0227 + 979 - K0229 + 657, Nueva Ecija-Aurora Rd - K0171 + (-322) - K0229 + 000","amountPesos":117500000,"lengthMeters":59092.0,"ratePesosPerMeter":1988.4248290800786,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520725"},{"year":2022,"category":"Roads","project":"Installation of Solar LED Street Lights and Road Safety Devices along Capas-San Jose-Mayantoc-Malacampa Rd - K0115 + (-752) - K0120 +643, Capas, Tarlac","amountPesos":60000000,"lengthMeters":6395.0,"ratePesosPerMeter":9382.329945269743,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520728"},{"year":2022,"category":"Roads","project":"Rehabilitation/Reconstruction/Upgrading along Manila North Road - K0031 + 579 - K0032 + 929, K0035 + 000 - K0035 + 600","amountPesos":87938000,"lengthMeters":1950.0,"ratePesosPerMeter":45096.41025641026,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520729"},{"year":2022,"category":"Roads","project":"Reconstruction of National Road with Slips, Slope Collapse and Landslide along Manila North Road - K0098+ (-070) - K0098 + 122, Bamban, Tarlac","amountPesos":100000000,"lengthMeters":192.0,"ratePesosPerMeter":520833.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520730"},{"year":2022,"category":"Roads","project":"Installation of Road Safety Devices along Calapan North Rd - K0007 + 400 - K0021 + 000, Calapan-Baco, Oriental Mindoro","amountPesos":79221000,"lengthMeters":13600.0,"ratePesosPerMeter":5825.073529411765,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520748"},{"year":2022,"category":"Roads","project":"Installation of Road Safety Devices along Calapan South Rd - K0007 + 400 - K0021 + 000, Calapan City-Naujan, Oriental Mindoro","amountPesos":79221000,"lengthMeters":13600.0,"ratePesosPerMeter":5825.073529411765,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520749"},{"year":2022,"category":"Roads","project":"Installation of Road Safety Devices along Calapan South Rd - K0021 + 000 - K0033 + 600, Naujan-Victoria, Oriental Mindoro","amountPesos":79221000,"lengthMeters":12600.0,"ratePesosPerMeter":6287.380952380952,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520750"},{"year":2022,"category":"Roads","project":"Installation of Road Safety Devices along Calapan South Rd - K0033 + 600 - K0047 + 200, Victoria, Oriental Mindoro","amountPesos":79221000,"lengthMeters":13600.0,"ratePesosPerMeter":5825.073529411765,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520751"},{"year":2022,"category":"Roads","project":"Installation of Road Safety Devices along Calapan South Rd - K0047 + 200 - K0060 + 800, Socorro, Oriental Mindoro","amountPesos":79221000,"lengthMeters":13600.0,"ratePesosPerMeter":5825.073529411765,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520752"},{"year":2022,"category":"Roads","project":"Construction of Road Slope Protection Structure along Barotac Viejo-Sn Rafael Rd - K0079 + 714 - K0080 + 321","amountPesos":75000000,"lengthMeters":607.0,"ratePesosPerMeter":123558.48434925865,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520755"},{"year":2022,"category":"Roads","project":"Installation of Solar LED lightings along Jct. (TNR) Cortes - Balilihan - Catigbian - Macaas Road (S00031BH) - K0017+ 150-K0028+580","amountPesos":69951000,"lengthMeters":11430.0,"ratePesosPerMeter":6119.94750656168,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520760"},{"year":2022,"category":"Roads","project":"Installation of Solar LED lightings along Jct. {TNR) Maribojoc - Antequera - Catagbacan {Loon) Road - K0016+605 - K0024+040","amountPesos":50857000,"lengthMeters":7435.0,"ratePesosPerMeter":6840.215198386012,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520761"},{"year":2022,"category":"Roads","project":"Installation of Solar LED lighting s along Jct. (TNR) Maribojoc - Antequera - Catagbacan ( Loon) Road - K0024+040 - K0033+574","amountPesos":64115000,"lengthMeters":9534.0,"ratePesosPerMeter":6724.879379064401,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520762"},{"year":2022,"category":"Roads","project":"Installation of Solar LED lightings along Jct. {TNR) Cortes -Balilihan - Catigbian - Macaas Road K0038 + 160 - K0049 + 568","amountPesos":78777000,"lengthMeters":11408.0,"ratePesosPerMeter":6905.417251051894,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520763"},{"year":2022,"category":"Roads","project":"Installation of Road Safety Facilities at Davao-Bukidnon Rd - K1659 + 883 - K1698 + 371, Davao City","amountPesos":100000000,"lengthMeters":38488.0,"ratePesosPerMeter":2598.2124298482645,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520777"},{"year":2022,"category":"Roads","project":"Rehabilitation/ Upgrading along Kaybiga Road - K0019 + (-328) -K0020 + 754, Caloocan City","amountPesos":22500000,"lengthMeters":2082.0,"ratePesosPerMeter":10806.916426512968,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520789"},{"year":2022,"category":"Roads","project":"Improvement/ Installation of Road Safety along Epifanio Delos Santos Ave (EDSA), Southbound, K0016 + (-530) - K0020 + 170, Quezon City","amountPesos":23000000,"lengthMeters":4700.0,"ratePesosPerMeter":4893.617021276596,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520796"},{"year":2022,"category":"Roads","project":"Reconstruction of Damaged Paved Road along Jct Potia-Mt Province Bdry Rd - K0436 + 700 - K0453 + 500 (Intermittent Sections)","amountPesos":4625000,"lengthMeters":16800.0,"ratePesosPerMeter":275.29761904761904,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520822"},{"year":2022,"category":"Roads","project":"Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Balbalan-Pinukpuk Rd - K0479 + 624 - K0487 + 144","amountPesos":50000000,"lengthMeters":7520.0,"ratePesosPerMeter":6648.936170212766,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520823"},{"year":2022,"category":"Roads","project":"Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Lubuagan-Batong Buhay-Abra Bdry Rd - K0459 + 917 - K0469 + 483, Lubuagan and Pasil, Kalinga","amountPesos":50000000,"lengthMeters":9566.0,"ratePesosPerMeter":5226.845076311938,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520824"},{"year":2022,"category":"Roads","project":"Installation of Guardrails along Eastern Bulacan Road, K0100 + 000 - K0106 + 000, Do±a Remedios Trinidad, Bulacan","amountPesos":20000000,"lengthMeters":6000.0,"ratePesosPerMeter":3333.3333333333335,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520829"},{"year":2022,"category":"Roads","project":"Preventive Maintenance (Asphalt Overlay) along Gen Alejo Santos Highway - K0058 + (-153) - K0058 + 850","amountPesos":16300000,"lengthMeters":1003.0,"ratePesosPerMeter":16251.246261216353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520832"},{"year":2022,"category":"Roads","project":"Installation of Solar LED Street Lights and Road Safety Devices along Tarlac-Zambales Rd - K0116 + 123 - K0116 +758, K0120+960 - K0122+800, K0125+000-K0128+200, Capas, Tarlac","amountPesos":40000000,"lengthMeters":5675.0,"ratePesosPerMeter":7048.458149779735,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520846"},{"year":2022,"category":"Roads","project":"Installation of Road Lights along Noveleta-Rosario Div Rd, K0026 + (-575) - K0027 + 000","amountPesos":31800000,"lengthMeters":1575.0,"ratePesosPerMeter":20190.47619047619,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520867"},{"year":2022,"category":"Roads","project":"Installation of Road Signages along Daang Maharlika (LZ) - K0135 + (-732) - K0159 + 000, Package A","amountPesos":50000000,"lengthMeters":24732.0,"ratePesosPerMeter":2021.6723273491832,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520911"},{"year":2022,"category":"Roads","project":"Installation of Road Signages along Daang Maharlika (LZ) - K0181 + 000 - K0246 + 724, Package B","amountPesos":50000000,"lengthMeters":65724.0,"ratePesosPerMeter":760.7571054713651,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520912"},{"year":2022,"category":"Roads","project":"Installation of Road Signages along MSR Jct-Lopez-Buenavista Rd - K0218 + (-808) - K0236 + 988","amountPesos":50000000,"lengthMeters":19796.0,"ratePesosPerMeter":2525.762780359669,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520913"},{"year":2022,"category":"Roads","project":"Installation (Completion) of Road Safety Facilities at Antipolo Circumferential Road \"A\", K0025 + (-398) - K0026 + 510, Hamaka Park (Ynares Side), Lico's Park","amountPesos":3080000,"lengthMeters":1908.0,"ratePesosPerMeter":1614.2557651991615,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520919"},{"year":2022,"category":"Roads","project":"Installation of Road Safety Facilities at Corazon C. Aquino Avenue, K0024 + 600 - K0031 + 643","amountPesos":8750000,"lengthMeters":7043.0,"ratePesosPerMeter":1242.3683089592503,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520920"},{"year":2022,"category":"Roads","project":"Installation of Road Safety Facilities at Marikina-Infanta Road, K0019 + (-218) - K0037 + 498","amountPesos":24460000,"lengthMeters":18716.0,"ratePesosPerMeter":1306.90318444112,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520923"},{"year":2022,"category":"Roads","project":"Installation of Road Safety Facilities at Sumulong Highway, K0022 + (-334) - K0028 + 476","amountPesos":8290000,"lengthMeters":6810.0,"ratePesosPerMeter":1217.3274596182084,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520924"},{"year":2022,"category":"Roads","project":"Repair/ Rehabilitation/ Reconstruction of National Road with Slips, Slope Collapsed and Land Slide along Romblon-Cogon Sablayan Road - K0001 + 350 - K0001 + 365","amountPesos":22000000,"lengthMeters":15.0,"ratePesosPerMeter":1466666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520934"},{"year":2022,"category":"Roads","project":"Preventive Maintenance (Asphalt Overlay) along Catanduanes Cir Rd - K0187 + 000 - K0190 + 500 (with exceptions), San Andres-Virac Road Section, Catanduanes","amountPesos":30000000,"lengthMeters":3500.0,"ratePesosPerMeter":8571.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520941"},{"year":2022,"category":"Roads","project":"Installation of Road Safety Devices along Isabela-Libas Negros Occ. Bdry Rd - K0086 + 421 - K0086 + 705, K0089 + 930 - K0090 + 120","amountPesos":40000000,"lengthMeters":474.0,"ratePesosPerMeter":84388.18565400844,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520948"},{"year":2022,"category":"Roads","project":"Preventive Maintenance (Asphalt Overlay) along Santander-Barili-Toledo Rd - K0179 + 000 - K0180 + 000, with Installation of Road Safety Devices (Internally Illuminated (Solar) Pavement Levelled Marker/Stud Flush Type)","amountPesos":25000000,"lengthMeters":1000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520951"},{"year":2022,"category":"Roads","project":"Preventive Maintenance (Asphalt Overlay) along Santander-Barili-Toledo Rd - K0207 + 013 - K0207+093, K0217 + 000 - K0217 + 870, with Installation of Road Safety Devices (Internally Illuminated (Solar) Pavement Levelled Marker/Stud Flush Type)","amountPesos":25000000,"lengthMeters":950.0,"ratePesosPerMeter":26315.78947368421,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520952"},{"year":2022,"category":"Roads","project":"Preventive Maintenance (Asphalt Overlay) along Santander-Barili-Toledo Rd - K0214 + 884 - K0217 + 000, with Installation of Road Safety Devices (Internally Illuminated (Solar) Pavement Levelled Marker/Stud Flush Type)","amountPesos":50000000,"lengthMeters":2116.0,"ratePesosPerMeter":23629.489603024576,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520953"},{"year":2022,"category":"Roads","project":"?Installation of Road Stud (Solar) along Palo-Carigara-Ormoc Rd - K0941 + 100 - K0956 + 000, K0962 + 000 - K0964 + 038","amountPesos":20000000,"lengthMeters":16938.0,"ratePesosPerMeter":1180.7769512339119,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520962"},{"year":2022,"category":"Roads","project":"Installation of Road Safety Devices - ABS-CBN-Quimpo Blvd Div. Rd - K1514 + 000 - K1515 + 343, Davao City","amountPesos":12500000,"lengthMeters":1343.0,"ratePesosPerMeter":9307.520476545049,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520970"},{"year":2022,"category":"Roads","project":"Installation of Road Safety Facilities - ABS-CBN-Quimpo Blvd Div. Rd - K1514 + 000 - K1515 + 343, Davao City","amountPesos":12500000,"lengthMeters":1343.0,"ratePesosPerMeter":9307.520476545049,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520971"},{"year":2022,"category":"Roads","project":"Installation of Road Safety Facilities - Daang Maharlika K1497 + 700 - K1508 + 000, Davao City","amountPesos":50000000,"lengthMeters":10300.0,"ratePesosPerMeter":4854.368932038835,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520972"},{"year":2022,"category":"Roads","project":"Installation of Road Safety Facilities - Davao-Cotabato Rd (Davao City - Jct Digos Sect), K1516 + 000 - K1517 + 000, Davao City","amountPesos":10000000,"lengthMeters":1000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520973"},{"year":2022,"category":"Roads","project":"Installation of Road Safety Facilities - R Castillo St - (S01459MN) Chainage 0 - Chainage 3153, Davao City","amountPesos":15200000,"lengthMeters":3153.0,"ratePesosPerMeter":4820.805581985411,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520974"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road including Drainage Structure at Mindanao Extension (from Regalado to Forest Hill, South Bound), Phase II, K0000 + 001 - K0000 + 650, Quezon City","amountPesos":50000000,"lengthMeters":649.0,"ratePesosPerMeter":77041.60246533128,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520991"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide -Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road Sta. 3+400 - Sta. 4+000, Nueva Era, Ilocos Norte","amountPesos":150000000,"lengthMeters":600.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520998"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide - Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road - Sta. 10+160 - Sta. 10+250, Nueva Era, Ilocos Norte","amountPesos":150000000,"lengthMeters":90.0,"ratePesosPerMeter":1666666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 520999"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide - Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road - Sta. 11+270 - Sta. 11+780, Nueva Era, Ilocos Norte","amountPesos":150000000,"lengthMeters":510.0,"ratePesosPerMeter":294117.64705882355,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521000"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide - Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road - Sta. 14+770 - Sta. 15+200, Nueva Era, Ilocos Norte","amountPesos":150000000,"lengthMeters":430.0,"ratePesosPerMeter":348837.20930232556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521001"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide - Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road - Sta. 2+570 - Sta. 2+900, Nueva Era, Ilocos Norte","amountPesos":150000000,"lengthMeters":330.0,"ratePesosPerMeter":454545.45454545453,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521002"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide - Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road - Sta. 2+950 - Sta. 3+250, Nueva Era, Ilocos Norte","amountPesos":150000000,"lengthMeters":300.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521003"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide - Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road - Sta. 6+660 - Sta. 6+940, Nueva Era, Ilocos Norte","amountPesos":150000000,"lengthMeters":280.0,"ratePesosPerMeter":535714.2857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521004"},{"year":2022,"category":"Roads","project":"Construction of Road Leading to Ambulong Port, Brgy. Jao-asan - Brgy. Dulangaan - Brgy. Poblacion, Sta. 0 + 000.00 - Sta. 2 + 500.00, Odiongan, Romblon","amountPesos":99000000,"lengthMeters":2500.0,"ratePesosPerMeter":39600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521171"},{"year":2022,"category":"Roads","project":"Construction of Road, Brgy. Marigondon Norte - Brgy. Linawan, Sta. 0 + 000.00 - Sta. 3 + 600.00, San Andres, Romblon","amountPesos":89000000,"lengthMeters":3600.0,"ratePesosPerMeter":24722.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521174"},{"year":2022,"category":"Roads","project":"Construction of Sugod-Cawayan Road Leading to Blue Holes, Sta. 10 + 500 - Sta. 10 + 600, San Agustin, Romblon","amountPesos":60000000,"lengthMeters":100.0,"ratePesosPerMeter":600000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521178"},{"year":2022,"category":"Roads","project":"Construction of Sugod-Cawayan Road Leading to Blue Holes, Sta. 11 + 100 - Sta 11 + 230, San Agustin, Romblon","amountPesos":80000000,"lengthMeters":130.0,"ratePesosPerMeter":615384.6153846154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521179"},{"year":2022,"category":"Roads","project":"Construction of Tuburan Road Leading to Elementary School, Aurora, Brgy. Patoo (Phase 2), Sta. 2 + 700 - Sta. 4 + 763.98, Odiongan, Romblon","amountPesos":99000000,"lengthMeters":2063.98,"ratePesosPerMeter":47965.581061832,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521180"},{"year":2022,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Port Barton - TDC Road Section , Sta17+770 - Sta.17+865, Sta.17+914 - Sta.17+969 , Sta.18+023 - Sta.18+244.","amountPesos":149700000,"lengthMeters":371.0,"ratePesosPerMeter":403504.0431266846,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521183"},{"year":2022,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Port Barton to Barangay Kemdeng Road, Sta.2+926 - Sta.3+230.","amountPesos":127400000,"lengthMeters":304.0,"ratePesosPerMeter":419078.94736842107,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521184"},{"year":2022,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Port Barton to Barangay Kemdeng Road, Sta.3+249 - Sta.3+326, Sta.3+351 - Sta.3+514.","amountPesos":103600000,"lengthMeters":240.0,"ratePesosPerMeter":431666.6666666667,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521185"},{"year":2022,"category":"Roads","project":"Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Port Barton to Barangay Kemdeng Road , Sta.3+558 - Sta.3+611, Sta.3+935 - Sta.4+025, Sta.4+091 - Sta.4+177, Sta. 4+240 - Sta.4+351, Sta.4+365 - Sta.4+426, Sta.4+446 - Sta.4+498.","amountPesos":176800000,"lengthMeters":453.0,"ratePesosPerMeter":390286.9757174393,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521186"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Itabiak - San Vicente Road, San Vicente, Palawan, Sta. 171 + 246.00 - Sta. 171 + 482.00","amountPesos":160703000,"lengthMeters":236.0,"ratePesosPerMeter":680944.9152542372,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521202"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Itabiak - San Vicente Road, San Vicente, Palawan, Sta. 171 + 482.00 - Sta. 171 + 718.00","amountPesos":160703000,"lengthMeters":236.0,"ratePesosPerMeter":680944.9152542372,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521203"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Itabiak -San Vicente Road, Sta. 167 + 325.00 - Sta. 167 + 430.00, San Vicente, Palawan","amountPesos":70634000,"lengthMeters":105.0,"ratePesosPerMeter":672704.7619047619,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521204"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Itabiak -San Vicente Road, Sta. 169 + 254.00 - Sta. 169 + 390.00, San Vicente, Palawan","amountPesos":82631000,"lengthMeters":136.0,"ratePesosPerMeter":607580.8823529412,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521205"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Itabiak -San Vicente Road, Sta.165 + 191.00 - Sta.165 + 359.00, San Vicente, Palawan","amountPesos":123950000,"lengthMeters":168.0,"ratePesosPerMeter":737797.619047619,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521206"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Itabiak -San Vicente Road, Sta.169 + 642.00 - Sta.169 + 841.00, San Vicente, Palawan","amountPesos":134731000,"lengthMeters":199.0,"ratePesosPerMeter":677040.2010050251,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521207"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Itabiak -San Vicente Road, Sta.169 + 841.00 - Sta.170 + 041.00, San Vicente, Palawan","amountPesos":135408000,"lengthMeters":200.0,"ratePesosPerMeter":677040.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521208"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Itabiak -San Vicente Road, Sta.170 + 851.00 - Sta.170 + 982.00, San Vicente, Palawan","amountPesos":54011000,"lengthMeters":131.0,"ratePesosPerMeter":412297.7099236641,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521209"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Taytay - Bantulan - Sta. Cruz Port Road, Sta. 2 + 360.00 - Sta. 2 + 568.00, Taytay, Palawan","amountPesos":126381000,"lengthMeters":208.0,"ratePesosPerMeter":607600.9615384615,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521210"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Port Barton-TDC Road, Sta. 17 + 477 - Sta. 17 + 761, Palawan","amountPesos":66958000,"lengthMeters":284.0,"ratePesosPerMeter":235767.60563380283,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521218"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along TDC - Pagdanan Road, San Vicente, Palawan, Sta. 8+266.00 to Sta. 8+351.00","amountPesos":50724000,"lengthMeters":85.0,"ratePesosPerMeter":596752.9411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521221"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along TDC - Pagdanan Road, San Vicente, Palawan, Sta. 9+012.00 to Sta. 9+167.00","amountPesos":87014000,"lengthMeters":155.0,"ratePesosPerMeter":561380.6451612903,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521222"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along TDC - Pagdanan Road, San Vicente, Palawan, Sta. 9+318.00 to Sta. 9+495.00","amountPesos":216051000,"lengthMeters":177.0,"ratePesosPerMeter":1220627.1186440678,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521223"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along TDC - Pagdanan Road, San Vicente, Palawan, Sta. 9+617.00 to Sta. 9+813.00","amountPesos":158432000,"lengthMeters":196.0,"ratePesosPerMeter":808326.5306122449,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521224"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along TDC - Pagdanan Road, San Vicente, Palawan, Sta. 10+458.00 to Sta. 10+612.00","amountPesos":100254000,"lengthMeters":154.0,"ratePesosPerMeter":651000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521225"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along TDC - Pagdanan Road, San Vicente, Palawan, Sta. 14+747.00 to Sta. 14+896.00","amountPesos":60624000,"lengthMeters":149.0,"ratePesosPerMeter":406872.4832214765,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521226"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along TDC - Pagdanan Road, San Vicente, Palawan, Sta. 14+973.00 to Sta. 15+167.00","amountPesos":113665000,"lengthMeters":194.0,"ratePesosPerMeter":585902.0618556701,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521227"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide, Sta. 7+163.00 to Sta. 7+571.00, Kemdeng, San Vicente, Palawan","amountPesos":342369000,"lengthMeters":408.0,"ratePesosPerMeter":839139.7058823529,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521228"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide, Sta. 9+180.00 to Sta. 9+440.00, Kemdeng, San Vicente, Palawan","amountPesos":125083000,"lengthMeters":260.0,"ratePesosPerMeter":481088.46153846156,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521229"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide, Port Barton - Kemdeng Road, Sta. 0+052.00 to Sta. 0+300.00, San Vicente, Palawan","amountPesos":145303000,"lengthMeters":248.0,"ratePesosPerMeter":585899.1935483871,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521230"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide, Port Barton - Kemdeng Road, San Vicente, Palawan Sta. 0+485.00 to Sta. 0+643.00","amountPesos":93738000,"lengthMeters":158.0,"ratePesosPerMeter":593278.4810126582,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521231"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide, Port Barton - Kemdeng Road, San Vicente, Palawan Sta. 0+767.00 to Sta. 0+887.00","amountPesos":59892000,"lengthMeters":120.0,"ratePesosPerMeter":499100.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521232"},{"year":2022,"category":"Roads","project":"Construction of PPSR Jct. - Napsan - Apurawan Road, Sta. 35+634.00 to Sta. 35+765.00, Palawan","amountPesos":110155000,"lengthMeters":131.0,"ratePesosPerMeter":840877.8625954199,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521233"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse, and Landslide along Itabiak-San Vicente Road, Sta. 165 + 662.00 - Sta. 165 + 911.09, San Vicente, Palawan","amountPesos":199994000,"lengthMeters":249.09,"ratePesosPerMeter":802898.550724649,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521237"},{"year":2022,"category":"Roads","project":"Construction of Access Road, Barangay Matutuna to Bolinganay. Sta. 0+000.00-Sta. 3+140.00, San Andres, Romblon","amountPesos":100000000,"lengthMeters":3140.0,"ratePesosPerMeter":31847.133757961783,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521239"},{"year":2022,"category":"Roads","project":"Construction of Brgy. Agpudlos - Sitio Pader Road, Sta. 0+000.00 - Sta. 2+800.00, San Andres, Romblon","amountPesos":75000000,"lengthMeters":2800.0,"ratePesosPerMeter":26785.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521240"},{"year":2022,"category":"Roads","project":"Construction of Brgy. Linawan - Brgy. Mari-Norte Road, Sta. 0+000.00 - Sta. 3+700.00, San Andres, Romblon","amountPesos":100000000,"lengthMeters":3700.0,"ratePesosPerMeter":27027.027027027027,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521241"},{"year":2022,"category":"Roads","project":"Construction of Tugdan to Cahayagan,Alcantara Road (Phase 2), Sta. 2+800.00 - Sta. 4+780.00, Odiongan, Romblon","amountPesos":100000000,"lengthMeters":1980.0,"ratePesosPerMeter":50505.0505050505,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521244"},{"year":2022,"category":"Roads","project":"Construction of Mancao-Galicia Access Route Road, Sta. 6 + 075 - Sta. 7 + 275, Rapu-Rapu, Albay","amountPesos":70000000,"lengthMeters":1200.0,"ratePesosPerMeter":58333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521252"},{"year":2022,"category":"Roads","project":"Construction of Manito Ridge Road (Cawayan Section), Sta. 0 + 000 - Sta. 0 + 750, Manito, Albay","amountPesos":100000000,"lengthMeters":750.0,"ratePesosPerMeter":133333.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521254"},{"year":2022,"category":"Roads","project":"Construction of Pinagbobong - Oson - Magapo Road (Phase 2), Sta. 1 + 500 - Sta. 2 + 500, Tabaco City, Albay","amountPesos":100000000,"lengthMeters":1000.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521260"},{"year":2022,"category":"Roads","project":"Construction of Road, Macabugos via Caratagan - Tagbac, Sta. 0 + 000 - Sta. 2 + 100, Libon, Albay","amountPesos":150000000,"lengthMeters":2100.0,"ratePesosPerMeter":71428.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521272"},{"year":2022,"category":"Roads","project":"Construction of San Pablo - Busdac Road, Sta. 0 + 000 - Sta. 1 + 250, Bacacay, Albay","amountPesos":100000000,"lengthMeters":1250.0,"ratePesosPerMeter":80000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521280"},{"year":2022,"category":"Roads","project":"Construction of San Vicente - Dalipay Road, Sta. 0 + 000 to Sta. 0 + 650, Brgy. San Vicente, Milaor, Camarines Sur","amountPesos":96000000,"lengthMeters":650.0,"ratePesosPerMeter":147692.3076923077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521282"},{"year":2022,"category":"Roads","project":"Construction of Cabasan - Pongco Bonga - Uson Road, Sta. 0 + 000 - Sta. 1 + 300, Bacacay, Albay","amountPesos":100000000,"lengthMeters":1300.0,"ratePesosPerMeter":76923.07692307692,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521298"},{"year":2022,"category":"Roads","project":"Construction of Canaway - Comon Road, Sta. 0 + 000 - Sta. 1 + 350, Malilipot, Albay","amountPesos":100000000,"lengthMeters":1350.0,"ratePesosPerMeter":74074.07407407407,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521300"},{"year":2022,"category":"Roads","project":"Construction of Road Slope Protection along Barili - Aloguinsan Bypass Rd., Brgy. Hilagasan, Barili, Cebu, Sta. 0 + 000.00 - Sta. 0 + 219.00","amountPesos":100000000,"lengthMeters":219.0,"ratePesosPerMeter":456621.00456621003,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521375"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slip, Slope Collapse and Landslide along Access Road Malbog Jct.-Sta Fe Gumbirayan Provincial Road Leading to San Jose Beaches, Sta. 7+280 - Sta. 7+400","amountPesos":60000000,"lengthMeters":120.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521389"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slip, Slope Collapse and Landslide along Access Road Malbog Jct.-Sta Fe Gumbirayan Provincial Road Leading to San Jose Beaches, Sta. 7+560 - Sta. 7+740","amountPesos":90000000,"lengthMeters":180.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521390"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slip, Slope Collapse and Landslide along Access Road Malbog Jct.-Sta Fe Gumbirayan Provincial Road Leading to San Jose Beaches, Sta. 8+360 - Sta. 8+520","amountPesos":115000000,"lengthMeters":160.0,"ratePesosPerMeter":718750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521391"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slip, Slope Collapse and Landslide along Access Road Malbog Jct.-Sta Fe Gumbirayan Provincial Road Leading to San Jose Beaches, Sta. 8+620 - Sta. 8+900","amountPesos":200000000,"lengthMeters":280.0,"ratePesosPerMeter":714285.7142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521392"},{"year":2022,"category":"Roads","project":"Construction of Lagundi-San Andres Road, Sta. 0 + 000 - Sta. 3 + 600, Catbalogan City, Samar","amountPesos":70000000,"lengthMeters":3600.0,"ratePesosPerMeter":19444.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521404"},{"year":2022,"category":"Roads","project":"Construction of Road, Camp Andres Tandu Bato Romandier National, Km. 38 + 000 - Km. 46 + 000, Luuk, Sulu","amountPesos":60000000,"lengthMeters":8000.0,"ratePesosPerMeter":7500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521426"},{"year":2022,"category":"Roads","project":"Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road - Sta. 18+446 - Sta. 18+486, Surigao del Norte","amountPesos":100000000,"lengthMeters":40.0,"ratePesosPerMeter":2500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521545"},{"year":2022,"category":"Roads","project":"Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road - Sta. 18+486 - Sta. 18+526, Surigao del Norte","amountPesos":100000000,"lengthMeters":40.0,"ratePesosPerMeter":2500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521546"},{"year":2022,"category":"Roads","project":"Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road - Sta. 18+558 - Sta. 18+601.41, Surgiao del Norte","amountPesos":100000000,"lengthMeters":43.41,"ratePesosPerMeter":2303616.678184758,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521547"},{"year":2022,"category":"Roads","project":"Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road - Sta. 18+601.41 - 18+645.9, Surigao del Norte","amountPesos":100000000,"lengthMeters":44.49,"ratePesosPerMeter":2247696.111485646,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521548"},{"year":2022,"category":"Roads","project":"Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road - Sta. 18+720 - Sta. 18+803.71, Surigao del Norte","amountPesos":100000000,"lengthMeters":83.71,"ratePesosPerMeter":1194600.4061641505,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521549"},{"year":2022,"category":"Roads","project":"Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road - Sta. 18+942 - Sta.19+046, Surigao del Norte","amountPesos":100000000,"lengthMeters":104.0,"ratePesosPerMeter":961538.4615384615,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521551"},{"year":2022,"category":"Roads","project":"Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1500+300 -K1500+700","amountPesos":100000000,"lengthMeters":400.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521612"},{"year":2022,"category":"Roads","project":"Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1477+530 -K1477+770","amountPesos":100000000,"lengthMeters":240.0,"ratePesosPerMeter":416666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521613"},{"year":2022,"category":"Roads","project":"Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1479+255 -K1479+515","amountPesos":100000000,"lengthMeters":260.0,"ratePesosPerMeter":384615.3846153846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521614"},{"year":2022,"category":"Roads","project":"Construction of Road, Naguilian Bagulin Road, Bagulin, La Union Sta. 009 + 090 - Sta. 009 + 483","amountPesos":50000000,"lengthMeters":393.0,"ratePesosPerMeter":127226.4631043257,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521934"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide, Naguilian Bagulin Road, Bagulin, La Union Sta. 010 + 390 - Sta. 010+585","amountPesos":50000000,"lengthMeters":195.0,"ratePesosPerMeter":256410.2564102564,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521938"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide, Naguilian Bagulin Road, Bagulin, La Union Sta. 010 + 930 - Sta. 011+320","amountPesos":50000000,"lengthMeters":390.0,"ratePesosPerMeter":128205.1282051282,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521939"},{"year":2022,"category":"Roads","project":"Construction of North and South Poblacion Road (Phase II), Sta. 0 + 000 - Sta. 3 + 000, Bucay, Abra","amountPesos":50000000,"lengthMeters":3000.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 521988"},{"year":2022,"category":"Roads","project":"Construction of Aninipil-Tabiog-Lulubnak-Abang Road (Phase III), Sta. 0+000 - Sta. 3+000, Bucay, Abra","amountPesos":50000000,"lengthMeters":3000.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522021"},{"year":2022,"category":"Roads","project":"Construction of Road, Poblacion - Malapaao (Phase II), Sta. 0+000 - Sta. 3+000, Langiden, Abra","amountPesos":50000000,"lengthMeters":3000.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522022"},{"year":2022,"category":"Roads","project":"Construction of Supiil-Bacooc Road (Phase II), Sta. 0+000 - Sta. 2+500, Langilang and San Juan, Abra","amountPesos":50000000,"lengthMeters":2500.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522023"},{"year":2022,"category":"Roads","project":"Rehabilitation of Sta. Rosa-Bugbog Road (Phase II), Sta. 0+000 - Sta. 3+500, Pe±arrubia and Bucay, Abra","amountPesos":50000000,"lengthMeters":3500.0,"ratePesosPerMeter":14285.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522024"},{"year":2022,"category":"Roads","project":"Construction of Sitio San Mariano - Mararigue Road (Brgy. Sta. Cruz - Brgy. Mararigue), Sta. 0 + 000 - Sta. 1+295.26, San Manuel, Isabela","amountPesos":21985000,"lengthMeters":1295.26,"ratePesosPerMeter":16973.42618470423,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522138"},{"year":2022,"category":"Roads","project":"Construction of Sitio Turod - Malalinta Road (Brgy. Sta. Cruz- Brgy. Malalinta), Sta. 0 + 000 - Sta. 1 + 437.70, San Manuel, Isabela","amountPesos":25731000,"lengthMeters":1437.7,"ratePesosPerMeter":17897.336022814216,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522139"},{"year":2022,"category":"Roads","project":"Rehabilitation of District 3 - Sta. Cruz Road (Brgy. District 3 - Brgy. Sta. Cruz), Sta. 0 + 000 - Sta. 0 + 625, San Manuel, Isabela","amountPesos":23110000,"lengthMeters":625.0,"ratePesosPerMeter":36976.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522140"},{"year":2022,"category":"Roads","project":"Construction of Road, Barangay Bonifacio to Barangay San Juan, Sta. 0 + 000 - Sta. 2 + 500, Cuyapo, Nueva Ecija","amountPesos":23700000,"lengthMeters":2500.0,"ratePesosPerMeter":9480.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522304"},{"year":2022,"category":"Roads","project":"Construction of Concrete Road with Slope Protection (Sta. 0+220- Sta. 0+433), Brgy. Iruhin, Tagaytay City, Cavite","amountPesos":25000000,"lengthMeters":213.0,"ratePesosPerMeter":117370.89201877934,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522447"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along TDC - Pagdanan Road, San Vicente, Palawan, Sta. 7+893.00 to Sta. 7+957.00","amountPesos":32984000,"lengthMeters":64.0,"ratePesosPerMeter":515375.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522593"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Itabiak - San Vicente Road, San Vicente, Palawan, Sta. 171 + 039.00 - Sta. 171 + 062.00","amountPesos":12143000,"lengthMeters":23.0,"ratePesosPerMeter":527956.5217391305,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522594"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Itabiak - San Vicente Road, San Vicente, Palawan, Sta. 171 + 173.00 - Sta. 171 + 223.00","amountPesos":39787000,"lengthMeters":50.0,"ratePesosPerMeter":795740.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522595"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Itabiak - San Vicente Road, San Vicente, Palawan, Sta. 171 + 736.00 - Sta. 171 + 797.00","amountPesos":28460000,"lengthMeters":61.0,"ratePesosPerMeter":466557.37704918033,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522596"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Itabiak -San Vicente Road, Sta.170 + 642.00 - Sta.170 + 689.00, San Vicente, Palawan","amountPesos":40796000,"lengthMeters":47.0,"ratePesosPerMeter":868000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522600"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Port Barton - Kemdeng Road, , Sta. 1 + 394.00 - Sta. 1 + 454.00, San Vicente, Palawan","amountPesos":22785000,"lengthMeters":60.0,"ratePesosPerMeter":379750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522601"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Taytay - Bantulan - Sta. Cruz Port Road, Sta. 1 + 026.00 - Sta. 1 + 149.00, Taytay, Palawan (R/S)","amountPesos":46709000,"lengthMeters":123.0,"ratePesosPerMeter":379747.9674796748,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522602"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Taytay - Bantulan - Sta. Cruz Port Road, Sta. 1 + 057.00 - Sta. 1 + 168.00, Taytay, Palawan (L/S)","amountPesos":39744000,"lengthMeters":111.0,"ratePesosPerMeter":358054.0540540541,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522603"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Taytay - Bantulan - Sta. Cruz Port Road, Sta. 2 + 214.00 - Sta. 2 + 284.00, Taytay, Palawan","amountPesos":21266000,"lengthMeters":70.0,"ratePesosPerMeter":303800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522604"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Taytay - Bantulan - Sta. Cruz Port Road, Sta. 2 + 749.00 - Sta. 2 + 827.00, Taytay, Palawan","amountPesos":34698000,"lengthMeters":78.0,"ratePesosPerMeter":444846.1538461539,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522605"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Taytay - Bantulan - Sta. Cruz Port Road, Sta. 3 + 558.00 - Sta. 3 + 675.00, Taytay, Palawan","amountPesos":34275000,"lengthMeters":117.0,"ratePesosPerMeter":292948.71794871794,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522606"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Taytay - Bantulan - Sta. Cruz Port Road, Sta. 4 + 131.00 - Sta. 4 + 181.00, Taytay, Palawan","amountPesos":17903000,"lengthMeters":50.0,"ratePesosPerMeter":358060.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522607"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Taytay - Bantulan - Sta. Cruz Port Road, Sta. 4 + 227.00 - Sta. 4 + 255.00, Taytay, Palawan","amountPesos":7291000,"lengthMeters":28.0,"ratePesosPerMeter":260392.85714285713,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522608"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Taytay - Bantulan - Sta. Cruz Port Road, Sta. 4 + 305.00 - Sta. 4 + 332.00, Taytay, Palawan","amountPesos":7031000,"lengthMeters":27.0,"ratePesosPerMeter":260407.40740740742,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522609"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Taytay - Bantulan - Sta. Cruz Port Road, Sta. 4 + 359.00 - Sta. 4 + 441.00, Taytay, Palawan","amountPesos":23132000,"lengthMeters":82.0,"ratePesosPerMeter":282097.56097560975,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522610"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Taytay - Bantulan - Sta. Cruz Port Road, Sta. 8 + 747.00 - Sta. 8 + 832.00, Taytay, Palawan","amountPesos":29512000,"lengthMeters":85.0,"ratePesosPerMeter":347200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522611"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along TDC - Pagdanan Road, San Vicente, Palawan, Sta. 8+030.00 to Sta. 8+066.00","amountPesos":17577000,"lengthMeters":36.0,"ratePesosPerMeter":488250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522612"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along TDC - Pagdanan Road, San Vicente, Palawan, Sta. 9+190.00 to Sta. 9+245.00","amountPesos":35805000,"lengthMeters":55.0,"ratePesosPerMeter":651000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522613"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along TDC - Pagdanan Road, San Vicente, Palawan, Sta. 14+040.00 to Sta. 14+122.00","amountPesos":35143000,"lengthMeters":82.0,"ratePesosPerMeter":428573.1707317073,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522614"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along TDC - Pagdanan Road, San Vicente, Palawan, Sta. 14+274.00 to Sta. 14+357.00","amountPesos":35121000,"lengthMeters":83.0,"ratePesosPerMeter":423144.578313253,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522615"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along TDC - Pagdanan Road, San Vicente, Palawan, Sta. 16+534.00 to Sta. 16+555.00","amountPesos":9570000,"lengthMeters":21.0,"ratePesosPerMeter":455714.28571428574,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522616"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide, Sta. 9+047.00 to Sta. 9+097.00, Kemdeng, San Vicente, Palawan","amountPesos":21971000,"lengthMeters":50.0,"ratePesosPerMeter":439420.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522617"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide, Sta. 9+741.00 to Sta. 9+793.00, Kemdeng, San Vicente, Palawan","amountPesos":24825000,"lengthMeters":52.0,"ratePesosPerMeter":477403.8461538461,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522618"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide, Sta. 10+302.00 to Sta. 10+348.00, Kemdeng, San Vicente, Palawan","amountPesos":18467000,"lengthMeters":46.0,"ratePesosPerMeter":401456.52173913043,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522619"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide, Sta. 11+007.00 to Sta. 11+098.00, Kemdeng, San Vicente, Palawan","amountPesos":44924000,"lengthMeters":91.0,"ratePesosPerMeter":493670.3296703297,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522620"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide, Port Barton - Kemdeng Road, San Vicente, Palawan Sta. 0+373.00 to Sta. 0+443.00","amountPesos":32279000,"lengthMeters":70.0,"ratePesosPerMeter":461128.5714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522621"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide, Port Barton - Kemdeng Road, San Vicente, Palawan Sta. 0+692.00 to Sta. 0+735.00","amountPesos":18195000,"lengthMeters":43.0,"ratePesosPerMeter":423139.5348837209,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522622"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide, Port Barton - Kemdeng Road, San Vicente, Palawan Sta. 1+089.00 to Sta. 1+166.00","amountPesos":32165000,"lengthMeters":77.0,"ratePesosPerMeter":417727.2727272727,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522623"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide, Port Barton - Kemdeng Road, San Vicente, Palawan Sta. 1+250.00 to Sta. 1+316.00","amountPesos":25780000,"lengthMeters":66.0,"ratePesosPerMeter":390606.0606060606,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522624"},{"year":2022,"category":"Roads","project":"Rehabilitation of Roads with Slips, Slope Collapse and Landslide, Port Barton - Kemdeng Road, San Vicente, Palawan Sta. 1+394.00 to Sta. 1+454.00","amountPesos":22785000,"lengthMeters":60.0,"ratePesosPerMeter":379750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522625"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide, Port Barton - Kemdeng Road, San Vicente, Palawan Sta. 1+527.00 to Sta. 1+573.00","amountPesos":22460000,"lengthMeters":46.0,"ratePesosPerMeter":488260.8695652174,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522626"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide, Port Barton - Kemdeng Road, San Vicente, Palawan Sta. 1+605.00 to Sta. 1+627.00","amountPesos":10742000,"lengthMeters":22.0,"ratePesosPerMeter":488272.7272727273,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522627"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse, and Landslide along Itabiak-San Vicente Road, Sta. 168 + 017.00 - Sta. 168 + 076.00, San Vicente, Palawan","amountPesos":34248000,"lengthMeters":59.0,"ratePesosPerMeter":580474.5762711865,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522628"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Tabon Cave Road, Sta. 6+356.00 to Sta. 6+436.00, Quezon, Palawan","amountPesos":28644000,"lengthMeters":80.0,"ratePesosPerMeter":358050.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522631"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Tabon Cave Road, Sta. 6+539.00 to Sta. 6+649.00, Quezon, Palawan","amountPesos":46547000,"lengthMeters":110.0,"ratePesosPerMeter":423154.54545454547,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522632"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along Tabon Cave Road, Sta. 7+100.00 to Sta. 7+154.00, Quezon, Palawan","amountPesos":17964000,"lengthMeters":54.0,"ratePesosPerMeter":332666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522633"},{"year":2022,"category":"Roads","project":"Construction of Sugod-Cawayan Road Leading to Blue Holes, Sta. 10 + 720 - Sta. 10 + 780, San Agustin, Romblon","amountPesos":24000000,"lengthMeters":60.0,"ratePesosPerMeter":400000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522636"},{"year":2022,"category":"Roads","project":"Construction of Sugod-Cawayan Road Leading to Blue Holes, Sta. 10 + 940 - Sta. 11 + 040, San Agustin, Romblon","amountPesos":50000000,"lengthMeters":100.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522637"},{"year":2022,"category":"Roads","project":"Construction of Sugod-Cawayan Road Leading to Blue Holes, Sta. 11 +450 - Sta. 11 + 510, San Agustin, Romblon","amountPesos":36000000,"lengthMeters":60.0,"ratePesosPerMeter":600000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522638"},{"year":2022,"category":"Roads","project":"Construction of Bagacay - San Pablo Road, Sta. 0 + 000 to Sta. 1 + 450, Brgy. Bagacay to Brgy. San Pablo, Libmanan, Camarines Sur","amountPesos":48000000,"lengthMeters":1450.0,"ratePesosPerMeter":33103.44827586207,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522734"},{"year":2022,"category":"Roads","project":"Construction of Beguito Viejo - Udoc Road, Sta. 0 + 000 to Sta. 1 + 400, Brgy. Beguito to Brgy. Udoc, Libmanan, Camarines Sur","amountPesos":48000000,"lengthMeters":1400.0,"ratePesosPerMeter":34285.71428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522735"},{"year":2022,"category":"Roads","project":"Construction of Cambalidio - Tinalmud Viejo Road, Sta. 0 + 000 to Sta. 0 + 320, Brgy. Tinalmud Viejo, Libmanan, Camarines Sur","amountPesos":20000000,"lengthMeters":320.0,"ratePesosPerMeter":62500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522736"},{"year":2022,"category":"Roads","project":"Construction of Dalupaon Road, Sta. 0 + 000 to Sta. 1 + 300, Brgy. Dalupaon, Pasacao, Camarines Sur","amountPesos":48000000,"lengthMeters":1300.0,"ratePesosPerMeter":36923.07692307692,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522737"},{"year":2022,"category":"Roads","project":"Construction of Road, Sta. 0 + 000 to Sta. 0 + 400, Brgy. Patong, Pamplona, Camarines Sur","amountPesos":25000000,"lengthMeters":400.0,"ratePesosPerMeter":62500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522738"},{"year":2022,"category":"Roads","project":"Construction of Sitio Balid - Sitio Camanoan I - Sitio Camanoan II Road, Sta. 0 + 000 to Sta. 1 + 400, Brgy. Malinao, Libmanan, Camarines Sur","amountPesos":48000000,"lengthMeters":1400.0,"ratePesosPerMeter":34285.71428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522739"},{"year":2022,"category":"Roads","project":"Construction of Sta. Cruz - Caima Road, Sta. 0 + 000 to Sta. 1 + 300, Brgy. Caima, Libmanan, Camarines Sur","amountPesos":48000000,"lengthMeters":1300.0,"ratePesosPerMeter":36923.07692307692,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522740"},{"year":2022,"category":"Roads","project":"Construction of Tanag Road, Sta. 0 + 000 to Sta. 1 + 300, Brgy. Tanag, Libmanan, Camarines Sur","amountPesos":48000000,"lengthMeters":1300.0,"ratePesosPerMeter":36923.07692307692,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522741"},{"year":2022,"category":"Roads","project":"Construction of Villa Socorro - Sitio Magsaysay Road, Sta. 0 + 000 to Sta. 1 + 300, Brgy. Villa Socorro, Libmanan, Camarines Sur","amountPesos":48000000,"lengthMeters":1300.0,"ratePesosPerMeter":36923.07692307692,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 522742"},{"year":2022,"category":"Roads","project":"Rehabilitation of Roads with Slips, Slope Collapse and Landslide - K0047 + 590 - K0047 + 625, K0037 + 500 - K0037 + 550, Garcia, Libjo, Dinagat Islands","amountPesos":19500000,"lengthMeters":85.0,"ratePesosPerMeter":229411.76470588235,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 523352"},{"year":2022,"category":"Roads","project":"Improvement of San Joaquin-Dita-Pawa Road, Sta. 0 + 000 - Sta. 1 + 900, Legazpi City, Albay","amountPesos":90000000,"lengthMeters":1900.0,"ratePesosPerMeter":47368.42105263158,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 523408"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road, Jolo - Batobato - Silangkan Road (Sta. 0010+750 - Sta. 0014+750), Jolo - Indanan, Sulu","amountPesos":150000000,"lengthMeters":4000.0,"ratePesosPerMeter":37500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 523419"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road, Maimbung - Ipil - Bilaan Road (Sta. 0008+000 - Sta. 0012+500), Maimbung and Talipao, Sulu","amountPesos":150000000,"lengthMeters":4500.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 523420"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road, Parang-Maimbung Road (Sta. 0000 +000 - Sta. 003+000), Parang and Maimbung, Sulu","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 523421"},{"year":2022,"category":"Roads","project":"Rehabilitation of Roxas-Quirino Road (Brgy. San Pedro-Brgy. Do±a Concha), Sta. 0 + 000 - Sta. 1 + 300, Sta. 2 + 500 - Sta. 4 + 400, Roxas, Isabela","amountPesos":50000000,"lengthMeters":3200.0,"ratePesosPerMeter":15625.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 523498"},{"year":2022,"category":"Roads","project":"Rehabilitation/Improvement (Asphalt Overlay) of Sagbat-Pililla Diversion Road, K0047 + (-078) to K0050 + 000, Morong and Baras, Rizal","amountPesos":50000000,"lengthMeters":3078.0,"ratePesosPerMeter":16244.314489928525,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 523510"},{"year":2022,"category":"Roads","project":"Rehabilitation/Improvement (Asphalt Overlay) of Pililia Junction - Jalajala Road, K0062+(-575) to K0062+000, K0062+259 to K0062+377, K0063+212 to K0064+454 and K0072+415 to K0074+000, Pililia and Jalajala, Rizal","amountPesos":50000000,"lengthMeters":3520.0,"ratePesosPerMeter":14204.545454545454,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 523511"},{"year":2022,"category":"Bridges","project":"Construction of Reinforced Concrete Slope Protection along Abacan River Upstream of Friendship Bridge, Sta. 0+050 to Sta. 0+650 (R/D), Brgy. Anunas, Angeles City, Pampanga","amountPesos":60000000,"lengthMeters":600.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 523697"},{"year":2022,"category":"Roads","project":"Construction of Road Dike Along Hitoma River, Sta. 0+000 - Sta. 0+300 (With Exception), Brgy. Obi, Caramoran, Catanduanes","amountPesos":180000000,"lengthMeters":300.0,"ratePesosPerMeter":600000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 523807"},{"year":2022,"category":"Roads","project":"Construction of Slope Protection along Jct. (TER) Guidulman - Anda - Badiang - Cogtong Road, Sta. 21+860-Sta. 22+000 (Left Side), Sta. 21+934-Sta.21+989 (Right Side), Anda , Bohol","amountPesos":80000000,"lengthMeters":140.0,"ratePesosPerMeter":571428.5714285715,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 523834"},{"year":2022,"category":"Roads","project":"Construction of Slope Protection along Jct. (TER) Guidulman - Anda - Badiang - Cogtong Road, Sta. 22+647-Sta. 22+695 (Left Side), Sta. 22+640-Sta.22+740 (Right Side),Sta. 24+040-Sta. 24+140 (Left Side), Sta. 24+250-Sta. 24+266 (Left Side), Anda , Bohol","amountPesos":79720000,"lengthMeters":216.0,"ratePesosPerMeter":369074.0740740741,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 523835"},{"year":2022,"category":"Roads","project":"Construction of Slope Protection Structure along Carcar-Barili Road, Sta. 56+000-Sta.57+000, Barili, Cebu","amountPesos":100000000,"lengthMeters":1000.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 523836"},{"year":2022,"category":"Bridges","project":"Construction of Flood Control Structure at Guiong Bridge along Basilan Circumferential Rd, Sta. 0 + 000 - Sta. 0 + 400, Basilan","amountPesos":55000000,"lengthMeters":400.0,"ratePesosPerMeter":137500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 523845"},{"year":2022,"category":"Roads","project":"Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1484+400 -K1484+750","amountPesos":100000000,"lengthMeters":350.0,"ratePesosPerMeter":285714.28571428574,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 523972"},{"year":2022,"category":"Roads","project":"Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1445+100 -K1445+300","amountPesos":100000000,"lengthMeters":200.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 523974"},{"year":2022,"category":"Roads","project":"Construction of Slope Protection Works along San Francisco - Ambitacay Road, Agoo, La Union Sta. 000 + 200 - Sta. 000 + 234","amountPesos":5000000,"lengthMeters":34.0,"ratePesosPerMeter":147058.82352941178,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 524078"},{"year":2022,"category":"Roads","project":"Construction of Slope Protection Works along San Francisco - Ambitacay Road, Agoo, La Union Sta. 000 + 650 - Sta. 000 + 710","amountPesos":8300000,"lengthMeters":60.0,"ratePesosPerMeter":138333.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 524079"},{"year":2022,"category":"Roads","project":"Construction of Slope Protection Works along San Francisco - Ambitacay Road, Agoo, La Union Sta. 000 + 810 - Sta. 000 + 900, Sta. 000 + 915- Sta. 000 + 940, Sta. 001 + 190 - Sta. 001 + 220, Sta. 001 + 740 - Sta. 001 + 764","amountPesos":36000000,"lengthMeters":169.0,"ratePesosPerMeter":213017.75147928993,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 524080"},{"year":2022,"category":"Roads","project":"Construction of Slope Protection Works along San Francisco - Ambitacay Road, Sta. 000 + 380 - Sta. 000 + 482, Agoo, La Union","amountPesos":13400000,"lengthMeters":102.0,"ratePesosPerMeter":131372.54901960783,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 524081"},{"year":2022,"category":"Bridges","project":"Rehabilitation of Existing Dike Along Parua River (San Francisco Section, Left Bank), Upstream of San Francisco Bridge, Concepcion, Tarlac Sta. 13+217.40 to Sta. 13+677.40","amountPesos":20000000,"lengthMeters":460.0,"ratePesosPerMeter":43478.260869565216,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 524356"},{"year":2022,"category":"Roads","project":"Construction of Slope Protection, Jct MSR Diversion Road, K0157 + 550 - K0158 + 600, Atimonan, Quezon","amountPesos":50000000,"lengthMeters":1050.0,"ratePesosPerMeter":47619.04761904762,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 524420"},{"year":2022,"category":"Roads","project":"Construction of Seawall Protection Works along Santander - Balili - Toledo Road, Brgy. Poblacion II, Sta. 0 + 000 - Sta. 0 + 167.00, Malabuyoc, Cebu","amountPesos":50000000,"lengthMeters":167.0,"ratePesosPerMeter":299401.19760479045,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 524683"},{"year":2022,"category":"Roads","project":"Construction of Seawall Protection Works along Santander - Balili - Toledo Road, Brgy. Sto Ni±o, Sta. 0 + 000 - Sta. 0 + 167.00, Malabuyoc, Cebu","amountPesos":50000000,"lengthMeters":167.0,"ratePesosPerMeter":299401.19760479045,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 524684"},{"year":2022,"category":"Roads","project":"Concreting of Lahing-lahing- Junction National Road, KM 2+000-12+000 Luuk, Sulu","amountPesos":40000000,"lengthMeters":10000.0,"ratePesosPerMeter":4000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 525967"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road along Baguio Proper to Brgy Tawan Tawan, Davao City, Davao Del Sur STA. 0+000.000-STA. 7+000.000","amountPesos":95000000,"lengthMeters":7000.0,"ratePesosPerMeter":13571.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 526000"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road and Drainage along A. Mabini Street (S02084LZ) K0008 +200- K0009+ 000, Barangays 15, 17, 18, 19, 20, 21 & 23, Caloocan City","amountPesos":20000000,"lengthMeters":800.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 526061"},{"year":2022,"category":"Roads","project":"Rehabilitation of Lagundi-Bogtong Road, Sta. 0+000 - Sta. 0+550, Rapu Rapu, Albay","amountPesos":30000000,"lengthMeters":550.0,"ratePesosPerMeter":54545.454545454544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 527157"},{"year":2022,"category":"Roads","project":"Rehabilitation of Road from Barangay Tawad to Barangay San Roque, Esperanza, Masbate (Sta. 0+850 to Sta. 2+850)","amountPesos":25000000,"lengthMeters":2000.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 527241"},{"year":2022,"category":"Roads","project":"Construction of Dahilayan Road, Sta. 0+000.00 - 1+300.00, Barangay Dahilayan, Manolo Fortich, Bukidnon","amountPesos":10000000,"lengthMeters":1300.0,"ratePesosPerMeter":7692.307692307692,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 527799"},{"year":2022,"category":"Roads","project":"General Alejo Santos Highway K0042 + (-495) - K0043 + 000, K0046 + 380 - K0047 + 204, K0049 + 100 - K0053 + 000, Bulacan","amountPesos":100000000,"lengthMeters":6219.0,"ratePesosPerMeter":16079.755587715066,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 534567"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1446 + 154 - K1447 + 652","amountPesos":53318000,"lengthMeters":1498.0,"ratePesosPerMeter":35592.79038718291,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 534600"},{"year":2022,"category":"Roads","project":"Sayre Highway, K1551 + 718 - K1554 + 000","amountPesos":100000000,"lengthMeters":2282.0,"ratePesosPerMeter":43821.209465381246,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 534601"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1472 + 388 - K1474 + 090","amountPesos":60000000,"lengthMeters":1702.0,"ratePesosPerMeter":35252.64394829612,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 534602"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1560 + 404 - K1562 + 000","amountPesos":62284000,"lengthMeters":1596.0,"ratePesosPerMeter":39025.0626566416,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 534603"},{"year":2022,"category":"Roads","project":"C-5 Road - K0015 + 171 - K0015 + 665","amountPesos":14903000,"lengthMeters":494.0,"ratePesosPerMeter":30168.016194331984,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 534618"},{"year":2022,"category":"Roads","project":"Marcos Highway - K0014 + 000 - K0014 + 606, K0015 + 1262 - K0014 + 000, K0015 + 578 - K0015 + 946","amountPesos":28848000,"lengthMeters":2262.0,"ratePesosPerMeter":12753.315649867374,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 534619"},{"year":2022,"category":"Roads","project":"Manila-Batangas Road K0086 + 197 - K0087+578","amountPesos":50912000,"lengthMeters":1381.0,"ratePesosPerMeter":36866.03910209993,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 534669"},{"year":2022,"category":"Roads","project":"Mcdonald Jct. Aguinaldo Highway via Talaba, Sta. K0015+(-290) to K0015+690","amountPesos":50000000,"lengthMeters":980.0,"ratePesosPerMeter":51020.4081632653,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 534672"},{"year":2022,"category":"Roads","project":"Iloilo-Antique Road - K0094 + 700 - K0095 + 385, K0088 + 626 - K0089 + 961","amountPesos":46000000,"lengthMeters":2020.0,"ratePesosPerMeter":22772.27722772277,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 534694"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1487 + 236 - K1488 + 000","amountPesos":32878000,"lengthMeters":764.0,"ratePesosPerMeter":43034.03141361257,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 534761"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1517 + 126 - K1517 + 387","amountPesos":11921000,"lengthMeters":261.0,"ratePesosPerMeter":45674.32950191571,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 534762"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1470 + 026 - K1470 + 920","amountPesos":32987000,"lengthMeters":894.0,"ratePesosPerMeter":36898.21029082774,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 534766"},{"year":2022,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1563 + (-706) - K1564 + 526","amountPesos":100000000,"lengthMeters":2232.0,"ratePesosPerMeter":44802.867383512545,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 535646"},{"year":2022,"category":"Roads","project":"C-2 Road - K0006 + 233.10 - K0006 + 850.20","amountPesos":27000000,"lengthMeters":617.1,"ratePesosPerMeter":43753.03840544486,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 535661"},{"year":2022,"category":"Roads","project":"Rosario-San Juan Road K0124 + 000 - K0124 + 872","amountPesos":25213000,"lengthMeters":872.0,"ratePesosPerMeter":28913.990825688074,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 535723"},{"year":2022,"category":"Roads","project":"Iloilo-Antique Road- K0067+000-K0068+000","amountPesos":26261000,"lengthMeters":1000.0,"ratePesosPerMeter":26261.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 535778"},{"year":2022,"category":"Roads","project":"Cebu Toledo Wharf Road (Jct Naga-Uling) - K0014 + 735 - K0016+620, K0017+717 - K0018+000","amountPesos":35000000,"lengthMeters":2168.0,"ratePesosPerMeter":16143.91143911439,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 535810"},{"year":2022,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0013 + 530 - K0014 + 190","amountPesos":16000000,"lengthMeters":660.0,"ratePesosPerMeter":24242.424242424244,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 535818"},{"year":2022,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0014 + 452 - K0015 + 671","amountPesos":25000000,"lengthMeters":1219.0,"ratePesosPerMeter":20508.613617719442,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 535819"},{"year":2022,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1573 + 382 - K1574 + 782","amountPesos":50000000,"lengthMeters":1400.0,"ratePesosPerMeter":35714.28571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 535854"},{"year":2022,"category":"Roads","project":"Sibutu-Ligayan Road - (S00007TW) Chainage 0 - Chainage 5000","amountPesos":61175000,"lengthMeters":5000.0,"ratePesosPerMeter":12235.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 536693"},{"year":2022,"category":"Roads","project":"Gen Alejo Santos Highway - K0059 + 572 - K0059 + 819, K0068 + 000 - K0069 + 000","amountPesos":20780000,"lengthMeters":1247.0,"ratePesosPerMeter":16663.993584603046,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 536794"},{"year":2022,"category":"Roads","project":"Gen Alejo Santos Highway - K0061 + 000 - K0063 + 000","amountPesos":50000000,"lengthMeters":2000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 536797"},{"year":2022,"category":"Roads","project":"Gen Alejo Santos Highway - K0063 + 000 - K0064 + 000, K0067 + 000 - K0068 + 000","amountPesos":50000000,"lengthMeters":2000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 536798"},{"year":2022,"category":"Roads","project":"Bacolod South Rd (Old Road) (S00124NR) - K0020 + 200 - K0020 + 768","amountPesos":11683000,"lengthMeters":568.0,"ratePesosPerMeter":20568.661971830985,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 536869"},{"year":2022,"category":"Roads","project":"Mabinay-Ayungon Road - K0100 + (-200) - K0100 + 346, K0109 + 715 - K0109 + 967, K0120 + 848 - K0121 + 055, K0129 + 650 - K0130 + 235","amountPesos":40000000,"lengthMeters":1590.0,"ratePesosPerMeter":25157.232704402515,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 536901"},{"year":2022,"category":"Roads","project":"Marawi-Malabang Road - (S01652MN) Chainage 20981 - Chainage 21897","amountPesos":20000000,"lengthMeters":916.0,"ratePesosPerMeter":21834.06113537118,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 537297"},{"year":2022,"category":"Roads","project":"Marawi-Malabang Road - (S01652MN) Chainage 32445 - Chainage 33327","amountPesos":20000000,"lengthMeters":882.0,"ratePesosPerMeter":22675.736961451246,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 537298"},{"year":2022,"category":"Roads","project":"Marawi-Malabang Road - (S01652MN) Chainage 6108 - Chainage 8308","amountPesos":50000000,"lengthMeters":2200.0,"ratePesosPerMeter":22727.272727272728,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 537299"},{"year":2022,"category":"Roads","project":"C-5 Road - K0017 + 496 - K0017 + 831, K0018 + 941 - K0019 + 138, K0019 + 418 - K0019 + 574","amountPesos":40000000,"lengthMeters":688.0,"ratePesosPerMeter":58139.53488372093,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 537305"},{"year":2022,"category":"Roads","project":"C-5 Road - K0020 + (-002) - K0020 + 000, K0020 + (-165) - K0020 + (-002), K0020 + (-190) - K0020 + (-165), K0020 + 000 - K0020 + 635","amountPesos":50000000,"lengthMeters":825.0,"ratePesosPerMeter":60606.06060606061,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 537306"},{"year":2022,"category":"Bridges","project":"Daang Maharlika (San Isidro-San Juanico Bridge), K0620+200-K0860+450)","amountPesos":30000000,"lengthMeters":240250.0,"ratePesosPerMeter":124.86992715920915,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 537363"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1456 + 688 - K1457 + 363, K1458 + 305 - K1458 + 686, K1463 + 689 - K1463 + 794","amountPesos":24500000,"lengthMeters":1161.0,"ratePesosPerMeter":21102.497846683895,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 537369"},{"year":2022,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) (S00391MN) - K1274 + 800 - K1275 + 157","amountPesos":15000000,"lengthMeters":357.0,"ratePesosPerMeter":42016.80672268908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 537384"},{"year":2022,"category":"Roads","project":"Palompon-Isabel-Merida-Ormoc Road-K1089+000-K1094+848","amountPesos":100000000,"lengthMeters":5848.0,"ratePesosPerMeter":17099.86320109439,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 538019"},{"year":2022,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0045 + 280 - K0045 + 550","amountPesos":121500000,"lengthMeters":270.0,"ratePesosPerMeter":450000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 538020"},{"year":2022,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1552 + 1017 - K1553 + 201","amountPesos":5000000,"lengthMeters":184.0,"ratePesosPerMeter":27173.91304347826,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 538166"},{"year":2022,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1567 + 847 - K1567 + 935","amountPesos":2200000,"lengthMeters":88.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 538167"},{"year":2022,"category":"Roads","project":"Tigbao - Sta. Fe - San Miguel Road, K0907+900 - K0907+980","amountPesos":150000000,"lengthMeters":80.0,"ratePesosPerMeter":1875000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 538855"},{"year":2022,"category":"Roads","project":"Dobleston-Butadon Road - K2003 + 509 - K2004 + 000, K2007 + 000 - K2008 + 000","amountPesos":52517000,"lengthMeters":1491.0,"ratePesosPerMeter":35222.66934942991,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 538856"},{"year":2022,"category":"Roads","project":"Jct Natl Road-Bitnong-Blance-N Vizcaya Bdry Rd - K0266 + 000 - K0266 + 347, K0273 + 000 - K0273 + 484","amountPesos":27906000,"lengthMeters":831.0,"ratePesosPerMeter":33581.22743682311,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 538914"},{"year":2022,"category":"Roads","project":"Balingasag By-Pass Road - K1389 + (-810) - K1392 + 443","amountPesos":48640000,"lengthMeters":4253.0,"ratePesosPerMeter":11436.632964965906,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 539010"},{"year":2022,"category":"Roads","project":"Marawi-Malabang Road - (S01652MN) Chainage 29900 - Chainage 30550","amountPesos":50000000,"lengthMeters":650.0,"ratePesosPerMeter":76923.07692307692,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 539366"},{"year":2022,"category":"Roads","project":"Marawi-Malabang Road - (S01652MN) Chainage 6900 - Chainage 7550","amountPesos":50000000,"lengthMeters":650.0,"ratePesosPerMeter":76923.07692307692,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 539367"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1463 + 025 - K1463 + 145","amountPesos":96000000,"lengthMeters":120.0,"ratePesosPerMeter":800000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 539370"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1463 + 710 - K1463 + 878","amountPesos":100000000,"lengthMeters":168.0,"ratePesosPerMeter":595238.0952380953,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 539371"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1427 + 668 - K1427 + 837","amountPesos":80000000,"lengthMeters":169.0,"ratePesosPerMeter":473372.78106508875,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 539372"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1486 + 060 - K1486 + 070","amountPesos":1800000,"lengthMeters":10.0,"ratePesosPerMeter":180000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 539428"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1510 + 265 - K1510 + 325","amountPesos":16200000,"lengthMeters":60.0,"ratePesosPerMeter":270000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 539429"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1510 + 275 - K1510 + 290","amountPesos":2700000,"lengthMeters":15.0,"ratePesosPerMeter":180000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 539430"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1538 + 030 - K1538 + 095","amountPesos":7800000,"lengthMeters":65.0,"ratePesosPerMeter":120000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 539431"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1459 + 735 - K1459 + 798","amountPesos":4000000,"lengthMeters":63.0,"ratePesosPerMeter":63492.06349206349,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 539433"},{"year":2022,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0029 + 200 - K0029 + 550","amountPesos":100000000,"lengthMeters":350.0,"ratePesosPerMeter":285714.28571428574,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540369"},{"year":2022,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0029 + 550 - K0029 + 640, K0029 + 770 - K0029 + 963","amountPesos":100000000,"lengthMeters":283.0,"ratePesosPerMeter":353356.89045936393,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540370"},{"year":2022,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0039 + 545 - K0039 + 630","amountPesos":100000000,"lengthMeters":85.0,"ratePesosPerMeter":1176470.5882352942,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540371"},{"year":2022,"category":"Roads","project":"Masiu-Ganassi Road - (S01653MN) Chainage 30000 - Chainage 31000","amountPesos":30000000,"lengthMeters":1000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540426"},{"year":2022,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1560 + 890 - K1560 + 990","amountPesos":100000000,"lengthMeters":100.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540436"},{"year":2022,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1566 + 935 - K1567 + 035","amountPesos":100000000,"lengthMeters":100.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540437"},{"year":2022,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1568 + 900 - K1569 + 000","amountPesos":100000000,"lengthMeters":100.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540438"},{"year":2022,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1570 + 035 - K1570 + 135","amountPesos":100000000,"lengthMeters":100.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540439"},{"year":2022,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1570 + 780 - K1570 + 880","amountPesos":100000000,"lengthMeters":100.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540440"},{"year":2022,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1573 + 900 - K1574 + 000","amountPesos":100000000,"lengthMeters":100.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540441"},{"year":2022,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1692 + 600 - K1692 + 700","amountPesos":100000000,"lengthMeters":100.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540442"},{"year":2022,"category":"Roads","project":"Surigao - Agusan West Coastal Road - Sta. 18+671 - Sta. 18+720","amountPesos":90000000,"lengthMeters":49.0,"ratePesosPerMeter":1836734.693877551,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540482"},{"year":2022,"category":"Roads","project":"Construction of Road Slope Protection Structure (Active Protection) - along Ternate-Nasugbu Rd - K0071+145 - K0071+166","amountPesos":10000000,"lengthMeters":21.0,"ratePesosPerMeter":476190.4761904762,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540568"},{"year":2022,"category":"Roads","project":"Construction of Road Slope Protection Structure (Active Protection) - along Ternate-Nasugbu Rd - K0071+187 - K0071+232","amountPesos":20000000,"lengthMeters":45.0,"ratePesosPerMeter":444444.44444444444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540569"},{"year":2022,"category":"Roads","project":"Construction of Road Slope Protection Structure (Active Protection) - along Ternate-Nasugbu Rd - K0071+232 - K0071+277","amountPesos":20000000,"lengthMeters":45.0,"ratePesosPerMeter":444444.44444444444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540570"},{"year":2022,"category":"Roads","project":"Construction of Road Slope Protection Structure (Active Protection) - along Ternate-Nasugbu Rd - K0068+586 - K0068+641","amountPesos":20000000,"lengthMeters":55.0,"ratePesosPerMeter":363636.36363636365,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540571"},{"year":2022,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0044 + 890 - K0045 + 049","amountPesos":50000000,"lengthMeters":159.0,"ratePesosPerMeter":314465.40880503145,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540630"},{"year":2022,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1571 + 135 - K1571 + 165","amountPesos":8300000,"lengthMeters":30.0,"ratePesosPerMeter":276666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540693"},{"year":2022,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1571 + 330 - K1571 + 350","amountPesos":4100000,"lengthMeters":20.0,"ratePesosPerMeter":205000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540694"},{"year":2022,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1571 + 380 - K1571 + 410","amountPesos":6140000,"lengthMeters":30.0,"ratePesosPerMeter":204666.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540695"},{"year":2022,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1572 + 695 - K1572 + 745","amountPesos":10240000,"lengthMeters":50.0,"ratePesosPerMeter":204800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540696"},{"year":2022,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1573 + 800 - K1573 + 820","amountPesos":10920000,"lengthMeters":20.0,"ratePesosPerMeter":546000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540697"},{"year":2022,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1574 + 000 - K1574 + 040","amountPesos":9560000,"lengthMeters":40.0,"ratePesosPerMeter":239000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540698"},{"year":2022,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1579 + 200 - K1579 + 230","amountPesos":7170000,"lengthMeters":30.0,"ratePesosPerMeter":239000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540699"},{"year":2022,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1581 + 350 - K1581 + 415","amountPesos":22190000,"lengthMeters":65.0,"ratePesosPerMeter":341384.6153846154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 540700"},{"year":2022,"category":"Roads","project":"Claveria-Calanasan Kabugao Road - K0632 + 007 - K0632 + 194","amountPesos":94770000,"lengthMeters":187.0,"ratePesosPerMeter":506791.4438502674,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 541414"},{"year":2022,"category":"Roads","project":"Claveria-Calanasan Kabugao Road - K0632 + 194 - K0632 + 310","amountPesos":93900000,"lengthMeters":116.0,"ratePesosPerMeter":809482.7586206896,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 541415"},{"year":2022,"category":"Roads","project":"Papaya-Mlabing-Wangal-Binugawan-Tadji-Runruno Road - K0314 + 720 - K0314 + 756, K0316 + 120 - K0316 + 156","amountPesos":100000000,"lengthMeters":72.0,"ratePesosPerMeter":1388888.888888889,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 541441"},{"year":2022,"category":"Roads","project":"Papaya-Malabing-Wangal-Binugawan-Tadji-Runruno Road - K0313 + 300 - K0313 + 380","amountPesos":100000000,"lengthMeters":80.0,"ratePesosPerMeter":1250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 541453"},{"year":2022,"category":"Roads","project":"Ubao-Taang Road - K0409 + 650 - K0409 + 716, K0410 + 249 - K0410 + 330, K0410 + 353 - K0410 + 395, K0413 + 243 - K0413 + 262, K0419 + 155 - K0419 + 181","amountPesos":8190000,"lengthMeters":234.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 541590"},{"year":2022,"category":"Roads","project":"Construction of Road Slope Protection Structure (Active Protection) - along Tagaytay-Taal Lake Rd. K0058+717 - K0058+767","amountPesos":19298000,"lengthMeters":50.0,"ratePesosPerMeter":385960.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 541621"},{"year":2022,"category":"Roads","project":"Construction of Road Slope Protection Structure (Active Protection) - along Tagaytay-Taal Lake Rd. K0058+767 - K0058+817","amountPesos":19298000,"lengthMeters":50.0,"ratePesosPerMeter":385960.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 541622"},{"year":2022,"category":"Roads","project":"Construction of Road Slope Protection Structure (Active Protection) - along Tagaytay-Taal Lake Rd. K0062+802 - K0062+868","amountPesos":19967000,"lengthMeters":66.0,"ratePesosPerMeter":302530.30303030304,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 541623"},{"year":2022,"category":"Roads","project":"Bacolod-Madalum Highway - K1568 + 180 - K1568 + 255","amountPesos":3825000,"lengthMeters":75.0,"ratePesosPerMeter":51000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 541696"},{"year":2022,"category":"Roads","project":"Bacolod-Madalum Highway - K1573 + 705 - K1574 + 075","amountPesos":18870000,"lengthMeters":370.0,"ratePesosPerMeter":51000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 541697"},{"year":2022,"category":"Roads","project":"Bacolod-Madalum Highway - K1573 + 905 - K1573 + 975","amountPesos":10080000,"lengthMeters":70.0,"ratePesosPerMeter":144000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 541698"},{"year":2022,"category":"Roads","project":"Bacolod-Madalum Highway - K1574 + 020 - K1574 + 100","amountPesos":11520000,"lengthMeters":80.0,"ratePesosPerMeter":144000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 541699"},{"year":2022,"category":"Roads","project":"Bacolod-Madalum Highway - K1574 + 085 - K1574 + 240","amountPesos":7905000,"lengthMeters":155.0,"ratePesosPerMeter":51000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 541700"},{"year":2022,"category":"Roads","project":"Bacolod-Madalum Highway - K1574 + 280 - K1574 + 315","amountPesos":2520000,"lengthMeters":35.0,"ratePesosPerMeter":72000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 541701"},{"year":2022,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1246 + 000 - K1247 + 219","amountPesos":108536000,"lengthMeters":1219.0,"ratePesosPerMeter":89036.9155045119,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 541985"},{"year":2022,"category":"Roads","project":"Manila North Road K0086 + 740 - K0086 + 970","amountPesos":25000000,"lengthMeters":230.0,"ratePesosPerMeter":108695.65217391304,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 541997"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1510 + 267 - K1511 + 413","amountPesos":40000000,"lengthMeters":1146.0,"ratePesosPerMeter":34904.01396160558,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 542046"},{"year":2022,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1255 + 836 - K1256 + 199","amountPesos":22000000,"lengthMeters":363.0,"ratePesosPerMeter":60606.06060606061,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 542066"},{"year":2022,"category":"Roads","project":"Corrales Extension St. - Port Road - K1438 + (-085) - K1438 + 450","amountPesos":80000000,"lengthMeters":535.0,"ratePesosPerMeter":149532.71028037384,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 542391"},{"year":2022,"category":"Roads","project":"Passi-Calinog Road - K0052 + 950- K0053 + 150, K0053 + 887 - K0054 + 174","amountPesos":4000000,"lengthMeters":487.0,"ratePesosPerMeter":8213.552361396303,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 542493"},{"year":2022,"category":"Roads","project":"Jct Tacloban-Baybay South Rd-Government Center Road Network - K0918 + (-170) - K0918 + 510","amountPesos":15000000,"lengthMeters":680.0,"ratePesosPerMeter":22058.823529411766,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 542852"},{"year":2022,"category":"Roads","project":"Bacolod-Madalum Highway - K1573+700 - K1574+240","amountPesos":10000000,"lengthMeters":540.0,"ratePesosPerMeter":18518.51851851852,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 542869"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1439 + 463 - K1440 + 602","amountPesos":100000000,"lengthMeters":1139.0,"ratePesosPerMeter":87796.3125548727,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 543805"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1442 + 739 - K1443 + 853","amountPesos":67545000,"lengthMeters":1114.0,"ratePesosPerMeter":60632.85457809695,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 543806"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1447 + 900 - K1449 + 420","amountPesos":90145000,"lengthMeters":1520.0,"ratePesosPerMeter":59305.92105263158,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 543807"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1535 + 606 - K1536 + 514","amountPesos":62056000,"lengthMeters":908.0,"ratePesosPerMeter":68343.61233480176,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 543808"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1543 + 052 - K1544 + 000, K1551 + 143 - K1551 + 203, K1553 + 109 - K1554 + 077, K1554 + 109 - K1554 + 414, K1561 + 900 - K1562 + 208","amountPesos":100000000,"lengthMeters":2589.0,"ratePesosPerMeter":38624.95171881035,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 543809"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1489 + 609 - K1490 + 106","amountPesos":18000000,"lengthMeters":497.0,"ratePesosPerMeter":36217.303822937625,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 543895"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1509 + 950 - K1510 + 303, K1512 + 371 - K1513 + 381","amountPesos":47000000,"lengthMeters":1363.0,"ratePesosPerMeter":34482.75862068965,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 543896"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1527 + 990 - K1528 + 514, K1530 + 690 - K1531 + 000","amountPesos":38492000,"lengthMeters":834.0,"ratePesosPerMeter":46153.47721822542,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 543897"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1528 + 514 - K1530 + 690","amountPesos":34050000,"lengthMeters":2176.0,"ratePesosPerMeter":15647.97794117647,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 543898"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1531 + 176 - K1531 + 345","amountPesos":6154000,"lengthMeters":169.0,"ratePesosPerMeter":36414.20118343195,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 543899"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1542 + 852 - K1543 + 036","amountPesos":10630000,"lengthMeters":184.0,"ratePesosPerMeter":57771.739130434784,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 543900"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1464 + 382 - K1464 + 508, K1464 + 667 - K1464 + 820","amountPesos":10881000,"lengthMeters":279.0,"ratePesosPerMeter":39000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 543901"},{"year":2022,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1264 + 579 - K1264 + 796, K1267 + 938 - K1268 + 000","amountPesos":12500000,"lengthMeters":279.0,"ratePesosPerMeter":44802.867383512545,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 543927"},{"year":2022,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1277 + 399 - K1277 + 795, K1279 + 100 - K1279 + 829","amountPesos":48000000,"lengthMeters":1125.0,"ratePesosPerMeter":42666.666666666664,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 543928"},{"year":2022,"category":"Roads","project":"Diokno Highway - K0072 + (-425) - K0072 + 000, K0072 + (-995) - K0072 + (-425), K0072 + 000 - K0072 + 515","amountPesos":70000000,"lengthMeters":1510.0,"ratePesosPerMeter":46357.615894039736,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 544888"},{"year":2022,"category":"Roads","project":"Jolo - Indanan - Parang - Silangkan Road (Package 1) - Sta. 0+000 - Sta. 3+500","amountPesos":140000000,"lengthMeters":3500.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 544955"},{"year":2022,"category":"Roads","project":"Jolo - Indanan - Parang - Silangkan Road (Package 2) - Sta. 0+000 - Sta. 3+500","amountPesos":140000000,"lengthMeters":3500.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 544956"},{"year":2022,"category":"Roads","project":"Jolo - Indanan - Parang - Silangkan Road (Package 3) - Sta. 7+000 - Sta. 10+750","amountPesos":40000000,"lengthMeters":3750.0,"ratePesosPerMeter":10666.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 544957"},{"year":2022,"category":"Roads","project":"Romandier-Camp Andres-Tanduh Bato Road - K0047 + 000 - K0050 + 000","amountPesos":114000000,"lengthMeters":3000.0,"ratePesosPerMeter":38000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 544960"},{"year":2022,"category":"Roads","project":"Romandier-Camp Andres-Tanduh Bato Road - K0050 + 000 - K0056 + 000","amountPesos":164000000,"lengthMeters":6000.0,"ratePesosPerMeter":27333.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 544961"},{"year":2022,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1568 + 000 - K1569 + 240","amountPesos":64000000,"lengthMeters":1240.0,"ratePesosPerMeter":51612.903225806454,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 544973"},{"year":2022,"category":"Roads","project":"Iloilo-Capiz Road (Old Route) - K0032 + 750 - K0033 + 176, K0033 + 492 - K0033 + 877, K0035 + 660 - K0035 + 710, K0035 + 728 - K0035 + 788, K0039 + 734 - K0040 + 100","amountPesos":28000000,"lengthMeters":1287.0,"ratePesosPerMeter":21756.021756021757,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 545110"},{"year":2022,"category":"Roads","project":"Sanga - Sanga - Bato - Bato Road (Package I) - Sta. 0+000 - Sta. 3+000","amountPesos":72950000,"lengthMeters":3000.0,"ratePesosPerMeter":24316.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 545702"},{"year":2022,"category":"Roads","project":"Gen Alejo Santos Highway - K0058 + (-153) - K0058 + (-074)","amountPesos":8200000,"lengthMeters":79.0,"ratePesosPerMeter":103797.46835443038,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 545724"},{"year":2022,"category":"Bridges","project":"Butuan City-Masao Port Rd Jct-Doongan Bridge - (S00420MN) Chainage 0 - Chainage 809, Chainage 834 - Chainage 848","amountPesos":22000000,"lengthMeters":823.0,"ratePesosPerMeter":26731.4702308627,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 545807"},{"year":2022,"category":"Roads","project":"Puerto Princesa South Diversion Road II K0047 + 409 - K0050 + 710, Puerto Princesa South Road","amountPesos":137000000,"lengthMeters":3301.0,"ratePesosPerMeter":41502.57497727961,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 547349"},{"year":2022,"category":"Roads","project":"Dr. Damian Reyes Memorial Road, Sta. 32 + 150 - Sta. 33 + 150","amountPesos":97800000,"lengthMeters":1000.0,"ratePesosPerMeter":97800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 548558"},{"year":2022,"category":"Roads","project":"Dr. Damian Reyes Memorial Road, Sta. 33 + 150 - Sta. 34 + 150","amountPesos":99500000,"lengthMeters":1000.0,"ratePesosPerMeter":99500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 548559"},{"year":2022,"category":"Roads","project":"Dr. Damian Reyes Memorial Road, Sta. 34 + 150 - Sta. 35 + 150","amountPesos":99500000,"lengthMeters":1000.0,"ratePesosPerMeter":99500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 548560"},{"year":2022,"category":"Roads","project":"Dr. Damian Reyes Memorial Road, Sta. 35 + 150 - Sta. 36 + 150","amountPesos":99500000,"lengthMeters":1000.0,"ratePesosPerMeter":99500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 548561"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1429 + 100 - K1437 + 799","amountPesos":80000000,"lengthMeters":8699.0,"ratePesosPerMeter":9196.45936314519,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 548978"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1512 + 000 - K1515 + 000","amountPesos":150000000,"lengthMeters":3000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 548979"},{"year":2022,"category":"Roads","project":"Sayre Highway - K1426 + (-718) - K1426 + 000","amountPesos":9995000,"lengthMeters":718.0,"ratePesosPerMeter":13920.612813370473,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 549013"},{"year":2022,"category":"Roads","project":"Masiu-Ganassi Road - (S01653MN) Chainage 16684 - Chainage 19869, Chainage 19881 - Chainage 21005","amountPesos":50000000,"lengthMeters":4309.0,"ratePesosPerMeter":11603.620329542817,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 549421"},{"year":2022,"category":"Roads","project":"Guiuan-Sulangan Peninsula Road - (S00188SM) Chainage 0 - Chainage 173, Chainage 231 - Chainage 277, Chainage 290 - Chainage 353, Chainage 534 - Chainage 557, Chainage 773 - Chainage 782, Chainage 889 - Chainage 952, Chainage 1056 - Chainage 2144","amountPesos":15000000,"lengthMeters":1465.0,"ratePesosPerMeter":10238.907849829351,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 549476"},{"year":2022,"category":"Roads","project":"Ubao-Taang Road - K0423 + 447 - K0424 + 084, K0425 + 385 - K0425 + 498, K0425 + 536 - K0425 + 553","amountPesos":8041000,"lengthMeters":767.0,"ratePesosPerMeter":10483.702737940026,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 549848"},{"year":2022,"category":"Roads","project":"Bacolod-Madalum Highway - K1568 + 601 - K1569 + 000","amountPesos":4626000,"lengthMeters":399.0,"ratePesosPerMeter":11593.984962406015,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 549892"},{"year":2022,"category":"Roads","project":"Zamboanga West Coastal Road (Sibuco-Sirawai Section) S01166MN Chainage 12494- Chainage 16000","amountPesos":50000000,"lengthMeters":3506.0,"ratePesosPerMeter":14261.266400456361,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 549993"},{"year":2022,"category":"Roads","project":"Zamboanga West Coastal Road (Limpapa- Sibuco Section) S01148MN Chainage 2294- Chainage 3934","amountPesos":21000000,"lengthMeters":1640.0,"ratePesosPerMeter":12804.878048780487,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 549994"},{"year":2022,"category":"Roads","project":"Zamboanga West Coastal Road (Limpapa- Sibuco Section) (S00014MN) -Lintangan Approaches K1988 + 847 - K1989 + 146, K1989 + 248 - K1989 + 385","amountPesos":10750000,"lengthMeters":436.0,"ratePesosPerMeter":24655.963302752294,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 549995"},{"year":2022,"category":"Bridges","project":"Pasig-Marikina River Channel Improvement Project, Contract Package No. 4-B, River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge) Sta. 15+700 to Sta. 15+957 (Phase 2), Right Bank, Marikina City","amountPesos":160243000,"lengthMeters":257.0,"ratePesosPerMeter":623513.6186770428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 561924"},{"year":2022,"category":"Bridges","project":"Rehabilitation of Existing Dike along Lucung River, Sta. 4+859 to Sta. 4+314, D/S of Santiago Bridge (Jefmin Section, Left Bank), Concepcion, Tarlac","amountPesos":60000000,"lengthMeters":545.0,"ratePesosPerMeter":110091.74311926606,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 562039"},{"year":2022,"category":"Roads","project":"Construction of Agbunyog Flood Control along Tablas Circumferential Road (B/S), Sta. 0+000 - Sta. 0+363.50, Sta. Maria, Romblon","amountPesos":99500000,"lengthMeters":363.5,"ratePesosPerMeter":273727.6478679505,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 562125"},{"year":2022,"category":"Roads","project":"Construction of Flood Mitigation Structure and Drainage Systems Phase I, Puerto Princesa North Road, Barangay San Manuel to Outfall, Sta. 0+000 - Sta. 0+600, Puerto Princesa, Palawan","amountPesos":100000000,"lengthMeters":600.0,"ratePesosPerMeter":166666.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 562128"},{"year":2022,"category":"Bridges","project":"Construction of Slope Protection along Maigo Bridge, (downstream) (LS), Sta. 0+000.00 - Sta. 0+260.00, Maigo, Lanao del Norte","amountPesos":70000000,"lengthMeters":260.0,"ratePesosPerMeter":269230.76923076925,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 562337"},{"year":2022,"category":"Roads","project":"Construction of Retarding Basin protecting national road, La Verna Section, Sta. 0+000 - Sta. 0+500, Davao City","amountPesos":340000000,"lengthMeters":500.0,"ratePesosPerMeter":680000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 562372"},{"year":2022,"category":"Bridges","project":"Construction of Dike Revetment along Hubo River Basin Protecting Hubo Bridge Abutment \"A\" Upstream, Brgy. Buhisan, Sta. 0+000.00 - Sta. 0+346.00, San Agustin, Surigao del Sur","amountPesos":104000000,"lengthMeters":346.0,"ratePesosPerMeter":300578.0346820809,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 562399"},{"year":2022,"category":"Bridges","project":"Construction of Dike with Concrete Revetment along Puyo River, Downstream Section along Abutment A of the Bridge, Sta. 0+000.00 - Sta. 0+500.00, Jabonga, Agusan del Norte","amountPesos":80000000,"lengthMeters":500.0,"ratePesosPerMeter":160000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 562400"},{"year":2022,"category":"Roads","project":"Construction of Flood Mitigation Structure along NRJ Tagcatong-Vinapor Road, Sta. 0+000.00 - Sta. 0+340.00, Carmen, Agusan del Norte","amountPesos":125000000,"lengthMeters":340.0,"ratePesosPerMeter":367647.0588235294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 562402"},{"year":2022,"category":"Bridges","project":"Construction of Revetment along Agusan River Basin, Esperanza Bridge Approaches, Sta. 0+000.00 - Sta. 0+400.00, Esperanza, Agusan del Sur","amountPesos":100000000,"lengthMeters":400.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 562406"},{"year":2022,"category":"Roads","project":"Construction of Drainage along Noveleta Naic-Tagaytay Road, Rosario, Cavite, K0027 + 383-K0028 + 453.375 (Both Sides) (Phase 1)","amountPesos":25000000,"lengthMeters":1070.375,"ratePesosPerMeter":23356.300362022655,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 562709"},{"year":2022,"category":"Roads","project":"Construction of Drainage along Noveleta Naic-Tagaytay Road, Rosario, Cavite, K0028 + 453.375 - K0029 + 523.75 (Both Sides) (Phase 2)","amountPesos":25000000,"lengthMeters":1070.375,"ratePesosPerMeter":23356.300362022655,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 562710"},{"year":2022,"category":"Roads","project":"Construction of Drainage System along Balud-Busaran Road, Sta. 0+000 - Sta. 1+709, Sablayan, Occidental Mindoro,","amountPesos":40000000,"lengthMeters":1709.0,"ratePesosPerMeter":23405.500292568755,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 562791"},{"year":2022,"category":"Bridges","project":"Construction of Flood Control Structure along Bicol River, Upstream Bacolod Bridge, Left Side, Sta. 0+147 - Sta. 0+600, Bato, Camarines Sur","amountPesos":50000000,"lengthMeters":453.0,"ratePesosPerMeter":110375.27593818985,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 562865"},{"year":2022,"category":"Bridges","project":"Construction of Flood Control Structure along Bicol River, Upstream Bacolod Bridge, Right Side, Sta. 0+147 - Sta. 0+600, Bato, Camarines Sur","amountPesos":50000000,"lengthMeters":453.0,"ratePesosPerMeter":110375.27593818985,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 562866"},{"year":2022,"category":"Roads","project":"Construction of Seawall Protection Works along Santander-Barili-Toledo Road at Brgy. Legaspi to Brgy. Poblacion, Sta. 0 + 000 - Sta. 0 + 167, Alegria, Cebu","amountPesos":50000000,"lengthMeters":167.0,"ratePesosPerMeter":299401.19760479045,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 562970"},{"year":2022,"category":"Roads","project":"Construction of Seawall Protection Works along Santander-Barili-Toledo Road at Brgy. Legaspi, Sta. 0 + 000 - Sta. 0 + 167, Alegria, Cebu","amountPesos":50000000,"lengthMeters":167.0,"ratePesosPerMeter":299401.19760479045,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 562971"},{"year":2022,"category":"Roads","project":"Construction of seawall protection along Santander - Barili-Toledo Road at Brgy. Poblacion to Brgy. Legaspi, Sta. 0+000 - Sta. 0+167, Alegria, Cebu","amountPesos":50000000,"lengthMeters":167.0,"ratePesosPerMeter":299401.19760479045,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 562976"},{"year":2022,"category":"Bridges","project":"Construction of Flood Control Structure at Pulid Bridge K0794 + 818 - K0794 + 825, Brgy. Quezon, Calbayog City, Samar","amountPesos":50000000,"lengthMeters":7.0,"ratePesosPerMeter":7142857.142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 563061"},{"year":2022,"category":"Mixed roads / bridges","project":"Construction of Flood Mitigation Structure along Kapalong-Talaingod-Valencia Road (Bonacao Stream - Bonacao Bridge, Tributary to Pulangui River), Brgy. Bonacao, Sta. 0+200 - Sta. 0+400 (BS), San Fernando, Bukidnon","amountPesos":50000000,"lengthMeters":200.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 563088"},{"year":2022,"category":"Roads","project":"Construction of Flood Mitigation Structure along Kapalong-Talaingod-Valencia Road (Malambago Stream - Tributary to Pulangui River), Brgy. Malambago, Sta. 0+200 - Sta. 0+400 (BS), San Fernando, Bukidnon","amountPesos":50000000,"lengthMeters":200.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 563089"},{"year":2022,"category":"Mixed roads / bridges","project":"Construction of Flood Control Structure along CDO City-Dominorog-Camp Kibaritan Road (Upstream & Downstream) of Tal-uban Bridge with Slope Protection, Sta. 0+000.00 - Sta. 0+420.00, Talakag, Bukidnon","amountPesos":50000000,"lengthMeters":420.0,"ratePesosPerMeter":119047.61904761905,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 563097"},{"year":2022,"category":"Mixed roads / bridges","project":"Construction of Flood Control Structure along Kalilangan Lampanusan Road (Upstream & Downstream) of Malatipay Bridge with Slope Protection, Sta. 0+000.00 - Sta. 0+400.00, Kalilangan, Bukidnon","amountPesos":50000000,"lengthMeters":400.0,"ratePesosPerMeter":125000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 563098"},{"year":2022,"category":"Bridges","project":"Construction of Alga River Control along Alga Bridge, K38.6+000.00 - K38.6+225, Catarman, Camiguin","amountPesos":20000000,"lengthMeters":225.0,"ratePesosPerMeter":88888.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 563100"},{"year":2022,"category":"Bridges","project":"Construction of River Control, along Timayog Bridge II, K38 + 000 - K39 + 220, Catarman, Camiguin","amountPesos":50000000,"lengthMeters":1220.0,"ratePesosPerMeter":40983.60655737705,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 563106"},{"year":2022,"category":"Bridges","project":"Construction of Tupsan River Control along Tupsan Bridge, K9+000 - K9+561 Bothsides, Mambajao, Camiguin","amountPesos":50000000,"lengthMeters":561.0,"ratePesosPerMeter":89126.559714795,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 563111"},{"year":2022,"category":"Bridges","project":"Construction of Slope Protection along Barogohan Bridge, (Downstream), Sta. 0+000.00 - Sta. 0+280.00, Maigo, Lanao del Norte","amountPesos":50000000,"lengthMeters":280.0,"ratePesosPerMeter":178571.42857142858,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 563118"},{"year":2022,"category":"Bridges","project":"Construction of Slope Protection along Baroy Bridge, (Upstream), Sta. 0+000.00 - Sta. 0+280.00, Baroy, Lanao del Norte","amountPesos":40000000,"lengthMeters":280.0,"ratePesosPerMeter":142857.14285714287,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 563120"},{"year":2022,"category":"Bridges","project":"Construction of Slope Protection along Kulasihan Bridge, Sta. 0+000.00 - Sta. 0+280.00, Kolambugan, Lanao del Norte","amountPesos":50000000,"lengthMeters":280.0,"ratePesosPerMeter":178571.42857142858,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 563121"},{"year":2022,"category":"Bridges","project":"Construction of Slope Protection along Muntay Bridge, Sta. 0+000.00 - Sta. 0+300.00, Kolambugan, Lanao del Norte","amountPesos":50000000,"lengthMeters":300.0,"ratePesosPerMeter":166666.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 563123"},{"year":2022,"category":"Bridges","project":"Construction of Slope Protection along Pangi Bridge, (Upstream), Sta. 0+000.00 - Sta. 0+280.00, Baroy, Lanao del Norte","amountPesos":40000000,"lengthMeters":280.0,"ratePesosPerMeter":142857.14285714287,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 563124"},{"year":2022,"category":"Bridges","project":"Construction of Slope Protection along Segapod Bridge, (Downstream) (L/S), Sta. 0+000.00 - Sta. 0+280.00, Maigo, Lanao del Norte","amountPesos":50000000,"lengthMeters":280.0,"ratePesosPerMeter":178571.42857142858,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 563125"},{"year":2022,"category":"Bridges","project":"Construction of Slope Protection along Titunod Bridge I, Sta. 0+000.00 - Sta. 0+260.00, Kulambugan, Lanao del Norte","amountPesos":50000000,"lengthMeters":260.0,"ratePesosPerMeter":192307.6923076923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 563126"},{"year":2022,"category":"Mixed roads / bridges","project":"Construction of Slope Protection (Upstream & Downstream) of Tudela Bridge along Ozamis - Oroquieta Road, Sta. 0+140.00 - Sta. 0+740.00, Tudela, Misamis Occidental","amountPesos":31531000,"lengthMeters":600.0,"ratePesosPerMeter":52551.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 563132"},{"year":2022,"category":"Bridges","project":"Construction of Revetment along Wawa River, Wawa Bridge Section, Agusan del Sur, Sta. 0+000.00 - Sta. 0+300.00, Bayugan City, Agusan del Sur","amountPesos":27000000,"lengthMeters":300.0,"ratePesosPerMeter":90000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 563171"},{"year":2022,"category":"Roads","project":"Construction of Bank Protection (Raising of Grades, protecting the National Road) along Bayugan-Esperanza Road, Crossing Luna Section, Sta. 0+000.00 - Sta. 0+350.00, Esperanza, Agusan del Sur","amountPesos":27000000,"lengthMeters":350.0,"ratePesosPerMeter":77142.85714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 563172"},{"year":2022,"category":"Bridges","project":"Rehabilitation of Dike along Rio Chico River, Downstream of Rio Chico Bridge, Sta.0+943.75 to Sta.1+349.75 (Brgy. San Roque Section, Right Bank), La Paz, Tarlac","amountPesos":100000000,"lengthMeters":406.0,"ratePesosPerMeter":246305.41871921183,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 565127"},{"year":2022,"category":"Bridges","project":"Construction of Revetment along Davao River, Sta. 0+077 - Sta. 0+412, Generoso Bridge Downstream, Right Bank, Davao City","amountPesos":100000000,"lengthMeters":335.0,"ratePesosPerMeter":298507.46268656716,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 565293"},{"year":2022,"category":"Bridges","project":"Construction of Flood Control Structure (Downstream Right Side of Mahayahay Bridge), Brgy. Mahayahay, Sta. 0+000.00 - Sta. 0+500.00, Kitcharao, Agusan del Norte","amountPesos":120000000,"lengthMeters":500.0,"ratePesosPerMeter":240000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 565322"},{"year":2022,"category":"Roads","project":"Construction of Flood Mitigation Facility/Drainage System along Kisad Road to Lake Drive 1 to Abad Santos Drive, Sta. 0+000 - Sta. 0+463, Baguio City","amountPesos":50000000,"lengthMeters":463.0,"ratePesosPerMeter":107991.36069114471,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 565446"},{"year":2022,"category":"Roads","project":"Construction of Drainage System along Tuguegarao Diversion Road 2 (Sta. 0+000 - Sta 0+600), Tuguegarao City","amountPesos":16000000,"lengthMeters":600.0,"ratePesosPerMeter":26666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 565495"},{"year":2022,"category":"Bridges","project":"Rehabilitation of Existing Dike along Parua River (San Francisco Section, Left Bank), Sta. 8 + 705.50 to Sta. 9 + 165.50, Upstream of San Francisco Bridge, Concepcion, Tarlac","amountPesos":50000000,"lengthMeters":460.0,"ratePesosPerMeter":108695.65217391304,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 565542"},{"year":2022,"category":"Bridges","project":"Construction of Revetment along Manat River (Up- stream and Down Stream) leading to Agusan River at Prk1C, 1B, 1A, 7, 8 and Manat Bridge, Sta. 15+780 - Sta. 16+170 (LS), Brgy. Poblacion, Montevista, Davao de Oro","amountPesos":50000000,"lengthMeters":390.0,"ratePesosPerMeter":128205.1282051282,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 565669"},{"year":2022,"category":"Bridges","project":"Construction of Maug Flood Control Structure along Riverbank of Maug Bridge Phase III (Downstream), Sta. 0+000.00 - Sta. 0+070.00 R/S, Prosperidad, Agusan del Sur","amountPesos":46000000,"lengthMeters":70.0,"ratePesosPerMeter":657142.8571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 565697"},{"year":2022,"category":"Roads","project":"Construction/Rehabilitation of Maytibog River Training along Agusan-Davao Road, Sta. 0+011.00 - Sta. 0+211.00, Bayugan City, Agusan del Sur","amountPesos":45109000,"lengthMeters":200.0,"ratePesosPerMeter":225545.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 565698"},{"year":2022,"category":"Bridges","project":"Construction of Bank Protection of Solibao River Protecting Solibao Bridge (Upstream), Sta. 0+000.00 - Sta. 0+150.00, Rosario, Agusan del Sur","amountPesos":30000000,"lengthMeters":150.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 565700"},{"year":2022,"category":"Roads","project":"Improvement of Drainage Canal along NRJ Cumawas- Tinuy-an Falls Road, Cumawas, Sta. 0+000.00 - Sta. 2+000.00, Bislig City, Surigao del Sur","amountPesos":50000000,"lengthMeters":2000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2022 GAA parquet · row 565704"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along National Roads - Primary Roads - Bakit-Bakit Jct - Umingan Rd - K0177+(-174) - K0181+200","amountPesos":85000000,"lengthMeters":4374.0,"ratePesosPerMeter":19433.013260173753,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524365"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along National Roads - Primary Roads - Bakit-Bakit Jct - Umingan Rd - K0181+200 - K0185+400","amountPesos":85000000,"lengthMeters":4200.0,"ratePesosPerMeter":20238.095238095237,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524366"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along National Roads - Primary Roads - Bakit-Bakit Jct - Umingan Rd - K0185+400 - K0189+200","amountPesos":90000000,"lengthMeters":3800.0,"ratePesosPerMeter":23684.21052631579,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524367"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along National Roads - Secondary Roads - Pangasinan - Nueva Ecija Roads - K0176+(-616) - K0180+000","amountPesos":90000000,"lengthMeters":4616.0,"ratePesosPerMeter":19497.400346620452,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524368"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along National Roads - Secondary Roads - Pangasinan - Nueva Ecija Roads - K0180+000 - K0184+079","amountPesos":90000000,"lengthMeters":4079.0,"ratePesosPerMeter":22064.231429271884,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524369"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along National Roads - Secondary Roads - Carmen Jct - Manat Road - K0172+(-859) - K0175+858","amountPesos":85000000,"lengthMeters":4717.0,"ratePesosPerMeter":18019.92792028832,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524370"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along National Roads - Primary Roads - Manila North Road - K0169+(-813) - K0170+1793","amountPesos":85000000,"lengthMeters":3606.0,"ratePesosPerMeter":23571.824736550196,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524372"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Manila North Rd - K0265 + (-644) - K0265 + 000, K0312 + 000 - K0312 + 551, Barangay Pagdalagan, San Fernando City and barangay Poblacion, barangay Ipet, Sudipen, La Union","amountPesos":250000000,"lengthMeters":1195.0,"ratePesosPerMeter":209205.02092050208,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524380"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along a. Sn Fernando Airport Rd - K0265 + (-273) - K0265 + (-128), K0266 + 828 - K0267 + 015, barangay Pagdalagan, barangay San Vicente, barangay Parian, barangay Canaoay, barangay San Francisco, San Fernando CIty, La Union, b. Sn Fernando Port Rd - K0267 + (-301) - K0267 + (-368), K0269 + 687 - K0269 + 789, barangay Sevilla, barangay Madayegdeg, barangay Catbangen, barangay San Agustin, barangay Poro, San Fernando City, La Union","amountPesos":250000000,"lengthMeters":501.0,"ratePesosPerMeter":499001.99600798404,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524381"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along a) Judge Jose de Venecia Sr Ave-K0207 + (-711) - K0207 + (-611), K0207 + (-611) - K0207 + 000, K0207 + 000 - K0207 + 073, K0207 + 183 - K0207 + 374, K0207 + 374 - K0207 + 996, b) Urdaneta Jct-Dagupan Rd - K0191 + (-266) - K0191 + 000, K0191 + 000 - K0192 + 000, K0192 + 000 - K0193 + 000, K0193 + 000 - K0194 + 000, K0194 + 000 - K0194 + 680, K0194 + 680 - K0195 + 000, K0195 + 000 - K0195 + 600, barangay Minien East, barangay Minien West, barangay Tebag East, barangay Tebag West and barangay Carusocan, Santa Barbara, Pangasinan","amountPesos":200000000,"lengthMeters":6463.0,"ratePesosPerMeter":30945.381401825776,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524384"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along a)Urdaneta Jct-Dagupan Rd - K0195 + 600 - K0196 + 000, K0196 + 000 - K0197 + 000, K0197 + 000 - K0198 + 000, K0198 + 000 - K0198 + 870, K0198 + 925 - K0199 + 118, K0199 + 173 - K0199 + 320, K0199 + 320 - K0199 + 703, K0199 + 703 - K0200 + 000, K0200 + 000 - K0200 + 728, K0200 + 728 - K0200 + 870, K0200 + 870 - K0201 + 000, barangay Banaoang, barangay Maningding, barangay Sapang, barangay Poblacion Norte, barangay Poblacion Sur, barangay Dalongue and barangay Tuliao, Santa Barbara, Pangasinan","amountPesos":200000000,"lengthMeters":5290.0,"ratePesosPerMeter":37807.18336483932,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524385"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along (a) Calasiao Old Rd - K0204 + 000 - K0204 + 725, K0204 + 741 - K0205 + 000, K0205 + 000 - K0205 + 108, K0205 + 120 - K0206 + 000, K0206 + 000 - K0207 + 000, K0207 + 000 -K0207 + 200, b) Camiling-Wawa-Bayambang-Malasiqui-Sta Barbara Rd - K0172 + (-200) - K0172 + (-010), K0172 + (-010) - K0172 + 608, K0172 + 608 - K0173 + 000, K0173 + 000 - K0173 + 423, K0173 + 863 - K0174 + 000, K0174 + 000 - K0174 + 300, K0174 + 300 - K0175 + 000, K0175 + 000 - K0175 + 336, K0175 + 336 - K0175 + 941, K0175 + 941 - K0176 + 237, K0176 + 237 - K0176 + 403, K0176 + 403 - K0177 + 000, K0177 + 000 - K0177 + 290, barangay Manangos, barangay Warding, barangay Pangdel, barangay Dusoc and barangay Buayaen, Bayambang, Pangasinan","amountPesos":200000000,"lengthMeters":8222.0,"ratePesosPerMeter":24324.98175626368,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524387"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along a) Sn Carlos-Calasiao Rd - K0211 + 000 - K0212 + 000, K0212 + 000 - K0212 + 471, K0212 + 560 - K0212 + 696, K0212 + 696 - K0212 + 775, K0212 + 923 - K0212 + 977, K0213 + 028 - K0213 + 080, K0213 + 080 - K0213 + 295, barangay Mancup, barangay Lasip, and barangay Poblacion West, Calasiao, Pangasinan, b) Sta Barbara Old Rd - K0199 + (-096) - K0199 + 000, K0199 + 000 - K0200 + 028, K0200 + 068 - K0200 + 945, K0200 + 945 - K0201 + 077, K0201 + 177 - K0201 + 321, barangay Sapang, barangay Poblacion Sur, barangay Poblacion Norte, and barangay Dalongue, Santa Barbara, Pangasinan, c) Sta Barbara-Mangaldan Rd - K0201 + (-160) - K0201 + 330, K0201 + 370 - K0202 + 000, K0202 + 000 - K0202 + 273, K0202 + 273 - K0202 + 575, K0202 + 577 - K0203 + 000, barangay Dalongue, barangay Poblacion Norte, barangay Ventinilla, and barangay Malanay, Santa Barbara, Pangasinan","amountPesos":200000000,"lengthMeters":6021.0,"ratePesosPerMeter":33217.07357581797,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524388"},{"year":2023,"category":"Roads","project":"Installation and Furnishing of Safety Devices Solar Studs along Kalinga-Cagayan Road (Calanan-Enrile Section) K0499 + (-593) - K0499 + 900 , Tabuk City, Kalinga","amountPesos":85062000,"lengthMeters":1493.0,"ratePesosPerMeter":56973.87809778968,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524389"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices Along Abra-Ilocos Norte Rd - K0416 + 400 - K0426 + 500","amountPesos":100000000,"lengthMeters":10100.0,"ratePesosPerMeter":9900.990099009901,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524390"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices Along Abra-Ilocos Norte Rd - K0427 + 000 - K0431 + 100","amountPesos":100000000,"lengthMeters":4100.0,"ratePesosPerMeter":24390.243902439026,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524391"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices Along Abra-Ilocos Norte Rd - K0431 + 100 - K0432 + 000","amountPesos":100000000,"lengthMeters":900.0,"ratePesosPerMeter":111111.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524392"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices Along Abra-Ilocos Norte Rd - K0432 + 000 - K0433 + 650","amountPesos":100000000,"lengthMeters":1650.0,"ratePesosPerMeter":60606.06060606061,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524393"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices Along Abra-Kalinga Rd - K0425 + 500 - K0432 + 600","amountPesos":100000000,"lengthMeters":7100.0,"ratePesosPerMeter":14084.507042253521,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524394"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices Along Abra-Kalinga Rd - K0432 + 600 - K0450 + 000","amountPesos":100000000,"lengthMeters":17400.0,"ratePesosPerMeter":5747.126436781609,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524395"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices and Street Lightings along Baguio-Bontoc Road, K0300 + 000 - K0341 + 000","amountPesos":100000000,"lengthMeters":41000.0,"ratePesosPerMeter":2439.0243902439024,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524396"},{"year":2023,"category":"Roads","project":"Installation and Furnishing of Safety Devices Solar Studs along Kalinga-Cagayan Road (Calanan-Enrile Section) K0499 + 915 - K0506 + 846, Tabuk City, Kalinga","amountPesos":99861000,"lengthMeters":6931.0,"ratePesosPerMeter":14407.877651132592,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524397"},{"year":2023,"category":"Roads","project":"Installation and Furnishing of Safety Devices Solar Studs along Kalinga-Cagayan Road (Calanan-Enrile Section) K0506 + 905 - K0512 + 444, Tabuk City, Kalinga","amountPesos":99976000,"lengthMeters":5539.0,"ratePesosPerMeter":18049.46741289041,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524398"},{"year":2023,"category":"Roads","project":"Installation and Furnishing of Safety Devices Solar Studs along Kalinga-Cagayan Road (Calanan-Enrile Section) K0512 + 469 - K0516 + 800, Tabuk City, Kalinga","amountPesos":99980000,"lengthMeters":4331.0,"ratePesosPerMeter":23084.73793581159,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524399"},{"year":2023,"category":"Roads","project":"Installation and Furnishing of Safety Devices Solar Studs along Rizal National Road (Liwan West-Babalag-Macutay Section) K0522 + (-569) - K0528 + 925, Rizal, Kalinga","amountPesos":99997000,"lengthMeters":7494.0,"ratePesosPerMeter":13343.608219909262,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524400"},{"year":2023,"category":"Roads","project":"Installation of Solar Pavement Studs along National Roads - Daang Maharlika (LZ) - K0394 + (-827) - K0460 + 752, Calamagui-Ilagan Rd - K0398 + (-425) - K0402 + 323, Isabela (Package 1)","amountPesos":100000000,"lengthMeters":67579.0,"ratePesosPerMeter":1479.7496263632192,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524401"},{"year":2023,"category":"Roads","project":"Installation of Solar Pavement Studs along National Roads - Ilagan-Bigao-Palanan Rd - K0408 + (-894) - K0424 + 433, Ilagan-Delfin Albano-Mallig Road - K0402 + (-783) - K0433 + 804, Jct Delfin Albano Rd - K0424 + (-607) - K0428 + 723, Old CVR-Cabagan Rd - Chainage 0 - Chainage 264, Cabagan-Sta. Maria Rd - K0448 + (-703) - K0459 + 016, Santiago-Tuguegarao Rd - K0419 + (-522) - K0433 + 260, Isabela (Package 2)","amountPesos":100000000,"lengthMeters":44570.0,"ratePesosPerMeter":2243.661655822302,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524402"},{"year":2023,"category":"Roads","project":"Installation of Solar Pavement Studs along Naguilian-San Mariano Road - K0384 + (-155) - K0406 + 379","amountPesos":100000000,"lengthMeters":22534.0,"ratePesosPerMeter":4437.738528445904,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524404"},{"year":2023,"category":"Roads","project":"Installation of Solar Pavement Studs along Manila North Road - K0590 + (-954) - K0685 + 495 with Exception","amountPesos":100000000,"lengthMeters":96449.0,"ratePesosPerMeter":1036.8173853539176,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524405"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Plaridel Bypass Road - K0035+(-602) - K0043+878, Plaridel and Bustos, Bulacan","amountPesos":100000000,"lengthMeters":9480.0,"ratePesosPerMeter":10548.523206751055,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524406"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Manila North Road (LZ), K0045+229 - K0050+1320, Calumpit, Bulacan","amountPesos":100000000,"lengthMeters":6091.0,"ratePesosPerMeter":16417.665407978984,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524409"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Manila North Road (LZ), K0037+(-993) - K0043+987, Malolos, Bulacan","amountPesos":100000000,"lengthMeters":7980.0,"ratePesosPerMeter":12531.328320802006,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524410"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Manila North Road (LZ), K0025+(-1138) - K0035+788, Balagtas and Bocaue, Bulacan","amountPesos":100000000,"lengthMeters":11926.0,"ratePesosPerMeter":8385.041086701325,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524411"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Bigaa-Plaridel via Bulacan and Malolos Rd, K0038+154 - K0050+354, Malolos, Bulacan","amountPesos":100000000,"lengthMeters":12200.0,"ratePesosPerMeter":8196.72131147541,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524412"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Quezon Eco-Tourism Rd - K0157 + 106 - K0157 + 491","amountPesos":100000000,"lengthMeters":385.0,"ratePesosPerMeter":259740.25974025973,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524418"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Quezon Eco-Tourism Rd - K0157 + 491 - K0157 + 666, K0157 + 692 - K0157 + 906, K0157 + 692 - K0157 + 898","amountPesos":100000000,"lengthMeters":389.0,"ratePesosPerMeter":257069.4087403599,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524419"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Quezon Eco-Tourism Rd - K0157 + 898 - K0158 + 139, K0158 + 829 - K0159 + 093","amountPesos":100000000,"lengthMeters":505.0,"ratePesosPerMeter":198019.801980198,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524420"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Quezon Eco-Tourism Rd - K0159 + 093 - K0159 + 210, K0159 + 312 - K0159 + 476","amountPesos":73200000,"lengthMeters":281.0,"ratePesosPerMeter":260498.2206405694,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524421"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Daang Maharlika (LZ) - K0224 + 090 - K0224 + 190, K0224 + 420 - K0224 + 560, K0224 + 800 - K0224 + 876, K0224 + 876 - K0224 + 1040, K0224 + 1040 - K0224 + 1130","amountPesos":130000000,"lengthMeters":570.0,"ratePesosPerMeter":228070.1754385965,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524422"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Daang Maharlika (LZ) - K0227 + 070 - K0227 + 170, K0229 + 450 - K0229 + 550, K0231 + 570 - K0231 + 630, K0231 + 880 - K0231 + 1030, K0232 + 560 - K0232 + 665, K0232 + 880 - K0233 + 060, K0233 + 200 - K0233 + 320, K0233 + 640 - K0233 + 745","amountPesos":130000000,"lengthMeters":920.0,"ratePesosPerMeter":141304.34782608695,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524423"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Daang Maharlika (LZ) - K0233 + 820 - K0233 + 906, K0235 + 380 - K0235 + 665, K0235 + 660 - K0235 + 715, K0236 + 000 - K0236 + 184, K0236 + 000 - K0236 + 310","amountPesos":130000000,"lengthMeters":731.0,"ratePesosPerMeter":177838.57729138166,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524424"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Daang Maharlika (LZ) - K0236 + 310 - K0236 + 771, K0236 + 900 - K0237 + 068","amountPesos":110000000,"lengthMeters":629.0,"ratePesosPerMeter":174880.76311605723,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524425"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Tiaong Bypass Rd - K0094 + (-262) - K0094 + 136, barangay Lalig, Tiaong, Quezon","amountPesos":91400000,"lengthMeters":398.0,"ratePesosPerMeter":229648.24120603016,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524426"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Sn Juan-Candelaria Jct-Candelaria-Bolboc Rd - K0147 + 760 - K0147 + 840, K0147 + 860 - K0148 + 220, K0149 + 180 - K0149 + 340, barangay Manggalang Bantilan, Sariaya, Quezon","amountPesos":99600000,"lengthMeters":600.0,"ratePesosPerMeter":166000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524427"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Sn Juan-Candelaria Jct-Candelaria-Bolboc Rd - K0149 + 388 - K0149 + 448, K0149 + 480 - K0149 + 630, K0149 + 655 - K0149 + 695, K0150 + 134 - K0150 + 175, K0150 + 320 - K0150 + 377, K0151 + 000 - K0151 + 207, barangay Manggalang Bantilan, Sariaya, Quezon","amountPesos":96600000,"lengthMeters":555.0,"ratePesosPerMeter":174054.05405405405,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524428"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Sariaya Bypass Rd - Sta. 4 + 581 - Sta. 4 + 870, barangay Gibanga, Sariaya, Quezon","amountPesos":75200000,"lengthMeters":289.0,"ratePesosPerMeter":260207.61245674742,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524430"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Candelaria Bypass Rd - K0106 + 361 - K0106 + 704, K0106 + 720 - K0106 + 762","amountPesos":100000000,"lengthMeters":385.0,"ratePesosPerMeter":259740.25974025973,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524431"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Candelaria Bypass Rd - K0106 + 762 - K0106 + 812, K0106 + 866 - K0107 + 201","amountPesos":100000000,"lengthMeters":385.0,"ratePesosPerMeter":259740.25974025973,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524432"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Candelaria Bypass Rd - K0107 + 201 - K0107 + 460, K0107 + 472 - K0107 + 529","amountPesos":82200000,"lengthMeters":316.0,"ratePesosPerMeter":260126.58227848102,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524433"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Candelaria Bypass Rd - K0111 + 094 - K0111 + 414, K0111 + 496 - K0111 + 676","amountPesos":65000000,"lengthMeters":500.0,"ratePesosPerMeter":130000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524434"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Quezon-Batangas Rd - K0099 + 163 - K0099 + 540, K0099 + 819 - K0100 + 214","amountPesos":100000000,"lengthMeters":772.0,"ratePesosPerMeter":129533.67875647669,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524435"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Quezon-Batangas Rd - K0100 + 214 - K0100 + 984","amountPesos":100000000,"lengthMeters":770.0,"ratePesosPerMeter":129870.12987012987,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524436"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Quezon-Batangas Rd - K0100 + 984 - K0101 + 077, K0101 + 612 - K0102 + 236","amountPesos":88000000,"lengthMeters":717.0,"ratePesosPerMeter":122733.61227336123,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524437"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Quezon Eco-Tourism Rd - K0147 + 710 - K0147 + 996, K0147 + 710 - K0147 + 996 (left and right)","amountPesos":74500000,"lengthMeters":286.0,"ratePesosPerMeter":260489.5104895105,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524438"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Quezon Eco-Tourism Rd - K0150 + 849 - K0151 + 336","amountPesos":100000000,"lengthMeters":487.0,"ratePesosPerMeter":205338.8090349076,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524439"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Quezon Eco-Tourism Rd - K0151 + 336 - K0151 + 721","amountPesos":100000000,"lengthMeters":385.0,"ratePesosPerMeter":259740.25974025973,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524440"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Quezon Eco-Tourism Rd - K0151 + 721 - K0152 + 212","amountPesos":100000000,"lengthMeters":491.0,"ratePesosPerMeter":203665.98778004074,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524441"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Quezon Eco-Tourism Rd - K0152 + 212 - K0152 + 713, K0152 + 757 - K0152 + 893, K0152 + 902 - K0152 + 968","amountPesos":100000000,"lengthMeters":703.0,"ratePesosPerMeter":142247.5106685633,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524442"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Quezon Eco-Tourism Rd - K0152 + 968 - K0153 + 353","amountPesos":100000000,"lengthMeters":385.0,"ratePesosPerMeter":259740.25974025973,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524443"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Quezon Eco-Tourism Rd - K0153 + 353 - K0153 + 468, K0154 + 654 - K0154 + 893","amountPesos":92100000,"lengthMeters":354.0,"ratePesosPerMeter":260169.49152542374,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524444"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Quezon Eco-Tourism Rd - K0156 + 336 - K0156 + 721","amountPesos":100000000,"lengthMeters":385.0,"ratePesosPerMeter":259740.25974025973,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524445"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Quezon Eco-Tourism Rd - K0156 + 721 - K0157 + 106","amountPesos":100000000,"lengthMeters":385.0,"ratePesosPerMeter":259740.25974025973,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524446"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Tertiary Roads - Jct. Msr-Old Zigzag Rd - K0158+030 - K0158+240 (Bs), K0158+240 -K0158+487 (Ls), Brgy Malinao Ilaya, Atimonan Quezon","amountPesos":110000000,"lengthMeters":457.0,"ratePesosPerMeter":240700.21881838073,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524453"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Primary Roads - Daang Maharlika (LZ) - K0189+520 - K0189+614 (LS), K0190+320 - K0190+460 (LS), K0190+550 - K0190+700 (LS), K0191+435 - K0191+671 (LS), K0205+300 - K0205+450 (BS), BRGYS INACLAGAN, VILLA ARCAYA AND HAGAKHAKIN, GUMACA, QUEZON","amountPesos":130000000,"lengthMeters":770.0,"ratePesosPerMeter":168831.16883116882,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524454"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Primary Roads - Quirino H-way - K0276+630 - K0276+830 (RS), K0276+168 - K0276+248 (LS), K0276+095 - K0276+205 (RS), K0275+908 - K0276+158 (RS), K0266+893 - K0267+019 (LS), K0264+450 - K0264+610 (LS), K0263+830 - K0263+910 (RS), Tagkawayan, Quezon","amountPesos":120000000,"lengthMeters":906.0,"ratePesosPerMeter":132450.33112582783,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524455"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Primary Roads - Daang Maharlika (LZ) - K0161+700 - K0162+060 (LS), K0163+720 - K0163+800 (LS), K0164+040 - K0164+236 (LS), K0170+140 - K0170+262 (RS), K0170+320 - K0170+420 (LS), Bgys. Malinao Ilaya, Magsaysay and San Isidro, Atimonan,Quezon","amountPesos":130000000,"lengthMeters":858.0,"ratePesosPerMeter":151515.15151515152,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524456"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices - Tertiary Roads - Jct. MSR-Old Zigzag Rd - K0157+214 - K0158+187 (RS) Bgy Malinao Ilaya, Atimonan, Quezon","amountPesos":120000000,"lengthMeters":973.0,"ratePesosPerMeter":123329.90750256937,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524457"},{"year":2023,"category":"Roads","project":"Installation of Solar Pavement Studs along Bacolod San Carlos Road (S00093NR) K0005+(-820) to K0013+580","amountPesos":40000000,"lengthMeters":9400.0,"ratePesosPerMeter":4255.31914893617,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524463"},{"year":2023,"category":"Roads","project":"Installation of Road Infrastructure Safety along Bacolod South Road, (S00123NR) K0011 + (-469) - K0018 + 819 Bago City, Negros Occidental","amountPesos":100000000,"lengthMeters":8288.0,"ratePesosPerMeter":12065.637065637065,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524464"},{"year":2023,"category":"Roads","project":"Installation of Solar Pavement Studs along Bacolod Circumferential Road South (S00097NR) K0005+000 to K0011+520","amountPesos":30000000,"lengthMeters":6520.0,"ratePesosPerMeter":4601.226993865031,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524465"},{"year":2023,"category":"Roads","project":"Installation of Solar Pavement Studs along Bacolod South Road (S00133NR) K0005+(-915) to K0010+529","amountPesos":30000000,"lengthMeters":6444.0,"ratePesosPerMeter":4655.493482309124,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524466"},{"year":2023,"category":"Roads","project":"Improvement of Road along Dalaguete - Mantalongon - Badian Road with Installation of Roller Guardrails and other Appurtenances K0110 + 000 - K0110 + 728","amountPesos":60000000,"lengthMeters":728.0,"ratePesosPerMeter":82417.58241758242,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524469"},{"year":2023,"category":"Roads","project":"Improvement of Road along Santander û Barili û Toledo Road with Installation of Road Safety Devices (Internally Illuminated (Solar) Pavement Levelled Marker/Stud, Flush Type, K0197+786- K0200+162","amountPesos":90000000,"lengthMeters":2376.0,"ratePesosPerMeter":37878.78787878788,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524470"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Structures along Siquijor Circumferential Rd - K0062 + 832 - K0074 + 588","amountPesos":100000000,"lengthMeters":11756.0,"ratePesosPerMeter":8506.294658046954,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524474"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Structures along Luyang-Poo-Lazi Rd - K0007+ 285 - K0008 + 120","amountPesos":100000000,"lengthMeters":835.0,"ratePesosPerMeter":119760.47904191617,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524476"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Structures along Luyang-Poo-Lazi Rd - K0008 + 120 - K0008 + 955","amountPesos":100000000,"lengthMeters":835.0,"ratePesosPerMeter":119760.47904191617,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524477"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Structures along Luyang-Poo-Lazi Rd - K0008 + 955 - K0009 + 790","amountPesos":100000000,"lengthMeters":835.0,"ratePesosPerMeter":119760.47904191617,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524478"},{"year":2023,"category":"Roads","project":"Installation of Streetlights along Dumaguete South Road K0100+000 - K0012+483","amountPesos":100000000,"lengthMeters":87517.0,"ratePesosPerMeter":1142.635145171795,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524485"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices/ Streetlights and Internally Illuminated (Solar) Pavement markers along Bdry. So. Leyte-Maasin-Macrohon-Daang Maharlika (S00194LT) - K1132+797 - K1133+674, K1141+403 - K1143+414, K1148+000 - K1149+946","amountPesos":100000000,"lengthMeters":4834.0,"ratePesosPerMeter":20686.80182043856,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524490"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices/ Streetlights and Internally Illuminated (Solar) Pavement markers along Daang Maharlika Rd. (S00223LT) K1004+(-031) - K1006+801, K1007+069 - K1009+528","amountPesos":100000000,"lengthMeters":5291.0,"ratePesosPerMeter":18900.0189000189,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524491"},{"year":2023,"category":"Roads","project":"Installation of Solar Street Lights and LED Solar Studs along Calubian-San Isidro-Tabango-Villaba-Palompon Road, K1005+(-346) - K1012+363, Calubian & San Isidro, Leyte","amountPesos":99996000,"lengthMeters":7709.0,"ratePesosPerMeter":12971.33220910624,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524492"},{"year":2023,"category":"Roads","project":"Installation of Solar Streetlights along Borongan-Guiuan Road - K1037+000 - K1049+000 (S00171SM)","amountPesos":100000000,"lengthMeters":12000.0,"ratePesosPerMeter":8333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524493"},{"year":2023,"category":"Roads","project":"Installation of Solar Street Lights along Wright-Taft-Borongan Road - K0892+000 - K0902+832 (S00173SM)","amountPesos":100000000,"lengthMeters":10832.0,"ratePesosPerMeter":9231.905465288035,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524494"},{"year":2023,"category":"Roads","project":"Installation of Solar Street Lights along Jct. Taft-Oras-San Policarpo-Arteche Road - K0917+073 - K0928+813 (S00167SM)","amountPesos":100000000,"lengthMeters":11740.0,"ratePesosPerMeter":8517.887563884156,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524495"},{"year":2023,"category":"Roads","project":"Installation of Solar Street Lights along Jct. Taft-Oras-San Policarpo-Arteche Road - K0928+779 - K0939+948 (S00167SM)","amountPesos":100000000,"lengthMeters":11169.0,"ratePesosPerMeter":8953.35303071,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524496"},{"year":2023,"category":"Mixed roads / bridges","project":"Installation of Solar LED Street Light along National Road and Bridge with the following Section (Cabaluay-Mampang Zamboanga City Diversion Road) Sta. 00+245.27 - Sta. 10+245.27","amountPesos":140000000,"lengthMeters":10000.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524505"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices, Pagadian City-Zamboanga City Rd (Licomo-Putik Road) - K1889 + 000 - K1927 + 000, Zamboanga City","amountPesos":150000000,"lengthMeters":38000.0,"ratePesosPerMeter":3947.3684210526317,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524506"},{"year":2023,"category":"Roads","project":"Installation of Solar Studs Lights along Pagadian City-Zamboanga City Rd (Licomo-Putik Road) - K1851 + 000 - K1889 + 000, Zamboanga City","amountPesos":150000000,"lengthMeters":38000.0,"ratePesosPerMeter":3947.3684210526317,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524507"},{"year":2023,"category":"Roads","project":"Installation of Solar Studs Lights along Pagadian City-Zamboanga City Rd (Licomo-Putik Road) - K1889 + 000 - K1927 + 000, Zamboanga City","amountPesos":150000000,"lengthMeters":38000.0,"ratePesosPerMeter":3947.3684210526317,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524508"},{"year":2023,"category":"Mixed roads / bridges","project":"Installation of Solar LED Street Light along National Road and Bridge with the following Section (Buenavista - Bolong By-pass Road) Sta. 1895+000 - Sta. 1904+499","amountPesos":120000000,"lengthMeters":9499.0,"ratePesosPerMeter":12632.908727234446,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524509"},{"year":2023,"category":"Mixed roads / bridges","project":"Installation of Solar LED Street Light along National Road and Bridge with the following Section (Buenavista - Bolong By-pass Road) Sta. 1885+000 - Sta. 1895+000","amountPesos":140000000,"lengthMeters":10000.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524510"},{"year":2023,"category":"Mixed roads / bridges","project":"Installation of Solarization along National Road and Bridge with the following Section (Cabaluay-Mampang Zamboanga City Diversion Road) Sta. 00+245.27 - Sta. 17+220.64","amountPesos":50000000,"lengthMeters":16975.37,"ratePesosPerMeter":2945.4438990136887,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524511"},{"year":2023,"category":"Roads","project":"Construction of Solar Street Light Lanao-Pagadian-Zamboanga City National Road Sta. 1724+ -595 - Sta. 1756 + 236","amountPesos":50000000,"lengthMeters":32831.0,"ratePesosPerMeter":1522.9508696049465,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524512"},{"year":2023,"category":"Mixed roads / bridges","project":"Installation of Solarization along National Road and Bridge with the following Section (Cabaluay-Mampang Zamboanga City Diversion Road) Sta. 10+245.27 - Sta. 17+220.64","amountPesos":50000000,"lengthMeters":6975.37,"ratePesosPerMeter":7168.078539202939,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524513"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices (Solar Studs for Carriageway Separator and Edges) along - CDO-Airport-Bukidnon Rd - K1440 + (-140) - K1453 + 033","amountPesos":100000000,"lengthMeters":13173.0,"ratePesosPerMeter":7591.285204585136,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524515"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices (Solar Studs for Carriageway Separator and Edges) along - CDO-Airport-Bukidnon Rd - K1453 + 033 - K1466 + 262","amountPesos":100000000,"lengthMeters":13229.0,"ratePesosPerMeter":7559.1503515004915,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524516"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Facilities along Digos-Makar Road, Davao del Sur - K1572 + 006 - K1581 + 000","amountPesos":140000000,"lengthMeters":8994.0,"ratePesosPerMeter":15565.9328441183,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524519"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Facilities along Davao-Sarangani Coastal Road (Malalag-Malita-JAS-Glan), Davao del Sur - K1584 + (-235) - K1598 + 853","amountPesos":175000000,"lengthMeters":15088.0,"ratePesosPerMeter":11598.621420996818,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524520"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Facilities along Bansalan-Mt. Apo Natl Park Rd, Davao del Sur - K1582 + (-964) - K1599 + 525, K1601 + (-1518) - K1604 + 780","amountPesos":154500000,"lengthMeters":23744.0,"ratePesosPerMeter":6506.907008086253,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524521"},{"year":2023,"category":"Roads","project":"Rehabilitation of Road Safety Devices along Epifanio Delos Santos Avenue (EDSA) North Bound K0020 + 778 - K0016 + (-557), Quezon City","amountPesos":36000000,"lengthMeters":5335.0,"ratePesosPerMeter":6747.891283973759,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524543"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Anduyan-San Pascual Rd - Chainage 000 - Chainage 5600, Brgy. Anduyan-Rizal, Tubao, La Union","amountPesos":75000000,"lengthMeters":5600.0,"ratePesosPerMeter":13392.857142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524555"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices Baler-Casiguran Road (Baler-Dinadiawan) K025+500 to K0283+000 (Intermittent Section)","amountPesos":30000000,"lengthMeters":257500.0,"ratePesosPerMeter":116.50485436893204,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524564"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Lucena-Tayabas-Mauban Port Rd - K0130 + 440 - K0130 + 640, barangay Gulang-Gulang, Lucena City, Quezon","amountPesos":26000000,"lengthMeters":200.0,"ratePesosPerMeter":130000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524603"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices along Tiaong Bypass Rd - K0094 + 700 - K0094 + 890, barangay Lumingon, Tiaong, Quezon","amountPesos":45500000,"lengthMeters":190.0,"ratePesosPerMeter":239473.68421052632,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524604"},{"year":2023,"category":"Roads","project":"Installation of Traffic Safety Devices along Naga-Carolina-Panicuason Road K0438+623 - K0443+650, Naga City, Camarines Sur","amountPesos":50000000,"lengthMeters":5027.0,"ratePesosPerMeter":9946.290033817386,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524607"},{"year":2023,"category":"Roads","project":"Installation of Solar Pavement Studs along Bacolod South Road (S00429NR) Chainage 0 to Chainage 2556","amountPesos":16100000,"lengthMeters":2556.0,"ratePesosPerMeter":6298.9045383411585,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524612"},{"year":2023,"category":"Roads","project":"Installation of Solar Pavement Studs along Bacolod South Road (S00081NR) K0006+(-190) to K0005+100","amountPesos":4700000,"lengthMeters":710.0,"ratePesosPerMeter":6619.718309859155,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524615"},{"year":2023,"category":"Roads","project":"Installation of Solar Pavement Studs along Bacolod South Road (S00421NR) Chainage 0 to Chainage 442","amountPesos":3000000,"lengthMeters":442.0,"ratePesosPerMeter":6787.330316742082,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524616"},{"year":2023,"category":"Roads","project":"Installation of Solar Pavement Studs along Sum-ag Abuanan Road (S00117NR) K0010+(-346) - K0010+825","amountPesos":11100000,"lengthMeters":1171.0,"ratePesosPerMeter":9479.077711357813,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524617"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices (Solar Pavement Studs)- Secondary Roads- Tagbilaran East Road-K0162+000.00 - K0171+000.00 (Candijay Section)","amountPesos":22350000,"lengthMeters":9000.0,"ratePesosPerMeter":2483.3333333333335,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524622"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Device/ Solar Streetlights along Siquijor Circumferential Road- K0063+ 000 - K0068+ 0000, Siquijor","amountPesos":50000000,"lengthMeters":5000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524625"},{"year":2023,"category":"Roads","project":"Installation of Road Stud (Solar) along Kiling-Tanauan-Tabontabon-Julita Road (S00068LT) - K0928+(-672) - K0931+184","amountPesos":45000000,"lengthMeters":3856.0,"ratePesosPerMeter":11670.1244813278,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524628"},{"year":2023,"category":"Roads","project":"Installation of LED Solar Road Studs along Sto. Rosario-Villaba Road (S00127LT) K1004+289 - K1010+238","amountPesos":20000000,"lengthMeters":5949.0,"ratePesosPerMeter":3361.9095646327114,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524629"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices (Solar Street Light) along National Road, Tacloban-Baybay South Road, K1000+274 - K1007+000","amountPesos":25000000,"lengthMeters":6726.0,"ratePesosPerMeter":3716.9194171870354,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524631"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices (Solar Street Light) along National Road, Daang Maharlika, K0959+(-205) - K0972+338","amountPesos":50000000,"lengthMeters":13543.0,"ratePesosPerMeter":3691.944177804032,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524632"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices (Solar Street Light) along National Road, Daang Maharlika, K0990+410 - K1003+972","amountPesos":50000000,"lengthMeters":13562.0,"ratePesosPerMeter":3686.771862557145,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524633"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices (Solar Street Light) along National Road, Ormoc-Baybay Southern Leyte Boundary Road, K1038+(-732) - K1051+290","amountPesos":50000000,"lengthMeters":14022.0,"ratePesosPerMeter":3565.82513193553,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524634"},{"year":2023,"category":"Roads","project":"Installation of Road Safety Devices (Solar Street Light) along National Road, Ormoc-Baybay-Southern Leyte Boundary Road, K1109+514 - K1123+094","amountPesos":50000000,"lengthMeters":13580.0,"ratePesosPerMeter":3681.8851251840942,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524635"},{"year":2023,"category":"Roads","project":"Installation of Solar LED Street Lights Along Tacloban - Baybay South Road (S00244LT) K0911+(-472) - K0904+017, Tacloban, City","amountPesos":30500000,"lengthMeters":6511.0,"ratePesosPerMeter":4684.380279526955,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524638"},{"year":2023,"category":"Roads","project":"Installation of Solar LED Street Lights Along Tacloban - Baybay South Road (S00246LT) K0915+(-110) - K0916+568, Tacloban, City","amountPesos":41200000,"lengthMeters":1678.0,"ratePesosPerMeter":24553.039332538738,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524639"},{"year":2023,"category":"Roads","project":"Installation of Solar LED Street Lights Along Naga-naga - Anibong Road (S00015LT) K0906+(-858)-K0906+1950, Tacloban, City","amountPesos":46000000,"lengthMeters":2808.0,"ratePesosPerMeter":16381.766381766382,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524641"},{"year":2023,"category":"Roads","project":"Installation of Solar LED Street Lights Along Paterno Road (S00017LT) K0908+(-992)-K0909+442, Tacloban, City","amountPesos":28700000,"lengthMeters":2434.0,"ratePesosPerMeter":11791.290057518489,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524642"},{"year":2023,"category":"Roads","project":"Installation of Solar LED Street Lights Along San Jose - Manlurip - Mac Arthur Park Road (S00021LT) K0912+(-336) -K0914+934, Tacloban, City","amountPesos":52300000,"lengthMeters":3270.0,"ratePesosPerMeter":15993.88379204893,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524644"},{"year":2023,"category":"Roads","project":"Installation of Solar LED Street Lights Along San Jose Candahug Road (S00023LT) K0913+(-956) -K0914+000, Tacloban, City","amountPesos":15680000,"lengthMeters":1956.0,"ratePesosPerMeter":8016.359918200409,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524645"},{"year":2023,"category":"Roads","project":"Installation of Hazard Markers (Chevron) and Safety Roller Barrier System along Benigno S. Aquino Jr. National Highway - K1585 + 000 - K1616 + 104 (Intermittent Section), Compostela, Davao de Oro","amountPesos":50000000,"lengthMeters":31104.0,"ratePesosPerMeter":1607.5102880658437,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 524671"},{"year":2023,"category":"Roads","project":"Construction of Road, Abra-Kalinga Road, K0485+000 - K0488+000, Malibcong, Abra","amountPesos":150000000,"lengthMeters":3000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 527131"},{"year":2023,"category":"Roads","project":"Rehabilitation of Magalang Road, Magalang, Pampanga, K000+000 - K001+865","amountPesos":75000000,"lengthMeters":1865.0,"ratePesosPerMeter":40214.47721179625,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 527162"},{"year":2023,"category":"Roads","project":"Rehabilitation of Road, Magalang, Pampanga, K0107+(-258) - K0110+000","amountPesos":60000000,"lengthMeters":3258.0,"ratePesosPerMeter":18416.206261510128,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 527163"},{"year":2023,"category":"Roads","project":"Rehabilitation of Angeles-Magalang Road, Magalang, Pampanga, Sta. 0+000 - Sta. 3+180","amountPesos":60000000,"lengthMeters":3180.0,"ratePesosPerMeter":18867.924528301886,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 527164"},{"year":2023,"category":"Roads","project":"Construction Lumban - Caliraya Road - K0096 + 675 - K0097 + 000, K0097 + 979 - K0099 + 000, K0101 + 000 - K0102 + 635","amountPesos":160000000,"lengthMeters":2981.0,"ratePesosPerMeter":53673.264005367324,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 527185"},{"year":2023,"category":"Roads","project":"Rehabilitation of F.V. Highway, Sta. 02+690 - Sta. 03+380, San Rafael, Bulacan","amountPesos":30000000,"lengthMeters":690.0,"ratePesosPerMeter":43478.260869565216,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 527837"},{"year":2023,"category":"Roads","project":"Construction of Road, Barleta Street - K0000 + 000 - K0000 + 388, Laguna","amountPesos":20000000,"lengthMeters":388.0,"ratePesosPerMeter":51546.39175257732,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 527925"},{"year":2023,"category":"Roads","project":"Rehabilitation of Jolo - Taglibi - Tiptipon Road, Sta. 021 + 500 - Sta. 025 + 000, Sulu","amountPesos":110000000,"lengthMeters":3500.0,"ratePesosPerMeter":31428.571428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 528390"},{"year":2023,"category":"Roads","project":"Construction of Road Slope Protection Structure, Burauen-Albuera Road (Albuera Section), Sta 9 + 600 - Sta 9 + 685, Leyte","amountPesos":71000000,"lengthMeters":85.0,"ratePesosPerMeter":835294.1176470588,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 530313"},{"year":2023,"category":"Roads","project":"Construction of Road Slope Protection Structure, Burauen-Albuera Road (Albuera Section), Sta 9 + 685 - Sta 9 +720, Leyte","amountPesos":71000000,"lengthMeters":35.0,"ratePesosPerMeter":2028571.4285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 530314"},{"year":2023,"category":"Roads","project":"Construction of Road Slope Protection Structure, Burauen-Albuera Road (Albuera Section), Sta 9 + 720 - Sta 9 + 755, Leyte","amountPesos":71000000,"lengthMeters":35.0,"ratePesosPerMeter":2028571.4285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 530315"},{"year":2023,"category":"Roads","project":"Construction of Road Slope Protection Structure, Burauen-Albuera Road (Albuera Section), Sta 9 + 755 - Sta 9 + 795, Leyte","amountPesos":70000000,"lengthMeters":40.0,"ratePesosPerMeter":1750000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 530316"},{"year":2023,"category":"Roads","project":"Construction of Road Slope Protection Structure, Sta. 9 + 153 - Sta. 9 + 674, Banga - Tupi - Malungon, Tupi, South Cotabato","amountPesos":105000000,"lengthMeters":521.0,"ratePesosPerMeter":201535.50863723608,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 530679"},{"year":2023,"category":"Roads","project":"Rehabilitation along Novaliches- San Jose Road, Caloocan City-K0025+(-692) to K0026+282","amountPesos":100000000,"lengthMeters":1974.0,"ratePesosPerMeter":50658.56129685917,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 534718"},{"year":2023,"category":"Roads","project":"Construction of Roads with Slips, Slope Collapse and Landslide at Sitio Talipanan, Sta.015+460-015+660 in Barangay Aninuan, Puerto Galera, Oriental Mindoro","amountPesos":165000000,"lengthMeters":200.0,"ratePesosPerMeter":825000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 534775"},{"year":2023,"category":"Roads","project":"Construction of Slope Protection along Jct. (TER) Dimiao-Oac-Bilar Jct.(LIR) Road, Dimiao, Bohol, Sta. 5+185-Sta. 5+318","amountPesos":80000000,"lengthMeters":133.0,"ratePesosPerMeter":601503.7593984962,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 534844"},{"year":2023,"category":"Roads","project":"Construction of Slope Protection along Jct. (TER) Dimiao-Oac-Bilar Jct.(LIR) Road, Dimiao, Bohol, Sta. 2+972-Sta. 3+128","amountPesos":100000000,"lengthMeters":156.0,"ratePesosPerMeter":641025.641025641,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 534845"},{"year":2023,"category":"Roads","project":"Concreting of Road (Phase I), 4.5km Radapan Zoning Road Network, Piagapo, Lanao del Sur","amountPesos":5000000,"lengthMeters":4500.0,"ratePesosPerMeter":1111.111111111111,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 534877"},{"year":2023,"category":"Roads","project":"Construction of Balete Drive Local Road (0+000 to 1+095), Brgy. Babanuang, San Manuel, Isabela","amountPesos":12000000,"lengthMeters":1095.0,"ratePesosPerMeter":10958.90410958904,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 535285"},{"year":2023,"category":"Roads","project":"Construction of Road Jct Bancal, Leon-Antique Rd, K0041+700 - K0041+820 - R/S","amountPesos":10000000,"lengthMeters":120.0,"ratePesosPerMeter":83333.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 536241"},{"year":2023,"category":"Roads","project":"Construction of Road, Barangays Basnunuk, Tubig Dakula and Jakarta, 183 + 000.00 - Sta. 184 + 500.00, Languyan, Tawi-Tawi","amountPesos":50000000,"lengthMeters":1500.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 537180"},{"year":2023,"category":"Roads","project":"Construction of Coastal Road with seawall along Catanauan Bay, Catanauan, Quezon (Sta. 4+380- Sta 4+745)","amountPesos":100000000,"lengthMeters":365.0,"ratePesosPerMeter":273972.602739726,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 537492"},{"year":2023,"category":"Roads","project":"Construction of Slope Protection Structure along NRJ Don Paulino - Bingag - Osme±a Road (KM 001+000 - K001+500) Phase 1, Dapa, Surigao del Norte","amountPesos":60000000,"lengthMeters":500.0,"ratePesosPerMeter":120000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 538383"},{"year":2023,"category":"Roads","project":"Construction of Drainage along San Fernando By-pass Road - K0267+810 - K0267+820 to Sevilla Road (Phase 1), Sevilla, City of San Fernando, La Union","amountPesos":10000000,"lengthMeters":10.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 538467"},{"year":2023,"category":"Roads","project":"Construction of Revetment along Matina River protecting Matina Pangi Road, Sta. 7+500 to Sta.7+800 Left Bank, Davao City","amountPesos":100000000,"lengthMeters":300.0,"ratePesosPerMeter":333333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 538942"},{"year":2023,"category":"Roads","project":"Construction of Revetment along Matina River protecting Matina Pangi Road, Sta. 7+200 to Sta. 7+500 Left Bank, Davao City","amountPesos":100000000,"lengthMeters":300.0,"ratePesosPerMeter":333333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 538943"},{"year":2023,"category":"Roads","project":"Construction of Revetment along Matina River protecting Matina Pangi Road, Sta. 7+000 to Sta. 7+300 Right Bank, Davao City","amountPesos":100000000,"lengthMeters":300.0,"ratePesosPerMeter":333333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 538945"},{"year":2023,"category":"Roads","project":"Construction of Revetment along Matina River protecting Matina Pangi Road, Sta. 7+500 to Sta. 7+800 Right Bank, Davao City","amountPesos":100000000,"lengthMeters":300.0,"ratePesosPerMeter":333333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 538946"},{"year":2023,"category":"Roads","project":"C-5 Road - K0016 + 268.10 - K0014 + 675","amountPesos":100000000,"lengthMeters":1593.1,"ratePesosPerMeter":62770.69863787582,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 550257"},{"year":2023,"category":"Roads","project":"Kennon Road (S00393LZ), K0216+814 - K0219+080, K0220+184 - K0220+303, K0221+092 - K0221+490, K0221+550 - K0223+244, K0223+960 - K0227+122, K0228+080 - K0228+435, K0228+801 - K0229+057, K0229+629 - K0230+608, K0230+681 - K0231+765, K0231+811 - K0232+399, K0232+835 - K0233+287, K0233+298 - K0233+425, K0233+434 - K0235+314, K0235+359 - K0235+554, K0235+825 - K0237+011, K0237+123 - K0238+234, K0238+278 - K0239+593, Tuba, Benguet","amountPesos":300000000,"lengthMeters":17167.0,"ratePesosPerMeter":17475.38882740141,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 550259"},{"year":2023,"category":"Roads","project":"Butuan City-Cagayan de Oro City - Iligan City Road, Misamis Oriental - K1391+409-K1392+383, K1393+000-K1395+000","amountPesos":79500000,"lengthMeters":2974.0,"ratePesosPerMeter":26731.674512441157,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 550357"},{"year":2023,"category":"Roads","project":"Davao Cotabato Road (Davao City - Jct. Digos Section) - K1514+850 - K1516+200, K1518+620 - K1518+834, Davao City","amountPesos":100000000,"lengthMeters":1564.0,"ratePesosPerMeter":63938.6189258312,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 550378"},{"year":2023,"category":"Roads","project":"Rehabilitation along Davao-Cotabato Road (Davao City - Jct. Digos Section) - K1546 + 833 - K1561 + 833","amountPesos":250000000,"lengthMeters":15000.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 550380"},{"year":2023,"category":"Roads","project":"Cotabato-Lanao Road K1856+330 - K1859+220","amountPesos":100000000,"lengthMeters":2890.0,"ratePesosPerMeter":34602.07612456747,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 550397"},{"year":2023,"category":"Roads","project":"Cotabato-Lanao Road K1859+220 - K1861+450","amountPesos":100000000,"lengthMeters":2230.0,"ratePesosPerMeter":44843.04932735426,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 550398"},{"year":2023,"category":"Roads","project":"Cotabato-Lanao Road K1861+450 - K1863+000","amountPesos":100000000,"lengthMeters":1550.0,"ratePesosPerMeter":64516.12903225807,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 550399"},{"year":2023,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1250 + 000 - K1254 + 000","amountPesos":200000000,"lengthMeters":4000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 550401"},{"year":2023,"category":"Roads","project":"C-5 Road - K0016 + (-986) - K0016 + 076","amountPesos":30726000,"lengthMeters":1062.0,"ratePesosPerMeter":28932.20338983051,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 550408"},{"year":2023,"category":"Roads","project":"C-5 Road - K0015 + 665 - K0016 + 261","amountPesos":40000000,"lengthMeters":596.0,"ratePesosPerMeter":67114.09395973154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 550411"},{"year":2023,"category":"Roads","project":"C-5 Road - K0015 + (-234) - K0016 + 000","amountPesos":20000000,"lengthMeters":1234.0,"ratePesosPerMeter":16207.45542949757,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 550412"},{"year":2023,"category":"Roads","project":"C-5 Road - K0015 + (-1851) - K0015 + (-386)","amountPesos":27000000,"lengthMeters":1465.0,"ratePesosPerMeter":18430.034129692835,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 550413"},{"year":2023,"category":"Roads","project":"Sumulong Highway - K0022 + 165 - K0022 + 430, K0025 + 144 - K0025 + 353","amountPesos":20217000,"lengthMeters":474.0,"ratePesosPerMeter":42651.898734177215,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 550501"},{"year":2023,"category":"Roads","project":"N. Bacalso Ave (Cebu South Road)- K001 + (-591) - K0011 + (-200)","amountPesos":20000000,"lengthMeters":10391.0,"ratePesosPerMeter":1924.74256568184,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 550532"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1481 + 783 - K1482 + 000","amountPesos":5180000,"lengthMeters":217.0,"ratePesosPerMeter":23870.967741935485,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 550567"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1449 + 420 - K1450 + 350, K1463 + 353 - K1463 + 689","amountPesos":37256000,"lengthMeters":1266.0,"ratePesosPerMeter":29428.120063191152,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 550570"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1450 + 350 - K1451 + 250","amountPesos":33569000,"lengthMeters":900.0,"ratePesosPerMeter":37298.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 550571"},{"year":2023,"category":"Roads","project":"Butuan City-Cagayan de Oro City - Iligan City Road, Misamis Oriental K1372+000-K1373+947","amountPesos":44390000,"lengthMeters":1947.0,"ratePesosPerMeter":22799.178222907038,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 550572"},{"year":2023,"category":"Roads","project":"Banay-Banay-Mojon-Cuenca Road K0086 + (-510) - K0087 + 294","amountPesos":60000000,"lengthMeters":1804.0,"ratePesosPerMeter":33259.42350332594,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 551732"},{"year":2023,"category":"Roads","project":"Mactan Circumferential Road (S00020LP) - K0018 + 500 - K0018 + 550, K0019 + 000 - K0021 + 000, K0023 + 028 - K0024 + 000, K0030 + 365 - K0031 + 000","amountPesos":100000000,"lengthMeters":3657.0,"ratePesosPerMeter":27344.818156959256,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 551787"},{"year":2023,"category":"Roads","project":"Governor Camins Road Chainage 465 - Chainage 1866","amountPesos":43512000,"lengthMeters":1401.0,"ratePesosPerMeter":31057.81584582441,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 551802"},{"year":2023,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1552 + 748 - K1552 + 1017, K1554 + 000 - K1554 + 991, K1555 + 772 - K1557 + 000, K1557 + 167 - K1557 + 411, K1571 + 000 - K1573 + 000","amountPesos":70000000,"lengthMeters":4732.0,"ratePesosPerMeter":14792.899408284024,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 551814"},{"year":2023,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1573 + 000 - K1577 + 910","amountPesos":100000000,"lengthMeters":4910.0,"ratePesosPerMeter":20366.598778004074,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 551823"},{"year":2023,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1579 + 000 - K1585 + 000","amountPesos":100000000,"lengthMeters":6000.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 551824"},{"year":2023,"category":"Roads","project":"Surallah-Lake Sebu-Maitum Road, K1806 + 894 - K1812 + 345, Lake Sebu, South Cotabato","amountPesos":200000000,"lengthMeters":5451.0,"ratePesosPerMeter":36690.5155017428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 551833"},{"year":2023,"category":"Roads","project":"C-2 Road - K0006 + 048.30 - K0006 + 241.10","amountPesos":9000000,"lengthMeters":192.8,"ratePesosPerMeter":46680.49792531116,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 551859"},{"year":2023,"category":"Roads","project":"C-5 Road - K0015 + (-625) - K0015 + (-164)","amountPesos":6149000,"lengthMeters":461.0,"ratePesosPerMeter":13338.394793926247,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 551869"},{"year":2023,"category":"Roads","project":"C-5 Road - K0015 + 184 - K0015 + 317","amountPesos":2218000,"lengthMeters":133.0,"ratePesosPerMeter":16676.69172932331,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 551870"},{"year":2023,"category":"Roads","project":"C-5 Road - K0015 + 317 - K0015 + 393","amountPesos":1335000,"lengthMeters":76.0,"ratePesosPerMeter":17565.78947368421,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 551874"},{"year":2023,"category":"Roads","project":"Pagsanjan-Lucban Road - K0110 + 279 - K0111 + 335","amountPesos":48690000,"lengthMeters":1056.0,"ratePesosPerMeter":46107.954545454544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 551934"},{"year":2023,"category":"Roads","project":"Manila East Road, K0039 + (-699) - K0041 + 000, Cardona, Rizal","amountPesos":50000000,"lengthMeters":2699.0,"ratePesosPerMeter":18525.37977028529,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 551945"},{"year":2023,"category":"Roads","project":"Iloilo City-Leganes-Dumangas Coastal Road, K0009+(-533) - K0009+390 and K0010+344 - K0011+000","amountPesos":40000000,"lengthMeters":1579.0,"ratePesosPerMeter":25332.4889170361,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 551984"},{"year":2023,"category":"Roads","project":"Bacolod North Road (S00406NR) K0062+678-K0066+120, Brgy. Daga - Brgy. Tinampa-an, Cadiz City, Negros Occidental","amountPesos":89680000,"lengthMeters":3442.0,"ratePesosPerMeter":26054.619407321326,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 551992"},{"year":2023,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1575 + 500 - K1577 + 100","amountPesos":41443000,"lengthMeters":1600.0,"ratePesosPerMeter":25901.875,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 552041"},{"year":2023,"category":"Roads","project":"Luna-Bangar Road - K0304+(-588)-K0304+000, K0304+000-K0304+603, K0305+000-K0306+000, K0306+000-K0306+296","amountPesos":100000000,"lengthMeters":2487.0,"ratePesosPerMeter":40209.08725371934,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553132"},{"year":2023,"category":"Roads","project":"Sibonga-Dumanjug Road - K0069 + 000 - K0071 + 739","amountPesos":96063000,"lengthMeters":2739.0,"ratePesosPerMeter":35072.2891566265,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553174"},{"year":2023,"category":"Roads","project":"Sibonga-Dumanjug Road - K0075 + 065 - K0077 + 600","amountPesos":86265000,"lengthMeters":2535.0,"ratePesosPerMeter":34029.585798816566,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553175"},{"year":2023,"category":"Roads","project":"Sibonga-Dumanjug Road - K0077 + 600 - K0080+ 430","amountPesos":99045000,"lengthMeters":2830.0,"ratePesosPerMeter":34998.233215547705,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553176"},{"year":2023,"category":"Roads","project":"Sibonga- Dumanjug K0081 +038 - K0082+ 023 with installation of road safety devices solar studs and solar street lights","amountPesos":100000000,"lengthMeters":985.0,"ratePesosPerMeter":101522.8426395939,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553179"},{"year":2023,"category":"Roads","project":"Southern Support Command Road - K1945 + (-075) - K1945 + 893","amountPesos":18640000,"lengthMeters":968.0,"ratePesosPerMeter":19256.198347107438,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553181"},{"year":2023,"category":"Roads","project":"Bayabas - Eden Road - K1529 + 002 - K1538 + 281","amountPesos":100000000,"lengthMeters":9279.0,"ratePesosPerMeter":10777.023386140749,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553184"},{"year":2023,"category":"Roads","project":"Calinan-Baguio-Cadalian Road - K1688 + 000 - K1689 + 133, K1697 + 525 - K1700 + 660","amountPesos":53000000,"lengthMeters":4268.0,"ratePesosPerMeter":12417.994376757264,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553186"},{"year":2023,"category":"Roads","project":"Tibanban û Lavigan Road - K1773 + 512 - K1777 + 704","amountPesos":100000000,"lengthMeters":4192.0,"ratePesosPerMeter":23854.961832061068,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553187"},{"year":2023,"category":"Roads","project":"Preventive Maintenance (Asphalt Overlay) along Butuan City - Malaybalay Road - K1247 + 000 - K1266 + 000","amountPesos":180000000,"lengthMeters":19000.0,"ratePesosPerMeter":9473.684210526315,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553192"},{"year":2023,"category":"Roads","project":"Taguig-Sta. Ana Road - K0020 + (-721) - K0020 + 013","amountPesos":6446000,"lengthMeters":734.0,"ratePesosPerMeter":8782.016348773843,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553202"},{"year":2023,"category":"Roads","project":"Gen Alejo Santos Highway - K0069 + 710 - K0070 + 245","amountPesos":15691000,"lengthMeters":535.0,"ratePesosPerMeter":29328.971962616823,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553284"},{"year":2023,"category":"Roads","project":"Gen Alejo Santos Highway - K0065 + 000 - K0065 + 501, K0066 + 000 - K0067 + 000","amountPesos":14370000,"lengthMeters":1501.0,"ratePesosPerMeter":9573.617588274483,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553285"},{"year":2023,"category":"Roads","project":"Gen Alejo Santos Highway - K0059 + 000 - K0059 + 565, K0059 + 835.10 - K0060 + 200","amountPesos":14370000,"lengthMeters":929.9,"ratePesosPerMeter":15453.274545650045,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553289"},{"year":2023,"category":"Roads","project":"Marikina-Infanta Road, K0057 + 500 - K0059 + 495, K0060 + 299 - K0061 + 065, Tanay, Rizal","amountPesos":50000000,"lengthMeters":2761.0,"ratePesosPerMeter":18109.380659181457,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553334"},{"year":2023,"category":"Roads","project":"Naga City Bdry-Calabanga-Balongay Road K0443+686 - K0449+000","amountPesos":50000000,"lengthMeters":5314.0,"ratePesosPerMeter":9409.10801656003,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553337"},{"year":2023,"category":"Roads","project":"Catarman Cadre Road - (S00052SM) Chainage 0 - Chainage 312","amountPesos":5680000,"lengthMeters":312.0,"ratePesosPerMeter":18205.128205128207,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553400"},{"year":2023,"category":"Roads","project":"C-5 Road - K0019 + 1020 - K0018 + 728","amountPesos":55665000,"lengthMeters":1292.0,"ratePesosPerMeter":43084.3653250774,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553887"},{"year":2023,"category":"Roads","project":"Rolando A Andaya Highway - K0313 + 009 - K0314 + 000, K0325 + 462 - K0325 + 562, K0333 + 368.70 - K0333 + 948","amountPesos":55217000,"lengthMeters":1670.3,"ratePesosPerMeter":33058.13326947278,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553908"},{"year":2023,"category":"Roads","project":"Marawi-Malabang Road - K1585 + 2053 - K1585 + 4030","amountPesos":18117000,"lengthMeters":1977.0,"ratePesosPerMeter":9163.884673748104,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553931"},{"year":2023,"category":"Roads","project":"Marawi-Malabang Road - K1578 + 000 - K1578 + 470, K1578 + 538 - K1578 + 717, K1578 + 767 - K1578 + 934","amountPesos":20280000,"lengthMeters":816.0,"ratePesosPerMeter":24852.941176470587,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553932"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1493 + 000 - K1493 + 750","amountPesos":53645000,"lengthMeters":750.0,"ratePesosPerMeter":71526.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553933"},{"year":2023,"category":"Roads","project":"Bangag-Magapit Road - K0689+900-K0689+996, K0689+1015-K0690+031, K0690+053-K0690+234","amountPesos":5600000,"lengthMeters":293.0,"ratePesosPerMeter":19112.62798634812,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553964"},{"year":2023,"category":"Bridges","project":"Manila North Rd - K0671+689-K0671+739, K0671+804 - K0671+854 (Reconstruction of Guiddam Bridge Approaches)","amountPesos":3000000,"lengthMeters":100.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553965"},{"year":2023,"category":"Bridges","project":"Manila North Rd - K0677+311-K0677+361, K0677+372-K0677+422 (Reconstruction of Zitanga Bridge Approaches)","amountPesos":3000000,"lengthMeters":100.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553966"},{"year":2023,"category":"Roads","project":"Road Construction along Daang Maharlika Road K0078+000 - K0079+500, San Miguel, Bulacan","amountPesos":50000000,"lengthMeters":1500.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553979"},{"year":2023,"category":"Roads","project":"Road Construction along Sibul-Biak Na Bato Road K0090+000 - K0091+456, San Miguel, Bulacan","amountPesos":50000000,"lengthMeters":1456.0,"ratePesosPerMeter":34340.65934065934,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 553980"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1530 + 000 - K1530 + 619","amountPesos":41646000,"lengthMeters":619.0,"ratePesosPerMeter":67279.48303715671,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 554031"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1463 + 002 - K1463 + 185","amountPesos":6368000,"lengthMeters":183.0,"ratePesosPerMeter":34797.81420765027,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 554032"},{"year":2023,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1275 + 480 - K1275 + 690","amountPesos":10763000,"lengthMeters":210.0,"ratePesosPerMeter":51252.380952380954,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 554049"},{"year":2023,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1256 + 654 - K1257 + 185, K1258 + 000 - K1258 + 447","amountPesos":25000000,"lengthMeters":978.0,"ratePesosPerMeter":25562.37218813906,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 554050"},{"year":2023,"category":"Roads","project":"Iloilo-Antique Road K075+114 - K079+043, K079+917 - K080+094, K080+400 - K080+502, K080+833 - K081+041","amountPesos":97500000,"lengthMeters":4416.0,"ratePesosPerMeter":22078.804347826088,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 554872"},{"year":2023,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1582 + 000 - K1584 + 236","amountPesos":100000000,"lengthMeters":2236.0,"ratePesosPerMeter":44722.719141323796,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 554881"},{"year":2023,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1585 + 717 - K1587 + 000","amountPesos":81611000,"lengthMeters":1283.0,"ratePesosPerMeter":63609.50896336711,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 554882"},{"year":2023,"category":"Roads","project":"C-3 Road - (S02120LZ) Chainage 20 - Chainage 378","amountPesos":21000000,"lengthMeters":358.0,"ratePesosPerMeter":58659.21787709497,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 554889"},{"year":2023,"category":"Roads","project":"C-3 Road - K0010 + 273 - K0010 + 778","amountPesos":28868000,"lengthMeters":505.0,"ratePesosPerMeter":57164.35643564357,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 554891"},{"year":2023,"category":"Roads","project":"C-3 Road - K0009 + (-611) - K0009 + (-055)","amountPesos":35201000,"lengthMeters":556.0,"ratePesosPerMeter":63311.15107913669,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 554892"},{"year":2023,"category":"Roads","project":"Rehabilitation along Novaliches- San Jose Road, Caloocan City-K0026+282 to K0026+ 737, K0028+000 to K0028+923","amountPesos":70000000,"lengthMeters":1378.0,"ratePesosPerMeter":50798.258345428156,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 555892"},{"year":2023,"category":"Roads","project":"Sibutu-Ligayan Road - Chainage 1000 - Chainage 3891","amountPesos":65600000,"lengthMeters":2891.0,"ratePesosPerMeter":22691.11034244206,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 555913"},{"year":2023,"category":"Roads","project":"Rehabilitation along Central Luzon Leprosarium Road-Caloocan City, K0029+(-890) to K0030+080","amountPesos":30000000,"lengthMeters":1970.0,"ratePesosPerMeter":15228.426395939086,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 555921"},{"year":2023,"category":"Roads","project":"Jct Natl Road-Bitnong-Blance-N Vizcaya Bdry Rd - K0272 + 698 - K0273 + 000","amountPesos":9140000,"lengthMeters":302.0,"ratePesosPerMeter":30264.900662251657,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 555962"},{"year":2023,"category":"Bridges","project":"Mc Donald Jct-Alido Bridge - K0015 + (-031) - K0015 + 105, K0015 + (-085) - K0015 + (-031), K0015 + (-203) - K0015 + (-085), K0015 + (-243) - K0015 + (-203), K0015 + 105 - K0015 + 132","amountPesos":23641000,"lengthMeters":375.0,"ratePesosPerMeter":63042.666666666664,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 555994"},{"year":2023,"category":"Roads","project":"Tinambac-Siruma Road, Siruma, Camarines Sur K0538+818 - K0538+900, K0543+154 - K0543+248","amountPesos":8000000,"lengthMeters":176.0,"ratePesosPerMeter":45454.545454545456,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 556015"},{"year":2023,"category":"Roads","project":"Albay West Coast Road, K0551 + 880 - K0552 + 000, K05252 + 559 - K0552 + 707.5","amountPesos":150000000,"lengthMeters":4699971.5,"ratePesosPerMeter":31.915087144677365,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 556553"},{"year":2023,"category":"Roads","project":"Albay West Coast Road, K0554 + 068 - K0554 + 598.5, K0554 + 756 - K0555 + 049.5","amountPesos":150000000,"lengthMeters":824.0,"ratePesosPerMeter":182038.83495145632,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 556554"},{"year":2023,"category":"Roads","project":"Marawi-Malabang Road - (S01652MN) Chainage 16300 - Chainage 17200","amountPesos":50000000,"lengthMeters":900.0,"ratePesosPerMeter":55555.555555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 556585"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1500 + 340 - K1500 + 540","amountPesos":60000000,"lengthMeters":200.0,"ratePesosPerMeter":300000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 556586"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1480 + 920 - K1481 + 100","amountPesos":90000000,"lengthMeters":180.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 556587"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1467 + 024 - K1467 + 148","amountPesos":100000000,"lengthMeters":124.0,"ratePesosPerMeter":806451.6129032258,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 556589"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1466 + 900 - K1467 + 024","amountPesos":100000000,"lengthMeters":124.0,"ratePesosPerMeter":806451.6129032258,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 556590"},{"year":2023,"category":"Roads","project":"Rolando A Andaya Highway - K0312 + 837 - K0313 + 000","amountPesos":12000000,"lengthMeters":163.0,"ratePesosPerMeter":73619.63190184049,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 556626"},{"year":2023,"category":"Roads","project":"Rolando A Andaya Highway - K0339 + 145 - K0339 + 262","amountPesos":13000000,"lengthMeters":117.0,"ratePesosPerMeter":111111.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 556627"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1503 + 690 - K1503 + 715","amountPesos":2400000,"lengthMeters":25.0,"ratePesosPerMeter":96000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 556655"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1490 + 280 - K1490 + 320","amountPesos":12000000,"lengthMeters":40.0,"ratePesosPerMeter":300000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 556656"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1464 + 200 - K1464 + 225","amountPesos":32386000,"lengthMeters":25.0,"ratePesosPerMeter":1295440.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 556657"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1465 + 265 - K1465 + 280, K1467 + 190 - K1467 + 212","amountPesos":7200000,"lengthMeters":37.0,"ratePesosPerMeter":194594.5945945946,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 556658"},{"year":2023,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1278 + 800 - K1279 + 100","amountPesos":38000000,"lengthMeters":300.0,"ratePesosPerMeter":126666.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 556685"},{"year":2023,"category":"Roads","project":"Gov. Bado Dangwa National Road, K0286+840 - K0286+980, Kapangan, Benguet","amountPesos":140000000,"lengthMeters":140.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558013"},{"year":2023,"category":"Roads","project":"Baguio-Bontoc Road, K0301+655-K0301+750, Atok, Benguet","amountPesos":100000000,"lengthMeters":95.0,"ratePesosPerMeter":1052631.5789473683,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558015"},{"year":2023,"category":"Roads","project":"Baguio-Bontoc Road, K0276+468 - K0276+588, Atok, Benguet","amountPesos":150000000,"lengthMeters":120.0,"ratePesosPerMeter":1250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558016"},{"year":2023,"category":"Roads","project":"Baguio-Bontoc Road, K0276+745 - K0276+885, Atok, Benguet","amountPesos":150000000,"lengthMeters":140.0,"ratePesosPerMeter":1071428.5714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558017"},{"year":2023,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0021 + 014 - K0021 + 175, Cebu City","amountPesos":60000000,"lengthMeters":161.0,"ratePesosPerMeter":372670.8074534162,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558080"},{"year":2023,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0025 + 676 - K0025 + 855, Cebu City","amountPesos":80000000,"lengthMeters":179.0,"ratePesosPerMeter":446927.374301676,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558081"},{"year":2023,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0020 + 493 - K0020 + 679, Cebu City","amountPesos":70000000,"lengthMeters":186.0,"ratePesosPerMeter":376344.08602150535,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558082"},{"year":2023,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0025 + 134 - K0025 + 267","amountPesos":63000000,"lengthMeters":133.0,"ratePesosPerMeter":473684.2105263158,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558087"},{"year":2023,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0027 + 254 - K0027 + 475","amountPesos":74000000,"lengthMeters":221.0,"ratePesosPerMeter":334841.628959276,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558088"},{"year":2023,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0024 + 279 - K0024 + 395, K0024 + 914 - K0024 + 984","amountPesos":104390000,"lengthMeters":186.0,"ratePesosPerMeter":561236.5591397849,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558090"},{"year":2023,"category":"Roads","project":"Biliran Circumferential Road - K1059+580 - K1059+740","amountPesos":100000000,"lengthMeters":160.0,"ratePesosPerMeter":625000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558092"},{"year":2023,"category":"Roads","project":"Masiu-Ganassi Road - (S01653MN) Chainage 850 - Chainage 1668","amountPesos":90814000,"lengthMeters":818.0,"ratePesosPerMeter":111019.55990220049,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558105"},{"year":2023,"category":"Roads","project":"Masiu-Ganassi Road - (S01653MN) Chainage 200 - Chainage 500","amountPesos":40000000,"lengthMeters":300.0,"ratePesosPerMeter":133333.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558110"},{"year":2023,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1583 + 800 - K1584 + 155","amountPesos":100000000,"lengthMeters":355.0,"ratePesosPerMeter":281690.1408450704,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558117"},{"year":2023,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1574 + 500 - K1574 + 830","amountPesos":100000000,"lengthMeters":330.0,"ratePesosPerMeter":303030.30303030304,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558118"},{"year":2023,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1571 + 860 - K1572 + 200","amountPesos":100000000,"lengthMeters":340.0,"ratePesosPerMeter":294117.64705882355,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558119"},{"year":2023,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1569 + 500 - K1569 + 780","amountPesos":100000000,"lengthMeters":280.0,"ratePesosPerMeter":357142.85714285716,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558120"},{"year":2023,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1569 + 100 - K1569 + 430","amountPesos":100000000,"lengthMeters":330.0,"ratePesosPerMeter":303030.30303030304,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558121"},{"year":2023,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1583 + 375 - K1583 + 675","amountPesos":100000000,"lengthMeters":300.0,"ratePesosPerMeter":333333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558122"},{"year":2023,"category":"Roads","project":"Gov Bado Dangwa National Road - K0286+740 - K0286+840, Kapangan, Benguet","amountPesos":50000000,"lengthMeters":100.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558165"},{"year":2023,"category":"Roads","project":"Kalinga - Abra Road K0470+110 - K0471+050, Kalinga","amountPesos":25000000,"lengthMeters":940.0,"ratePesosPerMeter":26595.744680851065,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558189"},{"year":2023,"category":"Roads","project":"Olongapo-Bugallon Road (OBR), K0128 + 435 - K0128 + 465","amountPesos":20000000,"lengthMeters":30.0,"ratePesosPerMeter":666666.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558195"},{"year":2023,"category":"Roads","project":"Tagbilaran North Road (Tagbilaran-Jetafe Section), K009+719-K009+757","amountPesos":45000000,"lengthMeters":38.0,"ratePesosPerMeter":1184210.5263157894,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558272"},{"year":2023,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0034 + 000 - K0034 + 200","amountPesos":20000000,"lengthMeters":200.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558275"},{"year":2023,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0039 + 709 - K0039 + 779","amountPesos":50000000,"lengthMeters":70.0,"ratePesosPerMeter":714285.7142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558277"},{"year":2023,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0023 + 499 - K0023 + 561","amountPesos":33000000,"lengthMeters":62.0,"ratePesosPerMeter":532258.0645161291,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558283"},{"year":2023,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0024 + 052 - K0024 + 162","amountPesos":30000000,"lengthMeters":110.0,"ratePesosPerMeter":272727.2727272727,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558284"},{"year":2023,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1579 + 000 - K1579 + 030","amountPesos":5120000,"lengthMeters":30.0,"ratePesosPerMeter":170666.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558356"},{"year":2023,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1581 + 750 - K1581 + 780","amountPesos":6140000,"lengthMeters":30.0,"ratePesosPerMeter":204666.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 558357"},{"year":2023,"category":"Roads","project":"Gov. Bado Dangwa National Road, K0329+000 - K0329+150, Kibungan, Benguet","amountPesos":200000000,"lengthMeters":150.0,"ratePesosPerMeter":1333333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559416"},{"year":2023,"category":"Roads","project":"Gov. Bado Dangwa National Road, K0328+1019 - K0328+1094, K0328+1119 - K0329+000, Kibungan, Benguet","amountPesos":200000000,"lengthMeters":119.0,"ratePesosPerMeter":1680672.268907563,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559417"},{"year":2023,"category":"Roads","project":"Gov. Bado Dangwa National Road, K0328+579 - K0328+684, K0328+789 - K0328+844, Kibungan, Benguet","amountPesos":200000000,"lengthMeters":160.0,"ratePesosPerMeter":1250000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559418"},{"year":2023,"category":"Roads","project":"Jct Natl Road-Bitnong-Blance-N Vizcaya Bdry Rd - K0262 + 138 - K0262 + 240","amountPesos":61200000,"lengthMeters":102.0,"ratePesosPerMeter":600000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559429"},{"year":2023,"category":"Roads","project":"Jct Natl Road-Bitnong-Blance-N Vizcaya Bdry Rd - K0262 + 653 - K0262 + 672","amountPesos":51643000,"lengthMeters":19.0,"ratePesosPerMeter":2718052.6315789474,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559430"},{"year":2023,"category":"Roads","project":"Papaya-Malabing-Wangal-Binungawan-Tadji-Runruno Road, K0314+250 - K0314+310, Runruno, Quezon, Nueva Vizcaya","amountPesos":75000000,"lengthMeters":60.0,"ratePesosPerMeter":1250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559431"},{"year":2023,"category":"Roads","project":"Papaya-Malabing-Wangal-Binungawan-Tadji-Runruno Road, K0314+350 - K0314+410, Runruno, Quezon, Nueva Vizcaya","amountPesos":75000000,"lengthMeters":60.0,"ratePesosPerMeter":1250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559432"},{"year":2023,"category":"Roads","project":"Papaya-Malabing-Wangal-Binungawan-Tadji-Runruno Road, K0317+300 - K0317+360, Runruno, Quezon, Nueva Vizcaya","amountPesos":75000000,"lengthMeters":60.0,"ratePesosPerMeter":1250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559433"},{"year":2023,"category":"Roads","project":"Bambang-Kasibu-Quezon-Solano Road, K0321+540 - K0321+620, Runruno, Quezon, Nueva Vizcaya","amountPesos":99000000,"lengthMeters":80.0,"ratePesosPerMeter":1237500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559439"},{"year":2023,"category":"Roads","project":"Bambang-Kasibu-Quezon-Solano Road, K0322+560 - K0322+620, Runruno, Quezon, Nueva Vizcaya","amountPesos":75000000,"lengthMeters":60.0,"ratePesosPerMeter":1250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559440"},{"year":2023,"category":"Roads","project":"Bambang-Kasibu-Quezon-Solano Road, K0324+040 - K0324+100, Runruno, Quezon, Nueva Vizcaya","amountPesos":75000000,"lengthMeters":60.0,"ratePesosPerMeter":1250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559441"},{"year":2023,"category":"Roads","project":"Construction of Road Slope Protection Structure Marikina-Infanta Road - K0101+038 - K0101+068, Quezon","amountPesos":100000000,"lengthMeters":30.0,"ratePesosPerMeter":3333333.3333333335,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559465"},{"year":2023,"category":"Roads","project":"Jct. (TNR) Cortes-Balilihan-Macaas Road, K0048+351-K0048+491","amountPesos":55000000,"lengthMeters":140.0,"ratePesosPerMeter":392857.14285714284,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559492"},{"year":2023,"category":"Roads","project":"Tigbao-Pulak-Sta. Fe Road - K0910+400 - K0910+520","amountPesos":91000000,"lengthMeters":120.0,"ratePesosPerMeter":758333.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559501"},{"year":2023,"category":"Roads","project":"Tigbao-Pulak-Sta. Fe Road - K0910+520 - K0910+680","amountPesos":98000000,"lengthMeters":160.0,"ratePesosPerMeter":612500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559502"},{"year":2023,"category":"Roads","project":"Tigbao-Pulak-Sta. Fe Road - K0910+680 - K0910+867","amountPesos":99000000,"lengthMeters":187.0,"ratePesosPerMeter":529411.7647058824,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559503"},{"year":2023,"category":"Roads","project":"Bagahupi-Babatngon-Sta. Cruz-Barugo-Carigara Road - K0916+494 - K0916+580","amountPesos":86000000,"lengthMeters":86.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559504"},{"year":2023,"category":"Roads","project":"Ubao-Taang Road - K0403 + 777 - K0403 + 916, K0404 + 390 - K0404 + 459, K0409 + 869 - K0409 + 959, K0410 + 032 - K0410 + 126, K0410 + 738 - K0410 + 808, K0411 + 220 - K0411 + 273","amountPesos":16480000,"lengthMeters":515.0,"ratePesosPerMeter":32000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559580"},{"year":2023,"category":"Roads","project":"Jct Natl Road-Bitnong-Blance-N Vizcaya Bdry Rd - K0262 + 379 - K0262 + 400","amountPesos":50000000,"lengthMeters":21.0,"ratePesosPerMeter":2380952.380952381,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559610"},{"year":2023,"category":"Roads","project":"Marikina- Infanta Road K0082+680- K0082+800","amountPesos":50000000,"lengthMeters":120.0,"ratePesosPerMeter":416666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559619"},{"year":2023,"category":"Roads","project":"Construction of Road Slope Protection Structure-Jct Bancal-Leon-Antique Bdry Rd, K0045 + 877 - K0045 + 977","amountPesos":100000000,"lengthMeters":100.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559633"},{"year":2023,"category":"Roads","project":"Luyang- Poo- Lazi Road- K0022+840- K0023+ 000, Lazi, Siquijor","amountPesos":50000000,"lengthMeters":160.0,"ratePesosPerMeter":312500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559648"},{"year":2023,"category":"Roads","project":"Bacolod-Madalum Highway - K1565 + -108 - K1565 + 000","amountPesos":7344000,"lengthMeters":108.0,"ratePesosPerMeter":68000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559700"},{"year":2023,"category":"Roads","project":"Bacolod-Madalum Highway - K1566 + 373 - K1566 + 545","amountPesos":8772000,"lengthMeters":172.0,"ratePesosPerMeter":51000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559701"},{"year":2023,"category":"Roads","project":"Bacolod-Madalum Highway - K1568 + 108 - K1568 + 180","amountPesos":4896000,"lengthMeters":72.0,"ratePesosPerMeter":68000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559702"},{"year":2023,"category":"Roads","project":"Bacolod-Madalum Highway - K1568 + 223 - K1568 + 355","amountPesos":8976000,"lengthMeters":132.0,"ratePesosPerMeter":68000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 559703"},{"year":2023,"category":"Roads","project":"Construction/Upgrading/Rehabilitation of Drainage Along National Roads û Primary Roads, Urdaneta Jct û Lingayen Road via Zambales Road K0377+1500- K0377+1744","amountPesos":25000000,"lengthMeters":244.0,"ratePesosPerMeter":102459.01639344262,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 560082"},{"year":2023,"category":"Roads","project":"Construction/Upgrading/Rehabilitation of Drainage Along National Roads û Secondary Roads, Dagupan û Bonuan û San Fabian Road K0379+470-K0380+083","amountPesos":40000000,"lengthMeters":613.0,"ratePesosPerMeter":65252.85481239804,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 560644"},{"year":2023,"category":"Roads","project":"Construction/Upgrading/Rehabilitation of Drainage Along National Roads û Secondary Roads, Urdaneta Jct û Dagupan û Lingayen Road K0208+900 - K0209+2087","amountPesos":25000000,"lengthMeters":2187.0,"ratePesosPerMeter":11431.184270690443,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 560645"},{"year":2023,"category":"Roads","project":"Bolboc Access Road - (S01938LZ) Chainage 000 - Chainage 630","amountPesos":20000000,"lengthMeters":630.0,"ratePesosPerMeter":31746.031746031746,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 560687"},{"year":2023,"category":"Roads","project":"Bolboc Access Road - (S01939LZ) Chainage 000 - Chainage 630","amountPesos":20000000,"lengthMeters":630.0,"ratePesosPerMeter":31746.031746031746,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 560689"},{"year":2023,"category":"Roads","project":"Isulan Jct - Ninoy Aquino Road (S00743MN) K1805+474 - K1806+279","amountPesos":24999000,"lengthMeters":805.0,"ratePesosPerMeter":31054.658385093167,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 560756"},{"year":2023,"category":"Roads","project":"Ganassi-Tubod Road - (S01651MN) Chainage 8000 - Chainage 9000","amountPesos":15116000,"lengthMeters":1000.0,"ratePesosPerMeter":15116.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 561103"},{"year":2023,"category":"Roads","project":"Ganassi-Tubod Road - (S01651MN) Chainage 9000 - Chainage 10500","amountPesos":22673000,"lengthMeters":1500.0,"ratePesosPerMeter":15115.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 561104"},{"year":2023,"category":"Roads","project":"Gen Alejo Santos Highway - K0052 + 000 - K0053 + 000","amountPesos":30000000,"lengthMeters":1000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 561141"},{"year":2023,"category":"Roads","project":"West Circumferential Road K0082+ (-389) -K0082+ (-037) Left Side with ROW","amountPesos":25000000,"lengthMeters":352.0,"ratePesosPerMeter":71022.72727272728,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 561147"},{"year":2023,"category":"Roads","project":"West Circumferential Road K0082+ 680 - K0083+ 820 Left Side","amountPesos":40000000,"lengthMeters":1140.0,"ratePesosPerMeter":35087.71929824561,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 561148"},{"year":2023,"category":"Roads","project":"along National Roads along Goa-Digdigon-San Isidro Road, Goa, Camarines Sur K0488 +(-818) - K0488+(-165)","amountPesos":42000000,"lengthMeters":653.0,"ratePesosPerMeter":64318.52986217458,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 561161"},{"year":2023,"category":"Roads","project":"Mandurriao-Pakiad Road - K0006 + 280 - K0006 + 415","amountPesos":4050000,"lengthMeters":135.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 561164"},{"year":2023,"category":"Roads","project":"Rolando A Andaya Highway - K0282 + 758 - K0283 + 000, K0296 + 842 - K0296 + 974, K0297 + 582 - K0300 + 000, K0301 + 840 - K0302 + 250, K0302 + 283 - K0303 + 280","amountPesos":105000000,"lengthMeters":4199.0,"ratePesosPerMeter":25005.953798523456,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 562258"},{"year":2023,"category":"Roads","project":"Rolando A Andaya Highway - K0304 + 941 - K0308 + 241, K0308 + 345 - K0308 + 942, K0308 + 970 - K0309 + 162","amountPesos":105000000,"lengthMeters":4089.0,"ratePesosPerMeter":25678.650036683783,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 562259"},{"year":2023,"category":"Roads","project":"Catarman - Calbayog Road (S00004SM) - K0752+961 - K0753+360, K0753+600 - K0755+554","amountPesos":111000000,"lengthMeters":2353.0,"ratePesosPerMeter":47173.820654483636,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 562273"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1443 + 160 - K1444 + 480","amountPesos":76950000,"lengthMeters":1320.0,"ratePesosPerMeter":58295.454545454544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 562291"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1455 + 062 - K1456 + 467","amountPesos":75000000,"lengthMeters":1405.0,"ratePesosPerMeter":53380.78291814947,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 562292"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1456 + 467 - K1457 + 749","amountPesos":59000000,"lengthMeters":1282.0,"ratePesosPerMeter":46021.840873634945,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 562293"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1457 + 749 - K1458 + 844","amountPesos":56000000,"lengthMeters":1095.0,"ratePesosPerMeter":51141.552511415524,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 562294"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1450 + 000 - K1451 + 806, K1451 + 867.15 - K1452 + 838","amountPesos":119076000,"lengthMeters":2776.85,"ratePesosPerMeter":42881.68248194753,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 562300"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1468 + 250 - K1470 + 575","amountPesos":107599000,"lengthMeters":2325.0,"ratePesosPerMeter":46279.13978494624,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 562301"},{"year":2023,"category":"Roads","project":"Montevista-Compostela-New bataan-Maragusan-Mati Boundary Road K1477 + 140 - K1479 + 355","amountPesos":100000000,"lengthMeters":2215.0,"ratePesosPerMeter":45146.72686230249,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 562307"},{"year":2023,"category":"Roads","project":"Cotabato-Lanao Road K883+680 - K1886+820","amountPesos":100000000,"lengthMeters":1003140.0,"ratePesosPerMeter":99.68698287377634,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 562318"},{"year":2023,"category":"Roads","project":"Cotabato-Lanao Road K1900+430 - K1903+280","amountPesos":100000000,"lengthMeters":2850.0,"ratePesosPerMeter":35087.71929824561,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 562319"},{"year":2023,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1255 + 836 - K1256 + 006","amountPesos":17544000,"lengthMeters":170.0,"ratePesosPerMeter":103200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 562323"},{"year":2023,"category":"Roads","project":"Manila North Road K0632+679-K0634+535, Sanchez Mira, Cagayan","amountPesos":22000000,"lengthMeters":1856.0,"ratePesosPerMeter":11853.448275862069,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 562332"},{"year":2023,"category":"Roads","project":"Manila North Road K0663+000- K0663+530, K0663+750 - K0664+019, K0667+1032- K0668+017, K0669+000- K0669+656","amountPesos":20000000,"lengthMeters":1470.0,"ratePesosPerMeter":13605.442176870749,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 562333"},{"year":2023,"category":"Roads","project":"Catarman - Calbayog Road (S00004SM) - K0771+268 - K0771+748","amountPesos":26972000,"lengthMeters":480.0,"ratePesosPerMeter":56191.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 562394"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1537 + 822 - K1538 + 990","amountPesos":50000000,"lengthMeters":1168.0,"ratePesosPerMeter":42808.21917808219,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 562402"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1436 + 000 - K1436 + 500","amountPesos":25000000,"lengthMeters":500.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 562404"},{"year":2023,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1264 + 067 - K1264 + 090, K1272 + 000 - K1272 + 749, K1272 + 771 - K1272 + 867","amountPesos":37000000,"lengthMeters":868.0,"ratePesosPerMeter":42626.72811059908,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 562428"},{"year":2023,"category":"Roads","project":"Olongapo-Bugallon Road (OBR) K0153 + 001.50 - K0153 + 944","amountPesos":53000000,"lengthMeters":942.5,"ratePesosPerMeter":56233.42175066313,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 563691"},{"year":2023,"category":"Roads","project":"Diokno Highway - K0072 + 515 - K0073 + 000","amountPesos":24350000,"lengthMeters":485.0,"ratePesosPerMeter":50206.18556701031,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 563699"},{"year":2023,"category":"Roads","project":"Diokno Highway - K0079 + 200 - K0080 + 200","amountPesos":49900000,"lengthMeters":1000.0,"ratePesosPerMeter":49900.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 563700"},{"year":2023,"category":"Roads","project":"Wright - Taft - Borongan Road (S00123SM) K0828+(-581) - K0859 + 931","amountPesos":200000000,"lengthMeters":32512.0,"ratePesosPerMeter":6151.574803149606,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 563737"},{"year":2023,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1563 + (-592) - K1564 + 000","amountPesos":79168000,"lengthMeters":1592.0,"ratePesosPerMeter":49728.6432160804,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 563750"},{"year":2023,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1564 + 000 - K1566 + 000","amountPesos":74950000,"lengthMeters":2000.0,"ratePesosPerMeter":37475.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 563751"},{"year":2023,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1571 + 000 - K1572 + 000","amountPesos":50050000,"lengthMeters":1000.0,"ratePesosPerMeter":50050.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 563752"},{"year":2023,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1417 + 493 - K1420 + 000","amountPesos":70000000,"lengthMeters":2507.0,"ratePesosPerMeter":27921.81890706023,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 563759"},{"year":2023,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1420 + 000 - K1422 + 443","amountPesos":70000000,"lengthMeters":2443.0,"ratePesosPerMeter":28653.29512893983,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 563760"},{"year":2023,"category":"Roads","project":"Biliran Circumferential Road K1062 + 400 - K1063 + 865","amountPesos":50000000,"lengthMeters":1465.0,"ratePesosPerMeter":34129.69283276451,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 563896"},{"year":2023,"category":"Roads","project":"Biliran Circumferential Road K1095 + 500 - K1097 + 343","amountPesos":50000000,"lengthMeters":1843.0,"ratePesosPerMeter":27129.679869777538,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 563897"},{"year":2023,"category":"Roads","project":"Biliran Circumferential Road K1097 + 600 - K1099 + 000","amountPesos":50000000,"lengthMeters":1400.0,"ratePesosPerMeter":35714.28571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 563898"},{"year":2023,"category":"Roads","project":"Biliran Circumferential Road K1112 + 085 - K1113 + 600, K1114 + 798 - K1116 + 031","amountPesos":50000000,"lengthMeters":2748.0,"ratePesosPerMeter":18195.050946142648,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 563899"},{"year":2023,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1588 + 100 - K1589 + 091, K1589 + 379 - K1590 + 000","amountPesos":49300000,"lengthMeters":1612.0,"ratePesosPerMeter":30583.126550868485,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 563919"},{"year":2023,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1607 + 000 - K1607 + 660","amountPesos":50000000,"lengthMeters":660.0,"ratePesosPerMeter":75757.57575757576,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 563929"},{"year":2023,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1427 + 389 - K1427 + 656","amountPesos":8000000,"lengthMeters":267.0,"ratePesosPerMeter":29962.5468164794,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 563930"},{"year":2023,"category":"Bridges","project":"Mc Donald Jct-Alido Bridge - K0015 + (-031) - K0015 + 105, K0015 + (-085) - K0015 + (-053), K0015 + 105 - K0015 + 132","amountPesos":5000000,"lengthMeters":195.0,"ratePesosPerMeter":25641.02564102564,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 564620"},{"year":2023,"category":"Roads","project":"By-Pass and Diversion Roads - Cawit to Baluno (Sta. 0+000 to Sta. 1+000), Zamboanga","amountPesos":100000000,"lengthMeters":1000.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 566805"},{"year":2023,"category":"Roads","project":"Manila North Road - K0491 + 799 - K0493 + 216","amountPesos":70000000,"lengthMeters":1417.0,"ratePesosPerMeter":49400.14114326041,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 568591"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1497 + 000 - K1499 + 106","amountPesos":60000000,"lengthMeters":2106.0,"ratePesosPerMeter":28490.02849002849,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 568596"},{"year":2023,"category":"Roads","project":"Along Sayre Highway, K1486+000 - K1520+000 (from Impalutao, Municipality of Impasug-ong to Aglayan, Malaybalay City, Bukidnon","amountPesos":150000000,"lengthMeters":34000.0,"ratePesosPerMeter":4411.764705882353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 568597"},{"year":2023,"category":"Roads","project":"Bacolod South Road - K0005 + 298 - K0009 + 085, K0010 + 094 - K0010 + 529","amountPesos":25300000,"lengthMeters":4222.0,"ratePesosPerMeter":5992.420653718616,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 568623"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1555 + 370 - K1556 + 097","amountPesos":18284000,"lengthMeters":727.0,"ratePesosPerMeter":25149.93122420908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 568641"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1559 + 500 - K1562 + 208","amountPesos":33311000,"lengthMeters":2708.0,"ratePesosPerMeter":12300.96011816839,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 568643"},{"year":2023,"category":"Roads","project":"Sayre Highway - K1426 + 501 - K1427 + 691","amountPesos":20000000,"lengthMeters":1190.0,"ratePesosPerMeter":16806.722689075632,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 568644"},{"year":2023,"category":"Roads","project":"Olongapo-Bugallon Road K0139 + 000 - K0140 + 019, K0140 + 100 - K0140 + 600, K0141 + 981 - K0142 + 554, K0142 + 562 - K0142 + 762, K0146 + 000 - K0148 + 000","amountPesos":68800000,"lengthMeters":4292.0,"ratePesosPerMeter":16029.82292637465,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 569142"},{"year":2023,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway (S00133MN) - K1417+000 - K1425+088","amountPesos":100000000,"lengthMeters":8088.0,"ratePesosPerMeter":12363.996043521267,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 569146"},{"year":2023,"category":"Roads","project":"Gen Alejo Santos Highway - K0061 + 563 - K0061 + 799","amountPesos":6715000,"lengthMeters":236.0,"ratePesosPerMeter":28453.389830508473,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 569628"},{"year":2023,"category":"Roads","project":"San Marcelino - San Antonio - San Narciso Road K0153 + 500 - K0154 + 550","amountPesos":13620000,"lengthMeters":1050.0,"ratePesosPerMeter":12971.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 569634"},{"year":2023,"category":"Roads","project":"Bacolod South Rd (Old Road) - K0025 + (-080) - K0025 + 240, K0025 + (-180) - K0025 + (-080)","amountPesos":4200000,"lengthMeters":420.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 569652"},{"year":2023,"category":"Roads","project":"Liloy-Siocon Road - K2037+860 - K2040+896","amountPesos":165000000,"lengthMeters":3036.0,"ratePesosPerMeter":54347.82608695652,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 569760"},{"year":2023,"category":"Roads","project":"Liloy-Siocon Road - K2056 + 000 - K2056 + 653","amountPesos":17000000,"lengthMeters":653.0,"ratePesosPerMeter":26033.690658499236,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 569770"},{"year":2023,"category":"Roads","project":"Liloy-Siocon Road - K2042+000 - K2042+571","amountPesos":28493000,"lengthMeters":571.0,"ratePesosPerMeter":49900.175131348515,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 569771"},{"year":2023,"category":"Roads","project":"Apayao-Cagayan Road (Ili-Guinamgamman-Rizal Road) - (S00694LZ) Chainage 0 - Chainage 3027","amountPesos":75000000,"lengthMeters":3027.0,"ratePesosPerMeter":24777.006937561942,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 570004"},{"year":2023,"category":"Roads","project":"Apayao-Cagayan Road (Ili-Guinamgamman-Rizal Road) - (S00694LZ) Chainage 3027 - Chainage 6054","amountPesos":75000000,"lengthMeters":3027.0,"ratePesosPerMeter":24777.006937561942,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 570005"},{"year":2023,"category":"Mixed roads / bridges","project":"Manduyong Bridge along Santander-Barili-Toledo Road - K0195 + 198 - K0195 + 220","amountPesos":150000000,"lengthMeters":22.0,"ratePesosPerMeter":6818181.818181818,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 570056"},{"year":2023,"category":"Mixed roads / bridges","project":"Calaba Bridge (Phase 1), Abra-Ilocos Norte Road; K0411+234 - K0412+081","amountPesos":50000000,"lengthMeters":847.0,"ratePesosPerMeter":59031.87721369539,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 571950"},{"year":2023,"category":"Mixed roads / bridges","project":"Abas Bridge, Abra-Cervantes Road; K0446+448 - K0446+638","amountPesos":50000000,"lengthMeters":190.0,"ratePesosPerMeter":263157.8947368421,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 571951"},{"year":2023,"category":"Mixed roads / bridges","project":"Calaba Bridge (Phase 2), Abra-Ilocos Norte Road; K0411+234 - K0412+081","amountPesos":50000000,"lengthMeters":847.0,"ratePesosPerMeter":59031.87721369539,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 571952"},{"year":2023,"category":"Bridges","project":"Construction of River Bank Slope Protection (Upstream of Maayon Bridge)(Right Bank) Sta. 000+000 - Sta. 000+322.40, Brgy. Poblacion Ilaya, Maayon, Capiz","amountPesos":79084000,"lengthMeters":322.4,"ratePesosPerMeter":245297.76674937966,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 584392"},{"year":2023,"category":"Bridges","project":"Construction of Flood Control Structure at Taytayan Bridge, Sta. 000 + 000 - Sta. 001 + 071, City of Bogo, Cebu","amountPesos":70000000,"lengthMeters":1071.0,"ratePesosPerMeter":65359.47712418301,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 584439"},{"year":2023,"category":"Bridges","project":"Construction of Flood Control Structure, Ilaya Bridge, Abutment A, Upstream Section, Dapitan City, Zamboanga del Norte Sta.0+100 - Sta.0+500","amountPesos":70000000,"lengthMeters":400.0,"ratePesosPerMeter":175000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 584546"},{"year":2023,"category":"Bridges","project":"Construction of Flood Control at Ilaya Bridge, Upstream Section, Dapitan City, Zamboanga del Norte Sta. 0+100 - Sta. 0+500","amountPesos":70000000,"lengthMeters":400.0,"ratePesosPerMeter":175000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 584547"},{"year":2023,"category":"Bridges","project":"Construction of Groundsill with Slope Protection along Abacan River, Downstream of NLEX Bridge, Sta. 0+000 - Sta 0+110, Angeles City, Pampanga","amountPesos":50000000,"lengthMeters":110.0,"ratePesosPerMeter":454545.45454545453,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 585086"},{"year":2023,"category":"Bridges","project":"Construction of Buluang Bridge I Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 225, Busuanga, Palawan","amountPesos":9250000,"lengthMeters":225.0,"ratePesosPerMeter":41111.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 585209"},{"year":2023,"category":"Bridges","project":"Construction of Magsarongsong Bridge Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 234, Roxas, Palawan","amountPesos":9250000,"lengthMeters":234.0,"ratePesosPerMeter":39529.91452991453,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 585210"},{"year":2023,"category":"Bridges","project":"Construction of Lamoro Bridge III Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 240, El Nido, Palawan","amountPesos":9250000,"lengthMeters":240.0,"ratePesosPerMeter":38541.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 585211"},{"year":2023,"category":"Roads","project":"Construction of Drainage Outfall at Antonio y De Pio Highway, Barangay Tabunok, Sta. 000 + 000 - Sta. 000 + 300, Tabuelan, Cebu","amountPesos":5740000,"lengthMeters":300.0,"ratePesosPerMeter":19133.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 585345"},{"year":2023,"category":"Bridges","project":"Construction of Flood Control Structure at Magsa-ubay Bridge, Section 1 and 2, Sta. 000 + 000 - Sta. 000 + 306, Daanbantayan, Cebu","amountPesos":20000000,"lengthMeters":306.0,"ratePesosPerMeter":65359.47712418301,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 585346"},{"year":2023,"category":"Roads","project":"Construction of Drainage System along Sibonga-Dumanjug Road, K0051 + (-450) - K0051 + (-050), Sibonga, Cebu","amountPesos":5000000,"lengthMeters":400.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 585347"},{"year":2023,"category":"Roads","project":"Construction of Drainage Outfall at Toledo-Tabuelan-San Remigio Road, Sta. 000 + 000 - Sta. 000 + 575, Barangay Putat, Tuburan, Cebu","amountPesos":11000000,"lengthMeters":575.0,"ratePesosPerMeter":19130.434782608696,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 585351"},{"year":2023,"category":"Roads","project":"Rehabilitation of damaged Seawall along Dumaguete South Road, K0092 + 300 - K0092 + 363, Sitio Nagbagang, Barangay Poblacion, Sta. Catalina, Negros Oriental","amountPesos":5423000,"lengthMeters":63.0,"ratePesosPerMeter":86079.36507936507,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 585377"},{"year":2023,"category":"Bridges","project":"Rehabilitation of Iponan Flood Control Works, Revetment (Iponan Bridge I & II - Iponan Bridge III), along Iponan River, Bulua Side, Sta. 1+088.00 - Sta. 1+441.00 with exception, Brgy. Iponan, Cagayan de Oro City","amountPesos":25000000,"lengthMeters":353.0,"ratePesosPerMeter":70821.5297450425,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 585467"},{"year":2023,"category":"Bridges","project":"Construction of Revetment at Ilian Bridge, along Bauyan Riverstream, Barangay Ilian, Sultan Naga Dimaporo, Lanao del Norte Sta.0+000 - Sta.0+200","amountPesos":50000000,"lengthMeters":200.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 585475"},{"year":2023,"category":"Roads","project":"Construction of Coastal Protection, Protecting Surigao Del Sur Bdry. Davao Oriental Coastal Road (San Victor Section), Sta. 0 + 000 - Sta. 0 + 350, Baganga, Davao Oriental","amountPesos":30000000,"lengthMeters":350.0,"ratePesosPerMeter":85714.28571428571,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 585490"},{"year":2023,"category":"Roads","project":"Construction of Flood Mitigation Structure along Surigao Del Sur - Davao Oriental Coastal Road (Sta Filomena - Central Section), Sta. 1541 + 000.00 - Sta. 1544 + 000.00, Cateel, Davao Oriental","amountPesos":20000000,"lengthMeters":3000.0,"ratePesosPerMeter":6666.666666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 585491"},{"year":2023,"category":"Bridges","project":"Construction of Labangan Bridge I Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 692, Coron, Palawan","amountPesos":20500000,"lengthMeters":692.0,"ratePesosPerMeter":29624.2774566474,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 588751"},{"year":2023,"category":"Bridges","project":"Construction of Andes Bridge River Control, Sta. 0 + 000 - Sta. 0 + 210, Sta. 0 + 000 - Sta. 0 + 090, Danao, Bohol","amountPesos":50000000,"lengthMeters":210.0,"ratePesosPerMeter":238095.2380952381,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2023 GAA parquet · row 588785"},{"year":2024,"category":"Roads","project":"Installation of Solar Street Lights and Road Safety Devices along Dr. A. Santos Avenue ( West Bound ) - K0016 + 149 - K0013 + 540, Parañaque City","amountPesos":50949000,"lengthMeters":2609.0,"ratePesosPerMeter":19528.171713300115,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535109"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Manila North Rd - K0489 + 040 - K0489 + 560","amountPesos":207183000,"lengthMeters":520.0,"ratePesosPerMeter":398428.8461538461,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535114"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Agoo - Baguio City Rd - K0240 + 752 - K0248 + 470, Tubao, La Union","amountPesos":100000000,"lengthMeters":7718.0,"ratePesosPerMeter":12956.724540036279,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535117"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Agoo - Baguio City Rd - K0248 + 470 - K0259 + 267, Pugo, La Union","amountPesos":100000000,"lengthMeters":10797.0,"ratePesosPerMeter":9261.831990367695,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535118"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Manila North Rd - K0561 + 174 - K0562 + 193, K0562 + 262 - K0562 + 512, K0566 + 000 - K0567 + 140, K0571 + 1000 - K0572 + 179, K0574 + 250 - K0575 + 000","amountPesos":190508000,"lengthMeters":3338.0,"ratePesosPerMeter":57072.49850209706,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535123"},{"year":2024,"category":"Roads","project":"Installation of Signage - Warning and Regulatory Signs, Pavement Markings, Street Lights, and Road Safey Barriers along Daang Maharlika ( LZ ) ( S00782LZ ) - K0383 + 577 - K0383 + 1577, Between Barangay Magsaysay ( Pob. ) and San Manuel, Naguilian, Isabela","amountPesos":1249000,"lengthMeters":1000.0,"ratePesosPerMeter":1249.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535140"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Cagayan Valley Rd - K0514 + 356 - K0514 + 880, K0538 + 093 - K0539 + 000, K0539 + 767 - K0539 + 795, K0529 + 606 - K0529 + 782, K0534 + 485 - K0535 + 000","amountPesos":155536000,"lengthMeters":2150.0,"ratePesosPerMeter":72342.32558139534,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535143"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( LZ ) - K0249 + 801 - K0249 + 905, K0266 + 595 - K0267 + 042, K0268 + 473 - K0268 + 790","amountPesos":70412000,"lengthMeters":868.0,"ratePesosPerMeter":81119.81566820276,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535145"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( LZ ) - K0271 + 522 - K0272 + 379, K0284 + 533 - K0285 + 000, K0286 + 202 - K0286 + 277, K0286 + 317 - K0287 + 000","amountPesos":188030000,"lengthMeters":2082.0,"ratePesosPerMeter":90312.19980787704,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535146"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( LZ ) - K0309 + ( - 890 ) - K0309 + - 606, K0310 + 522 - K0310 + 814, K0317 + 000 - K0318 + 131","amountPesos":81099000,"lengthMeters":1423.0,"ratePesosPerMeter":56991.56711173577,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535147"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( LZ ) - K0344 + 349 - K0344 + 623, K0348 + 424 - K0348 + 456, K0356 + 831 - K0356 + 994, K0346 + 771 - K0347 + 000, K0347 + 993 - K0348 + 424","amountPesos":61415000,"lengthMeters":1129.0,"ratePesosPerMeter":54397.69707705935,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535148"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( LZ ) - K0395 + 931 - K0397 + 209, K0401 + 820 - K0402 + 000","amountPesos":63742000,"lengthMeters":1458.0,"ratePesosPerMeter":43718.79286694102,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535149"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( LZ ) - K0412 + 000 - K0413 + 836","amountPesos":158774000,"lengthMeters":1836.0,"ratePesosPerMeter":86478.21350762527,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535150"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( LZ ) - K0423 + 144 - K0423 + 262","amountPesos":110940000,"lengthMeters":118.0,"ratePesosPerMeter":940169.4915254237,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535151"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Facilities along Mainit Park Rd ( S00137MN ) K1426 + 227 - K1429 + 350","amountPesos":50000000,"lengthMeters":3123.0,"ratePesosPerMeter":16010.24655779699,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535154"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Facilities along Mainit Park Rd ( S00137MN ) K1430 + 392 - K1433 + 360","amountPesos":50000000,"lengthMeters":2968.0,"ratePesosPerMeter":16846.361185983827,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535155"},{"year":2024,"category":"Roads","project":"Installation of Solar LED Street Lights along Secondary Roads, Olongapo - Bugallon Road - K0155 + 280 - K0156 + 037, K0163 + 097 - K0163 + 547, K0164 + 149 - K0164 + 930, K0176 + 584 - K0179 + 006, K0180 + 000 - K0182 + 000, K0182 + 823 - K0183 + 663, K0187 + 444 - K0188 + 000, K0201 + 423 - K0201 + 546, K0224 + 763 - K0226 + 455","amountPesos":62542000,"lengthMeters":9621.0,"ratePesosPerMeter":6500.5716661469705,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535167"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Daang Maharlika LZ ( S04414LZ ) - K0124 + 675 - K0125 + 675","amountPesos":21120000,"lengthMeters":1000.0,"ratePesosPerMeter":21120.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535168"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Daang Maharlika LZ ( S04414LZ ) - K0158 + 132 - K0159 + 161, Barangay Abar 1st, San Jose City, Nueva Ecija","amountPesos":5430000,"lengthMeters":1029.0,"ratePesosPerMeter":5276.967930029155,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535169"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Daang Maharlika ( LZ ) ( S00926LZ ) - K0111 + 583 - K0112 + 561, Hermogenes C. Concepcion, Sr., Cabanatuan City, Nueva Ecija","amountPesos":9310000,"lengthMeters":978.0,"ratePesosPerMeter":9519.427402862986,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535180"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Daang Maharlika ( LZ ) ( S00926LZ ) - K0114 + 370 - K0115 + 400, Dicarma ( Pob. ) , Cabanatuan City, Nueva Ecija","amountPesos":22650000,"lengthMeters":1030.0,"ratePesosPerMeter":21990.29126213592,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535181"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Manila South Rd - K0029 + 297 - K0029 + 358","amountPesos":4349000,"lengthMeters":61.0,"ratePesosPerMeter":71295.08196721312,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535187"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( LZ ) - K0123 + 085 - K0123 + 125","amountPesos":4000000,"lengthMeters":40.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535190"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along MSR Diversion Rd - ( S05869LZ ) Chainage 0 - Chainage 240","amountPesos":13903000,"lengthMeters":240.0,"ratePesosPerMeter":57929.166666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535196"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Manila South Rd - K0042 + 410 - K0042 + 725, K0043 + 000 - K0043 + 483","amountPesos":64092000,"lengthMeters":798.0,"ratePesosPerMeter":80315.78947368421,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535197"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Daang Maharlika ( LZ ) - K0097 + 000 - K0097 + 200, K0097 + 600 - K0098 + 000, Lusacan, Tiaong, Quezon","amountPesos":4910000,"lengthMeters":600.0,"ratePesosPerMeter":8183.333333333333,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535209"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Daang Maharlika ( LZ ) - K0108 + 500 - K0108 + 975, Candelaria, Quezon","amountPesos":3330000,"lengthMeters":475.0,"ratePesosPerMeter":7010.526315789473,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535210"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Daang Maharlika ( LZ ) - K0110 + 300 - K0110 + 474, Junction Candelaria By - Pass, Mangilag Sur, Candelaria, Quezon","amountPesos":710000,"lengthMeters":174.0,"ratePesosPerMeter":4080.4597701149423,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535211"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Daang Maharlika ( LZ ) - K0170 + 800 - K0171 + 000 ( L / S ) , K0171 + 000 - K0171 + 100 ( L / S ) , K0172 + 630 - K0173 + 000 ( L / S ) , K0173 + 000 - K0173 + 153 ( L / S ) , K0173 + 1020 - K0173 + 1080 ( L / S )","amountPesos":100000000,"lengthMeters":883.0,"ratePesosPerMeter":113250.28312570782,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535212"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Daang Maharlika ( LZ ) - K0173 + 1120 - K0174 + 480 ( L / S ) , K0174 + 650 - K0174 + 690 ( L / S ) , K0175 + 500 - K0175 + 860 ( L / S )","amountPesos":100000000,"lengthMeters":760.0,"ratePesosPerMeter":131578.94736842104,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535213"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Street Lights along Daang Maharlika ( LZ ) - K0103 + 000 - K0103 + 654, Bukal Sur, Candelaria, Quezon","amountPesos":4580000,"lengthMeters":654.0,"ratePesosPerMeter":7003.058103975535,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535215"},{"year":2024,"category":"Roads","project":"Installation of Roadway Lighting Structures along Puerto Princesa South Road - K0147 + 398 - K0148 + 278, K0152 + 288 - K0169 + 598, K0177 + 913 - K0180 + 313 ( with exceptions )","amountPesos":300000000,"lengthMeters":20590.0,"ratePesosPerMeter":14570.179698882954,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535225"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( LZ ) - K0371 + ( - 260 ) - K0371 + ( - 191 ) , K0392 + 000 - K0392 + 301, K0395 + 832 - K0395 + 897, K0396 + 473 - K0396+638","amountPesos":15748000,"lengthMeters":531.0,"ratePesosPerMeter":29657.25047080979,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535228"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Tagas - Daet Poblacion - Magang Rd ( S03787LZ ) - K0340 + 000 - K0341 + 000, K0342 + 462 - K0344 + 300, Daet, Camarines Norte","amountPesos":4250000,"lengthMeters":2838.0,"ratePesosPerMeter":1497.5334742776604,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535233"},{"year":2024,"category":"Roads","project":"Installation of Solar Street Lights along Rolando A Andaya Highway - K0286 + 000 - K0286 + 760, K0288 + 525 - K0292 + 554, K0293 + 000 - K0293 + 792, Del Gallego, Camarines Sur","amountPesos":80200000,"lengthMeters":5581.0,"ratePesosPerMeter":14370.184554739293,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535236"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( LZ ) - K0275 + 000 - K0276 + 024, K0276 + 510 - K0277 + 000, K0283 + 000 - K0283 + 311, K0284 + 000 - K0284 + 339, K0284 + 492 - K0285 + 000, K0285 + 658 - K0286 + 594, K0322 + 630 - K0323 + 150, K0328 + 440 - K0329 + 200","amountPesos":173372000,"lengthMeters":4888.0,"ratePesosPerMeter":35468.90343698854,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535237"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( LZ ) - K0333 + 000 - K0335 + 000, K0343 + 206 - K0344 + 000","amountPesos":87035000,"lengthMeters":2794.0,"ratePesosPerMeter":31150.680028632785,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535238"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( LZ ) - K0416 + 113 - K0416 + 378, K0420 + 500 - K0420 + 843, K0428 + 625 - K0429 + 183","amountPesos":94917000,"lengthMeters":1166.0,"ratePesosPerMeter":81403.94511149228,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535239"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( LZ ) - K0456 + 000 - K0457 + 000, K0458 + 150 - K0458 + 284, K0479 + 700 - K0479 + 840","amountPesos":109523000,"lengthMeters":1274.0,"ratePesosPerMeter":85967.81789638933,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535241"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( LZ ) - K0500 + 210.00 - K0500 + 272.00, K0500 + 702.00 - K0501 + 313.00, K0501 + 313 - K0501 + 528.00 ( L / S ) , '501 + 600.00 - K0502 + 250.00, K0506 + 190.00 - K0506 + 961.00, K0508 + 163.00 - K0508 + 382.00, K0483 + 000.00 - K0484 + 114.00, K0485 + 000.00 - K0485 + 959.00","amountPesos":95444000,"lengthMeters":4601.0,"ratePesosPerMeter":20744.18604651163,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535242"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( LZ ) - K0515 + 659 - K0516 + 005, K0516 + 596 - K0518 + 706, K0521 + 128 - K0522 + 434, K0522 + 800 - K0522 + 922, K0524 + 046 - K0524 + 480, K0527 + 627 - K0528 + 432","amountPesos":120260000,"lengthMeters":5123.0,"ratePesosPerMeter":23474.526644544214,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535243"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( LZ ) - K0524 + 480 - K0525 + 000, K0533 + 600 - K0534 + 300, K0536+190 - K0536 + 500, K0537 + 243 - K0537 + 840, K0537 + 847 - K0538 + 550","amountPesos":66908000,"lengthMeters":2830.0,"ratePesosPerMeter":23642.402826855123,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535244"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( LZ ) - K0601 + 240 - K0602 + 000, K0607 + 542 - K0607 + 700","amountPesos":87426000,"lengthMeters":918.0,"ratePesosPerMeter":95235.29411764706,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535245"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( LZ ) - K0602 + 000 - K0604 + 028, K0604 + 085 - K0604 + 230","amountPesos":57268000,"lengthMeters":2173.0,"ratePesosPerMeter":26354.348826507132,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535246"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Jct Putiao - Pilar - Donsol Rd - K0545 + 000 - K0546 + 000","amountPesos":51248000,"lengthMeters":1000.0,"ratePesosPerMeter":51248.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535247"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Jct Putiao - Pilar - Donsol Rd - K0549 + 000 - K0554 + 000","amountPesos":260519000,"lengthMeters":5000.0,"ratePesosPerMeter":52103.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535248"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Masbate - Cataingan - Placer Rd - K0006 + 060 - K0006 + 941","amountPesos":75917000,"lengthMeters":881.0,"ratePesosPerMeter":86171.39614074914,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535249"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Masbate - Cataingan - Placer Rd - K0027 + 384 - K0027 + 856, K0028 + 000 - K0029 + 800","amountPesos":75100000,"lengthMeters":2272.0,"ratePesosPerMeter":33054.57746478873,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535250"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Rolando A Andaya Highway - K0324 + 472 - K0325 + 000, K0325 + 562 - K0326 + 000","amountPesos":92868000,"lengthMeters":966.0,"ratePesosPerMeter":96136.64596273292,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535252"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( LZ ) - K0625 + 033 - K0625 + 230","amountPesos":18803000,"lengthMeters":197.0,"ratePesosPerMeter":95446.70050761421,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535253"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Aklan East Rd - K0286 + 349 - K0287 + 430, K0287 + 600 - K0287 + 890, K0288 + 174 - K0288 + 840, K0290 + 000 - K0290 + 174, K0290 + 223 - K0290 + 671, K0291 + 387 - K0293 + 649, K0294 + 112 - K0296 + 559","amountPesos":138202000,"lengthMeters":7368.0,"ratePesosPerMeter":18757.057546145494,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535255"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Aklan East Rd - K0296 + 800 - K0296 + 952, K0297 + 000 - K0297 + 340, K0298 + 000 - K0298 + 332, K0298 + 370 - K0299 + 146, K0299 + 223 - K0299 + 472, K0299 + 740 - K0300 + 000, K0300 + 600 - K0300 + 882, K0301 + 160 - K0302 + 733, K0303 + 380 - K0304 + 270, K0304 + 450 - K0304 + 788, K0305 + 800 - K0306 + 000, K0306 + 400 - K0306 + 517, K0307 + 070 - K0307 + 189, K0307 + 500 - K0308 + 238, K0308 + 419 - K0309 + 654, K0309 + 654 - K0309 + 760","amountPesos":142426000,"lengthMeters":7707.0,"ratePesosPerMeter":18480.083041390943,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535256"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Aklan West Rd ( Kalibo - Nabas ) - K0252 + 900 - K0254 + 590, K0258 + 730 - K0259 + 000, K0259 + 920 - K0260 + 890, K0261 + 230 - K0261 + 650, K0265 + 954 - K0266 + 227, K0267 + 750 - K0269 + 575","amountPesos":114922000,"lengthMeters":5448.0,"ratePesosPerMeter":21094.346549192363,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535257"},{"year":2024,"category":"Roads","project":"Installation of Roadway Lighting Structures along Bacolod - Murcia - DS Benedicto - San Carlos City Road ( S00427NR ) K0062 + 609 - K0064 + 300, K0065 + 052 - K0066 + 640, K0077 + 600 - K0078 + 00","amountPesos":100000000,"lengthMeters":3679.0,"ratePesosPerMeter":27181.29926610492,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535259"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Kabankalan - Bais Rd - K0089 + 000 - K0090 + 400, K0090 + 400 - K0090 + 985, K0107 + 000 - K0111+000, K0111 + 560 - K0113 + 260","amountPesos":173017000,"lengthMeters":7685.0,"ratePesosPerMeter":22513.597918022122,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535260"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Tagbilaran East Rd ( Tagbilaran - Jagna ) - K0193 + 568 - K0193 + 757, K0193 + 804 - K0193 + 878, K0193 + 937 - K0194 + 193, K0194 + 592 - K0194 + 643, K0194 + 712 - K0194 + 798, K0199 + 225 - K0199 + 292, K0199 + 335 - K0199 + 510, K0200 + 006 - K0200 + 150, K0200 + 187 - K0200 + 282, K0200 + 688 - K0200 + 753, K0200 + 722 - K0200 + 753, K0201 + 735 - K0201 + 772, K0201 + 857 - K0201 + 938, K0202 + 229 - K0202 + 247","amountPesos":150000000,"lengthMeters":1338.0,"ratePesosPerMeter":112107.62331838565,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535261"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Mactan Circumferential Rd ( S0020LP ) - K0015 + 076 - K0025 + 631, K0030 + 365 - K0034 + 775, Lapu - Lapu, Cebu","amountPesos":70900000,"lengthMeters":14965.0,"ratePesosPerMeter":4737.721349816238,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535262"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices, Informative Signs and Solar Lighting along Jct Dat - an - Carmen - Sierra Bullones - Pilar - Alicia Rd - K0075 + 000 - K0081 + 689","amountPesos":75000000,"lengthMeters":6689.0,"ratePesosPerMeter":11212.438331589176,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535263"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Bais - Kabankalan Rd - K0070+000 - K0071+000, K0075 + 459 - K0076 + 598, K0087 + 000 - K0088 + 054, K0090 + 000 - K0091 + 000, K0094 + 000 - K0095 + 585, K0100 + 201 - K0100+666","amountPesos":262539000,"lengthMeters":6243.0,"ratePesosPerMeter":42053.33974050937,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535265"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Cebu North Hagnaya Wharf Rd - K0009 + 205 - K0010 + 000","amountPesos":79740000,"lengthMeters":795.0,"ratePesosPerMeter":100301.88679245283,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535266"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Cebu North Hagnaya Wharf Rd - K0011 + 657 - K0012 + 497","amountPesos":52952000,"lengthMeters":840.0,"ratePesosPerMeter":63038.09523809524,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535267"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Cebu North Hagnaya Wharf Rd - K0018 + 000 - K0018 + 500, K0023 + 300 - K0024 + 000, K0031 + 454 - K0031 + 948","amountPesos":125820000,"lengthMeters":1694.0,"ratePesosPerMeter":74273.90791027155,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535268"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Cebu North Hagnaya Wharf Rd - K0015 + ( - 492 ) - K0015 + ( - 192 ) , K0021 + 860 - K0022 + 158, K0024 + 000 - K0024 + 795, K0029 + 328 - K0030 + 000","amountPesos":145590000,"lengthMeters":1765.0,"ratePesosPerMeter":82487.2521246459,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535269"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Cebu North Hagnaya Wharf Rd - K0047 + 849 - K0048 + 000, K0052 + 302 - K0052 + 356, K0052 + 491 - K0052 + 603,K0062+280 - K0062 + 342, K0063 + 610 - K0064 + 000, K0067 + 000 - K0068 + 000, K0072 + 710 - K0073 + 205, K0073 + 427 - K0073 + 694","amountPesos":96387000,"lengthMeters":2531.0,"ratePesosPerMeter":38082.57605689451,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535270"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Dumaguete North Rd ( Dumaguete - Jct Bais - Kabankalan ) - K0006 + 100 - K0006 + 1017, K0006 + 1078 - K0009 + 330, K0009 + 460 - K0010 + 395, K0010 + 440 - K0011 + 000","amountPesos":160555000,"lengthMeters":4664.0,"ratePesosPerMeter":34424.31389365352,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535271"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( SM ) ( Sn Isidro - Sn Juanico Br ) - K0810 + 134 - K0812 + 000, K0812 + 839 - K0813 + 120, K0813 + 600 - K0815 + 550, K0817 + 500 - K0817 + 648","amountPesos":344708000,"lengthMeters":4245.0,"ratePesosPerMeter":81203.29799764429,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535285"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( SM ) ( Sn Isidro - Sn Juanico Br ) - K0840 + 000 - K0840 + 200, K0846 + 081 - K0846 + 808","amountPesos":50179000,"lengthMeters":927.0,"ratePesosPerMeter":54130.52858683927,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535286"},{"year":2024,"category":"Roads","project":"Installation of Guardrails and Signage along Pagadian City - Zamboanga City Road, Sta. 1916 + 000 - Sta. 1938 + 062","amountPesos":10000000,"lengthMeters":22062.0,"ratePesosPerMeter":453.2680627322999,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535288"},{"year":2024,"category":"Roads","project":"Installation of Streetlights along Olutanga Circumferential Road - K1788 + 463 - K1791 + 000, K1792 + 800 - K1794 + 303, K1814 + 400 - K1815 + 500, K1817 + 000 - K1818 + 300, K1821 + 180 - K1821 + 685, K1841 + 000 - K1841 + 600","amountPesos":61000000,"lengthMeters":7545.0,"ratePesosPerMeter":8084.824387011266,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535289"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Dipolog - Oroquieta National Rd - K1801 + 404 - K1802 + 000, K1805 + 000 - K1805 + 219, K1807 + 000 - K1807 + 580, K1817 + 538 - K1817 + 747, K1826 + 1003 - K1827 + 1028, K1828 + 805 - K1829 + 557","amountPesos":65403000,"lengthMeters":3381.0,"ratePesosPerMeter":19344.27684117125,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535290"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Dipolog - Sindangan - Liloy Rd - K1848 + 060 - K1848 + 209, K1875 + 450 - K1877 + 000, K1883 + 400 - K1885 + 820, K1887 + 1028 - K1887 + 1963, K1887 + 2010 - K1890+307, K1900 + 000 - K1901 + 000, K1905 + 375 - K1906 + 955, K1906 +990 - K1908 + 000, K1920 + 787 - K1920 + 915, K1925 + 1003 - K1926 + 337, K1928 + 297 - K1929 + 005","amountPesos":272941000,"lengthMeters":11111.0,"ratePesosPerMeter":24564.935649356492,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535291"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Dipolog - Sindangan - Liloy Rd - K1885 + 820 - K1887 + 1028, K1877 + 636 - K1878 + 850, K1878 + 862 - K1879 + 000","amountPesos":166906000,"lengthMeters":3560.0,"ratePesosPerMeter":46883.70786516854,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535292"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Lanao - Pagadian - Zamboanga City Rd - K1724 + 180 - K1725 + 000, K1747 + 050 - K1747 + 150, K1747 + 195 - K1747 + 350, K1747 + 500 - K1747 + 558","amountPesos":54445000,"lengthMeters":1133.0,"ratePesosPerMeter":48053.83936451898,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535293"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Lanao - Pagadian - Zamboanga City Rd - K1767 + 608 - K1767 + 911, K1771 + 576 - K1771 + 894, K1789 + 000 - K1789 + 237, K1809 + 500 - K1810 + 000, K1812 + 458 - K1813 + 000, K1812 + 332 - K1812 + 458, K1814 + 000 - K1814 + 745, K1815 + 728 - K1816 + 275, K1845 + 000 - K1846 + 830","amountPesos":210080000,"lengthMeters":5148.0,"ratePesosPerMeter":40808.080808080806,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535294"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Pagadian City - Zamboanga City Rd - K1923 + 300 - K1923 + 695, K1922 + 763 - K1923 + 300, K1879 + 000 - K1880 + 000, K1882 + 000 - K1882 + 372","amountPesos":72500000,"lengthMeters":2304.0,"ratePesosPerMeter":31467.01388888889,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535295"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Sindangan - Liloy Rd - K1945 + 000 - K1946 + 000 , K1959 + 000 - K1959 + 679, K1962 + 000 - K1962 + 551, K1962 + 726 - K1963 + 836","amountPesos":79952000,"lengthMeters":3340.0,"ratePesosPerMeter":23937.724550898205,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535296"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Tucuran Jct - Karomatan Jct Rd - K1652 + 400 - K1652 + 500, K1652 + 900 - K1653 + 000, K1653 + 800 - K1653 + 900","amountPesos":10427000,"lengthMeters":300.0,"ratePesosPerMeter":34756.666666666664,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535297"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Pagadian City - Zamboanga City Rd - K1684 + 028 - K1684 + 300","amountPesos":8073000,"lengthMeters":272.0,"ratePesosPerMeter":29680.147058823528,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535300"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Pres. Diosdado P. Macapagal Nat'l Hi - way - K1725 + 000 - K1759 + 000","amountPesos":50000000,"lengthMeters":34000.0,"ratePesosPerMeter":1470.5882352941176,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535304"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Facilities ( Solar Lights ) along Davao - Bukidnon Rd - K1671 + 000 - K1675 + 430, Marilog District, Davao City","amountPesos":50000000,"lengthMeters":4430.0,"ratePesosPerMeter":11286.681715575622,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535305"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Facilities along Surigao - Davao Coastal Rd ( S01376MN ) - K1782 + 000 - K1785 + 000","amountPesos":50000000,"lengthMeters":3000.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535306"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Facilities along Surigao - Davao Coastal Rd ( S01376MN ) - K1785 + 000 - K1788 + 420","amountPesos":50000000,"lengthMeters":3420.0,"ratePesosPerMeter":14619.883040935672,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535307"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Davao - Bukidnon Rd - K1624 + 724 - K1625 + 321, K1625 + 773 - K1626 + 231,K1626 + 750 - K1627 + 168, K1627 + 558 - K1627 + 781, Marilog District, Davao City","amountPesos":50000000,"lengthMeters":1696.0,"ratePesosPerMeter":29481.132075471698,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535312"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( MN ) - K1391 + 856 - K1392 + 256","amountPesos":10457000,"lengthMeters":400.0,"ratePesosPerMeter":26142.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535315"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Street Lights at Specific Location along Makilala - Allah Valley Rd – K1622 + 000 – K1626 + 000, M’lang, North Cotabato","amountPesos":60592000,"lengthMeters":4000.0,"ratePesosPerMeter":15148.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535326"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Digos - Makar Rd - K1594 + 000 - K1595 + 000","amountPesos":21910000,"lengthMeters":1000.0,"ratePesosPerMeter":21910.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535327"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Marbel - Allah Valley - Cotabato Rd - K1810 + 1500 - K1812 + 900","amountPesos":58677000,"lengthMeters":1400.0,"ratePesosPerMeter":41912.142857142855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535330"},{"year":2024,"category":"Roads","project":"Installation of Signage - Warning, Advisory and Regulatory Signs, Pavement Markings, and Road Safety Barriers - Guardrails along Digos - Makar Rd - K1618 + 800 - K1619 + 000, Nagpan, Malungon, Sarangani","amountPesos":1320000,"lengthMeters":200.0,"ratePesosPerMeter":6600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535331"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Cotabato - Marbel Rd ( S00276MN ) - K1729 + 972 - K1731 + 084, Surallah, South Cotabato","amountPesos":9600000,"lengthMeters":1112.0,"ratePesosPerMeter":8633.093525179856,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535335"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Cotabato - Marbel Rd ( S00276MN ) - K1740 + 710 - K1741 + 706","amountPesos":8600000,"lengthMeters":996.0,"ratePesosPerMeter":8634.538152610441,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535336"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices / Facilities along Cotabato - Marbel Rd - K1712 + 800 - K1713 + 800, Barangay Paraiso, Koronadal, South Cotabato","amountPesos":11615000,"lengthMeters":1000.0,"ratePesosPerMeter":11615.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535338"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices / Facilities along Cotabato - Marbel Rd - K1731 + 700 - K1732 + 200, Barangay Dajay and Libertad, Surallah, South Cotabato","amountPesos":2490000,"lengthMeters":500.0,"ratePesosPerMeter":4980.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535339"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices / Facilities along Cotabato - Marbel Rd - K1741 + 900 - K1742 + 200, Barangay Poblacion, Sto. Niño, South Cotabato","amountPesos":1990000,"lengthMeters":300.0,"ratePesosPerMeter":6633.333333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535340"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Street Lights along Surigao - Davao Coastal Rd - K1162 + 000 - K1164 + 549, Bacuag, Surigao del Norte","amountPesos":56009000,"lengthMeters":2549.0,"ratePesosPerMeter":21972.930561004316,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535345"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Daang Maharlika ( Agusan - Davao Sect ) - K1367 + 000 - K1367 + 576, K1367 + 662 - K1367 + 685, K1367 + 788 - K1367 + 854, K1368 + 032 - K1368 + 228, K1372 + 000 - K1372 + 400, K1373 + 220 - K1374 + 475, K1374 + 519 - K1375 + 000, K1375 + 666 - K1376 + 840","amountPesos":249009000,"lengthMeters":4171.0,"ratePesosPerMeter":59700.07192519779,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535347"},{"year":2024,"category":"Roads","project":"Installation of Signage, Pavement Markings, and Pedestrian Fencing along South Super H - way East Service Road ( S03296LZ ) - K0021 + 561 - K0022 + 545, Muntinlupa City, Metro Manila","amountPesos":3535000,"lengthMeters":984.0,"ratePesosPerMeter":3592.479674796748,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535349"},{"year":2024,"category":"Roads","project":"Installation / Application of Signage and Pavement Markings along C - 3 Road - K0007 + 070 - K0007 + 789, Barangay Northbay, Navotas City","amountPesos":780000,"lengthMeters":719.0,"ratePesosPerMeter":1084.8400556328234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535355"},{"year":2024,"category":"Roads","project":"Installation / Application of Signage - Warning, Advisory and Regulatory Signs and Pavement Markings along Amang Rodriquez Road ( S03984LZ ) - K0018 + 655 - K0019 + 621, Pasig","amountPesos":743000,"lengthMeters":966.0,"ratePesosPerMeter":769.1511387163561,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535356"},{"year":2024,"category":"Roads","project":"Installation / Application of Signage - Warning, Advisory and Regulatory Signs, Pavement Markings, and Pedestrian Island along Manila East Road ( Rosario - Cainta Road ) ( S03919LZ ) - K0015 + 847 - K0016 + 920, Pasig City","amountPesos":1085000,"lengthMeters":1073.0,"ratePesosPerMeter":1011.1835973904939,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535366"},{"year":2024,"category":"Roads","project":"Installation / Application of Signage - Warning, Advisory and Regulatory Signs, Pavement Markings, and Road Safety Barriers along Marcos Highway ( S03870LZ ) - K0014 + 1280 - K0016 + 286","amountPesos":1647000,"lengthMeters":1006.0,"ratePesosPerMeter":1637.1769383697813,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535367"},{"year":2024,"category":"Roads","project":"Installation / Application of Signage - Warning, Advisory and Regulatory Signs, Pavement Markings, and Road Safety Barriers along Pasig Boulevard ( S04525LZ ) - K0013 + 009 - K0014 + 067, Pasig City","amountPesos":988000,"lengthMeters":1058.0,"ratePesosPerMeter":933.8374291115312,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535368"},{"year":2024,"category":"Roads","project":"Installation / Application of Signage - Warning, Advisory and Regulatory Signs, Pavement Markings, Pedestrian Fencing, and Channelization along C - 5 Road ( S03938LZ ) - K0015 + 773 - K0016 + 756, Taguig","amountPesos":1421000,"lengthMeters":983.0,"ratePesosPerMeter":1445.5747711088504,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535369"},{"year":2024,"category":"Roads","project":"Installation / Application of Signage - Warning, Advisory and Regulatory Signs and Pavement Markings along South Super Highway East Service Road ( S03359LZ ) - K0012 + 600 - K0013 + 603, Taguig","amountPesos":960000,"lengthMeters":1003.0,"ratePesosPerMeter":957.1286141575275,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535371"},{"year":2024,"category":"Roads","project":"Installation / Application of Signage, Pavement Markings, Zebra Pedestrian Crossing, and Improve Sight Distance - Clear Obstruction along Polo - Novaliches Road - K0014 + 868 - K0016 + 100, Maysan, Valenzuela City","amountPesos":3750000,"lengthMeters":1232.0,"ratePesosPerMeter":3043.8311688311687,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535377"},{"year":2024,"category":"Roads","project":"Installation of Signage - Warning, Advisory and Regulatory Signs, Pavement Markings and Improve Sight Distance - Clear Obstruction along Quirino Highway - K0021 + 405 - K0022 + 435, Fairview, Quezon City, Metro Manila","amountPesos":1300000,"lengthMeters":1030.0,"ratePesosPerMeter":1262.1359223300972,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535393"},{"year":2024,"category":"Roads","project":"Installation of Signage - Warning, Advisory and Regulatory Signs, Pavement Markings, and Zebra Pedestrian Crossing along Quirino Highway - K0017 + 157 - K0018 + 180, Novaliches, Quezon City, Metro Manila","amountPesos":1640000,"lengthMeters":1023.0,"ratePesosPerMeter":1603.128054740958,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535394"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Pres Quirino Ave - K0004 + 170 - K0004 + 522","amountPesos":20587000,"lengthMeters":352.0,"ratePesosPerMeter":58485.795454545456,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535408"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Manila North Rd ( S01366LZ ) - K0020 + 810 - K0022+060","amountPesos":29001000,"lengthMeters":1250.0,"ratePesosPerMeter":23200.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535504"},{"year":2024,"category":"Roads","project":"Installation of Solar Street Lights and Road Safety Devices along Pangasinan - La Union Inter - Provl Rd - K0380 + 206 - K0381 + 204","amountPesos":4000000,"lengthMeters":998.0,"ratePesosPerMeter":4008.0160320641285,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535442"},{"year":2024,"category":"Roads","project":"Installation of Pavement Markings along Apayao - Ilocos Norte Road - K0609 + 000 - K0613 + 000 - Kabugao, Apayao","amountPesos":5500000,"lengthMeters":4000.0,"ratePesosPerMeter":1375.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535446"},{"year":2024,"category":"Roads","project":"Installation of Pavement Markings along Conner - Kabugao Road - K0577 + 369 - K0589 + 497, Conner and Kabugao, Apayao","amountPesos":4500000,"lengthMeters":12128.0,"ratePesosPerMeter":371.042216358839,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535447"},{"year":2024,"category":"Roads","project":"Installation of Pavement Markings along Conner - Kabugao Road - K0589 + 497 - K0606 + 005 - Kabugao, Apayao","amountPesos":5600000,"lengthMeters":16508.0,"ratePesosPerMeter":339.2294645020596,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535448"},{"year":2024,"category":"Roads","project":"Installation of Pavement Markings along Kabugao - Pudtol - Luna - Cagayan Boundary Road - K0592 + 000 - K0605 + 536 - Kabugao, Apayao","amountPesos":6650000,"lengthMeters":13536.0,"ratePesosPerMeter":491.28250591016547,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535449"},{"year":2024,"category":"Roads","project":"Installation of Pavement Markings and Traffic Signage along Abbut - Conner Road - K0540 + 000 - K0565 + 855, Conner, Apayao","amountPesos":8000000,"lengthMeters":25855.0,"ratePesosPerMeter":309.4179075614001,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535450"},{"year":2024,"category":"Roads","project":"Installation of Traffic Signage along Conner - Kabugao Road - K0566 + 081 - K0589 + 156, Conner and Kabugao, Apayao","amountPesos":4470000,"lengthMeters":23075.0,"ratePesosPerMeter":193.71614301191767,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535451"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along National Road Network, Gov. Bado Dangwa National Road ( S00399LZ ) - K0279 + 000 - K0295 + 000 ( I.S. ) , Kapangan, Benguet","amountPesos":4385000,"lengthMeters":16000.0,"ratePesosPerMeter":274.0625,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535455"},{"year":2024,"category":"Roads","project":"Application of Pavement Markings along Baguio - Bontoc Road - K0262 + 000 - K0263 + 183, Barangay Caponga, Tublay, Benguet","amountPesos":2700000,"lengthMeters":1183.0,"ratePesosPerMeter":2282.333051563821,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535456"},{"year":2024,"category":"Roads","project":"Installation of Road Signs and Pavement Markings along Nueva Vizcaya - Ifugao - Mt. Province Road - K0300 + 300 - K0301 + 300, Barangay Nayon, Lamut, Ifugao","amountPesos":850000,"lengthMeters":1000.0,"ratePesosPerMeter":850.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535458"},{"year":2024,"category":"Roads","project":"Installation of Signage - Warning and Regulatory Signs, Pavement Markings, and Street Lights along Santiago - Tuguegarao Road ( S00760LZ ) - K0383 + 080 - K0384 + 046, Barangay San Placido, Roxas, Isabela","amountPesos":1362000,"lengthMeters":966.0,"ratePesosPerMeter":1409.9378881987577,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535461"},{"year":2024,"category":"Roads","project":"Construction / Installation / Application of Signage, Pavement Markings, and Sidewalk along Jct. Ipil - Quirino Boundary Road - K0364 + 493 - K0365 + 425, Barangay Masaya, San Agustin, Isabela","amountPesos":5390000,"lengthMeters":932.0,"ratePesosPerMeter":5783.261802575107,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535464"},{"year":2024,"category":"Roads","project":"Construction / Installation / Application of Signage, Pavement Markings, and Sidewalk along Santiago - Baluarte - Quirino Boundary Road - K0327 + 543 - K0328 + 543, Barangay Baluarte, Santiago, Isabela","amountPesos":5560000,"lengthMeters":1000.0,"ratePesosPerMeter":5560.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535465"},{"year":2024,"category":"Roads","project":"Installation / Application of Signage and Pavement Markings along Santiago - Baluarte - Quirino Boundary Road - K0326 + 200 - K0327 + 223, Barangay Calaocan, Santiago City, Isabela","amountPesos":2110000,"lengthMeters":1023.0,"ratePesosPerMeter":2062.5610948191597,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535470"},{"year":2024,"category":"Roads","project":"Installation / Application of Signage - Warning, Advisory and Regulatory Signs and Pavement Markings along Daang Maharlika, Nueva Vizcaya - Ifugao Road - K0283 + 891 - K0284 + 883, Nueva Vizcaya","amountPesos":1880000,"lengthMeters":992.0,"ratePesosPerMeter":1895.1612903225807,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535483"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Jose Abad Santos Ave ( JASA ) ( S01254LZ ) - K0100 + 309 - K0101 + 250, Barangay Santa Isabel ( Tabacan ) , Dinalupihan, Bataan","amountPesos":4200000,"lengthMeters":941.0,"ratePesosPerMeter":4463.336875664187,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535490"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Jose Abad Santos Ave ( JASA ) ( S01254LZ ) - K0102 + 125 - K0103 + 118, Barangay San Ramon, Dinalupihan, Bataan","amountPesos":4200000,"lengthMeters":993.0,"ratePesosPerMeter":4229.607250755287,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535491"},{"year":2024,"category":"Roads","project":"Installation of Road Lighting along Santa Maria - Norzagaray Road K0035 + 200 - K0038 + 500, Santa Maria, Bulacan","amountPesos":50000000,"lengthMeters":3300.0,"ratePesosPerMeter":15151.515151515152,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535503"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Manila North Rd ( S01366LZ ) - K0022 + 190 - K0022 + 1881, Barangay Abangan Sur, Marilao, Bulacan","amountPesos":21238000,"lengthMeters":1691.0,"ratePesosPerMeter":12559.432288586635,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535505"},{"year":2024,"category":"Roads","project":"Installation of Solar Streetlights along Gen. Alejo Santos Highway - K0060 + 560 - K0063 + 000","amountPesos":25000000,"lengthMeters":2440.0,"ratePesosPerMeter":10245.901639344262,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535506"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Nueva Ecija - Pangasinan Rd ( S00907LZ ) - K0151 + 738 - K0152 + 746, Barangay Abar 1st, San Jose, Nueva Ecija","amountPesos":10980000,"lengthMeters":1008.0,"ratePesosPerMeter":10892.857142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535507"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Nueva Ecija - Aurora Rd ( S06083LZ ) - K0129 + 982 - K0130 + 987, Caimito, Palayan City, Nueva Ecija","amountPesos":9310000,"lengthMeters":1005.0,"ratePesosPerMeter":9263.681592039802,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535509"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Manila North Rd ( S04206LZ ) - K0085 + 573 - K0086 + 345, Barangay Dau, Mabalacat, Pampanga","amountPesos":9884000,"lengthMeters":772.0,"ratePesosPerMeter":12803.108808290155,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535514"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Manila North Rd ( S04206LZ ) - K0089 + 550 - K0090 + 549, Barangay Mabiga, Mabalacat, Pampanga","amountPesos":11580000,"lengthMeters":999.0,"ratePesosPerMeter":11591.591591591592,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535515"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Manila North Rd ( S04206LZ ) - K0091 + 540 - K0092 + 542, Barangay San Francisco, Mabalacat, Pampanga","amountPesos":7000000,"lengthMeters":1002.0,"ratePesosPerMeter":6986.027944111776,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535516"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Manila North Rd ( S04206LZ ) - K0095 + 597 - K0096 + 618, Tabun, Mabalacat, Pampanga","amountPesos":14770000,"lengthMeters":1021.0,"ratePesosPerMeter":14466.20959843291,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535517"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Manila North Rd K0094 + 375 - K0095 + 377, Dolores, Mabalacat, Pampanga","amountPesos":14770000,"lengthMeters":1002.0,"ratePesosPerMeter":14740.518962075848,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535518"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Manila North Rd ( S00978LZ ) - K0106 + 264 - K0107 + 260, Santo Domingo 1st, Capas, Tarlac","amountPesos":3580000,"lengthMeters":996.0,"ratePesosPerMeter":3594.377510040161,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535521"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Olongapo - Bugallon Rd ( S01086LZ ) - K0162 + 426 - K0163 + 422, Barangay Libertad ( Poblacion ) , San Narciso, Zambales","amountPesos":11630000,"lengthMeters":996.0,"ratePesosPerMeter":11676.706827309237,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535534"},{"year":2024,"category":"Roads","project":"Installation of Solar Lights along Olongapo - Bugallon Road - K0170 + 359 - K0172 + 025, San Felipe, Zambales","amountPesos":6000000,"lengthMeters":1666.0,"ratePesosPerMeter":3601.4405762304923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535535"},{"year":2024,"category":"Roads","project":"Installation / Application of Signage and Pavement Markings along Olonggapo - Bugallon Road - K0202 + 700 - K0203 + 100, Iba, Zambales","amountPesos":720000,"lengthMeters":400.0,"ratePesosPerMeter":1800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535537"},{"year":2024,"category":"Roads","project":"Installation / Application of Signage and Pavement Markings along Olonggapo - Bugallon Road - K0233 + 400 - K0234 + 000, Masinloc, Zambales","amountPesos":720000,"lengthMeters":600.0,"ratePesosPerMeter":1200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535538"},{"year":2024,"category":"Roads","project":"Installation / Application of Signage and Pavement Markings along Olonggapo - Bugallon Road - K0234 + 200 - K0234 + 800, Baloganon, Masinloc, Zambales","amountPesos":920000,"lengthMeters":600.0,"ratePesosPerMeter":1533.3333333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535539"},{"year":2024,"category":"Roads","project":"Installation / Application of Signage and Pavement Markings along San Marcelino - San Antonio - San Narciso Road - K0162 + 400 - K0163 + 382, Antipolo, Poblacion, San Antonio, Zambales","amountPesos":720000,"lengthMeters":982.0,"ratePesosPerMeter":733.1975560081466,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535540"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Manila - Batangas Rd - K0096 + 000 - K0096 + 160, K0100 + 450 - K0100 + 600, K0101 + 000 - K0101 + 450, K0102 + 000 - K0104 + 100, Batangas City, Batangas","amountPesos":4160000,"lengthMeters":2860.0,"ratePesosPerMeter":1454.5454545454545,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535547"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Manila - Batangas Road - K0064 + 300 - K0065 + 300, Darasa, Tanauan City, Batangas","amountPesos":2770000,"lengthMeters":1000.0,"ratePesosPerMeter":2770.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535550"},{"year":2024,"category":"Bridges","project":"Construction of Pedestrian Overpass - Juanito Remulla Sr. Road ( S01913LZ ) - K0039 + 400 - K0039 + 500","amountPesos":20000000,"lengthMeters":100.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535558"},{"year":2024,"category":"Bridges","project":"Construction of Pedestrian Overpass - Noveleta - Rosario Diversion Road - K0028 + 000 - K0029 + 000","amountPesos":23080000,"lengthMeters":1000.0,"ratePesosPerMeter":23080.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535560"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Tagaytay - Batangas via Tuy Rd - K0061 + 000 - K0062 + 000, Mendez Crossing East, Tagaytay City Cavite","amountPesos":2300000,"lengthMeters":1000.0,"ratePesosPerMeter":2300.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535563"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Tagaytay - Manila via Silang Rd - K0056 + 100 - K0057 + 100, Tagaytay City Cavite","amountPesos":1770000,"lengthMeters":1000.0,"ratePesosPerMeter":1770.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535565"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Calamba - Sta Cruz - Famy Jct Rd - K0082 + 433 - K0083 + 437","amountPesos":1250000,"lengthMeters":1004.0,"ratePesosPerMeter":1245.019920318725,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535570"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Calamba - Sta Cruz - Famy Jct Rd - K0083 + 607 - K0084 + 615","amountPesos":860000,"lengthMeters":1008.0,"ratePesosPerMeter":853.1746031746031,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535571"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Paete - Famy Pob Rd - K0111 + 392 - K0112 + 422","amountPesos":730000,"lengthMeters":1030.0,"ratePesosPerMeter":708.7378640776699,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535572"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Sn Pablo - Calauan Rd - K0075 + 000 - K075 + 500, Barangay Balayha, Calauan, Laguna","amountPesos":860000,"lengthMeters":500.0,"ratePesosPerMeter":1720.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535579"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices ( Road Roller Barriers ) along Pagbilao - Dalahican Port Road - K0140 + 600 - K0141 + 400 ( Intermittent Section )","amountPesos":100000000,"lengthMeters":800.0,"ratePesosPerMeter":125000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535587"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Gumaca - Pitogo - Mulanay - Sn Narciso Rd - K0273 + 500 - K0274 + 000, Barangay Ajos, Mulanay, Quezon","amountPesos":880000,"lengthMeters":500.0,"ratePesosPerMeter":1760.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535589"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices, Road Signs and Pavement Markings along Catanauan - Buenavista Rd - K0265 + 000 - K0288 + 000","amountPesos":15000000,"lengthMeters":23000.0,"ratePesosPerMeter":652.1739130434783,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535590"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices, Road Signs and Pavement Markings along P Burgos - Pototanin Jct - K0188 + 000 - K0203 + 490","amountPesos":15000000,"lengthMeters":15490.0,"ratePesosPerMeter":968.3666881859264,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535592"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Quirino H - way - K0262 + 088 - K0262 + 360, K0264 + 650 - K0264 + 800, K0267 + 530 - K0267 + 680, K0269 + 200 - K0269 + 270, K0271 + 000 - K0271 + 348","amountPesos":30832000,"lengthMeters":990.0,"ratePesosPerMeter":31143.434343434343,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535596"},{"year":2024,"category":"Roads","project":"Installation / Application / Construction of Signage Warning, Advisory and Regulatory Signs, and Pavement Markings along Marinduque Circumferential Road ( S00001MQ ) - K0105 + 000 - K0119 + 000, Gasan to Boac, Marinduque","amountPesos":6086000,"lengthMeters":14000.0,"ratePesosPerMeter":434.7142857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535609"},{"year":2024,"category":"Roads","project":"Installation / Application / Construction of Signage Warning, Advisory and Regulatory Signs, and Pavement Markings along Marinduque Circumferential Road ( S00001MQ ) - K0000 + 000 - K0012 + 000, Boac to Mogpog, Marinduque","amountPesos":5820000,"lengthMeters":12000.0,"ratePesosPerMeter":485.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535610"},{"year":2024,"category":"Roads","project":"Installation / Construction of Street Lights, along Calapan South Road - K0061 + 935 - K0062 + 926, Socorro, Mindoro Oriental","amountPesos":10736000,"lengthMeters":991.0,"ratePesosPerMeter":10833.501513622603,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535613"},{"year":2024,"category":"Roads","project":"Installation of Roadway Lighting Structures along Calapan South Road - K0000 + 000 - K0007 + 400, Calapan City Oriental Mindoro","amountPesos":76000000,"lengthMeters":7400.0,"ratePesosPerMeter":10270.27027027027,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535614"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Calapan South Rd - K0053 + 378 - K0053 + 511,Socorro, Oriental Mindoro","amountPesos":4790000,"lengthMeters":133.0,"ratePesosPerMeter":36015.03759398496,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535617"},{"year":2024,"category":"Roads","project":"Construction / Installation / Application of Signage, Pavement Markings, Shoulder Sealing, and Metal Guardrail along Puerto Prinsesa North Road - K0128 + 700 - K0129 + 700","amountPesos":4150000,"lengthMeters":1000.0,"ratePesosPerMeter":4150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535618"},{"year":2024,"category":"Roads","project":"Construction / Installation / Application of Signage, Pavement Markings, Shoulder Sealing, Metal Guardrail, and Roadside Barrier along Puerto Prinsesa North Road - K0142 + 000 - K0143 + 000","amountPesos":8870000,"lengthMeters":1000.0,"ratePesosPerMeter":8870.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535619"},{"year":2024,"category":"Roads","project":"Construction / Installation / Application of Signage, Pavement Markings, Shoulder Sealing, Metal Guardrail, and Street Lights along Puerto Prinsesa North Road - K132 + 550 - K0133 + 200","amountPesos":3070000,"lengthMeters":650.0,"ratePesosPerMeter":4723.076923076923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535620"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices, Puerto Princesa North Rd - K0114 + 000 - K0115 + 000","amountPesos":25000000,"lengthMeters":1000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535621"},{"year":2024,"category":"Roads","project":"Construction / Installation / Application of Signage, Install Zebra Pedestrian Crossing ( Low Speed Roads ) and Intended Parking, Ban Parking, Intended Bus / Jeepney Stop, Relocate Bus / Jeepney Stop along Puerto Princesa South Rd - K0091 + 300 - K0091 + 700","amountPesos":3740000,"lengthMeters":400.0,"ratePesosPerMeter":9350.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535622"},{"year":2024,"category":"Roads","project":"Installation of Signage - Warning, Advisory and Regulatory Signs, Pavement Markings - Centerlines, Edge lines ( including Profile Edge Lines ) and Indented Parking, Ban Parking, Indented Bus / Jeepney Stop, Relocate Bus / Jeepney Stop along Calapan South Road - K0069 + 000 - K0069 + 600, Brgy. Marfrancisco, Pinamalayan, Oriental Mindoro","amountPesos":490000,"lengthMeters":600.0,"ratePesosPerMeter":816.6666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535625"},{"year":2024,"category":"Roads","project":"Installation of Signage - Warning, Advisory and Regulatory Signs, Pavement Markings - Pedestrian and Pedestrian Fencing along Calapan South Road - K0067 + 000 - K0068 + 000, Pinamalayan, Oriental, Mindoro","amountPesos":1050000,"lengthMeters":1000.0,"ratePesosPerMeter":1050.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535626"},{"year":2024,"category":"Roads","project":"Installation / Application / Construction of Signage - Warning, Advisory and Regulatory Signs and Pavement Markings - Centerlines, Edge lines ( including Profile Edge Lines ) along Calapan South Road - K0075 + 000 - K0076 + 000, Brgy. Bulaklakan, Gloria, Mindoro Oriental","amountPesos":1630000,"lengthMeters":1000.0,"ratePesosPerMeter":1630.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535631"},{"year":2024,"category":"Roads","project":"Intervention / Countermeasures of Blackspot Identified Locations along Calapan South Road, Bongabong, Oriental Mindoro, Calapan South Rd - K0102 + 000 - K0104 + 000","amountPesos":2161000,"lengthMeters":2000.0,"ratePesosPerMeter":1080.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535632"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Daang Maharlika Rd ( LZ ) ( S03784LZ ) - K0325 + 678 - K0326 + 633, Labo, Camarines Norte","amountPesos":3750000,"lengthMeters":955.0,"ratePesosPerMeter":3926.7015706806283,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535642"},{"year":2024,"category":"Roads","project":"Installation of Signage - Warning, Advisory and Regulatory Signs and Pavement Markings along Rolando A Andaya Highway - K0309 + 000 - K0310 + 000, Barangay Liboro, Ragay, Camarines Sur","amountPesos":1120000,"lengthMeters":1000.0,"ratePesosPerMeter":1120.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535646"},{"year":2024,"category":"Roads","project":"Installation of Signage - Warning, Advisory and Regulatory Signs and Pavement Markings along Rolando A Andaya Highway - K0328 + 000 - K0329 + 000, Barangay Colacling ( Del Rosario ) , Lupi, Camarines Sur","amountPesos":1280000,"lengthMeters":1000.0,"ratePesosPerMeter":1280.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535647"},{"year":2024,"category":"Roads","project":"Installation of Signage - Warning, Advisory and Regulatory Signs and Pavement Markings along Rolando A Andaya Highway - K0338 + 100 - K0339 + 100, Barangay Gaongan, Sipocot, Camarines Sur","amountPesos":1020000,"lengthMeters":1000.0,"ratePesosPerMeter":1020.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535648"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Daang Maharlika LZ ( S03493LZ ) - K0445 + 806 - K0446 + 815, Pili, Camarines Sur","amountPesos":2000000,"lengthMeters":1009.0,"ratePesosPerMeter":1982.1605550049555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535652"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Daang Maharlika Rd ( LZ ) ( S03493LZ ) - K0448 + 347 - K0449 + 349, Pili, Camarines Sur","amountPesos":4000000,"lengthMeters":1002.0,"ratePesosPerMeter":3992.015968063872,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535653"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Daang Maharlika Rd ( LZ ) ( S03493LZ ) - K0450 + 989 - K0451 + 988, Pili, Camarines Sur","amountPesos":4000000,"lengthMeters":999.0,"ratePesosPerMeter":4004.004004004004,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535654"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Baao - Iriga City - Nabua Rd ( S03543LZ ) - K0470 + 916 - K0471 + 815, Iriga City, Camarines Sur","amountPesos":8000000,"lengthMeters":899.0,"ratePesosPerMeter":8898.77641824249,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535657"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Street Luminaires along Jct Tawad - Balud Rd ( S00023MT ) - K0055 + 000 - K0058 + 000","amountPesos":40000000,"lengthMeters":3000.0,"ratePesosPerMeter":13333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535663"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Street Luminaires along Masbate - Cataingan - Placer Rd ( S00005MT ) - K0004 + 000 - K0007 + 000","amountPesos":30000000,"lengthMeters":3000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535664"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Street Luminaires along Masbate - Milagros Rd ( S00015MT ) - K0024 + 000 - K0025 + 000","amountPesos":30000000,"lengthMeters":1000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535665"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Lagta - Crossing Malinta Rd - K0099 + 225.60 - K0099 + 925","amountPesos":32632000,"lengthMeters":699.4,"ratePesosPerMeter":46657.13468687485,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535666"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Daang Maharlika Rd ( LZ ) ( S03732LZ ) - K0542 + 000 - K0553 + 000, Castilla, Sorsogon","amountPesos":2280000,"lengthMeters":11000.0,"ratePesosPerMeter":207.27272727272728,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535672"},{"year":2024,"category":"Roads","project":"Installation of Solar Streetlights along along Iloilo - Antique Road ( S00338PN ) - K0088 + 000 - K0089 + 000, Barangay Caridad, Hamtic, Antique","amountPesos":1060000,"lengthMeters":1000.0,"ratePesosPerMeter":1060.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535677"},{"year":2024,"category":"Roads","project":"Installation of Solar Streetlights along Iloilo - Antique Road ( S00338PN ) - K0095 + 400 - K0098 + 260, San Jose, Antique","amountPesos":6645000,"lengthMeters":2860.0,"ratePesosPerMeter":2323.426573426573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535678"},{"year":2024,"category":"Roads","project":"Installation of Signage - Warning, Advisory and Regulatory Signs, Pavement Markings, and Pedestrian Fencing along Mandurriao - Pakiad Road ( S00084PN ) - K0006 + 511 - K0007 + 515, Barangay Calajunan, Iloilo City","amountPesos":1062000,"lengthMeters":1004.0,"ratePesosPerMeter":1057.768924302789,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535690"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices along Jct Bagonawa - La Castellana - Isabela Rd K0064 + 000 - K0064 + 718, and Jct Pontevedra - La Castellana Rd - K0062 + 038 - K0062 + 443, La Castellana, Negros Occidental","amountPesos":25000000,"lengthMeters":1123.0,"ratePesosPerMeter":22261.79875333927,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535693"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Bacolod South Rd - K0088 + 235 - K0088 + 304","amountPesos":5999000,"lengthMeters":69.0,"ratePesosPerMeter":86942.02898550725,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535696"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Tagbilaran North Rd ( Tagbilaran - Jetafe Sect ) - K0055 + 326 - K0055 + 696","amountPesos":8669000,"lengthMeters":370.0,"ratePesosPerMeter":23429.72972972973,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535701"},{"year":2024,"category":"Roads","project":"Installation of Signage and Pavement Markings along Jct. ( LIR ) Carmen - Sagbayan - Bacani Road ( S00101BH ) - K0178 + 000 - K0179 + 000, Sagbayan, Bohol","amountPesos":634000,"lengthMeters":1000.0,"ratePesosPerMeter":634.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535702"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Tagbilaran North Rd ( Tagbilaran - Jetafe Sect ) - K0062+342 - K0062 + 535, K0062 + 591 - K0062 + 710","amountPesos":31487000,"lengthMeters":312.0,"ratePesosPerMeter":100919.8717948718,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535704"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Jct ( TER ) - Jagna - Sierra Bullones Rd - K0077 + 000 - K0077 + 050","amountPesos":2432000,"lengthMeters":50.0,"ratePesosPerMeter":48640.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535705"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices, Informative Signs and Solar Lighting along Jct Dat - an - Carmen - Sierra Bullones - Pilar - Alicia Rd - K0070 + 000 - K0078 + 000","amountPesos":100000000,"lengthMeters":8000.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535706"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices, Informative Signs and Solar Lighting along Jct. ( TER ) Jagna - Sierra Bullones Road, K063+478 - K0070 + 000","amountPesos":100000000,"lengthMeters":6522.0,"ratePesosPerMeter":15332.720024532353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535707"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices, Informative Signs and Solar Lighting along Jct Dat - an - Carmen - Sierra Bullones - Pilar - Alicia Rd - K0081 + 869 - K0092 + 000","amountPesos":100000000,"lengthMeters":10131.0,"ratePesosPerMeter":9870.693909781858,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535708"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Cebu North Hagnaya Wharf Rd ( S00163CB ) - K0015 + 213 - K0016 + 213, Liloan, Cebu","amountPesos":8670000,"lengthMeters":1000.0,"ratePesosPerMeter":8670.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535715"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Cebu North Hagnaya Wharf Rd ( S00163CB ) - K0028 + 324 - K0029 + 328, Danao City, Cebu","amountPesos":8650000,"lengthMeters":1004.0,"ratePesosPerMeter":8615.537848605578,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535716"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Cebu North Hagnaya Wharf Rd ( S00163CB ) - K0030 + 000 - K0031 + 000, Danao City, Cebu","amountPesos":8650000,"lengthMeters":1000.0,"ratePesosPerMeter":8650.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535717"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Cebu North Hagnaya Wharf Rd ( S00249CB ) - K0036 + 305 - K0037 + 305, Danao City, Cebu","amountPesos":14910000,"lengthMeters":1000.0,"ratePesosPerMeter":14910.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535718"},{"year":2024,"category":"Roads","project":"Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads along Cebu North Hagnaya Wharf Rd - K0062 + 000 - K0062 + 280, K0073 + 802 - K0073+960","amountPesos":17140000,"lengthMeters":438.0,"ratePesosPerMeter":39132.4200913242,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535719"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Mactan Circumferential Rd ( S0020LP ) - K0014 + 073 - K0015 + 076, Lapu - Lapu, Cebu","amountPesos":14610000,"lengthMeters":1003.0,"ratePesosPerMeter":14566.301096709873,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535720"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Mactan Circumferential Rd ( S0020LP ) - K0034 + 775 - K0035 + 702, Lapu - Lapu, Cebu","amountPesos":14490000,"lengthMeters":927.0,"ratePesosPerMeter":15631.067961165048,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535722"},{"year":2024,"category":"Roads","project":"Installation / Application / Construction of Signage - Warning, Advisory and Regulatory Signs, Pavement Markings, and Pedestrian Fencing along Jct Polo - Dapitan Park National Road - K1827 + 600 - K1830 + 355, Dapitan, Zamboanga del Norte","amountPesos":1200000,"lengthMeters":2755.0,"ratePesosPerMeter":435.5716878402904,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535751"},{"year":2024,"category":"Roads","project":"Installation / Application of Concrete Barriers with Complete Road Traffic Devices along Jct. Aurora - Monte Alegre - Labangan - K1649 + 250 - K1650 + 466, Zamboanga del Sur","amountPesos":10000000,"lengthMeters":1216.0,"ratePesosPerMeter":8223.684210526315,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535760"},{"year":2024,"category":"Roads","project":"Installation / Application of Signage and Pavement Markings along Jct. SH - Manolo Fortich - Libona - Indahag Road - K1481 + 000 - K1482 + 000, Barangay Agusan Canyon, Manolo Fortich Bukidnon and Barangay Crossing, Libona, Bukidnon","amountPesos":1675000,"lengthMeters":1000.0,"ratePesosPerMeter":1675.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535762"},{"year":2024,"category":"Roads","project":"Installation / Application of Signage and Pavement Markings along Sayre Highway - K1468 + 000 - K01469 + 000, Barangay San Vicente, Sumilao, Bukidnon","amountPesos":1600000,"lengthMeters":1000.0,"ratePesosPerMeter":1600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535764"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Butuan City - Cagayan de Oro City - Iligan City Rd - K1442 + 086 - K1443 + 070, Cagayan De Oro City, Misamis Oriental","amountPesos":28500000,"lengthMeters":984.0,"ratePesosPerMeter":28963.414634146342,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535765"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Misamis Oriental - Ma. Cristina Bdry Rd - K1521 + 757 - K1522 + 753, Iligan City, Lanao del Norte","amountPesos":17500000,"lengthMeters":996.0,"ratePesosPerMeter":17570.281124497993,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535783"},{"year":2024,"category":"Roads","project":"Installation of Solar Lights along Malabang - Dobleston - Tukuran Road - K1991 + 276 - K1991 + 876","amountPesos":3860000,"lengthMeters":600.0,"ratePesosPerMeter":6433.333333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535788"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Butuan City - Cagayan de Oro City - Iligan City Rd - K1449 + 708 - K1450 + 814, El Salvador, Misamis Oriental","amountPesos":2610000,"lengthMeters":1106.0,"ratePesosPerMeter":2359.8553345388787,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535792"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Butuan City - Cagayan de Oro City - Iligan City Rd - K1414 + 140 - K1415 + 162, Villanueva, Misamis Oriental","amountPesos":12600000,"lengthMeters":1022.0,"ratePesosPerMeter":12328.767123287671,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535793"},{"year":2024,"category":"Roads","project":"Installation of Signage - Warning, Advisory and Regulatory Signs along Surigao del Sur Boundary Road - Davao Oriental Coastal Road - K1588 + 300 - K1589 + 300, Barangay Saoquigue, Baganga, Davao Oriental","amountPesos":670000,"lengthMeters":1000.0,"ratePesosPerMeter":670.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535799"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Facilities along Benigno S. Aquino Jr. National Highway - K1573 + 000 - K1577 + 910","amountPesos":50000000,"lengthMeters":4910.0,"ratePesosPerMeter":10183.299389002037,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535800"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Facilities along Benigno S. Aquino Jr. National Highway - K1579 + 000 - K1585 + 000","amountPesos":50000000,"lengthMeters":6000.0,"ratePesosPerMeter":8333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535801"},{"year":2024,"category":"Roads","project":"Installation of Signage - Warning, Advisory and Regulatory Signs along Surigao del Sur Boundary Road - Davao Oriental Coastal Road - K1648 + 350 - K1649 + 350, Barangay Central Poblacion, Manay, Davao Oriental","amountPesos":650000,"lengthMeters":1000.0,"ratePesosPerMeter":650.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535802"},{"year":2024,"category":"Roads","project":"Installation / Application / Construction of Signage and Pavement Markings, Paved Shoulders along Surigao del Sur Boundary Road - Davao Oriental Coastal Road - K1545 + 113.18 - K1545 + 763.18, Barangay San Rafael, Poblacion, Cateel, Davao Oriental","amountPesos":2410000,"lengthMeters":650.0,"ratePesosPerMeter":3707.6923076923076,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535803"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Davao - Cotabato Rd ( Jct Digos - Cotabato Sect ) ( S00791MN ) - K1692 + 971 - K1693 + 965, Midsayap, Cotabato","amountPesos":9300000,"lengthMeters":994.0,"ratePesosPerMeter":9356.136820925552,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535805"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Facilities along Davao - Cotabato Rd ( Jct Digos - Cotabato Sect ) ( S00682MN ) - K1603 + 955 - K1604 + 911, Makilala, Cotabato","amountPesos":2150000,"lengthMeters":956.0,"ratePesosPerMeter":2248.9539748953976,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535806"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices / Facilities along Midsayap - Marbel Rd - K1781 + 000 - K1782 + 000, Dumadalig, Tantangan, South Cotabato","amountPesos":1660000,"lengthMeters":1000.0,"ratePesosPerMeter":1660.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535812"},{"year":2024,"category":"Roads","project":"Installation / Application / Construction of Signage - Warning, Advisory and Regulatory Signs, Pavement Markings, and Median Island along Butuan City - Cagayan de Oro City - Iligan City Road ( Agusan - Misamis Or Rd ) ( S00421MN ) - K1244 + 360 - K1245 + 360, Barangay Libertad, Butuan City","amountPesos":870000,"lengthMeters":1000.0,"ratePesosPerMeter":870.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535830"},{"year":2024,"category":"Roads","project":"Installation / Application / Construction of Signage - Warning, Advisory and Regulatory Signs, Pavement Markings, Median Island, and Paved Shoulder along Butuan City - Cagayan de Oro City - Iligan City Road ( Agusan - Misamis Or Rd ) ( S00421MN ) - K1247 + 000 - K1248 + 000, Bancasi, Butuan City","amountPesos":5800000,"lengthMeters":1000.0,"ratePesosPerMeter":5800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535831"},{"year":2024,"category":"Roads","project":"Installation of Road Safety Devices and Street Lights along Surigao - Davao Coastal Rd - K1195 + 000 - K1197 + 000, Claver, Surigao del Norte","amountPesos":43590000,"lengthMeters":2000.0,"ratePesosPerMeter":21795.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 535833"},{"year":2024,"category":"Roads","project":"Construction of San Fernando - Lubao Road - K000071 + 040 - K0073 + 695","amountPesos":70000000,"lengthMeters":2655.0,"ratePesosPerMeter":26365.348399246705,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 539447"},{"year":2024,"category":"Roads","project":"Construction of Lalud - Garchitorena Road ( Bahi - Azon Section ) , Sta. 48 + 765 - Sta.50 + 765 ( Package 11 ) , Garchitorena, Camarines Sur","amountPesos":150000000,"lengthMeters":2000.0,"ratePesosPerMeter":75000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 539702"},{"year":2024,"category":"Roads","project":"Construction of Lalud - Garchitorena Road ( Sagrada Section ) Sta. 37 + 200 - Sta. 39 + 200 ( Package 8 ) , Garchitorena, Camarines Sur","amountPesos":150000000,"lengthMeters":2000.0,"ratePesosPerMeter":75000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 539704"},{"year":2024,"category":"Roads","project":"Construction of Lalud - Garchitorena Road ( Sagrada Section ) , Sta. 34 + 576 - Sta.36 + 200 ( Package 7 ) , Garchitorena, Camarines Sur","amountPesos":135000000,"lengthMeters":1624.0,"ratePesosPerMeter":83128.07881773399,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 539705"},{"year":2024,"category":"Roads","project":"Construction of Lalud - Garchitorena Road ( Sagrada Section ) , Sta. 40 + 200 - Sta.42 + 200 ( Package 9 ) , Garchitorena, Camarines Sur","amountPesos":150000000,"lengthMeters":2000.0,"ratePesosPerMeter":75000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 539706"},{"year":2024,"category":"Roads","project":"Construction of Road, along Brgy. Carolina, Can - avid - Dolores road, sta. 24 + 579 - 25 + 975","amountPesos":100000000,"lengthMeters":1396.0,"ratePesosPerMeter":71633.23782234958,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 539793"},{"year":2024,"category":"Roads","project":"Construction of Road, along Brgy. Carolina, Can - avid - Dolores road, sta. 25 + 975 - 27 + 371","amountPesos":100000000,"lengthMeters":1396.0,"ratePesosPerMeter":71633.23782234958,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 539794"},{"year":2024,"category":"Roads","project":"Construction of Road, along Brgy. Carolina, Can - avid - Dolores road, sta. 27 + 371 - 28 + 767","amountPesos":100000000,"lengthMeters":1396.0,"ratePesosPerMeter":71633.23782234958,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 539795"},{"year":2024,"category":"Roads","project":"Rehabilitation of Sitio Mumang to Sitio Igangan Road Km. 0 + 000 - Km. 1 + 000 Brgy,Tanduh Bagua, Patikul","amountPesos":10000000,"lengthMeters":1000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 539841"},{"year":2024,"category":"Roads","project":"Rehabilitation of Brgy Buansa to Laum Saing Road Km. 0 + 000 - Km. 1 + 000 Brgy, Kagay, Indanan","amountPesos":10000000,"lengthMeters":1000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 539852"},{"year":2024,"category":"Roads","project":"Construction of Road, Salaysayon - Jagimitan Road, ( Sta K1 + 570 - K6 + 070 ) Package 2, Nasipit, Agusan Del Nore","amountPesos":200000000,"lengthMeters":4500.0,"ratePesosPerMeter":44444.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 539977"},{"year":2024,"category":"Roads","project":"Construction of Concrete Road - Culandanum Road Phase 2, Station 0 + 585.00 - Station 1 + 611.00, Aborlan, Palawan","amountPesos":40000000,"lengthMeters":1026.0,"ratePesosPerMeter":38986.35477582846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 540539"},{"year":2024,"category":"Roads","project":"Improvement of Waterways and Construction of River Wall with Road Dike along Angat River, Bonga Mayor - Tibagan Section, K00 + 900 to K01 + 150, Bustos, Bulacan","amountPesos":100000000,"lengthMeters":250.0,"ratePesosPerMeter":400000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 543874"},{"year":2024,"category":"Roads","project":"Improvement of Waterways and Construction of River Wall with Road Dike along Angat River, Bonga Menor - Bonga Mayor Section, K00 + 600 to K00 + 850, Bustos, Bulacan","amountPesos":100000000,"lengthMeters":250.0,"ratePesosPerMeter":400000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 543875"},{"year":2024,"category":"Roads","project":"Improvement of Waterways and Construction of River Wall with Road Dike along Angat River, Bonga Menor Section, K00 + 300 to K00 + 550, Bustos, Bulacan","amountPesos":100000000,"lengthMeters":250.0,"ratePesosPerMeter":400000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 543876"},{"year":2024,"category":"Roads","project":"Improvement of Waterways and Construction of River Wall with Road Dike along Angat River, Tanawan - Bonga Menor Section, K00 + 000 to K00 + 250, Bustos, Bulacan","amountPesos":100000000,"lengthMeters":250.0,"ratePesosPerMeter":400000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 543877"},{"year":2024,"category":"Bridges","project":"Rehabilitation of Existing Dike along Maet Creek ( Left and Right Bank ) , D / S of Lara Bridge ( Phase V ) , Sta. 3 + 004.50 - Sta. 3 + 479.5, La Paz, Tarlac","amountPesos":100000000,"lengthMeters":475.0,"ratePesosPerMeter":210526.31578947368,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 543888"},{"year":2024,"category":"Roads","project":"Construction of Drainage along Sagbat - Pililla Diversion Road K0050 + 448 - K0052 + 000, Baras, Rizal","amountPesos":50000000,"lengthMeters":1552.0,"ratePesosPerMeter":32216.494845360823,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 544342"},{"year":2024,"category":"Roads","project":"Rehabilitation of Jolo - Kasanyangan Road Sta.0 + 400 - Sta.0 + 900","amountPesos":20000000,"lengthMeters":500.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 551125"},{"year":2024,"category":"Roads","project":"Rehabilitation of Jolo - Kasanyangan Road Sta.2 + 500 - Sta.3 + 900","amountPesos":50000000,"lengthMeters":1400.0,"ratePesosPerMeter":35714.28571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 551129"},{"year":2024,"category":"Roads","project":"Rehabilitation of Jolo - Pantao Road Sta.5 + 050 - Sta.6 + 800 ( with exception )","amountPesos":50000000,"lengthMeters":1750.0,"ratePesosPerMeter":28571.428571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 551130"},{"year":2024,"category":"Roads","project":"Rehabilitation of Indanan - Lapa Road, Sta. 18 + 900 - Sta. 20 + 300, Maimbung, Sulu","amountPesos":50000000,"lengthMeters":1400.0,"ratePesosPerMeter":35714.28571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 551141"},{"year":2024,"category":"Roads","project":"Rehabilitation of Pagsalipangan - Maimbung Road, Sta. 15 + 050 - Sta. 16 + 400, Maimbung, Sulu","amountPesos":50000000,"lengthMeters":1350.0,"ratePesosPerMeter":37037.03703703704,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 551142"},{"year":2024,"category":"Roads","project":"Rehabilitation of Indanan - Lapa Road Sta. 16 + 400 - Sta. 17 + 800, Maimbung, Sulu","amountPesos":40000000,"lengthMeters":1400.0,"ratePesosPerMeter":28571.428571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 551143"},{"year":2024,"category":"Roads","project":"Rehabilitation of Parang - Maimbung Road Sta. 32 + 650 - Sta. 34 + 800, Maimbung, Sulu","amountPesos":40000000,"lengthMeters":2150.0,"ratePesosPerMeter":18604.6511627907,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 551144"},{"year":2024,"category":"Roads","project":"Rehabilitation / Improvement of Pagsalipangan - Maimbung Road Sta. 11 + 550 - Sta. 13 + 550, Maimbung, Sulu","amountPesos":40000000,"lengthMeters":2000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 551145"},{"year":2024,"category":"Roads","project":"Rehabilitation of Junction Timbangan - Romandier Road Chainage 316 - 1316, Indanan, Sulu","amountPesos":50000000,"lengthMeters":1000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 551147"},{"year":2024,"category":"Roads","project":"Concreting 1Km Brgy. Road Purok 5 - 6, Brgy. Francfort, Amai Manabilang, Lanao del Sur","amountPesos":20000000,"lengthMeters":1000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 551150"},{"year":2024,"category":"Roads","project":"Construction of Road along Surigao Del Sur Boundary - Davao Oriental Coastal Road K1652 + 000 - K1655 + 000, Tagtalisay, Manay, Davao Oriental","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 551183"},{"year":2024,"category":"Roads","project":"Constrcution / Improvement Rehabilation of Drainage Along Noveleta - Rosario Road K00028 + 789 to k0029 + 210, Brgy. Bacao II , General Trias, Cavite","amountPesos":10000000,"lengthMeters":421.0,"ratePesosPerMeter":23752.969121140144,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 552076"},{"year":2024,"category":"Roads","project":"Concreting of Road from Barangay Crossing Rubber to Barangay Palian, Tupi, South Cotabato, Sta. 0 + 000 - 1 + 500","amountPesos":10000000,"lengthMeters":1500.0,"ratePesosPerMeter":6666.666666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 553228"},{"year":2024,"category":"Roads","project":"Rehabilitation of Slope Protection Structure along Ilocos Norte - Apayao Road, K0536 + 410 - K0536 + 430, Maananteng, Solsona, Ilocos Norte","amountPesos":6000000,"lengthMeters":20.0,"ratePesosPerMeter":300000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 555674"},{"year":2024,"category":"Roads","project":"Bakit - Bakit Jct - Umingan Road, K0177 + 000 - K0178 + 000, K0181 + 000 - K0182 + 000, K0186 + 024 - K0188 + 644, K0189 + 000 - K0192 + 077","amountPesos":100000000,"lengthMeters":7697.0,"ratePesosPerMeter":12992.074834351046,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575512"},{"year":2024,"category":"Roads","project":"Manila North Road - K0072 + 730 - K0074 + 500","amountPesos":240000000,"lengthMeters":1770.0,"ratePesosPerMeter":135593.22033898305,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575542"},{"year":2024,"category":"Roads","project":"Santa Maria - Norzagaray Road K0039 + 649 - K0040 + 000, K0040 + 000 - K0040 + 226, K0042 + 000 - K0042 + 836","amountPesos":100000000,"lengthMeters":1413.0,"ratePesosPerMeter":70771.40835102618,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575561"},{"year":2024,"category":"Roads","project":"Dipolog - Oroquieta National Road ( S01316MN ) K1797 + 680 - K1797 + 966, K1797 + 966 - K1798 + 150, K1798 + 150 - K1800 + 999, K1800 + 999 - K1801 + 202, K1801 + 202 - K1801 + 400","amountPesos":125000000,"lengthMeters":3720.0,"ratePesosPerMeter":33602.15053763441,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575649"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1451 + 925 - K1456 + 131","amountPesos":150000000,"lengthMeters":4206.0,"ratePesosPerMeter":35663.33808844508,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575669"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1456 + 330 - K1460 + 729","amountPesos":250000000,"lengthMeters":4399.0,"ratePesosPerMeter":56831.09797681291,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575670"},{"year":2024,"category":"Roads","project":"Sayre Highway K1476 + 026 - K1479 + 000","amountPesos":114750000,"lengthMeters":2974.0,"ratePesosPerMeter":38584.39811701412,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575671"},{"year":2024,"category":"Roads","project":"Sayre Highway K1480 + 000 - K1480 + 881, K1480 + 917 - K1481 + 783, K1486 + 048 - K1486 + 319, K1486 + 740 - K1487 + 236","amountPesos":101145000,"lengthMeters":2514.0,"ratePesosPerMeter":40232.6968973747,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575672"},{"year":2024,"category":"Roads","project":"Sayre Highway K1488 + 324 - K1490 + 106, K1490 + 122 - K1490 + 970, K1491 + 175 - K1492 + 000, K1493 + 805 - K1494 + 000","amountPesos":144885000,"lengthMeters":3650.0,"ratePesosPerMeter":39694.520547945205,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575673"},{"year":2024,"category":"Roads","project":"Sayre Highway K1492 + 000 - K1492 + 540, K1519 + 324 - K1520 + 452, K1520 + 452 - K1521 + 862","amountPesos":200000000,"lengthMeters":3078.0,"ratePesosPerMeter":64977.2579597141,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575674"},{"year":2024,"category":"Roads","project":"Sayre Highway K1499 + 000 - K1500 + 000, K1500 + 588 - K1502 + 000, K1503 + 000 - K1503 + 659, K1503 + 764 - K1504 + 000","amountPesos":129310000,"lengthMeters":3307.0,"ratePesosPerMeter":39101.905049894165,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575675"},{"year":2024,"category":"Roads","project":"Sayre Highway K1514 + 000 - K1517 + 660","amountPesos":142680000,"lengthMeters":3660.0,"ratePesosPerMeter":38983.60655737705,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575676"},{"year":2024,"category":"Roads","project":"Sayre Highway K1515 + 850 - K1517 + 918","amountPesos":200000000,"lengthMeters":2068.0,"ratePesosPerMeter":96711.79883945841,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575677"},{"year":2024,"category":"Roads","project":"Sayre Highway K1519 + 285 - K1522 + 000","amountPesos":105580000,"lengthMeters":2715.0,"ratePesosPerMeter":38887.66114180479,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575678"},{"year":2024,"category":"Roads","project":"Sayre Highway K1522 + 568 - K1525 + 107","amountPesos":99450000,"lengthMeters":2539.0,"ratePesosPerMeter":39168.964159117764,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575679"},{"year":2024,"category":"Roads","project":"Sayre Highway K1525 + 274 - K1527 + 520, K1538 + 1014 - K1539 + 683","amountPesos":122720000,"lengthMeters":2915.0,"ratePesosPerMeter":42099.48542024014,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575680"},{"year":2024,"category":"Roads","project":"Sayre Highway K1527 + 000 - K1528 + 500, K1528 + 500 - K1530 + 000","amountPesos":200000000,"lengthMeters":3000.0,"ratePesosPerMeter":66666.66666666667,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575681"},{"year":2024,"category":"Roads","project":"Sayre Highway, K1430 + 610 - K1431 + 220, K1431 + 220 - K1431 + 900","amountPesos":300000000,"lengthMeters":1290.0,"ratePesosPerMeter":232558.13953488372,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575682"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1476 + 027 - K1479 + 010","amountPesos":71273000,"lengthMeters":2983.0,"ratePesosPerMeter":23893.060677170633,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575687"},{"year":2024,"category":"Roads","project":"Asphalt Overlay Ozamis - Pagadian Road ( Ozamiz Section ) , K1695 + 409 K1696 + 687, Misamis Occidental","amountPesos":150000000,"lengthMeters":1278.0,"ratePesosPerMeter":117370.89201877934,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575695"},{"year":2024,"category":"Roads","project":"Asphalt Overlay Ozamis - Oroquieta Road ( Ozamiz - Clarin Section ) , K1703 + 000 - K1704 + 252, Misamis Occidental","amountPesos":140000000,"lengthMeters":1252.0,"ratePesosPerMeter":111821.08626198083,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575697"},{"year":2024,"category":"Roads","project":"Sayre Highway - ﻿K1540 + 190 - K1540 + 501, K1550 + 260 - K1550 + 742, K1554 + 070 - K1555 + 272, K1560 + 000 - K1560 + 404 ( with exception )","amountPesos":125000000,"lengthMeters":2399.0,"ratePesosPerMeter":52105.04376823676,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575698"},{"year":2024,"category":"Roads","project":"Asphalt Overlay along Butuan City - Cagayan de Oro City - Iligan City Road - K1259+812 - K1262 + 812 18, CARAGA","amountPesos":180000000,"lengthMeters":3000.0,"ratePesosPerMeter":60000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575699"},{"year":2024,"category":"Roads","project":"Pres. Diosdado P. Macapagal Highway K1735 + 300 - K1736 + 805","amountPesos":100000000,"lengthMeters":1505.0,"ratePesosPerMeter":66445.18272425249,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575720"},{"year":2024,"category":"Roads","project":"Pres. Diosdado P. Macapagal Highway K1733 + 580 - K1735 + 000, K1735 + 000 - K1735 + 167, K1735 + 167 - K1735 + 300","amountPesos":100000000,"lengthMeters":1720.0,"ratePesosPerMeter":58139.53488372093,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575721"},{"year":2024,"category":"Roads","project":"Pres. Diosdado P. Macapagal National Highway - K1746 + 299 - K1746 + 617, K1747 + 587 - K1748 + 122, K1766 + 976 - K1767 + 872","amountPesos":100000000,"lengthMeters":1749.0,"ratePesosPerMeter":57175.528873642084,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575735"},{"year":2024,"category":"Roads","project":"Pres. Diosdado P. Macapagal National Highway - K1763 + 270 - K1765 + 000","amountPesos":100000000,"lengthMeters":1730.0,"ratePesosPerMeter":57803.46820809248,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575740"},{"year":2024,"category":"Roads","project":"Manila North Road - K0271 + 756 - K0272 + 719","amountPesos":20000000,"lengthMeters":963.0,"ratePesosPerMeter":20768.431983385253,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575804"},{"year":2024,"category":"Roads","project":"Sumulong Highway K0027 + 535 - K0028 + 475","amountPesos":45000000,"lengthMeters":940.0,"ratePesosPerMeter":47872.34042553192,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575846"},{"year":2024,"category":"Roads","project":"Asphalt Overlay along Jct. National Road Sagay - Bato - Dian - Marcelo - Balea Jct Rd - K0085 + 000 - K0085 + 361, K0085 + 484 - K0085 + 552, K0085 + 674 - K0086 + 000, K0086 + 000 - K0086 + 660, K0086 + 820 - K0087 + 000, K0092 + 000 - K0093 + 192, K0099 + 194 - K0099 + 639 ( with exception )","amountPesos":52500000,"lengthMeters":3232.0,"ratePesosPerMeter":16243.81188118812,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575863"},{"year":2024,"category":"Roads","project":"Asphalt Overlay of Road with Correction along Bacolod South Rd at K0054 + 804 - K0055 + 174, K0060 + 494 - K0060 + 900, K0061 + 763 - K0062 + 497 ( with exception )","amountPesos":70000000,"lengthMeters":1510.0,"ratePesosPerMeter":46357.615894039736,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575865"},{"year":2024,"category":"Roads","project":"Asphalt Overlay of Road with Correction along Bacolod South Rd K0058 + 739 - K0060 + 389 ( with exception )","amountPesos":105500000,"lengthMeters":1650.0,"ratePesosPerMeter":63939.393939393936,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575866"},{"year":2024,"category":"Roads","project":"Dumaguete South Road - K0000 + 383 - K0001 + 270","amountPesos":29056000,"lengthMeters":887.0,"ratePesosPerMeter":32757.6099210823,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575882"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1480 + 006 - K1480 + 887","amountPesos":21423000,"lengthMeters":881.0,"ratePesosPerMeter":24316.685584562998,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575896"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1480 + 923 - K1481 + 793","amountPesos":21131000,"lengthMeters":870.0,"ratePesosPerMeter":24288.505747126437,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575897"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1444 + 833 - K1445 + 575","amountPesos":38605000,"lengthMeters":742.0,"ratePesosPerMeter":52028.301886792455,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575899"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1426 + 574 - K1428 + 230","amountPesos":30000000,"lengthMeters":1656.0,"ratePesosPerMeter":18115.942028985508,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575900"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1430 + 610 - K1431 + 220","amountPesos":12572000,"lengthMeters":610.0,"ratePesosPerMeter":20609.83606557377,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575901"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1431 + 220 - K1431 + 900","amountPesos":21399000,"lengthMeters":680.0,"ratePesosPerMeter":31469.117647058825,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575902"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1431 + 900 - K1432 + 575","amountPesos":44232000,"lengthMeters":675.0,"ratePesosPerMeter":65528.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575903"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1436 + 702 - K1437 + 000","amountPesos":15076000,"lengthMeters":298.0,"ratePesosPerMeter":50590.604026845635,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 575904"},{"year":2024,"category":"Roads","project":"Quirino Highway ( S005621LZ ) K0012 + 000 - K0014 + 316","amountPesos":150000000,"lengthMeters":2316.0,"ratePesosPerMeter":64766.83937823834,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577378"},{"year":2024,"category":"Roads","project":"Sariaya Bypass Road - K0119 + 140 – K0119 + 367, K0119 + 449 – K0120 + 472","amountPesos":100000000,"lengthMeters":1250.0,"ratePesosPerMeter":80000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577426"},{"year":2024,"category":"Roads","project":"Sariaya Bypass Road – K0120 + 472 – K0121 + 722","amountPesos":100000000,"lengthMeters":1250.0,"ratePesosPerMeter":80000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577427"},{"year":2024,"category":"Roads","project":"Sariaya Bypass Road – K0121 + 722 – K0122 + 052, K0122 + 173 – K0122 + 655, K0123 + 029 – K0123 + 467","amountPesos":100000000,"lengthMeters":1250.0,"ratePesosPerMeter":80000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577428"},{"year":2024,"category":"Roads","project":"Sariaya Bypass Road – K0123 + 467 – K0124 + 717","amountPesos":100000000,"lengthMeters":1250.0,"ratePesosPerMeter":80000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577429"},{"year":2024,"category":"Roads","project":"Diokno Highway - K0079 + 000 - K0080 + 600","amountPesos":100000000,"lengthMeters":1600.0,"ratePesosPerMeter":62500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577452"},{"year":2024,"category":"Roads","project":"Diokno Highway – K0077 + 780 – K0078 + 829, K0085 + 000 – K0086 + 520","amountPesos":150000000,"lengthMeters":2569.0,"ratePesosPerMeter":58388.47800700662,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577453"},{"year":2024,"category":"Roads","project":"Mauban - Tignoan Road - K0117 + 000 - K0120 + 790, Real, Quezon","amountPesos":100000000,"lengthMeters":3790.0,"ratePesosPerMeter":26385.224274406333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577464"},{"year":2024,"category":"Roads","project":"Asphalt Overlay Along Diokno Highway, Batangas ( S05796Lz ) K0083 + 000 - K0085 + 000","amountPesos":80000000,"lengthMeters":2000.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577465"},{"year":2024,"category":"Roads","project":"along Calapan North Road - K0021 + 218 - K0022 + 000, K0023 + 024 - K0024 + 113","amountPesos":120000000,"lengthMeters":1871.0,"ratePesosPerMeter":64136.825227151254,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577468"},{"year":2024,"category":"Roads","project":"along Calapan North Road - K0011 + 000 - K0012 + 642","amountPesos":100000000,"lengthMeters":1642.0,"ratePesosPerMeter":60901.33982947625,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577469"},{"year":2024,"category":"Roads","project":"along Calapan North Road - K0034 + 1169 - K0035 + 705,K0042 + 000 - K0043 + 000,K0048 + 067 - K0048 + 226,K0048 + 236 - K0049 + 000,K0051 + 507 - K0051 + 746","amountPesos":130000000,"lengthMeters":2698.0,"ratePesosPerMeter":48183.83988139362,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577470"},{"year":2024,"category":"Roads","project":"C - 3 Road - K0011 + 025 - K0011 + 321","amountPesos":5000000,"lengthMeters":296.0,"ratePesosPerMeter":16891.891891891893,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577606"},{"year":2024,"category":"Roads","project":"Gingoog - Claveria - Villanueva Road - K1316 + 040 - K1317 + 839, K1318 + 011 - K1318 + 705","amountPesos":100000000,"lengthMeters":2493.0,"ratePesosPerMeter":40112.31448054553,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577554"},{"year":2024,"category":"Roads","project":"Maramag - Maradugao Road - K1575 + 000 - K1576 + 000, K1576 + 000 - K1576 + 850","amountPesos":141200000,"lengthMeters":1850.0,"ratePesosPerMeter":76324.32432432432,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577555"},{"year":2024,"category":"Roads","project":"Kadingilan - Kibawe - Kalilangan Road, K1609 + 310.55 - K1611 + 603.00","amountPesos":100000000,"lengthMeters":2292.45,"ratePesosPerMeter":43621.45303060133,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577556"},{"year":2024,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway ( S01432MN ) - K1599 + 522 - K1601 + 816, K1601 + 835 - K1606 + 000, K1596 + 000 - K1597 + 291, K1599 + 000 - K1599 + 491, K1613 + 320 - K1613 + 500","amountPesos":150000000,"lengthMeters":8421.0,"ratePesosPerMeter":17812.611328820803,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577558"},{"year":2024,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway ( S01432MN ) - K1608 + 000 - K1613 + 320","amountPesos":100000000,"lengthMeters":5320.0,"ratePesosPerMeter":18796.992481203008,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577559"},{"year":2024,"category":"Roads","project":"Tagum - Panabo Circumferential Road, K1476 + 000 - K1481 + 014, K1481 + 192 - K1482 + 000, Davao del Norte","amountPesos":100000000,"lengthMeters":5822.0,"ratePesosPerMeter":17176.228100309174,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577560"},{"year":2024,"category":"Roads","project":"Tagum - Panabo Circumferential Road, K1465 + 990 - K1471 + 826, K1474 + 923 - K1472 + 731, Davao del Norte","amountPesos":100000000,"lengthMeters":8028.0,"ratePesosPerMeter":12456.402590931737,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577561"},{"year":2024,"category":"Roads","project":"Babak - Samal - Kaputian Road K1515 + 000 - K1518 + 000","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577562"},{"year":2024,"category":"Roads","project":"Babak - Samal - Kaputian Road K1518 + 000 - K1520 + 000","amountPesos":100000000,"lengthMeters":2000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577563"},{"year":2024,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1414 + 800 - K1417 + 000, K1419 + 385 - K1422 + 204, K1425 + 000 - K1425 + 291","amountPesos":100000000,"lengthMeters":5310.0,"ratePesosPerMeter":18832.391713747646,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577564"},{"year":2024,"category":"Roads","project":"Preventive Maintenance of Road Asphalt Overlay with Road Safety Devices along Babak - Samal - Kaputian Road, K1519 + 000 - K1522 + 000, Davao Del Norte","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577567"},{"year":2024,"category":"Roads","project":"Preventive Maintenance of Road Asphalt Overlay with Road Safety Devices along Babak - Samal - Kaputian Road, K1522 + 000 - K1525 + 000, Davao Del Norte","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577568"},{"year":2024,"category":"Roads","project":"Asphalt Overlay Makar - Marbel Road ( S00253MN ) - K1692 + 788 - K1693 + 503 , Tupi, South Cotabato","amountPesos":100000000,"lengthMeters":715.0,"ratePesosPerMeter":139860.13986013987,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577585"},{"year":2024,"category":"Roads","project":"NAIA Rd ( MIA Road ) - ( S03317LZ ) Chainage 217 - Chainage 541","amountPesos":6776000,"lengthMeters":324.0,"ratePesosPerMeter":20913.58024691358,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577602"},{"year":2024,"category":"Roads","project":"C - 3 Road - K0008 + 129 - K0008 + 673","amountPesos":9764000,"lengthMeters":544.0,"ratePesosPerMeter":17948.529411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577605"},{"year":2024,"category":"Roads","project":"Preventive Maintenance ( Asphalt Overlay ) along C - 3 Road, K0009 + 000 - K0008 + 265","amountPesos":45000000,"lengthMeters":735.0,"ratePesosPerMeter":61224.489795918365,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577607"},{"year":2024,"category":"Roads","project":"Diokno Highway - K0074 + 406 - K0074 + 528, K0077 + 500 - K0078 + 267","amountPesos":15000000,"lengthMeters":889.0,"ratePesosPerMeter":16872.89088863892,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577688"},{"year":2024,"category":"Roads","project":"Diokno Highway - K0086 + 520 - K0087 + 900","amountPesos":23250000,"lengthMeters":1380.0,"ratePesosPerMeter":16847.82608695652,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577689"},{"year":2024,"category":"Roads","project":"Lipa - Rosario Road K0083 + 887 - K0084 + 564","amountPesos":44471000,"lengthMeters":677.0,"ratePesosPerMeter":65688.33087149188,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577705"},{"year":2024,"category":"Roads","project":"Manila East Road K0023 + 706 - K0024 + 946","amountPesos":32200000,"lengthMeters":1240.0,"ratePesosPerMeter":25967.74193548387,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577738"},{"year":2024,"category":"Roads","project":"Asphalt Overlay along Calapan South Road - K0040 + 000 - K0040 + 583,K0040 + 583 - K0041 + 250,K0044 + 321 - K0044 + 575","amountPesos":122000000,"lengthMeters":1504.0,"ratePesosPerMeter":81117.02127659574,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577746"},{"year":2024,"category":"Roads","project":"Asphalt Overlay along Calapan North Road - K0010 + 469 - K0011 + 000,K0013 + 370 - K0014 + 244,K0015 + 680 - K0016 + 000","amountPesos":116000000,"lengthMeters":1725.0,"ratePesosPerMeter":67246.37681159421,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577747"},{"year":2024,"category":"Roads","project":"Asphalt Overlay along Calapan North Road - K0050 + 014 - K0050 + 644,K0050 + 985 - K0051 + 462,K0051 + 778 - K0052 + 000, K0053 + 285 - K0054 + 066","amountPesos":107000000,"lengthMeters":2110.0,"ratePesosPerMeter":50710.90047393365,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577748"},{"year":2024,"category":"Roads","project":"Asphalt Overlay along Calapan North Road - K0056 + 985 - K0059 + 132, K0060 + 000 - K0061 + 000","amountPesos":105000000,"lengthMeters":3147.0,"ratePesosPerMeter":33365.10962821735,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577749"},{"year":2024,"category":"Roads","project":"Asphalt Overlay along Jct Balintawak - Old Escalante Road ( S00363NR ) K0099 + 000 - K0100 + 466, Iloilo City","amountPesos":25375000,"lengthMeters":1466.0,"ratePesosPerMeter":17309.00409276944,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577785"},{"year":2024,"category":"Roads","project":"Catarman Cadre Road - ( S00052SM ) Chainage 211 - Chainage 312","amountPesos":1999000,"lengthMeters":101.0,"ratePesosPerMeter":19792.079207920793,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577816"},{"year":2024,"category":"Roads","project":"Sayre Highway ( Jct Bukidnon - Davao City Rd - Cotabato Bdry ) - K1566 + 000 - K1566 + 600","amountPesos":50000000,"lengthMeters":600.0,"ratePesosPerMeter":83333.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 577842"},{"year":2024,"category":"Roads","project":"Malalao Nat'l RD ( Agbannawag - Malalao - Bulo Sect ) Road, K0514 + 000 - K0056 + 000, K0512 + 716 - K0513 + 000, K0516 + 415 - K0520 + 000, Tabuk City, Kalinga","amountPesos":150000000,"lengthMeters":461585.0,"ratePesosPerMeter":324.9672324707259,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 579232"},{"year":2024,"category":"Roads","project":"San Fernando - Lubao Road - K0068 + 726 - K0071 + 040","amountPesos":102878000,"lengthMeters":2314.0,"ratePesosPerMeter":44458.94554883319,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 579264"},{"year":2024,"category":"Roads","project":"San Mateo - Rodriguez Road, K0024 + 300 - K0025 + 100, San Mateo Rizal","amountPesos":76000000,"lengthMeters":800.0,"ratePesosPerMeter":95000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 579269"},{"year":2024,"category":"Roads","project":"Dapa - Cancohoy Road Phase 2 K0015 + 150 - K0018 + 678, Del Carmen, Surigao Del Norte","amountPesos":100000000,"lengthMeters":3528.0,"ratePesosPerMeter":28344.67120181406,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 579313"},{"year":2024,"category":"Roads","project":"Malacanang Road Network ( S02706LZ ) Chainage 0 - Chainage 1051","amountPesos":20000000,"lengthMeters":1051.0,"ratePesosPerMeter":19029.495718363465,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 579337"},{"year":2024,"category":"Roads","project":"Road 1 ( S05480LZ ) Chainage 0 - Chainage 880","amountPesos":35000000,"lengthMeters":880.0,"ratePesosPerMeter":39772.72727272727,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 579361"},{"year":2024,"category":"Roads","project":"Asphalt Overlay Binalonan - Asingan - Sta. Maria Road, K0194 + 329 - K0194 + 505, K0195 + 000 - K0196 + 000, K0196 + 187 - K0196 + 360, K0195 + 152 - K0203 + 594 ( with Corrections )","amountPesos":100000000,"lengthMeters":8770.0,"ratePesosPerMeter":11402.508551881414,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 579381"},{"year":2024,"category":"Roads","project":"Ubao - Taang Road - K0401 + 028 - K0401 + 083, K0408 + 000 - K0411 + 000","amountPesos":19531000,"lengthMeters":3055.0,"ratePesosPerMeter":6393.126022913257,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 579385"},{"year":2024,"category":"Roads","project":"Asphalt Overlay MSR JCT - Lopez - Catanauan Road K0240 + 000 - K0243 + 700","amountPesos":30000000,"lengthMeters":3700.0,"ratePesosPerMeter":8108.108108108108,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 579459"},{"year":2024,"category":"Roads","project":"Taytay Diversion Road K0022 + 310 - K0023 + 060","amountPesos":45000000,"lengthMeters":750.0,"ratePesosPerMeter":60000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 579474"},{"year":2024,"category":"Roads","project":"Asphalt Overlay Stop Aguinaldo - Bug - ang Road ( S00395NR ) K0115 + 520 - K0116 + 000, Iloilo City","amountPesos":8785000,"lengthMeters":480.0,"ratePesosPerMeter":18302.083333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 579499"},{"year":2024,"category":"Roads","project":"Bacolod South Rd ( Old Road ) - K0021 + 425 - K0021 + 627","amountPesos":7414000,"lengthMeters":202.0,"ratePesosPerMeter":36702.9702970297,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 579504"},{"year":2024,"category":"Roads","project":"Asphalt Overlay of Dalaguete - Mantalong - Badian Road, K0088 + 000 to K0092 + 000, Dalaguete, Cebu","amountPesos":100000000,"lengthMeters":4000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 579510"},{"year":2024,"category":"Roads","project":"Asphalt Overlay Tan Avenue Road, K1686 + 669 - K1687 + 1071, Misamis Occidental","amountPesos":40000000,"lengthMeters":1402.0,"ratePesosPerMeter":28530.670470756064,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 579569"},{"year":2024,"category":"Roads","project":"Asphalt Overlay - General Santos City - T'boli - Surallah Road - K1697 + 000 - K1694 + 500","amountPesos":50000000,"lengthMeters":2500.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 579575"},{"year":2024,"category":"Roads","project":"Asphalt Overlay - General Santos City - T'boli - Surallah Road - K1694 + 500 - K1692 + 000","amountPesos":50000000,"lengthMeters":2500.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 579576"},{"year":2024,"category":"Roads","project":"Marawi - Malabang Road - K1617 + 1815 - K1617 + 2541","amountPesos":16717000,"lengthMeters":726.0,"ratePesosPerMeter":23026.17079889807,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 580267"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1529 + 011 - K1530 + 014, K1530 + 633 - K1530 + 889","amountPesos":32813000,"lengthMeters":1259.0,"ratePesosPerMeter":26062.748212867355,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 580269"},{"year":2024,"category":"Roads","project":"Rolando A Andaya Highway - K0312 + 018 - K0312 + 644","amountPesos":40542000,"lengthMeters":626.0,"ratePesosPerMeter":64763.57827476038,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 580317"},{"year":2024,"category":"Roads","project":"Rolando A Andaya Highway - K0311 + 468 - K0312 + 018","amountPesos":50000000,"lengthMeters":550.0,"ratePesosPerMeter":90909.09090909091,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 580318"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1504 + 740 - K1506 + 886","amountPesos":40300000,"lengthMeters":2146.0,"ratePesosPerMeter":18779.123951537746,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 580354"},{"year":2024,"category":"Roads","project":"Butuan City - Cagayan de Oro City - Iligan City Road ( Agusan - Misamis Or Rd ) - K1277 + 220 - K1277 + 495","amountPesos":21791000,"lengthMeters":275.0,"ratePesosPerMeter":79240.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 580366"},{"year":2024,"category":"Roads","project":"Rizal - Dakak - Dapitan Coastal Loop road K1814 + 000 - K1815 + 000, K1817 + 000 - K1817 + 724, K1819 + 000 - K1819 + 577, K1831 + 000 - K1832 + 000","amountPesos":100000000,"lengthMeters":3301.0,"ratePesosPerMeter":30293.850348379277,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 581423"},{"year":2024,"category":"Roads","project":"Jolo Port - Bud Daho - Romandier Road K 5 + 767 - K7 + 767, Patikul, Sulu","amountPesos":40000000,"lengthMeters":2000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 581425"},{"year":2024,"category":"Roads","project":"Romandier - Camp Andres - Tanduh Bato Road Sta. 42 + 600 - Sta. 44 + 600","amountPesos":100000000,"lengthMeters":2000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 581426"},{"year":2024,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1417 + 000 - K1419 + 835","amountPesos":150000000,"lengthMeters":2835.0,"ratePesosPerMeter":52910.05291005291,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 581430"},{"year":2024,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1422 + 204 - K1425 + 000","amountPesos":150000000,"lengthMeters":2796.0,"ratePesosPerMeter":53648.0686695279,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 581431"},{"year":2024,"category":"Roads","project":"C - 3 Road ( Left ) ( S02121LZ ) - Chainage 0 - Chainage 710","amountPesos":50000000,"lengthMeters":710.0,"ratePesosPerMeter":70422.5352112676,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 581439"},{"year":2024,"category":"Roads","project":"Cebu - Balamban Transcentral Highway - K0048 + 493 - K0048 + 805","amountPesos":9970000,"lengthMeters":312.0,"ratePesosPerMeter":31955.128205128207,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 581564"},{"year":2024,"category":"Roads","project":"Cebu - Balamban Transcentral Highway - K0036 + 972 - K0037 + 281","amountPesos":10000000,"lengthMeters":309.0,"ratePesosPerMeter":32362.459546925566,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 581566"},{"year":2024,"category":"Roads","project":"Corrales Extension St. - Port Road - K1439 + 019 - K1439 + 558","amountPesos":13003000,"lengthMeters":539.0,"ratePesosPerMeter":24124.30426716141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 581609"},{"year":2024,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1566 + 751 - K1566 + 903","amountPesos":3209000,"lengthMeters":152.0,"ratePesosPerMeter":21111.842105263157,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 581613"},{"year":2024,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1568 + 053 - K1568 + 388","amountPesos":8318000,"lengthMeters":335.0,"ratePesosPerMeter":24829.850746268658,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 581614"},{"year":2024,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1568 + 629 - K1568 + 894","amountPesos":5186000,"lengthMeters":265.0,"ratePesosPerMeter":19569.811320754718,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 581615"},{"year":2024,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1568 + 894 - K1569 + 000","amountPesos":2290000,"lengthMeters":106.0,"ratePesosPerMeter":21603.77358490566,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 581616"},{"year":2024,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1569 + 000 - K1569 + 219","amountPesos":4286000,"lengthMeters":219.0,"ratePesosPerMeter":19570.776255707762,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 581617"},{"year":2024,"category":"Roads","project":"Concepcion - La Paz Road - K0133 + 033 - K0133+641","amountPesos":51287000,"lengthMeters":608.0,"ratePesosPerMeter":84353.61842105263,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 582670"},{"year":2024,"category":"Roads","project":"Eastern Bulacan Road - K0068 + 000 - K0070 + 000","amountPesos":100000000,"lengthMeters":2000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 582671"},{"year":2024,"category":"Roads","project":"Gen Alejo Santos Highway - K0060 + 899 - K0061 + 000, K0065 + 877 - K0067 + 000","amountPesos":51999000,"lengthMeters":1224.0,"ratePesosPerMeter":42482.8431372549,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 582672"},{"year":2024,"category":"Roads","project":"Tigbao - Sta. Fe - San Miguel Road - K0908 + 640 - K0908 + 770","amountPesos":65000000,"lengthMeters":130.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 582694"},{"year":2024,"category":"Roads","project":"Tigbao - Sta. Fe - San Miguel Road - K0907 + 745 - K0907 + 775, K0907 + 940 - K0908 + 012, K0908 + 340 - K0908 + 410, K0908 + 413 - K0908 + 418, K0908 + 555 - K0908 + 567","amountPesos":100000000,"lengthMeters":189.0,"ratePesosPerMeter":529100.5291005292,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 582695"},{"year":2024,"category":"Roads","project":"Pasolo - Rincon Road - K0015 + 898 - K0016 + 681","amountPesos":41467000,"lengthMeters":783.0,"ratePesosPerMeter":52959.131545338445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 582709"},{"year":2024,"category":"Roads","project":"Lanao - Pagadian - Zamboanga City Road ( RN9 ) K1646 + 500 - K1646 + 550 R / S","amountPesos":3000000,"lengthMeters":50.0,"ratePesosPerMeter":60000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 583499"},{"year":2024,"category":"Roads","project":"Lanao - Pagadian - Zamboanga City Road ( RN9 ) K1640 + 385 - K1640 + 465 L / S","amountPesos":12000000,"lengthMeters":80.0,"ratePesosPerMeter":150000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 583500"},{"year":2024,"category":"Roads","project":"Marawi - Malabang Road - K1595 + 378 - K1595 + 1242","amountPesos":40000000,"lengthMeters":864.0,"ratePesosPerMeter":46296.2962962963,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 583503"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1427 + 000 - K1427 + 200","amountPesos":100000000,"lengthMeters":200.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 583504"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1451 + 058 - K1451 + 144","amountPesos":5530000,"lengthMeters":86.0,"ratePesosPerMeter":64302.32558139535,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 583550"},{"year":2024,"category":"Roads","project":"Cong. Andres Acop Cosalan Road, K0316 + 375 - K0316 + 528","amountPesos":125000000,"lengthMeters":153.0,"ratePesosPerMeter":816993.4640522876,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 585268"},{"year":2024,"category":"Roads","project":"Cong. Andres Acop Cosalan Road, K0316 + 780 - K0316 + 828, K0317 + 042 - K0317 + 129","amountPesos":100000000,"lengthMeters":135.0,"ratePesosPerMeter":740740.7407407408,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 585269"},{"year":2024,"category":"Roads","project":"Catarman - Calbayog Road - K0784 + 439 - K0784 + 567","amountPesos":100000000,"lengthMeters":128.0,"ratePesosPerMeter":781250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 585320"},{"year":2024,"category":"Roads","project":"Cebu - Balamban Transcentral Highway - K0011 + 274 - K0011 + 405","amountPesos":102020000,"lengthMeters":131.0,"ratePesosPerMeter":778778.6259541984,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 585314"},{"year":2024,"category":"Roads","project":"Cebu - Balamban Transcentral Highway - K0037 + 569 - K0037 + 756","amountPesos":150000000,"lengthMeters":187.0,"ratePesosPerMeter":802139.0374331551,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 585315"},{"year":2024,"category":"Roads","project":"Cebu - Balamban Transcentral Highway - K0027 + 529 - K0027 + 624","amountPesos":95000000,"lengthMeters":95.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 585316"},{"year":2024,"category":"Roads","project":"Catarman - Calbayog Road - K0784 + 567 - K0784 + 698","amountPesos":100000000,"lengthMeters":131.0,"ratePesosPerMeter":763358.7786259542,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 585326"},{"year":2024,"category":"Roads","project":"Benguet - Nueva Vizcaya Road, K0276 + 207 - K0276 + 233, K0276 + 240 - K0276 + 418","amountPesos":100000000,"lengthMeters":204.0,"ratePesosPerMeter":490196.07843137253,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 585376"},{"year":2024,"category":"Roads","project":"Cebu - Balamban Transcentral Highway - K0037 + 468 - K0037 + 478","amountPesos":2500000,"lengthMeters":10.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 585458"},{"year":2024,"category":"Roads","project":"Cebu - Balamban Transcentral Highway - K0015 + 683 - K0015 + 727","amountPesos":44000000,"lengthMeters":44.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 585462"},{"year":2024,"category":"Roads","project":"Cebu - Balamban Transcentral Highway - K0016 + 165 - K0016 + 201","amountPesos":14000000,"lengthMeters":36.0,"ratePesosPerMeter":388888.8888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 585463"},{"year":2024,"category":"Roads","project":"Cebu - Balamban Transcentral Highway - K0026 + 834 - K0026 + 879","amountPesos":13103000,"lengthMeters":45.0,"ratePesosPerMeter":291177.77777777775,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 585464"},{"year":2024,"category":"Roads","project":"Calubian Jct. San Isidro - Tabango - Villaba - Palompon Road, K1049 + 046 - K1049 + 246, Villaba, Leyte","amountPesos":100000000,"lengthMeters":200.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 585476"},{"year":2024,"category":"Roads","project":"Sayre Highway ( Jct Bukidnon - Davao City Rd - Cotabato Bdry ) - K1604 + 740 - K1604 + 810","amountPesos":30000000,"lengthMeters":70.0,"ratePesosPerMeter":428571.4285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 585507"},{"year":2024,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1569 + 408 - K1569 + 568","amountPesos":13520000,"lengthMeters":160.0,"ratePesosPerMeter":84500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 585515"},{"year":2024,"category":"Roads","project":"Aritao - Quirino Road K0258 + 050 - K0258 + 480","amountPesos":130000000,"lengthMeters":430.0,"ratePesosPerMeter":302325.5813953488,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 586903"},{"year":2024,"category":"Roads","project":"Aritao - Quirino Road K0260 + 580 - K0260 + 970","amountPesos":130000000,"lengthMeters":390.0,"ratePesosPerMeter":333333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 586904"},{"year":2024,"category":"Roads","project":"Aritao - Quirino Road K0262 + 820 - K0263 + 423","amountPesos":130000000,"lengthMeters":603.0,"ratePesosPerMeter":215588.72305140962,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 586905"},{"year":2024,"category":"Roads","project":"Aritao - Quirino Road K0265 + 070 - K0265 + 440","amountPesos":110000000,"lengthMeters":370.0,"ratePesosPerMeter":297297.2972972973,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 586906"},{"year":2024,"category":"Roads","project":"Aritao - Quirino Road K0267 + 450 - K267 + 900","amountPesos":130000000,"lengthMeters":450.0,"ratePesosPerMeter":288888.8888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 586907"},{"year":2024,"category":"Roads","project":"Bambang - Kasibu - Solano Road - K0265 + 796 - K0265 + 946","amountPesos":110000000,"lengthMeters":150.0,"ratePesosPerMeter":733333.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 586916"},{"year":2024,"category":"Roads","project":"Jct Natl Road - Bitnong - Blance - N Vizcaya Bdry Rd - K0260 + 000 - K0260 + 071, K0260 + 100 - K0260 + 112, K0260 + 285 - K0260 + 348, K0261 + 740 - K0261 + 926","amountPesos":100000000,"lengthMeters":332.0,"ratePesosPerMeter":301204.8192771084,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 586918"},{"year":2024,"category":"Roads","project":"Alilem - Sugpon - Sudipen Road K0317 + 302 - K0317 + 400, La Union","amountPesos":40000000,"lengthMeters":98.0,"ratePesosPerMeter":408163.2653061224,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 586958"},{"year":2024,"category":"Roads","project":"Ubao - Taang Road - K0416 + 460 - K0416 + 515","amountPesos":3367000,"lengthMeters":55.0,"ratePesosPerMeter":61218.181818181816,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 587000"},{"year":2024,"category":"Roads","project":"Construction of Slope Protection Structure along Tagaytay Taal Lake Road, K0057 + 046 - K0057 + 200","amountPesos":32500000,"lengthMeters":154.0,"ratePesosPerMeter":211038.96103896105,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 587033"},{"year":2024,"category":"Roads","project":"Construction of Slope Protection Structure along Tagaytay Taal Lake Road, K0058 + 439 - K0058 + 554","amountPesos":40000000,"lengthMeters":115.0,"ratePesosPerMeter":347826.0869565217,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 587034"},{"year":2024,"category":"Roads","project":"Construction of Slope Protection Structure along Tagaytay Taal Lake Road, K0060 + 400 - K0060 + 525","amountPesos":40000000,"lengthMeters":125.0,"ratePesosPerMeter":320000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 587035"},{"year":2024,"category":"Roads","project":"Cagayan Valley Road K0477 + 331 - K0478 + 580","amountPesos":9000000,"lengthMeters":1249.0,"ratePesosPerMeter":7205.764611689351,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 587582"},{"year":2024,"category":"Roads","project":"Sumulong Highway - K0023 + 000 - K0024 + 523","amountPesos":20000000,"lengthMeters":1523.0,"ratePesosPerMeter":13131.976362442547,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 587597"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1491 + 054 - K1491 + 290","amountPesos":4400000,"lengthMeters":236.0,"ratePesosPerMeter":18644.06779661017,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 587615"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1511 + 247 - K1512 + 560","amountPesos":38409000,"lengthMeters":1313.0,"ratePesosPerMeter":29252.85605483625,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 587616"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1547 + 750 - K1548 + 000, K1548 + 200 - K1548 + 300","amountPesos":9000000,"lengthMeters":350.0,"ratePesosPerMeter":25714.285714285714,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 587621"},{"year":2024,"category":"Roads","project":"Corrales Extension St. - Port Road - K1438 + 500 - K1439 + 000","amountPesos":60000000,"lengthMeters":500.0,"ratePesosPerMeter":120000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 588255"},{"year":2024,"category":"Roads","project":"C - 3 Road - ( S02121LZ ) Chainage 278 - Chainage 710, Chainage 73.6 - Chainage 278","amountPesos":40000000,"lengthMeters":636.4,"ratePesosPerMeter":62853.55122564425,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 588260"},{"year":2024,"category":"Roads","project":"Sayre Highway ( Jct Bukidnon - Davao City Rd - Cotabato Bdry ) - K1580 + 000 - K1582 + 000","amountPesos":30799000,"lengthMeters":2000.0,"ratePesosPerMeter":15399.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 588367"},{"year":2024,"category":"Roads","project":"Bakit - Bakit Jct. - Umingan Road, K0180 + 412 - K0182 + 000, K0189 + 197 - K0189 + 818, K0191 + 522 - K0192 + 077, K0192 + 122 - K0192 + 355, K0193 + 070 - K0193 + 273 ( LS ) , K0194 + 038 - K0194 + 349 ( LS ) , K0194 + 725 - K0194 + 898 ( RS ) , K0201 + 692 - K0202 + 476, K0202 + 850 - K0203 + 102","amountPesos":80000000,"lengthMeters":4720.0,"ratePesosPerMeter":16949.15254237288,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 590146"},{"year":2024,"category":"Roads","project":"Rolando A Andaya Highway - K0293 + 000 - K0293 + 792","amountPesos":71568000,"lengthMeters":792.0,"ratePesosPerMeter":90363.63636363637,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 590174"},{"year":2024,"category":"Roads","project":"Rolando A Andaya Highway - K0295 + 985 - K0296 + 154, K0296 + 180 - K0296 + 792","amountPesos":71050000,"lengthMeters":781.0,"ratePesosPerMeter":90973.1113956466,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 590175"},{"year":2024,"category":"Roads","project":"Guimaras Circumferential Road ( S00028GR ) K0022 + 400 - K0023 + 654","amountPesos":90000000,"lengthMeters":1254.0,"ratePesosPerMeter":71770.33492822967,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 590187"},{"year":2024,"category":"Roads","project":"Guimaras Circumferential Road ( S00028GR ) K0023 + 654 - K0024 + 537, K0029 + 848 - K0030 + 000","amountPesos":95000000,"lengthMeters":1035.0,"ratePesosPerMeter":91787.43961352657,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 590188"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1432 + 586 - K1436 + 000","amountPesos":86100000,"lengthMeters":3414.0,"ratePesosPerMeter":25219.683655536028,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 590226"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1445 + 075 - K1446 + 483","amountPesos":72750000,"lengthMeters":1408.0,"ratePesosPerMeter":51669.03409090909,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 590227"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1482 + 453 - K1483 + 636","amountPesos":72100000,"lengthMeters":1183.0,"ratePesosPerMeter":60946.74556213018,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 590228"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1434 + 000 - K1436 + 000","amountPesos":80297000,"lengthMeters":2000.0,"ratePesosPerMeter":40148.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 590233"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1441 + 159 - K1441 + 358, K1444 + 480 - K1444 + 484","amountPesos":10150000,"lengthMeters":203.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 590350"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1441 + 812 - K1442 + 100","amountPesos":22501000,"lengthMeters":288.0,"ratePesosPerMeter":78128.47222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 590351"},{"year":2024,"category":"Roads","project":"Pangasinan - Nueva Vizcaya Road, K0201 + 000 - K0204 + 000","amountPesos":59000000,"lengthMeters":3000.0,"ratePesosPerMeter":19666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 591886"},{"year":2024,"category":"Roads","project":"Pangasinan - Nueva Vizcaya Road, K0194 + 144 - K0195 + 488, K095 + 498 - K0196 + 382, K0196 + 394 - K0197 + 662","amountPesos":86300000,"lengthMeters":102152.0,"ratePesosPerMeter":844.8194846894824,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 591887"},{"year":2024,"category":"Roads","project":"Puerto Princesa North Road K0159 + 944 - K0161 + 211, K0161 + 285 - K0161 + 760, K0162 + 484 - K0162 + 806","amountPesos":97771000,"lengthMeters":2064.0,"ratePesosPerMeter":47369.67054263566,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 591905"},{"year":2024,"category":"Roads","project":"Guiuan - Sulangan Peninsula Road - K1060 + 170 - K1062 + 670","amountPesos":50000000,"lengthMeters":2500.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 591949"},{"year":2024,"category":"Roads","project":"Sayre Highway ( Jct Bukidnon - Davao City Rd - Cotabato Bdry ) - K1569 + 240 - K1571 + 000, K1572 + 000 - K1573 + 000","amountPesos":112200000,"lengthMeters":2760.0,"ratePesosPerMeter":40652.17391304348,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 591977"},{"year":2024,"category":"Roads","project":"Laoag - Balacad Road - K0481 + 522 - K0482 + 000","amountPesos":30000000,"lengthMeters":478.0,"ratePesosPerMeter":62761.50627615063,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 591999"},{"year":2024,"category":"Roads","project":"Laoag - Balacad Road - K0484 + 158 - K0484 + 328","amountPesos":5000000,"lengthMeters":170.0,"ratePesosPerMeter":29411.764705882353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 592000"},{"year":2024,"category":"Roads","project":"Puerto Princesa North Road K0168 + 519 - K0168 + 644, K0168 + 686 - K0168 + 796, K0169 + 554 - K0170 + 189","amountPesos":39780000,"lengthMeters":870.0,"ratePesosPerMeter":45724.137931034486,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 592045"},{"year":2024,"category":"Roads","project":"Sayre Highway ( Jct Bukidnon - Davao City Rd - Cotabato Bdry ) - K1573 + 000 - K1573 + 500","amountPesos":20000000,"lengthMeters":500.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 592132"},{"year":2024,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1606 + 850 - K1607 + 000","amountPesos":15000000,"lengthMeters":150.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 592138"},{"year":2024,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1425 + 867 - K1426 + 179, K1606 + 609 - K1606 + 850","amountPesos":35000000,"lengthMeters":553.0,"ratePesosPerMeter":63291.13924050633,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 592139"},{"year":2024,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1601 + 000 - K1601 + 440","amountPesos":22750000,"lengthMeters":440.0,"ratePesosPerMeter":51704.545454545456,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 592140"},{"year":2024,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1604 + 000 - K1604 + 760","amountPesos":35000000,"lengthMeters":760.0,"ratePesosPerMeter":46052.63157894737,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 592141"},{"year":2024,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1561 + 954 - K1563 + 096","amountPesos":50000000,"lengthMeters":1142.0,"ratePesosPerMeter":43782.83712784589,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 592143"},{"year":2024,"category":"Roads","project":"San Nicolas - Natividad - San Quintin - Umingan - Guimba Road K0204 + 000 - K0205 + 177, K0210 + 000 - K0211 + 400, K0212 + 811 - K0213 + 813","amountPesos":92500000,"lengthMeters":3579.0,"ratePesosPerMeter":25845.20815870355,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 592906"},{"year":2024,"category":"Roads","project":"Iloilo - Capiz Road ( Old Route ) K0084+450 - K0084 + 572, K0084+603 - K0086 + 678","amountPesos":50000000,"lengthMeters":2197.0,"ratePesosPerMeter":22758.30678197542,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 592926"},{"year":2024,"category":"Roads","project":"Jct Monte Alegre - Switch Road K1642 + 331 - K1644 + 000, K1646 + 475 - K1647 + 000, K1647 + 500 - K1648 + 000","amountPesos":50000000,"lengthMeters":2694.0,"ratePesosPerMeter":18559.762435040833,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 592936"},{"year":2024,"category":"Roads","project":"Laoag - Balacad Road - K0482 + 528 - K0482 + 692","amountPesos":5000000,"lengthMeters":164.0,"ratePesosPerMeter":30487.80487804878,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 592947"},{"year":2024,"category":"Roads","project":"Nambaran - Isabela Road - K0511 + 578 - K0513 + 502","amountPesos":65000000,"lengthMeters":1924.0,"ratePesosPerMeter":33783.78378378379,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 592948"},{"year":2024,"category":"Roads","project":"Mandurriao - Pakiad Road - K0007 + 491 - K0007 + 528","amountPesos":1850000,"lengthMeters":37.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 593000"},{"year":2024,"category":"Roads","project":"Jct SH - Aglayan - Alanib - Ticalaan Road ( Ticalaan - Paganan Sect ) - K1515 + 320 - K1516 + 200","amountPesos":33815000,"lengthMeters":880.0,"ratePesosPerMeter":38426.13636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 593037"},{"year":2024,"category":"Roads","project":"Dahican - Lawigan Road - K1721 + 418 - K1723 + 820","amountPesos":40000000,"lengthMeters":2402.0,"ratePesosPerMeter":16652.789342214823,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 593043"},{"year":2024,"category":"Roads","project":"Rehabilitation of Road along Kawit - Noveleta Diversion Rd K0022+151 - K0022 + 528, K0023+000 - K0023+750","amountPesos":100000000,"lengthMeters":1127.0,"ratePesosPerMeter":88731.14463176575,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 595579"},{"year":2024,"category":"Roads","project":"Tagum City Diversion Road, K1458 + 195 - K1459 + 000, K1459 + 310 - K1459 + 535, K1460 + 001 - K1461 + 640, K1462 + 000 - K1462 + 705, K1463 + 000 - K1464 + 197, Davao del Norte","amountPesos":100000000,"lengthMeters":4571.0,"ratePesosPerMeter":21877.050973528767,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 595777"},{"year":2024,"category":"Roads","project":"Abra - Cervantes Road, Chainage 16915 - Chainage 18735, Abra","amountPesos":100000000,"lengthMeters":1820.0,"ratePesosPerMeter":54945.054945054944,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 597097"},{"year":2024,"category":"Roads","project":"Abra - Cervantes Road, Chainage 18735 - Chainage 22235, Abra","amountPesos":100000000,"lengthMeters":3500.0,"ratePesosPerMeter":28571.428571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 597099"},{"year":2024,"category":"Roads","project":"Calamba - Sta.Cruz - Famy Jct Road - K0051 + 460 - K0051 + 763,K0052 + 010 - K0052 + 430,K0052 + 443 - K0052 + 510,K0056 + 325 - K0056 + 553,K0056 + 650 - K0056 + 723,K0057 + 289 - K0057 + 651","amountPesos":50000000,"lengthMeters":1453.0,"ratePesosPerMeter":34411.562284927735,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 597718"},{"year":2024,"category":"Roads","project":"Sayre Highway - K1555 + 270 - K1557 + 078","amountPesos":26930000,"lengthMeters":1808.0,"ratePesosPerMeter":14894.91150442478,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 597736"},{"year":2024,"category":"Roads","project":"Guiuan - Sulangan Peninsula Road - K1050 + 318 - K1052 + 791, K1053 + 175 - K1056 + 012","amountPesos":90208000,"lengthMeters":5310.0,"ratePesosPerMeter":16988.323917137477,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 598299"},{"year":2024,"category":"Roads","project":"Pangpang - Palapag - Mapanas - Gamay - Lapinig Road - K0809 + 676 - K0809 + 780","amountPesos":150000000,"lengthMeters":104.0,"ratePesosPerMeter":1442307.6923076923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 598300"},{"year":2024,"category":"Roads","project":"Pangpang - Palapag - Mapanas - Gamay - Lapinig Road - K0809 + 855 - K0809 + 906","amountPesos":100000000,"lengthMeters":51.0,"ratePesosPerMeter":1960784.3137254901,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 598305"},{"year":2024,"category":"Roads","project":"Pangpang - Palapag - Mapanas - Gamay - Lapinig Road - K0810 + 751 - K0810 + 840","amountPesos":150000000,"lengthMeters":89.0,"ratePesosPerMeter":1685393.2584269664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 598307"},{"year":2024,"category":"Roads","project":"Pangpang - Palapag - Mapanas - Gamay - Lapinig Road - K0809 + 780 - K0809 + 855","amountPesos":150000000,"lengthMeters":75.0,"ratePesosPerMeter":2000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 598309"},{"year":2024,"category":"Roads","project":"Pangpang - Palapag - Mapanas - Gamay - Lapinig Road - K0810 + 751 - K0810 + 840","amountPesos":150000000,"lengthMeters":89.0,"ratePesosPerMeter":1685393.2584269664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 598311"},{"year":2024,"category":"Roads","project":"Pangpang - Palapag - Mapanas - Gamay - Lapinig Road - K0810 + 751 - K0810 + 840","amountPesos":150000000,"lengthMeters":89.0,"ratePesosPerMeter":1685393.2584269664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 598312"},{"year":2024,"category":"Roads","project":"Biliran Circumferential Road, K1039 + 032 - K1039 + 224, K1039 + 884 - K1040 + 724","amountPesos":20000000,"lengthMeters":1032.0,"ratePesosPerMeter":19379.84496124031,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 598370"},{"year":2024,"category":"Roads","project":"Sayre Highway ( Jct Bukidnon - Davao City Rd - Cotabato Bdry ) - K1564 + 465 - K1566 + 838","amountPesos":39878000,"lengthMeters":2373.0,"ratePesosPerMeter":16804.88832701222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 598376"},{"year":2024,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1608 + 660 - K1612 + 060","amountPesos":45000000,"lengthMeters":3400.0,"ratePesosPerMeter":13235.29411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 598378"},{"year":2024,"category":"Roads","project":"Road 8 - ( S05486LZ ) Chainage 0 - Chainage 560","amountPesos":15680000,"lengthMeters":560.0,"ratePesosPerMeter":28000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 598834"},{"year":2024,"category":"Roads","project":"Gen Alejo Santos Highway - K0043 + 347 - K0045 + 743, K0045 + 890 - K0048 + 297, K0048 + 464 - K0049 + 630, K0049 + 645 - K0050 + 428, K0050 + 452 - K0050 + 526","amountPesos":50000000,"lengthMeters":6826.0,"ratePesosPerMeter":7324.93407559332,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 598877"},{"year":2024,"category":"Roads","project":"Gen Alejo Santos Highway - K0070 + 808 - K0071 + 431","amountPesos":20190000,"lengthMeters":623.0,"ratePesosPerMeter":32407.704654895668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 598881"},{"year":2024,"category":"Roads","project":"Lamitan - Tuburan Road via Campo Uno - ( S00019BL ) Chainage 13240 - Chainage 13388, Chainage 14416 - Chainage 14476, Chainage 14678 - Chainage 14788, Chainage 14868 - Chainage 15009","amountPesos":10603000,"lengthMeters":459.0,"ratePesosPerMeter":23100.217864923747,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 599321"},{"year":2024,"category":"Roads","project":"Balbalan - Pinukpuk Road - K0484 + 347 - K0485 + 000","amountPesos":36580000,"lengthMeters":653.0,"ratePesosPerMeter":56018.37672281777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 599330"},{"year":2024,"category":"Mixed roads / bridges","project":"Manduyong Bridge along Santander - Barili - Toledo Road - K0195 + 198 - K0195 + 220 ( PHASE 2 )","amountPesos":100000000,"lengthMeters":22.0,"ratePesosPerMeter":4545454.545454546,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 599351"},{"year":2024,"category":"Bridges","project":"Construction of Cudal River Flood Control Mitigation Structure along Magabangon Bridge, Sta.0 + 000 - Sta.0 + 500 ( R / S Upstream ) Sta.00 + 000 - Sta.00 + 500 ( R / S ) , Kalinga","amountPesos":100000000,"lengthMeters":500.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 615751"},{"year":2024,"category":"Roads","project":"Construction of Road Dike, Sta. 00 + 000 - Sta. 00 + 134, Obando Section, Bulacan","amountPesos":150000000,"lengthMeters":134.0,"ratePesosPerMeter":1119402.985074627,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 615946"},{"year":2024,"category":"Mixed roads / bridges","project":"Construction of Flood Mitigation Structure along Barandias - Dominorog Road, Huwagon Bridge, K1608 + 484 - K1608 + 502.85 ( Both Sides ) , Dominorog, Talakag, Bukidnon","amountPesos":100000000,"lengthMeters":18.85,"ratePesosPerMeter":5305039.787772198,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 616630"},{"year":2024,"category":"Mixed roads / bridges","project":"Construction of Flood Mitigation Structure along Barandias - Dominorog Road, Kinikawayan Bridge, K1611 + 198 - K1611 + 213.60 ( Both Sides ) , Dominorog, Talakag, Bukidnon","amountPesos":100000000,"lengthMeters":15.6,"ratePesosPerMeter":6410256.410218141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 616631"},{"year":2024,"category":"Bridges","project":"Construction of Flood Control Dike along Doles River Sta. 0 + 850 - Sta. 1 + 250 B / S ( with Overflow bridge ) , Barangay Doles, Magpet, Cotabato","amountPesos":100000000,"lengthMeters":400.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 616671"},{"year":2024,"category":"Roads","project":"Construction of Drainage Canal along Mt. Province Bdry. - Calanan - Pinukpuk - Abbut Road, Calanan - Pinukpuk Junction Section, K0508 + 447 - K0508 + 647 ( B / S ) , Tannong, Tabuk City, Kalinga","amountPesos":35000000,"lengthMeters":200.0,"ratePesosPerMeter":175000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 616989"},{"year":2024,"category":"Bridges","project":"Rehabilitation of Existing Dike along Tinang Creek ( Left and Right Bank ) , D / S of Sta. Monica Bridge, Sta. 0 + 913 to Sta. 1 + 163, Concepcion, Tarlac","amountPesos":47705000,"lengthMeters":250.0,"ratePesosPerMeter":190820.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 617077"},{"year":2024,"category":"Bridges","project":"Construction of Revetment along Doles River Sta. 0 + 250 - Sta. 0 + 450 B / S ( with Overflow Bridge ) , Barangay Doles, Magpet, Cotabato","amountPesos":50000000,"lengthMeters":200.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 617489"},{"year":2024,"category":"Bridges","project":"Construction of Revetment along Mabato River Sta. 2 + 800 - Sta. 3 + 110 L / S ( Junction with Overflow bridge ) , Barangay Bantac, Magpet, Cotabato","amountPesos":50000000,"lengthMeters":310.0,"ratePesosPerMeter":161290.32258064515,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 617490"},{"year":2024,"category":"Bridges","project":"Construction of Mallig River Flood Control Mitigation Structure along Cassag Bridge, Tabuk - Paracelis Mun. Baoundary ( Tabuk Side ) , Sta.0 + 000 - Sta.0 + 930 ( LS ) , Kalinga","amountPesos":100000000,"lengthMeters":930.0,"ratePesosPerMeter":107526.8817204301,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 621046"},{"year":2024,"category":"Bridges","project":"Rehabilitation of Dike along O'Donnell River, ( Downstream of Palublub Bridge, Left Bank ) , Phase 1, Sta. 0 + 000 to Sta. 0+494.34, Capas, Tarlac","amountPesos":100000000,"lengthMeters":494.34,"ratePesosPerMeter":202289.92191609016,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 621250"},{"year":2024,"category":"Bridges","project":"Rehabilitation of Dike along O'Donnell River, ( Downstream of Palublub Bridge, Left Bank ) , Phase 2, Sta. 0 + 494.34 to Sta. 0 +991.76, Capas, Tarlac","amountPesos":100000000,"lengthMeters":497.42,"ratePesosPerMeter":201037.35274013912,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 621251"},{"year":2024,"category":"Bridges","project":"Rehabilitation of Dike along O'Donnell River, ( Downstream of Palublub Bridge, Left Bank ) , Phase 3, Sta. 0 + 991.76 to Sta. 1 + 489.18, Capas, Tarlac","amountPesos":100000000,"lengthMeters":497.42,"ratePesosPerMeter":201037.3527401391,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 621252"},{"year":2024,"category":"Bridges","project":"Rehabilitation of Dike along O'Donnell River, Downstream of Palublub Bridge, Right Bank, Lawy Section, Phase 1, Sta. 1 + 080.00 to Sta. 1 + 451.91, Capas, Tarlac.","amountPesos":100000000,"lengthMeters":371.91,"ratePesosPerMeter":268882.25645989616,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 621253"},{"year":2024,"category":"Bridges","project":"Rehabilitation of Dike along O'Donnell River, Downstream of Palublub Bridge, Right Bank, Lawy Section, Phase 2, Sta. 1 + 451.91 to Sta. 1 + 823.05, Capas, Tarlac","amountPesos":100000000,"lengthMeters":371.14,"ratePesosPerMeter":269440.1034649998,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 621254"},{"year":2024,"category":"Bridges","project":"Rehabilitation of Dike along O'Donnell River, Downstream of Palublub Bridge, Right Bank, Lawy Section, Phase 3, Sta. 1 + 823.05 to Sta. 2 + 194.05, Capas, Tarlac","amountPesos":100000000,"lengthMeters":371.0,"ratePesosPerMeter":269541.77897574106,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 621255"},{"year":2024,"category":"Bridges","project":"Rehabilitation of Dike along O'Donnell River, Downstream of Palublub Bridge, Right Bank, Lawy Section, Phase 4, Sta. 2 + 194.05 to Sta. 2 + 565.50, Capas, Tarlac","amountPesos":100000000,"lengthMeters":371.45,"ratePesosPerMeter":269215.2375824473,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 621256"},{"year":2024,"category":"Bridges","project":"Rehabilitation of Existing Dike along O' Donnell River, Upstream of Palublub Bridge, Right Bank ( Package A ) , Sta. 0 + 000 to Sta. 0 + 535.20, Capas, Tarlac","amountPesos":90000000,"lengthMeters":535.2,"ratePesosPerMeter":168161.43497757846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 621260"},{"year":2024,"category":"Bridges","project":"Rehabilitation of Existing Dike along Rio Chico River ( Matayumtayum Section, Right Bank ) U / S of Rio Chico Bridge, Phase 1, Sta. 14 + 395.50 to Sta. 14 + 871.90, La Paz, Tarlac","amountPesos":100000000,"lengthMeters":476.4,"ratePesosPerMeter":209907.6406381194,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 621263"},{"year":2024,"category":"Bridges","project":"Rehabilitation of Existing Dike along Rio Chico River ( Matayumtayum Section, Right Bank ) U / S of Rio Chico Bridge, Phase 2, Sta. 14 + 871.90 to Sta. 15 + 340, La Paz, Tarlac","amountPesos":100000000,"lengthMeters":468.1,"ratePesosPerMeter":213629.56633198017,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 621264"},{"year":2024,"category":"Bridges","project":"Construction of Balite River Control, Sta. 0 + 300 - Sta. 0 + 718 ( Balite Bridge Abutment B - Upstream ) , Barangay Balite, Gloria, Oriental Mindoro","amountPesos":70000000,"lengthMeters":418.0,"ratePesosPerMeter":167464.11483253588,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 621318"},{"year":2024,"category":"Mixed roads / bridges","project":"Construction of Flood Mitigation Structure along Maramag - Maradugao Road, Baguik - ikan Bridge, K1577 + 172 - K1577 + 201.75 ( Both Sides ) , Adtuyon, Pangantucan, Bukidnon","amountPesos":90000000,"lengthMeters":29.75,"ratePesosPerMeter":3025210.0840336136,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2024 GAA parquet · row 621571"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along South Super H-way - K0008 + 247 - K0008 + 887","amountPesos":50298000,"lengthMeters":640.0,"ratePesosPerMeter":78590.625,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552727"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along South Super H-way - K0004 + (-260) - K0004 + 895","amountPesos":50911000,"lengthMeters":1155.0,"ratePesosPerMeter":44078.78787878788,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552728"},{"year":2025,"category":"Roads","project":"Preventive Maintenance-Secondary Roads (Asphalt Overlay) along Pres Quirino Ave - K0004 + 391 - K0004 + 926","amountPesos":52293000,"lengthMeters":535.0,"ratePesosPerMeter":97743.92523364486,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552729"},{"year":2025,"category":"Bridges","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along EDSA/Ortigas Flyover (S03979LZ) - Chainage 0 - Chainage 348","amountPesos":1211000,"lengthMeters":348.0,"ratePesosPerMeter":3479.885057471264,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552730"},{"year":2025,"category":"Bridges","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along EDSA/Ortigas Flyover (S03978LZ) - Chainage 0 - Chainage 348","amountPesos":1211000,"lengthMeters":348.0,"ratePesosPerMeter":3479.885057471264,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552731"},{"year":2025,"category":"Roads","project":"Installation of Road Safety Facilities (Roadway Lighting) along Alaminos-Bolinao Rd - K0346 + 077 - K0353 + 598, Bolinao, Pangasinan","amountPesos":75000000,"lengthMeters":7521.0,"ratePesosPerMeter":9972.07818109294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552735"},{"year":2025,"category":"Roads","project":"Installation of Road Safety Facilities (Roadway Lighting) along Alaminos-Bolinao Rd - K0353 + 618 - K0361 + 121, Bolinao, Pangasinan","amountPesos":75000000,"lengthMeters":7503.0,"ratePesosPerMeter":9996.001599360256,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552737"},{"year":2025,"category":"Roads","project":"Installation of Road Safety Facilities (Roadway Lighting) along Bani-Agno Rd - K0336 + (-755) - K0340 + 980, K0344 + 329 - K0348 + 414, Bani to Agno, Pangasinan","amountPesos":75000000,"lengthMeters":9820.0,"ratePesosPerMeter":7637.474541751528,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552738"},{"year":2025,"category":"Roads","project":"Installation of Road Safety Facilities (Roadway Lighting) along Burgos-Agno Rd - K0303 + (-941) - K0309 + 559, Burgos, Pangasinan","amountPesos":75000000,"lengthMeters":7500.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552739"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Pangasinan-Nueva Vizcaya Rd - K0197 + 662 - K0197 + 690","amountPesos":615000,"lengthMeters":28.0,"ratePesosPerMeter":21964.285714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552740"},{"year":2025,"category":"Roads","project":"Installation of Solar LED Street Lights along Pangasinan-Zambales Road K0297 + 889 - K0301 + 380, Burgos, Pangasinan","amountPesos":75000000,"lengthMeters":3491.0,"ratePesosPerMeter":21483.815525637354,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552741"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bakit-Bakit Jct-Umingan Rd - K0177 + (-170) - K0177 + (-158)","amountPesos":615000,"lengthMeters":12.0,"ratePesosPerMeter":51250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552742"},{"year":2025,"category":"Roads","project":"Installation of Solar LED Street Lights along Pangasinan-Zambales Road K0276 + 500 - K0279 + 980, Dasol, Pangasinan","amountPesos":75000000,"lengthMeters":3480.0,"ratePesosPerMeter":21551.724137931036,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552743"},{"year":2025,"category":"Roads","project":"Installation of Solar LED Street Lights along Pangasinan-Zambales Road K0279 + 980 - K0283 + 460, Dasol, Pangasinan","amountPesos":75000000,"lengthMeters":3480.0,"ratePesosPerMeter":21551.724137931036,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552744"},{"year":2025,"category":"Roads","project":"Installation of Solar LED Streetlights along Alaminos-Bolinao Road K0357 + 660 - K0361 + 140, Bolinao, Pangasinan","amountPesos":75000000,"lengthMeters":3480.0,"ratePesosPerMeter":21551.724137931036,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552745"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Pangasinan-Nueva Vizcaya Rd - K0176 + (-185) - K0176 + (-132.70)","amountPesos":615000,"lengthMeters":52.3,"ratePesosPerMeter":11759.082217975849,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552747"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Binalonan-Asingan-Santa Maria Rd - K0201 + 846 - K0201 + 900","amountPesos":544000,"lengthMeters":54.0,"ratePesosPerMeter":10074.074074074075,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552748"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Pangasinan-Nueva Vizcaya Rd - K0190 + 402 - K0190 + 424","amountPesos":350000,"lengthMeters":22.0,"ratePesosPerMeter":15909.09090909091,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552749"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Pangasinan-Nueva Vizcaya Rd - K0196 + 163 - K0196 + 172.70","amountPesos":350000,"lengthMeters":9.7,"ratePesosPerMeter":36082.474226760816,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552750"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Pangasinan-Nueva Vizcaya Rd - K0196 + 382 - K0196 + 394","amountPesos":300000,"lengthMeters":12.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552751"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Pangasinan-Nueva Vizcaya Rd - K0194 + 133 - K0194 + 143.90","amountPesos":350000,"lengthMeters":10.9,"ratePesosPerMeter":32110.091743136414,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552752"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Sn Nicolas-Natividad-Sn Quintin-Umingan-Guimba Rd - K0209 + 632 - K0209 + 767","amountPesos":686000,"lengthMeters":135.0,"ratePesosPerMeter":5081.481481481482,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552753"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Sn Nicolas-Natividad-Sn Quintin-Umingan-Guimba Rd - K0209 + 940 - K0209 + 952","amountPesos":250000,"lengthMeters":12.0,"ratePesosPerMeter":20833.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552754"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bakit-Bakit Jct-Umingan Rd - K0200 + 341 - K0200 + 352","amountPesos":300000,"lengthMeters":11.0,"ratePesosPerMeter":27272.727272727272,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552755"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Binalonan-Asingan-Santa Maria Rd - K0200 + 482 - K0200 + 512","amountPesos":500000,"lengthMeters":30.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552756"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Pangasinan-Nueva Vizcaya Rd - K0195 + 211 - K0195 + 219.80","amountPesos":350000,"lengthMeters":8.8,"ratePesosPerMeter":39772.727272779885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552757"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Pangasinan-Nueva Vizcaya Rd - K0195 + 488 - K0195 + 497.30","amountPesos":350000,"lengthMeters":9.3,"ratePesosPerMeter":37634.40860219765,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552758"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Pangasinan-Nueva Vizcaya Rd - K0179 + 986 - K0179 + 1080","amountPesos":1200000,"lengthMeters":94.0,"ratePesosPerMeter":12765.95744680851,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552759"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Pangasinan-Nueva Vizcaya Rd - K0193 + 634 - K0193 + 981","amountPesos":2870000,"lengthMeters":347.0,"ratePesosPerMeter":8270.893371757926,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552760"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Binalonan-Asingan-Santa Maria Rd - K0196 + 724 - K0196 + 778.90","amountPesos":615000,"lengthMeters":54.9,"ratePesosPerMeter":11202.185792350914,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552761"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Sn Nicolas-Natividad-Sn Quintin-Umingan-Guimba Rd - K0203 + 418 - K0203 + 440.20","amountPesos":250000,"lengthMeters":22.2,"ratePesosPerMeter":11261.261261255357,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552762"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Sn Nicolas-Natividad-Sn Quintin-Umingan-Guimba Rd - K0203 + 845 - K0203 + 909","amountPesos":615000,"lengthMeters":64.0,"ratePesosPerMeter":9609.375,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552763"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Carmen East West Diversion Rd (S05915LZ) - Chainage 2252 - Chainage 2289.7","amountPesos":500000,"lengthMeters":37.7,"ratePesosPerMeter":13262.599469496085,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552764"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Sn Nicolas-Natividad-Sn Quintin-Umingan-Guimba Rd - K0203 + 033 - K0203 + 042","amountPesos":250000,"lengthMeters":9.0,"ratePesosPerMeter":27777.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552765"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bakit-Bakit Jct-Umingan Rd - K0200 + 501 - K0200 + 537","amountPesos":615000,"lengthMeters":36.0,"ratePesosPerMeter":17083.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552766"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Binalonan-Asingan-Santa Maria Rd - K0201 + 010 - K0201 + 281","amountPesos":2255000,"lengthMeters":271.0,"ratePesosPerMeter":8321.033210332103,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552767"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Binalonan-Asingan-Santa Maria Rd - K0208 + 979 - K0208 + 994.50","amountPesos":250000,"lengthMeters":15.5,"ratePesosPerMeter":16129.032258064517,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552768"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Tayug Cadre Rd (S00359LZ) - Chainage 45 - Chainage 63.4","amountPesos":250000,"lengthMeters":18.4,"ratePesosPerMeter":13586.956521739132,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552769"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Tayug Cadre Rd (S00359LZ) - Chainage 175 - Chainage 190","amountPesos":250000,"lengthMeters":15.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552770"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Carmen East West Diversion Rd (S05915LZ) - Chainage 4181 - Chainage 4216.4","amountPesos":500000,"lengthMeters":35.4,"ratePesosPerMeter":14124.29378531088,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552771"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Pangasinan-Nueva Ecija Rd - K0182 + 935 - K0182 + 955","amountPesos":615000,"lengthMeters":20.0,"ratePesosPerMeter":30750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552772"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Urdaneta Jct-Dagupan-Lingayen Rd - K0190 + 117 - K0190 + 178.30","amountPesos":922000,"lengthMeters":61.3,"ratePesosPerMeter":15040.783034260605,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552773"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Manila North Rd - K0383 + 000 - K0386 + 419","amountPesos":55000000,"lengthMeters":3419.0,"ratePesosPerMeter":16086.575021936238,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552774"},{"year":2025,"category":"Roads","project":"Installation of Roadway Lighting Structures in San Carlos - Calasiao Road, San Carlos City, Pangasinan 204 + (-1000) - 208 + 008 B/S","amountPesos":100000000,"lengthMeters":5008.0,"ratePesosPerMeter":19968.051118210864,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552775"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Pangasinan-Zambales Rd - K0358 + (-910) - K0360 + 064, K0360 + 713 - K0361 + 379, K0362 + 700 - K0364 + 987, K0367 + 746 - K0368 + 457, K0369 + 480 - K0370 + 200, K0370 + 700 - K0372 + 487","amountPesos":50891000,"lengthMeters":9145.0,"ratePesosPerMeter":5564.898851831602,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552779"},{"year":2025,"category":"Roads","project":"Installation of Street Lightings along Baguio-Bontoc Road K0278+700 - K0287+020, Atok, Benguet","amountPesos":100000000,"lengthMeters":8320.0,"ratePesosPerMeter":12019.23076923077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552780"},{"year":2025,"category":"Roads","project":"Installation of Street Lightings along Baguio-Bontoc Road K0287+020 - K0295+340, Atok, Benguet","amountPesos":100000000,"lengthMeters":8320.0,"ratePesosPerMeter":12019.23076923077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552781"},{"year":2025,"category":"Roads","project":"Installation of Street Lightings along Baguio-Bontoc Road K0320+045 - K0336+645,Buguias, Benguet","amountPesos":100000000,"lengthMeters":16600.0,"ratePesosPerMeter":6024.096385542169,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552782"},{"year":2025,"category":"Roads","project":"Installation of Street Lightings along Baguio-Bontoc Road K0336+645 - K0341+000, Buguias, Benguet","amountPesos":50000000,"lengthMeters":4355.0,"ratePesosPerMeter":11481.05625717566,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552783"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K0394 + 000 - K0394 + 295","amountPesos":14299000,"lengthMeters":295.0,"ratePesosPerMeter":48471.186440677964,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552785"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway - K0423 + 239 - K0423 + 356, K0459 + 243 - K0459 + 628, K0460 + 270 - K0460 + 323","amountPesos":13423000,"lengthMeters":555.0,"ratePesosPerMeter":24185.585585585584,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552798"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway ( Cagayan Valley Rd) - K0539 + 795 - K0541 + 000","amountPesos":30413000,"lengthMeters":1205.0,"ratePesosPerMeter":25239.004149377593,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552799"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Jct Logac-Magapit Rd - K0706 + 000 - K0708 + 050, K0711 + 229 - K0711 + 538.5","amountPesos":92473000,"lengthMeters":2359.5,"ratePesosPerMeter":39191.77791905065,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552800"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Manila North Rd - K0646 + 806 - K0647 + 000, K0648 + 565 - K0649 + 019, K0658 + 400 - K0658 + 750","amountPesos":44101000,"lengthMeters":998.0,"ratePesosPerMeter":44189.37875751503,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552801"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Manila North Rd - K0646 + 000 - K0646 + 170, K0646 + 245 - K0646 + 806, K0650 + 685 - K0650 + 876","amountPesos":26860000,"lengthMeters":922.0,"ratePesosPerMeter":29132.32104121475,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552802"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Manila North Rd - K0654 + 387.30 - K655 + 046, K0655 + 062 - K0655 + 392, K0657 + 000 - K0658 + 000, K0669 + 450 - K0669 + 815, K0671 + 341 - K0671 + 540, K0673 + 279 - K0673 + 968, K0674 + 108 - K0674 + 900, K0675 + 225 - K0675 + 824, K0676 + 063 - K0676 + 149, K0677 + 122 - K0677 + 293, K0678 + 729 - K0678 + 891","amountPesos":130124000,"lengthMeters":5051.7,"ratePesosPerMeter":25758.457548944156,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552803"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Manila North Rd - K0671 + 142 - K0671 + 341, K0677 + 384.53 - K0677 + 544.53, K0683 + 663 - K0683 + 924","amountPesos":8716000,"lengthMeters":620.0,"ratePesosPerMeter":14058.064516129032,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552804"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Bangag-Magapit Rd - K0686 + (-436) - K0686 + (-058), K0686 + 050 - K0686 + 576, K0687 + 009 - K0687 + 500, K0688 + 144 - K0689 + 000, K0689 + 005 - K0689 + 175","amountPesos":32018000,"lengthMeters":2421.0,"ratePesosPerMeter":13225.113589425857,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552805"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Manila North Rd - K0678 +000 - K0678 + 300, K0682 + 299 - K0682 + 521.5","amountPesos":12569000,"lengthMeters":522.5,"ratePesosPerMeter":24055.502392344497,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552806"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Manila North Rd - K0614 + 000 - K0615 + 000, K0617 + 198 - K0617 + 771, K0622 + 000 - K0623 + 182","amountPesos":59786000,"lengthMeters":2755.0,"ratePesosPerMeter":21700.907441016334,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552807"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway ( Cagayan Valley Rd) - K0475 + 842 - K0476 + 102, K0476 + 132 - K0476 + 225, K0476 + 672 - K0478 + 200, K0482 + 644 - K0483 + 073","amountPesos":107211000,"lengthMeters":2310.0,"ratePesosPerMeter":46411.68831168831,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552808"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway ( Cagayan Valley Rd) - K0484 + 855 - K0486 + 320, K0487 + 000 - K0487 + 484, K0487 + 610 - K0487 + 682, K0488 + 000 - K0488 + 765","amountPesos":137509000,"lengthMeters":2786.0,"ratePesosPerMeter":49357.142857142855,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552809"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway ( Cagayan Valley Rd) - K0461 + 489 - K0461 + 707, K0462 + (-113) - K0462 + (-43), K0469 + 780 - K0469 + 898","amountPesos":8326000,"lengthMeters":406.0,"ratePesosPerMeter":20507.389162561576,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552810"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K0349 + 012 - K0350 + 700, K0358 + 005 - K0358 + 581","amountPesos":135677000,"lengthMeters":2264.0,"ratePesosPerMeter":59928.0035335689,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552811"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K0340 + 623 - K0342 + 038, K0342 + 588 - K0342 + 764, K0342 + 794 - K0342 + 916","amountPesos":50113000,"lengthMeters":1713.0,"ratePesosPerMeter":29254.52422650321,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552812"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway - K0309 + 990 - K0310 + 465","amountPesos":14258000,"lengthMeters":475.0,"ratePesosPerMeter":30016.842105263157,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552813"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K0220 + 576 - K0222 + 290, K0237+ 627 - K0237 + 804, K0238 + 147 - K0238 + 420","amountPesos":144793000,"lengthMeters":2164.0,"ratePesosPerMeter":66909.88909426986,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552814"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K0257 + 000 - K0258 + 100","amountPesos":71335000,"lengthMeters":1100.0,"ratePesosPerMeter":64850.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552815"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K0247 + 000 - K0248 + 000, K0262 + 000 - K0262 + 874, K0281 + 101 - K0282 + 111, K0287 + 229.80 - K0287 + 500","amountPesos":200000000,"lengthMeters":3154.2,"ratePesosPerMeter":63407.52013188741,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552816"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway - K0263 + 000 - K0265 + 188, K0269 + 339 - K0270 + 189, K0273 + 392 - K0275 + 626.70, K0279 + 000 - K0280 + 596, K0281 + 000 - K0281 + 101, K0282 + 801 - K0283 + 533, K0283 + 614 - K0284 + 037, K0288 + 893 - K0291 + 000, K0294 + 407 - K0294 + 660","amountPesos":203669000,"lengthMeters":10484.7,"ratePesosPerMeter":19425.35313361372,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552817"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Maharlika Highway - K0309 + (-915) - K0314 + 671","amountPesos":59066000,"lengthMeters":6586.0,"ratePesosPerMeter":8968.417856058306,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552818"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Maharlika Highway ( Cagayan Valley Rd) - K0520 + 585 - K0527 + 112","amountPesos":30000000,"lengthMeters":6527.0,"ratePesosPerMeter":4596.292324191819,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552819"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Devices/Facilities along Maharlika Highway, K0394+(-827) - K0460+752 City of Ilagan to San Pablo, Isabela","amountPesos":70000000,"lengthMeters":67579.0,"ratePesosPerMeter":1035.8247384542535,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552820"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Jct Logac-Magapit Rd - K0705 + (-113) - K0713 + 595","amountPesos":41754000,"lengthMeters":8708.0,"ratePesosPerMeter":4794.901240238861,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552821"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Jct Layac-Balanga-Mariveles Port Rd - K0158 + (-494) - K0161 + 120","amountPesos":20000000,"lengthMeters":3614.0,"ratePesosPerMeter":5534.034311012729,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552822"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Alas-Asin Port Rd - K0156 + (-978) - K0157 + 509","amountPesos":9295000,"lengthMeters":2487.0,"ratePesosPerMeter":3737.4346602332125,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552823"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Angeles-Porac-Floridablanca-Dinalupihan Rd - K0113 + (-408) - K0113 + 085, K0114 + 297 - K0114 + 434, K0115 + 065 - K0118 + 715, K0118 + 823 - K0118 + 1215","amountPesos":24394000,"lengthMeters":4672.0,"ratePesosPerMeter":5221.318493150685,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552824"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Pavement Markings, Road Signs, Off-carriageway Improvement) along Maharlika Highway - K0160 + 510 - K0160 + 997","amountPesos":3600000,"lengthMeters":487.0,"ratePesosPerMeter":7392.197125256674,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552825"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bocaue-Sn Jose Rd - K0037 + 1122 - K0040 + 115, K0040 + 122 - K0042 + 140 and Muzon-Tungkong Manga Rd - K0042 + 315 - K0042 + 389, K0042 + 601 - K0045 + 036","amountPesos":65000000,"lengthMeters":6520.0,"ratePesosPerMeter":9969.325153374233,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552827"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Sn Miguel-Sibul Rd - K0078 + (-968) - K0078 + (-168)","amountPesos":50000000,"lengthMeters":800.0,"ratePesosPerMeter":62500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552829"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Manila North Rd - K0108+340 - K0115+190","amountPesos":53453000,"lengthMeters":6850.0,"ratePesosPerMeter":7803.3576642335765,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552830"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K0176 + 379 - K0176 + 520, K0176 + 597 - K0176 + 747","amountPesos":15440000,"lengthMeters":291.0,"ratePesosPerMeter":53058.41924398625,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552831"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway - K0207 + 000 - K0207 + 710","amountPesos":22406000,"lengthMeters":710.0,"ratePesosPerMeter":31557.74647887324,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552832"},{"year":2025,"category":"Roads","project":"Solar Street Lights Installation and Application, Old Cagayan Valley Road Section (KM54+(-1003) - KM54+759, San Rafael, Bulacan","amountPesos":100000000,"lengthMeters":1762.0,"ratePesosPerMeter":56753.688989784336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552833"},{"year":2025,"category":"Roads","project":"Solar Street Lights Installation and Application, Maharlika Highway Section (KM53+(-280) - KM54+794, San Rafael, Bulacan","amountPesos":100000000,"lengthMeters":2074.0,"ratePesosPerMeter":48216.00771456124,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552834"},{"year":2025,"category":"Roads","project":"Solar Street Lights Installation and Application, Maharlika Highway Section (KM82+000 - KM84+093), San Miguel, Bulacan","amountPesos":100000000,"lengthMeters":2093.0,"ratePesosPerMeter":47778.30864787386,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552835"},{"year":2025,"category":"Roads","project":"Solar Street Lights Installation and Application, Sta. Rita-Camias Old Road Section (KM74+000 - KM76+000), San Miguel, Bulacan","amountPesos":100000000,"lengthMeters":2000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552836"},{"year":2025,"category":"Roads","project":"Solar Street Lights Installation and Application, Sibul - Biak na Bato Road Section (KM93+000 - KM95+000), San Miguel, Bulacan","amountPesos":100000000,"lengthMeters":2000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552837"},{"year":2025,"category":"Roads","project":"Installation of Streetlights Along General Alejo Santos Highway K0047 + 707 - K0056 + 707, Bustos, Bulacan","amountPesos":100000000,"lengthMeters":9000.0,"ratePesosPerMeter":11111.111111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552839"},{"year":2025,"category":"Roads","project":"Installation of Streetlights Along Old Cagayan Valley Road K0045 + 400 - K0051 + 290, Baliwag, Bulacan","amountPesos":100000000,"lengthMeters":5890.0,"ratePesosPerMeter":16977.92869269949,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552843"},{"year":2025,"category":"Roads","project":"Installation / Application / Construction Of Road Safety Facilities (Roadway Lighting) Along Bagac Mariveles Rd - K0170 + 423 - K0179 + 923, Bataan","amountPesos":100000000,"lengthMeters":9500.0,"ratePesosPerMeter":10526.315789473685,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552846"},{"year":2025,"category":"Roads","project":"Installation /application / Construction Of Road Safety Facilities (Roadway Lighting) Along Bagac Mariveles Rd - K0179 + 923 - K0189 + 423, Bataan","amountPesos":100000000,"lengthMeters":9500.0,"ratePesosPerMeter":10526.315789473685,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552847"},{"year":2025,"category":"Roads","project":"Installation /application / Construction Of Road Safety Facilities (Roadway Lighting) Along Bagac Mariveles Rd - K0189 + 423 - K0195 + 546, Bataan","amountPesos":100000000,"lengthMeters":6123.0,"ratePesosPerMeter":16331.863465621427,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552848"},{"year":2025,"category":"Roads","project":"Installation /application / Construction Of Road Safety Facilities (Roadway Lighting) Along Epza By-pass (Baraso Country Rd) - K0160 + 853 - K0164 + 527, Bataan","amountPesos":100000000,"lengthMeters":3674.0,"ratePesosPerMeter":27218.290691344584,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552850"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway - K0198 + 467 - K0199 + 113","amountPesos":21173000,"lengthMeters":646.0,"ratePesosPerMeter":32775.54179566563,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552856"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Maspang H-way - K0070 + (-895) - K0073 + 282","amountPesos":70000000,"lengthMeters":4177.0,"ratePesosPerMeter":16758.43907110366,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552877"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Maharlika Highway - K0099 + 000 - K0099 + 584","amountPesos":1100000,"lengthMeters":584.0,"ratePesosPerMeter":1883.5616438356165,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552885"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs, Barrier, Off-carriageway Improvement) along Maharlika Highway ( Manila South Road) - K0029 + 600 - K0030 + 600","amountPesos":2290000,"lengthMeters":1000.0,"ratePesosPerMeter":2290.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552886"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Maharlika Highway - K0097 + 200 - K0098 + 096","amountPesos":1652000,"lengthMeters":896.0,"ratePesosPerMeter":1843.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552887"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities along Maharlika Highway - K0109 + 000 - K0109 + 903","amountPesos":1708000,"lengthMeters":903.0,"ratePesosPerMeter":1891.4728682170542,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552888"},{"year":2025,"category":"Roads","project":"Installation of Street Lights along Calapan South Road K0047+200 – K0060+800, Socorro, Oriental Mindoro","amountPesos":100000000,"lengthMeters":13600.0,"ratePesosPerMeter":7352.941176470588,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552915"},{"year":2025,"category":"Roads","project":"Installation of Street Lights along Calapan South Road K0007+400 – K0021+000, Calapan - Naujan, Oriental Mindoro","amountPesos":100000000,"lengthMeters":13600.0,"ratePesosPerMeter":7352.941176470588,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552918"},{"year":2025,"category":"Roads","project":"Installation of Street Lights along Calapan North Road K0007+000 – K0019+800, Baco - San Teodoro, Oriental Mindoro","amountPesos":100000000,"lengthMeters":12800.0,"ratePesosPerMeter":7812.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552919"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K0481 + (-680) - K0481 + (-497), K0490 + 437 - K0491 + 098","amountPesos":72341000,"lengthMeters":844.0,"ratePesosPerMeter":85712.08530805688,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552921"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K0319 + 000 - K0319 + 571","amountPesos":43212000,"lengthMeters":571.0,"ratePesosPerMeter":75677.75831873906,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552923"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K0328 + 000 - K0328 + 433, K0329 + 200 - K0329 + 417","amountPesos":47770000,"lengthMeters":650.0,"ratePesosPerMeter":73492.30769230769,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552924"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K0424 + 757 - K0425 + 131, K0426 + 722 - K0427 + 333","amountPesos":80000000,"lengthMeters":985.0,"ratePesosPerMeter":81218.27411167513,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552925"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Rolando R. Andaya Highway - K0282 + (-916) - K0282 + (-660), K0282 + (-531) - K0282 + (-458), K0282 + (-406) - K0282 + (-365), K0282 + (-203) - K0282 + (-139), K0282 + 000 - K0282 + 160, K0282 + 245 - K0282 + 460","amountPesos":50000000,"lengthMeters":809.0,"ratePesosPerMeter":61804.69715698393,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552926"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Rolando R. Andaya Highway - K0285 + 002 - K0285 + 888, K0285 + 916 - K0286 + 000","amountPesos":51521000,"lengthMeters":970.0,"ratePesosPerMeter":53114.43298969072,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552927"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Rolando R. Andaya Highway - K0288 + 996 - K0290 + 000","amountPesos":53156000,"lengthMeters":1004.0,"ratePesosPerMeter":52944.22310756972,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552928"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Rolando R. Andaya Highway - K0290 + 000 - K0290 + 948","amountPesos":50000000,"lengthMeters":948.0,"ratePesosPerMeter":52742.61603375527,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552929"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs, Roadway Lighting) along Rolando R. Andaya Highway - K0297 + 560 - K0326 + 000","amountPesos":58091000,"lengthMeters":28440.0,"ratePesosPerMeter":2042.5808720112518,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552930"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K0332 + (-910) - K0332 + (-384), K0335 + 160 - K0335 + 483","amountPesos":62559000,"lengthMeters":849.0,"ratePesosPerMeter":73685.51236749116,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552931"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Bacolod South Rd - K0008 + (-980) - K0007 + 349","amountPesos":57114000,"lengthMeters":329.0,"ratePesosPerMeter":173598.78419452888,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552950"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Tagas-Daet Poblacion-Magang Rd - K0342 + 010 - K0342 + 462","amountPesos":1921000,"lengthMeters":452.0,"ratePesosPerMeter":4250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552932"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities along Maharlika Highway - K0513 + (-194) - K0524 + 555","amountPesos":30000000,"lengthMeters":11749.0,"ratePesosPerMeter":2553.408800749,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552939"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Guardrails, Pavement Markings) along Maharlika Highway - K0332 + (-910) - K0333 + 660","amountPesos":40000000,"lengthMeters":2570.0,"ratePesosPerMeter":15564.20233463035,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552941"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K0347 + 604 - K0348 + 179","amountPesos":25000000,"lengthMeters":575.0,"ratePesosPerMeter":43478.260869565216,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552942"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway - K0528 + 460 - K0528 + 771, K0539 + 000 - K0539 + 285.5","amountPesos":29290000,"lengthMeters":596.5,"ratePesosPerMeter":49103.101424979046,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552943"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway - K0524 + 188 - K0524 + 481, K0526 + 000 - K0526 + 522","amountPesos":30838000,"lengthMeters":815.0,"ratePesosPerMeter":37838.03680981595,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552944"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K0319 + 708 - K0319 + 894, K0320 + 217 - K0320 + 528","amountPesos":39498000,"lengthMeters":497.0,"ratePesosPerMeter":79472.8370221328,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552945"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K0407 + 987 - K0408 + 739","amountPesos":75385000,"lengthMeters":752.0,"ratePesosPerMeter":100246.01063829787,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552946"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K0543 + 040 - K0543 + 410, K0553 + 000 - K0553 + 482, K0555 + 074 - K0557 + 000, K0557 + 000 - K0557 + 125","amountPesos":121221000,"lengthMeters":2903.0,"ratePesosPerMeter":41757.14777816052,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552947"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K0476 + 656 - K0476 + 979","amountPesos":15000000,"lengthMeters":323.0,"ratePesosPerMeter":46439.62848297213,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552948"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Aklan East Rd - K0286 + 071 - K0290 + 170","amountPesos":50000000,"lengthMeters":4099.0,"ratePesosPerMeter":12198.09709685289,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552949"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Bacolod South Rd - K0006 + (-190) - K0005 + 1000","amountPesos":80086000,"lengthMeters":190.0,"ratePesosPerMeter":421505.2631578947,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552951"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Iloilo-Capiz Rd (New Route) - K0081 + 692 - K0083 + 303, K0084 + 070 - K0084 + 708","amountPesos":126827000,"lengthMeters":2249.0,"ratePesosPerMeter":56392.61894175189,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552952"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Iloilo-Capiz Rd (New Route) - K0065 + 377 - K0066 + 390","amountPesos":59998000,"lengthMeters":1013.0,"ratePesosPerMeter":59228.035538005926,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552953"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Iloilo-Capiz Rd (New Route) - K0078 + 165 - K0079 + 373, K0080 + 800 - K0081 + 692","amountPesos":125841000,"lengthMeters":2100.0,"ratePesosPerMeter":59924.28571428572,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552954"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along Barotac Nuevo-Dumangas-Dacutan Wharf Rd - K0284 + 168 - K0285 + 342","amountPesos":53878000,"lengthMeters":1174.0,"ratePesosPerMeter":45892.67461669506,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552955"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bacolod North Rd - K0036 + 902 - K0042 + 280","amountPesos":64963000,"lengthMeters":5378.0,"ratePesosPerMeter":12079.397545555968,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552956"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along Hinigaran-Isabela Rd - K0054 + 183 - K0054 + 297, K0054 + 311 - K0054 + 335, K0054 + 390 - K0054 + 402, K0054 + 440 - K0054 + 539, K0054 + 539 - K0054 + 701, K0054 + 701 - K0054 + 746, K0054 + 746 - K0054 + 827, K0054 + 827 - K0054 + 868, K0054 + 868 - K0054 + 984, K0054 + 918 - K0054 + 931, K0054 + 984 - K0055 + 035, K0055 + 143 - K0055 + 202, K0055 + 310 - K0055 + 327, K0055 + 327 - K0055 + 341, K0055 + 382 - K0055 + 406, K0055 + 402 - K0055 + 410, K0055 + 406 - K0055 + 500, K0055 + 500 - K0055 + 613, K0055 + 613 - K0055 + 667, K0055 + 667 - K0055 + 708, K0055 + 708 - K0055 + 722, K0055 + 751 - K0055 + 760, K0055 + 875 - K0055 + 956, K0055 + 956 - K0056 + 000, K0056 + 000 - K0056 + 062, K0056 + 377 - K0056 + 409","amountPesos":29970000,"lengthMeters":1403.0,"ratePesosPerMeter":21361.368496079827,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552957"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads along Hinigaran-Isabela Rd - K0053 + 000 - K0053 + 377","amountPesos":10200000,"lengthMeters":377.0,"ratePesosPerMeter":27055.702917771883,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552958"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads along Jct Bagonawa-La Castellana-Isabela Rd - K0076 + 034 - K0076 + 440, K0076 + 468 - K0076 + 588, K0079 + 423 - K0079 + 502","amountPesos":16800000,"lengthMeters":605.0,"ratePesosPerMeter":27768.595041322315,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552959"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Bacolod South Rd - K0079 + 307 - K0080 + 555","amountPesos":34000000,"lengthMeters":1248.0,"ratePesosPerMeter":27243.589743589742,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552960"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads Tertiary Roads along Jct Pontevedra-La Castellana Rd - K0059 + (-093) - K0060 + 000, K0061 + 990 - K0062 + 031","amountPesos":36500000,"lengthMeters":1134.0,"ratePesosPerMeter":32186.94885361552,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552963"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Sta Catalina-Pamplona-Tanjay City - K0034 + 000 - K0046 + 000","amountPesos":150000000,"lengthMeters":12000.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552964"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Sta Catalina-Pamplona-Tanjay City - K0046 + 000 - K0057 + 800","amountPesos":150000000,"lengthMeters":11800.0,"ratePesosPerMeter":12711.864406779661,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552965"},{"year":2025,"category":"Roads","project":"Installation of Road Safety Devices, Informative Signs and Solar Lighting - Secondary Roads - The President Carlos P. Garcia Circumferential RD (Dimiao Section) - K0221+000 - K0227+000","amountPesos":100000000,"lengthMeters":6000.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552966"},{"year":2025,"category":"Roads","project":"Installation of Road Safety Devices, Informative Signs and Solar Lighting - Secondary Roads - The President Carlos P. Garcia Circumferential RD (Jagna Section) - k0191+000 - K021+000","amountPesos":100000000,"lengthMeters":170000.0,"ratePesosPerMeter":588.2352941176471,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552967"},{"year":2025,"category":"Roads","project":"Installation of Road Safety Devices, Informative Signs and Solar Lighting - Secondary Roads - The President Carlos P. Garcia Circumferential RD (Valencia Section) - K0213+000 - K0221+000","amountPesos":100000000,"lengthMeters":8000.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552968"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Cebu North Hagnaya Wharf Rd - K0022 + 496 - K0023 + 300, K0031 + 963 - K0032 + 397","amountPesos":96947000,"lengthMeters":1238.0,"ratePesosPerMeter":78309.36995153474,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552969"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along N Bacalso Ave (Cebu South Rd) - K0072 + 000 - K0075 + 000","amountPesos":90000000,"lengthMeters":3000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552970"},{"year":2025,"category":"Roads","project":"Installation of Solar Street Lights along Cebu-Balamban Transcentral Highway KM 14+452 - KM 17+295, KM 18+765 - KM 22+313, Cebu City, Cebu","amountPesos":100000000,"lengthMeters":6391.0,"ratePesosPerMeter":15647.003598810828,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552971"},{"year":2025,"category":"Roads","project":"Installation of Solar Street Lights along Cebu-Balamban Transcentral Highway KM 22+313 -KM 28+720, Cebu City, Cebu","amountPesos":100000000,"lengthMeters":6407.0,"ratePesosPerMeter":15607.928827844546,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552972"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Mactan Circumferential Rd - K0018 + 023 - K0020 + 151, K0031 + 765 - K0034 + 775","amountPesos":150000000,"lengthMeters":5138.0,"ratePesosPerMeter":29194.23900350331,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552974"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K0945 + 000 - K0945 + 910","amountPesos":85101000,"lengthMeters":910.0,"ratePesosPerMeter":93517.58241758242,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552975"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K0953 + 098 - K0953 + 125","amountPesos":2879000,"lengthMeters":27.0,"ratePesosPerMeter":106629.62962962964,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552976"},{"year":2025,"category":"Roads","project":"Installation of Road Safety Devices along Borongan-Guiuan Road - K0930 + 500 - K0939 + 100, Borongan Poblacion, Borongan City, Eastern Samar","amountPesos":100000000,"lengthMeters":8600.0,"ratePesosPerMeter":11627.906976744185,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552978"},{"year":2025,"category":"Roads","project":"Installation of Road Safety Devices along Borongan-Guiuan Road - K0939 + 130 - K0948 + 500, Borongan Poblacion, Borongan City, Eastern Samar","amountPesos":100000000,"lengthMeters":9370.0,"ratePesosPerMeter":10672.358591248665,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552979"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Off Carriageway improvement) along Borongan- Guiuan Rd - K0950 + 000 - K0984 + 000","amountPesos":85422000,"lengthMeters":34000.0,"ratePesosPerMeter":2512.4117647058824,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552982"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0681 + 800 - K0682 + 330, K0682 + 345 - K0682 + 960, K0683 + 000 - K0684 + 461","amountPesos":167227000,"lengthMeters":2606.0,"ratePesosPerMeter":64169.99232540292,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552985"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0697 + 000 - K0697 + 202, K0698 + 667 - K0698 + 687","amountPesos":8406000,"lengthMeters":222.0,"ratePesosPerMeter":37864.86486486487,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552986"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0705 + 000 - K0705 + 055, K0705 + 872 - K0706 + 000","amountPesos":10512000,"lengthMeters":183.0,"ratePesosPerMeter":57442.62295081967,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552987"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0714 + 906 - K0714 + 963","amountPesos":2148000,"lengthMeters":57.0,"ratePesosPerMeter":37684.21052631579,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552988"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0719 + 000 - K0719 + 153","amountPesos":5308000,"lengthMeters":153.0,"ratePesosPerMeter":34692.81045751634,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552989"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0734 + 000 - K0734 + 115","amountPesos":3098000,"lengthMeters":115.0,"ratePesosPerMeter":26939.130434782608,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552990"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0755 + 085 - K0756 + 000, K0757 + 502 - K0758 + 000, K0777 + 868 - K0778 + 000","amountPesos":48357000,"lengthMeters":1545.0,"ratePesosPerMeter":31299.02912621359,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552991"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0772 + 655 - K0772 + 676, K0772 + 741 - K0772 + 845","amountPesos":2478000,"lengthMeters":125.0,"ratePesosPerMeter":19824.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552992"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0777 + 389 - K0777 + 868","amountPesos":12722000,"lengthMeters":479.0,"ratePesosPerMeter":26559.498956158663,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552993"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0758 +000 - K0758 + 200, K0758 + 640 - K0758 + 690, K0781 + 230 - K0781 + 610","amountPesos":20735000,"lengthMeters":630.0,"ratePesosPerMeter":32912.69841269841,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552994"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0730+000 - K0730+136, K0730 + 809 - K0730 + 913","amountPesos":6463000,"lengthMeters":240.0,"ratePesosPerMeter":26929.166666666668,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552996"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0723 + 586 - K0723 + 866, K0726 + 929 - K0727 + 280, K0729 + 354 - K0729 + 412","amountPesos":18817000,"lengthMeters":689.0,"ratePesosPerMeter":27310.595065312045,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552997"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0756 + 000 - K0756 + 780","amountPesos":34515000,"lengthMeters":780.0,"ratePesosPerMeter":44250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552998"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0781 + 752 - K0782 + 000, K0759 + 656 - K0759 + 700","amountPesos":9441000,"lengthMeters":292.0,"ratePesosPerMeter":32332.19178082192,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 552999"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0853 + 000 - K0853 + 520, K0853 + 541 - K0855 + 000, K0856 + 000 - K0857 + 053, K0857 + 078 - K0857 + 638, K0857 + 663 - K0858 + 776","amountPesos":300000000,"lengthMeters":4705.0,"ratePesosPerMeter":63761.95536663124,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553000"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1928 + 000 - K1929 + 298, K1930 + 998 - K1931 + 694, K1931 + 694 - K1932 + 154","amountPesos":74841000,"lengthMeters":2454.0,"ratePesosPerMeter":30497.55501222494,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553001"},{"year":2025,"category":"Roads","project":"Installation of Solar LED Street Light along Maharlika Highway (Pagadian City - Zamboanga City Rd) K1915+008.20 - K1915+700, Zamboanga City","amountPesos":8000000,"lengthMeters":691.8,"ratePesosPerMeter":11564.035848510352,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553003"},{"year":2025,"category":"Roads","project":"Installation of Solar LED Street Light along Maharlika Highway (Pagadian City - Zamboanga City Rd) K1905+900 - K1908+300, Zamboanga City","amountPesos":25000000,"lengthMeters":2400.0,"ratePesosPerMeter":10416.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553004"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1651 + 060 - K1653 + 244.03","amountPesos":113120000,"lengthMeters":2184.03,"ratePesosPerMeter":51794.16033662475,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553006"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway ( Tucuran Jct-Karomatan Jct Rd) - K1651 + (-468) - K1652 + 400 (Intermittent Section), K1654 + 000 - K1654 + 708.8 (Intermittent Section)","amountPesos":38291000,"lengthMeters":2576.8,"ratePesosPerMeter":14859.903756597061,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553007"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1676 + 722 - K1677 + 000, K1677 + 853 - K1678+ 091, K1680 + 380 - K1680 + 603","amountPesos":43435000,"lengthMeters":739.0,"ratePesosPerMeter":58775.372124492555,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553008"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1726 + 098 - K1726 + 298, K1749+ 000 - K1749 + 635","amountPesos":43393000,"lengthMeters":835.0,"ratePesosPerMeter":51967.66467065868,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553009"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1773 + 361 - K1775 + 181","amountPesos":115151000,"lengthMeters":1820.0,"ratePesosPerMeter":63269.78021978022,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553010"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1757 + (-757) - K1757 + 832","amountPesos":83307000,"lengthMeters":1589.0,"ratePesosPerMeter":52427.3127753304,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553011"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1769 + 845 - K1769 + 900, K1813 + 000 - K1813 + 817, K1816 + 975 - K1817 + 061, K1842 + 000 - K1843 + 000","amountPesos":44381000,"lengthMeters":1958.0,"ratePesosPerMeter":22666.496424923393,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553012"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along Siocon-Sirawai-Sibuco-Limpapa Rd - (S01151MN) Chainage 23548 - Chainage 24284, Chainage 24608 - Chainage 26765, Chainage 26793 - Chainage 29000","amountPesos":89410000,"lengthMeters":5100.0,"ratePesosPerMeter":17531.37254901961,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553013"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1768 + 090 - K1769 + 000, K1794 + 000 - K1794 + 215","amountPesos":33500000,"lengthMeters":1125.0,"ratePesosPerMeter":29777.777777777777,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553015"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Dipolog - Punta - Dansullan - S Osmeña - Zamboanga del Norte/Sur Bdry Rd - K1853 + 580 - K1856 + 619","amountPesos":50584000,"lengthMeters":3039.0,"ratePesosPerMeter":16644.94899638039,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553016"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1805 + 392 - K1805 + 747, K1817 + 101 - K1817 + 711, K1821 + 000 - K1822 + 000","amountPesos":16734000,"lengthMeters":1965.0,"ratePesosPerMeter":8516.030534351145,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553017"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway( Cotabato-Malabang-Lanao del Norte Rd) - (S01650MN) Chainage 26000 - Chainage 27306","amountPesos":50000000,"lengthMeters":1306.0,"ratePesosPerMeter":38284.83920367534,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553018"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Butuan City-Cagayan de Oro City-Iligan City Rd - K1355 + 335 - K1356 + 733","amountPesos":60053000,"lengthMeters":1398.0,"ratePesosPerMeter":42956.366237482114,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553019"},{"year":2025,"category":"Roads","project":"Preventive Maintenance-Primary Roads along Butuan City- Cagayan de Oro City- Iligan City Rd- K1416 + 000 - K1418 + 004","amountPesos":53415000,"lengthMeters":2004.0,"ratePesosPerMeter":26654.191616766468,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553020"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Butuan City-Cagayan de Oro City-Iligan City Rd - K1406 + 759 - K1407 + 330, K1409 + 057 - K1410 + 000, K1412 + 780 - K1413 + 310, K1418 + 420 - K1418 + 680","amountPesos":88887000,"lengthMeters":2304.0,"ratePesosPerMeter":38579.427083333336,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553021"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Kalilangan-Lampanusan Rd - K1604 + 000 - K1605 + 600","amountPesos":15000000,"lengthMeters":1600.0,"ratePesosPerMeter":9375.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553022"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Barandias-Dominorog Rd - K1590 + (-1023) - K1590 + (-353), K1596 + 000 - K1597 + 194","amountPesos":16800000,"lengthMeters":1864.0,"ratePesosPerMeter":9012.875536480688,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553023"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway( Malabang-Dobleston-Tukuran Rd) - K1979 + 748 - K1981 + 737","amountPesos":51143000,"lengthMeters":1989.0,"ratePesosPerMeter":25712.921065862243,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553024"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway( Malabang-Dobleston-Tukuran Rd) - K1981 + 986 - K1983 + 853","amountPesos":58106000,"lengthMeters":1867.0,"ratePesosPerMeter":31122.656668452062,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553025"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway( Malabang-Dobleston-Tukuran Rd) - K1972 + 290 - K1972 + 620","amountPesos":11748000,"lengthMeters":330.0,"ratePesosPerMeter":35600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553026"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway( Malabang-Dobleston-Tukuran Rd) - K1985 + 273 - K1986 + 066","amountPesos":28551000,"lengthMeters":793.0,"ratePesosPerMeter":36003.78310214376,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553027"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Maharlika Highway( Malabang-Dobleston-Tukuran Rd) - K1978 + 500 - K1981 + 000","amountPesos":29000000,"lengthMeters":2500.0,"ratePesosPerMeter":11600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553028"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Jct SH Aglayan-Zamboanguita Rd - K1518 + 000 - K1536 + 000","amountPesos":66519000,"lengthMeters":18000.0,"ratePesosPerMeter":3695.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553029"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Gingoog-Claveria-Villanueva Rd - K1335 + 200 - K1337+500, K1338+033 - K1339+000","amountPesos":69553000,"lengthMeters":3267.0,"ratePesosPerMeter":21289.56228956229,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553032"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Tibanban-Lavigan Rd - K1773 + (-754) - K1829 + 862","amountPesos":100000000,"lengthMeters":57616.0,"ratePesosPerMeter":1735.6289919466815,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553033"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway( Digos-Makar Rd) - K1572 + 179 - K1572 + 739","amountPesos":58381000,"lengthMeters":560.0,"ratePesosPerMeter":104251.78571428571,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553034"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway - K1494 + 731 - K1495 + 420","amountPesos":32560000,"lengthMeters":689.0,"ratePesosPerMeter":47256.894049346876,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553036"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway - K1382 + 308 - K1384 + 352","amountPesos":45422000,"lengthMeters":2044.0,"ratePesosPerMeter":22222.11350293542,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553038"},{"year":2025,"category":"Roads","project":"Installation of Streetlights with Road Safety Facilities along Davao-Cotabato Rd (Jct Digos-Cotabato Sect), K1564+(-478) - K1581+000","amountPesos":100000000,"lengthMeters":17478.0,"ratePesosPerMeter":5721.478430026319,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553039"},{"year":2025,"category":"Roads","project":"Installation of Streetlights with Road Safety Facilities along Davao Cotabato Rd (Davao City - Jct. Digos Section) K1534+000 - K1559+ 000","amountPesos":100000000,"lengthMeters":25000.0,"ratePesosPerMeter":4000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553040"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway( Digos-Makar Rd) - K1579 + (-227) - K1579 + 256","amountPesos":50000000,"lengthMeters":483.0,"ratePesosPerMeter":103519.66873706004,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553043"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Guardrails, Road Signs, Pavement Markings, Roadway Lighting) along Banisilan-Guiling-Alamada-Libungan Rd - K1696 + 000 - K1700 + 000","amountPesos":50001000,"lengthMeters":4000.0,"ratePesosPerMeter":12500.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553044"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway (Surigao-Agusan Sect) - K1219 + 300 - K1219 + 950","amountPesos":28957000,"lengthMeters":650.0,"ratePesosPerMeter":44549.230769230766,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553056"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway (Agusan-Davao Sect) - K1304 + (-035) - K1305 + 810","amountPesos":79996000,"lengthMeters":1845.0,"ratePesosPerMeter":43358.265582655826,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553058"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway (Surigao-Agusan Sect) - K1136 + 075 - K1136 + 123, K1136 + 179 - K1136 + 239, K1138 + 395 - K1139 + 190","amountPesos":19713000,"lengthMeters":903.0,"ratePesosPerMeter":21830.564784053156,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553059"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway (Surigao-Agusan Sect) - K1147 + 093 - K1147+590","amountPesos":10705000,"lengthMeters":497.0,"ratePesosPerMeter":21539.23541247485,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553060"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway (Surigao-Agusan Sect) - K1160 + 600 - K1162 + 701","amountPesos":45717000,"lengthMeters":2101.0,"ratePesosPerMeter":21759.63826749167,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553061"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Maharlika Highway (Agusan-Davao Sect) - K1280 + 000 - K1285 + 063","amountPesos":51300000,"lengthMeters":5063.0,"ratePesosPerMeter":10132.332609125026,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553063"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Maharlika Highway (Agusan-Davao Sect) - K1317 + 708 - K1318 + 821","amountPesos":11300000,"lengthMeters":1113.0,"ratePesosPerMeter":10152.740341419587,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553064"},{"year":2025,"category":"Roads","project":"Construction/Installation of Solar Street Lights with Safety Signs and Devices, Jct. Del Carmen - Sta. Monica - San Isidro K0062+000 - K0068+627 Road, San Isidro, Surigao del Norte","amountPesos":100000000,"lengthMeters":6627.0,"ratePesosPerMeter":15089.78421608571,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553065"},{"year":2025,"category":"Roads","project":"Construction/Installation of Solar Street Lights with Safety Signs and Devices, Jct. Cancohoy-Pilar K0019+(-449) - K0026+000 Road, Del Carmen, Surigao del Norte","amountPesos":100000000,"lengthMeters":7449.0,"ratePesosPerMeter":13424.620754463687,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553066"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Maharlika Highway (Lipata-Surigao Sect) - K1114 + (-608) - K1121 + 231","amountPesos":66354000,"lengthMeters":7839.0,"ratePesosPerMeter":8464.600076540375,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553067"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs, Off-carriageway Improvement) along Shaw Blvd - K0008 + (-591) - K0008 + 409","amountPesos":1761000,"lengthMeters":1000.0,"ratePesosPerMeter":1761.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553068"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs, Off-carriageway Improvement) along Shaw Blvd - K0008 + 629 - K0009 + 652","amountPesos":1131000,"lengthMeters":1023.0,"ratePesosPerMeter":1105.5718475073315,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553080"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along EDSA/Ortigas Interchange (S03983LZ) - Chainage 0 - Chainage 492","amountPesos":1654000,"lengthMeters":492.0,"ratePesosPerMeter":3361.788617886179,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553081"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along EDSA/Ortigas Interchange (S03982LZ) - Chainage 0 - Chainage 492","amountPesos":1654000,"lengthMeters":492.0,"ratePesosPerMeter":3361.788617886179,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553082"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along South Super H-way - K0008 + 296 - K0008 + 703","amountPesos":25600000,"lengthMeters":407.0,"ratePesosPerMeter":62899.262899262896,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553090"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along South Super H-way - K0009 + 000 - K0009 + 156","amountPesos":6130000,"lengthMeters":156.0,"ratePesosPerMeter":39294.8717948718,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553091"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along South Super H-way - K0007 + 401 - K0007 + 712","amountPesos":23800000,"lengthMeters":311.0,"ratePesosPerMeter":76527.33118971062,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553092"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along South Super H-way - K0007 + 000 - K0007 + 305","amountPesos":17978000,"lengthMeters":305.0,"ratePesosPerMeter":58944.262295081964,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553093"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Tayuman - K0007 + (-539.50) - K0007 + (-242.80)","amountPesos":10000000,"lengthMeters":296.7,"ratePesosPerMeter":33704.07819346143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553150"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Velasquez - K0005 + (-123.80) - K0006 + 107.60","amountPesos":40000000,"lengthMeters":1231.4,"ratePesosPerMeter":32483.352281955482,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553151"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Quirino Hi-way - K0012 + 151 - K0013 + 180","amountPesos":1000000,"lengthMeters":1029.0,"ratePesosPerMeter":971.8172983479105,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553152"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along P Burgos Street - K0001 + (-448) - K0001 + (-417)","amountPesos":2439000,"lengthMeters":31.0,"ratePesosPerMeter":78677.41935483871,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553155"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads along Bonifacio Drive - K0001 + 605 - K0001 + 799","amountPesos":10888000,"lengthMeters":194.0,"ratePesosPerMeter":56123.71134020619,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553156"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads along Pres Quirino Ave - K0005 + 111 - K0005 + 249","amountPesos":30494000,"lengthMeters":138.0,"ratePesosPerMeter":220971.01449275363,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553161"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Pias-Currimao-Balaccad Rd - K0466 + 868 - K0470 + 100","amountPesos":21000000,"lengthMeters":3232.0,"ratePesosPerMeter":6497.524752475248,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553162"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Pias-Currimao-Balaccad Rd - K0471 + 400 - K0476 + 324","amountPesos":34847000,"lengthMeters":4924.0,"ratePesosPerMeter":7076.969943135662,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553163"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Manila North Rd - K0468 + 147 - K0469 + 562","amountPesos":11800000,"lengthMeters":1415.0,"ratePesosPerMeter":8339.22261484099,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553164"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Manila North Rd - K0452 + 582 - K0455 + 700","amountPesos":19000000,"lengthMeters":3118.0,"ratePesosPerMeter":6093.649775497113,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553165"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Manila North Rd - K0448 + 925 - K0452 + 550","amountPesos":22000000,"lengthMeters":3625.0,"ratePesosPerMeter":6068.9655172413795,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553166"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Manila North Rd - K0445 + (-281) - K0448 + 895","amountPesos":25000000,"lengthMeters":4176.0,"ratePesosPerMeter":5986.590038314176,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553167"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Batac-Espiritu (Banna) Rd - K0472 + 416 - K0474 + 262","amountPesos":14770000,"lengthMeters":1846.0,"ratePesosPerMeter":8001.083423618635,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553169"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) Along Manila North Road - 343 + 300 - 343 + 386","amountPesos":8000000,"lengthMeters":86.0,"ratePesosPerMeter":93023.25581395348,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553170"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Manila North Rd - K0279 + 800 - K0283 + 720","amountPesos":25000000,"lengthMeters":3920.0,"ratePesosPerMeter":6377.551020408163,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553171"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Sn Fernando-Bagulin Rd - K0271 + 000 - K0271 + 905, K0272 + 828 - K0280+000","amountPesos":25000000,"lengthMeters":8077.0,"ratePesosPerMeter":3095.20861706079,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553173"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Manila North Rd - K0223 + 506 - K0232 + 402","amountPesos":50000000,"lengthMeters":8896.0,"ratePesosPerMeter":5620.503597122302,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553174"},{"year":2025,"category":"Roads","project":"Installation of Solar LED Street Lights along Alaminos-Bolinao Road K0322 + 320 - K0325 + 811, Alaminos City, Pangasinan","amountPesos":50000000,"lengthMeters":3491.0,"ratePesosPerMeter":14322.543683758235,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553175"},{"year":2025,"category":"Roads","project":"Installation of Solar LED Street Lights along Pangasinan-Zambales Road K0283 + 460 - K0286 + 951, Dasol, Pangasinan","amountPesos":50000000,"lengthMeters":3491.0,"ratePesosPerMeter":14322.543683758235,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553176"},{"year":2025,"category":"Roads","project":"Installation of Solar LED Street Lights along Pangasinan-Zambales Road K0301 + 380 - K0304 + 971, Mabini, Pangasinan","amountPesos":50000000,"lengthMeters":3591.0,"ratePesosPerMeter":13923.69813422445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553177"},{"year":2025,"category":"Roads","project":"Installation of Solar LED Street Lights along Pangasinan-Zambales Road K0313 + 659 - K0317 + 150, Alaminos City, Pangasinan","amountPesos":50000000,"lengthMeters":3491.0,"ratePesosPerMeter":14322.543683758235,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553178"},{"year":2025,"category":"Roads","project":"Installation of Solar LED Street Lights along Pangasinan-Zambales Road K0317 + 170 - K0320 + 661, Alaminos City, Pangasinan","amountPesos":50000000,"lengthMeters":3491.0,"ratePesosPerMeter":14322.543683758235,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553179"},{"year":2025,"category":"Roads","project":"Installation of Solar LED Street Lights along Pangasinan-Zambales Road K0323 + 006 - K0326 + 497, Alaminos City, Pangasinan","amountPesos":50000000,"lengthMeters":3491.0,"ratePesosPerMeter":14322.543683758235,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553180"},{"year":2025,"category":"Roads","project":"Installation of Solar LED Street Lights along Pangasinan-Zambales Road K0326 + 617 - K0330 + 108, Sual, Pangasinan","amountPesos":50000000,"lengthMeters":3491.0,"ratePesosPerMeter":14322.543683758235,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553181"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Off-carriageway Improvement, Pavement Markings, Road Signs, Roadway Lighting) along Pangasinan-Tarlac Rd - K0181 + 375 - K0182 + 377","amountPesos":3740000,"lengthMeters":1002.0,"ratePesosPerMeter":3732.5349301397205,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553182"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Pangasinan-Zambales Rd - K0368 + 457 - K0369 + 480","amountPesos":890000,"lengthMeters":1023.0,"ratePesosPerMeter":869.9902248289346,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553183"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Lingayen-Labrador Div Rd - K0362 + (-613) - K0369 + 387","amountPesos":45540000,"lengthMeters":8000.0,"ratePesosPerMeter":5692.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553184"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Binmaley-Lingayen via Quibaol Rd - K0364 + 673 - K0367 + 573","amountPesos":20935000,"lengthMeters":2900.0,"ratePesosPerMeter":7218.9655172413795,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553185"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Pangasinan-Nueva Vizcaya Rd - K0173 + 865 - K0174 + 868","amountPesos":880000,"lengthMeters":1003.0,"ratePesosPerMeter":877.3678963110669,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553186"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Urdaneta Jct-Dagupan Rd - K0198 + 206 - K0199 + 196","amountPesos":840000,"lengthMeters":990.0,"ratePesosPerMeter":848.4848484848485,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553188"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Ayaga-Sta. Marcela-Flora-Lasam Rd - K0672 + (-945) - K0691+ 600","amountPesos":35000000,"lengthMeters":20545.0,"ratePesosPerMeter":1703.5775127768313,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553189"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0640 + 000 - K0669 + 850","amountPesos":40000000,"lengthMeters":29850.0,"ratePesosPerMeter":1340.033500837521,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553190"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Marcos Hi-way - K0268 + 000 - K0273 + 000","amountPesos":50000000,"lengthMeters":5000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553191"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Marcos Hi-way - K0274 + 000 - K0279 + 149","amountPesos":50000000,"lengthMeters":5149.0,"ratePesosPerMeter":9710.623422023695,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553192"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Road Signs, Pavement Markings) along Baguio-Bontoc Rd - K0267 + 812 - K0269 + 203","amountPesos":1500000,"lengthMeters":1391.0,"ratePesosPerMeter":1078.3608914450035,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553193"},{"year":2025,"category":"Roads","project":"Installation of Street Lightings along Baguio - Bontoc Road K0262+000 - K0270+350, Tublay & Atok, Benguet","amountPesos":100000000,"lengthMeters":8350.0,"ratePesosPerMeter":11976.047904191617,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553194"},{"year":2025,"category":"Roads","project":"Installation of Street Lightings along Baguio - Bontoc Road K0270+350 - K0278+700, Atok, Benguet","amountPesos":100000000,"lengthMeters":8350.0,"ratePesosPerMeter":11976.047904191617,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553195"},{"year":2025,"category":"Roads","project":"Installation of Street Lightings along Baguio - Bontoc Road K0295+340 - K0295+904, K0312+325 - K0320+045, Atok + Buguias, Benguet","amountPesos":100000000,"lengthMeters":8284.0,"ratePesosPerMeter":12071.463061323033,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553196"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Baguio-Bontoc Rd - K0388 + 955 - K0391 + 305","amountPesos":25000000,"lengthMeters":2350.0,"ratePesosPerMeter":10638.297872340425,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553197"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Mt Province-N Vizcaya Rd - K0383 + 954 - K0386 + 255","amountPesos":25000000,"lengthMeters":2301.0,"ratePesosPerMeter":10864.84137331595,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553198"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Mt Prov-Cagayan via Tabuk-Enrile Rd - K0392 + (-332) - K0396 + 683","amountPesos":50000000,"lengthMeters":5015.0,"ratePesosPerMeter":9970.089730807576,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553199"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Jct Magapit-Capissayan Rd - K0557 + (-265) - K0563 + 010","amountPesos":30000000,"lengthMeters":6275.0,"ratePesosPerMeter":4780.876494023904,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553200"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Cagayan Valley Rd (Magapit-Jct Aparri Airport Sect) - K0554 + (-334) - K0557 + 735","amountPesos":20000000,"lengthMeters":4069.0,"ratePesosPerMeter":4915.212582944212,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553201"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Devices/Facilities along Santiago Tuguegarao National Road K0419+(-522) - k0433+260","amountPesos":40000000,"lengthMeters":14782.0,"ratePesosPerMeter":2705.9937762143145,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553202"},{"year":2025,"category":"Roads","project":"Installation of Roadway Lighting Structures Along Echague Poblacion Road, K0340+000-K0342+979, Echague, Isabela","amountPesos":23000000,"lengthMeters":2979.0,"ratePesosPerMeter":7720.711648204096,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553203"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0339 + 000 - K0345 + 338","amountPesos":30000000,"lengthMeters":6338.0,"ratePesosPerMeter":4733.354370463869,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553210"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0322 + (-730) - K0339 + 000, K0360 + 000 - K0360 + 542","amountPesos":30000000,"lengthMeters":18272.0,"ratePesosPerMeter":1641.8563922942208,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553211"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Jct Mangandingay-Saguday-Isabela Bdry Rd - K0336 + (-310) - K0340 + 334","amountPesos":20000000,"lengthMeters":4644.0,"ratePesosPerMeter":4306.6322136089575,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553212"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Echague-Jones-Madella Rd (Villa Norte-Panang Sect) - K0377 + (-859) - K0380 + 298","amountPesos":20000000,"lengthMeters":4157.0,"ratePesosPerMeter":4811.1618955977865,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553213"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Jct Layac-Balanga-Mariveles Port Rd - K0117 + 151 - K0118 + 607, K0119 + 133 - K0119 + 849","amountPesos":50000000,"lengthMeters":2172.0,"ratePesosPerMeter":23020.25782688766,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553214"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Roman Expressway - K0125 + 392 - K0126 + 188","amountPesos":14580000,"lengthMeters":796.0,"ratePesosPerMeter":18316.582914572864,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553217"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Roman Expressway - K0126 + 213 - K0126 + 501, K0127 + 585 - K0128 + 061","amountPesos":14040000,"lengthMeters":764.0,"ratePesosPerMeter":18376.96335078534,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553218"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Roman Expressway - K0128 + 096 - K0128 + 676","amountPesos":10440000,"lengthMeters":580.0,"ratePesosPerMeter":18000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553219"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Roman Expressway - K0129 + 757 - K0130 + 906","amountPesos":21060000,"lengthMeters":1149.0,"ratePesosPerMeter":18328.981723237597,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553220"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Roman Expressway - K0130 + 956 - K0132 + 185","amountPesos":22860000,"lengthMeters":1229.0,"ratePesosPerMeter":18600.488201790075,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553221"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Roman Expressway - K0132 + 365 - K0132 + 786","amountPesos":7560000,"lengthMeters":421.0,"ratePesosPerMeter":17957.244655581948,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553222"},{"year":2025,"category":"Roads","project":"Installation of Road Safety Facilities (Roadway Lighting) along Roman Expressway - K0147 + 718 - K0152 + 634","amountPesos":100000000,"lengthMeters":4916.0,"ratePesosPerMeter":20341.741253051263,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553224"},{"year":2025,"category":"Roads","project":"Installation of Road Safety Facilities (Roadway Lighting) along Roman Expressway - K0152 + 634 - K0157 + 538","amountPesos":100000000,"lengthMeters":4904.0,"ratePesosPerMeter":20391.517128874388,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553225"},{"year":2025,"category":"Roads","project":"Installation of Road Safety Facilities (Roadway Lighting) along Bagac Mariveles Rd - K0160 + 886 - K0170 + 423","amountPesos":100000000,"lengthMeters":9537.0,"ratePesosPerMeter":10485.477613505294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553227"},{"year":2025,"category":"Roads","project":"Installation / Application / Construction of Road Safety Facilities (Roadway Lighting) Along Bataan Technical Park INC RD ( BTPI ) - K0175 + 000 - K0180 + 633","amountPesos":100000000,"lengthMeters":5633.0,"ratePesosPerMeter":17752.529735487307,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553229"},{"year":2025,"category":"Roads","project":"Installation of Streetlights along Pulilan - Baliuag By Pass Road Sta. 00 + 000 - Sta. 04 + 610 , Pulilan , Bulacan","amountPesos":100000000,"lengthMeters":4610.0,"ratePesosPerMeter":21691.973969631235,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553232"},{"year":2025,"category":"Roads","project":"Installation of Streetlights along Maharlika Highway - K0041 + 952 - K0045 + 452, Pulilan, Bulacan","amountPesos":65000000,"lengthMeters":3500.0,"ratePesosPerMeter":18571.428571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553233"},{"year":2025,"category":"Roads","project":"Installation of Streetlights along Plaridel Pulilan Diversion Road K0042 + 935 - K0044 + 282 , Pulilan, Bulacan","amountPesos":23000000,"lengthMeters":1347.0,"ratePesosPerMeter":17074.981440237563,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553237"},{"year":2025,"category":"Roads","project":"Installation of Streetlights along Bigaa - Plaridel via Bulacan & Malolos Road - K0050 + 354 - K0053 + 765","amountPesos":60000000,"lengthMeters":3411.0,"ratePesosPerMeter":17590.14951627089,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553238"},{"year":2025,"category":"Roads","project":"Installation of Solar Street Lights along Maharlika Highway (LZ)- K0053+ (-280)- K0057 + 460, San Rafael, Bulacan","amountPesos":100000000,"lengthMeters":4740.0,"ratePesosPerMeter":21097.04641350211,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553244"},{"year":2025,"category":"Roads","project":"Installation of Solar Street Lights along Maharlika Highway (LZ)- K0057 + 460- K0062 + 200, San Rafael and San Ildefonso, Bulacan","amountPesos":70000000,"lengthMeters":4740.0,"ratePesosPerMeter":14767.932489451478,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553245"},{"year":2025,"category":"Roads","project":"Installation of Road Safety Devices and Solar Street Lights at Barangay San Roque - Barangay Malimba - Barangay Santo Cristo Sur, City of Gapan, Nueva Ecija, Sta. 2 + 300 - Sta. 4 + 500","amountPesos":50000000,"lengthMeters":2200.0,"ratePesosPerMeter":22727.272727272728,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553247"},{"year":2025,"category":"Roads","project":"Installation of Road Safety Devices and Solar Street Lights at Barangay Santo Cristo Norte - Barangay Bayanihan, City of Gapan, Nueva Ecija, Sta. 6 + 500 - Sta. 8 + 650","amountPesos":50000000,"lengthMeters":2150.0,"ratePesosPerMeter":23255.81395348837,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553248"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Tarlac-Zambales Rd - K0109 + 500 - K0110 + 000, K0113 + 180 - K0116 + 100, K0117 + 090 - K0120 + 800, K0124 + 250 - K0124 + 850","amountPesos":46567000,"lengthMeters":7730.0,"ratePesosPerMeter":6024.191461836998,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553254"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Romulo H-way - K0139 + 968 - K0144 + 050","amountPesos":42127000,"lengthMeters":4082.0,"ratePesosPerMeter":10320.186183243508,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553258"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Manila North Rd - K0133 + 825 - K0135 + 400","amountPesos":17170000,"lengthMeters":1575.0,"ratePesosPerMeter":10901.587301587302,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553259"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Olongapo-Bugallon Rd - K0166 + 536 - K0168 + 423, K0169 + 000 - K0169 + 328, K0169 + 375 - K0169 + 538","amountPesos":26323000,"lengthMeters":2378.0,"ratePesosPerMeter":11069.386038687973,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553262"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Olongapo-Bugallon Rd - K0193 + 715 - K0195 + 200","amountPesos":18000000,"lengthMeters":1485.0,"ratePesosPerMeter":12121.212121212122,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553263"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Olongapo-Bugallon Rd - K0227 + 400 - K0230 + 000","amountPesos":30000000,"lengthMeters":2600.0,"ratePesosPerMeter":11538.461538461539,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553264"},{"year":2025,"category":"Roads","project":"Installation of Solar LED Street Lights along Secondary Roads, Olongapo - Bugallon Road K0245+000 - K0248+500","amountPesos":40000000,"lengthMeters":3500.0,"ratePesosPerMeter":11428.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553265"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Olongapo-Bugallon Rd - K0240 + 479 - K0241 + 800","amountPesos":15457000,"lengthMeters":1321.0,"ratePesosPerMeter":11700.984102952309,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553267"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along Batangas Port Diversion Rd - K0102 + (-188) - K0102 + 355","amountPesos":45510000,"lengthMeters":543.0,"ratePesosPerMeter":83812.1546961326,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553272"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bauan-Mabini Rd - K0153 + 985 - K0161 + 858","amountPesos":50000000,"lengthMeters":7873.0,"ratePesosPerMeter":6350.819255683983,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553273"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Reflective Pavement Studs, Road Sign) along Manila-Batangas Rd - K0103 + 100 - K0104 + 100","amountPesos":3423000,"lengthMeters":1000.0,"ratePesosPerMeter":3423.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553274"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Batangas-Tabangao-Lobo Rd - K0131 + 012 - K0131 + 496, K0131 + 507 - K0131 + 827, K0131 + 844 - K0133 + 000","amountPesos":41711000,"lengthMeters":1960.0,"ratePesosPerMeter":21281.122448979593,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553275"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Talisay-Laurel-Agoncillo Rd - K0116 + 567 - K0121 + 052","amountPesos":34333000,"lengthMeters":4485.0,"ratePesosPerMeter":7655.072463768116,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553276"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Tanauan-Talisay-Tagaytay Rd - K0074 + 000 - K0076 + 006","amountPesos":20000000,"lengthMeters":2006.0,"ratePesosPerMeter":9970.089730807578,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553278"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Reflective Pavement Studs, Pavement Markings, Road Signs) along Juanito R. Remulla, Sr. Rd - K0038 + 000 - K0039 + 000","amountPesos":3660000,"lengthMeters":1000.0,"ratePesosPerMeter":3660.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553285"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Barrier, Pavement Markings, Road Signs) along Noveleta-Rosario Div Rd - K0030 + 000 - K0030 + 894","amountPesos":3930000,"lengthMeters":894.0,"ratePesosPerMeter":4395.973154362416,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553286"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Noveleta-Naic-Tagaytay Rd - K0027 + (-399) - K0031 + 561","amountPesos":46000000,"lengthMeters":4960.0,"ratePesosPerMeter":9274.193548387097,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553287"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Reflective Pavement Studs, Pavement Markings, Road Signs) along Tejero-Gen Trias-Amadeo-Tagaytay Rd - K0035 + 724 - K0036 + 869","amountPesos":3750000,"lengthMeters":1145.0,"ratePesosPerMeter":3275.109170305677,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553288"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Tagaytay-Manila via Silang Rd - K0054 + 155 - K0055 + 477","amountPesos":31318000,"lengthMeters":1322.0,"ratePesosPerMeter":23689.86384266263,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553289"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Tagaytay-Batangas via Tuy Rd - K0059 + (-822) - K0059 + 918","amountPesos":36139000,"lengthMeters":1740.0,"ratePesosPerMeter":20769.540229885057,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553290"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Tagaytay-Batangas via Tuy Rd - K0059 + 918 - K0060 + 105","amountPesos":8031000,"lengthMeters":187.0,"ratePesosPerMeter":42946.52406417112,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553291"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Guardrails, Off-carriageway Improvement) along Tagaytay-Taal Lake Rd - K0058 + 851 - K0059 + 845","amountPesos":3876000,"lengthMeters":994.0,"ratePesosPerMeter":3899.396378269618,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553292"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Guardrails, Off-carriageway Improvement) along Tagaytay-Taal Lake Rd - K0060 + 027 - K0060 + 655","amountPesos":4651000,"lengthMeters":628.0,"ratePesosPerMeter":7406.050955414013,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553293"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Guardrails, Off-carriageway Improvement) along Tagaytay-Taal Lake Rd - K0061 + 000 - K0061 + 177","amountPesos":1247000,"lengthMeters":177.0,"ratePesosPerMeter":7045.197740112994,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553294"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Guardrails, Off-carriageway Improvement) along Ternate-Nasugbu Rd - K0068 + 000 - K0068 + 220","amountPesos":1498000,"lengthMeters":220.0,"ratePesosPerMeter":6809.090909090909,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553295"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Guardrails, Off-carriageway Improvement) along Juanito R. Remulla, Sr. Rd - K0067 + 350 - K0067 + 632","amountPesos":1912000,"lengthMeters":282.0,"ratePesosPerMeter":6780.141843971631,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553296"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Guardrails, Off-carriageway Improvement) along Juanito R. Remulla, Sr. Rd - K0068 + 180 - K0068 + 673","amountPesos":2668000,"lengthMeters":493.0,"ratePesosPerMeter":5411.764705882353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553297"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Guardrails, Off-carriageway Improvement) along Juanito R. Remulla, Sr. Rd - K0069 + 310 - K0069 + 558","amountPesos":1401000,"lengthMeters":248.0,"ratePesosPerMeter":5649.193548387097,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553298"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Calamba-Sta Cruz-Famy Jct Rd - K0086 + 449 - K0087 + 452","amountPesos":809000,"lengthMeters":1003.0,"ratePesosPerMeter":806.5802592223331,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553301"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Sta Cruz-Pob Rd - K0086 + 233 - K0087 + 271","amountPesos":888000,"lengthMeters":1038.0,"ratePesosPerMeter":855.4913294797688,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553302"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs, Barrier) along Calamba-Sta Cruz-Famy Jct Rd - K0073 + 000 - K0073 + 500","amountPesos":960000,"lengthMeters":500.0,"ratePesosPerMeter":1920.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553304"},{"year":2025,"category":"Roads","project":"Installation of Solar Streetlights along Tayabas-Mainit-Mauban Road, K0152+000-K0163+000","amountPesos":150000000,"lengthMeters":11000.0,"ratePesosPerMeter":13636.363636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553305"},{"year":2025,"category":"Roads","project":"Installation of Solar Streetlights along Lucena-Tayabas-Lucban-Sampaloc-Mauban Port Road, K0144+000-K0152+000","amountPesos":100000000,"lengthMeters":8000.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553306"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Quirino H-way - K0255 + 400 - K0255 + 553, K0255 + 610 - K0255 + 862 , K0258 + 720 - K0258 + 886.50, K0259 + 378 - K0259 + 684, K0259 + 883 - K0259 + 910","amountPesos":40562000,"lengthMeters":904.5,"ratePesosPerMeter":44844.66556108347,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553309"},{"year":2025,"category":"Roads","project":"Installation of Road Safety Facilities along Binangonan Div Rd - K0034 + (-687) - K0035 + 299, and Manila East Rd - K0036 + 440 - K0038 + 261, Binangonan, Rizal","amountPesos":50000000,"lengthMeters":3807.0,"ratePesosPerMeter":13133.701076963489,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553311"},{"year":2025,"category":"Roads","project":"Installation of Safety Roller Barrier System along Sumulong Highway - K0023 + 481 - K0023 + 772, K0023 + 792 - K0023 +830","amountPesos":40000000,"lengthMeters":329.0,"ratePesosPerMeter":121580.54711246201,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553312"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Road Signs, Pavement Markings) along Mogpog-Balanacan Port Rd - K0008 + (-1060) - K0016 + 732","amountPesos":1006000,"lengthMeters":9792.0,"ratePesosPerMeter":102.73692810457516,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553313"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Off-carriageway Improvement, Road Signs) along Calapan South Rd - K0041 + 000 - K0042 + 000","amountPesos":3050000,"lengthMeters":1000.0,"ratePesosPerMeter":3050.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553315"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Road Signs, Pavement Markings) along Puerto Princesa South Rd K0091 + 750 - K0092 + 137","amountPesos":7000000,"lengthMeters":387.0,"ratePesosPerMeter":18087.85529715762,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553316"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Road Signs, Pavement Markings) along Puerto Princesa South Rd K0215 + 307 - K0215 + 800","amountPesos":7000000,"lengthMeters":493.0,"ratePesosPerMeter":14198.782961460447,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553317"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Road Signs, Pavement Markings) along Puerto Princesa South Rd K0191 + 300 - K0191 + 800","amountPesos":4744000,"lengthMeters":500.0,"ratePesosPerMeter":9488.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553318"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Road Signs, Pavement Markings) along Puerto Princesa South Rd K0205 + 800 - K0206 + 500","amountPesos":7000000,"lengthMeters":700.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553319"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Puerto Princesa South Road - K0058 + (-464) - K0058 + 949","amountPesos":36600000,"lengthMeters":1413.0,"ratePesosPerMeter":25902.335456475583,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553320"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along Bongabong-Sagana-Roxas-Sn Aquilino Rd - K0105 + 574 - K0105 + 655","amountPesos":3316000,"lengthMeters":81.0,"ratePesosPerMeter":40938.27160493827,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553321"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along Calapan South Rd - K0131 + 467 - K0131 + 685","amountPesos":17014000,"lengthMeters":218.0,"ratePesosPerMeter":78045.87155963303,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553322"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along Calapan South Rd - K0153 + 000 - K0153 + 493","amountPesos":35258000,"lengthMeters":493.0,"ratePesosPerMeter":71517.24137931035,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553323"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads along Calapan South Rd - K0117 + 000 - K0117 + 100","amountPesos":3919000,"lengthMeters":100.0,"ratePesosPerMeter":39190.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553324"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads along Calapan South Rd - K0166 + 006 - K0166 + 261, K0168 + 605 - K0168 + 1000","amountPesos":13465000,"lengthMeters":650.0,"ratePesosPerMeter":20715.384615384617,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553325"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads along Calapan South Rd - K0137 + 493 - K0137 + 798","amountPesos":6318000,"lengthMeters":305.0,"ratePesosPerMeter":20714.754098360656,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553326"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Calapan South Rd - K0067 + 226 - K0068 + 220","amountPesos":1796000,"lengthMeters":994.0,"ratePesosPerMeter":1806.841046277666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553327"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Calapan South Rd - K0075 + 242 - K0076 + 238","amountPesos":4418000,"lengthMeters":996.0,"ratePesosPerMeter":4435.74297188755,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553328"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Calapan South Rd - K0072 + 721 - K0073 + 716","amountPesos":918000,"lengthMeters":995.0,"ratePesosPerMeter":922.6130653266332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553329"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Legazpi City-Punta de Jesus Rd - K0529 + (-131) - K0529 + 110, K0529 + 400 - K0531 + 361","amountPesos":20000000,"lengthMeters":2202.0,"ratePesosPerMeter":9082.652134423251,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553330"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Legazpi City-Punta de Jesus Rd - K0556 + 937 - K0558 + 1027","amountPesos":20000000,"lengthMeters":2090.0,"ratePesosPerMeter":9569.377990430621,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553331"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bagong Silang-Capalonga Rd - K0300 + (-625) - K0300 + 835, K0317 + 651 - K0319 + 638","amountPesos":25000000,"lengthMeters":3447.0,"ratePesosPerMeter":7252.68349289237,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553332"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Iloilo-Capiz Rd (New Route) - K0064 + (-490) - K0064 + (-077)","amountPesos":30817000,"lengthMeters":413.0,"ratePesosPerMeter":74617.43341404358,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553363"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Batobalani-Tawig-Tugos-Paracale Rd - K0330 + 574 - K0332 + 775","amountPesos":18623000,"lengthMeters":2201.0,"ratePesosPerMeter":8461.15402089959,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553333"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Rolando R. Andaya Highway - K0288 + 513 - K0288 + 996","amountPesos":9643000,"lengthMeters":483.0,"ratePesosPerMeter":19964.8033126294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553334"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Rolando R. Andaya Highway - K0319 + 938 - K0320 + 557","amountPesos":19967000,"lengthMeters":619.0,"ratePesosPerMeter":32256.86591276252,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553335"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Rolando R. Andaya Highway - K0321 + 992 - K0322 + 131, K0322 + 592 - K0322 + 682","amountPesos":4597000,"lengthMeters":229.0,"ratePesosPerMeter":20074.235807860263,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553336"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Rolando R. Andaya Highway - K0314 + 000 - K0314 + 202, K0314 + 240 - K0314 + 594","amountPesos":18799000,"lengthMeters":556.0,"ratePesosPerMeter":33811.15107913669,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553337"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Rolando R. Andaya Highway - K0283 + 000 - K0283 + 109, K0283 + 480 - K0283 + 671, K0284 + 000 - K0284 + 214, K0284 + 493 - K0284 + 787","amountPesos":42608000,"lengthMeters":808.0,"ratePesosPerMeter":52732.67326732673,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553338"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Rolando R. Andaya Highway - K0322 + 682 - K0323 + 448","amountPesos":40759000,"lengthMeters":766.0,"ratePesosPerMeter":53210.18276762402,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553339"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Rolando R. Andaya Highway - K0326 + 000 - K0335 + 700","amountPesos":11600000,"lengthMeters":9700.0,"ratePesosPerMeter":1195.8762886597938,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553341"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Rolando R. Andaya Highway - K0335 + 700 - K0341 + 619","amountPesos":11600000,"lengthMeters":5919.0,"ratePesosPerMeter":1959.7905051528974,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553342"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Sipocot-Cabusao Rd - K0394 + (-816) - K0410 + 243","amountPesos":11600000,"lengthMeters":17059.0,"ratePesosPerMeter":679.9929655900112,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553343"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads along Masbate-Milagros Rd - K0011 + 1004 - K0012 + 300","amountPesos":25553000,"lengthMeters":296.0,"ratePesosPerMeter":86327.7027027027,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553344"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along Lagta-Crossing Malinta Rd - K0110 + 256 - K0110 + 672","amountPesos":17017000,"lengthMeters":416.0,"ratePesosPerMeter":40906.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553345"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along Masbate-Cataingan-Placer Rd - K0017 + 935 - K0018 + 561","amountPesos":26107000,"lengthMeters":626.0,"ratePesosPerMeter":41704.47284345048,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553346"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads along Aklan East Rd - K0299 + 479 - K0299 + 740, K0300 + 005 - K0300 + 600, K0300 + 898 - K0301 + 000, K0302 + 733 - K0303 + 129, K0303 + 138 - K0303 + 369","amountPesos":35709000,"lengthMeters":1585.0,"ratePesosPerMeter":22529.337539432177,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553347"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads along Aklan West Rd (Kalibo-Nabas) - K0234 + 736 - K0235 + 205, K0239 + 153 - K0239 + 991, K0244 + 044 - K0244 + 174, K0244 + 298 - K0244 + 326, K0245 + 220 - K0245 + 316","amountPesos":35702000,"lengthMeters":1561.0,"ratePesosPerMeter":22871.236386931454,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553348"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Aklan West Rd (Kalibo-Nabas) - K0234 + (-920) - K0234 + 301, K0235 + 331 - K0235 + 578, K0236 + 589 - K0237 + 312","amountPesos":40174000,"lengthMeters":2191.0,"ratePesosPerMeter":18335.91967138293,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553349"},{"year":2025,"category":"Roads","project":"Installation of Solar Streetlights Along Iloilo-Antique Road (S00338PN) - K0098 + 000 - K0099 + 000, Antique","amountPesos":7705000,"lengthMeters":1000.0,"ratePesosPerMeter":7705.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553353"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Bacolod South Rd - K0010 + 000 - K0010 + 529","amountPesos":25758000,"lengthMeters":529.0,"ratePesosPerMeter":48691.87145557656,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553354"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Sto Niño-Banago Rd (North) - K0003 + (-706) - K0003 + 383","amountPesos":12000000,"lengthMeters":1089.0,"ratePesosPerMeter":11019.283746556473,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553355"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Lacson Street (S00114NR) - K0001 + (-151) to K0001 + 915","amountPesos":25000000,"lengthMeters":1066.0,"ratePesosPerMeter":23452.157598499063,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553356"},{"year":2025,"category":"Roads","project":"Installation of Solar Pavement Studs along Bacolod Circumferential Road (S00097NR) - K0003 + (-543) to K0009 + 750","amountPesos":20000000,"lengthMeters":7293.0,"ratePesosPerMeter":2742.355683532154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553357"},{"year":2025,"category":"Roads","project":"Installation of Solar Pavement Studs along Bacolod North Road (S00078NR) - K0000 + 000 to K0004 + 267","amountPesos":50000000,"lengthMeters":4267.0,"ratePesosPerMeter":11717.834544176236,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553358"},{"year":2025,"category":"Roads","project":"Installation of Solar Pavement Studs along Bacolod South Road (S00132NR) - K0000 + 000 to K0004 + 085","amountPesos":50000000,"lengthMeters":4085.0,"ratePesosPerMeter":12239.902080783353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553359"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Plaza-Capitol Rd (S00112NR) - K0001 + (-650) to K0001 + 300","amountPesos":10000000,"lengthMeters":950.0,"ratePesosPerMeter":10526.315789473685,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553360"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Iloilo-Capiz Rd (New Route) - K0087 + 968 - K0088 + 383","amountPesos":19886000,"lengthMeters":415.0,"ratePesosPerMeter":47918.072289156626,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553361"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along Capiz-Aklan Rd - K0333 + 270 - K0334 + 600","amountPesos":37148000,"lengthMeters":1330.0,"ratePesosPerMeter":27930.82706766917,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553362"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Iloilo-Capiz Rd (New Route) - K0074 + 569 - K0074 + 705","amountPesos":7882000,"lengthMeters":136.0,"ratePesosPerMeter":57955.882352941175,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553364"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo-Capiz Rd (New Route) - K0074 + 375 - K0075 + 659","amountPesos":15693000,"lengthMeters":1284.0,"ratePesosPerMeter":12221.96261682243,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553368"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Guimaras Circumferential Rd - K0000 + (-388) - K0007 + 010, K0106 + 000 - K0108 + 759","amountPesos":41000000,"lengthMeters":10157.0,"ratePesosPerMeter":4036.6249876932166,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553369"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) at Specific Locations along Rizal-Jordan Wharf Rd (S00026GR) K0008 + (-632) - K0008 + 565","amountPesos":7000000,"lengthMeters":1197.0,"ratePesosPerMeter":5847.953216374269,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553370"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Central Rd (Sn Miguel-Constancia-Cabano-Igcawayan) - K0063 + 600 - K0066 + 614`","amountPesos":14000000,"lengthMeters":3014.0,"ratePesosPerMeter":4644.990046449901,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553371"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo-Antigue Rd - K0021 + 000 - K0022 + 751","amountPesos":10000000,"lengthMeters":1751.0,"ratePesosPerMeter":5711.022272986865,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553372"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo-Antigue Rd - K0025 + 485 - K0027 + 000","amountPesos":20000000,"lengthMeters":1515.0,"ratePesosPerMeter":13201.320132013201,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553373"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal-Igbaras-Tubungan-Leon Rd - K0038 + 000 - K0040 + 253","amountPesos":30000000,"lengthMeters":2253.0,"ratePesosPerMeter":13315.579227696404,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553374"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Iloilo-Capiz (New Route) - K0036 + 126 - K0036 + 496","amountPesos":15514000,"lengthMeters":370.0,"ratePesosPerMeter":41929.72972972973,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553375"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along Barotac Nuevo-Dumangas-Dacutan Wharf Rd - K0274 + 000 - K0275 + 080","amountPesos":45450000,"lengthMeters":1080.0,"ratePesosPerMeter":42083.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553376"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along Iloilo City-Leganes-Dumangas Coastal Rd - K0018 + 659 - K0018 + 954, K0022 +059 - K0022 +162, K0022 + 833 - K0022 + 945, K0022 + 1001 - K0023 + 183","amountPesos":32327000,"lengthMeters":692.0,"ratePesosPerMeter":46715.31791907515,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553377"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Passi-Sn Rafael-Lemery-Sara Rd - K0050 + (-786) - K0053 + 1204","amountPesos":28513000,"lengthMeters":4990.0,"ratePesosPerMeter":5714.0280561122245,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553381"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo-Capiz Rd (Old Route) - K0024 + 000 - K0025 + 693","amountPesos":11278000,"lengthMeters":1693.0,"ratePesosPerMeter":6661.547548730065,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553382"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo-Capiz Rd (Old Route) - K0057 + 000 - K0057 + 591","amountPesos":4000000,"lengthMeters":591.0,"ratePesosPerMeter":6768.18950930626,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553383"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo-Capiz Rd (Old Route) - K0032 + 000 - K0033 + 937","amountPesos":11229000,"lengthMeters":1937.0,"ratePesosPerMeter":5797.108931337119,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553384"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo-Capiz Rd (Old Route) - K0046 + 644 - K0048 + 804","amountPesos":15060000,"lengthMeters":2160.0,"ratePesosPerMeter":6972.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553385"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Jct Bancal-Leon-Antique Bdry Rd - K0022 + (-518) - K0025 + 386","amountPesos":30000000,"lengthMeters":3904.0,"ratePesosPerMeter":7684.426229508197,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553386"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along New Lucena-Sta. Barbara Rd - K0016 + (-467) - K0021 + 500 and Cabatuan-New Lucena-Banga-Bante Rd - K0041 + (-677) - K0041 + (-186)","amountPesos":41661000,"lengthMeters":6458.0,"ratePesosPerMeter":6451.06844224218,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553387"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo City-Leganes-Dumangas Coastal Rd - K0004 + 949 - K0006 + 027, Jereos St - K0002 + (-592) - K0002 + 628, and La Paz-Jaro Rd - K0002 + 671 - K0003 + 208","amountPesos":14785000,"lengthMeters":2835.0,"ratePesosPerMeter":5215.167548500882,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553388"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo-Antique Rd - K0003 + (-924) - K0008 + 214 and Mandurriao-Sn Miguel Rd - K0006 + 096 - K0009 + 483","amountPesos":40000000,"lengthMeters":7407.0,"ratePesosPerMeter":5400.297016335899,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553389"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bacolod North Rd - K0034 + 242 - K0034 + 416, K0035 + 131 - K0036 + 706","amountPesos":19585000,"lengthMeters":1749.0,"ratePesosPerMeter":11197.827329902802,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553390"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bacolod Silay Airport Access Rd - K0014 + 932 - K0016 + 117","amountPesos":11800000,"lengthMeters":1185.0,"ratePesosPerMeter":9957.805907172995,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553391"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Silay-Lantawan Rd - K0015 + (-792) - K0015 + 668","amountPesos":14624000,"lengthMeters":1460.0,"ratePesosPerMeter":10016.438356164384,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553392"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Bacolod South Rd - - K0078 + 650 - K0079+307","amountPesos":39954000,"lengthMeters":657.0,"ratePesosPerMeter":60812.78538812786,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553393"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Bacolod South Rd - K0074 + 505 - K0074 + 950","amountPesos":29000000,"lengthMeters":445.0,"ratePesosPerMeter":65168.5393258427,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553394"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Kabankalan-Bais Rd - K0093 + 215 - K0093 + 393, K0096 + 400 - K0096 + 647, K0104 + 1013 - K0105 + 954","amountPesos":36258000,"lengthMeters":1366.0,"ratePesosPerMeter":26543.191800878478,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553400"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Bacolod South Rd - (S00210NR) Chainage 032 - Chainage 076, Chainage 076 - Chainage 217, Chainage 217 - Chainage 261","amountPesos":7594000,"lengthMeters":229.0,"ratePesosPerMeter":33161.572052401745,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553401"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bacolod South By-Pass Rd - K0019 + 144 - K0020 + 420","amountPesos":15000000,"lengthMeters":1276.0,"ratePesosPerMeter":11755.485893416928,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553402"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along The President Carlos P. Garcia Circumferential Rd - K0010 + 434 - K0010 + 676, K0011 + 000 - K0013 + 500, K0014 + 000 - K0014 + 400, K0014 + 740 - K0016 + 680, K0017 + 000 - K0018 + 000, K0018 + 450 - K0019 + 400","amountPesos":39058000,"lengthMeters":7032.0,"ratePesosPerMeter":5554.323094425484,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553403"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Jct (TNR) Maribojoc-Antequera-Catagbacan (Loon) - K0011 + (-357) - K0016 + 605","amountPesos":42800000,"lengthMeters":5962.0,"ratePesosPerMeter":7178.79906071788,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553404"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs, Off-carriageway Improvement) along The President Carlos P. Garcia Circumferential Rd - K0060 + 000 - K0061 + 300","amountPesos":1141000,"lengthMeters":1300.0,"ratePesosPerMeter":877.6923076923077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553405"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along The President Carlos P. Garcia Circumferential Rd - K0180 + 015 - K0182 + 835","amountPesos":25000000,"lengthMeters":2820.0,"ratePesosPerMeter":8865.248226950354,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553407"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along The President Carlos P. Garcia Circumferential Rd - K0195 + 000 - K0197 + 000, K0199 + 500 - K0200 + 710","amountPesos":19916000,"lengthMeters":3210.0,"ratePesosPerMeter":6204.3613707165105,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553408"},{"year":2025,"category":"Roads","project":"Installation of Road Safety Devices, Informative Signs and Solar Lighting - Secondary Roads - The President Carlos P. Garcia Circumferential Rd - K0204 + 400 - K0213 + 000 (Garcia-Hernandez Section)","amountPesos":100000000,"lengthMeters":8600.0,"ratePesosPerMeter":11627.906976744185,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553409"},{"year":2025,"category":"Roads","project":"Installation of Road Safety Devices, Informative Signs and Solar Lighting - Secondary Roads - The President Carlos P. Garcia Circumferential Rd - K0183 + 000 - K0190 +900 (Duero Section)","amountPesos":100000000,"lengthMeters":7900.0,"ratePesosPerMeter":12658.227848101265,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553410"},{"year":2025,"category":"Roads","project":"Installation of Road Safety Devices, Information Signs and Solar Lighting - Secondary Roads - The President Carlos P. Garcia Circumferential Rd (Candijay Section) - K0162+000- K0171+000","amountPesos":100000000,"lengthMeters":9000.0,"ratePesosPerMeter":11111.111111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553411"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along the Presidential Carlos P. Garcia Circumferencial Road -K0154 + (-434) - K0156 +398 (Alicia Section), Bohol","amountPesos":20000000,"lengthMeters":2832.0,"ratePesosPerMeter":7062.146892655367,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553412"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along The President Carlos P. Garcia Circumferential Rd - K0191 + 000 - K0194 + 980","amountPesos":25000000,"lengthMeters":3980.0,"ratePesosPerMeter":6281.407035175879,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553413"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along N Bacalso Ave (Cebu South Rd) - K0021 + 070 - K0022 + 068","amountPesos":2204000,"lengthMeters":998.0,"ratePesosPerMeter":2208.4168336673347,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553414"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along N Bacalso Ave (Cebu South Rd) - K0075 + 000 - K0076 + 000","amountPesos":21479000,"lengthMeters":1000.0,"ratePesosPerMeter":21479.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553416"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Pavement Markings) along Cebu North Hagnaya Wharf Rd - K0078 + (-949) - K0078 + 152","amountPesos":9112000,"lengthMeters":1101.0,"ratePesosPerMeter":8276.112624886468,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553417"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Pavement Markings) along Bogo-Polambato Wharf Rd - K0102 + (-518) - K0103 + 756","amountPesos":19705000,"lengthMeters":2274.0,"ratePesosPerMeter":8665.347405452947,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553418"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Sogod-Tabuelan Rd - K0109 + (-519) - K0113 + 287","amountPesos":30000000,"lengthMeters":4806.0,"ratePesosPerMeter":6242.197253433208,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553422"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Toledo-Tabuelan-Sn Remigio Rd - K0104 + (-355) - K0108 + 474","amountPesos":30000000,"lengthMeters":4829.0,"ratePesosPerMeter":6212.466349140609,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553423"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Cebu North Hagnaya Wharf Rd - K0016 + 836 - K0017 + 811","amountPesos":17478000,"lengthMeters":975.0,"ratePesosPerMeter":17926.153846153848,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553424"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Cebu North Hagnaya Wharf Rd - K0025 + 935 - K0026 + 000, K0031 + 000 - K0031 + 265, K0031 + 365 - K0031 + 454","amountPesos":14879000,"lengthMeters":419.0,"ratePesosPerMeter":35510.73985680191,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553425"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads along Cebu North Hagnaya Wharf Rd - K0052 + 000 - K0052 + 182, K0075 + 000 - K0075 + 430","amountPesos":21545000,"lengthMeters":612.0,"ratePesosPerMeter":35204.248366013075,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553426"},{"year":2025,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads along Cebu North Hagnaya Wharf Rd - K0048 + 000 - K0050 + 000, K0058 + 620 - K0059 + 000","amountPesos":47502000,"lengthMeters":2380.0,"ratePesosPerMeter":19958.823529411766,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553427"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Cebu North Hagnaya Wharf Rd - K0029 + 328 - K0029 + 847","amountPesos":1142000,"lengthMeters":519.0,"ratePesosPerMeter":2200.3853564547207,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553428"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Cebu North Hagnaya Wharf Rd - K0031 + 387 - K0032 + 392","amountPesos":2200000,"lengthMeters":1005.0,"ratePesosPerMeter":2189.0547263681597,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553429"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0073 + 200 - K0075 + 000","amountPesos":1093000,"lengthMeters":1800.0,"ratePesosPerMeter":607.2222222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553436"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0013 + 952 - K0014 + 755","amountPesos":23345000,"lengthMeters":803.0,"ratePesosPerMeter":29072.22914072229,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553437"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0048 + 240 - K0049 + 140","amountPesos":15834000,"lengthMeters":900.0,"ratePesosPerMeter":17593.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553438"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Bais-Kabankalan Rd - K0051 + (-608) - K0052 + 000","amountPesos":39595000,"lengthMeters":1608.0,"ratePesosPerMeter":24623.756218905473,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553439"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Bais-Kabankalan Rd - K0058 + 869 - K0059 + 135, K0060 + 300 - K0060 + 737","amountPesos":18668000,"lengthMeters":703.0,"ratePesosPerMeter":26554.765291607397,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553440"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Bais-Kabankalan Rd - K0064 + 000 - K0064 + 209, K0065 + 596 - K0067 + 160","amountPesos":39057000,"lengthMeters":1773.0,"ratePesosPerMeter":22028.76480541455,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553441"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Off-carriageway Improvement, Pavement Markings, Road Signs) along Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0023 + 540 - K0024 + 540","amountPesos":1500000,"lengthMeters":1000.0,"ratePesosPerMeter":1500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553443"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Dumaguete South Rd - K0012 + 000 - K0017 + 1006","amountPesos":15000000,"lengthMeters":6006.0,"ratePesosPerMeter":2497.5024975024976,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553444"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs, Off-carriageway Improvement) along Dumaguete South Rd - K0023 + 000 - K0029 + 050","amountPesos":15000000,"lengthMeters":6050.0,"ratePesosPerMeter":2479.3388429752067,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553445"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Dumaguete South Rd - K0057 + 015 - K0058 + 015","amountPesos":830000,"lengthMeters":1000.0,"ratePesosPerMeter":830.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553446"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs, Off-carriageway Improvement) along Dumaguete South Rd - K0008 + 000 - K0009 + 000","amountPesos":2330000,"lengthMeters":1000.0,"ratePesosPerMeter":2330.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553447"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities - Biliran Circumferential Rd - K1012 + 150 - K1016 + 650","amountPesos":30000000,"lengthMeters":4500.0,"ratePesosPerMeter":6666.666666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553448"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities - Naval-Caibiran Cross Country Rd - K1027 + 000 - K1031 + 530","amountPesos":30000000,"lengthMeters":4530.0,"ratePesosPerMeter":6622.516556291391,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553449"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Jct Buenavista-Lawaan-Marabut Rd - K0953 + 000 - K0954 + 000","amountPesos":470000,"lengthMeters":1000.0,"ratePesosPerMeter":470.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553450"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Palo-Carigara-Ormoc Rd - K0916 + (-809) - K0916 + 348, K0917 + 589 - K0919 + 205, K0919 + 247 - K0920 + 350","amountPesos":28814000,"lengthMeters":3876.0,"ratePesosPerMeter":7433.952528379773,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553451"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Off-carriageway Improvement) along Lemon-Leyte-Biliran Rd - K0977 + 000 - K0979 + 292","amountPesos":30000000,"lengthMeters":2292.0,"ratePesosPerMeter":13089.005235602095,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553454"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Off-carriageway Improvement) along Sambulawan Jct-Calaguise-Calubian Rd - K0984 + (-301) - K0986 + 195","amountPesos":20000000,"lengthMeters":2496.0,"ratePesosPerMeter":8012.820512820513,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553455"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Tabing-Kawayan-Sta Rosa-Lawis-Tabango Rd - K1025 + (-356) - K1025 + (-097), K1025 + (-799) - K1025 + (-356)","amountPesos":6592000,"lengthMeters":702.0,"ratePesosPerMeter":9390.313390313391,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553456"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Pavement Markings) along Palompon-Isabel-Merida-Ormoc Rd - K1127 + 509 - K1129 + 983","amountPesos":23538000,"lengthMeters":2474.0,"ratePesosPerMeter":9514.147130153597,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553457"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Pavement Markings) along Palo-Carigara-Ormoc Rd - K0989 + 000 - K0991 + 345.11","amountPesos":20000000,"lengthMeters":2345.11,"ratePesosPerMeter":8528.384596031794,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553458"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Pavement Markings) along Ormoc-Baybay-Southern Leyte Bdry Rd - K1015 + 612 - K1017 + 046","amountPesos":12389000,"lengthMeters":1434.0,"ratePesosPerMeter":8639.470013947,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553459"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Pavement Markings) along Ormoc-Baybay-Southern Leyte Bdry Rd - K1061 + 000 - K1068 + 500","amountPesos":45436000,"lengthMeters":7500.0,"ratePesosPerMeter":6058.133333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553460"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Pavement Markings) along Tacloban-Baybay South Rd - K0992 + 800 - K1000 + 250","amountPesos":47758000,"lengthMeters":7450.0,"ratePesosPerMeter":6410.4697986577185,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553461"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0824 + 500 - K0828 + 000","amountPesos":50000000,"lengthMeters":3500.0,"ratePesosPerMeter":14285.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553462"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Pavement Markings) along Bdry Southern Leyte-Maasin-Macrohon-Sogod-Jct Daang Maharlika - K1187 + 000 - K1188 + 639.40","amountPesos":15000000,"lengthMeters":1639.4,"ratePesosPerMeter":9149.68891057756,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553463"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bdry Southern Leyte-Maasin-Macrohon-Sogod-Jct Daang Maharlika - K1193 + 680 - K1196 + 271, K1197 + 065 - K1197 + 626","amountPesos":34262000,"lengthMeters":3152.0,"ratePesosPerMeter":10869.92385786802,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553464"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along Jct Pulauan Port Rd - K1827 + 450 - K1828 + 010.70","amountPesos":23037000,"lengthMeters":560.7,"ratePesosPerMeter":41086.14232210079,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553466"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Road Signs, Roadway Lighting) along Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1857 + (-1111) - K1870 + 949","amountPesos":20000000,"lengthMeters":15060.0,"ratePesosPerMeter":1328.0212483399735,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553467"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Road Signs, Roadway Lighting) along Dipolog-Polanco-Piñan-Jct Oroquieta Rd - K1810 + (-471) - K1811 + 117","amountPesos":20000000,"lengthMeters":1588.0,"ratePesosPerMeter":12594.458438287154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553468"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Road Signs, Roadway Lighting) along Dipolog-Oroquieta National Rd - K1795 + (-415) - K1796 + 475","amountPesos":12200000,"lengthMeters":1890.0,"ratePesosPerMeter":6455.026455026455,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553469"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Road Signs, Roadway Lighting) along Polanco-Macleodes Rd - K1828 + (-225) - K1848 + 950","amountPesos":25000000,"lengthMeters":21175.0,"ratePesosPerMeter":1180.637544273908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553470"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Road Signs, Roadway Lighting) along Piñan-Mutia Rd - K1816 + (-897) - K1839 + 409","amountPesos":25000000,"lengthMeters":24306.0,"ratePesosPerMeter":1028.5526207520777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553471"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Dipolog-Sindangan-Liloy Rd - K1925 + 874 - K1925 + 1003","amountPesos":3430000,"lengthMeters":129.0,"ratePesosPerMeter":26589.147286821706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553472"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Secondary Roads along Sindangan-Siayan-Dumingag-Mahayag Rd (Sindangan-Siayan Sect) - K1924 + 755 - K1924 + 938","amountPesos":4800000,"lengthMeters":183.0,"ratePesosPerMeter":26229.508196721312,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553473"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Pagadian City Airport Rd - K1664 + (-687) - K1664 + 260, K1664 + (-890) - K1664 + (-687), K1664 + (-960) - K1664 + (-890)","amountPesos":10000000,"lengthMeters":1220.0,"ratePesosPerMeter":8196.72131147541,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553474"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Lutiman-Guicam-Olutanga Rd - K1760 + (-095) - K1766 + 277","amountPesos":43860000,"lengthMeters":6372.0,"ratePesosPerMeter":6883.239171374765,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553475"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Lutiman-Guicam-Olutanga Rd - K1783 + (-600) - K1787 + 219","amountPesos":43860000,"lengthMeters":4819.0,"ratePesosPerMeter":9101.473334716746,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553476"},{"year":2025,"category":"Roads","project":"Installation of Road Safety Devices along Sayre Highway - K1522 + 000 - K1525 + 207","amountPesos":50000000,"lengthMeters":3207.0,"ratePesosPerMeter":15590.894917368258,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553477"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Misamis Or-Bukidnon-Agusan Rd - K1452 + 080 - K1459 + 337, K1460 + 883 - K1463 + 494","amountPesos":9000000,"lengthMeters":9868.0,"ratePesosPerMeter":912.0389136603162,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553481"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Jct SH-Sn Miguel-Del Monte Airport Rd - K1444 + (-528) - K1446 + 134","amountPesos":4000000,"lengthMeters":2662.0,"ratePesosPerMeter":1502.6296018031555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553482"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Road Signs) along Misamis Or-Bukidnon-Agusan Rd - K1428 + (-284) - K1432 + 000","amountPesos":1770000,"lengthMeters":4284.0,"ratePesosPerMeter":413.1652661064426,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553483"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along CDO-Airport-Bukidnon Rd - K1440 + 900 - K1442 + 422, K1445 + 000 - K1447 + 500","amountPesos":75000000,"lengthMeters":4022.0,"ratePesosPerMeter":18647.43908503232,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553484"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Butuan City-Cagayan de Oro City-Iligan City Rd - K1424 + 700 - K1425 + 400","amountPesos":22364000,"lengthMeters":700.0,"ratePesosPerMeter":31948.571428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553486"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Butuan City-Cagayan de Oro City-Iligan City Rd - K1433 + 800 - K1434 + 200","amountPesos":15040000,"lengthMeters":400.0,"ratePesosPerMeter":37600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553487"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Butuan City-Cagayan de Oro City-Iligan City Rd - K1425 + 018 - K1426 + 047","amountPesos":2000000,"lengthMeters":1029.0,"ratePesosPerMeter":1943.634596695821,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553490"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Camiguin Circumferential Rd - K0029 + 000 - K0030 + 492, K0030 + 693 - K0035 + 500","amountPesos":24753000,"lengthMeters":6299.0,"ratePesosPerMeter":3929.6713764089536,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553491"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Off-Carriageway Improvement, Traffic Signals, Pavement Markings, Road Signs, Roadway Lighting) along Misamis Oriental-Ma Cristina Bdry Rd - K1522 + 1013 - K1523 + 904","amountPesos":18000000,"lengthMeters":891.0,"ratePesosPerMeter":20202.0202020202,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553493"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Off-Carriageway Improvement, Traffic Signals, Pavement Markings, Road Signs, Roadway Lighting) along Misamis Oriental-Ma Cristina Bdry Rd - K1523 + 904 - K1524 + 915","amountPesos":18000000,"lengthMeters":1011.0,"ratePesosPerMeter":17804.154302670624,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553496"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Linamon-Zamboanga Rd - K1607 + 398 - K1609 + 899","amountPesos":30000000,"lengthMeters":2501.0,"ratePesosPerMeter":11995.201919232308,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553497"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Linamon-Zamboanga Rd - K1602 + 700 - K1603 + 500","amountPesos":1155000,"lengthMeters":800.0,"ratePesosPerMeter":1443.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553498"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Linamon-Zamboanga Rd - K1604 + 000 - K1604 + 500","amountPesos":1230000,"lengthMeters":500.0,"ratePesosPerMeter":2460.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553499"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Linamon-Zamboanga Rd - K1604 + 800 - K1605 + 300","amountPesos":1475000,"lengthMeters":500.0,"ratePesosPerMeter":2950.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553500"},{"year":2025,"category":"Roads","project":"Installation / Application or Road Safety Facilities (Roadway Lighting) along Calamba - Baliangao Rd - K1783 + 000 - K1785 + 200","amountPesos":20000000,"lengthMeters":2200.0,"ratePesosPerMeter":9090.90909090909,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553502"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Butuan City-Cagayan de Oro City-Iligan City Rd - K1359 + 000 - K1360 + 000","amountPesos":46743000,"lengthMeters":1000.0,"ratePesosPerMeter":46743.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553504"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Butuan City-Cagayan de Oro City-Iligan City Rd - K1292 + 000 - K1293 + 000, K1282 + 650 -K1284 + 040","amountPesos":50000000,"lengthMeters":2390.0,"ratePesosPerMeter":20920.50209205021,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553505"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Butuan City- Cagayan de Oro City-Iligan City Rd - K1468+000 - K1470+300","amountPesos":25000000,"lengthMeters":2300.0,"ratePesosPerMeter":10869.565217391304,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553508"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Butuan City- Cagayan de Oro City-Iligan City Rd - K1405+450 - K1406+414","amountPesos":15000000,"lengthMeters":964.0,"ratePesosPerMeter":15560.165975103735,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553509"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Gingoog-Claveria-Villanueva Rd - K1378+000 - K1380+000","amountPesos":15000000,"lengthMeters":2000.0,"ratePesosPerMeter":7500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553510"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Butuan City- Cagayan de Oro City-Iligan City Rd - K1445+(-275) - K1446+256","amountPesos":15000000,"lengthMeters":1531.0,"ratePesosPerMeter":9797.517962116264,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553512"},{"year":2025,"category":"Roads","project":"Installation of Solar Streetlight along Benigno S. Aquino Jr. National Highway, Compostela, Davao De Oro, K1418 + 418 - K1418 + 645 , K1418 + 665 - K1418 + 837, K1418 + 857 - K1419 + 873, K1419 + 893 - K1420 + 115, K1421 + 349 - K1421 + 976, K1421 + 996 - K1422 + 506, K1423 + 197 - K1424 + 258, K1424 + 278 - K1424 + 786","amountPesos":50000000,"lengthMeters":4343.0,"ratePesosPerMeter":11512.779184895233,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553514"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Surigao del Sur Bdry-Davao Or Coastal Rd - K1648 + 350 - K1649 + 350","amountPesos":650000,"lengthMeters":1000.0,"ratePesosPerMeter":650.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553515"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Pres. Diosdado P.Macapagal Natl Hi-way - K1760 + 500 - K1761 + 500","amountPesos":660000,"lengthMeters":1000.0,"ratePesosPerMeter":660.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553516"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs, Guardrails) along Midsayap-Makar Rd - K1694 + (-327) - K1694 + 673","amountPesos":5000000,"lengthMeters":1000.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553517"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Off-carriageway Improvement, Road Signs, Pavement Markings) along Filipino-American Friendship Ave. - K1662 + 850 - K1663 + 850","amountPesos":4300000,"lengthMeters":1000.0,"ratePesosPerMeter":4300.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553522"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Off-carriageway Improvement, Roadway Lighting) along Midsayap-Marbel Rd - K1789 + 210 - K1791 + 000","amountPesos":11376000,"lengthMeters":1790.0,"ratePesosPerMeter":6355.307262569832,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553523"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Off-carriageway Improvement, Roadway Lighting) along Midsayap-Marbel Rd - K1786 + 595 - K1787 + 300","amountPesos":4600000,"lengthMeters":705.0,"ratePesosPerMeter":6524.822695035461,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553524"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along NRJ Sn Francisco-Bahi-Barobo Rd - K1309 + (-402) - K1310 + 356","amountPesos":20000000,"lengthMeters":1758.0,"ratePesosPerMeter":11376.564277588168,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553527"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along NRJ Cuevas-Sampaguita Rd - K1373 + 000 - K1375 + 389","amountPesos":30000000,"lengthMeters":2389.0,"ratePesosPerMeter":12557.555462536626,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553528"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along NRJ Cuevas-Bislig Rd - K1371 + (-732) - K1373 + 802","amountPesos":20000000,"lengthMeters":3534.0,"ratePesosPerMeter":5659.309564233164,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553529"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Pavement Markings) along Butuan City-Malaybalay Rd - K1262 + 329 - K1266 + 296","amountPesos":13192000,"lengthMeters":3967.0,"ratePesosPerMeter":3325.434837408621,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553530"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Pavement Markings) along Butuan City-Pianing-Tandag Rd - K1232 + (-1016) - K1232 + (-392)","amountPesos":10000000,"lengthMeters":624.0,"ratePesosPerMeter":16025.641025641025,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553531"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Dinagat-Loreto Rd - K0084 + 500 - K0087 + 000","amountPesos":25657000,"lengthMeters":2500.0,"ratePesosPerMeter":10262.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553532"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Jct Magsaysay-Cagdianao Rd - K0006 + (-468) - K0016 + 653","amountPesos":10000000,"lengthMeters":11121.0,"ratePesosPerMeter":899.1997122560921,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553533"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Jct Mabini-Tubajon Rd - K0084 + (-280) - K0087 + 312","amountPesos":6000000,"lengthMeters":3592.0,"ratePesosPerMeter":1670.378619153675,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553534"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Jct Bolodbolod-Albor Rd - K0060 + (-914) - K0063 + 000","amountPesos":25657000,"lengthMeters":3914.0,"ratePesosPerMeter":6555.186509964231,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553535"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Dapa-Union-Gen. Luna Rd - K0015 + (-395) - K0020 + 405","amountPesos":23200000,"lengthMeters":5800.0,"ratePesosPerMeter":4000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553536"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Jct Del Carmen-Sta Monica-Sn Isidro Rd - K0019 + (-362) - K0023 + 547, K0024 + 415 - K0031 + 173","amountPesos":44984000,"lengthMeters":11667.0,"ratePesosPerMeter":3855.661266820948,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553540"},{"year":2025,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Median Island, Pavement Markings, Road Signs, Roadway Lighting) along Surigao-Davao Coastal Rd - K1463 + 196 - K1463 + 700, Bislig City, Surigao del Sur","amountPesos":8000000,"lengthMeters":504.0,"ratePesosPerMeter":15873.015873015873,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 553543"},{"year":2025,"category":"Roads","project":"Rehabilitation of Road with Drainage Improvement at Lakandula St. C 0.00 to C 414.20 , Asuncion St. C 0.00 to 255.50, Franco St. C 0.00 to C 489.00, Circumferential Road 2 K0006 + 241.10 to K0006 + 719.00, Manila City","amountPesos":100000000,"lengthMeters":477.9,"ratePesosPerMeter":209248.79681941844,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 558737"},{"year":2025,"category":"Roads","project":"Construction of Constantino-Ubihan Road Dike, Sta. 0+000 - Sta. 0+120, Marilao, Bulacan","amountPesos":100000000,"lengthMeters":120.0,"ratePesosPerMeter":833333.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 558979"},{"year":2025,"category":"Roads","project":"Construction of Road along Taal Lake Circumferential Road, Agoncillo Section, Chainage 800 - Chainage 1300, Agoncillo, Batangas (Phase 1)","amountPesos":100000000,"lengthMeters":500.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 559136"},{"year":2025,"category":"Roads","project":"Construction of Road along Taal Lake Circumferential Road, Balete Section, Chainage 1600 - Chainage 2100, Phase 1, Balete, Batangas","amountPesos":100000000,"lengthMeters":500.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 559137"},{"year":2025,"category":"Roads","project":"Construction of Road along Taal Lake Circumferential Road, Balete Section, Chainage 2100 - Chainage 2600, Phase 2, Balete, Batangas","amountPesos":100000000,"lengthMeters":500.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 559138"},{"year":2025,"category":"Roads","project":"Construction of Road along Taal Lake Circumferential Road, Tanauan City Section, Chainage 140 - Chainage 640, Phase 1, Tanauan City, Batangas","amountPesos":100000000,"lengthMeters":500.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 559139"},{"year":2025,"category":"Roads","project":"Construction of Road along Taal Lake Circumferential Road, Tanauan City Section, Chainage 640 - Chainage 1140, Phase 2, Tanauan City, Batangas","amountPesos":100000000,"lengthMeters":500.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 559140"},{"year":2025,"category":"Roads","project":"Construction of Jaro - Rubas - Ormoc Road, Sta. 9 + 230 - Sta. 9 + 285, Ormoc City, Leyte","amountPesos":150000000,"lengthMeters":55.0,"ratePesosPerMeter":2727272.727272727,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 559428"},{"year":2025,"category":"Roads","project":"Construction of Road Slope Protection Structure along Jaro-Rubas-Ormoc Road (Ormoc City Side), Sta. 9 + 180 - Sta. 9 + 230, Leyte","amountPesos":150000000,"lengthMeters":50.0,"ratePesosPerMeter":3000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 559450"},{"year":2025,"category":"Roads","project":"Construction of Mangusu - Muti Coastal Diversion Road, Zamboanga City Sta. 0+000 - Sta 4+040 Package 5","amountPesos":100000000,"lengthMeters":4040.0,"ratePesosPerMeter":24752.47524752475,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 559495"},{"year":2025,"category":"Roads","project":"Construction of Potia-Namnama-Halag-Nattum Road, Sta. 0+000 -Sta. 3+000, Alfonso Lista, lfugao","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 561873"},{"year":2025,"category":"Roads","project":"Pulilan-Baliuag Bypass Road - Barangay Balatong B and Barangay Calantipay, Chainage 6006 - Chainage 6700, Baliuag, Bulacan","amountPesos":100000000,"lengthMeters":694.0,"ratePesosPerMeter":144092.21902017292,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 561905"},{"year":2025,"category":"Roads","project":"Pulilan-Baliuag Bypass Road - Barangay Santa Peregrina (Phase 2), Chainage 1300 - Chainage 3890, Pulilan, Bulacan","amountPesos":100000000,"lengthMeters":2590.0,"ratePesosPerMeter":38610.03861003861,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 561906"},{"year":2025,"category":"Roads","project":"Pulilan-Baliuag Bypass Road - Dulong Malabon, Chainage 0 - Chainage 1300, Pulilan, Bulacan","amountPesos":100000000,"lengthMeters":1300.0,"ratePesosPerMeter":76923.07692307692,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 561907"},{"year":2025,"category":"Roads","project":"Construction of Road Slope Protection Structure along Shilan-Beckel Road (S00385Lz), K0263+120 - K0263+250","amountPesos":125000000,"lengthMeters":130.0,"ratePesosPerMeter":961538.4615384615,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 574056"},{"year":2025,"category":"Roads","project":"Construction of Road Slope Protection Structure along Cong. Andres Acop Cosalan Road (S00386Lz), K0301+(-600) - K0301+(-250)","amountPesos":125000000,"lengthMeters":350.0,"ratePesosPerMeter":357142.85714285716,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 574057"},{"year":2025,"category":"Roads","project":"Construction of Road Slope Protection Structure along Benguet-Nueva Vizcaya Road (S00382Lz), K0263+240 - K0263+360","amountPesos":125000000,"lengthMeters":120.0,"ratePesosPerMeter":1041666.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 574058"},{"year":2025,"category":"Roads","project":"Construction of Road Slope Protection Structure along Baguio-Bua-Itogon Road (S00390Lz), K0265+720 - K0265+870","amountPesos":125000000,"lengthMeters":150.0,"ratePesosPerMeter":833333.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 574059"},{"year":2025,"category":"Roads","project":"Construction of Road Slope Protection Structure along Itogon-Dalupirip-Sn. Manuel Bdry. Road (S00392Lz), K0275+310 - K0275+500","amountPesos":125000000,"lengthMeters":190.0,"ratePesosPerMeter":657894.7368421053,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 574060"},{"year":2025,"category":"Roads","project":"Construction of Road Slope Protection Structure along Itogon-Dalupirip-Sn. Manuel Bdry. Road (S00392Lz), K0276+540 - K0276+750","amountPesos":125000000,"lengthMeters":210.0,"ratePesosPerMeter":595238.0952380953,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 574061"},{"year":2025,"category":"Roads","project":"Construction of Lipa City – Mataasnakahoy Road - 4+800 – 5+400, Mataasnakahoy, Batangas","amountPesos":150000000,"lengthMeters":600.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 574174"},{"year":2025,"category":"Roads","project":"Construction of Lipa City – Mataasnakahoy Road - 2+400 – 3+200, Mataasnakahoy, Batangas","amountPesos":150000000,"lengthMeters":800.0,"ratePesosPerMeter":187500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 574175"},{"year":2025,"category":"Roads","project":"Construction of Lipa City – Mataasnakahoy Road - 3+200 – 4+000, Mataasnakahoy, Batangas","amountPesos":150000000,"lengthMeters":800.0,"ratePesosPerMeter":187500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 574176"},{"year":2025,"category":"Roads","project":"Construction of Lipa City – Mataasnakahoy Road - 4+000 – 4+800, Mataasnakahoy, Batangas","amountPesos":150000000,"lengthMeters":800.0,"ratePesosPerMeter":187500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 574199"},{"year":2025,"category":"Roads","project":"Construction of Santa Cruz - Cagurungan Eden Road, San Manuel, Isabela Sta. 0+000 to 1+330","amountPesos":25000000,"lengthMeters":1330.0,"ratePesosPerMeter":18796.992481203008,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 574765"},{"year":2025,"category":"Roads","project":"Construction of Burauen-Albuera Road, Sta 11 + 700 - Sta 11 + 810, Albuera, Leyte","amountPesos":150000000,"lengthMeters":110.0,"ratePesosPerMeter":1363636.3636363635,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 576427"},{"year":2025,"category":"Roads","project":"Construction of Burauen-Albuera Road, Sta 10 + 480 - Sta 10 + 580, Albuera, Leyte","amountPesos":150000000,"lengthMeters":100.0,"ratePesosPerMeter":1500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 576431"},{"year":2025,"category":"Roads","project":"Construction of Burauen-Albuera Road, Sta 10 + 580 - Sta 10 + 700, Albuera, Leyte","amountPesos":150000000,"lengthMeters":120.0,"ratePesosPerMeter":1250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 576432"},{"year":2025,"category":"Roads","project":"Construction of Burauen-Albuera Road, Sta 10 + 700 - Sta 10 + 790, Albuera, Leyte","amountPesos":150000000,"lengthMeters":90.0,"ratePesosPerMeter":1666666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 576433"},{"year":2025,"category":"Roads","project":"Construction of Drainage Structure along Carmen Jct. - Bayambang Manat Road - K186 + 100 - KM 189 +370, Barangay Cacandungan to Barangay Ketegan, Bautista, Pangasinan","amountPesos":48000000,"lengthMeters":3270.0,"ratePesosPerMeter":14678.899082568807,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 605885"},{"year":2025,"category":"Bridges","project":"Construction of Binalbagan River Bank Slope Protection (Downstream of Binalbagan Bagacay Bridge) along Hinigaran - Isabela Rd, Left Bank, Sta 18+687.6 - 18+837.6, Negros Occidental","amountPesos":100000000,"lengthMeters":150.0,"ratePesosPerMeter":666666.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 606672"},{"year":2025,"category":"Bridges","project":"Construction of Binalbagan River Bank Slope Protection (Downstream of Alicante Bridge) along Jct Bagonawa - La Castellana - Isabela Rd, Left Bank, Sta 30+030 - 30+180, Negros Occidental","amountPesos":100000000,"lengthMeters":150.0,"ratePesosPerMeter":666666.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 606673"},{"year":2025,"category":"Roads","project":"C-5 Road - K0015 + (-2117) - K0015 + (-611)","amountPesos":150000000,"lengthMeters":1506.0,"ratePesosPerMeter":99601.593625498,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608438"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Cagayan Valley Rd) - K0516 + 000 - K0516 + 339, K0530 + 143.1 - K0530 + 869, K0530 + 922 - K0531 + 000, K0536 + 000 - K0536 + 964.7, K0541 + 14.6 - K0541 + 533, K0548 + 000 - K0548 + 341.3, K0549 + 000 - K0549 + 940, K0550 + 094 - K0550 + 828","amountPesos":147985000,"lengthMeters":4641.3,"ratePesosPerMeter":31884.38584017377,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608450"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0367 + 506 - K0367 + 871, K0368 + 534 - K0369 + 000, K0370 + 000 - K0370 + 105, K0371 + 574 - K0372 + 417","amountPesos":100000000,"lengthMeters":1779.0,"ratePesosPerMeter":56211.354693648114,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608452"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0211 + 000 - K0211 + 520, K0212 + 625 - K0213 + 168, K0218 + 138 - K0218 + 758, K0218 + 758 - K0218 + 810, K0218 + 810 - K0218 + 960, K0218 + 960 - K0219 + 000, K0219 + 000 - K0219 + 173","amountPesos":108800000,"lengthMeters":2098.0,"ratePesosPerMeter":51858.91325071497,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608453"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0287 + 500 - K0288 + 000, K0291 + 000 - K0291 + 900","amountPesos":44592000,"lengthMeters":1400.0,"ratePesosPerMeter":31851.428571428572,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608454"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0304 + 245 - K0304 + 700","amountPesos":15000000,"lengthMeters":455.0,"ratePesosPerMeter":32967.03296703297,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608455"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0382 + 000 - K0382 + 644, K0382 + 826 - K0383 + 003, K0390 + 847 - K0391 + 050","amountPesos":62067000,"lengthMeters":1024.0,"ratePesosPerMeter":60612.3046875,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608456"},{"year":2025,"category":"Roads","project":"Maharlika Highway ( Cagayan Valley Rd) - K0471 + 128 - K0472 + 868, K0473 + 200 - K0473 + 522, K0473 + 748 - K0474 + 005","amountPesos":115373000,"lengthMeters":2319.0,"ratePesosPerMeter":49751.1858559724,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608457"},{"year":2025,"category":"Roads","project":"Preventive Maintenance - Primary Roads along Maharlika Highway ( Cagayan Valley Rd) - K0516 + 339 - K0519 + 000, K0523 + 400 - K0524 + 000, K0524 + 000 - K0524 + 691, K0527 + 000 - K0527 + 325, K0531 + 000 - K0532 + 000, K0532 + 693 - K0534 + 000, K0539 + 000 - K0539 + 710, K0541 + 000 - K0541 + 14.6, K0548 + 341.3 - K0548 + 970","amountPesos":226951000,"lengthMeters":7937.3,"ratePesosPerMeter":28592.972421352602,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608458"},{"year":2025,"category":"Roads","project":"Santiago - Tuguegarao Road - K0328 + (-687) - K0329 + 107","amountPesos":100000000,"lengthMeters":1794.0,"ratePesosPerMeter":55741.36008918618,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608459"},{"year":2025,"category":"Roads","project":"Santiago - Tuguegarao Road - K0329 + 107 - K0329 + 911","amountPesos":100000000,"lengthMeters":804.0,"ratePesosPerMeter":124378.10945273632,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608460"},{"year":2025,"category":"Roads","project":"Maharlika Highway ( Cagayan Valley Rd) - K0525 + 432 - K0528 + 292","amountPesos":48354000,"lengthMeters":2860.0,"ratePesosPerMeter":16906.99300699301,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608463"},{"year":2025,"category":"Roads","project":"Maharlika Highway ( Cagayan Valley Rd) - K0490 + 848 - K0492 + 1150, K0492 + 1284 - K0494 + 458, K0494 + 464 - K0495 + 931, K0499 + 097 - K0503 + 107","amountPesos":194203000,"lengthMeters":8953.0,"ratePesosPerMeter":21691.388361443092,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608464"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0361 + 590 - K0361 + 844, K0361 + 866 - K0364 + 014","amountPesos":139511000,"lengthMeters":2402.0,"ratePesosPerMeter":58081.182348043294,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608465"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0097 + 170 - K0099+000, K0099 + 806 - K0100 + 224, K0100 + 316 - K0101 + 786","amountPesos":300000000,"lengthMeters":3718.0,"ratePesosPerMeter":80688.54222700377,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608480"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0109 + 164 - K0109+ 617","amountPesos":38637000,"lengthMeters":453.0,"ratePesosPerMeter":85291.39072847682,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608481"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0101 + 786 - K0101 + 985, K0102 + 978 - K0103 + 721","amountPesos":76856000,"lengthMeters":942.0,"ratePesosPerMeter":81588.11040339703,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608483"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0169 + 1223 - K0170 + 000, K0180 + 000 - K0180 + 377","amountPesos":20309000,"lengthMeters":600.0,"ratePesosPerMeter":33848.333333333336,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608484"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0048 + 800 - K0048 + 984, K0051 + 755 - K0052 + 000, K0052+592 - K0052+725","amountPesos":27811000,"lengthMeters":562.0,"ratePesosPerMeter":49485.76512455516,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608491"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0057 + 000 - K0057 + 188","amountPesos":19105000,"lengthMeters":188.0,"ratePesosPerMeter":101622.34042553192,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608492"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0057 + 188 - K0057 + 264","amountPesos":7890000,"lengthMeters":76.0,"ratePesosPerMeter":103815.78947368421,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608493"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0057 + (-092) - K0057 + 138","amountPesos":23719000,"lengthMeters":230.0,"ratePesosPerMeter":103126.08695652174,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608504"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0058 + 076 - K0058 + 603","amountPesos":61603000,"lengthMeters":527.0,"ratePesosPerMeter":116893.73814041745,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608505"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0063 + 1083 - K0064 + 414","amountPesos":44170000,"lengthMeters":331.0,"ratePesosPerMeter":133444.1087613293,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608506"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Manila South Road) - K0044 + 000 - K0044 + 553","amountPesos":55353000,"lengthMeters":553.0,"ratePesosPerMeter":100095.84086799277,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608507"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0054 + 018 - K0054 + 105, K0055 + 000 - K0056 + 255","amountPesos":138608000,"lengthMeters":1342.0,"ratePesosPerMeter":103284.64977645305,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608508"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0135 + 990 - K0136 + 621","amountPesos":63437000,"lengthMeters":631.0,"ratePesosPerMeter":100534.07290015848,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608509"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Manila South Road) - K0047 + 090 - K0047 + 288","amountPesos":24000000,"lengthMeters":198.0,"ratePesosPerMeter":121212.12121212122,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608510"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Manila South Road) - K0051 + 000 - K0052 + 000","amountPesos":90121000,"lengthMeters":1000.0,"ratePesosPerMeter":90121.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608511"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0079 + 1344 - K0079 + 1967","amountPesos":62868000,"lengthMeters":623.0,"ratePesosPerMeter":100911.71749598716,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608512"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Manila South Road) - K0036 + 150 - K0036 + 860","amountPesos":81613000,"lengthMeters":710.0,"ratePesosPerMeter":114947.88732394367,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608514"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Manila South Road) - K0045 + 720 - K0045 + 810","amountPesos":11677000,"lengthMeters":90.0,"ratePesosPerMeter":129744.44444444444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608515"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0058 + 603 - K0058 + 679, K0064 + 414 - K0064 + 555","amountPesos":22500000,"lengthMeters":217.0,"ratePesosPerMeter":103686.63594470047,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608516"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0092 + (-249.5) - K0092 + (-029)","amountPesos":10000000,"lengthMeters":220.5,"ratePesosPerMeter":45351.47392290249,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608517"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Manila South Road) - K0041 + 516 - K0041 + 817","amountPesos":26169000,"lengthMeters":301.0,"ratePesosPerMeter":86940.19933554817,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608518"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Manila South Road) - K0041 + 817 - K0042 + 336","amountPesos":37632000,"lengthMeters":519.0,"ratePesosPerMeter":72508.67052023122,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608519"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Manila South Road) - K0029 + 601 - K0030 + 276","amountPesos":83000000,"lengthMeters":675.0,"ratePesosPerMeter":122962.96296296296,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608520"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0158 + (-872) - K0158 + (-552), K0162 + 390 - K0162 + 460","amountPesos":30533000,"lengthMeters":390.0,"ratePesosPerMeter":78289.7435897436,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608521"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0213 + 100 - K0213 + 150, K0245 + 200 - K0245 + 617","amountPesos":27994000,"lengthMeters":467.0,"ratePesosPerMeter":59944.32548179872,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608522"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0169 + 700 - K0170 + 290, K0170 + 310 - K0170 + 349","amountPesos":33468000,"lengthMeters":629.0,"ratePesosPerMeter":53208.26709062003,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608524"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0212 + 350 - K0212 + 400, K0212 + 420 - K0212 + 605, K0212 + 800 - K0212 + 874","amountPesos":16404000,"lengthMeters":309.0,"ratePesosPerMeter":53087.3786407767,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608526"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0522 + 469 - K0522 + 800, K0522 + 875 - K0522 + 922, K0528 + 204 - K0528 + 432","amountPesos":28146000,"lengthMeters":606.0,"ratePesosPerMeter":46445.544554455446,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608527"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0427 + 333 - K0428 + 132","amountPesos":60000000,"lengthMeters":799.0,"ratePesosPerMeter":75093.8673341677,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608528"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0493 + 200 - K0493 + 779","amountPesos":43307000,"lengthMeters":579.0,"ratePesosPerMeter":74796.20034542315,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608529"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0453 + 000 - K0453 + 286","amountPesos":20731000,"lengthMeters":286.0,"ratePesosPerMeter":72486.01398601399,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608530"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0439 + 000 - K0440 + 650","amountPesos":163591000,"lengthMeters":1650.0,"ratePesosPerMeter":99146.06060606061,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608531"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0440 + 650 - K0441 + 224.5","amountPesos":34980000,"lengthMeters":574.5,"ratePesosPerMeter":60887.72845953002,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608532"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0335 + 755 - K0336 + 040, K0336 + 858 - K0336 + 936","amountPesos":28000000,"lengthMeters":363.0,"ratePesosPerMeter":77134.98622589532,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608533"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0547 + 982 - K0548 + 244","amountPesos":20000000,"lengthMeters":262.0,"ratePesosPerMeter":76335.87786259541,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608534"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0638 + 012 - K0639 + 579","amountPesos":109817000,"lengthMeters":1567.0,"ratePesosPerMeter":70081.0465858328,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608535"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0505 + 419 - K0505 + 600, K0509 + 704 - K0510 + 912","amountPesos":106569000,"lengthMeters":1389.0,"ratePesosPerMeter":76723.54211663066,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608536"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0490 + 201 - K0490 + 437","amountPesos":18491000,"lengthMeters":236.0,"ratePesosPerMeter":78351.69491525424,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608537"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0461 + 000 - K0461 + 385, K0463 + 417 - K0464 + 023, K0475 + 610 - K0476 + 114, K0476 + 219 - K0476 + 537.5","amountPesos":108672000,"lengthMeters":1813.5,"ratePesosPerMeter":59923.90405293631,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608538"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0548 + 583.16 - K0548 + 985","amountPesos":38141000,"lengthMeters":401.84,"ratePesosPerMeter":94915.88692017493,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608541"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0565 + 845 - K0566 + 570","amountPesos":53402000,"lengthMeters":725.0,"ratePesosPerMeter":73657.93103448275,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608542"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0567 + 500 - K0568 + 644","amountPesos":100000000,"lengthMeters":1144.0,"ratePesosPerMeter":87412.58741258741,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608543"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0575 + 000 - K0575 + 482","amountPesos":36994000,"lengthMeters":482.0,"ratePesosPerMeter":76751.03734439834,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608544"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0575 + 482 - K0575 + 923","amountPesos":34006000,"lengthMeters":441.0,"ratePesosPerMeter":77111.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608545"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0569 + 000 - K0569 + 384, K0569 + 414 - K0569 + 485","amountPesos":44223000,"lengthMeters":455.0,"ratePesosPerMeter":97193.40659340659,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608546"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0339 + 131 - K0339 + 350, K0339 + 450 - K0339 + 815, K0341 + 319 - K0341 + 634, K0342 + 439 - K0342 + 487","amountPesos":66000000,"lengthMeters":947.0,"ratePesosPerMeter":69693.76979936642,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608547"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0352 + 953 - K0353 + 664","amountPesos":54758000,"lengthMeters":711.0,"ratePesosPerMeter":77015.4711673699,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608548"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0406 + 912 - K0407 + 000, K0407 + 216 - K0407 + 500","amountPesos":23075000,"lengthMeters":372.0,"ratePesosPerMeter":62029.56989247312,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608549"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0961 + 530 - K0961 + 673","amountPesos":8851000,"lengthMeters":143.0,"ratePesosPerMeter":61895.104895104894,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608575"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0962 + 550 - K0963 + 047","amountPesos":25564000,"lengthMeters":497.0,"ratePesosPerMeter":51436.619718309856,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608576"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0963 + 902 - K0964 + 979","amountPesos":54193000,"lengthMeters":1077.0,"ratePesosPerMeter":50318.477251624885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608577"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0968 + 000 - K0968 + 216","amountPesos":11479000,"lengthMeters":216.0,"ratePesosPerMeter":53143.51851851852,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608578"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0691 + 000 - K0691 + 286, K0691 + 754 - K0692 + 000, K0691 + (-029) - K0691 + 334","amountPesos":60085000,"lengthMeters":609.0,"ratePesosPerMeter":98661.74055829228,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608579"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0685 + 941 - K0687 + 211","amountPesos":102959000,"lengthMeters":1270.0,"ratePesosPerMeter":81070.07874015748,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608580"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1006 + 1151 - K1007 + 040, K1007 + 470 - K1008 + 235","amountPesos":28676000,"lengthMeters":876.0,"ratePesosPerMeter":32735.1598173516,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608581"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1015 + 390 - K1015 + 474","amountPesos":3532000,"lengthMeters":84.0,"ratePesosPerMeter":42047.619047619046,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608582"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1029 + 003 - K1030 + 000","amountPesos":42384000,"lengthMeters":997.0,"ratePesosPerMeter":42511.53460381144,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608583"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1045 + 603 - K1045 + 1048, K1045 + 1064 - K1046 + 720","amountPesos":51500000,"lengthMeters":1101.0,"ratePesosPerMeter":46775.65849227975,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608584"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1046 + 736 - K1047 + 038, K1047 + 106 - K1047 + 734","amountPesos":41400000,"lengthMeters":930.0,"ratePesosPerMeter":44516.12903225807,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608585"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0783 + 120 - K0783 + 400, K0783 + 600 - K0784 + 000","amountPesos":44561000,"lengthMeters":680.0,"ratePesosPerMeter":65530.882352941175,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608586"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0784 + 000 - K0784 + 160, K0784 + 190 - K0784 + 901","amountPesos":43676000,"lengthMeters":871.0,"ratePesosPerMeter":50144.66130884041,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608587"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1665 + 500 - K1666 + 804, K1667 + 516 - K1667 + 623","amountPesos":77000000,"lengthMeters":1411.0,"ratePesosPerMeter":54571.226080793764,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608589"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1657 + 207 - K1659 + 043","amountPesos":100000000,"lengthMeters":1836.0,"ratePesosPerMeter":54466.23093681917,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608590"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1684 + 300 - K1684 + 597.68, K1688 + 500 - K1689 + 000, K1700 + 360 - K1702 + 561.50","amountPesos":100000000,"lengthMeters":2999.18,"ratePesosPerMeter":33342.446935496424,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608591"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1711 + 000 - K1712+321","amountPesos":100000000,"lengthMeters":1321.0,"ratePesosPerMeter":75700.2271006813,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608592"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1813 + 842 - K1814 + 000, K1829 + 808 - K1832 + 578","amountPesos":94722000,"lengthMeters":2928.0,"ratePesosPerMeter":32350.409836065573,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608593"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1794 + 215 - K1795 + 000, K1800 + 642.30 - K1800 + 699.90, K1800 + 780.30 - K1800 + 835.10, K1800 + 930.40 - K1801 + 006.40, K1801 + 072.50 - K1801 + 135.50, K1801+163 - K1801+565, K1808 + 000 - K1809 + 313, K1810 + 460 - K1811 + 000","amountPesos":100194000,"lengthMeters":3291.4,"ratePesosPerMeter":30441.14966275835,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608594"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1843 + 221 - K1843 + 455, K1849 + 000 - K1850 + 322","amountPesos":34783000,"lengthMeters":1556.0,"ratePesosPerMeter":22354.113110539845,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608595"},{"year":2025,"category":"Roads","project":"Sayre Highway - K1476 + 027 - K1479 + 010, K1480 + 006 - K1480 + 874, K1480 + 915 - K1481 + 883","amountPesos":111000000,"lengthMeters":4819.0,"ratePesosPerMeter":23033.824444905582,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608604"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Malabang-Dobleston-Tukuran Rd) - K1986 + 066 - K1986 + 761","amountPesos":23150000,"lengthMeters":695.0,"ratePesosPerMeter":33309.352517985615,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608608"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Malabang-Dobleston-Tukuran Rd) - K1991 + 756 - K1993 + 336","amountPesos":47362000,"lengthMeters":1580.0,"ratePesosPerMeter":29975.949367088608,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608609"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Malabang-Dobleston-Tukuran Rd) - K1994 + 671 - K1996 + 010","amountPesos":39842000,"lengthMeters":1339.0,"ratePesosPerMeter":29755.041075429424,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608610"},{"year":2025,"category":"Roads","project":"Sayre Highway K1451+420 - K1451+560, K1451+700-K1451+760, K1452+360 - K1452+400","amountPesos":91000000,"lengthMeters":240.0,"ratePesosPerMeter":379166.6666666667,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608611"},{"year":2025,"category":"Roads","project":"Butuan City - Cagayan de Oro-Iligan City Road. K1447+605-K1449+000, K1450+465-k1451+174, k1451+468- k1451+993 (With Exception)","amountPesos":150000000,"lengthMeters":2629.0,"ratePesosPerMeter":57055.91479650057,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608612"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Malabang-Dobleston-Tukuran Rd) - K1996 + 010 - K1996 + 551","amountPesos":33773000,"lengthMeters":541.0,"ratePesosPerMeter":62426.98706099815,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608614"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1469 + 231 - K1469 + 530","amountPesos":26000000,"lengthMeters":299.0,"ratePesosPerMeter":86956.52173913043,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608622"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1472 + 048 - K1474 + 500, K1475 + 510 - K1473 + 994","amountPesos":207000000,"lengthMeters":3462.0,"ratePesosPerMeter":59792.02772963605,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608623"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1475 + 000 - K1475 + 665, K1476 + 346 - K1475 + 000","amountPesos":56000000,"lengthMeters":1346.0,"ratePesosPerMeter":41604.754829123325,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608624"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1479 + (-013) - K1479 + 179, K1478 + 833 - K1479 + 103, K1477 +069 - 1475 + 006, K1475 + 000 - K1476 + 928","amountPesos":200000000,"lengthMeters":2415.0,"ratePesosPerMeter":82815.73498964803,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608625"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1480 + (-956) - K1480 + (-695), K1480 + 695 - K1480 + 956, K1480 +956 - 1481 + 221, K1482 + (-370) - K1482 + 752, K1481 + 221 - K1482 + 370, K1482 + 828 - K1482 + 1017","amountPesos":200000000,"lengthMeters":2507.0,"ratePesosPerMeter":79776.62544874352,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608626"},{"year":2025,"category":"Roads","project":"Maharlika Highway(Davao City-Jct Digos Sect) - K1534+087 - K1535+550, Davao del Sur","amountPesos":150000000,"lengthMeters":1463.0,"ratePesosPerMeter":102529.04989747095,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608627"},{"year":2025,"category":"Roads","project":"Maharlika Highway(Davao City-Jct Digos Sect) - K1535+550 - K1536+560, K1536+753 - K1537+200","amountPesos":150000000,"lengthMeters":1457.0,"ratePesosPerMeter":102951.2697323267,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608628"},{"year":2025,"category":"Roads","project":"Maharlika Highway - Davao Cotobato Road (Davao City-Jct Digos Section)- K1552 + 000 - K1553 + 000","amountPesos":100000000,"lengthMeters":1000.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608629"},{"year":2025,"category":"Roads","project":"Maharlika Highwaya - Davao- Cotobato Road (Davao City-Jct. Digos Section) - K1562 + 000 - K1563 + 000","amountPesos":100000000,"lengthMeters":1000.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608630"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1485 + 311.23 - K1485 + 975, K1490 + 000 - K1490 + 432, K1490 + 654 - K1490 + 856, K1490 + 866 - K1491 + 082, K1491 + 102 - K1491 + 148, K1491 + 176 - K1491 + 565, K1491 + 574 - K1491 + 806, K1491 + 811 - K1491 + 965","amountPesos":205239000,"lengthMeters":2334.77,"ratePesosPerMeter":87905.44678919052,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608632"},{"year":2025,"category":"Roads","project":"Davao-Cotabato Road (Jct Digos-Cotabato Sect) - K1568 + 660 - K1569 + 000, K1569 + 338 - K1569 + 728, K1578 + 929 - K1579 + 093","amountPesos":100000000,"lengthMeters":894.0,"ratePesosPerMeter":111856.82326621925,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608634"},{"year":2025,"category":"Roads","project":"Maharlika Highway(Davao City-Jct Digos Sect) - K1534 + 585 - K1534 + 813, K1535 + 886 - K1535 + 034","amountPesos":39319000,"lengthMeters":1080.0,"ratePesosPerMeter":36406.48148148148,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608635"},{"year":2025,"category":"Roads","project":"Maharlika Highway(Davao City-Jct Digos Sect) - K1559 + 952 - K1560 + 746","amountPesos":79283000,"lengthMeters":794.0,"ratePesosPerMeter":99852.64483627204,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608636"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - K1567 + 400 - K1567 + 590","amountPesos":20000000,"lengthMeters":190.0,"ratePesosPerMeter":105263.15789473684,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608637"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - K1572 + 006 - K1572 + 179","amountPesos":18116000,"lengthMeters":173.0,"ratePesosPerMeter":104716.76300578035,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608638"},{"year":2025,"category":"Roads","project":"Davao-Cotabato Road (Jct. Digos - Cotabato Section -K1591+450-K1593+057","amountPesos":100000000,"lengthMeters":1607.0,"ratePesosPerMeter":62227.75357809583,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608639"},{"year":2025,"category":"Roads","project":"Davao-Cotabato Road (Jct. Digos - Cotabato Section) - K1588+500-K1590+050","amountPesos":100000000,"lengthMeters":1550.0,"ratePesosPerMeter":64516.12903225807,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608640"},{"year":2025,"category":"Roads","project":"Davao-Cotabato Road (Jct Digos-Cotabato Section) (SO1753MNH) K1721+000-K1724+000","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608644"},{"year":2025,"category":"Roads","project":"Davao-Cotabato Road (Jct Digos-Cotabato Section) (SO1753MNH) K1719+000-K1721+000","amountPesos":100000000,"lengthMeters":2000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608645"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - K1579 + 256 - K1579 + 794","amountPesos":55680000,"lengthMeters":538.0,"ratePesosPerMeter":103494.42379182157,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608648"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Cotabato-Marbel Rd) - K1740 + 000 - K1745 + 550","amountPesos":200000000,"lengthMeters":5550.0,"ratePesosPerMeter":36036.036036036036,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608649"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Cotabato-Lanao Rd) - K1877 + 479 - K1881 + 000","amountPesos":100000000,"lengthMeters":3521.0,"ratePesosPerMeter":28401.022436807725,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608651"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1769 + 689 - K1770 + 817","amountPesos":155000000,"lengthMeters":1128.0,"ratePesosPerMeter":137411.3475177305,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608654"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Marbel-Allah Valley-Cotabato Rd), K1773 + (-374) - K1773 + (-322), K1773 + (-322) - K1773 + (-232), K1773 + (-080) - K1773 + 054, K1772 + 675 - K1772 + 783, K1773 + 340 - K1773 + 456","amountPesos":25000000,"lengthMeters":407.0,"ratePesosPerMeter":61425.06142506142,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608655"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Cotabato-Lanao Rd) - K1863 + 000 - K1866 + 040","amountPesos":131665000,"lengthMeters":3040.0,"ratePesosPerMeter":43310.85526315789,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608656"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1782 + 000 - K1785 + 000","amountPesos":129927000,"lengthMeters":3000.0,"ratePesosPerMeter":43309.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608657"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1789 + 000 - K1792 + 000","amountPesos":129928000,"lengthMeters":3000.0,"ratePesosPerMeter":43309.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608658"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Cotabato-Marbel Rd) - K1738 + 462 - K1740 + 000","amountPesos":220000000,"lengthMeters":1538.0,"ratePesosPerMeter":143042.91287386217,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608666"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1768 + (-565) - K1768 + 248, K1769 + 152 - K1769 + 689","amountPesos":110614000,"lengthMeters":1350.0,"ratePesosPerMeter":81936.29629629629,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608667"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - K1650 + 200 - K1650 + 324, K1651 + 653 - K1651 + 835","amountPesos":27488000,"lengthMeters":306.0,"ratePesosPerMeter":89830.06535947713,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608668"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - (S00230MN) Chainage 000 - Chainage 008, Chainage 008 - Chainage 025, Chainage 025 - Chainage 175, K1653 + 852 - K1654 + 941","amountPesos":119324000,"lengthMeters":1264.0,"ratePesosPerMeter":94401.89873417722,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608669"},{"year":2025,"category":"Roads","project":"Davao-Cotabato Road (Jct. Digos - Cotabato Sect.) (S00791MN) (K1668 + 103 - K1669 + 000), Pikit, North Cotabato","amountPesos":90000000,"lengthMeters":897.0,"ratePesosPerMeter":100334.44816053512,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608670"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Cotabato-Marbel Rd) - K1728 + 418 - K1730 + 270","amountPesos":60000000,"lengthMeters":1852.0,"ratePesosPerMeter":32397.40820734341,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608671"},{"year":2025,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1235 + 224.11 - K1238 + 358.03","amountPesos":200000000,"lengthMeters":3133.92,"ratePesosPerMeter":63817.83836218051,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608672"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1217 + 363 - K1218 + 572","amountPesos":98036000,"lengthMeters":1209.0,"ratePesosPerMeter":81088.50289495451,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608675"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1196 + 212 - K1196 + 628, K1196 + 733 - K1196 + 751, K1196 + 856 - K1197 + 416","amountPesos":41007000,"lengthMeters":994.0,"ratePesosPerMeter":41254.527162977865,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608676"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1267 + 569 - K1268 + 000, K1268 + 613 - K1269 + 290","amountPesos":39492000,"lengthMeters":1108.0,"ratePesosPerMeter":35642.59927797834,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608677"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1273 + 925 - K1274 + 067","amountPesos":5207000,"lengthMeters":142.0,"ratePesosPerMeter":36669.01408450704,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608678"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1274 + 318 - K1274 + 345, K1274 + 384 - K1274 + 414, K1276 + 000 - K1276 + 360, K1276 + 994 - K1277 + 678, K1278 + 272 - K1278 + 508","amountPesos":53798000,"lengthMeters":1337.0,"ratePesosPerMeter":40237.8459237098,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608679"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1288 + 979 - K1290 + 000","amountPesos":41813000,"lengthMeters":1021.0,"ratePesosPerMeter":40952.987267384924,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608680"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1294 + 124 - K1295 + 445","amountPesos":58097000,"lengthMeters":1321.0,"ratePesosPerMeter":43979.560938682815,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608681"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1151 + 360 - K1152 + 012.2, K1152 + 298 - K1153 + 461.80, K1153 + 728 - K1155 + 683, K1155 + 711 - K1155 + 765.80, K1155 + 861 - K1156 + 128","amountPesos":131000000,"lengthMeters":4092.8,"ratePesosPerMeter":32007.427677872973,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608683"},{"year":2025,"category":"Roads","project":"Marcos Highway - K0014 + (-082) - K0014 + 054","amountPesos":13544000,"lengthMeters":136.0,"ratePesosPerMeter":99588.23529411765,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608685"},{"year":2025,"category":"Roads","project":"C-5 Road - K0014 + (-1359) - K0014 + (-1290)","amountPesos":6895000,"lengthMeters":69.0,"ratePesosPerMeter":99927.53623188406,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608686"},{"year":2025,"category":"Roads","project":"Sayre Highway - K1426 + (-300) - K1426 + 574","amountPesos":20000000,"lengthMeters":874.0,"ratePesosPerMeter":22883.29519450801,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608777"},{"year":2025,"category":"Roads","project":"Sayre Highway - K1429 + 540 - K1430 + 600","amountPesos":30871000,"lengthMeters":1060.0,"ratePesosPerMeter":29123.584905660377,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608778"},{"year":2025,"category":"Roads","project":"Asphalt Overlay, Pres. Diosdado P. Macapagal National Highway, Brgy. Dahican, Mati City, Davao Oriental KM1710 + 936 - KM 1711 + 296","amountPesos":20000000,"lengthMeters":360.0,"ratePesosPerMeter":55555.555555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 608780"},{"year":2025,"category":"Roads","project":"C-5 Road - K0015 + (-714) - K0015 + 1062","amountPesos":90000000,"lengthMeters":1776.0,"ratePesosPerMeter":50675.67567567567,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610734"},{"year":2025,"category":"Roads","project":"Road 1 (S05480LZ) - Chainage 660 - 880","amountPesos":15000000,"lengthMeters":220.0,"ratePesosPerMeter":68181.81818181818,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610739"},{"year":2025,"category":"Roads","project":"Maragondon-Magallanes-Amuyong Road - K0068 + 000 - K0068 + 590, K0068 + 950 - K0069 + 661, K0071 + 810 - K0073 + 200","amountPesos":150000000,"lengthMeters":2691.0,"ratePesosPerMeter":55741.36008918618,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610824"},{"year":2025,"category":"Roads","project":"Gumaca Bypass Road, K0201+342-K0203+107, Gumaca, Quezon","amountPesos":100000000,"lengthMeters":1765.0,"ratePesosPerMeter":56657.22379603399,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610893"},{"year":2025,"category":"Roads","project":"Calapan South Road K0057+226 - K0058+100","amountPesos":90000000,"lengthMeters":874.0,"ratePesosPerMeter":102974.82837528604,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610912"},{"year":2025,"category":"Roads","project":"Calapan North Road K0059+132 - K0060+000","amountPesos":50000000,"lengthMeters":868.0,"ratePesosPerMeter":57603.6866359447,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610913"},{"year":2025,"category":"Roads","project":"Calapan South Road K0026+000 - K0027+000","amountPesos":50000000,"lengthMeters":1000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610914"},{"year":2025,"category":"Roads","project":"Mindoro West Coastal Road (Section 3) (S00117MR) - K0324+679-K326+148, Ibud, Sablayan, Occidental Mindoro","amountPesos":80000000,"lengthMeters":1469.0,"ratePesosPerMeter":54458.81552076242,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610935"},{"year":2025,"category":"Roads","project":"Calapan North Road K0049+000 - K0050+014, K0050+644 - K0050+985, K0051+462 - K0051+507, K0051+746 - K0051+778","amountPesos":100000000,"lengthMeters":1432.0,"ratePesosPerMeter":69832.40223463687,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610937"},{"year":2025,"category":"Roads","project":"Calapan South Road - K0015+211- K0015+653, K0016+120 - K0018+000","amountPesos":145000000,"lengthMeters":2322.0,"ratePesosPerMeter":62446.16709732989,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610938"},{"year":2025,"category":"Roads","project":"Calapan South Road - K0042+908-K0044+322","amountPesos":140000000,"lengthMeters":1414.0,"ratePesosPerMeter":99009.900990099,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610939"},{"year":2025,"category":"Roads","project":"Calapan South Road -K0046+000-K0047+462","amountPesos":120000000,"lengthMeters":1462.0,"ratePesosPerMeter":82079.34336525308,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610940"},{"year":2025,"category":"Roads","project":"Calapan South Road -K0049+000-K0050+765","amountPesos":85000000,"lengthMeters":1765.0,"ratePesosPerMeter":48158.64022662889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610941"},{"year":2025,"category":"Roads","project":"Calapan South Road -K0062+000-K0063+015","amountPesos":110000000,"lengthMeters":1015.0,"ratePesosPerMeter":108374.38423645322,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610942"},{"year":2025,"category":"Roads","project":"Calapan South Road K0042+198 - K0042+908","amountPesos":75000000,"lengthMeters":710.0,"ratePesosPerMeter":105633.80281690141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610943"},{"year":2025,"category":"Roads","project":"Calapan South Road -K0050+765-K0052+246","amountPesos":90000000,"lengthMeters":1481.0,"ratePesosPerMeter":60769.750168804865,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610944"},{"year":2025,"category":"Roads","project":"Calapan South Road -K0052+246-K0053+511","amountPesos":60000000,"lengthMeters":1265.0,"ratePesosPerMeter":47430.83003952569,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610945"},{"year":2025,"category":"Roads","project":"Calapan South Road -K0061+129-K0062+000","amountPesos":75000000,"lengthMeters":871.0,"ratePesosPerMeter":86107.92192881745,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610946"},{"year":2025,"category":"Roads","project":"Calapan South Road -K0037+594-K0039+044","amountPesos":70000000,"lengthMeters":1450.0,"ratePesosPerMeter":48275.862068965514,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610947"},{"year":2025,"category":"Roads","project":"Calapan North Road K0037+000-K0039+000","amountPesos":50000000,"lengthMeters":2000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 610948"},{"year":2025,"category":"Roads","project":"Loay Interior Road, K0141+ 648 - K0146 + 356, K0147 + 069 - K0148 + 000, K0149 + 009 - K0151 + 522, K0149 + 009 - K0152 + 705","amountPesos":196000000,"lengthMeters":9335.0,"ratePesosPerMeter":20996.2506695233,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611001"},{"year":2025,"category":"Roads","project":"Rizal-Dakak-Dapitan Coastal Loop Road - K1821+000-K1822+000, K1822+000-K1823+000, K1823+000-K1824+000, K1824+000-K1825+000, K1825+000-K1826+000","amountPesos":100000000,"lengthMeters":5000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611022"},{"year":2025,"category":"Roads","project":"Rizal-Dakak-Dapitan Coastal Loop Road - K1826+000-K1827+000, K1827+000-K1828+000, K1828+000-K1829+000, K1829+000-K1830+000, K1830+000-K1831+000","amountPesos":100000000,"lengthMeters":5000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611023"},{"year":2025,"category":"Roads","project":"Malaybalay City Bypass Road - Chainage 3 - Chainage 2074, Chainage 2180 - Chainage 5644","amountPesos":250000000,"lengthMeters":5535.0,"ratePesosPerMeter":45167.11833785004,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611027"},{"year":2025,"category":"Roads","project":"Malaybalay City Bypass Road - Chainage 5644 - Chainage 11234","amountPesos":250000000,"lengthMeters":5590.0,"ratePesosPerMeter":44722.719141323796,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611028"},{"year":2025,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway K1414 + (-1205) - K1414 + 309, K1414 + 535 - K1414 + 800, K1415 + 311 - K1417 + 000, K1419 + 385 - K1422 + 204, K1425 + 291 - K1425 + 379, K1426 + 402 - K1427 + 080, K1427 + 189 - K1427 + 056","amountPesos":150000000,"lengthMeters":7162.0,"ratePesosPerMeter":20943.87042725496,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611039"},{"year":2025,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway K1611+100 - K1611 + 136, K1611+200 - K1611 + 230, K1611+570 - K 1611+600, K1611+600 - K1611+900, K1612+000 - K1612+ 150, K1612+100-K1612+130","amountPesos":125000000,"lengthMeters":546.0,"ratePesosPerMeter":228937.72893772894,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611053"},{"year":2025,"category":"Roads","project":"Nabunturan - Maragusan Road, Davao de Oro K1441+000 - K 1441+300, K1441+400 - K 1441+450, K1443+700 - K1443+730, K1444+500 - K1444+550, K1446+890 - K 1446+917, K1450+000 - K1450+050, K1450+800 - K1450+900, K1453+500 - K1453+550","amountPesos":125000000,"lengthMeters":657.0,"ratePesosPerMeter":190258.7519025875,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611054"},{"year":2025,"category":"Roads","project":"San Jose -T'boli-Surallah Road K1712 + 000 - K1707 + 000","amountPesos":100000000,"lengthMeters":5000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611058"},{"year":2025,"category":"Roads","project":"San Jose -T'boli-Surallah Road K1717 + 000 - K1712 + 000","amountPesos":100000000,"lengthMeters":5000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611059"},{"year":2025,"category":"Roads","project":"General Santos City -T' Boli-Surallah Road K1711+000-K1707+000","amountPesos":85000000,"lengthMeters":4000.0,"ratePesosPerMeter":21250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611078"},{"year":2025,"category":"Roads","project":"Simuay - Landasan- Parang Road (S01761MN) K1872+000-K1874+000","amountPesos":50000000,"lengthMeters":2000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611080"},{"year":2025,"category":"Roads","project":"Simuay Landasan- Parang Road (S01761MN) K1868+000-K1872+000","amountPesos":200000000,"lengthMeters":4000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611081"},{"year":2025,"category":"Roads","project":"C-3 Road (S02136LZ) - K0011 + (-319) - K0011 + 778","amountPesos":33000000,"lengthMeters":1097.0,"ratePesosPerMeter":30082.0419325433,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611108"},{"year":2025,"category":"Roads","project":"Banaybanay-Mojon-Cuenca Road - K0092 + 022 - K0094 + 000","amountPesos":34000000,"lengthMeters":1978.0,"ratePesosPerMeter":17189.079878665318,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611169"},{"year":2025,"category":"Roads","project":"Cavite-Batangas Road K0042+000 - K00042+900, K0048 + 100 - K0049 + 000","amountPesos":180000000,"lengthMeters":1800.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611179"},{"year":2025,"category":"Roads","project":"Calapan South Road - K0039+649-K0040+000","amountPesos":40000000,"lengthMeters":351.0,"ratePesosPerMeter":113960.11396011396,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611206"},{"year":2025,"category":"Roads","project":"Cabatuan Bypass Road - Chainage 929 - Chainage 3094","amountPesos":10000000,"lengthMeters":2165.0,"ratePesosPerMeter":4618.937644341801,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611249"},{"year":2025,"category":"Bridges","project":"Cansaga Bay Bridge - (S00406CB) Chainage 074 - Chainage 263","amountPesos":6000000,"lengthMeters":189.0,"ratePesosPerMeter":31746.031746031746,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611273"},{"year":2025,"category":"Roads","project":"Mactan Circumferential Road - K0026 + 000 - K0026 + 636, K0029 + 581 - K0030 + 228","amountPesos":45000000,"lengthMeters":1283.0,"ratePesosPerMeter":35074.045206547155,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611272"},{"year":2025,"category":"Roads","project":"Sarangani - Davao Del Sur Coastal Roads K1718+900 - K1722+000, Glan, Sarangani","amountPesos":100000000,"lengthMeters":3100.0,"ratePesosPerMeter":32258.064516129034,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611297"},{"year":2025,"category":"Roads","project":"Sarangani - Sultan Kudarat Coastala Roads, K1774+279 - K1777+323, Maitum, Sarangani","amountPesos":100000000,"lengthMeters":3044.0,"ratePesosPerMeter":32851.5111695138,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 611298"},{"year":2025,"category":"Roads","project":"Agoo - Baguio City Road, K0251 + 519 - K0255 + 042","amountPesos":100000000,"lengthMeters":3523.0,"ratePesosPerMeter":28384.89923360772,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613055"},{"year":2025,"category":"Roads","project":"Bauang - Baguio Road, K0259 + (-165) - K0261 + 365","amountPesos":100000000,"lengthMeters":2530.0,"ratePesosPerMeter":39525.691699604744,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613056"},{"year":2025,"category":"Roads","project":"Agoo Beach Road K0236+(-502)-K0238+918, Agoo, La Union","amountPesos":100000000,"lengthMeters":3420.0,"ratePesosPerMeter":29239.766081871345,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613058"},{"year":2025,"category":"Roads","project":"Agoo Beach Road K0238+918-K0238+4338, Agoo, La Union","amountPesos":100000000,"lengthMeters":3420.0,"ratePesosPerMeter":29239.766081871345,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613059"},{"year":2025,"category":"Roads","project":"Bauang - Baguio Road, K0261 + 365 - K0264 + 866, Bauang - Naguilian","amountPesos":100000000,"lengthMeters":3501.0,"ratePesosPerMeter":28563.267637817768,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613060"},{"year":2025,"category":"Roads","project":"Jct. Tabulin-Barlig-Natonin-Paracelis-Calaccad Road - (Amolong-Tawang Section) (Component M1) - Chainage 000 + 000 - Chainage 004 + 458","amountPesos":100000000,"lengthMeters":4458.0,"ratePesosPerMeter":22431.58366980709,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613062"},{"year":2025,"category":"Roads","project":"Peñablanca-Callao Cave Road (SO5071LZ) K0475 + 233 - K0483 + 550 & K0484 + 020 - K0485 + 550 (Two Lanes)","amountPesos":150000000,"lengthMeters":9847.0,"ratePesosPerMeter":15233.065908398497,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613065"},{"year":2025,"category":"Roads","project":"Jct. Ipiil - Quirino Bdry Road - K0349 + 413 - K0350 + 570 - K0352 + 047 - K0352 + 502 - K0353 + 500 - K353 + 384","amountPesos":100000000,"lengthMeters":1728.0,"ratePesosPerMeter":57870.37037037037,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613068"},{"year":2025,"category":"Roads","project":"Concepcion - La Paz Road K0124+000.00 to K0126+000.00","amountPesos":100000000,"lengthMeters":2000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613099"},{"year":2025,"category":"Roads","project":"Tarlac-Zambales Road, Package 4, K0116+168-K0117+780","amountPesos":100000000,"lengthMeters":1612.0,"ratePesosPerMeter":62034.73945409429,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613100"},{"year":2025,"category":"Roads","project":"Marcos Highway K0025 + 290.74 - K0026 + 052.26, K0026 + 150.90 - K0026 + 209.87","amountPesos":48000000,"lengthMeters":820.49,"ratePesosPerMeter":58501.62707650347,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613117"},{"year":2025,"category":"Roads","project":"Marcos Highway K0026 + 348.31 - K0027 + 042.60","amountPesos":49000000,"lengthMeters":694.29,"ratePesosPerMeter":70575.69603479841,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613118"},{"year":2025,"category":"Roads","project":"Marikina-Infanta Road KM 0035 + 000.00 - KM 0035 + 738.00","amountPesos":32000000,"lengthMeters":738.0,"ratePesosPerMeter":43360.433604336045,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613124"},{"year":2025,"category":"Roads","project":"Marikina-Infanta Road KM 0035 + 908.00 - KM 0036 + 000.00","amountPesos":5000000,"lengthMeters":92.0,"ratePesosPerMeter":54347.82608695652,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613125"},{"year":2025,"category":"Roads","project":"Marikina-Infanta Road KM 0036 + 226.00 - KM 0037 + 150.00","amountPesos":63000000,"lengthMeters":924.0,"ratePesosPerMeter":68181.81818181818,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613126"},{"year":2025,"category":"Roads","project":"Marikina-Infanta Road KM 0037 + 150.00 - KM0037 + 498","amountPesos":20000000,"lengthMeters":348.0,"ratePesosPerMeter":57471.26436781609,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613127"},{"year":2025,"category":"Roads","project":"Bacolod South Rd (Old Road) - K0019 + (-184) - K0020+ 200, K0020 + 768 - K0020 + 948","amountPesos":70000000,"lengthMeters":1564.0,"ratePesosPerMeter":44757.03324808184,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613177"},{"year":2025,"category":"Roads","project":"Sagbayan Danao Road, K0084 + 000 - K0087 + 158, K0093 + 960 - K0098 + 230","amountPesos":195000000,"lengthMeters":7428.0,"ratePesosPerMeter":26252.019386106622,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613188"},{"year":2025,"category":"Roads","project":"Piñan-Mutia Road K1827+000-K1828+000, K1828+000-K1829+000, K1829+000-K1830+000, K1830+000-K1831+000","amountPesos":100000000,"lengthMeters":4000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613200"},{"year":2025,"category":"Roads","project":"Polanco-Macleodes Road - K1832+000-K1833+000, K1833+000-K1834+000, K1834+000-K1835+000, K1835+000-K1836+000","amountPesos":100000000,"lengthMeters":4000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613201"},{"year":2025,"category":"Roads","project":"Polanco-Macleodes Road K1836+000-K1837+000, K1837+000-K1838+000, K1838+000-K1839+000, K1839+000-K1840+000,","amountPesos":100000000,"lengthMeters":4000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613202"},{"year":2025,"category":"Roads","project":"Polanco-Macleodes Road K1840+000-K1841+000, K1841+000-K1842+000, K1842+000-K1843+000, K1843+000-K1844+000,","amountPesos":100000000,"lengthMeters":4000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613203"},{"year":2025,"category":"Roads","project":"Jct SH-Aglayan-Alanib-Ticalaan Road (Ticalaan-Paganan Sect) - K1533 + 000 - K1534 + 461, K1535 + 000 - K1535 +731, K1536 + 000 - K1537 + 227","amountPesos":100000000,"lengthMeters":3419.0,"ratePesosPerMeter":29248.31822170225,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613206"},{"year":2025,"category":"Roads","project":"Jct SH-Aglayan-Alanib-Ticalaan Road (Ticalaan-Paganan Sect) - K1503 + 200 - K5014 + 754, K1506 + 910 - K1507 + 000, K1511 + 000 - K1512 + 000","amountPesos":100000000,"lengthMeters":3511554.0,"ratePesosPerMeter":28.4774205380296,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613208"},{"year":2025,"category":"Roads","project":"Jct SH-Aglayan-Alanib-Ticalaan Road (Ticalaan-Paganan Sect) - K1509 + 079 - K1514 + 169","amountPesos":100000000,"lengthMeters":5090.0,"ratePesosPerMeter":19646.365422396855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613209"},{"year":2025,"category":"Roads","project":"Asphalt Overlay - Mati Diversion Road K1715 + 562 - K1717 + 281","amountPesos":100000000,"lengthMeters":1719.0,"ratePesosPerMeter":58173.35660267597,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613212"},{"year":2025,"category":"Roads","project":"Asphalt Overlay - Mati Diversion Road K1717 + 281 - K1718 + 1036","amountPesos":100000000,"lengthMeters":1755.0,"ratePesosPerMeter":56980.05698005698,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613213"},{"year":2025,"category":"Roads","project":"Mati Diversion Road K1714 + (-229) - K1715 + 526","amountPesos":100000000,"lengthMeters":1755.0,"ratePesosPerMeter":56980.05698005698,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613215"},{"year":2025,"category":"Roads","project":"Montevista - DNAS Road K1413 + (-602) - K1413 + 000, K1414 + 189 - K1415 + 539, K1416 + 000 - K1422 + 002, K1431 + 541 - K1432 + 966","amountPesos":150000000,"lengthMeters":9379.0,"ratePesosPerMeter":15993.176244802218,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613216"},{"year":2025,"category":"Roads","project":"Manila East Road - K0015 + (-478) - K0015 + (-145)","amountPesos":12388000,"lengthMeters":333.0,"ratePesosPerMeter":37201.2012012012,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613256"},{"year":2025,"category":"Roads","project":"Jct Natl Road-Bitnong-Belance-N Vizcaya Bdry Rd - K0256 + (-804) - K0256 + 000","amountPesos":14282000,"lengthMeters":804.0,"ratePesosPerMeter":17763.6815920398,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613328"},{"year":2025,"category":"Roads","project":"Balagtas Service Road Chainage 175 - Chainage 370","amountPesos":6822000,"lengthMeters":195.0,"ratePesosPerMeter":34984.61538461538,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613346"},{"year":2025,"category":"Roads","project":"Gen Alejo Santos Highway - K0058 + (-153) - K0058 + (-074), K0058 + 593 - K0058 + 707, K0058 + 891 - K0059 + 565, K0059 + 572 - K0059 + 819, K0059 + 835 - K0060 + 000, K0061 + 080 - K0061 + 181","amountPesos":27804000,"lengthMeters":1380.0,"ratePesosPerMeter":20147.82608695652,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613349"},{"year":2025,"category":"Roads","project":"San Fernando - Lagundi Road K0067+ (-270) - K0067 +862","amountPesos":28910000,"lengthMeters":1132.0,"ratePesosPerMeter":25538.86925795053,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613371"},{"year":2025,"category":"Roads","project":"Tarlac Zambales Road K0120+500 to K0121+000, K0122+800 to K0123+000, K0123+000 to K0124+811, K0124+811 to K0125+000","amountPesos":100000000,"lengthMeters":2700.0,"ratePesosPerMeter":37037.03703703704,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613373"},{"year":2025,"category":"Roads","project":"Sablayan - Penal Colony Road - (S00101MR) - K0325+000 -K0328+065, Sto. Niño, Sablayan, Occidental Mindoro","amountPesos":87500000,"lengthMeters":3065.0,"ratePesosPerMeter":28548.123980424145,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613397"},{"year":2025,"category":"Roads","project":"Sablayan - Penal Colony Road - (S00101MR) - K0333+886 -K0337+000, Batong Buhay, Sablayan, Occidental Mindoro","amountPesos":87500000,"lengthMeters":3114.0,"ratePesosPerMeter":28098.908156711626,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613398"},{"year":2025,"category":"Roads","project":"Crossing MWCR (Pola) - Casague - Jct. Alacaak Road (S00162MR) - K0385+983-K0389+000, Casague, Sta. Cruz, Occidental Mindoro","amountPesos":87500000,"lengthMeters":3017.0,"ratePesosPerMeter":29002.320185614848,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613399"},{"year":2025,"category":"Roads","project":"Jct. MWCR (Bagong Silang) - Cabacao Diversion Road (S00098MR) - K0426+290 - K0428+1043, Bulos, Abra De Ilog, Occidental Mindoro","amountPesos":87500000,"lengthMeters":2753.0,"ratePesosPerMeter":31783.50889938249,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 613400"},{"year":2025,"category":"Roads","project":"Maharlika Highway ( Cagayan Valley Rd) - K0534 + 000 - K0534 + 142.8, K0534 + 991 - K0536 + 000, K0537 + 000 - K0537 + 200","amountPesos":34218000,"lengthMeters":1351.8,"ratePesosPerMeter":25312.916111849994,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614261"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0259 + 000 - K0260 + 024, K0265 + 530 - K0265 + 991, K0305 + 152 - K0306 + 677","amountPesos":76194000,"lengthMeters":3010.0,"ratePesosPerMeter":25313.621262458473,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614262"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Cagayan Valley Rd) - K0515 + 910 - K0516 + 000, K0534 + 142.8 - K0534 + 483","amountPesos":10912000,"lengthMeters":430.2,"ratePesosPerMeter":25364.9465364974,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614263"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0346 + 694 - K0347 + 282, K0347 + 430 - K0347 + 993, K0350 + 700 - K0351 + 561, K0352 + 000 - K0352 + 338, K0352 + 534 - K0354 + 246","amountPesos":77430000,"lengthMeters":4062.0,"ratePesosPerMeter":19062.038404726733,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614264"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0347 + 993 - K0348 + 136, K0348 + 423 - K0349 + 012","amountPesos":10490000,"lengthMeters":732.0,"ratePesosPerMeter":14330.601092896175,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614265"},{"year":2025,"category":"Roads","project":"Santiago-Tuguegarao Road (S00760LZ) K402+440-K0412+000","amountPesos":50000000,"lengthMeters":9560.0,"ratePesosPerMeter":5230.125523012553,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614266"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0335 + 822 - K0336 + 145, K0336 + 310 - K0336 + 521.99, K0342 + 038 - K0342 + 271","amountPesos":19689000,"lengthMeters":767.99,"ratePesosPerMeter":25637.052565788927,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614267"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0039+000 - K0039+770, K0040+000 - K0040+691","amountPesos":120000000,"lengthMeters":1461.0,"ratePesosPerMeter":82135.52361396304,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614271"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0048 + 458 - K0048 + 876.5","amountPesos":15794000,"lengthMeters":418.5,"ratePesosPerMeter":37739.54599761051,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614276"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0045 + 900 - K0046 + 350, K0046 + 410 - K0046 + 800, K0046 + 940 - K0047 + 800, K0048 + 300 - K0048 + 458, K0051 + 000 - K0051 + 755","amountPesos":100000000,"lengthMeters":2613.0,"ratePesosPerMeter":38270.18752391887,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614277"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0049+531 - K0050+000, K0050+274 - K0050+674, K0052+000 - K0052+592","amountPesos":120000000,"lengthMeters":1461.0,"ratePesosPerMeter":82135.52361396304,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614278"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0223 + 522 - K0223 + 858","amountPesos":15363000,"lengthMeters":336.0,"ratePesosPerMeter":45723.21428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614281"},{"year":2025,"category":"Roads","project":"Quirino Highway, K0253+000 - K0254+209. Guinayangan, Quezon","amountPesos":100000000,"lengthMeters":1209.0,"ratePesosPerMeter":82712.9859387924,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614283"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0160 + 315 - K0160 + 560, K0161 + 000 - K0161 + 025, K0163 + 410 - K0163 + 445, K0163 + 495 - K0163 + 755","amountPesos":19290000,"lengthMeters":565.0,"ratePesosPerMeter":34141.592920353985,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614285"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0498 + 675 - K0499 +024, K0499 + 280 - K0499 + 900","amountPesos":31480000,"lengthMeters":969.0,"ratePesosPerMeter":32487.100103199173,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614286"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0307 + 900 - K0308 + 201","amountPesos":28025000,"lengthMeters":301.0,"ratePesosPerMeter":93106.31229235881,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614287"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0547 + 670 - K0547 + 982","amountPesos":11215000,"lengthMeters":312.0,"ratePesosPerMeter":35945.51282051282,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614288"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0707 + 180 - K0707 + 287, K0703 + 459 - K0703 + 853, K0706 + 000 - K0706 + 500, K0696 + 563 - K0696 + 581","amountPesos":29962000,"lengthMeters":1019.0,"ratePesosPerMeter":29403.336604514232,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614315"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0694 + 312 - K0695 + 000, K0698 +163 - K0698 + 182","amountPesos":26100000,"lengthMeters":707.0,"ratePesosPerMeter":36916.54879773692,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614316"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0696 + 411 - K0696 + 563, K0705 + 045 - K0705 + 108","amountPesos":8522000,"lengthMeters":215.0,"ratePesosPerMeter":39637.20930232558,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614317"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0699 + 071 - K0700 + 000, K0675 + 535 - K0697 + 663, K0698 + 032 - K0698 + 163.5","amountPesos":35000000,"lengthMeters":23188.5,"ratePesosPerMeter":1509.368868188973,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614318"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0794 + 800 - K0794 + 873, K0797 + 140 - K0802 + 300, K0803 + 010 - K0803 + 300, K0803 + 750 - K0803 + 800, K0804 + 310 - K0804 + 355","amountPesos":20000000,"lengthMeters":5618.0,"ratePesosPerMeter":3559.98576005696,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614319"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0797 + 660 - K0799 + 100","amountPesos":30000000,"lengthMeters":1440.0,"ratePesosPerMeter":20833.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614320"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0955 + 000 - K0955 + 171","amountPesos":24153000,"lengthMeters":171.0,"ratePesosPerMeter":141245.61403508772,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614322"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0861 + 453 - K0862 + 355, K0862 +380 - K0862 + 786, K0863 + 064 - K0863 + 364, K0863 + 600 - K0863 + 685, K0863 + 685 - K0863 + 700, K0872 + 967 - K0874 + 000, K0877 + 000 - K0877 + 820, K0877 + 950 -K0878 + 590, K0880 + 950 - K0881 + 000, K0882 + 038 - K0883 + 000, K0893 + 000 - K0893 + 461","amountPesos":157000000,"lengthMeters":5674.0,"ratePesosPerMeter":27670.07402185407,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614323"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0833 + 560 - K0833 + 900, K0834 + 299 - K0834 + 460, K0839 + 000 - K0839 + 786, K0840 + 200 - K0840 + 300, K0851 + 740 - K0851 + 943, K0851 + 949 - K0852 + 000, K0854 + 450 - K0854 + 850","amountPesos":60288000,"lengthMeters":2041.0,"ratePesosPerMeter":29538.46153846154,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614324"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1879 + 000 - K1879 + 057, K1896 + 906 - K1897 + 048, K1899 + 868 - K1899 + 950","amountPesos":5174000,"lengthMeters":281.0,"ratePesosPerMeter":18412.811387900358,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614325"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1840 + 172 - K1843 + 200, K1845 +000 - K1846 + 711","amountPesos":103402000,"lengthMeters":4739.0,"ratePesosPerMeter":21819.37117535345,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614326"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1758 + 350 - K1758 + 626, K1764 + 187 - K1764 + 330, K1768 + 000 - K1768 + 090, K1816 + 275 - K1816 + 975","amountPesos":23444000,"lengthMeters":1209.0,"ratePesosPerMeter":19391.232423490488,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614327"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1846 + 858 - K1848 + 000, K1849 + 352 - K1849 + 407","amountPesos":25675000,"lengthMeters":1197.0,"ratePesosPerMeter":21449.456975772766,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614328"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Cotabato-Malabang-Lanao del Norte Rd) Chainage 21500 - Chainage 24500","amountPesos":48000000,"lengthMeters":3000.0,"ratePesosPerMeter":16000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614330"},{"year":2025,"category":"Roads","project":"Marawi-Malabang Road - (S01652MN) Chainage 7681 - Chainage 11500","amountPesos":100000000,"lengthMeters":3819.0,"ratePesosPerMeter":26184.86514794449,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614331"},{"year":2025,"category":"Roads","project":"Linamon-Zamboanga Road (S00914MN) K1590+408 - K1591+611, K1591+631 - K1593+488, K1593+504-K1593+774, Lanao Del Norte","amountPesos":100000000,"lengthMeters":3330.0,"ratePesosPerMeter":30030.03003003003,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614333"},{"year":2025,"category":"Roads","project":"Linamon-Zamboanga Road (00914MN) K1588+285-K1590+000, Lanao Del Norte","amountPesos":100000000,"lengthMeters":1715.0,"ratePesosPerMeter":58309.03790087464,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614334"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1469 + 530 - K1469 + 800, K1469 + 870 - K1470 + 168","amountPesos":35000000,"lengthMeters":568.0,"ratePesosPerMeter":61619.718309859156,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614336"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1809 + 914 - K1810 + 1500, K1812 + 900 - K1813 + 009","amountPesos":36448000,"lengthMeters":1695.0,"ratePesosPerMeter":21503.244837758113,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614337"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1813 + 603 - K1816 + 200","amountPesos":56142000,"lengthMeters":2597.0,"ratePesosPerMeter":21618.02079322295,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614338"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1818 + 000 - K1819 + 678","amountPesos":35960000,"lengthMeters":1678.0,"ratePesosPerMeter":21430.274135876043,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614339"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - K1592 + 174 - K1592 + 339","amountPesos":2702000,"lengthMeters":165.0,"ratePesosPerMeter":16375.757575757576,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614341"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Marbel-Makar Rd) - K1666 + 481 - K1667 + 698","amountPesos":20895000,"lengthMeters":1217.0,"ratePesosPerMeter":17169.268693508628,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614342"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1314 + 501 - K1314 + 525, K1314 + 930 - K1315 + 012","amountPesos":5685000,"lengthMeters":106.0,"ratePesosPerMeter":53632.07547169811,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614343"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1332 + 571 - K1333 + 300, K1333 + 390 - K1333 + 653","amountPesos":55450000,"lengthMeters":992.0,"ratePesosPerMeter":55897.17741935484,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614344"},{"year":2025,"category":"Roads","project":"C-5 Road - K0013 + 800 - K0013 + 944","amountPesos":5388000,"lengthMeters":144.0,"ratePesosPerMeter":37416.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614349"},{"year":2025,"category":"Roads","project":"Sayre Highway - K1443 + 088 - K1443 + 190, K1439 + 880 - K1439 + 935","amountPesos":6644000,"lengthMeters":157.0,"ratePesosPerMeter":42318.47133757962,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 614377"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0547 + 083 - K0547 + 426","amountPesos":12336000,"lengthMeters":343.0,"ratePesosPerMeter":35965.01457725948,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 615691"},{"year":2025,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0005 + (-502) - K0007 + 000","amountPesos":105000000,"lengthMeters":2502.0,"ratePesosPerMeter":41966.42685851319,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 615704"},{"year":2025,"category":"Roads","project":"C-5 Road - K0015 + (-960) - K0015 + (-850)","amountPesos":5250000,"lengthMeters":110.0,"ratePesosPerMeter":47727.27272727273,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 615751"},{"year":2025,"category":"Roads","project":"Kalinga-Abra Road - K0496 + 850 - K0499 + 015","amountPesos":40000000,"lengthMeters":2165.0,"ratePesosPerMeter":18475.750577367206,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 615777"},{"year":2025,"category":"Roads","project":"Guiuan-Sulangan Peninsula Road - K1056 + 352 - K1056 + 886, K1056 + 934 - K1056 + 952","amountPesos":7457000,"lengthMeters":552.0,"ratePesosPerMeter":13509.057971014492,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 615901"},{"year":2025,"category":"Roads","project":"Abut-Agbannawag Road K0409+(-469)-K0411+641, Quezon, Isabela","amountPesos":50000000,"lengthMeters":3110.0,"ratePesosPerMeter":16077.170418006432,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 617151"},{"year":2025,"category":"Roads","project":"Gen Alejo Santos Highway - K0053 + 840 - K0054 + 800, K0055 + 043 - K0056 + 582","amountPesos":100000000,"lengthMeters":2499.0,"ratePesosPerMeter":40016.006402561026,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 617152"},{"year":2025,"category":"Roads","project":"Gen Alejo Santos Highway - K0051 + 000 - K0051 + 775, K0053 + 470 - K0053 + 750, K0056 + 582 - K0056 + 1818","amountPesos":117719000,"lengthMeters":2291.0,"ratePesosPerMeter":51383.23876036665,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 617160"},{"year":2025,"category":"Roads","project":"Gen Alejo Santos Highway - K0064+000 - K0064+260, K0064+470 - K0064+800, K0065+000 - K0065+140, K0065+355 - K0065+405, K0065+576 - K0065+848, K0065+877 - K0065+1022, K0066+000 - K0066+100","amountPesos":72632000,"lengthMeters":1275.0,"ratePesosPerMeter":56966.27450980392,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 617162"},{"year":2025,"category":"Roads","project":"Sibutu-Ligayan Road - (S00007TW) Chainage 6000 - Chainage 8000","amountPesos":115675000,"lengthMeters":2000.0,"ratePesosPerMeter":57837.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 617176"},{"year":2025,"category":"Roads","project":"Sibutu-Ligayan Road - (S00007TW) Chainage 11125 - Chainage 15000","amountPesos":115542000,"lengthMeters":3875.0,"ratePesosPerMeter":29817.290322580644,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 617177"},{"year":2025,"category":"Roads","project":"Sibutu-Ligayan Road - (S00007TW) Chainage 19400 - Chainage 22000","amountPesos":77525000,"lengthMeters":2600.0,"ratePesosPerMeter":29817.30769230769,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 617178"},{"year":2025,"category":"Roads","project":"Pasolo-Rincon Road - K0015 + 321 - K0015 + 898","amountPesos":27840000,"lengthMeters":577.0,"ratePesosPerMeter":48249.56672443674,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 617186"},{"year":2025,"category":"Roads","project":"Pasolo-Rincon Road - K0015 + (-321) - K0015 + 321","amountPesos":30976000,"lengthMeters":642.0,"ratePesosPerMeter":48249.221183800626,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 617188"},{"year":2025,"category":"Roads","project":"Gen Alejo Santos Highway - K0060+144 - K0060+531, K0061+181 - K0061+573","amountPesos":30000000,"lengthMeters":779.0,"ratePesosPerMeter":38510.91142490372,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 617236"},{"year":2025,"category":"Roads","project":"Concepcion - La Paz Road - K0121 + 104 - K0121 + 854","amountPesos":34961000,"lengthMeters":750.0,"ratePesosPerMeter":46614.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 617258"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0520 + 622 - K0520 + 680","amountPesos":5000000,"lengthMeters":58.0,"ratePesosPerMeter":86206.89655172414,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618052"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0359 + (-159) - K0359 + (-089), K0366 + 486 - K0366 + 520, K0369 + 285 - K0369 + 315","amountPesos":88500000,"lengthMeters":134.0,"ratePesosPerMeter":660447.7611940298,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618053"},{"year":2025,"category":"Roads","project":"Rolando R. Andaya Highway K0338 + 725 - K0338 + 875","amountPesos":113750000,"lengthMeters":150.0,"ratePesosPerMeter":758333.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618054"},{"year":2025,"category":"Roads","project":"Rolando R. Andaya Highway K0338 + 600 - K0338 + 725","amountPesos":93750000,"lengthMeters":125.0,"ratePesosPerMeter":750000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618055"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0366 + 450 - K0366 + 486","amountPesos":25000000,"lengthMeters":36.0,"ratePesosPerMeter":694444.4444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618056"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0691 + 000 - K0691 + 150","amountPesos":200000000,"lengthMeters":150.0,"ratePesosPerMeter":1333333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618063"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0864 + 261 - K0864 + 552","amountPesos":200000000,"lengthMeters":291.0,"ratePesosPerMeter":687285.2233676976,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618064"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0692 + 684 - K0692 + 761","amountPesos":15000000,"lengthMeters":77.0,"ratePesosPerMeter":194805.1948051948,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618065"},{"year":2025,"category":"Roads","project":"Maharlika Highway (LT) - K1042 + 000 - K1042 + 160","amountPesos":50000000,"lengthMeters":160.0,"ratePesosPerMeter":312500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618066"},{"year":2025,"category":"Roads","project":"Maharlika Highway (LT) - K1042 + 160 - K1042 + 320","amountPesos":50000000,"lengthMeters":160.0,"ratePesosPerMeter":312500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618067"},{"year":2025,"category":"Roads","project":"Maharlika Highway (LT) - K1042 + 320 - K1042 + 432","amountPesos":34900000,"lengthMeters":112.0,"ratePesosPerMeter":311607.14285714284,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618068"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0697 + (-124) - K0697 + 000","amountPesos":25000000,"lengthMeters":124.0,"ratePesosPerMeter":201612.90322580645,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618069"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0698 + 541 - K0698 + 613","amountPesos":15000000,"lengthMeters":72.0,"ratePesosPerMeter":208333.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618070"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0700 + 450 - K0700 + 583","amountPesos":75000000,"lengthMeters":133.0,"ratePesosPerMeter":563909.7744360903,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618071"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0777 + 090 - K0777 + 138","amountPesos":12000000,"lengthMeters":48.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618072"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0777 + 138 - K0777 + 200","amountPesos":15000000,"lengthMeters":62.0,"ratePesosPerMeter":241935.48387096773,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618073"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0783 + 089 - K0783 + 120, K0784 + 160 - K0784 + 172.30","amountPesos":12000000,"lengthMeters":43.3,"ratePesosPerMeter":277136.25866021006,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618074"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1010 + 070 - K1010 + 120","amountPesos":50000000,"lengthMeters":50.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618075"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1010 + 630 - K1010 + 885","amountPesos":50000000,"lengthMeters":255.0,"ratePesosPerMeter":196078.431372549,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618076"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1010 + 885 - K1011 + 080, K1011 + 520 - K1011 + 595","amountPesos":52648000,"lengthMeters":270.0,"ratePesosPerMeter":194992.59259259258,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618077"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0778 + 265 - K0778 + 360","amountPesos":34921000,"lengthMeters":95.0,"ratePesosPerMeter":367589.4736842105,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618078"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0701 + 490 - K0701 + 565","amountPesos":35000000,"lengthMeters":75.0,"ratePesosPerMeter":466666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618079"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0783 + 456 - K0783 + 601","amountPesos":55000000,"lengthMeters":145.0,"ratePesosPerMeter":379310.3448275862,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618080"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0752 + 816 - K0753 + 000","amountPesos":6000000,"lengthMeters":184.0,"ratePesosPerMeter":32608.695652173912,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618081"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1703 + 540 - K1703 + 691","amountPesos":89449000,"lengthMeters":151.0,"ratePesosPerMeter":592377.4834437086,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618082"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1703 + 720 - K1703 + 900","amountPesos":80000000,"lengthMeters":180.0,"ratePesosPerMeter":444444.44444444444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618083"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1689 + 550 - K1689 + 600","amountPesos":15000000,"lengthMeters":50.0,"ratePesosPerMeter":300000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618084"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1680 + 400 - K1680 + 414, K1680 + 420 - K1680 + 438, K1681 + 200 - K1681 + 227","amountPesos":12000000,"lengthMeters":59.0,"ratePesosPerMeter":203389.83050847458,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618085"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1725 + 334 - K1725 + 806","amountPesos":62347000,"lengthMeters":472.0,"ratePesosPerMeter":132091.10169491524,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618086"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1735 + 754 - K1735 + 824, K1735 + 954 - K1736 + 008, K1736 + 036 - K1736 + 078, K1736 + 287 - K1736 + 373, K1746 + 500 - K1746 + 563","amountPesos":24083000,"lengthMeters":315.0,"ratePesosPerMeter":76453.96825396825,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618087"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1852 + (-060) - K1852 + 060, K1853 + 190 - K1853 + 485","amountPesos":88176000,"lengthMeters":415.0,"ratePesosPerMeter":212472.2891566265,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618088"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Malabang-Dobleston-Tukuran Rd) - K1985 + 295 - K1985 + 349","amountPesos":8338000,"lengthMeters":54.0,"ratePesosPerMeter":154407.40740740742,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618095"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1439 + 660 - K1439 + 900","amountPesos":241134000,"lengthMeters":240.0,"ratePesosPerMeter":1004725.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618096"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1378 + 450 - K1378 + 500, K1378 + 600 - K1378 + 700, K1379 + 100 - K1379 + 200, K1379 + 225 - K1379 + 345, K1379 + 805 - K1379 + 850, K1388 + 550 - K1388 + 600, K1399 + 580 - K1399 + 635, K1403 + 140 - K1403 + 190","amountPesos":200930000,"lengthMeters":570.0,"ratePesosPerMeter":352508.77192982455,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618099"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1381 + 900 - K1382 + 108","amountPesos":100000000,"lengthMeters":208.0,"ratePesosPerMeter":480769.23076923075,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618100"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1403 + 435 - K1403 + 665","amountPesos":50000000,"lengthMeters":230.0,"ratePesosPerMeter":217391.30434782608,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618101"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1388 + 000 - K1388 + 200","amountPesos":52223000,"lengthMeters":200.0,"ratePesosPerMeter":261115.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618102"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Digos-Makar Rd) - K1590 + 000 - K1590 + 224","amountPesos":104000000,"lengthMeters":224.0,"ratePesosPerMeter":464285.71428571426,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618103"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Digos-Makar Rd) - K1600 + 500 - K1600 + 525, K1603 + 060 - K1603 + 090, K1603 + 200 - K1603 + 250, K1603 + 650 - K1603 + 670","amountPesos":32000000,"lengthMeters":125.0,"ratePesosPerMeter":256000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618107"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Digos-Makar Rd) - K1616 + 520 - K1616 + 540, K1621 + 450 - K1621 + 465","amountPesos":8575000,"lengthMeters":35.0,"ratePesosPerMeter":245000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618108"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1240 + 550 - K1240 + 700","amountPesos":90000000,"lengthMeters":150.0,"ratePesosPerMeter":600000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618109"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1316 + 321 - K1316 + 630","amountPesos":165000000,"lengthMeters":309.0,"ratePesosPerMeter":533980.5825242718,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618111"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1135 + 800 - K1135 + 850, K1152 + 000 - K1152 + 100","amountPesos":54533000,"lengthMeters":150.0,"ratePesosPerMeter":363553.3333333333,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618112"},{"year":2025,"category":"Roads","project":"Sayre Highway - K1486 + 290 - K1486 + 355","amountPesos":19143000,"lengthMeters":65.0,"ratePesosPerMeter":294507.6923076923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 618134"},{"year":2025,"category":"Roads","project":"Baguio-Bontoc Road, K0282+790 - K0282+860, K0301+260 - K0301+455, Atok, Benguet","amountPesos":125000000,"lengthMeters":265.0,"ratePesosPerMeter":471698.11320754717,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 620125"},{"year":2025,"category":"Roads","project":"Baguio-Bontoc Road, K0290+223 - K0290+390, K0294+567 - K0294+715, K0294+825 - K0294+886, Atok, Benguet","amountPesos":125000000,"lengthMeters":376.0,"ratePesosPerMeter":332446.8085106383,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 620126"},{"year":2025,"category":"Roads","project":"Baguio-Bontoc Road, K0281+696 - K0281+756, K0289+466 - K0289+550, K0289+760 - K0289+825, Atok, Benguet","amountPesos":125000000,"lengthMeters":209.0,"ratePesosPerMeter":598086.1244019138,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 620127"},{"year":2025,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0009 + 200 - K0009 + 240","amountPesos":100000000,"lengthMeters":40.0,"ratePesosPerMeter":2500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 620159"},{"year":2025,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0009 + 240 - K0009 + 280","amountPesos":100000000,"lengthMeters":40.0,"ratePesosPerMeter":2500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 620160"},{"year":2025,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0016 + 786 - K0016 + 902","amountPesos":100000000,"lengthMeters":116.0,"ratePesosPerMeter":862068.9655172414,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 620161"},{"year":2025,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1575 + 400 - K1575 + 700","amountPesos":78650000,"lengthMeters":300.0,"ratePesosPerMeter":262166.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 620189"},{"year":2025,"category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Road - K0428 + 235 -K0428 +330","amountPesos":20553000,"lengthMeters":95.0,"ratePesosPerMeter":216347.36842105264,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 620253"},{"year":2025,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0016 + 077 - K0016 + 127","amountPesos":45000000,"lengthMeters":50.0,"ratePesosPerMeter":900000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 620297"},{"year":2025,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0018 + 420 - K0018 + 580","amountPesos":50000000,"lengthMeters":160.0,"ratePesosPerMeter":312500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 620298"},{"year":2025,"category":"Roads","project":"Calubian Jct. San Isidro - Tabango - Villaba - Palompon Road, K1037+425 - K1037+571","amountPesos":60000000,"lengthMeters":146.0,"ratePesosPerMeter":410958.90410958906,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 620317"},{"year":2025,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1573 + 350 - K1573 + 450, K1603 + 435 - K1603 + 470, K1604 + 890 - K1604 + 910","amountPesos":47500000,"lengthMeters":155.0,"ratePesosPerMeter":306451.6129032258,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 620339"},{"year":2025,"category":"Roads","project":"Sayre Highway (Jct.Bukidnon-Davao City Rd-Cotabato Bdry) - K1605 + 560 - K1605 + 675 (RS)","amountPesos":49000000,"lengthMeters":115.0,"ratePesosPerMeter":426086.95652173914,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 620340"},{"year":2025,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1586 + 705- K1586 + 755","amountPesos":29091000,"lengthMeters":50.0,"ratePesosPerMeter":581820.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 620346"},{"year":2025,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1591 + 564 - K1591 + 614","amountPesos":12105000,"lengthMeters":50.0,"ratePesosPerMeter":242100.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 620347"},{"year":2025,"category":"Roads","project":"Gov. Bado National Road, K0337+650 - K0338+927, Bakun, Benguet","amountPesos":125000000,"lengthMeters":1277.0,"ratePesosPerMeter":97885.66953797964,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 621937"},{"year":2025,"category":"Roads","project":"Gov. Bado National Road, K0286+890 - K0286+970, K0286+665 - K0286+745, Kapangan, Benguet","amountPesos":125000000,"lengthMeters":160.0,"ratePesosPerMeter":781250.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 621938"},{"year":2025,"category":"Roads","project":"Gov. Bado National Road, K0309+840 - K0309+940, Kibungan, Benguet","amountPesos":125000000,"lengthMeters":100.0,"ratePesosPerMeter":1250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 621939"},{"year":2025,"category":"Roads","project":"Dr. Damian Reyes Road (Boac Side) - K0019+400.00 - K0019+557.00","amountPesos":300000000,"lengthMeters":157.0,"ratePesosPerMeter":1910828.025477707,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 621953"},{"year":2025,"category":"Roads","project":"Dr. Damian Reyes Road (Boac Side) - K0019+557.00 - K0019+715.00","amountPesos":300000000,"lengthMeters":158.0,"ratePesosPerMeter":1898734.17721519,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 621954"},{"year":2025,"category":"Roads","project":"Construction of Road Slope Protection Structure, Jct Bancal - Leon - Antique Bdry Rd., K0040+750 - K0040+850","amountPesos":107500000,"lengthMeters":100.0,"ratePesosPerMeter":1075000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 621958"},{"year":2025,"category":"Roads","project":"Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0934 + 881 - K0935 + 058, K0935 + 205 - K0935 + 404 (Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide)","amountPesos":175000000,"lengthMeters":376.0,"ratePesosPerMeter":465425.5319148936,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 621964"},{"year":2025,"category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Road - K0457 + 950 - K0457 + 998, K0460 + 700 - K0460 + 795","amountPesos":15000000,"lengthMeters":143.0,"ratePesosPerMeter":104895.1048951049,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622020"},{"year":2025,"category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Road - K0436 + 828 - K0436 + 860, K0441 + 607 - K0441 + 637, K0441 + 915 - K0441 + 928, K0442 + 207 - K0442 + 237","amountPesos":25000000,"lengthMeters":105.0,"ratePesosPerMeter":238095.2380952381,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622021"},{"year":2025,"category":"Roads","project":"Mountain Province-Isabela Road- Chainage 4208 - Chainage 4216, Chainage 4250 - Chainage 4266, Chainage 8745 - Chainage 8754, Chainage 10895 - Chainage 10925, Chainage 11097 - Chainage 11110, Chainage 12321 - Chainage 12330, Chainage 13225 - Chainage 13262","amountPesos":8990000,"lengthMeters":122.0,"ratePesosPerMeter":73688.52459016393,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622022"},{"year":2025,"category":"Roads","project":"Cabungaan - Tabunok - Consuegra Road, K1027+044 - K1037 +246","amountPesos":40000000,"lengthMeters":10202.0,"ratePesosPerMeter":3920.799843168006,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622051"},{"year":2025,"category":"Roads","project":"Manila North Road, K0261+921 - K0262+102, Bauang, La Union","amountPesos":60000000,"lengthMeters":181.0,"ratePesosPerMeter":331491.71270718233,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622600"},{"year":2025,"category":"Roads","project":"Maharlika Highway ( Cagayan Valley Rd) - K0490 + 179 - K0490 + 983","amountPesos":19111000,"lengthMeters":804.0,"ratePesosPerMeter":23769.900497512437,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622601"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0039 + 000 - K0039 + 740, K0041 + 653 - K0042 + 000, K0048 + 000 - K0048 + 768","amountPesos":23252000,"lengthMeters":1855.0,"ratePesosPerMeter":12534.77088948787,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622603"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0037+(-960) - K0037+000, K0037+000 - K0037+540, K0037+453 - K0037+950","amountPesos":25004000,"lengthMeters":1910.0,"ratePesosPerMeter":13091.099476439791,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622604"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0112 + 468 - K0112 + 803.60","amountPesos":5284000,"lengthMeters":335.6,"ratePesosPerMeter":15744.9344457685,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622605"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0709 + 373 - K0710 + 840","amountPesos":33900000,"lengthMeters":1467.0,"ratePesosPerMeter":23108.38445807771,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622618"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0761 + 000 - K0761 + 936","amountPesos":57750000,"lengthMeters":936.0,"ratePesosPerMeter":61698.717948717946,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622619"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0714 + 005 - K0714 + 563","amountPesos":13775000,"lengthMeters":558.0,"ratePesosPerMeter":24686.37992831541,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622622"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0728 + 575 - K0729 + 005","amountPesos":14896000,"lengthMeters":430.0,"ratePesosPerMeter":34641.86046511628,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622623"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0764 + 400 - K0764 + 906","amountPesos":32834000,"lengthMeters":506.0,"ratePesosPerMeter":64889.328063241104,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622624"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0765 + 000 - K0766 + 000","amountPesos":65079000,"lengthMeters":1000.0,"ratePesosPerMeter":65079.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622625"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0770 + 051 - K0770 + 181","amountPesos":8467000,"lengthMeters":130.0,"ratePesosPerMeter":65130.769230769234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622626"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0754 + 000 - K0755 + 059, K0761 + 936 - K0762 + 386","amountPesos":90000000,"lengthMeters":1509.0,"ratePesosPerMeter":59642.14711729622,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622628"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0729 + 005 - K0729 + 428, K0736 + 000 - K0736 + 260, K0740 + 520 - K0741 + 430","amountPesos":60000000,"lengthMeters":1593.0,"ratePesosPerMeter":37664.78342749529,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622629"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0722 + 220 - K0722 + 280, K0722 + 283 - K0722 + 503, K0723 + 000 - K0723 + 470, K0723 + 700 - K0723 + 930, K0725 + 040 -K0725 + 467","amountPesos":65413000,"lengthMeters":1407.0,"ratePesosPerMeter":46491.11584932481,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622630"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1424 + 150 - K1424 + 350","amountPesos":20000000,"lengthMeters":200.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622631"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1484 + (-600) - K1484 + 722, K1485 + 200 - K1485 + 839","amountPesos":200000000,"lengthMeters":1961.0,"ratePesosPerMeter":101988.78123406426,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622632"},{"year":2025,"category":"Roads","project":"Maharlika Highway(Davao City-Jct Digos Sect) - K1543 + 670 - K1544 + 060","amountPesos":35856000,"lengthMeters":390.0,"ratePesosPerMeter":91938.46153846153,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622633"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1508 + (-092)- K1508 + (-056)","amountPesos":4000000,"lengthMeters":36.0,"ratePesosPerMeter":111111.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622634"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1488 + 057 - K1489 + 300, K1491 + 700 - K1491 + 842, K1494 + 100 - K1494 + 303 , K1495 + 000 - K1496 + 800, K1497 + 477 - K1497 + 792, K1504 + 000 - K1504 + 071, K1504 + 111 - K1504 + 461, K1504 + 515 - K1504 + 807","amountPesos":218293000,"lengthMeters":4416.0,"ratePesosPerMeter":49432.291666666664,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622636"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Cotabato-Marbel Rd) - K1713 + 500 - K1713 + 722","amountPesos":3618000,"lengthMeters":222.0,"ratePesosPerMeter":16297.297297297297,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622637"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Marbel-Makar Rd) - K1704 + 536 - K1705 + 410","amountPesos":20000000,"lengthMeters":874.0,"ratePesosPerMeter":22883.29519450801,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622638"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1768 + 314 - K1770 + 662","amountPesos":71127000,"lengthMeters":2348.0,"ratePesosPerMeter":30292.58943781942,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622639"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - K1646 + 300 - K1647 + 010","amountPesos":41690000,"lengthMeters":710.0,"ratePesosPerMeter":58718.30985915493,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622640"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - K1649 + 202 - K1649 + 750","amountPesos":40438000,"lengthMeters":548.0,"ratePesosPerMeter":73791.9708029197,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622641"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - K1650 + 624 - K1651 + 196, K1650 + 525 - K1650 + 624","amountPesos":27000000,"lengthMeters":671.0,"ratePesosPerMeter":40238.45007451565,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622642"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Makar-Marbel Rd) - K1659 + 358 - K1660 + 453","amountPesos":139680000,"lengthMeters":1095.0,"ratePesosPerMeter":127561.64383561644,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622643"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Marbel-Makar Rd) - K1669 + 243 - K1670 + 000","amountPesos":97140000,"lengthMeters":757.0,"ratePesosPerMeter":128322.3249669749,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622644"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Marbel-Makar Rd) K1665 + 162 - K1667 + 744 (Asphalt Overlay)","amountPesos":70490000,"lengthMeters":2582.0,"ratePesosPerMeter":27300.542215336947,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622645"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Marbel-Makar Rd) K1672 + 150 - K1673 + 350","amountPesos":123000000,"lengthMeters":1200.0,"ratePesosPerMeter":102500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622646"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1233 + 128 - K1234+534","amountPesos":102289000,"lengthMeters":1406.0,"ratePesosPerMeter":72751.77809388336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622647"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1234 + 534 - K1234 + 719","amountPesos":3869000,"lengthMeters":185.0,"ratePesosPerMeter":20913.513513513513,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622648"},{"year":2025,"category":"Roads","project":"Cebu North Hagnaya Wharf Road - K0009 + 270 - K0009 + 600","amountPesos":15780000,"lengthMeters":330.0,"ratePesosPerMeter":47818.181818181816,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622672"},{"year":2025,"category":"Roads","project":"Sayre Highway - K1549 + 380 - K1549 + 610, K1551 + 718 - K1553 + 025","amountPesos":21200000,"lengthMeters":1537.0,"ratePesosPerMeter":13793.103448275862,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 622682"},{"year":2025,"category":"Roads","project":"C-3 Road - K0010 + (-200) - K0010 + 260","amountPesos":35000000,"lengthMeters":460.0,"ratePesosPerMeter":76086.95652173914,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 623464"},{"year":2025,"category":"Roads","project":"Concepcion - Capas Road - K0110 + 782 - K0111 + 528","amountPesos":40000000,"lengthMeters":746.0,"ratePesosPerMeter":53619.30294906166,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 623491"},{"year":2025,"category":"Bridges","project":"Cansaga Bay Bridge - (S00406CB) Chainage 0-Chainage 150 (to outfall)","amountPesos":8200000,"lengthMeters":150.0,"ratePesosPerMeter":54666.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 623539"},{"year":2025,"category":"Roads","project":"Maharlika Highway ( Cagayan Valley Rd) - K0537 + 751 - K0538 + 401.1","amountPesos":28289000,"lengthMeters":650.1,"ratePesosPerMeter":43514.84387017538,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625604"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0277 + 580 - K0280 + 596, K0282 + 800 - K0283 + 100, K0290 + 703 - K0292 + 000","amountPesos":240000000,"lengthMeters":4613.0,"ratePesosPerMeter":52026.88055495339,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625605"},{"year":2025,"category":"Roads","project":"Maharlika Highway ( Cagayan Valley Rd) - K0539 + 071 - K0539 + 394.7","amountPesos":13541000,"lengthMeters":323.7,"ratePesosPerMeter":41831.94315725038,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625606"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Cagayan Valley Rd) - K0524 + 90.4- K0524 +691","amountPesos":25812000,"lengthMeters":600.6,"ratePesosPerMeter":42977.022977024644,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625608"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Cagayan Valley Rd) - K0538 + 401.1 - K0539 + 071","amountPesos":29196000,"lengthMeters":669.9,"ratePesosPerMeter":43582.62427227793,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625609"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Cagayan Valley Rd) - K0539 + 394.7 - K0539 + 710","amountPesos":13553000,"lengthMeters":315.3,"ratePesosPerMeter":42984.45924515699,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625610"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0412 + 690 - K0413 + 221","amountPesos":37500000,"lengthMeters":531.0,"ratePesosPerMeter":70621.46892655367,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625614"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0412 + 000 - K0412+ 345","amountPesos":15713000,"lengthMeters":345.0,"ratePesosPerMeter":45544.92753623189,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625615"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0348 + 060 - K0348 + 136, K0348 + 700 - K0348 + 800, K0354 + 473 - K0354 + 577","amountPesos":11292000,"lengthMeters":280.0,"ratePesosPerMeter":40328.57142857143,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625616"},{"year":2025,"category":"Roads","project":"Maharlika Highway ( Cagayan Valley Rd) - K0524 + 000 - K0524 + 90.4, K0529 + 597 - K0529 + 782, K0529 + 804.40 - K0529 + 809, K0530 + 811 - K0530 + 869, K0541 + 762 - K0542 + 143","amountPesos":25122000,"lengthMeters":719.0,"ratePesosPerMeter":34940.19471488178,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625617"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0415 + 800 - K0417 + 861, K0417 + 884 - K0418 + 800, K0444 + 700 - K0445 + 123, K0457 + 230 - K0457 + 512, K0457 + 529 - K0458 + 130","amountPesos":196213000,"lengthMeters":4283.0,"ratePesosPerMeter":45812.04763016577,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625620"},{"year":2025,"category":"Roads","project":"Santiago-Tuguegarao Road - K0367+799-K0369+000, Aurora, Isabela","amountPesos":100000000,"lengthMeters":1201.0,"ratePesosPerMeter":83263.94671107411,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625621"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0405 + 607 - K0405 + 865, K0434 + 000 - K0434 + 292, K0434 + 311 - K0436 + 400, K0440 + 474 - K0441 + 561","amountPesos":168247000,"lengthMeters":3726.0,"ratePesosPerMeter":45154.85775630703,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625622"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0133 + 000 - K0134 + 892","amountPesos":101799000,"lengthMeters":1892.0,"ratePesosPerMeter":53804.968287526426,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625623"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0063 + 000 - K0064 + 000, K0064 + 407 - K0065 + 000, K0068 + 801.60 - K0068 + 818","amountPesos":100629000,"lengthMeters":1609.4,"ratePesosPerMeter":62525.786007207884,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625625"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0135 + 193 - K0136 + 548","amountPesos":73584000,"lengthMeters":1355.0,"ratePesosPerMeter":54305.535055350556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625626"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0235 + 580 - K0236 + 051","amountPesos":33148000,"lengthMeters":471.0,"ratePesosPerMeter":70377.91932059448,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625629"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0218 + 771 - K0219 + 004, K0220 + 455 - K0221 + 153, K0221 + 168 - K0221 + 559, K0221 + 596 - K0221 + 829","amountPesos":54960000,"lengthMeters":1555.0,"ratePesosPerMeter":35344.05144694534,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625630"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0200 + 193.20 - K0200 + 770, K0201 + 252 - K0201 + 764","amountPesos":19150000,"lengthMeters":1088.8,"ratePesosPerMeter":17588.17046289512,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625631"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0415 + 360 - K0415 + 780","amountPesos":50000000,"lengthMeters":420.0,"ratePesosPerMeter":119047.61904761905,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625632"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0484 + 402.00 - K0484 + 607.00, K0484 + 607.00 - K0484 + 638.00, K0485 + 680.00 - K0486 + 045.00, K0486 + 179.00 - K0486 + 297.75, K0489 + 361.00 - K0489 + 509.00","amountPesos":64377000,"lengthMeters":867.75,"ratePesosPerMeter":74188.41832324979,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625633"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0401 + 970 - K0402 + 420","amountPesos":52603000,"lengthMeters":450.0,"ratePesosPerMeter":116895.55555555556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625634"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0482 + 113 - K0482 + 491, K0482 + 592 - K0482 + 840, K0482 + 840 - K0482 + 928, K0483 + 450 - K0483 + 850, K0483 + 857 - K0484 + 000, K0484 + 308 - K0484 + 324","amountPesos":61042000,"lengthMeters":1273.0,"ratePesosPerMeter":47951.296150824826,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625635"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0306 + 288 - K0306 + 618","amountPesos":35627000,"lengthMeters":330.0,"ratePesosPerMeter":107960.60606060606,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625636"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0274 + 954 - K0275 + 150","amountPesos":24533000,"lengthMeters":196.0,"ratePesosPerMeter":125168.36734693877,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625637"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0277 + 000 - K0278 + 956, K0278 + 994 - K0279 + 225","amountPesos":113146000,"lengthMeters":2187.0,"ratePesosPerMeter":51735.711019661634,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625638"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0297 + 310 - K0298 + 170","amountPesos":60270000,"lengthMeters":860.0,"ratePesosPerMeter":70081.3953488372,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625639"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0312 + 400 - K0312 + 574, K0312 + 615 - K0313 + 739","amountPesos":121375000,"lengthMeters":1298.0,"ratePesosPerMeter":93509.24499229583,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625640"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0295 + 000 - K0295 + 375","amountPesos":26442000,"lengthMeters":375.0,"ratePesosPerMeter":70512.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625641"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0464 + 609 - K0465 + 112, K0474 + 265 - K0474 + 363, K0474 + 830 - K0475 + 111, K0476 + 114 - K0476 +219","amountPesos":67000000,"lengthMeters":987.0,"ratePesosPerMeter":67882.4721377913,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625642"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0250 + 193 - K0250 + 398, K0250 + 509 - K0250 + 719, K0250 + 832 - K0250 + 910","amountPesos":29296000,"lengthMeters":493.0,"ratePesosPerMeter":59423.93509127789,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625643"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0315 + 756 - K0317 + 320","amountPesos":74291000,"lengthMeters":1564.0,"ratePesosPerMeter":47500.63938618926,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625644"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0254+ 047 - K0255 + 287, K0255 + 325 - K0255 + 580","amountPesos":160810000,"lengthMeters":1495.0,"ratePesosPerMeter":107565.21739130435,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625645"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0373 + 334 - K0374 + 160","amountPesos":85952000,"lengthMeters":826.0,"ratePesosPerMeter":104058.11138014527,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625646"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0478 + 956 - K0479 + 243, K0479 + 582 - K0479 + 840, K0479 + 866 - K0479 + 995","amountPesos":35897000,"lengthMeters":674.0,"ratePesosPerMeter":53259.64391691395,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625647"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0610 + 909.90 - K0611 + 595, K0624 + 149 - K0624 + 999, K0631 + 500 - K0631 + 670","amountPesos":127139000,"lengthMeters":1705.1,"ratePesosPerMeter":74563.95519324482,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625648"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0705 + 167 - K0705 +308, K0705 + 494 - K0705 + 607, K0705 + 607 - K0705 + 724","amountPesos":13451000,"lengthMeters":371.0,"ratePesosPerMeter":36256.06469002696,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625675"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0865 + 000 - K0865 + 150, K0865 + 337 - K0865 + 779, K0865 + 804 - K0866 + 700, K0866 + 700 - K0866 + 795, K0866 + 838 - K0866 + 909, K0866 + 1005 - K0867 + 302, K0867 + 302 - K0868 + 000, K0868 + 000 - K0869 + 044, K0869 + 044 - K0869 + 130, K0869 + 130 - K0869 + 793","amountPesos":144675000,"lengthMeters":4442.0,"ratePesosPerMeter":32569.788383610987,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625676"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0741 + 820 - K0741 + 913, K0741 + 914 - K0742 + 012","amountPesos":4423000,"lengthMeters":191.0,"ratePesosPerMeter":23157.068062827224,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625677"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0753 + 100 - K0753 + 284, K0757 + 000 - K0757 + 241","amountPesos":14255000,"lengthMeters":425.0,"ratePesosPerMeter":33541.17647058824,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625678"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0768 + 000 - K0768 + 777","amountPesos":24132000,"lengthMeters":777.0,"ratePesosPerMeter":31057.91505791506,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625679"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0771 + 511 - K0771 + 971","amountPesos":15263000,"lengthMeters":460.0,"ratePesosPerMeter":33180.434782608696,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625680"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0778 + 000 - K0778 + 137","amountPesos":5225000,"lengthMeters":137.0,"ratePesosPerMeter":38138.686131386865,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625681"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0791 + 837 - K0793 + 000","amountPesos":41436000,"lengthMeters":1163.0,"ratePesosPerMeter":35628.546861564915,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625682"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0786 + 424 - K0787 + 000","amountPesos":20000000,"lengthMeters":576.0,"ratePesosPerMeter":34722.22222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625683"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0796 + 795 - K0796 + 948, K0813 + 825 - K0814 + 000","amountPesos":12711000,"lengthMeters":328.0,"ratePesosPerMeter":38753.04878048781,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625684"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0789 + 000 - K0790 + 000","amountPesos":39289000,"lengthMeters":1000.0,"ratePesosPerMeter":39289.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625685"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0831 + 800 - K0832 + 920","amountPesos":87934000,"lengthMeters":1120.0,"ratePesosPerMeter":78512.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625686"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0975 + 155 - K0976 + 000, K0991 + 900 - K0992 + 432, K0996 + 148.60 - K0996 + 380, K0997 + 455 - K0997 + 610","amountPesos":67908000,"lengthMeters":1763.4,"ratePesosPerMeter":38509.69717590966,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625687"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0716 + 789 - K0716 + 985, K0720 + 386 - K0720 + 485, K0720 + 672 - K0720 + 710, K0720 + 721 - K0720 + 732, K0721 + 158 - K0721 + 181, K0721 + 287 - K0721 + 377, K0721 + 655 - K0721 + 737, K0729 + 282 - K0729 + 437, K0730 + 056 - K0730 + 361, K0730 + 468 - K0730 + 509, K0730 + 584 - K0730 + 742, K0730 + 762 - K0730 + 796, K0730 + 809 - K0730 + 913, K0730 + 935 - K0731 + 521, K0731 + 592 - K0731 + 619, K0731 + 842 - K0731 + 872, K0731 + 906 - K0732 + 090, K0732 + 122 - K0732 + 249, K0732 + 669 - K0732 + 710, K0732 + 711 - K0732 + 780, K0734 + 000 - K0734 + 189, K0734 + 303 - K0734 + 312, K0734 + 532 - K0734 + 563, K0734 + 573.03 - K0734 + 578, K0734 + 949 - K0734 + 959, K0735 + 101 - K0735 + 164, K0735 + 526 - K0735 + 684, K0735 + 853 - K0736 + 000, K0741 + 576 - K0741 + 580, K0741 + 596 - K0741 + 600, K0745 + 553 - K0745 + 633, K0748 + 347 - K0749 + 152, K0753 + 284 - K0753 + 288, K0753 + 326 - K0753 + 330, K0769 + 000 - K0769 + 146","amountPesos":98624000,"lengthMeters":4058.97,"ratePesosPerMeter":24297.789833381543,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625688"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0696 + 365 - K0696 + 411, K0696 + 481 - K0696 + 563, K0696 + 588 - K0696 + 660, K0696 + 851 - K0696 + 870, K0696 + 933 - K0696 + 972, K0697 + 202 - K0697 + 217, K0697 + 055 - K0697 + 220, K0698 + 300 - K0698 + 553, K0698 + 613 - K0698 + 720, K0699 + 034 - K0699 + 039, K0702 + 857 - K0703 + 000, K0705 + 101 - K0705 + 485, K0705 + 790 - K0705 + 811, K0705 + 872 - K0705 + 1110","amountPesos":32849000,"lengthMeters":1574.0,"ratePesosPerMeter":20869.758576874206,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625689"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0796 + 208 - K0796 + 685","amountPesos":12985000,"lengthMeters":477.0,"ratePesosPerMeter":27222.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625690"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0793 + 000 - K0794 + 302, K0795 + 000 - K0796 + 180, K0797 + 941 - K0799 + 767, K0813 + 600 - K0814 + 000, K0815 + 550 - K0816 + 000, K0818 + 565 - K0819 + 000, K0820 + 044 - K0820 + 893, K0820 + 921 - K0821 + 501","amountPesos":228290000,"lengthMeters":7022.0,"ratePesosPerMeter":32510.68071774423,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625691"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1913 + 785 - K1914 + 845, K1914 + 845 - K1914 + 947, K1914 + 947 - K1915 + 000, K1915 + 000 - K1915 + 752, K1915 + 843 - K1916 + 457","amountPesos":157463000,"lengthMeters":2581.0,"ratePesosPerMeter":61008.52382797365,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625693"},{"year":2025,"category":"Roads","project":"Maharlika Highway ( Tucuran Jct-Karomatan Jct Rd) - K1653 + 000 - K1656 + 076","amountPesos":163829000,"lengthMeters":3076.0,"ratePesosPerMeter":53260.40312093628,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625703"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1653 + 143 - K1655 + 806, K1655 + 825 - K1656 + 460","amountPesos":171757000,"lengthMeters":3298.0,"ratePesosPerMeter":52079.138872043666,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625704"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1659 + 250 - K1661 + 131","amountPesos":100000000,"lengthMeters":1881.0,"ratePesosPerMeter":53163.2110579479,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625705"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1680 + 000 - K1680 + 623","amountPesos":47651000,"lengthMeters":623.0,"ratePesosPerMeter":76486.35634028893,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625706"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1684 + 752 - K1686 + 078","amountPesos":100000000,"lengthMeters":1326.0,"ratePesosPerMeter":75414.78129713424,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625707"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1693 + 300 - K1694 + 590","amountPesos":100000000,"lengthMeters":1290.0,"ratePesosPerMeter":77519.37984496124,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625708"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1694 + 918 - K1695 + 866","amountPesos":69826000,"lengthMeters":948.0,"ratePesosPerMeter":73656.11814345991,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625709"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1706 + 000 - K1707 + 346","amountPesos":100000000,"lengthMeters":1346.0,"ratePesosPerMeter":74294.20505200594,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625710"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1724 + (-591) - K1726 + 253, K1726 + 298 - K1727 + 000","amountPesos":175405000,"lengthMeters":3546.0,"ratePesosPerMeter":49465.59503666103,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625711"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1732 + 000 - K1732 + 1000, K1736 + 648 - K1738 + 546","amountPesos":176968000,"lengthMeters":2898.0,"ratePesosPerMeter":61065.562456866806,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625712"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1742 + 000 - K1744 + 575","amountPesos":148161000,"lengthMeters":2575.0,"ratePesosPerMeter":57538.25242718447,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625713"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1813 + 000 - K1813 + 144","amountPesos":5573000,"lengthMeters":144.0,"ratePesosPerMeter":38701.38888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625714"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1782 + 707 - K1782 + 838, K1783 + 195 - K1783 + 897, K1784 + 015 - K1784 + 033, K1785 + 100 - K1786 + 234","amountPesos":49926000,"lengthMeters":1985.0,"ratePesosPerMeter":25151.637279596976,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625715"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1757 + (-757) - K1757 + 729, K1757 + 757 - K1758 + 350","amountPesos":91428000,"lengthMeters":2079.0,"ratePesosPerMeter":43976.91197691198,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625716"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1760 + 776 - K1763 + 549, K1763 + 573.84 - K1764 + 330","amountPesos":121584000,"lengthMeters":3529.16,"ratePesosPerMeter":34451.257523037464,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625717"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1766 + 048 - K1766 + 070, K1766 + 170 - K1767 + 000, K1768 + 090 - K1768 + 694","amountPesos":60232000,"lengthMeters":1456.0,"ratePesosPerMeter":41368.131868131866,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625718"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1770 + 590 - K1771 + 576, K1774 + 000 - K1775 + 139","amountPesos":84656000,"lengthMeters":2125.0,"ratePesosPerMeter":39838.117647058825,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625719"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1775 + 238.84 - K1776 + 000, K1777 + 846 - K1777 + 928, K1777 + 976 - K1778 + 580, K1778 + 662 - K1780 + 442, K1780 + 442 - K1780 + 466, K1780 + 475 - K1780 + 750","amountPesos":126618000,"lengthMeters":3526.16,"ratePesosPerMeter":35908.183406312535,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625720"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1904 + 493 - K1904 + 553, K1904 + 553 - K1905 + 346, K1905 + 346 - K1905 + 373, K1905 + 373 - K1905 + 391, K1905 + 391 - K1905 + 664, K1905 + 800 - K1905 + 812, K1905 + 812 - K1905 + 863, K1905 + 863 - K1906 + 188, K1906 + 900 - K1907 + 450, K1910 + 550 - K1911 + 300","amountPesos":172187000,"lengthMeters":2859.0,"ratePesosPerMeter":60226.30290311298,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625722"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1852 + (-971) - K1852 + (-878), K1852 + (-523) - K1852 + (-295), K1852 + 094 - K1852 + 217, K1852 + 338 - K1852 + 496, K1852 + 540 - K1852 + 880, K1853 + 351 - K1854 + 008, K1854 + 820 - K1855 + 008","amountPesos":31383000,"lengthMeters":1787.0,"ratePesosPerMeter":17561.835478455512,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625723"},{"year":2025,"category":"Roads","project":"Maharlika Highway ( Tucuran Jct-Karomatan Jct Rd) - K1648 + (-262) - K1648 + 045","amountPesos":20949000,"lengthMeters":307.0,"ratePesosPerMeter":68237.78501628664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625724"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1651 + 060 - K1651 + 163","amountPesos":2407000,"lengthMeters":103.0,"ratePesosPerMeter":23368.93203883495,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625725"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1675 + (-696) - K1676 + 000","amountPesos":39725000,"lengthMeters":1696.0,"ratePesosPerMeter":23422.759433962263,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625726"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1760 + 170 - K1760 + 223, K1770 + 550 - K1770 + 590, K1778 + 629 - K1778 + 662, K1780 + 442 - K1780 + 466, K1780 + 475 - K1781 + 435, K1786 + 234 - K1786 + 334","amountPesos":18775000,"lengthMeters":1210.0,"ratePesosPerMeter":15516.528925619834,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625727"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Cotabato-Malabang-Lanao del Norte Rd) - (S01650MN) Chainage 51905 - Chainage 53281","amountPesos":29399000,"lengthMeters":1376.0,"ratePesosPerMeter":21365.552325581397,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625729"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Malabang-Dobleston-Tukuran Rd) - K1980 + 969 - K1981 + 240, K1981 + 430 -K1981 + 608, K1981 + 875 - K1982 + 324","amountPesos":30961000,"lengthMeters":898.0,"ratePesosPerMeter":34477.72828507795,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625731"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Malabang-Dobleston-Tukuran Rd) - K1969 + (-651) - K1969 + (-641), K1981 + 600 - K1981 + 742, K1981 + 767.70 - K1982 + 000, K1984 + 000 - K1984 + 1067, K1985 + 060 - K1985 + 300, K1989 + 305 - K1989 + 449, K1990 + 724 - K1992 + 038, K1993 + 146 - K1993 + 368, K1993 + 391.70 - K1993 + 414, K2001 + 147 - K2001 + 244","amountPesos":84131000,"lengthMeters":3483.6,"ratePesosPerMeter":24150.59134228894,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625733"},{"year":2025,"category":"Roads","project":"Maharlika Highway(Davao City-Jct Digos Sect) - K1554 + 464 - K1554 + 835, K1555 + 099 - K1555 + 133, K1555 + 167 - K1555 + 191, K1557 + 466 - K1557 + 533, K1561 + 860 - K1561 + 872","amountPesos":64240000,"lengthMeters":508.0,"ratePesosPerMeter":126456.69291338582,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625737"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1480 + 956 - K1481 + 136","amountPesos":32735000,"lengthMeters":180.0,"ratePesosPerMeter":181861.11111111112,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625738"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1491 + 082 - K1491 + 102, K1491 + 148 - K1491 + 176, K1491 + 565 - K1491 + 574, K1491 + 806 - K1491 + 811, K1491 + 1010 - K1492 + 012","amountPesos":3950000,"lengthMeters":64.0,"ratePesosPerMeter":61718.75,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625739"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1489 + 870 - K1489 + 968, K1494 + 442.60 - K1495 + 000, K1503 + 969 - K1504 + 000, K1504 + 071 - K1504 + 111, K1504 + 461 - K1504 + 515","amountPesos":43570000,"lengthMeters":780.4,"ratePesosPerMeter":55830.343413640694,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625740"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1505 + 847 - K1505 + 902, K1506 + 183 - K1506 + 257, K1506 + 417 - K1506 + 650","amountPesos":29622000,"lengthMeters":362.0,"ratePesosPerMeter":81828.72928176796,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625741"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K1490 + 432 - K1490 + 449, K1490 + 856 - K1490 + 866, K1492 + 012 - K1492 + 028, K1492 + 660 - K1492 + 824, K1492 + 862 - K1492 + 867, K1492 + 897 - K1492 + 901","amountPesos":15450000,"lengthMeters":216.0,"ratePesosPerMeter":71527.77777777778,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625742"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - K1628 + 850 - K1630 + 142","amountPesos":49599000,"lengthMeters":1292.0,"ratePesosPerMeter":38389.31888544892,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625745"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Cotabato-Marbel Rd) - K1713 + 926 - K1714 + 275","amountPesos":20932000,"lengthMeters":349.0,"ratePesosPerMeter":59977.077363896846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625746"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Cotabato-Marbel Rd) - K1722 + 774 - K1722 + 882","amountPesos":5926000,"lengthMeters":108.0,"ratePesosPerMeter":54870.37037037037,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625747"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Cotabato-Marbel Rd) - K1754 + 495 - K1755 + 938","amountPesos":78882000,"lengthMeters":1443.0,"ratePesosPerMeter":54665.28066528067,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625748"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - K1631 + 653 - K1634 + 200","amountPesos":76996000,"lengthMeters":2547.0,"ratePesosPerMeter":30230.074597565763,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625749"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - K1634 + 200 - K1634 + 627, K1635 + 000 - K1635 + 383","amountPesos":27764000,"lengthMeters":810.0,"ratePesosPerMeter":34276.543209876545,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625750"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - K1641 + 277 - K1646 + 000","amountPesos":132541000,"lengthMeters":4723.0,"ratePesosPerMeter":28062.88376032183,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625751"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Marbel-Makar Rd) - K1671 + 000 - K1672 + 832","amountPesos":109980000,"lengthMeters":1832.0,"ratePesosPerMeter":60032.75109170306,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625752"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Cotabato-Lanao Rd) - K1867 + 445 - K1872 + 366, K1873 + 263 - K1876 + 207, K1876 + 223.22 - K1877 + 404, K1877 + 441.70 - K1879 + 000, K1879 + 425 - K1881 + 150","amountPesos":392560000,"lengthMeters":12329.08,"ratePesosPerMeter":31840.16974502539,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625753"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1822 + (-910) - K1822 + (-906), K1822 + (-878.50) - K1822 + 090, K1822 + 111 - K1826 + 704, K1826 + 726.80 - K1828 + 669","amountPesos":202755000,"lengthMeters":7507.7,"ratePesosPerMeter":27006.27355914611,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625754"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - K1612 + 961 - K1613 + 532, K1613 + 590 - K1613 + 996, K1618 + 526 - K1618 + 750","amountPesos":49552000,"lengthMeters":1201.0,"ratePesosPerMeter":41258.95087427144,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625755"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - (S01505MN) Chainage 000 - Chainage 095, Chainage 095 - Chainage 097, Chainage 097 - Chainage 109, Chainage 130 - Chainage 201","amountPesos":3461000,"lengthMeters":180.0,"ratePesosPerMeter":19227.777777777777,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625756"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - (S01506MN) Chainage 000 - Chainage 020, Chainage 020 - Chainage 037, Chainage 037 - Chainage 056, Chainage 056 - Chainage 067, Chainage 067 - Chainage 070, Chainage 092 - Chainage 094, Chainage 094 - Chainage 149","amountPesos":1905000,"lengthMeters":127.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625757"},{"year":2025,"category":"Roads","project":"Maharlika Highway( Cotabato-Marbel Rd) - K1722 + 882 - K1722 + 962, K1723 + 123 - K1723 + 243","amountPesos":10851000,"lengthMeters":200.0,"ratePesosPerMeter":54255.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625758"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1177 + 357 - K1177 + 410, K1194 + 092 - K1194 + 229","amountPesos":2603000,"lengthMeters":190.0,"ratePesosPerMeter":13700.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625759"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1188 + 748 - K1190 + 000","amountPesos":32737000,"lengthMeters":1252.0,"ratePesosPerMeter":26147.76357827476,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625760"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1187 + 400 - K1188 + 540","amountPesos":62258000,"lengthMeters":1140.0,"ratePesosPerMeter":54612.28070175439,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625761"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1181 + 740 - K1181 + 841, K1181 + 869.10 - K1181 + 970","amountPesos":12000000,"lengthMeters":201.9,"ratePesosPerMeter":59435.36404163217,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625762"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1258 + 000 - K1259 + 466, K1259 + 521.80 - K1259 + 630","amountPesos":76442000,"lengthMeters":1574.2,"ratePesosPerMeter":48559.268199721926,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625763"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1274 + 363 - K1274 + 414","amountPesos":5100000,"lengthMeters":51.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625764"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1243 + 800 - K1246 + 389, K1246 + 413.15 - K1248 + 550","amountPesos":314990000,"lengthMeters":4725.85,"ratePesosPerMeter":66652.55985695563,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625765"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1250 + 900 - K1251 + 542","amountPesos":64400000,"lengthMeters":642.0,"ratePesosPerMeter":100311.52647975078,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625766"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1250 + 098 - K1250 + 900","amountPesos":80200000,"lengthMeters":802.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625767"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1253 + 264 - K1254 + 609","amountPesos":126071000,"lengthMeters":1345.0,"ratePesosPerMeter":93733.08550185873,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625768"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1255 + 492 - K1257 + 004","amountPesos":150001000,"lengthMeters":1512.0,"ratePesosPerMeter":99207.01058201058,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625769"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1257 + 373 - K1257 + 481, K1257 + 721.40 - K1257 + 779","amountPesos":4514000,"lengthMeters":165.6,"ratePesosPerMeter":27258.454106264864,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625770"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1241 + (-321) - K1241 + 098","amountPesos":11421000,"lengthMeters":419.0,"ratePesosPerMeter":27257.756563245825,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625771"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1298 + 650 - K1301 + 246","amountPesos":188000000,"lengthMeters":2596.0,"ratePesosPerMeter":72419.1063174114,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625772"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1326 + 300 - K1327 + 220","amountPesos":67500000,"lengthMeters":920.0,"ratePesosPerMeter":73369.56521739131,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625773"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1329 + 000 - K1329 + 495","amountPesos":35906000,"lengthMeters":495.0,"ratePesosPerMeter":72537.37373737374,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625774"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1331 + 000 - K1331 + 759, K1331 + 789 - K1332 + 550","amountPesos":110000000,"lengthMeters":1520.0,"ratePesosPerMeter":72368.42105263157,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625775"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1332 + 550 - K1333 + 935","amountPesos":98383000,"lengthMeters":1385.0,"ratePesosPerMeter":71034.6570397112,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625776"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1338 + 413 - K1338 + 748","amountPesos":19563000,"lengthMeters":335.0,"ratePesosPerMeter":58397.014925373136,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625777"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1339 + 000 - K1340 + 100","amountPesos":80000000,"lengthMeters":1100.0,"ratePesosPerMeter":72727.27272727272,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625778"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1322 + 712 - K1323 + 000","amountPesos":20241000,"lengthMeters":288.0,"ratePesosPerMeter":70281.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625779"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1309 + 112 - K1309 + 183, K1313 + 420 - K1313 + 462, K1314 + 406 - K1314 + 501, K1317 + 782 - K1317 + 852, K1322 + 520 - K1322 + 712","amountPesos":46950000,"lengthMeters":470.0,"ratePesosPerMeter":99893.6170212766,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625780"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1323 + 605 - K1323 + 621, K1325 + 243 - K1325 + 353","amountPesos":8747000,"lengthMeters":126.0,"ratePesosPerMeter":69420.63492063493,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625781"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1343 + 832 - K1347 + 363","amountPesos":239000000,"lengthMeters":3531.0,"ratePesosPerMeter":67686.20787312376,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625782"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1347 + 363 - K1349 + 093","amountPesos":118089000,"lengthMeters":1730.0,"ratePesosPerMeter":68259.53757225434,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625783"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1351 + 634 - K1351 + 900, K1352 + 075 - K1354 + 519","amountPesos":138502000,"lengthMeters":2710.0,"ratePesosPerMeter":51107.74907749078,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625784"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1227 + 293 - K1228 + 400","amountPesos":30000000,"lengthMeters":1107.0,"ratePesosPerMeter":27100.271002710026,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625785"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1223 + 642 - K1224 + 677","amountPesos":28240000,"lengthMeters":1035.0,"ratePesosPerMeter":27285.024154589373,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625786"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1141 + 783 - K1143 + 853","amountPesos":125000000,"lengthMeters":2070.0,"ratePesosPerMeter":60386.47342995169,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625787"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1148 + 000 - K1150 + 500","amountPesos":135000000,"lengthMeters":2500.0,"ratePesosPerMeter":54000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625788"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1150 + 1008 - K1150 + 1040, K1151 + 088 - K1151 + 117","amountPesos":3460000,"lengthMeters":61.0,"ratePesosPerMeter":56721.311475409835,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625789"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1168 + 059.46 - K1168 + 344, K1169 + 000 - K1169 + 720, K1170 + 000 - K1170 + 200, K1176 + 960 - K1177 + 357, K1178 + 826 - K1179 + 110, K1186 + 785.57 - K1187 + 056, K1187 + 224.10 - K1187 + 400, K1188 + 540 - K1188 + 748, K1199 + 406 - K1199 + 422, K1203 + 577 - K1203 + 884, K1210 + 410 - K1210 + 595","amountPesos":91866000,"lengthMeters":3047.87,"ratePesosPerMeter":30141.04932297101,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625790"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1241 + 098 - K1241 + 498, K1242 + 983 - K1243 + 800","amountPesos":33227000,"lengthMeters":1217.0,"ratePesosPerMeter":27302.38290879211,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625791"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1304 + (-404) - K1306 + 958, K1307 + 296 - K1307 + 471, K1307 + 493 - K1307 + 585, K1309 + 183 - K1312 + 690, K1313 + 076 - K1313 + 077, K1313 + 462 - K1313 + 690, K1321 + 532 - K1322 + 520","amountPesos":227660000,"lengthMeters":8353.0,"ratePesosPerMeter":27254.87848677122,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625792"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1229 + 773 - K1230 + 045, K1238 + 135 - K1238 + 304","amountPesos":8560000,"lengthMeters":441.0,"ratePesosPerMeter":19410.430839002267,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625793"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1150 + 571 - K1150 + 993, K1158 + 580 - K1158 + 583.02, K1160 + 500 - K1162 + 242, K1162 + 264 - K1162 + 326, K1162 + 341 - K1163 + 142, K1163 + 160 - K1163 + 310, K1163 + 326 - K1163 + 489, K1164 + 317 - K1164 + 388, K1164 + 638 - K1164 + 773, K1165 + 645 - K1165 + 700, K1165 + 745 - K1165 + 800","amountPesos":99901000,"lengthMeters":3659.02,"ratePesosPerMeter":27302.665741099936,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625794"},{"year":2025,"category":"Roads","project":"Sayre Highway - K1443 + 053 - K1443 + 160, K1443 + 940 - K1444 + 010","amountPesos":16396000,"lengthMeters":177.0,"ratePesosPerMeter":92632.76836158193,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625826"},{"year":2025,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1279 + 325 - K1279 + 829","amountPesos":40000000,"lengthMeters":504.0,"ratePesosPerMeter":79365.07936507936,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 625838"},{"year":2025,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1563 + (-706) - K1563 + (-623), K1575 + 000 - K1576 + 300","amountPesos":77200000,"lengthMeters":1383.0,"ratePesosPerMeter":55820.67968185105,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 627720"},{"year":2025,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1573 + 500 - K1575 + 000","amountPesos":57800000,"lengthMeters":1500.0,"ratePesosPerMeter":38533.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 627721"},{"year":2025,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1580 + 000 - K1581 + 423","amountPesos":67900000,"lengthMeters":1423.0,"ratePesosPerMeter":47716.09276177091,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 627722"},{"year":2025,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1588 + 100 - K1588 + 400, K1590 + 000 - K1592 + 009","amountPesos":100000000,"lengthMeters":2309.0,"ratePesosPerMeter":43308.791684712,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 627723"},{"year":2025,"category":"Roads","project":"Surigao - Davao Coastal Road - K1471 + 566 - K1473 + 800","amountPesos":100000000,"lengthMeters":2234.0,"ratePesosPerMeter":44762.757385854966,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 627737"},{"year":2025,"category":"Roads","project":"Famy-Real-Infanta-Dinahican Port Road - K0128 + 064 - K0128 + 400","amountPesos":10000000,"lengthMeters":336.0,"ratePesosPerMeter":29761.904761904763,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 627768"},{"year":2025,"category":"Roads","project":"Sipocot Cabusao Road, K0400 + 000 - K0401 + 000","amountPesos":20000000,"lengthMeters":1000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 628780"},{"year":2025,"category":"Roads","project":"Sibutu-Ligayan Road - (S00007TW) Chainage 8898 - Chainage 11000","amountPesos":49119000,"lengthMeters":2102.0,"ratePesosPerMeter":23367.745004757373,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 628789"},{"year":2025,"category":"Roads","project":"Sibutu-Ligayan Road - (S00007TW) Chainage 22000 - Chainage 23732","amountPesos":40482000,"lengthMeters":1732.0,"ratePesosPerMeter":23372.9792147806,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 628790"},{"year":2025,"category":"Roads","project":"Jct Sayre Highway-Damulog Poblacion Rd - K1594 + (-484) - K1594 + 500","amountPesos":41400000,"lengthMeters":984.0,"ratePesosPerMeter":42073.170731707316,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 628793"},{"year":2025,"category":"Roads","project":"Jct. Nato-Sabang Coastal Road, Sta. 0+(-585)- Sta. 0+(-135), (Sto Niño - Huyon-Huyon Section) Package C, Sagñay and Tigaon, Camarines Sur","amountPesos":65000000,"lengthMeters":450.0,"ratePesosPerMeter":144444.44444444444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 631880"},{"year":2025,"category":"Roads","project":"Jct. Nato-Sabang Coastal Road Sta 0+(-135) - Sta 0+685 (Huyon-Huyon Section), Camarines Sur (Package D)","amountPesos":70000000,"lengthMeters":820.0,"ratePesosPerMeter":85365.85365853658,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 631904"},{"year":2025,"category":"Roads","project":"Zamboanga Del Sur Coastal Road (Liasan-Sugbay Uno-Sumbato Section) Chainage 700 - Chainage 1300, Zamboanga del Sur","amountPesos":30000000,"lengthMeters":600.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 633646"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Cagayan Valley Rd) - K0501 + 300 - K0503 + 072, K0503 + 658 - K0503 + 767","amountPesos":14157000,"lengthMeters":1881.0,"ratePesosPerMeter":7526.315789473684,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 634218"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0037 + (-747) - K0037 + (-690), K0037 + (-640) - K0037 + (-457)","amountPesos":13058000,"lengthMeters":240.0,"ratePesosPerMeter":54408.333333333336,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 634220"},{"year":2025,"category":"Roads","project":"Maharlika Highway - K0402 + 874 - K0404 + 000, K0404 + 202 - K0404 + 352, K0404 + 586 - K0405 + 856","amountPesos":37944000,"lengthMeters":2546.0,"ratePesosPerMeter":14903.377847604084,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 634221"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0734 + 578 - K0735 + 526, K0736 + 030 - K0736 + 254, K0738 + 215 - K0738 + 384, K0742 + 108 - K0742 + 430","amountPesos":17425000,"lengthMeters":1663.0,"ratePesosPerMeter":10478.051713770295,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 634227"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Digos-Makar Rd) - K1568 + 636 - K1569 + 039, K1570 + 042 - K1571 + 933, K1583 + 540 - K1584 + 266, K1585 + 572 - K1585 + 597, K1585 + 845 - K1585 + 882, K1585 + 919 - K1586 + 107","amountPesos":20308000,"lengthMeters":3270.0,"ratePesosPerMeter":6210.397553516819,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 634230"},{"year":2025,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1222 + 016 - K1223 + 642, K1224 + 677 - K1224 + 721, K1224 + 740.60 - K1224 + 779, K1224 + 920 - K1224 + 941, K1224 + 963.60 - K1224 + 986, K1225 + 010 - K1225 + 048, K1225 + 068 - K1225 + 148, K1225 + 824 - K1225 + 860, K1225 + 872.80 - K1225 + 923, K1234 + 236 - K1235 + 515","amountPesos":84940000,"lengthMeters":3235.0,"ratePesosPerMeter":26256.568778981797,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 634231"},{"year":2025,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1233 + 222 - K1233 + 272","amountPesos":1451000,"lengthMeters":50.0,"ratePesosPerMeter":29020.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 634242"},{"year":2025,"category":"Roads","project":"West Circumferencial Road, Angeles City K0082 + (-640) - K0085 + 048","amountPesos":22914000,"lengthMeters":3688.0,"ratePesosPerMeter":6213.1236442516265,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 634904"},{"year":2025,"category":"Roads","project":"West Circumferencial Road, Angeles City (Phase 2), K0082 + (-389) - K0089 + 589","amountPesos":10000000,"lengthMeters":7978.0,"ratePesosPerMeter":1253.4469791927802,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 634907"},{"year":2025,"category":"Roads","project":"Aramaywan-Berong-Pto Princesa Road K0093 + 809 - K0094 + 164, K0096 + 040 - K0096 + 457 Quezon, Palawan","amountPesos":30100000,"lengthMeters":772.0,"ratePesosPerMeter":38989.637305699485,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 635616"},{"year":2025,"category":"Roads","project":"Aramaywan-Berong-Pto Princesa Road K0116 + 921 - K0116 + 965","amountPesos":3000000,"lengthMeters":44.0,"ratePesosPerMeter":68181.81818181818,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 635625"},{"year":2025,"category":"Roads","project":"Quezon-Punta Baja Road K0165 + 432- K0165 + 458, K0170 + 613 - K0170 + 639, K0177 + 982 - K0177+ 986, K0200 + 948 - K0201 + 348","amountPesos":20000000,"lengthMeters":456.0,"ratePesosPerMeter":43859.649122807015,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 635626"},{"year":2025,"category":"Roads","project":"Palawan Circumferential Road (Panalingaan-Tagbita-Latud) K0254 + 876 - K0256 + 829","amountPesos":82500000,"lengthMeters":1953.0,"ratePesosPerMeter":42242.70353302611,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 635927"},{"year":2025,"category":"Roads","project":"Palawan Circumferential Road (Panalingaan-Tagbita-Latud) K0258+ 527 - K0258 + 725, K0258 + 920 - K0259 + 581, K0274 + 403 - K0275 + 441","amountPesos":92000000,"lengthMeters":1897.0,"ratePesosPerMeter":48497.62783342119,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 635928"},{"year":2025,"category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Road (S03997LZ)- K0427+525 - K0427+695","amountPesos":16000000,"lengthMeters":170.0,"ratePesosPerMeter":94117.64705882352,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 635941"},{"year":2025,"category":"Roads","project":"Jct. SH-Manolo Fortich-Libona-Indahag Road K1476 + 557 - K1476 + 826","amountPesos":22020000,"lengthMeters":269.0,"ratePesosPerMeter":81858.73605947956,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 635950"},{"year":2025,"category":"Roads","project":"Construction of Retaining Wall along Main Canal Service Road, Sta. 0 + 643.10 - Sta. 0 + 943.10, Bislig City, Surigao del Sur","amountPesos":15000000,"lengthMeters":300.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 657213"},{"year":2025,"category":"Roads","project":"Construction of Flood Control Structure along Meycauayan River, Sta. 02+275-Sta.02+370 (Ubihan-Liputan-Nagbalon Road Dike), Meycauayan City, Bulacan","amountPesos":100000000,"lengthMeters":95.0,"ratePesosPerMeter":1052631.5789473683,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 661890"},{"year":2025,"category":"Roads","project":"Construction of Flood Control Structure along Meycauayan River, Sta. 02+370-Sta.02+490 (Ubihan-Liputan-Nagbalon Road Dike), Meycauayan City, Bulacan","amountPesos":125000000,"lengthMeters":120.0,"ratePesosPerMeter":1041666.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 661891"},{"year":2025,"category":"Roads","project":"Construction of Flood Control Structure along Meycauayan River, Sta. 01+800-Sta.01+895 (Ubihan-Liputan-Nagbalon Road Dike), Meycauayan City, Bulacan","amountPesos":100000000,"lengthMeters":95.0,"ratePesosPerMeter":1052631.5789473683,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 661892"},{"year":2025,"category":"Roads","project":"Construction of Flood Control Structure along Meycauayan River, Sta. 01+895-Sta.01+990 (Ubihan-Liputan-Nagbalon Road Dike), Meycauayan City, Bulacan","amountPesos":100000000,"lengthMeters":95.0,"ratePesosPerMeter":1052631.5789473683,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 661893"},{"year":2025,"category":"Roads","project":"Construction of Flood Control Structure along Meycauayan River, Sta. 01+990-Sta.02+085 (Ubihan-Liputan-Nagbalon Road Dike), Meycauayan City, Bulacan","amountPesos":100000000,"lengthMeters":95.0,"ratePesosPerMeter":1052631.5789473683,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 661894"},{"year":2025,"category":"Roads","project":"Construction of Flood Control Structure along Meycauayan River, Sta. 02+085-Sta.02+180 (Ubihan-Liputan-Nagbalon Road Dike), Meycauayan City, Bulacan","amountPesos":100000000,"lengthMeters":95.0,"ratePesosPerMeter":1052631.5789473683,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 661895"},{"year":2025,"category":"Roads","project":"Construction of Flood Control Structure along Meycauayan River, Sta. 02+180-Sta.02+275 (Ubihan-Liputan-Nagbalon Road Dike), Meycauayan City, Bulacan","amountPesos":100000000,"lengthMeters":95.0,"ratePesosPerMeter":1052631.5789473683,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 661896"},{"year":2025,"category":"Bridges","project":"Construction of Revetment along Lasang River Protecting Lasang Bridge, Sta. 5 + 900 - Sta. 6 + 200, Right Bank, Davao City","amountPesos":100000000,"lengthMeters":300.0,"ratePesosPerMeter":333333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 662263"},{"year":2025,"category":"Bridges","project":"Construction of Revetment along Lasang River Protecting Lasang Bridge, Sta. 6 + 800 - Sta. 7 + 100, Right Bank, Davao City","amountPesos":100000000,"lengthMeters":300.0,"ratePesosPerMeter":333333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 662264"},{"year":2025,"category":"Bridges","project":"Construction of Revetment along Lasang River Protecting Lasang Bridge, Sta. 7 + 100 - Sta. 7 + 400, Right Bank, Davao City","amountPesos":100000000,"lengthMeters":300.0,"ratePesosPerMeter":333333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 662265"},{"year":2025,"category":"Bridges","project":"Construction of Revetment along Lasang River Protecting Lasang Bridge, Sta. 7 + 700 - Sta. 8 + 000, Right Bank, Davao City","amountPesos":100000000,"lengthMeters":300.0,"ratePesosPerMeter":333333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2025 GAA parquet · row 662266"},{"year":2026,"category":"Roads","project":"C-5 Road - K0012 + (-1181) - K0012 + (-618)","amountPesos":36950000.0,"lengthMeters":563.0,"ratePesosPerMeter":65630.55062166962,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3789"},{"year":2026,"category":"Roads","project":"C-5 Road - K0012 + (-1957) - K0012 + (-1181)","amountPesos":40092000.0,"lengthMeters":776.0,"ratePesosPerMeter":51664.948453608245,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3791"},{"year":2026,"category":"Roads","project":"C-5 Road - K0012 + 489 - K0013 + 800","amountPesos":53637000.0,"lengthMeters":1311.0,"ratePesosPerMeter":40913.04347826087,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3793"},{"year":2026,"category":"Roads","project":"C-5 Road - K0020 + (-370) - K0017 + 000, K0017 + 000 - K0020 + 418","amountPesos":89395000.0,"lengthMeters":3418.0,"ratePesosPerMeter":26154.183733177295,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3795"},{"year":2026,"category":"Roads","project":"Manila East Rd (Rosario-Cainta Rd) - K0015 + (-145) - K0016 + 140.64","amountPesos":52445000.0,"lengthMeters":1285.64,"ratePesosPerMeter":40792.91247938772,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3797"},{"year":2026,"category":"Roads","project":"Pangasinan-Tarlac Rd - K0168 + 130 - K0170 + 643","amountPesos":73208000.0,"lengthMeters":2513.0,"ratePesosPerMeter":29131.715081575807,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3802"},{"year":2026,"category":"Roads","project":"Pangasinan-Zambales Rd - K0370 + 000 - K0373 + 507","amountPesos":65497000.0,"lengthMeters":3507.0,"ratePesosPerMeter":18676.07641859139,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3804"},{"year":2026,"category":"Roads","project":"Urdaneta Jct - Dagupan Road, K0200+853 - K0201+410, K0202+314 - K0205+039","amountPesos":140698000.0,"lengthMeters":3282.0,"ratePesosPerMeter":42869.59171237051,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3806"},{"year":2026,"category":"Roads","project":"Cagayan-Apayao Rd (Tuguegarao Sect) - K0483 + 000 - K0486 + 045","amountPesos":60200000.0,"lengthMeters":3045.0,"ratePesosPerMeter":19770.114942528737,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3809"},{"year":2026,"category":"Roads","project":"Cauayan-Cabatuan Rd - K0378 + (-431) - K0378 + (-232), K0378 + 090 - K0378 + 137","amountPesos":19739000.0,"lengthMeters":246.0,"ratePesosPerMeter":80239.83739837399,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3811"},{"year":2026,"category":"Roads","project":"Maharlika Highway -  K0311 + 000 - K0311 + 455, K0311 + 526 - K0311 + 721","amountPesos":46708000.0,"lengthMeters":650.0,"ratePesosPerMeter":71858.46153846153,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3813"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0317 + 380- K0317 + 687.5","amountPesos":21299000.0,"lengthMeters":307.5,"ratePesosPerMeter":69265.0406504065,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3815"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0364 + 014 - K0364 + 514","amountPesos":35886000.0,"lengthMeters":500.0,"ratePesosPerMeter":71772.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3817"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0394 + (-672) - K0394 + (-202)","amountPesos":23136000.0,"lengthMeters":470.0,"ratePesosPerMeter":49225.53191489362,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3819"},{"year":2026,"category":"Roads","project":"Santiago-Tuguegarao Rd - K0343 + 000 - K0343 + 843","amountPesos":70034000.0,"lengthMeters":843.0,"ratePesosPerMeter":83077.10557532622,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3821"},{"year":2026,"category":"Roads","project":"Santiago-Tuguegarao Rd - K0419 + 664 - K0420 + 017, K0422 + 349 - K0422 + 708, K0424 + 194 - K0424 + 845, K0425 + 626 - K0425 + 991, K0429 + 164 - K0429 + 756","amountPesos":102944000.0,"lengthMeters":2320.0,"ratePesosPerMeter":44372.41379310345,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3823"},{"year":2026,"category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0078 + 375 - K0078 + 965, K0079 + 396 - K0080 + 000","amountPesos":59694000.0,"lengthMeters":1194.0,"ratePesosPerMeter":49994.97487437186,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3826"},{"year":2026,"category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0080 + 000 - K0081 + 134.56","amountPesos":100172000.0,"lengthMeters":1134.56,"ratePesosPerMeter":88291.4962628686,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3828"},{"year":2026,"category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0084 + 067.37 - K0085 + 729","amountPesos":89014000.0,"lengthMeters":1661.63,"ratePesosPerMeter":53570.2894146108,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3830"},{"year":2026,"category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0109 + 514 - K0110 + 499","amountPesos":45344000.0,"lengthMeters":985.0,"ratePesosPerMeter":46034.51776649746,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3832"},{"year":2026,"category":"Roads","project":"Jose Abad Santos Ave (JASA) Rd - Jose Abad Santos Ave (JASA) Rd - K0101 + 276 - K0101 + 689, K0105 + 016 - K0105 + 924","amountPesos":104640000.0,"lengthMeters":1321.0,"ratePesosPerMeter":79212.71763815291,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3834"},{"year":2026,"category":"Roads","project":"Jose Abad Santos Ave (JASA) Rd - K0100 + 000 - K0101 + 000, K0101 + 000 - K0101 + 276","amountPesos":104640000.0,"lengthMeters":1276.0,"ratePesosPerMeter":82006.26959247648,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3836"},{"year":2026,"category":"Roads","project":"Jose Abad Santos Ave (JASA) Rd -Jose Abad Santos Ave (JASA) Rd - K0107 + 000 - K0108 + 000, K0108 + 000 - K0108 + 384","amountPesos":104640000.0,"lengthMeters":1384.0,"ratePesosPerMeter":75606.93641618497,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3838"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0044 + 747 - K0044 + 887","amountPesos":10704000.0,"lengthMeters":140.0,"ratePesosPerMeter":76457.14285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3840"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0128 + 450 - K0131 + 000, K0131 + 878 - K0132 + 000, K0132 + 000 - K0132 + 245","amountPesos":108734000.0,"lengthMeters":2917.0,"ratePesosPerMeter":37275.96846074735,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3842"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0047+195 - K0047+761","amountPesos":31744000.0,"lengthMeters":566.0,"ratePesosPerMeter":56084.805653710246,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3844"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0068 + 101 - K0068 + 300, K0071 + 614 - K0071 + 951","amountPesos":30694000.0,"lengthMeters":536.0,"ratePesosPerMeter":57264.92537313433,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3846"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0099 + 412 - K0100 + 220","amountPesos":41856000.0,"lengthMeters":808.0,"ratePesosPerMeter":51801.9801980198,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3848"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0100 + 220 - K0101 + 000","amountPesos":41856000.0,"lengthMeters":780.0,"ratePesosPerMeter":53661.53846153846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3850"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0134 + 582 - K0135 + 472","amountPesos":60464000.0,"lengthMeters":890.0,"ratePesosPerMeter":67937.0786516854,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3852"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0142 + 093 - K0142 + 713, K0143 + 286 - K0143 + 665","amountPesos":66272000.0,"lengthMeters":999.0,"ratePesosPerMeter":66338.33833833833,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3854"},{"year":2026,"category":"Roads","project":"Manila North Road, Mabalacat City, Pampanga K088+000 to K088+694, K089+553 to K090+158","amountPesos":69760000.0,"lengthMeters":1299.0,"ratePesosPerMeter":53702.84834488068,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3856"},{"year":2026,"category":"Roads","project":"Romulo H-way - K0127 + 711 - K0128 + 825","amountPesos":55807000.0,"lengthMeters":1114.0,"ratePesosPerMeter":50096.05026929982,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3858"},{"year":2026,"category":"Roads","project":"Romulo H-way - K0128 + 825 - K0129 + 990","amountPesos":55808000.0,"lengthMeters":1165.0,"ratePesosPerMeter":47903.86266094421,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3860"},{"year":2026,"category":"Roads","project":"Sta. Rosa - Tarlac Rd - K0126 + 695 - K0126 + 746, K0126 + 763 - K0128 + 253","amountPesos":59296000.0,"lengthMeters":1541.0,"ratePesosPerMeter":38478.909798831926,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3862"},{"year":2026,"category":"Roads","project":"Tarlac-Sta Rosa Rd - K0144 + 314 - K0145 + 721","amountPesos":69760000.0,"lengthMeters":1407.0,"ratePesosPerMeter":49580.66808813078,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3864"},{"year":2026,"category":"Roads","project":"Calamba-Sta Cruz-Famy Jct Rd - K0051 + (-092) - K0052 + 425, K0057 + 207 - K00057 + 557","amountPesos":119873000.0,"lengthMeters":1867.0,"ratePesosPerMeter":64206.21317621853,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3867"},{"year":2026,"category":"Roads","project":"Calamba-Sta Cruz-Famy Jct Rd - K0062 + 335 - K0062 + 725, K0062 + 772 - K0062 + 892, K0063 + 298 - K0063 + 659, K0064 + 325 - K0065 + 000, K0065 + 167 - K0066 + 000","amountPesos":119873000.0,"lengthMeters":2379.0,"ratePesosPerMeter":50387.9781420765,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3869"},{"year":2026,"category":"Roads","project":"Calamba-Sta Cruz-Famy Jct Rd - K0069 + 560 - K0070 + 493","amountPesos":47869000.0,"lengthMeters":933.0,"ratePesosPerMeter":51306.53804930332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3871"},{"year":2026,"category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0038 + (-715.15) - K0038 + (-159), K0040 + 381 - K0040 + 494","amountPesos":53022000.0,"lengthMeters":669.15,"ratePesosPerMeter":79237.83904954029,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3873"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0080 + 695 - K0081 + 000, K0085 + 000 - K0086 + 000","amountPesos":74311000.0,"lengthMeters":1305.0,"ratePesosPerMeter":56943.295019157085,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3875"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0053 + 060 - K0053 + 245, K0056 + 255 - K0056 + 978","amountPesos":54342000.0,"lengthMeters":908.0,"ratePesosPerMeter":59848.01762114537,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3877"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0057 + 138 - K0058 + 000, K0061 + 163 - K0061 + 288","amountPesos":41978000.0,"lengthMeters":987.0,"ratePesosPerMeter":42530.901722391085,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3879"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0082 + 874 - K0082 + 1136","amountPesos":14106000.0,"lengthMeters":262.0,"ratePesosPerMeter":53839.69465648855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3881"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0093 + 000 - K0094 + 000, K0099 + 082 - K0100 + 440, K0102 + 679 - K0102 + 937, K0104 + 000 - K0105 + 102, K0105 + 367  - K0105 + 795","amountPesos":169139000.0,"lengthMeters":4146.0,"ratePesosPerMeter":40795.70670525808,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3883"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0105 + 795 - K0106 + 000, K0106 + 325 - K0106 + 711, K0107 + 124 - K0107 + 537, K0107 + 559 - K0107 + 700, K0108 + 831 - K0108 + 883","amountPesos":49049000.0,"lengthMeters":1197.0,"ratePesosPerMeter":40976.6081871345,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3885"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0108 + 883 - K0109 + 077","amountPesos":7026000.0,"lengthMeters":194.0,"ratePesosPerMeter":36216.49484536082,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3887"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0110 + 737 - K0111 + 700, K0112 + 120 - K0112 + 650, K0112 + 800 - K0114 + 000, K0114 + 485 - K0114 + 578","amountPesos":109479000.0,"lengthMeters":2786.0,"ratePesosPerMeter":39296.123474515436,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3889"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0122 + 378 - K0124 + 652","amountPesos":139466000.0,"lengthMeters":2274.0,"ratePesosPerMeter":61330.694810905894,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3891"},{"year":2026,"category":"Roads","project":"Manila-Batangas Rd - K0099 + 268 - K0100 + 340","amountPesos":75919000.0,"lengthMeters":1072.0,"ratePesosPerMeter":70819.96268656716,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3893"},{"year":2026,"category":"Roads","project":"Manila-Batangas Rd - K0101 + 838 - K0103 + 000","amountPesos":78114000.0,"lengthMeters":1162.0,"ratePesosPerMeter":67223.75215146299,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3895"},{"year":2026,"category":"Roads","project":"Noveleta-Rosario Div Rd - K0028 + 629.88 - K0029 + 533","amountPesos":79915000.0,"lengthMeters":903.12,"ratePesosPerMeter":88487.6871290638,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3897"},{"year":2026,"category":"Roads","project":"Tanza-Trece Martires City-Indang Rd. K0035 + 130 - K0036 + 380","amountPesos":58218000.0,"lengthMeters":1250.0,"ratePesosPerMeter":46574.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3899"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0447 + 152.5 - K0447 + 930","amountPesos":43525000.0,"lengthMeters":777.5,"ratePesosPerMeter":55980.70739549839,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3902"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0519 + 380 - K0521 + 123, K0525 + 000 - K0527 + 003, K0532 + 500 - K0532 + 700, K0533 + 600 - K0534 + 294","amountPesos":137511000.0,"lengthMeters":4640.0,"ratePesosPerMeter":29635.991379310344,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3904"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0255 + 580 - K0255 + 803, K0261 + 000 - K0261 + 515, K0263 + 000 - K0263 + 667, K0264 + 909 - K0265 + 000, K0266 + 470 - K0266 + 550","amountPesos":54645000.0,"lengthMeters":1576.0,"ratePesosPerMeter":34673.22335025381,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3906"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0273 + 485 - K0273 + 634, K0276 + 226 - K0276 + 471","amountPesos":14616000.0,"lengthMeters":394.0,"ratePesosPerMeter":37096.446700507615,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3908"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0287 + 690 - K0288 + 000, K0294 + 000 - K0294 + 823","amountPesos":29134000.0,"lengthMeters":1133.0,"ratePesosPerMeter":25714.033539276257,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3910"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0341 + 257 - K0341 + 319, K0341 + 755.33 - K0342 + 425, K0345 + 486 - K0346 + 015, K0347 + 557 - K0347 + 604, K0348 + 179 - K0348 + 303, K0350 + 255 - K0350 + 873","amountPesos":105217000.0,"lengthMeters":2049.67,"ratePesosPerMeter":51333.62931593907,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3912"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0352 + 229 - K0352 + 953, K0353 + 930 - K0354 + 076","amountPesos":49576000.0,"lengthMeters":870.0,"ratePesosPerMeter":56983.90804597701,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3914"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0382 + 000 - K0382 + 634","amountPesos":45280000.0,"lengthMeters":634.0,"ratePesosPerMeter":71419.55835962146,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3916"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0409 + 815 - K0410 + 126, K0410 + 185 - K0410 + 547, K0411 + 000 - K0411 + 369","amountPesos":53216000.0,"lengthMeters":1042.0,"ratePesosPerMeter":51071.01727447217,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3918"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0416 + 260 - K0416 + 502, K0416 + 760 - K0416 + 848","amountPesos":16242000.0,"lengthMeters":330.0,"ratePesosPerMeter":49218.181818181816,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3920"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0416 + 502 - K0416 + 760","amountPesos":15208000.0,"lengthMeters":258.0,"ratePesosPerMeter":58945.73643410853,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3922"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0469 + 194 - K0470 + 555","amountPesos":73994000.0,"lengthMeters":1361.0,"ratePesosPerMeter":54367.376928728874,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3924"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0481 + (-854) - K0481 + (-680)","amountPesos":9799000.0,"lengthMeters":174.0,"ratePesosPerMeter":56316.09195402299,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3926"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0485 + 959 - K0486 + 045, K0486 + 250 - K0488 + 749.30","amountPesos":113104000.0,"lengthMeters":2585.3,"ratePesosPerMeter":43748.88794337234,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3928"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0543 + 410 - K0543 + 961","amountPesos":33309000.0,"lengthMeters":551.0,"ratePesosPerMeter":60451.9056261343,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3930"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0544 + 904 - K0544 + 963.19, K0545 + 111 - K0546 + 000, K0548 + 244 - K0548 + 583","amountPesos":67428000.0,"lengthMeters":1287.19,"ratePesosPerMeter":52383.874952418,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3932"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0551 + 000 - K0551 + 366, K0569 + 485 - K0570 + 000, K0595 + 413 - K0595 + 465, K0599 + 727 - K0599 + 875.70","amountPesos":76261000.0,"lengthMeters":1081.7,"ratePesosPerMeter":70501.0631413546,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3934"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0551 + 815 - K0553 + 000","amountPesos":66191000.0,"lengthMeters":1185.0,"ratePesosPerMeter":55857.38396624473,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3936"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0594 + 852 - K0595 + 413","amountPesos":33220000.0,"lengthMeters":561.0,"ratePesosPerMeter":59215.686274509804,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3938"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0598 + 379 - K0598 + 597, K0598 + 874 - K0599 + 727","amountPesos":77089000.0,"lengthMeters":1071.0,"ratePesosPerMeter":71978.52474323062,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3940"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0610 + 009 - K0610 + 100, K0613 + 701 - K0613 + 883","amountPesos":17041000.0,"lengthMeters":273.0,"ratePesosPerMeter":62421.24542124542,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3942"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz (New Route) - K0034 + 056 - K0035 + 564","amountPesos":62510000.0,"lengthMeters":1508.0,"ratePesosPerMeter":41452.254641909814,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3945"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz Rd (New Route) - K0013 + 988 - K0014 + 056, K0014 + 263 - K0015 + 558","amountPesos":47237000.0,"lengthMeters":1363.0,"ratePesosPerMeter":34656.63976522377,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3947"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz Rd (New Route) - K0066 + 390 - K0068 + 100","amountPesos":72116000.0,"lengthMeters":1710.0,"ratePesosPerMeter":42173.09941520468,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3949"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz Rd (New Route) - K0106 + (-993) - K0106 + 190","amountPesos":59000000.0,"lengthMeters":1183.0,"ratePesosPerMeter":49873.20371935757,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3951"},{"year":2026,"category":"Roads","project":"Sen. Benigno S. Aquino, Jr. Ave -  K0003 + 897 - K0004 + 934,  K0004 + (-209) - K0004 + 108","amountPesos":48818000.0,"lengthMeters":1143.0,"ratePesosPerMeter":42710.41119860017,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3953"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0046 + 697 - K0047 + 000, K0062 + 206 - K0062 + 1013, K0069 + 000 - K0070 + 414","amountPesos":99616000.0,"lengthMeters":2524.0,"ratePesosPerMeter":39467.5118858954,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3956"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0118 + 531 - K0119 + 718","amountPesos":57993000.0,"lengthMeters":1187.0,"ratePesosPerMeter":48856.78180286437,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3958"},{"year":2026,"category":"Roads","project":"Bacolod South Rd - K0052 + 750 - K0054 + 812","amountPesos":91344000.0,"lengthMeters":2062.0,"ratePesosPerMeter":44298.73908826382,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3960"},{"year":2026,"category":"Roads","project":"Bacolod South Rd - K0057 + 183 -K0058 + 737","amountPesos":66806000.0,"lengthMeters":1554.0,"ratePesosPerMeter":42989.70398970399,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3962"},{"year":2026,"category":"Roads","project":"Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0047 + 000 - K0048 + 084","amountPesos":43970000.0,"lengthMeters":1084.0,"ratePesosPerMeter":40562.73062730627,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3964"},{"year":2026,"category":"Roads","project":"Bacolod-Sn Carlos Rd - K0009 + 864 - K0009 + 981, K0011 + 059 - K0012 + 000, K0012 + 960 - K0013 + 580","amountPesos":62901000.0,"lengthMeters":1678.0,"ratePesosPerMeter":37485.69725864124,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3966"},{"year":2026,"category":"Roads","project":"Dumaguete South Rd - K0003 + 770 - K0005 + 379","amountPesos":53902000.0,"lengthMeters":1609.0,"ratePesosPerMeter":33500.31075201989,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3968"},{"year":2026,"category":"Roads","project":"Cebu-Toledo Wharf Rd (Uling-Toledo Wharf) - K0043 + (-797) - K0043 + (-740), K0046 + 959 - K0048 + 456","amountPesos":77553000.0,"lengthMeters":1554.0,"ratePesosPerMeter":49905.40540540541,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3971"},{"year":2026,"category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - (S00008CB) Chainage 810 - Chainage 1770","amountPesos":59046000.0,"lengthMeters":960.0,"ratePesosPerMeter":61506.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3973"},{"year":2026,"category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0027 + 115 - K0029 + 057, K0029 + 062 - K0029 + 218","amountPesos":104106000.0,"lengthMeters":2098.0,"ratePesosPerMeter":49621.54432793136,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3975"},{"year":2026,"category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0029 + 218 - K0029 + 1300","amountPesos":58830000.0,"lengthMeters":1082.0,"ratePesosPerMeter":54371.534195933455,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3977"},{"year":2026,"category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0035 + 580 - K0037 + 069","amountPesos":52877000.0,"lengthMeters":1489.0,"ratePesosPerMeter":35511.75285426461,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3979"},{"year":2026,"category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0037 + 138 - K0039 + 000","amountPesos":115879000.0,"lengthMeters":1862.0,"ratePesosPerMeter":62233.61976369495,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3981"},{"year":2026,"category":"Roads","project":"Naga-Uling Rd - K0039 + 438 - K0040 + 440, K0040 + 780 - K0042 + 000","amountPesos":70051000.0,"lengthMeters":2222.0,"ratePesosPerMeter":31526.102610261027,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3983"},{"year":2026,"category":"Roads","project":"Toledo-Pinamungahan-Aloguinsan-Mantalongon Rd - K0081 + 000 - K0083 + 507","amountPesos":74028000.0,"lengthMeters":2507.0,"ratePesosPerMeter":29528.520143597925,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3985"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LT) - K0961 + 673 - K0961 + 863, K0972 + 000 - K0972 + 729","amountPesos":58242000.0,"lengthMeters":919.0,"ratePesosPerMeter":63375.40805223068,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3988"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LT) - K0978 + 000 - K0978 + 435","amountPesos":20781000.0,"lengthMeters":435.0,"ratePesosPerMeter":47772.41379310345,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3990"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LT) - K0989 + 724 - K0990 + 492","amountPesos":30388000.0,"lengthMeters":768.0,"ratePesosPerMeter":39567.708333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3992"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LT) - K0993 + 500 - K0995 + 263","amountPesos":112036000.0,"lengthMeters":1763.0,"ratePesosPerMeter":63548.49688031764,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3994"},{"year":2026,"category":"Roads","project":"Palo-Carigara-Ormoc Rd - K0929 + 159 - K0931 + 000","amountPesos":57034000.0,"lengthMeters":1841.0,"ratePesosPerMeter":30979.902227050516,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3996"},{"year":2026,"category":"Roads","project":"Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1846 + (-170) - K1848 + 093","amountPesos":82501000.0,"lengthMeters":2263.0,"ratePesosPerMeter":36456.473707467965,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 3999"},{"year":2026,"category":"Roads","project":"Ipil-Liloy-Sindangan Rd - K2004 + 477 - K2004 + 737, K2007 + 000 - K2008 + 000","amountPesos":70560000.0,"lengthMeters":1260.0,"ratePesosPerMeter":56000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4001"},{"year":2026,"category":"Roads","project":"Liloy-Ipil Rd - K1989 + 340 - K1990 + 601, K1990 + 625 - K1993 + 514","amountPesos":58800000.0,"lengthMeters":4150.0,"ratePesosPerMeter":14168.674698795181,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4003"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd)(S01113MN) - K1770 + 590 - K1771 + 576, K1771 + 894 - K1773 + 000, K1786 + 334 - K1786 + 386","amountPesos":64512000.0,"lengthMeters":2144.0,"ratePesosPerMeter":30089.55223880597,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4005"},{"year":2026,"category":"Roads","project":"Linamon-Zamboanga Rd - K1588 + 813 - K1589 + 900","amountPesos":51073000.0,"lengthMeters":1087.0,"ratePesosPerMeter":46985.28058877645,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4008"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1443 + 220 - K1443 + 550, K1444 + 185 - K1444 + 657, K1449 + 227 - K1449 + 420","amountPesos":47262000.0,"lengthMeters":995.0,"ratePesosPerMeter":47499.497487437184,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4010"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1445 + 315 – K1445 + 575, K1460 + 729 - K1461 + 336","amountPesos":52791000.0,"lengthMeters":867.0,"ratePesosPerMeter":60889.27335640138,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4012"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1461 + 336 – K1462 + 286","amountPesos":47809000.0,"lengthMeters":950.0,"ratePesosPerMeter":50325.26315789474,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4014"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1463 + 857 - K1464 + 824.87","amountPesos":50663000.0,"lengthMeters":967.87,"ratePesosPerMeter":52344.83969954038,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4016"},{"year":2026,"category":"Roads","project":"Davao-Bukidnon Rd - K1687 + 000 - K1689 + 251","amountPesos":90060000.0,"lengthMeters":2251.0,"ratePesosPerMeter":40008.884940026655,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4019"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1586 + 945 - K1588 + 009, K1590 + 386 - K1590 + 486","amountPesos":76538000.0,"lengthMeters":1164.0,"ratePesosPerMeter":65754.29553264605,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4021"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1590 + 486 - K1591 + 300, K1592 + 100 - K1593 + 057","amountPesos":95259000.0,"lengthMeters":1771.0,"ratePesosPerMeter":53788.255223037835,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4023"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Davao City-Jct Digos Sect) - K1536 + 560 - K1537 + 200, K1549 + 645 - K1550 + 254, K1550 + 1005 - K1551 + 695","amountPesos":152961000.0,"lengthMeters":1939.0,"ratePesosPerMeter":78886.53945332646,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4025"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Digos-Makar Rd) - K1578 + 329 - K1578 + 761","amountPesos":47630000.0,"lengthMeters":432.0,"ratePesosPerMeter":110254.62962962964,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4027"},{"year":2026,"category":"Roads","project":"Maharlika Highway (MN) - K1459 + 818 - K1460 + 812","amountPesos":95399000.0,"lengthMeters":994.0,"ratePesosPerMeter":95974.8490945674,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4031"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - K1566 + 561 - K1567 + 400, K1567 + 590 - K1567 + 732","amountPesos":90310000.0,"lengthMeters":981.0,"ratePesosPerMeter":92059.12334352701,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4033"},{"year":2026,"category":"Roads","project":"Pres. Diosdado P. Macapagal Natl Hi-way - K1710 + 157 - K1710+936,  K1718+502 - K1718+748, K1718 + 748 - K1719 + 304, K1719 + 430 - K1719 + 575","amountPesos":72717000.0,"lengthMeters":1726.0,"ratePesosPerMeter":42130.359212050986,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4035"},{"year":2026,"category":"Roads","project":"Pres. Diosdado P. Macapagal Natl Hi-way - K1762+002 - K1763+132, K1763+269 - K1763+520","amountPesos":75000000.0,"lengthMeters":1381.0,"ratePesosPerMeter":54308.47212165098,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4037"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) -  K1719 + 000 - K1720 + 000","amountPesos":41331000.0,"lengthMeters":1000.0,"ratePesosPerMeter":41331.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4040"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1618 + 028 - K1618 + 474","amountPesos":57863000.0,"lengthMeters":446.0,"ratePesosPerMeter":129737.66816143498,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4042"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1623 + 793 - K1624 + 702","amountPesos":82661000.0,"lengthMeters":909.0,"ratePesosPerMeter":90936.19361936193,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4044"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1646 +239 - K1646 + 850","amountPesos":45464000.0,"lengthMeters":611.0,"ratePesosPerMeter":74409.16530278232,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4046"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1696 + 010 - K1697 + 054","amountPesos":82661000.0,"lengthMeters":1044.0,"ratePesosPerMeter":79177.2030651341,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4048"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1698 + 121 - K1699 + 377","amountPesos":124818000.0,"lengthMeters":1256.0,"ratePesosPerMeter":99377.38853503185,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4050"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1713 + 000 - K1714 + 268","amountPesos":82661000.0,"lengthMeters":1268.0,"ratePesosPerMeter":65190.06309148265,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4052"},{"year":2026,"category":"Roads","project":"Kidapawan - Allah Junction Road - K1679 + 018 - K1680 + 100","amountPesos":82661000.0,"lengthMeters":1082.0,"ratePesosPerMeter":76396.48798521257,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4054"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Marbel-Allah Valley-Cotabato Rd) - K1765 + 284 -  K1765 + 519","amountPesos":26832000.0,"lengthMeters":235.0,"ratePesosPerMeter":114178.72340425532,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4056"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Marbel-Makar Rd) - K1676 + 268 - K1677 + 082","amountPesos":94764000.0,"lengthMeters":814.0,"ratePesosPerMeter":116417.69041769042,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4060"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Marbel-Makar Rd) - K1699 + 485 - K1700 + 038","amountPesos":29758000.0,"lengthMeters":553.0,"ratePesosPerMeter":53811.934900542496,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4062"},{"year":2026,"category":"Roads","project":"Makilala-Allah Valley Rd - K1624 + 000 - K1625 + 095","amountPesos":128125000.0,"lengthMeters":1095.0,"ratePesosPerMeter":117009.13242009132,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4064"},{"year":2026,"category":"Roads","project":"Makilala-Allah Valley Rd - K1625 + 095 - K1626 + 180","amountPesos":128125000.0,"lengthMeters":1085.0,"ratePesosPerMeter":118087.55760368664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4066"},{"year":2026,"category":"Roads","project":"Makilala-Allah Valley Rd - K1626 + 180 - K1627 + 634","amountPesos":171451000.0,"lengthMeters":1454.0,"ratePesosPerMeter":117916.78129298487,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4068"},{"year":2026,"category":"Roads","project":"Makilala-Allah Valley Rd - K1627 + 634 - K1628 + 996","amountPesos":161532000.0,"lengthMeters":1362.0,"ratePesosPerMeter":118599.11894273128,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4070"},{"year":2026,"category":"Roads","project":"Makilala-Allah Valley Rd - K1629 + 976 - K1631 + 134","amountPesos":82661000.0,"lengthMeters":1158.0,"ratePesosPerMeter":71382.55613126079,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4072"},{"year":2026,"category":"Roads","project":"Makilala-Allah Valley Rd - K1631 + 134 - K1631 + 650","amountPesos":58276000.0,"lengthMeters":516.0,"ratePesosPerMeter":112937.98449612403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4074"},{"year":2026,"category":"Roads","project":"Makilala-Allah Valley Rd - K1639 + 000 - K1640 + 915","amountPesos":151184000.0,"lengthMeters":1915.0,"ratePesosPerMeter":78947.25848563969,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4076"},{"year":2026,"category":"Roads","project":"Makilala-Allah Valley Rd - K1640 + 915 - K1642 + 861","amountPesos":153161000.0,"lengthMeters":1946.0,"ratePesosPerMeter":78705.54984583761,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4078"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Lipata-Surigao Sect) - K1115 + 000 - K1115 + 474, K1115 + 626 - K1116 + 000, K1120 + 000 - K1120 + 200, K1121 + 673 - K1122 + 177","amountPesos":125171000.0,"lengthMeters":1552.0,"ratePesosPerMeter":80651.4175257732,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4081"},{"year":2026,"category":"Roads","project":"Paranaque-Sucat Rd - (S03293LZ) Chainage 150 - Chainage 198","amountPesos":1168000.0,"lengthMeters":48.0,"ratePesosPerMeter":24333.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4084"},{"year":2026,"category":"Roads","project":"C-5 Road - (S05248LZ) Chainage 000 - Chainage 504","amountPesos":5098000.0,"lengthMeters":504.0,"ratePesosPerMeter":10115.079365079366,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4087"},{"year":2026,"category":"Roads","project":"C-5 Road - K0011 + 420 - K0012 + 489","amountPesos":25230000.0,"lengthMeters":1069.0,"ratePesosPerMeter":23601.496725912068,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4089"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0282 + 229 - K0282 + 463.50","amountPesos":3662000.0,"lengthMeters":234.5,"ratePesosPerMeter":15616.204690831557,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4093"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0233 + 383 - K0235 + 000","amountPesos":28457000.0,"lengthMeters":1617.0,"ratePesosPerMeter":17598.63945578231,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4096"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0242 + 342 - K0242 + 717","amountPesos":6722000.0,"lengthMeters":375.0,"ratePesosPerMeter":17925.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4098"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0243 + 337 - K0243 + 429","amountPesos":3186000.0,"lengthMeters":92.0,"ratePesosPerMeter":34630.434782608696,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4100"},{"year":2026,"category":"Roads","project":"Pangasinan-La Union Inter-Provl Rd - K0380 + 850 - K0381 + 500","amountPesos":11562000.0,"lengthMeters":650.0,"ratePesosPerMeter":17787.69230769231,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4103"},{"year":2026,"category":"Roads","project":"Pangasinan-Tarlac Rd - K0167 + (-883) - K0167 + 188","amountPesos":31333000.0,"lengthMeters":1071.0,"ratePesosPerMeter":29255.835667600375,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4105"},{"year":2026,"category":"Roads","project":"Pangasinan-Zambales Rd - K0361 + 000 - K0362 + 233","amountPesos":21564000.0,"lengthMeters":1233.0,"ratePesosPerMeter":17489.05109489051,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4107"},{"year":2026,"category":"Roads","project":"Pangasinan-Zambales Rd - K0367 + 000 - K0367 + 746","amountPesos":13373000.0,"lengthMeters":746.0,"ratePesosPerMeter":17926.27345844504,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4109"},{"year":2026,"category":"Roads","project":"Pangasinan-Zambales Rd - K0367 + 929 - K0370 + 000","amountPesos":34066000.0,"lengthMeters":2071.0,"ratePesosPerMeter":16449.058425881216,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4111"},{"year":2026,"category":"Roads","project":"Manila North Road K0206+413 - K0207+000, K0207+357 - K0207+731","amountPesos":48805000.0,"lengthMeters":961.0,"ratePesosPerMeter":50785.63995837669,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4114"},{"year":2026,"category":"Roads","project":"Gov Pack Rd - K0249 + (-623) - K0249 + 014","amountPesos":17150000.0,"lengthMeters":637.0,"ratePesosPerMeter":26923.076923076922,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4118"},{"year":2026,"category":"Roads","project":"Manuel S. Agyao Boulevard - K0500 + (-266) - K0500 + (-083), K0500 + (-038) - K0500 + 775.35","amountPesos":49000000.0,"lengthMeters":996.35,"ratePesosPerMeter":49179.50519395909,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4121"},{"year":2026,"category":"Roads","project":"Santiago-Tuguegarao Rd - K0346 + 751 - K0348 + 019","amountPesos":12723000.0,"lengthMeters":1268.0,"ratePesosPerMeter":10033.91167192429,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4125"},{"year":2026,"category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0100 + (-621) - K0100 + (-037)","amountPesos":29997000.0,"lengthMeters":584.0,"ratePesosPerMeter":51364.72602739726,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4129"},{"year":2026,"category":"Roads","project":"Sn Jose-Lupao Rd - K0160 + 000 - K0160 + 879, K0160 + 904 - K0161 + 000","amountPesos":26160000.0,"lengthMeters":975.0,"ratePesosPerMeter":26830.76923076923,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4132"},{"year":2026,"category":"Roads","project":"Sn Jose-Lupao Rd - K0163 + 529 - K0163 + 830","amountPesos":6976000.0,"lengthMeters":301.0,"ratePesosPerMeter":23176.07973421927,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4134"},{"year":2026,"category":"Roads","project":"Sn Jose-Lupao Rd - K0168 + 964 - K0169 + 782, K0169 + 823 - K0170 + 000","amountPesos":32438000.0,"lengthMeters":995.0,"ratePesosPerMeter":32601.00502512563,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4136"},{"year":2026,"category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0099+747 - K0100+000","amountPesos":4468000.0,"lengthMeters":253.0,"ratePesosPerMeter":17660.0790513834,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4139"},{"year":2026,"category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0109+352 - K0109+452, K0109+452 - K0109+896, K0109+896 - K0110+000, K0110+000-K0110+679","amountPesos":12235000.0,"lengthMeters":1327.0,"ratePesosPerMeter":9220.045214770158,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4141"},{"year":2026,"category":"Roads","project":"Sta Rosa-Tarlac Rd - K0108 + (-803) - K0108 + (-800), K0108 + (-257) - K0108 + 450, K0111 + 832 - K0112 + 000","amountPesos":19992000.0,"lengthMeters":878.0,"ratePesosPerMeter":22769.93166287016,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4143"},{"year":2026,"category":"Roads","project":"Sta Rosa-Tarlac Rd - K0113+000 - K0113+371.80","amountPesos":6534000.0,"lengthMeters":371.8,"ratePesosPerMeter":17573.96449704128,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4145"},{"year":2026,"category":"Roads","project":"Tarlac-Sta Rosa Rd - K0130+200 - K0130+840","amountPesos":31463000.0,"lengthMeters":640.0,"ratePesosPerMeter":49160.9375,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4148"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0133 + 381 - K0133 + 556, K0134 + 163 - K0134 + 582","amountPesos":33485000.0,"lengthMeters":594.0,"ratePesosPerMeter":56372.053872053875,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4151"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0147 + 532 - K0147 + 561","amountPesos":1937000.0,"lengthMeters":29.0,"ratePesosPerMeter":66793.10344827586,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4153"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0147 + 561 - K0147 + 578","amountPesos":1179000.0,"lengthMeters":17.0,"ratePesosPerMeter":69352.94117647059,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4155"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0154 + 247 - K0154 + 787","amountPesos":34880000.0,"lengthMeters":540.0,"ratePesosPerMeter":64592.59259259259,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4157"},{"year":2026,"category":"Roads","project":"Romulo H-way - K0153 + 1007 - K0153 + 1657","amountPesos":31942000.0,"lengthMeters":650.0,"ratePesosPerMeter":49141.53846153846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4159"},{"year":2026,"category":"Roads","project":"Romulo H-way Rd - K0163 + 257 - K0163 + 736","amountPesos":34880000.0,"lengthMeters":479.0,"ratePesosPerMeter":72818.37160751566,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4161"},{"year":2026,"category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0119 + 235 - K0119 + 930","amountPesos":40000000.0,"lengthMeters":695.0,"ratePesosPerMeter":57553.95683453237,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4164"},{"year":2026,"category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0040 + 916 - K0041 + 232, K0041 + 262 - K0042 + 118","amountPesos":31566000.0,"lengthMeters":1172.0,"ratePesosPerMeter":26933.44709897611,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4168"},{"year":2026,"category":"Roads","project":"Tanza Div Rd - K0033 + 000 - K0033 + 342","amountPesos":9270000.0,"lengthMeters":342.0,"ratePesosPerMeter":27105.263157894737,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4170"},{"year":2026,"category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0045 + 983 - K0046 + 486","amountPesos":35562000.0,"lengthMeters":503.0,"ratePesosPerMeter":70699.80119284295,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4173"},{"year":2026,"category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0046 + 486 - K0046 + 876","amountPesos":15184000.0,"lengthMeters":390.0,"ratePesosPerMeter":38933.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4175"},{"year":2026,"category":"Roads","project":"Manila-Cavite (NCR Bdry-Jct Cavite City Sect) - K0017 + 027 - K0017 + 479","amountPesos":33964000.0,"lengthMeters":452.0,"ratePesosPerMeter":75141.59292035399,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4177"},{"year":2026,"category":"Roads","project":"Biñan-Cavite Rd - K0035 + (-502) - K0035 + 000","amountPesos":30528000.0,"lengthMeters":502.0,"ratePesosPerMeter":60812.74900398406,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4180"},{"year":2026,"category":"Roads","project":"Calamba-Sta Cruz-Famy Jct Rd - K0068 + 814 - K0069 + 111","amountPesos":21018000.0,"lengthMeters":297.0,"ratePesosPerMeter":70767.67676767676,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4182"},{"year":2026,"category":"Roads","project":"Maspang H-way - K0072 + 205 - K0072 + 302, K0072 + 894 - K0073 + 000","amountPesos":17581000.0,"lengthMeters":203.0,"ratePesosPerMeter":86605.91133004926,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4185"},{"year":2026,"category":"Roads","project":"Sn Pablo-Calauan Rd - K0074 + 398 - K0075 + 437","amountPesos":25533000.0,"lengthMeters":1039.0,"ratePesosPerMeter":24574.59095283927,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4187"},{"year":2026,"category":"Roads","project":"Sn Pablo-Calauan Rd - K0081 + 094 - K0081 + 577","amountPesos":35963000.0,"lengthMeters":483.0,"ratePesosPerMeter":74457.5569358178,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4189"},{"year":2026,"category":"Roads","project":"Sumulong Highway - K0022 + 453 - K0022 + 773","amountPesos":11188000.0,"lengthMeters":320.0,"ratePesosPerMeter":34962.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4192"},{"year":2026,"category":"Roads","project":"Sumulong Highway - K0023 + 000 - K0023 + 960","amountPesos":31966000.0,"lengthMeters":960.0,"ratePesosPerMeter":33297.916666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4194"},{"year":2026,"category":"Roads","project":"Sumulong Highway - K0024 + 000 - K0024 + 939","amountPesos":33564000.0,"lengthMeters":939.0,"ratePesosPerMeter":35744.408945686904,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4196"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz Rd (New Route) - K0107 + 570 - K0108 + 637","amountPesos":43588000.0,"lengthMeters":1067.0,"ratePesosPerMeter":40850.984067478916,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4200"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz Road (New Route) - K0115 + 303 - K0115 + 459","amountPesos":6483000.0,"lengthMeters":156.0,"ratePesosPerMeter":41557.692307692305,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4202"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz Road (New Route) - K0116 + (-173) - K0116 + 100","amountPesos":9724000.0,"lengthMeters":273.0,"ratePesosPerMeter":35619.04761904762,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4204"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz (New Route) - K0036 + 440 - K0036 +625, K0043 + 745 - K0044 + 000, K0046 + 808 - K0046 + 1043, K0048 + 568 - K0048 + 785, K0049 + 794 - K0050 + 200","amountPesos":46304000.0,"lengthMeters":1298.0,"ratePesosPerMeter":35673.343605546994,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4207"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz (New Route) - K0059 +900 - K0060 + 099, K0062 + 466 - K0063 + 139","amountPesos":31764000.0,"lengthMeters":872.0,"ratePesosPerMeter":36426.605504587154,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4209"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz Rd (Old Route) - K0001 + (-927) - K0001 + (-590)","amountPesos":12153000.0,"lengthMeters":337.0,"ratePesosPerMeter":36062.31454005935,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4212"},{"year":2026,"category":"Roads","project":"Bacolod-Sn Carlos Rd - K0005 + 544 - K0006 + 000, K0006 + 000 - K0006 + 152, K0006 + 308 - K0007 + 000","amountPesos":37533000.0,"lengthMeters":1300.0,"ratePesosPerMeter":28871.53846153846,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4216"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0009 + 100 - K0009 + 520","amountPesos":16160000.0,"lengthMeters":420.0,"ratePesosPerMeter":38476.19047619047,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4219"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0024 + 057 - K0024 + 1064","amountPesos":47053000.0,"lengthMeters":1007.0,"ratePesosPerMeter":46725.91857000993,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4221"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0031 + 089 - K0031 + 458, K0032 + 018 - K0032 + 079","amountPesos":20822000.0,"lengthMeters":430.0,"ratePesosPerMeter":48423.25581395349,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4223"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0038 + 203 - K0038 + 401, K0051 + 862 - K0052 + 000","amountPesos":17773000.0,"lengthMeters":336.0,"ratePesosPerMeter":52895.833333333336,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4225"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0062 + 000 - K0062 + 206","amountPesos":9163000.0,"lengthMeters":206.0,"ratePesosPerMeter":44480.58252427184,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4227"},{"year":2026,"category":"Roads","project":"Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0016 + 708 - K0017 + 366","amountPesos":26474000.0,"lengthMeters":658.0,"ratePesosPerMeter":40234.04255319149,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4229"},{"year":2026,"category":"Roads","project":"Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0018 + 586 - K0018 + 771","amountPesos":9028000.0,"lengthMeters":185.0,"ratePesosPerMeter":48800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4231"},{"year":2026,"category":"Roads","project":"Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0020 + 264 - K0020 + 776","amountPesos":22080000.0,"lengthMeters":512.0,"ratePesosPerMeter":43125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4233"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0092 + (-532) - K0092 + 118","amountPesos":29036000.0,"lengthMeters":650.0,"ratePesosPerMeter":44670.769230769234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4236"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0115 + 648 - K0116 + 531","amountPesos":36300000.0,"lengthMeters":883.0,"ratePesosPerMeter":41109.85277463194,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4238"},{"year":2026,"category":"Roads","project":"Dumaguete South Rd - K0015 + 746 - K0016 + 369.99","amountPesos":28368000.0,"lengthMeters":623.99,"ratePesosPerMeter":45462.26702351001,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4241"},{"year":2026,"category":"Roads","project":"Dumaguete South Rd - K0017 + 974 - K0018 + 570.38","amountPesos":28368000.0,"lengthMeters":596.38,"ratePesosPerMeter":47566.98749119681,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4243"},{"year":2026,"category":"Roads","project":"Dumaguete South Rd - K0023 + 000 - K0023 + 628.38","amountPesos":28368000.0,"lengthMeters":628.38,"ratePesosPerMeter":45144.65769120589,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4245"},{"year":2026,"category":"Roads","project":"Dumaguete South Rd - K0094 + 500 - K0095 + 126.26","amountPesos":28368000.0,"lengthMeters":626.26,"ratePesosPerMeter":45297.48027975639,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4247"},{"year":2026,"category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0022 + 815 - K0022 + 934, K0024 + 978 - K0025 + 017, K0025 + 699 - K0025 + 945","amountPesos":20091000.0,"lengthMeters":404.0,"ratePesosPerMeter":49730.19801980198,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4251"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0915 + 550 - K0915 + 940","amountPesos":30945000.0,"lengthMeters":390.0,"ratePesosPerMeter":79346.15384615384,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4258"},{"year":2026,"category":"Roads","project":"Palo-Carigara-Ormoc Rd - K0940 + 407 - K0941 + 300","amountPesos":30291000.0,"lengthMeters":893.0,"ratePesosPerMeter":33920.49272116461,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4261"},{"year":2026,"category":"Roads","project":"Ormoc-Baybay-Southern Leyte Bdry Rd - K1034 + 082 - K1034 + 265, K1034 + 340 - K1034 + 806","amountPesos":44207000.0,"lengthMeters":649.0,"ratePesosPerMeter":68115.562403698,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4264"},{"year":2026,"category":"Roads","project":"Ormoc-Baybay-Southern Leyte Bdry Rd - K1035 + 045 - K1035 + 510, K1037 + 124 - K1037 + 246","amountPesos":33567000.0,"lengthMeters":587.0,"ratePesosPerMeter":57183.9863713799,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4266"},{"year":2026,"category":"Roads","project":"Palo-Carigara-Ormoc Rd - K0984 + (-753) - K0985 + 035","amountPesos":44207000.0,"lengthMeters":1788.0,"ratePesosPerMeter":24724.27293064877,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4268"},{"year":2026,"category":"Roads","project":"Palo-Carigara-Ormoc Rd - K0998 + 000 - K0998 + 507","amountPesos":26494000.0,"lengthMeters":507.0,"ratePesosPerMeter":52256.41025641026,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4270"},{"year":2026,"category":"Roads","project":"Palo-Carigara-Ormoc Rd - K1007 +000 - K1007 + 100, K1008 + 800 - K1008 + 099","amountPesos":29007000.0,"lengthMeters":801.0,"ratePesosPerMeter":36213.48314606742,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4272"},{"year":2026,"category":"Roads","project":"Dipolog-Oroquieta National Rd - K1839+123 - K1839+690","amountPesos":20580000.0,"lengthMeters":567.0,"ratePesosPerMeter":36296.2962962963,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4276"},{"year":2026,"category":"Roads","project":"Liloy-Ipil Rd - K1967 + 000 - K1967 + 400, K1972+688 - 1973+000,K1976 + 000 - K1976 + 953.39, K1986+897 - K1987+000","amountPesos":48513000.0,"lengthMeters":1768.39,"ratePesosPerMeter":27433.428146507733,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4279"},{"year":2026,"category":"Roads","project":"Liloy-Ipil Rd - K1972 + 000 - K1972+688","amountPesos":18977000.0,"lengthMeters":688.0,"ratePesosPerMeter":27582.8488372093,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4281"},{"year":2026,"category":"Roads","project":"Ipil-Liloy-Sindangan Rd - K2013 + 344 - K2013 + 568","amountPesos":22540000.0,"lengthMeters":224.0,"ratePesosPerMeter":100625.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4284"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1438 + (-118) - K1438 + 015, K1438 + 049 - K1438 + 210","amountPesos":7542000.0,"lengthMeters":294.0,"ratePesosPerMeter":25653.061224489797,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4288"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1445 + 575 - K1446 + 154, K1449 + 460 – K1449 + 630","amountPesos":41409000.0,"lengthMeters":749.0,"ratePesosPerMeter":55285.71428571428,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4290"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1462 + 286 – K1463 + 071","amountPesos":40941000.0,"lengthMeters":785.0,"ratePesosPerMeter":52154.140127388535,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4292"},{"year":2026,"category":"Roads","project":"Misamis Oriental-Ma Cristina Bdry Rd -  K1534 + 004 - K1534 + 234","amountPesos":9427000.0,"lengthMeters":230.0,"ratePesosPerMeter":40986.95652173913,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4295"},{"year":2026,"category":"Roads","project":"Misamis Oriental-Ma Cristina Bdry Rd - K1518 + 000 - K1518 + 555","amountPesos":5656000.0,"lengthMeters":555.0,"ratePesosPerMeter":10190.990990990991,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4297"},{"year":2026,"category":"Roads","project":"Linamon-Zamboanga Rd - K1607 + 000 - K1607 + 268","amountPesos":14140000.0,"lengthMeters":268.0,"ratePesosPerMeter":52761.19402985075,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4300"},{"year":2026,"category":"Roads","project":"Davao-Bukidnon Rd - K1686 + 000 - K1687 + 000","amountPesos":38290000.0,"lengthMeters":1000.0,"ratePesosPerMeter":38290.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4304"},{"year":2026,"category":"Roads","project":"Pres. Diosdado P.Macapagal Natl Hi-way - K1737 + 892 - K1738 + 400","amountPesos":35508000.0,"lengthMeters":508.0,"ratePesosPerMeter":69897.63779527559,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4307"},{"year":2026,"category":"Roads","project":"Pres. Diosdado P.Macapagal Natl Hi-way - K1738 + 400 - K1739 + 825","amountPesos":30000000.0,"lengthMeters":1425.0,"ratePesosPerMeter":21052.63157894737,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4309"},{"year":2026,"category":"Roads","project":"Pres. Diosdado P.Macapagal Natl Hi-way - K1738 + 825 - K1739 + 100","amountPesos":20000000.0,"lengthMeters":275.0,"ratePesosPerMeter":72727.27272727272,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4311"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1636 + 840 - K1637 + 706","amountPesos":32625000.0,"lengthMeters":866.0,"ratePesosPerMeter":37673.21016166282,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4315"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1649 + 670 - K1649 + 1000","amountPesos":25053000.0,"lengthMeters":330.0,"ratePesosPerMeter":75918.18181818182,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4317"},{"year":2026,"category":"Roads","project":"Kidapawan-Allah Junction Rd - K1659 + 327 - K1659 + 673","amountPesos":41331000.0,"lengthMeters":346.0,"ratePesosPerMeter":119453.75722543352,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4320"},{"year":2026,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1276 + 124 - K1276 + 953.38","amountPesos":38220000.0,"lengthMeters":829.38,"ratePesosPerMeter":46082.615929978,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4324"},{"year":2026,"category":"Roads","project":"Aurora Blvd - K0009 + (-789) - K0008 + 515","amountPesos":30072000.0,"lengthMeters":304.0,"ratePesosPerMeter":98921.05263157895,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4331"},{"year":2026,"category":"Roads","project":"C-3 Road - K0008 + (-320) - K0011 + 321","amountPesos":82265000.0,"lengthMeters":3641.0,"ratePesosPerMeter":22594.067563856082,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4333"},{"year":2026,"category":"Roads","project":"C-5 Road - K0015 + (-850) - K0015 + 084","amountPesos":39918000.0,"lengthMeters":934.0,"ratePesosPerMeter":42738.758029978584,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4335"},{"year":2026,"category":"Roads","project":"East Ave - K0011 + (-064) - K0012 + 890","amountPesos":35758000.0,"lengthMeters":1954.0,"ratePesosPerMeter":18299.897645854657,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4337"},{"year":2026,"category":"Roads","project":"J. Rizal Ave. (S02408LZ) K0005 + 077.50 - K0005 + 724.00, K0004 + 233.10 - K0003 + 165.80","amountPesos":44081000.0,"lengthMeters":1713.8,"ratePesosPerMeter":25721.20434123001,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4339"},{"year":2026,"category":"Roads","project":"JA Santos Ave - (S02299LZ) - K0004 + (-360.00) - K0004 + 754.00","amountPesos":50598000.0,"lengthMeters":1114.0,"ratePesosPerMeter":45420.107719928186,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4341"},{"year":2026,"category":"Roads","project":"Ortigas Ave - K0009 + (-439) - K0009 + 439, K0010 + 029 - K0010 + 286","amountPesos":33814000.0,"lengthMeters":1135.0,"ratePesosPerMeter":29792.070484581498,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4343"},{"year":2026,"category":"Roads","project":"Quezon Ave - K0007 + 373 - K0006 + 385","amountPesos":39029000.0,"lengthMeters":988.0,"ratePesosPerMeter":39503.03643724696,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4345"},{"year":2026,"category":"Roads","project":"Quirino Hi-way - K0016 + 550 - K0017 + 750","amountPesos":59597000.0,"lengthMeters":1200.0,"ratePesosPerMeter":49664.166666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4347"},{"year":2026,"category":"Roads","project":"R Magsaysay Blvd. - (S03032LZ) K0005 + (-288.30) - K0005 + (-038.40), K0005 + 384.30 - K0004 + 216","amountPesos":57716000.0,"lengthMeters":1168.3,"ratePesosPerMeter":49401.69477017888,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4349"},{"year":2026,"category":"Roads","project":"Regalado Ave (North) - K0024 + (-604.5) - K0024 + 000, K0025 + 000 - K0025 + 459","amountPesos":59597000.0,"lengthMeters":1063.5,"ratePesosPerMeter":56038.55195110484,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4351"},{"year":2026,"category":"Roads","project":"Zapote-Alabang Rd - K0023 + (-460) - K0023 + (-427), K0023 + (-117.80) - K0023 + 408","amountPesos":34078000.0,"lengthMeters":558.8,"ratePesosPerMeter":60984.25196850402,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4353"},{"year":2026,"category":"Roads","project":"Alaminos - Bolinao Rd- K0322+456 - K0345+000","amountPesos":97611000.0,"lengthMeters":22544.0,"ratePesosPerMeter":4329.799503193754,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4356"},{"year":2026,"category":"Roads","project":"Camiling - Wawa - Bayambang - Malasiqui - Sta. Barbara Rd, K0177+091 - K0178+053, K0178+500 - K0179+585","amountPesos":53598000.0,"lengthMeters":2047.0,"ratePesosPerMeter":26183.683439179284,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4358"},{"year":2026,"category":"Roads","project":"Carmen Jct. Manat Road, K0184+032 - K0184+666, K0187+000 - K0188+000","amountPesos":97611000.0,"lengthMeters":1634.0,"ratePesosPerMeter":59737.4541003672,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4360"},{"year":2026,"category":"Roads","project":"Pangasinan - Zambales Rd K0268+ (-815) - K0282+038","amountPesos":97611000.0,"lengthMeters":14853.0,"ratePesosPerMeter":6571.803676025045,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4362"},{"year":2026,"category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0518 + 000 - K0520 + 314","amountPesos":50960000.0,"lengthMeters":2314.0,"ratePesosPerMeter":22022.47191011236,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4365"},{"year":2026,"category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0523 + (-388) - K0525 + 000, K0526 + 000 - K0527 + 000","amountPesos":66640000.0,"lengthMeters":3388.0,"ratePesosPerMeter":19669.421487603307,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4367"},{"year":2026,"category":"Roads","project":"Jct. Ayaga (Abulug)-Ballesteros-Aparri Rd - K0682 + 345 - K0686 + 845","amountPesos":70062000.0,"lengthMeters":4500.0,"ratePesosPerMeter":15569.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4370"},{"year":2026,"category":"Roads","project":"Nueva Vizcaya-Benguet Rd - K0263 + 000 - K0265 + 677","amountPesos":65140000.0,"lengthMeters":2677.0,"ratePesosPerMeter":24333.208815838625,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4372"},{"year":2026,"category":"Roads","project":"Santiago Bypass Road, K0323 + (-381) - K0324 + 600, Santiago City, Isabela","amountPesos":93415000.0,"lengthMeters":1981.0,"ratePesosPerMeter":47155.47703180212,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4374"},{"year":2026,"category":"Roads","project":"Angeles-Porac-Floridablanca-Dinalupihan Rd - K0113 + 000 - K0114 + 000, K0115 + 000 - K0115 + 465","amountPesos":54739000.0,"lengthMeters":1465.0,"ratePesosPerMeter":37364.50511945393,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4377"},{"year":2026,"category":"Roads","project":"Nueva Ecija-Aurora Rd - K0117 + 000 - K0118 + 000","amountPesos":66697000.0,"lengthMeters":1000.0,"ratePesosPerMeter":66697.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4381"},{"year":2026,"category":"Roads","project":"Nueva Ecija-Aurora Rd - K0145 + (-664) - K0147 + 550","amountPesos":69760000.0,"lengthMeters":3214.0,"ratePesosPerMeter":21705.040448039825,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4383"},{"year":2026,"category":"Roads","project":"Nueva Ecija-Aurora Rd - K0147 + 550 - K0150 + 850","amountPesos":69760000.0,"lengthMeters":3300.0,"ratePesosPerMeter":21139.39393939394,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4385"},{"year":2026,"category":"Roads","project":"Nueva Ecija-Aurora Rd - K0150 + 850 - K0151 + 000, K0152 + 336 - K0154 + 145","amountPesos":45190000.0,"lengthMeters":1959.0,"ratePesosPerMeter":23067.891781521183,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4387"},{"year":2026,"category":"Roads","project":"Nueva Ecija-Aurora Rd - K0154 + 145 - K0154 + 729, K0154 + 741 - K0157 + 262.00","amountPesos":69760000.0,"lengthMeters":3105.0,"ratePesosPerMeter":22466.988727858294,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4389"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd - K0141 + 375 - K0141 + 984, K0141 + 998 - K0143 + 069","amountPesos":89231000.0,"lengthMeters":1680.0,"ratePesosPerMeter":53113.69047619047,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4391"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd -  K0137 + 512 - K0138 + 827","amountPesos":69760000.0,"lengthMeters":1315.0,"ratePesosPerMeter":53049.42965779467,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4393"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd -  K0144 + 000 -  K0145 + 315","amountPesos":69760000.0,"lengthMeters":1315.0,"ratePesosPerMeter":53049.42965779467,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4395"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd -  K0149 + 000 - K0149 + 650","amountPesos":34880000.0,"lengthMeters":650.0,"ratePesosPerMeter":53661.53846153846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4397"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd - K0145 + 800 - K0147 + 290","amountPesos":78898000.0,"lengthMeters":1490.0,"ratePesosPerMeter":52951.67785234899,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4399"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd - K0155 + (-107) - K0156 + 041, K0158 + 793 - K0161 + 000","amountPesos":98361000.0,"lengthMeters":3355.0,"ratePesosPerMeter":29317.734724292102,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4401"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd - K0158 + 286 - K0158 + 793, K0161 + 000 - K0162 + 515, K0169 + 927 - K0170 + 175","amountPesos":69760000.0,"lengthMeters":2270.0,"ratePesosPerMeter":30731.277533039647,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4403"},{"year":2026,"category":"Roads","project":"Paniqui-Camiling-Wawa Rd - K0159 + 904 - K0161 + 250","amountPesos":62784000.0,"lengthMeters":1346.0,"ratePesosPerMeter":46644.873699851414,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4405"},{"year":2026,"category":"Roads","project":"Plaridel Bypass Rd - (S06135LZ) Chainage 5873 - Chainage 9275","amountPesos":50366000.0,"lengthMeters":3402.0,"ratePesosPerMeter":14804.820693709582,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4407"},{"year":2026,"category":"Roads","project":"Roman Expressway - K0131+530 - K0132+000","amountPesos":48978000.0,"lengthMeters":470.0,"ratePesosPerMeter":104208.51063829787,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4409"},{"year":2026,"category":"Roads","project":"Roman Expressway - K0144 + 400 - K0144 + 750, K0150 + 731 - K0151 + 767","amountPesos":61378000.0,"lengthMeters":1386.0,"ratePesosPerMeter":44284.271284271286,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4411"},{"year":2026,"category":"Roads","project":"Alaminos -San Pablo City Bypass Rd - K0073 + 779 - K0074 + 068, K0074 + 161 - K0075 + 236","amountPesos":70673000.0,"lengthMeters":1364.0,"ratePesosPerMeter":51813.04985337243,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4414"},{"year":2026,"category":"Roads","project":"Banay-Banay-Mojon-Cuenca Rd - K0090 + 000 - K0090 + 961","amountPesos":75000000.0,"lengthMeters":961.0,"ratePesosPerMeter":78043.70447450572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4416"},{"year":2026,"category":"Roads","project":"Batangas-Quezon Rd - K0111 + 000 - K0112 + 079","amountPesos":63133000.0,"lengthMeters":1079.0,"ratePesosPerMeter":58510.658016682115,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4418"},{"year":2026,"category":"Roads","project":"Calamba-Sta. Cruz-Famy Jct Rd - K0085 + 000 - K0085 + 935","amountPesos":79915000.0,"lengthMeters":935.0,"ratePesosPerMeter":85470.58823529411,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4422"},{"year":2026,"category":"Roads","project":"Calamba-Sta. Cruz-Famy Jct Rd. - K0107 + 173 - K0107 + 579, K0107 + 588 - K0107 + 694, K0107 + 726 - K0107 + 906, K0108 + 640.47 - K0108 + 732","amountPesos":51945000.0,"lengthMeters":783.53,"ratePesosPerMeter":66296.12139930835,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4424"},{"year":2026,"category":"Roads","project":"Calamba-Sta. Cruz-Famy Jct Rd. K0106 + 054 - K0107 + 173","amountPesos":75919000.0,"lengthMeters":1119.0,"ratePesosPerMeter":67845.39767649687,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4426"},{"year":2026,"category":"Roads","project":"Cavite-Batangas Rd - K0031 + 908 - K0032 + 020, K0035 + 000 - K0035 + 922, K0036 + 014 - K0036 + 219, K0036 + 255 - K0036 + 900, K0050 + 000 - K0050 + 565","amountPesos":127864000.0,"lengthMeters":2449.0,"ratePesosPerMeter":52210.6982441813,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4428"},{"year":2026,"category":"Roads","project":"Cavite-Batangas Rd - K0052 + 618 - K0053 + 763","amountPesos":81998000.0,"lengthMeters":1145.0,"ratePesosPerMeter":71613.97379912664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4430"},{"year":2026,"category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0047 + 319 – K0048 + 452","amountPesos":71924000.0,"lengthMeters":1133.0,"ratePesosPerMeter":63481.02383053839,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4432"},{"year":2026,"category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0048 + 452 – K0049 + 440","amountPesos":71924000.0,"lengthMeters":988.0,"ratePesosPerMeter":72797.57085020244,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4434"},{"year":2026,"category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0049 + 440 – K0050 + 433, K0051 + 064 – K0051 + 602","amountPesos":71924000.0,"lengthMeters":1531.0,"ratePesosPerMeter":46978.445460483345,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4436"},{"year":2026,"category":"Roads","project":"Maragondon-Magallanes-Amuyong Rd - K0089 + 000 - K0090 + 108","amountPesos":46676000.0,"lengthMeters":1108.0,"ratePesosPerMeter":42126.35379061372,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4438"},{"year":2026,"category":"Roads","project":"Noveleta-Naic-Tagaytay Rd - K0067 + 000 – K0069 + 043","amountPesos":48109000.0,"lengthMeters":2043.0,"ratePesosPerMeter":23548.213411649533,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4440"},{"year":2026,"category":"Roads","project":"Quezon-Batangas Rd - K0104 + 480 - K0105 + 645","amountPesos":72747000.0,"lengthMeters":1165.0,"ratePesosPerMeter":62443.776824034336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4442"},{"year":2026,"category":"Roads","project":"Quezon-Batangas Rd - K0105 + 645 - K0106 + 284","amountPesos":41556000.0,"lengthMeters":639.0,"ratePesosPerMeter":65032.86384976526,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4444"},{"year":2026,"category":"Roads","project":"Rosario-Sn Juan Rd - K0131 + 324 - K0132 + 651","amountPesos":69526000.0,"lengthMeters":1327.0,"ratePesosPerMeter":52393.36850037679,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4446"},{"year":2026,"category":"Roads","project":"Sta Rosa-Ulat-Tagaytay Rd - K0041 + 000 - K0041 + 361, K0043 + 000 - K0043 + 241, K0043 + 361 - K0044 + 593","amountPesos":119873000.0,"lengthMeters":1834.0,"ratePesosPerMeter":65361.50490730644,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4448"},{"year":2026,"category":"Roads","project":"Sta Rosa-Ulat-Tagaytay Rd - K0067 + 721 - K0068 + 479, K0068 + 565 - K0068 + 741, K0069 + 797 - K0070 + 114","amountPesos":49547000.0,"lengthMeters":1251.0,"ratePesosPerMeter":39605.91526778577,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4450"},{"year":2026,"category":"Roads","project":"Tagaytay-Batangas via Tuy Rd. - K0067 + 000 - K0068 + 057","amountPesos":42914000.0,"lengthMeters":1057.0,"ratePesosPerMeter":40599.81078524125,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4452"},{"year":2026,"category":"Roads","project":"Tagaytay-Nasugbu Rd - K0079 + 670 - K0081 + 000","amountPesos":107885000.0,"lengthMeters":1330.0,"ratePesosPerMeter":81116.54135338347,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4454"},{"year":2026,"category":"Roads","project":"Tanauan-Talisay-Tagaytay Rd - K0070 + 629 - K0071 + 823","amountPesos":63253000.0,"lengthMeters":1194.0,"ratePesosPerMeter":52975.71189279732,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4456"},{"year":2026,"category":"Roads","project":"Tanauan-Talisay-Tagaytay Rd - K0080 + 771 - K0081 + 912","amountPesos":75000000.0,"lengthMeters":1141.0,"ratePesosPerMeter":65731.81419807186,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4458"},{"year":2026,"category":"Roads","project":"Tanza-Trece Martires City-Indang Rd - K0053 + 231 - K0053 + 800, K0053 + 966 - K0054 + 665, K0057 + 875 - K0058 + 000","amountPesos":53223000.0,"lengthMeters":1393.0,"ratePesosPerMeter":38207.46590093324,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4460"},{"year":2026,"category":"Roads","project":"Tayabas-Mainit-Mauban Rd - K0160 + 000 - K0163 + 522","amountPesos":47949000.0,"lengthMeters":3522.0,"ratePesosPerMeter":13614.139693356048,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4462"},{"year":2026,"category":"Roads","project":"Aramaywan-Berong-Pto Princesa Rd - K0073 + 000 - K0075 + 899","amountPesos":70799000.0,"lengthMeters":2899.0,"ratePesosPerMeter":24421.86961021042,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4465"},{"year":2026,"category":"Roads","project":"Aramaywan-Berong-Pto Princesa Rd - K0111 + 000 - K0115 + 840","amountPesos":132189000.0,"lengthMeters":4840.0,"ratePesosPerMeter":27311.77685950413,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4467"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0031 + 087 - K0031 + 614, K0032 + 124 - K0033 + 051","amountPesos":70234000.0,"lengthMeters":1454.0,"ratePesosPerMeter":48303.98899587345,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4469"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0058 + 260 - K0058 + 805","amountPesos":38731000.0,"lengthMeters":545.0,"ratePesosPerMeter":71066.05504587156,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4471"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0078 + 649 - K0079 + 238","amountPesos":42740000.0,"lengthMeters":589.0,"ratePesosPerMeter":72563.66723259763,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4473"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0125 + 014 - K0126 + 506","amountPesos":93297000.0,"lengthMeters":1492.0,"ratePesosPerMeter":62531.50134048257,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4475"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0031 + 614 - K0032 + 124","amountPesos":37148000.0,"lengthMeters":510.0,"ratePesosPerMeter":72839.2156862745,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4477"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0034 + 1030 - K0035 + 127","amountPesos":37148000.0,"lengthMeters":97.0,"ratePesosPerMeter":382969.07216494845,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4479"},{"year":2026,"category":"Roads","project":"Mindoro Oriental/Occidental East Coastal Rd - K0213 + 130 - K0215 + 285","amountPesos":59437000.0,"lengthMeters":2155.0,"ratePesosPerMeter":27580.974477958236,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4481"},{"year":2026,"category":"Roads","project":"Mindoro West Coastal Rd - K0357+000 - K0358+140","amountPesos":44578000.0,"lengthMeters":1140.0,"ratePesosPerMeter":39103.508771929824,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4483"},{"year":2026,"category":"Roads","project":"Mindoro West Coastal Rd - K0431+412 - K0433+000","amountPesos":59437000.0,"lengthMeters":1588.0,"ratePesosPerMeter":37428.84130982368,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4485"},{"year":2026,"category":"Roads","project":"Mindoro West Coastal Rd - K0443+000 - K0444+380","amountPesos":51265000.0,"lengthMeters":1380.0,"ratePesosPerMeter":37148.55072463768,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4487"},{"year":2026,"category":"Roads","project":"Mogpog - Balanacan Port Rd - K0009 + 084 - K0009 + 441, K0010 + 228 - K0010 + 749, K0010 + 765 - K0011 + 000","amountPesos":50000000.0,"lengthMeters":1113.0,"ratePesosPerMeter":44923.62982929021,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4489"},{"year":2026,"category":"Roads","project":"Palawan Circum. Rd - K0232 + 000 - K0234 + 476.90","amountPesos":62312000.0,"lengthMeters":2476.9,"ratePesosPerMeter":25157.25301788532,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4491"},{"year":2026,"category":"Roads","project":"Palawan Circum. Rd - K0239 + 278 -  K0241 + 545","amountPesos":54931000.0,"lengthMeters":2267.0,"ratePesosPerMeter":24230.701367445963,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4493"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0006 + 000 - K0007 + 000","amountPesos":49812000.0,"lengthMeters":1000.0,"ratePesosPerMeter":49812.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4495"},{"year":2026,"category":"Roads","project":"Puerto Princesa South Rd - K0004 + 115 - K0005 + 000","amountPesos":45693000.0,"lengthMeters":885.0,"ratePesosPerMeter":51630.50847457627,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4497"},{"year":2026,"category":"Roads","project":"Tablas Circumferential Rd - K0053 + 158 - K0053 + 980, K0054 + 827.95 - K0056 + 540","amountPesos":71659000.0,"lengthMeters":2534.05,"ratePesosPerMeter":28278.447544444633,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4499"},{"year":2026,"category":"Roads","project":"Baao-Iriga City-Nabua Rd - K0471 + 000 - K0472 + 000","amountPesos":53040000.0,"lengthMeters":1000.0,"ratePesosPerMeter":53040.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4502"},{"year":2026,"category":"Roads","project":"Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0540 + (-158) - K0540 + 662","amountPesos":46715000.0,"lengthMeters":820.0,"ratePesosPerMeter":56969.51219512195,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4504"},{"year":2026,"category":"Roads","project":"Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0542 + 100 - K0543 + 130","amountPesos":58514000.0,"lengthMeters":1030.0,"ratePesosPerMeter":56809.70873786408,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4506"},{"year":2026,"category":"Roads","project":"Lagonoy-Presentacion Rd - K0500 + 448 - K0505 + 073.6","amountPesos":81841000.0,"lengthMeters":4625.6,"ratePesosPerMeter":17693.0560359738,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4508"},{"year":2026,"category":"Roads","project":"Pili-Tigaon-Albay Bdry Rd - K0473 + (-924) - K0473 + 522","amountPesos":57664000.0,"lengthMeters":1446.0,"ratePesosPerMeter":39878.28492392808,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4510"},{"year":2026,"category":"Roads","project":"Aklan West Rd (Kalibo-Nabas) (S00324PN) - K0270 + 585 - K0272 + 196.67","amountPesos":50654000.0,"lengthMeters":1611.67,"ratePesosPerMeter":31429.51100411406,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4513"},{"year":2026,"category":"Roads","project":"Bantayan-Sn Pedro-Cubay Rd - K0097 + (-432) - K0098 + 122","amountPesos":58075000.0,"lengthMeters":1554.0,"ratePesosPerMeter":37371.299871299874,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4515"},{"year":2026,"category":"Roads","project":"Central Rd (Sn Miguel-Constancia-Cabano-Igcawayan) - K0055 + 603 - K0057 + 000","amountPesos":59606000.0,"lengthMeters":1397.0,"ratePesosPerMeter":42667.1438797423,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4517"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0169 + 000 - K0171 + 173","amountPesos":75938000.0,"lengthMeters":2173.0,"ratePesosPerMeter":34946.15738610216,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4519"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0251 + (-339) - K0251 + 179, K0253 + 000 - K0254 + 080.32","amountPesos":64475000.0,"lengthMeters":1598.32,"ratePesosPerMeter":40339.23119275222,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4521"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0279 + 359 - K0280 + 900","amountPesos":58528000.0,"lengthMeters":1541.0,"ratePesosPerMeter":37980.5321219987,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4523"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Estancia Wharf Rd - K0182 + 167 - K0183 + 502","amountPesos":56598000.0,"lengthMeters":1335.0,"ratePesosPerMeter":42395.50561797753,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4525"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz Rd (New Route) - K0120 + 198 - K0122 + 568","amountPesos":83347000.0,"lengthMeters":2370.0,"ratePesosPerMeter":35167.510548523205,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4527"},{"year":2026,"category":"Roads","project":"Bacolod Circumferential Rd - K0006 + 000 - K0007 + 000, K0007 + 442 - K0008 + 658, K0010 + 847 - K0011 + 520","amountPesos":58079000.0,"lengthMeters":2889.0,"ratePesosPerMeter":20103.49601938387,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4530"},{"year":2026,"category":"Roads","project":"Bayawan-Kabankalan Rd - K0117 + 1667 - K0121 + 400","amountPesos":62409000.0,"lengthMeters":2733.0,"ratePesosPerMeter":22835.345773874862,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4532"},{"year":2026,"category":"Roads","project":"Jct DS Benedicto-Spur 16-Calatrava Rd - K0054 + 131 - K0056 + 015, K0056 + 024 - K0057 + 172, K0057 + 184 - K0059 + 111","amountPesos":108383000.0,"lengthMeters":4959.0,"ratePesosPerMeter":21855.817705182497,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4534"},{"year":2026,"category":"Roads","project":"Sta Catalina-Pamplona-Tanjay City - K0045 + 455 - K0048 + 080","amountPesos":64773000.0,"lengthMeters":2625.0,"ratePesosPerMeter":24675.428571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4536"},{"year":2026,"category":"Roads","project":"Sta Catalina-Pamplona-Tanjay City - K0062 + (-083) - K0063 + 251","amountPesos":59723000.0,"lengthMeters":1334.0,"ratePesosPerMeter":44769.865067466264,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4538"},{"year":2026,"category":"Roads","project":"Vallehermoso-Canlaon City-La Castellana Rd - K0066 + 617 - K0069 + 000","amountPesos":56735000.0,"lengthMeters":2383.0,"ratePesosPerMeter":23808.224926563154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4540"},{"year":2026,"category":"Roads","project":"Vallehermoso-Canlaon City-La Castellana Rd - K0085 + 000 - K0087 + 242","amountPesos":53662000.0,"lengthMeters":2242.0,"ratePesosPerMeter":23934.879571810885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4542"},{"year":2026,"category":"Roads","project":"Vallehermoso-Canlaon City-La Castellana Rd - K0148 + (-992) - K0149 + 135.88","amountPesos":50350000.0,"lengthMeters":2127.88,"ratePesosPerMeter":23662.04861176377,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4544"},{"year":2026,"category":"Roads","project":"Vallehermoso-Canlaon City-La Castellana Rd - K0149 + 805 - K0150 + 000, K0150 + 778 - K0153 + 000, K0157 + 000 - K0157 + 378","amountPesos":65365000.0,"lengthMeters":2795.0,"ratePesosPerMeter":23386.404293381038,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4546"},{"year":2026,"category":"Roads","project":"Vallehermoso-Canlaon City-La Castellana Rd - K0166 + 513 - K0168 + 539","amountPesos":48461000.0,"lengthMeters":2026.0,"ratePesosPerMeter":23919.545903257655,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4548"},{"year":2026,"category":"Roads","project":"Antonio y De Pio H-way - K0109 + 579 - K0111 + 005","amountPesos":109544000.0,"lengthMeters":1426.0,"ratePesosPerMeter":76819.07433380085,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4551"},{"year":2026,"category":"Roads","project":"Carcar-Barili Rd - K0053 + 000 - K0057 + 068.29","amountPesos":124262000.0,"lengthMeters":4068.29,"ratePesosPerMeter":30544.03692952075,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4553"},{"year":2026,"category":"Roads","project":"Cebu North Hagnaya Wharf Rd - K0103 + 338 - K0105 + 000","amountPesos":127258000.0,"lengthMeters":1662.0,"ratePesosPerMeter":76569.19374247894,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4555"},{"year":2026,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0010 + 726 - K0011 + 274, K0011 + 405 - K0013 + 515","amountPesos":121618000.0,"lengthMeters":2658.0,"ratePesosPerMeter":45755.45522949586,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4557"},{"year":2026,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0020 + 000 - K0021 + 634","amountPesos":55521000.0,"lengthMeters":1634.0,"ratePesosPerMeter":33978.580171358626,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4559"},{"year":2026,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0038 + 350 - K0040 + 000","amountPesos":79316000.0,"lengthMeters":1650.0,"ratePesosPerMeter":48070.30303030303,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4561"},{"year":2026,"category":"Roads","project":"Cebu-Toledo Wharf Rd (Jct Naga-Uling) - K0032 + 000 - K0035 + 080","amountPesos":81079000.0,"lengthMeters":3080.0,"ratePesosPerMeter":26324.35064935065,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4563"},{"year":2026,"category":"Roads","project":"Mayor Demetrio M. Cortes Ave - K0011 + 140 -K0011 + 390","amountPesos":9959000.0,"lengthMeters":250.0,"ratePesosPerMeter":39836.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4567"},{"year":2026,"category":"Roads","project":"Santander-Barili-Toledo Rd - K0156 + 263 - K0156 + 398, K0156 + 436 - K0157 + 900","amountPesos":69622000.0,"lengthMeters":1599.0,"ratePesosPerMeter":43540.96310193871,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4569"},{"year":2026,"category":"Roads","project":"Santander-Barili-Toledo Rd - K0184 + 355 - K0186 + 382","amountPesos":92095000.0,"lengthMeters":2027.0,"ratePesosPerMeter":45434.139121854954,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4571"},{"year":2026,"category":"Roads","project":"Toledo-Tabuelan-Sn Remigio Rd - K0106 + 469 - K0108 + 474","amountPesos":117916000.0,"lengthMeters":2005.0,"ratePesosPerMeter":58810.97256857855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4573"},{"year":2026,"category":"Roads","project":"Jct Himay-angan-Silago-Abuyog Bdry Rd - K1057 + 946 - K1060 + 000","amountPesos":56490000.0,"lengthMeters":2054.0,"ratePesosPerMeter":27502.434274586172,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4576"},{"year":2026,"category":"Roads","project":"Jct. Taft-Oras-San Policarpo-Arteche Rd - (S00167SM) K0891 + 083 - K0896 + 880","amountPesos":88415000.0,"lengthMeters":5797.0,"ratePesosPerMeter":15251.85440745213,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4578"},{"year":2026,"category":"Roads","project":"Lemon-Leyte Biliran Rd-K0981+558-K0982+606,K0984+645-K0985+907","amountPesos":66311000.0,"lengthMeters":2310.0,"ratePesosPerMeter":28706.060606060608,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4580"},{"year":2026,"category":"Roads","project":"Palompon-Isabel-Merida-Ormoc Rd - K1101 + 133 - K1103 + 159","amountPesos":103615000.0,"lengthMeters":2026.0,"ratePesosPerMeter":51142.64560710761,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4582"},{"year":2026,"category":"Roads","project":"Wright - Taft - Borongan rd, (Asphalt Overlay), (S00173SM), k0899+708 - k0904+375","amountPesos":87531000.0,"lengthMeters":4667.0,"ratePesosPerMeter":18755.303192629097,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4584"},{"year":2026,"category":"Roads","project":"Lutiman-Guicam-Olutanga Rd (S01217MN) – K1764 + 000 - K1766 + 000, Zamboanga Sibugay","amountPesos":68600000.0,"lengthMeters":2000.0,"ratePesosPerMeter":34300.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4587"},{"year":2026,"category":"Roads","project":"Siocon-Sirawai-Sibuco-Limpapa Rd (S01151MN), K2111 + 000 - K2112 + 909, K2115 + 000 - K2116 + 000","amountPesos":54170000.0,"lengthMeters":2909.0,"ratePesosPerMeter":18621.519422481953,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4589"},{"year":2026,"category":"Roads","project":"Siocon-Sirawai-Sibuco-Limpapa Rd (S01151MN), K2112 + 926 - K2114 + 785","amountPesos":34599000.0,"lengthMeters":1859.0,"ratePesosPerMeter":18611.61915008069,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4591"},{"year":2026,"category":"Roads","project":"Siocon-Sirawai-Sibuco-Limpapa Rd (S01151MN), K2143 + 790 -  K2145 + 000,  K2145 + 000 - K2146 + 459","amountPesos":49711000.0,"lengthMeters":2669.0,"ratePesosPerMeter":18625.327838141628,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4593"},{"year":2026,"category":"Roads","project":"Zamboanga City Bypass Road - (S01215MN) Chainage 000 - Chainage 1388","amountPesos":52136000.0,"lengthMeters":1388.0,"ratePesosPerMeter":37561.959654178674,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4595"},{"year":2026,"category":"Roads","project":"Zamboanga West Coastal Road (Sibuco - Limpapa Section) (S01152MN), K2147 + 418 - K2148 + 947","amountPesos":28474000.0,"lengthMeters":1529.0,"ratePesosPerMeter":18622.62916939176,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4597"},{"year":2026,"category":"Roads","project":"Oroquieta City-Calamba Mt Rd - K1745 + (-456) - K1744 + 919","amountPesos":50827000.0,"lengthMeters":375.0,"ratePesosPerMeter":135538.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4600"},{"year":2026,"category":"Roads","project":"Valencia City Bypass Road - (S01254MN) Chainage 000 - Chainage 6221","amountPesos":146605000.0,"lengthMeters":6221.0,"ratePesosPerMeter":23566.146921716765,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4602"},{"year":2026,"category":"Roads","project":"Digos Div Rd - K1563 + 438 - K1564 + 100","amountPesos":75000000.0,"lengthMeters":662.0,"ratePesosPerMeter":113293.05135951661,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4605"},{"year":2026,"category":"Roads","project":"Davao-Cotabato By-Pass Road - K1549 + (-810) - K1549 + 245, K1550 + 286 - K1550 + 633","amountPesos":50000000.0,"lengthMeters":1402.0,"ratePesosPerMeter":35663.33808844508,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4607"},{"year":2026,"category":"Roads","project":"Nabunturan-Mainit Park Rd - K1425 + (-110) - K1427 + 245","amountPesos":75000000.0,"lengthMeters":2355.0,"ratePesosPerMeter":31847.133757961783,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4609"},{"year":2026,"category":"Roads","project":"Nabunturan-Mainit Park Rd - K1427 + 245 - K1429 + 719","amountPesos":75000000.0,"lengthMeters":2474.0,"ratePesosPerMeter":30315.278900565885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4611"},{"year":2026,"category":"Roads","project":"Tagum City Diversion Rd - K1455 + (-893) - K1455 + (-573), K1455 + 113 -K1455 +797","amountPesos":95259000.0,"lengthMeters":1004.0,"ratePesosPerMeter":94879.48207171315,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4613"},{"year":2026,"category":"Roads","project":"Awang-Upi-Lebak Rd - K1850 + 000 - K1855 + 000","amountPesos":75278000.0,"lengthMeters":5000.0,"ratePesosPerMeter":15055.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4616"},{"year":2026,"category":"Roads","project":"Filipino-American Friendship Ave. - K1666 + 399 - K1667 + 650","amountPesos":82661000.0,"lengthMeters":1251.0,"ratePesosPerMeter":66075.93924860112,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4618"},{"year":2026,"category":"Roads","project":"Isulan Jct-Ninoy Aquino Rd - K1785 + (-755) - K1785 +897","amountPesos":125645000.0,"lengthMeters":1652.0,"ratePesosPerMeter":76056.29539951574,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4620"},{"year":2026,"category":"Roads","project":"Isulan Jct-Ninoy Aquino Rd - K1783 + 596 - K1784 + 250","amountPesos":49183000.0,"lengthMeters":654.0,"ratePesosPerMeter":75203.36391437308,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4622"},{"year":2026,"category":"Roads","project":"Makar-Kiamba Rd - K1665 + 366 - K1665 + 743.70","amountPesos":43085000.0,"lengthMeters":377.7,"ratePesosPerMeter":114072.014826596,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4624"},{"year":2026,"category":"Roads","project":"Makar-Kiamba Rd - K1669 + 000 - K1669 + 725","amountPesos":51481000.0,"lengthMeters":725.0,"ratePesosPerMeter":71008.27586206897,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4626"},{"year":2026,"category":"Roads","project":"Midsayap-Marbel Rd - K1784 + 000 - K1784 + 962","amountPesos":57645000.0,"lengthMeters":962.0,"ratePesosPerMeter":59922.03742203742,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4628"},{"year":2026,"category":"Roads","project":"Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1628 + 026 - K1629 + 200","amountPesos":82661000.0,"lengthMeters":1174.0,"ratePesosPerMeter":70409.71039182282,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4630"},{"year":2026,"category":"Roads","project":"Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1636 + 551 - K1636 + 870, K1636 + 870 - K1637 + 000","amountPesos":128125000.0,"lengthMeters":449.0,"ratePesosPerMeter":285356.34743875277,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4632"},{"year":2026,"category":"Roads","project":"Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1637 + 000 - K1638 + 230","amountPesos":82661000.0,"lengthMeters":1230.0,"ratePesosPerMeter":67204.06504065041,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4634"},{"year":2026,"category":"Roads","project":"Sarangani-Sultan Kudarat Coastal Rd - K1772 + 827 - K1774 + 931","amountPesos":42846000.0,"lengthMeters":2104.0,"ratePesosPerMeter":20364.06844106464,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4636"},{"year":2026,"category":"Roads","project":"Dapa-Jct Cancohoy Rd - K0001 + (-1019) - K0001 + 479.05","amountPesos":59309000.0,"lengthMeters":1498.05,"ratePesosPerMeter":39590.801375120995,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4639"},{"year":2026,"category":"Roads","project":"PPTA Rd - K0029 + (-238) - K0029 + (-078)","amountPesos":3750000.0,"lengthMeters":160.0,"ratePesosPerMeter":23437.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4642"},{"year":2026,"category":"Roads","project":"PPTA Rd - K0029 + 152.5 - K0029 + 237","amountPesos":1593000.0,"lengthMeters":84.5,"ratePesosPerMeter":18852.07100591716,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4644"},{"year":2026,"category":"Roads","project":"Zapote-Alabang Rd - K0023 + (-615) - K0023 + (-460)","amountPesos":8813000.0,"lengthMeters":155.0,"ratePesosPerMeter":56858.06451612903,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4646"},{"year":2026,"category":"Roads","project":"Ortigas Ave - K0009 + 439 - K0010 + 029","amountPesos":8958000.0,"lengthMeters":590.0,"ratePesosPerMeter":15183.050847457627,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4649"},{"year":2026,"category":"Roads","project":"Ortigas Ave - K0011 + 950 - K0011 + 1203","amountPesos":7335000.0,"lengthMeters":253.0,"ratePesosPerMeter":28992.09486166008,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4651"},{"year":2026,"category":"Roads","project":"Pasig Blvd - (S04528LZ) Chainage 000 - Chainage 320","amountPesos":8939000.0,"lengthMeters":320.0,"ratePesosPerMeter":27934.375,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4653"},{"year":2026,"category":"Roads","project":"Pasig Blvd - K0013 + (-586) - K0014 + 019","amountPesos":17879000.0,"lengthMeters":1605.0,"ratePesosPerMeter":11139.56386292835,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4655"},{"year":2026,"category":"Roads","project":"PPTA Rd - K0024 + 105 - K0025 + 267","amountPesos":20859000.0,"lengthMeters":1162.0,"ratePesosPerMeter":17950.94664371773,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4657"},{"year":2026,"category":"Roads","project":"Sn Joaquin-Buting Rd - K0018 + (-765) - K0018 + 335","amountPesos":29798000.0,"lengthMeters":1100.0,"ratePesosPerMeter":27089.090909090908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4659"},{"year":2026,"category":"Roads","project":"Gil Puyat Ave - K0005 + 309 - K0005 + 518","amountPesos":2871000.0,"lengthMeters":209.0,"ratePesosPerMeter":13736.842105263158,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4662"},{"year":2026,"category":"Roads","project":"Gil Puyat Ave - K0006 + 454 - K0006 + 480, K0005 + 100 - K0005 + 250","amountPesos":3337000.0,"lengthMeters":176.0,"ratePesosPerMeter":18960.227272727272,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4664"},{"year":2026,"category":"Roads","project":"NAIA Rd (MIA Road) - (S03316LZ) Chainage 000 - Chainage 488","amountPesos":25618000.0,"lengthMeters":488.0,"ratePesosPerMeter":52495.901639344265,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4666"},{"year":2026,"category":"Roads","project":"Blumentritt St. (S02551LZ) - K0006 + (-670) - K0006 + (-029)","amountPesos":27937000.0,"lengthMeters":641.0,"ratePesosPerMeter":43583.46333853354,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4669"},{"year":2026,"category":"Roads","project":"P Sanchez St - (S02538LZ) Chainage 000 - Chainage 398","amountPesos":18773000.0,"lengthMeters":398.0,"ratePesosPerMeter":47168.34170854271,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4671"},{"year":2026,"category":"Roads","project":"Elliptical Rd - (S05670LZ) Chainage 000 - Chainage 520","amountPesos":12615000.0,"lengthMeters":520.0,"ratePesosPerMeter":24259.615384615383,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4674"},{"year":2026,"category":"Roads","project":"Elliptical Rd - (S05670LZ) Chainage 528 - Chainage 615, Chainage 664.50 - Chainage 734, Chainage 752.20 - Chainage 826, Chainage 871 - Chainage 973","amountPesos":7115000.0,"lengthMeters":332.3,"ratePesosPerMeter":21411.375263316284,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4676"},{"year":2026,"category":"Roads","project":"Luzon Avenue - (S05627LZ) Chainage 009 - Chainage 252","amountPesos":2380000.0,"lengthMeters":243.0,"ratePesosPerMeter":9794.238683127573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4678"},{"year":2026,"category":"Roads","project":"Quirino Hi-way - K0018 + 000 - K0018 + 800","amountPesos":29798000.0,"lengthMeters":800.0,"ratePesosPerMeter":37247.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4680"},{"year":2026,"category":"Roads","project":"Quirino Hi-way - K0021 + 410 - K0022 + 630","amountPesos":29798000.0,"lengthMeters":1220.0,"ratePesosPerMeter":24424.590163934427,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4682"},{"year":2026,"category":"Roads","project":"Quirino Hi-way - K0023 + 000 - K0023 + 464","amountPesos":29798000.0,"lengthMeters":464.0,"ratePesosPerMeter":64219.8275862069,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4684"},{"year":2026,"category":"Roads","project":"Sgt. Rivera (S05145LZ) - K0012 + 020 - K0012 + 195","amountPesos":11919000.0,"lengthMeters":175.0,"ratePesosPerMeter":68108.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4686"},{"year":2026,"category":"Roads","project":"Sgt. Rivera (S05162LZ) – K0012 + (-222) – K0012 + (-142), K0012 + 700 – K0013 + 140","amountPesos":23839000.0,"lengthMeters":520.0,"ratePesosPerMeter":45844.230769230766,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4688"},{"year":2026,"category":"Roads","project":"C-5 Road - K0015 + 084 - K0015 + 743","amountPesos":28606000.0,"lengthMeters":659.0,"ratePesosPerMeter":43408.194233687405,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4691"},{"year":2026,"category":"Roads","project":"P. Quirino Ave (S02859LZ) K0007 + 279 - K0007 + 458","amountPesos":5960000.0,"lengthMeters":179.0,"ratePesosPerMeter":33296.08938547486,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4694"},{"year":2026,"category":"Roads","project":"P Burgos Street - K0001 + (-555) - K0001 + (-414)","amountPesos":7922000.0,"lengthMeters":141.0,"ratePesosPerMeter":56184.397163120564,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4696"},{"year":2026,"category":"Roads","project":"P. Quirino Ave. (S02859LZ) K0006 + 000 - K0006 + 140","amountPesos":5960000.0,"lengthMeters":140.0,"ratePesosPerMeter":42571.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4698"},{"year":2026,"category":"Roads","project":"Laoag-Airport Rd - K0489 + 143 - K0489 + 315.83","amountPesos":1974000.0,"lengthMeters":172.83,"ratePesosPerMeter":11421.628189549348,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4702"},{"year":2026,"category":"Roads","project":"Laoag-Airport Rd - K0490 + 657 - K0491 + 685","amountPesos":12201000.0,"lengthMeters":1028.0,"ratePesosPerMeter":11868.677042801557,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4704"},{"year":2026,"category":"Roads","project":"Laoag-Balacad Rd - K0484 + 328 - K0484 + 819","amountPesos":15325000.0,"lengthMeters":491.0,"ratePesosPerMeter":31211.81262729124,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4706"},{"year":2026,"category":"Roads","project":"Pias-Currimao-Balacad Rd, K0463 + 500 - K0465 + 000, K0471 + 000 - K0471 + 317","amountPesos":27005000.0,"lengthMeters":1817.0,"ratePesosPerMeter":14862.410566868464,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4709"},{"year":2026,"category":"Roads","project":"Salomague Port Rd - K0433 + (-490) - K0434 + 422.50, K0434 + 433.50 - K0434 + 755","amountPesos":45584000.0,"lengthMeters":2234.0,"ratePesosPerMeter":20404.65532676813,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4712"},{"year":2026,"category":"Roads","project":"Tagudin-Cervantes Rd - K0326 + 227 - K0327 + 180","amountPesos":14173000.0,"lengthMeters":953.0,"ratePesosPerMeter":14871.983210912907,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4715"},{"year":2026,"category":"Roads","project":"Tagudin-Cervantes Rd - K0329 + 699 - K0331 + 643, K0346 + 007 - K0347 + 013, K0347 + 401 - K0347 + 668","amountPesos":14781000.0,"lengthMeters":3217.0,"ratePesosPerMeter":4594.653403792353,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4717"},{"year":2026,"category":"Roads","project":"Carmen Jct-Manat Rd - K0173 + 702 - K0174 + 747, K0175 + 000 - K0175 + 858, K0180 + 354 - K0180 + 473","amountPesos":36284000.0,"lengthMeters":2022.0,"ratePesosPerMeter":17944.609297725026,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4720"},{"year":2026,"category":"Roads","project":"Camiling-Wawa-Bayambang-Malasiqui-Sta Barbara Rd - K0192 + 190 - K0192 + 327, K0200 + 003 - K0200 + 659","amountPesos":24522000.0,"lengthMeters":793.0,"ratePesosPerMeter":30923.076923076922,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4723"},{"year":2026,"category":"Roads","project":"Carmen Jct - Bayambang - Manat Road, K0190+(-467) - K0190+167","amountPesos":19825000.0,"lengthMeters":634.0,"ratePesosPerMeter":31269.716088328074,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4725"},{"year":2026,"category":"Roads","project":"Carmen Jct - Bayambang - Manat Road, K0191+(-819) - K0191+819","amountPesos":44501000.0,"lengthMeters":1638.0,"ratePesosPerMeter":27167.88766788767,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4727"},{"year":2026,"category":"Roads","project":"Carmen Jct-Bayambang-Manat Rd - K0210 + 045 - K0211 + 271, K0212 + 446 - K0212 + 930","amountPesos":37091000.0,"lengthMeters":1710.0,"ratePesosPerMeter":21690.643274853803,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4729"},{"year":2026,"category":"Roads","project":"Carmen Jct-Bayambang-Manat Rd - K0212 + 930 - K0213 + 285, (S05988LZ) Chainage 000 - Chainage 289, K0193 + 149 - K0193 + 791","amountPesos":36506000.0,"lengthMeters":1286.0,"ratePesosPerMeter":28387.247278382583,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4731"},{"year":2026,"category":"Roads","project":"Sn Carlos-Calasiao Rd - K0210 + 080 - K0210 + 620, K0212 + 468 - K0212 + 600, K0212 + 694 - K0213 + 017","amountPesos":27264000.0,"lengthMeters":995.0,"ratePesosPerMeter":27401.00502512563,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4733"},{"year":2026,"category":"Roads","project":"Sta Barbara Old Rd - K0199 + (-100) - K0199 + 570","amountPesos":20986000.0,"lengthMeters":670.0,"ratePesosPerMeter":31322.388059701494,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4735"},{"year":2026,"category":"Roads","project":"Villasis-Malasiqui-Sn Carlos Rd - K0184 + 618 - K0185 + 102, K0190 + 514 - K0191 + 022","amountPesos":17963000.0,"lengthMeters":992.0,"ratePesosPerMeter":18107.862903225807,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4737"},{"year":2026,"category":"Roads","project":"Villasis-Malasiqui-Sn Carlos Rd - K0185 + 102 - K0186 + 607","amountPesos":30873000.0,"lengthMeters":1505.0,"ratePesosPerMeter":20513.621262458473,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4739"},{"year":2026,"category":"Roads","project":"Villasis-Malasiqui-Sn Carlos Rd,  K0189+120 - K0190+514","amountPesos":22119000.0,"lengthMeters":1394.0,"ratePesosPerMeter":15867.288378766141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4741"},{"year":2026,"category":"Roads","project":"Villasis-Malasiqui-Sn Carlos Rd, K0194+041 - K0195+587, K0198+608 - K0199+040","amountPesos":31655000.0,"lengthMeters":1978.0,"ratePesosPerMeter":16003.538928210313,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4743"},{"year":2026,"category":"Roads","project":"Abra-Kalinga Rd - K0444 + 061 - K0444 + 110, K0447 + 909 - K0448 + 030, K0451 + 746 - K0452 + 1600.79","amountPesos":14619000.0,"lengthMeters":2024.79,"ratePesosPerMeter":7220.00800082979,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4747"},{"year":2026,"category":"Roads","project":"Baguio-Bontoc Rd - K0337 + 544 - K0337 + 576, K0337 + 659 - K0337 + 720, K0337 + 810 - K0337 + 842","amountPesos":4900000.0,"lengthMeters":125.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4750"},{"year":2026,"category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0477 + 735 - K0479 + 768","amountPesos":45080000.0,"lengthMeters":2033.0,"ratePesosPerMeter":22174.126906050173,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4753"},{"year":2026,"category":"Roads","project":"Jct. Ayaga (Abulug)-Ballesteros-Aparri Rd - K0670 + 279 - K0670 + 943","amountPesos":2423000.0,"lengthMeters":664.0,"ratePesosPerMeter":3649.0963855421687,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4757"},{"year":2026,"category":"Roads","project":"Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0332 + 651 - K0333 + 648","amountPesos":32228000.0,"lengthMeters":997.0,"ratePesosPerMeter":32324.974924774324,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4760"},{"year":2026,"category":"Roads","project":"Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0336 + 050 - K0337 + 445","amountPesos":44839000.0,"lengthMeters":1395.0,"ratePesosPerMeter":32142.652329749104,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4762"},{"year":2026,"category":"Roads","project":"Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0342 + 050 - K0342 + 976","amountPesos":26810000.0,"lengthMeters":926.0,"ratePesosPerMeter":28952.483801295897,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4764"},{"year":2026,"category":"Roads","project":"Cordon-Aurora Bdry Rd (Jct Dumabato - Aurora Bdry) - K0371 + (-693) - K0371 + 077","amountPesos":26623000.0,"lengthMeters":770.0,"ratePesosPerMeter":34575.32467532468,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4766"},{"year":2026,"category":"Roads","project":"Baler-Casiguran Rd (Baler-Dinadiawan) - K0285 + 000 - K0285 + 674, K0286 + 000 - K0286 + 308","amountPesos":31300000.0,"lengthMeters":982.0,"ratePesosPerMeter":31873.727087576375,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4770"},{"year":2026,"category":"Roads","project":"Baler-Casiguran Rd (Dinadiawan-Casiguran Sect) - K0301 + 645 - K0302 + 000, K0303 + 558 - K0303 + 890","amountPesos":22980000.0,"lengthMeters":687.0,"ratePesosPerMeter":33449.781659388645,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4772"},{"year":2026,"category":"Roads","project":"Gov JJ Linao Rd - K0135 + 566 - K0136 + 000","amountPesos":27723000.0,"lengthMeters":434.0,"ratePesosPerMeter":63877.8801843318,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4775"},{"year":2026,"category":"Roads","project":"Gov JJ Linao Rd - K0136+000 - K0136+450","amountPesos":28462000.0,"lengthMeters":450.0,"ratePesosPerMeter":63248.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4777"},{"year":2026,"category":"Roads","project":"Gov JJ Linao Rd - K0136+485 - K0137+009","amountPesos":23537000.0,"lengthMeters":524.0,"ratePesosPerMeter":44917.93893129771,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4779"},{"year":2026,"category":"Roads","project":"Roman Expressway - K0119+951 - K0120+000","amountPesos":6093000.0,"lengthMeters":49.0,"ratePesosPerMeter":124346.9387755102,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4781"},{"year":2026,"category":"Roads","project":"Roman Expressway - K0129 + 883 - K0130 + 000, K0136 + 659 - K0136 + 670","amountPesos":12954000.0,"lengthMeters":128.0,"ratePesosPerMeter":101203.125,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4783"},{"year":2026,"category":"Roads","project":"Roman Expressway - K0132+185 - K0132+365","amountPesos":12304000.0,"lengthMeters":180.0,"ratePesosPerMeter":68355.55555555556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4785"},{"year":2026,"category":"Roads","project":"Roman Expressway - K0138+476 - K0138+789","amountPesos":20788000.0,"lengthMeters":313.0,"ratePesosPerMeter":66415.33546325879,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4787"},{"year":2026,"category":"Roads","project":"Roman Expressway - K0142+000 - K0142+324","amountPesos":21521000.0,"lengthMeters":324.0,"ratePesosPerMeter":66422.83950617284,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4789"},{"year":2026,"category":"Roads","project":"Tabacan Poblacion Rd - K0102 + (-686) - K0102 + 349, K0102 + 930 - K0103 + 124","amountPesos":18012000.0,"lengthMeters":1229.0,"ratePesosPerMeter":14655.817737998374,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4792"},{"year":2026,"category":"Roads","project":"Plaridel Bypass Rd - (S06135LZ) Chainage 1119 - Chainage 2875","amountPesos":17698000.0,"lengthMeters":1756.0,"ratePesosPerMeter":10078.58769931663,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4795"},{"year":2026,"category":"Roads","project":"Plaridel Bypass Rd - (S06135LZ) Chainage 3875 - Chainage 5873","amountPesos":9885000.0,"lengthMeters":1998.0,"ratePesosPerMeter":4947.447447447447,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4797"},{"year":2026,"category":"Roads","project":"San Jose City-Rizal Rd via Pinili-Porais-Villa Joson (Palarilla) Rd - K0170 + 000 - K0171 + 000, K0171 + 000 - K0171 + 169","amountPesos":33887000.0,"lengthMeters":1169.0,"ratePesosPerMeter":28988.02395209581,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4800"},{"year":2026,"category":"Roads","project":"Bongabon-Rizal-Aurora Rd - K0145 + 1094 - K0146 + 258, K0146 + 818 - K0146 + 1330, K0146 + 1369 - K0147 + 004, K0147 + 078 - K0147 + 137","amountPesos":18311000.0,"lengthMeters":715.0,"ratePesosPerMeter":25609.79020979021,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4803"},{"year":2026,"category":"Roads","project":"Nueva Ecija-Aurora Rd - K0123 + 000 - K0124 + 061, K0126 + 115 - K0126 + 165, K0126 + 171 - K0126 + 222, K0126 + 278.70 - K0126 + 498","amountPesos":20334000.0,"lengthMeters":1381.3,"ratePesosPerMeter":14720.915079997074,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4805"},{"year":2026,"category":"Roads","project":"Nueva Ecija-Aurora Rd - K0165 + 000 - K0165 + 432","amountPesos":8720000.0,"lengthMeters":432.0,"ratePesosPerMeter":20185.185185185186,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4807"},{"year":2026,"category":"Roads","project":"Lubao Bypass Rd - K0091 + 548.02 - K0092 + 000","amountPesos":23679000.0,"lengthMeters":451.98,"ratePesosPerMeter":52389.486260454476,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4810"},{"year":2026,"category":"Roads","project":"Concepcion-Capas Rd - K0119 + 120 - K0119 + 743","amountPesos":27904000.0,"lengthMeters":623.0,"ratePesosPerMeter":44789.72712680578,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4813"},{"year":2026,"category":"Roads","project":"Paniqui-Camiling-Wawa Rd - K0166 + 425 - K0166 + 460","amountPesos":1969000.0,"lengthMeters":35.0,"ratePesosPerMeter":56257.142857142855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4816"},{"year":2026,"category":"Roads","project":"Paniqui-Camiling-Wawa Rd - K0166 + 460 - K0167 + 131","amountPesos":34880000.0,"lengthMeters":671.0,"ratePesosPerMeter":51982.11624441133,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4818"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd - K0246 + 950 - K0248 + 492","amountPesos":31392000.0,"lengthMeters":1542.0,"ratePesosPerMeter":20357.9766536965,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4821"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd - K0169 + 000 - K0169 + 330, K0172 + 013 - K0173 + 314","amountPesos":27904000.0,"lengthMeters":1631.0,"ratePesosPerMeter":17108.522378908645,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4823"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd - K0169 + 375 - K0169 + 537, K0174 + 292 - K0174 + 491","amountPesos":6976000.0,"lengthMeters":361.0,"ratePesosPerMeter":19324.09972299169,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4825"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd - K0244 + 684 - K0245 + 358","amountPesos":27822000.0,"lengthMeters":674.0,"ratePesosPerMeter":41278.93175074184,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4827"},{"year":2026,"category":"Roads","project":"Palico-Balayan-Batangas Rd - K0123 + 100 - K0123 + 350, K0123 + 525 - K0124 + 200","amountPesos":57539000.0,"lengthMeters":925.0,"ratePesosPerMeter":62204.32432432433,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4831"},{"year":2026,"category":"Roads","project":"Palico-Balayan-Batangas Rd - K0149 + 160 - K0149 + 435","amountPesos":18524000.0,"lengthMeters":275.0,"ratePesosPerMeter":67360.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4834"},{"year":2026,"category":"Roads","project":"Lobo-Malabrigo-Sn Juan Rd - K0158 + 975 - K0159 + 668, K0160 + 000 - K0160 + 070","amountPesos":23975000.0,"lengthMeters":763.0,"ratePesosPerMeter":31422.018348623853,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4836"},{"year":2026,"category":"Roads","project":"Tanauan-Talisay-Tagaytay Rd - K0082 + 682 - K0083 + 597","amountPesos":30368000.0,"lengthMeters":915.0,"ratePesosPerMeter":33189.071038251364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4839"},{"year":2026,"category":"Roads","project":"Rosario-Sn Juan Rd - K0136 + 300 - K0137 + 510","amountPesos":39958000.0,"lengthMeters":1210.0,"ratePesosPerMeter":33023.14049586777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4842"},{"year":2026,"category":"Roads","project":"Labanan sa Binakayan Div Rd - K0021 + 857 - K0022 + 400","amountPesos":13550000.0,"lengthMeters":543.0,"ratePesosPerMeter":24953.959484346226,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4845"},{"year":2026,"category":"Roads","project":"Noveleta-Naic-Tagaytay Rd - K0039 + 814 - K0041 + 000, K0042 + 338 - K0042 + 545","amountPesos":35163000.0,"lengthMeters":1393.0,"ratePesosPerMeter":25242.64178033022,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4847"},{"year":2026,"category":"Roads","project":"Tanza-Trece Martires City-Indang Rd - K0049 + 000 - K0050 + 000, K0050 + 870 -K0051 + 607","amountPesos":38879000.0,"lengthMeters":1737.0,"ratePesosPerMeter":22382.843983880255,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4849"},{"year":2026,"category":"Roads","project":"Isaac O. Tolentino Ave. - K0057 + (-762) - K0057 + (-537)","amountPesos":11000000.0,"lengthMeters":225.0,"ratePesosPerMeter":48888.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4852"},{"year":2026,"category":"Roads","project":"Isaac O. Tolentino Ave. - K0057 + 1051 - K0058 + 689","amountPesos":32965000.0,"lengthMeters":638.0,"ratePesosPerMeter":51669.27899686521,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4854"},{"year":2026,"category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0055 + 000 - K0055 + 578","amountPesos":24598000.0,"lengthMeters":578.0,"ratePesosPerMeter":42557.09342560553,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4856"},{"year":2026,"category":"Roads","project":"Mahogany Ave - K0059 + (-890) - K0059 + (-706)","amountPesos":9944000.0,"lengthMeters":184.0,"ratePesosPerMeter":54043.47826086957,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4858"},{"year":2026,"category":"Roads","project":"Noveleta-Naic-Tagaytay Rd - K0043 + (-460) - K0043 + 013","amountPesos":23175000.0,"lengthMeters":473.0,"ratePesosPerMeter":48995.771670190275,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4860"},{"year":2026,"category":"Roads","project":"Tagaytay-Cavite via Mendez Rd - K0062 + 113 - K0062 + 732","amountPesos":30368000.0,"lengthMeters":619.0,"ratePesosPerMeter":49059.77382875606,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4862"},{"year":2026,"category":"Roads","project":"Ternate-Nasugbu Rd - K0068 + (-997) - K0068 + (-129)","amountPesos":22296000.0,"lengthMeters":868.0,"ratePesosPerMeter":25686.63594470046,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4864"},{"year":2026,"category":"Roads","project":"Carmona Div Rd - K0047 + 628 - K0047 + 803","amountPesos":12786000.0,"lengthMeters":175.0,"ratePesosPerMeter":73062.85714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4867"},{"year":2026,"category":"Roads","project":"Cavite-Batangas Rd - K0050 + 000 - K0050 + 634","amountPesos":54342000.0,"lengthMeters":634.0,"ratePesosPerMeter":85712.93375394322,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4869"},{"year":2026,"category":"Roads","project":"Sta Rosa-Ulat-Tagaytay Rd - (S01903LZ) Chainage 000 - Chainage 582","amountPesos":15184000.0,"lengthMeters":582.0,"ratePesosPerMeter":26089.3470790378,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4871"},{"year":2026,"category":"Roads","project":"Calamba-Sta Cruz-Famy Jct Rd - K0102 + 283 - K0102 + 585","amountPesos":15745000.0,"lengthMeters":302.0,"ratePesosPerMeter":52135.76158940397,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4874"},{"year":2026,"category":"Roads","project":"Calamba-Sta Cruz-Famy Jct Rd - K0107 + 915 - K0108 + 640.47","amountPesos":35013000.0,"lengthMeters":725.47,"ratePesosPerMeter":48262.505685969016,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4876"},{"year":2026,"category":"Roads","project":"Pagsanjan-Lucban Rd - K0095 + 400 - K0095 + 911","amountPesos":27970000.0,"lengthMeters":511.0,"ratePesosPerMeter":54735.81213307241,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4878"},{"year":2026,"category":"Roads","project":"Pagsanjan-Lucban Rd - K0106 + 720 - K0106 + 941","amountPesos":9622000.0,"lengthMeters":221.0,"ratePesosPerMeter":43538.46153846154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4880"},{"year":2026,"category":"Roads","project":"Pagsanjan-Lucban Rd - K0108 + 534 - K0109 + 097","amountPesos":15007000.0,"lengthMeters":563.0,"ratePesosPerMeter":26655.417406749555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4882"},{"year":2026,"category":"Roads","project":"Lipa City - Alaminos Rd - K0076 + (-337) - K0076 + (-011)","amountPesos":17581000.0,"lengthMeters":326.0,"ratePesosPerMeter":53929.447852760735,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4885"},{"year":2026,"category":"Roads","project":"Famy-Real-Infanta-Dinahican Port Rd - K0126 + 902 - K0127 + 987","amountPesos":23975000.0,"lengthMeters":1085.0,"ratePesosPerMeter":22096.774193548386,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4888"},{"year":2026,"category":"Roads","project":"Abuyon-Buenavista Rd - K0253 + 000 - K0253 + 089, K0253 + 105 - K0253 + 481.94","amountPesos":11987000.0,"lengthMeters":465.94,"ratePesosPerMeter":25726.48838906284,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4891"},{"year":2026,"category":"Roads","project":"Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0220 + 000 - K0220 + 621.25","amountPesos":15983000.0,"lengthMeters":621.25,"ratePesosPerMeter":25727.162977867203,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4893"},{"year":2026,"category":"Roads","project":"Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0290 + 306 - K0290 + 483, K0291 + 000 - K0291 + 288.95","amountPesos":11987000.0,"lengthMeters":465.95,"ratePesosPerMeter":25725.936259254642,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4895"},{"year":2026,"category":"Roads","project":"Mulanay-Sn Francisco Rd - K0280 + 120 - K0280 + 758","amountPesos":19979000.0,"lengthMeters":638.0,"ratePesosPerMeter":31315.047021943574,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4897"},{"year":2026,"category":"Roads","project":"Mulanay-Sn Francisco Rd - K0281 + 718 - K0282 + 000, K0286 + 000 - K0286 + 352.25","amountPesos":15983000.0,"lengthMeters":634.25,"ratePesosPerMeter":25199.842333464723,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4899"},{"year":2026,"category":"Roads","project":"Manila East Rd - K0019 + 825 - K0020 + 368","amountPesos":8791000.0,"lengthMeters":543.0,"ratePesosPerMeter":16189.686924493555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4902"},{"year":2026,"category":"Roads","project":"Manila East Rd - K0030 + 100 - K0030 + 555","amountPesos":15184000.0,"lengthMeters":455.0,"ratePesosPerMeter":33371.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4904"},{"year":2026,"category":"Roads","project":"Manila East Rd - K0033 + 1070 - K0034 + 321","amountPesos":10628000.0,"lengthMeters":251.0,"ratePesosPerMeter":42342.629482071716,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4906"},{"year":2026,"category":"Roads","project":"Calapan North Rd - K0029 + 720 - K0030 + 200, K0030 + 256 - K0030 + 619","amountPesos":28982000.0,"lengthMeters":843.0,"ratePesosPerMeter":34379.596678529066,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4910"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0034 + 965 - K0034 + 1030","amountPesos":5123000.0,"lengthMeters":65.0,"ratePesosPerMeter":78815.38461538461,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4914"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0084 + (-357) - K0084+818","amountPesos":36684000.0,"lengthMeters":1175.0,"ratePesosPerMeter":31220.425531914894,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4917"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0092+576 - K0092+854","amountPesos":9439000.0,"lengthMeters":278.0,"ratePesosPerMeter":33953.23741007194,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4919"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0094+738 - K0095+014","amountPesos":9480000.0,"lengthMeters":276.0,"ratePesosPerMeter":34347.82608695652,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4921"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0114 + 403 - K0114 + 684","amountPesos":9480000.0,"lengthMeters":281.0,"ratePesosPerMeter":33736.65480427046,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4923"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0118 + 693 - K0118 + 966","amountPesos":9235000.0,"lengthMeters":273.0,"ratePesosPerMeter":33827.83882783883,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4925"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0193 + 510 - K0193 + 753","amountPesos":8622000.0,"lengthMeters":243.0,"ratePesosPerMeter":35481.48148148148,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4927"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0219 + 271 - K0219 + 501","amountPesos":9399000.0,"lengthMeters":230.0,"ratePesosPerMeter":40865.217391304344,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4929"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0235 + 542 - K0235 + 774","amountPesos":9480000.0,"lengthMeters":232.0,"ratePesosPerMeter":40862.06896551724,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4931"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0241 + 594 - K0241 + 825","amountPesos":9439000.0,"lengthMeters":231.0,"ratePesosPerMeter":40861.47186147186,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4933"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0250 + 543 - K0250 + 773","amountPesos":10253000.0,"lengthMeters":230.0,"ratePesosPerMeter":44578.260869565216,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4935"},{"year":2026,"category":"Roads","project":"Roxas Diversion Rd - K0134+264 - K0134+607","amountPesos":11977000.0,"lengthMeters":343.0,"ratePesosPerMeter":34918.36734693877,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4937"},{"year":2026,"category":"Roads","project":"Puerto Princesa South Rd - K0136 + 327 - K0136 + 640","amountPesos":7198000.0,"lengthMeters":313.0,"ratePesosPerMeter":22996.805111821086,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4940"},{"year":2026,"category":"Roads","project":"Aramaywan-Berong-Pto Princesa Rd - K0069 + 1034 - K0071 + 505","amountPesos":36480000.0,"lengthMeters":1471.0,"ratePesosPerMeter":24799.456152277362,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4943"},{"year":2026,"category":"Roads","project":"Aramaywan-Berong-Pto Princesa Rd - K0080 + 000 - K0080 + 867","amountPesos":21701000.0,"lengthMeters":867.0,"ratePesosPerMeter":25029.988465974624,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4945"},{"year":2026,"category":"Roads","project":"Puerto Princesa South Rd - K0016 + 856 - K0017 + 398","amountPesos":27178000.0,"lengthMeters":542.0,"ratePesosPerMeter":50143.91143911439,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4947"},{"year":2026,"category":"Roads","project":"Tablas Circumferential Rd - K0095 + 260 - K0096 + 207","amountPesos":30574000.0,"lengthMeters":947.0,"ratePesosPerMeter":32285.110876451952,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4950"},{"year":2026,"category":"Roads","project":"Bongabong-Sagana-Roxas-Sn Aquilino Rd - K0105 + 682 - K0105 + 772","amountPesos":3276000.0,"lengthMeters":90.0,"ratePesosPerMeter":36400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4953"},{"year":2026,"category":"Roads","project":"Bongabong-Sagana-Roxas-Sn Aquilino Rd - K0111 + 736 - K0112 + 075","amountPesos":24829000.0,"lengthMeters":339.0,"ratePesosPerMeter":73241.88790560472,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4955"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0087 + 374 - K0087 + 801","amountPesos":29234000.0,"lengthMeters":427.0,"ratePesosPerMeter":68463.70023419203,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4957"},{"year":2026,"category":"Roads","project":"Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0541 + 000 - K0541 + 585","amountPesos":39060000.0,"lengthMeters":585.0,"ratePesosPerMeter":66769.23076923077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4961"},{"year":2026,"category":"Roads","project":"Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0558 + 000 - K0558 + 700","amountPesos":31620000.0,"lengthMeters":700.0,"ratePesosPerMeter":45171.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4963"},{"year":2026,"category":"Roads","project":"Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0558 + 700 - K0559 + 000","amountPesos":14462000.0,"lengthMeters":300.0,"ratePesosPerMeter":48206.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4965"},{"year":2026,"category":"Roads","project":"Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0559 + 922 - K0560 + 000","amountPesos":4836000.0,"lengthMeters":78.0,"ratePesosPerMeter":62000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4967"},{"year":2026,"category":"Roads","project":"Legazpi City - Punta de Jesus Rd - K0546+631 - K0547+000","amountPesos":11160000.0,"lengthMeters":369.0,"ratePesosPerMeter":30243.90243902439,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4970"},{"year":2026,"category":"Roads","project":"Legazpi City - Punta de Jesus Rd - K0555+399 - K0556+000","amountPesos":8556000.0,"lengthMeters":601.0,"ratePesosPerMeter":14236.272878535774,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4972"},{"year":2026,"category":"Roads","project":"Legazpi City - Punta de Jesus Rd - K0571+226- K0572+861","amountPesos":28458000.0,"lengthMeters":1635.0,"ratePesosPerMeter":17405.504587155963,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4974"},{"year":2026,"category":"Roads","project":"Talobatib-Jose Panganiban Pob-Port Rd - K0335 + 318 - K0336 + 1019","amountPesos":46500000.0,"lengthMeters":1701.0,"ratePesosPerMeter":27336.860670194004,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4977"},{"year":2026,"category":"Roads","project":"Baao-Iriga City-Nabua Rd - K0466 + 000 - K0466 + 693, K0467 + 363 - K0467 + 555","amountPesos":44181000.0,"lengthMeters":885.0,"ratePesosPerMeter":49922.03389830508,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4980"},{"year":2026,"category":"Roads","project":"Baao-Iriga City-Nabua Rd - K0469 + 610 - K0469 + 881","amountPesos":12722000.0,"lengthMeters":271.0,"ratePesosPerMeter":46944.64944649446,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4982"},{"year":2026,"category":"Roads","project":"Baao-Iriga City-Nabua Rd - K0476 + 625 - K0477 + 105","amountPesos":6340000.0,"lengthMeters":480.0,"ratePesosPerMeter":13208.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4984"},{"year":2026,"category":"Roads","project":"Iriga City-Masoli Rd - K0476 + 604 - K0476 + 860","amountPesos":14245000.0,"lengthMeters":256.0,"ratePesosPerMeter":55644.53125,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4986"},{"year":2026,"category":"Roads","project":"Iriga City-Masoli Rd - K0479 + 767 - K0479 + 920","amountPesos":4430000.0,"lengthMeters":153.0,"ratePesosPerMeter":28954.24836601307,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4988"},{"year":2026,"category":"Roads","project":"Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd - K0482 + 488 - K0482 + 785","amountPesos":9383000.0,"lengthMeters":297.0,"ratePesosPerMeter":31592.59259259259,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4990"},{"year":2026,"category":"Roads","project":"Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd - K0482 + 785 - K0484 + 150","amountPesos":35577000.0,"lengthMeters":1365.0,"ratePesosPerMeter":26063.736263736264,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4992"},{"year":2026,"category":"Roads","project":"Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd - K0487 + 387 - K0488 + 936","amountPesos":34255000.0,"lengthMeters":1549.0,"ratePesosPerMeter":22114.26726920594,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4994"},{"year":2026,"category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0000 + 480 - K0001 + 272","amountPesos":33462000.0,"lengthMeters":792.0,"ratePesosPerMeter":42250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 4997"},{"year":2026,"category":"Roads","project":"Bulan Seaport Rd - (S03772LZ) Chainage 186 - Chainage 350","amountPesos":4271000.0,"lengthMeters":164.0,"ratePesosPerMeter":26042.682926829268,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5000"},{"year":2026,"category":"Roads","project":"Gate-Bulan Airport Rd - K0630 + 525 - K0631 + 000, K0643 + 772 - K0644 + 194","amountPesos":22264000.0,"lengthMeters":897.0,"ratePesosPerMeter":24820.51282051282,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5002"},{"year":2026,"category":"Roads","project":"Iloilo- Antique Rd. - K0096 + 208 - K0096 + 640","amountPesos":16855000.0,"lengthMeters":432.0,"ratePesosPerMeter":39016.2037037037,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5006"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0116 + (-270) - K0116 + 100","amountPesos":9446000.0,"lengthMeters":370.0,"ratePesosPerMeter":25529.72972972973,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5009"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0118 + 350 - K0119 + 210","amountPesos":34182000.0,"lengthMeters":860.0,"ratePesosPerMeter":39746.51162790698,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5011"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0122 + 025 - K0122 + 258, K0122 + 736 - K0122 + 798, K0123 + 811 - K0124 + 250","amountPesos":25815000.0,"lengthMeters":734.0,"ratePesosPerMeter":35170.29972752043,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5013"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0145 + 000 - K0145 + 488.41","amountPesos":19901000.0,"lengthMeters":488.41,"ratePesosPerMeter":40746.50396183505,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5015"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0147 + 000 - K0147 + 689","amountPesos":26429000.0,"lengthMeters":689.0,"ratePesosPerMeter":38358.49056603773,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5017"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0149 + 551 - K0150 + 274","amountPesos":27782000.0,"lengthMeters":723.0,"ratePesosPerMeter":38426.00276625173,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5019"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0150 + 274 - K0151 + 350","amountPesos":37701000.0,"lengthMeters":1076.0,"ratePesosPerMeter":35038.104089219334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5021"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz Rd (New Route) - K0118 + 100 - K0119 + 184","amountPesos":36700000.0,"lengthMeters":1084.0,"ratePesosPerMeter":33856.08856088561,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5023"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz Rd (New Route) - K0120 + (-635) - K0120 + 198","amountPesos":31903000.0,"lengthMeters":833.0,"ratePesosPerMeter":38298.91956782713,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5025"},{"year":2026,"category":"Roads","project":"Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0107 + 205 - K0108 + 040.33","amountPesos":33311000.0,"lengthMeters":835.33,"ratePesosPerMeter":39877.653143069125,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5027"},{"year":2026,"category":"Roads","project":"Jct Natl Rd Cuartero-Tapulang-Maayon Rd - K0098 + 800 - K0100 + 103","amountPesos":25949000.0,"lengthMeters":1303.0,"ratePesosPerMeter":19914.81197237145,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5030"},{"year":2026,"category":"Roads","project":"Jct Natl Rd Cuartero-Tapulang-Maayon Rd - K0104 + 000 - K0106 + 550","amountPesos":42976000.0,"lengthMeters":2550.0,"ratePesosPerMeter":16853.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5032"},{"year":2026,"category":"Roads","project":"Guimaras Circumferential Rd - K0095 + 004 - K0095 + 264, K0000 + 137 - K0000 + 391","amountPesos":21528000.0,"lengthMeters":514.0,"ratePesosPerMeter":41883.268482490275,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5035"},{"year":2026,"category":"Roads","project":"Barotac Nuevo-Dumangas-Dacutan Wharf Rd - K0274 + (-1004) - K00274 + (-008)","amountPesos":38895000.0,"lengthMeters":996.0,"ratePesosPerMeter":39051.20481927711,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5038"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0268 + 500 - K0269 + 400","amountPesos":35191000.0,"lengthMeters":900.0,"ratePesosPerMeter":39101.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5040"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0271 + 000 - K0271 + 661","amountPesos":25930000.0,"lengthMeters":661.0,"ratePesosPerMeter":39228.44175491679,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5042"},{"year":2026,"category":"Roads","project":"Passi-Calinog Rd - K0054 + 000 - K0054 + 1780","amountPesos":7655000.0,"lengthMeters":1780.0,"ratePesosPerMeter":4300.561797752809,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5044"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0212 + 753 - K0213 + 554","amountPesos":30374000.0,"lengthMeters":801.0,"ratePesosPerMeter":37920.099875156055,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5049"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0237 + 083 - K0237 + 509","amountPesos":16886000.0,"lengthMeters":426.0,"ratePesosPerMeter":39638.49765258216,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5051"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0238 + 120 - K0238 + 560","amountPesos":16118000.0,"lengthMeters":440.0,"ratePesosPerMeter":36631.818181818184,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5053"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0245 + 444 - K0246 + 480","amountPesos":32313000.0,"lengthMeters":1036.0,"ratePesosPerMeter":31190.15444015444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5055"},{"year":2026,"category":"Roads","project":"Passi-Sn Rafael-Lemery-Sara Rd - K0069 + (-345) - K0069 + 603","amountPesos":36580000.0,"lengthMeters":948.0,"ratePesosPerMeter":38586.49789029536,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5057"},{"year":2026,"category":"Roads","project":"Passi-Sn Rafael-Lemery-Sara Rd - K0083 + 550 - K0084 + 000","amountPesos":18825000.0,"lengthMeters":450.0,"ratePesosPerMeter":41833.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5059"},{"year":2026,"category":"Roads","project":"Passi-Sn Rafael-Lemery-Sara Rd - K0087 + 515 - K0087 + 983","amountPesos":18203000.0,"lengthMeters":468.0,"ratePesosPerMeter":38895.29914529915,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5061"},{"year":2026,"category":"Roads","project":"Sen. Benigno S. Aquino, Jr. Ave - (S00563PN) K0015 + 518 - K0015 + 572","amountPesos":1482000.0,"lengthMeters":54.0,"ratePesosPerMeter":27444.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5064"},{"year":2026,"category":"Roads","project":"Cabatuan Bypass Rd - (S00565PN) Chainage 003 - Chainage 700","amountPesos":29283000.0,"lengthMeters":697.0,"ratePesosPerMeter":42012.912482066,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5067"},{"year":2026,"category":"Roads","project":"Iloilo-Antique Rd - K0005 + 008 - K0006 + 239","amountPesos":40120000.0,"lengthMeters":1231.0,"ratePesosPerMeter":32591.389114541023,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5070"},{"year":2026,"category":"Roads","project":"JM Basa-Gen Hughes Port-Sn Pedro Rd - (S00068PN) Chainage 000 - Chainage 284, Chainage 307 - Chainage 532","amountPesos":11070000.0,"lengthMeters":509.0,"ratePesosPerMeter":21748.52652259332,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5072"},{"year":2026,"category":"Roads","project":"Sto Niño-Banago Rd (South) - K0001 + (-417) - K0001 + 388","amountPesos":16221000.0,"lengthMeters":805.0,"ratePesosPerMeter":20150.31055900621,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5076"},{"year":2026,"category":"Roads","project":"Vito Port Rd - K0092 + 000 - K0093 + 021","amountPesos":46485000.0,"lengthMeters":1021.0,"ratePesosPerMeter":45528.89324191969,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5079"},{"year":2026,"category":"Roads","project":"Binalbagan-Isabela Rd - K0066 + 525 - K0067 + 191, K0070 + 296 - K0071 + 000","amountPesos":26034000.0,"lengthMeters":1370.0,"ratePesosPerMeter":19002.919708029196,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5082"},{"year":2026,"category":"Roads","project":"Isabela-Libas Negros Occ. Bdry Rd - K0078 + 837 - K0079 + 953","amountPesos":31394000.0,"lengthMeters":1116.0,"ratePesosPerMeter":28130.824372759856,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5084"},{"year":2026,"category":"Roads","project":"Isabela-Libas Negros Occ. Bdry Rd - K0079 + 953 - K0080 + 674","amountPesos":17021000.0,"lengthMeters":721.0,"ratePesosPerMeter":23607.48959778086,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5086"},{"year":2026,"category":"Roads","project":"Jct Bagonawa-La Castellana-Isabela Rd - K0058 + 908 - K0059 + 630","amountPesos":20803000.0,"lengthMeters":722.0,"ratePesosPerMeter":28813.019390581718,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5088"},{"year":2026,"category":"Roads","project":"Jct Bagonawa-La Castellana-Isabela Rd - K0060 + 231 - K0061 + 782.74","amountPesos":44821000.0,"lengthMeters":1551.74,"ratePesosPerMeter":28884.349182208396,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5090"},{"year":2026,"category":"Roads","project":"Jct Bagonawa-La Castellana-Isabela Rd - K0070 + 378 - K0071 + 000","amountPesos":14184000.0,"lengthMeters":622.0,"ratePesosPerMeter":22803.85852090032,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5092"},{"year":2026,"category":"Roads","project":"Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0128 + 000 - K0129 + 000","amountPesos":27099000.0,"lengthMeters":1000.0,"ratePesosPerMeter":27099.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5095"},{"year":2026,"category":"Roads","project":"Don Jorge Araneta-Ayungon-Yungue-Gurrea-La Carlota City Rd - K0037 + 537 - K0038 + 637","amountPesos":21938000.0,"lengthMeters":1100.0,"ratePesosPerMeter":19943.636363636364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5098"},{"year":2026,"category":"Roads","project":"Jct Bagonawa-La Castellana-Isabela Rd - K0040 + 137 - K0040 + 762","amountPesos":21749000.0,"lengthMeters":625.0,"ratePesosPerMeter":34798.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5100"},{"year":2026,"category":"Roads","project":"Jct Bagonawa-La Castellana-Isabela Rd - K0043 + 247 - K0044 + 050","amountPesos":22344000.0,"lengthMeters":803.0,"ratePesosPerMeter":27825.65379825654,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5102"},{"year":2026,"category":"Roads","project":"Jct Pulupandan-Pulupandan Pier Rd - K0028 + 147 - K0028 + 770","amountPesos":15129000.0,"lengthMeters":623.0,"ratePesosPerMeter":24284.109149277687,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5104"},{"year":2026,"category":"Roads","project":"Guihulngan-Baloc-Isabela Rd - K0119 + 000 - K0119 + 499, K0121 + 000 - K0121 + 917, K0147 + 862 - K0148 + 000","amountPesos":36642000.0,"lengthMeters":1554.0,"ratePesosPerMeter":23579.15057915058,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5107"},{"year":2026,"category":"Roads","project":"Dumaguete Airport Rd - K0001 + 380 - K0002 + 340","amountPesos":24426000.0,"lengthMeters":960.0,"ratePesosPerMeter":25443.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5110"},{"year":2026,"category":"Roads","project":"Sta Catalina-Pamplona-Tanjay City - K0038 + 940 - K0039 + 490, K0042 + 961 - K0043 + 770","amountPesos":32022000.0,"lengthMeters":1359.0,"ratePesosPerMeter":23562.91390728477,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5112"},{"year":2026,"category":"Roads","project":"Dumaguete South Rd - K0110 + 320 - K0111 + 133","amountPesos":36878000.0,"lengthMeters":813.0,"ratePesosPerMeter":45360.39360393604,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5115"},{"year":2026,"category":"Roads","project":"Siquijor Circumferential Rd - K0000 + 000 - K0001 + 000","amountPesos":42515000.0,"lengthMeters":1000.0,"ratePesosPerMeter":42515.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5118"},{"year":2026,"category":"Roads","project":"Siquijor Circumferential Rd - K0001 + 000 - K0002 + 000","amountPesos":36301000.0,"lengthMeters":1000.0,"ratePesosPerMeter":36301.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5120"},{"year":2026,"category":"Roads","project":"Siquijor Circumferential Rd - K0002 + 000 - K0002 + 826","amountPesos":26921000.0,"lengthMeters":826.0,"ratePesosPerMeter":32592.009685230023,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5122"},{"year":2026,"category":"Roads","project":"Siquijor Circumferential Rd - K0032 + 027 - K0032 + 327","amountPesos":9238000.0,"lengthMeters":300.0,"ratePesosPerMeter":30793.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5124"},{"year":2026,"category":"Roads","project":"Siquijor Circumferential Rd - K0040 + 266 - K0041 + 000","amountPesos":23290000.0,"lengthMeters":734.0,"ratePesosPerMeter":31730.24523160763,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5126"},{"year":2026,"category":"Roads","project":"Siquijor Circumferential Rd - K0041 + 000 - K0042 + 000","amountPesos":31157000.0,"lengthMeters":1000.0,"ratePesosPerMeter":31157.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5128"},{"year":2026,"category":"Roads","project":"Siquijor Circumferential Rd - K0042 + 337 - K0043 + 000","amountPesos":20803000.0,"lengthMeters":663.0,"ratePesosPerMeter":31377.07390648567,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5130"},{"year":2026,"category":"Roads","project":"Siquijor Circumferential Rd - K0043 + 000 - K0043 + 626","amountPesos":19857000.0,"lengthMeters":626.0,"ratePesosPerMeter":31720.44728434505,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5132"},{"year":2026,"category":"Roads","project":"Cebu South Coastal Rd (S00137CB) - K0015 + 500 - K0015 + 1100","amountPesos":20060000.0,"lengthMeters":600.0,"ratePesosPerMeter":33433.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5136"},{"year":2026,"category":"Roads","project":"Carcar-Barili Rd - K0051 + (-726) - K0051 + 000","amountPesos":26439000.0,"lengthMeters":726.0,"ratePesosPerMeter":36417.35537190083,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5139"},{"year":2026,"category":"Roads","project":"Cebu-Toledo Wharf Rd (Jct Naga-Uling) - K0030 + 474 - K0031 + 500","amountPesos":24571000.0,"lengthMeters":1026.0,"ratePesosPerMeter":23948.343079922026,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5141"},{"year":2026,"category":"Roads","project":"Mactan Circumferential Rd - K0017 + 642 - K0018 + 500","amountPesos":12779000.0,"lengthMeters":858.0,"ratePesosPerMeter":14893.939393939394,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5144"},{"year":2026,"category":"Roads","project":"Terminal Bldg Access Rd - K0013 + (-410) - K0013 + (-080)","amountPesos":22032000.0,"lengthMeters":330.0,"ratePesosPerMeter":66763.63636363637,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5146"},{"year":2026,"category":"Roads","project":"Santander-Barili-Toledo Rd - K0180 + 190 - K0181 + 000","amountPesos":35252000.0,"lengthMeters":810.0,"ratePesosPerMeter":43520.98765432099,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5149"},{"year":2026,"category":"Roads","project":"Santander-Barili-Toledo Rd - K0216 + 914 - K0217 + 358","amountPesos":24235000.0,"lengthMeters":444.0,"ratePesosPerMeter":54583.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5151"},{"year":2026,"category":"Roads","project":"Camp Lapu-lapu Rd (S00041CB) Chainage 469 - Chainage 525","amountPesos":7675000.0,"lengthMeters":56.0,"ratePesosPerMeter":137053.57142857142,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5154"},{"year":2026,"category":"Roads","project":"Cebu South Coastal Rd. - (S00135CB) K0008+536 - K0007+040, Cebu City, Cebu","amountPesos":39658000.0,"lengthMeters":1496.0,"ratePesosPerMeter":26509.358288770054,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5156"},{"year":2026,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0009 + 000 - K0009 + 200","amountPesos":7050000.0,"lengthMeters":200.0,"ratePesosPerMeter":35250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5158"},{"year":2026,"category":"Roads","project":"JCT Buenavista - Lawaan - Marabut, k0991+990 - k0996+238 ( Road Reblocking)","amountPesos":5789000.0,"lengthMeters":4248.0,"ratePesosPerMeter":1362.758945386064,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5162"},{"year":2026,"category":"Roads","project":"JCT Buenavista-Lawaan-Marabut - K0974 + 165 - K0988 + 700 (Road Reblocing)","amountPesos":26524000.0,"lengthMeters":14535.0,"ratePesosPerMeter":1824.8366013071895,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5164"},{"year":2026,"category":"Roads","project":"Wright - Taft -Borongan rd, Sta. k0914+680 - k0915+000Construction of retaining Wall and rehabilitaion of road along National Highway, Brgy. Libas, San Julian Eastern Samar","amountPesos":47058000.0,"lengthMeters":320.0,"ratePesosPerMeter":147056.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5166"},{"year":2026,"category":"Roads","project":"Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1047 + 103 - K1048 + 000, K1048 + 456.90 - K1050 + 000, K1050 + 097.5 - K1050 + 899.40, K1052 + 590.50 - K1053 + 609","amountPesos":17683000.0,"lengthMeters":4260.5,"ratePesosPerMeter":4150.4518249032935,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5169"},{"year":2026,"category":"Roads","project":"Allen-Catarman Rd - K0697 + (-147) - K0697 + 100, K0698 + 000 - K0698 + 118","amountPesos":16954000.0,"lengthMeters":365.0,"ratePesosPerMeter":46449.31506849315,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5172"},{"year":2026,"category":"Roads","project":"Catarman-Laoang Rd - K0765 + (-473) - K0765 + (-040)","amountPesos":44207000.0,"lengthMeters":433.0,"ratePesosPerMeter":102094.688221709,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5175"},{"year":2026,"category":"Roads","project":"Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0808 + 000 - K0808 + 310","amountPesos":35366000.0,"lengthMeters":310.0,"ratePesosPerMeter":114083.87096774194,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5177"},{"year":2026,"category":"Roads","project":"Sn Policarpo-Arteche-Lapinig Rd - K0862 + 800 - K0862 + 980","amountPesos":21220000.0,"lengthMeters":180.0,"ratePesosPerMeter":117888.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5179"},{"year":2026,"category":"Roads","project":"Tomas Oppus St - K1137 + (-911) - K1138 + 400","amountPesos":40999000.0,"lengthMeters":2311.0,"ratePesosPerMeter":17740.804846386847,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5182"},{"year":2026,"category":"Roads","project":"Jct Himay-angan-Silago-Abuyog Bdry Rd - K1068 + 417 - K1069 + 122, K1069 + 189 - K1069 + 732","amountPesos":34492000.0,"lengthMeters":1248.0,"ratePesosPerMeter":27637.82051282051,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5185"},{"year":2026,"category":"Roads","project":"Jct Himay-angan-Silago-Abuyog Bdry Rd - K1070 + 344 - K1070 + 676, K1072 + 000 - K1072 + 783.06","amountPesos":30892000.0,"lengthMeters":1115.06,"ratePesosPerMeter":27704.338779974576,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5187"},{"year":2026,"category":"Roads","project":"Gov Benjamin \"Kokoy\" T Romualdez Div Rd - K0908 + (-712) - K0908 + (-529)","amountPesos":5835000.0,"lengthMeters":183.0,"ratePesosPerMeter":31885.245901639344,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5190"},{"year":2026,"category":"Roads","project":"Picas-Sn Jose DZR Airport Rd - K0910 + (-881) - K0910 + (-549), K0910 + 931 - K0911 + 690","amountPesos":37134000.0,"lengthMeters":1091.0,"ratePesosPerMeter":34036.66361136572,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5192"},{"year":2026,"category":"Roads","project":"Airport Road - (S01208MN) Chainage 000 - Chainage 493","amountPesos":11546000.0,"lengthMeters":493.0,"ratePesosPerMeter":23419.878296146046,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5196"},{"year":2026,"category":"Roads","project":"NS Valderosa St - (S01205MN) Chainage 000 - Chainage 678","amountPesos":11835000.0,"lengthMeters":678.0,"ratePesosPerMeter":17455.75221238938,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5198"},{"year":2026,"category":"Roads","project":"Maramag-Maradugao Rd - K1560 + 284 - K1560 + 784.60","amountPesos":33888000.0,"lengthMeters":500.6,"ratePesosPerMeter":67694.76628045086,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5202"},{"year":2026,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1594 + 000 - K1595 + 000","amountPesos":21143000.0,"lengthMeters":1000.0,"ratePesosPerMeter":21143.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5204"},{"year":2026,"category":"Roads","project":"CDO-Port Rd - K1438 + (-124) - K1438 + 460","amountPesos":47135000.0,"lengthMeters":584.0,"ratePesosPerMeter":80710.61643835617,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5207"},{"year":2026,"category":"Roads","project":"H-way Secondary Div Rd - Chainage 0 - Chainage 266","amountPesos":10370000.0,"lengthMeters":266.0,"ratePesosPerMeter":38984.96240601504,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5210"},{"year":2026,"category":"Roads","project":"Mamay Bypass Rd - (S01585MN) Chainage 082 - Chainage 100, Chainage 155 - Chainage 160, Chainage 444 - Chainage 467, Chainage 735 - Chainage 744, Chainage 823 - Chainage 904","amountPesos":2307000.0,"lengthMeters":136.0,"ratePesosPerMeter":16963.235294117647,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5214"},{"year":2026,"category":"Roads","project":"ABS-CBN-Quimpo Blvd Div. Rd - K1511 + (-211) - K1511 + (-092)","amountPesos":17663000.0,"lengthMeters":119.0,"ratePesosPerMeter":148428.57142857142,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5217"},{"year":2026,"category":"Roads","project":"Nabunturan-Mainit Park Rd - K1429 + 719 - K1431 + 199","amountPesos":50000000.0,"lengthMeters":1480.0,"ratePesosPerMeter":33783.78378378379,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5220"},{"year":2026,"category":"Roads","project":"Tagum-Panabo Circum Road  K1486+ 000 - K1487 + 906","amountPesos":47630000.0,"lengthMeters":1906.0,"ratePesosPerMeter":24989.506820566632,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5223"},{"year":2026,"category":"Roads","project":"Digos Junction Rd - K1565 + 461 - K1566 + 240","amountPesos":47630000.0,"lengthMeters":779.0,"ratePesosPerMeter":61142.49037227214,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5226"},{"year":2026,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1553 + 201 - K1553 + 919","amountPesos":16822000.0,"lengthMeters":718.0,"ratePesosPerMeter":23428.969359331477,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5229"},{"year":2026,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1556 + 000 - K1556 + 782","amountPesos":17783000.0,"lengthMeters":782.0,"ratePesosPerMeter":22740.409207161127,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5231"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1679 + 000 - K1680 + 237","amountPesos":35000000.0,"lengthMeters":1237.0,"ratePesosPerMeter":28294.260307194825,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5233"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1680 + 237 - K1681 + 475","amountPesos":35000000.0,"lengthMeters":1238.0,"ratePesosPerMeter":28271.40549273021,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5235"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1681 + 298 - K1682 + 360","amountPesos":30000000.0,"lengthMeters":1062.0,"ratePesosPerMeter":28248.58757062147,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5237"},{"year":2026,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1556+782 - K1556+924, K1558+000 - K1558+062","amountPesos":9706000.0,"lengthMeters":204.0,"ratePesosPerMeter":47578.43137254902,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5239"},{"year":2026,"category":"Roads","project":"Bukidnon-Cotabato Rd - K1607 + (-058) - K1607 + 480","amountPesos":40306000.0,"lengthMeters":538.0,"ratePesosPerMeter":74918.2156133829,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5243"},{"year":2026,"category":"Roads","project":"Bukidnon-Cotabato Rd - K1611 + 000 - K1611 + 620","amountPesos":23432000.0,"lengthMeters":620.0,"ratePesosPerMeter":37793.54838709677,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5245"},{"year":2026,"category":"Roads","project":"Sarangani-Davao Del Sur Coastal Rd - K1716 + 000 - K1717 + 919","amountPesos":36449000.0,"lengthMeters":1919.0,"ratePesosPerMeter":18993.746743095362,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5248"},{"year":2026,"category":"Roads","project":"Sarangani-Sultan Kudarat Coastal Rd - K1770 + 129 - K1771 + 708","amountPesos":31704000.0,"lengthMeters":1579.0,"ratePesosPerMeter":20078.530715642813,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5250"},{"year":2026,"category":"Roads","project":"Buayan-Glan Rd - (S00366MN) Chainage 000 - Chainage 167","amountPesos":16532000.0,"lengthMeters":167.0,"ratePesosPerMeter":98994.0119760479,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5253"},{"year":2026,"category":"Roads","project":"Makar-Kiamba Rd - K1662 + 000 - K1663 + 000","amountPesos":29773000.0,"lengthMeters":1000.0,"ratePesosPerMeter":29773.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5255"},{"year":2026,"category":"Roads","project":"Makar-Kiamba Rd - K1666 + 940 - K1667 + 243","amountPesos":23351000.0,"lengthMeters":303.0,"ratePesosPerMeter":77066.00660066007,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5257"},{"year":2026,"category":"Roads","project":"Makar-Kiamba Rd (S00246MN) - K1658 + (-235) - K1659 + 000","amountPesos":39820000.0,"lengthMeters":1235.0,"ratePesosPerMeter":32242.914979757086,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5259"},{"year":2026,"category":"Roads","project":"Makar-Marbel Rd - K1656 + (-1069) - K1656 + (-769.66)","amountPesos":37888000.0,"lengthMeters":299.34,"ratePesosPerMeter":126571.791274101,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5261"},{"year":2026,"category":"Roads","project":"Dulawan-Marbel Rd - K1761 + 410 - K1761 + 678","amountPesos":24184000.0,"lengthMeters":268.0,"ratePesosPerMeter":90238.80597014926,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5264"},{"year":2026,"category":"Roads","project":"Dinagat-Loreto Rd - K0089 + 092 - K0089 + 100, K0089 + 143 - K0089 + 150","amountPesos":441000.0,"lengthMeters":15.0,"ratePesosPerMeter":29400.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5268"},{"year":2026,"category":"Roads","project":"Jct Magsaysay-Cagdianao Rd - K0008 +000 - K0009 + 000, K0012 + 530 - K0013 + 119, K0012 + 287 - K0012 + 314","amountPesos":19600000.0,"lengthMeters":1616.0,"ratePesosPerMeter":12128.712871287129,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5270"},{"year":2026,"category":"Roads","project":"Dapa-Jct Cancohoy Rd - K0001 + 497.05 - K0001 + 904.05, K0007 + 727 - K0007 + 902, K0008 + 160 - K0008 + 200","amountPesos":26273000.0,"lengthMeters":622.0,"ratePesosPerMeter":42239.5498392283,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5273"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd - K1147 + 191 - K1148 + 403","amountPesos":37321000.0,"lengthMeters":1212.0,"ratePesosPerMeter":30792.904290429044,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5276"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd - K1155 + 262 - K1156 + 663.50","amountPesos":33628000.0,"lengthMeters":1401.5,"ratePesosPerMeter":23994.291830181948,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5278"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd - K1216 + 872 - K1216 + 936, K1217 + 390 - K1217 + 482","amountPesos":1667000.0,"lengthMeters":156.0,"ratePesosPerMeter":10685.897435897436,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5281"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd - K1223 + 427 - K1223 + 505, K1224 + 265 - K1224 + 320","amountPesos":1422000.0,"lengthMeters":133.0,"ratePesosPerMeter":10691.729323308271,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5283"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd - K1276 + 818 - K1276 + 932, K1277 + 300 - K1277 + 428","amountPesos":2586000.0,"lengthMeters":242.0,"ratePesosPerMeter":10685.950413223141,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5285"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd - K1393 + 146 - K1393 + 177, K1393 + 236 - K1393 + 286, K1394 + 800 - K1394 + 850, K1394 + 905 - K1395 + 005","amountPesos":2469000.0,"lengthMeters":231.0,"ratePesosPerMeter":10688.311688311689,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5287"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd - K1413 + 000 - K1415 + 282.72","amountPesos":46605000.0,"lengthMeters":2282.72,"ratePesosPerMeter":20416.433027265968,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5290"},{"year":2026,"category":"Roads","project":"10th Ave - A. Mabini to Rizal Ave - K0009 + (-375) - K0009 + 842, Rizal Ave to Kamantigue - K0008 + (-857) - K0008 + 344","amountPesos":38738000.0,"lengthMeters":2418.0,"ratePesosPerMeter":16020.678246484698,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5297"},{"year":2026,"category":"Roads","project":"Alfonso Mendoza St - (S02250LZ) Chainage 012 - Chainage 930","amountPesos":47173000.0,"lengthMeters":918.0,"ratePesosPerMeter":51386.71023965142,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5299"},{"year":2026,"category":"Roads","project":"M. Dela Fuente St. (S02464LZ) - K0005 + (-970) - K0005 + 365.6","amountPesos":50061000.0,"lengthMeters":1335.6,"ratePesosPerMeter":37482.03054806827,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5301"},{"year":2026,"category":"Roads","project":"Gil Fernando K0018 + 000 - K0019 + 357","amountPesos":48848000.0,"lengthMeters":1357.0,"ratePesosPerMeter":35997.05232129698,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5305"},{"year":2026,"category":"Roads","project":"Binalonan-Asingan-Santa Maria Rd - K0190 + 936 - K0193 + 018, K0193 + 037 - K0193 + 835","amountPesos":74770000.0,"lengthMeters":2880.0,"ratePesosPerMeter":25961.805555555555,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5308"},{"year":2026,"category":"Roads","project":"Binmaley-Lingayen via Quibaol Rd - K0365 + 000 - K0368 + 485","amountPesos":60031000.0,"lengthMeters":3485.0,"ratePesosPerMeter":17225.53802008608,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5310"},{"year":2026,"category":"Roads","project":"Lingayen-Labrador Div Rd - K0365 + 000 - K0369 + 387","amountPesos":78089000.0,"lengthMeters":4387.0,"ratePesosPerMeter":17800.091178481878,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5312"},{"year":2026,"category":"Roads","project":"Bulanao-Paracelis Rd - K0500 + 000 - K0503 + 392","amountPesos":68253000.0,"lengthMeters":3392.0,"ratePesosPerMeter":20121.757075471698,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5315"},{"year":2026,"category":"Roads","project":"Aritao-Quirino Rd – K0264 + 000 – K0266 + 000","amountPesos":56049000.0,"lengthMeters":2000.0,"ratePesosPerMeter":28024.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5318"},{"year":2026,"category":"Roads","project":"Aritao-Quirino Rd - K0266 + 000 - K0268 + 378","amountPesos":56049000.0,"lengthMeters":2378.0,"ratePesosPerMeter":23569.806560134566,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5320"},{"year":2026,"category":"Roads","project":"Aritao-Quirino Rd – K0283 + 000 – K0285 + 000","amountPesos":60720000.0,"lengthMeters":2000.0,"ratePesosPerMeter":30360.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5322"},{"year":2026,"category":"Roads","project":"Aritao-Quirino Rd – K0287 + 000 – K0290 + 000","amountPesos":84250000.0,"lengthMeters":3000.0,"ratePesosPerMeter":28083.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5324"},{"year":2026,"category":"Roads","project":"Burgos-Gen Aguinaldo (NIA) Rd - K0342 + 131 - K0343+554","amountPesos":19991000.0,"lengthMeters":1423.0,"ratePesosPerMeter":14048.489107519325,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5326"},{"year":2026,"category":"Roads","project":"Cagayan-Apayao Rd (S00746LZ) - K0519 + 000 - K0522 + 101, K0522 + 112 - K0523 + 351, K0523 + 367 - K0530 + 000","amountPesos":91080000.0,"lengthMeters":10973.0,"ratePesosPerMeter":8300.373644399891,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5328"},{"year":2026,"category":"Roads","project":"Cagayan-Apayao Rd (S00741LZ)  - K0489 + 543 - K0496 + 283, K0497 + 712 - K0498 + 235, K0498 + 235 - K0498 + 694","amountPesos":130782000.0,"lengthMeters":7722.0,"ratePesosPerMeter":16936.285936285938,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5330"},{"year":2026,"category":"Roads","project":"Cagayan-Apayao Rd (S00741LZ)  - K0498 + 694 - K0501 + 132","amountPesos":74732000.0,"lengthMeters":2438.0,"ratePesosPerMeter":30652.994257588187,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5332"},{"year":2026,"category":"Roads","project":"Cagayan-Apayao Rd (S00746LZ)  - K0524 + 496 - K0530 + 000","amountPesos":74732000.0,"lengthMeters":5504.0,"ratePesosPerMeter":13577.761627906977,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5334"},{"year":2026,"category":"Roads","project":"Gamu-Roxas Rd - K0391 + (-281) - K0391 + 604, K0393 + 000 - K0394 + 130","amountPesos":94807000.0,"lengthMeters":2015.0,"ratePesosPerMeter":47050.620347394535,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5336"},{"year":2026,"category":"Roads","project":"Ilagan-Bigao-Palanan Rd - K0411 + 278 - K0413 + 502, K0415 + 070 - K0418 + 000","amountPesos":122374000.0,"lengthMeters":5154.0,"ratePesosPerMeter":23743.500194024058,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5338"},{"year":2026,"category":"Roads","project":"Ilagan-Delfin Albano-Mallig Rd - K0402 + (-783) - K0402 + (-150), K0403 + 164 - K0404 + 090, K0406 + 496 - K0407 + 086, K0409 + 000 - K0410 + 503, K0411 + 154 - K0412 + 000, K0417 + 807 - K0418 + 354","amountPesos":104438000.0,"lengthMeters":5045.0,"ratePesosPerMeter":20701.288404360752,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5340"},{"year":2026,"category":"Roads","project":"Jct Logac-Lasam-Gagabutan Rd - K0718 + 903 - K0724 + 000","amountPesos":93415000.0,"lengthMeters":5097.0,"ratePesosPerMeter":18327.44751814793,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5342"},{"year":2026,"category":"Roads","project":"Jct. Ipil - Quirino Bdry Road - K0348 + 430 - K0350 + 167, K0373 + 763 - K0376 + 211","amountPesos":93415000.0,"lengthMeters":4185.0,"ratePesosPerMeter":22321.385902031063,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5344"},{"year":2026,"category":"Roads","project":"Naguilian-Sn Mariano Rd - K0403 + 048 - K0404 + 016, K0406 + 048 - K0409 + 297","amountPesos":69127000.0,"lengthMeters":4217.0,"ratePesosPerMeter":16392.459094142756,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5346"},{"year":2026,"category":"Roads","project":"Peñablanca-Callao Cave Rd (S05071LZ) - K0486 + 434 - K0488 + 000","amountPesos":74732000.0,"lengthMeters":1566.0,"ratePesosPerMeter":47721.58365261814,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5348"},{"year":2026,"category":"Roads","project":"Bangad-Fort Magsaysay Rd - K0122 + (-450) - K0123 + 111, K0128 + 848 - K0129 + 171.50","amountPesos":41338000.0,"lengthMeters":1884.5,"ratePesosPerMeter":21935.791987264525,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5351"},{"year":2026,"category":"Roads","project":"Capas-San Jose-Mayantoc-Malacampa Rd - K0147 + 876 - K0149 + 653","amountPesos":94176000.0,"lengthMeters":1777.0,"ratePesosPerMeter":52997.186268992686,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5353"},{"year":2026,"category":"Roads","project":"Concepcion - La Paz Rd - K0116+(-222) - K0117+100","amountPesos":64986000.0,"lengthMeters":1322.0,"ratePesosPerMeter":49157.33736762481,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5355"},{"year":2026,"category":"Roads","project":"Concepcion - La Paz Rd - K0119 + 456- K0120 + 290, K0120+381.42 - K0120+420","amountPesos":39127000.0,"lengthMeters":872.58,"ratePesosPerMeter":44840.587682504665,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5357"},{"year":2026,"category":"Roads","project":"Gapan-Fort Magsaysay Rd - K0108 + 179 - K0109 + 000, K0113 + 000 - K0114 + 000","amountPesos":76736000.0,"lengthMeters":1821.0,"ratePesosPerMeter":42139.48380010983,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5359"},{"year":2026,"category":"Roads","project":"Ramos-Pura Rd - K0157 + 145 - K0158 + 206","amountPesos":51229000.0,"lengthMeters":1061.0,"ratePesosPerMeter":48283.69462770971,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5361"},{"year":2026,"category":"Roads","project":"Sn Fernando-Lubao Rd - K0074+458 - K0077+205, K0077+330-K0077+419.40","amountPesos":102959000.0,"lengthMeters":2836.4,"ratePesosPerMeter":36299.182061768515,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5363"},{"year":2026,"category":"Roads","project":"Sn Marcelino-Sn Antonio-Sn Narciso Rd - K0153 + 500 - K0154 + 507","amountPesos":34880000.0,"lengthMeters":1007.0,"ratePesosPerMeter":34637.53723932473,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5365"},{"year":2026,"category":"Roads","project":"Sn Marcelino-Sn Antonio-Sn Narciso Rd - K0155 + 000 - K0156 + 505","amountPesos":34880000.0,"lengthMeters":1505.0,"ratePesosPerMeter":23176.07973421927,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5367"},{"year":2026,"category":"Roads","project":"Sta Rosa-Fort Magsaysay Rd - K0108 + (-881) - K0108 + (-421), K0108 + (-240) - K0108 + (-203.90), K0108 + (-187.50) - K0108 + (-147), K0108 + (-142.50) - K0110 + 000","amountPesos":52286000.0,"lengthMeters":2679.1,"ratePesosPerMeter":19516.25545892273,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5369"},{"year":2026,"category":"Roads","project":"Sta. Maria - Bypass Road K0030 + (-204) - K0030 + 294, K0030 + 464 - K0031 + 904","amountPesos":129753000.0,"lengthMeters":1938.0,"ratePesosPerMeter":66952.01238390093,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5371"},{"year":2026,"category":"Roads","project":"Tarlac-Zambales North West Div Rd - K0111 + 790 - K0113 + 789","amountPesos":35707000.0,"lengthMeters":1999.0,"ratePesosPerMeter":17862.431215607805,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5373"},{"year":2026,"category":"Roads","project":"Tarlac-Zambales Rd - K0110+000 - K0110+300, K0121+636 - K0122+800, K0125+000 - K0125+185","amountPesos":69760000.0,"lengthMeters":1649.0,"ratePesosPerMeter":42304.42692540934,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5375"},{"year":2026,"category":"Roads","project":"Victoria - La Paz Road, K0139+925 - K0140+567, Chainage (7982 - 8624)","amountPesos":37504000.0,"lengthMeters":642.0,"ratePesosPerMeter":58417.445482866045,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5377"},{"year":2026,"category":"Roads","project":"Bacoor Blvd. - K0022 + 402 - K0022 + 847, K0022 + 982 - K0021 + 192, K0020 + 502 - K0019 + 005, K0019 + 742 - K0017 + 017, K0016 + 262 - K0016 + 650","amountPesos":107246000.0,"lengthMeters":5663.0,"ratePesosPerMeter":18938.018717993997,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5380"},{"year":2026,"category":"Roads","project":"Bacoor-Dasmariñas National Rd - K0016 + 766 - K0017 + 720, K0026 + 749 - K0026 + 953","amountPesos":43314000.0,"lengthMeters":1158.0,"ratePesosPerMeter":37404.145077720204,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5382"},{"year":2026,"category":"Roads","project":"Bacoor-Dasmariñas National Rd - K0028 + (-077) - K0029 + 464","amountPesos":99894000.0,"lengthMeters":1541.0,"ratePesosPerMeter":64824.140168721606,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5384"},{"year":2026,"category":"Roads","project":"Bauan-Mabini Rd - K0164 + 316 - K0166 + 100, K0168 + 495 - K0169 + 208","amountPesos":63932000.0,"lengthMeters":2497.0,"ratePesosPerMeter":25603.52422907489,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5386"},{"year":2026,"category":"Roads","project":"Cavinti-Caliraya Rd. K0100 + (-486) -K0100 + (-264), K0100 + (-204) - K0100 + 503, K0100 + 544 - K0101 +399","amountPesos":47949000.0,"lengthMeters":1784.0,"ratePesosPerMeter":26877.242152466366,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5388"},{"year":2026,"category":"Roads","project":"Lipa City - Alaminos Rd - K0087 + (-615) - K0088 + 460, K0090 + 000 - K0091 + 102","amountPesos":91902000.0,"lengthMeters":3177.0,"ratePesosPerMeter":28927.289896128423,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5390"},{"year":2026,"category":"Roads","project":"Lipa-Balete Rd - K0082 + (-219) - K0083 + 432","amountPesos":75000000.0,"lengthMeters":1651.0,"ratePesosPerMeter":45427.01393095094,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5392"},{"year":2026,"category":"Roads","project":"Silang By-Pass Rd - K0044 + 199 - K0044 + 788","amountPesos":55941000.0,"lengthMeters":589.0,"ratePesosPerMeter":94976.23089983022,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5394"},{"year":2026,"category":"Roads","project":"Talisay-Laurel-Agoncillo Rd - K0090 + 505 - K0090 + 781, K0094 + 613 - K0095 + 548","amountPesos":50346000.0,"lengthMeters":1211.0,"ratePesosPerMeter":41573.9058629232,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5396"},{"year":2026,"category":"Roads","project":"Tejero-Gen Trias-Amadeo-Tagaytay Rd - K0033 + 755.75 - K0035 + 000, K0035 + 349 - K0036 + 104.50","amountPesos":55941000.0,"lengthMeters":1999.75,"ratePesosPerMeter":27973.996749593698,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5398"},{"year":2026,"category":"Roads","project":"Tejero-Gen Trias-Amadeo-Tagaytay Rd - K0039 + 339.69 - K0040 + 622.77","amountPesos":59702000.0,"lengthMeters":1283.08,"ratePesosPerMeter":46530.22414814373,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5400"},{"year":2026,"category":"Roads","project":"CSR Jct-Minas Rd - K0035 + (-454) - K0036 + 544","amountPesos":93864000.0,"lengthMeters":1998.0,"ratePesosPerMeter":46978.97897897898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5403"},{"year":2026,"category":"Roads","project":"CSR Jct-Minas Rd - K0038 + 702 - K0040 + 325, K0041 + 428 - K0041 + 741","amountPesos":109843000.0,"lengthMeters":1936.0,"ratePesosPerMeter":56737.086776859505,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5405"},{"year":2026,"category":"Roads","project":"CSR Jct-Minas Rd - K0043 + 641 - K0043 + 735, K0048 + 135 - K0050 + 469, K0052 + 102 - K0052 + 231","amountPesos":111449000.0,"lengthMeters":2557.0,"ratePesosPerMeter":43585.8427845131,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5407"},{"year":2026,"category":"Roads","project":"CSR Jct-Minas Rd - K0044 + 405 - K0046 + 120.60","amountPesos":81449000.0,"lengthMeters":1715.6,"ratePesosPerMeter":47475.51876894385,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5409"},{"year":2026,"category":"Roads","project":"CSR Jct-Pola Rd - K0063 + 629 - K0064 + 993","amountPesos":91385000.0,"lengthMeters":1364.0,"ratePesosPerMeter":66997.80058651026,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5411"},{"year":2026,"category":"Roads","project":"CSR Jct-Pola Rd - K0070 + 156 - K0071 + 366","amountPesos":65985000.0,"lengthMeters":1210.0,"ratePesosPerMeter":54533.05785123967,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5413"},{"year":2026,"category":"Roads","project":"Odiongan-East-West Rd - K0003 + (-176) - K0005 + 350.68, K0005 + 830.36 - K0006 + 349.50","amountPesos":111445000.0,"lengthMeters":3045.82,"ratePesosPerMeter":36589.48985823193,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5415"},{"year":2026,"category":"Roads","project":"Ariman-Casiguran Rd - K0616+000 - K0617+000, K0619+000 - K0620+561","amountPesos":68823000.0,"lengthMeters":2561.0,"ratePesosPerMeter":26873.4869191722,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5418"},{"year":2026,"category":"Roads","project":"Ariman-Jct Bulusan Lake Rd - K0613 + 650 - K0616 + 322, K0627 + 000 - K0627 + 500","amountPesos":77444000.0,"lengthMeters":3172.0,"ratePesosPerMeter":24414.88020176545,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5420"},{"year":2026,"category":"Roads","project":"Bacon-Sawanga-Prieto Diaz Rd - K0612 + (-249) - K0615 + 485","amountPesos":141444000.0,"lengthMeters":3734.0,"ratePesosPerMeter":37880.02142474558,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5422"},{"year":2026,"category":"Roads","project":"Bagong Silang-Capalonga Rd - K0306 + 105 - K0309 + 248","amountPesos":93001000.0,"lengthMeters":3143.0,"ratePesosPerMeter":29589.88227807827,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5424"},{"year":2026,"category":"Roads","project":"Gahonon Rd - (S03781LZ) Chainage 006 - Chainage 378","amountPesos":6725000.0,"lengthMeters":372.0,"ratePesosPerMeter":18077.956989247312,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5426"},{"year":2026,"category":"Roads","project":"Gahonon Rd - K0342 + (-416) - K0342 + 618","amountPesos":18693000.0,"lengthMeters":1034.0,"ratePesosPerMeter":18078.33655705996,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5428"},{"year":2026,"category":"Roads","project":"Milaor-Minalabac-Pili Rd - K0446 + (-214) - K0448 + 561","amountPesos":50203000.0,"lengthMeters":2775.0,"ratePesosPerMeter":18091.171171171172,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5430"},{"year":2026,"category":"Roads","project":"Barotac Viejo-Sn Rafael  Rd - K0079 + 992 - K0081 + 492","amountPesos":60143000.0,"lengthMeters":1500.0,"ratePesosPerMeter":40095.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5433"},{"year":2026,"category":"Roads","project":"Sara-Concepcion Rd - K0214 + 523 - K0216 + 356","amountPesos":77846000.0,"lengthMeters":1833.0,"ratePesosPerMeter":42469.17621385706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5435"},{"year":2026,"category":"Roads","project":"Bacolod-City Bdry Rd - K0001 + (-069) - K0001 + 075, K0004 + 000 - K0005 + 000, K0005 + 285 - K0005 + 652.12","amountPesos":61189000.0,"lengthMeters":1511.12,"ratePesosPerMeter":40492.48239716237,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5438"},{"year":2026,"category":"Roads","project":"Bacolod-City Bdry Rd - K0006 + 263 - K0007 + 286.20","amountPesos":54137000.0,"lengthMeters":1023.2,"ratePesosPerMeter":52909.499609069586,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5440"},{"year":2026,"category":"Roads","project":"Bacolod-City Bdry Rd - K0010 + 175 - K0010 + 365, K0013 + 108 - K0013 + 643, K0014 + 401 - K0015 + 264","amountPesos":61314000.0,"lengthMeters":1588.0,"ratePesosPerMeter":38610.831234256926,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5442"},{"year":2026,"category":"Roads","project":"Dancalan-Candoni-Damutan Valley Rd - K0113 + 408 - K0122 + 000","amountPesos":172566000.0,"lengthMeters":8592.0,"ratePesosPerMeter":20084.49720670391,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5444"},{"year":2026,"category":"Roads","project":"Dancalan-Candoni-Damutan Valley Rd - K0122 + 000 - K0129 + 721","amountPesos":150178000.0,"lengthMeters":7721.0,"ratePesosPerMeter":19450.5893019039,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5446"},{"year":2026,"category":"Roads","project":"Argao-Ronda Rd - K0081 + 935 - K0084 + 214, K0085 + 464 - K0085 + 822","amountPesos":105755000.0,"lengthMeters":2637.0,"ratePesosPerMeter":40104.28517254456,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5449"},{"year":2026,"category":"Roads","project":"Balilihan-Hanopol-Batuan Rd - K0027 + 000 - K0028 + 140","amountPesos":51348000.0,"lengthMeters":1140.0,"ratePesosPerMeter":45042.10526315789,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5451"},{"year":2026,"category":"Roads","project":"Bogo-Curva-Medellin-Daanbantayan-Maya Rd - K0108 + 268 - K0109 + 000, K0112 + 599 - K0113 + 660","amountPesos":129851000.0,"lengthMeters":1793.0,"ratePesosPerMeter":72421.08198549916,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5453"},{"year":2026,"category":"Roads","project":"Colon St - (S00095CB) Chainage 027 - Chainage 841, Chainage 989 - Chainage 1165","amountPesos":69622000.0,"lengthMeters":990.0,"ratePesosPerMeter":70325.25252525252,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5455"},{"year":2026,"category":"Roads","project":"Jct (TNR) Maribojoc-Antequera-Catagbacan (Loon) - K0011 + (-335) - K0011 + 634, K0014 + 000 - K0014 + 200","amountPesos":54742000.0,"lengthMeters":1169.0,"ratePesosPerMeter":46828.05816937554,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5457"},{"year":2026,"category":"Roads","project":"ML Quezon St - (S00363CB) Chainage 1820 - Chainage 3245","amountPesos":29523000.0,"lengthMeters":1425.0,"ratePesosPerMeter":20717.894736842107,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5459"},{"year":2026,"category":"Roads","project":"Sibonga-Dumanjug Rd - K0058 + 083 - K0059 + 000, K0060 + 037 - K0061 + 687, K0061 + 916 - K0062 + 339","amountPesos":67630000.0,"lengthMeters":2990.0,"ratePesosPerMeter":22618.729096989966,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5461"},{"year":2026,"category":"Roads","project":"Sogod-Tabuelan Rd - K0112 + 040 - K0113 + 401","amountPesos":73189000.0,"lengthMeters":1361.0,"ratePesosPerMeter":53775.900073475386,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5463"},{"year":2026,"category":"Roads","project":"Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0940 + 548.80 - K0941 + 271.57","amountPesos":46083000.0,"lengthMeters":722.77,"ratePesosPerMeter":63758.87211700297,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5466"},{"year":2026,"category":"Roads","project":"Dulag-Julita-Burauen Rd - K0946 + 655.87 - K0948 + 000","amountPesos":46175000.0,"lengthMeters":1344.13,"ratePesosPerMeter":34353.07596735423,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5468"},{"year":2026,"category":"Roads","project":"Leyte-Samar Inter-Provl Rd - K0906 + 676 - K0906 + 760, K0906 + 792 - K0907 + 845","amountPesos":45523000.0,"lengthMeters":1137.0,"ratePesosPerMeter":40037.81882145998,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5470"},{"year":2026,"category":"Roads","project":"Mainit-Sn Miguel-Santol Rd - K0942 + 208 - K0943 + 617","amountPesos":59857000.0,"lengthMeters":1409.0,"ratePesosPerMeter":42481.9020581973,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5472"},{"year":2026,"category":"Roads","project":"Tanauan-Dagami Rd - K0923 + 490 - K0924 + 000, K0925 + 000 - K0925 + 124, K0925 + 155 - K0925 + 353, K0925 + 371 - K0925 + 895","amountPesos":51129000.0,"lengthMeters":1356.0,"ratePesosPerMeter":37705.75221238938,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5474"},{"year":2026,"category":"Roads","project":"Crossing Sta. Clara-Sandayong Rd - K1790 + 000 - K1792 + 352","amountPesos":50960000.0,"lengthMeters":2352.0,"ratePesosPerMeter":21666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5477"},{"year":2026,"category":"Roads","project":"Diplahan Jct-Malangas Port Rd - K1747 + 330 - K1749 + 016","amountPesos":63700000.0,"lengthMeters":1686.0,"ratePesosPerMeter":37781.73190984579,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5479"},{"year":2026,"category":"Roads","project":"Dipolog-Polanco-Piñan-Jct Oroquieta Rd - 1828 + 968 - K1830 + 202","amountPesos":88033000.0,"lengthMeters":1234.0,"ratePesosPerMeter":71339.54619124798,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5481"},{"year":2026,"category":"Roads","project":"Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Rd - K1767 + 848 - K1770 + 000","amountPesos":80360000.0,"lengthMeters":2152.0,"ratePesosPerMeter":37342.00743494424,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5483"},{"year":2026,"category":"Roads","project":"Ipil-Magdaup Wharf Rd - K2014 + (-483) - K2014 + 640, K2014 + 790 - K2015 + 153, K2015 + 310 - K2015 + 647.50","amountPesos":100940000.0,"lengthMeters":1823.5,"ratePesosPerMeter":55355.08637236084,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5485"},{"year":2026,"category":"Roads","project":"Old Rd (Ayala-Talisayan) - K1956 + (-597) - K1958 + 640","amountPesos":63700000.0,"lengthMeters":3237.0,"ratePesosPerMeter":19678.71485943775,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5487"},{"year":2026,"category":"Roads","project":"Sindangan-Bayog-Lakewood Rd - K1715 + (-074) - K1718+ 000","amountPesos":68600000.0,"lengthMeters":3074.0,"ratePesosPerMeter":22316.200390370854,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5489"},{"year":2026,"category":"Roads","project":"Sindangan-Bayog-Lakewood Rd - K1726 + 10894 - K1726 + 12896","amountPesos":67410000.0,"lengthMeters":2002.0,"ratePesosPerMeter":33671.32867132867,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5491"},{"year":2026,"category":"Roads","project":"Jct SH Aglayan-Zamboanguita Rd, K1527 + 793 - K1530 + 793","amountPesos":67425000.0,"lengthMeters":3000.0,"ratePesosPerMeter":22475.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5494"},{"year":2026,"category":"Roads","project":"Bansalan-Mt Apo Natl Park Rd - K1582 + (-957) - K1583 + 052","amountPesos":108355000.0,"lengthMeters":2009.0,"ratePesosPerMeter":53934.79342956695,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5497"},{"year":2026,"category":"Roads","project":"Bansalan-Mt Apo Natl Park Rd - K1584 + 200 - K1586 + 733","amountPesos":94000000.0,"lengthMeters":2533.0,"ratePesosPerMeter":37110.14607185156,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5499"},{"year":2026,"category":"Roads","project":"Dualing-New Panay-Midsayap Rd - K1688 + (-433) - K1688 + 227","amountPesos":41784000.0,"lengthMeters":660.0,"ratePesosPerMeter":63309.09090909091,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5502"},{"year":2026,"category":"Roads","project":"Matalam-Mlang-Bagontapay Jct Rd - K1644 + 133 - K1644 + 1025","amountPesos":65732000.0,"lengthMeters":892.0,"ratePesosPerMeter":73690.58295964125,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5504"},{"year":2026,"category":"Roads","project":"Surallah-Lake Sebu-Maitum Rd - K1738 + 790 - K1740 + 023","amountPesos":45464000.0,"lengthMeters":1233.0,"ratePesosPerMeter":36872.66828872668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5506"},{"year":2026,"category":"Roads","project":"Jct Osmeña-Pilar Rd - K0004 + (-359) - K0006 + 036.28","amountPesos":100000000.0,"lengthMeters":2395.28,"ratePesosPerMeter":41748.77258608597,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5509"},{"year":2026,"category":"Roads","project":"Jct Osmeña-Pilar Rd - K0015 + 500 - K0017 + 061.31","amountPesos":64840000.0,"lengthMeters":1561.31,"ratePesosPerMeter":41529.22866054784,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5511"},{"year":2026,"category":"Roads","project":"Jct. Nat'l Rd-Antipolo-Tuboran-Quezon-Mabini Rd - K0009 + (-364) - K0009 + 881.45","amountPesos":56101000.0,"lengthMeters":1245.45,"ratePesosPerMeter":45044.762937090985,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5513"},{"year":2026,"category":"Roads","project":"Muntinlupa-Insular Prison Rd - K0029 + (-039) - K0029 + 408","amountPesos":14527000.0,"lengthMeters":447.0,"ratePesosPerMeter":32498.88143176734,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5516"},{"year":2026,"category":"Roads","project":"Muntinlupa-Railroad Station Rd - K0028 + (-351) - K0028 + (-230)","amountPesos":2904000.0,"lengthMeters":121.0,"ratePesosPerMeter":24000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5518"},{"year":2026,"category":"Roads","project":"South Super H-way East Service Rd - K0021 + 948 - K0022 + 212","amountPesos":6714000.0,"lengthMeters":264.0,"ratePesosPerMeter":25431.81818181818,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5520"},{"year":2026,"category":"Roads","project":"Bonifacio-Sisa Rd - K0012 + (-405) - K0012 + (-140)","amountPesos":10032000.0,"lengthMeters":265.0,"ratePesosPerMeter":37856.6037735849,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5523"},{"year":2026,"category":"Roads","project":"Gov W Pascual Ave - K0016 + 793 - K0016 + 993","amountPesos":7586000.0,"lengthMeters":200.0,"ratePesosPerMeter":37930.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5525"},{"year":2026,"category":"Roads","project":"C-5 Service Road (S04558LZ) - Chainage 000 -Chainage 178","amountPesos":1687000.0,"lengthMeters":178.0,"ratePesosPerMeter":9477.52808988764,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5528"},{"year":2026,"category":"Roads","project":"C-5/Sampaguita West Service Rd - (S04512LZ) Chainage 000 - Chainage 1200","amountPesos":17992000.0,"lengthMeters":1200.0,"ratePesosPerMeter":14993.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5530"},{"year":2026,"category":"Roads","project":"C-5-Kalayaan Interchange 1 (West to East) -(S03993LZ) - Chainage 000 - Chainage 364","amountPesos":5066000.0,"lengthMeters":364.0,"ratePesosPerMeter":13917.582417582418,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5532"},{"year":2026,"category":"Roads","project":"C-5-Kalayaan Interchange 2 (East to West) -(S03994LZ) - Chainage 000 - Chainage 359","amountPesos":5066000.0,"lengthMeters":359.0,"ratePesosPerMeter":14111.42061281337,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5534"},{"year":2026,"category":"Roads","project":"Dr Sixto Antonio - K0017 + 000 - K0017 + 469.32","amountPesos":5709000.0,"lengthMeters":469.32,"ratePesosPerMeter":12164.408079775001,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5536"},{"year":2026,"category":"Roads","project":"Fort Bonifacio-Nichols Field Rd - K0012 + 000 - K0013 + 000","amountPesos":24082000.0,"lengthMeters":1000.0,"ratePesosPerMeter":24082.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5538"},{"year":2026,"category":"Roads","project":"J.P Rizal St - K0016 + (-962) - K0016 + 000","amountPesos":23839000.0,"lengthMeters":962.0,"ratePesosPerMeter":24780.665280665282,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5540"},{"year":2026,"category":"Roads","project":"Mckinley-Pateros Road (S03345LZ) - K0012+82 - K0012+687","amountPesos":10253000.0,"lengthMeters":605.0,"ratePesosPerMeter":16947.10743801653,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5542"},{"year":2026,"category":"Roads","project":"Old Capitol Building Rd - (S03920LZ) Chainage 000 - Chainage 471","amountPesos":11919000.0,"lengthMeters":471.0,"ratePesosPerMeter":25305.732484076434,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5544"},{"year":2026,"category":"Roads","project":"Pateros-McKinley Road (S03971LZ) - Chainage 0 - Chainage 375","amountPesos":6054000.0,"lengthMeters":375.0,"ratePesosPerMeter":16144.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5546"},{"year":2026,"category":"Roads","project":"Road Around Pasig Market Rd (Alcalde Jose St) - (S03932LZ) Chainage 000 - Chainage 262","amountPesos":2459000.0,"lengthMeters":262.0,"ratePesosPerMeter":9385.496183206107,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5548"},{"year":2026,"category":"Roads","project":"Road Around Pasig Market Road (Concepcion St.) - (S03933LZ) Chainage 000 - Chainage 280","amountPesos":3406000.0,"lengthMeters":280.0,"ratePesosPerMeter":12164.285714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5550"},{"year":2026,"category":"Roads","project":"Rotonda-Pariancillo Rd - (S03934LZ) Chainage 000 - Chainage 440","amountPesos":5353000.0,"lengthMeters":440.0,"ratePesosPerMeter":12165.90909090909,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5552"},{"year":2026,"category":"Roads","project":"Tipas-Napindan Rd - K0021 + 000 - K0024 + 262","amountPesos":21725000.0,"lengthMeters":3262.0,"ratePesosPerMeter":6660.024524831392,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5554"},{"year":2026,"category":"Roads","project":"Arellano Ave - (S03385LZ) Chainage 150 - Chainage 694","amountPesos":9436000.0,"lengthMeters":544.0,"ratePesosPerMeter":17345.58823529412,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5557"},{"year":2026,"category":"Roads","project":"Camp Claudio Cadre Rd - (S03263LZ) Chainage 000 - Chainage 151","amountPesos":2214000.0,"lengthMeters":151.0,"ratePesosPerMeter":14662.25165562914,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5559"},{"year":2026,"category":"Roads","project":"Kalayaan Ave - (S03367LZ) Chainage 000 - Chainage 495","amountPesos":6556000.0,"lengthMeters":495.0,"ratePesosPerMeter":13244.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5561"},{"year":2026,"category":"Roads","project":"Makati Ave - (S03371LZ) Chainage 000 - Chainage 726","amountPesos":18289000.0,"lengthMeters":726.0,"ratePesosPerMeter":25191.46005509642,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5563"},{"year":2026,"category":"Roads","project":"Pasong Tamo Ext - K0010 + (-430) - K0010 + 306","amountPesos":19324000.0,"lengthMeters":736.0,"ratePesosPerMeter":26255.434782608696,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5565"},{"year":2026,"category":"Roads","project":"B Serrano St. - K0010 + (-336) - K0010 + 1071","amountPesos":20859000.0,"lengthMeters":1407.0,"ratePesosPerMeter":14825.159914712154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5568"},{"year":2026,"category":"Roads","project":"Bagumbayan St. - (S02401LZ) Chainage 006 - Chainage 170","amountPesos":1758000.0,"lengthMeters":164.0,"ratePesosPerMeter":10719.512195121952,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5571"},{"year":2026,"category":"Roads","project":"Dagupan St. - (S02347LZ) - K0004 + 766.00 - K0005 + 038.50","amountPesos":13078000.0,"lengthMeters":272.5,"ratePesosPerMeter":47992.66055045871,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5573"},{"year":2026,"category":"Roads","project":"Dapitan St . (S02435LZ) - K0004 + 005 - K0004 + 297","amountPesos":11555000.0,"lengthMeters":292.0,"ratePesosPerMeter":39571.91780821918,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5575"},{"year":2026,"category":"Roads","project":"Ma. Clara St. (S02454LZ) - K0008 + (-007) - K0008 + 421","amountPesos":13360000.0,"lengthMeters":428.0,"ratePesosPerMeter":31214.953271028036,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5577"},{"year":2026,"category":"Roads","project":"Manga St. - (S02548LZ) Chainage 005 - Chainage 169","amountPesos":4172000.0,"lengthMeters":164.0,"ratePesosPerMeter":25439.024390243903,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5579"},{"year":2026,"category":"Roads","project":"VG Cruz (S02472LZ) - K0005 + 355 - K0005 + 520.00","amountPesos":7394000.0,"lengthMeters":165.0,"ratePesosPerMeter":44812.121212121216,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5581"},{"year":2026,"category":"Roads","project":"IBP-San Mateo Rd - K0020 + (-745) - K0020 + 155","amountPesos":21999000.0,"lengthMeters":900.0,"ratePesosPerMeter":24443.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5584"},{"year":2026,"category":"Roads","project":"IBP-San Mateo Rd - K0020 + 155 - K0020 + 915","amountPesos":18756000.0,"lengthMeters":760.0,"ratePesosPerMeter":24678.947368421053,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5586"},{"year":2026,"category":"Roads","project":"IBP-San Mateo Rd - K0021 + (-055) - K0021 + 450","amountPesos":16556000.0,"lengthMeters":505.0,"ratePesosPerMeter":32784.158415841586,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5588"},{"year":2026,"category":"Roads","project":"Luzon Avenue - (S05493LZ) Chainage 000 - Chainage 050","amountPesos":1108000.0,"lengthMeters":50.0,"ratePesosPerMeter":22160.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5590"},{"year":2026,"category":"Roads","project":"Payatas Rd - K0026 + 650 - K0026 + 700, K0026 + 500 - K0026 + 550,K0026 + 700 - K0026 + 749,K0026 + 800 - K0026 + 850,K0026 + 849.5 - K0026 + 895, K0026 + 700 - K0026 + 736","amountPesos":5234000.0,"lengthMeters":244.0,"ratePesosPerMeter":21450.819672131147,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5592"},{"year":2026,"category":"Roads","project":"Payatas Rd - K0027 + 000 - K0027 + 050,K0027 + 200 - K0027 + 250,K0027 + 050 - K0027 + 086,K0027 + 100 - K0027 + 136,K0027 + 100 - K0027 + 128","amountPesos":3800000.0,"lengthMeters":172.0,"ratePesosPerMeter":22093.023255813954,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5594"},{"year":2026,"category":"Roads","project":"Payatas Rd -K0027 + 250 - K0027 + 299, K0027 + 299 - K0027 + 349, K0027 + 500 - K0027 + 550, K0027 + 400 - K0027 + 450, K0027 + 250 - K0027 + 295, K0027 + 299 - K0027 + 332","amountPesos":6060000.0,"lengthMeters":199.0,"ratePesosPerMeter":30452.261306532662,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5596"},{"year":2026,"category":"Roads","project":"15th Ave - (S05245LZ) - K0011 + (-240) - K0011 + 810","amountPesos":11919000.0,"lengthMeters":1050.0,"ratePesosPerMeter":11351.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5599"},{"year":2026,"category":"Roads","project":"20th Ave - K0012 + (-090) - K0011 + 472","amountPesos":15149000.0,"lengthMeters":438.0,"ratePesosPerMeter":34586.75799086758,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5601"},{"year":2026,"category":"Bridges","project":"C-5 (Katipunan/Aurora Flyover) - (S05587LZ) Chainage 000 - Chainage 633","amountPesos":11025000.0,"lengthMeters":633.0,"ratePesosPerMeter":17417.061611374407,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5603"},{"year":2026,"category":"Bridges","project":"C-5 (Katipunan/Aurora Flyover) - (S05588LZ) Chainage 000 - Chainage 643","amountPesos":17879000.0,"lengthMeters":643.0,"ratePesosPerMeter":27805.598755832038,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5605"},{"year":2026,"category":"Roads","project":"Kalayaan Ave - K0012 + (-012) - K0013 + 830","amountPesos":26520000.0,"lengthMeters":1842.0,"ratePesosPerMeter":14397.394136807818,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5607"},{"year":2026,"category":"Roads","project":"N Ramirez St (Pulog St) - (S05147LZ) Chainage 000 - Chainage 821","amountPesos":9988000.0,"lengthMeters":821.0,"ratePesosPerMeter":12165.651644336176,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5609"},{"year":2026,"category":"Roads","project":"T Gener St - (S05144LZ) Chainage 000 - Chainage 415","amountPesos":5048000.0,"lengthMeters":415.0,"ratePesosPerMeter":12163.855421686747,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5611"},{"year":2026,"category":"Roads","project":"Certeza St Chainage 0 - Chainage 274","amountPesos":5960000.0,"lengthMeters":274.0,"ratePesosPerMeter":21751.82481751825,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5614"},{"year":2026,"category":"Roads","project":"F. Calderon St (S02809LZ) Chainage 0 - Chainage 111, S02806 Chainage 0 - Chainage 217","amountPesos":8939000.0,"lengthMeters":217.0,"ratePesosPerMeter":41193.54838709677,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5616"},{"year":2026,"category":"Roads","project":"J. Syquia St. Chainage 0 - Chainage 670","amountPesos":11919000.0,"lengthMeters":670.0,"ratePesosPerMeter":17789.55223880597,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5618"},{"year":2026,"category":"Roads","project":"Labores St. Chainage 0 - Chainage 554","amountPesos":11919000.0,"lengthMeters":554.0,"ratePesosPerMeter":21514.440433212996,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5620"},{"year":2026,"category":"Roads","project":"MH Del Pilar - K0001 + 000 - K0002 + 020","amountPesos":24445000.0,"lengthMeters":1020.0,"ratePesosPerMeter":23965.686274509804,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5622"},{"year":2026,"category":"Roads","project":"New Panaderos St K0006 + 770 - K0005 + 330","amountPesos":23839000.0,"lengthMeters":1440.0,"ratePesosPerMeter":16554.86111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5624"},{"year":2026,"category":"Roads","project":"Old Panaderos St Chainage 0 - Chainage 780","amountPesos":23839000.0,"lengthMeters":780.0,"ratePesosPerMeter":30562.82051282051,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5626"},{"year":2026,"category":"Roads","project":"P Burgos Street - (S04535LZ) Chainage 000 - Chainage 286","amountPesos":10839000.0,"lengthMeters":286.0,"ratePesosPerMeter":37898.6013986014,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5628"},{"year":2026,"category":"Roads","project":"R  Del Pan St - (S02719LZ) Chainage 361 - Chainage 585","amountPesos":4248000.0,"lengthMeters":224.0,"ratePesosPerMeter":18964.285714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5630"},{"year":2026,"category":"Roads","project":"Sn Andres St - K0003 + (-651) - K0003 + (-355)","amountPesos":12345000.0,"lengthMeters":296.0,"ratePesosPerMeter":41706.08108108108,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5632"},{"year":2026,"category":"Roads","project":"Tejeron St. S02961LZ K0006 + (-285) - K0006 + 491","amountPesos":20859000.0,"lengthMeters":776.0,"ratePesosPerMeter":26880.154639175256,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5634"},{"year":2026,"category":"Roads","project":"Zamora St. Chainage 342 - Chainage 623","amountPesos":9193000.0,"lengthMeters":281.0,"ratePesosPerMeter":32715.302491103204,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5636"},{"year":2026,"category":"Roads","project":"A Castro Ave - K0489 + (-080) - K0489 + 000, K0489 + 465 - K0489 + 615","amountPesos":3409000.0,"lengthMeters":230.0,"ratePesosPerMeter":14821.739130434782,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5640"},{"year":2026,"category":"Roads","project":"Pasuquin-Radar Airstation Rd - K0508 + 232 - K0508 + 689","amountPesos":6833000.0,"lengthMeters":457.0,"ratePesosPerMeter":14951.859956236323,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5642"},{"year":2026,"category":"Roads","project":"Pasuquin-Radar Airstation Rd - K0509 + 811 - K0510 + 880","amountPesos":14642000.0,"lengthMeters":1069.0,"ratePesosPerMeter":13696.913002806361,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5644"},{"year":2026,"category":"Roads","project":"Pasuquin-Radar Airstation Rd - K0513 + 149 - K0514 + 029","amountPesos":11601000.0,"lengthMeters":880.0,"ratePesosPerMeter":13182.954545454546,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5646"},{"year":2026,"category":"Roads","project":"Pasuquin-Radar Airstation Rd - K0515 + 000 - K0516 + 378","amountPesos":16106000.0,"lengthMeters":1378.0,"ratePesosPerMeter":11687.953555878084,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5648"},{"year":2026,"category":"Roads","project":"Banna (Espiritu)-Pinili Rd, K0490 + (-732) - K0490 + (-087), K0492 + 000 - K0493 + 000","amountPesos":24748000.0,"lengthMeters":1645.0,"ratePesosPerMeter":15044.376899696048,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5651"},{"year":2026,"category":"Roads","project":"Batac-Espiritu (Banna) Rd - K0470 + (-362) - K0470 + (-171), K0470 + 869 - K0471 + 000, K0471 + 131 - K0471 + 149.67","amountPesos":4794000.0,"lengthMeters":340.67,"ratePesosPerMeter":14072.269351572575,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5653"},{"year":2026,"category":"Roads","project":"MNR Jct-Baay-Suba Rd, K0476 + 440 - K0477 + 672, K0481 + 000 - K0482 + 000","amountPesos":33397000.0,"lengthMeters":2232.0,"ratePesosPerMeter":14962.813620071685,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5655"},{"year":2026,"category":"Roads","project":"Vigan-Caoayan Rd - K0408 + 423 - K0410 + 202","amountPesos":22890000.0,"lengthMeters":1779.0,"ratePesosPerMeter":12866.779089376054,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5658"},{"year":2026,"category":"Roads","project":"Vigan-Sta Catalina Rd - K0408 + 896 - K0409 + 571, K0409 + 748 - K0410 + 302","amountPesos":20236000.0,"lengthMeters":1229.0,"ratePesosPerMeter":16465.419039869812,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5660"},{"year":2026,"category":"Roads","project":"Jct Candon-Salcedo-Del Pilar Rd - K0353 + 812 - K0354 + 903.84","amountPesos":16607000.0,"lengthMeters":1091.84,"ratePesosPerMeter":15210.104044548296,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5663"},{"year":2026,"category":"Roads","project":"Sta Maria-Burgos Rd - K0370 + (-437) - K0370 + (-209)","amountPesos":3612000.0,"lengthMeters":228.0,"ratePesosPerMeter":15842.105263157895,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5665"},{"year":2026,"category":"Roads","project":"Binmaley Beach Rd - K0368 + 649 - K0369 + 274","amountPesos":11508000.0,"lengthMeters":625.0,"ratePesosPerMeter":18412.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5668"},{"year":2026,"category":"Roads","project":"Binmaley-Lingayen via Quibaol Rd - K0363 + 465 - K0365 + 000","amountPesos":27104000.0,"lengthMeters":1535.0,"ratePesosPerMeter":17657.328990228012,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5670"},{"year":2026,"category":"Roads","project":"Judge Jose De Venecia Boulevard Ext'n Rd - K0378 + 357 - K0379 + 400","amountPesos":18714000.0,"lengthMeters":1043.0,"ratePesosPerMeter":17942.473633748803,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5672"},{"year":2026,"category":"Roads","project":"Lingayen-Labrador Div Rd - K0362 + (-613) - K0362 + (-178)","amountPesos":8604000.0,"lengthMeters":435.0,"ratePesosPerMeter":19779.310344827587,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5674"},{"year":2026,"category":"Roads","project":"Abra-Cervantes Rd - K0443 + 335 - K0443 + 641, K0443 + 669 - K0443 + 801, K0443 + 952 - K0445 + 000, K0453 + 775 - K0454 + 005, K0459 + 000 - K0459 + 175, K0462 + 029 - K0462 + 045, K0464 + 192 - K0464 + 200, K0464 + 520 - K0464 + 530, K0464 + 570 - K0464 + 580, (S00667LZ) Chainage 000 - Chainage 454, Chainage 460 - Chainage 970","amountPesos":20134000.0,"lengthMeters":2899.0,"ratePesosPerMeter":6945.153501207313,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5678"},{"year":2026,"category":"Roads","project":"Manuel Roxas Rd - K0252 + (-517) - K0252 + (-131), K0252 + 463 - K0253 + 310","amountPesos":18620000.0,"lengthMeters":1233.0,"ratePesosPerMeter":15101.378751013788,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5681"},{"year":2026,"category":"Roads","project":"Gov. Bado  Dangwa National Rd - K0263 + (-163) - K0264 + 017","amountPesos":18160000.0,"lengthMeters":1180.0,"ratePesosPerMeter":15389.830508474577,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5684"},{"year":2026,"category":"Roads","project":"Gov. Bado  Dangwa National Rd - K0310 + 766 - K0310 + 805, K0311 + 000 - K0311 + 105","amountPesos":3920000.0,"lengthMeters":144.0,"ratePesosPerMeter":27222.222222222223,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5686"},{"year":2026,"category":"Roads","project":"Tabuk-Banawe via Tanudan-Barlig Rd - K0509 + 197 - K0509 + 557, K0509 + 901 - K0510 + 907, K0514 + 123 - K0514 + 306.61","amountPesos":26142000.0,"lengthMeters":1549.61,"ratePesosPerMeter":16870.051174166554,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5689"},{"year":2026,"category":"Roads","project":"Mayan-Mauyen Port Rd - K0006 + 768 - K0006 + 928","amountPesos":1160000.0,"lengthMeters":160.0,"ratePesosPerMeter":7250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5693"},{"year":2026,"category":"Roads","project":"Mayan-Mauyen Port Rd - K0007 + 272 - K0007 + 370","amountPesos":1528000.0,"lengthMeters":98.0,"ratePesosPerMeter":15591.836734693878,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5695"},{"year":2026,"category":"Roads","project":"Mayan-Mauyen Port Rd - K0007 + 810 - K0008 + 007","amountPesos":3008000.0,"lengthMeters":197.0,"ratePesosPerMeter":15269.035532994923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5697"},{"year":2026,"category":"Roads","project":"Jct. Gattaran - Cumao - Capissayan - Sta. Margarita - Bolos Pt. Rd. - K0579+537 – K0581+000","amountPesos":23354000.0,"lengthMeters":1463.0,"ratePesosPerMeter":15963.08954203691,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5700"},{"year":2026,"category":"Roads","project":"Ayaga-Sta. Marcela-Flora-Lasam Rd - K0742 + (-738) - K0744 + 567","amountPesos":7269000.0,"lengthMeters":3305.0,"ratePesosPerMeter":2199.394856278366,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5703"},{"year":2026,"category":"Roads","project":"Alicia-San Mateo Rd -  K0358 + 776 - K0360 + 252","amountPesos":9061000.0,"lengthMeters":1476.0,"ratePesosPerMeter":6138.888888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5706"},{"year":2026,"category":"Roads","project":"Jct Ipil-Quirino Bdry Rd - K0337 + 525 - K0338 + 057","amountPesos":18758000.0,"lengthMeters":532.0,"ratePesosPerMeter":35259.3984962406,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5709"},{"year":2026,"category":"Roads","project":"Echague-Jones-Maddela Rd (Villa Norte-Panang Sect) - K0377 + 918 - K0379 + 382","amountPesos":51379000.0,"lengthMeters":1464.0,"ratePesosPerMeter":35094.94535519126,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5712"},{"year":2026,"category":"Roads","project":"Echague-Jones-Maddela Rd (Villa Norte-Panang Sect) - K0379 + 382 - K0380 + 308","amountPesos":32322000.0,"lengthMeters":926.0,"ratePesosPerMeter":34904.967602591794,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5714"},{"year":2026,"category":"Roads","project":"Calaguiman Vicinal Rd - K0116 + (-343.14) - K0116 + 700","amountPesos":25146000.0,"lengthMeters":1043.14,"ratePesosPerMeter":24106.06438253735,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5718"},{"year":2026,"category":"Roads","project":"Balanga Poblacion Rd Chainage 0 - Chainage 227","amountPesos":9766000.0,"lengthMeters":227.0,"ratePesosPerMeter":43022.02643171806,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5721"},{"year":2026,"category":"Roads","project":"Jct Layac-Balanga-Mariveles Port Rd - K0122 + 960 - K0122 + 971, K0132 + 818 - K0132 + 900","amountPesos":2874000.0,"lengthMeters":93.0,"ratePesosPerMeter":30903.225806451614,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5723"},{"year":2026,"category":"Roads","project":"Eastern Bulacan Rd - K0067 + 500 - K0067 + 915","amountPesos":9332000.0,"lengthMeters":415.0,"ratePesosPerMeter":22486.746987951807,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5726"},{"year":2026,"category":"Roads","project":"Sta Rita-Camias Old Rd - K0073 + 323 - K0073 + 755","amountPesos":5159000.0,"lengthMeters":432.0,"ratePesosPerMeter":11942.12962962963,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5729"},{"year":2026,"category":"Roads","project":"Guimba-Talugtug-Umingan Rd - K0163 + 080 - K0163 + 389","amountPesos":14092000.0,"lengthMeters":309.0,"ratePesosPerMeter":45605.17799352751,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5732"},{"year":2026,"category":"Roads","project":"Jct Pinagpanaan-Rizal-Pantabangan Rd - K0156 + 300 - K0157 + 170, K0158 + 000 - K0158 + 580","amountPesos":34122000.0,"lengthMeters":1450.0,"ratePesosPerMeter":23532.41379310345,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5734"},{"year":2026,"category":"Roads","project":"Jct Pinagpanaan-Rizal-Pantabangan Rd - K0173 + 000 - K0174 + 000","amountPesos":27904000.0,"lengthMeters":1000.0,"ratePesosPerMeter":27904.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5736"},{"year":2026,"category":"Roads","project":"Muñoz-Lupao Rd - K0157 + 879 - K0158 + 201","amountPesos":9925000.0,"lengthMeters":322.0,"ratePesosPerMeter":30822.981366459626,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5738"},{"year":2026,"category":"Roads","project":"Cabanatuan City Circumferential Rd - K0114 + 379 - K0115 + 166","amountPesos":17440000.0,"lengthMeters":787.0,"ratePesosPerMeter":22160.10165184244,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5741"},{"year":2026,"category":"Roads","project":"Gapan-Fort Magsaysay Rd - K0106 + 300 - K0107 + 015, K0108 + 020 - K0108 + 179, K0118 + 000 - K0119 + 988","amountPesos":34097000.0,"lengthMeters":2862.0,"ratePesosPerMeter":11913.696715583508,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5743"},{"year":2026,"category":"Roads","project":"Gapan-Fort Magsaysay Rd - K0107 + 015 - K0107 + 700","amountPesos":10548000.0,"lengthMeters":685.0,"ratePesosPerMeter":15398.540145985402,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5745"},{"year":2026,"category":"Roads","project":"Bahay Pare-Sn Luis-Sto Domingo Rd - K0066 + 150 - K0066 + 1062","amountPesos":10891000.0,"lengthMeters":912.0,"ratePesosPerMeter":11941.88596491228,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5748"},{"year":2026,"category":"Roads","project":"Concepcion - La Paz Rd - K0120 + 420- K0121 + 000","amountPesos":25240000.0,"lengthMeters":580.0,"ratePesosPerMeter":43517.24137931035,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5751"},{"year":2026,"category":"Roads","project":"Tarlac - Zambales North West Diversion Road, K0111 + (-312) - K0111 + 790, Capas, Tarlac","amountPesos":20928000.0,"lengthMeters":1102.0,"ratePesosPerMeter":18990.92558983666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5753"},{"year":2026,"category":"Roads","project":"Capas-San Jose-Mayantoc-Malacampa Rd - K0144 + 199 - K0144 + 609","amountPesos":19595000.0,"lengthMeters":410.0,"ratePesosPerMeter":47792.68292682927,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5756"},{"year":2026,"category":"Roads","project":"Paniqui-Ramos Rd - K0146 + (-175) - K0146 + (-104)","amountPesos":4046000.0,"lengthMeters":71.0,"ratePesosPerMeter":56985.91549295775,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5758"},{"year":2026,"category":"Roads","project":"Paniqui-Ramos Rd - K0146 + (-236) - K0146 + (-175)","amountPesos":3488000.0,"lengthMeters":61.0,"ratePesosPerMeter":57180.32786885246,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5760"},{"year":2026,"category":"Roads","project":"Victoria-La Paz Rd - K0141 + 126 - K0141 + 782","amountPesos":34047000.0,"lengthMeters":656.0,"ratePesosPerMeter":51900.91463414634,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5762"},{"year":2026,"category":"Roads","project":"Victoria-La Paz Rd - K0143 + 817 - K0144 + 093","amountPesos":13952000.0,"lengthMeters":276.0,"ratePesosPerMeter":50550.72463768116,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5764"},{"year":2026,"category":"Roads","project":"Talisay-Laurel-Agoncillo Rd - K0117 + 947 - K0118 + 528, K0119 + 441 - K0119 + 541, K0120 + 686 - K0121 + 081.30","amountPesos":27331000.0,"lengthMeters":1076.3,"ratePesosPerMeter":25393.477654928854,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5768"},{"year":2026,"category":"Roads","project":"Talisay-Laurel-Agoncillo Rd - K0114 + 951 -  K0115 + 838","amountPesos":28500000.0,"lengthMeters":887.0,"ratePesosPerMeter":32130.777903043967,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5770"},{"year":2026,"category":"Roads","project":"Tejero-Gen Trias-Amadeo-Tagaytay Rd - K0036 + 104.50 - K0036 + 493","amountPesos":8892000.0,"lengthMeters":388.5,"ratePesosPerMeter":22888.030888030888,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5773"},{"year":2026,"category":"Roads","project":"Tejero-Gen Trias-Amadeo-Tagaytay Rd - K0039 + 166.11 - K0039 + 339.69","amountPesos":12456000.0,"lengthMeters":173.58,"ratePesosPerMeter":71759.41928793567,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5775"},{"year":2026,"category":"Roads","project":"Tejero-Gen Trias-Amadeo-Tagaytay Rd - K0045 + 000 - K0045 + 829.50","amountPesos":21098000.0,"lengthMeters":829.5,"ratePesosPerMeter":25434.599156118144,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5777"},{"year":2026,"category":"Roads","project":"Indang-Alfonso via Luksuhin Rd - K0065 + 043 - K0065 + 239, K0065 + 923 - K0066 + 316","amountPesos":10927000.0,"lengthMeters":589.0,"ratePesosPerMeter":18551.782682512734,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5780"},{"year":2026,"category":"Roads","project":"Indang-Alfonso via Luksuhin Rd - K0070 + 449 - K0071 + 063","amountPesos":17029000.0,"lengthMeters":614.0,"ratePesosPerMeter":27734.527687296417,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5782"},{"year":2026,"category":"Roads","project":"Tagaytay-Batangas Arterial Highway - K0055+(-718) - K0055+040","amountPesos":34098000.0,"lengthMeters":758.0,"ratePesosPerMeter":44984.16886543536,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5784"},{"year":2026,"category":"Roads","project":"Bacoor Blvd. - K0016 + (-659) - K0016 + (-239)","amountPesos":18380000.0,"lengthMeters":420.0,"ratePesosPerMeter":43761.90476190476,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5787"},{"year":2026,"category":"Roads","project":"Marcos Alvarez  Rd - (S01783LZ) Chainage 1053 - Chainage 1396","amountPesos":14624000.0,"lengthMeters":343.0,"ratePesosPerMeter":42635.568513119535,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5789"},{"year":2026,"category":"Roads","project":"Lipa City - Alaminos Rd - K0078 + 492 - K0078 + 916","amountPesos":19979000.0,"lengthMeters":424.0,"ratePesosPerMeter":47120.28301886792,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5792"},{"year":2026,"category":"Roads","project":"Sn Pablo-Rizal-Nagcarlan-Liliw Rd - K0090 + 752 - K0091 + 000, K0093 + 753 - K0093 + 936","amountPesos":11548000.0,"lengthMeters":431.0,"ratePesosPerMeter":26793.50348027842,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5794"},{"year":2026,"category":"Roads","project":"Sn Pablo-Rizal-Nagcarlan-Liliw Rd - K0096 + 520 - K0097 + 429, K0098 + 672 - K0099 + 135","amountPesos":33256000.0,"lengthMeters":1372.0,"ratePesosPerMeter":24239.067055393585,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5796"},{"year":2026,"category":"Roads","project":"Angono Div Rd - K0027 + (-884) - K0027 + (-775), K0027 + (-627) - K0027 + (-502)","amountPesos":12155000.0,"lengthMeters":234.0,"ratePesosPerMeter":51944.444444444445,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5799"},{"year":2026,"category":"Roads","project":"Binangonan Div Rd - K0034 + 396 - K0035 + 000","amountPesos":22928000.0,"lengthMeters":604.0,"ratePesosPerMeter":37960.26490066225,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5801"},{"year":2026,"category":"Roads","project":"Marikina - Infanta Rd - K0022+188 - K0023+000","amountPesos":24774000.0,"lengthMeters":812.0,"ratePesosPerMeter":30509.852216748768,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5803"},{"year":2026,"category":"Roads","project":"Marikina-Infanta Rd - K0021 + 191 - K0021 + 296, K0023 + 000 - K0023 + 109","amountPesos":7992000.0,"lengthMeters":214.0,"ratePesosPerMeter":37345.79439252336,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5805"},{"year":2026,"category":"Roads","project":"Marikina-Infanta Rd - K0023 + 958 - K0023 + 1188","amountPesos":23975000.0,"lengthMeters":230.0,"ratePesosPerMeter":104239.13043478261,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5807"},{"year":2026,"category":"Roads","project":"Marikina-Infanta Rd - K0024 + 051 - K0024 + 408, K0024 + 488 - K0025 + 000","amountPesos":27970000.0,"lengthMeters":869.0,"ratePesosPerMeter":32186.421173762945,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5809"},{"year":2026,"category":"Roads","project":"Marikina-Infanta Rd - K0026 + 051 - K0026 + 279","amountPesos":13694000.0,"lengthMeters":228.0,"ratePesosPerMeter":60061.40350877193,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5811"},{"year":2026,"category":"Roads","project":"Marikina-Victoria Valley-Antipolo Rd - K0017 + (-615) - K0017 + (-205)","amountPesos":15366000.0,"lengthMeters":410.0,"ratePesosPerMeter":37478.04878048781,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5813"},{"year":2026,"category":"Roads","project":"Taytay Div Rd - K0022+(-865)-K0017+(-537)","amountPesos":7992000.0,"lengthMeters":4672.0,"ratePesosPerMeter":1710.6164383561643,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5815"},{"year":2026,"category":"Roads","project":"Rodriguez-Sn Jose Rd - K0029 + 000 - K0029 + 200, K0030 + 523 - K0030 + 838","amountPesos":9590000.0,"lengthMeters":515.0,"ratePesosPerMeter":18621.35922330097,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5818"},{"year":2026,"category":"Roads","project":"Rodriguez-Sn Jose Rd - K0030 + (-323) - K0030 + 400","amountPesos":19703000.0,"lengthMeters":723.0,"ratePesosPerMeter":27251.728907330566,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5820"},{"year":2026,"category":"Roads","project":"Sagbat-Pililla Div Rd - K0058 + 200- K0058 + 520","amountPesos":9975000.0,"lengthMeters":320.0,"ratePesosPerMeter":31171.875,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5822"},{"year":2026,"category":"Roads","project":"Tanay-Sampaloc Rd - K0070 + 734 - K0071 + 080","amountPesos":14749000.0,"lengthMeters":346.0,"ratePesosPerMeter":42627.167630057804,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5824"},{"year":2026,"category":"Roads","project":"CSR Jct-Pola Rd - K0072 + 382 - K0072 + 902","amountPesos":20803000.0,"lengthMeters":520.0,"ratePesosPerMeter":40005.769230769234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5828"},{"year":2026,"category":"Roads","project":"PPNR Jct. - Taytay Poblacion Rd - K0209+765.50 - K0210+000","amountPesos":6129000.0,"lengthMeters":234.5,"ratePesosPerMeter":26136.460554371002,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5831"},{"year":2026,"category":"Roads","project":"Comun-Inarado-Peñafrancia Rd - K0517 + 350 - K0518 + 484","amountPesos":44640000.0,"lengthMeters":1134.0,"ratePesosPerMeter":39365.079365079364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5835"},{"year":2026,"category":"Roads","project":"Comun-Inarado-Peñafrancia Rd - K0528 + 818 - K0529 + 000","amountPesos":3363000.0,"lengthMeters":182.0,"ratePesosPerMeter":18478.021978021978,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5837"},{"year":2026,"category":"Roads","project":"MT Villanueva Ave-Magsaysay Rd - K0440 + 025 - K0440 + 570","amountPesos":21440000.0,"lengthMeters":545.0,"ratePesosPerMeter":39339.449541284404,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5840"},{"year":2026,"category":"Roads","project":"Ariman-Jct Bulusan Lake Rd - K0617 + 010 - K0617 + 516, K0619 + 130 - K0619 + 455","amountPesos":19661000.0,"lengthMeters":831.0,"ratePesosPerMeter":23659.446450060168,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5843"},{"year":2026,"category":"Roads","project":"Irosin-Sn Roque-Bulusan Lake Rd - K0630 + 000 - K0630 + 141","amountPesos":3672000.0,"lengthMeters":141.0,"ratePesosPerMeter":26042.55319148936,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5845"},{"year":2026,"category":"Roads","project":"Jct Gubat-Prieto Diaz Rd - K0599 + (-503) - K0599 + 877","amountPesos":32264000.0,"lengthMeters":1380.0,"ratePesosPerMeter":23379.710144927536,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5847"},{"year":2026,"category":"Roads","project":"Juban-Magallanes Rd - K0606 + 995 - K0608 + 336, K0609 + 652 - K0611 + 000","amountPesos":62917000.0,"lengthMeters":2689.0,"ratePesosPerMeter":23397.91744142804,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5849"},{"year":2026,"category":"Roads","project":"Ariman-Casiguran Rd - K0620 +561 - K0622+120","amountPesos":43220000.0,"lengthMeters":1559.0,"ratePesosPerMeter":27722.899294419498,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5852"},{"year":2026,"category":"Roads","project":"Alangan-Cubay-Sibalom Rd - K0107 + 000 - K0107 + 1010","amountPesos":18512000.0,"lengthMeters":1010.0,"ratePesosPerMeter":18328.712871287127,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5856"},{"year":2026,"category":"Roads","project":"Jct Natl Rd-Ayuyan-Tinaytayan Rd - K0093 + 483 - K0093 + 937.55","amountPesos":9261000.0,"lengthMeters":454.55,"ratePesosPerMeter":20373.99626003727,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5859"},{"year":2026,"category":"Roads","project":"Balabag-Maquina-Cayos-Patlad Rd - K0283 + (-518) - K0283 + (-208), K0283 + 137 - K0284 + 000, K0285 + 000 - K0285 + 100, K0286 + 000 - K0286 + 601, K0288 + 020 - K0288 + 090","amountPesos":4630000.0,"lengthMeters":1944.0,"ratePesosPerMeter":2381.687242798354,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5862"},{"year":2026,"category":"Roads","project":"Passi-San Enrique-Garrita Rd - K0050 + (-409) - K0050 + 353","amountPesos":14817000.0,"lengthMeters":762.0,"ratePesosPerMeter":19444.88188976378,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5864"},{"year":2026,"category":"Roads","project":"Ajuy-Jamul-awon-Concepcion Rd - K0218 + 353 - K0219 + 027","amountPesos":23523000.0,"lengthMeters":674.0,"ratePesosPerMeter":34900.59347181009,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5867"},{"year":2026,"category":"Roads","project":"Barotac Viejo-Sn Rafael  Rd - K0075 + (-514) - K0075 + 017","amountPesos":20374000.0,"lengthMeters":531.0,"ratePesosPerMeter":38369.114877589454,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5869"},{"year":2026,"category":"Roads","project":"Cabatuan-New Lucena-Banga-Bante Rd - K0034 + (-766) - K0034 + (-514.25)","amountPesos":5413000.0,"lengthMeters":251.75,"ratePesosPerMeter":21501.489572989078,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5872"},{"year":2026,"category":"Roads","project":"Baje-Ngi-ngi-an-Bingawan Rd - K0061 + 925 - K0063 + 328","amountPesos":28083000.0,"lengthMeters":1403.0,"ratePesosPerMeter":20016.39344262295,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5875"},{"year":2026,"category":"Roads","project":"North Capitol Rd - (S00105NR) Chainage 281 - Chainage 507","amountPesos":9109000.0,"lengthMeters":226.0,"ratePesosPerMeter":40305.30973451328,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5879"},{"year":2026,"category":"Roads","project":"Plaza-Capitol Rd - K0001 + 000 - K0001 + 070","amountPesos":2822000.0,"lengthMeters":70.0,"ratePesosPerMeter":40314.28571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5881"},{"year":2026,"category":"Roads","project":"South Capitol Rd - (S00108NR) Chainage 284 - Chainage 502","amountPesos":8786000.0,"lengthMeters":218.0,"ratePesosPerMeter":40302.752293577985,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5883"},{"year":2026,"category":"Roads","project":"Jct Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd - K0017 + (-276) - K0017 + 936","amountPesos":39377000.0,"lengthMeters":1212.0,"ratePesosPerMeter":32489.27392739274,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5886"},{"year":2026,"category":"Roads","project":"Jct Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd - K0017 + 936 - K0018 + 269","amountPesos":11016000.0,"lengthMeters":333.0,"ratePesosPerMeter":33081.08108108108,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5888"},{"year":2026,"category":"Roads","project":"Jct Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd - K0020 + 1205 - K0020 + 1393","amountPesos":9740000.0,"lengthMeters":188.0,"ratePesosPerMeter":51808.51063829787,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5890"},{"year":2026,"category":"Roads","project":"Jct Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd - K0023 + 789 - K0024 + 942","amountPesos":44726000.0,"lengthMeters":1153.0,"ratePesosPerMeter":38790.98005203816,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5892"},{"year":2026,"category":"Roads","project":"Dancalan-Candoni-Damutan Valley Rd - K0099 + (-817) - K0099 + (-401)","amountPesos":21766000.0,"lengthMeters":416.0,"ratePesosPerMeter":52322.11538461538,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5895"},{"year":2026,"category":"Roads","project":"Bacolod South Rd (Old Road) - K0020 + 944 - K0020 + 1003, K0021 + 756 - K0021 + 837","amountPesos":5796000.0,"lengthMeters":140.0,"ratePesosPerMeter":41400.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5898"},{"year":2026,"category":"Roads","project":"Jct Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd - K0034 + 325 - K0034 + 465","amountPesos":3380000.0,"lengthMeters":140.0,"ratePesosPerMeter":24142.85714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5900"},{"year":2026,"category":"Roads","project":"Jct Pontevedra-La Castellana Rd - K0054 + 670 - K0054 + 812","amountPesos":3593000.0,"lengthMeters":142.0,"ratePesosPerMeter":25302.816901408452,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5902"},{"year":2026,"category":"Roads","project":"Sum-ag-Abuanan Rd - K0011 + 384 - K0011 + 566, K0012 + 000 - K0012 + 308, K0013 + 000 - K0014 + 000","amountPesos":45489000.0,"lengthMeters":1490.0,"ratePesosPerMeter":30529.53020134228,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5904"},{"year":2026,"category":"Roads","project":"Dumaguete City-Valencia-Bacong Rd - K0003 + 000 - K0004 + 000","amountPesos":33455000.0,"lengthMeters":1000.0,"ratePesosPerMeter":33455.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5907"},{"year":2026,"category":"Roads","project":"Sagbayan-Danao Rd - K0089 + 912 - K0091 + 050","amountPesos":20213000.0,"lengthMeters":1138.0,"ratePesosPerMeter":17761.862917398947,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5911"},{"year":2026,"category":"Roads","project":"Tapal (Carcar) Zaragosa-Olango-Aloguinsan Rd - K0084 + 000 - K0085 + 492.49","amountPesos":26439000.0,"lengthMeters":1492.49,"ratePesosPerMeter":17714.691555722253,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5914"},{"year":2026,"category":"Roads","project":"Sogod-Tabuelan Rd - K0119 + (-845) - K0119 + (-015)","amountPesos":28548000.0,"lengthMeters":830.0,"ratePesosPerMeter":34395.180722891564,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5917"},{"year":2026,"category":"Roads","project":"Sogod-Tabuelan Rd - K0121 + 460 - K0122 + 046, K0122 + 867 - K0123 + 097, K0124 + 250 - K0124 + 500","amountPesos":37878000.0,"lengthMeters":1066.0,"ratePesosPerMeter":35532.833020637896,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5919"},{"year":2026,"category":"Roads","project":"AS Fortuna St - K0008 + 207 - K0008 + 965.63","amountPesos":23728000.0,"lengthMeters":758.63,"ratePesosPerMeter":31277.434322396984,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5922"},{"year":2026,"category":"Roads","project":"Dalaguete-Mantalongon Badian Rd - K0115 + 759 - K0116 + 559","amountPesos":33226000.0,"lengthMeters":800.0,"ratePesosPerMeter":41532.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5925"},{"year":2026,"category":"Roads","project":"Legaspi Ext (S00131CB) Chainage 000 - Chainage 344","amountPesos":28201000.0,"lengthMeters":344.0,"ratePesosPerMeter":81979.6511627907,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5930"},{"year":2026,"category":"Roads","project":"MC Briones St - (S00122CB) Chainage 290 - Chainage 747","amountPesos":34811000.0,"lengthMeters":457.0,"ratePesosPerMeter":76172.86652078775,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5932"},{"year":2026,"category":"Roads","project":"MJ Cuenco Ave (S00101CB) Chainage 681 - Chainage 980, Cebu City","amountPesos":22032000.0,"lengthMeters":299.0,"ratePesosPerMeter":73685.61872909698,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5934"},{"year":2026,"category":"Roads","project":"Burauen-Mahagnao Rd - K0988 + 739 - K0990 + 000","amountPesos":6754000.0,"lengthMeters":1261.0,"ratePesosPerMeter":5356.066613798573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5938"},{"year":2026,"category":"Roads","project":"Dulag-Julita-Burauen Rd - K0952 + 284 - K0952 + 800","amountPesos":17557000.0,"lengthMeters":516.0,"ratePesosPerMeter":34025.19379844961,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5940"},{"year":2026,"category":"Roads","project":"Libungao-Matag-ob-Palompon Rd - K0996 + 980 - K0997 + 755","amountPesos":43981000.0,"lengthMeters":775.0,"ratePesosPerMeter":56749.67741935484,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5943"},{"year":2026,"category":"Roads","project":"Rawis-Catubig Rd - K0797 + 928 - K0798 + 200","amountPesos":3799000.0,"lengthMeters":272.0,"ratePesosPerMeter":13966.911764705883,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5946"},{"year":2026,"category":"Roads","project":"Apitong-Paterno Rd - K0908 + (-915) - K0908 + (-557)","amountPesos":11692000.0,"lengthMeters":358.0,"ratePesosPerMeter":32659.217877094972,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5949"},{"year":2026,"category":"Roads","project":"Naga-Naga Anibong Rd - K0906 + 1431 - K0906 + 1635","amountPesos":6764000.0,"lengthMeters":204.0,"ratePesosPerMeter":33156.86274509804,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5951"},{"year":2026,"category":"Roads","project":"Sn Jose-Manlurip-MacArthur Park Rd - K0912 + 006 - K0912 + 845","amountPesos":26790000.0,"lengthMeters":839.0,"ratePesosPerMeter":31930.87008343266,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5953"},{"year":2026,"category":"Roads","project":"Mayor CA Fernandez Road - (S01496MN) Chainage 000 - Chainage 491","amountPesos":27440000.0,"lengthMeters":491.0,"ratePesosPerMeter":55885.947046843175,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5957"},{"year":2026,"category":"Roads","project":"RT Lim Blvd - K1940 + 1247 - K1940 + 1312, K1940 + 1688 - K1940 + 1727, K1940 + 1896 - K1940 + 2717","amountPesos":39200000.0,"lengthMeters":925.0,"ratePesosPerMeter":42378.37837837838,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5959"},{"year":2026,"category":"Roads","project":"Southern Command Main Road - (S01210MN)- K1943 + (-615) - K1943 + (-206), K1943 + (-206)- K1943 + 066","amountPesos":16660000.0,"lengthMeters":681.0,"ratePesosPerMeter":24464.0234948605,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5961"},{"year":2026,"category":"Roads","project":"Southern Command Main Road Loop - (S01209MN) Chainage 000 - Chainage 542","amountPesos":11270000.0,"lengthMeters":542.0,"ratePesosPerMeter":20793.357933579337,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5963"},{"year":2026,"category":"Roads","project":"Southern Support Command Road - (S01212MN) K1945 + (-075) - K1945 + (-050), K1945 + 926 - K1945 + 1225","amountPesos":7154000.0,"lengthMeters":324.0,"ratePesosPerMeter":22080.246913580246,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5965"},{"year":2026,"category":"Roads","project":"Pagadian City - Wharf Rd K1667 + 000 - K1667 + 512 S01319MN","amountPesos":24460000.0,"lengthMeters":512.0,"ratePesosPerMeter":47773.4375,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5970"},{"year":2026,"category":"Roads","project":"Imelda-Payao-Siay Rd - K1766 + 000 - K1767 + 156.21","amountPesos":43455000.0,"lengthMeters":1156.21,"ratePesosPerMeter":37584.00290604769,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5973"},{"year":2026,"category":"Roads","project":"Imelda-Payao-Siay Rd (S01216MN) – K1769 + 000 - K1771+229, Zamboanga Sibugay","amountPesos":49000000.0,"lengthMeters":2229.0,"ratePesosPerMeter":21982.951996410946,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5975"},{"year":2026,"category":"Roads","project":"Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Rd - K1757 + (-334) - K1757 + (-134), K1757 + 665 - K1758 + 311.5","amountPesos":19600000.0,"lengthMeters":846.5,"ratePesosPerMeter":23154.164205552275,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5978"},{"year":2026,"category":"Roads","project":"Jct Maradugao-Camp Kibaritan-Dominorog Rd - K1606 + 158 - K1607 + 000, K1614 + 1277 - K1615 + 000","amountPesos":24216000.0,"lengthMeters":1119.0,"ratePesosPerMeter":21640.750670241287,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5982"},{"year":2026,"category":"Roads","project":"Kibawe-Kadingilan-Kalilangan Rd - K1612 + 000 - K1612 + 750","amountPesos":20036000.0,"lengthMeters":750.0,"ratePesosPerMeter":26714.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5984"},{"year":2026,"category":"Roads","project":"Maramag-Maradugao Rd - K1591 + 000 - K1592 + 031, K1596 + 636 - K1596 + 986","amountPesos":36441000.0,"lengthMeters":1381.0,"ratePesosPerMeter":26387.400434467778,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5986"},{"year":2026,"category":"Roads","project":"Aloran Old Route - K1734 + (-579) - K1734 + (-465), K1734 + (-458) - K1734 + 111, K1734 + 173 - K1734 + 360","amountPesos":19797000.0,"lengthMeters":870.0,"ratePesosPerMeter":22755.172413793105,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5989"},{"year":2026,"category":"Roads","project":"Jimenez Port Rd - K1724 + (-848) - K1724 + 014","amountPesos":18373000.0,"lengthMeters":862.0,"ratePesosPerMeter":21314.385150812064,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5991"},{"year":2026,"category":"Roads","project":"Buhangin-Mandug-Callawa-Fatima Rd - (S01582MN) Chainage 2780 - Chainage 2810, Chainage 11012 - Chainage 11104, Chainage 16043 - Chainage 16059, Chainage 17896 - Chainage 17912, Chainage 19613 - Chainage 19655, Chainage 19984 - Chainage 19998, Chainage 20462 - Chainage 20475, Chainage 21017 - Chainage 21030, Chainage 21459 - Chainage 21468, Chainage 21488 - Chainage 21515, Chainage 22461 - Chainage 22486, Chainage 23399 - Chainage 23412, Chainage 25443 - Chainage 25479, Chainage 25512 - Chainage 25521, Chainage 27555 - Chainage 27580, Chainage 28373 - Chainage 28382, Chainage 28698 - Chainage 28713, Chainage 28715 - Chainage 28720, Chainage 28980 - Chainage 29060, Chainage 29088 - Chainage 29106, Chainage 29109 - Chainage 29123, Chainage 29268 - Chainage 29273, Chainage 31705 - Chainage 31720","amountPesos":4363000.0,"lengthMeters":541.0,"ratePesosPerMeter":8064.695009242144,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5995"},{"year":2026,"category":"Roads","project":"Surallah-Lake Sebu-Maitum Rd - K1740 + 504 - K1740 + 949","amountPesos":16639000.0,"lengthMeters":445.0,"ratePesosPerMeter":37391.011235955055,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 5999"},{"year":2026,"category":"Roads","project":"Surallah-Lake Sebu-Maitum Rd - K1755 + 815 - K1757 + 291","amountPesos":20101000.0,"lengthMeters":1476.0,"ratePesosPerMeter":13618.563685636856,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6001"},{"year":2026,"category":"Roads","project":"Surallah-Lake Sebu-Maitum Rd - K1757 + 291 - K1757 + 760","amountPesos":9244000.0,"lengthMeters":469.0,"ratePesosPerMeter":19710.02132196162,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6003"},{"year":2026,"category":"Roads","project":"Surallah-Lake Sebu-Maitum Rd - K1759 + 000 - K1761 + 020","amountPesos":22319000.0,"lengthMeters":2020.0,"ratePesosPerMeter":11049.009900990099,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6005"},{"year":2026,"category":"Roads","project":"Butuan City-Pianing-Tandag Rd - K1233 + 109 - K1234 + 299","amountPesos":7036000.0,"lengthMeters":1190.0,"ratePesosPerMeter":5912.605042016807,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6009"},{"year":2026,"category":"Roads","project":"MacArthur H-way (S02225LZ) K0014 + 570 - K0015 + 113","amountPesos":89378000.0,"lengthMeters":543.0,"ratePesosPerMeter":164600.36832412524,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6019"},{"year":2026,"category":"Roads","project":"MacArthur H-way (S02225LZ) K0015 + 113 - K0015 + 663","amountPesos":89378000.0,"lengthMeters":550.0,"ratePesosPerMeter":162505.45454545456,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6021"},{"year":2026,"category":"Roads","project":"Manila North Road - K0169 + (-813) - K0169 + (-540), K0169 + 571 - K0169 + 726","amountPesos":12740000.0,"lengthMeters":428.0,"ratePesosPerMeter":29766.355140186915,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6024"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0271 + 940 - K0272 + 110","amountPesos":4237000.0,"lengthMeters":170.0,"ratePesosPerMeter":24923.529411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6027"},{"year":2026,"category":"Roads","project":"Santiago-Tuguegarao Rd - K0356 + 609 - K0360 + 430","amountPesos":66522000.0,"lengthMeters":3821.0,"ratePesosPerMeter":17409.578644333946,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6029"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0060 + 561 - K0060 + 840, K0070 + 655 - K0070 + 745, K0054 + 721 - K0055 + 041","amountPesos":28849000.0,"lengthMeters":689.0,"ratePesosPerMeter":41870.82728592162,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6032"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0200 + 433 - K0201 + 000, K0201 + 000 - K0201 + 113","amountPesos":31940000.0,"lengthMeters":680.0,"ratePesosPerMeter":46970.58823529412,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6034"},{"year":2026,"category":"Roads","project":"Maharlika Highway, K0040 + 691 - K0041 + 174, K0041 + 196 - K0041 + 769, K0045 + 000 - K0045 + 607, K0045 + 635 - K0046 + 450, K0047 + 000 - K0047 + 977, K0047 + 987 - K0048 + 458, K0048 + 640 - K0048 + 787","amountPesos":358680000.0,"lengthMeters":4073.0,"ratePesosPerMeter":88062.8529339553,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6036"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0018+(-583) - K0018+(-575.1), K0018+(-575.1) - K0018+541, K0018+541 - K0018+700, K0018+942 - K0019+442.5","amountPesos":89572000.0,"lengthMeters":1783.5,"ratePesosPerMeter":50222.59601906364,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6038"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0047+000 - K0047+130, K0048+522 - K0048+720, K0050+1097 - K0050+1278","amountPesos":55860000.0,"lengthMeters":509.0,"ratePesosPerMeter":109744.59724950884,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6040"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0055 + 093 - K0055 + 131, K0055 + 139 - K0055 + 350, K0056 + 988 - K0057 + 550","amountPesos":101136000.0,"lengthMeters":811.0,"ratePesosPerMeter":124705.30209617756,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6042"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0064 + 357 - K0064 + 900","amountPesos":69745000.0,"lengthMeters":543.0,"ratePesosPerMeter":128443.8305709024,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6044"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0072 + 952 - K0074 + 000, K0079 + (-262) - K0079 + (-342), K0079 + 649 - K0079 + 726","amountPesos":34597000.0,"lengthMeters":1205.0,"ratePesosPerMeter":28711.203319502074,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6047"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0142 + 039 - K0142 + 200, K0142 + 300 - K0142 + 326","amountPesos":10786000.0,"lengthMeters":187.0,"ratePesosPerMeter":57679.14438502674,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6049"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0159 + 307 - K0159 + 907, K0162 + 180 - K0162 + 200","amountPesos":19089000.0,"lengthMeters":620.0,"ratePesosPerMeter":30788.709677419356,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6051"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0173 + 166 - K0173 + 374, K0173 + 407 - K0173 + 489, K0173 + 530 - K0173 + 615, K0173 + 730 - K0173+ 820, K0173 + 820 - K0173 + 860, K0174 + 056 - K0174 + 200, K0178 + 100 - K0178 + 500, K0178 + 500 - K0178 + 550, K0178 + 580 - K0178 + 1071","amountPesos":45595000.0,"lengthMeters":1590.0,"ratePesosPerMeter":28676.100628930817,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6053"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0167+920 - K0168+125 - K0168+145 - K0168+240 - K0168+270 - K0168+330 - K0168+350 - K0168+550 - K0168+610 - K0169+025","amountPesos":30040000.0,"lengthMeters":975.0,"ratePesosPerMeter":30810.25641025641,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6055"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0179+000 - K0180+276 - K0181+184 - K0182+000 - K0183+000 - K0183+260 - K0185+698 - K0185+853,K0185+868 - K0186+022","amountPesos":66699000.0,"lengthMeters":2661.0,"ratePesosPerMeter":25065.388951521985,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6057"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0181 + 814 - K0182 + 000, K0183 + 000 - K0183 + 260, K0185 + 698 - K0185 + 853 - K0185 + 868 - K0186 + 022, K0190 + 080 - K0190 + 149 - K0190 + 260 - K0190 + 320, K0190 + 370 - K0190 + 420 - K0190 + 746 - K0190 + 796, K0190 + 796 - K0190 + 850 - K0191+ 200 - K0192 + 000, K0193 + 1028 - K0194 + 032 - K0194 + 032 - K0194 + 149, K0194 + 149 - K0194 + 201 - K0194 + 690 - K0194 + 740, K0194 + 740 - K0195 + 000 - K0202 + 365 - K0202 + 432, K0203 + 800 - K0203 + 918 - K0203 + 956 - K0204 + 000","amountPesos":63372000.0,"lengthMeters":2550.0,"ratePesosPerMeter":24851.764705882353,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6059"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0204 + 000 - K0204 + 254, K0205 + 400 - K0205 + 627, K0210 + 261 - K0210 + 311 - K0210 + 820 - K0210 + 925 - K0211 + 010 - K0211 + 070 - K0211 + 161 - K0211 + 211, K0211 + 249 - K0211 + 374 - K0211 + 374 - K0211 + 425, K0211 + 514 - K0211 + 571 - K0211 + 571 - K0211 + 644, K0211 + 644 - K0212 + 000 - K0212 + 000 - K0212 + 132 - K0212 + 149 - K0212 + 303 - K0212 + 303 - K0212 + 358 - K0212 + 381 - K0212 + 452 - K0212 + 452 - K0212 + 718 - K0212 + 718 - K0212 + 819 - K0212 + 915 - K0213 + 000 - K0213 + 000 - K0213 + 050 - K0213 + 100 - K0213 + 403","amountPesos":63372000.0,"lengthMeters":2625.0,"ratePesosPerMeter":24141.714285714286,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6061"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0213 + 403 - K0213 + 560 - K0213 + 750 - K0213 + 800- K0213+ 800 - K0214 + 000 - K0214 + 880 - K0215 + 020 - K0220 + 455 - K0220 + 616 - K0221 + 168 - K0221 + 559 - K0221 + 878 - K0222 + 000 - K0223 + 522 - K0223 + 614 - K0223 + 614 - K0223 + 711 - K0224 + 540 - K0224 + 590 - K0227 + 440 - K0227 + 572 - K0228 + 138 - K0228 + 205 - K0228 + 850 - K0228 + 905 - K0230 + 641 - K0230 + 741 - K0230 + 897 - K0231 + 205 - K0231 + 542 - K0231 + 592 - K0238 + 000 - K0239 + 000 - K0241 + 145 - K0241 + 349 - K0241 + 584 - K0241 + 634 - K0242 + 599 - K0242 + 711 - K0243 + 114 - K0243 + 356 - K0243 + 738 - K0243 + 794","amountPesos":93379000.0,"lengthMeters":3836.0,"ratePesosPerMeter":24342.805005213766,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6063"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0201 + 736 - K0201 + 866, K0201 + 867 - K0202 + 075, K0202 + 369 - K0202 + 383","amountPesos":14415000.0,"lengthMeters":352.0,"ratePesosPerMeter":40951.704545454544,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6065"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0208 + 405 - K0208 + 795","amountPesos":11840000.0,"lengthMeters":390.0,"ratePesosPerMeter":30358.97435897436,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6067"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0224 + 329 - K0224 + 504, K0223 + 440 - K0223 + 573, K0227 + 362 - K0227 + 420, K0230 + 582 - K0230 + 682, K0231 + 479 - K0231 + 529, K0231 + 1051 - K0233 + 112, K0233 + 167 - K0233 + 296, K0234 + 717 - K0234 + 800, K0237 + 963 - K0238 + 100","amountPesos":61035000.0,"lengthMeters":1926.0,"ratePesosPerMeter":31690.031152647975,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6070"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0247 + (-272) - K0247 + 510, K0247 + 698 - K0247 + 932, K0249 + 770 - K0250 + 035","amountPesos":86073000.0,"lengthMeters":1281.0,"ratePesosPerMeter":67192.03747072599,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6073"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0259 + 660 - K0259 + 914, K0259 + 955.50 - K0260 + 745.5","amountPesos":35978000.0,"lengthMeters":1044.0,"ratePesosPerMeter":34461.685823754786,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6075"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0260 + 745.5 - K0260 + 818","amountPesos":3017000.0,"lengthMeters":72.5,"ratePesosPerMeter":41613.793103448275,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6077"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0329 + 417 - K0329 + 750, K0330 + 000 - K0330 + 371","amountPesos":23047000.0,"lengthMeters":704.0,"ratePesosPerMeter":32737.215909090908,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6079"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0335 + 484 - K0335 + 755, K0339 + 000 - K0339 + 131, K0345 + 000 - K0345 + 222, K0353 + 664 - K0353 + 799","amountPesos":34904000.0,"lengthMeters":759.0,"ratePesosPerMeter":45986.824769433464,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6081"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0351 + 000 - K0351 + 400","amountPesos":23050000.0,"lengthMeters":400.0,"ratePesosPerMeter":57625.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6083"},{"year":2026,"category":"Roads","project":"Cebu North Hagnaya Wharf Rd - K0019 + 292 - K0020 + 000, K0030 + 000 - K0030 + 805","amountPesos":130815000.0,"lengthMeters":1513.0,"ratePesosPerMeter":86460.67415730337,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6086"},{"year":2026,"category":"Roads","project":"N Bacalso Ave (Cebu South Rd) -  K0054 + 607 - K0055 + 070, K0055 + 228 - K0056 + 096","amountPesos":102794000.0,"lengthMeters":1331.0,"ratePesosPerMeter":77230.65364387678,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6088"},{"year":2026,"category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0016 + 000 - K0016 + 433, K0016 + 470 - K0017 + 115","amountPesos":55233000.0,"lengthMeters":1078.0,"ratePesosPerMeter":51236.549165120596,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6090"},{"year":2026,"category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0046 + 400 - K0049 + 000","amountPesos":135226000.0,"lengthMeters":2600.0,"ratePesosPerMeter":52010.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6092"},{"year":2026,"category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0053 + 000 - K0054 + 566","amountPesos":68436000.0,"lengthMeters":1566.0,"ratePesosPerMeter":43701.14942528736,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6094"},{"year":2026,"category":"Roads","project":"Naga-Uling Rd - K0032 + 000 - K0034 + 084, K0034 + 143 - K0034 + 596","amountPesos":61275000.0,"lengthMeters":2537.0,"ratePesosPerMeter":24152.542372881355,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6096"},{"year":2026,"category":"Roads","project":"Toledo-Pinamungahan-Aloguinsan-Mantalongon Rd - K0068 + 114 - K0069 + 227, K0069 + 565 - K0069 + 770, K0084 + 000 - K0085 + 205.95","amountPesos":56190000.0,"lengthMeters":2523.95,"ratePesosPerMeter":22262.723112581494,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6098"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LT) - K0955 + 171 - K0955 + 383.15","amountPesos":13141000.0,"lengthMeters":212.15,"ratePesosPerMeter":61942.02215412942,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6101"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LT) - K1009 + 000 - K1010 + 365","amountPesos":32584000.0,"lengthMeters":1365.0,"ratePesosPerMeter":23871.06227106227,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6103"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LT) - K1010 + 365 - K1010 + 877, K1012 + 000 - K1012 + 866","amountPesos":32351000.0,"lengthMeters":1378.0,"ratePesosPerMeter":23476.77793904209,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6105"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0702 + 857 - K0703 + 000, K0705 + 790 - K0705 + 816, K0711 + 000 - K0711 + 081, K0715 + 399 - K0715 + 474, K0715 + 614 - K0715 + 638, K0715 + 682 - K0715 + 686, K0715 + 700 - K0716 + 000, K0717 + 357 - K0717 + 390, K0720 + 672 - K0720 + 732, K0734 + 532 - K0734 + 563, K0737 + 101 - K0738 + 028","amountPesos":50000000.0,"lengthMeters":1704.0,"ratePesosPerMeter":29342.723004694835,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6109"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0696 + 178 - K0696 + 183, K0696 + 692 - K0696 + 851, K0698 + 388 - K0698 + 495, K0698 + 553 - K0698 + 613, K0698 + 687 - K0698 + 720, K0700 + 000 - K0700 + 895","amountPesos":46376000.0,"lengthMeters":1259.0,"ratePesosPerMeter":36835.58379666402,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6111"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0714 + 963 - K0715 + 000, K0718 + 815 - K0719 + 000, K0719 + 153 - K0719 + 275","amountPesos":13002000.0,"lengthMeters":344.0,"ratePesosPerMeter":37796.51162790698,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6113"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0715 + 474 - K0715 + 597, K0720 + 732 - K0720 + 762","amountPesos":6154000.0,"lengthMeters":153.0,"ratePesosPerMeter":40222.22222222222,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6115"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0730 + 136 - K0730 + 809, K0732 + 000 - K0732 + 100, K0733 + 630 - K0734 + 000","amountPesos":66339000.0,"lengthMeters":1143.0,"ratePesosPerMeter":58039.370078740154,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6117"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0762 + 929 - K0763 + 442, K0763 + 608 - K0764 + 200","amountPesos":27649000.0,"lengthMeters":1105.0,"ratePesosPerMeter":25021.719457013576,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6119"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0755 + 000 - K0755 + 055, K0757 + 438 - K0757 + 502  K0758 + 200 - K0758 + 600, K0758 + 690 - K0758 + 782, K0758 + 809 - K0759 + 210, K0760 + 817 - K0762 + 000, K0762 + 828 - K0762 + 929","amountPesos":72865000.0,"lengthMeters":2296.0,"ratePesosPerMeter":31735.62717770035,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6121"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0781 + 000 - K0781 + 233","amountPesos":6068000.0,"lengthMeters":233.0,"ratePesosPerMeter":26042.91845493562,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6123"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0781 + 780 - K0781 + 817","amountPesos":1223000.0,"lengthMeters":37.0,"ratePesosPerMeter":33054.05405405405,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6125"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0781 + 817 - K0782 + 508, K0784 + 901 - K0785 + 000","amountPesos":19052000.0,"lengthMeters":790.0,"ratePesosPerMeter":24116.45569620253,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6127"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0791 + 390 - K0791 + 649, K0792 + 286 - K0792 + 312, K0793 + 700 - 0793 + 926, K0795 + 000 - K0795 + 721, K0797 + 210 - K0797 + 938, K0815 + 649 - K0816 + 000, K0837 + 083 - K0837 + 297, K0838 + 000 - K0838 + 109","amountPesos":93100000.0,"lengthMeters":2634.0,"ratePesosPerMeter":35345.482156416096,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6129"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0804 + 537 - K0804 + 891, K0808 + 000 - K0809 + 496","amountPesos":60521000.0,"lengthMeters":1850.0,"ratePesosPerMeter":32714.054054054053,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6131"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0813 + 191 - K0813 + 298, K0813 + 343 - K0813 + 387, K0813 + 408 - K0813 + 511","amountPesos":7328000.0,"lengthMeters":254.0,"ratePesosPerMeter":28850.3937007874,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6133"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0863 + 541 - K0863 + 600, K0863 + 700 - K0863 + 772, K0870 + 606 - K0870 + 622, K0871 + 515 - K0871 + 953, K0872 + 064 - K0872 + 099, K0872 + 760 - K0872 + 967, K0874 + 000 - K0874 + 905, K0874 + 938 - K0875 + 000, K0878 + 590 - K0879 + 014, K0879 + 370 - K0880 + 228","amountPesos":88209000.0,"lengthMeters":3076.0,"ratePesosPerMeter":28676.527958387516,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6135"},{"year":2026,"category":"Roads","project":"Dipolog-Sindangan-Liloy Rd - K1847 + (-574) - K1847 + (-003), K1847 + 717 - K1847 + 812, K1847 + 967 - K1848 + 274, K1849 + 476 - K1850 + 188","amountPesos":33282000.0,"lengthMeters":1685.0,"ratePesosPerMeter":19751.928783382788,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6138"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) (S01315MN) - K1859 + 920 - K1859 + 984, K1866 + 303 - K1866 + 384, K1867 + 326 - K1867 + 412, K1868 + 848 - K1869 + 000 K1870 + 520 - K1870 + 1000, K1878 + 337 - K1878 + 867, K1889 + 504 - K1890 + 029","amountPesos":46029000.0,"lengthMeters":1918.0,"ratePesosPerMeter":23998.435870698646,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6140"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1807 + 644 - K1808 + 000, K1809 + 313 - K1809 + 500, K1810 + 000 - K1810 + 460, K1811 + 000 - K1811 + 541","amountPesos":31463000.0,"lengthMeters":1544.0,"ratePesosPerMeter":20377.59067357513,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6142"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1834 + 000 - K1835 + 000, K1835 + 600 - K1837 + 143, K1837 + 447 - K1837 + 702, K1838 + 000 - K1838 + 713, K1838 + 816 - K1839 + 250","amountPesos":78848000.0,"lengthMeters":3945.0,"ratePesosPerMeter":19986.81875792142,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6144"},{"year":2026,"category":"Roads","project":"Linamon-Zamboanga Rd - K1539+910 - K1540+123, K1544+000 - K1545+626, K1561+035 - K1561+845","amountPesos":59860000.0,"lengthMeters":2649.0,"ratePesosPerMeter":22597.206493016234,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6147"},{"year":2026,"category":"Roads","project":"Linamon-Zamboanga Rd (S00914MN) - K1556+ 000 - K1558 + 000","amountPesos":52855000.0,"lengthMeters":2000.0,"ratePesosPerMeter":26427.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6149"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1426 + (-928) - K1426 + (-300)","amountPesos":66069000.0,"lengthMeters":628.0,"ratePesosPerMeter":105205.41401273885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6151"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Cotabato-Lanao Rd) - K1875 + 851 - K1876 + 666, K1881 + 044 - K1881 + 321, K1883 + 281 - K1883 + 507, K1893 + 698 - K1893 + 931","amountPesos":164950000.0,"lengthMeters":1551.0,"ratePesosPerMeter":106350.74145712443,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6154"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1312 + 090 - K1312 + 655, K1315 + 085 - K1316 + 000","amountPesos":34315000.0,"lengthMeters":1480.0,"ratePesosPerMeter":23185.81081081081,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6157"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1358 + 905 - K1359 + 000","amountPesos":3933000.0,"lengthMeters":95.0,"ratePesosPerMeter":41400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6159"},{"year":2026,"category":"Roads","project":"Paranaque-Sucat Rd - K0016 + 000 - K0016 + 162","amountPesos":10996000.0,"lengthMeters":162.0,"ratePesosPerMeter":67876.54320987655,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6162"},{"year":2026,"category":"Roads","project":"Paranaque-Sucat Rd - K0016 + 349 - K0016 + 876","amountPesos":37186000.0,"lengthMeters":527.0,"ratePesosPerMeter":70561.66982922201,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6164"},{"year":2026,"category":"Roads","project":"Roxas Blvd - K0006 + 016 - K0006 + 102","amountPesos":1710000.0,"lengthMeters":86.0,"ratePesosPerMeter":19883.720930232557,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6166"},{"year":2026,"category":"Roads","project":"Roxas Blvd - K0007 + 271 - K0007 + 419","amountPesos":7559000.0,"lengthMeters":148.0,"ratePesosPerMeter":51074.32432432433,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6168"},{"year":2026,"category":"Roads","project":"MacArthur H-way (S02225LZ) K0011 + 540 - K0012 + 040","amountPesos":86356000.0,"lengthMeters":500.0,"ratePesosPerMeter":172712.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6171"},{"year":2026,"category":"Roads","project":"Manila North Road- K0336 + 000 - K0336 + 645","amountPesos":17993000.0,"lengthMeters":645.0,"ratePesosPerMeter":27896.124031007752,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6175"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0223 + 906 - K0224 + 1045","amountPesos":35476000.0,"lengthMeters":1139.0,"ratePesosPerMeter":31146.619841966636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6178"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0232 + 174 - K0233 + 212","amountPesos":15178000.0,"lengthMeters":1038.0,"ratePesosPerMeter":14622.350674373796,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6180"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0235 + 000-K0235 + 415","amountPesos":7310000.0,"lengthMeters":415.0,"ratePesosPerMeter":17614.4578313253,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6182"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0236 + 075 - K0236 + 238","amountPesos":4853000.0,"lengthMeters":163.0,"ratePesosPerMeter":29773.006134969324,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6184"},{"year":2026,"category":"Roads","project":"Pangasinan-Tarlac Rd - K0173 + 477 - K0173 + 829","amountPesos":8421000.0,"lengthMeters":352.0,"ratePesosPerMeter":23923.295454545456,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6187"},{"year":2026,"category":"Roads","project":"Manuel S. Agyao Boulevard - K0513 + 837 - K0513 + 943, K0514 + 134 - K0514 + 155, K0514 + 187 - K0514 + 262","amountPesos":2410000.0,"lengthMeters":202.0,"ratePesosPerMeter":11930.69306930693,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6191"},{"year":2026,"category":"Roads","project":"Santiago-Tuguegarao Rd - K0419 + (-522) - K0419 + (-422), K0431 + 052 - K0431 + 070","amountPesos":2842000.0,"lengthMeters":118.0,"ratePesosPerMeter":24084.745762711864,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6195"},{"year":2026,"category":"Roads","project":"Santiago-Tuguegarao Rd - K0378 + 803 - K0378 + 936","amountPesos":2177000.0,"lengthMeters":133.0,"ratePesosPerMeter":16368.421052631578,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6198"},{"year":2026,"category":"Roads","project":"Santiago-Tuguegarao Rd - K0340 + 665 - K0341 + 964","amountPesos":22174000.0,"lengthMeters":1299.0,"ratePesosPerMeter":17070.05388760585,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6201"},{"year":2026,"category":"Roads","project":"Santiago-Tuguegarao Rd - K0351 + 460 - K0352 + 000, K0352 + 926 - K0354 + 776","amountPesos":38168000.0,"lengthMeters":2390.0,"ratePesosPerMeter":15969.874476987448,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6203"},{"year":2026,"category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0073 + 561 - K0073 + 849","amountPesos":31444000.0,"lengthMeters":288.0,"ratePesosPerMeter":109180.55555555556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6207"},{"year":2026,"category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0090 + 041 - K0090 + 337, K0096 + 006 - K0096 + 057","amountPesos":20034000.0,"lengthMeters":347.0,"ratePesosPerMeter":57734.87031700288,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6209"},{"year":2026,"category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0096 + 167 - K0096 + 234","amountPesos":2194000.0,"lengthMeters":67.0,"ratePesosPerMeter":32746.268656716416,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6212"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0127 + 337 - K0127 + 588","amountPesos":15304000.0,"lengthMeters":251.0,"ratePesosPerMeter":60972.11155378486,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6215"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0127 + 588 - K0127 + 808, K0135 + 472 - K0136 + 345","amountPesos":35963000.0,"lengthMeters":1093.0,"ratePesosPerMeter":32903.019213174746,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6217"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0152 + 503 - K0153 + 035","amountPesos":17029000.0,"lengthMeters":532.0,"ratePesosPerMeter":32009.398496240603,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6219"},{"year":2026,"category":"Roads","project":"Romulo H-way - K0143 + 299 - K0143 + 811","amountPesos":14165000.0,"lengthMeters":512.0,"ratePesosPerMeter":27666.015625,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6221"},{"year":2026,"category":"Roads","project":"Romulo H-way - K0158 + 276 - K0158 + 529","amountPesos":7075000.0,"lengthMeters":253.0,"ratePesosPerMeter":27964.426877470356,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6223"},{"year":2026,"category":"Roads","project":"Romulo H-way - K0162 + 775 - K0163 + 226","amountPesos":12498000.0,"lengthMeters":451.0,"ratePesosPerMeter":27711.751662971175,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6225"},{"year":2026,"category":"Roads","project":"Tanza-Trece Martires City-Indang Rd - K0042 + 561 - K0042 + 898","amountPesos":7016000.0,"lengthMeters":337.0,"ratePesosPerMeter":20818.991097922848,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6229"},{"year":2026,"category":"Roads","project":"Quirino H-way - K0251 + 150 - K0251 + 300, K0251 + 876 - K0251 + 938, K0252 + 320 - K0252 +350, K0252 + 400 - K0252 + 430, K0252 + 560 - K0252 + 633, K0255 + 862 - K0255 + 885","amountPesos":12225000.0,"lengthMeters":368.0,"ratePesosPerMeter":33220.108695652176,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6232"},{"year":2026,"category":"Roads","project":"Quirino H-way - K0251 + 938 - K0252 + 250, K0252 + 350 - K0252 + 400, K0252 + 430 - K0252 + 479","amountPesos":12164000.0,"lengthMeters":411.0,"ratePesosPerMeter":29596.10705596107,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6234"},{"year":2026,"category":"Roads","project":"Quirino H-way - K0257 + 450 - K0257 + 550, K0257 + 569 - K0257 + 617, K0258 + 910 - K0259 + 000, K0259 + 150 - K0259 + 250, K0265 + 700 - K0265 + 800, K0278 + 200 - K0278 + 234","amountPesos":16691000.0,"lengthMeters":472.0,"ratePesosPerMeter":35362.28813559322,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6236"},{"year":2026,"category":"Roads","project":"Quirino H-way - K0263 + 600 - K0263 + 864","amountPesos":10202000.0,"lengthMeters":264.0,"ratePesosPerMeter":38643.93939393939,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6238"},{"year":2026,"category":"Roads","project":"Quirino H-way - K0270 + 600 - K0270 + 688","amountPesos":4042000.0,"lengthMeters":88.0,"ratePesosPerMeter":45931.818181818184,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6240"},{"year":2026,"category":"Roads","project":"Quirino H-way - K0271 + 050 - K0271 + 230, K0276 + 000 - K0276 + 204","amountPesos":14579000.0,"lengthMeters":384.0,"ratePesosPerMeter":37966.145833333336,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6242"},{"year":2026,"category":"Roads","project":"Quirino H-way - K0271 + 900 - K0272 + 060, K0274 + 750 - K0275 + 000, K0275 + 700 - K0275 + 886","amountPesos":19118000.0,"lengthMeters":596.0,"ratePesosPerMeter":32077.18120805369,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6244"},{"year":2026,"category":"Roads","project":"Rolando R. Andaya Highway - K0288 + 035 - K0288 + 097, K0288 + 298 - K0288 + 381","amountPesos":9265000.0,"lengthMeters":145.0,"ratePesosPerMeter":63896.55172413793,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6248"},{"year":2026,"category":"Roads","project":"Rolando R. Andaya Highway - K0304 + 554 - K0304 + 618, K0304 + 737 - K0304 + 885, K0304 + 946 - K0305 + 137","amountPesos":22507000.0,"lengthMeters":403.0,"ratePesosPerMeter":55848.63523573201,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6250"},{"year":2026,"category":"Roads","project":"Rolando R. Andaya Highway - K0315 + 085 - K0315 + 373, K0315 + 413 - K0315 + 458","amountPesos":21230000.0,"lengthMeters":333.0,"ratePesosPerMeter":63753.75375375376,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6252"},{"year":2026,"category":"Roads","project":"Rolando R. Andaya Highway - K0316 + 542 - K0316 + 735, K0333 + 951 - K0334 + 394","amountPesos":39051000.0,"lengthMeters":636.0,"ratePesosPerMeter":61400.943396226416,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6254"},{"year":2026,"category":"Roads","project":"Rolando R. Andaya Highway - K0333 + 349 - K0333 + 669","amountPesos":20412000.0,"lengthMeters":320.0,"ratePesosPerMeter":63787.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6256"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0047 + 000 - K0047 + 152, K0052 + 384 - K0052 + 606, K0054 + 865 - K0055 + 000","amountPesos":13670000.0,"lengthMeters":509.0,"ratePesosPerMeter":26856.5815324165,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6260"},{"year":2026,"category":"Roads","project":"Bacolod South Rd -  K0051 + 209 - K0051 + 318, K0062 + 577-K0063 + 747","amountPesos":39360000.0,"lengthMeters":1279.0,"ratePesosPerMeter":30774.042220484753,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6263"},{"year":2026,"category":"Roads","project":"Bacolod South Rd -  K0073 + 913 - K0074 + 505","amountPesos":37240000.0,"lengthMeters":592.0,"ratePesosPerMeter":62905.40540540541,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6265"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0099 + 916 - K0100 + 125","amountPesos":5400000.0,"lengthMeters":209.0,"ratePesosPerMeter":25837.32057416268,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6268"},{"year":2026,"category":"Roads","project":"Bais-Kabankalan Rd   K0090 + 000 - K0091 + 000","amountPesos":33815000.0,"lengthMeters":1000.0,"ratePesosPerMeter":33815.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6271"},{"year":2026,"category":"Roads","project":"Bais-Kabankalan Rd - K0074 + 700 - K0075 + 000","amountPesos":9800000.0,"lengthMeters":300.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6273"},{"year":2026,"category":"Roads","project":"Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0020 + 226 - K0020 + 399","amountPesos":5880000.0,"lengthMeters":173.0,"ratePesosPerMeter":33988.439306358385,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6275"},{"year":2026,"category":"Roads","project":"Dumaguete South Rd - K0027 + 670 - K0028 + 728.63","amountPesos":39316000.0,"lengthMeters":1058.63,"ratePesosPerMeter":37138.56588231956,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6278"},{"year":2026,"category":"Roads","project":"Dumaguete South Rd - K0071 + 909 - K0071 + 981, K0082 + 356 - K0083 + 000","amountPesos":25926000.0,"lengthMeters":716.0,"ratePesosPerMeter":36209.49720670391,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6280"},{"year":2026,"category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0121 + 000 - K0121 + 620","amountPesos":27469000.0,"lengthMeters":620.0,"ratePesosPerMeter":44304.83870967742,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6284"},{"year":2026,"category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0124 + 000 - K0125 + 448.33","amountPesos":31158000.0,"lengthMeters":1448.33,"ratePesosPerMeter":21513.052964448685,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6286"},{"year":2026,"category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0106 + 000 - K0107 + 207.99","amountPesos":29070000.0,"lengthMeters":1207.99,"ratePesosPerMeter":24064.76874808556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6288"},{"year":2026,"category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0129 + 240 - K0130 + 713","amountPesos":33605000.0,"lengthMeters":1473.0,"ratePesosPerMeter":22813.98506449423,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6290"},{"year":2026,"category":"Roads","project":"N Bacalso Ave (Cebu South Rd), K0107+207.99 – K0109+000","amountPesos":42008000.0,"lengthMeters":1792.01,"ratePesosPerMeter":23441.833471911497,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6292"},{"year":2026,"category":"Roads","project":"N. Bacalso Ave (Cebu South Rd), K0126+274 – K0127+225","amountPesos":20977000.0,"lengthMeters":951.0,"ratePesosPerMeter":22057.83385909569,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6294"},{"year":2026,"category":"Roads","project":"Cebu-Toledo Wharf Rd (Uling-Toledo Wharf) - K0053 + 468 - K0053 + 965","amountPesos":46548000.0,"lengthMeters":497.0,"ratePesosPerMeter":93657.9476861167,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6297"},{"year":2026,"category":"Roads","project":"Cebu North Hagnaya Wharf Rd - Chainage 0 - Chainage 905","amountPesos":29093000.0,"lengthMeters":905.0,"ratePesosPerMeter":32146.96132596685,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6300"},{"year":2026,"category":"Roads","project":"Cebu North Hagnaya Wharf Rd - K0026 + 000 - K0026 + 140","amountPesos":12297000.0,"lengthMeters":140.0,"ratePesosPerMeter":87835.71428571429,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6302"},{"year":2026,"category":"Roads","project":"Cebu North Hagnaya Wharf Rd - K0033 + (-496) - K0033 + 436","amountPesos":29093000.0,"lengthMeters":932.0,"ratePesosPerMeter":31215.665236051504,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6304"},{"year":2026,"category":"Roads","project":"Palo-Carigara-Ormoc Rd - K0956 + 000 - K0956 + 306","amountPesos":13262000.0,"lengthMeters":306.0,"ratePesosPerMeter":43339.86928104575,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6308"},{"year":2026,"category":"Roads","project":"Palo-Carigara-Ormoc Rd - K0963 + 000 - K0963 + 226, K0964 + 003 - K0964 + 290","amountPesos":27058000.0,"lengthMeters":513.0,"ratePesosPerMeter":52744.63937621832,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6310"},{"year":2026,"category":"Roads","project":"Palo-Carigara-Ormoc Rd - K0964 + 290 - K0965 + 000","amountPesos":39200000.0,"lengthMeters":710.0,"ratePesosPerMeter":55211.2676056338,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6312"},{"year":2026,"category":"Roads","project":"Palo-Carigara-Ormoc Rd - K0965 + 552 - K0965 + 879.41","amountPesos":38592000.0,"lengthMeters":327.41,"ratePesosPerMeter":117870.55984849625,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6314"},{"year":2026,"category":"Roads","project":"Palo-Carigara-Ormoc Rd - K0968 + 612 - K0969 + 339","amountPesos":40180000.0,"lengthMeters":727.0,"ratePesosPerMeter":55268.22558459422,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6316"},{"year":2026,"category":"Roads","project":"Ormoc-Baybay-Southern Leyte Bdry Rd - K1016 + 853 - K1017 + 197","amountPesos":4706000.0,"lengthMeters":344.0,"ratePesosPerMeter":13680.232558139534,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6319"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0766 + 860 - K0767 + 000, K0769 + 000 - K0769 + 146, K0769 + 400 - K0769 + 480,K0770 + 400 - K0770 + 410, K0770 + 745 - K0771 + 227, K0775 + 900 - K0775 + 980, K0776 + 090 - K0776 + 120, K0776 + 200 - K0776 + 400, K0776 + 780 - K0776 + 950","amountPesos":37690000.0,"lengthMeters":1338.0,"ratePesosPerMeter":28168.908819133034,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6322"},{"year":2026,"category":"Roads","project":"Dipolog-Oroquieta National Rd - K1815 + 1005 - K1816 + 1000, K1817 + 538 - K1817 + 687, K1818 + 797 - K1818 + 982, K1823 + 992 - K1824 + 217","amountPesos":34440000.0,"lengthMeters":1554.0,"ratePesosPerMeter":22162.162162162163,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6326"},{"year":2026,"category":"Roads","project":"Dipolog-Sindangan-Liloy Rd (S01057MN) - K1890+307-K1890+1072","amountPesos":17159000.0,"lengthMeters":765.0,"ratePesosPerMeter":22430.065359477125,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6329"},{"year":2026,"category":"Roads","project":"Bukidnon-Davao City Rd - K1593 + 048 - K1593 + 088","amountPesos":3923000.0,"lengthMeters":40.0,"ratePesosPerMeter":98075.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6333"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1547 + 455 - K1547+925","amountPesos":26324000.0,"lengthMeters":470.0,"ratePesosPerMeter":56008.51063829787,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6335"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1550 + 954 - K1551 + 718","amountPesos":17614000.0,"lengthMeters":764.0,"ratePesosPerMeter":23054.97382198953,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6337"},{"year":2026,"category":"Roads","project":"Sayre Highway - (S01381MN) Chainage 097.50 - Chainage 120","amountPesos":964000.0,"lengthMeters":22.5,"ratePesosPerMeter":42844.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6340"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1463 + 186 - K1463 + 350","amountPesos":7141000.0,"lengthMeters":164.0,"ratePesosPerMeter":43542.68292682927,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6342"},{"year":2026,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd (S01245MN), K1432 + 620 - K1433 + 145, K1435 + 640 - K1436 + 760, (Gusa - Lapasan Section), Cagayan de Oro City","amountPesos":24095000.0,"lengthMeters":1645.0,"ratePesosPerMeter":14647.41641337386,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6345"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1429 + 000 - K1429 + 300","amountPesos":28315000.0,"lengthMeters":300.0,"ratePesosPerMeter":94383.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6347"},{"year":2026,"category":"Roads","project":"Misamis Oriental-Ma Cristina Bdry Rd - K1512 + (-500) - K1512 + (-245), K1512 + 330 - K1512 + 466, K1512 + 982 – K1513 + 100, K1513 + 689 – K1513 + 867","amountPesos":31147000.0,"lengthMeters":687.0,"ratePesosPerMeter":45337.700145560404,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6350"},{"year":2026,"category":"Roads","project":"Misamis Oriental-Ma Cristina Bdry Rd - K1532 + 259 - K1532 + 466","amountPesos":8495000.0,"lengthMeters":207.0,"ratePesosPerMeter":41038.647342995166,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6352"},{"year":2026,"category":"Roads","project":"Overton-Buru-un Bdry Rd - K1532 + 532 - K1532 + 899, K1533 + 907 - K1534 + 242","amountPesos":30842000.0,"lengthMeters":702.0,"ratePesosPerMeter":43934.472934472935,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6354"},{"year":2026,"category":"Roads","project":"Linamon-Zamboanga Rd - K1611 + 527 - K1612 + 000, K1613 + 824 - K1614 + 642","amountPesos":47073000.0,"lengthMeters":1291.0,"ratePesosPerMeter":36462.432223082884,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6357"},{"year":2026,"category":"Roads","project":"Ozamis City-Oroquieta City Rd - K1739 + 000 - K1739 + 411, K1739 + 781 - K1740 + 387","amountPesos":23596000.0,"lengthMeters":1017.0,"ratePesosPerMeter":23201.573254670602,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6360"},{"year":2026,"category":"Roads","project":"Davao-Bukidnon Rd - K1634 + 465 - K1634 + 960","amountPesos":11895000.0,"lengthMeters":495.0,"ratePesosPerMeter":24030.303030303032,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6364"},{"year":2026,"category":"Roads","project":"Davao-Bukidnon Rd - K1638 + 688 - K1638 + 818","amountPesos":3124000.0,"lengthMeters":130.0,"ratePesosPerMeter":24030.76923076923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6366"},{"year":2026,"category":"Roads","project":"Davao-Bukidnon Rd - K1638 + 818 - K1638 + 880","amountPesos":1490000.0,"lengthMeters":62.0,"ratePesosPerMeter":24032.25806451613,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6368"},{"year":2026,"category":"Roads","project":"Davao-Bukidnon Rd - K1671 + 261 - K1672 + 170","amountPesos":21844000.0,"lengthMeters":909.0,"ratePesosPerMeter":24030.80308030803,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6370"},{"year":2026,"category":"Roads","project":"Davao-Bukidnon Rd - K1673 + 605 - K1673 + 707","amountPesos":3152000.0,"lengthMeters":102.0,"ratePesosPerMeter":30901.960784313724,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6372"},{"year":2026,"category":"Roads","project":"Davao-Bukidnon Rd - K1680 + 600 - K1680 + 842","amountPesos":5815000.0,"lengthMeters":242.0,"ratePesosPerMeter":24028.92561983471,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6374"},{"year":2026,"category":"Roads","project":"Davao-Bukidnon Rd - K1681 + 277 - K1681 + 373","amountPesos":2966000.0,"lengthMeters":96.0,"ratePesosPerMeter":30895.833333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6376"},{"year":2026,"category":"Roads","project":"Davao-Bukidnon Rd - K1682 + 220 - K1682 + 725","amountPesos":17961000.0,"lengthMeters":505.0,"ratePesosPerMeter":35566.33663366337,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6378"},{"year":2026,"category":"Roads","project":"Davao-Bukidnon Rd - K1683 + 478 - K1684 + 204","amountPesos":11433000.0,"lengthMeters":726.0,"ratePesosPerMeter":15747.933884297521,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6380"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd - K1790 + 039 -  K1790+167, K1790 + 366 - K1792 + 298","amountPesos":42294000.0,"lengthMeters":2060.0,"ratePesosPerMeter":20531.06796116505,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6383"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1641 + 018 - K1641 + 643","amountPesos":10664000.0,"lengthMeters":625.0,"ratePesosPerMeter":17062.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6387"},{"year":2026,"category":"Roads","project":"Makilala-Allah Valley Rd - K1644 + 050.00 - K1644 + 068, K1644 + 083 - K1644 + 204.50,K1644 + 237- K1644 + 264, K1644 + 275 - K1644 + 279.50, K1644 + 280 - K1644 + 284.50,  K1644 + 322 - K1644 + 331, K1644 + 345 - K1644 +  387.50,  K1644 + 397 - K1644 +  490.50, K1644 + 500 - K1644 +  630.5","amountPesos":4103000.0,"lengthMeters":451.0,"ratePesosPerMeter":9097.560975609756,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6389"},{"year":2026,"category":"Roads","project":"Kidapawan-Allah Junction Rd - K1664 + 656 - K1665 + 000","amountPesos":6901000.0,"lengthMeters":344.0,"ratePesosPerMeter":20061.04651162791,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6392"},{"year":2026,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1277 + 600 - K1277 + 750","amountPesos":5880000.0,"lengthMeters":150.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6396"},{"year":2026,"category":"Roads","project":"Polo-Novaliches Rd (S02222LZ) - K0015 + 000 - K0016 + 478, K0017 + 003 - K0017 + 016, K0017 + 242 - K0017 + 418","amountPesos":81252000.0,"lengthMeters":1667.0,"ratePesosPerMeter":48741.45170965807,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6403"},{"year":2026,"category":"Roads","project":"Abra-Kalinga Rd - K0435 + 830 - K0435 + 870, K0451 + 440 - K0451 + 474","amountPesos":55327000.0,"lengthMeters":74.0,"ratePesosPerMeter":747662.1621621621,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6406"},{"year":2026,"category":"Roads","project":"Abra-Kalinga Rd - K0440+594 - K0443+000, K0443+462 - K0443+487, K0443+538 - 443+550, K0444+200 - K0445+000, K0445+860 - 445+870","amountPesos":71365000.0,"lengthMeters":3253.0,"ratePesosPerMeter":21938.210882262527,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6408"},{"year":2026,"category":"Roads","project":"Nueva Ecija - Aurora Road - Nueva Ecija - Aurora Rd - K0140+060 - K0141+000, K0141+000 - K0141+614, K0141+823.50 - K0142+000, K0142+000 - K0142+400","amountPesos":58878000.0,"lengthMeters":2130.5,"ratePesosPerMeter":27635.76625205351,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6411"},{"year":2026,"category":"Roads","project":"Cavite-Batangas Rd - K0019 + (-059) - K0019 + 021, K0019 + 061 - K0019 + 606, K0019 + 628 - K0019 + 958","amountPesos":59337000.0,"lengthMeters":955.0,"ratePesosPerMeter":62132.98429319372,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6414"},{"year":2026,"category":"Roads","project":"Cavite-Batangas Rd - K0021 + 000 - K0021 + 812","amountPesos":60544000.0,"lengthMeters":812.0,"ratePesosPerMeter":74561.5763546798,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6416"},{"year":2026,"category":"Roads","project":"Cavite-Batangas Rd - K0034 + 262 - K0034 + 472, K0037 + 131.50 - K0038 + 034, K0038 + 901 - K0038 + 985","amountPesos":67752000.0,"lengthMeters":1196.5,"ratePesosPerMeter":56625.15670706226,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6420"},{"year":2026,"category":"Roads","project":"Jct Lucban-Luisiana Rd - K0129 + (-131) - K0130 + 000, K0131 + 193 - K0132 + 753, K0132 + 779 - K0133 + 369, K0133 + 451 - K0133 + 571","amountPesos":86492000.0,"lengthMeters":3401.0,"ratePesosPerMeter":25431.34372243458,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6422"},{"year":2026,"category":"Roads","project":"Julian Felipe Blvd - K0033 + (-470) - K0033 + 600","amountPesos":86739000.0,"lengthMeters":1070.0,"ratePesosPerMeter":81064.4859813084,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6424"},{"year":2026,"category":"Roads","project":"Noveleta-Naic-Tagaytay Rd – K0060 + (-318) – K0061 + 205, K0061 + 679 – K0062 + 000, K0064 +000 – K0064 + 669, K0064 + 850.80 - K0064 + 900.80","amountPesos":69193000.0,"lengthMeters":2563.0,"ratePesosPerMeter":26996.878657822865,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6426"},{"year":2026,"category":"Roads","project":"Noveleta-Naic-Tagaytay Rd – K0069 + 043 – K0071 + 385","amountPesos":52120000.0,"lengthMeters":2342.0,"ratePesosPerMeter":22254.483347566184,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6428"},{"year":2026,"category":"Roads","project":"Marinduque Circumferential Rd - K0004 + 600 - K0005 + 200, K0006 + 682 - K0008 + 000","amountPesos":49286000.0,"lengthMeters":1918.0,"ratePesosPerMeter":25696.558915537018,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6431"},{"year":2026,"category":"Roads","project":"Puerto Princesa South Rd - K0144 + 000 - K0146 + 146","amountPesos":45726000.0,"lengthMeters":2146.0,"ratePesosPerMeter":21307.548928238582,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6433"},{"year":2026,"category":"Roads","project":"Presentacion-Maligaya Rd - K0529 + (-664) - K0529 + (-516), K0530 + 000 - K0530 + 204, K0536 + 210 - K0536 + 495, K0541 + 000 - K0541 + 301, K0541 + 515 - K0541 + 752","amountPesos":50772000.0,"lengthMeters":1175.0,"ratePesosPerMeter":43210.21276595745,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6436"},{"year":2026,"category":"Roads","project":"Sn Fernando North Rd - K0000 + 539 - K0001 + 240, K0002 + 000 - K0002 + 258, K0002 + 317 - K0002 + 380, K0002 + 390 - K0002 + 600, K0002 + 803 - K0003 + 000","amountPesos":58150000.0,"lengthMeters":1429.0,"ratePesosPerMeter":40692.792162351296,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6438"},{"year":2026,"category":"Roads","project":"Sn Fernando North Rd - K0021 + 000 - K0021 + 182, K0023 + 000 - K0023 + 435, K0027 + 544 - K0028 + 000, K0028 + 400 - K0028 + 750","amountPesos":57794000.0,"lengthMeters":1423.0,"ratePesosPerMeter":40614.19536191146,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6440"},{"year":2026,"category":"Roads","project":"Aklan East Rd - K0295 + 880 - K0296 + 767, K0298 + 817 - K0299 + 224,  K0313 + 000 - K0314 + 827, K0315 + 919 - K0316 + 670, K0317 + 927 - K0318 + 000","amountPesos":100121000.0,"lengthMeters":3945.0,"ratePesosPerMeter":25379.214195183777,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6443"},{"year":2026,"category":"Roads","project":"Aklan West Rd (Kalibo-Nabas) - K0234 + (-375) - K0234 + 722, K0235 + 352 - K0235 + 667, K0236 + 912 - K0237 + 943, K0238 + 335 - K0238 + 461","amountPesos":58018000.0,"lengthMeters":2569.0,"ratePesosPerMeter":22583.884780070068,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6445"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0229 + 000 - K0231 + 030","amountPesos":50753000.0,"lengthMeters":2030.0,"ratePesosPerMeter":25001.47783251232,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6447"},{"year":2026,"category":"Roads","project":"Iloilo-Antique Rd - K0176 + 464 - K0178 + 040, K0178 + 060 - K0180  + 100","amountPesos":61250000.0,"lengthMeters":3616.0,"ratePesosPerMeter":16938.606194690266,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6449"},{"year":2026,"category":"Roads","project":"Iloilo-Antique Rd - K108 + 000 - K0109 + 181, K0110 + 000 - K0110 + 758, K0110 + 970 - K0111 + 875, K0112 + 000 - K0112 + 453, K0112 + 477 - K0113 + 000, K0115 + 000 - K0116 + 617, K0116 + 706 - K0117 + 247","amountPesos":91855000.0,"lengthMeters":5978.0,"ratePesosPerMeter":15365.506858481098,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6451"},{"year":2026,"category":"Roads","project":"Dumaguete South Rd - K0105 + 000 - K0106 + 506","amountPesos":54886000.0,"lengthMeters":1506.0,"ratePesosPerMeter":36444.88711819389,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6454"},{"year":2026,"category":"Roads","project":"Antonio y De Pio H-way - K0126 + 631 - K0126 + 845","amountPesos":52367000.0,"lengthMeters":214.0,"ratePesosPerMeter":244705.60747663552,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6457"},{"year":2026,"category":"Roads","project":"Cebu North Hagnaya Wharf Rd - K0050 + 778 - K0051 + 602, K0051 + 844 - K0052 + 000, K0055 + 725 - K0056 + 000, K0059 + 000 - K0060 + 000, K0063 + 100 - K0063 + 307, K0066 + 443 - K0067 + 000, K0070 + 162 - K0070 + 600","amountPesos":71836000.0,"lengthMeters":3457.0,"ratePesosPerMeter":20779.866936650276,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6459"},{"year":2026,"category":"Roads","project":"Cebu North Hagnaya Wharf Rd - K0068 + 000 - K0069 + 000, K0071 + 615 - K0072 + 110, K0074 + 725 - K0074 + 910","amountPesos":73958000.0,"lengthMeters":1680.0,"ratePesosPerMeter":44022.619047619046,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6461"},{"year":2026,"category":"Roads","project":"Cebu South Coastal Rd - (S00014CB) Chainage 000 - Chainage 512","amountPesos":193800000.0,"lengthMeters":512.0,"ratePesosPerMeter":378515.625,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6463"},{"year":2026,"category":"Roads","project":"The President Carlos P. Garcia Circumferential Rd - K0026 + 679 - K0026 + 811, K0029 + 000 - K0029 + 801, K0033 + 000 - K0034 + 000, K0041 + 158 - K0041 + 363, K0041 + 552 - K0041 + 679, K0051 + 466 - K0052 + 000","amountPesos":90634000.0,"lengthMeters":2799.0,"ratePesosPerMeter":32380.850303679887,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6465"},{"year":2026,"category":"Roads","project":"Toledo-Tabuelan-Sn Remigio Rd - K0050 + 000 - K0050 + 491, K0056 + 000 - K0059+000","amountPesos":87278000.0,"lengthMeters":3491.0,"ratePesosPerMeter":25000.859352621024,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6467"},{"year":2026,"category":"Roads","project":"Toledo-Tabuelan-Sn Remigio Rd - K0085 + 941 - K0087 + 000","amountPesos":54306000.0,"lengthMeters":1059.0,"ratePesosPerMeter":51280.45325779037,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6469"},{"year":2026,"category":"Roads","project":"Allen-Catarman Rd - K0735 + 180 - K0736 + 000","amountPesos":47596000.0,"lengthMeters":820.0,"ratePesosPerMeter":58043.90243902439,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6472"},{"year":2026,"category":"Roads","project":"Cabunga-an-Tabunok-Consuegra Rd K1015+000 - K1021+000","amountPesos":88762000.0,"lengthMeters":6000.0,"ratePesosPerMeter":14793.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6474"},{"year":2026,"category":"Roads","project":"Cabunga-an-Tabunok-Consuegra Rd K1021+050 - K1025+000","amountPesos":99857000.0,"lengthMeters":3950.0,"ratePesosPerMeter":25280.25316455696,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6476"},{"year":2026,"category":"Roads","project":"Catarman-Calbayog Rd - K0769 + 625 - K0770 + 643, K0780 + 200 - K0780 + 398, K0780 + 426 - K0781 + 000","amountPesos":60229000.0,"lengthMeters":1790.0,"ratePesosPerMeter":33647.486033519555,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6478"},{"year":2026,"category":"Roads","project":"Jolo Port-Bud Daho-Romadier Rd - (S00003SL) Chainage 149 - Chainage 1680","amountPesos":35612000.0,"lengthMeters":1531.0,"ratePesosPerMeter":23260.61397779229,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6481"},{"year":2026,"category":"Roads","project":"Jolo-Indanan-Parang-Silangkan Rd - (S00005SL) Chainage 14000 - Chainage 16601","amountPesos":52460000.0,"lengthMeters":2601.0,"ratePesosPerMeter":20169.165705497886,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6483"},{"year":2026,"category":"Roads","project":"Jolo-Indanan-Parang-Silangkan Rd - (S00005SL) Chainage 16601 - Chainage 20446","amountPesos":168824000.0,"lengthMeters":3845.0,"ratePesosPerMeter":43907.4122236671,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6485"},{"year":2026,"category":"Roads","project":"Jolo-Indanan-Parang-Silangkan Rd - (S00005SL) Chainage 20446 - Chainage 24261","amountPesos":168397000.0,"lengthMeters":3815.0,"ratePesosPerMeter":44140.76015727392,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6487"},{"year":2026,"category":"Roads","project":"Jolo-Indanan-Parang-Silangkan Rd - (S00005SL) Chainage 3500 - Chainage 7000","amountPesos":70579000.0,"lengthMeters":3500.0,"ratePesosPerMeter":20165.428571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6489"},{"year":2026,"category":"Roads","project":"Jolo-Indanan-Parang-Silangkan Rd - (S00005SL) Chainage 7000 - Chainage 10000","amountPesos":60495000.0,"lengthMeters":3000.0,"ratePesosPerMeter":20165.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6491"},{"year":2026,"category":"Roads","project":"Jolo-Taglibi-Tiptipon Rd - (S00021SL) Chainage 1392 - Chainage 2648","amountPesos":43394000.0,"lengthMeters":1256.0,"ratePesosPerMeter":34549.36305732484,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6493"},{"year":2026,"category":"Roads","project":"Seit-Tayungan-Camp Andres Rd - (S00020SL) Chainage 000 - Chainage 3900","amountPesos":92057000.0,"lengthMeters":3900.0,"ratePesosPerMeter":23604.358974358973,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6495"},{"year":2026,"category":"Roads","project":"Jolo-Taglibi-Tiptipon Road Sta. 2+500 to Sta. 4+000 Sulu","amountPesos":50000000.0,"lengthMeters":1500.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6497"},{"year":2026,"category":"Roads","project":"Seit-Tayungan-Camp Andres Rd - (S00020SL) Chainage 5585 - Chainage 7554","amountPesos":44212000.0,"lengthMeters":1969.0,"ratePesosPerMeter":22454.037582529203,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6499"},{"year":2026,"category":"Roads","project":"Zamboanga West Coastal Road (Sibuco - Limpapa Section) (S01152MN), Chainage 29618 - Chainage 29868","amountPesos":24500000.0,"lengthMeters":250.0,"ratePesosPerMeter":98000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6501"},{"year":2026,"category":"Roads","project":"Marawi-Masiu Rd - (S01603MN) Chainage 28023 - Chainage 28648, Chainage 29648 - Chainage 30162","amountPesos":26231000.0,"lengthMeters":1139.0,"ratePesosPerMeter":23029.850746268658,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6504"},{"year":2026,"category":"Roads","project":"Oroquieta City - Calamba Mt Rd - K1748 + 333 - K1748 + 403, K1749 + 060 - K1749 + 115, K1749 + 680 - K1749 + 730, K1754 + 980 - K1755 + 462, K1755+573 - K1755+874","amountPesos":43371000.0,"lengthMeters":958.0,"ratePesosPerMeter":45272.44258872652,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6506"},{"year":2026,"category":"Roads","project":"Tagum-Panabo Circum Rd - K1517 + 165 - K1519 + 000","amountPesos":147000000.0,"lengthMeters":1835.0,"ratePesosPerMeter":80108.99182561308,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6509"},{"year":2026,"category":"Roads","project":"Tagum-Panabo Circum Rd - K1519 + 948 - K1521 + 700","amountPesos":144186000.0,"lengthMeters":1752.0,"ratePesosPerMeter":82297.94520547945,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6511"},{"year":2026,"category":"Roads","project":"Tagum-Panabo Circum Rd - K1521 + 700 - K1523 + 262, K1525 + 602 - K1525 + 817","amountPesos":155135000.0,"lengthMeters":1777.0,"ratePesosPerMeter":87301.63196398424,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6513"},{"year":2026,"category":"Roads","project":"Banisilan-Guiling-Alamada-Libungan Rd - K1644 + 580 - K1644 + 650","amountPesos":3209000.0,"lengthMeters":70.0,"ratePesosPerMeter":45842.857142857145,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6516"},{"year":2026,"category":"Roads","project":"General Santos City-T'Boli-Surallah Rd (S01487MN) - Chainage 37184 - Chainage 45684","amountPesos":146540000.0,"lengthMeters":8500.0,"ratePesosPerMeter":17240.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6518"},{"year":2026,"category":"Roads","project":"R-10 - K0007 + (-149) - K0007 + 124","amountPesos":8125000.0,"lengthMeters":273.0,"ratePesosPerMeter":29761.904761904763,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6521"},{"year":2026,"category":"Roads","project":"Gil Puyat Ave - K0005 + (-262) - K0005 + (-202)","amountPesos":2941000.0,"lengthMeters":60.0,"ratePesosPerMeter":49016.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6524"},{"year":2026,"category":"Roads","project":"Gil Puyat Ave - K0007 + 213 - K0007 + 448","amountPesos":9893000.0,"lengthMeters":235.0,"ratePesosPerMeter":42097.87234042553,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6526"},{"year":2026,"category":"Roads","project":"Gil Puyat Ave - K0008 + 000 - K0008 + 720","amountPesos":28070000.0,"lengthMeters":720.0,"ratePesosPerMeter":38986.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6528"},{"year":2026,"category":"Roads","project":"South Super H-way K0007 + 712 - K0007 + 962","amountPesos":22513000.0,"lengthMeters":250.0,"ratePesosPerMeter":90052.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6530"},{"year":2026,"category":"Roads","project":"Gil Puyat Ave - K0008 + 983 - K0007 + 384","amountPesos":15674000.0,"lengthMeters":1599.0,"ratePesosPerMeter":9802.376485303315,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6532"},{"year":2026,"category":"Roads","project":"Gen. T. De Leon (S02221LZ) - K0015 + 441 - K0015 + 736","amountPesos":20313000.0,"lengthMeters":295.0,"ratePesosPerMeter":68857.62711864407,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6535"},{"year":2026,"category":"Roads","project":"Gen. T. De Leon (S02221LZ) - K0015 + 736 - K0016 + 253","amountPesos":32501000.0,"lengthMeters":517.0,"ratePesosPerMeter":62864.603481624756,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6537"},{"year":2026,"category":"Roads","project":"R-10 (S02378LZ) - K0004 + 002 - K0004 + 074","amountPesos":5885000.0,"lengthMeters":72.0,"ratePesosPerMeter":81736.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6540"},{"year":2026,"category":"Roads","project":"Bonny Serrano Ave - K0010 + (-770) - K0010 + 103","amountPesos":26404000.0,"lengthMeters":873.0,"ratePesosPerMeter":30245.131729667813,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6543"},{"year":2026,"category":"Roads","project":"Bonny Serrano Ave - K0010 + 103 - K0011 + 100","amountPesos":26616000.0,"lengthMeters":997.0,"ratePesosPerMeter":26696.088264794384,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6545"},{"year":2026,"category":"Roads","project":"G Araneta Ave - K0009 + (-660) - K0009 + (-360)","amountPesos":25976000.0,"lengthMeters":300.0,"ratePesosPerMeter":86586.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6547"},{"year":2026,"category":"Roads","project":"G Araneta Ave - K0009 + 289 - K0009 + 689","amountPesos":30734000.0,"lengthMeters":400.0,"ratePesosPerMeter":76835.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6549"},{"year":2026,"category":"Roads","project":"South Ave (Timog Ave) (S05269LZ) - K0010 + (-964) - K0010 + (-736)","amountPesos":16544000.0,"lengthMeters":228.0,"ratePesosPerMeter":72561.40350877192,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6551"},{"year":2026,"category":"Roads","project":"Roxas Blvd - K0001 +380 - K0001 + 470","amountPesos":10529000.0,"lengthMeters":90.0,"ratePesosPerMeter":116988.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6554"},{"year":2026,"category":"Roads","project":"Roxas Blvd S02858LZ K0002 + 575 - K0002 + 710","amountPesos":36021000.0,"lengthMeters":135.0,"ratePesosPerMeter":266822.22222222225,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6556"},{"year":2026,"category":"Roads","project":"Tagudin-Cervantes Rd - K0373 + 450 - K0374 + 150, K0378 + 000 - K0378 + 358, K0380 + 591 - K0381 + 000","amountPesos":24942000.0,"lengthMeters":1467.0,"ratePesosPerMeter":17002.04498977505,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6560"},{"year":2026,"category":"Roads","project":"Abra-Kalinga Rd - K0461 + 000 - K0462 + 530.81","amountPesos":22568000.0,"lengthMeters":1530.81,"ratePesosPerMeter":14742.521932832968,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6564"},{"year":2026,"category":"Roads","project":"Abra-Kalinga Rd - K0469 + 000 - K0469 + 444, K0469 + 476 - K0469 + 545, K0469 + 659 - K0472 + 000","amountPesos":46187000.0,"lengthMeters":2854.0,"ratePesosPerMeter":16183.251576734408,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6566"},{"year":2026,"category":"Roads","project":"Abbut-Conner Rd - K0542 + 125 - K0542 + 162, K0545 + 016 - K0545 + 028, K0545 + 441 - K0545 + 468, K0551 + 932 - K0551 + 945, K0552 + 925 - K0553 + 023","amountPesos":2166000.0,"lengthMeters":187.0,"ratePesosPerMeter":11582.887700534759,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6569"},{"year":2026,"category":"Roads","project":"Conner-Kabugao Rd -  K0569 + 401 - K0569 + 404.50, K0569 + 496.50 - K0569 + 500, K0583 + 342 - K0583 + 366, K0588 + 338 - K0588 + 352, K0588 + 410 - K0588 + 433","amountPesos":1725000.0,"lengthMeters":68.0,"ratePesosPerMeter":25367.647058823528,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6571"},{"year":2026,"category":"Roads","project":"Conner-Kabugao Rd - K0592 + 1030 - K0593 + 000, K0598 + 290 - K0598 + 331, K0604 + 460 - K0604 + 480","amountPesos":1725000.0,"lengthMeters":91.0,"ratePesosPerMeter":18956.043956043955,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6573"},{"year":2026,"category":"Roads","project":"Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0603 + 090 - K0603 + 100, K0603 + 542 - K0603 + 601, K0604 + 330 - K0604 + 379","amountPesos":3577000.0,"lengthMeters":118.0,"ratePesosPerMeter":30313.5593220339,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6575"},{"year":2026,"category":"Roads","project":"Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0603+ 646 - K0603 + 688, K0606 + 680 - K0606 + 740","amountPesos":1801000.0,"lengthMeters":102.0,"ratePesosPerMeter":17656.86274509804,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6577"},{"year":2026,"category":"Roads","project":"Legarda Rd - K0284 + (-465) - K0284 + 175","amountPesos":27440000.0,"lengthMeters":640.0,"ratePesosPerMeter":42875.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6580"},{"year":2026,"category":"Roads","project":"Baguio-Bontoc Rd - K0255 + 250 - K0255 + 382, K0256 + 449 - K0256 + 951, K0257 + 683 - K0258 + 178","amountPesos":47040000.0,"lengthMeters":1129.0,"ratePesosPerMeter":41665.1904340124,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6583"},{"year":2026,"category":"Roads","project":"Benguet-Nueva Vizcaya Rd - K0254 + 550 - K0254 + 770, K0256 + 300 - K0257 + 400, K0257 + 540 - K0257 + 600, K0257 + 780 - K0257 + 800","amountPesos":32340000.0,"lengthMeters":1400.0,"ratePesosPerMeter":23100.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6585"},{"year":2026,"category":"Roads","project":"Benguet-Nueva Vizcaya Rd - K0259 + 395 - K0259 + 410, K0260 + 415 - K0260 + 455, K0260 + 900 - K0261 + 000, K0261 + 390 - K0261 + 470, K0261 + 638 - K0261 + 838, K0261 + 995 - K0262 + 025","amountPesos":14700000.0,"lengthMeters":465.0,"ratePesosPerMeter":31612.90322580645,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6587"},{"year":2026,"category":"Roads","project":"Marcos Hi-way - (S00418LZ) Chainage 000 - Chainage 749","amountPesos":22055000.0,"lengthMeters":749.0,"ratePesosPerMeter":29445.92790387183,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6589"},{"year":2026,"category":"Roads","project":"Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0413 + 326 - K0413 + 764","amountPesos":18068000.0,"lengthMeters":438.0,"ratePesosPerMeter":41251.14155251141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6592"},{"year":2026,"category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0472 + 533 - K0472 + 909, K0474 + 163 - K0474 + 427","amountPesos":13835000.0,"lengthMeters":640.0,"ratePesosPerMeter":21617.1875,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6595"},{"year":2026,"category":"Roads","project":"Baguio-Bontoc Rd - K0351+200 – K0351+500, K0355+000 – K0355+600","amountPesos":9384000.0,"lengthMeters":900.0,"ratePesosPerMeter":10426.666666666666,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6598"},{"year":2026,"category":"Roads","project":"Mt Prov-Cagayan via Tabuk-Enrile Rd - K0392 + 667 - K0392 + 739, K0392 + 949 - K0393 + 028, K0401 + 093 - K0401 + 214, K0403 + 197 - K0403 + 270","amountPesos":14210000.0,"lengthMeters":345.0,"ratePesosPerMeter":41188.40579710145,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6600"},{"year":2026,"category":"Roads","project":"Mt Prov-Ilocos Sur via Tue Rd - K0413 + 570 - K0413 + 621, K0413 + 775 - K0413 + 902","amountPesos":5684000.0,"lengthMeters":178.0,"ratePesosPerMeter":31932.584269662922,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6602"},{"year":2026,"category":"Roads","project":"Mt Prov-Ilocos Sur via Tue Rd - K0416 + 188 - K0416 + 312, K0416 + 426 - K0416 + 568","amountPesos":10290000.0,"lengthMeters":266.0,"ratePesosPerMeter":38684.21052631579,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6604"},{"year":2026,"category":"Roads","project":"Sagada-Besao-Quirino Rd - (S04034LZ) Chainage 10183 - Chainage 10414","amountPesos":15847000.0,"lengthMeters":231.0,"ratePesosPerMeter":68601.7316017316,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6606"},{"year":2026,"category":"Roads","project":"Cagayan Valley Rd (Magapit-Jct Aparri Airport Sect) - K0554 + (-534) -  K0554+000","amountPesos":13631000.0,"lengthMeters":534.0,"ratePesosPerMeter":25526.21722846442,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6610"},{"year":2026,"category":"Roads","project":"Cagayan Valley Rd (Magapit-Jct Aparri Airport Sect) - K0554 + 000 -  K0558+000","amountPesos":34300000.0,"lengthMeters":4000.0,"ratePesosPerMeter":8575.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6612"},{"year":2026,"category":"Roads","project":"Jct. Ayaga (Abulug)-Ballesteros-Aparri Rd - Chainage 582 - 1168","amountPesos":12740000.0,"lengthMeters":586.0,"ratePesosPerMeter":21740.61433447099,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6614"},{"year":2026,"category":"Roads","project":"Cabagan-Sta Maria Rd - K0448 + 620 - K0448 + 740, K0449 + 805 - K0450 + 000","amountPesos":14504000.0,"lengthMeters":315.0,"ratePesosPerMeter":46044.444444444445,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6617"},{"year":2026,"category":"Roads","project":"Jct Natl-Potia Rd - K0342 + 1027 - K0343 + 095","amountPesos":3470000.0,"lengthMeters":68.0,"ratePesosPerMeter":51029.41176470588,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6620"},{"year":2026,"category":"Roads","project":"Nueva Vizcaya-Pangasinan Rd - K0216 + 000 - K0217 + 000","amountPesos":29914000.0,"lengthMeters":1000.0,"ratePesosPerMeter":29914.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6623"},{"year":2026,"category":"Roads","project":"Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0345 + 476 - K0346 + 036","amountPesos":8665000.0,"lengthMeters":560.0,"ratePesosPerMeter":15473.214285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6626"},{"year":2026,"category":"Roads","project":"Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0348 + 182 - K0348 + 300.70","amountPesos":2774000.0,"lengthMeters":118.7,"ratePesosPerMeter":23369.83993260091,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6628"},{"year":2026,"category":"Roads","project":"Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0349 + 025 - K0350 + 635","amountPesos":25730000.0,"lengthMeters":1610.0,"ratePesosPerMeter":15981.366459627328,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6630"},{"year":2026,"category":"Roads","project":"Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0369 + 587 - K0370 + 313","amountPesos":10831000.0,"lengthMeters":726.0,"ratePesosPerMeter":14918.732782369147,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6632"},{"year":2026,"category":"Roads","project":"Roman Expressway - K0106 + 729 - K0107 + 000","amountPesos":17688000.0,"lengthMeters":271.0,"ratePesosPerMeter":65269.37269372694,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6636"},{"year":2026,"category":"Roads","project":"Roman Expressway - K0108 + 1001 - K0109 + 463","amountPesos":27769000.0,"lengthMeters":462.0,"ratePesosPerMeter":60106.06060606061,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6638"},{"year":2026,"category":"Roads","project":"Roman Expressway - K0108 + 529 - K0108 + 810","amountPesos":16567000.0,"lengthMeters":281.0,"ratePesosPerMeter":58957.29537366548,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6640"},{"year":2026,"category":"Roads","project":"Roman Expressway - K0109 + 584 - K0110 + 000","amountPesos":24232000.0,"lengthMeters":416.0,"ratePesosPerMeter":58250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6642"},{"year":2026,"category":"Roads","project":"Roman Expressway - K0112 + 090 - K0112 + 185","amountPesos":9820000.0,"lengthMeters":95.0,"ratePesosPerMeter":103368.42105263157,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6644"},{"year":2026,"category":"Roads","project":"Roman Expressway - K0119+278 - K0119+919","amountPesos":43120000.0,"lengthMeters":641.0,"ratePesosPerMeter":67269.89079563183,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6647"},{"year":2026,"category":"Roads","project":"Roman Expressway - K0122 + 505 - K0122 + 838","amountPesos":23030000.0,"lengthMeters":333.0,"ratePesosPerMeter":69159.15915915916,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6649"},{"year":2026,"category":"Roads","project":"Jct Layac-Balanga-Mariveles Port Rd - K0158 + (-494) - K0158 + (-061), K0158 + 290 - K0158 + 517, K0158 + 757 - K0159 + 110","amountPesos":37657000.0,"lengthMeters":1013.0,"ratePesosPerMeter":37173.74136229023,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6652"},{"year":2026,"category":"Roads","project":"Bongabon-Rizal-Aurora Rd - K0153 + 452 - K0153 + 718","amountPesos":4883000.0,"lengthMeters":266.0,"ratePesosPerMeter":18357.14285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6655"},{"year":2026,"category":"Roads","project":"San Jose City-Rizal Rd via Pinili-Porais-Villa Joson (Palarilla) Rd - K0175 + 587 - K0175 + 686","amountPesos":2352000.0,"lengthMeters":99.0,"ratePesosPerMeter":23757.575757575756,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6657"},{"year":2026,"category":"Roads","project":"San Jose City-Rizal Rd via Pinili-Porais-Villa Joson (Palarilla) Rd - K0175 + 715 - K0176 + 000","amountPesos":7814000.0,"lengthMeters":285.0,"ratePesosPerMeter":27417.543859649122,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6659"},{"year":2026,"category":"Roads","project":"Paniqui-Camiling-Wawa Rd - K0170 + 162 - K0171 + 190","amountPesos":26509000.0,"lengthMeters":1028.0,"ratePesosPerMeter":25786.964980544748,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6662"},{"year":2026,"category":"Roads","project":"Paniqui-Camiling-Wawa Rd - K0171 + 190 - K0171 + 807","amountPesos":6511000.0,"lengthMeters":617.0,"ratePesosPerMeter":10552.674230145867,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6664"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd - K0179 + 800 - K0180 + 000","amountPesos":6590000.0,"lengthMeters":200.0,"ratePesosPerMeter":32950.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6667"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd - K0139 + 857 - K0140 + 000, K0140 + 219 - K0140 + 262, K0143 + 069 - K0143 + 284, K0143 + 297 - K0143 + 325, K0143 + 656 - K0143 + 892","amountPesos":17389000.0,"lengthMeters":665.0,"ratePesosPerMeter":26148.872180451126,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6670"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd - K0150 + 300 - K0150 + 514, K0150 + 867 - K0151 + 000","amountPesos":5393000.0,"lengthMeters":347.0,"ratePesosPerMeter":15541.78674351585,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6672"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd - K0152 + 965 - K0154 + 355, K0154 + 698 - K0154 + 897","amountPesos":23238000.0,"lengthMeters":1589.0,"ratePesosPerMeter":14624.29200755192,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6674"},{"year":2026,"category":"Roads","project":"Balayan-Balibago Rd - K0112 + 669.30 - K0113 + 000","amountPesos":16462000.0,"lengthMeters":330.7,"ratePesosPerMeter":49779.2561233751,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6678"},{"year":2026,"category":"Roads","project":"Balayan-Balibago Rd - K0115 + 000 - K0116 + 000","amountPesos":36484000.0,"lengthMeters":1000.0,"ratePesosPerMeter":36484.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6680"},{"year":2026,"category":"Roads","project":"Diokno Highway - K0088 + 970 - K0089 + 920","amountPesos":18355000.0,"lengthMeters":950.0,"ratePesosPerMeter":19321.052631578947,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6682"},{"year":2026,"category":"Roads","project":"Nasugbu-Lian-Calatagan Rd - K0105 + 000 - K0106 + 000","amountPesos":16358000.0,"lengthMeters":1000.0,"ratePesosPerMeter":16358.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6684"},{"year":2026,"category":"Roads","project":"Nasugbu-Lian-Calatagan Rd - K0116 + 867.05 - K0118 + 000","amountPesos":49012000.0,"lengthMeters":1132.95,"ratePesosPerMeter":43260.5145858159,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6686"},{"year":2026,"category":"Roads","project":"Nasugbu-Lian-Calatagan Rd - K0118 + 000 - K0118 + 167, K0119 + 200 - K0119 + 573","amountPesos":7227000.0,"lengthMeters":540.0,"ratePesosPerMeter":13383.333333333334,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6688"},{"year":2026,"category":"Roads","project":"Batangas-Quezon Rd - K0134 + (-664) - K0134 + (-050)","amountPesos":29167000.0,"lengthMeters":614.0,"ratePesosPerMeter":47503.25732899023,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6691"},{"year":2026,"category":"Roads","project":"Banay-Banay-Mojon-Cuenca Rd - K0096 + 519 - K0097 + 401","amountPesos":25258000.0,"lengthMeters":882.0,"ratePesosPerMeter":28637.18820861678,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6694"},{"year":2026,"category":"Roads","project":"Batangas-Lobo Rd - K0119 + 453 - K0120 + 259, K0120 + 974 - K0121 + 114","amountPesos":44155000.0,"lengthMeters":946.0,"ratePesosPerMeter":46675.47568710359,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6697"},{"year":2026,"category":"Roads","project":"Isaac O. Tolentino Ave. - K0057 + (-122) - K0057 + 385","amountPesos":19461000.0,"lengthMeters":507.0,"ratePesosPerMeter":38384.61538461538,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6700"},{"year":2026,"category":"Roads","project":"Maragondon-Magallanes-Amuyong Rd - K0067 + 710 - K0068 + 000, K0068 + 590 - K0068 + 854","amountPesos":10501000.0,"lengthMeters":554.0,"ratePesosPerMeter":18954.873646209388,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6702"},{"year":2026,"category":"Roads","project":"Maragondon-Magallanes-Amuyong Rd - K0075 + 000 - K0075 + 299","amountPesos":5766000.0,"lengthMeters":299.0,"ratePesosPerMeter":19284.28093645485,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6704"},{"year":2026,"category":"Roads","project":"Maragondon-Magallanes-Amuyong Rd - K0085 + 100 - K0085 + 949","amountPesos":17213000.0,"lengthMeters":849.0,"ratePesosPerMeter":20274.44051825677,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6706"},{"year":2026,"category":"Roads","project":"Maragondon-Magallanes-Amuyong Rd. - K0060 + 000 - K0060 + 221","amountPesos":9779000.0,"lengthMeters":221.0,"ratePesosPerMeter":44248.86877828054,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6708"},{"year":2026,"category":"Roads","project":"Noveleta-Naic-Tagaytay Rd - K0050 + 721 - K0051 + 039","amountPesos":6967000.0,"lengthMeters":318.0,"ratePesosPerMeter":21908.80503144654,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6710"},{"year":2026,"category":"Roads","project":"Tagaytay-Batangas via Tuy Rd - K0066 + 187 - K0067 + 000","amountPesos":25028000.0,"lengthMeters":813.0,"ratePesosPerMeter":30784.747847478473,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6712"},{"year":2026,"category":"Roads","project":"Pagsanjan-Lucban Rd - K0109 + 910 - K0110 + 000","amountPesos":2165000.0,"lengthMeters":90.0,"ratePesosPerMeter":24055.555555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6715"},{"year":2026,"category":"Roads","project":"Rizal Bdry-Famy-Quezon Rd - K0081 + 600 - K0082 + 000, K0082 + 824 - K0082 + 2448","amountPesos":38484000.0,"lengthMeters":2024.0,"ratePesosPerMeter":19013.83399209486,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6717"},{"year":2026,"category":"Roads","project":"Famy-Real-Infanta-Dinahican Port Rd - K0096 + 362 - K0097 + 000, K0100 + 000 - K0100 + 506, K0106 + 071 - K0106 + 950","amountPesos":40094000.0,"lengthMeters":2023.0,"ratePesosPerMeter":19819.08057340583,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6720"},{"year":2026,"category":"Roads","project":"Tayabas-Mainit-Mauban Rd - K0167 + 239 - K0168 + 209","amountPesos":19220000.0,"lengthMeters":970.0,"ratePesosPerMeter":19814.432989690722,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6722"},{"year":2026,"category":"Roads","project":"Tiaong Bypass Rd - K0096 + 100 - K0096 + 500","amountPesos":40363000.0,"lengthMeters":400.0,"ratePesosPerMeter":100907.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6725"},{"year":2026,"category":"Roads","project":"Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0211+ 844 - K0212 + 480","amountPesos":20890000.0,"lengthMeters":636.0,"ratePesosPerMeter":32845.911949685535,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6728"},{"year":2026,"category":"Roads","project":"Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0213 + 000 - K0213 +980","amountPesos":31311000.0,"lengthMeters":980.0,"ratePesosPerMeter":31950.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6730"},{"year":2026,"category":"Roads","project":"Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0215 + (-070) - K0215 + 730","amountPesos":25942000.0,"lengthMeters":800.0,"ratePesosPerMeter":32427.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6732"},{"year":2026,"category":"Roads","project":"MSR Jct-Lopez-Buenavista Rd - K0245 + 713 - K0246 + 000, K0247 + 400 - K0247 + 700, K0248 + 000 - K0248 + 130","amountPesos":6721000.0,"lengthMeters":717.0,"ratePesosPerMeter":9373.779637377964,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6734"},{"year":2026,"category":"Roads","project":"Mulanay-Sn Francisco Rd - K0275 + (-035) - K0275 + 068, K0278 + 000 - K0279 + 000, K0294 + 000 - K0294 + 484, K0307 + 000 - K0308 + 000","amountPesos":17223000.0,"lengthMeters":2587.0,"ratePesosPerMeter":6657.518361035949,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6736"},{"year":2026,"category":"Roads","project":"P Burgos-Pototanin Jct - K0161 + 013 - K0161 + 377, K0167 + 000 - K0167 + 656, K0173 + 648 - K0175 + 000","amountPesos":31988000.0,"lengthMeters":2372.0,"ratePesosPerMeter":13485.66610455312,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6738"},{"year":2026,"category":"Roads","project":"P Burgos-Pototanin Jct - K0183 + 000 - K0184 + 110, K0186 + 830 - K0187 + 500, K0190 + 841 - K0192 + 099","amountPesos":41552000.0,"lengthMeters":3038.0,"ratePesosPerMeter":13677.41935483871,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6740"},{"year":2026,"category":"Roads","project":"P Burgos-Pototanin Jct - K0193 + 035 - K0193 + 685","amountPesos":21067000.0,"lengthMeters":650.0,"ratePesosPerMeter":32410.76923076923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6742"},{"year":2026,"category":"Roads","project":"Sn Francisco-Sn Andres-Sn Narciso Rd - K0360 + 913 - K0361 + 149, K0366 + 355 - K0367 + 000, K0367 + 825 - K0368 + 050, K0368 + 117 - K0368 + 189, K0368 + 850 - K0369 + 000, K0370 + 000 - K0370 + 239, K0371 + 000 - K0372 + 000","amountPesos":34203000.0,"lengthMeters":2567.0,"ratePesosPerMeter":13324.113751460849,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6744"},{"year":2026,"category":"Roads","project":"Sn Francisco-Sn Andres-Sn Narciso Rd - K0372 + 000 - K0372 + 569, K0376 + 000 - K0376 + 545, K0376 + 936 - K0377 + 324, K0385 + 000 - K0386 + 000","amountPesos":35738000.0,"lengthMeters":2502.0,"ratePesosPerMeter":14283.772981614708,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6746"},{"year":2026,"category":"Roads","project":"Sn Francisco-Sn Andres-Sn Narciso Rd - K0378 + 055 - K0378 + 285, K0378 + 469 - K0378 + 618, K0378 + 869 - K0380 + 000, K0381 + 000 - K0382 + 000, K0383 + 000 - K0383 + 534.57","amountPesos":38459000.0,"lengthMeters":3044.57,"ratePesosPerMeter":12631.997293542245,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6748"},{"year":2026,"category":"Roads","project":"Calapan North Rd - K0054 + 066 - K0055 + 000","amountPesos":17319000.0,"lengthMeters":934.0,"ratePesosPerMeter":18542.826552462528,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6752"},{"year":2026,"category":"Roads","project":"El Nido-Jct New Ibahay Rd - K0272 + 318 - K0272 + 432, K0272 + 451 - K0272 + 598","amountPesos":9684000.0,"lengthMeters":261.0,"ratePesosPerMeter":37103.44827586207,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6755"},{"year":2026,"category":"Roads","project":"Culandanum-Panalingaan Cross Country Rd - K0238 + 000 - K0238 + 400","amountPesos":11546000.0,"lengthMeters":400.0,"ratePesosPerMeter":28865.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6758"},{"year":2026,"category":"Roads","project":"Culandanum-Panalingaan Cross Country Rd - K0239 + 393 - K0239 + 534, K0242 + 953 - K0243 + 020, K0243 + 926 - K0244 + 008","amountPesos":5771000.0,"lengthMeters":290.0,"ratePesosPerMeter":19900.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6760"},{"year":2026,"category":"Roads","project":"Palawan Circum. Rd - K0227+643 - K0227+692, K0229+110 - K0229+310, K0239+083 -K0239+227","amountPesos":11344000.0,"lengthMeters":393.0,"ratePesosPerMeter":28865.139949109416,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6762"},{"year":2026,"category":"Roads","project":"Palawan Circum. Rd - K0248+627 - K0248+758, K0249+335 - K0249+707, K0250+374 - K0250+441, K0251+545 - K0251+621","amountPesos":18647000.0,"lengthMeters":646.0,"ratePesosPerMeter":28865.325077399382,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6764"},{"year":2026,"category":"Roads","project":"Palawan Circum. Rd - K0261 + 115 - K0261 + 155, K0280 + 460 - K0280 + 540, K0283 + 165 - K0283 + 415, K0286 + 632 - K0287 + 402","amountPesos":24100000.0,"lengthMeters":1140.0,"ratePesosPerMeter":21140.35087719298,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6766"},{"year":2026,"category":"Roads","project":"Palawan Circum. Rd - K0275+570 - K0275+1130, K0278+119 - K0278+226, K0278+244 - K0278+348","amountPesos":25017000.0,"lengthMeters":771.0,"ratePesosPerMeter":32447.470817120622,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6768"},{"year":2026,"category":"Roads","project":"Quezon-Punta Baja Rd - K0158 + 276 - K0158 + 475","amountPesos":5744000.0,"lengthMeters":199.0,"ratePesosPerMeter":28864.3216080402,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6770"},{"year":2026,"category":"Roads","project":"Quezon-Punta Baja Rd - K0183 + 430 - K0183 + 505","amountPesos":1586000.0,"lengthMeters":75.0,"ratePesosPerMeter":21146.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6772"},{"year":2026,"category":"Roads","project":"Irawan-Tagburos Rd - K0014 + 700 - K0015 + 719, K0016 + 414 - K0016 + 554, K0016 + 569 - K0016 + 609","amountPesos":34697000.0,"lengthMeters":1199.0,"ratePesosPerMeter":28938.281901584654,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6775"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0023 + 406 - K0023 + 436, K0023 + 483 - K0023 + 520, K0025 + 102 - K0025 + 129, K0025 + 144 - K0025 + 192, K0031 + 901 - K0031 + 936, K0053 + 321 - K0053 + 355, K0053 + 460 - K0053 + 562, K0075 + 2122 - K0075 + 2154, K0075 + 2184 - K0075 + 2240","amountPesos":36563000.0,"lengthMeters":401.0,"ratePesosPerMeter":91179.55112219452,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6777"},{"year":2026,"category":"Roads","project":"Puerto Princesa South Rd - K0025 + 000 - K0025 + 1000","amountPesos":24055000.0,"lengthMeters":1000.0,"ratePesosPerMeter":24055.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6779"},{"year":2026,"category":"Roads","project":"Puerto Princesa South Rd - K0043 + 068 - K0043 + 118, K0043 + 208 - K0043 + 240, K0043 + 353 - K0043 + 440, K0043 + 547 - K0043 + 570","amountPesos":5773000.0,"lengthMeters":192.0,"ratePesosPerMeter":30067.708333333332,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6781"},{"year":2026,"category":"Roads","project":"Tablas Circumferential Rd - K0059 + 040 - K0059 + 157, K0059 + 177 - K0059 + 280","amountPesos":16604000.0,"lengthMeters":220.0,"ratePesosPerMeter":75472.72727272728,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6784"},{"year":2026,"category":"Roads","project":"Tablas Circumferential Rd - K0072 + 600 - K0073 + 000, K0073 + 518 - K0074 + 000, K0074 + 257 - K0074 + 275","amountPesos":33850000.0,"lengthMeters":900.0,"ratePesosPerMeter":37611.11111111111,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6786"},{"year":2026,"category":"Roads","project":"Tablas Circumferential Rd - K0075 + 500 - K0076 + 000","amountPesos":11959000.0,"lengthMeters":500.0,"ratePesosPerMeter":23918.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6788"},{"year":2026,"category":"Roads","project":"Tablas Circumferential Rd - K0106 + 392 - K0106 + 620","amountPesos":16465000.0,"lengthMeters":228.0,"ratePesosPerMeter":72214.91228070176,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6790"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0095 + 315 - K0095 + 563","amountPesos":14247000.0,"lengthMeters":248.0,"ratePesosPerMeter":57447.58064516129,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6793"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0166 + 755 - K0166 + 1016, K0168 + 151 - K0168 + 345, K0169 + 700 - K0169 + 820","amountPesos":15191000.0,"lengthMeters":575.0,"ratePesosPerMeter":26419.130434782608,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6795"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0174 + 504 - K0174 + 786","amountPesos":7055000.0,"lengthMeters":282.0,"ratePesosPerMeter":25017.7304964539,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6797"},{"year":2026,"category":"Roads","project":"Mindoro Oriental/Occidental East Coastal Rd - K0202 + 905 - K0203 + 951","amountPesos":31881000.0,"lengthMeters":1046.0,"ratePesosPerMeter":30478.967495219884,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6799"},{"year":2026,"category":"Roads","project":"Ligao-Tabaco Rd - K0519 + 066 - K0520 + 000","amountPesos":15986000.0,"lengthMeters":934.0,"ratePesosPerMeter":17115.63169164882,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6803"},{"year":2026,"category":"Roads","project":"Legazpi City-Punta de Jesus Rd - K0557 + 769 - K0558 + 000","amountPesos":4314000.0,"lengthMeters":231.0,"ratePesosPerMeter":18675.324675324675,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6806"},{"year":2026,"category":"Roads","project":"Danao-Pasacao Rd - K0426 + 400 - K0426 + 900","amountPesos":15673000.0,"lengthMeters":500.0,"ratePesosPerMeter":31346.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6809"},{"year":2026,"category":"Roads","project":"Lagonoy-Presentacion Rd -  K0519 + 797 - K0519 + 955, K0521 + 1022 - K0522 + 860, K0524 + 385 - K0524 + 660","amountPesos":36535000.0,"lengthMeters":1271.0,"ratePesosPerMeter":28745.082612116443,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6812"},{"year":2026,"category":"Roads","project":"Lagonoy-Presentacion Rd - K0509 + 772 - K0510 + 420, K0512 + 060 - K0510 + 677","amountPesos":35678000.0,"lengthMeters":2031.0,"ratePesosPerMeter":17566.715903495813,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6814"},{"year":2026,"category":"Roads","project":"Iriga City-Masoli Rd - K0474 + 050 - K0474 + 182","amountPesos":3397000.0,"lengthMeters":132.0,"ratePesosPerMeter":25734.848484848484,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6817"},{"year":2026,"category":"Roads","project":"Catanduanes Cir Rd - K0030+386-K0032+349, K0033+018-K0033+699","amountPesos":40816000.0,"lengthMeters":2644.0,"ratePesosPerMeter":15437.216338880484,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6820"},{"year":2026,"category":"Roads","project":"Catanduanes Cir Rd - K0059 + 300 - K0060 + 200, K0081 + 920 - K0082 + 166, K0090 + 461 - K0090 + 585","amountPesos":37136000.0,"lengthMeters":1270.0,"ratePesosPerMeter":29240.944881889765,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6822"},{"year":2026,"category":"Roads","project":"Catanduanes Cir Rd - K0138 + 000 - K0138 + 400, K0138 + 630 - K0138 + 889.97","amountPesos":19329000.0,"lengthMeters":659.97,"ratePesosPerMeter":29287.69489522246,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6824"},{"year":2026,"category":"Roads","project":"Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0059 + 911 - K0060 + 000, K0063 + 700 - K0064 + 000","amountPesos":8981000.0,"lengthMeters":389.0,"ratePesosPerMeter":23087.403598971723,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6826"},{"year":2026,"category":"Roads","project":"San Fernando North Road - K0015 + 520 - K0015 + 791, K0016 + 376 - K0016 + 576, K0016 + 792 - K0016 + 896","amountPesos":48812000.0,"lengthMeters":575.0,"ratePesosPerMeter":84890.43478260869,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6829"},{"year":2026,"category":"Roads","project":"Sn Fernando North Rd - K0015 + 104 - K0015 + 520","amountPesos":47240000.0,"lengthMeters":416.0,"ratePesosPerMeter":113557.69230769231,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6831"},{"year":2026,"category":"Roads","project":"Sn Fernando North Rd - K0018 + 935 - K0019 + 000, K0019 + 095 - K0019 + 197, K0019 + 811 - K0020 + 000, K0028 + 000 - K0028 + 400","amountPesos":40792000.0,"lengthMeters":756.0,"ratePesosPerMeter":53957.671957671955,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6833"},{"year":2026,"category":"Roads","project":"Jct Milagros-Baleno-Lagta Rd - K0036 + 461 - K0036 + 574","amountPesos":12568000.0,"lengthMeters":113.0,"ratePesosPerMeter":111221.2389380531,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6836"},{"year":2026,"category":"Roads","project":"Jct Tawad-Balud Rd - K0033 + 000 - K0033 + 252","amountPesos":23128000.0,"lengthMeters":252.0,"ratePesosPerMeter":91777.77777777778,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6838"},{"year":2026,"category":"Roads","project":"Lagta-Crossing Malinta Rd - K0099 + 520 - K0099 + 796","amountPesos":30993000.0,"lengthMeters":276.0,"ratePesosPerMeter":112293.47826086957,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6840"},{"year":2026,"category":"Roads","project":"Masbate-Milagros Rd - K0009 + 606 - K0010 + 281","amountPesos":54881000.0,"lengthMeters":675.0,"ratePesosPerMeter":81305.18518518518,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6842"},{"year":2026,"category":"Roads","project":"Masbate-Milagros Rd - K0020 + 698 - K0020 + 851","amountPesos":14913000.0,"lengthMeters":153.0,"ratePesosPerMeter":97470.58823529411,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6844"},{"year":2026,"category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0046 + 776 - K0047 + 139, K0047 + 845 - K0047 + 855","amountPesos":19062000.0,"lengthMeters":373.0,"ratePesosPerMeter":51104.55764075067,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6847"},{"year":2026,"category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0047 + 139 - K0047 + 845","amountPesos":35145000.0,"lengthMeters":706.0,"ratePesosPerMeter":49780.45325779037,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6849"},{"year":2026,"category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0053 + 555 - K0053 + 883","amountPesos":39050000.0,"lengthMeters":328.0,"ratePesosPerMeter":119054.87804878049,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6851"},{"year":2026,"category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0053 + 883 - K0054 + 000, K0054 + 785 - K0054 + 831","amountPesos":14831000.0,"lengthMeters":163.0,"ratePesosPerMeter":90987.73006134969,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6853"},{"year":2026,"category":"Roads","project":"Aklan West Rd (Kalibo-Nabas) (S00480PN) - K0247 + 971 - K0248 + 800, K0256 + 594 - K0257 + 310, K0259 + 764 - K0260 + 000","amountPesos":44067000.0,"lengthMeters":1781.0,"ratePesosPerMeter":24742.841100505335,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6857"},{"year":2026,"category":"Roads","project":"Anini-y-Tobias Fornier Rd - K0083 + 964 - K0084 + 708, K0085 + 426 - K0085 + 524, K0086 + 318 - K0086 + 440, K0090 + 507 - K0091 + 000, K0103 + 000 - K0103 + 621","amountPesos":35280000.0,"lengthMeters":2078.0,"ratePesosPerMeter":16977.86333012512,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6860"},{"year":2026,"category":"Roads","project":"Iloilo-Antique Rd - K0098 + 117 - K0099 + 170, K0099 + 619 - K0099 + 734, K0099 + 778 - K0099 + 859","amountPesos":20394000.0,"lengthMeters":1249.0,"ratePesosPerMeter":16328.26261008807,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6862"},{"year":2026,"category":"Roads","project":"Iloilo-Antique Rd - K0101 + 846 - K0103 + 379, K0103 + 484 - K0104 + 560","amountPesos":42748000.0,"lengthMeters":2609.0,"ratePesosPerMeter":16384.82177079341,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6864"},{"year":2026,"category":"Roads","project":"Iloilo-Antique Rd - K0128 + 037 - K0129 + 000, K0131 + 745 - K0132 + 417, K0132 + 597 - K0132 + 746, K0132 + 884 - K0133 + 030, K0133 + 150 - K0133 + 500, K0133 + 551 - K0133 + 670","amountPesos":43100000.0,"lengthMeters":2399.0,"ratePesosPerMeter":17965.819091288038,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6866"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0131 + 300 - K0131 + 730","amountPesos":9464000.0,"lengthMeters":430.0,"ratePesosPerMeter":22009.302325581397,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6869"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0154 + 100 - K0154 + 900","amountPesos":14353000.0,"lengthMeters":800.0,"ratePesosPerMeter":17941.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6871"},{"year":2026,"category":"Roads","project":"Guimaras Circumferential Rd - K0037 + 007 - K0037 + 221","amountPesos":6512000.0,"lengthMeters":214.0,"ratePesosPerMeter":30429.906542056076,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6874"},{"year":2026,"category":"Roads","project":"Guimaras Circumferential Rd - K0077 + 219 - K0077 + 732","amountPesos":16098000.0,"lengthMeters":513.0,"ratePesosPerMeter":31380.116959064326,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6876"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0215 + 1118 - K0217 + 016.93","amountPesos":25317000.0,"lengthMeters":898.93,"ratePesosPerMeter":28163.4832523113,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6879"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0231 + 048 - K0231 + 644","amountPesos":14257000.0,"lengthMeters":596.0,"ratePesosPerMeter":23921.140939597317,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6881"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0232 + 939 - K0234 + 018, K0234 + 039 - K0234 + 180","amountPesos":29472000.0,"lengthMeters":1220.0,"ratePesosPerMeter":24157.377049180326,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6883"},{"year":2026,"category":"Roads","project":"Passi-Sn Rafael-Lemery-Sara Rd - K0088 + 820 - K0089 + 031","amountPesos":9431000.0,"lengthMeters":211.0,"ratePesosPerMeter":44696.68246445498,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6885"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz Rd (Old Route) - K0016 + 200 - K0016 + 438","amountPesos":4751000.0,"lengthMeters":238.0,"ratePesosPerMeter":19962.18487394958,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6888"},{"year":2026,"category":"Roads","project":"Metro Iloilo Radial Rd (R4 Bypass Rd) - K0019 + 831 - K0020 + 064, K0020 + 168 - K0020 + 421","amountPesos":9340000.0,"lengthMeters":486.0,"ratePesosPerMeter":19218.106995884773,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6890"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz Rd (Old Route) - K0019 + (-641) - K0019 + 722","amountPesos":27747000.0,"lengthMeters":1363.0,"ratePesosPerMeter":20357.300073367573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6893"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz Rd (Old Route) - K0052 + 000 - K0053 + 044, K0057 + 334 - K0057 + 587","amountPesos":30127000.0,"lengthMeters":1297.0,"ratePesosPerMeter":23228.21896684657,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6895"},{"year":2026,"category":"Roads","project":"Jct Natl Rd Sagay-Bato-Dian-Marcelo-Balea Jct Rd - K0086 + 000 - K0086 + 109, K0086 + 1691 - K0088 + 430","amountPesos":20100000.0,"lengthMeters":848.0,"ratePesosPerMeter":23702.830188679247,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6899"},{"year":2026,"category":"Roads","project":"Silay-Lantawan Rd - K0015 + (-792) - K0015 + (-532)","amountPesos":7228000.0,"lengthMeters":260.0,"ratePesosPerMeter":27800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6901"},{"year":2026,"category":"Roads","project":"Vito Port Rd - K0097 + 500 - K0098 + 000","amountPesos":31532000.0,"lengthMeters":500.0,"ratePesosPerMeter":63064.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6903"},{"year":2026,"category":"Roads","project":"Isabela-Libas Negros Occ. Bdry Rd - K0075 + 187 - K0075 + 245, K0075 + 524 - K0075 + 800","amountPesos":7564000.0,"lengthMeters":334.0,"ratePesosPerMeter":22646.70658682635,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6906"},{"year":2026,"category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0089 + (-490) - K0089 + 000","amountPesos":14783000.0,"lengthMeters":490.0,"ratePesosPerMeter":30169.38775510204,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6909"},{"year":2026,"category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0093 + 054 - K0093 + 934","amountPesos":20254000.0,"lengthMeters":880.0,"ratePesosPerMeter":23015.909090909092,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6911"},{"year":2026,"category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0097 + 471 - K0098 + 360","amountPesos":26416000.0,"lengthMeters":889.0,"ratePesosPerMeter":29714.285714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6913"},{"year":2026,"category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0107 + 180 - K0108 + 561","amountPesos":32084000.0,"lengthMeters":1381.0,"ratePesosPerMeter":23232.440260680665,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6915"},{"year":2026,"category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0141 + 455 - K0142 + 000","amountPesos":13062000.0,"lengthMeters":545.0,"ratePesosPerMeter":23966.97247706422,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6917"},{"year":2026,"category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0147 + 847 - K0148 + 348, K0150 + 751 - K0151 + 000","amountPesos":17616000.0,"lengthMeters":750.0,"ratePesosPerMeter":23488.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6919"},{"year":2026,"category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0163 + 510 - K0164 + 140","amountPesos":14202000.0,"lengthMeters":630.0,"ratePesosPerMeter":22542.85714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6921"},{"year":2026,"category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0183 + 314 - K0184 + 081","amountPesos":17750000.0,"lengthMeters":767.0,"ratePesosPerMeter":23142.112125162974,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6923"},{"year":2026,"category":"Roads","project":"Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0097 + 000 - K0098+ 000, K0100 + 600 - K0101 + 000, K0101 + 548 - K0101 + 1002","amountPesos":43618000.0,"lengthMeters":1854.0,"ratePesosPerMeter":23526.42934196332,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6925"},{"year":2026,"category":"Roads","project":"Don Jorge Araneta-Ayungon-Yungue-Gurrea-La Carlota City Rd - K0041 + 000 - K0042 + 405","amountPesos":28128000.0,"lengthMeters":1405.0,"ratePesosPerMeter":20019.928825622777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6928"},{"year":2026,"category":"Roads","project":"Sta Catalina-Pamplona-Tanjay City - K0049 + 500 - K0049 + 794","amountPesos":6793000.0,"lengthMeters":294.0,"ratePesosPerMeter":23105.442176870747,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6931"},{"year":2026,"category":"Roads","project":"Dumaguete South Rd - K0103 + 877 - K0105 + 000","amountPesos":40046000.0,"lengthMeters":1123.0,"ratePesosPerMeter":35659.839715048976,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6934"},{"year":2026,"category":"Roads","project":"Siquijor Circumferential Rd - K0017 + 688 - K0018 + 000","amountPesos":11064000.0,"lengthMeters":312.0,"ratePesosPerMeter":35461.53846153846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6937"},{"year":2026,"category":"Roads","project":"Siquijor Circumferential Rd - K0056 + 000 - K0057 + 000","amountPesos":35819000.0,"lengthMeters":1000.0,"ratePesosPerMeter":35819.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6939"},{"year":2026,"category":"Roads","project":"Siquijor Circumferential Rd - K0061 + 222 - K0061 + 730","amountPesos":16827000.0,"lengthMeters":508.0,"ratePesosPerMeter":33124.015748031496,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6941"},{"year":2026,"category":"Roads","project":"Jct (TER)-Jagna-Sierra Bullones Rd - K0064 + 574 - K0064 + 825","amountPesos":7588000.0,"lengthMeters":251.0,"ratePesosPerMeter":30231.075697211156,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6945"},{"year":2026,"category":"Roads","project":"Jct Dat-an-Carmen-Sierra Bullones-Pilar-Alicia Rd - K0069 + 380 - K0069 + 457","amountPesos":2599000.0,"lengthMeters":77.0,"ratePesosPerMeter":33753.246753246756,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6947"},{"year":2026,"category":"Roads","project":"Loay Interior Rd - K0181 + 000 - K0182 + 429","amountPesos":44398000.0,"lengthMeters":1429.0,"ratePesosPerMeter":31069.27921623513,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6949"},{"year":2026,"category":"Roads","project":"Loay Interior Rd - K0188 + 200 - K0188 + 319, K0188 + 954 - K0189 + 279","amountPesos":43475000.0,"lengthMeters":444.0,"ratePesosPerMeter":97916.66666666667,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6951"},{"year":2026,"category":"Roads","project":"Cebu South Coastal Rd (S00136CB) - K0011 + (-572) - K0011 + 003, K0011 + 063 - K0011 + 934","amountPesos":41688000.0,"lengthMeters":1446.0,"ratePesosPerMeter":28829.875518672197,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6954"},{"year":2026,"category":"Roads","project":"Cebu South Coastal Rd (S00137CB) - K0012 + 064 - K0012 + 924, K0012 + 984- K0011 + 598","amountPesos":47780000.0,"lengthMeters":1386.0,"ratePesosPerMeter":34473.30447330447,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6956"},{"year":2026,"category":"Roads","project":"Santander-Barili-Toledo Rd - K0149 + 000 - K0150 + 302.12","amountPesos":29070000.0,"lengthMeters":1302.12,"ratePesosPerMeter":22325.131324301987,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6959"},{"year":2026,"category":"Roads","project":"Carcar-Barili Rd - K0059 + 436 - K0060 + 424","amountPesos":34911000.0,"lengthMeters":988.0,"ratePesosPerMeter":35335.02024291498,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6962"},{"year":2026,"category":"Roads","project":"Cebu-Toledo Wharf Rd (Jct Naga-Uling) - K0029 + (-443) - K0029 + 480","amountPesos":35881000.0,"lengthMeters":923.0,"ratePesosPerMeter":38874.32286023835,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6964"},{"year":2026,"category":"Roads","project":"Toledo-Tabuelan-Sn Remigio Rd -  K0091 + 612 - K0091 + 912","amountPesos":11637000.0,"lengthMeters":300.0,"ratePesosPerMeter":38790.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6966"},{"year":2026,"category":"Roads","project":"Toledo-Tabuelan-Sn Remigio Rd - K0088 + 000 - K0089 + 000","amountPesos":27132000.0,"lengthMeters":1000.0,"ratePesosPerMeter":27132.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6968"},{"year":2026,"category":"Roads","project":"Toledo-Tabuelan-Sn Remigio Rd - K0094 + 941 - K0095 + 490","amountPesos":11230000.0,"lengthMeters":549.0,"ratePesosPerMeter":20455.373406193077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6970"},{"year":2026,"category":"Roads","project":"Toledo-Tabuelan-Sn Remigio Rd - K0098 + 000 - K0099 + 000, K0102 + 710 - K0103 + 507","amountPesos":35911000.0,"lengthMeters":1797.0,"ratePesosPerMeter":19983.861992209237,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6972"},{"year":2026,"category":"Roads","project":"Cebu North Hagnaya Wharf Rd - K0038 + 600 - K0039 + 000, K0042 + 130 - K0042 + 155, K0042 + 550 - K0042 + 570","amountPesos":38790000.0,"lengthMeters":445.0,"ratePesosPerMeter":87168.53932584269,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6975"},{"year":2026,"category":"Roads","project":"Biliran Circumferential Rd - K1046 + 234 - K1046 + 287","amountPesos":4824000.0,"lengthMeters":53.0,"ratePesosPerMeter":91018.8679245283,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6979"},{"year":2026,"category":"Roads","project":"Biliran Circumferential Rd - K1105 + 913 - K1106 + 300","amountPesos":14472000.0,"lengthMeters":387.0,"ratePesosPerMeter":37395.348837209305,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6981"},{"year":2026,"category":"Roads","project":"Calubian Jct.-San Isidro-Tabango-Villaba-Palompon Rd - K1030 + 570 - K1030 + 710","amountPesos":9800000.0,"lengthMeters":140.0,"ratePesosPerMeter":70000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6984"},{"year":2026,"category":"Roads","project":"Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1051 + 000 - K1052 + 443","amountPesos":39200000.0,"lengthMeters":1443.0,"ratePesosPerMeter":27165.627165627167,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6986"},{"year":2026,"category":"Roads","project":"Lemon-Leyte-Biliran Rd - K0982 + 606 - K0982 + 931","amountPesos":15086000.0,"lengthMeters":325.0,"ratePesosPerMeter":46418.46153846154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6988"},{"year":2026,"category":"Roads","project":"Catarman-Calbayog Rd - K0767 + 507 - K0767 + 710.74","amountPesos":5645000.0,"lengthMeters":203.74,"ratePesosPerMeter":27706.881319329823,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6991"},{"year":2026,"category":"Roads","project":"Calbayog-Catarman Rd - K0798 + 858 - K0799 + 036, K0800 + 018 - K0800 + 222, K0800 + 256 - K0800 + 441","amountPesos":15065000.0,"lengthMeters":567.0,"ratePesosPerMeter":26569.664902998236,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6994"},{"year":2026,"category":"Roads","project":"Buri Access Rd - K0794 + (-466) - K0794 + 869","amountPesos":24263000.0,"lengthMeters":1335.0,"ratePesosPerMeter":18174.53183520599,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 6997"},{"year":2026,"category":"Roads","project":"Buenavista-Asuncion, Maasin City (Bontoc-Maasin) - K1138 + 300 - K1138 + 480, K1139 + 160 - K1139 + 520, K1139 + 888 - K1140 + 034, K1140 + 781 - K1141 + 000","amountPesos":27014000.0,"lengthMeters":905.0,"ratePesosPerMeter":29849.723756906078,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7000"},{"year":2026,"category":"Roads","project":"Buenavista-Asuncion, Maasin City (Bontoc-Maasin) - K1142 + 769 - K1142 + 827, K1143 + 166 - K1143 + 184, K1143 + 716 - K1144 + 099, K1146 + 400 - K1147 + 157","amountPesos":38592000.0,"lengthMeters":1216.0,"ratePesosPerMeter":31736.842105263157,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7002"},{"year":2026,"category":"Roads","project":"Liloy-Siocon Rd (S01330MN) - K2035 + 691 - K2035 + 711, K2037 + 220 - K2037 + 450, K2056 + 298 - K2056 + 318","amountPesos":24500000.0,"lengthMeters":270.0,"ratePesosPerMeter":90740.74074074074,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7006"},{"year":2026,"category":"Roads","project":"Sindangan-Siayan-Dumingag-Mahayag Rd (Mahayag-Dumingag Sect) - K1686 + 000 - K1686 + 500, K1688 + 600 - K1689 + 300","amountPesos":2894000.0,"lengthMeters":1200.0,"ratePesosPerMeter":2411.6666666666665,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7009"},{"year":2026,"category":"Roads","project":"Kapalong-Talaingod-Valencia (Bukidnon)  Rd - K1580 + 650 - K1580 + 780","amountPesos":4842000.0,"lengthMeters":130.0,"ratePesosPerMeter":37246.153846153844,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7013"},{"year":2026,"category":"Roads","project":"Kapalong-Talaingod-Valencia (Bukidnon)  Rd - K1590 + 580 - K1590 + 630, K1597 + 039 - K1597 + 084, K1597 + 111 - K1597 + 219, K1597 + 787 - K1597 + 899.50, K1599 + 1658 - K1599 + 1708, K1599 + 2417 - K1599 + 2467, K1602 + 760 - K1603 + 370, K1605 + 367 - K1605 + 425.50, K1605 + 903 - K1605 + 952, K1605 + 1869 - K1605 + 1919, K1607 + 220 - K1607 + 260, K1609 + 860 - K1609 + 905, K1609 + 905.50 - K1609 + 968, K1609 + 972.50 - K1610 + 106.50, K1610 + 265 - K1610 + 310","amountPesos":32266000.0,"lengthMeters":1509.5,"ratePesosPerMeter":21375.28983106989,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7016"},{"year":2026,"category":"Roads","project":"Cagayan de Oro City Coastal Bypass Rd - (S01248MN) Chainage 654 - Chainage 1123, Chainage 4000 - Chainage 4150","amountPesos":18877000.0,"lengthMeters":619.0,"ratePesosPerMeter":30495.961227786753,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7019"},{"year":2026,"category":"Roads","project":"CDO-Airport-Bukidnon Rd - K1459 + 910 - K1462 + 000","amountPesos":37754000.0,"lengthMeters":2090.0,"ratePesosPerMeter":18064.114832535884,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7021"},{"year":2026,"category":"Roads","project":"Iligan City Diversion Rd - K1523 + (-770) - K1523 + (-500), K1523 + (-084) - K1523 + 079, K1525 + 134 – K1525 + 188, K1525 + 690 – K1525 + 758, K1526 + 492 – K1526 + 546, K1533 + 056 – K1533 + 096, K1533 + 103 – K1533 + 150, K1533 + 157 - K1533 + 195","amountPesos":18877000.0,"lengthMeters":734.0,"ratePesosPerMeter":25717.983651226157,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7024"},{"year":2026,"category":"Roads","project":"Iligan Jct.-South Wharf Road - K1526 + (-089) - K1526 + 120","amountPesos":7551000.0,"lengthMeters":209.0,"ratePesosPerMeter":36129.18660287081,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7026"},{"year":2026,"category":"Roads","project":"Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1680 + 880 - K1681 + 000, K1681 + 400 - K1681 + 833, K1703 + 700 - K1704 + 000","amountPesos":29322000.0,"lengthMeters":853.0,"ratePesosPerMeter":34375.14654161782,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7030"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1543 + 625 - K1544 + 000","amountPesos":8628000.0,"lengthMeters":375.0,"ratePesosPerMeter":23008.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7033"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1544 + 000 - K1544 + 534","amountPesos":13089000.0,"lengthMeters":534.0,"ratePesosPerMeter":24511.23595505618,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7035"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1644 + 300 - K1644 + 380, K1645 + 300 - K1645 + 400","amountPesos":4861000.0,"lengthMeters":180.0,"ratePesosPerMeter":27005.555555555555,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7037"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1686 + 020 - K1686 + 100, K1686 + 660 - K1686 + 760","amountPesos":4893000.0,"lengthMeters":180.0,"ratePesosPerMeter":27183.333333333332,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7039"},{"year":2026,"category":"Roads","project":"Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1641 + 700 - K1642 + 374, K1642 + 602 - K1643 + 000","amountPesos":20479000.0,"lengthMeters":1072.0,"ratePesosPerMeter":19103.544776119405,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7043"},{"year":2026,"category":"Roads","project":"Bukidnon-Cotabato Rd - K1619 + 100 - K1619 + 118,  K1619 + 200 - K1619 + 218, K1646 + 400 - K1646 + 423, K1648 + 036 - K1648 + 087","amountPesos":4973000.0,"lengthMeters":110.0,"ratePesosPerMeter":45209.09090909091,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7046"},{"year":2026,"category":"Roads","project":"Jct Digos-Buayan Airport Rd - K1650 + 109 - K1650 + 417","amountPesos":5591000.0,"lengthMeters":308.0,"ratePesosPerMeter":18152.597402597403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7049"},{"year":2026,"category":"Roads","project":"Isulan Jct-Ninoy Aquino Rd - K1807 + 361 - K1807 + 439, K1808 + 100 - K1808 + 300","amountPesos":4813000.0,"lengthMeters":278.0,"ratePesosPerMeter":17312.94964028777,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7052"},{"year":2026,"category":"Roads","project":"Nasipit Port Rd - K1265 + 000 - K1265 + 123","amountPesos":2940000.0,"lengthMeters":123.0,"ratePesosPerMeter":23902.439024390245,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7056"},{"year":2026,"category":"Roads","project":"NJR Bah-Bah-Talacogon Rd - K1299 + 146.30 - K1299 + 619.40, K1299 + 705.70 - K1299 + 719.30, K1301 + 411.30 - K1301 + 448, K1301 + 546.80 - K1301 + 590.70, K1303 + 382 - K1303 + 766.16,  K1304 + 000 - K1304 + 278, K1304 + 323 - K1304 + 531, K1304 + 766 - K1304 + 840.50","amountPesos":40378000.0,"lengthMeters":1511.96,"ratePesosPerMeter":26705.732955903073,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7059"},{"year":2026,"category":"Roads","project":"NJR Bah-Bah-Talacogon Rd - K1313 + 640 - K1313 + 718, K1317 + 324 - K1319 + 006.96","amountPesos":40414000.0,"lengthMeters":1760.96,"ratePesosPerMeter":22949.981828094253,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7061"},{"year":2026,"category":"Roads","project":"Dinagat-Loreto Rd - K0010 + 600 - K0010 + 761, K0010 + 791 - K0010 + 965, K0011 + 422 - K0012 + 388","amountPesos":29225000.0,"lengthMeters":1301.0,"ratePesosPerMeter":22463.48962336664,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7064"},{"year":2026,"category":"Roads","project":"Dinagat-Loreto Rd - K0020 + 000 - K0021 + 005.94","amountPesos":28478000.0,"lengthMeters":1005.94,"ratePesosPerMeter":28309.83955305489,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7066"},{"year":2026,"category":"Roads","project":"Dinagat-Loreto Rd - K0088 + 000 - K0088 + 700","amountPesos":34300000.0,"lengthMeters":700.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7068"},{"year":2026,"category":"Roads","project":"Jct Magsaysay-Cagdianao Rd - K0010 + 645 - K0011 + 705","amountPesos":27075000.0,"lengthMeters":1060.0,"ratePesosPerMeter":25542.45283018868,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7070"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd - K1157 + 885 - K1158 + 000","amountPesos":2990000.0,"lengthMeters":115.0,"ratePesosPerMeter":26000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7073"},{"year":2026,"category":"Roads","project":"NRJ Barobo-Agusan Del Sur Bdry Rd - (S00315MN) Chainage 000 - Chainage 176","amountPesos":4047000.0,"lengthMeters":176.0,"ratePesosPerMeter":22994.31818181818,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7076"},{"year":2026,"category":"Roads","project":"NRJ Barobo-Agusan Del Sur Bdry Rd - K1412 + 899 - K1413 + 226","amountPesos":7517000.0,"lengthMeters":327.0,"ratePesosPerMeter":22987.76758409786,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7078"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd - K1488 + 500 - K1489 + 000","amountPesos":11486000.0,"lengthMeters":500.0,"ratePesosPerMeter":22972.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7080"},{"year":2026,"category":"Roads","project":"Ayaga-Sta. Marcela-Flora-Lasam Rd - K0673 + 000 - K0674 + 000","amountPesos":60760000.0,"lengthMeters":1000.0,"ratePesosPerMeter":60760.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7087"},{"year":2026,"category":"Roads","project":"Cagayan-Apayao Rd (Ili-Guinamgamman-Rizal Sect) - K0561 + 172 - K0562 + 151","amountPesos":58800000.0,"lengthMeters":979.0,"ratePesosPerMeter":60061.287027579165,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7089"},{"year":2026,"category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0464 + (-577) - K0464 + 379","amountPesos":68907000.0,"lengthMeters":956.0,"ratePesosPerMeter":72078.45188284518,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7091"},{"year":2026,"category":"Roads","project":"Calamagui-Ilagan Rd - K0399 + 552 - K0402 + 000","amountPesos":58389000.0,"lengthMeters":2448.0,"ratePesosPerMeter":23851.71568627451,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7094"},{"year":2026,"category":"Roads","project":"Gamu-Roxas Road – K0411 + 426 – K0413 + 421, K0414 + 000 – K0415 + 000, K0416 + 000 – K0417 + 321, K0417 + 410 – K0418 + 442","amountPesos":98000000.0,"lengthMeters":5348.0,"ratePesosPerMeter":18324.607329842933,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7096"},{"year":2026,"category":"Roads","project":"Gen. Alejo Santos Highway - K0063 + 300 - K0063 + 1040, K0064 + 000-K0064 + 025","amountPesos":52720000.0,"lengthMeters":740.0,"ratePesosPerMeter":71243.24324324324,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7099"},{"year":2026,"category":"Roads","project":"Meycauayan-Camalig-Bahay Pari Rd - K0021 + (-045) - K0021 + 200, K0021 + 600 - K0026 + 833, K0026 + 845 - K0028 + 219","amountPesos":157140000.0,"lengthMeters":6852.0,"ratePesosPerMeter":22933.450087565674,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7101"},{"year":2026,"category":"Roads","project":"Muzon-Tungkong Manga Rd - K0041 + (-779) - K0042 + 912","amountPesos":179379000.0,"lengthMeters":2691.0,"ratePesosPerMeter":66658.86287625418,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7103"},{"year":2026,"category":"Roads","project":"Concepion-La Paz Road K0127+716 - K0129+250, Concepcion, Tarlac","amountPesos":96000000.0,"lengthMeters":1534.0,"ratePesosPerMeter":62581.48631029987,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7105"},{"year":2026,"category":"Roads","project":"NCR/Bulacan Bdry-Bigte-Ipo Dam Rd - K0033 + 336 - K0034 + 016","amountPesos":133834000.0,"lengthMeters":680.0,"ratePesosPerMeter":196814.70588235295,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7107"},{"year":2026,"category":"Roads","project":"Dr Damian Reyes Rd (Boac Side) - K0005 + 361 - K0005 + 987, K0024 + 1054 - K0025 + 131","amountPesos":46280000.0,"lengthMeters":703.0,"ratePesosPerMeter":65832.1479374111,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7110"},{"year":2026,"category":"Roads","project":"Daet-San Vicente-San Lorenzo Circumferential Rd - (S06315LZ) Chainage 2750 - Chainage 3278","amountPesos":19695000.0,"lengthMeters":528.0,"ratePesosPerMeter":37301.13636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7113"},{"year":2026,"category":"Roads","project":"Daet-San Vicente-San Lorenzo Circumferential Rd - (S06316LZ) Chainage 8 - Chainage 508, Chainage 7648 - Chainage 8468","amountPesos":68600000.0,"lengthMeters":1320.0,"ratePesosPerMeter":51969.69696969697,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7115"},{"year":2026,"category":"Roads","project":"Juban-Magallanes Rd - K0618 + 010 - K0618 + 050, K0618 + 450 - K0618 + 700, K0620 + 300 - K0620 + 450, K0622 + 200 - K0622 + 400","amountPesos":52136000.0,"lengthMeters":640.0,"ratePesosPerMeter":81462.5,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7117"},{"year":2026,"category":"Roads","project":"Panganiban Rd - K0438 + (-600) - K0438 + 713","amountPesos":58800000.0,"lengthMeters":1313.0,"ratePesosPerMeter":44782.93983244478,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7119"},{"year":2026,"category":"Roads","project":"Pres. Cory C. Aquino Blvd Extension - (S06312LZ) Chainage 009 - Chainage 1367","amountPesos":63625000.0,"lengthMeters":1358.0,"ratePesosPerMeter":46851.9882179676,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7121"},{"year":2026,"category":"Roads","project":"Pres. Cory C. Aquino Blvd Extension - (S06312LZ) Chainage 2367 - Chainage 3726","amountPesos":63703000.0,"lengthMeters":1359.0,"ratePesosPerMeter":46874.90802060338,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7123"},{"year":2026,"category":"Roads","project":"San Pascual-Claveria Rd - K0014 + 100 - K0014 + 409, K0015 + 140 - K0015 + 229, K0016 + 301 - K0017 + 041, K0018 + 778 - K0018 + 828, K0023 + 145 - K0023 + 900, K0030 + 041 - K0030 + 400","amountPesos":97624000.0,"lengthMeters":2302.0,"ratePesosPerMeter":42408.340573414425,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7125"},{"year":2026,"category":"Roads","project":"Sta. Elena-Capalonga By Pass Coastal Rd - K0288 + 245 - K0288 + 689, K0289 + 000 - K0289 + 120, K0292 + 1001 - K0293 + 376","amountPesos":55080000.0,"lengthMeters":939.0,"ratePesosPerMeter":58658.14696485623,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7127"},{"year":2026,"category":"Roads","project":"Balasan-Carles Rd - K0177 + 296 - K0179 + 533","amountPesos":57948000.0,"lengthMeters":2237.0,"ratePesosPerMeter":25904.336164506036,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7130"},{"year":2026,"category":"Roads","project":"Sogod-Tabuelan Rd - K0120 + 138 - K0120 + 605, K0123 + 724 - K0124 + 035, K0124 + 820 - K0126 + 265","amountPesos":84969000.0,"lengthMeters":2223.0,"ratePesosPerMeter":38222.672064777325,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7133"},{"year":2026,"category":"Roads","project":"Allen Old Rd - K0697 + (-168) - K0698 + 312, K0699 + (-771) - K0699 + (-442)","amountPesos":58461000.0,"lengthMeters":1726.0,"ratePesosPerMeter":33870.79953650058,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7136"},{"year":2026,"category":"Roads","project":"Arteche-Jipapad-Las Navas-Rawis Rd - K0813 + 952 - K0814 + 800","amountPesos":100790000.0,"lengthMeters":848.0,"ratePesosPerMeter":118856.1320754717,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7138"},{"year":2026,"category":"Roads","project":"Catbalogan Diversion Rd - K0801 + (-075) - K0801 + 000, K0803 + (-722) - K0803 + 000, K0804 + 000 - K0805 + 000","amountPesos":51165000.0,"lengthMeters":1797.0,"ratePesosPerMeter":28472.45409015025,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7140"},{"year":2026,"category":"Roads","project":"Sto Rosario-Villaba Rd - K1006 + 000 - K1007 + 100, K1007 + 779 - K1008 + 100, K1008 + 334 - K1008 + 923, K1011 + 435 - K1011 + 720, K1011 + 991 - K1012 + 090, K1013 + 1000 - K1014 + 046, K1014 + 109 - K1014 + 123, K1014 + 136 - K1014 + 222, K1014 + 686 - K1014 + 757","amountPesos":54040000.0,"lengthMeters":2611.0,"ratePesosPerMeter":20697.0509383378,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7142"},{"year":2026,"category":"Roads","project":"Tungusong-Tubig Indangan Rd - (S00008TW) Chainage 000 - Chainage 3845","amountPesos":90962000.0,"lengthMeters":3845.0,"ratePesosPerMeter":23657.217165149545,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7145"},{"year":2026,"category":"Roads","project":"Marawi-Kapa-i Natl Rd - K1565 + 000 - K1565 + 995","amountPesos":20635000.0,"lengthMeters":995.0,"ratePesosPerMeter":20738.693467336685,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7148"},{"year":2026,"category":"Roads","project":"Lamsan-Semuay Jct. Rd - (S01756MN) Chainage 367 - Chainage 783","amountPesos":24423000.0,"lengthMeters":416.0,"ratePesosPerMeter":58709.13461538462,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7151"},{"year":2026,"category":"Roads","project":"Lamsan-Semuay Jct. Rd - (S01756MN) Chainage 783 - Chainage 1016","amountPesos":14004000.0,"lengthMeters":233.0,"ratePesosPerMeter":60103.00429184549,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7153"},{"year":2026,"category":"Roads","project":"Jct Capalayan-Cabongbongan Rd - K1136 + (-395) - K1136 + (-367), K1137 + 878 - K1139 + 637.6, K1139 + 644.86 - K1139 + 743, K1140 + 000 - K1142 + 009","amountPesos":88200000.0,"lengthMeters":3894.74,"ratePesosPerMeter":22645.927584383095,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7156"},{"year":2026,"category":"Roads","project":"Gen Luna St  (Malabon) - K0012 + (-677) - K0012 + (-587)","amountPesos":3328000.0,"lengthMeters":90.0,"ratePesosPerMeter":36977.77777777778,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7159"},{"year":2026,"category":"Roads","project":"North Bay Blvd - K0009 + 413 - K0009 + 570","amountPesos":12188000.0,"lengthMeters":157.0,"ratePesosPerMeter":77630.57324840764,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7161"},{"year":2026,"category":"Roads","project":"C-5 Service Rd - (S04554LZ) Chainage 000 - Chainage 796","amountPesos":18725000.0,"lengthMeters":796.0,"ratePesosPerMeter":23523.869346733667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7164"},{"year":2026,"category":"Roads","project":"Quirino Avenue - K0007 + (-832) - K0007 + (-761)","amountPesos":3677000.0,"lengthMeters":71.0,"ratePesosPerMeter":51788.7323943662,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7167"},{"year":2026,"category":"Roads","project":"Gov. T. Santiago St. (S02206LZ) K0018 + 286 - K0019 + 875","amountPesos":25327000.0,"lengthMeters":1589.0,"ratePesosPerMeter":15938.955317809943,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7170"},{"year":2026,"category":"Roads","project":"Polo-Pugad Baboy (S02211LZ) - K0017 + 237 - K0017 + 437, K0017 + 587 - K0017 + 647","amountPesos":22513000.0,"lengthMeters":260.0,"ratePesosPerMeter":86588.46153846153,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7172"},{"year":2026,"category":"Roads","project":"Gov. T. Santiago St. (S02206LZ) K0018 + 650 - K0018 + 1050","amountPesos":32501000.0,"lengthMeters":400.0,"ratePesosPerMeter":81252.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7174"},{"year":2026,"category":"Roads","project":"Pinili-Nueva Era Rd - K0457 + 020 - K0457 + 173, K0468 + 000 - K0469 + 000, K0470 + 938 - K0470 + 1019","amountPesos":25483000.0,"lengthMeters":1234.0,"ratePesosPerMeter":20650.72933549433,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7178"},{"year":2026,"category":"Roads","project":"Jct Candon-Salcedo-Del Pilar Rd - K0361 + (-346) - K0362 + 953, K0362 + 2362 - K0362 + 2730","amountPesos":44005000.0,"lengthMeters":2667.0,"ratePesosPerMeter":16499.81252343457,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7181"},{"year":2026,"category":"Roads","project":"San Fernando Bagulin Rd - K0284 + 752 - K0284 + 807","amountPesos":29400000.0,"lengthMeters":55.0,"ratePesosPerMeter":534545.4545454546,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7184"},{"year":2026,"category":"Roads","project":"Bani-Agno Rd - K0342+031 -K0342+391","amountPesos":30142000.0,"lengthMeters":360.0,"ratePesosPerMeter":83727.77777777778,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7187"},{"year":2026,"category":"Roads","project":"Apayao-Ilocos Norte Rd - K0608 + 107 - K0608 + 121, K0609 + 356 - K0609 + 396","amountPesos":1274000.0,"lengthMeters":54.0,"ratePesosPerMeter":23592.59259259259,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7191"},{"year":2026,"category":"Roads","project":"Apayao-Kalinga-Abra Rd (Buluan-Sacpil-Wagud-Tawang-Salegseg Sect.) - (S00695LZ) Chainage 4686 - Chainage 4738, Chainage 5242 - Chainage 5288","amountPesos":1646000.0,"lengthMeters":98.0,"ratePesosPerMeter":16795.918367346938,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7193"},{"year":2026,"category":"Roads","project":"Ayaga-Sta. Marcela-Flora-Lasam Rd - K0678 + 406 - K0679 + 000","amountPesos":36260000.0,"lengthMeters":594.0,"ratePesosPerMeter":61043.77104377104,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7196"},{"year":2026,"category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0642 + 646 - K0643 + 103","amountPesos":14455000.0,"lengthMeters":457.0,"ratePesosPerMeter":31630.19693654267,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7198"},{"year":2026,"category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0663 + 887 - K0664 + 000","amountPesos":9188000.0,"lengthMeters":113.0,"ratePesosPerMeter":81309.73451327434,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7200"},{"year":2026,"category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0672 + 1027.50 - K0672 + 1351","amountPesos":23814000.0,"lengthMeters":323.5,"ratePesosPerMeter":73613.60123647604,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7202"},{"year":2026,"category":"Roads","project":"Balbalan-Pinukpuk Rd - K0506 + 567 - K0506 + 639, K0506 + 2628 - K0506 + 2835, K0509 + 000 - K0509 + 050","amountPesos":7113000.0,"lengthMeters":329.0,"ratePesosPerMeter":21620.060790273557,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7205"},{"year":2026,"category":"Roads","project":"Bulanao-Paracelis Rd - K0503 + 747 - K0504 + 000, K0504 + 540 - K0504 + 838, K0504 + 938 - K0504 + 970, K0505 + 040 - K0505 + 090","amountPesos":13662000.0,"lengthMeters":633.0,"ratePesosPerMeter":21582.938388625593,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7207"},{"year":2026,"category":"Roads","project":"Malalao Natl Rd (Agbannawag-Malalao-Bulo Sect) - K0523 + 288 - K0523 + 414","amountPesos":2723000.0,"lengthMeters":126.0,"ratePesosPerMeter":21611.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7209"},{"year":2026,"category":"Roads","project":"Tabuk-Banawe via Tanudan-Barlig Rd - K0536 + 7400 - K0536 + 7714, K0536 + 7777 - K0536 + 7839, K0536 + 8433 - K0536 + 8611, K0536 + 8699 - K0536 + 8860","amountPesos":15456000.0,"lengthMeters":715.0,"ratePesosPerMeter":21616.783216783217,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7211"},{"year":2026,"category":"Roads","project":"Mt Prov-Ilocos Sur via Kayan Rd - K0395 + 289 - K0395 + 436, K0395 + 867 - K0395 + 990","amountPesos":7860000.0,"lengthMeters":270.0,"ratePesosPerMeter":29111.11111111111,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7214"},{"year":2026,"category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0465 + 000 - K0465 + 400","amountPesos":14700000.0,"lengthMeters":400.0,"ratePesosPerMeter":36750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7217"},{"year":2026,"category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0466 + 450 - K0466 + 820, K0466 + 832 - K0467 + 500","amountPesos":37122000.0,"lengthMeters":1038.0,"ratePesosPerMeter":35763.00578034682,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7219"},{"year":2026,"category":"Roads","project":"Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0472 + 000 - K0472 + 586.25","amountPesos":34300000.0,"lengthMeters":586.25,"ratePesosPerMeter":58507.46268656717,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7221"},{"year":2026,"category":"Roads","project":"Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0473 + 472 - K0473 + 599","amountPesos":14700000.0,"lengthMeters":127.0,"ratePesosPerMeter":115748.03149606299,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7223"},{"year":2026,"category":"Roads","project":"Paracelis-Mallig-Roxas Rd - (S04031LZ) Chainage 000 - Chainage 650","amountPesos":39200000.0,"lengthMeters":650.0,"ratePesosPerMeter":60307.692307692305,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7225"},{"year":2026,"category":"Roads","project":"Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0006 + 317 - K0006 + 441","amountPesos":19812000.0,"lengthMeters":124.0,"ratePesosPerMeter":159774.1935483871,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7229"},{"year":2026,"category":"Roads","project":"Jct Logac-Lasam-Gagabutan Rd - K0708+000 - K0713 + 873","amountPesos":43620000.0,"lengthMeters":5873.0,"ratePesosPerMeter":7427.209262727737,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7232"},{"year":2026,"category":"Roads","project":"Jct Magapit-Capissayan Rd - K0557+(-265)-K0560+000, K0564+257 - K0566+760, K0566+785-K0567+597, K0567+617-K0568+353, K0568+377-K0569+725","amountPesos":29400000.0,"lengthMeters":8664.0,"ratePesosPerMeter":3393.351800554017,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7234"},{"year":2026,"category":"Roads","project":"Sampaguita-Warat-La Suerte-Catarauan-Afusing Rd -K0522+(-103) - K0523+501","amountPesos":44100000.0,"lengthMeters":1604.0,"ratePesosPerMeter":27493.76558603491,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7236"},{"year":2026,"category":"Roads","project":"Sampaguita-Warat-La Suerte-Catarauan-Afusing Rd - K0517 + 303 - K0518 + 266, K0520 + 000 - K0520 + 206","amountPesos":18175000.0,"lengthMeters":1169.0,"ratePesosPerMeter":15547.476475620188,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7239"},{"year":2026,"category":"Roads","project":"Calamagui-Ilagan Rd - K0398 + (-376) - K0399 + 022, K0399 + 373 - K0399 + 552","amountPesos":36454000.0,"lengthMeters":1577.0,"ratePesosPerMeter":23116.04311984781,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7242"},{"year":2026,"category":"Roads","project":"Ilagan-Bigao-Palanan Rd - K0410 + 609 - K0410 + 926, K0413 + 502 - K0413 + 565","amountPesos":5998000.0,"lengthMeters":380.0,"ratePesosPerMeter":15784.21052631579,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7244"},{"year":2026,"category":"Roads","project":"Ilagan-Delfin Albano-Mallig Rd - (S00738LZ) Chainage 345 - Chainage 436","amountPesos":1646000.0,"lengthMeters":91.0,"ratePesosPerMeter":18087.91208791209,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7246"},{"year":2026,"category":"Roads","project":"Ilagan-Delfin Albano-Mallig Rd - K0403 + 060 - K0403 + 110, K0406 + 140 - K0406 + 338, K0406 + 427 - K0406 + 451, K0411 + 000 - K0411 + 154","amountPesos":5782000.0,"lengthMeters":426.0,"ratePesosPerMeter":13572.769953051644,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7248"},{"year":2026,"category":"Roads","project":"Gamu-Roxas Rd - K0405 + 744 - K0406 + 039, K0408 + 262 - K0408 + 411","amountPesos":7659000.0,"lengthMeters":444.0,"ratePesosPerMeter":17250.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7251"},{"year":2026,"category":"Roads","project":"Gamu-Roxas Road -Rd – K0402 + 000 – K0402 + 060, K0402 + 226 – K0402 + 490, K0404 + 403 – K0404 + 501, K0404 + 519 – K0404 + 569, K0405 + 581 – K0406 + 039, K0407 + 803 – K0408 + 031, K0408 + 842 – K0408 + 992, K0410 + 000 – K0410 + 638 (Municipality of Roxas, Isabela)","amountPesos":34300000.0,"lengthMeters":1946.0,"ratePesosPerMeter":17625.89928057554,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7253"},{"year":2026,"category":"Roads","project":"Alicia-San Mateo Rd - K0350 + 594 - K0352 + 558","amountPesos":32867000.0,"lengthMeters":1964.0,"ratePesosPerMeter":16734.7250509165,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7256"},{"year":2026,"category":"Roads","project":"Alicia-San Mateo Rd - K0361 + 973 - K0362 + 472","amountPesos":7693000.0,"lengthMeters":499.0,"ratePesosPerMeter":15416.83366733467,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7258"},{"year":2026,"category":"Roads","project":"Bambang-Kasibu-Solano Rd - K0268 + 644 - K0269 + 018, K0270 + 743 - K0271 + 241","amountPesos":19463000.0,"lengthMeters":872.0,"ratePesosPerMeter":22319.954128440368,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7261"},{"year":2026,"category":"Roads","project":"Bambang-Kasibu-Solano Rd - K0281 + 908 - K0282 + 472","amountPesos":14086000.0,"lengthMeters":564.0,"ratePesosPerMeter":24975.177304964538,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7263"},{"year":2026,"category":"Roads","project":"Bambang-Kasibu-Solano Rd - K0288 + 142 - K0288 + 763","amountPesos":14108000.0,"lengthMeters":621.0,"ratePesosPerMeter":22718.196457326892,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7265"},{"year":2026,"category":"Roads","project":"Jct Natl Road-Bitnong-Belance-N Vizcaya Bdry Rd - K0263 + 000 - K0263 + 630","amountPesos":14313000.0,"lengthMeters":630.0,"ratePesosPerMeter":22719.04761904762,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7267"},{"year":2026,"category":"Roads","project":"Jct Natl Road-Bitnong-Belance-N Vizcaya Bdry Rd - K0264 + 830 - K0265 + 415","amountPesos":12609000.0,"lengthMeters":585.0,"ratePesosPerMeter":21553.846153846152,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7269"},{"year":2026,"category":"Roads","project":"Jct Natl Road-Bitnong-Belance-N Vizcaya Bdry Rd - K0274 + 310 - K0275 + 000","amountPesos":15426000.0,"lengthMeters":690.0,"ratePesosPerMeter":22356.521739130436,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7271"},{"year":2026,"category":"Roads","project":"Pantabangan-Canili-Basal-Baler Rd - K0186 + (-507) -  K0186 + (-053.00)","amountPesos":9108000.0,"lengthMeters":454.0,"ratePesosPerMeter":20061.674008810573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7273"},{"year":2026,"category":"Roads","project":"Papaya-Malabing-Wangal-Binugawan-Tadji-Runruno Rd - K0312 + 000 - K0312 + 300, K0313 + 535 - K0314 + 185.7","amountPesos":21057000.0,"lengthMeters":950.7,"ratePesosPerMeter":22148.942884190325,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7276"},{"year":2026,"category":"Roads","project":"Old Cagayan Valley Road - K0043 + (-030)-K0043 + 241","amountPesos":10607000.0,"lengthMeters":271.0,"ratePesosPerMeter":39140.221402214025,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7280"},{"year":2026,"category":"Roads","project":"Gen Alejo Santos Highway - K0065 + 256 - K0065 + 461","amountPesos":9666000.0,"lengthMeters":205.0,"ratePesosPerMeter":47151.21951219512,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7283"},{"year":2026,"category":"Roads","project":"Norzagaray-Bigte Rd - K0071 + (-180) - K0071 + 000, K0073 + 000 - K0073 + 250, K0073 + 853 - K0074 + 760, K0076 + 520 - K0077 + 000","amountPesos":128600000.0,"lengthMeters":1817.0,"ratePesosPerMeter":70776.00440286186,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7285"},{"year":2026,"category":"Roads","project":"Bangad-Fort Magsaysay Rd - K0131 + 913 - K0133 + 686, K0133 + 704 - K0134 + 350, K0135 + 651 - K0135 + 835","amountPesos":43989000.0,"lengthMeters":2603.0,"ratePesosPerMeter":16899.34690741452,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7288"},{"year":2026,"category":"Roads","project":"Sta. Rosa - Fort Magsaysay Rd - K0114+000 - K0114+978.20, K0118+000 - K0118+708","amountPesos":39122000.0,"lengthMeters":1686.2,"ratePesosPerMeter":23201.280986834343,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7290"},{"year":2026,"category":"Roads","project":"Apalit-Macabebe-Masantol Rd - K0055 + (-009) - K0055 + 018","amountPesos":2250000.0,"lengthMeters":27.0,"ratePesosPerMeter":83333.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7293"},{"year":2026,"category":"Roads","project":"Apalit-Macabebe-Masantol Rd - K0055 + (-105) - K0055 + (-009)","amountPesos":7004000.0,"lengthMeters":96.0,"ratePesosPerMeter":72958.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7295"},{"year":2026,"category":"Roads","project":"Arayat-Magalang Rd - K0098 + 751 - K0099 + 325","amountPesos":9350000.0,"lengthMeters":574.0,"ratePesosPerMeter":16289.198606271777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7297"},{"year":2026,"category":"Roads","project":"Candaba-Sn Miguel Rd - K0075 + 100 - K0075 + 174","amountPesos":3409000.0,"lengthMeters":74.0,"ratePesosPerMeter":46067.56756756757,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7299"},{"year":2026,"category":"Roads","project":"Candaba-Sn Miguel Rd - K0080 + 700 - K0081 + 045","amountPesos":11234000.0,"lengthMeters":345.0,"ratePesosPerMeter":32562.318840579712,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7301"},{"year":2026,"category":"Roads","project":"Candaba-Sn Miguel Rd - K0081 + 045 - K0081 + 099","amountPesos":2600000.0,"lengthMeters":54.0,"ratePesosPerMeter":48148.148148148146,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7303"},{"year":2026,"category":"Roads","project":"Tulauc-Sto Domingo Rd - K0064 + 100 - K0066 + 000","amountPesos":31574000.0,"lengthMeters":1900.0,"ratePesosPerMeter":16617.894736842107,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7305"},{"year":2026,"category":"Roads","project":"Tulauc-Sto Domingo Rd - K0066 + 000 - K0067 + 000","amountPesos":15918000.0,"lengthMeters":1000.0,"ratePesosPerMeter":15918.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7307"},{"year":2026,"category":"Roads","project":"Tulauc-Sto Domingo Rd - K0067 + 000 - K0068 + 424","amountPesos":23549000.0,"lengthMeters":1424.0,"ratePesosPerMeter":16537.219101123595,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7309"},{"year":2026,"category":"Roads","project":"Capas-San Jose-Mayantoc-Malacampa Rd - K0125 + 974 - K0126 + 300","amountPesos":12949000.0,"lengthMeters":326.0,"ratePesosPerMeter":39720.85889570552,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7312"},{"year":2026,"category":"Roads","project":"Capas-San Jose-Mayantoc-Malacampa Rd - K0163 + 460 - K0163 + 844","amountPesos":19143000.0,"lengthMeters":384.0,"ratePesosPerMeter":49851.5625,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7314"},{"year":2026,"category":"Roads","project":"Capas-San Jose-Mayantoc-Malacampa Rd - K0163 + 844 - K0164 + 297","amountPesos":22485000.0,"lengthMeters":453.0,"ratePesosPerMeter":49635.76158940397,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7316"},{"year":2026,"category":"Roads","project":"Capas-San Jose-Mayantoc-Malacampa Rd - K0164 + 297 - K0164 + 698","amountPesos":20081000.0,"lengthMeters":401.0,"ratePesosPerMeter":50077.30673316708,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7318"},{"year":2026,"category":"Roads","project":"Capas-San Jose-Mayantoc-Malacampa Rd - K0164 + 698 - K0164 + 955","amountPesos":12869000.0,"lengthMeters":257.0,"ratePesosPerMeter":50073.929961089496,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7320"},{"year":2026,"category":"Roads","project":"Victoria-La Paz Rd K0137+050 - K0137+879, La Paz , Tarlac","amountPesos":50000000.0,"lengthMeters":829.0,"ratePesosPerMeter":60313.63088057901,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7323"},{"year":2026,"category":"Roads","project":"Subic-PHILSECO Rd - K0142 + (-1295) - K0142 + (-548)","amountPesos":11675000.0,"lengthMeters":747.0,"ratePesosPerMeter":15629.183400267737,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7326"},{"year":2026,"category":"Roads","project":"Indang-Alfonso via Luksuhin Rd - K0073 + 608 - K0074 + 000","amountPesos":7716000.0,"lengthMeters":392.0,"ratePesosPerMeter":19683.673469387755,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7330"},{"year":2026,"category":"Roads","project":"Isaac O. Tolentino Ave. - K0061 + 727 - K0062 + 075","amountPesos":3471000.0,"lengthMeters":348.0,"ratePesosPerMeter":9974.137931034482,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7332"},{"year":2026,"category":"Roads","project":"Bacoor-Dasmariñas National Rd - K0031 + 533 - K0031 + 830","amountPesos":21142000.0,"lengthMeters":297.0,"ratePesosPerMeter":71185.18518518518,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7335"},{"year":2026,"category":"Roads","project":"Gen Evangelista Rd - K0016 + 235 - K0016 + 410, K0016 + 848 - K0016 + 943, K0017 + 159 - K0017 + 240, K0018 + 763 - K0019 + 041","amountPesos":11226000.0,"lengthMeters":629.0,"ratePesosPerMeter":17847.376788553258,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7337"},{"year":2026,"category":"Bridges","project":"Mc Donald Jct-Alido Bridge - K0015 + (-243) - K0015 + 014","amountPesos":10424000.0,"lengthMeters":257.0,"ratePesosPerMeter":40560.31128404669,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7339"},{"year":2026,"category":"Roads","project":"Mt Makiling Eco Garden Rd - K0061 + (-952) - K0061 + 000, K0063 + 000 - K0063 + 590","amountPesos":36885000.0,"lengthMeters":1542.0,"ratePesosPerMeter":23920.23346303502,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7342"},{"year":2026,"category":"Roads","project":"Quezon-Alabat-Perez Rd - K0006 + 748 - K0007 + 004, K0021 + 103 - K0021 + 220, K0023 + 007 - K0023 + 024, K0023 + 250 - K0023 + 356","amountPesos":18771000.0,"lengthMeters":496.0,"ratePesosPerMeter":37844.75806451613,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7345"},{"year":2026,"category":"Roads","project":"Corazon C. Aquino Ave. - K0036 + 045 - K0036 + 173","amountPesos":2908000.0,"lengthMeters":128.0,"ratePesosPerMeter":22718.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7348"},{"year":2026,"category":"Roads","project":"Sn Mateo-Rodriguez Rd - K0025 +832- K0026 + 816","amountPesos":32703000.0,"lengthMeters":984.0,"ratePesosPerMeter":33234.756097560974,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7350"},{"year":2026,"category":"Roads","project":"Tagbac-Lubang-Looc Rd - K0003 + 237 - K0003 + 300","amountPesos":1333000.0,"lengthMeters":63.0,"ratePesosPerMeter":21158.73015873016,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7354"},{"year":2026,"category":"Roads","project":"Tagbac-Lubang-Looc Rd - K0004 + 092 - K0005 + 118","amountPesos":27268000.0,"lengthMeters":1026.0,"ratePesosPerMeter":26576.99805068226,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7356"},{"year":2026,"category":"Roads","project":"Tagbac-Lubang-Looc Rd - K0005 + 328 - K0005 + 608","amountPesos":8036000.0,"lengthMeters":280.0,"ratePesosPerMeter":28700.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7358"},{"year":2026,"category":"Roads","project":"Tagbac-Lubang-Looc Rd - K0011 + 723 - K0011 + 885","amountPesos":3309000.0,"lengthMeters":162.0,"ratePesosPerMeter":20425.925925925927,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7360"},{"year":2026,"category":"Roads","project":"Tagbac-Lubang-Looc Rd - K0012 +947 - K0013 + 152","amountPesos":5905000.0,"lengthMeters":205.0,"ratePesosPerMeter":28804.878048780487,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7362"},{"year":2026,"category":"Roads","project":"Tagbac-Lubang-Looc Rd - K0019 + 737 - K0020 + 004","amountPesos":3763000.0,"lengthMeters":267.0,"ratePesosPerMeter":14093.632958801498,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7364"},{"year":2026,"category":"Roads","project":"Palawan Circum. Rd (Panalingaan-Tagbita-Latud) - K0257 + 675 - K0257 + 970","amountPesos":6236000.0,"lengthMeters":295.0,"ratePesosPerMeter":21138.98305084746,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7367"},{"year":2026,"category":"Roads","project":"Looc (Cogon Tulay)-Odiongan Rd - K0103 + 198 - K0103 + 330.70, K0103 + 338.56 - K0103 + 362.50","amountPesos":4555000.0,"lengthMeters":156.64,"ratePesosPerMeter":29079.417773238107,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7370"},{"year":2026,"category":"Roads","project":"Looc (Cogon Tulay)-Odiongan Rd - K0104 + 000 - K0104 + 392","amountPesos":14022000.0,"lengthMeters":392.0,"ratePesosPerMeter":35770.4081632653,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7372"},{"year":2026,"category":"Roads","project":"Sto. Domingo-Buhatan-Cagraray Circumferential Rd - K0545 + 640 - K0545 + 832","amountPesos":47982000.0,"lengthMeters":192.0,"ratePesosPerMeter":249906.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7376"},{"year":2026,"category":"Roads","project":"Bagong Silang-Capalonga Rd - K0303 + 100 - K0303 + 340","amountPesos":9480000.0,"lengthMeters":240.0,"ratePesosPerMeter":39500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7379"},{"year":2026,"category":"Roads","project":"Sta. Elena-Capalonga By Pass Coastal Rd - K0266 + 345 - K0266 + 943","amountPesos":33530000.0,"lengthMeters":598.0,"ratePesosPerMeter":56070.23411371237,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7381"},{"year":2026,"category":"Roads","project":"Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - (S06317LZ) Chainage 10482 - Chainage 11182","amountPesos":35501000.0,"lengthMeters":700.0,"ratePesosPerMeter":50715.71428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7383"},{"year":2026,"category":"Roads","project":"Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - (S06317LZ) Chainage 11182 - Chainage 11882","amountPesos":35501000.0,"lengthMeters":700.0,"ratePesosPerMeter":50715.71428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7385"},{"year":2026,"category":"Roads","project":"Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - Chainage 18752 - Chainage 19452","amountPesos":35105000.0,"lengthMeters":700.0,"ratePesosPerMeter":50150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7387"},{"year":2026,"category":"Roads","project":"Camarines Sur-Albay Diversion Rd - (S03525LZ) Chainage 5653 - Chainage 6028","amountPesos":16932000.0,"lengthMeters":375.0,"ratePesosPerMeter":45152.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7390"},{"year":2026,"category":"Roads","project":"Jct Balaynan-Tabgon-Lamon-Pinamihagan Rd - K0498 + 666 - K0498 + 983, K0499 + 033 - K0499 + 129, K0502 + 407 - K0502 + 515","amountPesos":10709000.0,"lengthMeters":521.0,"ratePesosPerMeter":20554.702495201534,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7393"},{"year":2026,"category":"Roads","project":"Albay Diversion Rd - K0446 + 807 - K0448 + 926.50","amountPesos":61259000.0,"lengthMeters":2119.5,"ratePesosPerMeter":28902.57136117009,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7396"},{"year":2026,"category":"Roads","project":"Nabua-Balatan Rd - K0482 + 213 - K0482 + 270","amountPesos":4900000.0,"lengthMeters":57.0,"ratePesosPerMeter":85964.91228070176,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7398"},{"year":2026,"category":"Roads","project":"Nabua-Balatan Rd - K0482 + 454 - K0482 + 530, K0489 + 443 - K0489 + 525, K0489 + 742 - K0489 + 797","amountPesos":11682000.0,"lengthMeters":213.0,"ratePesosPerMeter":54845.07042253521,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7400"},{"year":2026,"category":"Roads","project":"Nabua-Bato-Libon (Tandaay-Buluang, Bato) Rd - K0490 + 408 - K0490 + 717","amountPesos":15507000.0,"lengthMeters":309.0,"ratePesosPerMeter":50184.46601941747,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7402"},{"year":2026,"category":"Roads","project":"Nabua-Bato-Libon (Tandaay-Buluang, Bato) Rd - K0491 + 270 - K0492 + 170","amountPesos":45024000.0,"lengthMeters":900.0,"ratePesosPerMeter":50026.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7404"},{"year":2026,"category":"Roads","project":"Jct Bato-Baras Rd - K0022+286-K0023+993","amountPesos":43855000.0,"lengthMeters":1707.0,"ratePesosPerMeter":25691.2712360867,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7407"},{"year":2026,"category":"Roads","project":"San Pascual-Claveria Rd - K0051 + 280 - K0051 + 770","amountPesos":19525000.0,"lengthMeters":490.0,"ratePesosPerMeter":39846.93877551021,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7410"},{"year":2026,"category":"Roads","project":"Sn Pascual-Claveria Rd - K0052 + 380 - K0052 + 500, K0054 + 280 - K0054 + 423, K0054 + 454 - K0054 + 520, K0054 + 720 - K0054 + 960","amountPesos":23823000.0,"lengthMeters":569.0,"ratePesosPerMeter":41868.18980667838,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7412"},{"year":2026,"category":"Roads","project":"Daraga, Placer-Cawayan Rd - (S00035MT) Chainage 000 - Chainage 430","amountPesos":21219000.0,"lengthMeters":430.0,"ratePesosPerMeter":49346.51162790698,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7415"},{"year":2026,"category":"Roads","project":"Daraga, Placer-Cawayan Rd - (S00035MT) Chainage 11106 - Chainage 11481","amountPesos":18319000.0,"lengthMeters":375.0,"ratePesosPerMeter":48850.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7417"},{"year":2026,"category":"Roads","project":"Bacon-Sawanga-Prieto Diaz Rd -  K0591 + 956 - K0592 + 071","amountPesos":5377000.0,"lengthMeters":115.0,"ratePesosPerMeter":46756.52173913043,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7420"},{"year":2026,"category":"Roads","project":"Alangan-Cubay-Sibalom Rd - K0107 + (-552) - K0107 + 000","amountPesos":9377000.0,"lengthMeters":552.0,"ratePesosPerMeter":16987.318840579712,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7424"},{"year":2026,"category":"Roads","project":"Bugasong-Valderrama Rd - K0137 + 394 - K0137 + 600, K0137 + 636 - K0138 + 135 - K0147 + 579 - K0147 + 830","amountPesos":19600000.0,"lengthMeters":956.0,"ratePesosPerMeter":20502.092050209205,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7426"},{"year":2026,"category":"Roads","project":"Bingawan-Tapaz Rd - (S00557PN) Chainage 1013 - Chainage 1129","amountPesos":1756000.0,"lengthMeters":116.0,"ratePesosPerMeter":15137.931034482759,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7429"},{"year":2026,"category":"Roads","project":"Guimbal-Igbaras-Tubungan-Leon Rd - K0041 + 038 - K0041 + 565","amountPesos":15487000.0,"lengthMeters":527.0,"ratePesosPerMeter":29387.09677419355,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7432"},{"year":2026,"category":"Roads","project":"Balasan-Carles Rd - K0180 + 490 - K0181 + 349","amountPesos":16470000.0,"lengthMeters":859.0,"ratePesosPerMeter":19173.457508731084,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7435"},{"year":2026,"category":"Roads","project":"Balasan-Carles Rd - K0185 + 255 - K0186 + 455","amountPesos":26993000.0,"lengthMeters":1200.0,"ratePesosPerMeter":22494.166666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7437"},{"year":2026,"category":"Roads","project":"Concepcion-Sn Dionisio Rd - K0219 + 568 - K0220 + 201","amountPesos":13597000.0,"lengthMeters":633.0,"ratePesosPerMeter":21480.252764612953,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7439"},{"year":2026,"category":"Roads","project":"Jct Bancal-Leon-Antique Bdry Rd - K0022 + 769 - K0022 + 834, K0028 + 200 - K0028 + 750","amountPesos":36175000.0,"lengthMeters":615.0,"ratePesosPerMeter":58821.13821138212,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7442"},{"year":2026,"category":"Roads","project":"Leganes-Sta. Barbara Rd - K0016 + (-412) - K0016 + (-225), K0017 + 263 - K0017 + 490, K0022 + 542 - K0023 + 000","amountPesos":34071000.0,"lengthMeters":872.0,"ratePesosPerMeter":39072.247706422015,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7444"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz Rd (Old Route) - K0064 + 100 - K0064 + 261","amountPesos":21560000.0,"lengthMeters":161.0,"ratePesosPerMeter":133913.04347826086,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7447"},{"year":2026,"category":"Roads","project":"Bulanon Rd - K0088 + 315 - K0088 + 922, K0090 + 000 - K0090 + 634","amountPesos":44151000.0,"lengthMeters":1241.0,"ratePesosPerMeter":35576.954069298954,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7451"},{"year":2026,"category":"Roads","project":"Bulanon Rd - K0090 + 634 - K0090 + 690, K0092 + 000 - K0092 + 788","amountPesos":18444000.0,"lengthMeters":844.0,"ratePesosPerMeter":21853.08056872038,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7453"},{"year":2026,"category":"Roads","project":"Silay-Lantawan Rd - K0022 + 894 - K0023 + 183","amountPesos":7840000.0,"lengthMeters":289.0,"ratePesosPerMeter":27128.0276816609,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7455"},{"year":2026,"category":"Roads","project":"Jct Pontevedra-La Castellana Rd -  K0062 + 031 - K0062 + 298","amountPesos":8820000.0,"lengthMeters":267.0,"ratePesosPerMeter":33033.70786516854,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7458"},{"year":2026,"category":"Roads","project":"Dancalan-Candoni-Damutan Valley Rd - K0102 + 226 - K0102 + 372, K0106 + 501 - K0106 + 605, K0107 + 384 - K0107 + 600","amountPesos":10616000.0,"lengthMeters":466.0,"ratePesosPerMeter":22781.115879828325,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7461"},{"year":2026,"category":"Roads","project":"Jct Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd - K0031 + 172 - K0031 + 1642","amountPesos":24989000.0,"lengthMeters":1470.0,"ratePesosPerMeter":16999.319727891158,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7464"},{"year":2026,"category":"Roads","project":"Stop Aguinaldo-Bug-ang Rd - K0111 + 160 - K0111 + 385","amountPesos":5390000.0,"lengthMeters":225.0,"ratePesosPerMeter":23955.555555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7467"},{"year":2026,"category":"Roads","project":"Luyang-Poo-Lazi Rd - K0012 + 480 - K0013 + 000","amountPesos":17052000.0,"lengthMeters":520.0,"ratePesosPerMeter":32792.307692307695,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7470"},{"year":2026,"category":"Roads","project":"Luyang-Poo-Lazi Rd - K0023 + 269 - K0023 + 462","amountPesos":6272000.0,"lengthMeters":193.0,"ratePesosPerMeter":32497.40932642487,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7472"},{"year":2026,"category":"Roads","project":"Antequera-San Isidro-Libertad (Tubigon) Rd - K0026 + 780 - K0028 + 641","amountPesos":47421000.0,"lengthMeters":1861.0,"ratePesosPerMeter":25481.46157979581,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7476"},{"year":2026,"category":"Roads","project":"Antequera-San Isidro-Libertad (Tubigon) Rd - K0032 + 278 - K0033 + 000","amountPesos":17015000.0,"lengthMeters":722.0,"ratePesosPerMeter":23566.481994459835,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7478"},{"year":2026,"category":"Roads","project":"Jct Dat-an-Carmen-Sierra Bullones-Pilar-Alicia Rd - K0082 + 395 - K0083 + 105","amountPesos":32733000.0,"lengthMeters":710.0,"ratePesosPerMeter":46102.81690140845,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7481"},{"year":2026,"category":"Roads","project":"Dulag-Julita-Burauen Rd - K0941 + (-991) - K0941 + (-331), K0941 + (-039) - K0941 + 000","amountPesos":40831000.0,"lengthMeters":699.0,"ratePesosPerMeter":58413.44778254649,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7485"},{"year":2026,"category":"Roads","project":"Jaro-Dagami-Burauen-Lapaz Rd - K0966 + 550 - K0966 + 731","amountPesos":9648000.0,"lengthMeters":181.0,"ratePesosPerMeter":53303.867403314915,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7487"},{"year":2026,"category":"Roads","project":"Belen-Consuegra Rd - K0981 + 546 - K0981 + 746, K0984 + 682 - K0984 + 732","amountPesos":4025000.0,"lengthMeters":250.0,"ratePesosPerMeter":16100.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7490"},{"year":2026,"category":"Roads","project":"Bugko-Nenita-Mirador-Cagpanit-an-De Maria-Sn Jose Rd - K0768 + 250 - K0768 + 800, K0770 + 000 - K0770 + 335.73","amountPesos":28944000.0,"lengthMeters":885.73,"ratePesosPerMeter":32678.12990414755,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7493"},{"year":2026,"category":"Roads","project":"Sn Antonio Circumferential Rd - K0003 + 680 - K0004 + 000, K0008 + 046 - K0008 + 204, K0009 + 775 - K0009 + 995","amountPesos":28944000.0,"lengthMeters":698.0,"ratePesosPerMeter":41467.04871060172,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7495"},{"year":2026,"category":"Roads","project":"Calbayog Diversion Rd - K0731 + 460 - K0732 + 000","amountPesos":57171000.0,"lengthMeters":540.0,"ratePesosPerMeter":105872.22222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7498"},{"year":2026,"category":"Roads","project":"Catbalogan Diversion Rd - K0801 + 000 - K0801 + 510","amountPesos":17640000.0,"lengthMeters":510.0,"ratePesosPerMeter":34588.23529411765,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7501"},{"year":2026,"category":"Roads","project":"Catbalogan Diversion Rd - K0803 + 000 - K0803 + 311, K0803 + 393 - K0804 + 000, K0801 + 510 - K0802 + 260","amountPesos":29681000.0,"lengthMeters":1668.0,"ratePesosPerMeter":17794.364508393286,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7503"},{"year":2026,"category":"Roads","project":"Hinabangan Diversion Rd - K0837 + (-075) - K0837 + 958","amountPesos":19653000.0,"lengthMeters":1033.0,"ratePesosPerMeter":19025.16940948693,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7505"},{"year":2026,"category":"Roads","project":"Ayala-La Paz Road - (S01496MN) Chainage 4023 - Chainage 4032, Chainage 11570 - Chainage 11600, Chainage 17700- Chainage 17736, Chainage 17770 - Chainage 17900, Chainage 18110 - Chainage 18120","amountPesos":6753000.0,"lengthMeters":215.0,"ratePesosPerMeter":31409.302325581397,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7509"},{"year":2026,"category":"Roads","project":"Eastern Bobongan-Sominot-Midsalip-Dumingag Rd - K1666 + 615 - K1666 + 622, K1666 + 676 - K1666 + 940","amountPesos":10612000.0,"lengthMeters":271.0,"ratePesosPerMeter":39158.671586715864,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7512"},{"year":2026,"category":"Roads","project":"Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Rd (S01451MN) - K1737 + 939 - K1741 + 153, K1741 + 220 - K1741 + 285","amountPesos":51940000.0,"lengthMeters":3279.0,"ratePesosPerMeter":15840.195181457762,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7515"},{"year":2026,"category":"Roads","project":"Jct Maradugao-Camp Kibaritan-Dominorog Rd - K1603 + 1300 - K1604 + 213, K1606 + 009 - K1606 + 132, K1610 + 000 - K1610 + 592","amountPesos":43313000.0,"lengthMeters":802.0,"ratePesosPerMeter":54006.23441396509,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7519"},{"year":2026,"category":"Roads","project":"Maramag-Maradugao Rd - K1594 + 000 - K1594 + 429.67","amountPesos":9814000.0,"lengthMeters":429.67,"ratePesosPerMeter":22840.784788329885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7521"},{"year":2026,"category":"Roads","project":"Lumbia - Uguiaban By-Pass Rd - (S00618MN) Chainage 3095 - Chainage 3805","amountPesos":18877000.0,"lengthMeters":710.0,"ratePesosPerMeter":26587.323943661973,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7524"},{"year":2026,"category":"Roads","project":"Tambacan Rd-Tubod Natl H-way Jct - K1526 + 876 - K1527 + 433","amountPesos":19821000.0,"lengthMeters":557.0,"ratePesosPerMeter":35585.27827648115,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7527"},{"year":2026,"category":"Roads","project":"Lanao del Norte Interior Circum. Rd (LDNICR) - K1535 + 204 - K1535 + 400","amountPesos":4719000.0,"lengthMeters":196.0,"ratePesosPerMeter":24076.530612244896,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7530"},{"year":2026,"category":"Roads","project":"Dobleston-Butadon Rd - K1994 + 760 - K1995 + 000, K1996 + 914 - K1997 + 000, K1999 + 000 - K1999 + 085, K2000 + 468 - K2000 + 523, K2001 + 000 - K2001 + 070, K2001 + 182 - K2001 + 273, K2001 + 805 - K2001 + 865, K2002 + 140 - K2002 + 216","amountPesos":21598000.0,"lengthMeters":763.0,"ratePesosPerMeter":28306.684141546528,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7533"},{"year":2026,"category":"Roads","project":"Lanao del Norte Interior Circum. Rd (LDNICR) - K1577 + 935 - K1578 + 021","amountPesos":2501000.0,"lengthMeters":86.0,"ratePesosPerMeter":29081.39534883721,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7535"},{"year":2026,"category":"Roads","project":"Buhangin-Mandug-Callawa-Fatima Rd - (S01582MN) Chainage 4090 - Chainage 4172, Chainage 4191 - Chainage 4268, Chainage 4300 - Chainage 4485, Chainage 4630 - Chainage 4688","amountPesos":4623000.0,"lengthMeters":402.0,"ratePesosPerMeter":11500.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7539"},{"year":2026,"category":"Roads","project":"Fatima-Malabog Rd - K1504 + 212 - K1504 + 257, K1504 + 583 - K1504 + 601, K1504 + 803 - K1504 + 843, K1508 + 440 - K1508 + 529","amountPesos":1868000.0,"lengthMeters":192.0,"ratePesosPerMeter":9729.166666666666,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7541"},{"year":2026,"category":"Roads","project":"Mabuhay-Panalum-Paquibato Rd - K1524 + 930 - K1524 + 1006, K1525 + 545 - K1525 + 693, K1525 + 766 - K1525 + 970,  K1530 + 100 - K1530 + 136, K1530 + 280 - K1530 + 339","amountPesos":8232000.0,"lengthMeters":523.0,"ratePesosPerMeter":15739.961759082218,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7543"},{"year":2026,"category":"Roads","project":"Magpet-Nowa-Doroluman-Greenfield  Rd - K1662 + 000 - K1664 + 528","amountPesos":43762000.0,"lengthMeters":2528.0,"ratePesosPerMeter":17310.91772151899,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7547"},{"year":2026,"category":"Roads","project":"Matalam-Mlang-Bagontapay Jct Rd - K1642 + (-1370) - K1642 + (-529), K1642 + (-519) - K1642 + (-492), K1642 + (-474) - K1642 + (-423), K1642 + (-394) - K1642 + (-385)","amountPesos":13193000.0,"lengthMeters":928.0,"ratePesosPerMeter":14216.594827586207,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7550"},{"year":2026,"category":"Roads","project":"Maitum-Lake Sebu Rd - K1783 + 124- K1784 + 260","amountPesos":24958000.0,"lengthMeters":1136.0,"ratePesosPerMeter":21970.070422535213,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7553"},{"year":2026,"category":"Roads","project":"Maitum-Lake Sebu Rd - K1784 + 260 - K1786 + 425","amountPesos":47572000.0,"lengthMeters":2165.0,"ratePesosPerMeter":21973.210161662817,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7555"},{"year":2026,"category":"Roads","project":"Surallah-Lake Sebu-Maitum Rd - K1801 + 000 - K1801 + 950","amountPesos":28206000.0,"lengthMeters":950.0,"ratePesosPerMeter":29690.526315789473,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7558"},{"year":2026,"category":"Roads","project":"Buenavista-Bunaguit Rd - K1258 + 000 - K1259 + 000","amountPesos":27440000.0,"lengthMeters":1000.0,"ratePesosPerMeter":27440.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7562"},{"year":2026,"category":"Roads","project":"Agusan-Malaybalay Rd - K1274 + 000 - K1274 + 211","amountPesos":4900000.0,"lengthMeters":211.0,"ratePesosPerMeter":23222.748815165876,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7564"},{"year":2026,"category":"Roads","project":"Jct. Mabini - Tubajon Rd - K0086 + 342 - K0086 + 442","amountPesos":7840000.0,"lengthMeters":100.0,"ratePesosPerMeter":78400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7567"},{"year":2026,"category":"Roads","project":"Quezon-Mapawa-Capalayan-Espina-Navarro Rd - K1130 + (-578.30) - K1130 + (-492), K1135 + 528 - K1135 + 595, (S00365MN) Chainage 004 - Chainage 024","amountPesos":4910000.0,"lengthMeters":173.3,"ratePesosPerMeter":28332.371609917373,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7570"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0578 + 580 - K0578 + 930","amountPesos":294000000.0,"lengthMeters":350.0,"ratePesosPerMeter":840000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7580"},{"year":2026,"category":"Roads","project":"Kennon Rd - K0237 + 648 - K0237+725","amountPesos":98000000.0,"lengthMeters":77.0,"ratePesosPerMeter":1272727.2727272727,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7583"},{"year":2026,"category":"Roads","project":"Kennon Rd - K0242 + 725 - K0242 + 755","amountPesos":56304000.0,"lengthMeters":30.0,"ratePesosPerMeter":1876800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7585"},{"year":2026,"category":"Roads","project":"Bangag-Magapit Rd - K0703 + 730 - K0703 + 920, K0704 + 510 - K0704 + 650","amountPesos":34300000.0,"lengthMeters":330.0,"ratePesosPerMeter":103939.39393939394,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7588"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0675 + 705 - K0675 + 824","amountPesos":4116000.0,"lengthMeters":119.0,"ratePesosPerMeter":34588.23529411765,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7590"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0168 + 020 - K0168 + 040","amountPesos":98000000.0,"lengthMeters":20.0,"ratePesosPerMeter":4900000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7593"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0186 + 300 - K0186 + 342","amountPesos":49000000.0,"lengthMeters":42.0,"ratePesosPerMeter":1166666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7595"},{"year":2026,"category":"Roads","project":"Calamba-Sta Cruz-Famy Jct Rd - K0059 + 753 - K0061 + 085","amountPesos":144153000.0,"lengthMeters":1332.0,"ratePesosPerMeter":108222.97297297297,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7598"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0247 + 931 - K0247 + 991","amountPesos":7883000.0,"lengthMeters":60.0,"ratePesosPerMeter":131383.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7601"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0251 + 000 - K0251 + 032, K0251 + 1030 - K0252 + 000,  K0266 + 543 - K0266 + 564, K0266 + 723 - K0266 + 781","amountPesos":49157000.0,"lengthMeters":141.0,"ratePesosPerMeter":348631.2056737589,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7603"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0279 + 180 - K0279 + 202","amountPesos":2782000.0,"lengthMeters":22.0,"ratePesosPerMeter":126454.54545454546,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7605"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0284 + 199 - K0284 + 218, K0284 + 508 - K0284 + 572, K0286 + 288 - K0286 + 349, K0286 + 674 - K0286 + 783","amountPesos":71814000.0,"lengthMeters":253.0,"ratePesosPerMeter":283849.8023715415,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7607"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0287 + 630 - K0287 + 677","amountPesos":11128000.0,"lengthMeters":47.0,"ratePesosPerMeter":236765.95744680852,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7609"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0627 + 850 - K0627 + 930, K0640 + 460 - K0640 + 480","amountPesos":12377000.0,"lengthMeters":100.0,"ratePesosPerMeter":123770.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7611"},{"year":2026,"category":"Roads","project":"Dumaguete South Rd - K0076 + 000 - K0077 + 000","amountPesos":98000000.0,"lengthMeters":1000.0,"ratePesosPerMeter":98000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7614"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0684 + 000 - K0684 + 300","amountPesos":76483000.0,"lengthMeters":300.0,"ratePesosPerMeter":254943.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7617"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0692 + 460 - K0692 + 500, K0692 + 642 - K0692 + 684","amountPesos":14700000.0,"lengthMeters":82.0,"ratePesosPerMeter":179268.29268292684,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7619"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0700 + (-112) - K0700 + (-022)","amountPesos":13446000.0,"lengthMeters":90.0,"ratePesosPerMeter":149400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7621"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0707 + (-665) - K0707 + (-615)","amountPesos":19600000.0,"lengthMeters":50.0,"ratePesosPerMeter":392000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7623"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0719 + 910 - K0720 + 325","amountPesos":11270000.0,"lengthMeters":415.0,"ratePesosPerMeter":27156.626506024095,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7625"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0784 + 087 - K0784 + 150","amountPesos":14117000.0,"lengthMeters":63.0,"ratePesosPerMeter":224079.3650793651,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7627"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0805 + 481 - K0805 + 600","amountPesos":53900000.0,"lengthMeters":119.0,"ratePesosPerMeter":452941.17647058825,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7629"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0815 + 305 - K0815 + 520","amountPesos":84704000.0,"lengthMeters":215.0,"ratePesosPerMeter":393972.0930232558,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7631"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0842 + 460 - K0842 + 530","amountPesos":34300000.0,"lengthMeters":70.0,"ratePesosPerMeter":490000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7633"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0859 + 080 - K0859 + 122","amountPesos":24500000.0,"lengthMeters":42.0,"ratePesosPerMeter":583333.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7635"},{"year":2026,"category":"Roads","project":"Palo-Carigara-Ormoc Rd - K0972 + 572 - K0972 + 645.50","amountPesos":65881000.0,"lengthMeters":73.5,"ratePesosPerMeter":896340.1360544218,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7637"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) (S01453MN)- K1703 + 620 - K1703 + 720","amountPesos":38220000.0,"lengthMeters":100.0,"ratePesosPerMeter":382200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7640"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) (S01453MN)- K1710 + 800 - K1710 + 950","amountPesos":29400000.0,"lengthMeters":150.0,"ratePesosPerMeter":196000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7642"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) (S01453MN)- K1711 + 362 - K1711 + 468","amountPesos":86292000.0,"lengthMeters":106.0,"ratePesosPerMeter":814075.4716981133,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7644"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd)(S01453MN) - K1707 + 368 - K1707 + 468","amountPesos":19600000.0,"lengthMeters":100.0,"ratePesosPerMeter":196000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7646"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd)(S01453MN)- K1681 + 105 - K1681 + 136, K1706 + 582 - K1706 + 666","amountPesos":14700000.0,"lengthMeters":115.0,"ratePesosPerMeter":127826.08695652174,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7648"},{"year":2026,"category":"Roads","project":"Bukidnon-Davao City Rd - K1607 + 260 - K1607 + 346, K1607 + 580 - K1607 + 720","amountPesos":94800000.0,"lengthMeters":226.0,"ratePesosPerMeter":419469.0265486726,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7651"},{"year":2026,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1398 + 150 - K1398 + 300","amountPesos":47435000.0,"lengthMeters":150.0,"ratePesosPerMeter":316233.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7653"},{"year":2026,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1505+458 - K1505+562","amountPesos":96381000.0,"lengthMeters":104.0,"ratePesosPerMeter":926740.3846153846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7655"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Malabang-Dobleston-Tukuran Rd) - K1980 + 918 - K1980 + 938","amountPesos":3680000.0,"lengthMeters":20.0,"ratePesosPerMeter":184000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7657"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Malabang-Dobleston-Tukuran Rd) - K1981 + 339 - K1981 + 429","amountPesos":6625000.0,"lengthMeters":90.0,"ratePesosPerMeter":73611.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7659"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Malabang-Dobleston-Tukuran Rd) - K1985 + 540 - K1985 + 605","amountPesos":9673000.0,"lengthMeters":65.0,"ratePesosPerMeter":148815.38461538462,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7661"},{"year":2026,"category":"Roads","project":"Marawi-Malabang Road - (S01652MN) Chainage 000 - Chainage 533","amountPesos":37176000.0,"lengthMeters":533.0,"ratePesosPerMeter":69748.59287054409,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7663"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1451 + 000 - K1451 + 500","amountPesos":185882000.0,"lengthMeters":500.0,"ratePesosPerMeter":371764.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7665"},{"year":2026,"category":"Roads","project":"Sayre Highway K1486 + 000 - K1486 + 060, K1486 + 090 - K1486 + 130, K1486 + 500 - K1486 + 600","amountPesos":111142000.0,"lengthMeters":200.0,"ratePesosPerMeter":555710.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7667"},{"year":2026,"category":"Roads","project":"Maharlika Highway (MN) - K1399 + 700 - K1399 + 800, K1406 + 100 - K1406 + 180, K1406 + 300 - K1406 + 325","amountPesos":71040000.0,"lengthMeters":205.0,"ratePesosPerMeter":346536.5853658537,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7670"},{"year":2026,"category":"Roads","project":"Maharlika Highway (MN) - K1439 + 190 - K1439 + 920","amountPesos":283468000.0,"lengthMeters":730.0,"ratePesosPerMeter":388312.3287671233,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7672"},{"year":2026,"category":"Roads","project":"Maharlika Highway (MN) - K1440 + 600 - K1440 + 650","amountPesos":98000000.0,"lengthMeters":50.0,"ratePesosPerMeter":1960000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7674"},{"year":2026,"category":"Roads","project":"Maharlika Highway (MN) - K1442 + 100 - K1442 + 183","amountPesos":49000000.0,"lengthMeters":83.0,"ratePesosPerMeter":590361.4457831326,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7676"},{"year":2026,"category":"Roads","project":"Maharlika Highway (MN) - K1445 + 800 - K1445 + 840","amountPesos":146214000.0,"lengthMeters":40.0,"ratePesosPerMeter":3655350.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7678"},{"year":2026,"category":"Roads","project":"Maharlika Highway (MN) - K1449 + 750 - K1449 + 810, K1463 + 135 - K1463 + 195, K1464 + 980 - K1465 + 060","amountPesos":33281000.0,"lengthMeters":200.0,"ratePesosPerMeter":166405.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7680"},{"year":2026,"category":"Roads","project":"Pres. Diosdado P.Macapagal Natl Hi-way - K1728 + 650 - K1728 + 740, K1728 + 885 - K1728 + 960, K1729 + 980 - K1730 + 039, K1730 + 905 - K1730 + 955","amountPesos":106583000.0,"lengthMeters":274.0,"ratePesosPerMeter":388989.0510948905,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7682"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1594 + 400 - K1594 + 480","amountPesos":87736000.0,"lengthMeters":80.0,"ratePesosPerMeter":1096700.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7685"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1681 + 270 - K1681 + 420","amountPesos":56151000.0,"lengthMeters":150.0,"ratePesosPerMeter":374340.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7687"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - K1617 + 300 - K1617 + 315","amountPesos":4387000.0,"lengthMeters":15.0,"ratePesosPerMeter":292466.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7689"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - K1634 + 627 - K1634 + 801","amountPesos":40273000.0,"lengthMeters":174.0,"ratePesosPerMeter":231454.02298850575,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7691"},{"year":2026,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1277 + 340 - K1277 + 620","amountPesos":103730000.0,"lengthMeters":280.0,"ratePesosPerMeter":370464.28571428574,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7694"},{"year":2026,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1278 + 745 - K1278 + 799","amountPesos":63471000.0,"lengthMeters":54.0,"ratePesosPerMeter":1175388.888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7696"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1125 + 930 - K1126 + 050","amountPesos":67398000.0,"lengthMeters":120.0,"ratePesosPerMeter":561650.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7698"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1181 + 370 - K1181 + 407","amountPesos":17288000.0,"lengthMeters":37.0,"ratePesosPerMeter":467243.24324324325,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7700"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0460 + 250 - K0460 + 422, K0461 + 000 - K0461 + 130","amountPesos":15066000.0,"lengthMeters":302.0,"ratePesosPerMeter":49887.41721854304,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7704"},{"year":2026,"category":"Roads","project":"Bauang-Baguio Rd - K0277 + 157 - K0277 + 287","amountPesos":17623000.0,"lengthMeters":130.0,"ratePesosPerMeter":135561.53846153847,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7707"},{"year":2026,"category":"Roads","project":"Kennon Rd - K0247 + 340 - K0247 + 550","amountPesos":34533000.0,"lengthMeters":210.0,"ratePesosPerMeter":164442.85714285713,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7711"},{"year":2026,"category":"Roads","project":"Quirino H-Way (Baguio-Bauang) - K0303 + 180 - K0303 + 210","amountPesos":1877000.0,"lengthMeters":30.0,"ratePesosPerMeter":62566.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7713"},{"year":2026,"category":"Roads","project":"Manuel S. Agyao Boulevard- K0496+133- K0496+141, K0515+774- K0515+784, K0517+437-K0517+453","amountPesos":4992000.0,"lengthMeters":34.0,"ratePesosPerMeter":146823.5294117647,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7716"},{"year":2026,"category":"Roads","project":"Santiago-Tuguegarao Rd - K0419 + (-195) - K0419 + (-100)","amountPesos":10486000.0,"lengthMeters":95.0,"ratePesosPerMeter":110378.94736842105,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7720"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - (S00403NR) - K0073 + 417 - K0074 + 075","amountPesos":4900000.0,"lengthMeters":658.0,"ratePesosPerMeter":7446.808510638298,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7724"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - (S00414NR) - K0075 + 393 - K0074 + 098","amountPesos":4900000.0,"lengthMeters":1295.0,"ratePesosPerMeter":3783.7837837837837,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7726"},{"year":2026,"category":"Roads","project":"Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0035 + 000 - K0035 + 093.9","amountPesos":36362000.0,"lengthMeters":93.9,"ratePesosPerMeter":387241.74653886515,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7728"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0096 + 942 - K0097 + 042, K0102 + 796 - K0102 + 814","amountPesos":5000000.0,"lengthMeters":118.0,"ratePesosPerMeter":42372.8813559322,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7731"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0111 + 851 - K0111 + 977","amountPesos":22726000.0,"lengthMeters":126.0,"ratePesosPerMeter":180365.07936507938,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7733"},{"year":2026,"category":"Roads","project":"Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0047 + 296 - K0047 + 403, K0054 + 554 - K0054 + 620","amountPesos":27726000.0,"lengthMeters":173.0,"ratePesosPerMeter":160265.89595375722,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7735"},{"year":2026,"category":"Roads","project":"Dumaguete South Rd - K0032 + 000 - K0032 + 478","amountPesos":28846000.0,"lengthMeters":478.0,"ratePesosPerMeter":60347.280334728035,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7738"},{"year":2026,"category":"Roads","project":"Dumaguete South Rd - K0056 + 600 - K0056 + 806","amountPesos":18690000.0,"lengthMeters":206.0,"ratePesosPerMeter":90728.15533980583,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7740"},{"year":2026,"category":"Roads","project":"Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1877 + 700 - K1877 + 960","amountPesos":19395000.0,"lengthMeters":260.0,"ratePesosPerMeter":74596.15384615384,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7744"},{"year":2026,"category":"Roads","project":"Liloy-Ipil Rd - K1975 + 017 - K1975 + 106","amountPesos":32002000.0,"lengthMeters":89.0,"ratePesosPerMeter":359573.03370786516,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7747"},{"year":2026,"category":"Roads","project":"Sindangan-Liloy Rd - K1938 + 344 - K1938 + 388","amountPesos":1960000.0,"lengthMeters":44.0,"ratePesosPerMeter":44545.454545454544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7749"},{"year":2026,"category":"Roads","project":"Jct Aurora-Ozamis City Rd - K1640 + 300 - K1640 + 360","amountPesos":4572000.0,"lengthMeters":60.0,"ratePesosPerMeter":76200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7752"},{"year":2026,"category":"Roads","project":"Jct Aurora-Ozamis City Rd - K1641 + 800 - K1641 + 840","amountPesos":2743000.0,"lengthMeters":40.0,"ratePesosPerMeter":68575.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7754"},{"year":2026,"category":"Roads","project":"Jct Blancia-Molave-Josefina Rd - K1676 + (-030) - K1676 + 035","amountPesos":3657000.0,"lengthMeters":65.0,"ratePesosPerMeter":56261.53846153846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7756"},{"year":2026,"category":"Roads","project":"Lanao-Pagadian-Zamboanga City Rd - K1637 + 960 - K1638 + 040","amountPesos":10972000.0,"lengthMeters":80.0,"ratePesosPerMeter":137150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7758"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1456 + 645 - K1456 + 705","amountPesos":3855000.0,"lengthMeters":60.0,"ratePesosPerMeter":64250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7762"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1466 + 364 - K1466 + 394","amountPesos":18588000.0,"lengthMeters":30.0,"ratePesosPerMeter":619600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7764"},{"year":2026,"category":"Roads","project":"Iligan City-Marawi City Rd - K1536 + 840 - K1536 + 888, K1538 + 870 - K1538 + 910, K1547 + 370 - K1547 + 489, K1547 + 895 - K1548 + 221, K1548 + 341 - K1548 + 383, K1548 + 723 - K1548 + 835, K1549 + 312 - K1549 + 385, K1549 + 859 - K1549 + 921, K1549 + 958 - K1550 + 004, K1550 + 063 - K1550 + 091, K1551 + 037 - K1551 + 179","amountPesos":39478000.0,"lengthMeters":1038.0,"ratePesosPerMeter":38032.75529865125,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7767"},{"year":2026,"category":"Roads","project":"Linamon-Zamboanga Rd - K1536 + 861 - K1536 + 889","amountPesos":7714000.0,"lengthMeters":28.0,"ratePesosPerMeter":275500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7769"},{"year":2026,"category":"Roads","project":"Linamon-Zamboanga Rd - K1618 + 724 - K1618 + 857","amountPesos":9790000.0,"lengthMeters":133.0,"ratePesosPerMeter":73609.02255639098,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7772"},{"year":2026,"category":"Roads","project":"Oroquieta City-Plaridel-Calamba-Sapang Dalaga Rd - K1789 + 280 - K1789 + 480","amountPesos":37176000.0,"lengthMeters":200.0,"ratePesosPerMeter":185880.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7775"},{"year":2026,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1342 + 460 - K1342 + 730","amountPesos":45530000.0,"lengthMeters":270.0,"ratePesosPerMeter":168629.62962962964,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7778"},{"year":2026,"category":"Roads","project":"Davao-Bukidnon Rd - K1627 + 955 - K1627 + 977","amountPesos":25441000.0,"lengthMeters":22.0,"ratePesosPerMeter":1156409.0909090908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7782"},{"year":2026,"category":"Roads","project":"Davao-Bukidnon Rd - K1630 + 740 - K1630 + 772","amountPesos":36749000.0,"lengthMeters":32.0,"ratePesosPerMeter":1148406.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7784"},{"year":2026,"category":"Roads","project":"Davao-Bukidnon Rd - K1631 + 370 - K1631 + 388","amountPesos":29429000.0,"lengthMeters":18.0,"ratePesosPerMeter":1634944.4444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7786"},{"year":2026,"category":"Roads","project":"Davao-Bukidnon Rd - K1645 + 365 - K1645 + 400","amountPesos":23363000.0,"lengthMeters":35.0,"ratePesosPerMeter":667514.2857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7788"},{"year":2026,"category":"Roads","project":"Davao-Bukidnon Rd - K1653 + 307 - K1653 + 350","amountPesos":28704000.0,"lengthMeters":43.0,"ratePesosPerMeter":667534.8837209302,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7790"},{"year":2026,"category":"Roads","project":"Davao-Bukidnon Rd - K1662 + 367 - K1662 + 417","amountPesos":25206000.0,"lengthMeters":50.0,"ratePesosPerMeter":504120.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7792"},{"year":2026,"category":"Roads","project":"Davao-Bukidnon Rd - K1665 + 739 - K1665 + 767","amountPesos":26552000.0,"lengthMeters":28.0,"ratePesosPerMeter":948285.7142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7794"},{"year":2026,"category":"Roads","project":"NRJ Cuevas-Bislig Rd - K1386 + 036 - K1386 + 154","amountPesos":37663000.0,"lengthMeters":118.0,"ratePesosPerMeter":319177.9661016949,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7798"},{"year":2026,"category":"Roads","project":"Jct Lingig-Trento Rd - K1476 + 661 - K1476 + 689","amountPesos":43221000.0,"lengthMeters":28.0,"ratePesosPerMeter":1543607.142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7801"},{"year":2026,"category":"Roads","project":"Abra-Kalinga Rd - K0470 + 000 - K0470 + 100, K0470 + 375 - K0470 + 399, K0470 + 712 - K0471 + 050, K0471 + 166 - K0471 + 420, K0472 + 146 - K0472 + 444, K0472 + 904 - K0473 + 015, K0473 + 082 - K0473 + 100, K0473 + 253 - K0473 + 318, K0473 + 628 - K0473 + 665, K0473 + 790 - K0474 + 026, K0474 + 450 - K0474 + 585","amountPesos":101528000.0,"lengthMeters":1616.0,"ratePesosPerMeter":62826.732673267325,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7808"},{"year":2026,"category":"Roads","project":"Abra-Kalinga Road - K0435+890 - K0435+920, K0436+730 - K0436+740, K0437+910 - K0437+940, K0441+1320 - K0441+1330, K0441+1420 - K0441+1430, K0441+1450 - K0441+1460, K0441+1520 - K0441+1530, K0442+150 - K0442+160, K0446+620 - K0446+625, K0448+770 - K0448+790, K0448+830 - K0448+840, K0460 + 460 - K0460 + 500, K0469+570 - K0469+630, K0473+450 - K0473+540,  K0480+270 - K0480+360, K0480+430 - K0480+459, K0480+574 - K0480+680, K0481+000 - K0481+025, K0481+040 - K0481+530, K0481+640 - K0481+860, K0484+500-K0484+560, K0484+600-K0484+700, K0485+690-K0485+750","amountPesos":132300000.0,"lengthMeters":1525.0,"ratePesosPerMeter":86754.09836065574,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7810"},{"year":2026,"category":"Roads","project":"Abra-Kalinga Road - K0489+000 - K0490+000","amountPesos":68329000.0,"lengthMeters":1000.0,"ratePesosPerMeter":68329.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7812"},{"year":2026,"category":"Roads","project":"Abra-llocos Sur Road-K0390+059-K0390+199, K0394+124-K0395+000","amountPesos":58800000.0,"lengthMeters":1016.0,"ratePesosPerMeter":57874.015748031496,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7814"},{"year":2026,"category":"Roads","project":"Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0357 + 360 - K0357 + 560","amountPesos":56304000.0,"lengthMeters":200.0,"ratePesosPerMeter":281520.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7816"},{"year":2026,"category":"Roads","project":"Benguet-Nueva Vizcaya Rd - K0278 + 760 - K0278 + 785, K0284 + 245 - K0284 + 278, K0294 + 372 - K0294 + 395, K0307 + 653 - K0307 + 663, K0307 + 802 - K0307 + 814, K0309 + 500 - K0309 + 540, K0309 + 905 - K0309 + 977, K0310 + 380 - K0310 + 397, K0311 + 019 - K0311 + 051, K0311 + 069 - K0311 + 099, K0311 + 874 - K0311 + 920, K0311 + 970 - K0312 + 000, K0314+015 - K0314 + 040, K0315 + 070 - K0315 + 112, K0315 + 540 - K0315 + 560, K0318 + 125 - K0318 + 133","amountPesos":63700000.0,"lengthMeters":465.0,"ratePesosPerMeter":136989.24731182796,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7818"},{"year":2026,"category":"Roads","project":"Kalinga-Abra Rd - K0464 + 064 - K0464 + 103, K0464 + 149 - K0464 + 194, K0464 + 286 - K0464 + 318, K0464 + 694 - K0464 + 713, K0464 + 878 - K0464 + 930, K0465 + 554 - K0465 + 603, K0466 + 663 - K0466 + 703, K0468 + 842 - K0468 + 912, K0471 + 000 - K0471 + 100, K0471 + 439 - K0471 + 501, K0474 + 064 - K0474 + 089, K0474 + 132 - K0474 + 158, K0474 + 287 - K0474 + 312, K0474 + 920 - K0474 + 980, K0474 + 993 - K0474 + 1036, K0476 + 997 - K0477 + 047","amountPesos":64745000.0,"lengthMeters":737.0,"ratePesosPerMeter":87849.38941655359,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7820"},{"year":2026,"category":"Roads","project":"Marcos Hi-way - K0280 + 869 - K0281 + 130, K0282 + 424 - K0282 + 600","amountPesos":140760000.0,"lengthMeters":437.0,"ratePesosPerMeter":322105.2631578947,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7822"},{"year":2026,"category":"Roads","project":"Mt Prov-Ilocos Sur via Tue Rd - K0408 + 700 - K0408 + 850","amountPesos":70380000.0,"lengthMeters":150.0,"ratePesosPerMeter":469200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7824"},{"year":2026,"category":"Roads","project":"Batangas-Tabangao-Lobo Rd - K0137 + 518 - K0137 + 808","amountPesos":72756000.0,"lengthMeters":290.0,"ratePesosPerMeter":250882.75862068965,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7827"},{"year":2026,"category":"Roads","project":"MSR Jct Lopez-Hondagua Port Rd - K0225 + 304 - K0225 + 400","amountPesos":89008000.0,"lengthMeters":96.0,"ratePesosPerMeter":927166.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7829"},{"year":2026,"category":"Roads","project":"Mulanay-Sn Francisco Rd - K0288 + 220 - K0288 + 367, K0293 + 200 - K0293 + 257","amountPesos":48052000.0,"lengthMeters":204.0,"ratePesosPerMeter":235549.01960784313,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7831"},{"year":2026,"category":"Roads","project":"P Burgos-Pototanin Jct - K0203 + 100 - K0203 + 490","amountPesos":93692000.0,"lengthMeters":390.0,"ratePesosPerMeter":240235.89743589744,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7833"},{"year":2026,"category":"Roads","project":"Mogpog-Balanacan Port Rd - K0011 + 603 - K0012 + 967","amountPesos":403268000.0,"lengthMeters":1364.0,"ratePesosPerMeter":295651.02639296185,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7836"},{"year":2026,"category":"Roads","project":"Mogpog-Balanacan Port Rd - K0013 + 168 - K0013 + 418","amountPesos":138579000.0,"lengthMeters":250.0,"ratePesosPerMeter":554316.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7838"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0172 + 145 - K0172 + 276","amountPesos":137655000.0,"lengthMeters":131.0,"ratePesosPerMeter":1050801.5267175573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7840"},{"year":2026,"category":"Roads","project":"Puerto Princesa South Rd - K0140 + 735 - K0140 + 835, K0142 + 980 - K0143 + 070","amountPesos":50304000.0,"lengthMeters":190.0,"ratePesosPerMeter":264757.8947368421,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7842"},{"year":2026,"category":"Roads","project":"Romblon-Cogon-Sablayan Rd - K0001 + 447 - K0001 + 523, K0001 + 618 - K0001 + 650, K0004 + 590 - K0004 + 620","amountPesos":61917000.0,"lengthMeters":138.0,"ratePesosPerMeter":448673.9130434783,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7844"},{"year":2026,"category":"Roads","project":"Romblon-Cogon-Sablayan Rd - K0011 + 556 - K0011 + 610","amountPesos":78528000.0,"lengthMeters":54.0,"ratePesosPerMeter":1454222.2222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7846"},{"year":2026,"category":"Roads","project":"Sibuyan Circumferential Rd - K0065 + 445 - K0065 + 611","amountPesos":138579000.0,"lengthMeters":166.0,"ratePesosPerMeter":834813.2530120482,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7848"},{"year":2026,"category":"Roads","project":"Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0582 + 405 - K0582 + 670","amountPesos":139106000.0,"lengthMeters":265.0,"ratePesosPerMeter":524928.3018867924,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7851"},{"year":2026,"category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0019 + (-458) - K0019 + (-260)","amountPesos":92737000.0,"lengthMeters":198.0,"ratePesosPerMeter":468368.68686868687,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7853"},{"year":2026,"category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0034 + 000 - K0034 + 500","amountPesos":64916000.0,"lengthMeters":500.0,"ratePesosPerMeter":129832.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7855"},{"year":2026,"category":"Roads","project":"Aklan East Rd - K0294 + 800 - K0294 + 900, K0295 + 900 - K0296 + 561","amountPesos":69090000.0,"lengthMeters":761.0,"ratePesosPerMeter":90788.43626806833,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7858"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz Rd (Old Route) - K0017 + 260 - K0017 + 360","amountPesos":58800000.0,"lengthMeters":100.0,"ratePesosPerMeter":588000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7860"},{"year":2026,"category":"Roads","project":"Cebu North Hagnaya Wharf Rd - K0046 + 000 - K0046 + 220","amountPesos":94799000.0,"lengthMeters":220.0,"ratePesosPerMeter":430904.54545454547,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7863"},{"year":2026,"category":"Roads","project":"Jct (TER)-Jagna-Sierra Bullones Rd -  K0067 + 674 - K0067 + 700, K0067 + 903 - K0067 + 928, K0073 + 570 - K0073 + 640, K0082 + 500 - K0082 + 579, K0094 + 580 - K0094 + 600","amountPesos":96975000.0,"lengthMeters":220.0,"ratePesosPerMeter":440795.45454545453,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7865"},{"year":2026,"category":"Roads","project":"Jct (TER)-Jagna-Sierra Bullones Rd - K0069 + 660 - K0069 + 760","amountPesos":67883000.0,"lengthMeters":100.0,"ratePesosPerMeter":678830.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7867"},{"year":2026,"category":"Roads","project":"Loay Interior Rd - K0127 + 556 - K0127 + 672, K0134 + 089 - K0134 + 177, K0134 + 183 - K0134 + 220, K0134 + 350 - K0134 + 428, K0137 + 650 - K0137 + 705","amountPesos":37820000.0,"lengthMeters":374.0,"ratePesosPerMeter":101122.99465240641,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7869"},{"year":2026,"category":"Roads","project":"Loay Interior Rd - K0182 + 700 - K0183 + 000","amountPesos":113759000.0,"lengthMeters":300.0,"ratePesosPerMeter":379196.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7871"},{"year":2026,"category":"Roads","project":"The President Carlos P. Garcia Circumferential Rd - K0078 + 313 - K0078 + 340, K0109 + 920 - K0110 + 068, K0110 + 086 - K0110 + 145, K0110 + 255 - K0110 + 813","amountPesos":69189000.0,"lengthMeters":792.0,"ratePesosPerMeter":87359.84848484848,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7873"},{"year":2026,"category":"Roads","project":"Catarman-Calbayog Rd -  K0752 + 250 - K0752 + 262, K0763 + 799 - K0763 + 945, K0764 + 450 - K0764 + 620, K0766 + 1160 - K0767 + 040, K0767 + 274 - K0767 + 324, K0767 + 924 - K0767 + 982,  K0772 + 940 - K0772 + 970, K0773 + 145 - K0773 + 170, K0773 + 210 - K0773 + 225","amountPesos":98039000.0,"lengthMeters":626.0,"ratePesosPerMeter":156611.82108626197,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7876"},{"year":2026,"category":"Roads","project":"Liloan-S Ricardo Rd - K1083 + 220 - K1083 + 300","amountPesos":94115000.0,"lengthMeters":80.0,"ratePesosPerMeter":1176437.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7878"},{"year":2026,"category":"Roads","project":"Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0810 + 690 - K0811 + 105","amountPesos":68600000.0,"lengthMeters":415.0,"ratePesosPerMeter":165301.2048192771,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7880"},{"year":2026,"category":"Roads","project":"Sn Policarpo-Arteche-Lapinig Rd - K0858 + 300 - K0858 + 550, K0860 + 500 - K0860 + 700","amountPesos":82692000.0,"lengthMeters":450.0,"ratePesosPerMeter":183760.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7882"},{"year":2026,"category":"Roads","project":"Sindangan-Siayan-Dumingag-Mahayag Rd (Sindangan-Siayan Sect) - K1929 + 940 - K1930 + 220","amountPesos":141723000.0,"lengthMeters":280.0,"ratePesosPerMeter":506153.5714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7885"},{"year":2026,"category":"Roads","project":"Zamboanga City Bypass Rd - (S01215MN) - K1941 + 907 - K1942 + 127, K1947 + 037 - K1947 + 387, K1947 + 477 - K1947 + 757, K1949 + 407 - K1949 + 507, K1949 + 717 - K1949 + 777,","amountPesos":107800000.0,"lengthMeters":1010.0,"ratePesosPerMeter":106732.67326732674,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7887"},{"year":2026,"category":"Roads","project":"Zamboanga West Coastal Rd (Sibuco-Limpapa Section) (S01152MN)- K2165 + 383 - K2165 + 401, K2165 + 832 - K2165 + 855, K2167 + 615 - K2167 + 672, K2167 + 704 - K2167 + 727, K2169 + 279 - K2169 + 334, K2169 + 554 - K2169 + 597, K2169 + 658 - K2169 + 740","amountPesos":196000000.0,"lengthMeters":301.0,"ratePesosPerMeter":651162.7906976744,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7889"},{"year":2026,"category":"Roads","project":"CDO City-Dominorog-Camp Kibaritan Rd - K1487 + 772 - K1487 + 845","amountPesos":59482000.0,"lengthMeters":73.0,"ratePesosPerMeter":814821.9178082192,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7892"},{"year":2026,"category":"Roads","project":"Kapalong-Talaingod-Valencia (Bukidnon)  Rd - K1579 + 977 - K1580 + 037, K1580 + 078 - K1580 + 138","amountPesos":18588000.0,"lengthMeters":120.0,"ratePesosPerMeter":154900.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7894"},{"year":2026,"category":"Roads","project":"Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1540 + 100 - K1540 + 160, K1538 + 646 - K1538 + 721, K1561 + 021 - K1561 + 109, K1585+ 096 - K1585 + 145","amountPesos":92941000.0,"lengthMeters":272.0,"ratePesosPerMeter":341694.85294117645,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7896"},{"year":2026,"category":"Roads","project":"Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1545 + 090 - K1545+160, K1581+172 - K1581+363, K1581+860 - K1581+882","amountPesos":92941000.0,"lengthMeters":283.0,"ratePesosPerMeter":328413.4275618375,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7898"},{"year":2026,"category":"Roads","project":"Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1573 + 872 - K1573 + 960, K1574 + 325 - K1574 + 352, K1575 + 364 - K1575 + 523","amountPesos":92941000.0,"lengthMeters":274.0,"ratePesosPerMeter":339200.7299270073,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7900"},{"year":2026,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1603 + 506 - K1603 + 588, K1603 + 652 - K1603 + 696, K1603 + 762 - K1603 + 794","amountPesos":55765000.0,"lengthMeters":158.0,"ratePesosPerMeter":352943.03797468357,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7902"},{"year":2026,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1570 + 640 - K1570 + 932","amountPesos":53900000.0,"lengthMeters":292.0,"ratePesosPerMeter":184589.04109589042,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7905"},{"year":2026,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1579 + 200 - K1579 + 500","amountPesos":50176000.0,"lengthMeters":300.0,"ratePesosPerMeter":167253.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7907"},{"year":2026,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1589 + 340 - K1589 + 375, K1594 + 160 - 1594 + 200, K1599 + 010 - K1599 + 050","amountPesos":98000000.0,"lengthMeters":115.0,"ratePesosPerMeter":852173.9130434783,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7909"},{"year":2026,"category":"Roads","project":"Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1524 + 300 - K1524 + 500","amountPesos":98000000.0,"lengthMeters":200.0,"ratePesosPerMeter":490000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7911"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1672 + 400 - K1672 + 750","amountPesos":52234000.0,"lengthMeters":350.0,"ratePesosPerMeter":149240.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7913"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1673 + 000 -K1673 + 240, K1673 + 340 - K1673 + 511","amountPesos":79027000.0,"lengthMeters":411.0,"ratePesosPerMeter":192279.80535279805,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7915"},{"year":2026,"category":"Roads","project":"Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K1961 + 027 - K1961 + 090, K1961 + 350 - K1961 + 400, K1961 + 700 - K1961 + 799, K1961 + 950 - K1962 + 000","amountPesos":62065000.0,"lengthMeters":262.0,"ratePesosPerMeter":236889.31297709924,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7918"},{"year":2026,"category":"Roads","project":"Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K1970 + 745 - K1970 + 793, K1971 + 163 - K1971 + 240, K1971 + 277 - K1971 + 317, K1971 + 344 - K1971 + 465","amountPesos":122117000.0,"lengthMeters":286.0,"ratePesosPerMeter":426982.51748251746,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7920"},{"year":2026,"category":"Roads","project":"Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K2005 + 888 - K2006 + 120, K2006 + 140 - K2006 + 195, K2006 + 287 - K2006 + 385, K2006 + 399 - K2006 + 490","amountPesos":156609000.0,"lengthMeters":476.0,"ratePesosPerMeter":329010.50420168065,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7922"},{"year":2026,"category":"Roads","project":"Bukidnon-Cotabato Rd - K1629 + 530 - K1629 + 625","amountPesos":55274000.0,"lengthMeters":95.0,"ratePesosPerMeter":581831.5789473684,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7924"},{"year":2026,"category":"Roads","project":"General Santos City-T'Boli-Surallah Rd - K1682 + 774 - K1682 + 832, K1683 + 160 - K1683 + 170","amountPesos":92123000.0,"lengthMeters":68.0,"ratePesosPerMeter":1354750.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7926"},{"year":2026,"category":"Roads","project":"General Santos City-T'Boli-Surallah Rd - K1689 + 700 - K1689 + 730, K1691 + 796 - K1691 + 826, K1692 + 150 - K1692 + 195","amountPesos":96510000.0,"lengthMeters":105.0,"ratePesosPerMeter":919142.8571428572,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7928"},{"year":2026,"category":"Roads","project":"General Santos City-T'Boli-Surallah Rd - K1695 + 072 - K1695 + 166","amountPesos":29308000.0,"lengthMeters":94.0,"ratePesosPerMeter":311787.2340425532,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7930"},{"year":2026,"category":"Roads","project":"General Santos City-T'Boli-Surallah Rd - K1698 + 330 - K1698 + 365, K1698 + 862 - K1698 + 905, K1702 + 606 - K1702 + 669","amountPesos":96510000.0,"lengthMeters":141.0,"ratePesosPerMeter":684468.085106383,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7932"},{"year":2026,"category":"Roads","project":"Isulan Jct-Ninoy Aquino Rd - K1802 + 880 - K1803 + 000, K1803 + 200 - K1803 + 260, K1803 + 590 - K1803 + 650, K1803 + 710 - K1803 + 830, K1803 + 965 - K1803 + 980","amountPesos":146540000.0,"lengthMeters":375.0,"ratePesosPerMeter":390773.3333333333,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7934"},{"year":2026,"category":"Roads","project":"Isulan Jct-Ninoy Aquino Rd - K1803 + 988 - K1804 + 054, K1804 + 280 - K1804 + 400, K1809 + 750 - K1809 + 820, K1810 + 736 - K1810 + 836","amountPesos":122117000.0,"lengthMeters":356.0,"ratePesosPerMeter":343025.28089887643,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7936"},{"year":2026,"category":"Roads","project":"Isulan Jct-Ninoy Aquino Rd - K1812 + 410 - K1812 + 460, K1812 + 640 - K1812 + 690, K1812 + 710 - K1812 + 803, K1813 + 250 - K1813 + 350, K1813 + 900 - K1813 + 970","amountPesos":131604000.0,"lengthMeters":363.0,"ratePesosPerMeter":362545.45454545453,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7938"},{"year":2026,"category":"Roads","project":"Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1670 + 707 - K1671 + 000","amountPesos":170963000.0,"lengthMeters":293.0,"ratePesosPerMeter":583491.4675767918,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7940"},{"year":2026,"category":"Roads","project":"Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1684 + 090 - K1684 + 225","amountPesos":87736000.0,"lengthMeters":135.0,"ratePesosPerMeter":649896.2962962963,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7942"},{"year":2026,"category":"Roads","project":"Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1684 + 359 - K1684 + 439","amountPesos":70189000.0,"lengthMeters":80.0,"ratePesosPerMeter":877362.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7944"},{"year":2026,"category":"Roads","project":"SNA-Lebak-Kalamansig Rd - K1873 + 945 - K1874 + 000, K1874 + 360 - K1874 + 424, K1876 + 646 - K1876 + 690","amountPesos":87736000.0,"lengthMeters":163.0,"ratePesosPerMeter":538257.6687116565,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7950"},{"year":2026,"category":"Roads","project":"Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1360 + 077 - K1360 + 240","amountPesos":86442000.0,"lengthMeters":163.0,"ratePesosPerMeter":530319.018404908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7953"},{"year":2026,"category":"Roads","project":"Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1362 + 603 - K1362 + 649, K1362 + 681 - K1362 + 783","amountPesos":52322000.0,"lengthMeters":148.0,"ratePesosPerMeter":353527.02702702704,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7955"},{"year":2026,"category":"Roads","project":"Dinagat-Loreto Rd - K0011 + 820 - K0012 + 340","amountPesos":51865000.0,"lengthMeters":520.0,"ratePesosPerMeter":99740.38461538461,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7957"},{"year":2026,"category":"Roads","project":"Dinagat-Loreto Rd - K0033 + 500 - K0034 + 000","amountPesos":86442000.0,"lengthMeters":500.0,"ratePesosPerMeter":172884.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7959"},{"year":2026,"category":"Roads","project":"Jct Magsaysay-Cagdianao Rd - K0006 + 000 - K0006 + 400","amountPesos":86442000.0,"lengthMeters":400.0,"ratePesosPerMeter":216105.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7961"},{"year":2026,"category":"Roads","project":"Abra-IIocos Sur Road - K0387+580 - K0387+600, K0387+830-K0387+850","amountPesos":6297000.0,"lengthMeters":40.0,"ratePesosPerMeter":157425.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7965"},{"year":2026,"category":"Roads","project":"Abra-Kalinga Rd - K0436 + 405 - K0436 + 428, K0448 + 215 - K0448 + 231","amountPesos":1220000.0,"lengthMeters":39.0,"ratePesosPerMeter":31282.05128205128,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7967"},{"year":2026,"category":"Roads","project":"Abra-Kalinga Rd - K0465 + 648 - K0465 + 682, K0466 + 325 - K0466 + 395, K0467 + 000 - K0467 + 015, K0467 + 133 - K0467 + 326, K0467 + 544 - K0467 + 630, K0468 + 063 - K0468 + 093, K0468 + 208 - K0468 + 245, K0469 + 476 - K0469 + 494, K0469 + 888 - K0469 + 934, K0474 + 810 -K0474 + 930","amountPesos":18542000.0,"lengthMeters":649.0,"ratePesosPerMeter":28570.107858243453,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7971"},{"year":2026,"category":"Roads","project":"Abra-Kalinga Rd - K0475 + 160 - K0475 + 253, K0475 + 378 - K0475 + 502, K0475 + 590 - K0475 + 678, K0476 + 000 - K0476 + 115, K0476 + 540 - K0476 + 670, K0476 + 815 - K0476 + 846, K0476 + 922 - K0477 + 000, K0477 + 160 - K0477 + 184, K0477 + 197 - K0477 + 219, K0477 + 370 - K0477 + 413, K0477 + 450 - K0477 + 467, K0477 + 679 - K0477 + 752, K0478 + 072 - K0478 + 108, K0478 + 178 - K0478 + 210, K0478 + 415 - K0478 + 500, K0478 + 582 - K0478 + 626, K0478 + 827 - K0479 + 000, K0479 + 286 - K0479 + 417, K0479 + 492 - K0479 + 628","amountPesos":29714000.0,"lengthMeters":1475.0,"ratePesosPerMeter":20145.084745762713,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7973"},{"year":2026,"category":"Roads","project":"Abra-Kalinga Rd - K0480 + 230 - K0480 + 303, K0480 + 926 - K0481 + 000, K0481 + 912.50 - K0481 + 947, K0482 + 575 - K0482 + 663, K0482 + 795 - K0482 + 929, K0483 + 242 - K0483 + 400, K0483 + 580 - K0483 + 617, K0483 + 710 - K0483 + 810, K0484 + 150 - K0484 + 219, K0484 + 637 - K0484 + 740, K0484 + 952 - K0485 + 000, K0487 + 714 - K0487 + 754","amountPesos":22324000.0,"lengthMeters":958.5,"ratePesosPerMeter":23290.5581637976,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7975"},{"year":2026,"category":"Roads","project":"Abra-Kalinga Rd- K0434 + 750 - K0434 + 775, K0436 + 405 - K0436 + 428, K0437+ 120 - K0437 + 150, K0442 + 000 - K0442 + 012, K0460 + 000 - K0460 + 046, K0477 + 174 - K0477 + 210, K0486 + 510 - K0486 + 600, K0487 + 282 -K0487 + 306, K0487 + 500 - K0487 + 583","amountPesos":39200000.0,"lengthMeters":369.0,"ratePesosPerMeter":106233.0623306233,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7977"},{"year":2026,"category":"Roads","project":"Abbut-Conner Rd - K0546 + 539 - K0546 + 611","amountPesos":7038000.0,"lengthMeters":72.0,"ratePesosPerMeter":97750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7980"},{"year":2026,"category":"Roads","project":"Abbut-Conner Rd - K0547 + 979 - K0548 + 027","amountPesos":5630000.0,"lengthMeters":48.0,"ratePesosPerMeter":117291.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7982"},{"year":2026,"category":"Roads","project":"Abbut-Conner Rd - K0551 + 110 - K0551 + 211","amountPesos":5630000.0,"lengthMeters":101.0,"ratePesosPerMeter":55742.574257425746,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7984"},{"year":2026,"category":"Roads","project":"Abbut-Conner Rd - K0553 + 772 - K0553 + 800","amountPesos":7507000.0,"lengthMeters":28.0,"ratePesosPerMeter":268107.14285714284,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7986"},{"year":2026,"category":"Roads","project":"Abbut-Conner Rd - K0558 + 352 - K0558 + 496","amountPesos":9384000.0,"lengthMeters":144.0,"ratePesosPerMeter":65166.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7988"},{"year":2026,"category":"Roads","project":"Conner-Kabugao Rd - K0589 + 136 - K0589 + 156, K0581+792 - K0581+868","amountPesos":23460000.0,"lengthMeters":96.0,"ratePesosPerMeter":244375.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7990"},{"year":2026,"category":"Roads","project":"Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0591 + 699 - K0591 + 722","amountPesos":5630000.0,"lengthMeters":23.0,"ratePesosPerMeter":244782.60869565216,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7992"},{"year":2026,"category":"Roads","project":"Asin Rd - K0305 + 374 - K0305 + 414","amountPesos":4692000.0,"lengthMeters":40.0,"ratePesosPerMeter":117300.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7995"},{"year":2026,"category":"Roads","project":"Cong. Andres Acop Cosalan Rd (S00379LZ) -  K0322+635 - K0322+655, K0323 + 042 - K0323 + 065, K0332+721 - K0332+744, K0332+800 - K0332+848, K0333+176 - K0333+245, K0334+526 - K0334+545, K0337 + 164 - K0337 + 245","amountPesos":29400000.0,"lengthMeters":283.0,"ratePesosPerMeter":103886.925795053,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 7998"},{"year":2026,"category":"Roads","project":"Baguio-Bontoc Rd - K0275 + 180 - K0275 + 230","amountPesos":44100000.0,"lengthMeters":50.0,"ratePesosPerMeter":882000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8001"},{"year":2026,"category":"Roads","project":"Baguio-Bontoc Rd - K0318 + 045 - K0318 + 068, K0338 + 330 - K0338 + 365","amountPesos":3357000.0,"lengthMeters":58.0,"ratePesosPerMeter":57879.31034482759,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8003"},{"year":2026,"category":"Roads","project":"Cong. Andres Acop Cosalan Rd - K0344 + 590 - K0344 + 620, K0347 + 020 - K0347 + 055","amountPesos":4805000.0,"lengthMeters":65.0,"ratePesosPerMeter":73923.07692307692,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8005"},{"year":2026,"category":"Roads","project":"Nueva Vizcaya-Ifugao-Mt Province Rd - K0308 + 385 - K0308 + 455","amountPesos":6100000.0,"lengthMeters":70.0,"ratePesosPerMeter":87142.85714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8008"},{"year":2026,"category":"Roads","project":"Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0356 + 363 - K0356 + 399, K0357 + 609 - K0357 + 627, K0366 + 767 - K0366 + 785","amountPesos":5715000.0,"lengthMeters":72.0,"ratePesosPerMeter":79375.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8011"},{"year":2026,"category":"Roads","project":"Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0362 + 818 - K0362 + 840, K0363 + 688 - K0363 + 786, K0365 + 317 - K0365 + 357, K0365 + 465 - K0365 + 488, K0373 + 385 - K0373 + 403, K0374 + 583 - K0374 + 688, K0378 + 718 - K0378 + 745, K0378 + 762 - K0378 + 807, K0379 + (-001) - K0379 + 020, K0379 + 165 - K0379 + 300, K0379 + 673 - K0379 + 723, K0379 + 822 - K0379 + 908","amountPesos":32122000.0,"lengthMeters":670.0,"ratePesosPerMeter":47943.28358208955,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8013"},{"year":2026,"category":"Roads","project":"Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0380 + 076 - K0380 + 203, K0387 + 374 - K0387 + 424, K0387 + 491 - K0387 + 560, K0387 + 720 - K0387 + 856, K0387 + 951 - K0387 + 1024, K0388 + 193 - K0388 + 261, K0388 + 727 - K0388 + 786","amountPesos":28445000.0,"lengthMeters":582.0,"ratePesosPerMeter":48874.57044673539,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8015"},{"year":2026,"category":"Roads","project":"Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0396 + 650 - K0396 + 736, K0396 + 759 - K0396 + 822, K0396 + 1144 - K0396 + 1267, K0396 + 1363 - K0396 + 1459","amountPesos":14347000.0,"lengthMeters":368.0,"ratePesosPerMeter":38986.413043478264,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8017"},{"year":2026,"category":"Roads","project":"Nueva Vizcaya-Ifugao-Mt Province Rd - K0341 + 525 - K0341 + 556, K0347 + 040 - K0347 + 100, K0347 + 415 - K0347 + 463, K0347 + 498 - K0347 + 576, K0349 + 100 - K0349 + 133","amountPesos":13704000.0,"lengthMeters":250.0,"ratePesosPerMeter":54816.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8019"},{"year":2026,"category":"Roads","project":"Nueva Vizcaya-Ifugao-Mt Province Rd - K0351 + (-041) - K0351 + (-018), K0351 + 027 - K0351 + 054, K0357 + 158 - K0357 + 266, K0353 + 415 - K0353 + 430, K0359+ 711 - K0359 + 720, K0360+ 137 - K0360 + 206","amountPesos":17111000.0,"lengthMeters":251.0,"ratePesosPerMeter":68171.31474103585,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8021"},{"year":2026,"category":"Roads","project":"Mt Province Bdry- Calanan-Pinukpuk- Abbut Road ( Calanan-Pinukpuk Section)- K0519+406- K0519+422, K0519+644- K0519+656, K0519+889-K0519+907","amountPesos":2815000.0,"lengthMeters":46.0,"ratePesosPerMeter":61195.65217391304,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8024"},{"year":2026,"category":"Roads","project":"Mt Province Bdry-Calanan- Pinukpuk- Abbut Rd (Cagaluan-Calanan Sect)- K0471+672-K0471+687, K0471+750- K0471+757, K0474+291-K0474+306, K0474+1001-K0474+1015, K0475+443-K0475+485","amountPesos":6944000.0,"lengthMeters":93.0,"ratePesosPerMeter":74666.66666666667,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8026"},{"year":2026,"category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0523 + (-033) - K0523 + (-021), K0533 + 569 - K0533 + 575","amountPesos":1689000.0,"lengthMeters":18.0,"ratePesosPerMeter":93833.33333333333,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8028"},{"year":2026,"category":"Roads","project":"Baguio-Bontoc Rd -  K0349 + 902 - K0349 + 938, K0352 + 290 - K0352 + 320","amountPesos":6821000.0,"lengthMeters":66.0,"ratePesosPerMeter":103348.48484848485,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8031"},{"year":2026,"category":"Roads","project":"Baguio-Bontoc Rd - K0350+450 – K0350+540","amountPesos":18768000.0,"lengthMeters":90.0,"ratePesosPerMeter":208533.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8033"},{"year":2026,"category":"Roads","project":"Baguio-Bontoc Rd - K0358 + 940 - K0358 + 977, K0361 + 484 - K0361 + 545, K0366 + 147 - K0366 + 198, K0369 + 220 - K0369 + 260","amountPesos":7911000.0,"lengthMeters":189.0,"ratePesosPerMeter":41857.142857142855,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8035"},{"year":2026,"category":"Roads","project":"Baguio-Bontoc Rd - K0381 + 720 - K0381 + 748, K0387 + 640 - K0387 + 770, K0387 + 1006 - K0388 + 125","amountPesos":13794000.0,"lengthMeters":277.0,"ratePesosPerMeter":49797.833935018054,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8037"},{"year":2026,"category":"Roads","project":"Baguio-Bontoc Rd- K0359+800 – K0360+140,  K0363+400 – K0363+650, K0365+160 – K0365+225, K0365+680 – K0365+800","amountPesos":11913000.0,"lengthMeters":775.0,"ratePesosPerMeter":15371.612903225807,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8039"},{"year":2026,"category":"Roads","project":"Baguio-Bontoc Road, K0381 + 840 – k0381+880","amountPesos":5630000.0,"lengthMeters":40.0,"ratePesosPerMeter":140750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8041"},{"year":2026,"category":"Roads","project":"Dantay-Sagada Rd - K0389 + 750 - K0389 + 765","amountPesos":938000.0,"lengthMeters":15.0,"ratePesosPerMeter":62533.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8043"},{"year":2026,"category":"Roads","project":"Maba-ay Abatan Rd - (S04032LZ) Chainage 4180 - Chainage 4205, Chainage 8183 - Chainage 8238","amountPesos":7076000.0,"lengthMeters":80.0,"ratePesosPerMeter":88450.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8045"},{"year":2026,"category":"Roads","project":"Mt Prov-Cagayan via Tabuk-Enrile Rd - K0393+318 - K0393+332","amountPesos":13230000.0,"lengthMeters":14.0,"ratePesosPerMeter":945000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8047"},{"year":2026,"category":"Roads","project":"Mt Prov-Cagayan via Tabuk-Enrile Rd - K0409 + 079 - K0409 + 257, K0413 + 081 - K0413 + 180, K0415 + 191 - K0415 + 296","amountPesos":11760000.0,"lengthMeters":382.0,"ratePesosPerMeter":30785.340314136127,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8049"},{"year":2026,"category":"Roads","project":"Mt Prov-Cagayan via Tabuk-Enrile Rd - K0416 + 672 - K0416 + 929, K0417 + 233 - K0417 + 284, K0417 + 320 - K0417 + 363","amountPesos":9853000.0,"lengthMeters":351.0,"ratePesosPerMeter":28071.22507122507,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8051"},{"year":2026,"category":"Roads","project":"Mt Prov-Cagayan via Tabuk-Enrile Rd - K0417 + 516 - K0417 + 660","amountPesos":2815000.0,"lengthMeters":144.0,"ratePesosPerMeter":19548.61111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8053"},{"year":2026,"category":"Roads","project":"Mt Prov-Ilocos Sur via Tue Rd - K0409 + 294 - K0409 + 304","amountPesos":1004000.0,"lengthMeters":10.0,"ratePesosPerMeter":100400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8055"},{"year":2026,"category":"Roads","project":"Mt Province-N Vizcaya Rd - K0363 + (-288) - K0363 + (-234), K0363 + 325 - K0363 + 340, K0366 + 200 - K0366 + 232, K0366 + 338 - K0366 + 377","amountPesos":8943000.0,"lengthMeters":140.0,"ratePesosPerMeter":63878.57142857143,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8057"},{"year":2026,"category":"Roads","project":"Sagada-Besao-Quirino Rd - (S04034LZ) Chainage 2810 - Chainage 2850, Chainage 4345 - Chainage 4360","amountPesos":5949000.0,"lengthMeters":55.0,"ratePesosPerMeter":108163.63636363637,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8059"},{"year":2026,"category":"Roads","project":"Sagada-Besao-Quirino, Ilocos Sur Road, Chainage 7580 – Chainage 7740","amountPesos":5880000.0,"lengthMeters":160.0,"ratePesosPerMeter":36750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8061"},{"year":2026,"category":"Roads","project":"Kalinga- Abra Rd- K0483+644-K0483+685, K0484+062-K0484+092,K0485+470-K0485+497, K0486+091-K0486+121","amountPesos":20645000.0,"lengthMeters":128.0,"ratePesosPerMeter":161289.0625,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8064"},{"year":2026,"category":"Roads","project":"Kalinga-Abra Rd - K0474 + 1832 - K0474 + 1870, K0474 + 2002 - K0476 + 093, K0476 + 122 - K0476 + 153, K0476 + 873 - K0476 + 988","amountPesos":18768000.0,"lengthMeters":275.0,"ratePesosPerMeter":68247.27272727272,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8066"},{"year":2026,"category":"Roads","project":"Kalinga-Abra Rd -K0515+488 - K0515+508, K0515+869 - K0515+878, K0516+538 - K0516+552, K0516+572 - K0516+589, K0516+759 - K0516+769, K0517+1191 - K0517+1203, K0517+1215 - K0517+1227, K0517+1242 - K0518+026, K0521+362 - K0521+385, K0521+770 - K0521+800, K0522+089 - K0522+144, K0522+543 - K0522+585, K0523+351 - K0523+381, K0523+1000 - K0523+1045, K0525+637 - K0525+686","amountPesos":44590000.0,"lengthMeters":560.0,"ratePesosPerMeter":79625.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8068"},{"year":2026,"category":"Roads","project":"Mt Province Bdry- Calanan- Pinukpuk- Abbut Rd (Cagaluan- Calanan Sect)- K0469+501- K0469+557","amountPesos":29090000.0,"lengthMeters":56.0,"ratePesosPerMeter":519464.28571428574,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8070"},{"year":2026,"category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0439 + 281 - K0439 + 358","amountPesos":30074000.0,"lengthMeters":77.0,"ratePesosPerMeter":390571.4285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8072"},{"year":2026,"category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0451 + 046 - K0451 + 172, K0452 + 855 - K0452 + 899, K0454 + 402 - K0454 + 665, K0455 + 823 - K0455 + 854, K0455 + 1039 - K0456 + 013, K0458 + 789 - K0458 + 833","amountPesos":30037000.0,"lengthMeters":534.0,"ratePesosPerMeter":56249.06367041198,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8074"},{"year":2026,"category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0465 + 651 - K0465 + 668, K0466 + 346 - K0466 + 413, K0467 + 328 - K0467 + 397, K0467 + 492 - K0467 + 507, K0468 + 114 - K0468 + 135, K0468 + 188 - K0468 + 235, K0468 + 320 - K0468 + 360, K0469 + 053 - K0469 + 099","amountPesos":19361000.0,"lengthMeters":322.0,"ratePesosPerMeter":60127.32919254658,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8076"},{"year":2026,"category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0468 + 357 - K0468 + 493","amountPesos":21583000.0,"lengthMeters":136.0,"ratePesosPerMeter":158698.5294117647,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8078"},{"year":2026,"category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0469+200 - K0469+350","amountPesos":9384000.0,"lengthMeters":150.0,"ratePesosPerMeter":62560.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8080"},{"year":2026,"category":"Roads","project":"Mt. Province Bdry- Calanan- Pinukpuk- Abbut Rd- K0426+080- K0426+109, K0435+766- K0435+831","amountPesos":6569000.0,"lengthMeters":94.0,"ratePesosPerMeter":69882.97872340426,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8082"},{"year":2026,"category":"Roads","project":"Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0335 + 596 - K0335 + 656","amountPesos":5509000.0,"lengthMeters":60.0,"ratePesosPerMeter":91816.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8086"},{"year":2026,"category":"Roads","project":"Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0353 + 502 - K0353 + 552","amountPesos":4591000.0,"lengthMeters":50.0,"ratePesosPerMeter":91820.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8088"},{"year":2026,"category":"Roads","project":"Cordon-Aurora Bdry Rd (Jct Dumabato-Aurora Bdry) - K0384 + 630 - K0384 + 680","amountPesos":4591000.0,"lengthMeters":50.0,"ratePesosPerMeter":91820.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8090"},{"year":2026,"category":"Roads","project":"Diokno Highway - K0085 + 547 - K0085 + 571","amountPesos":32534000.0,"lengthMeters":24.0,"ratePesosPerMeter":1355583.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8094"},{"year":2026,"category":"Roads","project":"Diokno Highway - K0087 + 020 - K0087 + 071","amountPesos":20181000.0,"lengthMeters":51.0,"ratePesosPerMeter":395705.8823529412,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8096"},{"year":2026,"category":"Roads","project":"Batangas-Lobo Rd - K0131 + 267 - K0131 + 297, K0133 + 995 - K0134 + 000","amountPesos":12367000.0,"lengthMeters":35.0,"ratePesosPerMeter":353342.85714285716,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8099"},{"year":2026,"category":"Roads","project":"Batangas-Lobo Rd - K0134 + 565 - K0134 + 680, K0135 + 060 - K0135 + 340, K0135 + 460 - K0135 + 515, K0135 + 600 - K0135 + 710","amountPesos":46846000.0,"lengthMeters":560.0,"ratePesosPerMeter":83653.57142857143,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8101"},{"year":2026,"category":"Roads","project":"Batangas-Lobo Rd - K0133 + 600 - K0133 + 774, K0137 + 180 - K0137 + 570","amountPesos":23423000.0,"lengthMeters":564.0,"ratePesosPerMeter":41530.14184397163,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8103"},{"year":2026,"category":"Roads","project":"Batangas-Tabangao-Lobo Rd - K0120 + 662 - K0120 + 692","amountPesos":14415000.0,"lengthMeters":30.0,"ratePesosPerMeter":480500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8105"},{"year":2026,"category":"Roads","project":"Pagsanjan-Lucban Rd - (S01672LZ) K0093 + 640 - K0093 + 680","amountPesos":30368000.0,"lengthMeters":40.0,"ratePesosPerMeter":759200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8108"},{"year":2026,"category":"Roads","project":"Pagsanjan-Lucban Rd - (S01672LZ) K0095 + 949 - K0096 + 000","amountPesos":43246000.0,"lengthMeters":51.0,"ratePesosPerMeter":847960.7843137255,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8110"},{"year":2026,"category":"Roads","project":"Pagsanjan-Lucban Rd - (S01672LZ) K0101 + 197 - K0101 + 230","amountPesos":37581000.0,"lengthMeters":33.0,"ratePesosPerMeter":1138818.1818181819,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8112"},{"year":2026,"category":"Roads","project":"Pagsanjan-Lucban Rd - (S01672LZ) K0104 + 840 - K0104 + 855","amountPesos":22776000.0,"lengthMeters":15.0,"ratePesosPerMeter":1518400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8114"},{"year":2026,"category":"Roads","project":"Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0240 + 850 - K0240 + 910, K0241 + 160 - K0241 + 185, K0276 + 000 - K0276 + 120, K0277 +  755 - K0277 + 841","amountPesos":46846000.0,"lengthMeters":291.0,"ratePesosPerMeter":160982.8178694158,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8117"},{"year":2026,"category":"Roads","project":"Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0270 + 800 - K0271 + 070","amountPesos":46846000.0,"lengthMeters":270.0,"ratePesosPerMeter":173503.7037037037,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8119"},{"year":2026,"category":"Roads","project":"Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0273 + 723 - K0274 + 000","amountPesos":46846000.0,"lengthMeters":277.0,"ratePesosPerMeter":169119.13357400722,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8121"},{"year":2026,"category":"Roads","project":"Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0276 + 294 - K0276 + 338, K0276 + 823 - K0277 + 191, K0287 + 940 - K0288 + 030","amountPesos":46846000.0,"lengthMeters":502.0,"ratePesosPerMeter":93318.7250996016,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8123"},{"year":2026,"category":"Roads","project":"Mulanay-Sn Francisco Rd – K0299 + 853 - K0300 + 200, K0300 + 268 - K0300 + 305, K0305 + 402 - K0305 + 423","amountPesos":48051000.0,"lengthMeters":405.0,"ratePesosPerMeter":118644.44444444444,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8125"},{"year":2026,"category":"Roads","project":"Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0202 + 670 - K0202 + 760, K0203 + 300 - K0203 + 360, K0203 + 600 - K0203 + 690","amountPesos":23423000.0,"lengthMeters":240.0,"ratePesosPerMeter":97595.83333333333,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8128"},{"year":2026,"category":"Roads","project":"Mindoro West Coastal Rd - K0335 + 491 - K0335 + 586","amountPesos":13858000.0,"lengthMeters":95.0,"ratePesosPerMeter":145873.68421052632,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8132"},{"year":2026,"category":"Roads","project":"Calapan North Rd - K0025 + 100 - K0025 + 280","amountPesos":24944000.0,"lengthMeters":180.0,"ratePesosPerMeter":138577.77777777778,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8135"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0157 + 530 - K0157 + 630","amountPesos":36954000.0,"lengthMeters":100.0,"ratePesosPerMeter":369540.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8138"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0176 + 770 - K0176 + 795","amountPesos":9239000.0,"lengthMeters":25.0,"ratePesosPerMeter":369560.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8140"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0262+950 - K0262+990","amountPesos":19244000.0,"lengthMeters":40.0,"ratePesosPerMeter":481100.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8142"},{"year":2026,"category":"Roads","project":"Roxas Diversion Rd - K0134 + 100 - K0134 + 200","amountPesos":32335000.0,"lengthMeters":100.0,"ratePesosPerMeter":323350.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8144"},{"year":2026,"category":"Roads","project":"Aramaywan-Berong-Pto Princesa Rd - K0106 + 901 - K0107 + 149","amountPesos":19244000.0,"lengthMeters":248.0,"ratePesosPerMeter":77596.7741935484,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8147"},{"year":2026,"category":"Roads","project":"Palawan Circum. Rd - K0231 + 440 - K0231 + 500, K0231 + 630 - K0231 + 674","amountPesos":9239000.0,"lengthMeters":104.0,"ratePesosPerMeter":88836.53846153847,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8149"},{"year":2026,"category":"Roads","project":"Palawan Circum. Rd - K0256 + 695 - K0256 + 730","amountPesos":3695000.0,"lengthMeters":35.0,"ratePesosPerMeter":105571.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8151"},{"year":2026,"category":"Roads","project":"Quezon-Punta Baja Rd - K0170 + 637 - K0170 + 727, K0178 + 620 - K0178 + 670","amountPesos":19521000.0,"lengthMeters":140.0,"ratePesosPerMeter":139435.7142857143,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8153"},{"year":2026,"category":"Roads","project":"Aramaywan-Berong-Pto Princesa Rd - K0083 + 010 - K0083 + 070","amountPesos":13858000.0,"lengthMeters":60.0,"ratePesosPerMeter":230966.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8156"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0083 + 125 - K0083 + 170","amountPesos":13858000.0,"lengthMeters":45.0,"ratePesosPerMeter":307955.55555555556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8158"},{"year":2026,"category":"Roads","project":"Puerto Princesa South Rd - K0035 + 640 - K0035 + 670","amountPesos":13858000.0,"lengthMeters":30.0,"ratePesosPerMeter":461933.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8160"},{"year":2026,"category":"Roads","project":"Puerto Princesa South Rd - K0045 + 050 - K0045 + 252","amountPesos":9239000.0,"lengthMeters":202.0,"ratePesosPerMeter":45737.623762376235,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8162"},{"year":2026,"category":"Roads","project":"Romblon-Cogon-Sablayan Rd - K0004 + 490 - K0004 + 525","amountPesos":10116000.0,"lengthMeters":35.0,"ratePesosPerMeter":289028.5714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8165"},{"year":2026,"category":"Roads","project":"Sibuyan Circumferential Rd - K0006 + 000 - K0006 + 104","amountPesos":33287000.0,"lengthMeters":104.0,"ratePesosPerMeter":320067.3076923077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8167"},{"year":2026,"category":"Roads","project":"Tablas Circumferential Rd - K0029 + 639 - K0029 + 682","amountPesos":9636000.0,"lengthMeters":43.0,"ratePesosPerMeter":224093.02325581395,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8169"},{"year":2026,"category":"Roads","project":"Tablas Circumferential Rd - K0071 + 850 - K0071 + 870","amountPesos":7502000.0,"lengthMeters":20.0,"ratePesosPerMeter":375100.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8171"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0104 + 132 - K0104 + 160, K0104 + 812 - K0104 + 941","amountPesos":28270000.0,"lengthMeters":157.0,"ratePesosPerMeter":180063.69426751594,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8174"},{"year":2026,"category":"Roads","project":"Legazpi City - Punta de Jesus Rd - K0536 + 000 - K0536 + 044, K0536 + 073 - K0536 + 118, K0537 + 109 - K0537 + 300, K0542 + 648 - K0542 + 808, K0551 + 300 - K0552 + 000, K0552 + 605 - K0552 + 635, K0559 + 322 - K0559 + 434, K0560 + 754 - K0560 + 930","amountPesos":22257000.0,"lengthMeters":1458.0,"ratePesosPerMeter":15265.432098765432,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8178"},{"year":2026,"category":"Roads","project":"Legazpi City-Punta de Jesus Rd - K0580 + (-510) - K0580 + (-438)","amountPesos":3246000.0,"lengthMeters":72.0,"ratePesosPerMeter":45083.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8180"},{"year":2026,"category":"Roads","project":"Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd - K0488 + 728 - K0488 + 770, K0488 + 833 - K0488 + 850","amountPesos":19600000.0,"lengthMeters":59.0,"ratePesosPerMeter":332203.3898305085,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8183"},{"year":2026,"category":"Roads","project":"Catanduanes Cir Rd - K0098+280-K0098+350","amountPesos":12472000.0,"lengthMeters":70.0,"ratePesosPerMeter":178171.42857142858,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8188"},{"year":2026,"category":"Roads","project":"Catanduanes Cir Rd - K0168 + 290 - K0168 + 350","amountPesos":11760000.0,"lengthMeters":60.0,"ratePesosPerMeter":196000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8190"},{"year":2026,"category":"Roads","project":"Jct Milagros-Baleno-Lagta Rd - K0038 + 150 - K0038 + 200","amountPesos":46369000.0,"lengthMeters":50.0,"ratePesosPerMeter":927380.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8193"},{"year":2026,"category":"Roads","project":"Dancalan-Sta. Cruz, Donsol-Pio Duran Road - K0584 + 750 - K0584 + 900, K0587 + 100 - K0587 + 200, K0588 + 089 - K0588 + 130, K0588 + 500 - K0588 + 629","amountPesos":41795000.0,"lengthMeters":420.0,"ratePesosPerMeter":99511.90476190476,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8196"},{"year":2026,"category":"Roads","project":"Iloilo-Antique Rd - K0072 + (-248) - K0072 + (-100), K0072 + 080 - K0072 + 215, K0074 + (-128) - K0074 + (-050), K0074 + 147 - K0074 + 195","amountPesos":24855000.0,"lengthMeters":409.0,"ratePesosPerMeter":60770.171149144255,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8200"},{"year":2026,"category":"Roads","project":"Guimaras Circumferential Rd - K0006 + 582 - K0006 + 752, K0097 + 058 - K0097 + 155, K0097 + 245 - K0097 + 325, K0100 + 000 - K0100 + 142","amountPesos":33366000.0,"lengthMeters":489.0,"ratePesosPerMeter":68233.12883435583,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8203"},{"year":2026,"category":"Roads","project":"Guimaras Circumferential Rd - K0095 + 264 - K0095 + 568","amountPesos":21329000.0,"lengthMeters":304.0,"ratePesosPerMeter":70161.18421052632,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8205"},{"year":2026,"category":"Roads","project":"Passi-Sn Rafael-Lemery-Sara Rd - K0057 + 908 - K0057 + 939, K0063 + 057 - K0063 + 206, K0063 + 654 - K0063 + 752, K0065 + 803 - K0065 + 822","amountPesos":22391000.0,"lengthMeters":297.0,"ratePesosPerMeter":75390.57239057239,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8208"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0240 + 377 - K0240 + 424","amountPesos":24237000.0,"lengthMeters":47.0,"ratePesosPerMeter":515680.8510638298,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8211"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz Rd (Old Route) - K0061 + 306 - K0061 + 357","amountPesos":24500000.0,"lengthMeters":51.0,"ratePesosPerMeter":480392.1568627451,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8214"},{"year":2026,"category":"Roads","project":"Jct Natl Rd Sagay-Bato-Dian-Marcelo-Balea Jct Rd - K0100 + 670 - K0100 + 775","amountPesos":4545000.0,"lengthMeters":105.0,"ratePesosPerMeter":43285.71428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8218"},{"year":2026,"category":"Roads","project":"Vallehermoso-Canlaon City-La Castellana Rd - K0071 + 190 - K0071 + 440","amountPesos":3273000.0,"lengthMeters":250.0,"ratePesosPerMeter":13092.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8221"},{"year":2026,"category":"Roads","project":"Jct DS Benedicto-Spur 16-Calatrava Rd - K0083 + 737 - K0084 + 000","amountPesos":4545000.0,"lengthMeters":263.0,"ratePesosPerMeter":17281.368821292777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8224"},{"year":2026,"category":"Roads","project":"Jct Natl Rd Sagay-Bato-Dian-Marcelo-Balea Jct Rd - K0118 + 378 - K0118 + 578","amountPesos":6818000.0,"lengthMeters":200.0,"ratePesosPerMeter":34090.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8226"},{"year":2026,"category":"Roads","project":"Vallehermoso-Canlaon City-La Castellana Rd - K0152 + 573 - K0152 + 600, K0152 + 688 - K0152 + 725, K0154 + 216 - K0154 + 407","amountPesos":15155000.0,"lengthMeters":255.0,"ratePesosPerMeter":59431.37254901961,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8229"},{"year":2026,"category":"Roads","project":"Sta Catalina-Pamplona-Tanjay City - K0047 + 850 - K0047 + 920, K0049 + 040 - K0049 + 230, K0051 + 255 - K0051 + 307, K0053 + 180 - K0053 + 265","amountPesos":28518000.0,"lengthMeters":397.0,"ratePesosPerMeter":71833.7531486146,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8232"},{"year":2026,"category":"Roads","project":"The President Carlos P. Garcia Circumferential Rd - K0122 + 481 - K0122 + 616","amountPesos":15128000.0,"lengthMeters":135.0,"ratePesosPerMeter":112059.25925925926,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8236"},{"year":2026,"category":"Roads","project":"Cebu North Hagnaya Wharf Rd - K0085 + 450 - K0085 + 500","amountPesos":9480000.0,"lengthMeters":50.0,"ratePesosPerMeter":189600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8239"},{"year":2026,"category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0006 + 960 - K0007 + 030","amountPesos":47400000.0,"lengthMeters":70.0,"ratePesosPerMeter":677142.8571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8242"},{"year":2026,"category":"Roads","project":"Biliran Circumferential Rd - K1012 + 852 - K1013 + 083, K1013 + 839 - K1014 + 009, K1014 + 603 - K1014 + 683, K1014 + 869 - K1014 + 991","amountPesos":39200000.0,"lengthMeters":603.0,"ratePesosPerMeter":65008.29187396351,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8246"},{"year":2026,"category":"Roads","project":"Naval-Caibiran Cross Country Rd - K1032 + 517 - K1032 + 657","amountPesos":9412000.0,"lengthMeters":140.0,"ratePesosPerMeter":67228.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8248"},{"year":2026,"category":"Roads","project":"Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1020 + 010 - K1020 + 070, K1036 + 875 - K1036 + 971","amountPesos":49000000.0,"lengthMeters":156.0,"ratePesosPerMeter":314102.5641025641,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8251"},{"year":2026,"category":"Roads","project":"Lemon-Leyte-Biliran Rd - K0991 + 480 - K0991 + 630","amountPesos":49000000.0,"lengthMeters":150.0,"ratePesosPerMeter":326666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8253"},{"year":2026,"category":"Roads","project":"Catarman-Calbayog Rd - K0764 + 785 - K0765 + 145","amountPesos":42126000.0,"lengthMeters":360.0,"ratePesosPerMeter":117016.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8256"},{"year":2026,"category":"Roads","project":"Calbayog-Catarman Rd - K0785 + (-261) - K0785 + (-196)","amountPesos":32940000.0,"lengthMeters":65.0,"ratePesosPerMeter":506769.23076923075,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8259"},{"year":2026,"category":"Roads","project":"Calbayog-Catarman Rd - K0800 + 415 - K0800 + 555","amountPesos":42352000.0,"lengthMeters":140.0,"ratePesosPerMeter":302514.28571428574,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8261"},{"year":2026,"category":"Roads","project":"Rizal-Dakak-Dapitan Coastal Loop Rd - K1814 + 450 - K1814 + 570","amountPesos":8065000.0,"lengthMeters":120.0,"ratePesosPerMeter":67208.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8265"},{"year":2026,"category":"Roads","project":"Rizal-Dakak-Dapitan Coastal Loop Rd - K1832 + 616 - K1832 + 756, K1832 + 800 - K1832 + 850","amountPesos":10750000.0,"lengthMeters":190.0,"ratePesosPerMeter":56578.94736842105,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8267"},{"year":2026,"category":"Roads","project":"Sindangan-Siayan-Dumingag-Mahayag Rd (Sindangan-Siayan Sect) - K1936+340-K1936+380","amountPesos":9800000.0,"lengthMeters":40.0,"ratePesosPerMeter":245000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8270"},{"year":2026,"category":"Roads","project":"Sindangan-Siayan-Dumingag-Mahayag Rd (Sindangan-Siayan Sect) - K1941 + 090 - K1941 + 180","amountPesos":10972000.0,"lengthMeters":90.0,"ratePesosPerMeter":121911.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8272"},{"year":2026,"category":"Roads","project":"Sindangan-Siayan-Dumingag-Mahayag Rd (Sindangan-Siayan Sect) - K1941 + 460 - K1941 + 570","amountPesos":7315000.0,"lengthMeters":110.0,"ratePesosPerMeter":66500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8274"},{"year":2026,"category":"Roads","project":"Liloy-Siocon Rd - K2014 + 380 - K2014 + 412","amountPesos":9800000.0,"lengthMeters":32.0,"ratePesosPerMeter":306250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8277"},{"year":2026,"category":"Roads","project":"Liloy-Siocon Rd (S01330MN) - K2039 + 055 - K2039 + 112","amountPesos":19600000.0,"lengthMeters":57.0,"ratePesosPerMeter":343859.649122807,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8280"},{"year":2026,"category":"Roads","project":"Liloy-Siocon Road (S01330MN), K2035 + 419 - K2035 + 491, K2059+723 - K2059+795","amountPesos":21560000.0,"lengthMeters":144.0,"ratePesosPerMeter":149722.22222222222,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8282"},{"year":2026,"category":"Roads","project":"Siocon-Sirawai-Sibuco-Limpapa Road, K2110 + 153 - K2110 + 189, K2110 + 265 - K2110 + 290, K2110+991 - K2110 + 1014, K2104 + 782 - K2104 + 814","amountPesos":14700000.0,"lengthMeters":116.0,"ratePesosPerMeter":126724.13793103448,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8284"},{"year":2026,"category":"Roads","project":"Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - K2152 + 107 - K2152 + 167, K2152 + 850 - K2152 + 874, K2153 + 263 - K2153 + 287, K2153 + 598 - K2153 + 620","amountPesos":30036000.0,"lengthMeters":130.0,"ratePesosPerMeter":231046.15384615384,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8286"},{"year":2026,"category":"Roads","project":"Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - K2172 + 460 - K2172 + 520","amountPesos":25480000.0,"lengthMeters":60.0,"ratePesosPerMeter":424666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8288"},{"year":2026,"category":"Roads","project":"CDO City-Dominorog-Camp Kibaritan Rd - K1468 + 103 - K1468 + 182, K1468 + 279 - K1468 + 460","amountPesos":18588000.0,"lengthMeters":260.0,"ratePesosPerMeter":71492.30769230769,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8292"},{"year":2026,"category":"Roads","project":"CDO-Airport-Bukidnon Rd - K1453 + 000 - K1453 + 055, K1453+714 - K1453+782","amountPesos":24095000.0,"lengthMeters":123.0,"ratePesosPerMeter":195894.30894308942,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8295"},{"year":2026,"category":"Roads","project":"Camiguin Circumferential Rd - K0005 + 934 - K0006 + 034","amountPesos":9294000.0,"lengthMeters":100.0,"ratePesosPerMeter":92940.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8298"},{"year":2026,"category":"Roads","project":"Camiguin Circumferential Rd - K0022 + 473.40 - K0022 + 855.40","amountPesos":46471000.0,"lengthMeters":382.0,"ratePesosPerMeter":121651.83246073299,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8300"},{"year":2026,"category":"Roads","project":"Camiguin Circumferential Rd - K0022 + 855.40 - K0023 + 277","amountPesos":46471000.0,"lengthMeters":421.6,"ratePesosPerMeter":110225.33206831157,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8302"},{"year":2026,"category":"Roads","project":"Iligan City Diversion Rd - Iligan City Diversion Rd - K1525 + 385 – K1525 + 455","amountPesos":10494000.0,"lengthMeters":70.0,"ratePesosPerMeter":149914.2857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8305"},{"year":2026,"category":"Roads","project":"Oroquieta City-Calamba Mt Rd - K1762 + 040 - K1762 + 160","amountPesos":23235000.0,"lengthMeters":120.0,"ratePesosPerMeter":193625.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8308"},{"year":2026,"category":"Roads","project":"Gingoog-Claveria-Villanueva Rd - K1351+347 - K1351+417","amountPesos":38552000.0,"lengthMeters":70.0,"ratePesosPerMeter":550742.8571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8311"},{"year":2026,"category":"Roads","project":"Gingoog-Claveria-Villanueva Rd - K1363+440 - K1363+560","amountPesos":19276000.0,"lengthMeters":120.0,"ratePesosPerMeter":160633.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8313"},{"year":2026,"category":"Roads","project":"Asuncion-San Isidro-Laak-Veruela Rd - K1518 + 422 - K1518 + 513","amountPesos":9800000.0,"lengthMeters":91.0,"ratePesosPerMeter":107692.30769230769,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8317"},{"year":2026,"category":"Roads","project":"Montevista-Compostela-Mati Bdry Rd - K1494 + (-450) - K1494 + (-150)","amountPesos":49000000.0,"lengthMeters":300.0,"ratePesosPerMeter":163333.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8319"},{"year":2026,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1611+080 - K1611+162","amountPesos":45975000.0,"lengthMeters":82.0,"ratePesosPerMeter":560670.731707317,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8322"},{"year":2026,"category":"Roads","project":"Nabunturan-Maragusan Rd - K1450 + 449 - K1450 + 470","amountPesos":9310000.0,"lengthMeters":21.0,"ratePesosPerMeter":443333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8324"},{"year":2026,"category":"Roads","project":"Nabunturan-Maragusan Rd - K1450 + 470 - K1450 + 600","amountPesos":39383000.0,"lengthMeters":130.0,"ratePesosPerMeter":302946.1538461539,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8326"},{"year":2026,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1566 + 832 - K1566 + 889","amountPesos":6664000.0,"lengthMeters":57.0,"ratePesosPerMeter":116912.28070175438,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8329"},{"year":2026,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1571 + 060 - K1571 + 100","amountPesos":8722000.0,"lengthMeters":40.0,"ratePesosPerMeter":218050.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8331"},{"year":2026,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1571 + 520 - K1571 + 560","amountPesos":8722000.0,"lengthMeters":40.0,"ratePesosPerMeter":218050.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8333"},{"year":2026,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1572 + 364 - K1572 + 415","amountPesos":16954000.0,"lengthMeters":51.0,"ratePesosPerMeter":332431.3725490196,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8335"},{"year":2026,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1573 + 626 - K1573 + 676","amountPesos":8722000.0,"lengthMeters":50.0,"ratePesosPerMeter":174440.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8337"},{"year":2026,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1581 + 350 - K1581 + 415","amountPesos":11192000.0,"lengthMeters":65.0,"ratePesosPerMeter":172184.61538461538,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8339"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1519 + 000 - K1519 + 070","amountPesos":25480000.0,"lengthMeters":70.0,"ratePesosPerMeter":364000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8341"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1520 + 102 - K1520 + 119","amountPesos":5594000.0,"lengthMeters":17.0,"ratePesosPerMeter":329058.82352941175,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8343"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1530 + 828 - K1530 + 955","amountPesos":15680000.0,"lengthMeters":127.0,"ratePesosPerMeter":123464.56692913386,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8345"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1531 + 475 - K1531 + 515","amountPesos":8722000.0,"lengthMeters":40.0,"ratePesosPerMeter":218050.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8347"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1531 + 800 - K1531 + 875","amountPesos":19600000.0,"lengthMeters":75.0,"ratePesosPerMeter":261333.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8349"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1532 + 920 - K1532 + 975","amountPesos":9545000.0,"lengthMeters":55.0,"ratePesosPerMeter":173545.45454545456,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8351"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1533 + 250 - K1533 + 300","amountPesos":8722000.0,"lengthMeters":50.0,"ratePesosPerMeter":174440.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8353"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1534 + 380 - K1534 + 410","amountPesos":8722000.0,"lengthMeters":30.0,"ratePesosPerMeter":290733.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8355"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1535 + 600 - K1535 + 650","amountPesos":8722000.0,"lengthMeters":50.0,"ratePesosPerMeter":174440.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8357"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1535 + 685 - K1535 + 735","amountPesos":8722000.0,"lengthMeters":50.0,"ratePesosPerMeter":174440.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8359"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1536 + 320 - K1536 + 420","amountPesos":16954000.0,"lengthMeters":100.0,"ratePesosPerMeter":169540.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8361"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1624 + 400 - K1624 + 450","amountPesos":8722000.0,"lengthMeters":50.0,"ratePesosPerMeter":174440.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8363"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1625 + 795 - K1625 + 810, K1625 + 835 - K1625 +846","amountPesos":8887000.0,"lengthMeters":26.0,"ratePesosPerMeter":341807.6923076923,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8365"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1629 + 400 - K1629 + 450","amountPesos":8722000.0,"lengthMeters":50.0,"ratePesosPerMeter":174440.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8367"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1633 + 480 - K1633 + 530","amountPesos":8722000.0,"lengthMeters":50.0,"ratePesosPerMeter":174440.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8369"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1637 + 570 - K1637 + 620","amountPesos":8722000.0,"lengthMeters":50.0,"ratePesosPerMeter":174440.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8371"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1638 + 050 - K1638 + 100","amountPesos":8722000.0,"lengthMeters":50.0,"ratePesosPerMeter":174440.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8373"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1671 + 765 - K1671 + 835","amountPesos":12015000.0,"lengthMeters":70.0,"ratePesosPerMeter":171642.85714285713,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8375"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1675 + 180 - K1675 + 230","amountPesos":7840000.0,"lengthMeters":50.0,"ratePesosPerMeter":156800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8377"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1681 + 380 - K1681 + 430","amountPesos":8722000.0,"lengthMeters":50.0,"ratePesosPerMeter":174440.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8379"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1686 + 750 - K1686 + 800","amountPesos":8722000.0,"lengthMeters":50.0,"ratePesosPerMeter":174440.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8381"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1687 + 925 - K1687 + 980","amountPesos":9545000.0,"lengthMeters":55.0,"ratePesosPerMeter":173545.45454545456,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8383"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1691 + 150 - K1691 + 240","amountPesos":22716000.0,"lengthMeters":90.0,"ratePesosPerMeter":252400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8385"},{"year":2026,"category":"Roads","project":"Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1684 + 030 - K1684 + 090","amountPesos":39481000.0,"lengthMeters":60.0,"ratePesosPerMeter":658016.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8389"},{"year":2026,"category":"Roads","project":"Sarangani-Davao Del Sur Coastal Rd - K1701 + 300 - K1701 + 310, K1701 + 500 - K1701 + 510, K1701 + 980 - K1701 + 995, K1704 + 900 - K1704 + 920, K1725 + 100 - K1725 + 140","amountPesos":26321000.0,"lengthMeters":95.0,"ratePesosPerMeter":277063.15789473685,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8392"},{"year":2026,"category":"Roads","project":"Sarangani-Davao Del Sur Coastal Rd - K1743 + 600 - K1743 + 610, K1743 + 700 - K1743 + 720, K1748 + 400 - K1748 + 415, K1748 + 700 - K1748 + 720","amountPesos":28076000.0,"lengthMeters":65.0,"ratePesosPerMeter":431938.46153846156,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8394"},{"year":2026,"category":"Roads","project":"General Santos City-T'Boli-Surallah Rd - K1679 + 315 - K1679 + 370","amountPesos":42223000.0,"lengthMeters":55.0,"ratePesosPerMeter":767690.9090909091,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8397"},{"year":2026,"category":"Roads","project":"General Santos City-T'Boli-Surallah Rd - K1685 + 123 - K1685 + 163","amountPesos":30708000.0,"lengthMeters":40.0,"ratePesosPerMeter":767700.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8399"},{"year":2026,"category":"Roads","project":"General Santos City-T'Boli-Surallah Rd - K1685 + 819 - K1685 + 839","amountPesos":35094000.0,"lengthMeters":20.0,"ratePesosPerMeter":1754700.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8401"},{"year":2026,"category":"Roads","project":"Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K1959 + 600 - K1959 + 680, K1965 + 000 - K1965 + 020, K1968 + 400 - K1968 + 470, K1970 + 048 - K1970 + 130","amountPesos":44079000.0,"lengthMeters":252.0,"ratePesosPerMeter":174916.66666666666,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8404"},{"year":2026,"category":"Roads","project":"Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K1978 + 825 - K1978 + 860","amountPesos":19192000.0,"lengthMeters":35.0,"ratePesosPerMeter":548342.8571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8406"},{"year":2026,"category":"Roads","project":"SNA-Lebak-Kalamansig Rd - K1864 + 030 - K1864 + 112","amountPesos":16547000.0,"lengthMeters":82.0,"ratePesosPerMeter":201792.68292682926,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8408"},{"year":2026,"category":"Roads","project":"NJR Bah-Bah-Talacogon Rd - K1294 + 229.20 - K1294 + 274.30, K1294 + 906.10 - K1294 + 938","amountPesos":12966000.0,"lengthMeters":77.0,"ratePesosPerMeter":168389.6103896104,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8412"},{"year":2026,"category":"Roads","project":"Asuncion-San Isidro-Laak-Veruela Rd - K1532+032 - K1532+078, K1532+114 - K1532+218 , K1532+805 - K1532+861","amountPesos":43221000.0,"lengthMeters":206.0,"ratePesosPerMeter":209810.6796116505,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8415"},{"year":2026,"category":"Roads","project":"Asuncion-San Isidro-Laak-Veruela Rd - K1534 + 132 - K1534 + 281, K1534 + 671 - K1534 + 715","amountPesos":43221000.0,"lengthMeters":193.0,"ratePesosPerMeter":223943.00518134714,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8417"},{"year":2026,"category":"Roads","project":"Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1347 + 125 - K1347 + 261","amountPesos":31724000.0,"lengthMeters":136.0,"ratePesosPerMeter":233264.70588235295,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8419"},{"year":2026,"category":"Roads","project":"Dinagat-Loreto Rd - K0019 + 900 - K0020 + 100","amountPesos":25932000.0,"lengthMeters":200.0,"ratePesosPerMeter":129660.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8422"},{"year":2026,"category":"Roads","project":"Dinagat-Loreto Rd - K0030 + 930 - K0031 + 000, K0029 + 441 - K0029+600, K0011 + 762 - K0011+820","amountPesos":39458000.0,"lengthMeters":287.0,"ratePesosPerMeter":137484.3205574913,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8424"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd - K1175 + 540 - K1175 + 560, K1175 + 580 - K1175 + 600","amountPesos":3458000.0,"lengthMeters":40.0,"ratePesosPerMeter":86450.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8427"},{"year":2026,"category":"Roads","project":"Payasan-Los Arcos Rd - K1390 + 000 - K1391 + 542","amountPesos":34577000.0,"lengthMeters":1542.0,"ratePesosPerMeter":22423.476005188066,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8430"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd - K1259 + 718 - K1260 + 022, K1261 + 400 - K1261 + 639","amountPesos":8846000.0,"lengthMeters":543.0,"ratePesosPerMeter":16290.97605893186,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8432"},{"year":2026,"category":"Roads","project":"Bani- Agno Rd- K0348+439 - K0348+614","amountPesos":60646000.0,"lengthMeters":175.0,"ratePesosPerMeter":346548.5714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8439"},{"year":2026,"category":"Roads","project":"Ilocos Norte-Apayao Rd - K0528 + 060 - K0528 + 177, K0528 + 677 - K0528 + 695, K0528 + 970 - K0529 + 006, K0529 + 821 - K0529 + 876","amountPesos":106620000.0,"lengthMeters":226.0,"ratePesosPerMeter":471769.91150442476,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8441"},{"year":2026,"category":"Roads","project":"Ilocos Norte-Apayao Rd - K0532 + 127 - K0532 + 163, K0534 + 437 - K0534 + 459, K0534 + 580 - K0534 + 660, K0534 + 700 - K0534 + 779","amountPesos":94882000.0,"lengthMeters":217.0,"ratePesosPerMeter":437244.2396313364,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8443"},{"year":2026,"category":"Roads","project":"Ilocos Norte-Apayao Rd - K0536 + 320 - K0536 + 390, K0536 + 568 - K0536 + 616, K0536 + 623 - K0536 + 679","amountPesos":78400000.0,"lengthMeters":174.0,"ratePesosPerMeter":450574.7126436782,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8445"},{"year":2026,"category":"Roads","project":"Ilocos Norte-Apayao Rd - K0537 + 028 - K0537 + 074, K0537 + 545 - K0537 + 601, K0538 + 089 - K0538 + 099","amountPesos":88502000.0,"lengthMeters":112.0,"ratePesosPerMeter":790196.4285714285,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8447"},{"year":2026,"category":"Roads","project":"Ilocos Norte-Apayao Rd - K0539 + 103 - K0539 + 148, K0539 + 267 - K0539 + 315","amountPesos":60060000.0,"lengthMeters":93.0,"ratePesosPerMeter":645806.4516129033,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8449"},{"year":2026,"category":"Roads","project":"Abra-Ilocos Norte Rd - K0445 + 117 - K0445 + 136, K0445 + 160 - K0445 + 185, K0445 + 229 - K0445 + 257, K0445 + 270 - K0445 + 296, K0445 + 600 - K0445 + 650, K0445 + 808 - K0445 + 836, K0445 + 870 - K0445 + 900, K0446 + 000 - K0446 + 078, K0446 + 134 - K0446 + 186, K0446 + 270 - K0446 + 280, K0446 + 410 - K0446 + 434, K0448 + 176 - K0448 + 206","amountPesos":59045000.0,"lengthMeters":400.0,"ratePesosPerMeter":147612.5,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8452"},{"year":2026,"category":"Roads","project":"Abra-Ilocos Norte Rd - K0448 + 215 - K0448 + 231, K0448 + 262 - K0448 + 342, K0448 + 379 - K0448 + 400, K0448 + 405 - K0448 + 464, K0448 + 480 - K0448 + 523, K0448 + 609 - K0448 + 643, K0448 + 710 - K0448 + 780, K0448 + 930 - K0448 + 955, K0449 + 228 - K0449 + 320, K0449 + 368 - K0449 + 566, K0449 + 682 - K0449 + 755","amountPesos":60040000.0,"lengthMeters":711.0,"ratePesosPerMeter":84444.44444444444,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8454"},{"year":2026,"category":"Roads","project":"Abra-Ilocos Norte Road - K0423+500 - K0425+500, K0428+900 - K0429+000, K0429+100 - K0429+170, K0432+320 - K0432+369, K0432+413 - K0432+444, K0432+460 - K0432+598, K0432+605 -K0432+646 K0435+616 - K0435+625, K0438+141 - K0438+156, K0438+280 - K0438+320, K0438+400 - K0438+410, K0433+229 - K0433+260, K0435+476 - K0435+491, K0440+050 - K0440+070, K0442+260 - K0442+300, K0442+320 - K0442+342, K0444+437 - K0444+465, K0444+561 - K0444+581, K0444+174 - K0444+210, K0444+780 - K0444+890, K0444+960 - K0445+000, K0445+240 - K0445+260, K0447+349 - K0447+411","amountPesos":117600000.0,"lengthMeters":2947.0,"ratePesosPerMeter":39904.98812351544,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8456"},{"year":2026,"category":"Roads","project":"Abra-Ilocos Norte Road - K0450+500 - K0451+703","amountPesos":136068000.0,"lengthMeters":1203.0,"ratePesosPerMeter":113107.2319201995,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8458"},{"year":2026,"category":"Roads","project":"Abra-llocos Norte Road- K0429+170 - K0430+462, K0430+560 - K0430 + 668, K0430+691 - K0431+000","amountPesos":93840000.0,"lengthMeters":1709.0,"ratePesosPerMeter":54909.30368636629,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8460"},{"year":2026,"category":"Roads","project":"Balbalan-Pinukpuk Rd - K0480 + 010 - K0480 + 050, K0480 + 098 - K0480 + 153, K0482 + 182 - K0482 + 220, K0482 + 783 - K0482 + 818, K0483 + 070 - K0483 + 090, K0483 + 282 - K0483 + 332, K0483 + 384 - K0483 + 392, K0483 + 878 - K0483 + 935, K0485 + 495 - K0485 + 526, K0487 + 291 - K0487 + 381, K0491 + 448 - K0491 + 477, K0492 + 415 - K0492 + 428, K0492 + 994 - K0492 + 1017, K0494 + 029 - K0494 + 110","amountPesos":57520000.0,"lengthMeters":570.0,"ratePesosPerMeter":100912.28070175438,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8462"},{"year":2026,"category":"Roads","project":"Banaue-Hungduan-Benguet Bdry Rd - K0384 + (-740) - K0384 + (-712), K0384 + 825 - K0384 + 879, K0385 + 678 - K0385 + 733, K0387 + 672 - K0387 + 755, K0388 + 888 - K0388 + 933","amountPesos":69911000.0,"lengthMeters":265.0,"ratePesosPerMeter":263815.09433962265,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8464"},{"year":2026,"category":"Roads","project":"Banaue-Hungduan-Benguet Bdry Rd - K0393 + 583 - K0393 + 629, K0394 + 549 - K0394 + 581, K0394 + 932 - K0394 + 952, K0396 + 930 - K0396 + 960, K0398 + 207 - K0398 + 219, K0398 + 426 - K0398 + 440, K0398 + 817 - K0398 + 841","amountPesos":55835000.0,"lengthMeters":178.0,"ratePesosPerMeter":313679.7752808989,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8466"},{"year":2026,"category":"Roads","project":"Banaue-Hungduan-Benguet Bdry Rd - K0399 + 308 - K0399 + 367, K0399 + 864 - K0399 + 912, K0402 + 720 - K0402 + 885, K0403 + 038 - K0403 + 081, K0403 + 426 - K0403 + 507, K0403 + 703 - K0403 + 752, K0404 + 061 - K0404 + 090, K0404 + 765 - K0404 + 782","amountPesos":63833000.0,"lengthMeters":491.0,"ratePesosPerMeter":130006.1099796334,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8468"},{"year":2026,"category":"Roads","project":"Banaue-Hungduan-Benguet Bdry Rd - K0408 + 935 - K0408 + 958, K0410 + 382 - K0410 + 395, K0411 + 060 - K0411 + 081, K0411 + 108 - K0411 + 130, K0411 + 166 - K0411 + 208, K0412 + 430 - K0412 + 573, K0414 + 452 - K0414 + 475","amountPesos":52306000.0,"lengthMeters":287.0,"ratePesosPerMeter":182250.87108013936,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8470"},{"year":2026,"category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0678 + 434 - K0678 + 454, K0678 + 477 - K0678 + 550, K0678 + 766 - K0678 + 996","amountPesos":57195000.0,"lengthMeters":323.0,"ratePesosPerMeter":177074.30340557275,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8472"},{"year":2026,"category":"Roads","project":"Gov. Bado Dangwa National Rd - K0272 + 780 - K0272 + 864","amountPesos":55178000.0,"lengthMeters":84.0,"ratePesosPerMeter":656880.9523809524,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8474"},{"year":2026,"category":"Roads","project":"Gov. Bado Dangwa National Rd - K0340 + 876 - K0340 + 953, K0341 + 180 - K0341 + 200, K0341 + 650 - K0341 + 690","amountPesos":65688000.0,"lengthMeters":137.0,"ratePesosPerMeter":479474.45255474455,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8476"},{"year":2026,"category":"Roads","project":"Kiangan-Tinoc-Buguias Rd - K0340 + 270 - K0340 + 291, K0342 + 335 - K0342 + 371, K0345 + 648 - K0345 + 690, K0355 + 883 - K0355 + 909, K0357 + 314 - K0357 + 360, K0361 + 044 - K0361 + 070","amountPesos":60151000.0,"lengthMeters":197.0,"ratePesosPerMeter":305335.02538071066,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8478"},{"year":2026,"category":"Roads","project":"PMA Cut Off Rd 6 - (S05061LZ) Chainage 713 - Chainage 863, Chainage 888 - Chainage 1026, Chainage 1074 - Chainage 1164, Chainage 1184 - Chainage 1244, Chainage 1747 - Chainage 1777","amountPesos":77909000.0,"lengthMeters":468.0,"ratePesosPerMeter":166472.22222222222,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8480"},{"year":2026,"category":"Roads","project":"Aritao-Quirino Rd - K0250 + 073 - K0250 + 443","amountPesos":70658000.0,"lengthMeters":370.0,"ratePesosPerMeter":190967.56756756757,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8483"},{"year":2026,"category":"Roads","project":"Jct Ipil-Quirino Bdry Rd - K0352 + 901 - K0353 + 300","amountPesos":137717000.0,"lengthMeters":399.0,"ratePesosPerMeter":345155.38847117795,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8485"},{"year":2026,"category":"Roads","project":"Jct Ipil-Quirino Bdry Rd - K0369 + 135 - K0369 + 681","amountPesos":54648000.0,"lengthMeters":546.0,"ratePesosPerMeter":100087.91208791209,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8487"},{"year":2026,"category":"Roads","project":"Sasmuan-Lubao Rd - K0076 + (-069) - K0076 + 321","amountPesos":98000000.0,"lengthMeters":390.0,"ratePesosPerMeter":251282.05128205128,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8490"},{"year":2026,"category":"Roads","project":"Sasmuan-Lubao Rd - K0076 + 630 - K0077 + 000","amountPesos":98000000.0,"lengthMeters":370.0,"ratePesosPerMeter":264864.86486486485,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8492"},{"year":2026,"category":"Roads","project":"Calamba-Tagaytay Rd - K0064 + 146 - K0064 + 394","amountPesos":100244000.0,"lengthMeters":248.0,"ratePesosPerMeter":404209.67741935485,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8495"},{"year":2026,"category":"Roads","project":"Marikina-Infanta Rd - K0031 + 500 - K0032 + 140","amountPesos":93692000.0,"lengthMeters":640.0,"ratePesosPerMeter":146393.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8497"},{"year":2026,"category":"Roads","project":"Dr. Damian Reyes Rd ( Torrijos Side) - K0042 + 130 - K0042 + 230","amountPesos":57732000.0,"lengthMeters":100.0,"ratePesosPerMeter":577320.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8500"},{"year":2026,"category":"Roads","project":"Tagbac-Lubang-Looc Rd - K0033 + 910 - K0034 + 010","amountPesos":92386000.0,"lengthMeters":100.0,"ratePesosPerMeter":923860.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8502"},{"year":2026,"category":"Roads","project":"Tagbac-Lubang-Looc Rd - K0034 + 010 - K0034 + 137","amountPesos":63410000.0,"lengthMeters":127.0,"ratePesosPerMeter":499291.3385826772,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8504"},{"year":2026,"category":"Roads","project":"Tagbac-Lubang-Looc Rd - K0034 + 625 - K0034 + 825","amountPesos":96219000.0,"lengthMeters":200.0,"ratePesosPerMeter":481095.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8506"},{"year":2026,"category":"Roads","project":"Basud-Lanot Rd - K0363 + 764 - K0363 + 955","amountPesos":46369000.0,"lengthMeters":191.0,"ratePesosPerMeter":242769.6335078534,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8509"},{"year":2026,"category":"Roads","project":"Nabua-Balatan Road, K0490+852-K0490+930","amountPesos":97020000.0,"lengthMeters":78.0,"ratePesosPerMeter":1243846.1538461538,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8511"},{"year":2026,"category":"Roads","project":"Nabua-Balatan Road, K0493+270-K0493+430","amountPesos":102900000.0,"lengthMeters":160.0,"ratePesosPerMeter":643125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8513"},{"year":2026,"category":"Roads","project":"Jct Bancal-Leon-Antique Bdry Rd - K0043 + 445 - K0043 + 490","amountPesos":58170000.0,"lengthMeters":45.0,"ratePesosPerMeter":1292666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8516"},{"year":2026,"category":"Roads","project":"Jct Bancal-Leon-Antique Bdry Rd - K0046 + 360 - K0046 + 480","amountPesos":87255000.0,"lengthMeters":120.0,"ratePesosPerMeter":727125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8518"},{"year":2026,"category":"Roads","project":"Odiong-Sibalom-Sn Remigio-Leon Rd - K0119 + 252 - K0119 + 328, K0119 + 637 - K0119 + 687, K0122 + 000 - K0122 + 096, K0123 + 457 - K0123 + 508, K0124 + 026 - K0124 + 086, K0124 + 510 - K0124 + 536, K0124 + 828 - K0124 + 896, K0128 + 205 - K0128 + 247, K0132 + 299 - K0132 + 358","amountPesos":73500000.0,"lengthMeters":528.0,"ratePesosPerMeter":139204.54545454544,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8520"},{"year":2026,"category":"Roads","project":"Dancalan-Candoni-Damutan Valley Rd - K0122 + 629 - K0122 + 916, K0124 + 203 - K0124 + 680","amountPesos":122461000.0,"lengthMeters":764.0,"ratePesosPerMeter":160289.2670157068,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8523"},{"year":2026,"category":"Roads","project":"Argao-Moalboal Rd - K0061 + 040 - K0061 + 080, K0063 + 800 - K0063 + 900, K0064 + 300 - K0064 + 400, K0064 + 510 - K0064 + 570","amountPesos":66360000.0,"lengthMeters":300.0,"ratePesosPerMeter":221200.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8526"},{"year":2026,"category":"Roads","project":"Dalaguete-Mantalongon Badian Rd - K0101 + 400 - K0101 + 880","amountPesos":113759000.0,"lengthMeters":480.0,"ratePesosPerMeter":236997.91666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8528"},{"year":2026,"category":"Roads","project":"Tigbao-Sta Fe-Sn Miguel Rd - K0908 + 377 - K0908 + 409, K0908 + 414 - K0908 + 510, K0908 + 642 - K0908 + 653, K0908 + 656 - K0908 + 761","amountPesos":115206000.0,"lengthMeters":244.0,"ratePesosPerMeter":472155.737704918,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8531"},{"year":2026,"category":"Roads","project":"Tabango-Catmon-La Fortuna-Manlawaan-Gimarco Road, K1035 + 580 - K1035 + 621, K1034 + 310 - K1034 + 351, K1038 + 170 - K1038 + 210, K1014 + 320 - K1014 + 434","amountPesos":100000000.0,"lengthMeters":236.0,"ratePesosPerMeter":423728.81355932204,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8533"},{"year":2026,"category":"Roads","project":"Jct Dumalinao-Margosatubig Rd - K1702 + 293 - K1702 + 380","amountPesos":25480000.0,"lengthMeters":87.0,"ratePesosPerMeter":292873.5632183908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8536"},{"year":2026,"category":"Roads","project":"Sindangan-Bayog-Lakewood Rd - K1729 + 653 - K1729 + 920","amountPesos":50289000.0,"lengthMeters":267.0,"ratePesosPerMeter":188348.31460674157,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8538"},{"year":2026,"category":"Roads","project":"Sindangan-Bayog-Lakewood Rd - K1730 + 400 - K1730 + 500","amountPesos":64004000.0,"lengthMeters":100.0,"ratePesosPerMeter":640040.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8540"},{"year":2026,"category":"Roads","project":"Sindangan-Bayog-Lakewood Rd - K1738 + 000 - K1738 + 200","amountPesos":82291000.0,"lengthMeters":200.0,"ratePesosPerMeter":411455.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8542"},{"year":2026,"category":"Roads","project":"Sindangan-Bayog-Lakewood Rd - K1738 + 880 - K1739 + 000","amountPesos":46631000.0,"lengthMeters":120.0,"ratePesosPerMeter":388591.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8544"},{"year":2026,"category":"Roads","project":"Sindangan-Bayog-Lakewood Rd - K1934+130-K1934+270","amountPesos":19600000.0,"lengthMeters":140.0,"ratePesosPerMeter":140000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8546"},{"year":2026,"category":"Roads","project":"Sindangan-Bayog-Lakewood Rd - K1944+380-K1944+430","amountPesos":12740000.0,"lengthMeters":50.0,"ratePesosPerMeter":254800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8548"},{"year":2026,"category":"Roads","project":"Sindangan-Bayog-Lakewood Rd - K1945+700-K1945+780","amountPesos":14700000.0,"lengthMeters":80.0,"ratePesosPerMeter":183750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8550"},{"year":2026,"category":"Roads","project":"Sindangan-Bayog-Lakewood Rd - K1947+150-K1947+350","amountPesos":16660000.0,"lengthMeters":200.0,"ratePesosPerMeter":83300.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8552"},{"year":2026,"category":"Roads","project":"Jct SH Aglayan-Zamboanguita Rd K1522 + 852 - K1522 + 952, K1522 + 974 - K1523 + 067","amountPesos":55765000.0,"lengthMeters":193.0,"ratePesosPerMeter":288937.8238341969,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8555"},{"year":2026,"category":"Roads","project":"Jct SH Aglayan-Zamboanguita Rd K1542 + 112 - K1542 + 175","amountPesos":102235000.0,"lengthMeters":63.0,"ratePesosPerMeter":1622777.7777777778,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8557"},{"year":2026,"category":"Roads","project":"Jct SH-Aglayan-Alanib-Ticalaan Rd (Aglayan-Basak) - K1546 + 580 - K1546 + 898","amountPesos":92941000.0,"lengthMeters":318.0,"ratePesosPerMeter":292267.2955974843,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8559"},{"year":2026,"category":"Roads","project":"Jct SH-Aglayan-Alanib-Ticalaan Rd (Aglayan-Basak) - K1547 + 465 - K1547 + 670","amountPesos":92941000.0,"lengthMeters":205.0,"ratePesosPerMeter":453370.73170731706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8561"},{"year":2026,"category":"Roads","project":"Misamis Or-Bukidnon-Agusan Rd - K1449 + 715 - K1449 + 761","amountPesos":60412000.0,"lengthMeters":46.0,"ratePesosPerMeter":1313304.347826087,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8563"},{"year":2026,"category":"Roads","project":"Mulondo-Wao Road Chainage 20600 - Chainage 20800","amountPesos":37176000.0,"lengthMeters":200.0,"ratePesosPerMeter":185880.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8565"},{"year":2026,"category":"Roads","project":"Bansalan-Mt Apo Natl Park Rd - K1602 + 449 - K1602 + 754","amountPesos":117600000.0,"lengthMeters":305.0,"ratePesosPerMeter":385573.7704918033,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8568"},{"year":2026,"category":"Roads","project":"Bansalan-Mt Apo Natl Park Rd - K1604 + 000 - K1604 + 300","amountPesos":98000000.0,"lengthMeters":300.0,"ratePesosPerMeter":326666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8570"},{"year":2026,"category":"Roads","project":"Demoloc-Little Baguio-Alabel Rd - K1649 + 031 - K1649 + 059, K1650 + 698 - K1650 + 725, K1650 + 785 - K1650 + 820, K1651 + 949 - K1652 + 000, K1661 + 520 - K1661 + 585, K1664 + 091 - K1664 + 426, K1664 + 762 - K1664 + 827","amountPesos":55164000.0,"lengthMeters":606.0,"ratePesosPerMeter":91029.70297029703,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8572"},{"year":2026,"category":"Roads","project":"Fatima-Malabog Rd - K1505 + 025 - K1505 + 097","amountPesos":64915000.0,"lengthMeters":72.0,"ratePesosPerMeter":901597.2222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8574"},{"year":2026,"category":"Roads","project":"H-way Jct Mana-Ticulon-Lagumit-Little Baguio Rd - K1661 + 430 - K1661 + 558","amountPesos":61400000.0,"lengthMeters":128.0,"ratePesosPerMeter":479687.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8576"},{"year":2026,"category":"Roads","project":"Jct Manikling-Gov Generoso Rd - K1762 + 510 - K1762 + 570, K1763 + 345 - K1763 + 405, K1767 + 600 - K1767 + 630, K1769 + 072 - K1769 + 082","amountPesos":71540000.0,"lengthMeters":160.0,"ratePesosPerMeter":447125.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8578"},{"year":2026,"category":"Roads","project":"Montevista-Compostela-Mati Bdry Road  - K1454 + 920 - K1455 + 160","amountPesos":75000000.0,"lengthMeters":240.0,"ratePesosPerMeter":312500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8580"},{"year":2026,"category":"Roads","project":"Montevista-DNAS Rd - K1423+103 - K1423+207, K1431+122 - K1431+222, K1431+737 - K1431+874","amountPesos":98000000.0,"lengthMeters":341.0,"ratePesosPerMeter":287390.02932551317,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8582"},{"year":2026,"category":"Roads","project":"Demoloc-Little Baguio-Alabel Rd - K1676 + 720 - K1676 + 735, K1676 + 780- K1676 + 840, K1676 + 880 - K1676 + 990, K1684 + 840 - K1684 + 900, K1686 + 330 - K1686 + 350, K1686 + 410 - K1686 + 460, K1688 + 720 - K1688 + 750, K1693 + 290 - K1693 + 310","amountPesos":78155000.0,"lengthMeters":365.0,"ratePesosPerMeter":214123.2876712329,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8585"},{"year":2026,"category":"Roads","project":"Dualing-New Panay-Midsayap Rd - K1689 + 900 - K1689 + 920, K1691 + 300 - K1691 + 400, K1692 + 678 - K1692 + 840","amountPesos":58432000.0,"lengthMeters":282.0,"ratePesosPerMeter":207205.67375886525,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8587"},{"year":2026,"category":"Roads","project":"Dualing-New Panay-Midsayap Rd - K1691 + 672 - K1691 + 836","amountPesos":78524000.0,"lengthMeters":164.0,"ratePesosPerMeter":478804.8780487805,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8589"},{"year":2026,"category":"Roads","project":"Dualing-New Panay-Midsayap Rd - K1692 + 975 - K1693 + 163","amountPesos":156309000.0,"lengthMeters":188.0,"ratePesosPerMeter":831430.8510638297,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8591"},{"year":2026,"category":"Roads","project":"Surallah-Lake Sebu-Maitum Rd - K1748 + 641 - K1748 + 773","amountPesos":34193000.0,"lengthMeters":132.0,"ratePesosPerMeter":259037.87878787878,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8593"},{"year":2026,"category":"Roads","project":"Surallah-Lake Sebu-Maitum Rd - K1777 + 086 - K1778 + 000 L/S","amountPesos":34193000.0,"lengthMeters":914.0,"ratePesosPerMeter":37410.28446389497,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8595"},{"year":2026,"category":"Roads","project":"Agusan - Malaybalay Rd (S00455MN) - K1290+841 - K1290+908.20, K1292+003.30 - K1292+066.80, K1292+163 - K1292+218, K1292+440 - K1292+836","amountPesos":129662000.0,"lengthMeters":581.7,"ratePesosPerMeter":222901.8394361533,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8598"},{"year":2026,"category":"Roads","project":"Agusan - Malaybalay Rd (S00470MN) - K1277+587.6 - K1277+637.5, K1278+025.5 - K1278+061, K1280+358.3 - K1280+402.6, K1280+434.3 - K1280+461.5, K1280+608.5 - K1280+665.70","amountPesos":61374000.0,"lengthMeters":214.1,"ratePesosPerMeter":286660.43904736126,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8600"},{"year":2026,"category":"Roads","project":"Buenavista-Bunaguit Rd - K1272 + 600 - K1272 + 675","amountPesos":91801000.0,"lengthMeters":75.0,"ratePesosPerMeter":1224013.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8602"},{"year":2026,"category":"Roads","project":"Butuan Ciry - Malaybalay Rd - K1259 + 538 - K1259 + 638","amountPesos":49000000.0,"lengthMeters":100.0,"ratePesosPerMeter":490000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8604"},{"year":2026,"category":"Roads","project":"Butuan City-Malaybalay Rd - K1265 + 266 - K1265 + 416","amountPesos":60509000.0,"lengthMeters":150.0,"ratePesosPerMeter":403393.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8606"},{"year":2026,"category":"Roads","project":"Batac-Espiritu (Banna) Rd - K0482 + 250 - K0482 + 350","amountPesos":15142000.0,"lengthMeters":100.0,"ratePesosPerMeter":151420.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8610"},{"year":2026,"category":"Roads","project":"Batac-Espiritu (Banna) Rd - K0486 + 200 - K0486 + 280","amountPesos":10095000.0,"lengthMeters":80.0,"ratePesosPerMeter":126187.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8612"},{"year":2026,"category":"Roads","project":"Batac-Pinili via Maipalig Rd - K0482 + 369 - K0482 + 375, K0482 + 831 - K0482 + 869, K0483 + 259 - K0483 + 353, K0483 + 427 - K0483 + 541, K0484 + 105 - K0484 + 133","amountPesos":26739000.0,"lengthMeters":280.0,"ratePesosPerMeter":95496.42857142857,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8614"},{"year":2026,"category":"Roads","project":"Ilocos Norte-Abra Rd - K0503 + 203 - K0503 + 242","amountPesos":15175000.0,"lengthMeters":39.0,"ratePesosPerMeter":389102.5641025641,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8616"},{"year":2026,"category":"Roads","project":"Ilocos Norte-Abra Rd - K0514 + 766 - K0514 + 819, K0526 + 108 - K0526 + 131, K0526 + 405 - K0526 + 435, K0526 + 711 - K0526 + 726, K0527 + 753 - K0527 + 777, K0527 + 814 - K0527 + 833, K0528 + 000 - K0528 + 020, K0528 + 395 - K0528 + 410, K0529 + 546 - K0529 + 585","amountPesos":45142000.0,"lengthMeters":238.0,"ratePesosPerMeter":189672.26890756303,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8618"},{"year":2026,"category":"Roads","project":"Ilocos Norte-Abra Rd - K0526 + (-040) - K0526 + (-013)","amountPesos":5907000.0,"lengthMeters":27.0,"ratePesosPerMeter":218777.77777777778,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8620"},{"year":2026,"category":"Roads","project":"Ilocos Norte-Abra Rd - K0526 + 250 - K0526 + 294","amountPesos":4840000.0,"lengthMeters":44.0,"ratePesosPerMeter":110000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8622"},{"year":2026,"category":"Roads","project":"Ilocos Norte-Abra Rd - K0527 + 850 - K0527 + 870","amountPesos":4697000.0,"lengthMeters":20.0,"ratePesosPerMeter":234850.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8624"},{"year":2026,"category":"Roads","project":"Ilocos Norte-Abra Rd - K0527 + 950 - K0527 + 970","amountPesos":5125000.0,"lengthMeters":20.0,"ratePesosPerMeter":256250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8626"},{"year":2026,"category":"Roads","project":"Ilocos Norte-Abra Rd - K0529 + 600 - K0529 + 620","amountPesos":2899000.0,"lengthMeters":20.0,"ratePesosPerMeter":144950.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8628"},{"year":2026,"category":"Roads","project":"Ilocos Norte-Abra Rd - K0529 + 710 - K0529 + 740, K0538 + 510 - K0538 + 550, K0540 + 527 - K0540 + 561","amountPesos":17560000.0,"lengthMeters":104.0,"ratePesosPerMeter":168846.15384615384,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8630"},{"year":2026,"category":"Roads","project":"Ilocos Norte-Abra Rd - K0530 + 350 - K0530 + 360","amountPesos":1022000.0,"lengthMeters":10.0,"ratePesosPerMeter":102200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8632"},{"year":2026,"category":"Roads","project":"Ilocos Norte-Abra Rd - K0532 + 800 - K0532 + 820","amountPesos":5434000.0,"lengthMeters":20.0,"ratePesosPerMeter":271700.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8634"},{"year":2026,"category":"Roads","project":"Ilocos Norte-Abra Rd - K0544 + 158 - K0544 + 271","amountPesos":9044000.0,"lengthMeters":113.0,"ratePesosPerMeter":80035.3982300885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8636"},{"year":2026,"category":"Roads","project":"Ilocos Norte-Apayao Rd - K0516 + 545 - K0516 + 664, K0516 + 715 - K0516 + 754, K0516 + 840 - K0516 + 866, K0518 + 040 - K0518 + 099, K0518 + 109 - K0518 + 137, K0518 + 430 - K0518 + 460, K0518 + 540 - K0518 + 569, K0519 + 267 - K0519 + 304, K0519 + 455 - K0519 + 470, K0519 + 503 - K0519 + 561, K0519 + 614 - K0519 + 640","amountPesos":35660000.0,"lengthMeters":466.0,"ratePesosPerMeter":76523.60515021459,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8638"},{"year":2026,"category":"Roads","project":"Ilocos Norte-Apayao Rd - K0526 + 000 - K0526 + 040, K0526 + 445 - K0526 + 573, K0527 + 536 - K0527 + 586","amountPesos":44100000.0,"lengthMeters":218.0,"ratePesosPerMeter":202293.57798165138,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8640"},{"year":2026,"category":"Roads","project":"Ilocos Norte-Apayao Rd - K0530 + 610 - K0530 + 670","amountPesos":10173000.0,"lengthMeters":60.0,"ratePesosPerMeter":169550.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8642"},{"year":2026,"category":"Roads","project":"Anduyan-San Pascual Rd - K0249 + 870 - K0249 + 944","amountPesos":3375000.0,"lengthMeters":74.0,"ratePesosPerMeter":45608.10810810811,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8645"},{"year":2026,"category":"Roads","project":"Anduyan-San Pascual Rd - K0250 + 027 - K0250 + 112","amountPesos":24630000.0,"lengthMeters":85.0,"ratePesosPerMeter":289764.70588235295,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8647"},{"year":2026,"category":"Roads","project":"Abra-Cervantes Road - K0464+270 - K0464+279, K0464+640 - K0464+654, K0464+710 - K0464+719","amountPesos":4200000.0,"lengthMeters":32.0,"ratePesosPerMeter":131250.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8651"},{"year":2026,"category":"Roads","project":"Abra-Ilocos Norte Rd - K0444 + (-185) - K0444 + (-084), K0444 + 416 - K0444 + 453, K0444 + 532 - K0444 + 581, K0444 + 782 - K0444 + 807, K0449 + 013 - K0449 + 070, K0444 + 986 - K0445 + 000, K0436 + (-405) - K0436 + (-428), K0439 + 265 - K0439 + 300, K0439 + 676 - K0439 + 686, K0441 + 853 - K0441 + 878, K0442 + 000 - K0442 + 012, K0423 + 522 - K0423 + 533, K0429 + 175 - K0429 + 210, K0432 + 570 - K0432 + 598, K0433 + 229 - K0433 + 260, K0435 + 477 - K0435 + 490","amountPesos":35559000.0,"lengthMeters":506.0,"ratePesosPerMeter":70274.70355731226,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8653"},{"year":2026,"category":"Roads","project":"Apayao-Ilocos Norte Rd - K0609 + 687 - K0609 + 710","amountPesos":4692000.0,"lengthMeters":23.0,"ratePesosPerMeter":204000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8656"},{"year":2026,"category":"Roads","project":"Apayao-Ilocos Norte Rd - K0615 + 431 - K0615 + 446","amountPesos":3284000.0,"lengthMeters":15.0,"ratePesosPerMeter":218933.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8658"},{"year":2026,"category":"Roads","project":"Apayao (Calanasan)-Ilocos Norte Rd - K0608 + 1400 - K0608 + 1441","amountPesos":11261000.0,"lengthMeters":41.0,"ratePesosPerMeter":274658.53658536583,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8661"},{"year":2026,"category":"Roads","project":"Apayao (Calanasan)-Ilocos Norte Rd - K0610 + 280 - K0610 + 357","amountPesos":24398000.0,"lengthMeters":77.0,"ratePesosPerMeter":316857.14285714284,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8663"},{"year":2026,"category":"Roads","project":"Apayao (Calanasan)-Ilocos Norte Rd - K0614 + 737 - K0614 + 804.50","amountPesos":22522000.0,"lengthMeters":67.5,"ratePesosPerMeter":333659.25925925927,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8665"},{"year":2026,"category":"Roads","project":"Apayao (Calanasan)-Ilocos Norte Rd - K0616 + 074 - K0616 + 127","amountPesos":15014000.0,"lengthMeters":53.0,"ratePesosPerMeter":283283.0188679245,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8667"},{"year":2026,"category":"Roads","project":"Apayao (Calanasan)-Ilocos Norte Rd - K0619 + 843 - K0620 + 095.50","amountPesos":36598000.0,"lengthMeters":252.5,"ratePesosPerMeter":144942.57425742573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8669"},{"year":2026,"category":"Roads","project":"Apayao (Calanasan)-Ilocos Norte Rd - K0627 + 645 - K0627 + 708","amountPesos":17830000.0,"lengthMeters":63.0,"ratePesosPerMeter":283015.873015873,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8671"},{"year":2026,"category":"Roads","project":"Apayao-Ilocos Norte Rd - K0638 + (-284) - K0638 + (-167)","amountPesos":10792000.0,"lengthMeters":117.0,"ratePesosPerMeter":92239.31623931623,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8673"},{"year":2026,"category":"Roads","project":"Apayao-Ilocos Norte Rd - K0666 + 856 - K0666 + 914, K0668 + 807 - K0668 + 867.50","amountPesos":17830000.0,"lengthMeters":118.5,"ratePesosPerMeter":150464.13502109706,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8675"},{"year":2026,"category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0632 + 076.50 - K0632 + 106, K0632 + 179 - K0632 + 232, K0632 + 437 - K0632 + 516.50","amountPesos":28433000.0,"lengthMeters":162.0,"ratePesosPerMeter":175512.34567901236,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8677"},{"year":2026,"category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0653 + 323 - K0653 + 365, K0653 + 823 - K0653 + 860, K0653 + 934 - K0654 + 044","amountPesos":22522000.0,"lengthMeters":189.0,"ratePesosPerMeter":119164.02116402116,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8679"},{"year":2026,"category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0659 + 099 - K0659 + 133","amountPesos":5537000.0,"lengthMeters":34.0,"ratePesosPerMeter":162852.9411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8681"},{"year":2026,"category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0668 + 841 - K0668 + 901.5","amountPesos":19555000.0,"lengthMeters":60.5,"ratePesosPerMeter":323223.14049586776,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8683"},{"year":2026,"category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0677 + 042 - K0677 + 121.50, K0677 + 181 - K0677 + 251, K0677 + 437 - K0677 + 461.50","amountPesos":30404000.0,"lengthMeters":174.0,"ratePesosPerMeter":174735.63218390805,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8685"},{"year":2026,"category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0687 + 487 - K0687 + 530.50, K0688 + 576 - K0688 + 622, K0688 + 1005 - K0688 + 1051","amountPesos":24680000.0,"lengthMeters":135.5,"ratePesosPerMeter":182140.22140221403,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8687"},{"year":2026,"category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0702 + 338 - K0702 + 394","amountPesos":15390000.0,"lengthMeters":56.0,"ratePesosPerMeter":274821.4285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8689"},{"year":2026,"category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0704 + 306 - K0704 + 582, K0704 + 603 - K0704 + 900","amountPesos":37067000.0,"lengthMeters":573.0,"ratePesosPerMeter":64689.35427574171,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8691"},{"year":2026,"category":"Roads","project":"Eastern Link Circumferential Rd - K0247 + 930 - K0248 + 000, K0249 + 502 - K0249 + 522","amountPesos":43100000.0,"lengthMeters":90.0,"ratePesosPerMeter":478888.8888888889,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8694"},{"year":2026,"category":"Roads","project":"Quezon Hill Rd #1 - K0305 + 620 - K0305 + 700","amountPesos":4223000.0,"lengthMeters":80.0,"ratePesosPerMeter":52787.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8696"},{"year":2026,"category":"Roads","project":"Asin (Km 8)-Nangalisan-Sn Pascual, Tuba, Benguet-La Union Bdry Rd - K0264 + 907 - K0264 + 932,  K0265 + 284 - K0265 + 320, K0278 + 435 - K0278 + 460","amountPesos":6860000.0,"lengthMeters":86.0,"ratePesosPerMeter":79767.44186046511,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8699"},{"year":2026,"category":"Roads","project":"Baguio-Itogon Rd - K0264 + 739 - K0264 + 781","amountPesos":5630000.0,"lengthMeters":42.0,"ratePesosPerMeter":134047.61904761905,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8701"},{"year":2026,"category":"Roads","project":"Abatan-Mankayan-Cervantes Rd - K0337 + 452 - K0337 + 485, K0342 + 520 - K0342 + 535","amountPesos":3927000.0,"lengthMeters":48.0,"ratePesosPerMeter":81812.5,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8704"},{"year":2026,"category":"Roads","project":"Gov. Bado Dangwa National Rd - K0306 + 783 - K0306 + 962, K0307 + 212 - K0307 + 286, K0307 + 302 - K0307 + 386, K0312 + 905 - K0312 + 950","amountPesos":19228000.0,"lengthMeters":382.0,"ratePesosPerMeter":50335.07853403141,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8706"},{"year":2026,"category":"Roads","project":"Gov. Bado Dangwa National Rd - K0330 + 117 - K0330 + 172, K0331 + 473 - K0331 + 504, K0334 + 850 - K0334 + 885, K0335 + 097 - K0335 + 122, K0337 + 700 - K0337 + 760","amountPesos":18762000.0,"lengthMeters":206.0,"ratePesosPerMeter":91077.66990291262,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8708"},{"year":2026,"category":"Roads","project":"Gov. Bado Dangwa National Rd - K0330 + 307 - K0330 + 592, K0348 + 550 - K0348 +595","amountPesos":18179000.0,"lengthMeters":330.0,"ratePesosPerMeter":55087.878787878784,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8710"},{"year":2026,"category":"Roads","project":"Banaue-Hungduan-Benguet Bdry Rd - K0354 + 073 - K0354 + 097, K0357 + 606 - K0357 + 627, K0357 + 633 - K0357 + 671, K0359 + 804 - K0359 + 884, K0361 + 098 - K0361 + 136, K0362 + 826 - K0362 + 840","amountPesos":16497000.0,"lengthMeters":215.0,"ratePesosPerMeter":76730.23255813954,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8713"},{"year":2026,"category":"Roads","project":"Banaue-Hungduan-Benguet Bdry Rd - K0369 + 756 - K0369 + 763, K0372 + 896 - K0373 + 020, K0373 + 507 - K0373 + 562, K0375 + 007 - K0375 + 030, K0376 + 182 - K0376 + 192, K0376 + 947 - K0376 + 977, K0379 + 222 - K0379 + 262","amountPesos":27814000.0,"lengthMeters":289.0,"ratePesosPerMeter":96242.21453287198,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8715"},{"year":2026,"category":"Roads","project":"Kiangan-Tinoc-Buguias Rd - K0320 + 705 - K0320 + 725, K0323 + 418 - K0323 + 444, K0323 + 1012 - K0324 + 000, K0324 + 134 - K0324 + 149, K0328 + 737 - K0328 + 779, K0335 + 907 - K0336 + 010","amountPesos":24492000.0,"lengthMeters":218.0,"ratePesosPerMeter":112348.62385321101,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8717"},{"year":2026,"category":"Roads","project":"Alfonso Lista - Aurora Bdry. Rd - K0449 + 233 - K0449 + 273, K0452 + 241 - K0452 + 300, K0457 + 022 - K0457 + 134","amountPesos":8291000.0,"lengthMeters":211.0,"ratePesosPerMeter":39293.83886255924,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8720"},{"year":2026,"category":"Roads","project":"Banaue-Hungduan-Benguet Bdry Rd - K0343 + 648 - K0343 + 659, K0343 + 885 - K0343 + 900, K0347 + (-010) - K0347 + 038, K0347 + 262 - K0347 + 322, K0347 + 536 - K0347 + 576, K0348 + 482 - K0348 + 563, K0348 + 628 - K0348 + 704, K0350 + 040 - K0350 + 048, K0350 + 210 - K0350 + 232, K0351 + 645 - K0351 + 664","amountPesos":26270000.0,"lengthMeters":380.0,"ratePesosPerMeter":69131.57894736843,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8722"},{"year":2026,"category":"Roads","project":"Balbalan-Pinukpuk Rd - K0498 + 116 - K0498 + 139, K0506 + 1886 - K0506 + 1916, K0512 + 874 - K0513 + 000, K0516 + 227 - K0516 + 249, K0516 + 269 - K0516 + 336, K0495 + 461 - K0495 + 510, K0496 + 426 - K0496 + 450, K0496 + 458 - K0496 + 474","amountPesos":26715000.0,"lengthMeters":357.0,"ratePesosPerMeter":74831.93277310925,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8725"},{"year":2026,"category":"Roads","project":"Bulanao- Paracelis Road- K0504+868- K0504+883, K0510+535- K0510+565, K0510+606-K0510+641","amountPesos":7376000.0,"lengthMeters":80.0,"ratePesosPerMeter":92200.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8727"},{"year":2026,"category":"Roads","project":"Rizal Natl Rd (Liwan West- Babalag- Macutay Section) K0526+279-K0526+324","amountPesos":1839000.0,"lengthMeters":45.0,"ratePesosPerMeter":40866.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8729"},{"year":2026,"category":"Roads","project":"Tabuk-Banawe via Tanudan-Barlig Rd - K0510 + 385 - K0510 + 410, K0517 + 729 - K0517 + 744, K0521 + 570 - K0521 + 684, K0521 + 2557 - K0521 + 2573, K0526 + 1223 - K0526 + 1240, K0536 + 367 - K0536 + 393, K0536 + 1199 - K0536 + 1261","amountPesos":37240000.0,"lengthMeters":275.0,"ratePesosPerMeter":135418.18181818182,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8731"},{"year":2026,"category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0377 + (-102) - K0377 + (-091.5), K0378 + 235 - K0378 + 253, K0380 + 133 - K0380 + 188","amountPesos":10107000.0,"lengthMeters":83.5,"ratePesosPerMeter":121041.91616766468,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8734"},{"year":2026,"category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0383 + 993 - K0384 + 012, K0384 + 1012 - K0384 + 1048","amountPesos":2721000.0,"lengthMeters":55.0,"ratePesosPerMeter":49472.72727272727,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8736"},{"year":2026,"category":"Roads","project":"Mountain Province-Cervantes, Ilocos Sur via Dacudac-Pilipil Rd - (S04033LZ) Chainage 2998 - Chainage 3021, Chainage 14046 - Chainage 14091, Chainage 17916 - Chainage 17934","amountPesos":5114000.0,"lengthMeters":86.0,"ratePesosPerMeter":59465.11627906977,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8738"},{"year":2026,"category":"Roads","project":"Mt Prov-Ilocos Sur via Kayan Rd - K0399 + 1121 - K0399 + 1153","amountPesos":2323000.0,"lengthMeters":32.0,"ratePesosPerMeter":72593.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8740"},{"year":2026,"category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0389 + 870 - K0389 + 905, K0389 + 985 - K0390 + 010, K0391 + 850 - K0391 + 870, K0393 + 300 - K0393 + 345, K0394 + 135 - K0394 + 220, K0398 + 400 - K0398 + 415, K0399 + 545 - K0399 + 565, K0401 + 845 - K0401 + 890, K0405 + 315 - K0405 + 345, K0406 + 000 - K0406 + 055","amountPesos":25078000.0,"lengthMeters":375.0,"ratePesosPerMeter":66874.66666666667,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8743"},{"year":2026,"category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0433 + 755 - K0433 + 810","amountPesos":6250000.0,"lengthMeters":55.0,"ratePesosPerMeter":113636.36363636363,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8745"},{"year":2026,"category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0453 + 585 - K0453 + 615, K0455 + 333 - K0455 + 365, K0455 + 855 - K0455 + 880","amountPesos":4429000.0,"lengthMeters":87.0,"ratePesosPerMeter":50908.0459770115,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8747"},{"year":2026,"category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0464 + (-730) - K0464 + (-660), K0465 + 702 - K0465 + 740, K0470 + 713 - K0470 + 735, K0470 + 1289 - K0470 + 1334, K0472 + 135 - K0472 + 155, K0480 + 435 - K0480 + 520","amountPesos":12490000.0,"lengthMeters":280.0,"ratePesosPerMeter":44607.142857142855,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8749"},{"year":2026,"category":"Roads","project":"Balbalan-Pinukpuk Rd - K0488 + 947 - K0489 + 000","amountPesos":1743000.0,"lengthMeters":53.0,"ratePesosPerMeter":32886.79245283019,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8752"},{"year":2026,"category":"Roads","project":"Lubuagan-Batong Buhay-Abra Bdry Rd - (S00563LZ) Chainage 616 - Chainage 751","amountPesos":4692000.0,"lengthMeters":135.0,"ratePesosPerMeter":34755.555555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8754"},{"year":2026,"category":"Roads","project":"Lubuagan-Batong Buhay-Abra Bdry Rd - K0465 + 093 - K0465 + 153, K0468 + 888 - K0468 + 914, K0469 + 128 - K0469 + 203, K0469 + 263 - K0469 + 289","amountPesos":18768000.0,"lengthMeters":187.0,"ratePesosPerMeter":100363.63636363637,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8756"},{"year":2026,"category":"Roads","project":"Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd - K0009 + 000 - K0009 + 051","amountPesos":27543000.0,"lengthMeters":51.0,"ratePesosPerMeter":540058.8235294118,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8760"},{"year":2026,"category":"Roads","project":"Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd - K0009 + 798 - K0009 + 889","amountPesos":45906000.0,"lengthMeters":91.0,"ratePesosPerMeter":504461.53846153844,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8762"},{"year":2026,"category":"Roads","project":"Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd - K0023 + 883 - K0023 + 950","amountPesos":34300000.0,"lengthMeters":67.0,"ratePesosPerMeter":511940.29850746266,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8764"},{"year":2026,"category":"Roads","project":"Mayan-Mauyen Port Rd - K0005 + 330 - K0005 + 393, K0005 + 520 - K0005 + 540","amountPesos":9800000.0,"lengthMeters":83.0,"ratePesosPerMeter":118072.2891566265,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8766"},{"year":2026,"category":"Roads","project":"Mayan-Mauyen Port Rd - K0005 + 858 - K0005 + 931, K0005 + 996 - K0006 + 035","amountPesos":25480000.0,"lengthMeters":112.0,"ratePesosPerMeter":227500.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8768"},{"year":2026,"category":"Roads","project":"Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0018 + 093 - K0018 + 143","amountPesos":32134000.0,"lengthMeters":50.0,"ratePesosPerMeter":642680.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8770"},{"year":2026,"category":"Roads","project":"Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0020 + 500 - K0020 + 570","amountPesos":11906000.0,"lengthMeters":70.0,"ratePesosPerMeter":170085.7142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8772"},{"year":2026,"category":"Roads","project":"Uyugan-Mahatao Interior Rd - K0029 + 294 - K0029 + 345","amountPesos":19600000.0,"lengthMeters":51.0,"ratePesosPerMeter":384313.7254901961,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8774"},{"year":2026,"category":"Roads","project":"Cagayan-Apayao Rd (Tuao-Rizal Sect) - K0531 + 289 - K0531 + 329","amountPesos":18362000.0,"lengthMeters":40.0,"ratePesosPerMeter":459050.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8777"},{"year":2026,"category":"Roads","project":"Cagayan-Apayao Rd (Tuao-Rizal Sect) - K0537 + 123 - K0537 + 375","amountPesos":16660000.0,"lengthMeters":252.0,"ratePesosPerMeter":66111.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8779"},{"year":2026,"category":"Roads","project":"Cagayan-Apayao Rd (Tuao-Rizal Sect) - K0545 + 450 - K0545 + 500","amountPesos":13772000.0,"lengthMeters":50.0,"ratePesosPerMeter":275440.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8781"},{"year":2026,"category":"Roads","project":"Claveria-Diaballo-Luzon-Cagayan Bdry Rd - K0614 + 050 - K0614 + 085","amountPesos":3397000.0,"lengthMeters":35.0,"ratePesosPerMeter":97057.14285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8783"},{"year":2026,"category":"Roads","project":"Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 17045 - Chainage 17115","amountPesos":13772000.0,"lengthMeters":70.0,"ratePesosPerMeter":196742.85714285713,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8785"},{"year":2026,"category":"Roads","project":"Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 17690 - Chainage 17760","amountPesos":11476000.0,"lengthMeters":70.0,"ratePesosPerMeter":163942.85714285713,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8787"},{"year":2026,"category":"Roads","project":"Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 20795 - Chainage 20965","amountPesos":22953000.0,"lengthMeters":170.0,"ratePesosPerMeter":135017.64705882352,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8789"},{"year":2026,"category":"Roads","project":"Ilagan-Delfin Albano-Mallig Rd - K0405 + 425 - K0405 + 624, K0405 + 656 - K0405 + 924, K0419 + 755 - K0420 + 097","amountPesos":14323000.0,"lengthMeters":809.0,"ratePesosPerMeter":17704.573547589618,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8792"},{"year":2026,"category":"Roads","project":"Naguilian-Sn Mariano Rd - K0395 + 100 - K0395 + 166, K0395 + 430 - K0395 + 471, K0395 + 770 - K0395 + 830, K0397 + 805 - K0397 + 840, K0405 + 350 - K0405 + 405","amountPesos":13129000.0,"lengthMeters":257.0,"ratePesosPerMeter":51085.603112840465,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8795"},{"year":2026,"category":"Roads","project":"Naguilian-Sn Mariano Rd - K0396 + 805 - K0396 + 840","amountPesos":2387000.0,"lengthMeters":35.0,"ratePesosPerMeter":68200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8797"},{"year":2026,"category":"Roads","project":"Aritao-Quirino Rd - K0239 + 268 - K0239 + 274, K0273 + 680 - K0273 + 693","amountPesos":1034000.0,"lengthMeters":19.0,"ratePesosPerMeter":54421.05263157895,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8800"},{"year":2026,"category":"Roads","project":"Bambang-Kasibu-Solano Rd - K0284 + 293 - K0284 + 335, K0285 + 503 - K0285 + 517","amountPesos":2842000.0,"lengthMeters":56.0,"ratePesosPerMeter":50750.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8802"},{"year":2026,"category":"Roads","project":"Bambang-Kasibu-Solano Rd - K0286 + 250 - K0286 + 270","amountPesos":8919000.0,"lengthMeters":20.0,"ratePesosPerMeter":445950.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8804"},{"year":2026,"category":"Roads","project":"Bambang-Kasibu-Solano Rd - K0288 + 052 - K0288 + 142","amountPesos":23692000.0,"lengthMeters":90.0,"ratePesosPerMeter":263244.44444444444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8806"},{"year":2026,"category":"Roads","project":"Jct Natl Road-Bitnong-Belance-N Vizcaya Bdry Rd - K0266 + 993 - K0266 + 1032, K0268 + 300 - K0268 + 332, K0271 + 312 - K0271 + 374","amountPesos":7206000.0,"lengthMeters":133.0,"ratePesosPerMeter":54180.45112781955,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8808"},{"year":2026,"category":"Roads","project":"Papaya-Malabing-Wangal-Binugawan-Tadji-Runruno Rd - K0297 + 800 - K0297 + 850","amountPesos":12966000.0,"lengthMeters":50.0,"ratePesosPerMeter":259320.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8810"},{"year":2026,"category":"Roads","project":"Papaya-Malabing-Wangal-Binugawan-Tadji-Runruno Rd - K0297 + 940 - K0297 + 980","amountPesos":13757000.0,"lengthMeters":40.0,"ratePesosPerMeter":343925.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8812"},{"year":2026,"category":"Roads","project":"Papaya-Malabing-Wangal-Binugawan-Tadji-Runruno Rd - K0299 + 700 - K0299 + 726","amountPesos":9775000.0,"lengthMeters":26.0,"ratePesosPerMeter":375961.53846153844,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8814"},{"year":2026,"category":"Roads","project":"Papaya-Malabing-Wangal-Binugawan-Tadji-Runruno Rd - K0299 + 800 - K0299 + 850","amountPesos":13749000.0,"lengthMeters":50.0,"ratePesosPerMeter":274980.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8816"},{"year":2026,"category":"Roads","project":"Jct Abbag-Nagtipunan-Nueva Vizcaya Rd via Dupax - K0453 + 135 - K0453 + 169","amountPesos":3443000.0,"lengthMeters":34.0,"ratePesosPerMeter":101264.70588235294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8819"},{"year":2026,"category":"Roads","project":"Jct Abbag-Nagtipunan-Nueva Vizcaya Rd via Dupax - K0464 + 050 - K0464 + 070, K0464 + 700 - K0464 + 720","amountPesos":8584000.0,"lengthMeters":40.0,"ratePesosPerMeter":214600.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8821"},{"year":2026,"category":"Roads","project":"Jct Victoria-Maddela-Alicia-Kasibu Bdry Rd - K0359 + 418 - K0359 + 438, K0359 + 890 - K0360 + 003, K0364 + 578 - K0364 + 608, K0365 + 374 - K0365 + 394, K0365 + 533 - K0365 + 573, K0366 + 384 - K0366 + 420, (S04786LZ) Chainage 7652 - Chainage 7680, Chainage 7838 - Chainage 7882, Chainage 8026 - Chainage 8081, Chainage 9855 - Chainage 9880","amountPesos":31801000.0,"lengthMeters":411.0,"ratePesosPerMeter":77374.69586374697,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8823"},{"year":2026,"category":"Roads","project":"Jct Victoria-Maddela-Alicia-Kasibu Bdry Rd (Jct Victoria-Kasibu Bdry) - K0415 + 160 - K0415 + 260","amountPesos":6860000.0,"lengthMeters":100.0,"ratePesosPerMeter":68600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8825"},{"year":2026,"category":"Roads","project":"NRJ Villa Sur-San Pedro-Cabua-an-Ysmael-Disimungal Rd - K0370 + 550 - K0370 + 630","amountPesos":6978000.0,"lengthMeters":80.0,"ratePesosPerMeter":87225.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8827"},{"year":2026,"category":"Roads","project":"NRJ Villa Sur-San Pedro-Cabua-an-Ysmael-Disimungal Rd - K0373 + 709 - K0373 + 804","amountPesos":3581000.0,"lengthMeters":95.0,"ratePesosPerMeter":37694.73684210526,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8829"},{"year":2026,"category":"Roads","project":"NRJ Villa Sur-San Pedro-Cabua-an-Ysmael-Disimungal Rd - K0375 + 335 - K0375 + 410, K0375 + 554 - K0375 + 639, K0375 + 798 - K0375 + 826, K0375 + 880 - K0375 + 940","amountPesos":21756000.0,"lengthMeters":248.0,"ratePesosPerMeter":87725.80645161291,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8831"},{"year":2026,"category":"Roads","project":"NRJ Villa Sur-San Pedro-Cabua-an-Ysmael-Disimungal Rd - K0381 + 574 - K0381 + 604","amountPesos":2754000.0,"lengthMeters":30.0,"ratePesosPerMeter":91800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8833"},{"year":2026,"category":"Roads","project":"Jct Pinagpanaan-Rizal-Pantabangan Rd - K0164 + 350 - K0164 + 530, K0170 + 058 - K0170 + 158","amountPesos":9016000.0,"lengthMeters":280.0,"ratePesosPerMeter":32200.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8837"},{"year":2026,"category":"Roads","project":"Bauan-Mabini Rd - K0153 + 651 - K0153 + 811, K0168 + 455 - K0168 + 608","amountPesos":13117000.0,"lengthMeters":313.0,"ratePesosPerMeter":41907.3482428115,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8841"},{"year":2026,"category":"Roads","project":"Bauan-Mabini Rd - K0160 + 160 - K0160 + 240","amountPesos":37477000.0,"lengthMeters":80.0,"ratePesosPerMeter":468462.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8843"},{"year":2026,"category":"Roads","project":"Bauan-Mabini Rd - K0172 + 817 - K0172 + 850, K0172 + 885 - K0172 + 912","amountPesos":26524000.0,"lengthMeters":60.0,"ratePesosPerMeter":442066.6666666667,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8845"},{"year":2026,"category":"Roads","project":"Bauan-Mabini Rd - K0173 + 645 - K0173 + 680","amountPesos":15084000.0,"lengthMeters":35.0,"ratePesosPerMeter":430971.4285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8847"},{"year":2026,"category":"Roads","project":"Bauan-Mabini Rd - K0175 + 400 - K0175 + 432","amountPesos":3159000.0,"lengthMeters":32.0,"ratePesosPerMeter":98718.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8849"},{"year":2026,"category":"Roads","project":"Isaac O. Tolentino Ave. (S06088LZ) - K0062 + 076 - K0062 + 146","amountPesos":3844000.0,"lengthMeters":70.0,"ratePesosPerMeter":54914.28571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8852"},{"year":2026,"category":"Roads","project":"Majayjay-Lucban Rd - (S01679LZ) K0118 + 840 - K0118 + 855","amountPesos":32675000.0,"lengthMeters":15.0,"ratePesosPerMeter":2178333.3333333335,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8855"},{"year":2026,"category":"Roads","project":"Marikina-Infanta Rd - K0029 + 500 - K0029 + 700","amountPesos":18738000.0,"lengthMeters":200.0,"ratePesosPerMeter":93690.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8858"},{"year":2026,"category":"Roads","project":"Dr. Damian Reyes Rd (Boac Side) - K0014 + 850 - K0014 + 932","amountPesos":36954000.0,"lengthMeters":82.0,"ratePesosPerMeter":450658.53658536583,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8862"},{"year":2026,"category":"Roads","project":"Coron-Busuanga Rd - K0009 + 200 - K0009 + 415","amountPesos":12871000.0,"lengthMeters":215.0,"ratePesosPerMeter":59865.11627906977,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8865"},{"year":2026,"category":"Roads","project":"Coron-Busuanga Rd - K0033 + 918 - K0033 + 963, K0034 + 015 - K0034 + 075, K0034 + 085 - K0034 + 220","amountPesos":35920000.0,"lengthMeters":240.0,"ratePesosPerMeter":149666.66666666666,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8867"},{"year":2026,"category":"Roads","project":"Coron-Busuanga Rd - K0058 + 588 - K0058 + 633","amountPesos":14887000.0,"lengthMeters":45.0,"ratePesosPerMeter":330822.22222222225,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8869"},{"year":2026,"category":"Roads","project":"Palawan Circum. Rd (Panalingaan-Tagbita-Latud) - K0253 + 352 - K0253 + 419, K0266 + 582 - K0266 + 622, K0266 + 667 - K0266 + 767","amountPesos":25286000.0,"lengthMeters":207.0,"ratePesosPerMeter":122154.58937198068,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8872"},{"year":2026,"category":"Roads","project":"Tapul-Bahile Rd - K0042 + 976 - K0042 + 1068","amountPesos":32335000.0,"lengthMeters":92.0,"ratePesosPerMeter":351467.39130434784,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8875"},{"year":2026,"category":"Roads","project":"Parpagoha (Marigondon)-Binoog Rd - K0019 + 220 - K0019 + 350","amountPesos":19891000.0,"lengthMeters":130.0,"ratePesosPerMeter":153007.6923076923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8878"},{"year":2026,"category":"Roads","project":"Parpagoha (Marigondon)-Binoog Rd - K0027 + 215 - K0028 + 500","amountPesos":7134000.0,"lengthMeters":1285.0,"ratePesosPerMeter":5551.750972762646,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8880"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0187 + 070 - K0187 + 150","amountPesos":14597000.0,"lengthMeters":80.0,"ratePesosPerMeter":182462.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8883"},{"year":2026,"category":"Roads","project":"Nabua-Balatan Rd - K0490 + 340 - K0490 + 590","amountPesos":48651000.0,"lengthMeters":250.0,"ratePesosPerMeter":194604.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8887"},{"year":2026,"category":"Roads","project":"Nabua-Balatan Rd - K0491 + 605 - K0491 + 640","amountPesos":7718000.0,"lengthMeters":35.0,"ratePesosPerMeter":220514.2857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8889"},{"year":2026,"category":"Roads","project":"Nabua-Balatan Rd - K0491 + 862 - K0492 + 015","amountPesos":29944000.0,"lengthMeters":153.0,"ratePesosPerMeter":195712.4183006536,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8891"},{"year":2026,"category":"Roads","project":"Baras-Gigmoto-Viga Rd - K0043 + 160 - K0043 + 178","amountPesos":7345000.0,"lengthMeters":18.0,"ratePesosPerMeter":408055.55555555556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8894"},{"year":2026,"category":"Roads","project":"Jct Bato-Baras Rd - K0013 + 750 - K0013 + 800","amountPesos":52396000.0,"lengthMeters":50.0,"ratePesosPerMeter":1047920.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8896"},{"year":2026,"category":"Roads","project":"Baras-Gigmoto-Viga Road- K0028+024 - K0028+054, K0042+900 - K0042+950, K0044+900 - K0044+950","amountPesos":33320000.0,"lengthMeters":130.0,"ratePesosPerMeter":256307.6923076923,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8898"},{"year":2026,"category":"Roads","project":"Juban-Magallanes Rd - K0608 + 080 - K0608 + 110, K0608 + 192 - K0608 + 215, K0608 + 455 - K0608 + 487, K0610 + 971 - K0610 + 986, K0611 + 440 - K0611 + 500","amountPesos":7855000.0,"lengthMeters":160.0,"ratePesosPerMeter":49093.75,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8901"},{"year":2026,"category":"Roads","project":"Juban Magallanes Rd - K0613 + 635 - K0613 + 785, K0621 + 400 - K0621 + 490, K0623 + 215 - K0623 + 579","amountPesos":29730000.0,"lengthMeters":604.0,"ratePesosPerMeter":49221.85430463576,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8904"},{"year":2026,"category":"Roads","project":"Balabag-Maquina-Cayos-Patlad Rd - K0284 + 180 -K0284 + 186, K0284 + 609 - K0284 + 740, K0284 + 821 - K0284 + 882, K0285 + 037 - K0285 + 179, K0285 + 273 - K0285 + 308, K0285 + 300 - K0285 + 332, K0285 + 378 - K0285 + 415, K0285 + 492 - K0285 + 509, K0286 + 105 - K0286 + 210","amountPesos":21952000.0,"lengthMeters":558.0,"ratePesosPerMeter":39340.501792114694,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8908"},{"year":2026,"category":"Roads","project":"Passi-San Enrique-Garrita Rd - K0065 + 589 - K0065 + 658","amountPesos":5017000.0,"lengthMeters":69.0,"ratePesosPerMeter":72710.14492753622,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8910"},{"year":2026,"category":"Roads","project":"Jct Bancal-Leon-Antique Bdry Rd - K0041 + 382 - K0041 + 440","amountPesos":39200000.0,"lengthMeters":58.0,"ratePesosPerMeter":675862.0689655172,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8913"},{"year":2026,"category":"Roads","project":"Janiuay-Badiangan-Tina Rd - K0038 + 850 - K0038 + 917","amountPesos":4847000.0,"lengthMeters":67.0,"ratePesosPerMeter":72343.28358208956,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8916"},{"year":2026,"category":"Roads","project":"Lambunao-INCA Rd - K0059 + 390 - K0059 + 500, K0059 + 530 - K0059 + 560, K0059 + 600 - K0059 + 630","amountPesos":27563000.0,"lengthMeters":170.0,"ratePesosPerMeter":162135.29411764705,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8918"},{"year":2026,"category":"Roads","project":"Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd - K0031 + 148 - K0031 + 180","amountPesos":9695000.0,"lengthMeters":32.0,"ratePesosPerMeter":302968.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8920"},{"year":2026,"category":"Roads","project":"Bacolod North Rd (Old Route) - K0074 + 409 - K0074 + 450","amountPesos":4545000.0,"lengthMeters":41.0,"ratePesosPerMeter":110853.65853658537,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8924"},{"year":2026,"category":"Roads","project":"Silay-Lantawan Rd - K0032 + 040 - K0032 + 145","amountPesos":4545000.0,"lengthMeters":105.0,"ratePesosPerMeter":43285.71428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8926"},{"year":2026,"category":"Roads","project":"Mabinay-Ayungon Rd - K0107 + 385 - K0107 + 463, K0107 + 507 - K0107 + 672, K0107 + 707 - K0107 + 965, K0110 + 328 - K0110 + 485, K0110 + 565 - K0110 + 785, K0120 + 000 - K0120 + 232","amountPesos":26753000.0,"lengthMeters":1110.0,"ratePesosPerMeter":24101.8018018018,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8929"},{"year":2026,"category":"Roads","project":"Bayawan-Mabinay Rd. - K0141 + 410 - K0141 + 453, K0155 + 050 - K0155 + 100","amountPesos":19408000.0,"lengthMeters":93.0,"ratePesosPerMeter":208688.17204301077,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8932"},{"year":2026,"category":"Roads","project":"Balilihan-Hanopol-Batuan Rd - K0036 + 655 - K0036 + 735, K0036 + 758 - K0036 + 825","amountPesos":4849000.0,"lengthMeters":147.0,"ratePesosPerMeter":32986.39455782313,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8936"},{"year":2026,"category":"Roads","project":"Jct Dat-an-Carmen-Sierra Bullones-Pilar-Alicia Rd - K0082 + 609 - K0082 + 840","amountPesos":37920000.0,"lengthMeters":231.0,"ratePesosPerMeter":164155.84415584416,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8939"},{"year":2026,"category":"Roads","project":"Cabunga-an-Tabunok-Consuegra Rd - K1023 + 555 - K1023 + 750","amountPesos":49000000.0,"lengthMeters":195.0,"ratePesosPerMeter":251282.05128205128,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8943"},{"year":2026,"category":"Roads","project":"Sto Rosario-Villaba Rd - K1008 + 269 - K1008 + 388, K1011 + 225 - K1011 + 275","amountPesos":43851000.0,"lengthMeters":169.0,"ratePesosPerMeter":259473.3727810651,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8945"},{"year":2026,"category":"Roads","project":"Calbayog Diversion Rd - K0730 + 207 - K0730 + 250, K0732 + (-190) - K0732 + (-145)","amountPesos":23529000.0,"lengthMeters":88.0,"ratePesosPerMeter":267375.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8948"},{"year":2026,"category":"Roads","project":"Calbayog Diversion Rd - K0741 + (-040) - K0741 + 235","amountPesos":39200000.0,"lengthMeters":275.0,"ratePesosPerMeter":142545.45454545456,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8950"},{"year":2026,"category":"Roads","project":"Catbalogan Diversion Rd - K0805+ 120 - K0805+ 150","amountPesos":14700000.0,"lengthMeters":30.0,"ratePesosPerMeter":490000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8953"},{"year":2026,"category":"Roads","project":"Sn Ricardo-Bilatan Rd - K1100 + 1233 - K1101 + 115","amountPesos":47058000.0,"lengthMeters":118.0,"ratePesosPerMeter":398796.6101694915,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8956"},{"year":2026,"category":"Roads","project":"Sindangan-Bayog-Lakewood Rd - K1930+300-K1930+340","amountPesos":4900000.0,"lengthMeters":40.0,"ratePesosPerMeter":122500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8960"},{"year":2026,"category":"Roads","project":"Sindangan-Bayog-Lakewood Rd - K1943 + 660 - K1943 + 720","amountPesos":7840000.0,"lengthMeters":60.0,"ratePesosPerMeter":130666.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8962"},{"year":2026,"category":"Roads","project":"Sindangan-Bayog-Lakewood Rd - K1945+080-K1945+220","amountPesos":16660000.0,"lengthMeters":140.0,"ratePesosPerMeter":119000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8964"},{"year":2026,"category":"Roads","project":"Sindangan-Bayog-Lakewood Rd - K1951 + 090 - K1951 + 180","amountPesos":9143000.0,"lengthMeters":90.0,"ratePesosPerMeter":101588.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8966"},{"year":2026,"category":"Roads","project":"Sindangan-Bayog-Lakewood Rd - K1951 + 740 - K1951 + 820","amountPesos":13715000.0,"lengthMeters":80.0,"ratePesosPerMeter":171437.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8968"},{"year":2026,"category":"Roads","project":"Eastern Bobongan-Sominot-Midsalip-Dumingag Rd - K1669 + 330 - K1669 + 403","amountPesos":10058000.0,"lengthMeters":73.0,"ratePesosPerMeter":137780.8219178082,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8971"},{"year":2026,"category":"Roads","project":"Eastern Bobongan-Sominot-Midsalip-Dumingag Rd - K1670 + (-150) - K1670 + 050","amountPesos":8686000.0,"lengthMeters":200.0,"ratePesosPerMeter":43430.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8973"},{"year":2026,"category":"Roads","project":"Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Rd (S01175MN) - K1719 + 933 - K1720 + 165","amountPesos":14700000.0,"lengthMeters":232.0,"ratePesosPerMeter":63362.06896551724,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8976"},{"year":2026,"category":"Roads","project":"Sindangan-Bayog-Lakewood Rd - K1729 + 410 - K1729 + 653","amountPesos":45717000.0,"lengthMeters":243.0,"ratePesosPerMeter":188135.80246913582,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8978"},{"year":2026,"category":"Roads","project":"Sindangan-Bayog-Lakewood Rd - K1737 + 200 - K1737 + 250","amountPesos":20116000.0,"lengthMeters":50.0,"ratePesosPerMeter":402320.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8980"},{"year":2026,"category":"Roads","project":"Diplahan Jct-Malangas Port Rd - K1746 + 072 - K1746 + 104, K1748 + 104 - K1748 + 114, K1750 + 312 - K1750 + 484","amountPesos":9143000.0,"lengthMeters":214.0,"ratePesosPerMeter":42724.299065420564,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8983"},{"year":2026,"category":"Roads","project":"Jct Imelda-Alicia Rd - K1756 + 565 - K1756 + 717, K1764 + 868 - K1764 + 906, K1765 + 227 - K1765 + 475","amountPesos":27065000.0,"lengthMeters":438.0,"ratePesosPerMeter":61792.23744292237,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8985"},{"year":2026,"category":"Roads","project":"Jct Sayre H-way-Impasugong-Patulangan By-Pass Rd - K1484 + 084 - K1484 + 165, K1484 + 543 - K1484 + 565","amountPesos":46471000.0,"lengthMeters":103.0,"ratePesosPerMeter":451174.7572815534,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8989"},{"year":2026,"category":"Roads","project":"Jct Sayre Highway-Damulog Poblacion Rd. K1595+395-K1595+615","amountPesos":22168000.0,"lengthMeters":220.0,"ratePesosPerMeter":100763.63636363637,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8992"},{"year":2026,"category":"Roads","project":"Jct SH-Manolo Fortich-Libona-Indahag Rd - K1474 + 774 - K1474 + 842, K1474 + 933 - K1475 + 040, K1475 + 114 - K1475 + 331","amountPesos":23131000.0,"lengthMeters":392.0,"ratePesosPerMeter":59007.65306122449,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8995"},{"year":2026,"category":"Roads","project":"Jct SH-Manolo Fortich-Libona-Indahag Rd - K1475 + 683 - K1475 + 792","amountPesos":6506000.0,"lengthMeters":109.0,"ratePesosPerMeter":59688.07339449541,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8997"},{"year":2026,"category":"Roads","project":"Jct SH-Manolo Fortich-Libona-Indahag Rd - K1475 + 820 - K1475 + 860, K1475 + 982 - K1475 + 1020","amountPesos":4819000.0,"lengthMeters":78.0,"ratePesosPerMeter":61782.05128205128,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 8999"},{"year":2026,"category":"Roads","project":"Jct SH-Manolo Fortich-Libona-Indahag Rd - K1491 + 783 - K1491 + 837","amountPesos":13941000.0,"lengthMeters":54.0,"ratePesosPerMeter":258166.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9001"},{"year":2026,"category":"Roads","project":"Misamis Or-Bukidnon-Agusan Rd - K1457 + 845 - K1457 + 860","amountPesos":13941000.0,"lengthMeters":15.0,"ratePesosPerMeter":929400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9003"},{"year":2026,"category":"Roads","project":"Misamis Or-Bukidnon-Agusan Rd - K1458 + 714 - K1458 + 750","amountPesos":33459000.0,"lengthMeters":36.0,"ratePesosPerMeter":929416.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9005"},{"year":2026,"category":"Roads","project":"Overton-Abaga Bdry Rd - K1531 + 883 - K1531 + 964, K1535 + 377 - K1535 + 421","amountPesos":18588000.0,"lengthMeters":125.0,"ratePesosPerMeter":148704.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9008"},{"year":2026,"category":"Roads","project":"Lanao del Norte Interior Circum. Rd (LDNICR) - K1543 + 180 - K1543 + 252","amountPesos":13476000.0,"lengthMeters":72.0,"ratePesosPerMeter":187166.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9011"},{"year":2026,"category":"Roads","project":"Tubod-Ganassi Rd - K1610 + 300 - K1610 + 310","amountPesos":8365000.0,"lengthMeters":10.0,"ratePesosPerMeter":836500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9013"},{"year":2026,"category":"Roads","project":"Dobleston-Butadon Rd - K1995+581 - K1995+806","amountPesos":13384000.0,"lengthMeters":225.0,"ratePesosPerMeter":59484.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9016"},{"year":2026,"category":"Roads","project":"Dobleston-Butadon Rd - K2002 + 430 - K2002 + 543","amountPesos":8318000.0,"lengthMeters":113.0,"ratePesosPerMeter":73610.61946902655,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9018"},{"year":2026,"category":"Roads","project":"Dobleston-Butadon Rd - K2008+540 - K2008+607","amountPesos":4936000.0,"lengthMeters":67.0,"ratePesosPerMeter":73671.64179104478,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9020"},{"year":2026,"category":"Roads","project":"Lanao del Norte Interior Circum. Rd (LDNICR) - (S00972MN)  Chainage 17010 - Chainage 17040","amountPesos":9294000.0,"lengthMeters":30.0,"ratePesosPerMeter":309800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9022"},{"year":2026,"category":"Roads","project":"Lanao del Norte Interior Circum. Rd (LDNICR) - (S00972MN)  Chainage 19536 - Chainage 19649","amountPesos":11000000.0,"lengthMeters":113.0,"ratePesosPerMeter":97345.13274336283,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9024"},{"year":2026,"category":"Roads","project":"Lanao del Norte Interior Circum. Rd (LDNICR) - (S00972MN)  Chainage 20536 - Chainage 20649","amountPesos":11618000.0,"lengthMeters":113.0,"ratePesosPerMeter":102814.1592920354,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9026"},{"year":2026,"category":"Roads","project":"Fatima-Malabog Rd - K1511 + 742 - K1511 + 783","amountPesos":40180000.0,"lengthMeters":41.0,"ratePesosPerMeter":980000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9030"},{"year":2026,"category":"Roads","project":"H-way Jct Mana-Ticulon-Lagumit-Little Baguio Rd - K1660 + 910 - K1660 + 1063","amountPesos":49000000.0,"lengthMeters":153.0,"ratePesosPerMeter":320261.4379084967,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9033"},{"year":2026,"category":"Roads","project":"H-way Jct Mana-Ticulon-Lagumit-Little Baguio Rd - K1669 + 297 - K1669 + 384","amountPesos":20999000.0,"lengthMeters":87.0,"ratePesosPerMeter":241367.816091954,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9035"},{"year":2026,"category":"Roads","project":"Demoloc-Little Baguio-Alabel Rd - K1668 + 340 - K1668 + 390, K1676 + 570 - K1676 + 600, K1677 + 300 - K1677 + 350","amountPesos":29308000.0,"lengthMeters":130.0,"ratePesosPerMeter":225446.15384615384,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9039"},{"year":2026,"category":"Roads","project":"Surallah-Lake Sebu-Maitum Rd - K1745 + 300 - K1745 + 453","amountPesos":36014000.0,"lengthMeters":153.0,"ratePesosPerMeter":235385.6209150327,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9042"},{"year":2026,"category":"Roads","project":"Surallah-Lake Sebu-Maitum Rd - K1755 + 720 - K1755 + 840","amountPesos":10528000.0,"lengthMeters":120.0,"ratePesosPerMeter":87733.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9044"},{"year":2026,"category":"Roads","project":"Surallah-Lake Sebu-Maitum Rd - K1777 + 750 - K1777 + 900 R/S","amountPesos":30093000.0,"lengthMeters":150.0,"ratePesosPerMeter":200620.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9046"},{"year":2026,"category":"Roads","project":"Surallah-Lake Sebu-Maitum Rd - K1789 + 815 - K1789 + 925","amountPesos":25889000.0,"lengthMeters":110.0,"ratePesosPerMeter":235354.54545454544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9048"},{"year":2026,"category":"Roads","project":"Buenavista-Bunaguit Rd - K1270 + 220 - K1270 + 300","amountPesos":36305000.0,"lengthMeters":80.0,"ratePesosPerMeter":453812.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9052"},{"year":2026,"category":"Roads","project":"Buenavista-Bunaguit Rd - K1270 + 648 - K1270 + 714","amountPesos":24204000.0,"lengthMeters":66.0,"ratePesosPerMeter":366727.2727272727,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9054"},{"year":2026,"category":"Roads","project":"Buenavista-Bunaguit Rd - K1280 + 274 - K1280 + 330","amountPesos":20746000.0,"lengthMeters":56.0,"ratePesosPerMeter":370464.28571428574,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9056"},{"year":2026,"category":"Roads","project":"Butuan City-Malaybalay Rd - K1253 + 411 - K1253 + 471","amountPesos":28526000.0,"lengthMeters":60.0,"ratePesosPerMeter":475433.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9059"},{"year":2026,"category":"Roads","project":"Butuan City-Malaybalay Rd - K1262 + 082 - K1262 + 112","amountPesos":12966000.0,"lengthMeters":30.0,"ratePesosPerMeter":432200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9061"},{"year":2026,"category":"Roads","project":"Butuan City-Malaybalay Rd - K1262 + 314 - K1262 + 344","amountPesos":12966000.0,"lengthMeters":30.0,"ratePesosPerMeter":432200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9063"},{"year":2026,"category":"Roads","project":"Butuan City-Malaybalay Rd - K1263 + 020 - K1263 + 129","amountPesos":34577000.0,"lengthMeters":109.0,"ratePesosPerMeter":317220.18348623853,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9065"},{"year":2026,"category":"Roads","project":"Butuan City-Pianing-Tandag Rd - K1246 + 528 - K1246 + 568","amountPesos":22597000.0,"lengthMeters":40.0,"ratePesosPerMeter":564925.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9067"},{"year":2026,"category":"Roads","project":"Butuan City-Pianing-Tandag Rd - K1249 + 710 - K1249 + 770","amountPesos":34577000.0,"lengthMeters":60.0,"ratePesosPerMeter":576283.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9069"},{"year":2026,"category":"Roads","project":"Jct Capalayan-Cabongbongan Rd - K1139 + 010 - K1139 + 080, K1139 + 120 - K1139 + 190, K1139 + 220 - K1139 + 455","amountPesos":9800000.0,"lengthMeters":375.0,"ratePesosPerMeter":26133.333333333332,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9072"},{"year":2026,"category":"Roads","project":"Surigao City-Sn Juan Coastal Rd - K1115 + 040 - K1115 + 140","amountPesos":1470000.0,"lengthMeters":100.0,"ratePesosPerMeter":14700.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9074"},{"year":2026,"category":"Roads","project":"Urdaneta  Jct - Lingayen Road via Zambales - K0377 + 500 - K0377+1410","amountPesos":91892000.0,"lengthMeters":910.0,"ratePesosPerMeter":100980.21978021978,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9098"},{"year":2026,"category":"Roads","project":"Bakit-Bakit Jct.-Umingan Road, K0199+401 - K0200+125, K0201+600 - K0202+476","amountPesos":49651000.0,"lengthMeters":1600.0,"ratePesosPerMeter":31031.875,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9100"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0293 + 359 - K0294 + 094","amountPesos":10017000.0,"lengthMeters":735.0,"ratePesosPerMeter":13628.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9103"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0326 + 227.77 - K0326 + 409.77","amountPesos":65227000.0,"lengthMeters":182.0,"ratePesosPerMeter":358390.1098901099,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9105"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0359 + 000 - K0359 + 817","amountPesos":12196000.0,"lengthMeters":817.0,"ratePesosPerMeter":14927.784577723378,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9107"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0042 + 250 - K0042 + 620, K0042 + 750 - K0042 + 846","amountPesos":13571000.0,"lengthMeters":466.0,"ratePesosPerMeter":29122.317596566525,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9116"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0153 + 580 - K0154 + 500, K0155 + 100 - K0155 + 980","amountPesos":68600000.0,"lengthMeters":1800.0,"ratePesosPerMeter":38111.11111111111,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9118"},{"year":2026,"category":"Roads","project":"Upgrading of Drainage System along Manila North Road (Left Side),K0082 + (-295) to K0086 + 689 Angeles City, Pampanga","amountPesos":98000000.0,"lengthMeters":4984.0,"ratePesosPerMeter":19662.921348314605,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9130"},{"year":2026,"category":"Roads","project":"Upgrading of Drainage System along Manila North Road (Left Side),K0086 + 690 to K0097 + 470 Mabalacat City, Pampanga","amountPesos":98000000.0,"lengthMeters":10780.0,"ratePesosPerMeter":9090.90909090909,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9132"},{"year":2026,"category":"Roads","project":"Upgrading of Drainage System along Manila North Road (Right Side), K0082 + (-295) to K0086 + 689 Angeles City, Pampanga","amountPesos":98000000.0,"lengthMeters":4984.0,"ratePesosPerMeter":19662.921348314605,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9134"},{"year":2026,"category":"Roads","project":"Upgrading of Drainage System along Manila North Road (Right Side),K0086 + 690 to K0097 + 470 Mabalacat City, Pampanga","amountPesos":98000000.0,"lengthMeters":10780.0,"ratePesosPerMeter":9090.90909090909,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9136"},{"year":2026,"category":"Roads","project":"Maharlika Highway ( Manila South Road) - K0036 + 935 - K0037 + 612","amountPesos":32792000.0,"lengthMeters":677.0,"ratePesosPerMeter":48437.22304283604,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9145"},{"year":2026,"category":"Roads","project":"Maharlika Highway ( Manila South Road) - K0039 + 272 - K0039 + 987","amountPesos":46665000.0,"lengthMeters":715.0,"ratePesosPerMeter":65265.73426573427,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9147"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0111 + 735 - K0112 + 053","amountPesos":11148000.0,"lengthMeters":318.0,"ratePesosPerMeter":35056.6037735849,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9149"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Manila South Rd) - K0050 + 300 - K0050 + 865","amountPesos":12637000.0,"lengthMeters":565.0,"ratePesosPerMeter":22366.37168141593,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9151"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0728 + 927 - K0729 + 005","amountPesos":3460000.0,"lengthMeters":78.0,"ratePesosPerMeter":44358.97435897436,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9181"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0766 + 036 - K0766 + 126, K0766 + 720 - K0766 + 850, K0767 + 656 - K0767 + 812.5, K0772 + 578 - K0772 + 823, K0773 + 093 - K0773 + 447.5, K0775 + 475.5 - K0775 + 521","amountPesos":32994000.0,"lengthMeters":1021.5,"ratePesosPerMeter":32299.559471365636,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9183"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0775 + 521 - K0775 + 688, K0778 +879 - K0779 + 512, K0780 + 653 - K0780 + 936","amountPesos":27440000.0,"lengthMeters":1083.0,"ratePesosPerMeter":25337.02677746999,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9185"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0780 + 936 - K0781 + 148, K0782 + 676 - K0783 + 218, K0784 + 164 - K0784 + 893","amountPesos":39200000.0,"lengthMeters":1483.0,"ratePesosPerMeter":26432.906271072152,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9187"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd)(S01315MN) - 1932 + 540 - 1934 + 050","amountPesos":98452000.0,"lengthMeters":1510.0,"ratePesosPerMeter":65200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9194"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd)(S01453MN) - K1691 + 000 - K1691 + 715, K1691 + 801 - K1694 + 723, K1694 + 870 - K1694 + 896","amountPesos":37918000.0,"lengthMeters":3663.0,"ratePesosPerMeter":10351.624351624352,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9200"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1725 + 507 - K1726 + 253, K1730 + 031 - K1732 + 637","amountPesos":45717000.0,"lengthMeters":3352.0,"ratePesosPerMeter":13638.723150357995,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9202"},{"year":2026,"category":"Roads","project":"Construction of Cross Drainage along Iligan-Marawi Road (Chainage 0 - Chainage 1200)","amountPesos":50000000.0,"lengthMeters":1200.0,"ratePesosPerMeter":41666.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9207"},{"year":2026,"category":"Roads","project":"Marawi-Malabang Road - (S01652MN) Chainage 000 - Chainage 081","amountPesos":1350000.0,"lengthMeters":81.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9211"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K1489 + 500 - K1489 + 863, K1490 + 000 - K1491 + 400","amountPesos":147531000.0,"lengthMeters":1763.0,"ratePesosPerMeter":83681.79239931934,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9222"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K1492 + 013 - K1492 + 240, K1492 + 889 - K1493 + 218","amountPesos":58799000.0,"lengthMeters":556.0,"ratePesosPerMeter":105753.59712230216,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9224"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K1497 + 229 - K1497 + 299","amountPesos":5063000.0,"lengthMeters":70.0,"ratePesosPerMeter":72328.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9226"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K1497 + 299 - K1499 + 318","amountPesos":202086000.0,"lengthMeters":2019.0,"ratePesosPerMeter":100092.12481426448,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9228"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Davao City-Jct Digos Sect) - K1518 + 800 - K1519 + 722","amountPesos":71407000.0,"lengthMeters":922.0,"ratePesosPerMeter":77447.93926247288,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9230"},{"year":2026,"category":"Roads","project":"Maharlika Highway(Davao City-Jct Digos Sect) - K1515 + 167 - K1515 + 750","amountPesos":32853000.0,"lengthMeters":583.0,"ratePesosPerMeter":56351.6295025729,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9232"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Digos-Makar Rd) - K1639 + 680 - K1642 + 658","amountPesos":82551000.0,"lengthMeters":2978.0,"ratePesosPerMeter":27720.28206850235,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9239"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Marbel-Allah Valley-Cotabato Rd) - K1766 + 300 - K1767 + 327","amountPesos":32327000.0,"lengthMeters":1027.0,"ratePesosPerMeter":31477.117818889972,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9241"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Marbel-Makar Rd) - K1708 + 500 - K1710 + 721","amountPesos":96510000.0,"lengthMeters":2221.0,"ratePesosPerMeter":43453.39936965331,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9243"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Cotabato-Marbel Rd) - K1713 + 782 - K1715 + 110","amountPesos":21934000.0,"lengthMeters":1328.0,"ratePesosPerMeter":16516.566265060243,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9245"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1785 + 800 - K1786 + 241","amountPesos":8046000.0,"lengthMeters":441.0,"ratePesosPerMeter":18244.897959183672,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9247"},{"year":2026,"category":"Roads","project":"Pangasinan-Nueva Ecija Road K0185+(-637)-K0185+478","amountPesos":19563000.0,"lengthMeters":1115.0,"ratePesosPerMeter":17545.29147982063,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9302"},{"year":2026,"category":"Roads","project":"Bakit-Bakit Jct.-Umingan Road K0204+ 198-K0204+802","amountPesos":17150000.0,"lengthMeters":604.0,"ratePesosPerMeter":28394.039735099337,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9304"},{"year":2026,"category":"Roads","project":"Manila North Road - K0169 + (-813) - K0169+571","amountPesos":24500000.0,"lengthMeters":1384.0,"ratePesosPerMeter":17702.312138728324,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9306"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0932 + 510- K0932 + 945","amountPesos":9404000.0,"lengthMeters":435.0,"ratePesosPerMeter":21618.3908045977,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9406"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1558 + 333 - K1559 + 020","amountPesos":15986000.0,"lengthMeters":687.0,"ratePesosPerMeter":23269.28675400291,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9427"},{"year":2026,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1257 + 155 - K1257 + 414, K1257 + 606 - K1258 + 084, K1258 + 198 - K1258 + 364","amountPesos":24149000.0,"lengthMeters":903.0,"ratePesosPerMeter":26743.078626799557,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9491"},{"year":2026,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1240 + 555 - K1240 + 638","amountPesos":23999000.0,"lengthMeters":83.0,"ratePesosPerMeter":289144.578313253,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9494"},{"year":2026,"category":"Roads","project":"Upgrading of Drainage System along Old Manila North Road,(Left Side) K0082 + (-640) to K0085 + 048 Angeles City, Pampanga","amountPesos":98000000.0,"lengthMeters":3688.0,"ratePesosPerMeter":26572.668112798263,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9526"},{"year":2026,"category":"Roads","project":"Upgrading of Drainage System along Old Manila North Road,(Right Side) K0082 + (-640) to K0085 + 048 Angeles City, Pampanga","amountPesos":98000000.0,"lengthMeters":3688.0,"ratePesosPerMeter":26572.668112798263,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9528"},{"year":2026,"category":"Roads","project":"Upgrading of Drainage System along West Circumferential Road (Left Side), K0082 + (-415) to K0089 + 541) Angeles City, Pampanga","amountPesos":98000000.0,"lengthMeters":7956.0,"ratePesosPerMeter":12317.74761186526,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9530"},{"year":2026,"category":"Roads","project":"Upgrading of Drainage System along West Circumferential Road (Right Side), K0082 + (-415) to K0089 + 541) Angeles City, Pampanga","amountPesos":98000000.0,"lengthMeters":7956.0,"ratePesosPerMeter":12317.74761186526,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9532"},{"year":2026,"category":"Roads","project":"Abra-Ilocos Sur Road - K0401+350 - K0402+089.29","amountPesos":17640000.0,"lengthMeters":739.29,"ratePesosPerMeter":23860.7312421384,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9627"},{"year":2026,"category":"Roads","project":"Abra-Ilocos Sur Road - K0407+088 - K0407+898","amountPesos":19600000.0,"lengthMeters":810.0,"ratePesosPerMeter":24197.53086419753,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9629"},{"year":2026,"category":"Roads","project":"Salvador H. Escudero III Diversion Road - K0580 + 750 - K0581 + 761, K0581 + 781 - K0582 + 023","amountPesos":31291000.0,"lengthMeters":1253.0,"ratePesosPerMeter":24972.86512370311,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 9897"},{"year":2026,"category":"Roads","project":"Jct Pulauan Port Road - K1827 + 450 - K1828 + 562","amountPesos":13715000.0,"lengthMeters":1112.0,"ratePesosPerMeter":12333.633093525179,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10014"},{"year":2026,"category":"Roads","project":"Corrales Extension St. - Port Road - K1439 + 000 - K1439 + 558","amountPesos":27882000.0,"lengthMeters":558.0,"ratePesosPerMeter":49967.74193548387,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10027"},{"year":2026,"category":"Roads","project":"Abra-Ilocos Norte Road- K0409+200-K0409+630, K0409+640-K0410+850","amountPesos":60760000.0,"lengthMeters":1640.0,"ratePesosPerMeter":37048.78048780488,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10085"},{"year":2026,"category":"Roads","project":"San Nicolas-Natividad-San Quintin-Umingan-Guimba Road, K0201+(-082) - K0201+429","amountPesos":14700000.0,"lengthMeters":511.0,"ratePesosPerMeter":28767.12328767123,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10169"},{"year":2026,"category":"Roads","project":"Abra-Ilocos Norte Road-  K0416+269-K0416+648, K0417+235-K0417+370, K0418+000-K0418+066, K0418+140-K0418+422, K0418+561-K0418+570, K0418+691-K0419+024.48, K0419+450-K0419+452, K0419+665-K0419+667, K0419+516-K0419+548, K0419+624-K0419+628, K0419+797-K0419+866, K0419+970-K0419+974, K0420+071-K0420+427","amountPesos":41160000.0,"lengthMeters":1673.48,"ratePesosPerMeter":24595.453784927493,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10175"},{"year":2026,"category":"Roads","project":"Gen Alejo Santos Highway - K0069 + 412 - K0069 + 484","amountPesos":3816000.0,"lengthMeters":72.0,"ratePesosPerMeter":53000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10253"},{"year":2026,"category":"Roads","project":"Gen Alejo Santos Highway - K0069 + 484 - K0069 + 737","amountPesos":12386000.0,"lengthMeters":253.0,"ratePesosPerMeter":48956.52173913043,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10255"},{"year":2026,"category":"Roads","project":"Pototan-Mina-Janiuay Road - K0030 + (-516) - K0030+ 279","amountPesos":21329000.0,"lengthMeters":795.0,"ratePesosPerMeter":26828.930817610064,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10337"},{"year":2026,"category":"Roads","project":"Opon Airport Road - K0036 + (-277) - K0036 + 000, (S00003LP) Chainage 300 - Chainage 544","amountPesos":38790000.0,"lengthMeters":521.0,"ratePesosPerMeter":74452.97504798464,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10373"},{"year":2026,"category":"Roads","project":"Jct Logac-Magapit Rd -  K0712 + 760 - K0712 + 992","amountPesos":14239000.0,"lengthMeters":232.0,"ratePesosPerMeter":61375.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10436"},{"year":2026,"category":"Roads","project":"Jct Logac-Magapit Rd - K0712 + 520 - K0712 + 760","amountPesos":14781000.0,"lengthMeters":240.0,"ratePesosPerMeter":61587.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10438"},{"year":2026,"category":"Roads","project":"Jct Logac-Magapit Rd - K0712 + 992 - K0713 + 085","amountPesos":5527000.0,"lengthMeters":93.0,"ratePesosPerMeter":59430.10752688172,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10440"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0246 + 504 - K0246 + 554","amountPesos":3167000.0,"lengthMeters":50.0,"ratePesosPerMeter":63340.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10442"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0269 + 005 - K0269 + 325, K0275 + 158.10 - K0275 + 785","amountPesos":65266000.0,"lengthMeters":946.9,"ratePesosPerMeter":68925.96895131312,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10444"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0277 + 580 - K0278 + 450","amountPesos":58800000.0,"lengthMeters":870.0,"ratePesosPerMeter":67586.20689655172,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10446"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0278 + 450 - K0279 + 200","amountPesos":52400000.0,"lengthMeters":750.0,"ratePesosPerMeter":69866.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10448"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0291 + 000 - K0291 + 430","amountPesos":33190000.0,"lengthMeters":430.0,"ratePesosPerMeter":77186.04651162791,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10450"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0300 + 000 - K0300 + 603, K0301 + 142.60 - K0301 +  465","amountPesos":68934000.0,"lengthMeters":925.4,"ratePesosPerMeter":74491.03090555248,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10452"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0301 + 465 - K0301 + 525","amountPesos":4760000.0,"lengthMeters":60.0,"ratePesosPerMeter":79333.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10454"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0348 + 060 - K0348 + 452, K0354 + 473 - K0354 + 577","amountPesos":18307000.0,"lengthMeters":496.0,"ratePesosPerMeter":36909.27419354839,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10456"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0373 + (-050) - K0373 + 575","amountPesos":37188000.0,"lengthMeters":625.0,"ratePesosPerMeter":59500.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10458"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0397 + 515 - K0398 + 043","amountPesos":49000000.0,"lengthMeters":528.0,"ratePesosPerMeter":92803.0303030303,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10460"},{"year":2026,"category":"Roads","project":"Maharlika Highway ( Cagayan Valley Rd) -  K0526 + 140 - K0526 + 836.5","amountPesos":51415000.0,"lengthMeters":696.5,"ratePesosPerMeter":73819.09547738693,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10462"},{"year":2026,"category":"Roads","project":"Maharlika Highway ( Cagayan Valley Rd) - K0515 + 631 - K0515 + 683, K0524 + 880 - K0525 + 658","amountPesos":50851000.0,"lengthMeters":830.0,"ratePesosPerMeter":61266.26506024096,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10464"},{"year":2026,"category":"Roads","project":"Maharlika Highway ( Cagayan Valley Rd) - K0539 + 085 - K0539 +500, K0541 + 762 - K0541 + 859 ,  K0542 + 700 - K0543 + 332","amountPesos":68187000.0,"lengthMeters":1144.0,"ratePesosPerMeter":59604.02097902098,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10466"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0617 + 771 - K0618 + 1000.37","amountPesos":27050000.0,"lengthMeters":1229.37,"ratePesosPerMeter":22003.13981958247,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10468"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0618 + 1000.37 - K0620 + 557.59","amountPesos":35977000.0,"lengthMeters":1557.22,"ratePesosPerMeter":23103.350843169654,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10470"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0634 + 260 - K0635 + 700","amountPesos":39701000.0,"lengthMeters":1440.0,"ratePesosPerMeter":27570.13888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10472"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0635 + 700 - K0636 + 050","amountPesos":8279000.0,"lengthMeters":350.0,"ratePesosPerMeter":23654.285714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10474"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0671 + 853 - K0673 + 367, K0676 + 149 - K0677 + 293","amountPesos":86465000.0,"lengthMeters":2658.0,"ratePesosPerMeter":32530.0978179082,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10476"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0677 + 384.53 - K0678 + 729, K0678 + 937 - K0679 + 272, K0679 + 762 - K0679 + 992","amountPesos":96793000.0,"lengthMeters":1909.47,"ratePesosPerMeter":50691.02944796274,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10478"},{"year":2026,"category":"Roads","project":"Santiago-Tuguegarao Rd - K0379 + 706 - K0380 + 054, K0386 + 205 - K0387 + 092, K0387 + 976 - K0388 + 865, K0389 + 776 - K0391 + 000","amountPesos":89727000.0,"lengthMeters":3348.0,"ratePesosPerMeter":26800.179211469534,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10480"},{"year":2026,"category":"Roads","project":"Bigaa - Plaridel via Bulacan & Malolos Rd - K0037 + 711 - K0038 + 607, K0039 + 700 - K0041 + 662","amountPesos":294000000.0,"lengthMeters":2858.0,"ratePesosPerMeter":102869.13925822254,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10483"},{"year":2026,"category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0069 + 781 - K0070 + 337, K0070 + 362 - K0072 + 489","amountPesos":59982000.0,"lengthMeters":2683.0,"ratePesosPerMeter":22356.317554975773,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10485"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0167 + 561 - K0168 + 232","amountPesos":47235000.0,"lengthMeters":671.0,"ratePesosPerMeter":70394.93293591654,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10488"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0112 + 053 - K0112 + 120","amountPesos":3273000.0,"lengthMeters":67.0,"ratePesosPerMeter":48850.746268656716,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10490"},{"year":2026,"category":"Roads","project":"Quirino H-way - K0265 + 140 - K0266 + 335","amountPesos":61279000.0,"lengthMeters":1195.0,"ratePesosPerMeter":51279.49790794979,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10492"},{"year":2026,"category":"Roads","project":"Quirino H-way - K0266 + 335 - K0267 + 548","amountPesos":61277000.0,"lengthMeters":1213.0,"ratePesosPerMeter":50516.90024732069,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10494"},{"year":2026,"category":"Roads","project":"Quirino H-way - K0267 + 548 - K0268 + 325","amountPesos":44102000.0,"lengthMeters":777.0,"ratePesosPerMeter":56759.33075933076,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10496"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0256 +000 - K0256 + 538","amountPesos":53242000.0,"lengthMeters":538.0,"ratePesosPerMeter":98962.82527881041,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10499"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0349 + 253 - K0350 + 201","amountPesos":59358000.0,"lengthMeters":948.0,"ratePesosPerMeter":62613.92405063291,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10501"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0519 + 249 - K0519 + 844, K0520 + 073 - K0520 + 251, K0520 + 501 - K0520 + 599, K0521 + 080 - K0521 + 100, K0522 + 035 - K0522 + 160, K0522 + 330 - K0522 + 444, K0522 + 499 - K0522 + 750, K0527 + 003 - K0527 + 745, K0531 + 640 - K0532 + 000, K0535 + 220 - K0535 + 855, K0538 + 000 - K0538 + 400, K0539 + 000 - K0539 + 452","amountPesos":68600000.0,"lengthMeters":3970.0,"ratePesosPerMeter":17279.596977329973,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10503"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0402 + 420 - K0402 + 458, K0415 + 780 - K0416 + 110","amountPesos":35150000.0,"lengthMeters":368.0,"ratePesosPerMeter":95516.30434782608,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10505"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0416 + 110 - K0416 + 265","amountPesos":15035000.0,"lengthMeters":155.0,"ratePesosPerMeter":97000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10507"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0513 + 300 - K0513 + 750, K0514 + 000 - K0514 + 585, K0523 + 300 - K0524 + 200","amountPesos":80493000.0,"lengthMeters":1935.0,"ratePesosPerMeter":41598.4496124031,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10509"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0526 + 482 - K0527 + 003","amountPesos":55993000.0,"lengthMeters":521.0,"ratePesosPerMeter":107472.1689059501,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10511"},{"year":2026,"category":"Roads","project":"Rolando R. Andaya Highway - K0313+900 - K0314+000, K0315+135 - K0315+450","amountPesos":66901000.0,"lengthMeters":415.0,"ratePesosPerMeter":161207.22891566265,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10513"},{"year":2026,"category":"Roads","project":"Rolando R. Andaya Highway - K0315 + 450 - K0315 + 671, K0315 + 912 - K0316 + 145","amountPesos":67234000.0,"lengthMeters":454.0,"ratePesosPerMeter":148092.51101321587,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10515"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz Rd (New Route) - K0096 + 705 - K0097 + 652, K0097 + 666 - K0097 + 911, K0098 + 127 - K0098 + 793","amountPesos":144999000.0,"lengthMeters":1858.0,"ratePesosPerMeter":78040.36598493003,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10518"},{"year":2026,"category":"Roads","project":"Iloilo-Capiz Rd (New Rute) - K0079 + 580 - K0079 + 981, K0093 + 660 - K0093 + 927","amountPesos":61486000.0,"lengthMeters":668.0,"ratePesosPerMeter":92044.91017964072,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10520"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0119 + 718 - K0121 + 143","amountPesos":52479000.0,"lengthMeters":1425.0,"ratePesosPerMeter":36827.36842105263,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10523"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0122 + 000 - K0123 + 815","amountPesos":70749000.0,"lengthMeters":1815.0,"ratePesosPerMeter":38980.1652892562,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10525"},{"year":2026,"category":"Roads","project":"Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0064 + 289 - K0065 + 052, K0068 + 293 - K0069 + 571","amountPesos":73500000.0,"lengthMeters":2041.0,"ratePesosPerMeter":36011.75894169525,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10527"},{"year":2026,"category":"Roads","project":"Bais-Kabankalan Rd - K0093 + 040 - K0094 + 000","amountPesos":68382000.0,"lengthMeters":960.0,"ratePesosPerMeter":71231.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10529"},{"year":2026,"category":"Roads","project":"Bais-Kabankalan Rd - K0095 + 000 - K0095 + 846","amountPesos":60243000.0,"lengthMeters":846.0,"ratePesosPerMeter":71209.21985815602,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10531"},{"year":2026,"category":"Roads","project":"Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0033 + 000 - K0034 + 000","amountPesos":75541000.0,"lengthMeters":1000.0,"ratePesosPerMeter":75541.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10533"},{"year":2026,"category":"Roads","project":"Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0034 + 000 - K0035 + 200","amountPesos":92558000.0,"lengthMeters":1200.0,"ratePesosPerMeter":77131.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10535"},{"year":2026,"category":"Roads","project":"Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0046 + 148 - K0048 + 048","amountPesos":147000000.0,"lengthMeters":1900.0,"ratePesosPerMeter":77368.42105263157,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10537"},{"year":2026,"category":"Roads","project":"Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0063 + 340 - K0064 + 480","amountPesos":78204000.0,"lengthMeters":1140.0,"ratePesosPerMeter":68600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10539"},{"year":2026,"category":"Roads","project":"Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0089 + 400 - K0089 + 648, K0089 + 721 - K0090 + 490","amountPesos":53900000.0,"lengthMeters":1017.0,"ratePesosPerMeter":52999.01671583088,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10541"},{"year":2026,"category":"Roads","project":"Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0127 + 900 - K0129 + 284","amountPesos":68600000.0,"lengthMeters":1384.0,"ratePesosPerMeter":49566.473988439306,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10543"},{"year":2026,"category":"Roads","project":"Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0131 + 484 - K0132 + 850","amountPesos":83300000.0,"lengthMeters":1366.0,"ratePesosPerMeter":60980.96632503661,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10545"},{"year":2026,"category":"Roads","project":"Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0132 + 850 - K0132 + 935, K0132 + 982 - K0133 + 863","amountPesos":56840000.0,"lengthMeters":966.0,"ratePesosPerMeter":58840.57971014493,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10547"},{"year":2026,"category":"Roads","project":"Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0133 + 863 - K0135 + 241","amountPesos":63700000.0,"lengthMeters":1378.0,"ratePesosPerMeter":46226.41509433962,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10549"},{"year":2026,"category":"Roads","project":"Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0135 + 304 - K0136 + 500","amountPesos":55796000.0,"lengthMeters":1196.0,"ratePesosPerMeter":46652.17391304348,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10551"},{"year":2026,"category":"Roads","project":"Carcar-Barili-Mantayupan Rd - K0041 + 265 - K0042 + 000","amountPesos":97061000.0,"lengthMeters":735.0,"ratePesosPerMeter":132055.78231292518,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10554"},{"year":2026,"category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0050 + 676 - K0051 + 000","amountPesos":53295000.0,"lengthMeters":324.0,"ratePesosPerMeter":164490.74074074073,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10556"},{"year":2026,"category":"Roads","project":"Naga-Uling Rd - K0022 + 855 - K0023 + 485","amountPesos":145350000.0,"lengthMeters":630.0,"ratePesosPerMeter":230714.2857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10558"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K0935 + 625 - K0936 + 000","amountPesos":10780000.0,"lengthMeters":375.0,"ratePesosPerMeter":28746.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10561"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0705 + 485 - K0705 + 494, K0705 + 724 - K0705 + 790, K0706 + 943 - K0706 + 985","amountPesos":4887000.0,"lengthMeters":117.0,"ratePesosPerMeter":41769.230769230766,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10563"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0796 + 685 - K0796 + 795, K0796 + 948 - K0797 + 136, K0797 + 938 - K0797 + 941, K0799 + 767 - K0799 + 954, K0805 + 000 - K0805 + 136","amountPesos":30084000.0,"lengthMeters":624.0,"ratePesosPerMeter":48211.53846153846,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10565"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0813 + 567 - K0813 + 600, K0816 + 000 - K0816 + 037, K0826 + 000 - K0826 + 128","amountPesos":12993000.0,"lengthMeters":198.0,"ratePesosPerMeter":65621.21212121213,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10567"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0816 + 300 - K0816 + 800, K0830 + 000 - K0830 + 293, K0830 + 500 - K0830 + 800, K0832 + 920 - K0833 + 150, K0840 + 500 - K0840 + 850, K0841 + 900 - K0842 + 660, K0844 + 180 - K0844 + 400, K0846+ 082 - K0846 + 814","amountPesos":196798000.0,"lengthMeters":3385.0,"ratePesosPerMeter":58138.25701624816,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10569"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0840 + 000 - K0840 + 500","amountPesos":26294000.0,"lengthMeters":500.0,"ratePesosPerMeter":52588.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10571"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0846 + 886 - K0847 + 000, K0847 + 345 - K0847 + 393, K0847 + 507 - K0847 + 586, K0848 + 090 - K0848 + 500, K0854 + 000 - K0854 + 220","amountPesos":40171000.0,"lengthMeters":871.0,"ratePesosPerMeter":46120.55109070034,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10573"},{"year":2026,"category":"Roads","project":"Jct Aurora - Ozamis City Rd  K1653+539 - K1653+812, K1653+843 - K1654 + 876, S01085MN","amountPesos":65824000.0,"lengthMeters":1306.0,"ratePesosPerMeter":50401.22511485452,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10576"},{"year":2026,"category":"Roads","project":"Jct Aurora - Ozamis City Rd K1649 + 500 - K1651 + 135, S01085MN","amountPesos":77709000.0,"lengthMeters":1635.0,"ratePesosPerMeter":47528.44036697248,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10578"},{"year":2026,"category":"Roads","project":"Dipolog-Sindangan-Liloy Rd - (S01057MN) - K1926 + 040 - K1928 + 201","amountPesos":104360000.0,"lengthMeters":2161.0,"ratePesosPerMeter":48292.45719574271,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10580"},{"year":2026,"category":"Roads","project":"Dipolog-Sindangan-Liloy Rd - (S01057MN) K1869 + 700 - K1870 + 700, K1878 + 220 - K1878 + 850, K1878 + 870 - K1879 + 000, K1880 + 442 - K1881 + 375, K1902 + 840 - K1902 + 906, K1902 + 948 - K1903 + 017","amountPesos":162252000.0,"lengthMeters":2828.0,"ratePesosPerMeter":57373.408769448375,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10582"},{"year":2026,"category":"Roads","project":"Dipolog-Sindangan-Liloy Rd - (S01057MN) K1921 + 592 - K1922 + 321, K1922 + 402 - K1923 + 000, K1924 + 540 - K1925 + 872","amountPesos":120128000.0,"lengthMeters":2659.0,"ratePesosPerMeter":45177.88642346747,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10584"},{"year":2026,"category":"Roads","project":"Dipolog-Sindangan-Liloy Rd - K1866 + 000 - K1866 + 820, K1866 + 940 - K1867 + 599, K1868 + 220 - K1868 + 700","amountPesos":64337000.0,"lengthMeters":1959.0,"ratePesosPerMeter":32841.75599795814,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10586"},{"year":2026,"category":"Roads","project":"Dipolog-Sindangan-Liloy Rd (S01057MN) - K1887+857-K1888+151, K1888+377 - K1888+940","amountPesos":52920000.0,"lengthMeters":857.0,"ratePesosPerMeter":61750.29171528588,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10588"},{"year":2026,"category":"Roads","project":"Lanao-Pagadian-Zamboanga City Rd - K1630 + 515 - K1633 + 000","amountPesos":90247000.0,"lengthMeters":2485.0,"ratePesosPerMeter":36316.70020120724,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10590"},{"year":2026,"category":"Roads","project":"Liloy-Ipil Rd - K1966 + (-931) - K1966 + (-861), K1975 + 661 - K1976 + 000, K1989 + 340 - K1990 + 601, K1990 + 625 - K1991 + 196.20","amountPesos":73444000.0,"lengthMeters":2241.2,"ratePesosPerMeter":32769.94467249756,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10592"},{"year":2026,"category":"Roads","project":"Liloy-Siocon Rd - K1991 + 786 - K1996 + 204","amountPesos":147000000.0,"lengthMeters":4418.0,"ratePesosPerMeter":33272.97419646899,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10594"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1718 + 160 - K1718 + 1203","amountPesos":37447000.0,"lengthMeters":1043.0,"ratePesosPerMeter":35903.16395014382,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10596"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1857 + 056 - K1857 + 373, K1857 + 615 - K1857 + 682, K1857 + 956 - K1858 + 441","amountPesos":18558000.0,"lengthMeters":869.0,"ratePesosPerMeter":21355.581127733025,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10598"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1913 + 274 - K1913 + 779","amountPesos":30694000.0,"lengthMeters":505.0,"ratePesosPerMeter":60780.19801980198,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10600"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1922 + 695 - K1922 + 758, K1923 + 344 - K1926 + 553","amountPesos":40395000.0,"lengthMeters":3272.0,"ratePesosPerMeter":12345.660146699267,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10602"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd)(S01328MN) - K1656 + 240 - K1658 + 322, K1658 + 549 - K1658 + 900","amountPesos":149484000.0,"lengthMeters":2433.0,"ratePesosPerMeter":61440.19728729963,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10604"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1744 + 575 - K1747 + 018, K1747 + 050 - K1747 + 558","amountPesos":68128000.0,"lengthMeters":2951.0,"ratePesosPerMeter":23086.411385970856,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10606"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1838 + 000 - K1840 + 064, K1840 + 172.55 - K1843 + 200","amountPesos":130514000.0,"lengthMeters":5091.45,"ratePesosPerMeter":25633.95496371391,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10608"},{"year":2026,"category":"Roads","project":"Sindangan-Liloy Rd - K1935 + 242 - K1935 + 342, K1941 + 654 - K1941 + 699, K1941 + 923 - K1941 + 957, K1952 + 439 - K1953 + 500, K1956 + 040 - K1956 + 495, K1957 + 768 - K1958 + 040, K1958 + 040 - 1958 + 349","amountPesos":95815000.0,"lengthMeters":2276.0,"ratePesosPerMeter":42097.97891036907,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10610"},{"year":2026,"category":"Roads","project":"Bukidnon-Davao City Rd - K1580 + 000 - K1581 + 000","amountPesos":52913000.0,"lengthMeters":1000.0,"ratePesosPerMeter":52913.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10613"},{"year":2026,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1487+351 - K1488+404, K1491+144 - K1491+298, K1496+100 - K1496+260","amountPesos":60238000.0,"lengthMeters":1367.0,"ratePesosPerMeter":44065.837600585226,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10615"},{"year":2026,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1506+040 - K1508+000","amountPesos":86743000.0,"lengthMeters":1960.0,"ratePesosPerMeter":44256.63265306123,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10617"},{"year":2026,"category":"Roads","project":"Linamon-Zamboanga Road (S00914MN),  K1575 + 641 - K1576 + 079, K1577 + 1055 - K1577 + 1097, K1579 + 563 -  K1579 + 668, K1579 + 687 - K1580 + 807","amountPesos":84946000.0,"lengthMeters":1705.0,"ratePesosPerMeter":49821.7008797654,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10619"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Cotabato-Malabang-Lanao del Norte Rd) - (S01650MN) Chainage 31552 - Chainage 32638, Chainage 32669 - Chainage 32820, Chainage 32851 - Chainage 33332, Chainage 33355 - Chainage 33520, Chainage 33542 - Chainage 35560, Chainage 35618 - Chainage 35757","amountPesos":123820000.0,"lengthMeters":4040.0,"ratePesosPerMeter":30648.51485148515,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10621"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Cotabato-Malabang-Lanao del Norte Rd) - (S01650MN) Chainage 5100 - Chainage 8966, Chainage 8992 - Chainage 9039","amountPesos":128385000.0,"lengthMeters":3913.0,"ratePesosPerMeter":32809.864554050604,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10623"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Malabang-Dobleston-Tukuran Rd) - K1969 + (-025) - K1969 + 023,  K1986 + 937 - K1986 + 958, K1987 + 293 - K1987 + 309","amountPesos":5241000.0,"lengthMeters":85.0,"ratePesosPerMeter":61658.82352941176,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10625"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Malabang-Dobleston-Tukuran Rd) - K1982 + 324 - K1983 + 412","amountPesos":17751000.0,"lengthMeters":1088.0,"ratePesosPerMeter":16315.257352941177,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10627"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Malabang-Dobleston-Tukuran Rd) - K1983 + 412 - K1983 + 455, K1983 + 835 - K1983 + 984","amountPesos":6317000.0,"lengthMeters":192.0,"ratePesosPerMeter":32901.041666666664,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10629"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Malabang-Dobleston-Tukuran Rd) - K1998 + 720 - K2000 + 108","amountPesos":48853000.0,"lengthMeters":1388.0,"ratePesosPerMeter":35196.68587896253,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10631"},{"year":2026,"category":"Roads","project":"Misamis Oriental-Ma Cristina Bdry Rd - K1518 + 721 - K1519 + 920","amountPesos":107598000.0,"lengthMeters":1199.0,"ratePesosPerMeter":89739.78315262719,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10633"},{"year":2026,"category":"Roads","project":"Sayre Highway -K1440 + 890 - K1441 + 363, K1445 + 885 - K1446 + 374","amountPesos":82467000.0,"lengthMeters":962.0,"ratePesosPerMeter":85724.53222453223,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10635"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K1395 + 498 - K1395 + 525","amountPesos":961000.0,"lengthMeters":27.0,"ratePesosPerMeter":35592.59259259259,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10638"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K1449 + 882 - K1450 + 416","amountPesos":18672000.0,"lengthMeters":534.0,"ratePesosPerMeter":34966.29213483146,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10640"},{"year":2026,"category":"Roads","project":"Maharlika Highway(Davao City-Jct Digos Sect) - K1529 + 333 - K1529 + 523, K1529 + 1067 - K1530 + 315, K1530 + 369 - K1530 + 377, K1530 + 603 - K1530 + 656, K1530 + 742 - K1530 + 928","amountPesos":40453000.0,"lengthMeters":685.0,"ratePesosPerMeter":59055.47445255474,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10642"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1594 + 000 - K1594 + 400, K1594 + 480 -K1596 + 270","amountPesos":71733000.0,"lengthMeters":2190.0,"ratePesosPerMeter":32754.794520547945,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10645"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1599 + 875 - K1600 + 170, K1601 + 350 - K1603 + 371, K1603 + 601- K1604 + 280","amountPesos":94836000.0,"lengthMeters":2995.0,"ratePesosPerMeter":31664.774624373957,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10647"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1618 + 440 - K1618 + 590","amountPesos":5493000.0,"lengthMeters":150.0,"ratePesosPerMeter":36620.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10649"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1632 + 430 - K1633 + 393","amountPesos":42676000.0,"lengthMeters":963.0,"ratePesosPerMeter":44315.68016614745,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10651"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1638 + 000 - K1639 + 753","amountPesos":50249000.0,"lengthMeters":1753.0,"ratePesosPerMeter":28664.575014261267,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10653"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1660 + 049 - K1660 + 404","amountPesos":10228000.0,"lengthMeters":355.0,"ratePesosPerMeter":28811.267605633802,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10655"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1663 + 116 - K1663 + 945","amountPesos":23885000.0,"lengthMeters":829.0,"ratePesosPerMeter":28811.821471652594,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10657"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1686 + 821 - K1688 + 617","amountPesos":71643000.0,"lengthMeters":1796.0,"ratePesosPerMeter":39890.31180400891,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10659"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1717 + (-751) - K1717 + 546","amountPesos":30855000.0,"lengthMeters":1297.0,"ratePesosPerMeter":23789.51426368543,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10661"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) (S00842MN) - K1703 + 669 -  K1705 + 820","amountPesos":97693000.0,"lengthMeters":2151.0,"ratePesosPerMeter":45417.480241748024,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10663"},{"year":2026,"category":"Roads","project":"Kidapawan - Allah Junction Road - K1660 + 589 - K1660 + 883","amountPesos":9769000.0,"lengthMeters":294.0,"ratePesosPerMeter":33227.89115646258,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10665"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Cotabato-Marbel Rd) - K1752 + 471 - K1753 + 000, K1756 + 488 - K1758 + 460","amountPesos":79849000.0,"lengthMeters":2501.0,"ratePesosPerMeter":31926.829268292684,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10667"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Digos-Makar Rd) - K1600 + 120 - K1600 + 167, K1601 + 700 - K1602 + 000, K1613 + 532 - K1613 + 538, K1613 + 584 - K1613 + 590, K1618 + 750 - K1620 + 098, K1623 + 337 - K1623 + 357, K1623 + 397 - K1623 + 408, K1628 + 617 - K1629 + 000","amountPesos":89899000.0,"lengthMeters":2121.0,"ratePesosPerMeter":42385.195662423386,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10669"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Digos-Makar Rd) - K1629 + 000 - K1629 + 200","amountPesos":7815000.0,"lengthMeters":200.0,"ratePesosPerMeter":39075.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10671"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Marbel-Makar Rd) - K1661 + 348 - K1663 + 500, K1667 + 744 - K1668 + 000, K1669 + 065 - K1669 + 243, K1670 + 000 - K1671 + 000, K1673 + 350 - K1675 + 196","amountPesos":142765000.0,"lengthMeters":5432.0,"ratePesosPerMeter":26282.21649484536,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10673"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Marbel-Makar Rd) - K1663 + 500 - K1663 + 790","amountPesos":20043000.0,"lengthMeters":290.0,"ratePesosPerMeter":69113.79310344828,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10675"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Cotabato-Lanao Rd) - K1881 + 150 - K1883 + 680, K1886 + 820 - K1887 + 057","amountPesos":79724000.0,"lengthMeters":2767.0,"ratePesosPerMeter":28812.43223707987,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10677"},{"year":2026,"category":"Roads","project":"Maharlika Highway( Cotabato-Marbel Rd) - K1713 + 188 - K1713 + 500","amountPesos":20064000.0,"lengthMeters":312.0,"ratePesosPerMeter":64307.692307692305,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10679"},{"year":2026,"category":"Roads","project":"Widening of Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1661 + 409 - K1661 + 911","amountPesos":102444000.0,"lengthMeters":502.0,"ratePesosPerMeter":204071.71314741037,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10681"},{"year":2026,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1250 + (-542) - K1253 + 000","amountPesos":104223000.0,"lengthMeters":3542.0,"ratePesosPerMeter":29424.901185770752,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10684"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) -  K1317 + 852 - K1319 + 950","amountPesos":68835000.0,"lengthMeters":2098.0,"ratePesosPerMeter":32809.81887511916,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10686"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - (S00443MN) Chainage 000 - Chainage 022, Chainage 022 - Chainage 160","amountPesos":3071000.0,"lengthMeters":160.0,"ratePesosPerMeter":19193.75,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10688"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1251 + 542 - K1251 + 682","amountPesos":5397000.0,"lengthMeters":140.0,"ratePesosPerMeter":38550.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10690"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1254 + 609 - K1254 + 853","amountPesos":9678000.0,"lengthMeters":244.0,"ratePesosPerMeter":39663.934426229505,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10692"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1259 + 630 - K1262 + 431, K1265 + 776 - K1266 + 000","amountPesos":13677000.0,"lengthMeters":3025.0,"ratePesosPerMeter":4521.322314049587,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10694"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1269 + 290 - K1269 + 490","amountPesos":7628000.0,"lengthMeters":200.0,"ratePesosPerMeter":38140.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10696"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1272 + 000 - K1272 + 140","amountPesos":5415000.0,"lengthMeters":140.0,"ratePesosPerMeter":38678.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10698"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1272 + 587 - K1273 + 933, K1274 + 414 - K1276 + 000, K1277 + 119.20 - K1277 + 888","amountPesos":147000000.0,"lengthMeters":3700.8,"ratePesosPerMeter":39721.141374837374,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10700"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1280 + 857.55 - K1282 + 844","amountPesos":82929000.0,"lengthMeters":1986.45,"ratePesosPerMeter":41747.3382164172,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10702"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1294 + 000 - K1294 + 035, K1294 + 160.01 - K1294 + 305","amountPesos":7198000.0,"lengthMeters":179.99,"ratePesosPerMeter":39991.110617258586,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10704"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1313 + 915 - K1314 + 406","amountPesos":19940000.0,"lengthMeters":491.0,"ratePesosPerMeter":40610.99796334012,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10706"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1317 + 073 - K1317 + 627","amountPesos":24511000.0,"lengthMeters":554.0,"ratePesosPerMeter":44243.68231046932,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10708"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1337 + 790 - K1338 + 413","amountPesos":36579000.0,"lengthMeters":623.0,"ratePesosPerMeter":58714.28571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10710"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1349 + 093 - K1350 + 000","amountPesos":36737000.0,"lengthMeters":907.0,"ratePesosPerMeter":40503.858875413454,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10712"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1354 + 519 - K1354 + 958, K1358 + 900 - K1360 + 020","amountPesos":75024000.0,"lengthMeters":1559.0,"ratePesosPerMeter":48123.15586914689,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10714"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Agusan-Davao Sect) - K1364 + 726 - K1367 + 586, K1367 + 646 - K1367 + 980","amountPesos":152064000.0,"lengthMeters":3194.0,"ratePesosPerMeter":47609.26737633062,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10716"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Lipata-Surigao Sect) - K1114 + (-608) - K1115 + 474, K1115 + 490 - K1115 + 800","amountPesos":128907000.0,"lengthMeters":2392.0,"ratePesosPerMeter":53890.88628762542,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10718"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Lipata-Surigao Sect) - K1118 + 000 - K1119 + 700","amountPesos":88990000.0,"lengthMeters":1700.0,"ratePesosPerMeter":52347.05882352941,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10720"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Surigao - Agusan Sect) - K1146 + 800 - K1148 + 000, K1151 + 067 - K1151 + 088, K1151 + 117 - K1151 + 643, K1151 + 652 - K1152 + 000","amountPesos":88545000.0,"lengthMeters":2095.0,"ratePesosPerMeter":42264.91646778043,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10722"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Surigao - Agusan Sect) - K1164 + 010 - K1164 + 317, K1164 + 773 - K1165 + 645, K1165 + 800 - K1167 + 172","amountPesos":122412000.0,"lengthMeters":2551.0,"ratePesosPerMeter":47985.8878871031,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10724"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1174 + 701 - K1175 + 133","amountPesos":15225000.0,"lengthMeters":432.0,"ratePesosPerMeter":35243.055555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10726"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1197 + 416 - K1197 + 533, K1197 + 551 - K1198 + 000, K1199 + 000 - K1199 + 296, K1199 + 325.60 - K1199 + 406, K1199 + 422 - K1199 + 553, K1199 + 572 - K1200 + 404","amountPesos":36267000.0,"lengthMeters":1905.4,"ratePesosPerMeter":19033.79867744399,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10728"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1209 + 270 - K1210 + 410, K1210 + 839.60 - K1213 + 900","amountPesos":177868000.0,"lengthMeters":4200.4,"ratePesosPerMeter":42345.490905628976,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10730"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1224 + 788 - K1224 + 920, K1224 + 986 - K1225 + 010, K1232 + 860 - K1233 + 077","amountPesos":10749000.0,"lengthMeters":373.0,"ratePesosPerMeter":28817.69436997319,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10732"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1225 + 207 - K1225 + 824, K1226 + 000 - K1227 + 293, K1228 + 400 - K1229 + 000, K1232 + 462 - K1232 + 812, K1232 + 833.14 - K1232 + 860","amountPesos":117600000.0,"lengthMeters":2886.86,"ratePesosPerMeter":40736.30172574902,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10734"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0391 + 327 - K0391 + 530","amountPesos":5887000.0,"lengthMeters":203.0,"ratePesosPerMeter":29000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10738"},{"year":2026,"category":"Roads","project":"Bauang-Baguio Rd - K0264 + 984 - K0265 + 820","amountPesos":22240000.0,"lengthMeters":836.0,"ratePesosPerMeter":26602.87081339713,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10741"},{"year":2026,"category":"Roads","project":"Bauang-Baguio Rd - K0267 + 652 - K0268 + 643.29","amountPesos":29002000.0,"lengthMeters":991.29,"ratePesosPerMeter":29256.82696284701,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10743"},{"year":2026,"category":"Roads","project":"Bakit - Bakit Jct. -Umingan Road-K0183+358-K0184+000, K0199 + 223- K0199+401","amountPesos":31142000.0,"lengthMeters":820.0,"ratePesosPerMeter":37978.04878048781,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10746"},{"year":2026,"category":"Roads","project":"Manuel S. Agyao Boulevard  - K0515 + 000 - K0516 + 662","amountPesos":47745000.0,"lengthMeters":1662.0,"ratePesosPerMeter":28727.436823104694,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10750"},{"year":2026,"category":"Roads","project":"Santiago-Tuguegarao Rd - K0371 + 000 - K0371 + 470, K0374 + 590 - K0374 + 947, K0376 + 000 - K0376 + 120","amountPesos":24906000.0,"lengthMeters":947.0,"ratePesosPerMeter":26299.89440337909,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10754"},{"year":2026,"category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0035 + 179 - K0036 + 071","amountPesos":44687000.0,"lengthMeters":892.0,"ratePesosPerMeter":50097.533632287,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10758"},{"year":2026,"category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0035 + 650 - K0036 + 279, K0036 + 867 - K0036 + 955","amountPesos":36519000.0,"lengthMeters":717.0,"ratePesosPerMeter":50933.054393305436,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10760"},{"year":2026,"category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0037 + 970 - K0038 + 188, K0038 + 214 - K0038 + 244, K0038 + 274 - K0038 + 494, K0038 + 503 - K0038 + 724","amountPesos":34116000.0,"lengthMeters":689.0,"ratePesosPerMeter":49515.23947750363,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10762"},{"year":2026,"category":"Roads","project":"MSR Passing Poblacion Rd - K0082 + 1440 - K0083 + 033","amountPesos":12721000.0,"lengthMeters":407.0,"ratePesosPerMeter":31255.528255528254,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10765"},{"year":2026,"category":"Roads","project":"Quirino H-way - K0268 + 325 - K0268 + 658","amountPesos":17208000.0,"lengthMeters":333.0,"ratePesosPerMeter":51675.67567567567,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10768"},{"year":2026,"category":"Roads","project":"Quirino H-way - K0268 + 658 - K0268 + 1019","amountPesos":23814000.0,"lengthMeters":361.0,"ratePesosPerMeter":65966.75900277008,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10770"},{"year":2026,"category":"Roads","project":"Bacolod South Rd - K0040 + 234 - K0040 + 533","amountPesos":19600000.0,"lengthMeters":299.0,"ratePesosPerMeter":65551.83946488294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10774"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0102 + 229 - K0102 + 638, K0105 + 810 - K0105 + 936","amountPesos":17150000.0,"lengthMeters":535.0,"ratePesosPerMeter":32056.07476635514,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10777"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0116 + 550 - K0117 + 739","amountPesos":49000000.0,"lengthMeters":1189.0,"ratePesosPerMeter":41211.10176619008,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10779"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0124 + 238 - K0125 + 000","amountPesos":33320000.0,"lengthMeters":762.0,"ratePesosPerMeter":43727.034120734905,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10781"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0130 + 453 - K0130 + 919, K0132 + 233 - K0132 + 904, K0153 + 056 - K0153 + 281, K0153 + 453 - K0153 + 483, K0156 + 501 - K0156 + 631","amountPesos":36959000.0,"lengthMeters":1522.0,"ratePesosPerMeter":24283.18002628121,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10783"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0135 + 580 - K0135 + 897","amountPesos":11270000.0,"lengthMeters":317.0,"ratePesosPerMeter":35552.05047318612,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10785"},{"year":2026,"category":"Roads","project":"Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd -  K0069 + 571 - K0070 + 332","amountPesos":33046000.0,"lengthMeters":761.0,"ratePesosPerMeter":43424.44152431012,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10787"},{"year":2026,"category":"Roads","project":"Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0036 + (-531) - K0036 + (-506), K0036 + (-407) - K0036 + 057, K0037 + 587 - K0037 + 672","amountPesos":15680000.0,"lengthMeters":574.0,"ratePesosPerMeter":27317.073170731706,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10789"},{"year":2026,"category":"Roads","project":"Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0052 + 182 - K0052 + 744","amountPesos":20580000.0,"lengthMeters":562.0,"ratePesosPerMeter":36619.21708185053,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10791"},{"year":2026,"category":"Roads","project":"Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0080 + 833 - K0081 + 604, K0082 + 203 - K0082 + 427","amountPesos":36260000.0,"lengthMeters":995.0,"ratePesosPerMeter":36442.211055276384,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10793"},{"year":2026,"category":"Roads","project":"Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0021 + 187 - K0021 + 500","amountPesos":20859000.0,"lengthMeters":313.0,"ratePesosPerMeter":66642.17252396166,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10796"},{"year":2026,"category":"Roads","project":"Dumaguete South Rd - K0063 + 700 - K0064 + 405","amountPesos":36640000.0,"lengthMeters":705.0,"ratePesosPerMeter":51971.63120567376,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10799"},{"year":2026,"category":"Roads","project":"Dumaguete South Rd - K0065 + 726 - K0066 + 546","amountPesos":42717000.0,"lengthMeters":820.0,"ratePesosPerMeter":52093.90243902439,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10801"},{"year":2026,"category":"Roads","project":"Dumaguete South Rd - K0066 + 546 - K0066 + 867","amountPesos":16699000.0,"lengthMeters":321.0,"ratePesosPerMeter":52021.80685358255,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10803"},{"year":2026,"category":"Roads","project":"Cebu-Toledo Wharf Rd (Uling-Toledo Wharf) - K0051 + 500 - K0052 + 000","amountPesos":29093000.0,"lengthMeters":500.0,"ratePesosPerMeter":58186.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10807"},{"year":2026,"category":"Roads","project":"Naga-Uling Rd - K0037 + (-161) - K0037 + 200","amountPesos":24036000.0,"lengthMeters":361.0,"ratePesosPerMeter":66581.71745152355,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10809"},{"year":2026,"category":"Roads","project":"Cebu North Hagnaya Wharf Rd - K0031+663 - K0031+948","amountPesos":12316000.0,"lengthMeters":285.0,"ratePesosPerMeter":43214.0350877193,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10812"},{"year":2026,"category":"Roads","project":"Cebu North Hagnaya Wharf Rd - (S00166CB) Chainage 000 - Chainage 170","amountPesos":6177000.0,"lengthMeters":170.0,"ratePesosPerMeter":36335.294117647056,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10815"},{"year":2026,"category":"Roads","project":"Dipolog-Punta-Dansullan-S Osmeña (S01056MN)-Zamboanga del Norte/Sur Bdry Rd - K1855+640 - K1856+619","amountPesos":43987000.0,"lengthMeters":979.0,"ratePesosPerMeter":44930.541368743616,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10819"},{"year":2026,"category":"Roads","project":"Dipolog-Sindangan-Liloy Rd - K1847+705 - K1847+812, K1847+967 - K1848+063","amountPesos":10805000.0,"lengthMeters":203.0,"ratePesosPerMeter":53226.600985221674,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10821"},{"year":2026,"category":"Roads","project":"Dipolog-Sindangan-Liloy Rd (S01057MN) - K1898+440 - K1899+000","amountPesos":19600000.0,"lengthMeters":560.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10823"},{"year":2026,"category":"Roads","project":"Dipolog-Sindangan-Liloy Rd(S01057MN)  - K1869+700 - K1870+204","amountPesos":22540000.0,"lengthMeters":504.0,"ratePesosPerMeter":44722.22222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10825"},{"year":2026,"category":"Roads","project":"Liloy-Ipil Rd - K1991 + 196 - K1991 + 601","amountPesos":19600000.0,"lengthMeters":405.0,"ratePesosPerMeter":48395.06172839506,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10828"},{"year":2026,"category":"Roads","project":"Sindangan-Liloy Rd - K1951 + 000 - K1952 + 439","amountPesos":48235000.0,"lengthMeters":1439.0,"ratePesosPerMeter":33519.80542043086,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10830"},{"year":2026,"category":"Roads","project":"Sindangan-Liloy Rd - K1956 + 580 - K1957 + 662","amountPesos":45513000.0,"lengthMeters":1082.0,"ratePesosPerMeter":42063.7707948244,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10832"},{"year":2026,"category":"Roads","project":"Sindangan-Liloy Rd - K1958 + 394 - K1958 + 457, K1960 + 941 - K1961 + 013","amountPesos":5164000.0,"lengthMeters":135.0,"ratePesosPerMeter":38251.851851851854,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10834"},{"year":2026,"category":"Roads","project":"Sindangan-Liloy Rd - K1961 + 031 - K1961 + 152, K1964 + 472 - K1965 + 185","amountPesos":26046000.0,"lengthMeters":834.0,"ratePesosPerMeter":31230.21582733813,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10836"},{"year":2026,"category":"Roads","project":"Bukidnon-Davao City Rd - K1598 + 585 - K1598 + 646","amountPesos":4719000.0,"lengthMeters":61.0,"ratePesosPerMeter":77360.65573770492,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10840"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1444 + 010 - K1444 + 180","amountPesos":15792000.0,"lengthMeters":170.0,"ratePesosPerMeter":92894.11764705883,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10843"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1447 + 034 - K1447 + 304","amountPesos":22470000.0,"lengthMeters":270.0,"ratePesosPerMeter":83222.22222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10845"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1531 + 841 - K1533 + 000","amountPesos":67549000.0,"lengthMeters":1159.0,"ratePesosPerMeter":58282.13977566868,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10848"},{"year":2026,"category":"Roads","project":"Oroquieta City-Plaridel-Calamba-Sapang Dalaga Rd - K1765 + 610 - K1765 + 810, K1765 + 845 - K1766 + 117","amountPesos":15366000.0,"lengthMeters":472.0,"ratePesosPerMeter":32555.084745762713,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10851"},{"year":2026,"category":"Roads","project":"Ozamiz - Oroquieta Road, K1720 + 184 - K1720 + 665, K1717 + 425 - K1717 + 589","amountPesos":47192000.0,"lengthMeters":645.0,"ratePesosPerMeter":73165.89147286821,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10854"},{"year":2026,"category":"Roads","project":"Ozamiz - Oroquieta Road, K1720 + 692 - K1721 + 223","amountPesos":47192000.0,"lengthMeters":531.0,"ratePesosPerMeter":88873.82297551789,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10856"},{"year":2026,"category":"Roads","project":"Ozamiz - Pagadian Road, K1667 + 847 - K1668 + 647","amountPesos":47192000.0,"lengthMeters":800.0,"ratePesosPerMeter":58990.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10858"},{"year":2026,"category":"Roads","project":"Ozamiz - Pagadian Road, K1668 + 647 - K1669 + 287, K1694 + 788 - K1694 + 950","amountPesos":47192000.0,"lengthMeters":802.0,"ratePesosPerMeter":58842.8927680798,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10860"},{"year":2026,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1416+000 - K1416+500","amountPesos":14457000.0,"lengthMeters":500.0,"ratePesosPerMeter":28914.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10863"},{"year":2026,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1454+653 - K1455+000, K1470+826 - K1471 + 080","amountPesos":24095000.0,"lengthMeters":601.0,"ratePesosPerMeter":40091.51414309484,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10865"},{"year":2026,"category":"Roads","project":"Pres. Diosdado P.Macapagal Natl Hi-way - K1778 + 858 - K1779 + 204","amountPesos":9833000.0,"lengthMeters":346.0,"ratePesosPerMeter":28419.07514450867,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10869"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1594 + (-807) - K1594 + (-232)","amountPesos":17450000.0,"lengthMeters":575.0,"ratePesosPerMeter":30347.82608695652,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10873"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1636 + (-948) - K1636 + (-108)","amountPesos":28137000.0,"lengthMeters":840.0,"ratePesosPerMeter":33496.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10876"},{"year":2026,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1272 + 878 - K1273 + 027","amountPesos":4381000.0,"lengthMeters":149.0,"ratePesosPerMeter":29402.68456375839,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10880"},{"year":2026,"category":"Roads","project":"Pangasinan-Zambales Rd - K0331 + 000 - K0332 + 760","amountPesos":48174000.0,"lengthMeters":1760.0,"ratePesosPerMeter":27371.590909090908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10887"},{"year":2026,"category":"Roads","project":"Pangasinan-Zambales Rd - K0350 + 485  - K0350 + 845, K0351 + 000 - K0351 + 055, K0351 + 358 - K0351 + 553","amountPesos":73500000.0,"lengthMeters":610.0,"ratePesosPerMeter":120491.80327868853,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10889"},{"year":2026,"category":"Roads","project":"Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0680 + 356 - K0681 + 473","amountPesos":50674000.0,"lengthMeters":1117.0,"ratePesosPerMeter":45366.15935541629,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10892"},{"year":2026,"category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0490 + 000 - K0491 + 175, K0491 + 187 - K0492 + 038","amountPesos":72827000.0,"lengthMeters":2026.0,"ratePesosPerMeter":35946.1994076999,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10894"},{"year":2026,"category":"Roads","project":"Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0339 + 876 - K0342 + 050","amountPesos":58203000.0,"lengthMeters":2174.0,"ratePesosPerMeter":26772.309107635694,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10897"},{"year":2026,"category":"Roads","project":"Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0357 + 047 - K0357 + 594, K0357 + 719 - K0358 + 520","amountPesos":50467000.0,"lengthMeters":1348.0,"ratePesosPerMeter":37438.42729970327,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10899"},{"year":2026,"category":"Roads","project":"Dugo - San Vicente (Mission - Sta. Ana Section)- K0630+707 - K0631+783, K0631+835 - K0632+331, K0636 + 173 - K0637 + 318, K0637+331 - K0639+210","amountPesos":95420000.0,"lengthMeters":4596.0,"ratePesosPerMeter":20761.5317667537,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10901"},{"year":2026,"category":"Roads","project":"Nueva Vizcaya-Ifugao Rd - K0283 + (-900) - K0283 + (-047), K0285 + 551 - K0286 + 776","amountPesos":72669000.0,"lengthMeters":2078.0,"ratePesosPerMeter":34970.64485081809,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10903"},{"year":2026,"category":"Roads","project":"Gov JJ Linao Rd - K0146 + 000 - K0146 + 604, K0153 + 058 - K0153 + 700","amountPesos":67130000.0,"lengthMeters":1246.0,"ratePesosPerMeter":53876.40449438202,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10906"},{"year":2026,"category":"Roads","project":"Meycauayan-Camalig-Bahay Pari Rd - K0020 + (-854) - K0020 + 596","amountPesos":53469000.0,"lengthMeters":1450.0,"ratePesosPerMeter":36875.1724137931,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10908"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd K0166 + 480 - K0168 + 000","amountPesos":73500000.0,"lengthMeters":1520.0,"ratePesosPerMeter":48355.26315789474,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10910"},{"year":2026,"category":"Roads","project":"Candelaria Bypass Rd - K0109 + 228 - K0110 + 154","amountPesos":72318000.0,"lengthMeters":926.0,"ratePesosPerMeter":78097.19222462203,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10913"},{"year":2026,"category":"Roads","project":"Famy-Real-Infanta-Dinahican Port Rd - K0128 + 905 - K0129 + 685, K0129 + 701 - K0129 + 902, K0129 + 917 - K0134 + 003","amountPesos":112836000.0,"lengthMeters":5067.0,"ratePesosPerMeter":22268.798105387803,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10915"},{"year":2026,"category":"Roads","project":"Sta. Teresita - Alitagtag Diversion Rd -  K0102 + (-183) -  K0103 + 404","amountPesos":60000000.0,"lengthMeters":1587.0,"ratePesosPerMeter":37807.18336483932,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10917"},{"year":2026,"category":"Roads","project":"Gumaca Bypass Rd - K0191 + 969 - K0194 + 027, K0194 + 080 - K0194 + 605, K0194 + 987 - K0195 + 057, K0195 + 238 - K0195 + 303","amountPesos":75728000.0,"lengthMeters":2718.0,"ratePesosPerMeter":27861.662987490803,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10919"},{"year":2026,"category":"Roads","project":"Lucena-Tayabas-Lucban-Sampaloc-Mauban Port Rd - K0129 + 071 - K0134 + 000","amountPesos":93221000.0,"lengthMeters":4929.0,"ratePesosPerMeter":18912.761209170218,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10921"},{"year":2026,"category":"Roads","project":"Manila East Rd - K0039 + (-669) - K0040 + 240, K0040 + 245 - K0040 + 248, K0040 + 253 - K0040 + 958","amountPesos":80185000.0,"lengthMeters":2617.0,"ratePesosPerMeter":30640.045854031334,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10923"},{"year":2026,"category":"Roads","project":"Manila East Rd - K0052 + 384 - K0053 + 366","amountPesos":75453000.0,"lengthMeters":982.0,"ratePesosPerMeter":76836.04887983706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10925"},{"year":2026,"category":"Roads","project":"Noveleta-Naic-Tagaytay Rd - K0060 + 728 - K0061 + 737","amountPesos":57325000.0,"lengthMeters":1009.0,"ratePesosPerMeter":56813.67690782954,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10927"},{"year":2026,"category":"Roads","project":"Noveleta-Naic-Tagaytay Rd - K0063 + 215 - K0064 + 876, K0064 + 891 - K0065 + 000","amountPesos":77939000.0,"lengthMeters":1770.0,"ratePesosPerMeter":44033.333333333336,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10931"},{"year":2026,"category":"Roads","project":"Quezon Eco-Tourism Rd - K0167 + 012 - K0168 + 120","amountPesos":73969000.0,"lengthMeters":1108.0,"ratePesosPerMeter":66759.02527075812,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10933"},{"year":2026,"category":"Roads","project":"Tayabas-Mainit-Mauban Rd - K0146 + 000 - K0146 + 909, K0147 + 908 - K0151 + 178","amountPesos":92357000.0,"lengthMeters":4179.0,"ratePesosPerMeter":22100.263220866236,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10935"},{"year":2026,"category":"Roads","project":"Tayabas-Mainit-Mauban Rd - K0153 + 320 - K0154 + 902, K0154 + 914 - K0155 + 784, K0155 + 806 - K0157 + 592","amountPesos":107782000.0,"lengthMeters":4238.0,"ratePesosPerMeter":25432.279377064653,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10937"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0109 + 481 - K0111 + 025, K0113 + 000 - K0114 + 575","amountPesos":160384000.0,"lengthMeters":3119.0,"ratePesosPerMeter":51421.60949022123,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10940"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0137 + 483 - K0137 + 786, K0140 + 405 - K0141 + 213","amountPesos":51658000.0,"lengthMeters":1111.0,"ratePesosPerMeter":46496.849684968496,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10942"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0162 + 1041 - K0163 + 156, K0163 + 247 - K0163 + 879, K0164 + 231 - K0164 + 297, K0166 + 006 - K0166 + 261","amountPesos":49174000.0,"lengthMeters":1068.0,"ratePesosPerMeter":46043.07116104869,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10944"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0169 + 820 - K0170 + 893, K0173 + 205 - K0173 + 366","amountPesos":45599000.0,"lengthMeters":1234.0,"ratePesosPerMeter":36952.18800648298,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10946"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0174 + 125 - K0174 + 504, K0175 + 141 - K0175 + 835, K0176 + 535 - K0177 + 176, K0178 + 348 - K0178 + 564, K0180 + 807 - K0181 + 000","amountPesos":84323000.0,"lengthMeters":2123.0,"ratePesosPerMeter":39718.794159208664,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10948"},{"year":2026,"category":"Roads","project":"Mindoro West Coastal Rd - K0307+000 - K0308+702","amountPesos":57732000.0,"lengthMeters":1702.0,"ratePesosPerMeter":33920.09400705053,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10950"},{"year":2026,"category":"Roads","project":"Mindoro West Coastal Rd - K0309 + 500 - K0311 + 000","amountPesos":44002000.0,"lengthMeters":1500.0,"ratePesosPerMeter":29334.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10952"},{"year":2026,"category":"Roads","project":"Mindoro West Coastal Rd - K0332 + 500 - K0334 + 338","amountPesos":52304000.0,"lengthMeters":1838.0,"ratePesosPerMeter":28457.01849836779,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10954"},{"year":2026,"category":"Roads","project":"Mindoro West Coastal Rd - K0365+000 - K0368+000","amountPesos":96219000.0,"lengthMeters":3000.0,"ratePesosPerMeter":32073.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10956"},{"year":2026,"category":"Roads","project":"Mindoro West Coastal Rd - K0376 + 503 - K0378 + 000","amountPesos":48983000.0,"lengthMeters":1497.0,"ratePesosPerMeter":32720.774883099533,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10958"},{"year":2026,"category":"Roads","project":"Mindoro West Coastal Rd - K0394 + 000 - K0396 + 000","amountPesos":57285000.0,"lengthMeters":2000.0,"ratePesosPerMeter":28642.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10960"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0045 + 000 - K0046 + 244","amountPesos":55068000.0,"lengthMeters":1244.0,"ratePesosPerMeter":44266.88102893891,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10962"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0159+459 - K0159+745, K0160+250 - K0161+140","amountPesos":59924000.0,"lengthMeters":1176.0,"ratePesosPerMeter":50955.78231292517,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10964"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0198 + 015 - K0199+950","amountPesos":118587000.0,"lengthMeters":1935.0,"ratePesosPerMeter":61285.27131782946,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10966"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0226+500 - K0227+076, K0227+265 - K0228+245, K0228+393 - K0229+500","amountPesos":132390000.0,"lengthMeters":2663.0,"ratePesosPerMeter":49714.60758542996,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10968"},{"year":2026,"category":"Roads","project":"Puerto Princesa North Rd - K0230+000 - K0231+438, K0231+628 - K0231+930","amountPesos":87109000.0,"lengthMeters":1740.0,"ratePesosPerMeter":50062.64367816092,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10970"},{"year":2026,"category":"Roads","project":"Puerto Princesa South Rd - K0177 + 913 - K0178 + 740, K0179 + 000 - K0181 + 870","amountPesos":108012000.0,"lengthMeters":3697.0,"ratePesosPerMeter":29216.121179334597,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10972"},{"year":2026,"category":"Roads","project":"Puerto Princesa South Rd - K0182 + 475 - K0184 + 340","amountPesos":54795000.0,"lengthMeters":1865.0,"ratePesosPerMeter":29380.69705093834,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10974"},{"year":2026,"category":"Roads","project":"Puerto Princesa South Rd - K0187+560 - K0189+850","amountPesos":77649000.0,"lengthMeters":2290.0,"ratePesosPerMeter":33907.86026200873,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10976"},{"year":2026,"category":"Roads","project":"Puerto Princesa South Rd - K0234+556 - K0236+320, K0236+600 - K0238+100","amountPesos":119778000.0,"lengthMeters":3264.0,"ratePesosPerMeter":36696.69117647059,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10978"},{"year":2026,"category":"Roads","project":"Albay West Coast Rd - K0513 + 325 - K0514 + 437","amountPesos":66444000.0,"lengthMeters":1112.0,"ratePesosPerMeter":59751.79856115108,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10981"},{"year":2026,"category":"Roads","project":"Albay West Coast Rd - K0514 + 437 - K0514 + 503, K0514 + 524 - K0514 + 818, K0514 + 859 - K0515 + 391, K0515 + 474 - K0515 + 739","amountPesos":65213000.0,"lengthMeters":1157.0,"ratePesosPerMeter":56363.872082973205,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10983"},{"year":2026,"category":"Roads","project":"Catanduanes Cir Rd - K0187 + 480 - K0187 + 930, K0188 + 420 - K0189 + 700, K0190 + 550 - K0191 + 384","amountPesos":187467000.0,"lengthMeters":2564.0,"ratePesosPerMeter":73115.05460218409,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10985"},{"year":2026,"category":"Roads","project":"Catanduanes Cir Rd - K0193 + 790 - K0195 + 823","amountPesos":59693000.0,"lengthMeters":2033.0,"ratePesosPerMeter":29362.026561731433,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10987"},{"year":2026,"category":"Roads","project":"Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0537+987 - K0539+054","amountPesos":65660000.0,"lengthMeters":1067.0,"ratePesosPerMeter":61537.01968134958,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10989"},{"year":2026,"category":"Roads","project":"Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0549 + 825 - K0550 + 809","amountPesos":55860000.0,"lengthMeters":984.0,"ratePesosPerMeter":56768.29268292683,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10991"},{"year":2026,"category":"Roads","project":"Jct Putiao-Pilar-Donsol Rd - K0545 + 820 - K0546 + 000, K0547 + 000 - K0547 + 359","amountPesos":57827000.0,"lengthMeters":539.0,"ratePesosPerMeter":107285.71428571429,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10993"},{"year":2026,"category":"Roads","project":"Jct Putiao-Pilar-Donsol Rd - K0548 + 476 - K0549 +000","amountPesos":56570000.0,"lengthMeters":524.0,"ratePesosPerMeter":107958.01526717558,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10995"},{"year":2026,"category":"Roads","project":"Lagta-Crossing Malinta Rd - K0104 + 907 - K0105 + 597","amountPesos":55775000.0,"lengthMeters":690.0,"ratePesosPerMeter":80833.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10997"},{"year":2026,"category":"Roads","project":"Lagta-Crossing Malinta Rd - K0106 + 141 - K0107 + 116","amountPesos":78400000.0,"lengthMeters":975.0,"ratePesosPerMeter":80410.2564102564,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 10999"},{"year":2026,"category":"Roads","project":"Legazpi City - Punta de Jesus Rd - K0575+630 - K0576+435","amountPesos":54880000.0,"lengthMeters":805.0,"ratePesosPerMeter":68173.91304347826,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11001"},{"year":2026,"category":"Roads","project":"Ligao - Pio Duran Rd - K0526 + 600 - K0528 + 182","amountPesos":70289000.0,"lengthMeters":1582.0,"ratePesosPerMeter":44430.46776232617,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11003"},{"year":2026,"category":"Roads","project":"Ligao - Pio Duran Rd - K0529 + 000 - K0529 + 088, K0529 + 088 - K0529 + 368, K0529 + 425 - K0529 + 585, K0529 + 585 - K0529 + 652, K0529 + 652 - K0530 + 058","amountPesos":58574000.0,"lengthMeters":1001.0,"ratePesosPerMeter":58515.484515484524,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11005"},{"year":2026,"category":"Roads","project":"Ligao - Pio Duran Rd - K0531 + 540 - K0532 + 000, K0532 + 000 - K0532 + 646, K0532 + 672 - K0532 + 940","amountPesos":66700000.0,"lengthMeters":1374.0,"ratePesosPerMeter":48544.395924308585,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11007"},{"year":2026,"category":"Roads","project":"Ligao - Pio Duran Rd - K0532 + 940 - K0533 + 280, K0533 + 360 - K0534 + 396","amountPesos":66424000.0,"lengthMeters":1376.0,"ratePesosPerMeter":48273.25581395349,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11009"},{"year":2026,"category":"Roads","project":"Ligao-Pio Duran Rd - K0530 + 058 - K0530 + 085, K0530+112 - K0531 + 360","amountPesos":66429000.0,"lengthMeters":1275.0,"ratePesosPerMeter":52101.17647058824,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11011"},{"year":2026,"category":"Roads","project":"Ligao-Pioduran Rd - K0503 + 853 - K0504 + 455, K0510 + 840 - K0511 + 590","amountPesos":78099000.0,"lengthMeters":1352.0,"ratePesosPerMeter":57765.5325443787,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11013"},{"year":2026,"category":"Roads","project":"Pili-Tigaon-Albay Bdry Rd - K0459 + 912- K0462 + 300","amountPesos":98000000.0,"lengthMeters":2388.0,"ratePesosPerMeter":41038.52596314908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11015"},{"year":2026,"category":"Roads","project":"Pili-Tigaon-Albay Bdry Rd - K0476 + 569 - K0478 + 000","amountPesos":62705000.0,"lengthMeters":1431.0,"ratePesosPerMeter":43819.007686932215,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11017"},{"year":2026,"category":"Roads","project":"Polangui Poblacion Road - K0491 + 171 - K0491 + 606, K0491 + 676 - K0491 + 1046","amountPesos":50648000.0,"lengthMeters":805.0,"ratePesosPerMeter":62916.7701863354,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11019"},{"year":2026,"category":"Roads","project":"Aklan East Rd - K0295 + 880 - K0296 + 300, K0296 + 577 - K0296 + 886, K0297 + 017 - K0298 + 324","amountPesos":109751000.0,"lengthMeters":2036.0,"ratePesosPerMeter":53905.20628683693,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11022"},{"year":2026,"category":"Roads","project":"Aklan West Rd (Kalibo-Nabas) - K0237 + 471 - K0238 + 693","amountPesos":55573000.0,"lengthMeters":1222.0,"ratePesosPerMeter":45477.08674304419,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11024"},{"year":2026,"category":"Roads","project":"Aklan West Rd (Kalibo-Nabas) - K0248 + 800 - K0249 + 960","amountPesos":112687000.0,"lengthMeters":1160.0,"ratePesosPerMeter":97143.96551724138,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11026"},{"year":2026,"category":"Roads","project":"Aklan West Rd (Kalibo-Nabas) - K0249 + 960 - K0251 + 122","amountPesos":127155000.0,"lengthMeters":1162.0,"ratePesosPerMeter":109427.7108433735,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11028"},{"year":2026,"category":"Roads","project":"Altavas Bypass Road (S00540PN) - Chainage 25 - Chainage 117, Chainage 152 - Chainage 1147","amountPesos":124394000.0,"lengthMeters":1087.0,"ratePesosPerMeter":114437.90248390065,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11030"},{"year":2026,"category":"Roads","project":"Banga Bypass Road (S00543PN) - Chainage 126 - Chainage 749","amountPesos":79563000.0,"lengthMeters":623.0,"ratePesosPerMeter":127709.47030497593,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11032"},{"year":2026,"category":"Roads","project":"Capiz-Aklan Rd - K0333 + 335 - K0333 + 605, K0333 + 904 - K0334 + 252","amountPesos":47824000.0,"lengthMeters":618.0,"ratePesosPerMeter":77385.11326860842,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11034"},{"year":2026,"category":"Roads","project":"Capiz-Aklan Rd - K0335 + 240 - K0335 + 580, K0335 + 760 - K0336 + 200, K0336 + 880 - K0337 + 260","amountPesos":86161000.0,"lengthMeters":1160.0,"ratePesosPerMeter":74276.72413793103,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11036"},{"year":2026,"category":"Roads","project":"Capiz-Aklan Rd - K0338 + 630 - K0339 + 580","amountPesos":69571000.0,"lengthMeters":950.0,"ratePesosPerMeter":73232.63157894737,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11038"},{"year":2026,"category":"Roads","project":"Capiz-Aklan Rd - K0340 + 133 - K0341 + 122, K0343 + 529 - K0343 + 650","amountPesos":71196000.0,"lengthMeters":1110.0,"ratePesosPerMeter":64140.54054054054,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11040"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0162 + 303 - K0162 + 340, K0165 + 879 - K0167 + 332, K0167 + 363 - K0168 + 663","amountPesos":65307000.0,"lengthMeters":2790.0,"ratePesosPerMeter":23407.52688172043,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11042"},{"year":2026,"category":"Roads","project":"Jaime Cardinal Sin Ave - K0281 + 328 - K0283 + 000","amountPesos":92764000.0,"lengthMeters":1672.0,"ratePesosPerMeter":55480.861244019135,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11044"},{"year":2026,"category":"Roads","project":"Jaime Cardinal Sin Ave - K0293 + 136 - K0295 + 900","amountPesos":118510000.0,"lengthMeters":2764.0,"ratePesosPerMeter":42876.266280752534,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11046"},{"year":2026,"category":"Roads","project":"Maayon Jct-Bailan Rd - K0126 + 973 - K0127 + 327, K0127 + 378 - K0130 + 235","amountPesos":75153000.0,"lengthMeters":3211.0,"ratePesosPerMeter":23404.85829959514,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11048"},{"year":2026,"category":"Roads","project":"Jct Bagonawa-La Castellana-Isabela Rd - K0053 + 103 - K0054 + 561","amountPesos":71256000.0,"lengthMeters":1458.0,"ratePesosPerMeter":48872.42798353909,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11051"},{"year":2026,"category":"Roads","project":"Jct Natl Rd Sagay-Bato-Dian-Marcelo-Balea Jct Rd - K0087 + 929 - K0089 + 555","amountPesos":68600000.0,"lengthMeters":1626.0,"ratePesosPerMeter":42189.42189421894,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11053"},{"year":2026,"category":"Roads","project":"Cebu North Hagnaya Wharf Rd - K0042 + 896 - K0044 + 135","amountPesos":50751000.0,"lengthMeters":1239.0,"ratePesosPerMeter":40961.259079903146,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11056"},{"year":2026,"category":"Roads","project":"Jct (LIR) Carmen-Sagbayan-Bacani Rd - K0162 + 300 - K0163 + 000, K0167 + 361 - K0168 + 920, K0170 + 000 - K0171 + 040, K0171 + 071.44 - K0171 + 337","amountPesos":96975000.0,"lengthMeters":3564.56,"ratePesosPerMeter":27205.32127387393,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11058"},{"year":2026,"category":"Roads","project":"Santander-Barili-Toledo Rd - K0160 + 300 - K0160 + 700","amountPesos":55276000.0,"lengthMeters":400.0,"ratePesosPerMeter":138190.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11060"},{"year":2026,"category":"Roads","project":"Santander-Barili-Toledo Rd - K0177 + 078 - K0178 + 000","amountPesos":110934000.0,"lengthMeters":922.0,"ratePesosPerMeter":120318.87201735358,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11062"},{"year":2026,"category":"Roads","project":"Santander-Barili-Toledo Rd - K0207 + 390 - K0208 + 281","amountPesos":82090000.0,"lengthMeters":891.0,"ratePesosPerMeter":92132.4354657688,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11064"},{"year":2026,"category":"Roads","project":"Santander-Barili-Toledo Rd - K0211 + 840 - K0212 + 776","amountPesos":115798000.0,"lengthMeters":936.0,"ratePesosPerMeter":123715.81196581197,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11066"},{"year":2026,"category":"Roads","project":"Santander-Barili-Toledo Rd - K0219 + 750 - K0220 + 419","amountPesos":73906000.0,"lengthMeters":669.0,"ratePesosPerMeter":110472.34678624813,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11068"},{"year":2026,"category":"Roads","project":"The President Carlos P. Garcia Circumferential Rd - K0075 + 200 - K0075 + 735, K0078 + 573 - K0078 + 695, K0089 + 689 - K0090 + 600","amountPesos":56443000.0,"lengthMeters":1568.0,"ratePesosPerMeter":35996.81122448979,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11070"},{"year":2026,"category":"Roads","project":"The President Carlos P. Garcia Circumferential Rd - K0103 + 380 - K0105 + 094","amountPesos":65068000.0,"lengthMeters":1714.0,"ratePesosPerMeter":37962.660443407236,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11072"},{"year":2026,"category":"Roads","project":"The President Carlos P. Garcia Circumferential Rd - K0126 + 228 - K0127 + 797","amountPesos":56974000.0,"lengthMeters":1569.0,"ratePesosPerMeter":36312.30082855322,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11074"},{"year":2026,"category":"Roads","project":"The President Carlos P. Garcia Circumferential Rd - K0146 + 000 - K0147 + 500","amountPesos":54285000.0,"lengthMeters":1500.0,"ratePesosPerMeter":36190.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11076"},{"year":2026,"category":"Roads","project":"The President Carlos P. Garcia Circumferential Rd - K0243 + 000 - K0243 + 599, K0243 + 626 - K0244 + 259, K0244 + 295 - K0245 + 880","amountPesos":96900000.0,"lengthMeters":2817.0,"ratePesosPerMeter":34398.29605963791,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11078"},{"year":2026,"category":"Roads","project":"Bdry  Southern Leyte-Maasin-Macrohon-Sogod-Jct Daang Maharlika - K1147 + 499 - K1147 +607, K1147 + 662 - K1147 + 687.8, K1153 + 955 - K1154 + 262, K1157 + 608 - K1157 + 820, K1158 + 585 - K1159 + 564","amountPesos":56207000.0,"lengthMeters":1631.8,"ratePesosPerMeter":34444.78490010933,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11081"},{"year":2026,"category":"Roads","project":"Biliran Circumferential Rd - K1086 + 940 - K1088 + 800","amountPesos":72360000.0,"lengthMeters":1860.0,"ratePesosPerMeter":38903.22580645161,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11083"},{"year":2026,"category":"Roads","project":"Borongan-Guiuan Rd - (S00171SM) K1034 + 150 - K1036 + 441","amountPesos":88200000.0,"lengthMeters":2291.0,"ratePesosPerMeter":38498.47228284592,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11085"},{"year":2026,"category":"Roads","project":"Jct Taft-Oras-Sn Policarpo-Arteche Rd - K0789 + 373 - K0789 + 385, K0789 + 430 - K0789 + 457, K0790 + 022 - K0790 + 220, K0790 + 251 - K0790 + 407, K0790 + 418 - K0790 + 449, K0792 + 137 - K0792 + 201, K0792 + 261 - K0792 + 399, K0792 + 777 - K0792 + 858, K0793 + 000 - K0793 + 034, K0793 + 360- K0793 + 462","amountPesos":117600000.0,"lengthMeters":843.0,"ratePesosPerMeter":139501.7793594306,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11087"},{"year":2026,"category":"Roads","project":"Jct Taft-Oras-Sn Policarpo-Arteche Rd - K0793 + 000 - K0793 + 034, K0793 + 360 - K0793 + 407, K0795 + 066 - K0795 + 079, K0795 + 511 - K0795 + 567, K0796 + 485 - K0797 + 000","amountPesos":110952000.0,"lengthMeters":665.0,"ratePesosPerMeter":166845.1127819549,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11089"},{"year":2026,"category":"Roads","project":"Jct Taft-Oras-Sn Policarpo-Arteche Rd - K0797 + 000 - K0797 + 043, K0797 + 882 - K0798 + 134, K0798 + 381 - K0799 + 000","amountPesos":120600000.0,"lengthMeters":914.0,"ratePesosPerMeter":131947.48358862146,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11091"},{"year":2026,"category":"Roads","project":"Jct Taft-Oras-Sn Policarpo-Arteche Rd - K0799 + 000 - K0799+ 126, K0799 + 159 - K0799 + 218","amountPesos":91656000.0,"lengthMeters":185.0,"ratePesosPerMeter":495437.8378378378,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11093"},{"year":2026,"category":"Roads","project":"Jct Taft-Oras-Sn Policarpo-Arteche Rd - K0898 + 478 - K0899 + 787, K0899 + 1106 - K0900 + 348","amountPesos":98000000.0,"lengthMeters":1551.0,"ratePesosPerMeter":63185.04190844616,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11095"},{"year":2026,"category":"Roads","project":"Jct Taft-Oras-Sn Policarpo-Arteche Rd (S00167SM) - K0936 + 010 - K0937 + 538","amountPesos":68600000.0,"lengthMeters":1528.0,"ratePesosPerMeter":44895.28795811519,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11097"},{"year":2026,"category":"Roads","project":"Ormoc-Baybay-Southern Leyte Bdry Rd - K1066 + 367 - K1067 + 000, K1071 + 000 - K1071 + 425, K1071 + 525 - K1072 + 722, K1072 + 755 - K1073 + 048, K1073 + 078 - K1073 + 714","amountPesos":93100000.0,"lengthMeters":3184.0,"ratePesosPerMeter":29239.94974874372,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11099"},{"year":2026,"category":"Roads","project":"Pangpang - Palapag - Mapanas - Gamay - Lapinig Rd, K0834+180 - K0835+100","amountPesos":82008000.0,"lengthMeters":920.0,"ratePesosPerMeter":89139.13043478261,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11101"},{"year":2026,"category":"Roads","project":"Sn Policarpo - Arteche - Lapinig Rd, K0855+400 - K0856+000","amountPesos":51135000.0,"lengthMeters":600.0,"ratePesosPerMeter":85225.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11103"},{"year":2026,"category":"Roads","project":"Tacloban City Bypass Rd - (S00294LT) Chainage 1910 - Chainage 3799","amountPesos":83555000.0,"lengthMeters":1889.0,"ratePesosPerMeter":44232.39809422975,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11105"},{"year":2026,"category":"Roads","project":"Basilan Circumferential Rd (Maluso-Isabela Rd) - (S00016BL) Chainage 5651 - Chainage 7948, Chainage 8432 - Chainage 9185","amountPesos":88730000.0,"lengthMeters":3050.0,"ratePesosPerMeter":29091.803278688523,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11108"},{"year":2026,"category":"Roads","project":"Basilan Circumferential Rd (S00012BL) - K0031 + 156 - K0033 + 616","amountPesos":72790000.0,"lengthMeters":2460.0,"ratePesosPerMeter":29589.43089430894,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11110"},{"year":2026,"category":"Roads","project":"Jolo-Indanan-Parang-Silangkan Rd - (S00005SL) Chainage 10550 - Chainage 14450","amountPesos":113458000.0,"lengthMeters":3900.0,"ratePesosPerMeter":29091.79487179487,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11112"},{"year":2026,"category":"Roads","project":"Jolo-Indanan-Parang-Silangkan Rd - (S00005SL) Chainage 15000 - Chainage 15629, Chainage 15659 - Chainage 19350","amountPesos":168610000.0,"lengthMeters":4320.0,"ratePesosPerMeter":39030.09259259259,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11114"},{"year":2026,"category":"Roads","project":"Jolo-Indanan-Parang-Silangkan Rd - (S00005SL) Chainage 2750 - Chainage 6650","amountPesos":113458000.0,"lengthMeters":3900.0,"ratePesosPerMeter":29091.79487179487,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11116"},{"year":2026,"category":"Roads","project":"Jolo-Indanan-Parang-Silangkan Rd - (S00005SL) Chainage 6650 - Chainage 10550","amountPesos":113458000.0,"lengthMeters":3900.0,"ratePesosPerMeter":29091.79487179487,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11118"},{"year":2026,"category":"Roads","project":"Liloy - Siocon Rd (S01330MN), K2069 + 000 - K2070 + 000","amountPesos":44453000.0,"lengthMeters":1000.0,"ratePesosPerMeter":44453.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11120"},{"year":2026,"category":"Roads","project":"Liloy-Siocon Rd - K2024 + (-898) - K2025 + 000","amountPesos":83134000.0,"lengthMeters":1898.0,"ratePesosPerMeter":43800.84299262382,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11122"},{"year":2026,"category":"Roads","project":"Romandier-Camp Andres-Tanduh Bato Rd - (S00022SL) Chainage 24163 - Chainage 24524","amountPesos":8706000.0,"lengthMeters":361.0,"ratePesosPerMeter":24116.34349030471,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11124"},{"year":2026,"category":"Roads","project":"Siocon-Sirawai Rd (S01147MN), K2080 + 000 - K2081 + 000","amountPesos":45423000.0,"lengthMeters":1000.0,"ratePesosPerMeter":45423.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11126"},{"year":2026,"category":"Roads","project":"Siocon-Sirawai Rd (S01147MN), K2083 + 500 - K2084 + 780","amountPesos":56487000.0,"lengthMeters":1280.0,"ratePesosPerMeter":44130.46875,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11128"},{"year":2026,"category":"Roads","project":"Siocon-Sirawai-Sibuco-Limpapa Road (S01163MN), K2096 + (-011) - K2098 + 500","amountPesos":110735000.0,"lengthMeters":2511.0,"ratePesosPerMeter":44099.96017522899,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11130"},{"year":2026,"category":"Roads","project":"Zamboanga City-Labuan-Limpapa Rd - K1939 + (-780) - K1940 + 206, K1941 + 105 - K1941 + 169, K1941 + 185.05 - K1941 + 245, K1950 + 187.23 - K1950 + 250, K1957 + 670 - K1957 + 719, K1957 + 737 - K1957 + 971, K1958 + 248 - K1958 + 264, K1958 + 341 - K1958 + 388, K1958 + 527 - K1958 + 538, K1962 + 411 - K1962 + 512, K1964 + 555 - K1965 + 929, K1966 + 463 - K1966 + 558, K1967 + 841 - K1967 + 865, K1967 + 894 - K1967 + 911, K1968 + 686 - K1968 + 826, K1968 + 847 - K1968 + 860, K1969 + 189 - K1969 + 213, K1969 + 264 - K1969 + 282, K1969 + 328.40 - K1969 + 347, K1969 + 497 - K1969 + 512, K1969 + 593 - K1969 + 619, K1969 + 863 - K1969 + 924, K1970 + 649 - K1970 + 650, K1971 + 327 - K1971 + 338, K1971 + 780 - K1971 + 789, K1971 + 817 - K1971 + 833, K1972 + 422 - K1972 + 598, K1972 + 715 - K1972 + 892, K1973 + 395 - K1973 + 614, K1973 + 695 - K1973 + 752, K1973 + 782 - K1973 + 828, K1975 + 120 - K1975 + 173, K1975 + 895 - K1975 + 902, K1976 + 545 - K1976 + 595, K1977 + 251 - K1977 + 291, K1978 + 119 - K1978 + 187, K1978 + 309 - K1978 + 524, K1978 + 619 - K1978 + 909","amountPesos":202153000.0,"lengthMeters":5891.32,"ratePesosPerMeter":34313.70219237756,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11132"},{"year":2026,"category":"Roads","project":"Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - (S01152MN) Chainage 18541 - Chainage 20541","amountPesos":93405000.0,"lengthMeters":2000.0,"ratePesosPerMeter":46702.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11134"},{"year":2026,"category":"Roads","project":"Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - (S01152MN) Chainage 20541 - Chainage 22522","amountPesos":85999000.0,"lengthMeters":1981.0,"ratePesosPerMeter":43411.91317516406,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11136"},{"year":2026,"category":"Roads","project":"Camiguin Circumferential Rd - K0019 + 197 - K0019 + 750, K0019 + 803 - K0020 + 521, K0021 + 000 - K0021 + 387","amountPesos":54672000.0,"lengthMeters":1658.0,"ratePesosPerMeter":32974.668275030155,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11141"},{"year":2026,"category":"Roads","project":"Camiguin Circumferential Rd - K0028 + 267 - K0029 + 250, K0030 + 320 - K0030 + 559, K0030 + 605 - K0030 + 993","amountPesos":57355000.0,"lengthMeters":1610.0,"ratePesosPerMeter":35624.223602484475,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11143"},{"year":2026,"category":"Roads","project":"Camiguin Circumferential Rd - K0035 + 144 - K0036 + 154, K0036 + 175 - K0036 + 574, K0040 + 735.93 - K0041 + 366","amountPesos":51917000.0,"lengthMeters":2039.07,"ratePesosPerMeter":25461.117077883548,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11145"},{"year":2026,"category":"Roads","project":"CDO City-Dominorog-Camp Kibaritan Rd - K1477 + 740 - K1478 + 833","amountPesos":63838000.0,"lengthMeters":1093.0,"ratePesosPerMeter":58406.22140896615,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11147"},{"year":2026,"category":"Roads","project":"CDO City-Dominorog-Camp Kibaritan Rd - K1481 + 515 - K1482 + 606","amountPesos":63838000.0,"lengthMeters":1091.0,"ratePesosPerMeter":58513.290559120076,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11149"},{"year":2026,"category":"Roads","project":"CDO City-Dominorog-Camp Kibaritan Rd - K1483 + 419 - K1484 + 297","amountPesos":48954000.0,"lengthMeters":878.0,"ratePesosPerMeter":55756.26423690205,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11151"},{"year":2026,"category":"Roads","project":"Gingoog - Claveria - Villanueva Rd - K1340 + 503 - K1341 + 283","amountPesos":52753000.0,"lengthMeters":780.0,"ratePesosPerMeter":67632.05128205128,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11153"},{"year":2026,"category":"Roads","project":"Gingoog - Claveria - Villanueva Rd - K1341 + 283 - K1342 + 074","amountPesos":52753000.0,"lengthMeters":791.0,"ratePesosPerMeter":66691.52970922882,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11155"},{"year":2026,"category":"Roads","project":"Gingoog-Claveria-Villanueva Rd - K1378+000 - K1381+500","amountPesos":131119000.0,"lengthMeters":3500.0,"ratePesosPerMeter":37462.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11157"},{"year":2026,"category":"Roads","project":"Wao-Bumbaran Rd - Chainage 818 - Chainage 2500","amountPesos":79695000.0,"lengthMeters":1682.0,"ratePesosPerMeter":47381.09393579073,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11159"},{"year":2026,"category":"Roads","project":"Wao-Bumbaran section - (S01605MN) Chainage 13750 - Chainage 15000","amountPesos":43885000.0,"lengthMeters":1250.0,"ratePesosPerMeter":35108.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11161"},{"year":2026,"category":"Roads","project":"Montevista-Compostela-Mati Bdry Rd - K1470 + 500 - K1474 + 358","amountPesos":75000000.0,"lengthMeters":3858.0,"ratePesosPerMeter":19440.12441679627,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11164"},{"year":2026,"category":"Roads","project":"Asuncion-San Isidro-Laak-Veruela Rd - K1504 + 000 - K1506 + 000","amountPesos":63021000.0,"lengthMeters":2000.0,"ratePesosPerMeter":31510.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11166"},{"year":2026,"category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1604+760 - K1606+609, K1607+660 - K1608+660","amountPesos":96124000.0,"lengthMeters":2849.0,"ratePesosPerMeter":33739.55773955774,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11168"},{"year":2026,"category":"Roads","project":"Nabunturan-Maragusan Rd - K1460+219 - K1461+719","amountPesos":72093000.0,"lengthMeters":1500.0,"ratePesosPerMeter":48062.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11170"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Road (S01376MN)  K1781+ (-486) - K1783+000","amountPesos":72597000.0,"lengthMeters":2486.0,"ratePesosPerMeter":29202.333065164923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11172"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Road (S01376MN)  K1783+000 - K1785+486","amountPesos":66000000.0,"lengthMeters":2486.0,"ratePesosPerMeter":26548.672566371682,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11174"},{"year":2026,"category":"Roads","project":"Nabunturan-Maragusan Rd - K1461+719 - K1463+819","amountPesos":96124000.0,"lengthMeters":2100.0,"ratePesosPerMeter":45773.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11176"},{"year":2026,"category":"Roads","project":"Albert Morrow Blvd. (S00686MN) - K1645 + (-773) - K1645 + 802","amountPesos":37734000.0,"lengthMeters":1575.0,"ratePesosPerMeter":23958.095238095237,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11181"},{"year":2026,"category":"Roads","project":"Albert Morrow Blvd. (S00729MN) - K1664 + 340 -K1664 + 407, K1664 + 606 - K1664 + 825, K1665 + 208 - K1665 + 547","amountPesos":9983000.0,"lengthMeters":625.0,"ratePesosPerMeter":15972.8,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11183"},{"year":2026,"category":"Roads","project":"Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K1915 + 784 - K1916 + 194, K1916 + 337 - K1917 + 221","amountPesos":92131000.0,"lengthMeters":1294.0,"ratePesosPerMeter":71198.60896445131,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11185"},{"year":2026,"category":"Roads","project":"Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K2033 + 096 - K2034 + 237, K2034 + 375 - K2035 + 500","amountPesos":89227000.0,"lengthMeters":2266.0,"ratePesosPerMeter":39376.43424536628,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11187"},{"year":2026,"category":"Roads","project":"Filipino-American Friendship Ave. (S01440MN) - K1664 + 092 - K1666 + 000","amountPesos":48847000.0,"lengthMeters":1908.0,"ratePesosPerMeter":25601.153039832287,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11189"},{"year":2026,"category":"Roads","project":"Makar-Marbel Rd (S00243MN) - K1656 + 013 - K1656 + 754, K1656 + 877 - K1657 + 280","amountPesos":31477000.0,"lengthMeters":1144.0,"ratePesosPerMeter":27514.86013986014,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11191"},{"year":2026,"category":"Roads","project":"Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1658 + 680 - K1659 + 000, K1660 + 364 - K1660 + 740","amountPesos":21061000.0,"lengthMeters":696.0,"ratePesosPerMeter":30260.05747126437,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11193"},{"year":2026,"category":"Roads","project":"Sarangani-Davao Del Sur Coastal Rd - K1681 + 892.2 - K1687 + 379","amountPesos":156309000.0,"lengthMeters":5486.8,"ratePesosPerMeter":28488.189837427766,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11195"},{"year":2026,"category":"Roads","project":"Sarangani-Davao Del Sur Coastal Rd - K1693 + 874- K1693 + 968, K1693 + 1000- K1694 + 081","amountPesos":6839000.0,"lengthMeters":175.0,"ratePesosPerMeter":39080.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11197"},{"year":2026,"category":"Roads","project":"Sarangani-Davao Del Sur Coastal Rd - K1705 + 121 - K1711 + 500","amountPesos":152236000.0,"lengthMeters":6379.0,"ratePesosPerMeter":23865.182630506348,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11199"},{"year":2026,"category":"Roads","project":"Sarangani-Davao Del Sur Coastal Rd - K1734 + 075 - K1735 + 115, K1735 + 206 - K1736 + 252","amountPesos":48847000.0,"lengthMeters":2086.0,"ratePesosPerMeter":23416.586768935762,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11201"},{"year":2026,"category":"Roads","project":"Sarangani-Sultan Kudarat Coastal Rd - K1710 + 073 - K1713 + 193","amountPesos":84855000.0,"lengthMeters":3120.0,"ratePesosPerMeter":27197.115384615383,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11203"},{"year":2026,"category":"Roads","project":"Widening of Midsayap-Dulawan-Makar Rd - K1720 + 866 - K1722 + 834","amountPesos":94836000.0,"lengthMeters":1968.0,"ratePesosPerMeter":48189.0243902439,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11205"},{"year":2026,"category":"Roads","project":"Widening of Midsayap-Dulawan-Makar Rd - K1726 + 591 - K1728 + 581","amountPesos":94836000.0,"lengthMeters":1990.0,"ratePesosPerMeter":47656.281407035174,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11207"},{"year":2026,"category":"Roads","project":"NJR Bah-Bah-Talacogon Rd - K1311 + 000 - K1312 + 079, K1314 + 396 - K1314 + 963","amountPesos":98000000.0,"lengthMeters":1646.0,"ratePesosPerMeter":59538.27460510328,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11210"},{"year":2026,"category":"Roads","project":"Surigao - Davao Coastal Rd - K1408+ 300 - K1409+256, K1414+000 - K1414+876","amountPesos":80360000.0,"lengthMeters":1832.0,"ratePesosPerMeter":43864.6288209607,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11212"},{"year":2026,"category":"Roads","project":"Surigao - Davao Coastal Rd - K1491+600 - K1492+797, K1492+950 - K1493+025","amountPesos":78400000.0,"lengthMeters":1272.0,"ratePesosPerMeter":61635.22012578617,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11214"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd – K1154+100 - K1155+258, K1155+306 - K1155+629, K1155+668 - K1155+968, K1157+388 - K1157+885","amountPesos":96040000.0,"lengthMeters":2278.0,"ratePesosPerMeter":42159.78928884987,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11216"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd – K1158+000 - K1158+730, K1158+822 - K1160+000","amountPesos":78400000.0,"lengthMeters":1908.0,"ratePesosPerMeter":41090.14675052411,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11218"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd – K1166+000 - K1166+251, K1166+336 - K1167+201, K1167+231 - K1167+807, K1171+879 - K1172+000, K1189+000 - K1190+000","amountPesos":78400000.0,"lengthMeters":2813.0,"ratePesosPerMeter":27870.600782083184,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11220"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd – K1180+500 - K1182+000, K1183+300 – K1184+295","amountPesos":98000000.0,"lengthMeters":2495.0,"ratePesosPerMeter":39278.55711422845,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11222"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd – K1190+000 - K1192+371, K1192+596 - K1192+700","amountPesos":98000000.0,"lengthMeters":2475.0,"ratePesosPerMeter":39595.9595959596,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11224"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd - K1218 +432 - K1220 + 205","amountPesos":67620000.0,"lengthMeters":1773.0,"ratePesosPerMeter":38138.74788494078,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11226"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd - K1259 + 000 - K1259 + 696, K1259 + 718 - K1260 + 022, K1261 + 400 - K1261 + 639, K1261 + 717 - K1261 + 869","amountPesos":58867000.0,"lengthMeters":1391.0,"ratePesosPerMeter":42319.91373112868,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11228"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd – K1321 + 000 – K1323 + 190, K1323 + 232 – K1323 + 755","amountPesos":98000000.0,"lengthMeters":2713.0,"ratePesosPerMeter":36122.373755989676,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11230"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd - K1336 + 855.78 - K1338 + 178, K1338 + 214 - K1338 + 442","amountPesos":64081000.0,"lengthMeters":1550.22,"ratePesosPerMeter":41336.71349872996,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11232"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd - K1457 + 663 - K1459 + 000","amountPesos":51675000.0,"lengthMeters":1337.0,"ratePesosPerMeter":38649.962602842184,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11234"},{"year":2026,"category":"Roads","project":"Gen Santos Ave - K0025 + 008 - K0025 + 108","amountPesos":40626000.0,"lengthMeters":100.0,"ratePesosPerMeter":406260.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11237"},{"year":2026,"category":"Roads","project":"Alaminos - Bolinao Road K0349+046 - K0349+577","amountPesos":29002000.0,"lengthMeters":531.0,"ratePesosPerMeter":54617.70244821093,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11241"},{"year":2026,"category":"Roads","project":"Alaminos - Bolinao Road K0354+810 - K0355+340","amountPesos":29002000.0,"lengthMeters":530.0,"ratePesosPerMeter":54720.75471698113,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11243"},{"year":2026,"category":"Roads","project":"Alaminos-Lucap Rd - K0323 + 598 - K0324 + 650","amountPesos":28542000.0,"lengthMeters":1052.0,"ratePesosPerMeter":27131.178707224335,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11245"},{"year":2026,"category":"Roads","project":"Pangasinan - Zambales Rd - K0283+476 - K0283+994","amountPesos":29002000.0,"lengthMeters":518.0,"ratePesosPerMeter":55988.41698841699,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11247"},{"year":2026,"category":"Roads","project":"Pangasinan - Zambales Rd - K0286+438 - K0286+989","amountPesos":30936000.0,"lengthMeters":551.0,"ratePesosPerMeter":56145.19056261343,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11249"},{"year":2026,"category":"Roads","project":"Pangasinan - Zambales Rd - K0324+604 - K0325+120","amountPesos":29002000.0,"lengthMeters":516.0,"ratePesosPerMeter":56205.426356589145,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11251"},{"year":2026,"category":"Roads","project":"Pangasinan-Zambales Rd - K0274 + 457 - K0275 + 007","amountPesos":14217000.0,"lengthMeters":550.0,"ratePesosPerMeter":25849.090909090908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11253"},{"year":2026,"category":"Roads","project":"Pangasinan-Zambales Rd - K0352 + 547 - K0353 + 440","amountPesos":23811000.0,"lengthMeters":893.0,"ratePesosPerMeter":26664.053751399777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11256"},{"year":2026,"category":"Roads","project":"Pangasinan Nueva Vizcaya Road K0183 +733-K0184+747,K0185+000-K0186+000","amountPesos":48805000.0,"lengthMeters":2014.0,"ratePesosPerMeter":24232.869910625624,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11259"},{"year":2026,"category":"Roads","project":"Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0678 + 552 - K0679 + 360","amountPesos":39507000.0,"lengthMeters":808.0,"ratePesosPerMeter":48894.80198019802,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11263"},{"year":2026,"category":"Roads","project":"Gov Pack Rd - (S04725LZ) Chainage 018 - Chainage 091","amountPesos":13328000.0,"lengthMeters":73.0,"ratePesosPerMeter":182575.34246575343,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11266"},{"year":2026,"category":"Roads","project":"Harrison Rd No 2 - (S00453LZ) Chainage 190 - Chainage 235","amountPesos":6566000.0,"lengthMeters":45.0,"ratePesosPerMeter":145911.11111111112,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11268"},{"year":2026,"category":"Roads","project":"Marcos Hi-way - K0280 + 869 - K0281 + 130, K0282 + 424 - K0282 + 570","amountPesos":5962000.0,"lengthMeters":407.0,"ratePesosPerMeter":14648.648648648648,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11270"},{"year":2026,"category":"Roads","project":"Outlook Drive - K0253 + 840 - K0253 + 920","amountPesos":6370000.0,"lengthMeters":80.0,"ratePesosPerMeter":79625.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11272"},{"year":2026,"category":"Roads","project":"Session Rd #2 - K0251 + 270 - K0251 + 420","amountPesos":8820000.0,"lengthMeters":150.0,"ratePesosPerMeter":58800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11274"},{"year":2026,"category":"Roads","project":"Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0359 + 000 - K0360 + 407","amountPesos":44984000.0,"lengthMeters":1407.0,"ratePesosPerMeter":31971.570717839375,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11278"},{"year":2026,"category":"Roads","project":"Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0360 + 946 - K0361 + 869","amountPesos":29571000.0,"lengthMeters":923.0,"ratePesosPerMeter":32037.91982665222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11280"},{"year":2026,"category":"Roads","project":"Cordon-Aurora Bdry Rd (Jct Dumabato-Aurora Bdry) - K0371+ 992 - K0372 + 447","amountPesos":13631000.0,"lengthMeters":455.0,"ratePesosPerMeter":29958.24175824176,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11282"},{"year":2026,"category":"Roads","project":"Cordon-Aurora Bdry Rd (Jct Dumabato-Aurora Bdry) - K0380 + 454 - K0380 + 702","amountPesos":6226000.0,"lengthMeters":248.0,"ratePesosPerMeter":25104.83870967742,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11284"},{"year":2026,"category":"Roads","project":"Plaridel Bypass Rd - K0035 + 735 - K0036 + 020","amountPesos":6650000.0,"lengthMeters":285.0,"ratePesosPerMeter":23333.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11288"},{"year":2026,"category":"Roads","project":"Pulilan-Calumpit Rd - K0050 + 030 - K0050 + 485, K0053 + 060 - K0053 + 160","amountPesos":27145000.0,"lengthMeters":555.0,"ratePesosPerMeter":48909.90990990991,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11290"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd - K0188 + 000 - K0189 + 000","amountPesos":49000000.0,"lengthMeters":1000.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11293"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd - K0232 + 000 - K0233 + 000","amountPesos":29400000.0,"lengthMeters":1000.0,"ratePesosPerMeter":29400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11295"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd K0183 + 828 - K0184 + 468","amountPesos":44100000.0,"lengthMeters":640.0,"ratePesosPerMeter":68906.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11297"},{"year":2026,"category":"Roads","project":"Olongapo-Bugallon Rd K0209 + 851 - K0210 + 180","amountPesos":21560000.0,"lengthMeters":329.0,"ratePesosPerMeter":65531.914893617024,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11299"},{"year":2026,"category":"Roads","project":"Tagaytay - Nasugbu Rd - K0102 + 854 - K0103 + 682","amountPesos":40219000.0,"lengthMeters":828.0,"ratePesosPerMeter":48573.67149758454,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11303"},{"year":2026,"category":"Roads","project":"Tanauan-Talisay-Tagaytay Rd - K0078 + 344 - K0079 + 339","amountPesos":25419000.0,"lengthMeters":995.0,"ratePesosPerMeter":25546.73366834171,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11306"},{"year":2026,"category":"Roads","project":"Noveleta-Naic-Tagaytay Rd - K0030 + 962 - K0031 + 561","amountPesos":35094000.0,"lengthMeters":599.0,"ratePesosPerMeter":58587.646076794656,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11309"},{"year":2026,"category":"Roads","project":"Bacoor-Dasmariñas National Rd - K0022 + 539 - K0022 + 740","amountPesos":6727000.0,"lengthMeters":201.0,"ratePesosPerMeter":33467.661691542286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11312"},{"year":2026,"category":"Roads","project":"Sta Rosa-Ulat-Tagaytay Rd - K0065 + 610 - K0066 + 083, K0067 + 721 - K0067 + 768","amountPesos":32732000.0,"lengthMeters":520.0,"ratePesosPerMeter":62946.153846153844,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11314"},{"year":2026,"category":"Roads","project":"Sta Rosa-Ulat-Tagaytay Rd - K0068 + 615 - K0068 + 755, K0068 + 768 - K0068 + 798, K0068 + 835 - K0068 + 855, K0069 + 797 - K0068 + 855, K0069 + 797 - K0069 + 803, K0069 + 841 - K0069 + 868, K0070 + 011 - K0070 + 047, K0070 + 114 - K0070 + 239, K0072 + 445 - K0072 + 483, K0072 + 533 - K0072 + 615","amountPesos":28831000.0,"lengthMeters":1446.0,"ratePesosPerMeter":19938.450899031814,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11316"},{"year":2026,"category":"Roads","project":"Calamba-Sta Cruz-Famy Jct Rd - K0104 + 350 - K0104 + 505, K0104 + 775 - K0105 + 180","amountPesos":35606000.0,"lengthMeters":560.0,"ratePesosPerMeter":63582.142857142855,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11319"},{"year":2026,"category":"Roads","project":"Pagsanjan-Lucban Rd - K0098 + 621 -  K0099 + 240, K0107 + 071 - K0107 + 220","amountPesos":41896000.0,"lengthMeters":768.0,"ratePesosPerMeter":54552.083333333336,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11321"},{"year":2026,"category":"Roads","project":"Rizal Bdry-Famy-Quezon Rd - K0080 + 262 - K0080 + 757","amountPesos":12134000.0,"lengthMeters":495.0,"ratePesosPerMeter":24513.131313131315,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11323"},{"year":2026,"category":"Roads","project":"Quezon Eco-Tourism Rd - K0170 + 294 - K0170 + 597","amountPesos":22199000.0,"lengthMeters":303.0,"ratePesosPerMeter":73264.02640264026,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11326"},{"year":2026,"category":"Roads","project":"Gumaca Bypass Road - K0191 + (-045) - K0191 + 055, K0191 + 060 - K0191 + 969","amountPesos":40092000.0,"lengthMeters":1009.0,"ratePesosPerMeter":39734.39048562934,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11329"},{"year":2026,"category":"Roads","project":"Lopez Bypass Road - K0216 + 030 - K0216 + 323, K0218 + 076 - K0218 + 088, K0218 + 088 - K0218 + 166, K0218 + 166 - K0218 + 180, K0219 + 769 - K0219 + 860, K0220 + 000 - K0220 + 664","amountPesos":25659000.0,"lengthMeters":1152.0,"ratePesosPerMeter":22273.4375,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11331"},{"year":2026,"category":"Roads","project":"Mindoro West Coastal Rd - K0278+000 - K0279+000","amountPesos":33677000.0,"lengthMeters":1000.0,"ratePesosPerMeter":33677.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11335"},{"year":2026,"category":"Roads","project":"Mindoro West Coastal Rd - K0373 + 708 - K0375 + 003","amountPesos":36530000.0,"lengthMeters":1295.0,"ratePesosPerMeter":28208.49420849421,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11337"},{"year":2026,"category":"Roads","project":"Mindoro West Coastal Rd - K0423 + 562 - K0423 + 900","amountPesos":9963000.0,"lengthMeters":338.0,"ratePesosPerMeter":29476.331360946744,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11339"},{"year":2026,"category":"Roads","project":"Mindoro West Coastal Rd - K0424 + 758 - K0425 + 731","amountPesos":28228000.0,"lengthMeters":973.0,"ratePesosPerMeter":29011.30524152107,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11341"},{"year":2026,"category":"Roads","project":"Mindoro West Coastal Rd - K0429+100 - K0429+700","amountPesos":20206000.0,"lengthMeters":600.0,"ratePesosPerMeter":33676.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11343"},{"year":2026,"category":"Roads","project":"Calapan South Rd - Jct. Pola Road - K0065 + 253 - K0066 + 057, K0066 + 179 - K0066 + 500","amountPesos":35493000.0,"lengthMeters":1125.0,"ratePesosPerMeter":31549.333333333332,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11346"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0014+247 - K0014+716","amountPesos":24029000.0,"lengthMeters":469.0,"ratePesosPerMeter":51234.54157782516,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11348"},{"year":2026,"category":"Roads","project":"Puerto Princesa South Rd - K0116+431 - K0117+122, K0117+388 - K0118+000","amountPesos":44261000.0,"lengthMeters":1303.0,"ratePesosPerMeter":33968.53415195702,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11351"},{"year":2026,"category":"Roads","project":"Puerto Princesa South Rd - K0151 + 017 - K0151 + 312","amountPesos":8634000.0,"lengthMeters":295.0,"ratePesosPerMeter":29267.79661016949,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11353"},{"year":2026,"category":"Roads","project":"Puerto Princesa South Rd - K0204+352 - K0204+521","amountPesos":5773000.0,"lengthMeters":169.0,"ratePesosPerMeter":34159.76331360947,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11355"},{"year":2026,"category":"Roads","project":"Bongabong-Sagana-Roxas-Sn Aquilino Rd - K0110 + 736 - K0111 + 334, K0115 + 078 - K0115 + 449","amountPesos":27174000.0,"lengthMeters":969.0,"ratePesosPerMeter":28043.343653250773,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11358"},{"year":2026,"category":"Roads","project":"Bongabong-Sagana-Roxas-Sn Aquilino Rd - K0126 + 438 - K0126 + 539, K0126 + 635 - K0127 + 144","amountPesos":17983000.0,"lengthMeters":610.0,"ratePesosPerMeter":29480.32786885246,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11360"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0088 + 806 - K0088 + 859","amountPesos":2346000.0,"lengthMeters":53.0,"ratePesosPerMeter":44264.15094339623,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11362"},{"year":2026,"category":"Roads","project":"Calapan South Rd - K0142 + 019 - K0142 + 134, K0142 + 371 - K0142 + 726, K0143 + 577 - K0143 + 714, K0143 + 847 - K0144 + 011, K0146 + 535-K0146 + 751, K0151 + 104 - K0151 + 167","amountPesos":45522000.0,"lengthMeters":1050.0,"ratePesosPerMeter":43354.28571428572,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11364"},{"year":2026,"category":"Roads","project":"Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0562 + 411 - K0562 + 788","amountPesos":22911000.0,"lengthMeters":377.0,"ratePesosPerMeter":60771.88328912467,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11368"},{"year":2026,"category":"Roads","project":"Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0564 + 454 - K0565 + 000","amountPesos":37508000.0,"lengthMeters":546.0,"ratePesosPerMeter":68695.9706959707,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11370"},{"year":2026,"category":"Roads","project":"Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0535 + 147 - K0535 + 335","amountPesos":14595000.0,"lengthMeters":188.0,"ratePesosPerMeter":77632.97872340426,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11373"},{"year":2026,"category":"Roads","project":"Legazpi City - Punta de Jesus Rd - K0563+398 - K0563+850","amountPesos":36358000.0,"lengthMeters":452.0,"ratePesosPerMeter":80438.05309734514,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11375"},{"year":2026,"category":"Roads","project":"Legazpi City-Punta de Jesus Rd - K0562+890 - K0563+208","amountPesos":22540000.0,"lengthMeters":318.0,"ratePesosPerMeter":70880.50314465408,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11377"},{"year":2026,"category":"Roads","project":"Ligao - Pio Duran Rd - K0511 + 590 - K0512 + 600","amountPesos":43931000.0,"lengthMeters":1010.0,"ratePesosPerMeter":43496.039603960395,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11380"},{"year":2026,"category":"Roads","project":"Ligao-Pio Duran Rd - K0531+ 360 - K0531 + 540","amountPesos":11712000.0,"lengthMeters":180.0,"ratePesosPerMeter":65066.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11382"},{"year":2026,"category":"Roads","project":"Ligao-Pioduran Rd - K0528 + 182 - K0528 + 992","amountPesos":39050000.0,"lengthMeters":810.0,"ratePesosPerMeter":48209.87654320987,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11384"},{"year":2026,"category":"Roads","project":"Danao-Pasacao Rd - K0419+(-631) - K0419+(-281)","amountPesos":28693000.0,"lengthMeters":350.0,"ratePesosPerMeter":81980.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11387"},{"year":2026,"category":"Roads","project":"Baao-Iriga City-Nabua Rd - K0474 + 885 - K0475 + 000","amountPesos":1783000.0,"lengthMeters":115.0,"ratePesosPerMeter":15504.347826086956,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11390"},{"year":2026,"category":"Roads","project":"Iriga City-Masoli Rd - K0479 + 402 - K0479 + 603","amountPesos":9290000.0,"lengthMeters":201.0,"ratePesosPerMeter":46218.90547263682,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11392"},{"year":2026,"category":"Roads","project":"Iriga City-Masoli Rd - K0480 + 000 - K0480 + 810","amountPesos":36515000.0,"lengthMeters":810.0,"ratePesosPerMeter":45080.246913580246,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11394"},{"year":2026,"category":"Roads","project":"Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd - K0471 + 140 - K0471 + 299, K0471 + 320 - K0471 + 524","amountPesos":21187000.0,"lengthMeters":363.0,"ratePesosPerMeter":58366.391184573,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11396"},{"year":2026,"category":"Roads","project":"Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd - K0473 + 565 - K0473 + 810","amountPesos":13716000.0,"lengthMeters":245.0,"ratePesosPerMeter":55983.67346938775,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11398"},{"year":2026,"category":"Roads","project":"Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd - K0475 + 000 - K0475 + 480","amountPesos":30353000.0,"lengthMeters":480.0,"ratePesosPerMeter":63235.416666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11400"},{"year":2026,"category":"Roads","project":"Jct Milagros-Baleno-Lagta Rd -  K0078 + 605 - K0079 + 590","amountPesos":73344000.0,"lengthMeters":985.0,"ratePesosPerMeter":74460.91370558375,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11403"},{"year":2026,"category":"Roads","project":"Jct Milagros-Baleno-Lagta Rd - K0074 + 448 - K0075 + 030","amountPesos":43976000.0,"lengthMeters":582.0,"ratePesosPerMeter":75560.13745704468,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11405"},{"year":2026,"category":"Roads","project":"Jct Milagros-Baleno-Lagta Rd - K0077 + 383 - K0078 + 605","amountPesos":87497000.0,"lengthMeters":1222.0,"ratePesosPerMeter":71601.47299509002,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11407"},{"year":2026,"category":"Roads","project":"Lagta-Crossing Malinta Rd - K0105 + 597- K0106 + 141","amountPesos":45110000.0,"lengthMeters":544.0,"ratePesosPerMeter":82922.79411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11409"},{"year":2026,"category":"Roads","project":"Lagta-Crossing Malinta Rd - K0107 + 116 - K0107 + 902","amountPesos":60861000.0,"lengthMeters":786.0,"ratePesosPerMeter":77431.29770992366,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11411"},{"year":2026,"category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0009 + 502 - K0010 + 289","amountPesos":67137000.0,"lengthMeters":787.0,"ratePesosPerMeter":85307.49682337993,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11413"},{"year":2026,"category":"Roads","project":"Masbate-Milagros Rd - K0002 + (-711) - K0002 + 925","amountPesos":128303000.0,"lengthMeters":1636.0,"ratePesosPerMeter":78424.81662591686,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11415"},{"year":2026,"category":"Roads","project":"Buenavista-Kawayan Rd - K0033 + (-980) - K0033 + (-558)","amountPesos":24388000.0,"lengthMeters":422.0,"ratePesosPerMeter":57791.4691943128,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11418"},{"year":2026,"category":"Roads","project":"Buenavista-Kawayan Rd - K0033 + 075 - K0033 + 400","amountPesos":18760000.0,"lengthMeters":325.0,"ratePesosPerMeter":57723.07692307692,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11420"},{"year":2026,"category":"Roads","project":"Buenavista-Kawayan Rd - K0052 +640 - K0053 + 000","amountPesos":20847000.0,"lengthMeters":360.0,"ratePesosPerMeter":57908.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11422"},{"year":2026,"category":"Roads","project":"Buenavista-Kawayan Rd - K0053 + 000 - K0053 + 153","amountPesos":8817000.0,"lengthMeters":153.0,"ratePesosPerMeter":57627.450980392154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11424"},{"year":2026,"category":"Roads","project":"Buenavista-Kawayan Rd - K0054 + 500 - K0055 + 203","amountPesos":40710000.0,"lengthMeters":703.0,"ratePesosPerMeter":57908.96159317212,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11426"},{"year":2026,"category":"Roads","project":"Buenavista-Kawayan Rd - K0056 +116 - K0056 +163","amountPesos":2698000.0,"lengthMeters":47.0,"ratePesosPerMeter":57404.255319148935,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11428"},{"year":2026,"category":"Roads","project":"Buenavista-Kawayan Rd - K0061+300 - K0061+440","amountPesos":10780000.0,"lengthMeters":140.0,"ratePesosPerMeter":77000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11430"},{"year":2026,"category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0044 + 500 - K0044 +717","amountPesos":12507000.0,"lengthMeters":217.0,"ratePesosPerMeter":57635.94470046083,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11432"},{"year":2026,"category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0045 + 060 - K0045 + 300","amountPesos":13758000.0,"lengthMeters":240.0,"ratePesosPerMeter":57325.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11434"},{"year":2026,"category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0051 + 200 - K0051 + 640","amountPesos":25451000.0,"lengthMeters":440.0,"ratePesosPerMeter":57843.181818181816,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11436"},{"year":2026,"category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0060 + 000 - K0060 + 428","amountPesos":24702000.0,"lengthMeters":428.0,"ratePesosPerMeter":57714.95327102804,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11438"},{"year":2026,"category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0066 + 380 - K0067 + 052","amountPesos":39553000.0,"lengthMeters":672.0,"ratePesosPerMeter":58858.630952380954,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11440"},{"year":2026,"category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0074 + 220 - K0074 +795","amountPesos":33143000.0,"lengthMeters":575.0,"ratePesosPerMeter":57640.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11442"},{"year":2026,"category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0077 + 204 - K0077 + 530, K0078 + 380 - K0078 + 621","amountPesos":32768000.0,"lengthMeters":567.0,"ratePesosPerMeter":57791.887125220455,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11444"},{"year":2026,"category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0079 + 150 - K0079 + 493","amountPesos":19792000.0,"lengthMeters":343.0,"ratePesosPerMeter":57702.623906705536,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11446"},{"year":2026,"category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0090 + 626 - K0091 + 000","amountPesos":22231000.0,"lengthMeters":374.0,"ratePesosPerMeter":59441.17647058824,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11448"},{"year":2026,"category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0093 + 190 - K0093 + 635","amountPesos":25701000.0,"lengthMeters":445.0,"ratePesosPerMeter":57755.05617977528,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11450"},{"year":2026,"category":"Roads","project":"Jct Putiao-Pilar-Donsol Rd - K0552 + 373.50 - K0552 + 671","amountPesos":21361000.0,"lengthMeters":297.5,"ratePesosPerMeter":71801.6806722689,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11453"},{"year":2026,"category":"Roads","project":"Jct Putiao-Pilar-Donsol Rd - K0552 + 671 - 552 + 850","amountPesos":13457000.0,"lengthMeters":179.0,"ratePesosPerMeter":75178.77094972067,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11455"},{"year":2026,"category":"Roads","project":"Aklan East Rd - K0316 + 697 - K0317 + 218, K0317 + 258 - K0317 + 927","amountPesos":45718000.0,"lengthMeters":1190.0,"ratePesosPerMeter":38418.487394957985,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11459"},{"year":2026,"category":"Roads","project":"Aklan West Rd (Kalibo-Nabas) (S00480PN) - K0239 + 952 - K0240 + 834","amountPesos":45452000.0,"lengthMeters":882.0,"ratePesosPerMeter":51532.879818594105,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11461"},{"year":2026,"category":"Roads","project":"Aklan West Rd (Kalibo-Nabas) (S00480PN) - K0245 + 885 - K0246 + 775","amountPesos":39960000.0,"lengthMeters":890.0,"ratePesosPerMeter":44898.87640449438,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11463"},{"year":2026,"category":"Roads","project":"Jaime Cardinal Sin Ave - K0283 + 000 - K0283 + 460, K0283 + 505 - K0284 + 012, K0284 + 025 - K0284 + 079","amountPesos":43059000.0,"lengthMeters":1021.0,"ratePesosPerMeter":42173.359451518125,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11465"},{"year":2026,"category":"Roads","project":"Iloilo- Antique Rd. - K0087 + 760 - K0088 + 240","amountPesos":19600000.0,"lengthMeters":480.0,"ratePesosPerMeter":40833.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11468"},{"year":2026,"category":"Roads","project":"Iloilo-Antique Rd - K0106 + 708 - K0107 + 220","amountPesos":33320000.0,"lengthMeters":512.0,"ratePesosPerMeter":65078.125,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11470"},{"year":2026,"category":"Roads","project":"Iloilo-Antique Rd - K0199 + 224 - K0199 + 624","amountPesos":28420000.0,"lengthMeters":400.0,"ratePesosPerMeter":71050.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11472"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0143 + 407 - K0143 + 637","amountPesos":5610000.0,"lengthMeters":230.0,"ratePesosPerMeter":24391.304347826088,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11475"},{"year":2026,"category":"Roads","project":"Capiz-Aklan Rd - K0337 + 260 - K0337 + 340, K0337 + 800 - K0338 + 050, K0338 + 420 - K0338 + 630","amountPesos":39255000.0,"lengthMeters":540.0,"ratePesosPerMeter":72694.44444444444,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11478"},{"year":2026,"category":"Roads","project":"Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0101 + 460 - K0101 + 830","amountPesos":32859000.0,"lengthMeters":370.0,"ratePesosPerMeter":88808.1081081081,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11480"},{"year":2026,"category":"Roads","project":"Guimaras Circumferential Rd - K0006 + 592 - K0006 + 799","amountPesos":3778000.0,"lengthMeters":207.0,"ratePesosPerMeter":18251.2077294686,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11483"},{"year":2026,"category":"Roads","project":"Guimaras Circumferential Rd - K0047 + 800 - K0048 + 119","amountPesos":19600000.0,"lengthMeters":319.0,"ratePesosPerMeter":61442.00626959248,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11485"},{"year":2026,"category":"Roads","project":"Guimaras Circumferential Rd - K0095 + 264 - K0095 + 448","amountPesos":9272000.0,"lengthMeters":184.0,"ratePesosPerMeter":50391.30434782609,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11487"},{"year":2026,"category":"Roads","project":"Iloilo Antique Road - K0036 + 822 - K0037 + 339","amountPesos":27357000.0,"lengthMeters":517.0,"ratePesosPerMeter":52914.89361702128,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11490"},{"year":2026,"category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0271 + 661 - K0272 + 898","amountPesos":42249000.0,"lengthMeters":1237.0,"ratePesosPerMeter":34154.405820533546,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11493"},{"year":2026,"category":"Roads","project":"Bacolod Silay Airport Access Rd - K0007 + (-858) - K0007 + 252","amountPesos":33012000.0,"lengthMeters":1110.0,"ratePesosPerMeter":29740.54054054054,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11497"},{"year":2026,"category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0117 + 670 - K0118 + 809","amountPesos":46541000.0,"lengthMeters":1139.0,"ratePesosPerMeter":40861.2818261633,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11500"},{"year":2026,"category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0125 + 136 - K0125 + 705","amountPesos":19992000.0,"lengthMeters":569.0,"ratePesosPerMeter":35135.32513181019,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11502"},{"year":2026,"category":"Roads","project":"The President Carlos P. Garcia Circumferential Rd - K0054 + 700 - K0055 + 696","amountPesos":38790000.0,"lengthMeters":996.0,"ratePesosPerMeter":38945.78313253012,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11506"},{"year":2026,"category":"Roads","project":"Jct (LIR) Carmen-Sagbayan-Bacani Rd - K0176 + 000 - K0177 + 010","amountPesos":36315000.0,"lengthMeters":1010.0,"ratePesosPerMeter":35955.44554455446,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11509"},{"year":2026,"category":"Roads","project":"The President Carlos P. Garcia Circumferential Rd - K0109 + 515 - K0109 + 815","amountPesos":11420000.0,"lengthMeters":300.0,"ratePesosPerMeter":38066.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11511"},{"year":2026,"category":"Roads","project":"The President Carlos P. Garcia Circumferential Rd - K0120 + 203 - K0120 + 603, K0120 + 736 - K0120 + 880","amountPesos":20624000.0,"lengthMeters":544.0,"ratePesosPerMeter":37911.76470588235,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11513"},{"year":2026,"category":"Roads","project":"The President Carlos P. Garcia Circumferential Rd - K0129 + 178 - K0130 + 128","amountPesos":34373000.0,"lengthMeters":950.0,"ratePesosPerMeter":36182.10526315789,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11515"},{"year":2026,"category":"Roads","project":"The President Carlos P. Garcia Circumferential Rd - K0139 + 599 - K0140 + 116","amountPesos":18676000.0,"lengthMeters":517.0,"ratePesosPerMeter":36123.79110251451,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11517"},{"year":2026,"category":"Roads","project":"The President Carlos P. Garcia Circumferential Rd - K0141 + 857 - K0141 + 1029, K0145 + 022 - K0145 + 512","amountPesos":25232000.0,"lengthMeters":662.0,"ratePesosPerMeter":38114.803625377644,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11519"},{"year":2026,"category":"Roads","project":"Jct Dat-an-Carmen-Sierra Bullones-Pilar-Alicia Rd - K0066 + 000 - K0066 + 500","amountPesos":15656000.0,"lengthMeters":500.0,"ratePesosPerMeter":31312.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11522"},{"year":2026,"category":"Roads","project":"Cebu North Hagnaya Wharf Rd - K0062 + 548 - K0062 + 680","amountPesos":48488000.0,"lengthMeters":132.0,"ratePesosPerMeter":367333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11525"},{"year":2026,"category":"Roads","project":"Biliran Circumferential Rd - K1046 + 445 - K1047 + 750, K1049 + 057 - K1049 + 243","amountPesos":38592000.0,"lengthMeters":1491.0,"ratePesosPerMeter":25883.299798792756,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11529"},{"year":2026,"category":"Roads","project":"Biliran Circumferential Rd - K1061 + 078 - K1062 + 400","amountPesos":48240000.0,"lengthMeters":1322.0,"ratePesosPerMeter":36490.166414523446,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11531"},{"year":2026,"category":"Roads","project":"Biliran Circumferential Rd - K1083 + 026 - K1084 + 018","amountPesos":24120000.0,"lengthMeters":992.0,"ratePesosPerMeter":24314.516129032258,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11533"},{"year":2026,"category":"Roads","project":"Biliran Circumferential Rd - K1094 + 918 - K1095 + 500","amountPesos":24120000.0,"lengthMeters":582.0,"ratePesosPerMeter":41443.298969072166,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11535"},{"year":2026,"category":"Roads","project":"Naval-Caibiran Cross Country Rd - K1027 + 896 - K1028 + 238, K1028 + 411 - K1028 + 770","amountPesos":19296000.0,"lengthMeters":701.0,"ratePesosPerMeter":27526.39087018545,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11537"},{"year":2026,"category":"Roads","project":"Borongan-Guiuan Rd - (S00171SM) K1016 + (-449) - K1016 + 651","amountPesos":49000000.0,"lengthMeters":1100.0,"ratePesosPerMeter":44545.454545454544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11540"},{"year":2026,"category":"Roads","project":"Borongan-Guiuan Rd - K1044 + 000 - K1045 + 084","amountPesos":49000000.0,"lengthMeters":1084.0,"ratePesosPerMeter":45202.9520295203,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11542"},{"year":2026,"category":"Roads","project":"Guiuan-Sulangan Peninsula Road (S00188SM) - K1064 + 097 - K1065 + 197","amountPesos":49000000.0,"lengthMeters":1100.0,"ratePesosPerMeter":44545.454545454544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11544"},{"year":2026,"category":"Roads","project":"Jct Buenavista-Lawaan-Marabut Rd (S00147SM) - K0952 + (-728) - K0952 + (-068)","amountPesos":29400000.0,"lengthMeters":660.0,"ratePesosPerMeter":44545.454545454544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11546"},{"year":2026,"category":"Roads","project":"Jct Buenavista-Lawaan-Marabut Rd (S00147SM) - K0970 + 600 - K0971 + 999","amountPesos":62720000.0,"lengthMeters":1399.0,"ratePesosPerMeter":44832.02287348106,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11548"},{"year":2026,"category":"Roads","project":"Jct Taft-Oras-Sn Policarpo-Arteche Rd - K0893 + 618 - K895 + 318","amountPesos":49000000.0,"lengthMeters":1700.0,"ratePesosPerMeter":28823.529411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11550"},{"year":2026,"category":"Roads","project":"Wright-Taft-Borongan Rd - K0891 + (-752) - K0891 + 013","amountPesos":49000000.0,"lengthMeters":765.0,"ratePesosPerMeter":64052.28758169935,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11552"},{"year":2026,"category":"Roads","project":"Wright-Taft-Borongan Rd (S00172SM) - K0863 + 915 - K0865 + 354, K0865 + 468 - K0865 + 1012","amountPesos":49000000.0,"lengthMeters":1983.0,"ratePesosPerMeter":24710.03530005043,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11554"},{"year":2026,"category":"Roads","project":"Wright-Taft-Borongan Rd (S00172SM) - K0886 + 322 - K0886 + 470, K0886 + 984 - K0887 + 533","amountPesos":49000000.0,"lengthMeters":697.0,"ratePesosPerMeter":70301.2912482066,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11556"},{"year":2026,"category":"Roads","project":"Wright-Taft-Borongan Rd (S00173SM) - K0891 + 625 - K0892 + 623","amountPesos":49000000.0,"lengthMeters":998.0,"ratePesosPerMeter":49098.19639278557,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11558"},{"year":2026,"category":"Roads","project":"Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1057 + 468 - K1058 + 322","amountPesos":26221000.0,"lengthMeters":854.0,"ratePesosPerMeter":30703.74707259953,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11561"},{"year":2026,"category":"Roads","project":"Palompon-Isabel-Merida-Ormoc Rd - K1088 + 200 - K1088 + 805, K1090 + 589 - K1090 + 975, K1091 + 163 - K1091 + 716, K1092 + 048 - K1092 + 078, K1092 + 211 - K1092 + 261, K1092 + 449 - K1092 + 660, K1093 + 068 - K1093 + 913","amountPesos":41452000.0,"lengthMeters":2680.0,"ratePesosPerMeter":15467.164179104477,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11564"},{"year":2026,"category":"Roads","project":"Catarman-Laoang Rd - K0776 + 814 - K0777 + 100","amountPesos":27996000.0,"lengthMeters":286.0,"ratePesosPerMeter":97888.11188811189,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11567"},{"year":2026,"category":"Roads","project":"Catarman-Laoang Rd - K0783 + 608.80 - K0783 + 857.70, K0785 + 992 - K0786 + 170","amountPesos":37737000.0,"lengthMeters":426.9,"ratePesosPerMeter":88397.75122981549,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11569"},{"year":2026,"category":"Roads","project":"Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0798 + 400 - K0798 + 650","amountPesos":26294000.0,"lengthMeters":250.0,"ratePesosPerMeter":105176.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11571"},{"year":2026,"category":"Roads","project":"Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0802 + 955.10 - K0803 + 150","amountPesos":20553000.0,"lengthMeters":194.9,"ratePesosPerMeter":105454.07901486683,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11573"},{"year":2026,"category":"Roads","project":"Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0812 + 850 - K0813 + 000","amountPesos":14508000.0,"lengthMeters":150.0,"ratePesosPerMeter":96720.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11575"},{"year":2026,"category":"Roads","project":"Calbayog-Catarman Rd - K0795 + 148 - K0795 + 158, K0795 + 178 - K0795 + 200, K0795 + 511 - K0795 + 612, K0796 + 485 - K0797 + 000","amountPesos":16241000.0,"lengthMeters":648.0,"ratePesosPerMeter":25063.271604938273,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11578"},{"year":2026,"category":"Roads","project":"Calbayog-Catarman Rd - K0797 + 855 - K0798 + 126","amountPesos":33027000.0,"lengthMeters":271.0,"ratePesosPerMeter":121870.84870848709,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11580"},{"year":2026,"category":"Roads","project":"Calbayog-Catarman Rd - K0805 + 000 - K0805 + 480","amountPesos":32079000.0,"lengthMeters":480.0,"ratePesosPerMeter":66831.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11582"},{"year":2026,"category":"Roads","project":"Calbayog-Catarman Rd - K0806 + 077 - K0807 + 000","amountPesos":92710000.0,"lengthMeters":923.0,"ratePesosPerMeter":100444.2036836403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11584"},{"year":2026,"category":"Roads","project":"Wright - Taft - Borongan Rd - K0835+200 - K0835+630","amountPesos":21560000.0,"lengthMeters":430.0,"ratePesosPerMeter":50139.53488372093,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11587"},{"year":2026,"category":"Roads","project":"Bdry  Southern Leyte-Maasin-Macrohon-Sogod-Jct Daang Maharlika - K1145 + 350 - K1146 + 287, K1147 + 076 - K1147 + 385","amountPesos":42241000.0,"lengthMeters":1246.0,"ratePesosPerMeter":33901.28410914928,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11590"},{"year":2026,"category":"Roads","project":"Basilan Circumferential Rd (Maluso-Isabela Rd) K0101+400 - K0102+690","amountPesos":38064000.0,"lengthMeters":1290.0,"ratePesosPerMeter":29506.976744186046,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11594"},{"year":2026,"category":"Roads","project":"Zamboanga City Bypass Rd (S01213MN) - Chainage 000 - Chainage 124, Chainage 250 - Chainage 378","amountPesos":6753000.0,"lengthMeters":252.0,"ratePesosPerMeter":26797.619047619046,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11597"},{"year":2026,"category":"Roads","project":"Liloy-Siocon Rd - K2026 + 000 - K2027 + 000","amountPesos":44584000.0,"lengthMeters":1000.0,"ratePesosPerMeter":44584.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11600"},{"year":2026,"category":"Roads","project":"Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - (S01152MN) Chainage 17541 - Chainage 18541","amountPesos":43412000.0,"lengthMeters":1000.0,"ratePesosPerMeter":43412.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11602"},{"year":2026,"category":"Roads","project":"Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) -  K1563+(-592)-K1563+(-470)","amountPesos":5783000.0,"lengthMeters":122.0,"ratePesosPerMeter":47401.639344262294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11606"},{"year":2026,"category":"Roads","project":"Camiguin Circumferential Rd - K0046 + 516 - K0046 + 953, K0047 + 054 - K0047 + 170, K0047 + 236 - K0047 + 317, K0047 + 497 - K0047 + 545, K0047 + 552 - K0047 +648","amountPesos":14229000.0,"lengthMeters":778.0,"ratePesosPerMeter":18289.203084832905,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11609"},{"year":2026,"category":"Roads","project":"Calamba-Baliangao Rd - K1790 + 000 - K1790 + 950","amountPesos":33978000.0,"lengthMeters":950.0,"ratePesosPerMeter":35766.31578947369,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11612"},{"year":2026,"category":"Roads","project":"Asuncion-San Isidro-Laak-Veruela Rd - K1492 + 911 - K1494 + 000","amountPesos":40853000.0,"lengthMeters":1089.0,"ratePesosPerMeter":37514.23324150597,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11616"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Road (S01376MN) K1808 + 592 – K1809 + 324","amountPesos":27600000.0,"lengthMeters":732.0,"ratePesosPerMeter":37704.91803278688,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11618"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Road (S01376MN) K1811+197 – K1812+346","amountPesos":48000000.0,"lengthMeters":1149.0,"ratePesosPerMeter":41775.45691906005,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11620"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Road (S01376MN) K1816+849 – K1817+280","amountPesos":15273000.0,"lengthMeters":431.0,"ratePesosPerMeter":35436.194895591645,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11622"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Road (S01376MN) K1791+354 – K1792+703","amountPesos":50000000.0,"lengthMeters":1349.0,"ratePesosPerMeter":37064.49221645664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11624"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Road (S01376MN) K1799+409 – K1800+244","amountPesos":25400000.0,"lengthMeters":835.0,"ratePesosPerMeter":30419.161676646705,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11626"},{"year":2026,"category":"Roads","project":"Asuncion-San Isidro-Laak-Veruela Rd - K1509 + 684 - K1510 + 784","amountPesos":31305000.0,"lengthMeters":1100.0,"ratePesosPerMeter":28459.090909090908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11628"},{"year":2026,"category":"Roads","project":"Montevista-Compostela-Mati Bdry Rd - K1491 + 175 - K1491 + 795","amountPesos":23300000.0,"lengthMeters":620.0,"ratePesosPerMeter":37580.645161290326,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11631"},{"year":2026,"category":"Roads","project":"Montevista-Compostela-Mati Bdry Rd - K1491 + 795 - K1492 + 965","amountPesos":40843000.0,"lengthMeters":1170.0,"ratePesosPerMeter":34908.54700854701,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11633"},{"year":2026,"category":"Roads","project":"Nabunturan-Maragusan Rd - K1459+219 - K1460+219","amountPesos":48062000.0,"lengthMeters":1000.0,"ratePesosPerMeter":48062.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11635"},{"year":2026,"category":"Roads","project":"Babak-Samal-Kaputian Rd - K1506 + 054 - K1506 + 894, K1510 + 000 - K1510 + 460","amountPesos":41251000.0,"lengthMeters":1300.0,"ratePesosPerMeter":31731.53846153846,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11638"},{"year":2026,"category":"Roads","project":"Saturnino R. Silva Rd - K1480 + 431 - K1481 + 235, K1482 + 292 - K1482 + 372","amountPesos":29763000.0,"lengthMeters":884.0,"ratePesosPerMeter":33668.55203619909,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11640"},{"year":2026,"category":"Roads","project":"Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1584 + 176 - K1584 + 376","amountPesos":11028000.0,"lengthMeters":200.0,"ratePesosPerMeter":55140.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11643"},{"year":2026,"category":"Roads","project":"Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1584 + 376 - K1585 + 474, K1585 + 494 - K1585 + 505","amountPesos":49000000.0,"lengthMeters":1109.0,"ratePesosPerMeter":44183.94950405771,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11645"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1532+376 -K1533+627","amountPesos":49000000.0,"lengthMeters":1251.0,"ratePesosPerMeter":39168.66506794564,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11648"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1555+260 - K1556+665","amountPesos":48062000.0,"lengthMeters":1405.0,"ratePesosPerMeter":34207.829181494664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11650"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1566+049 - K1567+000","amountPesos":29400000.0,"lengthMeters":951.0,"ratePesosPerMeter":30914.826498422713,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11652"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1575+192-K1575+892","amountPesos":24031000.0,"lengthMeters":700.0,"ratePesosPerMeter":34330.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11654"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1661 + 920 - K1662 +929","amountPesos":20000000.0,"lengthMeters":1009.0,"ratePesosPerMeter":19821.605550049557,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11656"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1615 + 000- K1615+700","amountPesos":24031000.0,"lengthMeters":700.0,"ratePesosPerMeter":34330.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11658"},{"year":2026,"category":"Roads","project":"Bukidnon-Cotabato Rd - K1625 + 716 - K1627 + 175","amountPesos":41980000.0,"lengthMeters":1459.0,"ratePesosPerMeter":28773.132282385195,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11662"},{"year":2026,"category":"Roads","project":"Bukidnon-Cotabato Rd - K1627 + 175 - K1627 + 975","amountPesos":48789000.0,"lengthMeters":800.0,"ratePesosPerMeter":60986.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11664"},{"year":2026,"category":"Roads","project":"Bukidnon-Cotabato Rd - K1654 + 923 - K1655 + 000","amountPesos":2655000.0,"lengthMeters":77.0,"ratePesosPerMeter":34480.51948051948,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11666"},{"year":2026,"category":"Roads","project":"Sarangani-Davao Del Sur Coastal Rd - K1724 + 000 - K1724 + 315, K1724 + 348 - K1725 + 884","amountPesos":44149000.0,"lengthMeters":1851.0,"ratePesosPerMeter":23851.43165856294,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11669"},{"year":2026,"category":"Roads","project":"Makar-Kiamba Rd - K1666 + 714 - K1666 + 940, K1667 + 073 - K1667 + 254","amountPesos":8365000.0,"lengthMeters":407.0,"ratePesosPerMeter":20552.825552825554,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11672"},{"year":2026,"category":"Roads","project":"Makar-Kiamba Rd - K1671 + 693 - K1673 + 000","amountPesos":37831000.0,"lengthMeters":1307.0,"ratePesosPerMeter":28944.912012241773,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11674"},{"year":2026,"category":"Roads","project":"Makar-Kiamba Rd - K1673 + 607 - K1675 + 117","amountPesos":43233000.0,"lengthMeters":1510.0,"ratePesosPerMeter":28631.12582781457,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11676"},{"year":2026,"category":"Roads","project":"Makar-Marbel Rd - K1657 + 280 - K1657 + 700, K1657 + 791 - K1657 + 908","amountPesos":15278000.0,"lengthMeters":537.0,"ratePesosPerMeter":28450.651769087523,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11678"},{"year":2026,"category":"Roads","project":"Dulawan-Marbel Rd - K1765 + 388 - K1766 + 001","amountPesos":29308000.0,"lengthMeters":613.0,"ratePesosPerMeter":47810.76672104405,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11681"},{"year":2026,"category":"Roads","project":"Isulan Jct - Ninoy Aquino Rd - K1842 + 000 - K1843 + 000","amountPesos":35582000.0,"lengthMeters":1000.0,"ratePesosPerMeter":35582.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11684"},{"year":2026,"category":"Roads","project":"Dapa-Gen Luna Rd - K0002 + 539 - K0004 + 000","amountPesos":43580000.0,"lengthMeters":1461.0,"ratePesosPerMeter":29828.884325804243,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11688"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd – K1156+131 - K1157+358","amountPesos":49000000.0,"lengthMeters":1227.0,"ratePesosPerMeter":39934.80032599837,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11691"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd – K1160+100 - K1160+272, K1161+000 - K1162+000","amountPesos":49000000.0,"lengthMeters":1172.0,"ratePesosPerMeter":41808.87372013652,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11693"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd - K1187 + 660 - K1188 + 580 , K1190 + 000 - K1190 + 300","amountPesos":49000000.0,"lengthMeters":1220.0,"ratePesosPerMeter":40163.934426229505,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11695"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd - K1194 + 700 - K1194 + 872, K1194 + 904 - K1195 + 000","amountPesos":9712000.0,"lengthMeters":268.0,"ratePesosPerMeter":36238.80597014925,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11697"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd – K1277 + 200 - K1278 + 560","amountPesos":49000000.0,"lengthMeters":1360.0,"ratePesosPerMeter":36029.41176470588,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11700"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd – K1366 + 000 – K1366 + 893","amountPesos":19600000.0,"lengthMeters":893.0,"ratePesosPerMeter":21948.4882418813,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11702"},{"year":2026,"category":"Roads","project":"Bambang-Kasibu-Solano Rd - K0339 + 253.64 - K0339 + 977.64, K0340 + 500.46 - K0341 + 680","amountPesos":72944000.0,"lengthMeters":1903.54,"ratePesosPerMeter":38320.1823970081,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11709"},{"year":2026,"category":"Roads","project":"Gamu-Roxas Rd - K0397 + 341 - K0399 + 000","amountPesos":93786000.0,"lengthMeters":1659.0,"ratePesosPerMeter":56531.645569620254,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11711"},{"year":2026,"category":"Roads","project":"Jct Ipil-Quirino Bdry Rd - K0366 + 256 - K0366 + 762, K0367 + 343 - K0368 + 531","amountPesos":61181000.0,"lengthMeters":1694.0,"ratePesosPerMeter":36116.29279811098,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11713"},{"year":2026,"category":"Roads","project":"Naguilian-Sn Mariano Rd - K0390 + 029 - K0392 + 000","amountPesos":106218000.0,"lengthMeters":1971.0,"ratePesosPerMeter":53890.41095890411,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11715"},{"year":2026,"category":"Roads","project":"Norzagaray-Bigte Rd - K0075 + 000 - K0075 + 200, K0075 + 650 - K0077 + 883","amountPesos":92631000.0,"lengthMeters":2433.0,"ratePesosPerMeter":38072.749691738594,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11718"},{"year":2026,"category":"Roads","project":"Sta Maria By-Pass Rd - K0030 + (-117) - K0030 + 290, K0030 + 520 - K0030 + 638, K031 + 124 - K0031 + 196, K0031 + 307 - K0032 + 513, K0033 + 901 - K0034 + 055","amountPesos":97830000.0,"lengthMeters":1957.0,"ratePesosPerMeter":49989.78027593255,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11720"},{"year":2026,"category":"Roads","project":"Lipa City - Alaminos Rd - K0084 + 268 - K0084 + 680","amountPesos":70091000.0,"lengthMeters":412.0,"ratePesosPerMeter":170123.78640776698,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11725"},{"year":2026,"category":"Roads","project":"Marikina-Infanta Rd - K0020 + 250 - K0020 + 475","amountPesos":60138000.0,"lengthMeters":225.0,"ratePesosPerMeter":267280.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11727"},{"year":2026,"category":"Roads","project":"Sagbat-Pililla Div Rd - K0047 + (-072) - K0047 + 650","amountPesos":44897000.0,"lengthMeters":722.0,"ratePesosPerMeter":62184.21052631579,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11729"},{"year":2026,"category":"Roads","project":"Sagbat-Pililla Div Rd - K0050 + 576 - K0051 + 650 , K0053+ 628 - K0054 + 555","amountPesos":118619000.0,"lengthMeters":2001.0,"ratePesosPerMeter":59279.86006996502,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11731"},{"year":2026,"category":"Roads","project":"Sn Mateo-Rodriguez Rd - K0026 + 542 - K0027 + 540","amountPesos":64328000.0,"lengthMeters":998.0,"ratePesosPerMeter":64456.91382765531,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11733"},{"year":2026,"category":"Roads","project":"Coron - Busuanga Rd - K0017+113 - K0018+500","amountPesos":69873000.0,"lengthMeters":1387.0,"ratePesosPerMeter":50377.072819033885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11736"},{"year":2026,"category":"Roads","project":"Coron - Busuanga Rd - K0052 + 200 - K0054 + 780","amountPesos":129021000.0,"lengthMeters":2580.0,"ratePesosPerMeter":50008.13953488372,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11738"},{"year":2026,"category":"Roads","project":"Coron - Busuanga Rd K0044+812 - K0046+646, K0047+596 - K0047+861, K0047+924 - K0048+246","amountPesos":125071000.0,"lengthMeters":2421.0,"ratePesosPerMeter":51660.8839322594,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11740"},{"year":2026,"category":"Roads","project":"Cubay-Balabago Rd - K0005 + 452 - K0006 + 728","amountPesos":57745000.0,"lengthMeters":1276.0,"ratePesosPerMeter":45254.70219435736,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11743"},{"year":2026,"category":"Roads","project":"Molo Blvd - K0005 + 575 - K0006 + 807","amountPesos":55752000.0,"lengthMeters":1232.0,"ratePesosPerMeter":45253.246753246756,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11745"},{"year":2026,"category":"Roads","project":"Bacolod-City Bdry Rd - K0015 + 698 - K0015 + 821, K0015 + 907 - K0016 + 000, K0017 + 500 - K0018 + 658","amountPesos":39795000.0,"lengthMeters":1374.0,"ratePesosPerMeter":28962.88209606987,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11748"},{"year":2026,"category":"Roads","project":"Jct Pontevedra-La Castellana Rd - K0047 + 525 - K0049 + 000","amountPesos":56840000.0,"lengthMeters":1475.0,"ratePesosPerMeter":38535.59322033898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11750"},{"year":2026,"category":"Roads","project":"Tagbilaran City-Corella-Sikatuna-Loboc Rd - K0002 + 555 - K0003 + 025, K0004 + 032 - K0005 + 000","amountPesos":104652000.0,"lengthMeters":1438.0,"ratePesosPerMeter":72776.0778859527,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11753"},{"year":2026,"category":"Roads","project":"Arteche - Jipapad - Las Navas - Rawis Rd - K0805 + (-762) - K0805 + 384","amountPesos":90160000.0,"lengthMeters":1146.0,"ratePesosPerMeter":78673.64746945899,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11756"},{"year":2026,"category":"Roads","project":"Belen - Consuegra Road (S0012LT), K980 + (-334) - K0984+732","amountPesos":123495000.0,"lengthMeters":5066.0,"ratePesosPerMeter":24377.22068693249,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11758"},{"year":2026,"category":"Roads","project":"Kiling-Tanauan-Tabontabon-Julita Rd - K0928 + 500 - K0931 + 363","amountPesos":82973000.0,"lengthMeters":2863.0,"ratePesosPerMeter":28981.13866573524,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11760"},{"year":2026,"category":"Roads","project":"Mainit-Sn Miguel-Santol Rd - K0938 + 000 - K0940 + 084","amountPesos":60783000.0,"lengthMeters":2084.0,"ratePesosPerMeter":29166.506717850287,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11762"},{"year":2026,"category":"Roads","project":"Mainit-Sn Miguel-Santol Rd - K0945 + 933.60 - K0948 + 000","amountPesos":59800000.0,"lengthMeters":2066.4,"ratePesosPerMeter":28939.21796360788,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11764"},{"year":2026,"category":"Roads","project":"Rawis - Catubig Rd, K0795+043 - K0795+873","amountPesos":71395000.0,"lengthMeters":830.0,"ratePesosPerMeter":86018.07228915663,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11766"},{"year":2026,"category":"Roads","project":"Rawis - Catubig Rd, K0801+201.30 - K0801+465.60, K0803+833.30 - K0804+430","amountPesos":75255000.0,"lengthMeters":861.0,"ratePesosPerMeter":87404.18118468081,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11768"},{"year":2026,"category":"Roads","project":"Dipolog-Polanco-Piñan-Jct Oroquieta Rd - K1817 + 718 - K1818 + 738, K1818 + 940 - K1819 + 457, K1821 + 000 - K1823 + 752","amountPesos":129205000.0,"lengthMeters":4289.0,"ratePesosPerMeter":30124.737701095826,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11771"},{"year":2026,"category":"Roads","project":"Eastern Bobongan-Sominot-Midsalip-Dumingag Rd - K1654 + 000 - K1655 + 801","amountPesos":58498000.0,"lengthMeters":1801.0,"ratePesosPerMeter":32480.84397556913,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11773"},{"year":2026,"category":"Roads","project":"Jct Aurora - Jct Monte Alegre - Jct Labangan Rd K1641 + 384 - K1643 + 500, S01086MN","amountPesos":98000000.0,"lengthMeters":2116.0,"ratePesosPerMeter":46313.79962192816,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11775"},{"year":2026,"category":"Roads","project":"Jct Switch-Jct Monte Alegre Rd - K1643 + 296 - K1643 + 748, K1643 + 778.84 - K1645 + 000","amountPesos":53776000.0,"lengthMeters":1673.16,"ratePesosPerMeter":32140.381075332123,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11777"},{"year":2026,"category":"Roads","project":"Sibutu-Ligayan Road (S00007TW) Chainage 19000 -Chainage 21500","amountPesos":86824000.0,"lengthMeters":2500.0,"ratePesosPerMeter":34729.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11779"},{"year":2026,"category":"Roads","project":"Sibutu-Ligayan Road (S00007TW) Chainage 6000 -Chainage 8388","amountPesos":98000000.0,"lengthMeters":2388.0,"ratePesosPerMeter":41038.52596314908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11781"},{"year":2026,"category":"Roads","project":"Tunggusong -Tubig Indangan Road (S00008TW) Chainage 0 -Chainage 2200, Chainage 4000 - Chainage 4250","amountPesos":98000000.0,"lengthMeters":2450.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11783"},{"year":2026,"category":"Roads","project":"Don Carlos-Kadingilan Rd - K1586 + 000 - K1588 + 000","amountPesos":65675000.0,"lengthMeters":2000.0,"ratePesosPerMeter":32837.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11786"},{"year":2026,"category":"Roads","project":"Jct Dologon-Busco-Quezon Rd - K1551+ 388 - K1553 + 000","amountPesos":67635000.0,"lengthMeters":1612.0,"ratePesosPerMeter":41957.19602977668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11788"},{"year":2026,"category":"Roads","project":"Dualing-New Panay-Midsayap Rd - K1694 + 000 - K1697 + 458, K1697 + 670 - K1699 + 053","amountPesos":94836000.0,"lengthMeters":4841.0,"ratePesosPerMeter":19590.167320801487,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11791"},{"year":2026,"category":"Roads","project":"Dualing-New Panay-Midsayap Rd - K1700 + 000 - K1703 + 757","amountPesos":113974000.0,"lengthMeters":3757.0,"ratePesosPerMeter":30336.438647857332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11793"},{"year":2026,"category":"Roads","project":"Matalam-Lampayan-Antipas Rd - K1660 + 869 - K1662 + 000, K1663 + 442 - K1662 + 653, K1663 + 742 - K1663 + 815, K1667 + 000 - K1668 + 535","amountPesos":97693000.0,"lengthMeters":3528.0,"ratePesosPerMeter":27690.75963718821,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11797"},{"year":2026,"category":"Roads","project":"Bani-Agno Rd - K0345 + 427.15 - K0347 + 000","amountPesos":33610000.0,"lengthMeters":1572.85,"ratePesosPerMeter":21368.852719585782,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11801"},{"year":2026,"category":"Roads","project":"Sto Tomas-Mt Cabuyo Rd - K0282 + 000 - K0282 + 215","amountPesos":6860000.0,"lengthMeters":215.0,"ratePesosPerMeter":31906.976744186046,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11805"},{"year":2026,"category":"Roads","project":"Nambaran-Isabela Rd - K0518 + 497 - K0520 + 068","amountPesos":24332000.0,"lengthMeters":1571.0,"ratePesosPerMeter":15488.224061107574,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11808"},{"year":2026,"category":"Roads","project":"Rizal Natl Rd (Babalag-Kinama-Sn Francisco Sect) - K0534 + 054 - K0534 + 125","amountPesos":1542000.0,"lengthMeters":71.0,"ratePesosPerMeter":21718.309859154928,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11810"},{"year":2026,"category":"Roads","project":"CVR Regional Govt Center Rd Network (S00707LZ) - Chainage 297 - 819","amountPesos":16126000.0,"lengthMeters":522.0,"ratePesosPerMeter":30892.72030651341,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11814"},{"year":2026,"category":"Roads","project":"Roads - Cagayan-Apayao Rd - K0469 + 572 - K0497 + 562, K0498 + 000 - K0498 + 235","amountPesos":30772000.0,"lengthMeters":28225.0,"ratePesosPerMeter":1090.239149689991,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11816"},{"year":2026,"category":"Roads","project":"Naguilian-Sn Mariano Rd - K0413 + 817 - K0414 + 769","amountPesos":58231000.0,"lengthMeters":952.0,"ratePesosPerMeter":61167.01680672269,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11819"},{"year":2026,"category":"Roads","project":"Jct Ipil-Quirino Bdry Rd - K0339 + 299 - K0340 + 413, K0340 + 470 - K0341 + 358","amountPesos":58800000.0,"lengthMeters":2002.0,"ratePesosPerMeter":29370.629370629373,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11822"},{"year":2026,"category":"Roads","project":"Echague-Jones-Maddela Rd (Villa Norte-Panang Sect) - K0385 + 540 - K0385 + 650","amountPesos":2762000.0,"lengthMeters":110.0,"ratePesosPerMeter":25109.090909090908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11825"},{"year":2026,"category":"Roads","project":"Bigaa-Plaridel via Bulacan & Malolos Rd - K0031 + (-230) - K0031 + (-125)","amountPesos":3695000.0,"lengthMeters":105.0,"ratePesosPerMeter":35190.47619047619,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11829"},{"year":2026,"category":"Roads","project":"Sta. Maria - Norzagaray Rd K0034+300 - K0035+513, K0034+713 - K0035+509","amountPesos":48040000.0,"lengthMeters":1213.0,"ratePesosPerMeter":39604.2868920033,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11832"},{"year":2026,"category":"Roads","project":"Talisay-Laurel-Agoncillo Rd - K0102 + 324 - K0102 + 803","amountPesos":39000000.0,"lengthMeters":479.0,"ratePesosPerMeter":81419.624217119,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11836"},{"year":2026,"category":"Roads","project":"Tejero-Gen Trias-Amadeo-Tagaytay Rd -K0041 + 247 - K0041 + 287.9, K0041 + 581 - K0041 + 700, K0042 + 500 - K0042 + 635, K0044 + 252 - K0044 + 412","amountPesos":13620000.0,"lengthMeters":454.9,"ratePesosPerMeter":29940.64629588911,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11839"},{"year":2026,"category":"Roads","project":"Bacoor-Dasmariñas National Rd - K0027 + 975 - K0028 + 419, K0029 + 198 - K0029 + 360, K0031 + 623 - K0031 + 667, K0031 + 730 - K0031 + 787","amountPesos":25467000.0,"lengthMeters":707.0,"ratePesosPerMeter":36021.21640735502,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11842"},{"year":2026,"category":"Roads","project":"Bacoor-Dasmariñas National Rd - K0032 + 833 - K0032 + 857, K0033 + 041 - K0033 + 532, K0034 + 936 - K0035 + 152, K0035 + 181 - K0035 + 186","amountPesos":44687000.0,"lengthMeters":736.0,"ratePesosPerMeter":60716.032608695656,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11844"},{"year":2026,"category":"Roads","project":"Lutucan-Guisguis Port Rd - K0119 + 354 - K0120 + 315","amountPesos":30753000.0,"lengthMeters":961.0,"ratePesosPerMeter":32001.040582726328,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11847"},{"year":2026,"category":"Roads","project":"Marikina-Infanta Rd - K0038 + 213 - K0038 + 1000","amountPesos":45153000.0,"lengthMeters":787.0,"ratePesosPerMeter":57373.570520965695,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11850"},{"year":2026,"category":"Roads","project":"Marikina-Infanta Rd - K0058 + 906 - K0060 + 299","amountPesos":40953000.0,"lengthMeters":1393.0,"ratePesosPerMeter":29399.13854989232,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11852"},{"year":2026,"category":"Roads","project":"Marikina-Infanta Rd - K0066+180 - K0067 + 000, K0067 + 665 - K0067 + 947","amountPesos":40092000.0,"lengthMeters":1102.0,"ratePesosPerMeter":36381.125226860255,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11854"},{"year":2026,"category":"Roads","project":"Pililla Jct-Jala Jala Rd - K0070 + 095 - K0070 + 580","amountPesos":37826000.0,"lengthMeters":485.0,"ratePesosPerMeter":77991.75257731958,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11856"},{"year":2026,"category":"Roads","project":"Sn Mateo-Rodriguez Rd - K0025 + 085 - K0025 + 330","amountPesos":16081000.0,"lengthMeters":245.0,"ratePesosPerMeter":65636.73469387754,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11858"},{"year":2026,"category":"Roads","project":"Tanay-Sampaloc Rd - K0062 + 615 - K0063 + 124.60","amountPesos":31326000.0,"lengthMeters":509.6,"ratePesosPerMeter":61471.7425431713,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11860"},{"year":2026,"category":"Roads","project":"Naga City Bdry-Calabanga-Balongay Rd - K0440 + 779 - K0440 + 946, K0442 + 976 - K0443 + 686","amountPesos":103242000.0,"lengthMeters":877.0,"ratePesosPerMeter":117721.77879133409,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11864"},{"year":2026,"category":"Roads","project":"Naga-Carolina-Panicuason Rd - K0438 + 100 - K0438 + 583, K0440 + 043 - K0440 + 262","amountPesos":23030000.0,"lengthMeters":702.0,"ratePesosPerMeter":32806.26780626781,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11866"},{"year":2026,"category":"Roads","project":"Masbate Circumferential Rd - K0005 + 906 - K0006 + 188","amountPesos":41871000.0,"lengthMeters":282.0,"ratePesosPerMeter":148478.72340425532,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11869"},{"year":2026,"category":"Roads","project":"Masbate Port Rd - K0001 + (-799) - K0001 + (-244)","amountPesos":37241000.0,"lengthMeters":555.0,"ratePesosPerMeter":67100.9009009009,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11871"},{"year":2026,"category":"Roads","project":"Pototan-Mina-Janiuay Rd - K0032 + 075 - K0032 + 875","amountPesos":49000000.0,"lengthMeters":800.0,"ratePesosPerMeter":61250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11875"},{"year":2026,"category":"Roads","project":"Bacolod-City Bdry Rd - (S00428NR) Chainage 000 - Chainage 620","amountPesos":23799000.0,"lengthMeters":620.0,"ratePesosPerMeter":38385.48387096774,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11879"},{"year":2026,"category":"Roads","project":"Dumaguete City-Valencia-Bacong Rd - K0005 + 494 - K0005 + 870","amountPesos":31971000.0,"lengthMeters":376.0,"ratePesosPerMeter":85029.25531914894,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11882"},{"year":2026,"category":"Roads","project":"La Paz-Javier-Bito Rd - K0964 + 224 - K0964 + 304, K0970 + 317 - K0970 + 784, K0970 + 845 - K0970 + 870 (L), K0970 + 845 - K0970 + 870 (L), K0971 + 048 - K0971 + 063, K0971 + 203 - K0971 + 213 (L), K0971 + 228 - K0971 + 238 (L), K0971 + 402 - K0971 + 435 ( R), K0971 + 476 - K0971 + 488 (L)","amountPesos":24222000.0,"lengthMeters":652.0,"ratePesosPerMeter":37150.30674846626,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11886"},{"year":2026,"category":"Roads","project":"Naga-Naga Anibong Rd - K0906 + 1139 - K0906 + 1401","amountPesos":16366000.0,"lengthMeters":262.0,"ratePesosPerMeter":62465.64885496183,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11889"},{"year":2026,"category":"Roads","project":"Piñan - Mutia Rd - K1829 + 006 - K1829 + 307, K1829 + 777 - K1830 + 588","amountPesos":40824000.0,"lengthMeters":1112.0,"ratePesosPerMeter":36712.23021582734,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11893"},{"year":2026,"category":"Roads","project":"Jct Aurora - Jct Monte Alegre - Jct Labangan Rd K1655 + 975 - K1656+174, S01086MN","amountPesos":7840000.0,"lengthMeters":199.0,"ratePesosPerMeter":39396.98492462312,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11896"},{"year":2026,"category":"Roads","project":"Jct Switch - Jct Monte Alegre Rd K1648 + 588 - K1648 + 892, S01097MN","amountPesos":15680000.0,"lengthMeters":304.0,"ratePesosPerMeter":51578.94736842105,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11898"},{"year":2026,"category":"Roads","project":"Jct. Aurora - Jct Monte Alegre - Jct Labangan Rd K1631+124 - K1632+324","amountPesos":48235000.0,"lengthMeters":1200.0,"ratePesosPerMeter":40195.833333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11900"},{"year":2026,"category":"Roads","project":"Jct. Aurora - Jct Monte Alegre - Jct Labangan Rd K1647+892 - K1648+892","amountPesos":41424000.0,"lengthMeters":1000.0,"ratePesosPerMeter":41424.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11902"},{"year":2026,"category":"Roads","project":"Imelda-Payao-Siay Rd (S01216MN), Zamboanga Sibugay – K1757+ (-894.15) – K1757+(-294.15), RS - K1757+(-731) – K1757+(-707), LS – K1757+(-478) – K 1757+(-416), RS – K1757+(-305) – K1757+(-269), RS – K1757+402 – K1757+430, LS – K1764+235 – K1764+273, LS – K1764+330 – K1764+354, RS – K1766+282 – K1766+301","amountPesos":33320000.0,"lengthMeters":734.15,"ratePesosPerMeter":45385.820336449266,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11905"},{"year":2026,"category":"Roads","project":"Jct Imelda-Alicia Rd - K1759 + 000 - K1760 + 000","amountPesos":36183000.0,"lengthMeters":1000.0,"ratePesosPerMeter":36183.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11907"},{"year":2026,"category":"Roads","project":"Ipil-Magdaup Wharf Rd - K2015 + 153 - K2015 + 260, K2016 + 673 - K2016 + 702, K2016 + 702 - K2017 + 245","amountPesos":32935000.0,"lengthMeters":679.0,"ratePesosPerMeter":48505.154639175256,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11910"},{"year":2026,"category":"Roads","project":"Jct Dologon-Busco-Quezon Rd - K1550 + 000 - K1550 + 188, K1550 + 836 - K1550 + 987","amountPesos":11154000.0,"lengthMeters":339.0,"ratePesosPerMeter":32902.654867256635,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11914"},{"year":2026,"category":"Roads","project":"Jct. SH-Manolo Fortich-Libona-Indahag Road -K1452 + 038 - K1452 + 174","amountPesos":6747000.0,"lengthMeters":136.0,"ratePesosPerMeter":49610.294117647056,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11917"},{"year":2026,"category":"Roads","project":"Maramag-Maradugao Rd - K1596 + 986 - K1597 + 480","amountPesos":32557000.0,"lengthMeters":494.0,"ratePesosPerMeter":65904.85829959514,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11920"},{"year":2026,"category":"Roads","project":"Kidapawan-Calunasan-Mlang Rd - K1622 + 000 - K1623 + 000","amountPesos":29043000.0,"lengthMeters":1000.0,"ratePesosPerMeter":29043.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11924"},{"year":2026,"category":"Roads","project":"NRJ Bayugan-Esperanza Rd - K1270+(-920.65) - K1270+(-878), K1270+(-331) - K1270+038, K1270+122.90 - K1270+407, K1270+526 - K1270+830.25","amountPesos":49000000.0,"lengthMeters":1000.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11928"},{"year":2026,"category":"Roads","project":"NRJ Bayugan-Esperanza Rd - K1279+500 - K1280+750","amountPesos":49000000.0,"lengthMeters":1250.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11930"},{"year":2026,"category":"Roads","project":"Bauang-San Fernando-San Juan Bypass Road, Barangay. Camansi - Barangay. Langcuas - Barangay. Cadaclan Section, Sta. 9+500 -  Sta. 11+500,  San Fernando, La Union","amountPesos":145011000.0,"lengthMeters":2000.0,"ratePesosPerMeter":72505.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11941"},{"year":2026,"category":"Roads","project":"Bauang-San Fernando-San Juan Bypass Road, Barangay. Camansi - Barangay. Langcuas - Barangay. Cadaclan Section, Sta. 9+500 -  Sta. 11+500,  San Fernando, La Union","amountPesos":119874000.0,"lengthMeters":2000.0,"ratePesosPerMeter":59937.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11943"},{"year":2026,"category":"Roads","project":"Dagupan-Mangaldan Diversion Road, Barangay. Pantal - Barangay. Tambac - Barangay. Mamalingling Section, Sta. 1 + 512 - Sta. 5 + 280, Dagupan, Pangasinan","amountPesos":192235000.0,"lengthMeters":3768.0,"ratePesosPerMeter":51017.7813163482,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11949"},{"year":2026,"category":"Roads","project":"Dagupan-Mangaldan-Calasiao Circumferential Road, Barangay. Buenlag - Barangay. Anolid (Mangaldan) - Barangay. Bolosan - Barangay. Mamalingling (Dagupan) Section, Sta. 1 + 800 - Sta. 5 + 372.44, Pangasinan","amountPesos":146372000.0,"lengthMeters":3572.44,"ratePesosPerMeter":40972.55657197882,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11951"},{"year":2026,"category":"Roads","project":"Darayday Road, Barangay. 49-A (Darayday) - Barangay. 50 (Buttong) Section, Sta. 2 + 443 - Sta. 3 + 657, Laoag City, Ilocos Norte","amountPesos":29002000.0,"lengthMeters":1214.0,"ratePesosPerMeter":23889.621087314663,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11953"},{"year":2026,"category":"Roads","project":"Darayday Road, Barangay. San Marcos Section, Sta. 0 + 000 - Sta. 2 + 443, San Nicolas, Ilocos Norte","amountPesos":29002000.0,"lengthMeters":2443.0,"ratePesosPerMeter":11871.469504707327,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11955"},{"year":2026,"category":"Roads","project":"Dingras Diversion Road, Barangay. Bungcag-Barangay. Peralta - Barangay. Sulquiano - Barangay. Saludares Section, Sta. 0 + 000 - Sta. 4 + 510, Dingras, Ilocos Norte","amountPesos":113682000.0,"lengthMeters":4510.0,"ratePesosPerMeter":25206.651884700666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11957"},{"year":2026,"category":"Roads","project":"Laoag-San Nicolas Bypass Road, Barangay. 28 (San Bernardo), Barangay. 29 (Sto. Tomas) - Barangay. 54-B (Camangaan) - Barangay. 55-B (Salet-Bulangon) Section, Sta. 5 + 400 - Sta. 6 + 620, Laoag City, Ilocos Norte","amountPesos":48337000.0,"lengthMeters":1220.0,"ratePesosPerMeter":39620.49180327869,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11959"},{"year":2026,"category":"Roads","project":"Laoag-San Nicolas Bypass Road, Poblacion Section, San Nicolas, Sta. 4+237.62 - Sta. 5+318.72, Ilocos Norte","amountPesos":175812000.0,"lengthMeters":1081.1,"ratePesosPerMeter":162623.2540930533,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11961"},{"year":2026,"category":"Roads","project":"Lingayen Baywalk-Bonuan Road, Barangay Pugaro Section, Sta. 0 + 000 - Sta. 0 + 900, Dagupan, Pangasinan","amountPesos":292743000.0,"lengthMeters":900.0,"ratePesosPerMeter":325270.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11963"},{"year":2026,"category":"Roads","project":"Lingayen Bypass Road (Package 2), Sta. 0 + 890 - Sta. 0 + 996.06, Pangasinan","amountPesos":29345000.0,"lengthMeters":106.06,"ratePesosPerMeter":276683.00961719797,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11965"},{"year":2026,"category":"Roads","project":"Malasiqui Diversion Road, Barangay. Tambac-Barangay. Barang - Barangay. Banawang - Barangay. Alacan - Barangay. Guilig - Barangay. Talog Section, Sta. 1 + 300 - Sta. 8 + 129.62, Malasiqui, Pangasinan","amountPesos":292743000.0,"lengthMeters":6829.62,"ratePesosPerMeter":42863.7318035264,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11967"},{"year":2026,"category":"Roads","project":"Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Barangay. Poblacion Oeste - Barangay. Calmay Section, Sta. 5+902.059 - Sta. 6+313.209, Dagupan City, Pangasinan","amountPesos":160033000.0,"lengthMeters":411.15,"ratePesosPerMeter":389232.64015566127,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11969"},{"year":2026,"category":"Roads","project":"Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Barangay. Poblacion-Barangay. Caloocan Sur Section, Sta. 1 + 180 - Sta. 1 + 800, Binmaley, Pangasinan","amountPesos":176070000.0,"lengthMeters":620.0,"ratePesosPerMeter":283983.87096774194,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11971"},{"year":2026,"category":"Roads","project":"Road connecting Villasis-Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Barangay. Palina East - Barangay. Sta. Lucia - Barangay. Tombod Section, Sta. 0 + 000 - Sta. 5 + 664, Urdaneta, Pangasinan","amountPesos":98000000.0,"lengthMeters":5664.0,"ratePesosPerMeter":17302.25988700565,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11973"},{"year":2026,"category":"Roads","project":"Rosario Bypass Road, Barangay. Esperanza-Barangay. Agat Section, Sta. 0 + 000 - Sta. 5 + 000, Rosario, La Union","amountPesos":48337000.0,"lengthMeters":5000.0,"ratePesosPerMeter":9667.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11975"},{"year":2026,"category":"Roads","project":"Tagudin Bypass Road, Barangay. Bario-an - Barangay. Tallaoen - Barangay. Garitan - Barangay. Lubnac - Barangay. Bitalag Section, Sta. 1 + 830 - Sta. 4 + 040, Sta. 4 + 080 - Sta. 4 + 694, Tagudin, Ilocos Sur","amountPesos":146372000.0,"lengthMeters":2824.0,"ratePesosPerMeter":51831.444759206795,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11977"},{"year":2026,"category":"Roads","project":"Vigan-Cabugao Coastal/Diversion Road, Barangay. Mindoro-Pantay Laud (Vigan) - Barangay. Cabittaogan (Sta. Catalina) Section, Sta 0+348 - Sta 0+418,Ilocos Sur","amountPesos":164345000.0,"lengthMeters":70.0,"ratePesosPerMeter":2347785.714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11979"},{"year":2026,"category":"Roads","project":"Villasis-Sto. Tomas Bypass Road, Barangay. Puelay (Villasis) - Barangay Salvacion (Sto. Tomas) Section, Sta. 2+587.22 - Sta. 3+497.72, Pangasinan","amountPesos":213325000.0,"lengthMeters":910.5,"ratePesosPerMeter":234294.3437671609,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11981"},{"year":2026,"category":"Roads","project":"Major Mane to Kennon Road Bypass Road, Sta. 4+189 - Sta. 4+437, Baguio City","amountPesos":89148000.0,"lengthMeters":248.0,"ratePesosPerMeter":359467.7419354839,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11986"},{"year":2026,"category":"Roads","project":"Alcala Bypass Road, Package 1, Sta. 1+005 - Sta. 1+095, Cagayan","amountPesos":98000000.0,"lengthMeters":90.0,"ratePesosPerMeter":1088888.888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11989"},{"year":2026,"category":"Roads","project":"Alcala-Santo Niño-Lasam Road, Carallangan Section (Sta. 0+530.071 - Sta. 0+785.245), Alcala, Cagayan","amountPesos":49000000.0,"lengthMeters":255.174,"ratePesosPerMeter":192025.83335292785,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11991"},{"year":2026,"category":"Roads","project":"Construction of Bypass and Diversion Roads - Alcala-Santo Niño-Lasam Road, Tupang Section (Sta. 0+000 – Sta. 0+124.71), Alcala, Cagayan","amountPesos":32400000.0,"lengthMeters":124.71,"ratePesosPerMeter":259802.7423622805,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11993"},{"year":2026,"category":"Roads","project":"Alicia-Angadanan-San Guillermo-Cauayan City-Naguilian Alternate Route, Package 1, Brgy. Progreso (Sta. 3+400 - Sta. 4+278, Sta. 11+617.50 - Sta. 11+622.50), San Guillermo, Isabela","amountPesos":49000000.0,"lengthMeters":883.0,"ratePesosPerMeter":55492.63873159683,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 11995"},{"year":2026,"category":"Roads","project":"Roxas Bypass Road (Sta. 0 + 000 - Sta. 1 + 500), Roxas, Isabela","amountPesos":73500000.0,"lengthMeters":1500.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12001"},{"year":2026,"category":"Roads","project":"Cabagan - Sta. Maria Bypass Road, Cabagan, Package 2, Brgy. Casibarag - Brgy. Catabayungan - Brgy. Ugad Section (Sta. 0+000 - Sta.3+109.12), Isabela","amountPesos":181752000.0,"lengthMeters":3109.12,"ratePesosPerMeter":58457.698641416224,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12003"},{"year":2026,"category":"Roads","project":"Cauayan City Alternate Route, Barangay San Francisco - Barangay San Antonio - Barangay Santa Luciana Section (Sta. 4+300 - Sta. 6+800), City of Cauayan, Isabela","amountPesos":147000000.0,"lengthMeters":2500.0,"ratePesosPerMeter":58800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12005"},{"year":2026,"category":"Roads","project":"Cauayan City Alternate Route, Brgy. Sinippil Section (Sta. 6+800 - Sta.7+492.62, Sta. 7+853.42 - Sta. 8+712.15), Cauayan City, Isabela","amountPesos":98000000.0,"lengthMeters":1551.35,"ratePesosPerMeter":63170.78673413481,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12007"},{"year":2026,"category":"Roads","project":"Cauayan City Bypass Road, Brgy. Dadap Section (Sta. 1+756 - Sta. 2+170), Luna, Isabela","amountPesos":49000000.0,"lengthMeters":414.0,"ratePesosPerMeter":118357.48792270532,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12009"},{"year":2026,"category":"Roads","project":"Cauayan City Bypass Road, Brgy. Marabulig Section (Sta. 4+600 - Sta. 5+104), Cauayan City, Isabela","amountPesos":45438000.0,"lengthMeters":504.0,"ratePesosPerMeter":90154.76190476191,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12011"},{"year":2026,"category":"Bridges","project":"Cauayan City Northeast Alternate Route (Alicaocao Bridge) (Sta. 0+687.16 - Sta. 1+228.16), City of Cauayan, Isabela","amountPesos":505680000.0,"lengthMeters":541.0,"ratePesosPerMeter":934713.4935304989,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12013"},{"year":2026,"category":"Roads","project":"Cordon Bypass Road, Brgy. Sagat Section (Sta. 2+016.50 - Sta. 3+555), Cordon, Isabela","amountPesos":90876000.0,"lengthMeters":1538.5,"ratePesosPerMeter":59067.92330191745,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12015"},{"year":2026,"category":"Roads","project":"Gattaran Diversion Road, Package 1,Sta. 4+640.50 - Sta.6+000","amountPesos":98000000.0,"lengthMeters":1359.5,"ratePesosPerMeter":72085.32548731151,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12017"},{"year":2026,"category":"Roads","project":"Iguig Bypass Road Phase VII, Cagayan Sta. 0+274 – Sta. 0+540, Sta. 0+630 – Sta. 2+700, Sta. 2+960 – Sta. 3+250, Sta. 3+300 – Sta. 3+500","amountPesos":105000000.0,"lengthMeters":2826.0,"ratePesosPerMeter":37154.98938428875,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12019"},{"year":2026,"category":"Roads","project":"Ilagan City Bypass Road, Brgy. Alibagu Section (Sta. 1+021 - Sta. 3+520), Isabela","amountPesos":136314000.0,"lengthMeters":2499.0,"ratePesosPerMeter":54547.41896758704,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12021"},{"year":2026,"category":"Roads","project":"Cauayan City Alternate Route, Barangay Nungnungan - Barangay Faustino - Barangay San Francisco Section (Sta. 0+740 - Sta. 1+400, Sta. 1+900 - Sta. 4+300), City of Cauayan, Isabela","amountPesos":196000000.0,"lengthMeters":3060.0,"ratePesosPerMeter":64052.28758169935,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12025"},{"year":2026,"category":"Roads","project":"Mallig Bypass Road, Package 1, Isabela, Sta 0 + 000 - Sta 0 + 850, Sta 0 + 915 - Sta 1 + 238, Sta 2 + 922 - Sta 5 + 232","amountPesos":113533000.0,"lengthMeters":3483.0,"ratePesosPerMeter":32596.325007177722,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12027"},{"year":2026,"category":"Roads","project":"Ramon-Cordon-Diadi Bypass Road, Brgy. Dallao Section (Sta. 0+430 - Sta. 1+200), Cordon, Isabela","amountPesos":45438000.0,"lengthMeters":770.0,"ratePesosPerMeter":59010.38961038961,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12029"},{"year":2026,"category":"Roads","project":"Santiago Circumferential Road, Brgy. Sagat Section (Sta. 1+468 - Sta. 2+657.9), Santiago, Isabela","amountPesos":73500000.0,"lengthMeters":1189.9,"ratePesosPerMeter":61769.8966299689,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12035"},{"year":2026,"category":"Roads","project":"Tuguegarao West Diversion Road, Brgy. Buntun - Brgy. Pallua Section (0+000  to 1+800), Tuguegarao City, Cagayan","amountPesos":156800000.0,"lengthMeters":1800.0,"ratePesosPerMeter":87111.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12037"},{"year":2026,"category":"Roads","project":"Tuguegarao West Diversion Road, Brgy. Linao East Section (4+290 to 5+520), Tuguegarao City, Cagayan","amountPesos":200900000.0,"lengthMeters":1230.0,"ratePesosPerMeter":163333.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12039"},{"year":2026,"category":"Roads","project":"Arayat-Magalang By-pass Road, Brgy. Lapaz Turu Section, Arayat, Pampanga, Sta. 9+232 - Sta. 10+100","amountPesos":98000000.0,"lengthMeters":868.0,"ratePesosPerMeter":112903.2258064516,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12048"},{"year":2026,"category":"Roads","project":"Barretto Bypass Road, Brgy. Kalaklan Section (Sta. 6+320 - Sta. 6+720), Zambales","amountPesos":100000000.0,"lengthMeters":400.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12050"},{"year":2026,"category":"Roads","project":"Barretto Bypass Road, Barangay Naugsol Section (Sta. 1+660 - Sta. 2+440), Zambales","amountPesos":93314000.0,"lengthMeters":780.0,"ratePesosPerMeter":119633.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12052"},{"year":2026,"category":"Roads","project":"San Roque - Maturanoc Road, Guimba By-Pass, Nueva Ecija (Phase II), Sta. 0+000 - Sta. 3+347","amountPesos":245000000.0,"lengthMeters":3347.0,"ratePesosPerMeter":73199.88048999103,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12056"},{"year":2026,"category":"Roads","project":"Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija (Phase II), Sta. 1+580 - Sta. 8+000","amountPesos":294000000.0,"lengthMeters":6420.0,"ratePesosPerMeter":45794.392523364484,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12058"},{"year":2026,"category":"Roads","project":"Cawag-Philseco Bypass Road, Brgy. Balaybay Resettlement Section - Brgy. Asinan Proper Section,  Sta. 1+488 - Sta. 3+378, Zambales","amountPesos":100000000.0,"lengthMeters":1890.0,"ratePesosPerMeter":52910.05291005291,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12060"},{"year":2026,"category":"Roads","project":"Concepcion-Mabalacat Bypass Rd, Barangay Calumpang to Barangay Tabun, Sta. 2 + 932 - Sta. 3 + 400, Pampanga","amountPesos":246960000.0,"lengthMeters":468.0,"ratePesosPerMeter":527692.3076923077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12062"},{"year":2026,"category":"Roads","project":"Lubao-Guagua-Minalin-Sto. Tomas Rd (Sta. 017 + 413.64 - Sta. 018 + 736.8), Pampanga","amountPesos":229709000.0,"lengthMeters":1323.16,"ratePesosPerMeter":173606.3665769824,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12068"},{"year":2026,"category":"Roads","project":"Lubao-Guagua-Minalin-Sto. Tomas Rd (Sta. 018 + 736.8 - Sta. 018 + 961.40, Sta. 25 + 850 - Sta. 26 + 710), Pampanga","amountPesos":188286000.0,"lengthMeters":1084.6,"ratePesosPerMeter":173599.48368061925,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12070"},{"year":2026,"category":"Roads","project":"Lubao-Guagua-Minalin-Sto. Tomas Road, Sta 003+980-Sta 004+280, Sta 004+400- Sta 004+640, Sta 005+920- Sta 006+820, Pampanga","amountPesos":295960000.0,"lengthMeters":1440.0,"ratePesosPerMeter":205527.77777777778,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12078"},{"year":2026,"category":"Roads","project":"Lubao-Guagua-Minalin-Sto. Tomas Road, Sta 006+820- Sta 006+860, Sta 006+980- Sta 007+040, Pampanga","amountPesos":201880000.0,"lengthMeters":100.0,"ratePesosPerMeter":2018800.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12080"},{"year":2026,"category":"Roads","project":"Lubao-Guagua-Minalin-Sto. Tomas Road, Sta 007+040- Sta 007+260, Sta 007+400-Sta 007+575, Sta 007+756-Sta 008+581, Pampanga","amountPesos":250880000.0,"lengthMeters":1220.0,"ratePesosPerMeter":205639.34426229508,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12082"},{"year":2026,"category":"Roads","project":"Lubao-Guagua-Minalin-Sto. Tomas Road, Sta 008+581- Sta 010+131, Pampanga","amountPesos":318500000.0,"lengthMeters":1550.0,"ratePesosPerMeter":205483.87096774194,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12084"},{"year":2026,"category":"Roads","project":"MNR to Tarlac-San Miguel via. Macabulos Road, Tarlac, Segment 1: Sta. 0+716.04 - Sta. 1+095.62, Sta. 1+518.00 - Sta. 2+050.82, Segment 2: Sta. 1+220.33 - Sta. 1+602.00","amountPesos":98000000.0,"lengthMeters":1210.07,"ratePesosPerMeter":80987.05033593097,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12086"},{"year":2026,"category":"Roads","project":"Pandi By-pass, Sta. 6 + 100 - Sta. 6 + 660, Bulacan","amountPesos":94143000.0,"lengthMeters":560.0,"ratePesosPerMeter":168112.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12088"},{"year":2026,"category":"Roads","project":"Porac - Angeles Bypass Road, Porac, Pampanga, Sta. 4 + 618.19 - Sta. 5 + 620.19,","amountPesos":147000000.0,"lengthMeters":1002.0,"ratePesosPerMeter":146706.5868263473,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12090"},{"year":2026,"category":"Roads","project":"San Ildefonso - San Miguel Bypass Road, San Ildefonso and San Miguel, Sta 006+432- Sta 009+000, Sta 020+800- Sta 022+702, Bulacan","amountPesos":175253000.0,"lengthMeters":4470.0,"ratePesosPerMeter":39206.48769574944,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12092"},{"year":2026,"category":"Roads","project":"San Jose City Bypass Road, Nueva Ecija Sta. 6+690 - Sta. 6+903, Sta. 7+194 - Sta. 7+761","amountPesos":98000000.0,"lengthMeters":780.0,"ratePesosPerMeter":125641.02564102564,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12096"},{"year":2026,"category":"Roads","project":"Sta Ana-Arayat Bypass Road, Brgy. San Isidro Section, Sta. Ana, Pampanga, Sta. 4+921 - Sta. 5+421","amountPesos":98000000.0,"lengthMeters":500.0,"ratePesosPerMeter":196000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12102"},{"year":2026,"category":"Roads","project":"Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 1+409 - Sta. 3+228","amountPesos":147000000.0,"lengthMeters":1819.0,"ratePesosPerMeter":80813.63386476086,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12104"},{"year":2026,"category":"Roads","project":"Tarlac City Northwestern Alternate Route (San Isidro-Aguso), Tarlac, Sta. 1+141.10 - Sta.1+225.40, Sta. 1+500.30 - Sta.1+648.60","amountPesos":195727000.0,"lengthMeters":232.6,"ratePesosPerMeter":841474.6345657776,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12118"},{"year":2026,"category":"Roads","project":"Alabang-Zapote Diversion Road, Sta 0+774 - Sta 0 +881, Bacoor, Cavite","amountPesos":47763000.0,"lengthMeters":107.0,"ratePesosPerMeter":446383.1775700935,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12121"},{"year":2026,"category":"Roads","project":"Bacoor Diversion Road, Sta 0+630 - Sta 01+410, Sta 0+668 - Sta 0+688, Bacoor, Cavite","amountPesos":120277000.0,"lengthMeters":780.0,"ratePesosPerMeter":154201.28205128206,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12125"},{"year":2026,"category":"Roads","project":"Bacoor Diversion Road, Sta. 2 + 369 - Sta. 3 + 020, Bacoor, Cavite","amountPesos":240254000.0,"lengthMeters":651.0,"ratePesosPerMeter":369053.7634408602,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12127"},{"year":2026,"category":"Roads","project":"Batangas City-San Pascual-Bauan Diversion Road, Sta. 102+510 - Sta. 103+000, Batangas City, Batangas","amountPesos":96102000.0,"lengthMeters":490.0,"ratePesosPerMeter":196126.5306122449,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12129"},{"year":2026,"category":"Roads","project":"Binangonan - Angono - Taytay Diversion Road, Sta. 11 + 938 - Sta. 12 + 488, Binangonan, Rizal","amountPesos":288305000.0,"lengthMeters":550.0,"ratePesosPerMeter":524190.9090909091,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12131"},{"year":2026,"category":"Roads","project":"Binangonan - Angono - Taytay Diversion Road, Sta. 12 + 488 - Sta. 13 + 038, Binangonan, Rizal","amountPesos":288305000.0,"lengthMeters":550.0,"ratePesosPerMeter":524190.9090909091,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12133"},{"year":2026,"category":"Roads","project":"Binangonan - Angono - Taytay Diversion Road, Sta. 13 + 038 - Sta. 13 + 588, Binangonan, Rizal","amountPesos":288305000.0,"lengthMeters":550.0,"ratePesosPerMeter":524190.9090909091,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12135"},{"year":2026,"category":"Roads","project":"Carmona - Biñan Diversion Road, Sta. 1 + 751 - 2 + 000, Sta. 2 + 039 - 2 + 320, Sta. 3 + 147 - 3 + 352, Sta. 5 + 918 - 6 + 211","amountPesos":96102000.0,"lengthMeters":1028.0,"ratePesosPerMeter":93484.43579766537,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12137"},{"year":2026,"category":"Roads","project":"Carmona-Silang Diversion Road, Sta. 9 + 200 - Sta. 9 + 600, Cavite","amountPesos":76881000.0,"lengthMeters":400.0,"ratePesosPerMeter":192202.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12139"},{"year":2026,"category":"Roads","project":"Carsadang Bago - Malagasang Diversion Road, Sta. 06 + 607 - Sta. 09 + 052, Brgy. Malagasang - Brgy. Alapan Section, Imus, Cavite","amountPesos":119873000.0,"lengthMeters":2445.0,"ratePesosPerMeter":49027.811860940696,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12141"},{"year":2026,"category":"Roads","project":"Carsadang Bago - Malagasang Diversion Road, Sta. 00 + 699 - Sta. 01 + 145, Brgy. Malagasang 2E to Brgy. Malagasang 2G, Imus, Cavite","amountPesos":95477000.0,"lengthMeters":446.0,"ratePesosPerMeter":214073.99103139012,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12143"},{"year":2026,"category":"Roads","project":"Carsadang Bago-Malagasang Diversion Road, Malagasang Section, Sta. 00 + 000 - Sta. 00 + 383, Barangay Malagasang 2C to Barangay Malagasang 2D, Imus, Cavite","amountPesos":96102000.0,"lengthMeters":383.0,"ratePesosPerMeter":250919.0600522193,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12145"},{"year":2026,"category":"Roads","project":"Carsadang Bago-Malagasang Diversion Road, Malagasang Section, Sta. 00 + 383 - Sta. 00 + 699, Barangay Malagasang 2D to Barangay Malagasang 2E, Imus, Cavite","amountPesos":80576000.0,"lengthMeters":316.0,"ratePesosPerMeter":254987.3417721519,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12147"},{"year":2026,"category":"Roads","project":"Cavite - Batangas Bypass Road, Buhay na Tubig Section, Sta. 00 + 734 - Sta. 01 + 348, Imus, Cavite","amountPesos":144153000.0,"lengthMeters":614.0,"ratePesosPerMeter":234776.8729641694,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12149"},{"year":2026,"category":"Roads","project":"Cavite - Batangas Bypass Road, Tanzang Luma Section, Sta. 00 + 000 - Sta. 00 + 734, Imus, Cavite","amountPesos":144153000.0,"lengthMeters":734.0,"ratePesosPerMeter":196393.73297002725,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12151"},{"year":2026,"category":"Roads","project":"Infanta Bypass Road, Brgy. Silangan, Infanta, Quezon, Sta. 0+243 - Sta. 0+918","amountPesos":96102000.0,"lengthMeters":675.0,"ratePesosPerMeter":142373.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12157"},{"year":2026,"category":"Roads","project":"Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 26+000 - Sta. 26+700, Barangay. Malanday to Barangay. Maly, San Mateo, Rizal","amountPesos":144153000.0,"lengthMeters":700.0,"ratePesosPerMeter":205932.85714285713,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12159"},{"year":2026,"category":"Roads","project":"Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 30+328 - Sta. 30+620, Brgy. San Rafael, Montalban, Rizal","amountPesos":80185000.0,"lengthMeters":292.0,"ratePesosPerMeter":274606.16438356164,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12161"},{"year":2026,"category":"Roads","project":"Jct Daang Maharlika-Tayabas Diversion Road and Quezon Eco-Tourism Road Extension, Barangay Potol, Sta. 2+464 - Sta. 3+274, Tayabas City, Quezon","amountPesos":74912000.0,"lengthMeters":810.0,"ratePesosPerMeter":92483.95061728395,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12165"},{"year":2026,"category":"Roads","project":"Jct-Batasan San Mateo - Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 25+000, Barangay. Guitnang Bayan II to Barangay. Dulong Bayan II, San Mateo, Rizal","amountPesos":144153000.0,"lengthMeters":600.0,"ratePesosPerMeter":240255.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12167"},{"year":2026,"category":"Roads","project":"Lipa City-Padre Garcia Diversion Road, Sta 88 + 402 - Sta 89 + 155, Batangas","amountPesos":187385000.0,"lengthMeters":753.0,"ratePesosPerMeter":248851.26162018592,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12169"},{"year":2026,"category":"Roads","project":"Lipa City-Padre Garcia Diversion Road, Sta 90 + 240 - Sta 90 + 491, Batangas","amountPesos":187385000.0,"lengthMeters":251.0,"ratePesosPerMeter":746553.7848605578,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12171"},{"year":2026,"category":"Roads","project":"Luisiana Diversion Road, Sta. 107 + 980 -  Sta. 108 + 520, Luisiana, Laguna","amountPesos":43246000.0,"lengthMeters":540.0,"ratePesosPerMeter":80085.18518518518,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12175"},{"year":2026,"category":"Roads","project":"Luisiana Diversion Road, Sta. 0 + 000 - Sta. 1 + 395, Luisiana, Laguna","amountPesos":74572000.0,"lengthMeters":1395.0,"ratePesosPerMeter":53456.63082437276,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12177"},{"year":2026,"category":"Roads","project":"Luisiana-Mauban Diversion Road, Sta. 34+351.00 - Sta. 34+956.00, Mauban, Quezon","amountPesos":48111000.0,"lengthMeters":605.0,"ratePesosPerMeter":79522.31404958677,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12179"},{"year":2026,"category":"Roads","project":"Luisiana-Mauban Diversion Road, Sta. 01 + 720 - Sta. 02 + 120, Luisiana, Laguna","amountPesos":28831000.0,"lengthMeters":400.0,"ratePesosPerMeter":72077.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12181"},{"year":2026,"category":"Roads","project":"Luisiana-Mauban Diversion Road, STA 1 + 100 - STA 2 + 620, Luisiana, Laguna","amountPesos":80185000.0,"lengthMeters":1520.0,"ratePesosPerMeter":52753.28947368421,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12183"},{"year":2026,"category":"Roads","project":"Majayjay Diversion Road, Sta. 106 + 035 - Sta. 106 + 485, Majayjay, Laguna","amountPesos":24055000.0,"lengthMeters":450.0,"ratePesosPerMeter":53455.555555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12185"},{"year":2026,"category":"Roads","project":"Malabon Grande - San Juan - Mulawin Diversion Road, Tanza Section, Sta 0 + 000 - Sta 1 + 035, Barangay Bagtas, Tanza, Cavite","amountPesos":120277000.0,"lengthMeters":1035.0,"ratePesosPerMeter":116209.66183574879,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12187"},{"year":2026,"category":"Roads","project":"Malvar-Sto. Tomas Road, Brgy. San Joaquin, Sta. 5+340 - Sta. 5+636, Sto. Tomas City, Batangas","amountPesos":40092000.0,"lengthMeters":296.0,"ratePesosPerMeter":135445.94594594595,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12189"},{"year":2026,"category":"Roads","project":"Manila-Cavite Bypass Road, Sta 26 + 955 - Sta 27 + 055, Kawit, Cavite","amountPesos":67581000.0,"lengthMeters":100.0,"ratePesosPerMeter":675810.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12191"},{"year":2026,"category":"Roads","project":"Manila-Cavite Bypass Road, Sta 27 + 055 - Sta 27 + 300, Kawit, Cavite","amountPesos":160369000.0,"lengthMeters":245.0,"ratePesosPerMeter":654567.3469387755,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12193"},{"year":2026,"category":"Roads","project":"Morong Bypass Road, Sta. 2+144.55 - Sta. 2+878.55, Brgy. CCL, Morong, Rizal","amountPesos":144153000.0,"lengthMeters":734.0,"ratePesosPerMeter":196393.73297002725,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12197"},{"year":2026,"category":"Roads","project":"Padre Garcia-Ibaan Diversion Road, Sta 121 + 626.18 - Sta 121 + 687.99, Sta 123 + 038.50 - Sta 123 + 078.50, Batangas","amountPesos":119786000.0,"lengthMeters":101.81,"ratePesosPerMeter":1176564.188193553,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12199"},{"year":2026,"category":"Roads","project":"Padre Garcia-Rosario Diversion Road, Sta. 118 + 547.5 - Sta. 118 + 870, Batangas","amountPesos":48051000.0,"lengthMeters":322.5,"ratePesosPerMeter":148995.3488372093,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12201"},{"year":2026,"category":"Roads","project":"Pagbilao Bypass Road, Sta. 140 + 780 - Sta. 141 + 060, Pagbilao, Quezon","amountPesos":9369000.0,"lengthMeters":280.0,"ratePesosPerMeter":33460.71428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12203"},{"year":2026,"category":"Roads","project":"Pagbilao-Tayabas-Lucban Diversion Road (Pagbilao Side), Sta. 5+717 - Sta. 6+410, Quezon","amountPesos":48111000.0,"lengthMeters":693.0,"ratePesosPerMeter":69424.24242424243,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12207"},{"year":2026,"category":"Roads","project":"Pagbilao-Tayabas-Lucban Diversion Road (Tayabas Section), Sta. 13+032 - Sta. 14+032, Quezon","amountPesos":80185000.0,"lengthMeters":1000.0,"ratePesosPerMeter":80185.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12209"},{"year":2026,"category":"Roads","project":"Parian - San Jose - Bucal Diversion Road Sta. 1 + 471.50 - Sta. 1 + 791.50, Calamba, Laguna","amountPesos":185199000.0,"lengthMeters":320.0,"ratePesosPerMeter":578746.875,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12211"},{"year":2026,"category":"Roads","project":"Plaridel By-Pass Road, STA. 002+060 - STA. 002+100, STA. 002+200 - STA. 002+250, STA. 002+340 - STA. 002+395, STA. 002+620 - STA. 003+085, Plaridel, Quezon","amountPesos":144153000.0,"lengthMeters":610.0,"ratePesosPerMeter":236316.39344262294,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12213"},{"year":2026,"category":"Roads","project":"Sampaloc Bypass Road, Brgy. Ilayang Owain, Sampaloc, Quezon, Sta. 0+634 - Sta. 1+420","amountPesos":52856000.0,"lengthMeters":786.0,"ratePesosPerMeter":67246.81933842239,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12215"},{"year":2026,"category":"Roads","project":"San Juan Bypass (Rosario-San Juan-Laiya Tourism Bypass Road), Sta 139 + 195 - Sta 139 + 220, Batangas","amountPesos":48051000.0,"lengthMeters":25.0,"ratePesosPerMeter":1922040.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12217"},{"year":2026,"category":"Roads","project":"Sta. Cruz - Pagsanjan Diversion Road, Laguna, Sta. 1 + 300 - 1 + 839","amountPesos":24055000.0,"lengthMeters":539.0,"ratePesosPerMeter":44628.94248608534,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12219"},{"year":2026,"category":"Roads","project":"STAR Tollway-Pinamucan Bypass, Sta 106 + 856.5 - Sta 106 + 951.5, Batangas","amountPesos":48051000.0,"lengthMeters":95.0,"ratePesosPerMeter":505800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12221"},{"year":2026,"category":"Roads","project":"STAR Tollway-Pinamucan Bypass, Sta 109 + 500 - Sta 110 + 035, Sta 110 + 130 - Sta 110+375, Batangas","amountPesos":48051000.0,"lengthMeters":780.0,"ratePesosPerMeter":61603.846153846156,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12223"},{"year":2026,"category":"Roads","project":"Tagaytay Bypass Road (Sta. 3+705 to Sta. 3+745, Sta. 5+630 to Sta. 5+660), Tagaytay City, Cavite","amountPesos":73685000.0,"lengthMeters":70.0,"ratePesosPerMeter":1052642.857142857,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12225"},{"year":2026,"category":"Roads","project":"Tagkawayan-Labo Diversion Road (Tagkawayan Section), STA. 279+820.00 - STA. 280+537.00","amountPesos":48051000.0,"lengthMeters":717.0,"ratePesosPerMeter":67016.73640167364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12227"},{"year":2026,"category":"Roads","project":"Tejero Diversion Road, Sta 0+060 - Sta 0+360, General Trias, Cavite","amountPesos":22103000.0,"lengthMeters":300.0,"ratePesosPerMeter":73676.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12229"},{"year":2026,"category":"Roads","project":"Camarines Sur - Albay Diversion Road, Alongong - Molosbolos - Villa Petrona - San Ramon, Libon, Albay, Sta. 473+857.71 - Sta. 475+580","amountPesos":117600000.0,"lengthMeters":1722.29,"ratePesosPerMeter":68281.18377276848,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12232"},{"year":2026,"category":"Roads","project":"Camarines Sur Expressway, Barangay New San Roque - Barangay Anayan Section, Pili, Camarines Sur, Sta. 443+480 - Sta. 443+900","amountPesos":210895000.0,"lengthMeters":420.0,"ratePesosPerMeter":502130.95238095237,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12240"},{"year":2026,"category":"Roads","project":"Camarines Sur Expressway, K0443 + 088.19 - K0443 + 103.83, Pili, Camarines Sur","amountPesos":57808000.0,"lengthMeters":15.64,"ratePesosPerMeter":3696163.682861149,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12242"},{"year":2026,"category":"Roads","project":"Daraga Urban Tourism Eco Route Project, Sta. 527  +  039.70 - Sta. 527  +  130.3, Barangay Kilicao, Daraga - Barangay Pawa, Legazpi City, Albay","amountPesos":73218000.0,"lengthMeters":90.6,"ratePesosPerMeter":808145.6953634077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12248"},{"year":2026,"category":"Roads","project":"Iriga City Rapid Exit Bypass Road, Barangay San Isidro - Barangay San Jose - Barangay San Roque, Iriga City, Camarines Sur, Sta. 0+000.00 - Sta. 1+441.00","amountPesos":117600000.0,"lengthMeters":1441.0,"ratePesosPerMeter":81609.99306037473,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12250"},{"year":2026,"category":"Roads","project":"Jct. Nato-Sabang Coastal Road, Telegrafo Section, Barangay Telegrafo, Sta. 7 + 467 - Sta.8 + 127, San Jose, Camarines Sur","amountPesos":146436000.0,"lengthMeters":660.0,"ratePesosPerMeter":221872.72727272726,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12252"},{"year":2026,"category":"Roads","project":"Legazpi City Coastal Road, Sta. 1+763.50 - Sta. 1+888.50, Sta. 2+491.00 - Sta. 2+583.40, Barangay Rawis, Legazpi City, Albay","amountPesos":63700000.0,"lengthMeters":217.4,"ratePesosPerMeter":293008.2796688131,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12254"},{"year":2026,"category":"Roads","project":"Mabolo-Almeda Bypass Road Sta. 434+951.00 - Sta. 434+056.00, Sta. 434+520.00 - Sta. 434+565.00, Sta. 434+575.00 - Sta. 434+605.00, Sta. 434+730.60 - Sta. 435+229.50, Sta. 435+429.50 - Sta. 436+073.13, Naga City, Camarines Sur","amountPesos":136673000.0,"lengthMeters":1817.13,"ratePesosPerMeter":75213.66110294787,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12256"},{"year":2026,"category":"Roads","project":"Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Sta. 420+070.32 - Sta. 420+520.32, Barangay Barobaybay Section, Magarao, Camarines Sur","amountPesos":385996000.0,"lengthMeters":450.0,"ratePesosPerMeter":857768.8888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12260"},{"year":2026,"category":"Roads","project":"Pamplona-San Fernando Bypass Road - Sta. 425+991 - 426+526, Barangay Santa Cruz, San Fernando, Camarines Sur","amountPesos":92737000.0,"lengthMeters":535.0,"ratePesosPerMeter":173340.18691588784,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12262"},{"year":2026,"category":"Roads","project":"Sorsogon City Coastal Bypass Road, Package 21, Barangay Buhatan, Sorsogon City Section, Sta. 2 + 855 - Sta. 3 + 114, Sorsogon","amountPesos":146436000.0,"lengthMeters":259.0,"ratePesosPerMeter":565389.9613899614,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12264"},{"year":2026,"category":"Roads","project":"Sorsogon City Coastal Bypass Road, Package 22, Barangay Abuyog, Sorsogon City Section, Sta. 3 + 114 - Sta. 3 + 367, Sorsogon","amountPesos":146436000.0,"lengthMeters":253.0,"ratePesosPerMeter":578798.418972332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12266"},{"year":2026,"category":"Roads","project":"Sorsogon City Coastal Bypass Road, Package 23, Barangay Abuyog, Sorsogon City Section, Sta. 3 + 367 - Sta. 3 + 631, Sorsogon","amountPesos":145490000.0,"lengthMeters":264.0,"ratePesosPerMeter":551098.4848484849,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12268"},{"year":2026,"category":"Roads","project":"Tagkawayan - Labo Diversion Road, Barangay Exciban - Barangay Dumagmang Section, Labo, Camarines Norte, Sta. 311+906 - Sta. 312+000, Sta. 312+200 - Sta. 312+741.24, Sta. 313+443.12 - Sta. 313+465","amountPesos":63455000.0,"lengthMeters":657.12,"ratePesosPerMeter":96565.315315316,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12270"},{"year":2026,"category":"Roads","project":"Balete Bypass Road Sta. 1 + 020 - Sta. 1 + 507, Barangay Calizo - Barangay Aranas, Balete, Aklan","amountPesos":137821000.0,"lengthMeters":487.0,"ratePesosPerMeter":283000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12273"},{"year":2026,"category":"Roads","project":"Iloilo Circumferential Road 3, San Miguel, Iloilo - Sta. 5+941.25 - Sta. 6+168.25","amountPesos":47844000.0,"lengthMeters":227.0,"ratePesosPerMeter":210766.51982378855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12277"},{"year":2026,"category":"Roads","project":"Iloilo R-1 Bypass Road, Tigbauan, Iloilo - Sta. 12+470 - Sta. 13+270","amountPesos":71766000.0,"lengthMeters":800.0,"ratePesosPerMeter":89707.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12279"},{"year":2026,"category":"Roads","project":"Kalibo Circumferential Road, Lezo, Aklan - K0273+127 - K0273+307","amountPesos":19138000.0,"lengthMeters":180.0,"ratePesosPerMeter":106322.22222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12281"},{"year":2026,"category":"Roads","project":"Kalibo Circumferential Road, Kalibo, Aklan - Chainage 1747 - Chainage 2174, Chainage 2693 - Chainage 2923","amountPesos":47844000.0,"lengthMeters":657.0,"ratePesosPerMeter":72821.91780821918,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12283"},{"year":2026,"category":"Roads","project":"Maayon-Sara Bypass Road, Maayon, Capiz - Sta. 0+493 - Sta. 1+300, Sta. 3+774 - Sta. 4+271, Sta. 4+453 - Sta. 4+524","amountPesos":47844000.0,"lengthMeters":1375.0,"ratePesosPerMeter":34795.63636363636,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12285"},{"year":2026,"category":"Roads","project":"Passi Bypass Road, Passi City, Iloilo - Sta. 2+764 - Sta. 3+665.40","amountPesos":98000000.0,"lengthMeters":901.4,"ratePesosPerMeter":108719.76924783668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12287"},{"year":2026,"category":"Roads","project":"Pontevedra By-Pass Road, Pontevedra, Capiz - Sta. 0+382 - Sta.0+502","amountPesos":75335000.0,"lengthMeters":120.0,"ratePesosPerMeter":627791.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12289"},{"year":2026,"category":"Roads","project":"Roxas City Circumferential Road, C1 Section, Roxas City, Capiz - Sta. 7+372 - Sta. 7+732, Sta. 7+960 - Sta. 8+016","amountPesos":95688000.0,"lengthMeters":416.0,"ratePesosPerMeter":230019.23076923078,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12291"},{"year":2026,"category":"Roads","project":"Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 01+586 - Sta. 02+585, Silay City, Negros Occidental","amountPesos":98000000.0,"lengthMeters":999.0,"ratePesosPerMeter":98098.0980980981,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12294"},{"year":2026,"category":"Roads","project":"Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 04+340 - Sta. 04+599, EB Magalona, Negros Occidental","amountPesos":49000000.0,"lengthMeters":259.0,"ratePesosPerMeter":189189.1891891892,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12296"},{"year":2026,"category":"Roads","project":"Asturias-Danao-Liloan Bypass Road, Danao-Liloan Section, Barangay Cabadiangan - Barangay Mulao (Sta. 21 + 420 - Sta. 26 + 620), Liloan, Cebu","amountPesos":198514000.0,"lengthMeters":5200.0,"ratePesosPerMeter":38175.769230769234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12299"},{"year":2026,"category":"Roads","project":"Asturias-Danao-Liloan Bypass Road, Danao-Liloan Section, Sta. 0+000 - 2+400, Brgy. Jubay, Liloan, Cebu","amountPesos":145463000.0,"lengthMeters":2400.0,"ratePesosPerMeter":60609.583333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12301"},{"year":2026,"category":"Roads","project":"Asturias-Danao-Liloan Bypass Road, Sta. 1+900 - Sta. 3+300, Asturias Section, Cebu","amountPesos":77580000.0,"lengthMeters":1400.0,"ratePesosPerMeter":55414.28571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12303"},{"year":2026,"category":"Roads","project":"Carcar Bypass Road (STA. 1 + 990 - STA. 2 + 526, STA. 3 + 198 - STA. 3 + 349), Cebu","amountPesos":145350000.0,"lengthMeters":687.0,"ratePesosPerMeter":211572.0524017467,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12305"},{"year":2026,"category":"Roads","project":"Metro Cebu Expressway, Sta. 3 + 560 - Sta. 3 + 920, Brgy. Cantao-an, Naga City, Cebu","amountPesos":242439000.0,"lengthMeters":360.0,"ratePesosPerMeter":673441.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12307"},{"year":2026,"category":"Roads","project":"Basey-Maydolong Road, Barangay Del Pilar, Maydolong, Eastern Samar (Sta. 22+993 - Sta. 24+073)","amountPesos":130731000.0,"lengthMeters":1080.0,"ratePesosPerMeter":121047.22222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12310"},{"year":2026,"category":"Roads","project":"Bontoc Bypass Road (Sogod to Buenavista), Barangay San Miguel, Sogod, Southern Leyte (STA 0+000 - STA 1+000)","amountPesos":72698000.0,"lengthMeters":1000.0,"ratePesosPerMeter":72698.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12314"},{"year":2026,"category":"Roads","project":"Bontoc Bypass Road (Sogod to Buenavista), Pandan Br. , Barangay Pandan, Sogod, Southern Leyte (STA 1+145 - STA 1+205)","amountPesos":67840000.0,"lengthMeters":60.0,"ratePesosPerMeter":1130666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12316"},{"year":2026,"category":"Roads","project":"Burauen Bypass Road, Chainage 2 + 331 - Chainage 2 + 431, Chainage 2 + 931 - Chainage 3 + 330, Barangay Balorinay, Burauen, Leyte","amountPesos":94222000.0,"lengthMeters":499.0,"ratePesosPerMeter":188821.64328657315,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12318"},{"year":2026,"category":"Roads","project":"Burauen Bypass Road, Chainage 0 + 979.25 - Chainage 1 + 079.25, Barangay Maghubas, Burauen, Leyte","amountPesos":94222000.0,"lengthMeters":100.0,"ratePesosPerMeter":942220.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12320"},{"year":2026,"category":"Roads","project":"Tacloban - Sta Fe - San Miguel Road, Barangay San Roque, (Sta. 14+890 - 15+040), Tacloban City, Leyte","amountPesos":230097000.0,"lengthMeters":150.0,"ratePesosPerMeter":1533980.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12328"},{"year":2026,"category":"Roads","project":"Capoocan - Leyte (Leyte Coastal Road) Chainage 14 + 509.85 - Chainage 15 + 500, Barangay Potot-Barangay Gayad, Capoocan, Leyte","amountPesos":96480000.0,"lengthMeters":990.15,"ratePesosPerMeter":97439.7818512347,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12330"},{"year":2026,"category":"Bridges","project":"Construction of Lib-og Mangrove Flyover (Segment 2) along Maasin City Coastal Bypass Road, Maasin City, Southern Leyte (Sta. 4+725 - Sta. 4+800)","amountPesos":147980000.0,"lengthMeters":75.0,"ratePesosPerMeter":1973066.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12332"},{"year":2026,"category":"Roads","project":"Maasin City Coastal Bypass Road (West Bypass Road Segment 9), Barangay Lib-og, Maasin City, Southern Leyte (Sta. 3+290 - 3+520)","amountPesos":143055000.0,"lengthMeters":230.0,"ratePesosPerMeter":621978.2608695652,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12334"},{"year":2026,"category":"Roads","project":"Ormoc Diversion Road, Sta. 0+000 - Sta. 2+500, Barangay Donghol to Barangay Bantigue, Ormoc, Leyte","amountPesos":96480000.0,"lengthMeters":2500.0,"ratePesosPerMeter":38592.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12336"},{"year":2026,"category":"Roads","project":"Pawikan - Esperanza Diversion Rd, Barangay Esperanza, Cabucgayan, Biliran (Sta. 3+625 - Sta. 4+381)","amountPesos":72360000.0,"lengthMeters":756.0,"ratePesosPerMeter":95714.28571428571,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12338"},{"year":2026,"category":"Roads","project":"Barangay Banonong, Dapitan City - Pob. Sibutad Road, Barangay Ma. Cristina Section, Zamboanga del Norte - Sta. 1+818 - Sta. 2+976.20","amountPesos":48917000.0,"lengthMeters":1158.2,"ratePesosPerMeter":42235.36522189605,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12343"},{"year":2026,"category":"Roads","project":"Buug By-Pass Road, Barangay Guminta - Barangay Manlin section, Zamboanga Sibugay - K1725+310 - K1728+122","amountPesos":106118000.0,"lengthMeters":2812.0,"ratePesosPerMeter":37737.5533428165,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12345"},{"year":2026,"category":"Roads","project":"Ipil Circumferential Road, Barangay Sanito Section Sta. 16+260.00 - Sta. 16+617.00, Sta. 16+719.90 - Sta. 17+800.00, Ipil, Zamboanga Sibugay","amountPesos":153926000.0,"lengthMeters":1437.1,"ratePesosPerMeter":107108.7606986293,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12349"},{"year":2026,"category":"Roads","project":"Labason By-Pass Road, Barangay Imelda - Barangay La Union Section, Zamboanga del Norte - Sta. 0+000 - Sta. 0+760.42, Sta. 0+821.32 - Sta. 1+180","amountPesos":50165000.0,"lengthMeters":1119.1,"ratePesosPerMeter":44826.19962469842,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12353"},{"year":2026,"category":"Roads","project":"NRJ Baluno - La Paz (Sitio Pole) Diversion Road, Barangay Baluno Section Sta. 0+000.00 - Sta. 2+100.00, Sta. 2+427.36 - Sta. 2+865.00, Sta. 2+865.00 - Sta. 2+925.90, Zamboanga City","amountPesos":197068000.0,"lengthMeters":2598.54,"ratePesosPerMeter":75837.97055269497,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12355"},{"year":2026,"category":"Roads","project":"NRJ Sangali By-Pass Road, Sta. 1+480 - Sta. 1+980, Sta. 2+535 - Sta. 2+878, Sta. 5+915 - Sta. 6+173, Sta. 5+739.00 - 5+781.90, Zamboanga City","amountPesos":131571000.0,"lengthMeters":1143.9,"ratePesosPerMeter":115019.66955153426,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12357"},{"year":2026,"category":"Roads","project":"Zamboanga City Diversion Road, Barangay Sta. Catalina - Barangay Zambowood Section Sta. 8+460.00 - Sta. 8+641.80, Zamboanga City","amountPesos":148498000.0,"lengthMeters":181.8,"ratePesosPerMeter":816820.6820682101,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12361"},{"year":2026,"category":"Roads","project":"Rehabilitation of RT Lim - Siocon Road, Sta. 1842+333 - Sta. 1842+387, Sta. 1842+819 - Sta. 1842+846","amountPesos":58800000.0,"lengthMeters":81.0,"ratePesosPerMeter":725925.925925926,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12363"},{"year":2026,"category":"Roads","project":"Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Pagalungan-Taglimao, Sta. 4+220 - Sta. 8+370, Cagayan de Oro City","amountPesos":48191000.0,"lengthMeters":4150.0,"ratePesosPerMeter":11612.289156626506,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12366"},{"year":2026,"category":"Roads","project":"Cagayan de Oro Coastal Road (Puerto-Gusa Section), Barangay Gusa, sta. 8+640-sta. 8+690, sta. 8+780-sta. 8+828, sta. 8+900-sta. 8+970, Cagayan de Oro City","amountPesos":67467000.0,"lengthMeters":168.0,"ratePesosPerMeter":401589.28571428574,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12368"},{"year":2026,"category":"Roads","project":"Cagayan de Oro Diversion Road (Jct. Balubal-Sayre Highway-Pueblo de Oro), CDO Old Airport Diversion Road, Barangay F.S. Catanico, Sta. 19+000 - Sta. 19+700 , Cagayan de Oro City","amountPesos":66069000.0,"lengthMeters":700.0,"ratePesosPerMeter":94384.28571428571,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12370"},{"year":2026,"category":"Roads","project":"Cagayan de Oro (PCE) Bypass/Alternate Road Extension (Jct. Lumbia/CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Brgy. Bagocboc Section, Sta. 9+620 - Sta. 9+810, Opol, Misamis Oriental","amountPesos":45822000.0,"lengthMeters":190.0,"ratePesosPerMeter":241168.42105263157,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12372"},{"year":2026,"category":"Roads","project":"Cagayan de Oro Coastal Road (Puerto-Gusa Section), Barangay Puerto, Sta. 0+172 - Sta. 0+647, Cagayan de Oro City","amountPesos":143608000.0,"lengthMeters":475.0,"ratePesosPerMeter":302332.63157894736,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12374"},{"year":2026,"category":"Roads","project":"Cagayan de Oro Diversion Road Extension (Jct. Sayre Highway (Balubal)-Manolo Fortich-Malitbog-Claveria-Eureka, Gingoog City Road), Brgy. Lunocan Section, Sta. 8+000 - Sta. 9+000, Manolo Fortich, Bukidnon","amountPesos":48191000.0,"lengthMeters":1000.0,"ratePesosPerMeter":48191.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12376"},{"year":2026,"category":"Roads","project":"CDO-New Western Diversion Road (Kauswagan-Bonbon Section), Barangay Bonbon-Barangay Bayabas, Sta. 0+000 - Sta. 0+160, Sta. 0+224 - Sta. 0+271, Sta. 0+400 - Sta. 1+110, Sta. 1+540 - Sta. 1+970, Cagayan de Oro City","amountPesos":77105000.0,"lengthMeters":1347.0,"ratePesosPerMeter":57242.019302152934,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12382"},{"year":2026,"category":"Roads","project":"CDO-Opol-El Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Brgy. Malanang Section, Sta. 10+800 - Sta. 11+800,Opol, Misamis Oriental","amountPesos":48191000.0,"lengthMeters":1000.0,"ratePesosPerMeter":48191.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12388"},{"year":2026,"category":"Roads","project":"Claveria-Balingoan Bypass Road, Brgy. Kagumahan Section, Sta. 55+700 - Sta. 56+700, Kinoguitan, Misamis Oriental","amountPesos":47192000.0,"lengthMeters":1000.0,"ratePesosPerMeter":47192.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12390"},{"year":2026,"category":"Roads","project":"Construction of Connector Road, Jct. BCIR-Jct. CDO Coastal Road, Baragay Gusa, Sta. 0+000 - Sta. 0+425, Cagayan de Oro City","amountPesos":96381000.0,"lengthMeters":425.0,"ratePesosPerMeter":226778.82352941178,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12392"},{"year":2026,"category":"Roads","project":"Construction of Road, Jct. BCIR - Jct SH-Manolo Fortich-Libona-Indahag Rd Alternate Diversion Road, Brgy. Palabucan Section, Sta. 19+765 - Sta. 21+965, Libona, Bukidnon","amountPesos":192762000.0,"lengthMeters":2200.0,"ratePesosPerMeter":87619.09090909091,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12394"},{"year":2026,"category":"Roads","project":"Gingoog Bypass Road, Brgy. 26 Section, Sta. 4+278 - Sta. 4+348, Gingoog City, Misamis Oriental","amountPesos":45822000.0,"lengthMeters":70.0,"ratePesosPerMeter":654600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12398"},{"year":2026,"category":"Roads","project":"Jct. Buda, Quezon-Jct. Valencia-Talaingod Road-Kalagangan, San Fernando Alternate/Bypass Road, Brgy. Kalagangan Section, Sta. 0+681 - Sta. 1+681, San Fernando, Bukidnon","amountPesos":47192000.0,"lengthMeters":1000.0,"ratePesosPerMeter":47192.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12402"},{"year":2026,"category":"Roads","project":"Jct. CDO - Talakag Road/ Macapagal Drive - Upper Carmen - Patag - Jct. BCIR/ Kauswagan Diversion Road, Barangay Patag, Sta. 2+940 - Sta. 3+940, Cagayan de Oro City","amountPesos":47192000.0,"lengthMeters":1000.0,"ratePesosPerMeter":47192.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12404"},{"year":2026,"category":"Roads","project":"Jct. Maramag-Maradugao Road-Jct. Lampanusan Road Ext. (Jct. Sayre Highway (Damulog)-Kibawe-Jct. Buda, Kitaotao By-Pass/Alternate Road, Brgy. Tawas, Sta. 54+600 - Sta. 54+660, Kitaotao, Bukidnon","amountPesos":18329000.0,"lengthMeters":60.0,"ratePesosPerMeter":305483.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12406"},{"year":2026,"category":"Roads","project":"Jct. Sayre Highway (Kibawe) Puntian - San Fernando (Jct. Valencia-Talaingod) Alternate Route, Brgy. Sinayawan Section, Sta. 0+000 - Sta. 1+000, Valencia City, Bukidnon","amountPesos":47192000.0,"lengthMeters":1000.0,"ratePesosPerMeter":47192.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12408"},{"year":2026,"category":"Roads","project":"Jct. Sayre Highway Dalirig - Kisolon Bypass Road, Brgy. Dalirig, Sta. 0+000 - Sta. 5+000, Manolo Fortich, Bukidnon","amountPesos":47192000.0,"lengthMeters":5000.0,"ratePesosPerMeter":9438.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12410"},{"year":2026,"category":"Roads","project":"Kadingilan-Bukidnon/North Cotabato By-Pass Road, Brgy. Bagongbayan, Sta. 21+000 - Sta. 21+700, Kadingilan, Bukidnon","amountPesos":139412000.0,"lengthMeters":700.0,"ratePesosPerMeter":199160.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12412"},{"year":2026,"category":"Roads","project":"Opol Diversion Road (Opol-Canito-an), Barangay Canito-an - Barangay Baikingon Section, Sta. 0+500 - Sta. 3+500, Cagayan de Oro City","amountPesos":92941000.0,"lengthMeters":3000.0,"ratePesosPerMeter":30980.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12418"},{"year":2026,"category":"Roads","project":"Ozamiz City Coastal Bypass Road (Ozamiz - Tangub Section), Barangay Pulot - Dimaluna - Tabid, Sta. 0+000 - Sta. 0+954, Ozamiz City, Misamis Occidental","amountPesos":96381000.0,"lengthMeters":954.0,"ratePesosPerMeter":101028.30188679245,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12420"},{"year":2026,"category":"Roads","project":"Panguil Bay Access Road (Ozamiz - Tangub Section), Barangay Pulot - Barangay Dimaluna, Sta. 0+000 - Sta. 0+954, Ozamiz City, Misamis Occidental","amountPesos":96381000.0,"lengthMeters":954.0,"ratePesosPerMeter":101028.30188679245,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12422"},{"year":2026,"category":"Roads","project":"Puerto - Claveria Bypass Road, Brgy. Rosario Section, Sta. 19+855 - Sta. 20+855, Tagoloan, Misamis Oriental","amountPesos":56631000.0,"lengthMeters":1000.0,"ratePesosPerMeter":56631.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12424"},{"year":2026,"category":"Roads","project":"Sayre Highway Bypass Road, Maluko Section (Climbing Lanes), Brgy. Maluko, Sta. 1+442 - Sta. 1+560, Manolo Fortich, Bukidnon","amountPesos":46471000.0,"lengthMeters":118.0,"ratePesosPerMeter":393822.0338983051,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12426"},{"year":2026,"category":"Roads","project":"Sayre Highway Parallel Road I (Libona - Manolo Fortich - Impasug-ong Section), Barangay Maambong, Sta. 5+000 - Sta. 6+000, Libona, Bukidnon","amountPesos":47192000.0,"lengthMeters":1000.0,"ratePesosPerMeter":47192.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12428"},{"year":2026,"category":"Roads","project":"Sayre Highway Parallel Road II (Manolo Fortich Section), Brgy. Maluko Section, Sta. 20+200 - Sta. 21+200, Manolo Fortich, Bukidnon","amountPesos":47192000.0,"lengthMeters":1000.0,"ratePesosPerMeter":47192.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12430"},{"year":2026,"category":"Roads","project":"Sayre Highway Parallel Road II (Quezon Section), Brgy. Puntian, Sta. 166+400 - Sta. 168+700, Quezon, Bukidnon","amountPesos":188769000.0,"lengthMeters":2300.0,"ratePesosPerMeter":82073.47826086957,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12432"},{"year":2026,"category":"Roads","project":"Sayre Highway Parallel Road II (Quezon Section), Brgy. Sta. Cruz, Sta. 164+100 - Sta. 166+400, Quezon, Bukidnon","amountPesos":188769000.0,"lengthMeters":2300.0,"ratePesosPerMeter":82073.47826086957,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12434"},{"year":2026,"category":"Roads","project":"Valencia Bypass Extension, San Carlos, Sta. 10+500 - Sta. 13+500 Valencia City, Bukidnon","amountPesos":28315000.0,"lengthMeters":3000.0,"ratePesosPerMeter":9438.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12442"},{"year":2026,"category":"Roads","project":"Valencia Bypass Road Extension (Lantapan-Bagontaas Section), Brgy. Bagontaas, Sta. 14+200 - Sta. 16+500, Valencia City, Bukidnon","amountPesos":28315000.0,"lengthMeters":2300.0,"ratePesosPerMeter":12310.869565217392,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12444"},{"year":2026,"category":"Roads","project":"Construction of Road Connecting National Road Junction to Misamis Oriental West Diversion Road, Sta.0+000 - Sta.2+750, Lugait To Manticao, Misamis Oriental","amountPesos":100000000.0,"lengthMeters":2750.0,"ratePesosPerMeter":36363.63636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12446"},{"year":2026,"category":"Roads","project":"Valencia City-Pangantucan Diversion Road, Brgy. La Roxas - Brgy. Bagong Silang, Sta. 16+100 - Sta. 20+100,  Maramag, Bukidnon","amountPesos":192762000.0,"lengthMeters":4000.0,"ratePesosPerMeter":48190.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12448"},{"year":2026,"category":"Roads","project":"Alternate Road from Region XI to Region X (Jct Davao City Diversion Road-Catalunan Grande-Talandag-Sumimao-Panalum-Tapak-Cabanglasan-Aglayan, Malaybalay), Barangay Sumimao Section, Sta. 1514+140.296 - Sta. 1515+772.296, Davao City","amountPesos":63700000.0,"lengthMeters":1632.0,"ratePesosPerMeter":39031.86274509804,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12451"},{"year":2026,"category":"Roads","project":"Carmen - Tagum City Coastal Road, Barangay Busaon Section, Sta. 1833+539.587 - Sta. 1833+869.587, Tagum City,Davao del Norte","amountPesos":62480000.0,"lengthMeters":330.0,"ratePesosPerMeter":189333.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12453"},{"year":2026,"category":"Roads","project":"Davao de Oro Bypass Road (Mapawa-Bahi-Langgawisan), Barangay Bahi Section, Sta. 1+847.500 - Sta. 3+057.50, Maragusan, Davao de Oro","amountPesos":96124000.0,"lengthMeters":1210.0,"ratePesosPerMeter":79441.32231404958,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12459"},{"year":2026,"category":"Roads","project":"Don Mariano Marcos-Malig Sabat-Calagasan-San Isidro-Tagboa-New Visayas-Macangao Road, Barangay Don Mariano Marcos Section, Sta. 1523+746.367 - Sta. 1527+100.000, Sta. 1530+260.107 - Sta. 1530+300.107, Lupon, Davao Oriental","amountPesos":144186000.0,"lengthMeters":3393.633,"ratePesosPerMeter":42487.210608808804,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12461"},{"year":2026,"category":"Roads","project":"Jct. Cabantian Road (Acacia Section)-Jct. Mandug-Callawa Road (Mandug Section)-Jct. Magtuod-Tugbok Road (New Valencia Section), Barangay New Valencia Section , Sta. 1517+650.000 - Sta. 1519+800.000, Davao City","amountPesos":134573000.0,"lengthMeters":2150.0,"ratePesosPerMeter":62592.09302325582,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12463"},{"year":2026,"category":"Roads","project":"Jct. Tagum - Panabo Circumferential Road - Dalisay - Mabuhay- Pañalum, Barangay Dalisay, Panabo City - Barangay Mabuhay, Carmen Section, Davao Del Norte - 1 + 480 - 6 + 960","amountPesos":144186000.0,"lengthMeters":5480.0,"ratePesosPerMeter":26311.31386861314,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12467"},{"year":2026,"category":"Roads","project":"Jct. Tagum - Panabo Circumferential Road - Malitbog - Kasilak to Jct. Consolacion, Barangay Kasilak-Jct. Consolacion Section, Sta. 1519+455.909 - Sta. 1522+155.909, Panabo City, Davao Del Norte","amountPesos":98000000.0,"lengthMeters":2700.0,"ratePesosPerMeter":36296.2962962963,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12469"},{"year":2026,"category":"Roads","project":"Matiao-Magsaysay Coastal Road, Barangay Matiao Section, Sta. 1718+015 - Sta. 1718+075, Mati City, Davao Oriental","amountPesos":147000000.0,"lengthMeters":60.0,"ratePesosPerMeter":2450000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12471"},{"year":2026,"category":"Roads","project":"Mati-Tarragona By-Pass (Lucatan-Tagabakid Road), Mati Section, Barangay Tagabakid, Sta. 3+450.000-Sta. 3+480.000, Mati City, Davao Oriental","amountPesos":49000000.0,"lengthMeters":30.0,"ratePesosPerMeter":1633333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12473"},{"year":2026,"category":"Roads","project":"Mati-Tarragona By-Pass (Lucatan-Tagabakid Road),Tarragona Section, Barangay Lucatan, Sta. 10+033.000-Sta. 10+074.000, Tarragona, Davao Oriental","amountPesos":54978000.0,"lengthMeters":41.0,"ratePesosPerMeter":1340926.8292682928,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12475"},{"year":2026,"category":"Roads","project":"Mawab-Maco Bypass Road, Barangay Sawangan - Barangay Concepcion Section, Sta. 1442+560.000 - Sta. 1443+480.000, Mawab, Davao de Oro","amountPesos":63700000.0,"lengthMeters":920.0,"ratePesosPerMeter":69239.13043478261,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12477"},{"year":2026,"category":"Roads","project":"Monkayo - Montevista Road, Davao de Oro(Banlag - San Isidro - Banglasan - Canidkid), Barangay San Isidro Section, Sta. 1406+720.000 - Sta. 1407+220.000, Sta. 1407+588.350 - Sta. 1408+261.113, Monkayo, Davao De Oro","amountPesos":120155000.0,"lengthMeters":1172.763,"ratePesosPerMeter":102454.63064576579,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12479"},{"year":2026,"category":"Roads","project":"Monkayo-Boston Road, Barangay Caatihan Section, Sta. 1527+200.000 - Sta. 1528+400.000, Boston, Davao Oriental","amountPesos":80613000.0,"lengthMeters":1200.0,"ratePesosPerMeter":67177.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12481"},{"year":2026,"category":"Roads","project":"Montevista (Jct. Mayaon) - Laak Diversion Road, Barangay Kilagding Section, Sta. 1504+900.000 - Sta. 1505+233.585, Laak, Davao de Oro","amountPesos":28837000.0,"lengthMeters":333.585,"ratePesosPerMeter":86445.73347123887,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12483"},{"year":2026,"category":"Roads","project":"Nabunturan-New Corella-Tagum Road (Tagum-New Corella Section), Barangay Poblacion-Barangay Patrocenio Section, Sta. 1+600.000 to Sta. 3+525.000, New Corella, Davao del Norte","amountPesos":96040000.0,"lengthMeters":1925.0,"ratePesosPerMeter":49890.90909090909,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12485"},{"year":2026,"category":"Roads","project":"Panabo City Bypass Road, Barangay Quezon Section, Sta. 1489+846.062 - Sta. 1491+066.168, Panabo City, Davao del Norte","amountPesos":96124000.0,"lengthMeters":1220.106,"ratePesosPerMeter":78783.31882638767,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12487"},{"year":2026,"category":"Roads","project":"San Ignacio Bypass Road, Barangay San Ignacio Section, Sta. 1664+337.000- Sta. 1664+827.000, Sta. 1667+430.000-Sta. 1668+261.000, Manay, Davao Oriental","amountPesos":81817000.0,"lengthMeters":1321.0,"ratePesosPerMeter":61935.65480696442,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12489"},{"year":2026,"category":"Roads","project":"Upper Tibanban-Oregon-Magdug Road, Barangay Oregon Section, Sta. 1797+129.400-Sta. 1797+249.700, Governor Generoso, Davao Oriental","amountPesos":77533000.0,"lengthMeters":120.3,"ratePesosPerMeter":644497.0906065669,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12491"},{"year":2026,"category":"Roads","project":"Banga-Tupi-Malungon Road ( Tupi-Malungon Section) Sta. 25 + 942 - Sta. 27 + 899, South Cotabato","amountPesos":103525000.0,"lengthMeters":1957.0,"ratePesosPerMeter":52899.84670413899,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12494"},{"year":2026,"category":"Roads","project":"Banga-Tupi-Malungon Road ( Tupi-Malungon Section), Sta. 27 + 899 - Sta. 29 + 317, South Cotabato","amountPesos":28451000.0,"lengthMeters":1418.0,"ratePesosPerMeter":20064.17489421721,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12496"},{"year":2026,"category":"Roads","project":"Koronadal City Bypass Road (Segment 2) Sta. 1 + 200 - Sta. 3 + 763","amountPesos":117232000.0,"lengthMeters":2563.0,"ratePesosPerMeter":45740.14826375341,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12498"},{"year":2026,"category":"Roads","project":"Midsayap-Libungan Bypass Road, Brgy. Nalin - Brgy. Gumaga Section, Cotabato, Sta. 7+080 - Sta. 7+155","amountPesos":113330000.0,"lengthMeters":75.0,"ratePesosPerMeter":1511066.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12500"},{"year":2026,"category":"Roads","project":"Bislig City-San Isidro-San Antonio-San Jose, (3 + 059.17 - 5 + 482.85), Brgy. San Isidro Section, Surigao del Sur","amountPesos":98000000.0,"lengthMeters":2423.68,"ratePesosPerMeter":40434.380776340106,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12503"},{"year":2026,"category":"Roads","project":"Bonbon - Libertad By-pass Rd, (0 + 000 - 0+776), Brgy. Bonbon - Libertad Section, Butuan City","amountPesos":53900000.0,"lengthMeters":776.0,"ratePesosPerMeter":69458.76288659793,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12505"},{"year":2026,"category":"Roads","project":"Butuan City - Agusan del Norte Logistical Highway, (26 + 400 -26+800) Brgy. Cubi-Cubi Section, Agusan del Norte","amountPesos":49000000.0,"lengthMeters":400.0,"ratePesosPerMeter":122500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12507"},{"year":2026,"category":"Roads","project":"Butuan City - Agusan del Norte Logistical Highway, (10+703 - 11+300) Brgy. Guiasan - Brgy. Masao Section, Butuan City","amountPesos":63700000.0,"lengthMeters":597.0,"ratePesosPerMeter":106700.1675041876,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12509"},{"year":2026,"category":"Roads","project":"Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section), (Sta. 5+929 - Sta. 6+382.5, Sta. 6+357.50 - Sta. 7+300), Brgy. Antongalon Section, Butuan City","amountPesos":102900000.0,"lengthMeters":1371.0,"ratePesosPerMeter":75054.70459518599,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12511"},{"year":2026,"category":"Roads","project":"Daang Maharlika (Alternate Route) (NRJ - Mayor Democrito D. Plaza II Avenue - Las Nieves - Sibagat), (1261 + 360 - 1262 + 560),Brgy. Pigdaulan - Brgy. Maguinda Section, Butuan City","amountPesos":63700000.0,"lengthMeters":1200.0,"ratePesosPerMeter":53083.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12513"},{"year":2026,"category":"Roads","project":"Lanuza- Tandag Bypass Road (SDCR Alternate Route), (13 + 975 - 16 + 775), Brgy. Buenavista Section, Surigao del Sur","amountPesos":83300000.0,"lengthMeters":2800.0,"ratePesosPerMeter":29750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12515"},{"year":2026,"category":"Roads","project":"Lianga Coastal Bypass Road (SDCR Alternate Route), (1 + 930 - 2 + 163), Brgy. Poblacion Section, Surigao del Sur","amountPesos":83300000.0,"lengthMeters":233.0,"ratePesosPerMeter":357510.7296137339,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12519"},{"year":2026,"category":"Roads","project":"NRJ Agusan-Malaybalay Road-Brgy. Ambacon-Brgy. Malicato-NRJ Daang Maharlika, (4 + 180 - 5 + 950), Brgy. Ambacon - Brgy. Malicato Section, Agusan del Norte","amountPesos":127400000.0,"lengthMeters":1770.0,"ratePesosPerMeter":71977.40112994351,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12521"},{"year":2026,"category":"Roads","project":"NRJ Daang Maharlika (Taguibo Section) - Masao Port, (3+700 - 3+780, 5+460 - 5+580), Brgy. Lumbocan Section, Butuan City","amountPesos":98000000.0,"lengthMeters":200.0,"ratePesosPerMeter":490000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12523"},{"year":2026,"category":"Roads","project":"NRJ Hubang - Managbay - Alegria Diversion Road, Brgy. 1 to Brgy. Alegria Section, Sta. 3 + 659.50 - Sta. 4 + 099.50, Agusan del Sur","amountPesos":56403000.0,"lengthMeters":440.0,"ratePesosPerMeter":128188.63636363637,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12525"},{"year":2026,"category":"Roads","project":"Patin-ay - Omot - Magsaysay Road, Sta. 0+000 - Sta. 1+500, Brgy. Patin-ay Section, Agusan del Sur","amountPesos":98000000.0,"lengthMeters":1500.0,"ratePesosPerMeter":65333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12527"},{"year":2026,"category":"Roads","project":"Rosario-Marfil-Tagbina Rd, (17+800 - 18+777.48), Brgy. Cabantao - Brgy. Marfil Section, Agusan del Sur","amountPesos":68600000.0,"lengthMeters":977.48,"ratePesosPerMeter":70180.46405041538,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12529"},{"year":2026,"category":"Roads","project":"Surigao-Agusan West Coastal Rd, (20+880 -22+350), Brgy. Binuangan - Brgy. La Fraternidad Section, Agusan del Norte","amountPesos":117600000.0,"lengthMeters":1470.0,"ratePesosPerMeter":80000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12531"},{"year":2026,"category":"Roads","project":"Surigao-Agusan West Coastal Road, (22+350 - 24+150), Brgy. Amontay - Brgy. Jubgan Section, Surigao del Norte","amountPesos":147000000.0,"lengthMeters":1800.0,"ratePesosPerMeter":81666.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12533"},{"year":2026,"category":"Roads","project":"Tago - La Paz Bypass Road, (0+153.65 - 0+473.65), Brgy. La Paz Section, Surigao del Sur","amountPesos":147000000.0,"lengthMeters":320.0,"ratePesosPerMeter":459375.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12535"},{"year":2026,"category":"Roads","project":"Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Brgy. Tagongon - Brgy. Sta. Maria Section, Sta. 1+366.5 - Sta. 1+720, Surigao del Sur","amountPesos":86442000.0,"lengthMeters":353.5,"ratePesosPerMeter":244531.82461103253,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12537"},{"year":2026,"category":"Roads","project":"Talacogon Bypass Road, Sta. 1+240 - Sta. 1+524.40, Brgy. Labnig Section, Agusan del Sur","amountPesos":48346000.0,"lengthMeters":284.4,"ratePesosPerMeter":169992.96765119545,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12539"},{"year":2026,"category":"Roads","project":"Trento - Lingig Road, (13+010 - 17+960), Brgy. Bogac - Brgy. Rajah Cabungsu-an Section, Surigao del Sur","amountPesos":98000000.0,"lengthMeters":4950.0,"ratePesosPerMeter":19797.9797979798,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12541"},{"year":2026,"category":"Roads","project":"Trento-Lingig Road, (11+160 - 12+140), Trento, Brgy. Santa Maria Section, Agusan del Sur","amountPesos":98000000.0,"lengthMeters":980.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12543"},{"year":2026,"category":"Roads","project":"Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1+194 - Sta. 1+594, Baguio City","amountPesos":28152000.0,"lengthMeters":400.0,"ratePesosPerMeter":70380.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12547"},{"year":2026,"category":"Roads","project":"Marcos Highway to Kennon Road Diversion Road, Sta. 1+140 - Sta. 1+670, Baguio City","amountPesos":29400000.0,"lengthMeters":530.0,"ratePesosPerMeter":55471.698113207545,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12549"},{"year":2026,"category":"Roads","project":"Marcos Highway to Western Link Circumferential Road Bypass Road, Sta. 0+000 - Sta. 0+150, Baguio City","amountPesos":23460000.0,"lengthMeters":150.0,"ratePesosPerMeter":156400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12551"},{"year":2026,"category":"Roads","project":"Alfonso Lista-San Manuel Diversion Rd, Sta. 6+494.5 - Sta. 7+360, Sta. 8+240 - Sta. 8+624.50, Ifugao","amountPesos":39181000.0,"lengthMeters":1250.0,"ratePesosPerMeter":31344.8,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12556"},{"year":2026,"category":"Roads","project":"Cagaluan Bypass Road, Sta. 0+000 - Sta. 0+500, Kalinga","amountPesos":28152000.0,"lengthMeters":500.0,"ratePesosPerMeter":56304.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12559"},{"year":2026,"category":"Roads","project":"Claveria Diversion Road, Cagayan Sta. 13+852 - Sta. 14+500","amountPesos":22719000.0,"lengthMeters":648.0,"ratePesosPerMeter":35060.18518518518,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12563"},{"year":2026,"category":"Roads","project":"Solana Diversion Road Phase IV Sta. 0+578 - Sta. 0+700","amountPesos":26106000.0,"lengthMeters":122.0,"ratePesosPerMeter":213983.60655737706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12566"},{"year":2026,"category":"Roads","project":"Roxas Bypass Road, Isabela, Sta. 2 + 520 - Sta. 3 + 967","amountPesos":45906000.0,"lengthMeters":1447.0,"ratePesosPerMeter":31724.94816862474,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12571"},{"year":2026,"category":"Roads","project":"Cauayan City-Cabatuan Diversion Road, Sta. 0 + 447 - Sta. 1 + 165, Cauayan City, Package 2, Isabela","amountPesos":45438000.0,"lengthMeters":718.0,"ratePesosPerMeter":63284.12256267409,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12574"},{"year":2026,"category":"Roads","project":"Guiguinto Bypass Road, Phase 6. Sta. 3+140.00 - Sta. 3+670.00, Guiguinto, Bulacan","amountPesos":49000000.0,"lengthMeters":530.0,"ratePesosPerMeter":92452.83018867925,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12578"},{"year":2026,"category":"Roads","project":"Construction of Concepcion-Mabalacat Bypass Road, Sta. 9 + 300 - Sta. 9 + 900","amountPesos":19600000.0,"lengthMeters":600.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12581"},{"year":2026,"category":"Roads","project":"Anao to Ramos, Tarlac, Sta. 0+620.80 - Sta. 0+828.74, Sta. 0+622.10 - Sta. 0+828.74","amountPesos":19600000.0,"lengthMeters":207.94,"ratePesosPerMeter":94257.95902664227,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12584"},{"year":2026,"category":"Roads","project":"Tanauan City - Sto. Tomas Diversion Road via Sampalocan Road, Brgy. San Miguel, Sta. 1+825 - Sta. 1 +980, Sto. Tomas City, Batangas","amountPesos":32074000.0,"lengthMeters":155.0,"ratePesosPerMeter":206929.03225806452,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12588"},{"year":2026,"category":"Roads","project":"Agdangan By-Pass Road, Sta.0+400 - Sta.0+910","amountPesos":16037000.0,"lengthMeters":510.0,"ratePesosPerMeter":31445.098039215685,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12591"},{"year":2026,"category":"Roads","project":"Catanauan Diversion Road, Brgy. Cawayanin Ibaba - Tagbacan Ibaba Section 1, Quezon Sta. 260 + 092 - Sta. 262 + 610","amountPesos":40092000.0,"lengthMeters":2518.0,"ratePesosPerMeter":15922.160444797459,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12593"},{"year":2026,"category":"Roads","project":"Padre Burgos By-Pass Road, Chainage 458 - Chainage 1272","amountPesos":19220000.0,"lengthMeters":814.0,"ratePesosPerMeter":23611.79361179361,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12595"},{"year":2026,"category":"Roads","project":"Unisan Diversion Road, Sta.3+670 - Sta.4+000","amountPesos":16037000.0,"lengthMeters":330.0,"ratePesosPerMeter":48596.969696969696,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12597"},{"year":2026,"category":"Roads","project":"Malilipot Bypass Road, Barangay San Isidro Ilawod - Barangay San Isidro Iraya, Sta. 3 + 646.00 - Sta. 4 + 288.00, Albay","amountPesos":48812000.0,"lengthMeters":642.0,"ratePesosPerMeter":76031.15264797508,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12601"},{"year":2026,"category":"Roads","project":"Malinao-Paraputo-San Antonio Diversion Road, Estancia and Tuliw, Sta. 0 + 308 - Sta. 0 + 798 and Sta. 6 + 657.66 - Sta. 6 + 848.66, Albay","amountPesos":29287000.0,"lengthMeters":681.0,"ratePesosPerMeter":43005.87371512481,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12603"},{"year":2026,"category":"Roads","project":"Tabaco City Bypass Road, Barangay Pinagbobong Section, Sta. 4 + 365.00 - Sta. 4 + 570.00, Albay","amountPesos":39050000.0,"lengthMeters":205.0,"ratePesosPerMeter":190487.80487804877,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12605"},{"year":2026,"category":"Roads","project":"Tiwi By-pass Road (Alternate Route), Barangay Baybay, Sta 0 + 076.20 - Sta 0 + 150, Albay","amountPesos":29287000.0,"lengthMeters":73.8,"ratePesosPerMeter":396842.8184281843,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12607"},{"year":2026,"category":"Roads","project":"Camarines Sur - Albay Diversion Road, Bololo-Doña Mercedes Section, Guinobatan, Albay, Sta. 511+656 - Sta. 512+906","amountPesos":48812000.0,"lengthMeters":1250.0,"ratePesosPerMeter":39049.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12610"},{"year":2026,"category":"Roads","project":"Milaor-Pili Bypass Road - Sta. 433+602.32 - 433+680.48, Sta. 433+789.07 - 433+978.41, Barangay Alimbuyog - Barangay Cabugao, Milaor, Camarines Sur","amountPesos":46369000.0,"lengthMeters":267.5,"ratePesosPerMeter":173342.05607480407,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12613"},{"year":2026,"category":"Roads","project":"Jct. Nato-Sabang Coastal Road, Telegrafo Section, Sta.  10 + 368 - Sta.1 + 768, Camarines Sur","amountPesos":41978000.0,"lengthMeters":8600.0,"ratePesosPerMeter":4881.162790697675,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12618"},{"year":2026,"category":"Roads","project":"Juban - Bulan Diversion Road, Sta. 608  +  835.20 - Sta. 609  +  574.20, Sorsogon","amountPesos":48812000.0,"lengthMeters":739.0,"ratePesosPerMeter":66051.42083897158,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12621"},{"year":2026,"category":"Roads","project":"Juban - Bulan Diversion Road, Sta. 609  +  574.20 - Sta. 610  +  925.20, Sorsogon","amountPesos":48812000.0,"lengthMeters":1351.0,"ratePesosPerMeter":36130.27387120651,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12623"},{"year":2026,"category":"Roads","project":"Badiang-Mojon-Igbonglo Bypass Road- Sta. 02+044 - Sta. 02+316, Barangay Magcalon Section, San Jose, Antique","amountPesos":9569000.0,"lengthMeters":272.0,"ratePesosPerMeter":35180.14705882353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12627"},{"year":2026,"category":"Roads","project":"Sibalom-University of Antique Diversion Road- Sta. 02+376 - Sta. 02+648, Barangay District III Section, Sibalom, Antique","amountPesos":9569000.0,"lengthMeters":272.0,"ratePesosPerMeter":35180.14705882353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12629"},{"year":2026,"category":"Roads","project":"Panitan By-Pass Road, Barangay Tabuc Norte, Panitan, Capiz, Sta. 001 + 152 - Sta. 001 + 296.70","amountPesos":48475000.0,"lengthMeters":144.7,"ratePesosPerMeter":335003.45542501716,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12632"},{"year":2026,"category":"Roads","project":"Sigma Bypass Road, Barangay Amaga, Sigma, Capiz - Sta. 0+691- Sta. 0+737, Sta. 1+122- Sta. 1+237","amountPesos":9569000.0,"lengthMeters":161.0,"ratePesosPerMeter":59434.782608695656,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12635"},{"year":2026,"category":"Roads","project":"Anilao By-pass Road, Barangay Sambag Culob - Barangay Santa Rita, Anilao, Iloilo - Sta. 0 + 140 - Sta. 1 + 340","amountPesos":47844000.0,"lengthMeters":1200.0,"ratePesosPerMeter":39870.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12638"},{"year":2026,"category":"Roads","project":"Dumangas-Barotac Nuevo Diversion Road, Barangay Agcuyawan Calsada - Barangay Agcuyawan Pulo, Barotac Nuevo, Iloilo - Barangay Bolilao, Dumangas, Iloilo - Sta. 0 + 000 - Sta. 1 + 140","amountPesos":34902000.0,"lengthMeters":1140.0,"ratePesosPerMeter":30615.78947368421,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12640"},{"year":2026,"category":"Roads","project":"Janiuay Diversion Road, Iloilo, Barangay Gines Section, Janiuay, Iloilo - Station 2+476.5 - Station 2+986.5","amountPesos":38275000.0,"lengthMeters":510.0,"ratePesosPerMeter":75049.01960784313,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12643"},{"year":2026,"category":"Roads","project":"Maasin Bypass Road, Iloilo, Barangay Nasaka-Mandog Section, Maasin, Iloilo - Station 2+007 - Station 2+517","amountPesos":38275000.0,"lengthMeters":510.0,"ratePesosPerMeter":75049.01960784313,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12645"},{"year":2026,"category":"Roads","project":"Pototan Bypass Road, Iloilo, Barangay Bagacay Section, Pototan, Iloilo - Station 2+796 - Station 3+306","amountPesos":38275000.0,"lengthMeters":510.0,"ratePesosPerMeter":75049.01960784313,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12647"},{"year":2026,"category":"Roads","project":"Metro Iloilo Radial Rd (R4 Bypass Rd) - K0010 + 773 - K0011+078","amountPesos":48475000.0,"lengthMeters":305.0,"ratePesosPerMeter":158934.4262295082,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12650"},{"year":2026,"category":"Roads","project":"Metro Dumaguete Diversion Road, Brgy. Bajumpandan - Brgy. Camanjac, Sta. 4+300 - Sta. 11+000, Dumaguete City, Negros Oriental","amountPesos":36362000.0,"lengthMeters":6700.0,"ratePesosPerMeter":5427.164179104478,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12654"},{"year":2026,"category":"Roads","project":"Metro Dumaguete Diversion Road, Brgy. Combado - Brgy. Buntis Section, Bacong, Negros Oriental, (Completion) Sta. 0+000 - Sta. 1+120","amountPesos":49000000.0,"lengthMeters":1120.0,"ratePesosPerMeter":43750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12657"},{"year":2026,"category":"Roads","project":"Barili - Aloguinsan Coastal Road (Sta. 7+000 - Sta. 7+750, Cebu","amountPesos":26137000.0,"lengthMeters":750.0,"ratePesosPerMeter":34849.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12661"},{"year":2026,"category":"Roads","project":"Construction of Looc-Poblacion-Argawanon Diversionary Road Segments & Road Leading to Government Center, Sta. 000+000 - Sta. 002+300, San Remigio, Cebu","amountPesos":45000000.0,"lengthMeters":2300.0,"ratePesosPerMeter":19565.217391304348,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12664"},{"year":2026,"category":"Roads","project":"Sto. Rosario-Villaba Diversion Road, Barangay A.Tumamak & Brgy. Buga-buga, Villaba, Leyte, Stations 0+425 - 0+730, 1+135 - 1+180, 1+225 - 1+320, 1+820 - 2+130","amountPesos":49000000.0,"lengthMeters":755.0,"ratePesosPerMeter":64900.66225165563,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12668"},{"year":2026,"category":"Roads","project":"Javier By-Pass Road, Sta. 0+928 - 1+188, Barangay Pinocawan,Leyte","amountPesos":28173000.0,"lengthMeters":260.0,"ratePesosPerMeter":108357.69230769231,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12671"},{"year":2026,"category":"Roads","project":"Abuyog By-Pass Road, Sta. 2+951 - 3+440, Barangay Balocawe, Leyte","amountPesos":48240000.0,"lengthMeters":489.0,"ratePesosPerMeter":98650.30674846626,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12673"},{"year":2026,"category":"Roads","project":"Bato By-Pass Road, Sta. 2+233 - 2+513, Barangay Tabunok, Leyte","amountPesos":33768000.0,"lengthMeters":280.0,"ratePesosPerMeter":120600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12675"},{"year":2026,"category":"Roads","project":"Baybay City Diversion Road, Sta. 2+980 - 3+002.70, Sta. 3+576.65 - 4+515, Barangay Hipusngo-Barangay Palhi, Leyte","amountPesos":19600000.0,"lengthMeters":961.05,"ratePesosPerMeter":20394.360335050213,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12677"},{"year":2026,"category":"Roads","project":"Hindang By-Pass Road, Sta. 0+685 - 1+522, Barangay Tagbibi, Poblacion I and Poblacion II, Leyte","amountPesos":28944000.0,"lengthMeters":837.0,"ratePesosPerMeter":34580.645161290326,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12679"},{"year":2026,"category":"Roads","project":"Capoocan - Dagum Diversion Road, Sta. 0+356 - Sta. 0+613, Calbayog City, Samar","amountPesos":19600000.0,"lengthMeters":257.0,"ratePesosPerMeter":76264.59143968871,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12682"},{"year":2026,"category":"Roads","project":"Bontoc Bypass Road (Sogod to Buenavista), Barangay Esperanza - Barangay Himakilo, Bontoc, Southern Leyte (Sta. 5+880 - Sta. 6+380)","amountPesos":48240000.0,"lengthMeters":500.0,"ratePesosPerMeter":96480.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12685"},{"year":2026,"category":"Roads","project":"Maasin Hillside (Segment 6), Barangay Combado, Maasin City, Southern Leyte (Sta. 3+200 - Sta. 3+950)","amountPesos":48240000.0,"lengthMeters":750.0,"ratePesosPerMeter":64320.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12687"},{"year":2026,"category":"Roads","project":"Barangay Alvenda, Mutia - Pob. Sergio Osmeña Sr. Road, Barangay Teresita Section, Zamboanga del Norte - Sta. 3+485 - Sta. 3+515.84","amountPesos":37008000.0,"lengthMeters":30.84,"ratePesosPerMeter":1199999.9999999944,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12691"},{"year":2026,"category":"Roads","project":"NRJ Lituban - Andres Micubo By-Pass Road, Sta. 03+255 - Sta. 03+505, Siocon, Zamboanga del Norte","amountPesos":9647000.0,"lengthMeters":250.0,"ratePesosPerMeter":38588.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12694"},{"year":2026,"category":"Roads","project":"Alang-Alang – Lower Tiparak – Tungawan By-Pass Road, Barangay Alang-Alang Section, Zamboanga del Sur Sta. 04+354 - Sta. 04+854","amountPesos":19294000.0,"lengthMeters":500.0,"ratePesosPerMeter":38588.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12697"},{"year":2026,"category":"Roads","project":"Dipolo - Miligan - San Isidro Diversion Road, Barangay Miligan - Barangay San Isidro Section, Zamboanga del Sur 04+230 - Sta 04+730","amountPesos":19294000.0,"lengthMeters":500.0,"ratePesosPerMeter":38588.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12699"},{"year":2026,"category":"Roads","project":"NRJ Bobongan - Sapa Anding - Upper Laperian - NRJ Gapasan Circumferencial Road, Barangay Gapasan Section, Zamboanga del Sur 07+617 - Sta. 7+952","amountPesos":19294000.0,"lengthMeters":335.0,"ratePesosPerMeter":57594.02985074627,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12701"},{"year":2026,"category":"Roads","project":"NRJ Camanga- Tabuan- Manlayag-Navalan By-Pass Rd, Barangay Navalan Section, Zamboanga del Sur Sta 9+670.2 - Sta 10+277","amountPesos":24118000.0,"lengthMeters":606.8,"ratePesosPerMeter":39746.20962425845,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12703"},{"year":2026,"category":"Roads","project":"NRJ Lantian - San Isidro - Balimbingan - Luy-A - Tabuan - NRJ Camanga Diversion Road, Barangay Lantian - Barangay San Isidro Section, Zamboanga del Sur 06+173 - Sta. 06+738","amountPesos":24118000.0,"lengthMeters":565.0,"ratePesosPerMeter":42686.72566371682,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12705"},{"year":2026,"category":"Roads","project":"NRJ Panagaan - Barangay Guripan - Brgy Upper Salug Daku By-Pass Road, Barangay Guripan Section, Zamboanga del Sur 06+352 - Sta. 07+012","amountPesos":21744000.0,"lengthMeters":660.0,"ratePesosPerMeter":32945.454545454544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12707"},{"year":2026,"category":"Roads","project":"NRJ Poblacion-Tambulig-Tungawan-Kauswagan Road, Barangay Kauswagan Section, Zamboanga del Sur 06+954 - Sta. 07+319","amountPesos":14388000.0,"lengthMeters":365.0,"ratePesosPerMeter":39419.17808219178,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12709"},{"year":2026,"category":"Roads","project":"NRJ Poblacion-Tambulig-Tungawan-Kauswagan Road, Barangay Tungawan - Barangay Kapalaran Section, Zamboanga del Sur Sta. 03+223 - Sta. 03+253","amountPesos":34300000.0,"lengthMeters":30.0,"ratePesosPerMeter":1143333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12711"},{"year":2026,"category":"Roads","project":"Sominot-Mahayag Road, Barangay Lower Salug Section, Zamboanga del Sur Sta. 12+960 - Sta. 13+400","amountPesos":19294000.0,"lengthMeters":440.0,"ratePesosPerMeter":43850.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12713"},{"year":2026,"category":"Roads","project":"Buug - Bayog Diversion Road FS15248MN, Sta. 0 + 250 - Sta. 0 + 265, Zamboanga del Sur","amountPesos":14700000.0,"lengthMeters":15.0,"ratePesosPerMeter":980000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12716"},{"year":2026,"category":"Roads","project":"NRJ Poblacion Guipos - Lintum, Sta. 4 + 456 - Sta. 4 + 806, Zamboanga del Sur","amountPesos":9800000.0,"lengthMeters":350.0,"ratePesosPerMeter":28000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12718"},{"year":2026,"category":"Roads","project":"NRJ-Bogayo-Kitaan Dagat-Mahayahay Road, Sta. 1719+503.92 - Sta. 1719+980, Zamboanga del Sur","amountPesos":14471000.0,"lengthMeters":476.08,"ratePesosPerMeter":30396.151907237723,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12720"},{"year":2026,"category":"Roads","project":"Poblacion Bayog-Salawagan-Depore Diversion Road, Sta. 0+445- Sta. 0+945, Zamboanga del Sur","amountPesos":14471000.0,"lengthMeters":500.0,"ratePesosPerMeter":28942.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12722"},{"year":2026,"category":"Roads","project":"NRJ Barangay Balugo to Barangay San Jose, Zamboanga Sibugay, Sta. 00+000 - Sta. 00+070 & Sta. 00+290 - Sta. 00+772.50","amountPesos":14471000.0,"lengthMeters":552.5,"ratePesosPerMeter":26191.85520361991,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12725"},{"year":2026,"category":"Roads","project":"Cabanglasan-San Fernando Alternate Road (Mandahican-Nakabuklad-Halapitan Road), Brgy. Nacabuklad Section, Sta. 8+100 - Sta. 12+100, San Fernando, Bukidnon","amountPesos":18877000.0,"lengthMeters":4000.0,"ratePesosPerMeter":4719.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12729"},{"year":2026,"category":"Roads","project":"Sayre Highway Parallel Road I (Libona - Manolo Fortich - Impasug-ong Section), Brgy. Cawayan Section, Sta. 40+300 - Sta. 40+800, Impasug-ong, Bukidnon","amountPesos":18877000.0,"lengthMeters":500.0,"ratePesosPerMeter":37754.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12731"},{"year":2026,"category":"Roads","project":"Sayre Highway Parallel Road II (Impasug-ong - Malaybalay City Section), Brgy. Sayawan Section, Sta. 31+820 - Sta. 33+020, Impasug-ong, Bukidnon","amountPesos":28315000.0,"lengthMeters":1200.0,"ratePesosPerMeter":23595.833333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12733"},{"year":2026,"category":"Roads","project":"Valencia Bypass Extension, Brgy. Balila Section, Sta. 0+365 - Sta. 0+405, Lantapan, Bukidnon","amountPesos":18329000.0,"lengthMeters":40.0,"ratePesosPerMeter":458225.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12735"},{"year":2026,"category":"Roads","project":"Mangima-Agusan Canyon Bypass Road, Brgy. Tankulan Section, Sta. 1+453 - Sta. 1+753, Manolo Fortich, Bukidnon","amountPesos":48191000.0,"lengthMeters":300.0,"ratePesosPerMeter":160636.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12738"},{"year":2026,"category":"Roads","project":"Manolo Fortich-Misamis Oriental Alternate/Bypass Road, Brgy. Dalirig Section, Sta. 6+310 - Sta. 6+940, Manolo Fortich, Bukidnon","amountPesos":48191000.0,"lengthMeters":630.0,"ratePesosPerMeter":76493.6507936508,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12740"},{"year":2026,"category":"Roads","project":"Jct. Wao-Banisilan Road - Jct. Kalilangan-Lampanusan Road, Brgy. Malipayon Section, Sta. 2+163 - Sta. 4+100, Pangantucan, Bukidnon","amountPesos":28914000.0,"lengthMeters":1937.0,"ratePesosPerMeter":14927.207021166752,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12743"},{"year":2026,"category":"Roads","project":"Agusan - Balubal By-pass Road - Sta. 0+000 to Sta. 0+560, Barangay Agusan, Cagayan de Oro City","amountPesos":28914000.0,"lengthMeters":560.0,"ratePesosPerMeter":51632.142857142855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12746"},{"year":2026,"category":"Roads","project":"Cagayan de Oro Coastal Road (Punta-Macabalan Section), Barangay Macabalan, Sta. 0+118 - Sta. 0+158, Sta. 0+672 - Sta. 0+971, Cagayan de Oro City","amountPesos":32868000.0,"lengthMeters":339.0,"ratePesosPerMeter":96955.75221238939,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12748"},{"year":2026,"category":"Roads","project":"Oroquieta City Bypass Road, Brgy. Mobod (Sta. 1+550 - Sta. 1+680), Brgy. Villaflor (Sta. 0+990 - Sta. 1+110) and Brgy. Talic (Sta. 0+870 - Sta. 0+950), Misamis Occidental","amountPesos":18877000.0,"lengthMeters":330.0,"ratePesosPerMeter":57203.030303030304,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12756"},{"year":2026,"category":"Roads","project":"Magsaysay-Butuan City Coastal Bypass/Alternate Road (Sta. Cruz, Magsaysay), Brgy. Sta. Cruz Section, Sta. 0+103 - Sta. 0+474, Magsaysay, Misamis Oriental","amountPesos":47192000.0,"lengthMeters":371.0,"ratePesosPerMeter":127202.15633423181,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12759"},{"year":2026,"category":"Roads","project":"Opol Diversion Road (Opol-Canito-an), Brgy. Taboc - Brgy. Igpit Section, Sta. 3+500 - Sta. 7+000, Opol, Misamis Oriental","amountPesos":47192000.0,"lengthMeters":3500.0,"ratePesosPerMeter":13483.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12762"},{"year":2026,"category":"Roads","project":"Kidapawan City Circumferential Road, Sta. 6 + 266.50 - Sta. 6 + 310, Sta. 6 + 330 - Sta. 6 + 400.10, Cotabato","amountPesos":24713000.0,"lengthMeters":113.6,"ratePesosPerMeter":217544.01408450634,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12766"},{"year":2026,"category":"Roads","project":"Silway 8-Upper Labay Road, Sta. 22 + 030 - Sta. 22 + 150, South Cotabato","amountPesos":12700000.0,"lengthMeters":120.0,"ratePesosPerMeter":105833.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12769"},{"year":2026,"category":"Roads","project":"Banga - Tupi - Malungon Road, Sta. 15 + 872 - Sta. 16 + 187, South Cotabato","amountPesos":4742000.0,"lengthMeters":315.0,"ratePesosPerMeter":15053.968253968254,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12772"},{"year":2026,"category":"Roads","project":"Tacurong West Bypass Road, Sta. 0 + 000 - Sta. 0 + 980, Sta. 1 + 980 - Sta. 2 + 055,  Sta. 2 + 055 - Sta. 3 + 019, Sultan Kudarat","amountPesos":33131000.0,"lengthMeters":2019.0,"ratePesosPerMeter":16409.608717186726,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12775"},{"year":2026,"category":"Roads","project":"Butuan City West Diversion Road, (Sta. 4+662 - Sta. 5+220), Brgy. Pinamanculan - Brgy. Ambago Section, Butuan City","amountPesos":49000000.0,"lengthMeters":558.0,"ratePesosPerMeter":87813.62007168459,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12779"},{"year":2026,"category":"Roads","project":"Cantilan-Madrid Bypass Road (SDCR Alternate Route), (4+015-4+256, 4+339-4+593.5), Brgy. Lobo Section, Surigao del Sur","amountPesos":49000000.0,"lengthMeters":495.5,"ratePesosPerMeter":98890.01009081736,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12782"},{"year":2026,"category":"Roads","project":"Bantay (Ilocos Sur) - San Quintin-Langiden (Abra) Road, Barangay. San Mariano Section (Sta 1+427.03 - Sta. 1+779.93), Bantay, Ilocos Sur","amountPesos":185404000.0,"lengthMeters":352.9,"ratePesosPerMeter":525372.6268064609,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12791"},{"year":2026,"category":"Roads","project":"Bolinao-Dasol Coastal Road, Barangay. Gayusan-Barangay. Baruan-Barangay. Pogoruac Section, Sta. 47 +400 - Sta. 53 + 200, Agno, Pangasinan","amountPesos":207849000.0,"lengthMeters":5800.0,"ratePesosPerMeter":35836.03448275862,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12793"},{"year":2026,"category":"Roads","project":"Cabugao-Nueva Era-Danglas Road, Barangay Barikir - Barangay Poblacion - Barangay Naguilian Section, Sta. 0 + 000 - Sta. 4 + 200, Nueva Era, Ilocos Norte","amountPesos":44100000.0,"lengthMeters":4200.0,"ratePesosPerMeter":10500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12795"},{"year":2026,"category":"Roads","project":"Cervantes - Quirino (Ilocos Sur) - Abra Road, Barangay. Legleg - Barangay. Lamag Section, Sta. 0 + 000 - Sta. 2 + 151, Qurino, Ilocos Sur","amountPesos":19600000.0,"lengthMeters":2151.0,"ratePesosPerMeter":9112.04091120409,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12799"},{"year":2026,"category":"Roads","project":"Cervantes (Ilocos Sur) - Besao-Sagada via Laylaya Road, Barangay. Patiacan Section, Sta. 9 + 900 - Sta. 14 + 760, Quirino, Ilocos Sur","amountPesos":72505000.0,"lengthMeters":4860.0,"ratePesosPerMeter":14918.724279835391,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12801"},{"year":2026,"category":"Roads","project":"Mangatarem-Sta Cruz Road, Barangay Buenlag Section, Sta. 0 + 900 - Sta. 4 + 725.39 (Section 2), Mangatarem, Pangasinan","amountPesos":145011000.0,"lengthMeters":3825.39,"ratePesosPerMeter":37907.5074698266,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12805"},{"year":2026,"category":"Roads","project":"Naguilian-Bagulin-Kapangan Road, Barangay. Tagudtud - Barangay. Baay - Barangay. Tio-Angan Section, Sta. 3 + 715 - Sta. 6 + 440, Bagulin, La Union","amountPesos":271540000.0,"lengthMeters":2725.0,"ratePesosPerMeter":99647.70642201835,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12807"},{"year":2026,"category":"Roads","project":"Piddig-Carasi (Ilocos Norte) - Calanasan (Apayao) Connecting Cabugao-Conner (Apayao)-Tuao (Cagayan) Road, Sta. 32 + 800 - Sta. 34 + 880, Ilocos Norte","amountPesos":125676000.0,"lengthMeters":2080.0,"ratePesosPerMeter":60421.153846153844,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12809"},{"year":2026,"category":"Roads","project":"Piddig-Carasi-Calanasan Road, Barangay. Angset - Barangay. Barbaqueso Section, Sta. 34 + 880 - 36 + 680, Carasi, Ilocos Norte","amountPesos":101507000.0,"lengthMeters":1800.0,"ratePesosPerMeter":56392.77777777778,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12811"},{"year":2026,"category":"Roads","project":"Road Connecting Santa-Rancho Road (S00089LZ) and Santa-Caoayan Road, Barangay. Puro - Barangay Tamurong Section, Sta. 2+404.81 - Sta. 2+487.31\n , Caoayan, Ilocos Sur","amountPesos":230300000.0,"lengthMeters":82.5,"ratePesosPerMeter":2791515.1515151514,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12813"},{"year":2026,"category":"Roads","project":"Santol (La Union) - Kibungan (Benguet) Road, Barangay. Licungan Section, Sta. 12 + 860 - Sta. 14 + 450, Sugpon, Ilocos Sur","amountPesos":97817000.0,"lengthMeters":1590.0,"ratePesosPerMeter":61520.125786163524,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12817"},{"year":2026,"category":"Roads","project":"Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, Barangay. Lipay - Barangay. Daking - Barangay. Balbalayang - Barangay. Lon-oy -Barangay. Bayabas Section, Sta. 17 + 780 - Sta. 24 + 980, San Gabriel, La Union","amountPesos":100197000.0,"lengthMeters":7200.0,"ratePesosPerMeter":13916.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12819"},{"year":2026,"category":"Roads","project":"Abra - Cervantes Road, Sitio Liwang- Pil-Pila, Brgy. Alangtin, Sta. 24+520 - Sta. 27+829, Abra","amountPesos":98000000.0,"lengthMeters":3309.0,"ratePesosPerMeter":29616.198247204593,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12822"},{"year":2026,"category":"Roads","project":"Abra - Cervantes Road, Sitio Mayabo, Brgy. Poblacion, Sta. 19+578 - Sta. 23+470, Abra","amountPesos":98000000.0,"lengthMeters":3892.0,"ratePesosPerMeter":25179.856115107912,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12824"},{"year":2026,"category":"Roads","project":"Abra - Cervantes Road, Sitio Paskok-Palting, Brgy. Dilong, Sta. 30+994 - Sta. 34+642, Abra","amountPesos":93801000.0,"lengthMeters":3648.0,"ratePesosPerMeter":25712.99342105263,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12826"},{"year":2026,"category":"Roads","project":"Abra-Kalinga-Apayao Road (Buluan-Banban-Daga-Puguin-Sacpil-Pinukpuk), Sta.17+449 - Sta.20+839, Conner, Apayao","amountPesos":126224000.0,"lengthMeters":3390.0,"ratePesosPerMeter":37234.21828908555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12828"},{"year":2026,"category":"Roads","project":"Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section), Sta. 15+964 - Sta. 17+951, Kalinga","amountPesos":98000000.0,"lengthMeters":1987.0,"ratePesosPerMeter":49320.58379466533,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12830"},{"year":2026,"category":"Roads","project":"Aguinaldo-Natonin Road, Sta. 15+380 - Sta. 16+830, Mountain Province","amountPesos":96040000.0,"lengthMeters":1450.0,"ratePesosPerMeter":66234.4827586207,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12832"},{"year":2026,"category":"Roads","project":"Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct. - Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of the BLISTT Outer Ring Circumferential Road)- Sta. 8+249 - Sta. 8+408, Sta. 11+524 - Sta. 11+614, Sta. 12+459 - Sta. 12+637, Sta. 12+734 - Sta. 12+771, Sta. 13+076 - Sta. 13+275, Sablan, Benguet","amountPesos":36746000.0,"lengthMeters":663.0,"ratePesosPerMeter":55423.83107088989,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12834"},{"year":2026,"category":"Roads","project":"Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct. - Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of the BLISTT Outer Ring Circumferential Road) - Sta. 1+545 - Sta. 1+859, Sablan, Benguet","amountPesos":24500000.0,"lengthMeters":314.0,"ratePesosPerMeter":78025.47770700637,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12836"},{"year":2026,"category":"Roads","project":"Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road) - Sta. 7+020 - Sta. 7+995, Itogon, Benguet","amountPesos":24102000.0,"lengthMeters":975.0,"ratePesosPerMeter":24720.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12838"},{"year":2026,"category":"Roads","project":"Banaue-Barlig-Tanudan-Tabuk Road, Sta. 1+509 - Sta. 2+759, Ifugao","amountPesos":64861000.0,"lengthMeters":1250.0,"ratePesosPerMeter":51888.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12840"},{"year":2026,"category":"Roads","project":"Halsema - Madaymen - Masala - Sagpat Rd, Sta. 21+040 - Sta. 22+450, Kibungan, Benguet","amountPesos":64615000.0,"lengthMeters":1410.0,"ratePesosPerMeter":45826.24113475177,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12842"},{"year":2026,"category":"Roads","project":"PENRO Apayao (Burot)-San Isidro-Quirino Road, Sta. 0+606 - Sta. 1+606, Brgy. San Isidro Sur - Brgy. Quirino, Apayao","amountPesos":107800000.0,"lengthMeters":1000.0,"ratePesosPerMeter":107800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12844"},{"year":2026,"category":"Roads","project":"Piddig,Carasi (Ilocos Norte)-Calanasan-Langnao-Kabugao Road (Construction of Concrete Road), Sta.2+800 - Sta.6+861.15, Brgy. Laco, Kabugao, Apayao","amountPesos":141965000.0,"lengthMeters":4061.15,"ratePesosPerMeter":34956.847198453645,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12848"},{"year":2026,"category":"Roads","project":"Piddig,Carasi (Ilocos Norte)-Calanasan-Langnao-Kabugao Road (Construction of Concrete Road), Sta.6+861.15 - Sta.10+783.20, Brgy. Laco, Kabugao, Apayao","amountPesos":147000000.0,"lengthMeters":3922.05,"ratePesosPerMeter":37480.39928098825,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12850"},{"year":2026,"category":"Roads","project":"Piddig-Carasi-Calanasan Road (Calanasan Side), Sta. 11+616 - Sta. 11+711, Sta. 11+741 - Sta. 14+646, Calanasan, Apayao","amountPesos":140760000.0,"lengthMeters":3000.0,"ratePesosPerMeter":46920.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12852"},{"year":2026,"category":"Roads","project":"Piddig-Carasi-Calanasan Road (Calanasan Side), Sta. 14+646 - Sta. 17+596, Calanasan, Apayao","amountPesos":145040000.0,"lengthMeters":2950.0,"ratePesosPerMeter":49166.101694915254,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12854"},{"year":2026,"category":"Roads","project":"Piddig-Carasi-Calanasan Road (Calanasan Side), Sta. 9+116 - Sta. 11+616, Calanasan, Apayao","amountPesos":119203000.0,"lengthMeters":2500.0,"ratePesosPerMeter":47681.2,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12856"},{"year":2026,"category":"Roads","project":"Tabuk-Banawe via Tanudan-Barlig Rd, Sta. 4 + 220 - Sta. 6 + 220, Kalinga","amountPesos":97978000.0,"lengthMeters":2000.0,"ratePesosPerMeter":48989.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12858"},{"year":2026,"category":"Roads","project":"Aritao-Quirino Road, Brgy. Biyoy Section (Sta. 5+588.28  - Sta. 6+974.28), Kasibu, Nueva Vizcaya","amountPesos":66339000.0,"lengthMeters":1386.0,"ratePesosPerMeter":47863.63636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12861"},{"year":2026,"category":"Roads","project":"Aritao-Quirino Road, Sitio Papalungan Section (Sta. 5+220 - Sta. 5+588.28 ), Kasibu, Nueva Vizcaya","amountPesos":45438000.0,"lengthMeters":368.28,"ratePesosPerMeter":123378.95079830573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12863"},{"year":2026,"category":"Roads","project":"Jct Abbag-Nagtipunan-Nueva Vizcaya Rd via Dupax (Mactol-Bucao Section), San Pugo, Quirino - Sta.0+000 - Sta. 3+380","amountPesos":117600000.0,"lengthMeters":3380.0,"ratePesosPerMeter":34792.89940828402,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12865"},{"year":2026,"category":"Roads","project":"Jct. Cagayan Valley Rd - Sampaguita-Warat-La Suerte-Catarauan-Afusing Rd Phase IV, Cagayan Sta. 10+376 - Sta. 9+872","amountPesos":105000000.0,"lengthMeters":504.0,"ratePesosPerMeter":208333.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12867"},{"year":2026,"category":"Bridges","project":"Tuguegarao City Boulevard (Pinacanauan Bridge 2 and Approaches), Tuguegarao City, Cagayan, Sta. 0+000 - Sta. 0+718.40","amountPesos":150000000.0,"lengthMeters":718.4,"ratePesosPerMeter":208797.32739420937,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12869"},{"year":2026,"category":"Roads","project":"San Jose-Quibal Road, Package 1, Sta. 21+167.63 - Sta. 21+182.63, Sta. 21+555.14 - Sta. 21+570.14, Cagayan","amountPesos":39200000.0,"lengthMeters":30.0,"ratePesosPerMeter":1306666.6666666667,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12871"},{"year":2026,"category":"Roads","project":"San Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Road, Chavayan Section (Sta. 01+870.50 - Sta. 02+091), Package 1, Batanes","amountPesos":50496000.0,"lengthMeters":220.5,"ratePesosPerMeter":229006.80272108843,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12873"},{"year":2026,"category":"Bridges","project":"Capas-Botolan Rd (Zambales Section), Zambales, Baquillan Bridge 1, Sta. 000+045.68 - Sta. 000+562.48","amountPesos":39145000.0,"lengthMeters":516.8,"ratePesosPerMeter":75744.96904024767,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12878"},{"year":2026,"category":"Roads","project":"Sta. Cruz - Mangatarem Road, Sta. Cruz, Zambales Sta. 197+444.0 - Sta. 199+264.00","amountPesos":147000000.0,"lengthMeters":1820.0,"ratePesosPerMeter":80769.23076923077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12880"},{"year":2026,"category":"Roads","project":"Atimonan-Mauban Road, STA.002+450 - STA. 002+625, Atimonan Section, Quezon","amountPesos":46846000.0,"lengthMeters":175.0,"ratePesosPerMeter":267691.4285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12883"},{"year":2026,"category":"Roads","project":"General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 1 + 525 to Sta. 1 + 605, Magallanes Section, Cavite","amountPesos":81686000.0,"lengthMeters":80.0,"ratePesosPerMeter":1021075.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12893"},{"year":2026,"category":"Roads","project":"MSR JCT Canda-Hondagua-Roma Point Road, STA. 288 + 000.00 - STA. 288 + 562.00","amountPesos":48051000.0,"lengthMeters":562.0,"ratePesosPerMeter":85500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12901"},{"year":2026,"category":"Roads","project":"Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Sta. 13 + 430 - Sta. 14 + 540, Quezon","amountPesos":80185000.0,"lengthMeters":1110.0,"ratePesosPerMeter":72238.73873873874,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12905"},{"year":2026,"category":"Roads","project":"Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Sta. 7 + 910 - Sta. 8 + 940.5, Quezon","amountPesos":100414000.0,"lengthMeters":1030.5,"ratePesosPerMeter":97442.01843765163,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12907"},{"year":2026,"category":"Roads","project":"Sangley Airport Access Road, Sta 31 + 204 - Sta 31 + 228, Sta 31 + 750 - Sta 31 + 800, Cavite City, Cavite","amountPesos":160369000.0,"lengthMeters":74.0,"ratePesosPerMeter":2167148.6486486485,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12909"},{"year":2026,"category":"Roads","project":"Sangley Airport Access Road, Sta 31 + 920 - Sta 31 + 945, Cavite City, Cavite","amountPesos":48051000.0,"lengthMeters":25.0,"ratePesosPerMeter":1922040.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12911"},{"year":2026,"category":"Roads","project":"Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Sta. 0 + 520 - Sta. 2 + 880, San Antonio, Quezon","amountPesos":100000000.0,"lengthMeters":2360.0,"ratePesosPerMeter":42372.8813559322,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12913"},{"year":2026,"category":"Roads","project":"Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Section I: Sta. 2 + 880 - Sta. 4 + 160, Section II: Sta. 4 + 195 - Sta. 4 + 692, San Antonio, Quezon","amountPesos":100000000.0,"lengthMeters":1777.0,"ratePesosPerMeter":56274.62014631401,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12915"},{"year":2026,"category":"Roads","project":"Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Sta. 4 + 692 - Sta. 6 + 992, San Antonio, Quezon","amountPesos":100000000.0,"lengthMeters":2300.0,"ratePesosPerMeter":43478.260869565216,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12917"},{"year":2026,"category":"Roads","project":"Tagaytay - Calamba Road via Canlubang, Sta. 64 + 223 - 64 + 395.20, Sta. 64 + 495 - 64 + 965.30, Calamba, Laguna","amountPesos":140539000.0,"lengthMeters":642.5,"ratePesosPerMeter":218737.74319066148,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12919"},{"year":2026,"category":"Roads","project":"Bulalacao- San Jose-Jct Mapaya Road, K0216+112 - K0216+580, Barangay Purnaga, Magsaysay, Occidental Mindoro","amountPesos":49813000.0,"lengthMeters":468.0,"ratePesosPerMeter":106438.03418803419,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12922"},{"year":2026,"category":"Roads","project":"Mindoro Island Circumferential Road (Puerto Galera-Abra De Ilog), Sta. 006+800 - Sta. 007+350, Barangay Udalo, Abra De Ilog, Mindoro Occidental","amountPesos":43233000.0,"lengthMeters":550.0,"ratePesosPerMeter":78605.45454545454,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12924"},{"year":2026,"category":"Roads","project":"Cabusao-Balongay Road Sta. 410+381 - Sta. 412+209, Barangay Santa Cruz Section, Cabusao, Camarines Sur","amountPesos":146436000.0,"lengthMeters":1828.0,"ratePesosPerMeter":80107.22100656455,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12927"},{"year":2026,"category":"Roads","project":"Claveria - San Isidro - Peñafrancia Road - Sta. 7 + 425 - Sta. 9 + 150, Masbate","amountPesos":98000000.0,"lengthMeters":1725.0,"ratePesosPerMeter":56811.59420289855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12931"},{"year":2026,"category":"Roads","project":"Lagonoy-Caramoan Road (Ason Section), Sta. 11 + 434.39 - Sta. 12 + 706.39, Barangay Ason, Garchitorena, Camarines Sur","amountPesos":73218000.0,"lengthMeters":1272.0,"ratePesosPerMeter":57561.32075471698,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12933"},{"year":2026,"category":"Roads","project":"Lalud-Garchitorena Road, Bocogan Section, Sta.17 + 086 - Sta18 + 445, Barangay Bocogan, Lagonoy, Camarines Sur","amountPesos":64323000.0,"lengthMeters":1359.0,"ratePesosPerMeter":47331.12582781457,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12937"},{"year":2026,"category":"Roads","project":"Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd) Himanag Road, Sta.12 + 300 - Sta.13 + 484, Barangay Sipaco, Lagonoy, Camarines Sur","amountPesos":73218000.0,"lengthMeters":1184.0,"ratePesosPerMeter":61839.52702702703,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12939"},{"year":2026,"category":"Roads","project":"Pasacao - Balatan Tourism Coastal Highway, Barangay Luluasan - Barangay Pararao Section, Balatan, Camarines Sur, Sta. 494+980 - Sta. 495+740","amountPesos":49000000.0,"lengthMeters":760.0,"ratePesosPerMeter":64473.68421052631,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12941"},{"year":2026,"category":"Roads","project":"Tabaco City-Malinao-Buhi-Iriga City Road. Sta. 38 + 800 - Sta. 40 + 300, Camarines Sur","amountPesos":82980000.0,"lengthMeters":1500.0,"ratePesosPerMeter":55320.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12943"},{"year":2026,"category":"Roads","project":"Panay East-West Road, Lambunao, Iloilo - Sta. 13+870.90 - Sta. 14+420.90","amountPesos":95688000.0,"lengthMeters":550.0,"ratePesosPerMeter":173978.18181818182,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12946"},{"year":2026,"category":"Roads","project":"Panay East-West Road, Valderrama, Antique - Sta. 7+853 - Sta. 8+100","amountPesos":76550000.0,"lengthMeters":247.0,"ratePesosPerMeter":309919.028340081,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12948"},{"year":2026,"category":"Roads","project":"San Remigio-Bugo-Gen. Fullon-Valderama Road, Valderrama, Antique - Sta. 0+000 - Sta. 0+200","amountPesos":24362000.0,"lengthMeters":200.0,"ratePesosPerMeter":121810.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12950"},{"year":2026,"category":"Roads","project":"Candoni - Gatuslao - Basay Bdry Road, Sta. 20+280 - Sta. 21+530, Negros Occidental","amountPesos":98000000.0,"lengthMeters":1250.0,"ratePesosPerMeter":78400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12953"},{"year":2026,"category":"Roads","project":"Himamaylan City - Negros Oriental Boundary - Tayasan Road, Sta. 18+553 - Sta. 19+178, Negros Occidental","amountPesos":49000000.0,"lengthMeters":625.0,"ratePesosPerMeter":78400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12955"},{"year":2026,"category":"Roads","project":"Albuera – Burauen Rd (Albuera Section), Sta. 7+584.73 - Sta. 7+733.5, Barangay San Pedro, Albuera, Leyte","amountPesos":72360000.0,"lengthMeters":148.77,"ratePesosPerMeter":486388.38475498947,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12958"},{"year":2026,"category":"Roads","project":"Burauen-Albuera Road (Burauen Side), Chainage 8 + 102 - Chainage 8 + 162, Chainage 9 + 342 - Chainage 9 + 462, Barangay Catagbacan and Barangay Tagadtaran,  Burauen, Leyte","amountPesos":94115000.0,"lengthMeters":180.0,"ratePesosPerMeter":522861.1111111111,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12960"},{"year":2026,"category":"Roads","project":"Liloan-San Ricardo Circumferential Road, Barangay Looc, San Ricardo, Southern Leyte (STA 25+043.0 - STA 25+813.0 )","amountPesos":85493000.0,"lengthMeters":770.0,"ratePesosPerMeter":111029.87012987013,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12962"},{"year":2026,"category":"Roads","project":"Labangan-Midsalip Road, Barangay Langapod Section, Zamboanga del Sur Sta 22+720 - Sta 25+720","amountPesos":96471000.0,"lengthMeters":3000.0,"ratePesosPerMeter":32157.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12969"},{"year":2026,"category":"Roads","project":"Sindangan - Bayog - Lakewood Road, Zamboanga del Norte Sta. 23+156 - Sta. 23+200, Sta. 23+350 - Sta. 23+400, Sta. 23+940 - Sta. 24+200","amountPesos":37975000.0,"lengthMeters":354.0,"ratePesosPerMeter":107274.01129943503,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12973"},{"year":2026,"category":"Bridges","project":"Zamboanga del Sur Coastal Rd FS15172MN (Jct Kulot - Poblacion Margosatubig) Tigbalugo Bridge FB00003MN Sta. 1 + 020 - Sta. 1 + 040, Margosatubig, Zamboanga del Sur","amountPesos":49000000.0,"lengthMeters":20.0,"ratePesosPerMeter":2450000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12975"},{"year":2026,"category":"Roads","project":"Bukidnon-Compostela Valley Road (Barangay Namnam, San Fernando Bukidnon- Laak Compostela Valley), Brgy. Namnam Section, Sta. 1+400 - Sta. 2+000, Sta. 2+300 - Sta. 2+950, San Fernando, Bukidnon","amountPesos":41824000.0,"lengthMeters":1250.0,"ratePesosPerMeter":33459.2,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12980"},{"year":2026,"category":"Roads","project":"East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road) (Libona-Baungon Section), Brgy. San Vicente Section, Sta. 11+570 - Sta. 12+520, Baungon, Bukidnon","amountPesos":48191000.0,"lengthMeters":950.0,"ratePesosPerMeter":50727.36842105263,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12982"},{"year":2026,"category":"Roads","project":"Iligan City - Cagayan de Oro City Alternate Road (Digkilaan-Bulua Section), K12 + 400 - K13 + 800, Iligan City","amountPesos":57829000.0,"lengthMeters":1400.0,"ratePesosPerMeter":41306.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12986"},{"year":2026,"category":"Roads","project":"Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Brgy. Bal-ason - Brgy. Hindangon Section, Sta. 126+151 - Sta. 126+211, Gingoog City, Misamis Oriental","amountPesos":54987000.0,"lengthMeters":60.0,"ratePesosPerMeter":916450.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12990"},{"year":2026,"category":"Roads","project":"Muslim-Christian Unity Crossroad, Brgy. Dalamas, Sta. 2+500 - Sta. 5+850, Tagoloan, Lanao del Norte","amountPesos":75508000.0,"lengthMeters":3350.0,"ratePesosPerMeter":22539.701492537315,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12992"},{"year":2026,"category":"Roads","project":"Tubod - Ganassi By-Pass Road, Barangay Pawak, Sta. 0+000 - Sta. 2+250, Salvador, Lanao del Norte","amountPesos":88846000.0,"lengthMeters":2250.0,"ratePesosPerMeter":39487.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12994"},{"year":2026,"category":"Roads","project":"Bukidnon-Compostela Valley Road (Namnam, San Fernando, Bukidnon-Laak Compostela Valley), Barangay Panamoren Section, Sta. 1529+417.696 - Sta. 1529+747.566, Sta. 1531+470.000 - Sta. 1532+340.125, Laak , Davao De Oro","amountPesos":63700000.0,"lengthMeters":1199.995,"ratePesosPerMeter":53083.55451480553,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12997"},{"year":2026,"category":"Roads","project":"Davao-Bukidnon Road (Jct. Marahan)-Gumitan-Jct.Fatima-Malabog Road, Barangay Marilog Proper Section, Sta. 1558+340.000 - Sta. 1559+100.000, Davao City","amountPesos":48062000.0,"lengthMeters":760.0,"ratePesosPerMeter":63239.47368421053,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 12999"},{"year":2026,"category":"Roads","project":"Matanao-Kiblawan-Padada Rd, Barangay Upper Malinao, Sta. 2+920.000 - Sta. 3+431.944, Padada, Davao del Sur","amountPesos":49000000.0,"lengthMeters":511.944,"ratePesosPerMeter":95713.59367430814,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13001"},{"year":2026,"category":"Roads","project":"Nabunturan - Laak Road, Barangay Kilagding Section, Sta. 1509+856.400 - Sta. 1511+273.494, Laak, Davao De Oro","amountPesos":68600000.0,"lengthMeters":1417.094,"ratePesosPerMeter":48408.92700131256,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13003"},{"year":2026,"category":"Roads","project":"NRJ Panabo City-Jct Fatima-Malabog Road, Barangay Consolacion-Barangay Kauswagan Section, Sta. 1489+874.000 - Sta. 1492+360.000, Panabo City, Davao del Norte","amountPesos":64403000.0,"lengthMeters":2486.0,"ratePesosPerMeter":25906.275140788413,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13007"},{"year":2026,"category":"Roads","project":"Columbio - Lutayan - Koronadal Road, Sta. 4 + 970 - Sta. 7 + 370, Sta.10 + 135 - Sta.10 + 200,  Sultan Kudarat","amountPesos":94836000.0,"lengthMeters":2465.0,"ratePesosPerMeter":38473.02231237323,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13010"},{"year":2026,"category":"Roads","project":"Datu Paglas - Columbio - Matanao Road, Sta. 17 + 739 - Sta. 17 + 849.15, Sultan Kudarat","amountPesos":70189000.0,"lengthMeters":110.15,"ratePesosPerMeter":637212.8915115667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13012"},{"year":2026,"category":"Roads","project":"Demoloc-Little Baguio-Alabel Rd, Sta. 42 + 021 - Sta. 45 + 129, Sarangani","amountPesos":189672000.0,"lengthMeters":3108.0,"ratePesosPerMeter":61027.02702702703,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13014"},{"year":2026,"category":"Roads","project":"Doroluman-President Roxas-Kadingilan Road, Sta. 10 + 522 - Sta. 10 + 641, Cotabato","amountPesos":87736000.0,"lengthMeters":119.0,"ratePesosPerMeter":737277.3109243697,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13016"},{"year":2026,"category":"Roads","project":"Koronadal - Lutayan - Columbio - Matanao Road, Sta.8 + 800 - Sta. 8 + 958.34, Sultan Kudarat","amountPesos":87736000.0,"lengthMeters":158.34,"ratePesosPerMeter":554098.7747884295,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13018"},{"year":2026,"category":"Roads","project":"Butuan City - Pianing - Tandag Road, (5+550 - 5+750), Brgy. Mabuhay Section, Surigao del Sur","amountPesos":176400000.0,"lengthMeters":200.0,"ratePesosPerMeter":882000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13021"},{"year":2026,"category":"Roads","project":"Butuan City - Pianing - Tandag Road, (23+198 - 24+518), Brgy. Pakwan Section, Surigao del Sur","amountPesos":176400000.0,"lengthMeters":1320.0,"ratePesosPerMeter":133636.36363636365,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13023"},{"year":2026,"category":"Roads","project":"Butuan City-Pianing-Tandag Road,(13+960 - 15+860), Brgy. Padiay Section, Agusan del Sur","amountPesos":73500000.0,"lengthMeters":1900.0,"ratePesosPerMeter":38684.21052631579,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13025"},{"year":2026,"category":"Roads","project":"Cabadbaran - Puting Bato - Lanuza Road, (19+375.564 - 19+998), Brgy. Pakwan Section, Surigao del Sur","amountPesos":73500000.0,"lengthMeters":622.436,"ratePesosPerMeter":118084.42956384242,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13027"},{"year":2026,"category":"Roads","project":"Cabadbaran - Puting Bato - Lanuza Road, (32+100 - 32+600), Brgy. Puting Bato Section, Agusan del Norte","amountPesos":73500000.0,"lengthMeters":500.0,"ratePesosPerMeter":147000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13029"},{"year":2026,"category":"Roads","project":"East-West Lateral Road, connecting Agusan del Sur to Bukidnon, San Miguel Proper (Surigao del Sur) - Calaitan (Bayugan),(1355+360 - 1356+560) Brgy. Umalag, Surigao del Sur","amountPesos":176400000.0,"lengthMeters":1200.0,"ratePesosPerMeter":147000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13031"},{"year":2026,"category":"Roads","project":"East-West Lateral Road connecting Agusan del Sur / Bukidnon Agusan-Malaybalay Road, Brgy. San Vicente Section,(0+000 - 2+620) Agusan Del Sur","amountPesos":115640000.0,"lengthMeters":2620.0,"ratePesosPerMeter":44137.40458015267,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13033"},{"year":2026,"category":"Roads","project":"East-West lateral road connecting Agusan Del Sur to Bukidnon San Miguel Proper (Surigao del Sur) - Calaitan (Bayugan), (1296+673 - 1297+123), Brgy. San Juan Section, Agusan del Sur","amountPesos":49980000.0,"lengthMeters":450.0,"ratePesosPerMeter":111066.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13035"},{"year":2026,"category":"Roads","project":"East-West Lateral Road connecting Agusan Del Sur to Bukidnon, San Miguel Proper (Surigao del Sur) - Calaitan (Bayugan), (1355+360 - 1355+760), Brgy. Castillo Section, Surigao del Sur","amountPesos":73500000.0,"lengthMeters":400.0,"ratePesosPerMeter":183750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13037"},{"year":2026,"category":"Roads","project":"Tubay - Cabadbaran Coastal Road, Brgy. Poblacion 2 - Brgy. (0+797.25 - 1+162.75), Poblacion 1 Section, Agusan del Norte","amountPesos":117600000.0,"lengthMeters":365.5,"ratePesosPerMeter":321751.0259917921,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13039"},{"year":2026,"category":"Roads","project":"Construction of Missing Link/ New Roads Mindanano Avenue Extension 2C, Phase I and Phase II, Barangay 166, Caloocan City Metro Manila(K020 + 500 to K020 + 850)","amountPesos":39692000.0,"lengthMeters":350.0,"ratePesosPerMeter":113405.71428571429,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13042"},{"year":2026,"category":"Roads","project":"Alilem-Sugpon (Ilocos Sur) - Bakun (Benguet) Road, Barangay. Anaao Section, Sta 0+000 - Sta 0+100, Sugpon, Ilocos Sur","amountPesos":48791000.0,"lengthMeters":100.0,"ratePesosPerMeter":487910.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13046"},{"year":2026,"category":"Roads","project":"San Manuel (Pangasinan)-Itogon (Benguet) Road,Barangay. Casaratan - Barangay. San Roque - Barangay. Sobol - Barangay. Amistad Section, Sta. 13 + 725 - Sta. 15 + 780, San Nicolas, Pangasinan","amountPesos":48908000.0,"lengthMeters":2055.0,"ratePesosPerMeter":23799.513381995133,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13049"},{"year":2026,"category":"Roads","project":"Itogon-Dalupirip-San Nicolas Road - Sta. 6+108 - Sta. 6+795, Sta. 6+941 - Sta. 7+437, Sta. 7+714 - Sta. 7+771, Itogon, Benguet","amountPesos":46920000.0,"lengthMeters":1240.0,"ratePesosPerMeter":37838.709677419356,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13053"},{"year":2026,"category":"Roads","project":"Kiangan-Asipulo-Ambaguio-Bayombong Road, Brgy. Camandag, Ifugao Sta. 29+670 - Sta. 30+720","amountPesos":64216000.0,"lengthMeters":1050.0,"ratePesosPerMeter":61158.09523809524,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13056"},{"year":2026,"category":"Roads","project":"Aguinaldo-Toboy-Natonin Road, Sta. 7+420 - Sta. 7+620.32, Ifugao","amountPesos":5096000.0,"lengthMeters":200.32,"ratePesosPerMeter":25439.297124600675,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13059"},{"year":2026,"category":"Roads","project":"Besao-Tubo (via Tamboan) Road, Sta. 3+785 - Sta. 4+140, Besao, Mountain Province","amountPesos":20580000.0,"lengthMeters":355.0,"ratePesosPerMeter":57971.83098591549,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13062"},{"year":2026,"category":"Roads","project":"Sagada - Besao - Quirino (via Laylaya) Road, Sta. 6+965 - Sta. 27+345, Besao, Mountain Province","amountPesos":26122000.0,"lengthMeters":20380.0,"ratePesosPerMeter":1281.746810598626,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13064"},{"year":2026,"category":"Roads","project":"Aguinaldo-Natonin Road, Sta. 4+925 - Sta. 5+887, Mountain Province","amountPesos":37240000.0,"lengthMeters":962.0,"ratePesosPerMeter":38711.01871101871,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13067"},{"year":2026,"category":"Roads","project":"Tanudan-Barlig-Ifugao Road (Barlig-Banaue Section), Sta. 3+000 - Sta. 3+600, Mountain Province","amountPesos":29400000.0,"lengthMeters":600.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13069"},{"year":2026,"category":"Roads","project":"Tanudan-Barlig-Ifugao Road (Tanudan-Barlig Section), Sta. 1+120 - Sta. 1+396, Mountain Province","amountPesos":9800000.0,"lengthMeters":276.0,"ratePesosPerMeter":35507.24637681159,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13071"},{"year":2026,"category":"Roads","project":"San Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Road, Sumnanga Section (Sta. 01+923.50 - Sta. 02+123.50), Package 2, Batanes","amountPesos":45906000.0,"lengthMeters":200.0,"ratePesosPerMeter":229530.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13075"},{"year":2026,"category":"Roads","project":"Roxas-Paracelis Road, Brgy. Simimbaan Section (Sta. 4+035- Sta. 4+668.94), Roxas, Isabela","amountPesos":36350000.0,"lengthMeters":633.94,"ratePesosPerMeter":57339.81133861244,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13078"},{"year":2026,"category":"Roads","project":"General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 72+252 to Sta. 72+282, Gen. Emilio Aguinaldo Section, Cavite","amountPesos":28831000.0,"lengthMeters":30.0,"ratePesosPerMeter":961033.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13082"},{"year":2026,"category":"Roads","project":"San Francisco-San Andres-San Narciso Road, Chainage 19980 - Chainage 20780","amountPesos":16037000.0,"lengthMeters":800.0,"ratePesosPerMeter":20046.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13085"},{"year":2026,"category":"Roads","project":"Calauag-Guinayangan-Buenavista-Lopez Road, STA. 010+735 - STA. 011+770, STA. 018+890 - STA. 018+915, Guinayangan, Quezon","amountPesos":40092000.0,"lengthMeters":1060.0,"ratePesosPerMeter":37822.64150943396,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13088"},{"year":2026,"category":"Roads","project":"Quezon - Alabat - Perez Circumferential Road, STA. 019+650 - STA. 021+070, Alabat, Quezon","amountPesos":40092000.0,"lengthMeters":1420.0,"ratePesosPerMeter":28233.802816901407,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13090"},{"year":2026,"category":"Roads","project":"Tabaco City-Malinao-Buhi-Iriga Road, Barangay Quinarabasahan, Sta. 1 + 873.00 - Sta. 2 + 197.00, Sta. 2 + 431.00 - Sta. 2 + 631.00, Sta. 3 + 960.00 - Sta. 4 + 135.0, Malinao, Albay","amountPesos":48812000.0,"lengthMeters":699.0,"ratePesosPerMeter":69831.18741058656,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13098"},{"year":2026,"category":"Roads","project":"Claveria - San Isidro - Peñafrancia Road - Sta. 5 + 350 - Sta. 5 + 695, Masbate","amountPesos":19525000.0,"lengthMeters":345.0,"ratePesosPerMeter":56594.20289855073,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13101"},{"year":2026,"category":"Roads","project":"Poblacion Morocborocan-Guinhadap Road - Sta. 5 + 615 - Sta. 5 + 875, Masbate","amountPesos":19525000.0,"lengthMeters":260.0,"ratePesosPerMeter":75096.15384615384,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13103"},{"year":2026,"category":"Roads","project":"Poblacion-Quintina, San Pascual Road - Sta. 5 + 335 - Sta. 5 + 680, Masbate","amountPesos":19525000.0,"lengthMeters":345.0,"ratePesosPerMeter":56594.20289855073,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13105"},{"year":2026,"category":"Roads","project":"San Fernando - San Jacinto - Monreal Road - Sta. 18 + 518 - Sta. 18 + 818, Masbate","amountPesos":19525000.0,"lengthMeters":300.0,"ratePesosPerMeter":65083.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13107"},{"year":2026,"category":"Roads","project":"Asid-Tigbao-Bara-Malbug Road, Masbate, Sta. 38 + 430 - Sta. 39 + 726","amountPesos":98000000.0,"lengthMeters":1296.0,"ratePesosPerMeter":75617.28395061729,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13110"},{"year":2026,"category":"Roads","project":"Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7 + 250 - Sta. 7 + 541","amountPesos":22453000.0,"lengthMeters":291.0,"ratePesosPerMeter":77158.07560137457,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13112"},{"year":2026,"category":"Roads","project":"Mandaon-Dayhagan Road, Masbate, Sta. 7 + 155 - Sta. 7 + 380","amountPesos":26244000.0,"lengthMeters":225.0,"ratePesosPerMeter":116640.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13114"},{"year":2026,"category":"Roads","project":"Arteche, Brgy. Catumsan-Jipapad-Las Navas-Catubig-Rawis Road (Sta. 15+960 - Sta. 16+103), Brgy. San Francisco, Las Navas, Northern Samar","amountPesos":42352000.0,"lengthMeters":143.0,"ratePesosPerMeter":296167.8321678322,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13122"},{"year":2026,"category":"Roads","project":"Midsalip-Buboan Road, Barangay Sigapod Section, Midsalip, Zamboanga del Sur  Sta 12+960 - Sta 13+585","amountPesos":22152000.0,"lengthMeters":625.0,"ratePesosPerMeter":35443.2,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13126"},{"year":2026,"category":"Roads","project":"Midsalip - Buboan Road, Barangay Sta. 0+000 - Sta. 0+600, Bayog, Zamboanga del Sur 2nd","amountPesos":17847000.0,"lengthMeters":600.0,"ratePesosPerMeter":29745.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13129"},{"year":2026,"category":"Roads","project":"Zamboanga Del Sur Coastal Road, Sta. 0+000 - Sta. 0+5600, Pitogo, Zamboanga Del Sur","amountPesos":16373000.0,"lengthMeters":5600.0,"ratePesosPerMeter":2923.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13131"},{"year":2026,"category":"Roads","project":"Bukidnon-Davao Connector Road (Jct. Panganan-Kiulom), Brgy. Matupe Section, Sta. 0+340 - Sta. 0+700, San Fernando, Bukidnon","amountPesos":18588000.0,"lengthMeters":360.0,"ratePesosPerMeter":51633.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13135"},{"year":2026,"category":"Roads","project":"East-West lateral road connecting Agusan Del Sur/Agusan del Norte to Bukidnon, Cabanglasan-Bukidnon Bdry (Brgy. Makilos), Brgy. Mandahikan Section, Sta. 13+400 - Sta. 14+000, Cabanglasan, Bukidnon","amountPesos":18877000.0,"lengthMeters":600.0,"ratePesosPerMeter":31461.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13137"},{"year":2026,"category":"Roads","project":"Iligan City - Cagayan de Oro City Alternate Road (Digkilaan-Bulua Section), K9 + 500 - K10 + 728, Iligan City","amountPesos":42473000.0,"lengthMeters":1228.0,"ratePesosPerMeter":34587.1335504886,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13140"},{"year":2026,"category":"Roads","project":"Sta. Felomina-Bonbonon-Digkilaan-Rogongon Road, Brgy. Rogongon, Chainage 3592 - Chainage 4379, Iligan City","amountPesos":42473000.0,"lengthMeters":787.0,"ratePesosPerMeter":53968.23379923761,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13142"},{"year":2026,"category":"Bridges","project":"Daraga Albay Diversion Road, (Malabog Flyover), 0+338.52 - 0+450.75, 0+630.76 - 0+710.50, Barangay Malabog, Albay","amountPesos":98000000.0,"lengthMeters":191.97,"ratePesosPerMeter":510496.4317341251,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13156"},{"year":2026,"category":"Bridges","project":"Daraga Albay Diversion Road, (Tabon-Tabon Flyover), 0+(-100) - 0+583.47, Barangay Tabon-tabon, Albay","amountPesos":115126000.0,"lengthMeters":683.47,"ratePesosPerMeter":168443.38449383294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13158"},{"year":2026,"category":"Bridges","project":"Construction of Flyover along Mactan Circumferential Rd Jct. Pajo-Basak-Marigondon Rd., K0024+233 - K0024+565, Lapu-Lapu City","amountPesos":216310000.0,"lengthMeters":332.0,"ratePesosPerMeter":651536.1445783132,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13164"},{"year":2026,"category":"Bridges","project":"Tri-Level Interchange along Cebu North Hagnaya Wharf Road (M.C. Briones Street) corner U.N. Avenue, Sta. 0+212 - Sta. 0+272, Mandaue City","amountPesos":45328000.0,"lengthMeters":60.0,"ratePesosPerMeter":755466.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13166"},{"year":2026,"category":"Roads","project":"Maharlika Highway ( Cagayan Valley Rd) - K0464 + 826 - K0464 + 879, K0464 + 938 - K0464 + 940, K0464 + 975 - K0464 + 976, K0464 + 997 - K0465 + 178, K0466 + 398 - K0466 + 548, K0466 + 660 - K0466 + 940, K0467 + 000 - K0467 + 207, K0467 + 256 - K0467 + 292, K0467 + 308 - K0467 + 373, K0467 + 413 - K0467 + 441, K0467 + 526 - K0467 + 661, K0467 + 794 - K0467 + 896, K0468 + 000 - K0468 + 048, K0468 + 089 - K0468 + 133, K0468 + 140 - K0468 + 183, K0468 + 583 - K0468 + 643, K0469 + 787 - K0470 + 342, K0471 + 118 - K0471 + 222, K0473 + 470 - K0473 + 567, K0473 + 798 - K0473 + 864, K0474 + 656 - K0474 + 774, K0474 + 795 - K0475 + 006, K0475 + 081 - K0475 + 676, K0475 + 727 - K0476 + 102, K0476 + 133 - K0476 + 655, K0476 + 790 - K0476 + 822, K0476 + 966 - K0477 + 094, K0477 + 331 - K0477 + 385, K0477 + 459 - K0480 + 572","amountPesos":85196000.0,"lengthMeters":7405.0,"ratePesosPerMeter":11505.199189736664,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13176"},{"year":2026,"category":"Roads","project":"Linamon-Zamboanga Rd - K1594 + (-098) - K1594 + 137, K1594 + 318 - K1598 + 315, K1598 + 525 - K1599 + 027","amountPesos":68619000.0,"lengthMeters":4734.0,"ratePesosPerMeter":14494.930291508239,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13181"},{"year":2026,"category":"Roads","project":"Maharlika Highway - K1508+ 284 - K1508 + 429, K1508 + 484 - K1509 + 017, K1509+337 - K1509+377, K1509+443 - K1509+483, K1509 + 570 - K1509 + 650, K1509 + 904 -  K1510 + 024, K1510 + 206 - K1510 + 396, K1510 + 410 - K1510 + 593","amountPesos":22258000.0,"lengthMeters":1331.0,"ratePesosPerMeter":16722.76483846732,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13184"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Davao City - Jct. Digos Sect.) - K1520 + 519 - K1520 + 669","amountPesos":7350000.0,"lengthMeters":150.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13186"},{"year":2026,"category":"Roads","project":"Kidapawan - Allah Junction Rd - K1659 + (-191) - K1665 + 290, K1666 + 284 - K1670 + 984","amountPesos":109417000.0,"lengthMeters":11181.0,"ratePesosPerMeter":9785.976209641356,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13189"},{"year":2026,"category":"Roads","project":"Kidapawan - Allah Junction Rd - K1673 + 000 - K1681 + 000","amountPesos":87924000.0,"lengthMeters":8000.0,"ratePesosPerMeter":10990.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13191"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Digos-Makar Rd) - K1641 + 275 - K1643 + 130, K1643 + 330 - K1648 + 000","amountPesos":104563000.0,"lengthMeters":6525.0,"ratePesosPerMeter":16024.980842911877,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13193"},{"year":2026,"category":"Roads","project":"Maharlika Highway (Marbel-Makar Rd) - K1688 + 750 - K1690 + 088","amountPesos":20516000.0,"lengthMeters":1338.0,"ratePesosPerMeter":15333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13195"},{"year":2026,"category":"Roads","project":"Manila North Rd - K0375 + 765 - K0376 + 224","amountPesos":1470000.0,"lengthMeters":459.0,"ratePesosPerMeter":3202.6143790849674,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13199"},{"year":2026,"category":"Roads","project":"Bakit-Bakit Jct. - Umingan Road, K0188 + 659 - K0189 + 197","amountPesos":14700000.0,"lengthMeters":538.0,"ratePesosPerMeter":27323.420074349444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13202"},{"year":2026,"category":"Roads","project":"Kennon Rd - K0247 + 630 - K0248 + 154","amountPesos":7507000.0,"lengthMeters":524.0,"ratePesosPerMeter":14326.335877862595,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13206"},{"year":2026,"category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0100 + 140 - K0100 + 408","amountPesos":14700000.0,"lengthMeters":268.0,"ratePesosPerMeter":54850.746268656716,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13210"},{"year":2026,"category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0103 + 228 - K0105 + 006","amountPesos":27066000.0,"lengthMeters":1778.0,"ratePesosPerMeter":15222.722159730034,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13212"},{"year":2026,"category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0105 + 013.40 - K0105 + 429, K0105 + 451.65 - K0105 + 544, K0105 + 562.40 - K0105 + 871, K0106 + 318 - K0107 + 512","amountPesos":20458000.0,"lengthMeters":2010.55,"ratePesosPerMeter":10175.32515978206,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13214"},{"year":2026,"category":"Roads","project":"Calamba-Sta Cruz-Famy Jct Rd - K0073 + 800 - K0074 + 659","amountPesos":13586000.0,"lengthMeters":859.0,"ratePesosPerMeter":15816.065192083819,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13218"},{"year":2026,"category":"Roads","project":"Bacolod North Rd (S00078NR) - K0003 + 000- K0003 + 336","amountPesos":17143000.0,"lengthMeters":336.0,"ratePesosPerMeter":51020.833333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13222"},{"year":2026,"category":"Roads","project":"Bacolod South By-Pass Rd - K0021 + 488.60 - K0021 + 537.60, K0021 + 450 - K0021 + 684.10","amountPesos":7350000.0,"lengthMeters":234.1,"ratePesosPerMeter":31396.838957710574,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13225"},{"year":2026,"category":"Roads","project":"Bacolod North Rd - K0141 + 954 - K0143 + 120","amountPesos":19713000.0,"lengthMeters":1166.0,"ratePesosPerMeter":16906.518010291595,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13228"},{"year":2026,"category":"Roads","project":"Bukidnon-Davao City Rd K1565+031- K1565+161","amountPesos":9445000.0,"lengthMeters":130.0,"ratePesosPerMeter":72653.84615384616,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13232"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1543+663 - K1546+000","amountPesos":44957000.0,"lengthMeters":2337.0,"ratePesosPerMeter":19237.056054771074,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13234"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1553+160 -K1554+565","amountPesos":17638000.0,"lengthMeters":1405.0,"ratePesosPerMeter":12553.73665480427,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13236"},{"year":2026,"category":"Roads","project":"Sayre Highway - K1438 + 404 - K1440 + 319","amountPesos":20081000.0,"lengthMeters":1915.0,"ratePesosPerMeter":10486.16187989556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13239"},{"year":2026,"category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - (S01247MN) K1441 + (-840) - K1439 + 124","amountPesos":9638000.0,"lengthMeters":1036.0,"ratePesosPerMeter":9303.088803088804,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13242"},{"year":2026,"category":"Roads","project":"Off-carriageway Improvement including Drainage along Butuan City-Cagayan de Oro City-Iligan City Rd, K1436+300 - K1436+730, Brgy. Lapasan, Cagayan de Oro City","amountPesos":19276000.0,"lengthMeters":430.0,"ratePesosPerMeter":44827.90697674418,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13245"},{"year":2026,"category":"Roads","project":"Misamis Oriental-Ma Cristina Bdry Rd - K1513 + 277 - K1513 + 977","amountPesos":30203000.0,"lengthMeters":700.0,"ratePesosPerMeter":43147.142857142855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13248"},{"year":2026,"category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) (S00842MN) - K1698 + 100 - K1703 + 000","amountPesos":72479000.0,"lengthMeters":4900.0,"ratePesosPerMeter":14791.632653061224,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13252"},{"year":2026,"category":"Roads","project":"Rosario-Sn Juan Rd - K0141 + 656 - K0142 + 805","amountPesos":48111000.0,"lengthMeters":1149.0,"ratePesosPerMeter":41872.06266318538,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13259"},{"year":2026,"category":"Roads","project":"Siquijor-Bolos-San Juan Rd - K0063 + (-010) - K0064 + 620, K0064 + 620 - K0064 + 760, K0065 + 379 - K0065 + 589, K0065 + 726 - K0065 + 738, K0065 + 894 - K0065 + 925, K0066 + 016 - K0069 + 518, K0066+290 - K0069+518","amountPesos":51940000.0,"lengthMeters":5525.0,"ratePesosPerMeter":9400.904977375565,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13262"},{"year":2026,"category":"Roads","project":"Naval-Caibiran Cross Country Rd - K1037 + 708 - K1039 + 640, K1040 + 250 - K1040 + 578","amountPesos":72360000.0,"lengthMeters":2260.0,"ratePesosPerMeter":32017.699115044248,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13265"},{"year":2026,"category":"Roads","project":"CDO-Airport-Bukidnon K1447 + 917 - K1452 + 700","amountPesos":93490000.0,"lengthMeters":4783.0,"ratePesosPerMeter":19546.309847376124,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13268"},{"year":2026,"category":"Roads","project":"CDO-Airport-Bukidnon K1452 + 700 - K1457 + 700","amountPesos":96381000.0,"lengthMeters":5000.0,"ratePesosPerMeter":19276.2,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13270"},{"year":2026,"category":"Roads","project":"CDO-Airport-Bukidnon K1457 + 700 - K1462 + 000","amountPesos":83470000.0,"lengthMeters":4300.0,"ratePesosPerMeter":19411.627906976744,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13272"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1584+000 - K1589+600, K1590+250 - K1592+800","amountPesos":98000000.0,"lengthMeters":8150.0,"ratePesosPerMeter":12024.539877300613,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13275"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1648+150 - K1650+000, K1651+000 - K1655+0000, K1663+000 - K1664+400, K1661+250 - K1661+850","amountPesos":98000000.0,"lengthMeters":7850.0,"ratePesosPerMeter":12484.07643312102,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13277"},{"year":2026,"category":"Roads","project":"Filipino-American Friendship Ave.- K1666 + 145 - K1666 + 753, K1666 + 871 - K1667 + 492","amountPesos":17995000.0,"lengthMeters":1229.0,"ratePesosPerMeter":14641.985353946298,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13280"},{"year":2026,"category":"Roads","project":"Jct Digos-Buayan Airport Rd - K1649 + 000 - K1650 + 954","amountPesos":41031000.0,"lengthMeters":1954.0,"ratePesosPerMeter":20998.46468781986,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13282"},{"year":2026,"category":"Roads","project":"Carmen Jct-Bayambang-Manat Rd - K0197 + 763 - K0197 + 900","amountPesos":1987000.0,"lengthMeters":137.0,"ratePesosPerMeter":14503.649635036496,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13286"},{"year":2026,"category":"Roads","project":"Conner-Kabugao Rd - K0579 + 498 - K0579 + 550, K0579 + 571 - K0579 + 668, K0579 + 693 - K0579 + 784, K0579 + 847 - K0579 + 983","amountPesos":2940000.0,"lengthMeters":376.0,"ratePesosPerMeter":7819.148936170212,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13290"},{"year":2026,"category":"Roads","project":"Gibraltar Rd - K0252 + (-380) - K0252 + (-120)","amountPesos":980000.0,"lengthMeters":260.0,"ratePesosPerMeter":3769.230769230769,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13293"},{"year":2026,"category":"Roads","project":"Baguio-Bontoc Rd - K0288 + 050 - K0289 + 000","amountPesos":9321000.0,"lengthMeters":950.0,"ratePesosPerMeter":9811.578947368422,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13296"},{"year":2026,"category":"Roads","project":"Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0404 + 249 - K0404 + 850, K0405 + 640 - K0406 + 186","amountPesos":22545000.0,"lengthMeters":1147.0,"ratePesosPerMeter":19655.623365300784,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13299"},{"year":2026,"category":"Roads","project":"Nueva Vizcaya-Ifugao-Mt Province Rd - K0357 + 354 - K0358 + 486","amountPesos":14888000.0,"lengthMeters":1132.0,"ratePesosPerMeter":13151.943462897527,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13301"},{"year":2026,"category":"Roads","project":"Baguio-Bontoc Rd - K0345 + 863 - K0346 + 093, K0355 + 920 - K0356 + 088","amountPesos":10584000.0,"lengthMeters":398.0,"ratePesosPerMeter":26592.9648241206,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13304"},{"year":2026,"category":"Roads","project":"Baguio-Bontoc Rd - K0369 + 932 - K0370 + 095","amountPesos":7723000.0,"lengthMeters":163.0,"ratePesosPerMeter":47380.36809815951,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13306"},{"year":2026,"category":"Roads","project":"Baguio-Bontoc Rd - K0388 + 847 - K0388 + 912, K0390 + 030 - K0390 + 170","amountPesos":10716000.0,"lengthMeters":205.0,"ratePesosPerMeter":52273.170731707316,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13308"},{"year":2026,"category":"Roads","project":"Baguio-Bontoc Road- K0383+415-K0383+658, K0386+170-K0386+362","amountPesos":26950000.0,"lengthMeters":435.0,"ratePesosPerMeter":61954.02298850575,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13310"},{"year":2026,"category":"Roads","project":"Dantay-Sagada Rd - K0394 + 811 - K0395 + 175","amountPesos":11809000.0,"lengthMeters":364.0,"ratePesosPerMeter":32442.30769230769,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13312"},{"year":2026,"category":"Roads","project":"Mt Prov-Ilocos Sur via Tue Rd - K0414 + 820 - K0415 + 000, K0415 + 072 - K0415 + 438, K0415 + 758 - K0415 + 954","amountPesos":32340000.0,"lengthMeters":742.0,"ratePesosPerMeter":43584.90566037736,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13314"},{"year":2026,"category":"Roads","project":"Mt Province-N Vizcaya Rd - K0371 + 206 - K0371 + 306, K0372 + 067 - K0372 + 342, K0378 + 598 - K0378 + 660","amountPesos":12478000.0,"lengthMeters":437.0,"ratePesosPerMeter":28553.775743707094,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13316"},{"year":2026,"category":"Roads","project":"Sagada-Besao-Quirino Rd - (S03998LZ) Chainage 15560 - Chainage 15710, Chainage 20570 - Chainage 20670","amountPesos":6125000.0,"lengthMeters":250.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13318"},{"year":2026,"category":"Roads","project":"Angeles-Porac-Floridablanca-Dinalupihan Rd - K0089 + 443 - K0090 + 000","amountPesos":26739000.0,"lengthMeters":557.0,"ratePesosPerMeter":48005.385996409335,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13322"},{"year":2026,"category":"Roads","project":"Batangas-Lobo Rd - K0115 + 058 - K0116 + 212","amountPesos":33636000.0,"lengthMeters":1154.0,"ratePesosPerMeter":29147.3136915078,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13326"},{"year":2026,"category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0049 + 432 - K0051 + 125","amountPesos":14944000.0,"lengthMeters":1693.0,"ratePesosPerMeter":8826.93443591258,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13329"},{"year":2026,"category":"Roads","project":"Mindoro West Coastal Rd - K0324+579 - K0326+258","amountPesos":32907000.0,"lengthMeters":1679.0,"ratePesosPerMeter":19599.16617033949,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13333"},{"year":2026,"category":"Roads","project":"Catanduanes Cir Rd - K0027 + 152 - K0027 + 276","amountPesos":1094000.0,"lengthMeters":124.0,"ratePesosPerMeter":8822.58064516129,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13342"},{"year":2026,"category":"Roads","project":"Gate-Bulan Airport Rd - K0632 + 879 - K0633 + 000","amountPesos":1394000.0,"lengthMeters":121.0,"ratePesosPerMeter":11520.661157024793,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13345"},{"year":2026,"category":"Roads","project":"Siquijor Circumferential Rd - K0012 + 402 - K0013 + 000, K0023 + 739 - K0024 + 114, K0024 + 170 - K0024 + 722","amountPesos":16660000.0,"lengthMeters":1525.0,"ratePesosPerMeter":10924.590163934427,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13349"},{"year":2026,"category":"Roads","project":"Naval-Caibiran Cross Country Rd - K1026 + 470 - K1026 + 620","amountPesos":4824000.0,"lengthMeters":150.0,"ratePesosPerMeter":32160.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13363"},{"year":2026,"category":"Roads","project":"Catarman - Laoang Rd, K0772+519 - K0774+300","amountPesos":46311000.0,"lengthMeters":1781.0,"ratePesosPerMeter":26002.807411566537,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13366"},{"year":2026,"category":"Roads","project":"Catarman-Laoang Rd - K0765 + 600 - K0765 + 710","amountPesos":3447000.0,"lengthMeters":110.0,"ratePesosPerMeter":31336.363636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13368"},{"year":2026,"category":"Roads","project":"Pangpang - Palapag - Mapanas - Gamay- Lapinig Rd, K0803+745.70 - K0805+221","amountPesos":38592000.0,"lengthMeters":1475.3,"ratePesosPerMeter":26158.74737341475,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13370"},{"year":2026,"category":"Roads","project":"Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0805 + 690 - K0805 + 836, K0809 + 000 - K0809 + 200","amountPesos":12007000.0,"lengthMeters":346.0,"ratePesosPerMeter":34702.312138728324,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13372"},{"year":2026,"category":"Roads","project":"CDO-Port Road, K1438 + (-124) to K1438 + 500, Cagayan de Oro City","amountPesos":28914000.0,"lengthMeters":624.0,"ratePesosPerMeter":46336.53846153846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13376"},{"year":2026,"category":"Roads","project":"Montevista-Compostela-Mati Bdry Rd - K1432 + 240 - K1435 + 145","amountPesos":14342000.0,"lengthMeters":2905.0,"ratePesosPerMeter":4937.005163511188,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13380"},{"year":2026,"category":"Roads","project":"Nabunturan-Maragusan Rd - K1445 + 135 -  K1446 + 672, K1448 + 020 - K1448 + 906","amountPesos":14297000.0,"lengthMeters":2423.0,"ratePesosPerMeter":5900.536524969047,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13382"},{"year":2026,"category":"Roads","project":"Surigao del Sur Bdry-Davao Or Coastal Rd - K1626+100 - K1630+200, K1631+350-K1632+050","amountPesos":49000000.0,"lengthMeters":4800.0,"ratePesosPerMeter":10208.333333333334,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13385"},{"year":2026,"category":"Roads","project":"Midsayap-Marbel Rd - K1777 + 126 - K1780 + 469","amountPesos":32628000.0,"lengthMeters":3343.0,"ratePesosPerMeter":9760.095722405025,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13389"},{"year":2026,"category":"Roads","project":"Midsayap-Marbel Rd - K1791 + 000 - K1792 + 800","amountPesos":17585000.0,"lengthMeters":1800.0,"ratePesosPerMeter":9769.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13391"},{"year":2026,"category":"Roads","project":"Surigao-Davao Coastal Rd - K1176 + 000 - K1177 + 460","amountPesos":20985000.0,"lengthMeters":1460.0,"ratePesosPerMeter":14373.287671232876,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13402"},{"year":2026,"category":"Roads","project":"Muñoz-Lupao Rd - K0153 + 512 - K0153 + 723, K0153 + 827 - K0154 + 336","amountPesos":56840000.0,"lengthMeters":720.0,"ratePesosPerMeter":78944.44444444444,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13409"},{"year":2026,"category":"Roads","project":"Jct Donsol-Banuang Gurang Rd - K0579 + 904 - K0580 + 609, K0581 + 238 - K0582 + 437, K0583 + 230 - K0583 + 824, K0583 + 900 - K0585 + 431, K0585 + 447 - K0585 + 554, K0585 + 854 - K0587 + 043, K0589 + 902 - K0590 + 043, K0590 + 213 - K0590 + 336","amountPesos":58098000.0,"lengthMeters":5589.0,"ratePesosPerMeter":10395.061728395061,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13412"},{"year":2026,"category":"Roads","project":"Lanao del Norte Interior Circum. Rd (LDNICR) - K1619+000 - K1623+265, K1628+160 - K1629+600","amountPesos":71921000.0,"lengthMeters":5705.0,"ratePesosPerMeter":12606.660823838738,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13418"},{"year":2026,"category":"Roads","project":"Sn Nicolas-Natividad-Sn Quintin-Umingan-Guimba Rd. - K0212+000 - K0212+800, K0218+986 - K0219+532","amountPesos":32842000.0,"lengthMeters":1346.0,"ratePesosPerMeter":24399.702823179792,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13422"},{"year":2026,"category":"Roads","project":"Abra-Cervantes Road - K0433+000 - K0434+000, K0436+000 - K0439+000, K0445+000 - K0448+000, K0460+000 - K0460+889","amountPesos":49000000.0,"lengthMeters":7889.0,"ratePesosPerMeter":6211.180124223602,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13426"},{"year":2026,"category":"Roads","project":"Abra-Cervantes Road - K0462+700 - K0463+000, K0470+000 - K0470+560, K0473+000-K0478+733","amountPesos":49000000.0,"lengthMeters":6593.0,"ratePesosPerMeter":7432.124981040498,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13428"},{"year":2026,"category":"Roads","project":"Apayao-Kalinga-Abra Rd (Buluan-Sacpil-Wagud-Tawang-Salegseg Sect.) - (S00695LZ) Chainage 7539 - Chainage 7916","amountPesos":4900000.0,"lengthMeters":377.0,"ratePesosPerMeter":12997.3474801061,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13431"},{"year":2026,"category":"Roads","project":"Gov. Bado  Dangwa National Rd - K0300 + 170 - K0300 + 364, K0300 + 480 - K0300 + 559, K0300 + 690 - K0300 + 805, K0301 + 340 - K0302 + 336","amountPesos":8211000.0,"lengthMeters":1384.0,"ratePesosPerMeter":5932.803468208092,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13434"},{"year":2026,"category":"Roads","project":"Jct Potia-Mt Province Bdry Rd - K0451 + 387 - K0452 + 475, K0452 + 770 - K0452 + 938, K0452 + 963 - K0453 + 626, K0453 + 840 - K0454 + 100, K0454 + 150 - K0455 + 126","amountPesos":43767000.0,"lengthMeters":3155.0,"ratePesosPerMeter":13872.266244057053,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13437"},{"year":2026,"category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0396 + 730 - K0396 + 1286","amountPesos":34790000.0,"lengthMeters":556.0,"ratePesosPerMeter":62571.94244604316,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13440"},{"year":2026,"category":"Roads","project":"Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0456 + (-388) - K0456 + (-086)","amountPesos":19600000.0,"lengthMeters":302.0,"ratePesosPerMeter":64900.66225165563,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13442"},{"year":2026,"category":"Roads","project":"Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0458 + 192 - K0458 + 292","amountPesos":6860000.0,"lengthMeters":100.0,"ratePesosPerMeter":68600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13444"},{"year":2026,"category":"Roads","project":"Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0459 + 000 - K0459 + 480","amountPesos":32183000.0,"lengthMeters":480.0,"ratePesosPerMeter":67047.91666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13446"},{"year":2026,"category":"Roads","project":"Mayan-Mauyen Port Rd - K0001 + 626 - K0001 + 806","amountPesos":8077000.0,"lengthMeters":180.0,"ratePesosPerMeter":44872.22222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13450"},{"year":2026,"category":"Roads","project":"Gamu - Roxas Rd - K0396 + 310 - K0397 + 135","amountPesos":9310000.0,"lengthMeters":825.0,"ratePesosPerMeter":11284.848484848484,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13453"},{"year":2026,"category":"Roads","project":"Naguilian-Sn Mariano Rd - K0386 + 872 - K0386 + 972","amountPesos":1208000.0,"lengthMeters":100.0,"ratePesosPerMeter":12080.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13455"},{"year":2026,"category":"Roads","project":"Naguilian-Sn Mariano Rd - K0387 + 332 - K0388 + 185","amountPesos":6860000.0,"lengthMeters":853.0,"ratePesosPerMeter":8042.203985932005,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13457"},{"year":2026,"category":"Roads","project":"Alas-Asin Port Rd - K0156 + 526 - K0159 + 293","amountPesos":39101000.0,"lengthMeters":2767.0,"ratePesosPerMeter":14131.189013371883,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13461"},{"year":2026,"category":"Roads","project":"Bacoor-Dasmariñas National Rd - K0028 + 670 - K0028 + 970","amountPesos":9838000.0,"lengthMeters":300.0,"ratePesosPerMeter":32793.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13465"},{"year":2026,"category":"Roads","project":"Irosin-Sn Roque-Bulusan Lake Rd - K0633 + 790 - K0633 + 882","amountPesos":1078000.0,"lengthMeters":92.0,"ratePesosPerMeter":11717.391304347826,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13469"},{"year":2026,"category":"Roads","project":"Jct Donsol-Banuang Gurang Rd - K0582 + 437 - K0583 + 230","amountPesos":12668000.0,"lengthMeters":793.0,"ratePesosPerMeter":15974.779319041614,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13472"},{"year":2026,"category":"Roads","project":"Bacolod-City Bdry Rd - K0001 + 220 - K0001 + 390, K0002 + 000 - K0002 + 509","amountPesos":4284000.0,"lengthMeters":679.0,"ratePesosPerMeter":6309.278350515464,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13476"},{"year":2026,"category":"Roads","project":"Bacolod-City Bdry Rd - K0003 + 000 - K0006 + 220, K0007 + 130 - K0007 + 907","amountPesos":21237000.0,"lengthMeters":3997.0,"ratePesosPerMeter":5313.234926194646,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13478"},{"year":2026,"category":"Roads","project":"Bago-Mambucal Rd - K0037 + 817 - K0038 + 000, K0038 + 048 - K0038 + 656, K0039 + 100 - K0040 + 888, K0040 + 907 - K0043 + 000","amountPesos":35280000.0,"lengthMeters":4672.0,"ratePesosPerMeter":7551.369863013699,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13481"},{"year":2026,"category":"Roads","project":"Arteche-Jipapad-Las Navas-Rawis Rd - K0810 + 709 - K0811 + 700","amountPesos":27114000.0,"lengthMeters":991.0,"ratePesosPerMeter":27360.242179616547,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13485"},{"year":2026,"category":"Roads","project":"Rawis-Catubig Rd - K0790 + 189.30 - K0790 + 396.10, K0790 + 614 - K0790 + 823, K0791 + 299 - K0791 + 800","amountPesos":27654000.0,"lengthMeters":916.8,"ratePesosPerMeter":30163.612565447325,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13487"},{"year":2026,"category":"Roads","project":"Dobleston-Butadon Rd - K1997 + 520 - K1997 + 567, K2001 + 273 - K2001 + 355, K2006 + 670 - K2007 + 520","amountPesos":10278000.0,"lengthMeters":979.0,"ratePesosPerMeter":10498.46782431052,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13491"},{"year":2026,"category":"Roads","project":"Dipolog-Oroquieta National Rd - (S01066MN) Chainage 262 - Chainage 306","amountPesos":3293000.0,"lengthMeters":44.0,"ratePesosPerMeter":74840.90909090909,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13500"},{"year":2026,"category":"Roads","project":"Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0075 + 354 - K0075 + 418, K0067 + 646 - K0067 + 292, K0074 + 636 - K0075 + 295, K0077 + 430 - K0077 + 902, K0080 + 922 - K0081 + 896","amountPesos":65062000.0,"lengthMeters":2523.0,"ratePesosPerMeter":25787.554498612764,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13507"},{"year":2026,"category":"Roads","project":"Sagada-Besao-Quirino Rd - (S03998LZ) Chainage 26755 - Chainage 26965","amountPesos":14700000.0,"lengthMeters":210.0,"ratePesosPerMeter":70000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13511"},{"year":2026,"category":"Roads","project":"Sibuyan Circumferential Rd - K0039 + 033.40 - K0039 + 334, K0040 + 647 - K0040 + 651, K0040 + 673 - K0040 + 677","amountPesos":15397000.0,"lengthMeters":308.6,"ratePesosPerMeter":49893.065456902375,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13515"},{"year":2026,"category":"Roads","project":"Sibuyan Circumferential Rd - K0051 + 441 - K0051 + 554","amountPesos":5812000.0,"lengthMeters":113.0,"ratePesosPerMeter":51433.62831858407,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13517"},{"year":2026,"category":"Roads","project":"Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1338 + 766 - K1339 + 119.25","amountPesos":14210000.0,"lengthMeters":353.25,"ratePesosPerMeter":40226.468506723286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13521"},{"year":2026,"category":"Roads","project":"Lubuagan-Batong Buhay-Abra Bdry Rd - K0472 + 054 - K0473 + 658","amountPesos":66949000.0,"lengthMeters":1604.0,"ratePesosPerMeter":41738.77805486284,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13528"},{"year":2026,"category":"Roads","project":"PMA Cut Off Rd 6 - Chainage 840 - Chainage 2008","amountPesos":58181000.0,"lengthMeters":1168.0,"ratePesosPerMeter":49812.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13530"},{"year":2026,"category":"Roads","project":"Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 8919 - Chainage 10415, Chainage 12184 - Chainage 13000","amountPesos":81788000.0,"lengthMeters":2312.0,"ratePesosPerMeter":35375.43252595155,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13533"},{"year":2026,"category":"Roads","project":"Papaya - Malabing - WangaI - Binugawan - Tadji - Runrunoo Road - K0302 + 895 - K0303 + 210","amountPesos":11359000.0,"lengthMeters":315.0,"ratePesosPerMeter":36060.31746031746,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13535"},{"year":2026,"category":"Roads","project":"Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Rd (S01513MN) Chainage 4016 - Chainage 4831, Chainage 6568 - Chainage 8069, Chainage 13801 - Chainage 14397","amountPesos":88200000.0,"lengthMeters":2912.0,"ratePesosPerMeter":30288.46153846154,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13538"},{"year":2026,"category":"Roads","project":"Zamboanga del Sur Coastal Road (S01169MN) - Chainage 12925 - Chainage 13534, Chainage 19040 - Chainage 21127","amountPesos":62720000.0,"lengthMeters":2696.0,"ratePesosPerMeter":23264.094955489614,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13540"},{"year":2026,"category":"Roads","project":"Misamis Oriental-Bukidnon-Agusan Road K1460 + 678 - K1460 + 868","amountPesos":54937000.0,"lengthMeters":190.0,"ratePesosPerMeter":289142.1052631579,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13543"},{"year":2026,"category":"Roads","project":"Lanao del Norte Interior Circum. Rd (LDNICR) - (S00969MN)  Chainage 2526 - Chainage 5910","amountPesos":116187000.0,"lengthMeters":3384.0,"ratePesosPerMeter":34334.21985815603,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13545"},{"year":2026,"category":"Roads","project":"Lanao del Norte Interior Circum. Rd (LDNICR) - (S00969MN) Chainage 890 - Chainage 2526","amountPesos":56211000.0,"lengthMeters":1636.0,"ratePesosPerMeter":34358.80195599022,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13547"},{"year":2026,"category":"Roads","project":"Misamis Oriental-Bukidnon-Agusan Road - K1451 + 753 - K1452 + 076, K1459 + 376 - K1460 + 000","amountPesos":67467000.0,"lengthMeters":947.0,"ratePesosPerMeter":71242.8722280887,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13549"},{"year":2026,"category":"Roads","project":"Mountain Province-Cervantes, Ilocos Sur via Dacudac-Pilipil Rd - (S04033LZ) Chainage 21149 - Chainage 21539","amountPesos":29400000.0,"lengthMeters":390.0,"ratePesosPerMeter":75384.61538461539,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13553"},{"year":2026,"category":"Roads","project":"Paracelis-Mallig-Roxas Rd - (S04031LZ) Chainage 7797 - Chainage 9006","amountPesos":49000000.0,"lengthMeters":1209.0,"ratePesosPerMeter":40529.36311000827,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13556"},{"year":2026,"category":"Roads","project":"Lubuagan- Batong Buhay- Abra Bdry Rd- K0470+888- K0471+084","amountPesos":9800000.0,"lengthMeters":196.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13559"},{"year":2026,"category":"Roads","project":"Lubuagan-Batong Buhay-Abra Bdry Rd - K0474 + 909 - K0475 + 119, K0475 + 211 - K0475 + 823","amountPesos":33515000.0,"lengthMeters":822.0,"ratePesosPerMeter":40772.50608272506,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13561"},{"year":2026,"category":"Roads","project":"Lubuagan-Batong Buhay-Abra Bdry Rd - K0476 + 2881.50 - K0476 + 3331.50","amountPesos":18237000.0,"lengthMeters":450.0,"ratePesosPerMeter":40526.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13563"},{"year":2026,"category":"Roads","project":"Baybayog - Baggao - Dalin -Sta. Margarita Rd. - K0554+112 - K0554+217, K0554+303 - K0554+508","amountPesos":9800000.0,"lengthMeters":310.0,"ratePesosPerMeter":31612.90322580645,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13567"},{"year":2026,"category":"Roads","project":"Jct. Gattaran - Cumao - Capissayan - Sta. Margarita - Bolos Pt. Rd. -  K0577+171- K0577+240, K0577+328 - K0577+570, K0579+274-K0579+423, K0579+447-K0579+537","amountPesos":19237000.0,"lengthMeters":550.0,"ratePesosPerMeter":34976.36363636364,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13569"},{"year":2026,"category":"Roads","project":"Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 7960 - Chainage 8797","amountPesos":29080000.0,"lengthMeters":837.0,"ratePesosPerMeter":34743.130227001195,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13572"},{"year":2026,"category":"Roads","project":"Sablayan-Penal Colony Rd (S00101MR) - K0337+222 - K0337+302","amountPesos":2376000.0,"lengthMeters":80.0,"ratePesosPerMeter":29700.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13576"},{"year":2026,"category":"Roads","project":"Sta. Elena-Capalonga By Pass Coastal Rd - K0276 + 744 - K0277 + 015","amountPesos":14467000.0,"lengthMeters":271.0,"ratePesosPerMeter":53383.76383763838,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13580"},{"year":2026,"category":"Roads","project":"Sta. Elena-Capalonga By Pass Coastal Rd - K0277 + 169 - K0277 + 358, K0279 + 491 - K0279 + 512, K0279 + 774 - K0279 + 868","amountPesos":17927000.0,"lengthMeters":304.0,"ratePesosPerMeter":58970.39473684211,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13582"},{"year":2026,"category":"Roads","project":"Jct (LIR) Buenavista-Carmen-Danao-Jetafe Rd - K0162 + 335 - K0162 + 516, K0162 + 537 - K0162 + 807","amountPesos":29070000.0,"lengthMeters":451.0,"ratePesosPerMeter":64456.762749445676,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13586"},{"year":2026,"category":"Roads","project":"Sindangan - Bayog - Lakewood Rd - Chainage 2730 - Chainage 3718","amountPesos":38588000.0,"lengthMeters":988.0,"ratePesosPerMeter":39056.68016194332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13590"},{"year":2026,"category":"Roads","project":"Sindangan-Bayog-Lakewood Rd S01173MN - K1726 + 16832 - K1726 + 16962","amountPesos":12250000.0,"lengthMeters":130.0,"ratePesosPerMeter":94230.76923076923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13593"},{"year":2026,"category":"Roads","project":"Tubod-Ganassi Rd - (S00938MN) Chainage 1070 - Chainage 1396, Chainage 1545 - Chainage 1638","amountPesos":20501000.0,"lengthMeters":419.0,"ratePesosPerMeter":48928.40095465394,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13597"},{"year":2026,"category":"Roads","project":"Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN)  Chainage 14883 - Chainage 15883","amountPesos":34357000.0,"lengthMeters":1000.0,"ratePesosPerMeter":34357.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13600"},{"year":2026,"category":"Roads","project":"Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN)  Chainage 15883 - Chainage 16413","amountPesos":18210000.0,"lengthMeters":530.0,"ratePesosPerMeter":34358.49056603773,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13602"},{"year":2026,"category":"Roads","project":"Surallah-Lake Sebu-Maitum Rd (S00838MN) K1781 + 470.90 - K1781 + 660","amountPesos":19539000.0,"lengthMeters":189.1,"ratePesosPerMeter":103326.28239021881,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13606"},{"year":2026,"category":"Bridges","project":"Completion of Parallel Buluan Br. (B02157MN) along Kidapawan-Allah Juntion Rd, K1658 + 710 - K1658 + 771","amountPesos":17585000.0,"lengthMeters":61.0,"ratePesosPerMeter":288278.68852459016,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13756"},{"year":2026,"category":"Bridges","project":"Replacement of Bulit Br. (B02151MN) along Davao-Cotabato Rd. (Jct Digos-Cotabato Sect), K1655 + (-900)  -  K1655 + (-880)","amountPesos":30480000.0,"lengthMeters":20.0,"ratePesosPerMeter":1524000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13772"},{"year":2026,"category":"Bridges","project":"San Vicente Br., Sta. Rita, Pampanga, Sta. 0 + 000 - Sta. 0 + 018.50","amountPesos":29400000.0,"lengthMeters":18.5,"ratePesosPerMeter":1589189.189189189,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 13821"},{"year":2026,"category":"Bridges","project":"Ambayaoan Bridge, Sta.0+000 - Sta.0+405, San Nicolas, Pangasinan","amountPesos":29400000.0,"lengthMeters":405.0,"ratePesosPerMeter":72592.5925925926,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 14773"},{"year":2026,"category":"Bridges","project":"Aliwanay Br. (B00677CB) along Toledo-Tabuelan-Sn Remigio Rd, K0061+832 - K0061+861, Brgy. Pondol, Brgy. Aliwanay, Balamban, Cebu","amountPesos":9698000.0,"lengthMeters":29.0,"ratePesosPerMeter":334413.7931034483,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15008"},{"year":2026,"category":"Bridges","project":"Barili Br. (B00679CB) along Carcar Barili Rd, K0060+535 - K0060+579, Brgy. Sta. Ana, Barili, Cebu","amountPesos":9698000.0,"lengthMeters":44.0,"ratePesosPerMeter":220409.0909090909,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15010"},{"year":2026,"category":"Bridges","project":"Caridad Br. (B00678CB) along Toledo-Tabuelan-Sn Remigio Rd, K0089+448 - K0089+491, Brgy. Caridad, Tuburan, Cebu","amountPesos":9698000.0,"lengthMeters":43.0,"ratePesosPerMeter":225534.88372093023,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15012"},{"year":2026,"category":"Bridges","project":"Pondol Br. (B00534CB) along Toledo-Tabuelan-Sn Remigio Rd, K0060+565 - K0060+604, Brgy. Abucayan, Brgy. Pondol, Balamban, Cebu","amountPesos":9698000.0,"lengthMeters":39.0,"ratePesosPerMeter":248666.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15014"},{"year":2026,"category":"Bridges","project":"Naguilian Parallel Br. K0265+817-K0265+961.65 along Bauang-Baguio Rd","amountPesos":230291000.0,"lengthMeters":144.65,"ratePesosPerMeter":1592056.6885583336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15240"},{"year":2026,"category":"Bridges","project":"Dalibubon Parallel Br. (B01203LZ), Sta. 0+000 - Sta. 0+440, along Jct Ipil-Quirino Bdry Rd","amountPesos":73500000.0,"lengthMeters":440.0,"ratePesosPerMeter":167045.45454545456,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15253"},{"year":2026,"category":"Bridges","project":"Ibo Br. (B00555CB) along Toledo-Pinamungahan-Aloguinsan-Mantalongon Rd, K0050+651 - K0050+932, Brgy. Ibo, Toledo City, Cebu","amountPesos":72524000.0,"lengthMeters":281.0,"ratePesosPerMeter":258092.52669039145,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15354"},{"year":2026,"category":"Bridges","project":"Talavera Br. (B00661CB) along Toledo-Tabuelan-Sn Remigio Rd, K0050+590 - K0050+905, Brgy. Talavera, Toledo City, Cebu","amountPesos":81590000.0,"lengthMeters":315.0,"ratePesosPerMeter":259015.87301587302,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15356"},{"year":2026,"category":"Bridges","project":"Daguitan Parallel Br., K0975 + 360 - K0975 + 499.70 along Jaro-Dagami-Burauen-La Paz Road","amountPesos":137200000.0,"lengthMeters":139.7,"ratePesosPerMeter":982104.5096638921,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15363"},{"year":2026,"category":"Bridges","project":"Completion of Parallel Kabulnan Br. (B02177MN) along Maharlika Highway (Marbel-Allah Valley-Cotabato Rd), K1796 + 049 - K1796 + 125","amountPesos":32825000.0,"lengthMeters":76.0,"ratePesosPerMeter":431907.8947368421,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15425"},{"year":2026,"category":"Bridges","project":"Pancian Viaduct, K0 578+755 - K0579+295 along Manila, Ilocos Norte","amountPesos":829496000.0,"lengthMeters":540.0,"ratePesosPerMeter":1536103.7037037036,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15812"},{"year":2026,"category":"Bridges","project":"Ampalioc Br. along  Abra-Cervantes Road (Phase II), K0477+730 - K0477+880, Brgy. Ampalioc, Luba, Abra","amountPesos":68600000.0,"lengthMeters":150.0,"ratePesosPerMeter":457333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15815"},{"year":2026,"category":"Bridges","project":"Bulo Br. 4 along Malalao National Road (Agbannawag-Malalao-Bulo Sect), K0512+111 - K0512+178, Brgy. Bulo, Tabuk, Kalinga","amountPesos":7713000.0,"lengthMeters":67.0,"ratePesosPerMeter":115119.40298507463,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15817"},{"year":2026,"category":"Bridges","project":"Tuburan Br. (Sta. Maria), (K0075 + 000 - K0075 + 160) including approaches along Tablas Circumferential Rd, Sta. Maria, Romblon","amountPesos":116639000.0,"lengthMeters":160.0,"ratePesosPerMeter":728993.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15836"},{"year":2026,"category":"Bridges","project":"Cabanbanan Br., Along Nabua-Balatan Road, K0489+350 - K0489+375","amountPesos":64000000.0,"lengthMeters":25.0,"ratePesosPerMeter":2560000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15839"},{"year":2026,"category":"Bridges","project":"Irosin Viaduct along Maharlika Highway, Salvacion, Irosin Sorsogon, K0625+040.00 - K0625+290.00","amountPesos":150000000.0,"lengthMeters":250.0,"ratePesosPerMeter":600000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15841"},{"year":2026,"category":"Bridges","project":"Laganac Br., Along Nabua- Balatan Road, K0490+785 - K0490+860","amountPesos":145000000.0,"lengthMeters":75.0,"ratePesosPerMeter":1933333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15843"},{"year":2026,"category":"Bridges","project":"Poblacion/Barrera Jr Br. along Cabutagan-Haluban-Sooc Road, K0389+760 - K0389+910 (Package 1)","amountPesos":105000000.0,"lengthMeters":150.0,"ratePesosPerMeter":700000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15845"},{"year":2026,"category":"Bridges","project":"Viaduct along Daang Maharlika, Barangay Beguito Viejo - Barangay Beguito Nuevo, Libmanan, Camarines Sur, K0397+575.75 - K0397+827.79","amountPesos":145000000.0,"lengthMeters":252.04,"ratePesosPerMeter":575305.5070624189,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15847"},{"year":2026,"category":"Bridges","project":"Viaduct along Daang Maharlika, Barangay Beguito Viejo, Libmanan, Camarines Sur, K0397+332.37 - K0397+575.75","amountPesos":149390000.0,"lengthMeters":243.38,"ratePesosPerMeter":613813.7891363183,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15849"},{"year":2026,"category":"Bridges","project":"Agpipili Br. along Tapaz-Jamindan-Altavas Rd, Sta. 88+840 - Sta. 88+990","amountPesos":137821000.0,"lengthMeters":150.0,"ratePesosPerMeter":918806.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15852"},{"year":2026,"category":"Bridges","project":"Maranlig Br. 2 along Dr. Damian Reyes Rd (Torrijos Side), K0058+003 - K0058+028","amountPesos":48110000.0,"lengthMeters":25.0,"ratePesosPerMeter":1924400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15893"},{"year":2026,"category":"Bridges","project":"Danao Br. (K0071 + 960 - K0072 + 180.00) including approaches along Sibuyan Circumferential Rd, Brgy. Danao, Cajidiocan, Romblon","amountPesos":45798000.0,"lengthMeters":220.0,"ratePesosPerMeter":208172.72727272726,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15896"},{"year":2026,"category":"Bridges","project":"Matanlang Br.  along Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd K0326+680.40 - K0326+711","amountPesos":30000000.0,"lengthMeters":30.6,"ratePesosPerMeter":980392.156863491,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15900"},{"year":2026,"category":"Bridges","project":"Madum Br. (FB00405MN), K2030 + 387 - K2030 + 417, along Liloy-Siocon Rd","amountPesos":44410000.0,"lengthMeters":30.0,"ratePesosPerMeter":1480333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15904"},{"year":2026,"category":"Bridges","project":"Baganian 2 Br. (FB42028MN) along Zamboanga del Sur Coastal Road Sta. 1+180 - Sta. 1+200","amountPesos":21560000.0,"lengthMeters":20.0,"ratePesosPerMeter":1078000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15907"},{"year":2026,"category":"Bridges","project":"Kalilangan Br. K1719 + 090 - K1719 + 110, along Zamboanga del Sur Coastal Rd","amountPesos":27756000.0,"lengthMeters":20.0,"ratePesosPerMeter":1387800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15909"},{"year":2026,"category":"Roads","project":"Paoay-Laoag International Airport Access Road, Sta. 2 + 700 - Sta. 7 + 620, Sta. 8 + 260 - Sta. 8 + 562.25, Paoay, Ilocos Norte","amountPesos":159512000.0,"lengthMeters":5222.25,"ratePesosPerMeter":30544.68859208196,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15934"},{"year":2026,"category":"Roads","project":"Access Road leading to Palanan Airport (Sta. 3+760 - Sta. 7+849), Palanan, Isabela","amountPesos":136314000.0,"lengthMeters":4089.0,"ratePesosPerMeter":33336.75715333822,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15937"},{"year":2026,"category":"Roads","project":"Bantulan-Sandoval Airport Access Road, Sta. 22+601.00 - Sta. 23+774.96, Taytay, Palawan","amountPesos":44832000.0,"lengthMeters":1173.96,"ratePesosPerMeter":38188.694674435275,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15940"},{"year":2026,"category":"Roads","project":"Marufinas-Caruray-Port Barton Road leading to San Vicente Airport, San Vicente, Palawan Sta. 1+921.00 - Sta. 3+841.42","amountPesos":64768000.0,"lengthMeters":1920.42,"ratePesosPerMeter":33725.955780506345,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15944"},{"year":2026,"category":"Roads","project":"Jct. DM (Tabon-Tabon)-Mariawa-Homapon-Maslog-Lamba-Puro Road leading to Bicol International Airport (Maslog-Lamba Section), Legazpi City, Albay, Sta. 541+700 - Sta. 542+611","amountPesos":49000000.0,"lengthMeters":911.0,"ratePesosPerMeter":53787.04720087816,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15947"},{"year":2026,"category":"Roads","project":"Access Road leading to Francisco B. Reyes Airport (Brgy. San Nicolas to Brgy. Decalachao), Sta. 23+334.70 - Sta. 23+638.898, Coron, Palawan","amountPesos":12278000.0,"lengthMeters":304.198,"ratePesosPerMeter":40361.86957179201,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15953"},{"year":2026,"category":"Roads","project":"New Quezon-Cheey-San Jose-Decalachao Road leading to Busuanga Airport, Sta 45+290.00 - Sta. 46+076.22 - Sta. 46+178.50 - Sta. 46+548.68, Sta 46+811.45 - Sta. 46+827.05, Busuanga, Palawan","amountPesos":41511000.0,"lengthMeters":1172.0,"ratePesosPerMeter":35418.941979521966,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15957"},{"year":2026,"category":"Roads","project":"Access Road leading to Balabac Port, Sta. 0+509 - Sta. 0+710, Balabac, Palawan","amountPesos":16604000.0,"lengthMeters":201.0,"ratePesosPerMeter":82606.96517412935,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15960"},{"year":2026,"category":"Roads","project":"Ilocos Fly-in Cruise Road, Sta. 1 + 096 - Sta. 5 + 000, Currimao and Paoay, Ilocos Norte","amountPesos":38669000.0,"lengthMeters":3904.0,"ratePesosPerMeter":9904.969262295082,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15967"},{"year":2026,"category":"Roads","project":"Access Road leading to Mauyen Port (Sta. 0+602.00 - Sta. 0+902.00), Itbayat, Batanes","amountPesos":94102000.0,"lengthMeters":300.0,"ratePesosPerMeter":313673.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15970"},{"year":2026,"category":"Roads","project":"Calibuyo Road leading to Cavite Gateway Terminal, Chainage 315 - 1032.44, Tanza, Cavite","amountPesos":131659000.0,"lengthMeters":717.44,"ratePesosPerMeter":183512.21008028544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15973"},{"year":2026,"category":"Roads","project":"Jct. Guijalo-San Vicente Road leading to San Vicente Port, Caramoan, Camarines Sur, Sta. 9+220 - Sta.9+868-Section 1, Sta. 9+200 - Sta.9+362-Section 2","amountPesos":58574000.0,"lengthMeters":668.0,"ratePesosPerMeter":87685.62874251496,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15982"},{"year":2026,"category":"Roads","project":"San Isidro-Bahao Road leading to Bahao Port - Sta. 406+564 to Sta. 408+214, Barangay San Isidro - Barangay Malinao, Libmanan, Camarines Sur","amountPesos":134131000.0,"lengthMeters":1650.0,"ratePesosPerMeter":81291.51515151515,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15984"},{"year":2026,"category":"Roads","project":"Access Road leading to Maribojoc Port (Sta. 000 + 346.00 - Sta. 000 + 392.00), Maribojoc, Bohol","amountPesos":19380000.0,"lengthMeters":46.0,"ratePesosPerMeter":421304.347826087,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15987"},{"year":2026,"category":"Roads","project":"Nasipit-Buenavista-Masao Port Coastal Road leading to Masao Port, (3+090 - 3+490), Buenavista, Agusan del Norte","amountPesos":49000000.0,"lengthMeters":400.0,"ratePesosPerMeter":122500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15990"},{"year":2026,"category":"Roads","project":"Nasipit-Buenavista-Masao Port Coastal Road leading to Masao Port, (1+240 - 1+450), Butuan City, Agusan del Norte","amountPesos":185325000.0,"lengthMeters":210.0,"ratePesosPerMeter":882500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15992"},{"year":2026,"category":"Roads","project":"Access Road leading to Tachimus Port (Sta. 1+336 - Sta. 1+398), Itbayat, Batanes","amountPesos":4544000.0,"lengthMeters":62.0,"ratePesosPerMeter":73290.32258064517,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 15996"},{"year":2026,"category":"Roads","project":"Construction of Road leading to Liminangcong Port, Sta. 1+206 - Sta. 2+454, Taytay, Palawan","amountPesos":50000000.0,"lengthMeters":1248.0,"ratePesosPerMeter":40064.10256410256,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16000"},{"year":2026,"category":"Roads","project":"Karangahan Boulevard Road, Tabaco City, Albay, Sta. 1+729 - Sta. 1+996","amountPesos":19525000.0,"lengthMeters":267.0,"ratePesosPerMeter":73127.34082397004,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16004"},{"year":2026,"category":"Roads","project":"Access Road leading to Ubay Port via Reclamation Area, Ubay, Bohol Sta. 1+500.00-Sta. 1+600 and Sta. 1+640.00-Sta 1+740.00","amountPesos":29093000.0,"lengthMeters":200.0,"ratePesosPerMeter":145465.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16008"},{"year":2026,"category":"Roads","project":"Argawanon Road leading to Hagnaya Wharf, Sta. 000+298 - Sta. 000+378, San Remigio, Cebu","amountPesos":20249000.0,"lengthMeters":80.0,"ratePesosPerMeter":253112.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16011"},{"year":2026,"category":"Roads","project":"Panabo Wharf Road, Panabo City, Davao del Norte - 0+000 - 0+233","amountPesos":10093000.0,"lengthMeters":233.0,"ratePesosPerMeter":43317.59656652361,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16015"},{"year":2026,"category":"Roads","project":"Access Road leading to Doña Helene Port, Bucas Grande Island, Section 1 - Sta. 7+434.13 - Sta. 8+420, Section 2 - Sta. 6+114.87 - Sta. 6+400, Socorro, Surigao del Norte","amountPesos":50000000.0,"lengthMeters":1271.0,"ratePesosPerMeter":39339.10306845004,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16019"},{"year":2026,"category":"Roads","project":"Access Road leading to Guiguinto Station, Felville Subdivision-Felville 1 & 2, Guiguinto, Bulacan, Sta. 0 + 000 - Sta. 0 + 859, and Sta. 0 + 000 - Sta. 1 + 831","amountPesos":56486000.0,"lengthMeters":1831.0,"ratePesosPerMeter":30849.80884762425,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16028"},{"year":2026,"category":"Roads","project":"Access Road leading to Marilao Station, Lias Road, Sta. 00+000 - Sta. 01+600, Marilao, Bulacan","amountPesos":84084000.0,"lengthMeters":1600.0,"ratePesosPerMeter":52552.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16030"},{"year":2026,"category":"Roads","project":"Access Road leading to Meycauayan and Marilao Station, Meycauayan-Marilao Road, Sta. 00+000 - Sta. 02+918, Marilao and Meycauayan City, Bulacan","amountPesos":98000000.0,"lengthMeters":2918.0,"ratePesosPerMeter":33584.64701850583,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16032"},{"year":2026,"category":"Roads","project":"Access Road leading to Guiguinto Station, Chico Street, Guiguinto, Bulacan, Sta. 0 + 000 - Sta. 0 + 225","amountPesos":12427000.0,"lengthMeters":225.0,"ratePesosPerMeter":55231.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16036"},{"year":2026,"category":"Roads","project":"Access Road leading to Guiguinto Station, Gladiola Street, Guiguinto, Bulacan, Sta. 0 + 000 - Sta. 0 + 270","amountPesos":2824000.0,"lengthMeters":270.0,"ratePesosPerMeter":10459.25925925926,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16038"},{"year":2026,"category":"Roads","project":"Access Road leading to Guiguinto Station, Ilang-Ilang Street, Guiguinto, Bulacan, Sta. 0 + 000 - Sta. 0 + 324","amountPesos":18075000.0,"lengthMeters":324.0,"ratePesosPerMeter":55787.03703703704,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16040"},{"year":2026,"category":"Roads","project":"Access Road leading to Guiguinto Station, Lanzones Street, Guiguinto, Bulacan, Sta. 0 + 000 - Sta. 0 + 486","amountPesos":27113000.0,"lengthMeters":486.0,"ratePesosPerMeter":55788.0658436214,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16042"},{"year":2026,"category":"Roads","project":"Access Road leading to Guiguinto Station, Maunlad Homes Subdivision-Street 1, Street 2 and Street 3, Guiguinto, Bulacan, Sta. 0 + 000 - Sta. 0 + 337","amountPesos":12427000.0,"lengthMeters":337.0,"ratePesosPerMeter":36875.37091988131,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16044"},{"year":2026,"category":"Roads","project":"Access Road leading to Guiguinto Station, San Antonio Street, Guiguinto, Bulacan, Sta. 0 + 000 - Sta. 0 + 330","amountPesos":10732000.0,"lengthMeters":330.0,"ratePesosPerMeter":32521.21212121212,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16046"},{"year":2026,"category":"Roads","project":"Access Road leading to Marilao Station, Marilao Diversion Road, Sta. 00+000 - Sta. 00+200, Marilao, Bulacan","amountPesos":21403000.0,"lengthMeters":200.0,"ratePesosPerMeter":107015.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16049"},{"year":2026,"category":"Roads","project":"Access Road leading to Angel Cave and Alicupen Beach, Sta. 13 + 783 - Sta.14 + 283, Bani, Pangasinan","amountPesos":12084000.0,"lengthMeters":500.0,"ratePesosPerMeter":24168.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16056"},{"year":2026,"category":"Roads","project":"Access Road leading to Mapita Tribal Community and View Deck to Nayong Aguilar (Ylang-Ylang Plantation and Agri-Tourism Destination), Barangay Laoag, Sta. 11 + 120 - Sta. 11 + 920, Aguilar, Pangasinan","amountPesos":14501000.0,"lengthMeters":800.0,"ratePesosPerMeter":18126.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16060"},{"year":2026,"category":"Roads","project":"Access Road leading to San Fabian Beach, Sta. 11 + 120 - Sta. 11 + 920, San Fabian, Pangasinan","amountPesos":4402000.0,"lengthMeters":800.0,"ratePesosPerMeter":5502.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16062"},{"year":2026,"category":"Roads","project":"Access Road leading to Sangbay Falls and Mini Rice Terraces, Barangay. Gusing Sur, Sta. 0 + 760 - Sta. 0 + 960, Naguilian, La Union","amountPesos":4350000.0,"lengthMeters":200.0,"ratePesosPerMeter":21750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16064"},{"year":2026,"category":"Roads","project":"Bucao-Amontoc Access Road leading to Tangadan Falls, Barangay. Bucao, Sta. 2 + 189 - Sta. 2 + 404, San Gabriel, La Union","amountPesos":4350000.0,"lengthMeters":215.0,"ratePesosPerMeter":20232.558139534885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16066"},{"year":2026,"category":"Roads","project":"Construction of Access Road leading to Minor Basilica of St. Dominic De Guzman, San Carlos City, Pangasinan Sta. 1+110 - Sta. 2+348","amountPesos":62838000.0,"lengthMeters":1238.0,"ratePesosPerMeter":50757.67366720517,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16068"},{"year":2026,"category":"Roads","project":"Construction of Access Road leading to St. Vincent Ferrer Statue, Bayambang, Pangasinan Sta. 5+756 - Sta. 8+560","amountPesos":62838000.0,"lengthMeters":2804.0,"ratePesosPerMeter":22410.128388017118,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16070"},{"year":2026,"category":"Roads","project":"Laguit Padilla Road leading to Mt. Zion Pilgrim, Ecotourism Parks & Besay Falls, Barangay Laguit Padilla, Sta. 1 + 080 - Sta. 1 + 605, Bugallon, Pangasinan","amountPesos":14501000.0,"lengthMeters":525.0,"ratePesosPerMeter":27620.95238095238,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16072"},{"year":2026,"category":"Roads","project":"Poblacion-Sto Niño Access Road leading to Madongan Dam, Nueva Era, Ilocos Norte, Sta. 3+841 - Sta. 3+866, Sta 6+974-Sta 7+004, Sta. 8+893 - Sta. 9+473","amountPesos":62940000.0,"lengthMeters":635.0,"ratePesosPerMeter":99118.11023622047,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16074"},{"year":2026,"category":"Roads","project":"Vigan Boardwalk Road leading to the Heritage Village, Sta. 0+973 - Sta. 1+192.20, Sta. 1+292.26 - Sta.1+747.26, Vigan City, Ilocos Sur","amountPesos":4350000.0,"lengthMeters":674.2,"ratePesosPerMeter":6452.091367546722,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16076"},{"year":2026,"category":"Roads","project":"Caglayan-Paddig-Cupis Road leading to Nabuangan River, Banselan Cave, Cupis Loomweaving, Sta.7+543.00 - Sta. 8+933, Brgy. Caglayan (New Pob.), Conner, Apayao","amountPesos":68110000.0,"lengthMeters":1390.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16079"},{"year":2026,"category":"Roads","project":"Access Road leading to Garaw-Garaw Falls, Kittag,Sta. 1+277 - Sta. 1+313,Sanchez Mira, Cagayan","amountPesos":49000000.0,"lengthMeters":36.0,"ratePesosPerMeter":1361111.111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16082"},{"year":2026,"category":"Roads","project":"Access Road leading to Tayak Hills, Sta. 00 + 640 - Sta. 00 + 860, Sta. 01 + 044 - Sta. 01 + 219, Tanaw de Rizal, Laguna","amountPesos":14054000.0,"lengthMeters":395.0,"ratePesosPerMeter":35579.74683544304,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16085"},{"year":2026,"category":"Roads","project":"(Sua-Laboy Access) Bulan-Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park, Sorsogon, Sta. 1+340 - Sta. 2+225","amountPesos":58574000.0,"lengthMeters":885.0,"ratePesosPerMeter":66185.31073446327,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16088"},{"year":2026,"category":"Roads","project":"Bulan-Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park (Matnog Section) Bulan, Sorsogon, K0660 + 176 - K0660 + 736","amountPesos":46369000.0,"lengthMeters":560.0,"ratePesosPerMeter":82801.78571428571,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16090"},{"year":2026,"category":"Roads","project":"Daet-Basud-Mercedes Coastal Road leading to Lanot Soda Spring, Colasi Falls, Mangcamagong Beach, and Mercedes Group of Islands, Sta. 0+000 - Sta. 0+227, Mercedes, Camarines Norte","amountPesos":4393000.0,"lengthMeters":227.0,"ratePesosPerMeter":19352.422907488988,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16092"},{"year":2026,"category":"Roads","project":"Donsol-Pilar-Castilla-Sorsogon City (DONPICASO) Tourism Highway, Sta. 44+433 - Sta. 45+646","amountPesos":73218000.0,"lengthMeters":1213.0,"ratePesosPerMeter":60361.08821104699,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16098"},{"year":2026,"category":"Roads","project":"Matnog-Bulan-Magallanes Tourism West Coast Highway (Matnog-Bulan Side), Sorsogon, Sta. 7+445 - Sta. 8+030","amountPesos":97624000.0,"lengthMeters":585.0,"ratePesosPerMeter":166878.63247863247,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16100"},{"year":2026,"category":"Roads","project":"San Antonio Road along San Antonio, Milaor-Camarines Sur Watersports Complex (CWC), San Antonio Br. 1, Pili Road - Sta. 0+067.70 - Sta. 0+111.10, San Antonio, Milaor, Camarines Sur","amountPesos":63700000.0,"lengthMeters":43.4,"ratePesosPerMeter":1467741.9354838713,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16102"},{"year":2026,"category":"Roads","project":"Pinagtigasan to Mahabang Buhangin Road leading to White Sand beaches, Calaguas Island, Sta. 2+811 - Sta. 2+824, Brgy. Mangcawayan, Vinzons, Camarines Norte","amountPesos":4410000.0,"lengthMeters":13.0,"ratePesosPerMeter":339230.76923076925,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16106"},{"year":2026,"category":"Roads","project":"Access Road leading to Cinchona Reforestation Area, Barangay Kaatuan, Sta. 2+490 - Sta. 2+582, Lantapan, Bukidnon","amountPesos":9164000.0,"lengthMeters":92.0,"ratePesosPerMeter":99608.69565217392,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16117"},{"year":2026,"category":"Roads","project":"Island Garden City of Samal (IGACOS) Circumferential Road, Sta. 1523+054.388 - Sta. 1523+268.738, Sta. 1523+354.149 - Sta. 1523+391.257, Davao del Norte","amountPesos":3845000.0,"lengthMeters":251.458,"ratePesosPerMeter":15290.823914936183,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16120"},{"year":2026,"category":"Roads","project":"Access Road leading to Don Bosco Biodynamic Farm Sta. 4 + 080 - Sta. 4 + 630 , Sanggawan Falls and Hot spring, Brgy. Batasan, Makilala, North Cotabato","amountPesos":48616000.0,"lengthMeters":550.0,"ratePesosPerMeter":88392.72727272728,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16123"},{"year":2026,"category":"Roads","project":"Access Road leading to the Tourist Spots and Centers, Barangay. San Joaquin (Sta. 1+125.70 - Sta. 1+170), Sarrat, Ilocos Norte","amountPesos":4350000.0,"lengthMeters":44.3,"ratePesosPerMeter":98194.130925508,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16129"},{"year":2026,"category":"Roads","project":"Banban-Payac Road leading to Usukan Ecotourism and Adventure Park, Nanglimasan Falls and Guano Cave (Sta. 0+161 - Sta. 0+250), Barangay. Banban, Bangui, Ilocos Norte","amountPesos":4350000.0,"lengthMeters":89.0,"ratePesosPerMeter":48876.40449438202,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16131"},{"year":2026,"category":"Roads","project":"Coastal Road leading to Bangui Windmill and Municipal Beach (Sta. 1+664.50 - Sta. 1+694.50), Bangui, Ilocos Norte","amountPesos":4350000.0,"lengthMeters":30.0,"ratePesosPerMeter":145000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16133"},{"year":2026,"category":"Roads","project":"Dupitac-Estancia Road leading to Sunflower Farm and Maminminaw Falls (Sta. 3+194.20 - Sta. 3+494.20), Piddig, Ilocos Norte","amountPesos":4350000.0,"lengthMeters":300.0,"ratePesosPerMeter":14500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16135"},{"year":2026,"category":"Roads","project":"Maruaya Road leading to Piddig Food Factory School and Agro-Tourism (Sta. 0+427 - 0+727), Piddig, Ilocos Norte","amountPesos":4350000.0,"lengthMeters":300.0,"ratePesosPerMeter":14500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16139"},{"year":2026,"category":"Roads","project":"Maruaya-Dupitac-Calambeg-Estancia Road leading to Lowland Coffee Convergence Initiative Project (Sta. 9+750 - 10+050), Barangay. Maruaya, Piddig, Ilocos Norte","amountPesos":4350000.0,"lengthMeters":300.0,"ratePesosPerMeter":14500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16141"},{"year":2026,"category":"Roads","project":"Tangaoan-Pallas Road leading to Paraiso Ecotourism Project Eco and Reforestation Project (Sta. 10+350 - Sta. 10+600), Piddig, Ilocos Norte","amountPesos":4350000.0,"lengthMeters":250.0,"ratePesosPerMeter":17400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16145"},{"year":2026,"category":"Roads","project":"Access Road leading to Madongan Dam, Marcos, Ilocos Norte, Sta. 5+658 - Sta. 5+838","amountPesos":4350000.0,"lengthMeters":180.0,"ratePesosPerMeter":24166.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16148"},{"year":2026,"category":"Roads","project":"Pug-Os-Salasap-Namruangan-Daclapan Road leading to Public Beaches and Surfing Area, Cabugao, Ilocos Sur Sta. 0 + 894.42 - Sta. 1 + 357.02","amountPesos":4350000.0,"lengthMeters":462.6,"ratePesosPerMeter":9403.372243839169,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16151"},{"year":2026,"category":"Roads","project":"Access Road leading to Madarang Falls, Salcedo, Ilocos Sur, Sta. 1+276 - Sta. 1+376","amountPesos":4350000.0,"lengthMeters":100.0,"ratePesosPerMeter":43500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16154"},{"year":2026,"category":"Roads","project":"Access Road leading to Sangbay ni Ragsak Falls, Barangay. Urzadan, Suyo, Ilocos Sur, Sta. 2+197 - Sta. 2+247","amountPesos":24454000.0,"lengthMeters":50.0,"ratePesosPerMeter":489080.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16156"},{"year":2026,"category":"Roads","project":"Cervantes-Sigay Road leading to Tirad Pass via Barangay Libang, Cervantes, Ilocos Sur,  Sta. 6+263 - Sta. 6+513","amountPesos":4350000.0,"lengthMeters":250.0,"ratePesosPerMeter":17400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16158"},{"year":2026,"category":"Roads","project":"Access Road leading to Sitio of Pines, Tubaday, Santol, La Union, Sta. 0+100 - Sta 0+225","amountPesos":4350000.0,"lengthMeters":125.0,"ratePesosPerMeter":34800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16161"},{"year":2026,"category":"Roads","project":"Rissing to Paratong No. 4 Road leading to Paratong District Beach, Bangar, La Union, Sta 1+509 - Sta 1+634","amountPesos":4350000.0,"lengthMeters":125.0,"ratePesosPerMeter":34800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16163"},{"year":2026,"category":"Roads","project":"Access Road leading to Budahaw Falls, Barangay Bilis, Burgos, La Union,Sta. 0+780 - Sta. 0+965","amountPesos":4350000.0,"lengthMeters":185.0,"ratePesosPerMeter":23513.513513513513,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16166"},{"year":2026,"category":"Roads","project":"Access Road leading to San Carlos Beach, Caba, La Union, Sta 1+100- Sta 1+260, \n Sta 2+003- Sta 2+103","amountPesos":4350000.0,"lengthMeters":260.0,"ratePesosPerMeter":16730.76923076923,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16168"},{"year":2026,"category":"Roads","project":"Baybay-Narvacan Road leading to Sungyot Island, Santo Tomas, La Union, Sta.0+000- Sta.0+141","amountPesos":4350000.0,"lengthMeters":141.0,"ratePesosPerMeter":30851.063829787236,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16170"},{"year":2026,"category":"Roads","project":"Capula-Sta. Rita Provincial Road leading to Agoo Eco Fun World along the Agoo Damortis Protected Landscape and Seascape, Agoo, La Union, Sta 1+62.6- Sta 1+247.5","amountPesos":4350000.0,"lengthMeters":184.9,"ratePesosPerMeter":23526.230394807993,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16172"},{"year":2026,"category":"Roads","project":"Access Road leading to Busay Calabeng Falls(0+000 - 0+234), Bani, Pangasinan","amountPesos":4350000.0,"lengthMeters":234.0,"ratePesosPerMeter":18589.74358974359,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16175"},{"year":2026,"category":"Roads","project":"Access Road leading to Lucap Boulevard and Mangrove Park(0+000 - 0+234), Barangay. Bued, Alaminos City, Pangasinan","amountPesos":4350000.0,"lengthMeters":234.0,"ratePesosPerMeter":18589.74358974359,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16177"},{"year":2026,"category":"Roads","project":"Access Road leading to Surip Beach and Pilgrimage Site(1+448 - 1+671), Bani, Pangasinan","amountPesos":4350000.0,"lengthMeters":223.0,"ratePesosPerMeter":19506.7264573991,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16179"},{"year":2026,"category":"Roads","project":"Access Road leading to Tubong Beach and Dacap Sur Pilgrimage Site(0+000 - 0+242), Bani, Pangasinan","amountPesos":4350000.0,"lengthMeters":242.0,"ratePesosPerMeter":17975.206611570247,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16181"},{"year":2026,"category":"Roads","project":"Access Road leading to Tondaligan Park, Sta. 2 + 980 - Sta. 3 + 300, Dagupan City, Pangasinan","amountPesos":4402000.0,"lengthMeters":320.0,"ratePesosPerMeter":13756.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16184"},{"year":2026,"category":"Roads","project":"Access Road along Coffee Plantation Convergence Project,  STA. 0+938 - STA. 1+111, Balungao, Pangasinan","amountPesos":4350000.0,"lengthMeters":173.0,"ratePesosPerMeter":25144.50867052023,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16187"},{"year":2026,"category":"Roads","project":"Access Road leading to Diket Eco-Tourism and Diket Falls, STA. 1+081 - STA. 1+391, Umingan, Pangasinan","amountPesos":4350000.0,"lengthMeters":310.0,"ratePesosPerMeter":14032.258064516129,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16189"},{"year":2026,"category":"Roads","project":"Alimusgan-Bai-Caganayan Road leading to Kaparkan Falls, Sta. 0+800 - Sta. 0+980, Caganayan, Tineg, Abra","amountPesos":4410000.0,"lengthMeters":180.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16193"},{"year":2026,"category":"Roads","project":"Manag-Liwan Road leading to Purag River, Purag Cave and Bellang Cave, Sta.4+330.50 - Sta.4+450.50, Conner, Apayao","amountPesos":4410000.0,"lengthMeters":120.0,"ratePesosPerMeter":36750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16196"},{"year":2026,"category":"Roads","project":"Kabangwelan Road leading to Villamor Falls, Sta. 4+842 - Sta. 4+954.5, Luna, Apayao","amountPesos":4410000.0,"lengthMeters":112.5,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16199"},{"year":2026,"category":"Roads","project":"Lydia-Lalanggan Road leading to Pudtol Tourism Sites, Sta. 3+182.5 - Sta. 3+313, Pudtol, Apayao","amountPesos":4410000.0,"lengthMeters":130.5,"ratePesosPerMeter":33793.10344827586,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16201"},{"year":2026,"category":"Roads","project":"San Carlos-San Antonio-Nueva-Marcela Road leading to Bacut Lake, Sta. 7+124 - Sta. 7+304, Sta. Marcela, Apayao","amountPesos":4410000.0,"lengthMeters":180.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16205"},{"year":2026,"category":"Roads","project":"San Isidro Sur-Poblacion-Lappa-Marag-Cadaclan-Salagunting Tourism Road leading to Manacota Underground River and Other Tourism Areas, Sta. 26+149 - Sta. 26+239, Brgy. Cadaclan, Calanasan (Bayag), Apayao","amountPesos":10792000.0,"lengthMeters":90.0,"ratePesosPerMeter":119911.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16207"},{"year":2026,"category":"Roads","project":"Turod-Bayugao Road leading to Bayugao Waterfalls, Sta. 3+352.5 - Sta. 3+451, Luna, Apayao","amountPesos":4410000.0,"lengthMeters":98.5,"ratePesosPerMeter":44771.57360406091,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16209"},{"year":2026,"category":"Roads","project":"Poblacion-Karao-Ekip Access Road leading to Mount Purgatory - 0+822 - 0+942, Bokod, Benguet","amountPesos":4410000.0,"lengthMeters":120.0,"ratePesosPerMeter":36750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16214"},{"year":2026,"category":"Roads","project":"Timbak Caves Road leading to Timbak Caves and Mummy of Apo Anno - 8+546 - 8+764, Atok/Kabayan, Benguet","amountPesos":4703000.0,"lengthMeters":218.0,"ratePesosPerMeter":21573.394495412846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16216"},{"year":2026,"category":"Roads","project":"Guinzadan-Cagubatan-Balili (Mankayan) Road leading to Mogao Mountain and Gawaan Lake, Sta. 20+515 - Sta. 20+570, Mankayan, Benguet","amountPesos":4410000.0,"lengthMeters":55.0,"ratePesosPerMeter":80181.81818181818,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16219"},{"year":2026,"category":"Roads","project":"NRJ Bulalacao-Cabacab-Sinto Road leading to Agri-Tourism Farms Sta. 5+762 - Sta. 5+862, Mankayan, Benguet","amountPesos":4410000.0,"lengthMeters":100.0,"ratePesosPerMeter":44100.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16221"},{"year":2026,"category":"Roads","project":"NRJ Natubleng-Nabalicong-Cabuguiasan-Pacso-Tonglo-Saclalan Road leading to Various Tourist Attractions, Sta. 1+559 - Sta. 1+663, Sta. 1+766 - Sta.1+781, Buguias, Benguet","amountPesos":4410000.0,"lengthMeters":119.0,"ratePesosPerMeter":37058.82352941176,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16223"},{"year":2026,"category":"Roads","project":"Cudog-Mungayang-Kiangan Road leading to Ambuaya Lake, Yamashita Shrine and Kiyangan Settlement, Kiangan and Lagawe, Ifugao Sta. 5+040 - Sta 5+070 (L/S)","amountPesos":4223000.0,"lengthMeters":30.0,"ratePesosPerMeter":140766.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16226"},{"year":2026,"category":"Roads","project":"Lagawe-Boliwong-Abinuan Road leading to Inchang Falls, Lagawe, Ifugao Sta. 14+693 - Sta. 14+870","amountPesos":4410000.0,"lengthMeters":177.0,"ratePesosPerMeter":24915.254237288136,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16228"},{"year":2026,"category":"Roads","project":"Lagawe-Hingyon Road via Burnay leading to Mt. Atugo and other tourism destinations, Lagawe and Hingyon, Ifugao Sta. 5+740 - Sta 5+940","amountPesos":4410000.0,"lengthMeters":200.0,"ratePesosPerMeter":22050.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16230"},{"year":2026,"category":"Roads","project":"Lubuong-Bokiawan-Nungulunan Road leading to Bakung Spider Web and other tourism destinations, Hungduan, Ifugao Sta. 3+632 - Sta. 3+832","amountPesos":4410000.0,"lengthMeters":200.0,"ratePesosPerMeter":22050.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16232"},{"year":2026,"category":"Roads","project":"Access Road leading to Ammung Festival, Yao Jia Xi Dragon Fruit Farm, Domingo's Integrated Organic Farm, Municipal Forest Library (Magat dam Wetlands, Maris Dam Wetlands, BFAR-Aqua Park), Sta. 5+194 - Sta. 5+320, Brgy. Santo Domingo, Alfonso Lista, Ifugao","amountPesos":4410000.0,"lengthMeters":126.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16235"},{"year":2026,"category":"Roads","project":"Access Road leading to Banga-Banga Falls, Sta. 2 + 482 - Sta. 2+629, Tabuk City, Kalinga","amountPesos":4410000.0,"lengthMeters":147.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16238"},{"year":2026,"category":"Roads","project":"Macutay-Greenhills-San Pedro and San Vicente Access Road leading to Elephant Hill, Archeological Tourism Site, Sta. 2 + 820 - Sta. 3 + 480, Rizal (Liwan), Kalinga","amountPesos":19110000.0,"lengthMeters":660.0,"ratePesosPerMeter":28954.545454545456,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16240"},{"year":2026,"category":"Roads","project":"Bontoc-Mainit-Sagada Road leading to Guina-ang Rice Terraces, Mainit Hotsprings, Bomod-ok Falls, Sta. 398+212 - Sta. 398+357, Bontoc, Mountain Province","amountPesos":4410000.0,"lengthMeters":145.0,"ratePesosPerMeter":30413.793103448275,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16243"},{"year":2026,"category":"Roads","project":"Tadian-Sagada via Besao Road leading to Tirad Pass View, Fidelisan Falls, Sumaguing Cave, Balangagan Cave, Ayyuweng di Lambak ed Tadian Festival, Kiltepan Sunrise, Besao Sunset Hanging Coffins, Echo Valley, Sta. 12+830 - Sta. 12+928, Tadian, Mountain Province","amountPesos":4410000.0,"lengthMeters":98.0,"ratePesosPerMeter":45000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16245"},{"year":2026,"category":"Roads","project":"Cassag-Bacarri-Camparadi-Cawayan-Buringal Proper-Sinamar Road leading to Smokey Hill, Makilo Sphinx, Mabarutbot Mud Pool, Little Chocolate Hills, Buringal Waterfalls, Sta. 8+866 - Sta. 9+070, Paracelis, Mt. Province","amountPesos":4410000.0,"lengthMeters":204.0,"ratePesosPerMeter":21617.647058823528,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16248"},{"year":2026,"category":"Roads","project":"Butbut Proper-Tulgao-Dananao-Sumadel-Mallango Road, Sta. 2+050 - Sta. 2+170, Kalinga","amountPesos":4410000.0,"lengthMeters":120.0,"ratePesosPerMeter":36750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16251"},{"year":2026,"category":"Roads","project":"Uguid Subterranean Tourism Destination Access Road, Sta. 2+879 - Sta. 2+999, Kalinga","amountPesos":4410000.0,"lengthMeters":120.0,"ratePesosPerMeter":36750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16253"},{"year":2026,"category":"Roads","project":"Access Road leading to Valugan Boulder Beach (Sta. 0+822.50 - Sta. 0+876.40), Basco, Batanes","amountPesos":4132000.0,"lengthMeters":53.9,"ratePesosPerMeter":76660.48237476812,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16257"},{"year":2026,"category":"Roads","project":"Access Road leading to Arindar Cave, Sta. 5+954.62 - Sta. 6+124.62, Brgy. Pateng, Gonzaga, Cagayan","amountPesos":4089000.0,"lengthMeters":170.0,"ratePesosPerMeter":24052.941176470587,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16260"},{"year":2026,"category":"Roads","project":"Access Road leading to Cabanbanan Cave, Sta. 0+672.50 - Sta. 1+130.50 Gonzaga, Cagayan","amountPesos":13631000.0,"lengthMeters":458.0,"ratePesosPerMeter":29762.008733624454,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16262"},{"year":2026,"category":"Roads","project":"Access Road leading to Hotspring Falls & Caves, Asinga-Via, Sta. 5+587.80 - Sta. 5+853.80, Brgy. Asinga-Via, Baggao, Cagayan","amountPesos":4089000.0,"lengthMeters":266.0,"ratePesosPerMeter":15372.180451127819,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16264"},{"year":2026,"category":"Roads","project":"Access Road leading to Manaring Hotspring, Sta. 5+660.50 - Sta. 6+622.50, Brgy. Cabiraoan, Gonzaga, Cagayan","amountPesos":13631000.0,"lengthMeters":962.0,"ratePesosPerMeter":14169.43866943867,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16266"},{"year":2026,"category":"Roads","project":"Access Road leading to Tallag Beach Resort, Sta. 2+317 - Sta. 2+556, Gonzaga, Cagayan","amountPesos":4089000.0,"lengthMeters":239.0,"ratePesosPerMeter":17108.786610878662,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16268"},{"year":2026,"category":"Roads","project":"Access Road leading to Tanglagan Falls, Sta. 5+231.93 - Sta. 5+337.23, Brgy. Tanglagan, Gattaran, Cagayan","amountPesos":9542000.0,"lengthMeters":105.3,"ratePesosPerMeter":90617.28395061792,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16270"},{"year":2026,"category":"Roads","project":"Alucao-Luga Road, Sta. 2+716 - Sta. 2+975, Sta. Teresita, Cagayan","amountPesos":4089000.0,"lengthMeters":259.0,"ratePesosPerMeter":15787.644787644787,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16272"},{"year":2026,"category":"Roads","project":"Bucale-Tagcar Road leading to Bucale Cave, Sta. 2+253 - Sta. 2+412, Sta Teresita, Cagayan","amountPesos":4089000.0,"lengthMeters":159.0,"ratePesosPerMeter":25716.98113207547,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16274"},{"year":2026,"category":"Roads","project":"Callao Bayview Boulevard including Access Road, Sta.0+000 - Sta. 0+270, Callao, Gonzaga, Cagayan","amountPesos":4089000.0,"lengthMeters":270.0,"ratePesosPerMeter":15144.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16276"},{"year":2026,"category":"Roads","project":"Masi-Aridowen-Luga Road leading to Bangalao Lake and Caves, Sta. 0+391.50- Sta. 0+591.50, Brgy. Masi, Sta. Teresita, Cagayan","amountPesos":4089000.0,"lengthMeters":200.0,"ratePesosPerMeter":20445.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16278"},{"year":2026,"category":"Roads","project":"Mission-Bucale-Tagcar Road leading to Bucale Cave, Sta. 2+448.55 - Sta. 2+608.55, Sta. Teresita, Cagayan","amountPesos":4089000.0,"lengthMeters":160.0,"ratePesosPerMeter":25556.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16280"},{"year":2026,"category":"Roads","project":"Poblacion Sta. Ana-Marede-Sta. Clara-Patunungan-Sinago Road leading to Boacag Falls & Sinago Coves, Sta. 21+014.43 - Sta. 21+526.30, Dungeg, Sta. Ana, Cagayan","amountPesos":24500000.0,"lengthMeters":511.87,"ratePesosPerMeter":47863.71539648749,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16282"},{"year":2026,"category":"Roads","project":"Abulug-Ballesteros Bay View Boulevard including Access Road leading to Beach Resorts,Sta. 0+845- Sta. 0+899,Abulug, Cagayan","amountPesos":4089000.0,"lengthMeters":54.0,"ratePesosPerMeter":75722.22222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16285"},{"year":2026,"category":"Roads","project":"Abulug-Ballesteros Bay View Boulevard including Access Road leading to Beach Resorts,Sta. 0+000-Sta. 0+579, Sta. 0+000- Sta. 0+046,Ballesteros, Cagayan","amountPesos":7997000.0,"lengthMeters":579.0,"ratePesosPerMeter":13811.744386873921,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16287"},{"year":2026,"category":"Roads","project":"Access Road along Minanga Namuac Road leading to Estuary Sand Dunes and Beaches,Sta. 2+554 - Sta. 2+744,Sanchez Mira, Cagayan","amountPesos":9815000.0,"lengthMeters":190.0,"ratePesosPerMeter":51657.89473684211,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16289"},{"year":2026,"category":"Roads","project":"Bidduang Bay view including access road leading to beach resorts, Bidduang,Sta. 3+945 - Sta. 4+125,Pamplona, Cagayan","amountPesos":36350000.0,"lengthMeters":180.0,"ratePesosPerMeter":201944.44444444444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16291"},{"year":2026,"category":"Roads","project":"Maddarulug to Cadaanan Road leading to Ecotourism Park, Solana, Cagayan (Sta. 5+217.20 - Sta. 5+036.20)","amountPesos":4089000.0,"lengthMeters":181.0,"ratePesosPerMeter":22591.160220994476,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16296"},{"year":2026,"category":"Roads","project":"Construction of Roads Leading to Tourism Site (Sta. 1+027 - Sta. 2+877), Pallacot Waterfalls, Barangay Caligayan, Tumauini, Isabela","amountPesos":30000000.0,"lengthMeters":1850.0,"ratePesosPerMeter":16216.216216216217,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16299"},{"year":2026,"category":"Roads","project":"Access Road leading to Lower Magat Ecotourism Park (Sta. 1+144 - Sta. 1+314), Diadi, Nueva Vizcaya","amountPesos":4089000.0,"lengthMeters":170.0,"ratePesosPerMeter":24052.941176470587,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16302"},{"year":2026,"category":"Roads","project":"Jct. Maharlika Highway-Masoc-Ambaguio Road leading to Mt. Pulag National Park (Sta. 2+898.17 - Sta. 2+998.17), Ambaguio, Nueva Vizcaya","amountPesos":4089000.0,"lengthMeters":100.0,"ratePesosPerMeter":40890.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16304"},{"year":2026,"category":"Roads","project":"Access Road leading to Agri-Tourism Park, Villa Cardenas, Saguday, Quirino - Sta. 1+500 - Sta. 1+662","amountPesos":4544000.0,"lengthMeters":162.0,"ratePesosPerMeter":28049.382716049382,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16307"},{"year":2026,"category":"Roads","project":"Access Road leading to Asaklat Caves, Nagtipunan, Quirino - Sta. 0+639.6 - Sta. 0+744","amountPesos":4089000.0,"lengthMeters":104.4,"ratePesosPerMeter":39166.66666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16309"},{"year":2026,"category":"Roads","project":"Access Road leading to Bantay Aran, Villa Agullana, Maddela, Quirino - Sta. 1+510 - Sta. 1+708","amountPesos":4089000.0,"lengthMeters":198.0,"ratePesosPerMeter":20651.515151515152,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16311"},{"year":2026,"category":"Roads","project":"Access Road leading to Bantay Lakay in Calaocan, Cabarroguis, Quirino - Sta. 2+286 - Sta. 2+423","amountPesos":4089000.0,"lengthMeters":137.0,"ratePesosPerMeter":29846.715328467155,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16313"},{"year":2026,"category":"Roads","project":"Access Road leading to Eagle's Beak-Batumbaket, Diffun, Quirino - Sta. 2+179.7 - Sta. 2+280","amountPesos":4089000.0,"lengthMeters":100.3,"ratePesosPerMeter":40767.69690927211,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16315"},{"year":2026,"category":"Roads","project":"Access Road leading to Ganano Falls, Diffun, Quirino - Sta. 19+650 - Sta. 19+755","amountPesos":4089000.0,"lengthMeters":105.0,"ratePesosPerMeter":38942.857142857145,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16317"},{"year":2026,"category":"Roads","project":"Access Road leading to Governor's Rapids, Maddela, Quirino - Sta. 2+097.2 - Sta. 2+249","amountPesos":4089000.0,"lengthMeters":151.8,"ratePesosPerMeter":26936.7588932806,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16319"},{"year":2026,"category":"Roads","project":"Access Road leading to Napipiwongan, Mabo and Dibiwen Falls, Aglipay, Quirino - Sta. 15+431.7 - Sta. 15+589","amountPesos":4089000.0,"lengthMeters":157.3,"ratePesosPerMeter":25994.91417673248,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16321"},{"year":2026,"category":"Roads","project":"Access Road leading to Pedlisan Falls, Maddela, Quirino - Sta. 1+313.6 - Sta. 1+493","amountPesos":4089000.0,"lengthMeters":179.4,"ratePesosPerMeter":22792.642140468215,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16323"},{"year":2026,"category":"Roads","project":"Dinadiawan-Ditawini Bypass Road leading to Tourism Sites/Destinations, Barangay Ditawini, Dinalungan, Aurora, Sta. 2 + 568 - 2 + 638","amountPesos":4236000.0,"lengthMeters":70.0,"ratePesosPerMeter":60514.28571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16327"},{"year":2026,"category":"Roads","project":"Mulawin-Tala Road leading to Mt. Natib, Bataan National Park, Orani, Bataan, Sta. 12+463 - Sta. 12+710","amountPesos":4236000.0,"lengthMeters":247.0,"ratePesosPerMeter":17149.7975708502,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16330"},{"year":2026,"category":"Roads","project":"Access Road leading to Mt. Samat Shrine of Valor, Barangay Diwa, Pilar, Bataan, Sta. 6+269 - Sta. 6+422.50","amountPesos":4236000.0,"lengthMeters":153.5,"ratePesosPerMeter":27596.091205211727,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16333"},{"year":2026,"category":"Roads","project":"Sta. Isabel-San Ramon Diversion Road, Dinalupihan, Bataan, Sta. 0 + 660 - 0 + 800","amountPesos":4707000.0,"lengthMeters":140.0,"ratePesosPerMeter":33621.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16336"},{"year":2026,"category":"Roads","project":"Access Road leading to Ditabuyan Falls, Barangay Cadaclan, Pantabangan, Nueva Ecija, Sta. 1+412 - Sta. 1+517","amountPesos":4410000.0,"lengthMeters":105.0,"ratePesosPerMeter":42000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16339"},{"year":2026,"category":"Roads","project":"Access Road leading to Dueg Ecotourism Nature's Park, Barangay Maasin, San Clemente, Tarlac, Section 1: Sta. 0+000.00 - Sta. 1+207.20, Section 2: Sta. 7+022.50 - Sta. 7+352.00","amountPesos":47072000.0,"lengthMeters":1536.7,"ratePesosPerMeter":30631.873495151947,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16342"},{"year":2026,"category":"Roads","project":"Access Road leading to Tarlac Ecotourism Park, San Jose, Tarlac, Sta. 0+964.10 - Sta. 1+126.40","amountPesos":9414000.0,"lengthMeters":162.3,"ratePesosPerMeter":58003.696857670955,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16344"},{"year":2026,"category":"Roads","project":"Bugaan-Gulod-Buso-Buso Road leading to Taal Lake Circumferential Road, Sta. 0+873 - Sta. 1+023, Laurel, Batangas","amountPesos":8018000.0,"lengthMeters":150.0,"ratePesosPerMeter":53453.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16348"},{"year":2026,"category":"Roads","project":"Poblacion-As-is-Niyugan Ecotourism Road leading to Laurel Tourism Spots and Taal Volcano, Sta. 0+544 - Sta. 0+794, Laurel, Batangas","amountPesos":8018000.0,"lengthMeters":250.0,"ratePesosPerMeter":32072.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16350"},{"year":2026,"category":"Roads","project":"San Pedro-Sta. Cruz Ecotourism Road leading to National Shrine of St. Padre Pio, Sta. 6+900 - Sta. 7+056, Sto. Tomas, Batangas","amountPesos":8018000.0,"lengthMeters":156.0,"ratePesosPerMeter":51397.4358974359,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16352"},{"year":2026,"category":"Roads","project":"Taal Lake Circumferential Road (Sta. Teresita Section), Sta. 3+928 - Sta. 4+132, Sta. Teresita, Batangas","amountPesos":12028000.0,"lengthMeters":204.0,"ratePesosPerMeter":58960.78431372549,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16354"},{"year":2026,"category":"Roads","project":"Jct MSR Calumpang-Tayabas Road leading to Minor Basilica of St. Michael de Archangel, and Kamay ni Hesus, Sta. 2+277 - Sta. 2+292, Tayabas, Quezon","amountPesos":8018000.0,"lengthMeters":15.0,"ratePesosPerMeter":534533.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16357"},{"year":2026,"category":"Roads","project":"Polillo-Panukulan-Burdeos Road leading to Beaches and Tourism Spots, Sta. 7+934 - Sta. 8+206, Panukulan, Quezon","amountPesos":4009000.0,"lengthMeters":272.0,"ratePesosPerMeter":14738.970588235294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16359"},{"year":2026,"category":"Roads","project":"Polillo-Panukulan-Burdeos Road leading to Beaches and Tourism Spots, Sta. 4+947 - Sta. 5+218, Polillo, Quezon","amountPesos":4009000.0,"lengthMeters":271.0,"ratePesosPerMeter":14793.357933579337,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16361"},{"year":2026,"category":"Roads","project":"Access Road leading to Bosque Cave, STA. 002+045 - STA. 002+503.86, Gumaca, Quezon","amountPesos":10825000.0,"lengthMeters":458.86,"ratePesosPerMeter":23591.073530052734,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16364"},{"year":2026,"category":"Roads","project":"Access Road leading to Inaclagan Falls, STA. 001+180 - STA. 001+495, Gumaca, Quezon","amountPesos":12180000.0,"lengthMeters":315.0,"ratePesosPerMeter":38666.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16366"},{"year":2026,"category":"Roads","project":"Access Road leading to Kabakan Falls, STA. 000+956 - STA. 001+056, Tagkawayan, Quezon","amountPesos":3608000.0,"lengthMeters":100.0,"ratePesosPerMeter":36080.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16368"},{"year":2026,"category":"Roads","project":"Access Road leading to Lamesang Bato, STA. 002+230 - STA. 002+340, Calauag, Quezon","amountPesos":3608000.0,"lengthMeters":110.0,"ratePesosPerMeter":32800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16370"},{"year":2026,"category":"Roads","project":"Access Road leading to Limbon-Limbon Falls, STA. 003+125 - STA. 003+303.43, Gumaca, Quezon","amountPesos":3608000.0,"lengthMeters":178.43,"ratePesosPerMeter":20220.814885389245,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16372"},{"year":2026,"category":"Roads","project":"Access Road leading to Mahinta Cave, STA. 005+039 - STA. 005+139, Tagkawayan, Quezon","amountPesos":3608000.0,"lengthMeters":100.0,"ratePesosPerMeter":36080.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16374"},{"year":2026,"category":"Roads","project":"Access Road leading to Pristine Beaches, STA. 000+710 - STA. 000+810, Tagkawayan, Quezon","amountPesos":3608000.0,"lengthMeters":100.0,"ratePesosPerMeter":36080.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16376"},{"year":2026,"category":"Roads","project":"Camagong-Villa Norte Eco-Tourism Road, STA. 004+346 - STA. 004+461, Alabat, Quezon","amountPesos":3608000.0,"lengthMeters":115.0,"ratePesosPerMeter":31373.91304347826,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16378"},{"year":2026,"category":"Roads","project":"Concepcion-Ilaya Eco-tourism Road, STA. 000+833 - STA. 000+847, Plaridel, Quezon","amountPesos":4216000.0,"lengthMeters":14.0,"ratePesosPerMeter":301142.85714285716,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16380"},{"year":2026,"category":"Roads","project":"Dungawan Central-A. Mabini Ecotourism Road leading to Mabini Highlands Hiking and Mountainspring Sites, STA. 001+597 - STA. 001+712, Guinayangan, Quezon","amountPesos":3608000.0,"lengthMeters":115.0,"ratePesosPerMeter":31373.91304347826,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16382"},{"year":2026,"category":"Roads","project":"Ecotourism Road leading to Candalapdap Beach and Laurel Beach, STA. 001 + 728 - STA. 001 + 758, STA. 001 + 800 - STA. 001 + 840, STA. 001 + 875 - STA. 001 + 905, Tagkawayan, Quezon","amountPesos":3608000.0,"lengthMeters":100.0,"ratePesosPerMeter":36080.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16384"},{"year":2026,"category":"Roads","project":"Ecotourism Road leading to Maguibuay Falls, STA. 000+554 - STA. 000+654, Tagkawayan, Quezon","amountPesos":3608000.0,"lengthMeters":100.0,"ratePesosPerMeter":36080.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16386"},{"year":2026,"category":"Roads","project":"Gapas-Danlagan Batis Ecotourism Road leading to Gapas Cave and Danlagan Batis Cave and Danlagan Reserva Spring Resort, STA. 000+395 - STA. 000+510, Guinayangan, Quezon","amountPesos":3608000.0,"lengthMeters":115.0,"ratePesosPerMeter":31373.91304347826,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16388"},{"year":2026,"category":"Roads","project":"Himbubulo Este-Dancalan Central Coastal Ecotourism Road leading to Pristine Beaches, STA. 000+573 - STA. 000+603, Guinayangan, Quezon","amountPesos":4216000.0,"lengthMeters":30.0,"ratePesosPerMeter":140533.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16390"},{"year":2026,"category":"Roads","project":"Lalaguna Ecotourism Road leading to Kampo Pusa, Marshland, Vera Shrine, Centennial Trees, Community Flower Garden, and Community Livelihood Center and Delicacies, STA. 000+225 - STA. 000+380, Lopez, Quezon","amountPesos":3608000.0,"lengthMeters":155.0,"ratePesosPerMeter":23277.41935483871,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16392"},{"year":2026,"category":"Roads","project":"Pinagsakayan-Kinamaligan-Atulayan-Lagay-Kunalum-Villa Magsino-Sto. Angel Road leading to Isla Pulong Pasig Beach, STA. 017+700 - STA. 017+810, Calauag, Quezon","amountPesos":3608000.0,"lengthMeters":110.0,"ratePesosPerMeter":32800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16394"},{"year":2026,"category":"Roads","project":"Poblacion to Sabang Eco-Tourism Road leading to Nanay Emma's Beach, Sasot Beach, Almase Beach and Lolo Daddy's Beach, STA. 007+673 - STA. 007+783, Quezon, Quezon","amountPesos":3608000.0,"lengthMeters":110.0,"ratePesosPerMeter":32800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16396"},{"year":2026,"category":"Roads","project":"Sitio Canumay-Tumiis Ecotourism Road leading to Alabat Island, STA. 002+179 - STA. 002+294, Alabat, Quezon","amountPesos":3608000.0,"lengthMeters":115.0,"ratePesosPerMeter":31373.91304347826,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16398"},{"year":2026,"category":"Roads","project":"Villa Manzano Norte-Pambuhan-Mainit Norte-Rizal Eco-Tourism Road leading to Mainit Hotspring, STA. 002+308 - STA. 002+418, Perez, Quezon","amountPesos":3608000.0,"lengthMeters":110.0,"ratePesosPerMeter":32800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16400"},{"year":2026,"category":"Roads","project":"Viñas-Tiniguiban-Maligaya Road leading to Baporbaporan Beach, STA. 000+840 - STA. 000+950, Calauag, Quezon","amountPesos":3608000.0,"lengthMeters":110.0,"ratePesosPerMeter":32800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16402"},{"year":2026,"category":"Roads","project":"Viñas-Tiniguiban-Tamis-Sinag-Dapdap Road leading to Sampitan Beach, STA. 017+000 - STA. 017+110, Calauag, Quezon","amountPesos":3608000.0,"lengthMeters":110.0,"ratePesosPerMeter":32800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16404"},{"year":2026,"category":"Roads","project":"Tanay-Pililla Road leading to Windmills, Sta. 5+845 - Sta. 6+028, Tanay-Pililla, Rizal","amountPesos":3608000.0,"lengthMeters":183.0,"ratePesosPerMeter":19715.84699453552,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16407"},{"year":2026,"category":"Roads","project":"Access Road leading to Devil's Mountain and Farms, Sta. 006+090 - Sta. 006+590, Brgy. Batasan, San Jose, Mindoro Occidental","amountPesos":9622000.0,"lengthMeters":500.0,"ratePesosPerMeter":19244.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16411"},{"year":2026,"category":"Roads","project":"Access Road leading to Luyang Baga Cave, Sta. 004+982 - Sta. 005+482, Abra de Ilog, Occidental Mindoro","amountPesos":8302000.0,"lengthMeters":500.0,"ratePesosPerMeter":16604.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16413"},{"year":2026,"category":"Roads","project":"Access Road leading to Wawa Fish Sanctuary and Beaches, Sta. 003+431 - Sta. 003+931, Calintaan, Mindoro Occidental","amountPesos":8302000.0,"lengthMeters":500.0,"ratePesosPerMeter":16604.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16415"},{"year":2026,"category":"Roads","project":"Access Road from Coron Town Proper to Borac RoRo Port, Sta. 12+546.00 - Sta. 12+784.00, Coron, Palawan","amountPesos":8302000.0,"lengthMeters":238.0,"ratePesosPerMeter":34882.35294117647,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16420"},{"year":2026,"category":"Roads","project":"Access Road leading to Araceli Beach, Sta. 1+140.00 Sta. 1+378.00, Araceli, Palawan","amountPesos":8302000.0,"lengthMeters":238.0,"ratePesosPerMeter":34882.35294117647,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16424"},{"year":2026,"category":"Roads","project":"Access Road leading to Bacuit Bay Island Hopping, Miniloc and Pangulasian Islands, Sta. 245+003.00 - Sta. 245+240.50, Barangay Bebeladan, El Nido, Palawan","amountPesos":8302000.0,"lengthMeters":237.5,"ratePesosPerMeter":34955.78947368421,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16426"},{"year":2026,"category":"Roads","project":"Access Road leading to Dumaran Beach, Sta. 0+862.00 - Sta. 1+098.00, Dumaran, Palawan","amountPesos":8302000.0,"lengthMeters":236.0,"ratePesosPerMeter":35177.96610169492,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16428"},{"year":2026,"category":"Roads","project":"Access Road leading to Lake Manguao, Sta. 0+594.50 - Sta. 0+831.00, Taytay, Palawan","amountPesos":8302000.0,"lengthMeters":236.5,"ratePesosPerMeter":35103.59408033827,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16430"},{"year":2026,"category":"Roads","project":"Access Road leading to Linapacan Beach, Sta. 1+084.50 - Sta. 1+317.00, Linapacan, Palawan","amountPesos":8302000.0,"lengthMeters":232.5,"ratePesosPerMeter":35707.52688172043,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16432"},{"year":2026,"category":"Roads","project":"Access Road leading to Malampaya Sound Dolphin Watching Tour, Sta. 207+812.00 - Sta. 208+188.50, Brgy. Old Guinlo, Taytay, Palawan","amountPesos":14957000.0,"lengthMeters":376.5,"ratePesosPerMeter":39726.42762284196,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16434"},{"year":2026,"category":"Roads","project":"Access Road leading to Malawig Beach and Buenavista Bay Area, Sta. 1+822.50 - Sta. 2+052.00, Coron, Palawan","amountPesos":8302000.0,"lengthMeters":229.5,"ratePesosPerMeter":36174.29193899782,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16436"},{"year":2026,"category":"Roads","project":"Access Road leading to Maricaban Bay, Sitio Aran, Sta. 1+462.50 -Sta. 1+690.00, Brgy. San Nicolas, Coron, Palawan","amountPesos":9622000.0,"lengthMeters":227.5,"ratePesosPerMeter":42294.505494505494,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16438"},{"year":2026,"category":"Roads","project":"Access Road leading to Roxas Diving Spots, Sta. 137+247.00 - Sta. 137+486.00, Roxas, Palawan","amountPesos":8302000.0,"lengthMeters":239.0,"ratePesosPerMeter":34736.40167364017,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16440"},{"year":2026,"category":"Roads","project":"Access Road to Malampaya Sound, Mt. Capuas and San Vicente Long Beach, Sta. 2+854.00 - Sta. 3+084.50, San Vicente & Taytay, Palawan","amountPesos":8302000.0,"lengthMeters":230.5,"ratePesosPerMeter":36017.3535791757,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16442"},{"year":2026,"category":"Roads","project":"Mampio Road from Seaport to Cagayancillo Poblacion, Sta. 4+619.00 - Sta. 4+847.00, Brgy. Mampio, Cagayancillo, Palawan","amountPesos":9622000.0,"lengthMeters":228.0,"ratePesosPerMeter":42201.754385964916,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16448"},{"year":2026,"category":"Roads","project":"Road from Poblacion to Capari Cove, Sta. 1+839.50 - Sta. 2+071.00, San Vicente, Palawan","amountPesos":8302000.0,"lengthMeters":231.5,"ratePesosPerMeter":35861.77105831533,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16450"},{"year":2026,"category":"Roads","project":"Road Junction of Sitio Ocam-Ocam Road to Busuanga, Sta. 1+129.50 - Sta. 1+367.50, Busuanga, Palawan","amountPesos":8302000.0,"lengthMeters":238.0,"ratePesosPerMeter":34882.35294117647,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16452"},{"year":2026,"category":"Roads","project":"Access Road leading to Aramaywan Taraw Caves, Sta. 2+849 - Sta. 3+334, Brgy. Aramaywan, Quezon, Palawan","amountPesos":9622000.0,"lengthMeters":485.0,"ratePesosPerMeter":19839.17525773196,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16455"},{"year":2026,"category":"Roads","project":"Access Road leading to Candis River Pools, Sta. 3+600 - Sta. 4+530, Brgy. Ransang, Rizal, Palawan","amountPesos":19244000.0,"lengthMeters":930.0,"ratePesosPerMeter":20692.47311827957,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16457"},{"year":2026,"category":"Roads","project":"Access Road leading to Ogis Tau't Bato Cultural Community, Sta. 6+420 - Sta. 6+910, Brgy. Ransang, Rizal, Palawan","amountPesos":9622000.0,"lengthMeters":490.0,"ratePesosPerMeter":19636.73469387755,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16459"},{"year":2026,"category":"Roads","project":"Balabac Circumferential Road, Sta. 8+813 - Sta. 9+013, Balabac, Palawan","amountPesos":3321000.0,"lengthMeters":200.0,"ratePesosPerMeter":16605.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16461"},{"year":2026,"category":"Roads","project":"Construction of Access Road in Brgy. Carmen-Sugod-Cawayan Road leading to Blue Hole, Sta. 2+742.75 - Sta. 3+172.28, San Agustin, Romblon","amountPesos":50000000.0,"lengthMeters":429.53,"ratePesosPerMeter":116406.30456545521,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16464"},{"year":2026,"category":"Roads","project":"Internal Access Road to Sitio Palamang, Manihala leading to Manihala Waterfalls II, STA 1 + 120.00 - STA 1 + 336.50 Bansud, Oriental Mindoro","amountPesos":3736000.0,"lengthMeters":216.5,"ratePesosPerMeter":17256.35103926097,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16469"},{"year":2026,"category":"Roads","project":"Cagraray Circumferential Road, Bacacay, Albay, Sta. 0+861 - Sta. 0+911 and Sta. 1+109 - Sta. 1+159","amountPesos":8786000.0,"lengthMeters":100.0,"ratePesosPerMeter":87860.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16475"},{"year":2026,"category":"Roads","project":"Tabaco-Malinao Road leading to Vera Falls, Malinao, Albay, Sta. 0+797 - Sta. 1+319","amountPesos":13179000.0,"lengthMeters":522.0,"ratePesosPerMeter":25247.126436781607,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16477"},{"year":2026,"category":"Roads","project":"Access Road leading to Mayon Southeast Quadrant (Sta. 0+000 - Sta. 0+132), Legazpi City, Albay","amountPesos":4393000.0,"lengthMeters":132.0,"ratePesosPerMeter":33280.30303030303,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16480"},{"year":2026,"category":"Roads","project":"Batan Island Circumferential Road (Sta. 0+979 - Sta. 1+379), Albay","amountPesos":36218000.0,"lengthMeters":400.0,"ratePesosPerMeter":90545.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16482"},{"year":2026,"category":"Roads","project":"Polangui-Albay West Coast Road leading to Beaches, Albay, Sta. 0+195 - Sta. 0+548","amountPesos":4393000.0,"lengthMeters":353.0,"ratePesosPerMeter":12444.759206798866,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16485"},{"year":2026,"category":"Roads","project":"Daet-Talobatib-Jose Panganiban Road leading to Pag-asa Beach, Jose Panganiban Monument (National Hero) & Bulalakao beach to Larap to Caroline Island to Bagong Silang-Capalonga Road, Road leading to Pag-asa Beach to Larap to Caroline Island to Bagong Silang-Capalonga, Camarines Norte, Chainage 11650 - Chainage 11747.50","amountPesos":4410000.0,"lengthMeters":97.5,"ratePesosPerMeter":45230.769230769234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16488"},{"year":2026,"category":"Roads","project":"Access Road leading to Herodes Falls - Sta. 2+485 - 2+600, Brgy. Bagamelon, Libmanan, Camarines Sur","amountPesos":4393000.0,"lengthMeters":115.0,"ratePesosPerMeter":38200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16491"},{"year":2026,"category":"Roads","project":"Almeda Highway connecting Centro Heritage District to Mt. Isarog Natural Park, Naga City, Camarines Sur - Sta. 1+600 - Sta. 1+745","amountPesos":12679000.0,"lengthMeters":145.0,"ratePesosPerMeter":87441.37931034483,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16494"},{"year":2026,"category":"Roads","project":"Virac-Bato-Batalay-Bote-Bitaogan-Carorian-Cagraray-Radar Station Roads leading to Maribina Falls, Balongbong Falls, Mangrove Eco-Park, Sakahon Beach, Bote Lighthouse, Japanese Garrison (Mt. Arinawan), Bitaogan Beach, Carorian Wonders, Bato, Catanduanes, at Japanese Garisson Section STA. 1+053.5-STA. 1+553.50","amountPesos":14644000.0,"lengthMeters":500.0,"ratePesosPerMeter":29288.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16499"},{"year":2026,"category":"Roads","project":"Junction National Road Sitio Calulod-B. Titong-Ubongan Dacu Section leading to Various Tourism Sites, Masbate City, Masbate, Sta. 19+547 - Sta. 19+671","amountPesos":8786000.0,"lengthMeters":124.0,"ratePesosPerMeter":70854.83870967742,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16502"},{"year":2026,"category":"Roads","project":"Esperanza-Placer Road leading to Pasiagon Beach Front, Balay na Bato and Esperanza Seaport, Masbate, Sta. 130+880 - Sta. 131+080","amountPesos":4393000.0,"lengthMeters":200.0,"ratePesosPerMeter":21965.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16505"},{"year":2026,"category":"Roads","project":"Access Road from Makato Proper to Hagachac leading to Baybay Beach and Alibagon Bakhawan Park, Makato, Aklan - Sta. 5 + 182.80 - Sta. 5 + 335","amountPesos":36752000.0,"lengthMeters":152.2,"ratePesosPerMeter":241471.7477003945,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16512"},{"year":2026,"category":"Roads","project":"Access Road leading to Kamalasag Falls Sta. 02+850 - Sta. 02+930, Barangay Abiera, Sebaste, Antique","amountPesos":4306000.0,"lengthMeters":80.0,"ratePesosPerMeter":53825.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16515"},{"year":2026,"category":"Roads","project":"Access Road leading to San Jose Port, Public Beaches & Sunset Viewing, San Jose Boulevard/Esplanade (Hotels, Inns and Beach Resorts) Sta. 00+961 - Sta. 00+981, San Jose, Antique","amountPesos":4363000.0,"lengthMeters":20.0,"ratePesosPerMeter":218150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16517"},{"year":2026,"category":"Roads","project":"Access Road from Brgy. Balaring leading to the Beach Area, Brgy. Basiao, Ivisan, Capiz - Sta. 6+700 - Sta. 6+880","amountPesos":4306000.0,"lengthMeters":180.0,"ratePesosPerMeter":23922.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16522"},{"year":2026,"category":"Roads","project":"Access Road leading to Nabaye Falls, Brgy. Duran, Dumalag, Capiz - Sta. 2+320 - Sta. 2+540","amountPesos":23922000.0,"lengthMeters":220.0,"ratePesosPerMeter":108736.36363636363,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16524"},{"year":2026,"category":"Roads","project":"Access Road leading to Sitio Cabanbanan, Capiz leading to Mt. Panginhiraon Peak, Brgy. Dolores, Dumalag, Capiz - Sta. 0+000 - Sta. 0+049, Sta. 0+780 - Sta. 0+880, Sta. 0+900 - Sta. 1+131","amountPesos":16267000.0,"lengthMeters":380.0,"ratePesosPerMeter":42807.89473684211,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16526"},{"year":2026,"category":"Roads","project":"Sta.Teresa-Sinapsapan Road access leading to Isla Naburot & Ave Maria Islet, Cabaling, Higante Cave, Jordan Marine Turtle Sanctuary, Baras Beach at Barangay Espinosa, Jordan, Guimaras - Sta. 11 + 378 - Sta. 11 + 468","amountPesos":23922000.0,"lengthMeters":90.0,"ratePesosPerMeter":265800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16529"},{"year":2026,"category":"Roads","project":"Brgy. Potrido to Brgy. Alimodias Road leading to Various Tourism Sites including Bugsukan and Banogon Falls and the 500 Hectares Rice Terraces, Miagao, Iloilo - Sta.7+088.50 - Sta. 7+688.50","amountPesos":23443000.0,"lengthMeters":600.0,"ratePesosPerMeter":39071.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16532"},{"year":2026,"category":"Roads","project":"Igbaras-Passi-Igcabugao-Igbulo Road leading to Igcabugao Cave, Igbaras, Iloilo - Sta. 10+200 - Sta.10+790","amountPesos":23443000.0,"lengthMeters":590.0,"ratePesosPerMeter":39733.898305084746,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16534"},{"year":2026,"category":"Roads","project":"Malagyan-Tigmalapad Road leading to Sinuhotan Cave and Tinagong Dagat Lake, \nMiagao, Iloilo - Sta. 8+747 - Sta. 9+230","amountPesos":13875000.0,"lengthMeters":483.0,"ratePesosPerMeter":28726.708074534163,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16538"},{"year":2026,"category":"Roads","project":"Quianan-Pitogo-Lomboyan-Bad-as Road, leading to Mt. Dalang, Caves, Waterfalls, Rice \nTerraces and World's Biggest Flower, San Joaquin, Iloilo - Sta. 8+290 - Sta.08+890","amountPesos":23443000.0,"lengthMeters":600.0,"ratePesosPerMeter":39071.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16540"},{"year":2026,"category":"Roads","project":"Tubungan-Igtuble-San Remegio Road leading to Tourism and Agri-Center, Iloilo - Sta. 18+389 - Sta. 18+969","amountPesos":23443000.0,"lengthMeters":580.0,"ratePesosPerMeter":40418.96551724138,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16542"},{"year":2026,"category":"Roads","project":"NRJ Puerto Princesa-San Francisco Road leading to Balaring Beach Resorts and Sitio Miao Beach Resorts, Barotac Viejo, Iloilo, Sta. 5 +428 - Sta. 6 + 258","amountPesos":47844000.0,"lengthMeters":830.0,"ratePesosPerMeter":57643.3734939759,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16545"},{"year":2026,"category":"Roads","project":"Access Road from the National Road, Brgy. San Antonio-Brgy. Sto. Angel, San Miguel-Brgy. Baguingin-Lanot , Alimodian leading to Goducate, San Miguel, Iloilo - Sta. 004 + 006 - Sta. 004 + 146","amountPesos":4306000.0,"lengthMeters":140.0,"ratePesosPerMeter":30757.14285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16548"},{"year":2026,"category":"Roads","project":"Access Road leading to Sitio Bago-ATA Village, (Sta. 0+750 - Sta. 0+975) Brgy. Puey, Sagay City, Negros Occidental","amountPesos":4410000.0,"lengthMeters":225.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16555"},{"year":2026,"category":"Roads","project":"Access Road leading to Binadlan Falls, Brgy. Bi-ao, Binalbagan, Negros Occidental (Sta. 22+575 - Sta. 23+475)","amountPesos":19110000.0,"lengthMeters":900.0,"ratePesosPerMeter":21233.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16558"},{"year":2026,"category":"Roads","project":"Access Road from Crossing Tabuac to Cantumbol Dos Falls, Sta. 2+557.50 - 2+667, Bais City, Negros Oriental","amountPesos":4410000.0,"lengthMeters":109.5,"ratePesosPerMeter":40273.97260273973,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16561"},{"year":2026,"category":"Roads","project":"Access Road from Sitio Palangging leading to Tindog Bato Lake, Sta. 3+029.5 - 3+137.5, Bais City, Negros Oriental","amountPesos":4410000.0,"lengthMeters":108.0,"ratePesosPerMeter":40833.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16563"},{"year":2026,"category":"Roads","project":"Access Road leading to Bahia de Bais, Sta. 0+229.5 - Sta. 0+411, Dewey Island, Bais City, Negros Oriental","amountPesos":4410000.0,"lengthMeters":181.5,"ratePesosPerMeter":24297.520661157025,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16565"},{"year":2026,"category":"Roads","project":"Access Road leading to Sulfur Lagoon, Sta. 0+308.54 - Sta. 0+491.54, Brgy. San Miguel, Tanjay City, Negros Oriental","amountPesos":4410000.0,"lengthMeters":183.0,"ratePesosPerMeter":24098.360655737706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16567"},{"year":2026,"category":"Roads","project":"Access Road leading to Tugas Falls, Sta. 0+593 - Sta. 0+701, Brgy. Sab-ahan, Bais City, Negros Oriental","amountPesos":4410000.0,"lengthMeters":108.0,"ratePesosPerMeter":40833.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16569"},{"year":2026,"category":"Roads","project":"Bais-Cambagahan Road leading to Niludhan Falls, Sta. 1+248 - Sta. 1+356, Bais City, Negros Oriental","amountPesos":4410000.0,"lengthMeters":108.0,"ratePesosPerMeter":40833.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16571"},{"year":2026,"category":"Roads","project":"Silab Barangay Road 1 leading to Kan-untol/Pasalan Falls, Purok, Bougainvilla, Roses, Santan, Calachuchi & Water Shed Area, Sta. 2+721.63 - Sta. 2+837.13, Brgy. Silab, Amlan, Negros Oriental","amountPesos":4410000.0,"lengthMeters":115.5,"ratePesosPerMeter":38181.818181818184,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16573"},{"year":2026,"category":"Roads","project":"Access Road leading to Balanan Lake, Siaton, Negros Oriental, (Continuation), Sta. 0+113.62 - Sta. 0+201.62","amountPesos":4410000.0,"lengthMeters":88.0,"ratePesosPerMeter":50113.63636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16576"},{"year":2026,"category":"Roads","project":"Access Road leading to the Fil-Am-Jap Amity Memorial Shrine, Sagbang, Valencia, Negros Oriental, (Continuation), Sta. 0+420 - Sta. 0+508","amountPesos":4410000.0,"lengthMeters":88.0,"ratePesosPerMeter":50113.63636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16578"},{"year":2026,"category":"Roads","project":"Access Road leading to the Red Rock Hot Spring, Ocean 24 and Geothermal Power Plant, Valencia, Negros Oriental, (Continuation), Sta. 0+414.90 - Sta. 0+502.90","amountPesos":4410000.0,"lengthMeters":88.0,"ratePesosPerMeter":50113.63636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16580"},{"year":2026,"category":"Roads","project":"Banga-Mantapi-Mag-aso Road leading to Mag-aso and Mantapi Falls, Brgy. Nangka, Bayawan City, Negros Oriental, (Continuation), Sta. 0+124 - Sta. 0+224","amountPesos":4410000.0,"lengthMeters":100.0,"ratePesosPerMeter":44100.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16582"},{"year":2026,"category":"Roads","project":"Canalum-Narra-Lourdes Falls Road leading to Lourdes Falls, Brgy. Narra, Bayawan City, Negros Oriental, (Continuation), Sta. 0+704.10 - Sta. 0+804","amountPesos":4410000.0,"lengthMeters":99.9,"ratePesosPerMeter":44144.14414414416,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16584"},{"year":2026,"category":"Roads","project":"Crossing Arco Road leading to Forest Conservation and Rehabilitation Eco-Tourism Site (Kabulakan-San Miguel-Buenavista Section), Sta. Catalina, Negros Oriental, (Continuation), Sta. 0+092 - Sta. 0+180","amountPesos":4410000.0,"lengthMeters":88.0,"ratePesosPerMeter":50113.63636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16586"},{"year":2026,"category":"Roads","project":"Lapay-Dawis-Niludhan Road leading to Niludhan Falls, Brgy. Dawis, Bayawan City, Negros Oriental, (Continuation), Sta. 0+760 - Sta. 0+848","amountPesos":4410000.0,"lengthMeters":88.0,"ratePesosPerMeter":50113.63636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16588"},{"year":2026,"category":"Roads","project":"Road from Manalongon Crossing Highway leading to the Station of the Cross in Brgy. Milagrosa, Santa Catalina, Negros Oriental, (Continuation), Sta. 0+197.84 - Sta. 0+285.84","amountPesos":4410000.0,"lengthMeters":88.0,"ratePesosPerMeter":50113.63636363638,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16590"},{"year":2026,"category":"Roads","project":"Access Road leading to Ompas Beach, Liloan, Maria, Siquijor, Sta. 1+360 - Sta. 1+579","amountPesos":4900000.0,"lengthMeters":219.0,"ratePesosPerMeter":22374.429223744293,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16593"},{"year":2026,"category":"Roads","project":"Canlambo-Balolong-Bintangan Road, Brgy. Canlambo, Larena, Siquijor, Sta. 1+560 - Sta. 1+782","amountPesos":5880000.0,"lengthMeters":222.0,"ratePesosPerMeter":26486.486486486487,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16597"},{"year":2026,"category":"Roads","project":"Ponong-Cantabon Barangay Road leading to Tulawog Cave to Cantabon Cave, Siquijor, Siquijor, Sta. 1+339 - Sta. 1+609","amountPesos":5880000.0,"lengthMeters":270.0,"ratePesosPerMeter":21777.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16599"},{"year":2026,"category":"Roads","project":"San Antonio-Cantabon-Bandilaan Road leading to various Cantabon Cave, Healing Sites and Mountain View Park, Siquijor, Siquijor, Sta. 1+823 - Sta. 2+543","amountPesos":19600000.0,"lengthMeters":720.0,"ratePesosPerMeter":27222.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16601"},{"year":2026,"category":"Roads","project":"Abatan-Agahay-Busao-Toril-Aghao Road (Cabawan) leading to several tourism sites (Sta. 000 + 360.00 - Sta. 000 + 400.00), Maribojoc, Bohol","amountPesos":8721000.0,"lengthMeters":40.0,"ratePesosPerMeter":218025.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16605"},{"year":2026,"category":"Roads","project":"Cantoyoc Brgy. Road leading to Binaliw Falls, Brgy. Nahawan, Clarin, Bohol Sta. 0+710-sta. 1+201.26","amountPesos":4360000.0,"lengthMeters":491.26,"ratePesosPerMeter":8875.13740178317,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16608"},{"year":2026,"category":"Roads","project":"Danao-Sagbayan Road Jct. to Sto. Niño to Magtangtang Barangay Road leading to Danao Adventure Park, Danao, Bohol Sta. 0+224-Sta. 0+399.00","amountPesos":4360000.0,"lengthMeters":175.0,"ratePesosPerMeter":24914.285714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16610"},{"year":2026,"category":"Roads","project":"Hinlayagan Ilaya-Banlasan-San Isidro Road leading to Kawasan Falls, Brgy. Hinlayagan Ilaya, Trinidad, Bohol Sta. 3+748.36-Sta. 3+948.36","amountPesos":4360000.0,"lengthMeters":200.0,"ratePesosPerMeter":21800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16612"},{"year":2026,"category":"Roads","project":"Jct. TER Mabuhay-Gabi-Bayongan-Camanaga Road leading to Bayongan Dam, San Miguel, Bohol Sta. 0+437.87-Sta. 0+618","amountPesos":4360000.0,"lengthMeters":180.13,"ratePesosPerMeter":24204.741020374175,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16614"},{"year":2026,"category":"Roads","project":"Poblacion to Sitio Catoogan Candungao Brgy. Road leading to Candungao Peak Tourism Site, Brgy. Poblacion, San Isidro, Bohol Sta.2+480-Sta.2+660","amountPesos":4360000.0,"lengthMeters":180.0,"ratePesosPerMeter":24222.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16618"},{"year":2026,"category":"Roads","project":"Construction of Road in M. Cabiguhan-Kinaoan Kauswagan-Diis (Trinidad) - Candiis, San Carlos - Magtangtang Danao leading to Danao Adventure Park, Brgy. Kauswagan, Trinidad, Bohol - Sta.3+380 - Sta.5+380","amountPesos":50000000.0,"lengthMeters":2000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16620"},{"year":2026,"category":"Roads","project":"Construction of Road Hinlayagan Ilaya-Banlasan-San Isidro to Kagawasan Falls in Brgy. Hinlayagan Ilaya, Trinidad, Bohol - Sta.3+748.36 - Sta.5+748.36","amountPesos":50000000.0,"lengthMeters":2000.0,"ratePesosPerMeter":25000.000000000007,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16622"},{"year":2026,"category":"Roads","project":"Taming to Villa Anunciado Road leading to Highland Tourism, Brgy. Taming, Danao, Bohol Sta. 0+722.71-Sta. 0+903.00","amountPesos":4360000.0,"lengthMeters":180.29,"ratePesosPerMeter":24183.26030284542,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16624"},{"year":2026,"category":"Roads","project":"Jct. (TER) Dimiao-Oac-Bilar-Jct. (LIR) Road Access from Beaches leading to Man-Made Forest, Tarsier, Logarita Spring, Butterfly, Rajah Sikatuna Park and Chocolate Hills, Bohol, Sta. 0+200.00 - Sta. 0+280.00","amountPesos":4360000.0,"lengthMeters":80.0,"ratePesosPerMeter":54500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16627"},{"year":2026,"category":"Roads","project":"Jct. (TER) Gabayan-Canawa (Candijay)-Inaghuban-Pilar Road leading to Canawa Spring and Can-Umantad Water Falls, Pilar, Bohol, Sta. 2+466.00 - Sta. 2+641.00","amountPesos":4360000.0,"lengthMeters":175.0,"ratePesosPerMeter":24914.285714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16629"},{"year":2026,"category":"Roads","project":"Jct. (TER) Itum-Duay-Payao Road, Duero leading to Camp Verde Nature Park, Duero, Bohol, Sta. 5+554.00 - Sta. 5 + 655.00, Sta. 6 + 535.69 - Sta. 6 + 609.69","amountPesos":4360000.0,"lengthMeters":175.0,"ratePesosPerMeter":24914.285714285714,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16631"},{"year":2026,"category":"Roads","project":"Santa Fe-Bantayan Provincial Road leading to tourist destinations, Sta. 000+215.688 - Sta. 000+344.31, Bantayan Island, Cebu","amountPesos":4360000.0,"lengthMeters":128.622,"ratePesosPerMeter":33897.77798510363,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16637"},{"year":2026,"category":"Roads","project":"Access Road leading to Santiago Public Beach Resort, San Francisco, Cebu - Sta. 0+000.00 - Sta. 0+750.00","amountPesos":21802000.0,"lengthMeters":750.0,"ratePesosPerMeter":29069.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16640"},{"year":2026,"category":"Roads","project":"Bugas-Tigbao-Santicon Road leading to Candungao and Sohoton Peaks, Sta. 0 + 000 - Sta. 0 + 132, Badian, Cebu","amountPesos":4360000.0,"lengthMeters":132.0,"ratePesosPerMeter":33030.30303030303,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16643"},{"year":2026,"category":"Roads","project":"Tubod-Basiao-Candiis Road leading to Salagmaya Peak, Sta. 1 + 439 - Sta. 1 + 577, Badian, Cebu","amountPesos":4360000.0,"lengthMeters":138.0,"ratePesosPerMeter":31594.202898550724,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16647"},{"year":2026,"category":"Roads","project":"NRJ to Lintaon Road leading to Lintaon Peak, Sta. 3+884 - 3+894.70, Baybay City, Leyte","amountPesos":4235000.0,"lengthMeters":10.7,"ratePesosPerMeter":395794.3925233712,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16651"},{"year":2026,"category":"Roads","project":"Capul Circumferential Road, Aguin-Landusan-Sawang-Sagaosawan-Jubang-Oson-Poblacion Section, Sta. 000+633 - Sta. 000+733, Capul, Northern Samar","amountPesos":4342000.0,"lengthMeters":100.0,"ratePesosPerMeter":43420.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16654"},{"year":2026,"category":"Roads","project":"Access Road leading to Pinipisakan Falls (Sta. 15+488 - Sta. 15+558), Las Navas, Northern Samar","amountPesos":4342000.0,"lengthMeters":70.0,"ratePesosPerMeter":62028.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16659"},{"year":2026,"category":"Roads","project":"Access Road leading to Sulpan Cave, Sta. 0+887.38 - Sta. 0+919.38, Matuguinao, Samar","amountPesos":4235000.0,"lengthMeters":32.0,"ratePesosPerMeter":132343.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16662"},{"year":2026,"category":"Roads","project":"Limasawa Circumferential Road, Limasawa, Southern Leyte (Sta. 13+086 - Sta. 13+286)","amountPesos":4342000.0,"lengthMeters":200.0,"ratePesosPerMeter":21710.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16665"},{"year":2026,"category":"Roads","project":"Access Road leading to Maniway Peaks, Rizal, Zamboanga del Norte - Sta. 0+405 - Sta. 0+527","amountPesos":4341000.0,"lengthMeters":122.0,"ratePesosPerMeter":35581.96721311475,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16672"},{"year":2026,"category":"Roads","project":"Buenasuerte-La Purisima Canon Road leading to Canon Falls, Mutia, Zamboanga del Norte - Sta. 0+839 - Sta. 0+860, Sta. 0+920 - Sta. 0+996.60","amountPesos":4341000.0,"lengthMeters":97.6,"ratePesosPerMeter":44477.45901639343,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16674"},{"year":2026,"category":"Roads","project":"G. Bergado Road leading to Pigbuklugan Falls, Mutia, Zamboanga del Norte - Sta. 1+414.20 - Sta. 1+516.50","amountPesos":4341000.0,"lengthMeters":102.3,"ratePesosPerMeter":42434.01759530794,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16676"},{"year":2026,"category":"Roads","project":"Unidos Road leading to Bagait Falls, Mutia, Zamboanga del Norte - Sta. 0+954.30 - Sta. 1+067.60","amountPesos":4341000.0,"lengthMeters":113.3,"ratePesosPerMeter":38314.21006178289,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16678"},{"year":2026,"category":"Roads","project":"Access Road leading to Solaj Beach to Patawag Beach, Liloy, Zamboanga del Norte - Sta. 7+260 - Sta. 7+420","amountPesos":4341000.0,"lengthMeters":160.0,"ratePesosPerMeter":27131.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16688"},{"year":2026,"category":"Roads","project":"Lantungan-Bag-ong Oslob Road leading to Seaview Panoramic and Eco Park, Bag-ong Oslob, Aurora, Zamboanga del Sur 01+451 - Sta. 01+575","amountPesos":4341000.0,"lengthMeters":124.0,"ratePesosPerMeter":35008.06451612903,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16691"},{"year":2026,"category":"Roads","project":"NRJ Pagadian City-Zamboanga City Road leading to Palpalan Peak, Pagadian City, Zamboanga del Sur Sta. 00+712 - Sta. 00+905","amountPesos":4341000.0,"lengthMeters":193.0,"ratePesosPerMeter":22492.227979274612,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16699"},{"year":2026,"category":"Roads","project":"Naga-Naga Calades Tourism Access Road, Alicia, Zamboanga Sibugay, Sta. 02+700 - Sta. 2+927.50","amountPesos":4341000.0,"lengthMeters":227.5,"ratePesosPerMeter":19081.31868131868,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16705"},{"year":2026,"category":"Roads","project":"National Road Junction leading to Buntong Highland Agri-Tourism Park, Malangas, Zamboanga Sibugay, Sta. 04+050 - Sta. 04 + 198.50","amountPesos":4341000.0,"lengthMeters":148.5,"ratePesosPerMeter":29232.323232323233,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16707"},{"year":2026,"category":"Roads","project":"NRJ Imelda-Alicia Rd to Payao Provincial Road leading to Panggalamatan Beach, Payao, Zamboanga Sibugay, Sta. 01+000 - Sta. 02+068","amountPesos":28941000.0,"lengthMeters":1068.0,"ratePesosPerMeter":27098.314606741573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16711"},{"year":2026,"category":"Roads","project":"National Road Junction leading to Malagandis Falls Sta. 2+063 to Sta. 2+205.5, Titay, Zamboanga Sibugay","amountPesos":4341000.0,"lengthMeters":142.5,"ratePesosPerMeter":30463.157894736843,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16714"},{"year":2026,"category":"Roads","project":"Road Junction leading to Tigpalay Falls Sta. 1+208 to Sta. 1+350.50, Tungawan, Zamboanga Sibugay","amountPesos":4341000.0,"lengthMeters":142.5,"ratePesosPerMeter":30463.157894736843,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16720"},{"year":2026,"category":"Roads","project":"Access Road leading to Sto. Niño View Deck, Sta. 5+880 - Sta. 6+120, Manolo Fortich, Bukidnon","amountPesos":4500000.0,"lengthMeters":240.0,"ratePesosPerMeter":18750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16724"},{"year":2026,"category":"Roads","project":"Access Road leading to Napalit Lake, Barangay Pigtauranan, Sta. 1+340 - Sta. 1+640, Pangantucan, Bukidnon","amountPesos":4247000.0,"lengthMeters":300.0,"ratePesosPerMeter":14156.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16727"},{"year":2026,"category":"Roads","project":"Access Road leading to Mighty Cave, Barangay Dimayon, Sta. 0+590 - Sta. 0+740, Tagoloan, Lanao del Norte","amountPesos":4247000.0,"lengthMeters":150.0,"ratePesosPerMeter":28313.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16730"},{"year":2026,"category":"Roads","project":"Road leading to Kalilangan Cold Spring, from Barangay Pinpin to Barangay Kalilangan, Sta. 0+906 - Sta. 1+036, Tubod, Lanao del Norte","amountPesos":4247000.0,"lengthMeters":130.0,"ratePesosPerMeter":32669.23076923077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16732"},{"year":2026,"category":"Roads","project":"Access Road leading to Mt. Sioan Tri-rock Resort, Sta. 3+262 - Sta. 3+362, Gingoog City, Misamis Oriental","amountPesos":4247000.0,"lengthMeters":100.0,"ratePesosPerMeter":42470.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16735"},{"year":2026,"category":"Roads","project":"Jct. Fatima-Malabog Road leading to Megkawayan Peak Resort, Sta. 1+826 - Sta. 1+874, Brgy. Malabog, Davao City","amountPesos":3920000.0,"lengthMeters":48.0,"ratePesosPerMeter":81666.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16739"},{"year":2026,"category":"Roads","project":"Malabog-Paquibato Road leading to Megkawayan Peak Resort, Sta. 5+430 - Sta. 5+520, Malabog, Davao City","amountPesos":3845000.0,"lengthMeters":90.0,"ratePesosPerMeter":42722.22222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16741"},{"year":2026,"category":"Roads","project":"Sitio Binaton-Sitio Polokon-Jct. KTC Road leading to Megkawayan Peak Resort and Remy Areja's Resort, Brgy. Malabog, Sta. 4+457 - Sta. 4+527, Paquibato District, Davao City","amountPesos":4326000.0,"lengthMeters":70.0,"ratePesosPerMeter":61800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16743"},{"year":2026,"category":"Roads","project":"Libudon Road leading to Laki Pool Inland Resort (Sta. 3+740 - Sta. 3+885), Brgy. Libudon, Mabini, Davao De Oro","amountPesos":4326000.0,"lengthMeters":145.0,"ratePesosPerMeter":29834.48275862069,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16746"},{"year":2026,"category":"Roads","project":"Sto. Niño Road leading to Sto. Niño Caves (Sta. 0+000 - Sta. 0+200), Brgy. Sto. Niño, Laak, Davao de Oro","amountPesos":4326000.0,"lengthMeters":200.0,"ratePesosPerMeter":21630.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16748"},{"year":2026,"category":"Roads","project":"San Jose Road leading to Awao Falls, Brgy. San Jose, Sta. 6+243.375 - Sta. 6+422.375, Monkayo, Davao de Oro","amountPesos":4326000.0,"lengthMeters":179.0,"ratePesosPerMeter":24167.597765363127,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16751"},{"year":2026,"category":"Roads","project":"Jct. City Road Sitio Buhangin leading to Magongawong Falls, Brgy. Tagbaobo, Island Garden City of Samal, Davao del Norte - Section 1 - 0+000 - 0+079, Section 2 - 0+000 - 0+340","amountPesos":9612000.0,"lengthMeters":340.0,"ratePesosPerMeter":28270.58823529412,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16758"},{"year":2026,"category":"Roads","project":"Jct. Road Tuganay-Dujali-Kinamayan to Pob New Casay, RJS Purok 5, Pob Cabayangan to Purok Sampaguita leading to Palayamanan, Brgy. Cabay-Angan, B.E. Dujali, Davao del Norte - 0+000 - 0+270","amountPesos":3845000.0,"lengthMeters":270.0,"ratePesosPerMeter":14240.74074074074,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16760"},{"year":2026,"category":"Roads","project":"Jct. Tagum-Panabo-Circumferential Road to Fd Rd 5 Road leading to Various Tourism Sites, Brgy. San Jose, Sto. Tomas, Davao del Norte - 0+000 - 0+300","amountPesos":4326000.0,"lengthMeters":300.0,"ratePesosPerMeter":14420.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16762"},{"year":2026,"category":"Roads","project":"NRJ (Cabaluna Road) to Junction Consolacion leading to Inland Resorts of Malativas, Panabo City, Davao del Norte - Sec.1: 0+000 - 0+020, 0+054 - 0+074, Sec.2: 0+000 - 0+052","amountPesos":3920000.0,"lengthMeters":72.0,"ratePesosPerMeter":54444.444444444445,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16764"},{"year":2026,"category":"Roads","project":"NRJ Fd Rd 5-Lagdek Road leading to Municipal Ecological Park and Ecology Center (MEPEC), Brgy. San Jose, Sto. Tomas, Davao del Norte - 0+000 - 0+237","amountPesos":3845000.0,"lengthMeters":237.0,"ratePesosPerMeter":16223.628691983122,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16766"},{"year":2026,"category":"Roads","project":"Sitio Pasog-Licup-Tagbitan-ag-Sitio Tagluno Road leading to Puting Bato and Canibad Resort, Brgy. Aundanao, Island Garden City of Samal, Davao del Norte - 0+000 - 0+090","amountPesos":3845000.0,"lengthMeters":90.0,"ratePesosPerMeter":42722.22222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16768"},{"year":2026,"category":"Roads","project":"Access Road leading to Tagum Energy Park, Brgy. Apokon to Hijo Resources to Lanikai Boutique Hotel and Banana Beach, Tagum City (Sta. 0+890 - Sta. 1+124), Davao del Norte","amountPesos":4326000.0,"lengthMeters":234.0,"ratePesosPerMeter":18487.17948717949,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16771"},{"year":2026,"category":"Roads","project":"Access Road leading to Tribal Village, Tibyun Cave, San Miguel Cave and Paradise Cave, New Corella (Sta. 5 +946 -Sta. 6 + 049), Davao del Norte","amountPesos":3845000.0,"lengthMeters":103.0,"ratePesosPerMeter":37330.09708737864,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16773"},{"year":2026,"category":"Roads","project":"Brgy. Liboganon Road leading to Local Beach Resorts, Brgy. Liboganon, Tagum City (Sta. 1+043-1+153, Sta. 3+540-3+580), Davao del Norte","amountPesos":9612000.0,"lengthMeters":150.0,"ratePesosPerMeter":64080.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16775"},{"year":2026,"category":"Roads","project":"Dagohoy-Sitio Paiton Road leading to Pabahay sa Lumad, Brgy. Dagohoy, Talaingod (Sta. 5+598- Sta. 5+414), Davao del Norte","amountPesos":4326000.0,"lengthMeters":184.0,"ratePesosPerMeter":23510.869565217392,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16777"},{"year":2026,"category":"Roads","project":"Davao del Norte-Compostela Valley-Agusan del Sur Road leading to Various Tourism Sites, Sawata (Sta. 16 +897.35- Sta. 17+ 001.35), Davao del Norte","amountPesos":4326000.0,"lengthMeters":104.0,"ratePesosPerMeter":41596.153846153844,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16779"},{"year":2026,"category":"Roads","project":"Jct. Tagum City By pass Road-San Agustin-New Bohol New Corella leading to Matin-ao Inland Resort, New Corella (Sta. 1+ 091-Sta. 1+189) , Davao del Norte","amountPesos":4326000.0,"lengthMeters":98.0,"ratePesosPerMeter":44142.857142857145,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16781"},{"year":2026,"category":"Roads","project":"Matin-ao Road leading to Burako and Casilak Falls, Brgy. New Cortez, New Corella (Sta. 1+640 - Sta. 1+783), Davao del Norte","amountPesos":4326000.0,"lengthMeters":143.0,"ratePesosPerMeter":30251.748251748253,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16783"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road -Access Road from Waterfall Road leading to Pandong Bato Trail, Sta. 1+700.00 - Sta. 1+850.00, Kiblawan, Davao del Sur","amountPesos":4326000.0,"lengthMeters":150.0,"ratePesosPerMeter":28840.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16786"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road - Access Road leading to Pula Tana Viewing Deck, Sta. 2+502.83 - Sta. 2+741.30, Kiblawan, Davao del Sur","amountPesos":4326000.0,"lengthMeters":238.47,"ratePesosPerMeter":18140.646622216613,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16788"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road - Marawer - Baruring Road leading to Tudaya Falls, Sta. 4+522 - Sta. 4+622 Digos City, Davao del Sur","amountPesos":4326000.0,"lengthMeters":100.0,"ratePesosPerMeter":43260.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16792"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road - NRJ Leading to Soong Ecopark, Sta.3+182.90-Sta. 3+362.90 Digos City, Davao Del Sur","amountPesos":4326000.0,"lengthMeters":180.0,"ratePesosPerMeter":24033.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16794"},{"year":2026,"category":"Roads","project":"Balut Island Circumferential Road, Sta. 9+891 - Sta. 10+072, Sarangani, Davao Occidental","amountPesos":4326000.0,"lengthMeters":181.0,"ratePesosPerMeter":23900.552486187844,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16799"},{"year":2026,"category":"Roads","project":"Access Road from Sitio Sangab to Sitio Panlaisan, Brgy. Pichon leading to Pinutuan Falls, Mandaya Indigenous Community, and Forest Protected Area, Sta. 28+083.000-Sta. 28+231.000, Caraga, Davao Oriental","amountPesos":3845000.0,"lengthMeters":148.0,"ratePesosPerMeter":25979.72972972973,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16802"},{"year":2026,"category":"Roads","project":"Jct. Manay-Taocanga Road leading to Diamaboc Lake, Sta. 22+070.000-Sta. 22+230.897, Manay, Davao Oriental","amountPesos":3845000.0,"lengthMeters":160.897,"ratePesosPerMeter":23897.275897002306,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16806"},{"year":2026,"category":"Roads","project":"NRJ San Antonio-Lamiawan-Sangab Road leading to Sangab Cultural Community, Brgy. Pichon, Sta. 8+244.890- Sta. 8+420.166, Caraga, Davao Oriental","amountPesos":3845000.0,"lengthMeters":175.276,"ratePesosPerMeter":21936.831055021816,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16810"},{"year":2026,"category":"Roads","project":"Construction of Road , Brgy. Dawan to Brgy. Macambol leading to Macambol (Sitio Wagon) Spring Resort and Pujada Bay, Brgy. Macambol, Mati City, Davao Oriental - Sta.0+000 - Sta.0+104.082","amountPesos":3845000.0,"lengthMeters":104.082,"ratePesosPerMeter":36942.026479122236,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16813"},{"year":2026,"category":"Roads","project":"Construction of Road ,Langka-Luban-Cabuaya Road leading to Rock Formations, Lake and White Sands Beaches, Barangay Luban, Mati City, Davao Oriental - (Sta. 1833+811.50 - Sta. 1833+913.487)","amountPesos":3845000.0,"lengthMeters":101.987,"ratePesosPerMeter":37700.88344594247,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16815"},{"year":2026,"category":"Roads","project":"Lupon Coastal Road From Purok San Roque, Brgy. Poblacion To Purok Bundas, Brgy. Bagumbayan leading to Diving Site and Other Tourism Areas, Brgy. Bagumbayan, Lupon, Davao Oriental- (Sta. 0+000 - Sta. 0+175.276)","amountPesos":3845000.0,"lengthMeters":175.276,"ratePesosPerMeter":21936.831055021794,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16817"},{"year":2026,"category":"Roads","project":"Access Road leading to Kansal falls and Paniki Falls Sta. 2 + 996 - Sta. 3 + 143 , Brgy. Balabag, Kidapawan City, North Cotabato","amountPesos":3948000.0,"lengthMeters":147.0,"ratePesosPerMeter":26857.14285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16821"},{"year":2026,"category":"Roads","project":"Access Road leading to Twin Falls Sta. 3 + 669 - Sta. 4 + 279, Brgy. Manongol, Kidapawan City, North Cotabato","amountPesos":17547000.0,"lengthMeters":610.0,"ratePesosPerMeter":28765.573770491803,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16823"},{"year":2026,"category":"Roads","project":"Bongolanon-Kinarum Road leading to Kirungdong Waterfalls and Wildlife Rescue Center Sta. 5 + 764 - Sta. 5 + 911 , Brgy. Kinarum, Magpet, North Cotabato","amountPesos":3948000.0,"lengthMeters":147.0,"ratePesosPerMeter":26857.14285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16825"},{"year":2026,"category":"Roads","project":"Jct. Davao-Bukidnon Road to Brgy. San Miguel leading to Lupisan Ecosites Sta. 3 + 764 - Sta. 4 + 764, Brgy. San Miguel, Arakan, North Cotabato","amountPesos":31770000.0,"lengthMeters":1000.0,"ratePesosPerMeter":31770.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16827"},{"year":2026,"category":"Roads","project":"Access Road leading to Malagap Underground River - Sta. 0+455 - Sta. 0+577, Banisilan, North Cotabato","amountPesos":4268000.0,"lengthMeters":122.0,"ratePesosPerMeter":34983.60655737705,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16830"},{"year":2026,"category":"Roads","project":"NRJ Rancho Centro Nagpan-Sitio Kalonbarak Road leading to Kalonbarak Skyline, Sta. 2+730 - Sta. 2+946, Brgy. Poblacion, Malungon, Sarangani","amountPesos":4268000.0,"lengthMeters":216.0,"ratePesosPerMeter":19759.25925925926,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16837"},{"year":2026,"category":"Roads","project":"Poblacion Nalus Road leading to Bocay-il Falls, Sta. 3+311 - Sta. 3+536, Kiamba, Sarangani","amountPesos":4268000.0,"lengthMeters":225.0,"ratePesosPerMeter":18968.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16839"},{"year":2026,"category":"Roads","project":"Jct. Lang Dulay Road leading to Brgy. Lamdalag-Brgy. Klubi-Brgy. Lamcade (Site of world's most number of T'nalak weavers), Brgy. Klubi, Lake Sebu, STA. 0+000-STA. 0+205 South Cotabato","amountPesos":4268000.0,"lengthMeters":205.0,"ratePesosPerMeter":20819.51219512195,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16842"},{"year":2026,"category":"Roads","project":"Banza to Magallanes Road leading to Centennial Tree and Beaches, Sta. 0+418.90 - Sta. 0+436.40 Magallanes, Agusan del Norte","amountPesos":3920000.0,"lengthMeters":17.5,"ratePesosPerMeter":224000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16848"},{"year":2026,"category":"Roads","project":"Circumferential Road leading to Lake Mainit, (0+125 - 0+176.39), Jabonga, Agusan del Norte","amountPesos":3920000.0,"lengthMeters":51.39,"ratePesosPerMeter":76279.4317960693,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16850"},{"year":2026,"category":"Roads","project":"NRJ-Comagascas-Del Pilar-Pirada leading to Tunnel Road, Sta. 3+105 - Sta 3+166.6, Brgy. Del Pilar, Cabadbaran, Agusan del Norte","amountPesos":14700000.0,"lengthMeters":61.6,"ratePesosPerMeter":238636.363636364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16854"},{"year":2026,"category":"Roads","project":"Road leading to Top Ridge and Camp Site, Sta. 3+560 - Sta. 4+410, Magdagooc, Jabonga, Agusan del Norte","amountPesos":39200000.0,"lengthMeters":850.0,"ratePesosPerMeter":46117.64705882353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16856"},{"year":2026,"category":"Roads","project":"Sanghan Road leading to Ragas Farm (Agritourism), Sta. 1+190 - Sta. 1+830, Cabadbaran City, Agusan del Norte","amountPesos":19600000.0,"lengthMeters":640.0,"ratePesosPerMeter":30625.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16858"},{"year":2026,"category":"Roads","project":"NRJ Mabuhay-San Lorenzo Road leading to Bega Park and Resort, Ugnop Caves, Hapon Falls, Tugonan Falls and San Lorenzo Hot spring, Sta. 0+391 - Sta. 0+541, Prosperidad, Agusan del Sur","amountPesos":3920000.0,"lengthMeters":150.0,"ratePesosPerMeter":26133.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16863"},{"year":2026,"category":"Roads","project":"NRJ Poblacion-Puting Buhangin Road leading to Puting Buhangin Cave and Agri-Fruit Farm, Sta. 3+640 - Sta. 3+825, Prosperidad, Agusan del Sur","amountPesos":3920000.0,"lengthMeters":185.0,"ratePesosPerMeter":21189.18918918919,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16867"},{"year":2026,"category":"Roads","project":"Cabantao Road leading to Maanghit Cave & Panganan Falls, Sta. 6+851 - Sta. 6+926, Brgy. Cabantao, Rosario, Agusan del Sur","amountPesos":17993000.0,"lengthMeters":75.0,"ratePesosPerMeter":239906.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16870"},{"year":2026,"category":"Roads","project":"NRJ Maharlika Highway Bunawan Brook-Tagbayangbang Road leading to Bulongbulungan Water Falls, Sta. 8+720 - Sta. 8+940, Brgy. Bunawan Brook, Bunawan, Agusan del Sur","amountPesos":14798000.0,"lengthMeters":220.0,"ratePesosPerMeter":67263.63636363637,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16872"},{"year":2026,"category":"Roads","project":"NRJ Maharlika Highway-Purok 6-Purok 9-Masabong-Cossep Road leading to Dinagitan Cave and Falls, Sta. 3+200 - Sta.3+303, Brgy. Bayugan 3, Rosario, Agusan del Sur","amountPesos":3920000.0,"lengthMeters":103.0,"ratePesosPerMeter":38058.25242718447,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16874"},{"year":2026,"category":"Roads","project":"NRJ Pasta-Buenasuerte-Caimpogan Road leading to Caimpogan Peat Swamp Forest & Agusan Marsh Wildlife Sanctuary, Sta. 9+839 - Sta. 9+990, San Francisco, Agusan del Sur","amountPesos":5150000.0,"lengthMeters":151.0,"ratePesosPerMeter":34105.96026490066,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16876"},{"year":2026,"category":"Roads","project":"NRJ Poblacion-Conception-Sayon-Tagmanoro-Awao Crossing Doldol Road leading to Tugpan Falls & Binugwakan Cold Spring, Sta. 2+680 - Sta. 2+730, Sta. 6+911 - Sta. 6+988, Santa Josefa, Agusan del Sur","amountPesos":3920000.0,"lengthMeters":127.0,"ratePesosPerMeter":30866.141732283464,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16878"},{"year":2026,"category":"Roads","project":"Pisaan-Lucac-Bitan-agan Road leading to Datu Kanawa Kalipay Cave, Sta. 3+762 - Sta. 3+895, San Francisco, Agusan del Sur","amountPesos":3920000.0,"lengthMeters":133.0,"ratePesosPerMeter":29473.684210526317,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16880"},{"year":2026,"category":"Roads","project":"Access Road leading to 8 Enchanted Wonders (Wetland Center/GK Enchanted Farm), (Sta. 1+205 - Sta. 1+341.84), Butuan City, Agusan del Norte","amountPesos":3920000.0,"lengthMeters":136.84,"ratePesosPerMeter":28646.594562993294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16883"},{"year":2026,"category":"Roads","project":"Access Road leading to Altar Falls, (Sta. 7+075.05 - Sta. 7+138.05 L/S), Butuan City, Agusan del Norte","amountPesos":47040000.0,"lengthMeters":63.0,"ratePesosPerMeter":746666.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16885"},{"year":2026,"category":"Roads","project":"Access Road leading to Farmers Producers Cooperative Nursery Demo and Integrated Farm, (Sta. 8+653.16 - Sta. 8+772), Brgy. Tungao, Butuan City, Agusan del Norte","amountPesos":3920000.0,"lengthMeters":118.84,"ratePesosPerMeter":32985.526758667074,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16887"},{"year":2026,"category":"Roads","project":"Access Road leading to Lawaan Park, (Sta. 1+082 - Sta. 1+104), Brgy. Tungao, Butuan City, Agusan del Norte","amountPesos":3920000.0,"lengthMeters":22.0,"ratePesosPerMeter":178181.81818181818,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16889"},{"year":2026,"category":"Roads","project":"Access Road leading to Sumile Zoological and Botanical Park, (Sta. 7+491.50 - Sta. 7+628.34), Butuan City, Agusan del Norte","amountPesos":3920000.0,"lengthMeters":136.84,"ratePesosPerMeter":28646.594562993247,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16891"},{"year":2026,"category":"Roads","project":"NRJ Butuan City-Malaybalay Road leading to NRJ Buenavista-Bunaguit Road (Bitan-agan-Nongnong-Mt. Mayapay-Bunaguit, Buenavista Section), (Sta. 7+235.16 - Sta. 7+372.00), Butuan City, Agusan del Norte","amountPesos":3920000.0,"lengthMeters":136.84,"ratePesosPerMeter":28646.594562993247,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16895"},{"year":2026,"category":"Roads","project":"NRJ-Butuan City-Mayor Democrito D. Plaza II Ave. Road leading to Mt. Mayapay (Delta Discovery Park), (Sta. 3+422.4 - Sta. 3+436.08), Sitio Matin-ao, Bonbon, Butuan City, Agusan del Norte","amountPesos":3458000.0,"lengthMeters":13.68,"ratePesosPerMeter":252777.7777777808,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16899"},{"year":2026,"category":"Roads","project":"Access Road leading to Loreto Landing Site/Campintac Black Beach No. 2, (9+096.5 - 9+296.5), Loreto, Dinagat Islands","amountPesos":9800000.0,"lengthMeters":200.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16903"},{"year":2026,"category":"Roads","project":"Brgy. Bayanihan via Brgy. San Jose Road leading to Mount Palhi, (1+231.39 - 1+338.74), Libjo (Albor), Dinagat Islands","amountPesos":4900000.0,"lengthMeters":107.35,"ratePesosPerMeter":45645.08616674424,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16905"},{"year":2026,"category":"Roads","project":"Diegas-Rita Glenda-Benglen Road leading to Gaas Inlet, (3+598.4 - 3+698), Basilisa, Dinagat Islands","amountPesos":4900000.0,"lengthMeters":99.6,"ratePesosPerMeter":49196.78714859442,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16907"},{"year":2026,"category":"Roads","project":"Mahayahay (San Jose)-Gomez (Dinagat) Road leading to Tagbuyakhaw Tourism Area, (1+975 - STA. 2+100), Dinagat, Dinagat Islands","amountPesos":4900000.0,"lengthMeters":125.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16909"},{"year":2026,"category":"Roads","project":"Matingbe(San Jose)-Gomez(Dinagat)-Luna (San Jose)-Cayetano(Dinagat) Coastal Road leading to Resorts and Tourism Area, (0 +787 - STA. 0+868), San Jose, Dinagat Islands","amountPesos":4900000.0,"lengthMeters":81.0,"ratePesosPerMeter":60493.82716049383,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16911"},{"year":2026,"category":"Roads","project":"Municipal Coastal Road from Ferdinand-Melgar leading to the nearest point to Lake Bababu, (2+245 - STA. 2+345), Basilisa (Rizal), Dinagat Islands","amountPesos":4900000.0,"lengthMeters":100.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16913"},{"year":2026,"category":"Roads","project":"NRJ Brgy. Campo-Brgy. Payapag Road leading to Sitio Little Baguio Falls and Farm, (6+857 - 6+892), Bacuag, Surigao del Norte","amountPesos":33842000.0,"lengthMeters":35.0,"ratePesosPerMeter":966914.2857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16916"},{"year":2026,"category":"Roads","project":"NRJ Poblacion Alegria Road leading to Mainit Lake Boat Landing Facility, (2+041.25 - 2+441.25), Brgy. Poblacion, Alegria, Surigao del Norte","amountPesos":9800000.0,"lengthMeters":400.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16918"},{"year":2026,"category":"Roads","project":"Access Road leading to Caguyao Mangrove site, Sta. 11+370 - Sta. 11+440.11, Sta. 11+470.11 - Sta. 11+511.5, Brgy. Caguyao, Bislig City, Surigao del Sur","amountPesos":3920000.0,"lengthMeters":111.5,"ratePesosPerMeter":35156.95067264574,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16921"},{"year":2026,"category":"Roads","project":"Campa Road leading to Ligad White Beach, Sta. 1+840 - Sta. 1+951.5, Brgy. Campa, Hinatuan, Surigao del Sur","amountPesos":3920000.0,"lengthMeters":111.5,"ratePesosPerMeter":35156.95067264574,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16923"},{"year":2026,"category":"Roads","project":"Dugmanon-Tiwi-San Juan Road leading to Ecotourism & Century Mangrove, Sta. 2+680.5 - Sta. 2+792, Brgy. San Juan, Hinatuan, Surigao del Sur","amountPesos":3920000.0,"lengthMeters":111.5,"ratePesosPerMeter":35156.95067264574,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16925"},{"year":2026,"category":"Roads","project":"Jct. Baculin Access Road leading to Harip White Beach Resort, Sta. 0+316 - Sta. 0+427.5, Brgy. Harip, Hinatuan, Surigao del Sur","amountPesos":3920000.0,"lengthMeters":111.5,"ratePesosPerMeter":35156.95067264574,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16927"},{"year":2026,"category":"Roads","project":"Jct. Mahogany Road leading to Tagpoporan Blue Water Resort, Sta. 8+650 - Sta. 8+761.5, Brgy. Tagpoporan, Lingig, Surigao del Sur","amountPesos":3920000.0,"lengthMeters":111.5,"ratePesosPerMeter":35156.95067264574,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16929"},{"year":2026,"category":"Roads","project":"NRJ-Dugmanon-Enchanted River-Baculin Road leading to Enchanted River, Sta. 23+850 - Sta. 24+147 (L/S), Sta. 24+040 - Sta. 24+147 (R/S), Hinatuan, Surigao del Sur","amountPesos":43221000.0,"lengthMeters":297.0,"ratePesosPerMeter":145525.25252525252,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16931"},{"year":2026,"category":"Roads","project":"NRJ-Sitio Sta. Maria Road leading to Palo Alto White Beach Resort, Sta. 4+978.2 - Sta. 5+104.7, Brgy. Palo Alto, Lingig, Surigao del Sur","amountPesos":3920000.0,"lengthMeters":126.5,"ratePesosPerMeter":30988.14229249012,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16933"},{"year":2026,"category":"Roads","project":"Tagasaka-Tarusan-Loyola Road leading to Gateway Palaran Ultimate Adventure Caves and Loyola White Beaches, Sta. 3+880 - Sta. 4+006.5, Brgy. Tarusan, Hinatuan, Surigao del Sur","amountPesos":3920000.0,"lengthMeters":126.5,"ratePesosPerMeter":30988.14229249012,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16935"},{"year":2026,"category":"Roads","project":"Barangay. Patima-Bamban Road connecting Pangasinan-Zambales Road, in support of the Mining Industry, Sta. 7 + 120 - Sta. 8 + 200, Infanta, Pangasinan","amountPesos":44470000.0,"lengthMeters":1080.0,"ratePesosPerMeter":41175.92592592593,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16942"},{"year":2026,"category":"Roads","project":"Poblacion Sur-Sorioan-Lucbuban-Ubbog-Baybayading Road connecting Candon-Salcedo-San Emilio Del Pilar National Road in support of the Cacao Processing Center and Cacao Plantation, Sta. 1 + 100 - Sta. 1 + 800, Salcedo, Ilocos Sur","amountPesos":17401000.0,"lengthMeters":700.0,"ratePesosPerMeter":24858.571428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16944"},{"year":2026,"category":"Roads","project":"Poblacion-Puguil-Tubaday Road connecting Balaoan-Santol Road in support of the Soft Broom Industry and other High Value Agricultural Products, Sta. 9 + 880 - Sta. 12 + 640, Santol, La Union","amountPesos":17401000.0,"lengthMeters":2760.0,"ratePesosPerMeter":6304.710144927536,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16946"},{"year":2026,"category":"Roads","project":"Punta-Subec-Mindanao-Paratong-Tamorong Roads connecting Fishponds and Agricultural Lands, Sta. 0 + 000 - Sta. 0 + 200, Santa Catalina, Ilocos Su","amountPesos":1933000.0,"lengthMeters":200.0,"ratePesosPerMeter":9665.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16948"},{"year":2026,"category":"Roads","project":"Silangan Road (C.A. Yulo Avenue) connecting South Luzon Expressway leading to the Industrial Parks, Sta. 047 + 260 - Sta. 047 + 960, Calamba City, Laguna","amountPesos":23423000.0,"lengthMeters":700.0,"ratePesosPerMeter":33461.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16956"},{"year":2026,"category":"Roads","project":"Cantao-an-Cogon Road leading to Naga Valley (NAVA) Industrial Park, Sta. 0+000 - Sta. 1+420, Naga City, Cebu","amountPesos":43605000.0,"lengthMeters":1420.0,"ratePesosPerMeter":30707.74647887324,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16962"},{"year":2026,"category":"Roads","project":"Estaka Road leading to Naga Valley (NAVA) Industrial Park, Sta. 0+000 - Sta. 4+300, Naga City, Cebu","amountPesos":193800000.0,"lengthMeters":4300.0,"ratePesosPerMeter":45069.767441860466,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16964"},{"year":2026,"category":"Roads","project":"Inayagan-Cantao-an Road leading to Naga Valley (NAVA) Industrial Park, Sta. 0+000 - Sta. 1+190, Naga City, Cebu","amountPesos":36822000.0,"lengthMeters":1190.0,"ratePesosPerMeter":30942.85714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16966"},{"year":2026,"category":"Roads","project":"Construction of Bal-ason Road, Sitio Mangliit, in support to coffee processing site, cacao and coffee plantation, Barangay Bal-ason, Sta. 0+000 - Sta. 3+000, Gingoog City, Misamis Oriental","amountPesos":96381000.0,"lengthMeters":3000.0,"ratePesosPerMeter":32127.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16972"},{"year":2026,"category":"Roads","project":"Construction of Esperanza to Barangay Suarez Road in support to coconut plantation, Sta. 0+000 - Sta. 5+000, Kinoguitan, Misamis Oriental","amountPesos":151015000.0,"lengthMeters":5000.0,"ratePesosPerMeter":30203.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16974"},{"year":2026,"category":"Roads","project":"Northern Bukidnon Agri-Industrial Economic Zone Road Network Development Project (Kalilangan Br.), Sta. 6+225 - Sta. 6+295, Baungon, Bukidnon","amountPesos":33611000.0,"lengthMeters":70.0,"ratePesosPerMeter":480157.14285714284,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16976"},{"year":2026,"category":"Roads","project":"Southern Bukidnon Agri-Industrial Economic Zone Road Network Development Project (San Miguel Br. 2), Sta. 94+512 - Sta. 94+582, Maramag, Bukidnon","amountPesos":32076000.0,"lengthMeters":70.0,"ratePesosPerMeter":458228.5714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16978"},{"year":2026,"category":"Roads","project":"NRJ Sagayen-Sonlon Road connecting Asuncion Overland Transport Terminal in support of the Coconut, Banana and Rice Industries, Asuncion (Sta. 1485+873 - Sta. 1488+673), Davao del Norte","amountPesos":56713000.0,"lengthMeters":2800.0,"ratePesosPerMeter":20254.64285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16981"},{"year":2026,"category":"Roads","project":"Poblacion-San Isidro-Liberty-Pulabato-Palo Road connecting to HVCC Plantation Areas and Tampakan Public Market in support of the Agribusiness Industry, Sta. 10+902\n- Sta. 12+882, Tampakan, South Cotabato","amountPesos":52160000.0,"lengthMeters":1980.0,"ratePesosPerMeter":26343.434343434343,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16984"},{"year":2026,"category":"Roads","project":"Nambaran-Pulangi-Paninaan Road connecting the Manila North Road in support of the Wine and Fruit Juice Making Industry (Sta. 1+495 - Sta. 2+070), Barangay. 23, Paninaan, Bacarra, Ilocos Norte","amountPesos":9667000.0,"lengthMeters":575.0,"ratePesosPerMeter":16812.17391304348,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16988"},{"year":2026,"category":"Roads","project":"Kinmarin-Boguibog Road Connecting Sta. Cruz-Sigay Road and National Road in support of the Coffee Processing Center and Coffee Plantation, Salcedo, Ilocos Sur, Sta. 0+558 - Sta. 0+700","amountPesos":4834000.0,"lengthMeters":142.0,"ratePesosPerMeter":34042.25352112676,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16991"},{"year":2026,"category":"Roads","project":"Sitio Manggaan Road in support of the Vegetable, Pigeon Pea, Purple Yam, Mung Bean, Banana, Coffee, Gabi, Annato, Peanut, Corn and Other High-Value Crops Processing Center, Sugpon, Ilocos Sur,  Sta. 0+000 - Sta. 0+950","amountPesos":27069000.0,"lengthMeters":950.0,"ratePesosPerMeter":28493.684210526317,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16993"},{"year":2026,"category":"Roads","project":"San Antonio Linking to Naguilian-Bagulin Road leading to San Antonio Rice Wine Production, Naguilian, La Union, Sta. 2+553-Sta.2+803","amountPesos":9667000.0,"lengthMeters":250.0,"ratePesosPerMeter":38668.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 16998"},{"year":2026,"category":"Roads","project":"Barangay. Garrita-San Vicente-Banog Sur Road in support of the Processing of Agricultural Food Products (Watermelon, Mango, and other high value crops)(0+470 - 0+705), Bani, Pangasinan","amountPesos":4834000.0,"lengthMeters":235.0,"ratePesosPerMeter":20570.212765957447,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17001"},{"year":2026,"category":"Roads","project":"Abra-Cervantes Road-Palaquio Road in support of the Cacao Industry, Sta. 0+737 - Sta. 1+307, Bucay, Abra","amountPesos":4900000.0,"lengthMeters":570.0,"ratePesosPerMeter":8596.491228070176,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17005"},{"year":2026,"category":"Roads","project":"Alaoa to Lapat Balantay Road in support of the Coffee Industry, Sta. 0+433.50 - Sta. 0+733.5, Tineg, Abra","amountPesos":4900000.0,"lengthMeters":300.0,"ratePesosPerMeter":16333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17007"},{"year":2026,"category":"Roads","project":"Daguioman-Bucay Road in support of the Coffee, Fruit, Cacao and Homestyles Industries, Sta. 0+462.5 - Sta. 0+762.5, Daguioman, Bucloc, Sallapadan and Bucay, Abra","amountPesos":4900000.0,"lengthMeters":300.0,"ratePesosPerMeter":16333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17009"},{"year":2026,"category":"Roads","project":"Lamunan-Ableg Road in support of the Coffee, Fruits, and Homestyles Industry, Sta. 1+035.70 - Sta. 1+235.70, Daguioman, Abra","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17011"},{"year":2026,"category":"Roads","project":"Nagpaoayan-Mapisla Road in support of the Coffee Industry, Sta. 0+982.50 - Sta. 1+182.50, Licuan-Baay, Abra","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17013"},{"year":2026,"category":"Roads","project":"Poblacion Tubo to Quirino Road connecting Poblacion, Tubo to Quirino, Ilocos Sur in support of the Loomweaving Industry, Sta. 0+862.50 - Sta. 1+062.50, Tubo, Abra","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17015"},{"year":2026,"category":"Roads","project":"Sto. Tomas-Luba Road connecting Sto. Tomas Manabo to Luba in support of the Processed Food, Loomweaving and Furniture Industries, Sta. 3+380 - Sta. 3+580, Luba and Manabo, Abra","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17017"},{"year":2026,"category":"Roads","project":"Manag-Talifugo-Paddaoan Road in support of the Banana, Coffee, Cacao, Rice and Corn Industries, Sta.6+223.50- Sta.7+068.50, Conner, Apayao","amountPesos":38872000.0,"lengthMeters":845.0,"ratePesosPerMeter":46002.36686390533,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17020"},{"year":2026,"category":"Roads","project":"Anninipan-Pantay-Pantay Road in support of the Rice, Corn and Banana Industry, Sta. 1+425 - Sta. 1+635, Flora, Apayao","amountPesos":12199000.0,"lengthMeters":210.0,"ratePesosPerMeter":58090.47619047619,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17023"},{"year":2026,"category":"Roads","project":"Dagupan-Salvacion Road in support of the Handicrafts, Furniture, Pineapple, Banana, Vegetables, Rice and Corn Industries, Sta. 1+115.5 - Sta. 1+201.5, Luna, Apayao","amountPesos":4900000.0,"lengthMeters":86.0,"ratePesosPerMeter":56976.74418604651,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17025"},{"year":2026,"category":"Roads","project":"Doña Loreta-Lydia Road in support of the Furniture, Handicraft, Loomweaving, Blacksmithing, Pineapple, Banana, Vegetables, Rootcrops, Rice, and Corn Industries, Sta. 0+490 - Sta. 0+694, Pudtol, Apayao","amountPesos":19281000.0,"lengthMeters":204.0,"ratePesosPerMeter":94514.70588235294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17027"},{"year":2026,"category":"Roads","project":"Malubibit Sur-Balasi-Atok Road in support of the Handicraft, Furniture, High Value Crops Processing and Support to Tourism Industries, Sta. 2+466.5 - Sta. 3+617.5, Flora, Apayao","amountPesos":4900000.0,"lengthMeters":1151.0,"ratePesosPerMeter":4257.167680278019,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17029"},{"year":2026,"category":"Roads","project":"Panay-Bato, Sabel Road in support of the Cassava, Corn, Rice, Mandarin, Tourism, Handicraft, Furniture, Fruit Wines and Coconut, Sta. 3+565.5 - Sta. 3+617.5, Santa Marcela, Apayao","amountPesos":4900000.0,"lengthMeters":52.0,"ratePesosPerMeter":94230.76923076923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17031"},{"year":2026,"category":"Roads","project":"Pudtol-Bagutong Road in support of the Furniture Handicrafts, Loom Weaving, Banana, Pineapple, Vegetables, and root crops, Corn and Rice, Sta. 5+368 - Sta. 5+555.5, Pudtol, Apayao","amountPesos":4900000.0,"lengthMeters":187.5,"ratePesosPerMeter":26133.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17033"},{"year":2026,"category":"Roads","project":"San Sebastian-San Jose-San Francisco Road in support of the Handicraft, Furniture, Processed High Value Crops, Vegetable Rice and Corn Industries, Sta. 1+975.5 - Sta. 2+125.5, Luna, Apayao","amountPesos":4900000.0,"lengthMeters":150.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17035"},{"year":2026,"category":"Roads","project":"Santa Maria-Mallig Road in support of the Furniture, Handicrafts, Banana, Rice, Corn, and Tourism Industries, Sta. 2+349 - Sta. 2+842, Flora, Apayao","amountPesos":16170000.0,"lengthMeters":493.0,"ratePesosPerMeter":32799.18864097363,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17037"},{"year":2026,"category":"Roads","project":"Sta. Filomena Road in support of the Multi-Crop Processing Center (Coffee, Cacao, Pineapple, Coconut) Furniture Processing Center, Sta. 8+630 - Sta. 8+780, Calanasan, Apayao","amountPesos":4900000.0,"lengthMeters":150.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17039"},{"year":2026,"category":"Roads","project":"Baguio-Bontoc Road Jct. to Batan-Adaoay, Kabayan Road in support of the Vegetable, Processed Tea and Coffee Industry - 3+191 - 3+304, Kabayan, Benguet","amountPesos":4900000.0,"lengthMeters":113.0,"ratePesosPerMeter":43362.83185840708,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17042"},{"year":2026,"category":"Roads","project":"Baguio-Bontoc Road Jct. to Guiweng-Nawal-Tickey-Daclan Road in support of the Coffee, and Processed Food Meat Industries - 7+330 - 7+443, Bokod, Benguet","amountPesos":4900000.0,"lengthMeters":113.0,"ratePesosPerMeter":43362.83185840708,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17044"},{"year":2026,"category":"Roads","project":"Beckes-Bulala Road in support of the Coffee, Cacao, Bamboo, Cutflower, Tiger Grass, Fruit Trees, Heirloom Rice, Livestock, High Value Vegetables and Services - 6+181 - 6+294, Sablan, Benguet","amountPesos":4900000.0,"lengthMeters":113.0,"ratePesosPerMeter":43362.83185840708,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17046"},{"year":2026,"category":"Roads","project":"Camp 3 Torre-Antamok-Mangga-Belis-Piminggan-Ansagan Proper Road in support of the Cacao and Coffee Industry - 22+848 - 22+961, Tuba, Benguet","amountPesos":4900000.0,"lengthMeters":113.0,"ratePesosPerMeter":43362.83185840708,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17048"},{"year":2026,"category":"Roads","project":"Piminggan-Saguitlang-Lubas-Dungon Road in support of the Coffee, Cacao, Bamboo, Gold, Livestock, High Value Vegetables and Food Processing - 4+145 - 4+258, Tuba, Benguet","amountPesos":4900000.0,"lengthMeters":113.0,"ratePesosPerMeter":43362.83185840708,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17050"},{"year":2026,"category":"Roads","project":"Bangho-Daclan-Basil-Tublay Central Road in support of the Coffee, Bamboo, Cutflowers and Fruit Tree Industries, Sta. 2+850 - Sta. 2+868, Sta. 3+069 - Sta. 3+166, Tublay, Benguet","amountPesos":4900000.0,"lengthMeters":115.0,"ratePesosPerMeter":42608.69565217391,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17053"},{"year":2026,"category":"Roads","project":"Betwag-Pongayan Road in support of the Coffee, Cacao, Bamboo, Cut Flower, Banana, Heirloom rice, Livestock and other High Value Vegetables, Sta. 4+785 - Sta. 4+891, Kapangan, Benguet","amountPesos":4900000.0,"lengthMeters":106.0,"ratePesosPerMeter":46226.41509433962,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17055"},{"year":2026,"category":"Roads","project":"Guiswak-Lokot-Ambalideng Access Road in support of the Coffee, Cacao, Bamboo, Cutflower, Banana, Livestock, Heirloom Rice, and other High Value Vegetables, Sta. 2+367 - Sta. 2+473, Kibungan, Benguet","amountPesos":4900000.0,"lengthMeters":106.0,"ratePesosPerMeter":46226.41509433962,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17057"},{"year":2026,"category":"Roads","project":"Kapangan Central Gaswiling-Catiaoan Road-Bagulin Road in support of the Coffee, Bamboo, Food and Feed Crops, Cutflowers and Fruit Trees Industry, Sta. 5+702 - Sta. 5+808, Kapangan, Benguet","amountPesos":4900000.0,"lengthMeters":106.0,"ratePesosPerMeter":46226.41509433962,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17059"},{"year":2026,"category":"Roads","project":"King Solomon Sto. Nino-Coroz-Tabeyo Road in support of the Coffee, Cacao, Bamboo Cut Flower Heirloom Rice, Livestock, and other High Value Vegetables, Sta. 5+830 - Sta. 5+936, Tublay, Benguet","amountPesos":4900000.0,"lengthMeters":106.0,"ratePesosPerMeter":46226.41509433962,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17061"},{"year":2026,"category":"Roads","project":"Poblacion-Naguey-Pasdong-Lubo Road in support of the Coffee, Cacao, Bamboo, Cutflower, Banana, Livestock, and Other High Value Vegetables, Sta. 6+553 - Sta. 6+659, Atok, Benguet","amountPesos":4900000.0,"lengthMeters":106.0,"ratePesosPerMeter":46226.41509433962,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17063"},{"year":2026,"category":"Roads","project":"Tabio-Bedbed-Baguingey-Sayapot Road in support of the Coffee, Bamboo, Food and Feed Crops, Plantation Crops, Cutflowers and Fruit Trees Industries, Sta. 3+155 - Sta. 3+275, Mankayan, Benguet","amountPesos":4900000.0,"lengthMeters":120.0,"ratePesosPerMeter":40833.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17065"},{"year":2026,"category":"Roads","project":"Boliwong-Jucbong-Abinuan-Ponghal-Luta-Caba-Tungngod Access Road in support of the Agri-production, Coffee and Ginger Tea Processing, Lagawe, Ifugao Sta. 2+406 - Sta. 3+156","amountPesos":19600000.0,"lengthMeters":750.0,"ratePesosPerMeter":26133.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17068"},{"year":2026,"category":"Roads","project":"Halag-Ubao Road in support of the Fish, Banana, Coffee, Cacao, fruits and nuts and Corn Production and Processing, Sta.3+842 - Sta.4+395.5, Aguinaldo, Ifugao","amountPesos":19600000.0,"lengthMeters":553.5,"ratePesosPerMeter":35411.02077687444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17071"},{"year":2026,"category":"Roads","project":"Babalag West-Liwan West-Alibangbang Access Road connecting Enrile-Tabuk National Road and Alibangbang Access Road in support of the Veggie Noodles/Chips Processing and Sugarcane Processing, Sta. 4 + 281 - Sta. 4 + 611, Rizal, Kalinga","amountPesos":9800000.0,"lengthMeters":330.0,"ratePesosPerMeter":29696.969696969696,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17074"},{"year":2026,"category":"Roads","project":"Bangaan-Bakir Access Road connecting Liwan West National Road and Bangaan-Bakir Access Road in support of the Veggie Noodle Processing Industry, Sta. 2 + 556 - Sta. 3+211 Rizal, Kalinga","amountPesos":19600000.0,"lengthMeters":655.0,"ratePesosPerMeter":29923.664122137405,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17076"},{"year":2026,"category":"Roads","project":"Lucog-Magnao Road connecting Mt. Province Boundary-Calanan-Abbut National Road and Magnao Road in support of the Coffee and Tiger Grass Processing, Sta. 2 + 398 - Sta. 2+758, Tabuk City, Kalinga","amountPesos":9800000.0,"lengthMeters":360.0,"ratePesosPerMeter":27222.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17078"},{"year":2026,"category":"Roads","project":"Tallac/Tangbay Road-Guilayon-Pinukpuk in support of the Coffee Processing Industry and Processed Fruit Industry, Sta. 4 + 712.5 - Sta. 4+877, Tabuk City, Kalinga","amountPesos":4900000.0,"lengthMeters":164.5,"ratePesosPerMeter":29787.23404255319,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17080"},{"year":2026,"category":"Roads","project":"Abatan-Bagnen Road, in support of the Agribusiness, Coffee, Food Processing and Tourism Industries, Sta. 409+054 - Sta. 409+195, Bauko, Mountain Province","amountPesos":4900000.0,"lengthMeters":141.0,"ratePesosPerMeter":34751.77304964539,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17083"},{"year":2026,"category":"Roads","project":"Asdan-Kadso-Masapa Road connecting Asdan and Kadso to the Mt. Province-Ilocos Sur National Road in support of the Heirloom Rice, Banana Chips, Coffee and other Industries, Sta. 1+702.5 - Sta. 1+843.5, Tadian, Mountain Province","amountPesos":4900000.0,"lengthMeters":141.0,"ratePesosPerMeter":34751.77304964539,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17085"},{"year":2026,"category":"Roads","project":"Banaao-Lenga-Cadad-Anan-Am-am Road connecting Banaao, Lenga and Cadad-anan, Sta. 5+830.5 - Sta. 5+875.5 and Sta. 7+238 - Sta. 7+338, Tadian, Mountain Province","amountPesos":4900000.0,"lengthMeters":145.0,"ratePesosPerMeter":33793.10344827586,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17087"},{"year":2026,"category":"Roads","project":"Bato-Cuba-Balicanao-Pua-Mankingao Road connecting Bato and Mankingao in support of the Food/Vegetable Processing and Coffee Industries, Sta. 4+911 - Sta. 5+052, Bauko, Mountain Province","amountPesos":4900000.0,"lengthMeters":141.0,"ratePesosPerMeter":34751.77304964539,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17089"},{"year":2026,"category":"Roads","project":"Bila-Bagnen Oriente Road in support of the Agribusiness, Coffee and Food Processing Industries, Sta. 2+434.75 - Sta. 2+575.75, Bauko, Mountain Province","amountPesos":4900000.0,"lengthMeters":141.0,"ratePesosPerMeter":34751.77304964539,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17091"},{"year":2026,"category":"Roads","project":"Bunga-Gayang-Palina Road connecting Bunga and Gayang to Mountain Province-Ilocos Sur National Road in support of the Heirloom Rice, Coffee, Banana Chips, and other Industries, Sta. 1+160 - Sta. 1+301, Tadian, Mountain Province","amountPesos":4900000.0,"lengthMeters":141.0,"ratePesosPerMeter":34751.77304964539,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17093"},{"year":2026,"category":"Roads","project":"Lacbaben-Magiyad Road in support of the Coffee, Food Processing, and Heirloom Rice Industries, Sta. 1+317.65 - Sta. 1+458.65, Bauko, Mountain Province","amountPesos":4900000.0,"lengthMeters":141.0,"ratePesosPerMeter":34751.77304964539,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17095"},{"year":2026,"category":"Roads","project":"Lubon-Bilig Road connecting Lubon and Bilig to Tadian-Besao-Sagada Provincial Road in support of the Heirloom Rice, Coffee, and Muscovado Processing and other Food Processing Industries, Sta. 1+150 - Sta. 1+291, Tadian, Mountain Province","amountPesos":4900000.0,"lengthMeters":141.0,"ratePesosPerMeter":34751.77304964539,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17097"},{"year":2026,"category":"Roads","project":"Lukib-Naigawa-Tamog-o-Suyo-Panas Road in support of the Agribusiness Industry, Sta. 2+345 - Sta. 2+425, Bauko, Mountain Province","amountPesos":4900000.0,"lengthMeters":80.0,"ratePesosPerMeter":61250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17099"},{"year":2026,"category":"Roads","project":"Masla-Duagan Road in support of the Sugarcane, Coffee, Food Processing and Furniture Industries, Sta. 0+417 - Sta. 0+558, Tadian, Mountain Province","amountPesos":4900000.0,"lengthMeters":141.0,"ratePesosPerMeter":34751.77304964539,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17101"},{"year":2026,"category":"Roads","project":"Nacawang-Mabalite Road connecting Barangays Batayan and Mabalite in support of the Sugarcane, Coffee, Corn, Mango and Furniture Industries, Sta. 1+260 - Sta. 1+401, Tadian, Mountain Province","amountPesos":4900000.0,"lengthMeters":141.0,"ratePesosPerMeter":34751.77304964539,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17103"},{"year":2026,"category":"Roads","project":"Poblacion, Sagada-Aguid Road in support of the Coffee Weaving, Food Processing and Tourism Industries, Sta. 401+834 - Sta. 401+904.5, Sagada, Mountain Province","amountPesos":4900000.0,"lengthMeters":70.5,"ratePesosPerMeter":69503.54609929078,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17105"},{"year":2026,"category":"Roads","project":"Fina-ig-Banawel Proper Road connecting Banawel Proper, Natonin and National Road in support of the Coffee, Rice, Banana, Bambo, Corn, and Food Processing Industries, Sta. 0+183 - Sta. 0+296, Natonin, Mountain Province","amountPesos":4900000.0,"lengthMeters":113.0,"ratePesosPerMeter":43362.83185840708,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17110"},{"year":2026,"category":"Roads","project":"Jct. Nansuso-Bacarri-BANTAHS-MPSPC-Tawang Road in support of the Banana, Coffee, Cacao, Corn and Food Processing Industries, Sta. 6+415 - Sta. 6+540, Paracelis, Mountain Province","amountPesos":4900000.0,"lengthMeters":125.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17112"},{"year":2026,"category":"Roads","project":"Paracelis-Cassag-Makilo-Camparadi-Bantay Road connecting Bantay, Paracelis and National Road in support of the Banana, Corn and Food Processing Industries, Sta. 3+346 - Sta. 3+564, Paracelis, Mountain Province","amountPesos":4900000.0,"lengthMeters":218.0,"ratePesosPerMeter":22477.064220183485,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17114"},{"year":2026,"category":"Roads","project":"Poblacion Natonin-Maducayan-Saliok Road connecting Maducayan to the National Road in support of the Coffee, Cacao, Rice, Bamboo, Corn, and Food Processing Industries, Sta. 10+547 - Sta. 10+660, Natonin, Mountain Province","amountPesos":4900000.0,"lengthMeters":113.0,"ratePesosPerMeter":43362.83185840708,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17116"},{"year":2026,"category":"Roads","project":"Poblacion, Natonin-Toboy Road in support of the Abaca, Banana, Cacao, Corn and Tourism Industries, Sta. 4+803 - Sta. 4+916, Natonin, Mountain Province","amountPesos":4900000.0,"lengthMeters":113.0,"ratePesosPerMeter":43362.83185840708,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17118"},{"year":2026,"category":"Roads","project":"Poblacion, Paracelis-Bantay-Buringal Road in support of the Banana, Cacao, Corn and Tourism Industries, Sta. 7+771 - Sta. 7+884 Paracelis, Mountain Province","amountPesos":4900000.0,"lengthMeters":113.0,"ratePesosPerMeter":43362.83185840708,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17120"},{"year":2026,"category":"Roads","project":"Balantoy-Dao-angan-Poswoy-Ababa-an Road, Sta. 16+256 - Sta. 18+146, Kalinga","amountPesos":35280000.0,"lengthMeters":1890.0,"ratePesosPerMeter":18666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17123"},{"year":2026,"category":"Roads","project":"Lubuagan-Batong Buhay Junction Awichon-Upper Uma Road, Sta. 3+586 - Sta. 3+692, Kalinga","amountPesos":4900000.0,"lengthMeters":106.0,"ratePesosPerMeter":46226.41509433962,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17125"},{"year":2026,"category":"Roads","project":"Mallango-Asafang-Tabtaban-Sumadel Road, Sta. 4+665 - Sta. 4+778, Kalinga","amountPesos":4900000.0,"lengthMeters":113.0,"ratePesosPerMeter":43362.83185840708,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17127"},{"year":2026,"category":"Roads","project":"Mountain Province Boundary Cagaluan Junction Sukiap, Tanglag-Mabongtot Road, Sta. 3+034 - Sta. 3+174, Kalinga","amountPesos":4900000.0,"lengthMeters":140.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17129"},{"year":2026,"category":"Roads","project":"Pasil River Junction-Vaaw Galdang Road connecting Limood-Amdalao Provincial Road and Vaaw Galdang Road, Sta. 1+724 - Sta. 1+864, Kalinga","amountPesos":4900000.0,"lengthMeters":140.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17131"},{"year":2026,"category":"Roads","project":"Access Road leading to Cabiraoan-Capadeco Provincial/Barangay Roads leading to Dugo-San Vicente Road connecting to Meat and Milk Production, Watermelon, and Corn Plantation, Sta. 4+134 - Sta. 4+428, Cabiraoan, Gonzaga, Cagayan","amountPesos":4544000.0,"lengthMeters":294.0,"ratePesosPerMeter":15455.78231292517,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17139"},{"year":2026,"category":"Roads","project":"Access Road leading to Corn Growers to Dugo-San Vicente Road, Sitio Lacub, Sta.0+476.50 - Sta.0+728.50, Tapel, Gonzaga, Cagayan","amountPesos":4544000.0,"lengthMeters":252.0,"ratePesosPerMeter":18031.74603174603,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17141"},{"year":2026,"category":"Roads","project":"Access Road leading to Meat and Dairy Stations, Sta. 0+904.50 - Sta. 1+165.50, Dagupan, Lal-lo, Cagayan","amountPesos":4544000.0,"lengthMeters":261.0,"ratePesosPerMeter":17409.961685823753,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17143"},{"year":2026,"category":"Roads","project":"Access Road leading to Sta. Clara Tourism and High Agricultural and Processing, Sta. 1+985 - Sta. 2+157.50, Gonzaga, Cagayan","amountPesos":4544000.0,"lengthMeters":172.5,"ratePesosPerMeter":26342.028985507248,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17145"},{"year":2026,"category":"Roads","project":"Alcala-Afusing-Catarauan-La Suerte-Warat-Sampaguita Road leading to Cagayan Apayao Road in support of the Agribusiness: Processed Fruits, Nuts & Dairy, Sta.9+503 - Sta.9+593, Alcala, Cagayan","amountPesos":4544000.0,"lengthMeters":90.0,"ratePesosPerMeter":50488.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17147"},{"year":2026,"category":"Roads","project":"Diora-Zinungan Barangay Road leading to Dugo San Vicente Road in support of the Agribusiness (Pineapple Growers), Sta. 5+645.50 - Sta. 6+170.50, Sta. Ana, Cagayan","amountPesos":4544000.0,"lengthMeters":525.0,"ratePesosPerMeter":8655.238095238095,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17149"},{"year":2026,"category":"Roads","project":"Jct. Gattaran Cumao Capissayan Sta. Margarita Bolos Point Road to Capissayan Norte-Sibuga leading to Banana Plantation, Sta 1+406 - Sta 1+827.50, Gattaran, Cagayan","amountPesos":9088000.0,"lengthMeters":421.5,"ratePesosPerMeter":21561.09134045077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17151"},{"year":2026,"category":"Roads","project":"Jct. Gattaran Cumao Capissayan Sta. Margarita Bolos Point Road to Capissayan Sur-Sibuga leading to Banana Plantation, Sta 2+509.50 - Sta. 2+640.50, Gattaran, Cagayan","amountPesos":4544000.0,"lengthMeters":131.0,"ratePesosPerMeter":34687.02290076336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17153"},{"year":2026,"category":"Roads","project":"Jct. Gattaran Cumao Capissayan Sta. Margarita Bolos Point Road to Piña Weste leading to Banana Plantation, Sta. 0+720 - Sta. 0+780, Gattaran, Cagayan","amountPesos":4544000.0,"lengthMeters":60.0,"ratePesosPerMeter":75733.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17155"},{"year":2026,"category":"Roads","project":"Access Road leading to Citrus, Pineapple and Coconut, Cusiteng-Gammaro Road, Bangan,Sta. 0+440 - Sta. 0+540,Sanchez Mira, Cagayan","amountPesos":4635000.0,"lengthMeters":100.0,"ratePesosPerMeter":46350.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17160"},{"year":2026,"category":"Roads","project":"Access Road leading to Palusao-Niug in support of the Vegetables and Crops Industry,Sta. 2+333 - Sta. 2+598,Sto. Niño, Cagayan","amountPesos":4544000.0,"lengthMeters":265.0,"ratePesosPerMeter":17147.169811320753,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17162"},{"year":2026,"category":"Roads","project":"Access Road leading to Pineapple Growers, Baran,Sta. 1+270- Sta. 1+870,Ballesteros, Cagayan","amountPesos":9905000.0,"lengthMeters":600.0,"ratePesosPerMeter":16508.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17164"},{"year":2026,"category":"Roads","project":"Aggunetan-Tagao-Viga Barangay Road to Jct. Logac-Lasam-Gagabutan Road connecting to Coconut, Banana, and Citrus Plantation and Processing,Sta. 1+882.5 - Sta. 2+172.5,Lasam, Cagayan","amountPesos":4544000.0,"lengthMeters":290.0,"ratePesosPerMeter":15668.965517241379,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17166"},{"year":2026,"category":"Roads","project":"Bannag Road connecting to Vegetable/Corn/Coconut and Dragon Fruit Plantation Area in support of the Vegetables, Corn, Coconut, Dragon Fruit Industries,Sta. 2+695- Sta. 2+997,Abulug, Cagayan","amountPesos":4544000.0,"lengthMeters":302.0,"ratePesosPerMeter":15046.35761589404,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17168"},{"year":2026,"category":"Roads","project":"Basiguian Road leading to Manila North Road connecting to Agribusiness Industry (Livestock Production, Vegetables, Rice, Corn and Coconut),Sta. 0+405 - Sta. 0+547,Abulug, Cagayan","amountPesos":6816000.0,"lengthMeters":142.0,"ratePesosPerMeter":48000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17170"},{"year":2026,"category":"Roads","project":"Cabatacan East Barangay Road to Jct. Logac-Lasam-Gagabutan Road connecting to Cacao Plantation and Processing, Cabatacan East,Sta. 1+897- Sta. 2+367,Lasam, Cagayan","amountPesos":11087000.0,"lengthMeters":470.0,"ratePesosPerMeter":23589.36170212766,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17172"},{"year":2026,"category":"Roads","project":"Cagayan-Apayao Road to Brgy. Liwan-connecting Brgy. Anungu-Anuruture Road leading to Mango and Peanut Growers,Sta. 0+793.5 - Sta. 1+493.5,Rizal, Cagayan","amountPesos":12904000.0,"lengthMeters":700.0,"ratePesosPerMeter":18434.285714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17174"},{"year":2026,"category":"Roads","project":"Centro 2-Nagbaranganan-Cagayan State University Road connecting to Cacao Plantation Area in support of the Cacao Industry, Centro 2,Sta. 6+393 - Sta. 6+623,Sanchez Mira, Cagayan","amountPesos":4544000.0,"lengthMeters":230.0,"ratePesosPerMeter":19756.521739130436,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17176"},{"year":2026,"category":"Roads","project":"Jct. Manila North Road leading to Meat, Citrus, Rambutan, and Dragon Fruit Plantation,Sta. 0+960-Sta. 1+180,Ballesteros, Cagayan","amountPesos":4544000.0,"lengthMeters":220.0,"ratePesosPerMeter":20654.545454545456,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17178"},{"year":2026,"category":"Roads","project":"San Julian-Tayak Barangay Road leading to Manila North Road ( MNR) Connecting to Agri Business Industry-aquatic Resources, Vegetables, Rice and Nipa by Products ( Nipa Wine, Vinegar), Siguiran,Sta. 2+569-Sta. 2+810,Abulug, Cagayan","amountPesos":4998000.0,"lengthMeters":241.0,"ratePesosPerMeter":20738.58921161826,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17182"},{"year":2026,"category":"Roads","project":"San Pedro-Magsaysay-Cabatacan West Barangay Road to Jct. Logac-Lasam-Gagabutan Road connecting to Banana, Coconut, and Cacao Plantation and Processing,Sta. 2+490-2+640,Lasam, Cagayan","amountPesos":4544000.0,"lengthMeters":150.0,"ratePesosPerMeter":30293.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17184"},{"year":2026,"category":"Roads","project":"Sta. Filomena-Langay Barangay Road leading to Jct. Ayaga in support of the Agribusiness, Banguian, and Sta. Filomena,Sta. 1+139- Sta. 1+488.50\nSta. 1+509.30-1+527.50,Abulug, Cagayan","amountPesos":7361000.0,"lengthMeters":367.7,"ratePesosPerMeter":20019.037258634755,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17186"},{"year":2026,"category":"Roads","project":"Junction Santiago-Tuguegarao Road-Divisoria-Kapitan Martin leading to Cagayan Robina Sugar Milling Company (CARSUMCO) and Agribusiness Industry, Enrile, Cagayan (Sta. 6+079 - Sta. 6+329)","amountPesos":3726000.0,"lengthMeters":250.0,"ratePesosPerMeter":14904.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17189"},{"year":2026,"category":"Roads","project":"Junction Santiago-Tuguegarao Road-Magalalag-Aba-San Miguel-Roma leading to Cagayan Robina Sugar Milling Company (CARSUMCO) and Agribusiness Industry, Enrile, Cagayan (Sta. 0+682 - Sta. 1+122)","amountPesos":8088000.0,"lengthMeters":440.0,"ratePesosPerMeter":18381.81818181818,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17191"},{"year":2026,"category":"Roads","project":"Sampaguita, Patul, Pataya, Furagui, Bantay Road leading to Cagayan-Apayao Road, CARSUMCO, Sto. Domingo, Piat, Cagayan in support of the Sugarcane Production Industry, Solana, Cagayan (Sta. 0+058.80 - Sta. 0+070.80)","amountPesos":11760000.0,"lengthMeters":12.0,"ratePesosPerMeter":980000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17193"},{"year":2026,"category":"Roads","project":"Barangay Balagan-Macayucayu Road leading to Sugarcane, Rice and Corn Production Areas connecting to Bio-Ethanol Plant (Sta. 1+942.80 - Sta. 2+196.30) Section 8, San Mariano, Isabela","amountPesos":4544000.0,"lengthMeters":253.5,"ratePesosPerMeter":17925.04930966468,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17196"},{"year":2026,"category":"Roads","project":"Marasat Pequeño road connecting to Munggo Processing and Packaging Center to National Highway in support of the Agribusiness(Sta. 0+942.00 - Sta. 1+062.00 Section 2), San Mateo, Isabela","amountPesos":4544000.0,"lengthMeters":120.0,"ratePesosPerMeter":37866.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17198"},{"year":2026,"category":"Roads","project":"San Ignacio Daramuangan Sur and Daramuangan Norte Roads connecting Munggo Processing and Packaging Center to National Highway in support of the Agribusiness Industry (Sta. 0+337.50 - Sta. 0+639.00 Section 7 (with exception)), San Mateo, Isabela","amountPesos":4544000.0,"lengthMeters":301.5,"ratePesosPerMeter":15071.310116086235,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17200"},{"year":2026,"category":"Roads","project":"Sinamar Norte Villa Fuerte and San Marcos Roads connecting Munggo Production Areas to Munggo Processing and Packaging Center in support of the High-Value Crops Industry (Mungbean)(Sta. 0+819.00 - Sta. 0+969.00 Section 4), San Mateo, Isabela","amountPesos":4544000.0,"lengthMeters":150.0,"ratePesosPerMeter":30293.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17202"},{"year":2026,"category":"Roads","project":"Villa Gamiao, San Antonio, Daramuangan Sur and Salinungan East Roads connecting to Munggo Processing and Packaging Center to National Highway in support of the Agribusiness Industry (Sta. 0+499.50 - Sta. 0+612.00 Section 4), San Mateo, Isabela","amountPesos":4544000.0,"lengthMeters":112.5,"ratePesosPerMeter":40391.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17204"},{"year":2026,"category":"Roads","project":"Balintocatoc-Bannawag Norte Road leading to Santiago-Saguday Road in support of the Sugar Industry, Sta. 2+784 - Sta. 3+180, Santiago City, Isabela","amountPesos":13631000.0,"lengthMeters":396.0,"ratePesosPerMeter":34421.71717171717,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17207"},{"year":2026,"category":"Roads","project":"Rizal-Salvador-Divisoria Road leading to Maharlika Highway in support of the Mungbean Industry, Sta. 4+525 - Sta. 4+709, Santiago City, Isabela","amountPesos":4544000.0,"lengthMeters":184.0,"ratePesosPerMeter":24695.652173913044,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17209"},{"year":2026,"category":"Roads","project":"Victory Norte-Sinili Road leading to Maharlika Highway in support of the Mango Industry, Sta. 3+674 - Sta. 3+976, Santiago City, Isabela","amountPesos":4544000.0,"lengthMeters":302.0,"ratePesosPerMeter":15046.35761589404,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17211"},{"year":2026,"category":"Roads","project":"Villa Gonzaga-Nabbuan Road leading to Santiago-Saguday Road in support of the Peanut Industry, Sta. 1+985.5 - Sta. 2+113.5, Barangay Villa Gonzaga-Nabbuan, Santiago City, Isabela","amountPesos":4544000.0,"lengthMeters":128.0,"ratePesosPerMeter":35500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17213"},{"year":2026,"category":"Roads","project":"Balete Road connecting Dalacquit and Sinapaoan to Maharlika Highway in support of the Coffee Industry of LGU under OTOP Program (Sta. 2+073.50 - Sta. 2+508.50), Santa Fe, Nueva Vizcaya","amountPesos":13441000.0,"lengthMeters":435.0,"ratePesosPerMeter":30898.850574712644,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17216"},{"year":2026,"category":"Roads","project":"Poblacion-Baclas Road connecting Brgy. Baclas and Provincial Road in support of the Coffee Industry (Sta. 3+158.50 - Sta. 3+291), Ambaguio, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":132.5,"ratePesosPerMeter":34294.339622641506,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17221"},{"year":2026,"category":"Roads","project":"Divisoria Sur-San Salvador-Dungo Road Connecting Banana Chips Making, Feeds Processing, Muscovado Processing and Sugar Cane Juice Making and Cordon-Aurora Road (National Secondary Road) in support of the Agribusiness: Food and Resourced Based Processing, Maddela and Aglipay, Quirino - Sta. 6+240 - Sta. 6+373","amountPesos":4900000.0,"lengthMeters":133.0,"ratePesosPerMeter":36842.10526315789,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17224"},{"year":2026,"category":"Roads","project":"Maldanum-San Bernabe Road connecting Feeds Processing (Corn/Cassava) and Echague-Jones-Maddela Rd and Cordon-Aurora Rd in support of the Agribusiness: Food and Resourced Based Processing, Maddela, Quirino - Sta. 3+414.6 - Sta. 3+552","amountPesos":4544000.0,"lengthMeters":137.4,"ratePesosPerMeter":33071.32459970886,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17226"},{"year":2026,"category":"Roads","project":"Palacian-Victoria Road connecting Loom Weaving and Feeds Processing Jct. Victoria-Kasibu Rd, Dumabato-Balligui Rd, and Cordon-Aurora Rd in support of the Agribusiness: Food and Resourced Based Processing, Aglipay, Quirino - Sta. 4+033 - Sta. 4+181","amountPesos":4544000.0,"lengthMeters":148.0,"ratePesosPerMeter":30702.702702702703,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17228"},{"year":2026,"category":"Roads","project":"Ramos-San Ramon Road Connecting Feeds Processing and Cordon-Aurora Road (National Secondary Road) in support of the Agribusiness: Food and Resourced Based Processing, Aglipay, Quirino - Sta. 2+600.4 - Sta. 2+746","amountPesos":4544000.0,"lengthMeters":145.6,"ratePesosPerMeter":31208.79120879123,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17230"},{"year":2026,"category":"Roads","project":"Access Road from Hermosa Economic and Industrial Zone connecting Palihan-Mabiga-SBMA, Sta. 5 + 700 - Sta. 5 + 802, Hermosa, Bataan","amountPesos":22075000.0,"lengthMeters":102.0,"ratePesosPerMeter":216421.568627451,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17234"},{"year":2026,"category":"Roads","project":"Victoria Road Connecting Gov. JJ Linao Road to Bataan New Port City in support of the Agribusiness/ Food Industry (Mongo, Rice, Turnip, Peanut, Bread and Pastries), Pilar, Bataan, Sta. 1+020.50 - Sta. 1+580.50","amountPesos":23536000.0,"lengthMeters":560.0,"ratePesosPerMeter":42028.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17237"},{"year":2026,"category":"Roads","project":"Barangay Pita Road leading to Agro-industrial Area, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 075","amountPesos":1883000.0,"lengthMeters":75.0,"ratePesosPerMeter":25106.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17240"},{"year":2026,"category":"Roads","project":"Barangay San Simon to Barangay Tucop Road Agro-industrial Area, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 075","amountPesos":1883000.0,"lengthMeters":75.0,"ratePesosPerMeter":25106.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17242"},{"year":2026,"category":"Roads","project":"Barangay Torres-New San Jose-Pagalangang Road to Agricultural Area, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 150","amountPesos":4707000.0,"lengthMeters":150.0,"ratePesosPerMeter":31380.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17244"},{"year":2026,"category":"Roads","project":"Barangay Tubo-Tubo Road leading to Agro-Tourism Area, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 075","amountPesos":1883000.0,"lengthMeters":75.0,"ratePesosPerMeter":25106.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17246"},{"year":2026,"category":"Roads","project":"Matungao-Guiguinto Provincial Road connecting McArthur Highway and Bantayan Road in support of the Electronic Manufacturing, Chemicals, Furnitures and Garments and Agri Business Industries, Guiguinto, Bulacan, Sta. 0 + 000 - Sta. 0 + 180","amountPesos":28243000.0,"lengthMeters":180.0,"ratePesosPerMeter":156905.55555555556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17249"},{"year":2026,"category":"Roads","project":"Camachilles-Sapang-Biabas-Bical Road, Mabalacat City, Pampanga Sta. 0 + 000 to Sta. 0 + 190","amountPesos":4707000.0,"lengthMeters":190.0,"ratePesosPerMeter":24773.684210526317,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17252"},{"year":2026,"category":"Roads","project":"East Circumferential Road connecting MacArthur Highway to Angeles-Magalang Road in support of the Handicraft, Furniture and Garments, and Food Processing Industries, Angeles City, Pampanga Sta. 0 + 000.00 to Sta. 0 + 135.00","amountPesos":4707000.0,"lengthMeters":135.0,"ratePesosPerMeter":34866.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17254"},{"year":2026,"category":"Roads","project":"NLEX-SCTEX Connecting Road in support of the Furniture, IT-BPM, Hotels, Garments and Textile Industries, Angeles City, Pampanga Sta. 0 + 000.00 to Sta. 0 + 135.00","amountPesos":4707000.0,"lengthMeters":135.0,"ratePesosPerMeter":34866.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17256"},{"year":2026,"category":"Roads","project":"Sta. Ines-Atlu Bola Road, Mabalacat City, Pampanga Sta. 0 + 000.00 to Sta. 0 + 135.00","amountPesos":4707000.0,"lengthMeters":135.0,"ratePesosPerMeter":34866.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17258"},{"year":2026,"category":"Roads","project":"Access Roads leading to Honeybee Industry in Brgys. Malabanan and Paligawan, Sta. 000+000 - Sta. 000+192, Sta. 000+300 - Sta. 000+345, Balete, Batangas","amountPesos":4009000.0,"lengthMeters":237.0,"ratePesosPerMeter":16915.61181434599,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17262"},{"year":2026,"category":"Roads","project":"Access Roads to Quirino Highway in support of the Agri-based Industries, STA. 000+753 - STA. 000+863, Tagkawayan, Quezon","amountPesos":4009000.0,"lengthMeters":110.0,"ratePesosPerMeter":36445.454545454544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17265"},{"year":2026,"category":"Roads","project":"Barangays Mabunga, Bungahan Access Road in support of the Agri-based Industries, STA. 005+443 - STA. 005+568, Gumaca, Quezon","amountPesos":4009000.0,"lengthMeters":125.0,"ratePesosPerMeter":32072.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17267"},{"year":2026,"category":"Roads","project":"Barangays Pagsabangan-Villa Fuerte Access Road in support of the Agri-based Industries, STA. 008+185 - STA. 008+310, Gumaca, Quezon","amountPesos":4009000.0,"lengthMeters":125.0,"ratePesosPerMeter":32072.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17269"},{"year":2026,"category":"Roads","project":"Barangays Villa Victoria-M.H. del Pilar Access Road in support of the Agri-based Industries, STA. 000+844 - STA. 000+969, Gumaca, Quezon","amountPesos":4009000.0,"lengthMeters":125.0,"ratePesosPerMeter":32072.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17271"},{"year":2026,"category":"Roads","project":"San Diego Bukid-Bantad-Gayagayaan Barangay Roads connecting Provincial Road in support of the Agri-based Industries, STA. 005+514 - STA. 005+639, Gumaca, Quezon","amountPesos":4009000.0,"lengthMeters":125.0,"ratePesosPerMeter":32072.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17273"},{"year":2026,"category":"Roads","project":"Access Road leading to Fishing Industry, Sta. 226+327.50 - Sta. 226+731.904, Taytay, Palawan","amountPesos":14856000.0,"lengthMeters":404.404,"ratePesosPerMeter":36735.54168603587,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17277"},{"year":2026,"category":"Roads","project":"Access Road leading to Mussel Production and Fishing Industry, Sta. 205+736.40 -Sta. 205+944.90, Taytay, Palawan","amountPesos":8302000.0,"lengthMeters":208.5,"ratePesosPerMeter":39817.74580335731,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17279"},{"year":2026,"category":"Roads","project":"Access Road leading to Seaweed Plantations in Brgy. Danleg, Sta. 1+980.00 - Sta. 2+180.00, Dumaran, Palawan","amountPesos":9622000.0,"lengthMeters":200.0,"ratePesosPerMeter":48110.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17281"},{"year":2026,"category":"Roads","project":"Access Road leading to Seaweed Plantations in Brgy. Sta. Teresita, Sta. 6+783.50 - Sta. 6+992.00, Dumaran, Palawan","amountPesos":9622000.0,"lengthMeters":208.5,"ratePesosPerMeter":46148.681055155874,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17283"},{"year":2026,"category":"Roads","project":"Access Roads to Barangays Aporawan, Barake, Magbabadil, Mabini to Poblacion, Sta. 09+669 - Sta. 10+577, in support of the Coconut, Cacao, and Oil Palm Industry, Aborlan, Palawan","amountPesos":20756000.0,"lengthMeters":908.0,"ratePesosPerMeter":22859.030837004404,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17286"},{"year":2026,"category":"Roads","project":"Barangay Cullat-Bongalon-Balinad Road connecting to Various Small-Scale Enterprises, Brgys. Cullat, Bongalon and Balinad (Sta. 0+000 - Sta. 0+156), Daraga, Albay","amountPesos":4881000.0,"lengthMeters":156.0,"ratePesosPerMeter":31288.46153846154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17290"},{"year":2026,"category":"Roads","project":"Brgy. 3-Brgy. 4-Brgy. 5 Road connecting Ligao-Pioduran Road and Albay West Coast Road in support of the Agribusiness (Food Resource Based Processing), Pio-Duran, Albay, Sta. 0+361.00 - Sta. 0+505.00","amountPesos":29287000.0,"lengthMeters":144.0,"ratePesosPerMeter":203381.94444444444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17293"},{"year":2026,"category":"Roads","project":"Brgy. 3-Brgy. 2-Brgy. 1 Road connecting Ligao-Pioduran Road and Pioduran-Donsol Road in support of the Agribusiness (Food Resource Based Processing), Pio-Duran, Albay, Sta. 1+161.98 - Sta. 1+234.98","amountPesos":29287000.0,"lengthMeters":73.0,"ratePesosPerMeter":401191.7808219178,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17295"},{"year":2026,"category":"Roads","project":"Guisican Brgy. Road Connecting Maharlika Highway in support of the Guisican MPC Sankaka Production Area, Brgy. Guisican, Labo, Camarines Norte, Chainage 2788 - Chainage 2896.50","amountPesos":4881000.0,"lengthMeters":108.5,"ratePesosPerMeter":44986.17511520737,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17298"},{"year":2026,"category":"Roads","project":"Dalipay-San Antonio Road leading to IT-BPO Industry - Sta. 0+447 - 0+980.00, Sta. 4+707 to 4+874, Barangay Dalipay - Barangay Cabugao, Milaor, Camarines Sur","amountPesos":39050000.0,"lengthMeters":700.0,"ratePesosPerMeter":55785.71428571428,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17301"},{"year":2026,"category":"Roads","project":"Balud National Road connecting Barangay Danao in support of the Agribusiness, Balud, Masbate, K0071+014 - K0071+049","amountPesos":4881000.0,"lengthMeters":35.0,"ratePesosPerMeter":139457.14285714287,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17304"},{"year":2026,"category":"Roads","project":"Brgy. Lumboyan-Brgy. Mablad Road connecting to Iloilo-Antique Road and Public Market of Barbaza, in support of the Abaca Industry Sta. 6+420 - Sta. 6+620, Barbaza, Antique","amountPesos":29085000.0,"lengthMeters":200.0,"ratePesosPerMeter":145425.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17308"},{"year":2026,"category":"Roads","project":"Brgy. San Ramon-Brgy. Latazon-Brgy. Liberato Road connecting to Iloilo-Antique Road, Public Market of Laua-an and to the Processing & Packaging Plant of Muscovado Sugar in support of the Agribusiness Industry (Rootcrops, Peanuts, Ginger, Corn and Sugar Cane Plantation) Sta. 10+500 - Sta. 11+000, Laua-an, Antique","amountPesos":19600000.0,"lengthMeters":500.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17310"},{"year":2026,"category":"Roads","project":"Brgy. Tula-Tula-Brgy. Calu-oy-Brgy. Bulalacao Circumferential Road connecting to Public Market of Sibalom in support of the Agribusiness Industry (Coffee, Rootcrops, Peanuts and Ginger)Segmet 1 Sta. 05+802 - Sta. 05+894, Segment 2 Sta. 06+004 - Sta. 06+130, Segmet 3 - Sta. 07+050 - Sta. 07+582 , Sibalom, Antique","amountPesos":28706000.0,"lengthMeters":750.0,"ratePesosPerMeter":38274.666666666664,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17312"},{"year":2026,"category":"Roads","project":"Sitio Lomboy, Brgy. Linambasan to Brgy. Ganzon, Brgy. Jaena and Brgy. San Juan to National Highway in support of the Abaca Industry, Jamindan, Capiz - Sta. 8+540 - Sta. 8+701","amountPesos":4784000.0,"lengthMeters":161.0,"ratePesosPerMeter":29714.285714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17317"},{"year":2026,"category":"Roads","project":"Brgy. Gines Viejo to Brgy. Tagubong Road, in support of the Sugar Milling Industry, Passi City, Iloilo - Sta. 17 + 470 - Sta. 17 + 770","amountPesos":4784000.0,"lengthMeters":300.0,"ratePesosPerMeter":15946.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17320"},{"year":2026,"category":"Roads","project":"San Jose-Anabo-Gen. Luna connecting Nueva Swine Valley, NJR Passi- San Rafael-Lemery-Sara Road, Lemery, Iloilo, Sta. 4 + 948 - Sta. 5 + 006, Sta. 5 + 031 - Sta. 5 + 088","amountPesos":14353000.0,"lengthMeters":115.0,"ratePesosPerMeter":124808.69565217392,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17325"},{"year":2026,"category":"Roads","project":"Junction Hernaez St. to Bangga Vista Alegre Road in support of the Micro Food Processing Industry, Brgy. Vista Alegre, along Vista Alegre-Mansilingan Bdry Rd. Sta. 2+235 - Sta. 2+640 , Bacolod City, Negros Occidental","amountPesos":24500000.0,"lengthMeters":405.0,"ratePesosPerMeter":60493.82716049383,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17329"},{"year":2026,"category":"Roads","project":"Sitio Cantugot, Brgy. Sab-ahan connecting to the LCC Duyan ng Pag-ibig Foundation Inc. Farm School and Bais-Dumaguete National Road in support of the Coffee Industry, Sta. 0+751.5 - Sta. 0+882, Bais City, Negros Oriental","amountPesos":4900000.0,"lengthMeters":130.5,"ratePesosPerMeter":37547.89272030651,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17334"},{"year":2026,"category":"Roads","project":"Sitio Nalandan-Sitio Cambayugon connecting National Highway (Boundary Tamisu) in support of the Cacao Processing Industry, Sta. 0+685.5 - Sta. 0+814.5, Bais City, Negros Oriental","amountPesos":4900000.0,"lengthMeters":129.0,"ratePesosPerMeter":37984.49612403101,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17336"},{"year":2026,"category":"Roads","project":"Bentig-Tinibgan-Sampoangon Road connecting Tagbilaran North Road in support of the Furnitures and Agribusiness Industries (Sta. 002 + 423.70 - Sta. 003 + 011.70), Calape, Bohol","amountPesos":19926000.0,"lengthMeters":588.0,"ratePesosPerMeter":33887.755102040814,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17340"},{"year":2026,"category":"Roads","project":"Cantubod-Dagohoy-Causwagan Barangay Road connecting Palm Oil Plantation to Danao-Getafe Road in support of the Agribusiness Industry, Danao, Bohol Sta. 1+074-Sta.1+241","amountPesos":4845000.0,"lengthMeters":167.0,"ratePesosPerMeter":29011.97604790419,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17343"},{"year":2026,"category":"Roads","project":"Catigbian-Clarin via Bogtongbod Road (Clarin Side) connecting Cortes-Balilihan-Catigbian-Macaas Road and Clarin-Sagbayan-Carmen Road in support of the Agribusiness Industry, Clarin, Bohol Sta. 4+422.40-Sta. 4+589.40","amountPesos":4845000.0,"lengthMeters":167.0,"ratePesosPerMeter":29011.97604790419,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17345"},{"year":2026,"category":"Roads","project":"Jct. (LIR) Mahayag (San Miguel)-Danao Road in support of the Agribusiness Industry, Danao, Bohol Sta. 7+847.27-Sta. 7+982.27","amountPesos":4845000.0,"lengthMeters":135.0,"ratePesosPerMeter":35888.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17347"},{"year":2026,"category":"Roads","project":"Lapacan Sur (Bugtong Lubi) Inabanga-Magtangtang (Danao) Road in support of the Agribusiness Industry, Danao, Bohol Sta. 4+987.16-Sta. 5+118","amountPesos":4845000.0,"lengthMeters":130.84,"ratePesosPerMeter":37029.96025680216,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17349"},{"year":2026,"category":"Roads","project":"Lubang-Nueva Montana-Bunga Road connecting Tagbilaran North Road to Danao-Getafe Road in support of the Gifts and Housewares, and Agribusiness Industries, Buenavista, Bohol Sta. 1+071-Sta.1+238","amountPesos":4845000.0,"lengthMeters":167.0,"ratePesosPerMeter":29011.97604790419,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17351"},{"year":2026,"category":"Roads","project":"Mabuhay (Ubay)-Bulilis-Bayongan San Miguel Road connecting Loay Interior Road and Tagbilaran East Road in support of the Furniture and Agribusiness Industries, San Miguel, Bohol Sta. 4+060-Sta. 4+227","amountPesos":4845000.0,"lengthMeters":167.0,"ratePesosPerMeter":29011.97604790419,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17353"},{"year":2026,"category":"Roads","project":"Magtangtang-Carbon-Cabatuan Barangay Road connecting Cabatuan Loomweaving Center to Sagbayan-Danao Road in support of the Gifts and Housewares Industry, Danao, Bohol  Sta. 1+094.42-Sta. 1+261.42","amountPesos":4845000.0,"lengthMeters":167.0,"ratePesosPerMeter":29011.97604790419,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17355"},{"year":2026,"category":"Roads","project":"Poblacion-Masonoy-Candungao (Centro) Road connecting Tagbilaran North Road and Antequera San Isidro-Libertad Road in support of the Gifts and Housewares Industry, San Isidro, Bohol Sta. 1+112.64-Sta. 1+279.64","amountPesos":4845000.0,"lengthMeters":167.0,"ratePesosPerMeter":29011.97604790423,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17357"},{"year":2026,"category":"Roads","project":"Talibon Causeway Bypass-from Poblacion-via Barangay San Francisco-Barangay San Jose Road connecting Tagbilaran North Road to Jct. TNR Talibon Road in support of the Furniture and Agribusiness Industries, Talibon, Bohol Sta. 0+000- Sta. 0+200","amountPesos":4845000.0,"lengthMeters":200.0,"ratePesosPerMeter":24225.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17359"},{"year":2026,"category":"Roads","project":"Hinawanan (Loay)-Conception-Jct. (Sikatuna-Loboc) Road in support of the Furniture and Garments Industry, Loay, Bohol, Sta.2+895.50 - Sta.3+080.50","amountPesos":4845000.0,"lengthMeters":185.0,"ratePesosPerMeter":26189.18918918919,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17362"},{"year":2026,"category":"Roads","project":"Jct. (Dimiao-Bilar) Oac-Omjon Road in support of the Agribusiness Industry, Dimiao, Bohol, Sta. 3+ 235.55 - Sta. 3+ 415.55","amountPesos":4845000.0,"lengthMeters":180.0,"ratePesosPerMeter":26916.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17364"},{"year":2026,"category":"Roads","project":"Jct. (LIR) Buenos Aires-Nueva Vida (Carmen)-Omjon (Valencia) Road in support of the Agribusiness Industry, Carmen, Bohol, Sta. 3+054.82 - Sta.3+200.82","amountPesos":4845000.0,"lengthMeters":146.0,"ratePesosPerMeter":33184.931506849316,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17366"},{"year":2026,"category":"Roads","project":"Jct. (LIR) Quinoguitan-Sevilla-Hanopol-Tagustusan (Balilihan) Road in support of the Furniture and Garments and Tourism Industries, Sevilla, Bohol, Sta. 6+374.5 - Sta. 6+541.179","amountPesos":4845000.0,"lengthMeters":166.679,"ratePesosPerMeter":29067.848979175527,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17368"},{"year":2026,"category":"Roads","project":"Jct. (TER) Dimiao-Oac-Bilar Jct. (LIR) Road in support of the Agribusiness Industry, Bilar, Bohol, Sta.16+719.12 - Sta.16+886.12","amountPesos":4845000.0,"lengthMeters":167.0,"ratePesosPerMeter":29011.97604790419,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17370"},{"year":2026,"category":"Roads","project":"Jct. (TER) Gabayan-Anoling (Candijay)-Inaghuban-Pilar Road in support of the Agribusiness Industry, Candijay, Bohol, Sta.2+301.00 - Sta.2+466.00","amountPesos":4845000.0,"lengthMeters":165.0,"ratePesosPerMeter":29363.636363636364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17372"},{"year":2026,"category":"Roads","project":"Jct. (TER) Itum-Duay-Payao-Eskaya Road in support of the Agribusiness Industry, Duero, Bohol, Sta. 7+029.00-Sta. 7+197","amountPesos":4845000.0,"lengthMeters":168.0,"ratePesosPerMeter":28839.285714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17374"},{"year":2026,"category":"Roads","project":"Jct. (TER) Pob. (Valencia)-Anoyon-Omjon-Quezon (Batuan) Road in support of the Agribusiness Industry, Valencia, Bohol, Sta. 14+003.35 - Sta.14+201.00","amountPesos":4845000.0,"lengthMeters":197.65,"ratePesosPerMeter":24513.028079939333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17376"},{"year":2026,"category":"Roads","project":"San Roque to Baybayon Road, Mabini, Bohol, Sta.2+305 -Sta.2+445","amountPesos":4845000.0,"lengthMeters":140.0,"ratePesosPerMeter":34607.142857142855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17378"},{"year":2026,"category":"Roads","project":"Alegria-Bangkito Road leading to Kabangkalan Coffee Plantation (Sta. 14+000 - Sta. 14+200), Brgy. Alegria-Bangkito, Tuburan, Cebu","amountPesos":4845000.0,"lengthMeters":200.0,"ratePesosPerMeter":24225.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17381"},{"year":2026,"category":"Roads","project":"Sitio Ylaya Road leading to Solar Power Plant, Brgy. Talavera, Toledo City, Cebu Sta 1+720 - Sta. 1+780","amountPesos":8728000.0,"lengthMeters":60.0,"ratePesosPerMeter":145466.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17385"},{"year":2026,"category":"Roads","project":"Provincial Road connecting Poblacion and Cabadiangan in support of the Steel Asia, Inosa Feed Mill, Poultry & Piggery Industries, Compostela, Cebu - Sta. 0+000.00 - Sta. 0+800.00","amountPesos":24225000.0,"lengthMeters":800.0,"ratePesosPerMeter":30281.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17391"},{"year":2026,"category":"Roads","project":"Barangay Dampalan-Princesa Lamaya Road, connecting San Juan and Mabuhay in support of the Rubber and Coconut Industries, Sergio Osmeña, Zamboanga del Norte - Sta. 4+294 - Sta. 4+369, Sta. 4+695 - Sta. 4+924, Sta. 5+090 - Sta. 5+739.40","amountPesos":44012000.0,"lengthMeters":953.4,"ratePesosPerMeter":46163.20537025385,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17395"},{"year":2026,"category":"Roads","project":"Barangay San Juan-Dampalan-San Isidro Road Connecting National Road and Marapong in support of the Rubber, Coconut and Abaca Industries, Sergio Osmeña, Zamboanga del Norte - Sta. 9+436 - Sta. 10+152.80","amountPesos":33765000.0,"lengthMeters":716.8,"ratePesosPerMeter":47105.189732142906,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17397"},{"year":2026,"category":"Roads","project":"Barangay San Juan-New Tangub Road, connecting National Road, in support of the Coconut and Rubber Industries, Sergio Osmeña, Zamboanga del Norte - Sta. 5+847 - Sta. 5+958.30","amountPesos":4824000.0,"lengthMeters":111.3,"ratePesosPerMeter":43342.31805929912,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17399"},{"year":2026,"category":"Roads","project":"Barangay Situbo-Antonino-Penacio Road connecting National Road leading to Situbo, Antonino, Penacio Farmers Association in support of the Coconut, Rubber and Abaca Industries, Sergio Osmeña, Zamboanga del Norte - Sta. 0+530 - Sta. 1+509.40","amountPesos":4824000.0,"lengthMeters":979.4,"ratePesosPerMeter":4925.464570144986,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17401"},{"year":2026,"category":"Roads","project":"Biayon-Wilben-San Jose Road, in support of the Biayon Corn and Coconut Production, Sergio Osmeña, Zamboanga del Norte - Sta. 3+257 - Sta.3+380.40","amountPesos":4572000.0,"lengthMeters":123.4,"ratePesosPerMeter":37050.24311183141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17403"},{"year":2026,"category":"Roads","project":"Buenavista-Sinai Barangay Road, in support of the Corn and Vegetables Production at Barangay Buenavista, Sergio Osmeña, Zamboanga del Norte - Sta. 6+148.40 - Sta. 6+760, Sta. 8+311.50 - Sta. 8+440.70","amountPesos":4824000.0,"lengthMeters":740.8,"ratePesosPerMeter":6511.879049676017,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17405"},{"year":2026,"category":"Roads","project":"Sitio Bobonao, Ilaya-Burgos-Tamion-Diwa-An Road in support of the Copra Industry, Dapitan City, Zamboanga del Norte - Sta. 4+860.50 - Sta. 4+975.30","amountPesos":4824000.0,"lengthMeters":114.8,"ratePesosPerMeter":42020.90592334488,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17407"},{"year":2026,"category":"Roads","project":"Sitio Dunlog-Sitio Janing, Barangay Potungan Road connecting Provincial Road and Bagacay in support of the Cacao and Coffee Industries, Sitio Dunlog-Sitio Janing, Dapitan City, Zamboanga del Norte - Sta. 0+000 - Sta. 0+449.30","amountPesos":1929000.0,"lengthMeters":449.3,"ratePesosPerMeter":4293.345203650122,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17409"},{"year":2026,"category":"Roads","project":"Tinindugan Barangay Road in support of the Corn and Vegetables Production, Tinindugan, Sergio Osmeña, Zamboanga del Norte - Sta. 3+380 - Sta. 3+410, Sta. 4+180 - Sta. 4+258","amountPesos":4572000.0,"lengthMeters":108.0,"ratePesosPerMeter":42333.333333333336,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17411"},{"year":2026,"category":"Roads","project":"Tubac-New Siquijor-Bergado Barangay Road, connecting Provincial Road and El Paraiso in support of the Abaca and Coconut Industries, Mutia, Zamboanga del Norte - Sta. 1+448 - Sta. 1+538.84","amountPesos":37669000.0,"lengthMeters":90.84,"ratePesosPerMeter":414674.15235578973,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17413"},{"year":2026,"category":"Roads","project":"Jct. Dipolog-Sindangan-Liloy Road connecting to Bago Dalongdong (Joaquin Macias) in support of the Rice, Rubber, Coconut, & Abaca Industries, Sindangan, Zamboanga del Norte - Sta. 13+620 - Sta. 13+720","amountPesos":4824000.0,"lengthMeters":100.0,"ratePesosPerMeter":48240.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17416"},{"year":2026,"category":"Roads","project":"Jct. Dipolog-Sindangan-Liloy Road connecting to Bago-Siari Section in support of the Rice, Rubber, Coconut, & Abaca Industries, Sindangan, Zamboanga del Norte - Sta. 4+805 - Sta. 4+940","amountPesos":4824000.0,"lengthMeters":135.0,"ratePesosPerMeter":35733.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17418"},{"year":2026,"category":"Roads","project":"NRJ Dipolog-Sindangan-Liloy Road to Jct. Dinasan-Lipay, in support of the Agribusiness (Rubber, and Coco), Jose Dalman, Zamboanga del Norte - Sta. 21+350 - Sta. 21+480","amountPesos":4824000.0,"lengthMeters":130.0,"ratePesosPerMeter":37107.692307692305,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17420"},{"year":2026,"category":"Roads","project":"El Paraiso - Compra Road in support to Rubber and Coconut Industries, Liloy, Zamboanga del Norte - Sta. 2+520 - Sta. 2+850","amountPesos":9647000.0,"lengthMeters":330.0,"ratePesosPerMeter":29233.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17423"},{"year":2026,"category":"Roads","project":"Lipakan-Ipilan Road connecting to National Highway leading to Biodiesel Processing Plant in support of the Coconut Industry, Salug, Zamboanga del Norte - Sta. 2+040 - Sta. 2+320","amountPesos":9647000.0,"lengthMeters":280.0,"ratePesosPerMeter":34453.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17425"},{"year":2026,"category":"Roads","project":"Jct. Imelda-Alicia, Lutiman-Guicam Road, connecting Jct. Imelda and Barangay Sawa, in support of the Seaweeds and Coconut Industry, Mabuhay, Zamboanga Sibugay, Sta. 01+879 - Sta. 02+015","amountPesos":4824000.0,"lengthMeters":136.0,"ratePesosPerMeter":35470.58823529412,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17435"},{"year":2026,"category":"Roads","project":"Road at Barangay Fatima in support of the Coal Industry, Seaweeds and Coconut, leading to Provincial Road and National Highway in Payao, Zamboanga Sibugay, Sta. 03+047.20 to Sta. 03+188.20","amountPesos":4824000.0,"lengthMeters":141.0,"ratePesosPerMeter":34212.765957446805,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17439"},{"year":2026,"category":"Roads","project":"Barangay Kaliantana Road connecting Barangay Kaliantana and Junction National Highway in support of the Seaweeds and Coconut Industries Sta. 2+934 to Sta. 3+141.50, Naga, Zamboanga Sibugay","amountPesos":4824000.0,"lengthMeters":207.5,"ratePesosPerMeter":23248.192771084337,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17442"},{"year":2026,"category":"Roads","project":"Barangay Road connecting IMAVEMCO to Junction National Highway in support of the Noodles Processing Sta. 1+978.50 to Sta. 2+186.00, Tiayon, Ipil, Zamboanga Sibugay","amountPesos":4824000.0,"lengthMeters":207.5,"ratePesosPerMeter":23248.192771084337,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17444"},{"year":2026,"category":"Roads","project":"Barangay Tambanan Road connecting Barangay Tambanan and Junction National Highway in support of the Rubber Industry Sta. 3+087 to Sta. 3+294.50, Naga, Zamboanga Sibugay","amountPesos":4824000.0,"lengthMeters":207.5,"ratePesosPerMeter":23248.192771084337,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17446"},{"year":2026,"category":"Roads","project":"Road connecting Junction National Highway at Barangay Coloran to Barangay Paruk in support of the Rubber Industry Sta. 2+017 to Sta. 2+224.50, Siay, Zamboanga Sibugay","amountPesos":4824000.0,"lengthMeters":207.5,"ratePesosPerMeter":23248.192771084337,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17448"},{"year":2026,"category":"Roads","project":"Road connecting Junction National Highway at Barangay Mirangan to Barangay Balucanan in support of the Calamansi Processing Sta. 1+995 to Sta. 2+202.50, Siay, Zamboanga Sibugay","amountPesos":4824000.0,"lengthMeters":207.5,"ratePesosPerMeter":23248.192771084337,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17450"},{"year":2026,"category":"Roads","project":"Southern Bukidnon Agri-Industrial Economic Zone Road Network Development Project, Barangay San Roque, Sta. 99+600 - Sta. 100+100, Maramag, Bukidnon","amountPesos":24095000.0,"lengthMeters":500.0,"ratePesosPerMeter":48190.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17454"},{"year":2026,"category":"Roads","project":"Jct. (Manolo Fortich) Sankanan-Kalugmanan-Dahilayan Road connecting Mindanao lnternational Container Terminal (Hineleban Coffee Processing Plant) and Pegasus-CP Floriculture Company (Cutflower Exporter) in support of the Transport and Logistics, Sta. 10+753 - Sta. 10+903,  Manolo Fortich, Bukidnon","amountPesos":5000000.0,"lengthMeters":150.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17457"},{"year":2026,"category":"Roads","project":"Northern Bukidnon Agri-Industrial Economic Zone Road Network Development Project, Brgy. Nangka Section, Sta. 3+375 - Sta. 4+175, Libona, Bukidnon","amountPesos":19276000.0,"lengthMeters":800.0,"ratePesosPerMeter":24095.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17459"},{"year":2026,"category":"Roads","project":"Segapod to Maliwanag Road connecting National Highway of Segapod in support of the Coconut Oil, Rubber and Tablea Processing Industry, Sta. 5+924 - Sta. 6+090, Barangay Maliwanag, Maigo, Lanao del Norte","amountPesos":4719000.0,"lengthMeters":166.0,"ratePesosPerMeter":28427.710843373494,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17462"},{"year":2026,"category":"Roads","project":"Barangay Pinuyak-El Salvador-Darumawang Ilaya Road in support of the Calamansi Processing Plant, Barangay Pinuyak Section, Sta. 3+275 - Sta. 3+418, Lala, Lanao del Norte","amountPesos":4719000.0,"lengthMeters":143.0,"ratePesosPerMeter":33000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17465"},{"year":2026,"category":"Roads","project":"Construction of Kiraging to Sitio Tiningalan Road in support to the poultry facilities and copra drying facilities, (Section A: Sta. 0+463 - Sta. 0+707, Section B: Sta. 0+757 - Sta. 1+065, Section C: Sta. 1+167 - Sta. 1+388), Sugbongcogon, Misamis Oriental","amountPesos":37754000.0,"lengthMeters":773.0,"ratePesosPerMeter":48840.879689521345,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17468"},{"year":2026,"category":"Roads","project":"Callawa Proper-Purok 5, 14, and 15 Road connecting Cassava Processing Area in support of the Cassava, Banana and Cacao Industries of Brgy. Callawa, Sta. 2+766 - Sta. 2+866, Buhangin District, Davao City, Davao del Sur","amountPesos":4806000.0,"lengthMeters":100.0,"ratePesosPerMeter":48060.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17472"},{"year":2026,"category":"Roads","project":"Sitio Tibungol-Purok 13 Road connecting to Future Cacao & Coconut Processing Area in support of the Cacao, Banana & Coconut Industries of Barangay Pandaitan, Sta. 4+335 - Sta. 4+410, Paquibato District, Davao City, Davao del Sur","amountPesos":4806000.0,"lengthMeters":75.0,"ratePesosPerMeter":64080.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17474"},{"year":2026,"category":"Roads","project":"Bantacan-Magsaysay Road in support of the Coconut, Rice, and Banana Plantation, Sta. 1+512.000 - Sta. 1+760.000, New Bataan, Davao De Oro","amountPesos":4806000.0,"lengthMeters":248.0,"ratePesosPerMeter":19379.032258064515,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17477"},{"year":2026,"category":"Roads","project":"Magsaysay-Siocon-Compostela Road in support of the Rice, Coconut, Banana, and Oil Palm Production, Sta. 0+000.000 - Sta. 0+316.000, Compostela, Davao de Oro","amountPesos":4806000.0,"lengthMeters":316.0,"ratePesosPerMeter":15208.860759493671,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17479"},{"year":2026,"category":"Roads","project":"Mapawa-Tigbao-New Panay Road in support of the Banana and Rice Production, Sta. 0+000 - Sta. 0+132, Maragusan, Davao De Oro","amountPesos":4806000.0,"lengthMeters":132.0,"ratePesosPerMeter":36409.09090909091,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17481"},{"year":2026,"category":"Roads","project":"Naboc -Pilar- Tamia Road in support of the Banana Industry, Monkayo-Compostela, Sta. 0+607.000 - Sta. 1+497.000, Davao de Oro","amountPesos":17357000.0,"lengthMeters":890.0,"ratePesosPerMeter":19502.247191011236,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17483"},{"year":2026,"category":"Roads","project":"Tubo-tubo-Mamunga Road in support of the Rice, Banana, and Oil Palm Production, Sta. 2+239 - Sta. 2+493, Monkayo, Davao De Oro","amountPesos":4806000.0,"lengthMeters":254.0,"ratePesosPerMeter":18921.259842519685,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17485"},{"year":2026,"category":"Roads","project":"NRJ Tagum Road-Panabo Pag-asa (Kapalong) Road-Kimamon (Sto. Tomas)-Lunga-og Road, Salvacion-San Miguel Sto. Tomas Road connecting Panabo Wharf to Banana Industries, Santo Tomas, Davao del Norte - 0+000 - 0+600","amountPesos":14419000.0,"lengthMeters":600.0,"ratePesosPerMeter":24031.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17488"},{"year":2026,"category":"Roads","project":"Kapalong (Luna Elementary School)-Kapalong (Sampao Road)-Kapalong (Mamacao Road) connecting Tagum – Panabo Circumferential Road and Banana Industries and Rubber Industries, Kapalong (Sta. 2+927 - Sta. 3+149), Davao del Norte","amountPesos":4806000.0,"lengthMeters":222.0,"ratePesosPerMeter":21648.64864864865,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17493"},{"year":2026,"category":"Roads","project":"La Filipina Road-Sitio San Isidro Road-Nueva Fuerza Road-Baca, New Corella Road connecting Tagum City Diversion Road to Shared Service Facilities, Cacao Industries and Coconut Industries, Tagum City (Sta. 2+558- Sta. 2+792), Davao del Norte","amountPesos":4806000.0,"lengthMeters":234.0,"ratePesosPerMeter":20538.46153846154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17495"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road Bacungan-Malawanit Road in support of the Cacao Industry, Sta. 0+869.015 - Sta. 1+269.015, Magsaysay, Davao del Sur","amountPesos":11535000.0,"lengthMeters":400.0,"ratePesosPerMeter":28837.500000000007,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17502"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road - Brgy. Kinuskusan Road connecting Sitio Alo Farmers Agricultural Cooperative (SAFACO) and Davao - Cotabato Road (Cotabato Section) in Support of Processed Meat Industry, Sta. 1+940 - Sta. 2+380, Brgy. Darapuay, Bansalan, Davao del Sur","amountPesos":14419000.0,"lengthMeters":440.0,"ratePesosPerMeter":32770.454545454544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17504"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road -Brgy. Poblacion-Brgy. Dalawinon connecting to Brgy. Kasuga in support of the Meat Processing, Sta. 9+468.500 - Sta. 10+040.500, Magsaysay, Davao del Sur","amountPesos":12977000.0,"lengthMeters":572.0,"ratePesosPerMeter":22687.062937062936,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17506"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road - Guihing-Aplaya Road connecting Nagkahiusang Mananahi sa Camucaan Association (NMCA) and Digos-Makar Road in support of the Wearables and Homestyles Industry, Brgy. Aplaya, Sta. 5+269.60 - Sta. 5+481.10, Hagonoy, Davao del Sur","amountPesos":4806000.0,"lengthMeters":211.5,"ratePesosPerMeter":22723.40425531915,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17508"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road - San Miguel Road in support of the Cacao Industry, Sta. 1+104.00 - Sta. 1+284.00, Magsaysay, Davao del Sur","amountPesos":4806000.0,"lengthMeters":180.0,"ratePesosPerMeter":26700.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17510"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road-Sitio Balutakay - Purok Pluto Road connecting Balutakay Coffee Farmers Association (BACOFA) and Bansalan Mt. Apo National Park Road in support of Coffee Processing Industry, Managa, Sta. 2+120.00-Sta.2+520.00, Bansalan, Davao del Sur","amountPesos":19225000.0,"lengthMeters":400.0,"ratePesosPerMeter":48062.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17512"},{"year":2026,"category":"Roads","project":"Brgy. Ompao to Sitio Langgawisan Road connecting Tarragona Public Terminal to Abaca, Corn & Coffee Processing Site in support of the Agribusiness: Abaca, Corn & Coffee Industries, Sta. 11+028.000-Sta. 11+208.000, Tarragona, Davao Oriental","amountPesos":4806000.0,"lengthMeters":180.0,"ratePesosPerMeter":26700.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17517"},{"year":2026,"category":"Roads","project":"Junction National Highway to Brgy. Alegria Proper to Brgy. San Vicente, Cateel, Davao Oriental connecting Cateel Public Transport Terminal to Coconut, Rice, and Corn Processing in Brgy. Alegria and Brgy. San Vicente in support of the Agribusiness: Coconut, Rice and Corn Industry, Sta. 4+027.000-Sta. 4+049.000, Cateel, Davao Oriental","amountPesos":4900000.0,"lengthMeters":22.0,"ratePesosPerMeter":222727.27272727274,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17521"},{"year":2026,"category":"Roads","project":"National Highway Junction Sakuan to Barangay Alvar to Sitio Bantolinao, Barangay Palma Gil to Sitio Tubilan, Barangay Pichon Road connecting Caraga Public Terminal to Abaca Processing and Hand Loom (Dagmay) Weaving in support of the Agri Business: Abaca, Corn, Falcata, Coconut, Rubber, Mango, Upland Rice, Banana and Cacao, Sta 9+696.000-Sta. 9+825.000, Caraga, Davao Oriental","amountPesos":4900000.0,"lengthMeters":129.0,"ratePesosPerMeter":37984.49612403101,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17523"},{"year":2026,"category":"Roads","project":"Road connecting Sitio Mahayahay to Sitio Buko Buko sa Anay in support of the Coffee, Cacao, Abaca & Coconut Industries, Sta. 4+068.000- Sta. 4+078.000,\nSta. 6+739.000- Sta. 6+858.000, Boston, Davao Oriental","amountPesos":4806000.0,"lengthMeters":129.0,"ratePesosPerMeter":37255.813953488374,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17527"},{"year":2026,"category":"Roads","project":"Road from National Highway Junction to Sitio Luha of Barangay Poblacion connecting Boston Public Terminal to Bamboo and Driftwood Crafts and Furniture Manufacturing, Abaca Processing, Fish Processing, and Coconut Processing in support of the Agribusiness: Bamboo, Driftwood, Abaca, Fish, and Coconut Industry, Sta. 3+715.000- Sta. 3+904.000, Boston, Davao Oriental","amountPesos":4900000.0,"lengthMeters":189.0,"ratePesosPerMeter":25925.925925925927,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17529"},{"year":2026,"category":"Roads","project":"Constrution of Road , Brgy. Maragatas to Brgy. Langka Road connecting Lupon Public Terminal in support of the Agribusiness: Coconut, Corn and Rice Industries, Lupon, Davao Oriental - (Sta.8+571.105 - Sta.8+760.000)","amountPesos":4806000.0,"lengthMeters":188.895,"ratePesosPerMeter":25442.706265385474,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17532"},{"year":2026,"category":"Roads","project":"Construction of Roads , Brgy. Marayag Hi-way Junction connecting to Sitio DCS in support of the Coffee and Rubber Industries, Lupon, Davao Oriental - (Section 1 - Sta.1+867.84 - Sta.2+187.84, Section 2 - Sta.2+103.35 - Sta.2+623.35, Section 3 - Sta.2+098.00 - Sta.2+618.00)","amountPesos":39300000.0,"lengthMeters":755.51,"ratePesosPerMeter":52017.84225225346,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17534"},{"year":2026,"category":"Roads","project":"Construction of Road , Brgy. Panikian Centro to Brgy. Mahayag Road connecting Banaybanay Public Terminal and Coconut and Corn Processing Sites in support of the Agribusiness: Coconut and Corn industries, Banaybanay, Davao Oriental - (Sta.1+775.58 - Sta. 1+964.475)","amountPesos":4806000.0,"lengthMeters":188.895,"ratePesosPerMeter":25442.706265385536,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17536"},{"year":2026,"category":"Roads","project":"Construction of Road , Purok Gemilina to Purok Lawaan Barangay Tandang Sora in support of the Coffee, Corn, and Banana Industries, Governor Generoso, Davao Oriental - (Sta.7+631.000 - Sta.7+819.895)","amountPesos":4806000.0,"lengthMeters":188.895,"ratePesosPerMeter":25442.706265385474,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17538"},{"year":2026,"category":"Roads","project":"Construction of Road from Junction Brgy. Sainz connecting to Sitio Licop in support of the Cacao, Coffee, Corn, and Mango Industries, Mati City, Davao Oriental -(Sta.5+720.46 - Sta.5+909.355 )","amountPesos":4806000.0,"lengthMeters":188.895,"ratePesosPerMeter":25442.706265385594,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17540"},{"year":2026,"category":"Roads","project":"Aleosan Barangay Road from Katalicanan-Cawilihan connecting to Lawili in support of the Rubber and Palm Oil Industries, Aleosan, Cotabato, Sta. 5+578.8 - Sta. 5+752.19","amountPesos":9484000.0,"lengthMeters":173.39,"ratePesosPerMeter":54697.50273948891,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17544"},{"year":2026,"category":"Roads","project":"Aleosan Barangay Road from Lawili to Pentil connecting to Palacat in support of the Rubber and Palm Oil Industries, Aleosan, Cotabato, Sta. 5+953 - Sta. 6+153","amountPesos":4742000.0,"lengthMeters":200.0,"ratePesosPerMeter":23710.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17546"},{"year":2026,"category":"Roads","project":"Aleosan Barangay Road from San Mateo-Sitio Taguan connecting to Pupoyon Dualing, in support of the Rubber, Palm Oil and Coconut Industries, Aleosan, Cotabato, Sta. 4+696 - Sta. 5+389.08","amountPesos":17070000.0,"lengthMeters":693.08,"ratePesosPerMeter":24629.191435332144,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17548"},{"year":2026,"category":"Roads","project":"Jct. Davao-Cotabato (crossing Baguer)-Sitio Dalumangkom-Sitio Lampaki Road, , Pigkawayan, North Cotabato, Sta. 20+430 - Sta. 21+230","amountPesos":23709000.0,"lengthMeters":800.0,"ratePesosPerMeter":29636.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17550"},{"year":2026,"category":"Roads","project":"Jct. Dulao-Ricor-New Leon-Patag, Dado Road in support of the Banana, Coffee and Highland Vegetable Production and Marketing,  Alamada, North Cotabato, Sta. 3+197 - Sta. 4+697","amountPesos":40542000.0,"lengthMeters":1500.0,"ratePesosPerMeter":27028.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17552"},{"year":2026,"category":"Roads","project":"Lawili-Palacat-Bao Road in support of the Banana, Corn, Coconut, and Palm Oil Industries, Alamada-Aleosan,  North Cotabato, Sta. 4+024 - Sta. 4+036","amountPesos":18006000.0,"lengthMeters":12.0,"ratePesosPerMeter":1500500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17554"},{"year":2026,"category":"Roads","project":"Patil-Baugan-Badak- Junction Campo 10 (Rangayen) Road in support of the Banana Industry, Coffee Production and Processing, Corn Production and Marketing and Rice Granary, , Alamada, North Cotabato, Sta. 4+215 - Sta. 4+815","amountPesos":14225000.0,"lengthMeters":600.0,"ratePesosPerMeter":23708.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17556"},{"year":2026,"category":"Roads","project":"Buayan-Lepaga-Gaunan Road in support of the Cavendish Banana Project - Sta 3+859.6 - Sta. 4+ 081.1, M'lang, Cotabato","amountPesos":9484000.0,"lengthMeters":221.5,"ratePesosPerMeter":42817.15575620768,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17559"},{"year":2026,"category":"Roads","project":"Sayre Road-Sitio Tawagon-Kilambay, Brgy. Kibudtungan connecting to Salama, Banisilan Road in support of the Coconut Processing Industry (Tree Life Organic Coco Sugar) - Sta. 11+523.87 - Sta. 11+751.37, Carmen, Cotabato","amountPesos":9484000.0,"lengthMeters":227.5,"ratePesosPerMeter":41687.91208791209,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17561"},{"year":2026,"category":"Roads","project":"Brgy. Alegria Proper (Alabel-Malungon Provincial Road Junction) to Sitio Likon (Alabel-Malungon Road), Brgy. Domolok in support of the Cacao, Coconut, Mango and Banana Agri-Industries, Sta. 8+567 - Sta. 8+767, Alabel, Sarangani","amountPesos":4742000.0,"lengthMeters":200.0,"ratePesosPerMeter":23710.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17564"},{"year":2026,"category":"Roads","project":"Junction from National Highway Mangelen to Libas to Junction Kyumad in support of the Animal Production (Poultry) and Crop Production (Banana, Sugarcane, Coconut, Sorghum, Corn) Agribusiness Subsectors, Sta. 2+690 - Sta. 4+250, Maasim, Sarangani","amountPesos":47418000.0,"lengthMeters":1560.0,"ratePesosPerMeter":30396.153846153848,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17566"},{"year":2026,"category":"Roads","project":"Junction National Highway to San Jose Proper in support of the Coco Coir and Aquamarine Industries, Sta. 3+179 - Sta. 3+309, Glan, Sarangani","amountPesos":4742000.0,"lengthMeters":130.0,"ratePesosPerMeter":36476.92307692308,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17568"},{"year":2026,"category":"Roads","project":"Junction NHW , Mabuhay-Prk. Mustives-Sitio Datal Tatudak-Sitio Datal Lenuyong, Kapate Road in support of the Coffee & Banana Industries, Sta. 0+410 - Sta. 0+680, Kiamba, Sarangani","amountPesos":4742000.0,"lengthMeters":270.0,"ratePesosPerMeter":17562.962962962964,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17570"},{"year":2026,"category":"Roads","project":"National Highway Junction JP Laurel-Sitio Sabangan Road in support of the Banana, Cacao, Coffee and Processed Food Industries, Sta. 0+780 - Sta. 1+682, Malungon, Sarangani","amountPesos":33193000.0,"lengthMeters":902.0,"ratePesosPerMeter":36799.33481152993,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17572"},{"year":2026,"category":"Roads","project":"Blagan-Datal Laguh San Jose-Pao Pao Sinawal Road connecting to Gensan Diversion Road in support of the Agribusiness industry, Sta. 18+667 - Sta. 18+832, General Santos City, South Cotabato","amountPesos":4742000.0,"lengthMeters":165.0,"ratePesosPerMeter":28739.39393939394,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17575"},{"year":2026,"category":"Roads","project":"Jainal Abedin St., Brgy. Buayan Road in support of the Milkfish, Salt, Coconut, and Banana Industries, Sta. 2+575 - 2+740, General Santos City, South Cotabato","amountPesos":4742000.0,"lengthMeters":165.0,"ratePesosPerMeter":28739.39393939394,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17577"},{"year":2026,"category":"Roads","project":"NRJ Crossing Palkan-Lamcaliaf-Kalsangi Road connecting National Highway in support of the Agribusiness, Sta. 17+402.5 - Sta. 18+602, Polomolok, South Cotabato","amountPesos":66148000.0,"lengthMeters":1199.5,"ratePesosPerMeter":55146.31096290121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17579"},{"year":2026,"category":"Roads","project":"Colongulo-Buenavista Road in support of the Banana, Coffee, Coconut and Papaya Industries, Surallah, STA. 0+000-STA.0+250 South Cotabato","amountPesos":4742000.0,"lengthMeters":250.0,"ratePesosPerMeter":18968.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17582"},{"year":2026,"category":"Roads","project":"Sitio Morales, Brgy. Centrala-Sitio Pula, Brgy. Tubi-Ala Road in support of the Food Industry (Sugarcane, Banana, Monggo, Fish and Vegetables) in Surallah, STA. 0+000-STA.0+250 South Cotabato","amountPesos":4742000.0,"lengthMeters":250.0,"ratePesosPerMeter":18968.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17584"},{"year":2026,"category":"Roads","project":"Junction Provincial Road to New Cebu-Pimbalayan-Mamali Road in support of the Agribusiness Industries, Banana Plantation/Processing Plant - Sta. 2 + 831.5 - Sta. 3 + 081.5, Lambayong, Sultan Kudarat","amountPesos":4742000.0,"lengthMeters":250.0,"ratePesosPerMeter":18968.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17587"},{"year":2026,"category":"Roads","project":"Tacurong East By-Pass Road from Brgy. San Antonio-D'Ledesma-San Pablo connecting to Brgy. Kalandagan Barangay Road in support of the Banana and Palm Oil Industries - Sta. 3 + 523 - Sta. 3 + 773, Tacurong City, Sultan Kudarat","amountPesos":4742000.0,"lengthMeters":250.0,"ratePesosPerMeter":18968.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17589"},{"year":2026,"category":"Roads","project":"Jct NHW Biwang-Daguma-Kapaya to Jct. NHW-Nakan Road in support of the Banana, Rice, Corn, Coconut, Monggo, Poultry/Eggs and Piggery - Sta. 2+170 - Sta. 2+635, Bagumbayan, Sultan Kudarat","amountPesos":14225000.0,"lengthMeters":465.0,"ratePesosPerMeter":30591.397849462366,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17594"},{"year":2026,"category":"Roads","project":"Tuka-Bai Saripinang Road in Bagumbayan SK in support of the Agri-based Industries: Pineapple, Coffee, Rubber, Corn and Muscovado Processing Plant - Sta. 14+401 - Sta. 15+176, Bagumbayan, Sultan Kudarat","amountPesos":23709000.0,"lengthMeters":775.0,"ratePesosPerMeter":30592.25806451613,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17596"},{"year":2026,"category":"Roads","project":"Access Road leading to Nasipit-Agusan del Norte Industrial Estate Special Economic Zone (NANIE-SEZ), Sta. 11+867.50 - Sta. 12+033.50, Nasipit, Agusan del Norte","amountPesos":4900000.0,"lengthMeters":166.0,"ratePesosPerMeter":29518.072289156626,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17600"},{"year":2026,"category":"Roads","project":"Brgy. Lingayao-Interim Barangay of Lawan-Lawan Road in support of the Las Nieves, Buenavista, Nasipit, Carmen (LASBUENASCAR) Sustainable Agro-Forestry Development Project, Sta. 0+710.5 - Sta 0+876.5, Las Nieves, Agusan del Norte","amountPesos":50470000.0,"lengthMeters":166.0,"ratePesosPerMeter":304036.1445783133,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17602"},{"year":2026,"category":"Roads","project":"Jct. Maharlika Highway (Surigao-Agusan Section)-Zapanta Valley Kitcharao in support of the Agribusiness, Abaca, and High-value Crops Industries, Sta. 9+259.5 - Sta. 9+320.5, Kitcharao, Agusan del Norte","amountPesos":29007000.0,"lengthMeters":61.0,"ratePesosPerMeter":475524.59016393445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17604"},{"year":2026,"category":"Roads","project":"Road connecting Brgys. Mat-i and E.G. Montilla, Sta. 0+511 - Sta. 0+677, Las Nieves, Agusan del Norte","amountPesos":4900000.0,"lengthMeters":166.0,"ratePesosPerMeter":29518.072289156626,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17606"},{"year":2026,"category":"Roads","project":"Access Road in support of the Match Factory, Sta. 6+445 - Sta. 6+565, Talacogon, Agusan del Sur","amountPesos":4900000.0,"lengthMeters":120.0,"ratePesosPerMeter":40833.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17609"},{"year":2026,"category":"Roads","project":"Purok 3-Afga-Anahawan-Kauswagan-San Vicente Road connecting Coconut and Falcata Plantation Sites and National Road Junction in support of the Coconut and Wood Industries, Sta. 0+791.50 - Sta. 0+859, Sibagat, Agusan del Sur","amountPesos":4900000.0,"lengthMeters":67.5,"ratePesosPerMeter":72592.5925925926,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17611"},{"year":2026,"category":"Roads","project":"Sitio San Jose/Bakingking Municipal Road connecting Coffee, Cacao and Wood Plantation sites and Provincial Road Junction in support of the Coffee, Cacao and Wood Industries, Sta. 2+630 - Sta. 2+777, Esperanza, Agusan del Sur","amountPesos":4900000.0,"lengthMeters":147.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17613"},{"year":2026,"category":"Roads","project":"Buhisan-Manlawigan-Calasian-Padigusan Road connecting Oil Palm, Rice and Corn Farms and National Road Junction in support of the Oil Palm, Rice, and Corn Farms Industries, Sta. 0+570 - Sta. 0+670, Rosario, Agusan del Sur","amountPesos":4900000.0,"lengthMeters":100.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17616"},{"year":2026,"category":"Roads","project":"Lapinigan-Mate Bato Road connecting Filipinas Palm Oil Plantations, Inc. (FPPI) and National Road Junction in support of the Oil Palm Industries, Sta. 3+400 - Sta. 3+493, San Francisco, Agusan del Sur","amountPesos":4900000.0,"lengthMeters":93.0,"ratePesosPerMeter":52688.17204301075,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17618"},{"year":2026,"category":"Roads","project":"Left Side 45/San Andres Barangay Road in support of the Rubber IC, Sta. 0+845 - Sta. 0+938, Bunawan, Agusan del Sur","amountPesos":4900000.0,"lengthMeters":93.0,"ratePesosPerMeter":52688.17204301075,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17620"},{"year":2026,"category":"Roads","project":"Purok Marasigan-Purok 7- Panganan Road Connecting Rubber, Cacao and Coffee Plantation Sites and National Road Junction in support of the Rubber, Cacao and Coffee Industries, Sta. 1+541.5 - Sta. 1+638.5, Rosario, Agusan del Sur","amountPesos":4900000.0,"lengthMeters":97.0,"ratePesosPerMeter":50515.463917525776,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17622"},{"year":2026,"category":"Roads","project":"Simulao-Imelda-Libertad Road connecting Oil Palm Plantation Sites and National Highway in support of the Oil Palm IC, Sta. 4+910 - Sta. 5+010.5, Bunawan, Agusan del Sur","amountPesos":4900000.0,"lengthMeters":100.5,"ratePesosPerMeter":48756.21890547263,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17624"},{"year":2026,"category":"Roads","project":"Sitio Palo, Alegria Road connecting Rubber and Coconut Plantation Sites and National Road Junction in support of the Rubber and Coconut Industries, Sta. 1+400 - Sta. 1+500, San Francisco, Agusan del Sur","amountPesos":4900000.0,"lengthMeters":100.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17626"},{"year":2026,"category":"Roads","project":"Tagyago-Comota-Lydia Road connecting Rubber, Cacao, Oil Palm and Wood Plantation Site and National Road Junction in support of the Rubber, Cacao, Oil Palm and Wood Industry, Sta. 0+920 - Sta. 1+045, La Paz, Agusan del Sur","amountPesos":4900000.0,"lengthMeters":125.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17628"},{"year":2026,"category":"Roads","project":"Tugpan-Kiunyap Road connecting Rubber, Banana and Wood Plantation Sites and National Road Junction in support of the Rubber, Banana and Wood Industries, Sta. 0+977 - Sta. 1+070, Veruela, Agusan del Sur","amountPesos":4900000.0,"lengthMeters":93.0,"ratePesosPerMeter":52688.17204301075,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17630"},{"year":2026,"category":"Roads","project":"NRJ BCIR- Capitol-Bonbon Road in support of the proposed Butuan City IT Park and Public Utility Transport Terminal, (Sta. 2+110 - Sta. 2+348), Butuan City, Agusan del Norte","amountPesos":4900000.0,"lengthMeters":238.0,"ratePesosPerMeter":20588.235294117647,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 17633"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along MacArthur H-way - K0010 + (-625) - K0010 + 629","amountPesos":1800000.0,"lengthMeters":1254.0,"ratePesosPerMeter":1435.4066985645934,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18099"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along EDSA-Ayala Tunnel (South Bound) - (S03463LZ) Chainage 000 - Chainage 942","amountPesos":55689000.0,"lengthMeters":942.0,"ratePesosPerMeter":59117.83439490446,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18101"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0027 + 285 - K0028 + 075","amountPesos":20263000.0,"lengthMeters":790.0,"ratePesosPerMeter":25649.367088607596,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18103"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0028 + 590 - K0029 + 350","amountPesos":20263000.0,"lengthMeters":760.0,"ratePesosPerMeter":26661.842105263157,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18105"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Secondary Roads - South Super H-way - K0004 + (-889) - K0004 + (-272.23)","amountPesos":36139000.0,"lengthMeters":616.77,"ratePesosPerMeter":58593.96533553837,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18107"},{"year":2026,"category":"Roads","project":"Installation of Roadway Lighting Structures along Manila North Road K0171+275 - K0176+700","amountPesos":73500000.0,"lengthMeters":5425.0,"ratePesosPerMeter":13548.387096774193,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18116"},{"year":2026,"category":"Roads","project":"Installation of Roadway Lighting Structures along Manila North Road K0176+700 - K0186+093","amountPesos":73500000.0,"lengthMeters":9393.0,"ratePesosPerMeter":7824.976045991696,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18118"},{"year":2026,"category":"Roads","project":"Installation of Roadway Lighting Structures along Manila North Road K0186+093 - K0194+773","amountPesos":73500000.0,"lengthMeters":8680.0,"ratePesosPerMeter":8467.741935483871,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18120"},{"year":2026,"category":"Roads","project":"Installation of Roadway Lighting Structures along Manila North Road K0194+773 - K0204+050","amountPesos":73500000.0,"lengthMeters":9277.0,"ratePesosPerMeter":7922.819877115447,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18122"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Dagupan-Bonuan-San Fabian Rd - K0379 + 564 - K0379 + 714","amountPesos":1588000.0,"lengthMeters":150.0,"ratePesosPerMeter":10586.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18126"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Manila North Rd - K0497 + 758 - K0497 + 823, K0498 + 288 - K0498 + 733","amountPesos":5642000.0,"lengthMeters":510.0,"ratePesosPerMeter":11062.745098039215,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18128"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Manila North Rd - K0510+ 000 - K0510 + 450","amountPesos":5073000.0,"lengthMeters":450.0,"ratePesosPerMeter":11273.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18130"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Manila North Rd - K0531 + 549 - K0531 + 569, K0531 + 872 - K0531 + 878, K0531 + 890 - K0531 + 917, K0531 + 958 - K0532 + 015, K0532 + 032 - K0532 + 782","amountPesos":4131000.0,"lengthMeters":860.0,"ratePesosPerMeter":4803.488372093023,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18132"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Manila North Rd - K0546 + 000 - K0546 + 960","amountPesos":9654000.0,"lengthMeters":960.0,"ratePesosPerMeter":10056.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18134"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Pangasinan-Zambales Rd - K0341 + (-840) - K0357 + 082","amountPesos":79772000.0,"lengthMeters":16922.0,"ratePesosPerMeter":4714.099988181066,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18148"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Urdaneta Jct-Dagupan-Lingayen Rd - K0209 + 000 - K0209 + 210","amountPesos":1960000.0,"lengthMeters":210.0,"ratePesosPerMeter":9333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18150"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Urdaneta Jct-Lingayen Rd via Zambales - K0377 + 1277 - K0377 + 1667","amountPesos":3676000.0,"lengthMeters":390.0,"ratePesosPerMeter":9425.641025641025,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18152"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0498 + 593 - K0500 + 601, K0500 + 617.40 - K0503 + 185, K0503 + 191.70 - K0508 + 008, K0508 + 044.50 - K0511 + 115","amountPesos":125836000.0,"lengthMeters":12462.4,"ratePesosPerMeter":10097.252535627194,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18155"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Maharlika Highway (Cagayan Valley Rd) -  K0544 + 427 - K0545 + 142","amountPesos":6650000.0,"lengthMeters":715.0,"ratePesosPerMeter":9300.699300699302,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18166"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Maharlika Highway (LZ) - K0350 + 768 - K0352 + 516.12","amountPesos":11760000.0,"lengthMeters":1748.12,"ratePesosPerMeter":6727.226963824011,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18168"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Bangag-Magapit Rd - K0692 + 000 - K0692 + 723","amountPesos":21899000.0,"lengthMeters":723.0,"ratePesosPerMeter":30289.073305670816,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18170"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Jct Logac-Magapit Rd - K0708 + 591 -  K0709 + 166","amountPesos":24942000.0,"lengthMeters":575.0,"ratePesosPerMeter":43377.391304347824,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18172"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - K0341 + 985 - K0342 + 038, K0342 + 271 - K0343 + 538.09","amountPesos":77456000.0,"lengthMeters":1320.09,"ratePesosPerMeter":58674.787325105484,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18174"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway ( Cagayan Valley Rd) - K0461+(-265) - K0461+322, K0461+761 - K0462+(-113), K0462+953 - K0463+227.20","amountPesos":66418000.0,"lengthMeters":987.2,"ratePesosPerMeter":67279.1734197723,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18176"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway ( Cagayan Valley Rd) - K0533 + 373 - K0533 + 788","amountPesos":28959000.0,"lengthMeters":415.0,"ratePesosPerMeter":69780.72289156627,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18178"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0232 + 197 - K0233 + 318, K0234 + 801 - K0235 + 020, K0236 + 190 - K0237 + 260","amountPesos":183506000.0,"lengthMeters":2410.0,"ratePesosPerMeter":76143.56846473028,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18180"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0237 + 260 - K0237 + 592, K0237 + 626.9 -  K0237+918, K0238 + 420 - K0239 + 268, K0240 + 045 - K0240 + 320","amountPesos":113088000.0,"lengthMeters":1746.1,"ratePesosPerMeter":64766.05005440675,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18182"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0258 + 100 - K0258 + 175","amountPesos":5605000.0,"lengthMeters":75.0,"ratePesosPerMeter":74733.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18184"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0270 + 189 - K0271 + 522","amountPesos":96127000.0,"lengthMeters":1333.0,"ratePesosPerMeter":72113.2783195799,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18186"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0321 + 497 - K0322 + 000","amountPesos":34564000.0,"lengthMeters":503.0,"ratePesosPerMeter":68715.70576540756,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18188"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0386 + 000 - K0386 + 460, K0388 + 105 - K0388 + 282, K0388 + 771 - K0389 + 286, K0373 + 916 - K0375 + 067, K0375 + 133 - K0376 + 000","amountPesos":178422000.0,"lengthMeters":3170.0,"ratePesosPerMeter":56284.54258675079,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18190"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0410 + 600 - K0410 + 860","amountPesos":14946000.0,"lengthMeters":260.0,"ratePesosPerMeter":57484.61538461538,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18192"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Manila North Rd - K0644 + 019 - K0644 + 325","amountPesos":24711000.0,"lengthMeters":306.0,"ratePesosPerMeter":80754.90196078431,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18194"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Manila North Rd - K0644 + 325 - K0644 + 740","amountPesos":32893000.0,"lengthMeters":415.0,"ratePesosPerMeter":79260.24096385542,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18196"},{"year":2026,"category":"Roads","project":"Installation of Solar LED Street Lights along Secondary Roads, Olongapo - Bugallon Road - K0183 + 829 - K0185 + 072, K0186 + 177 - K0187 + 444, K0188 + 000 - K0190 + 000, K0200 + 400 - K0201 + 011, K0203 + 013 - K0205 + 165, K0205 + 195 - K0207 + 351","amountPesos":98000000.0,"lengthMeters":9429.0,"ratePesosPerMeter":10393.466963622866,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18201"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Central Luzon Link Expressway (CLLEX)-Decreasing, Chainage 2240-5110, La Paz, Tarlac","amountPesos":75000000.0,"lengthMeters":2870.0,"ratePesosPerMeter":26132.40418118467,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18203"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Central Luzon Link Expressway (CLLEX)-Decreasing, Chainage 5110-7988, La Paz, Tarlac","amountPesos":75000000.0,"lengthMeters":2878.0,"ratePesosPerMeter":26059.763724808894,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18205"},{"year":2026,"category":"Roads","project":"Installation of Road Safety Facilities (Solar LED Street Lights) along Concepcion-Capas Road, K0109 + (-321) - K0114 + 500, Concepcion and Capas, Tarlac","amountPesos":50000000.0,"lengthMeters":5821.0,"ratePesosPerMeter":8589.589417625837,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18207"},{"year":2026,"category":"Roads","project":"Maharlika Highway (LZ) - K0131 + 000 - K0132 + 878","amountPesos":47159000.0,"lengthMeters":1878.0,"ratePesosPerMeter":25111.28860489883,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18211"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0058 + 516 - K0059 + 314","amountPesos":55710000.0,"lengthMeters":798.0,"ratePesosPerMeter":69812.03007518797,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18213"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Jct MSR-Old Zigzag Rd - K0153 + (-632) - K0153 + (-321), K0153 + (-305.90) - K0155 + 595","amountPesos":76881000.0,"lengthMeters":3211.9,"ratePesosPerMeter":23936.299386655915,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18222"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Mauban-Tignoan Rd - K0115 + 000 - K0122 + 477, K0122 + 577.10 - K0126 + 616","amountPesos":76881000.0,"lengthMeters":11515.9,"ratePesosPerMeter":6676.0739499301,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18224"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) -  K0081 + 000 - K0081 + 127, K0084 + (-060) - K0084 + 424","amountPesos":35163000.0,"lengthMeters":611.0,"ratePesosPerMeter":57549.918166939446,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18226"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0114 + 578 - K0116 + 143, K0116 + 179 - K0116 + 262","amountPesos":64012000.0,"lengthMeters":1648.0,"ratePesosPerMeter":38842.23300970874,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18228"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0116 + 262 - K0117 + 566, K0117 + 665 - K0117 + 887, K0117 + 907 - K0118 + 071, K0118 + 082 - K0118 + 252","amountPesos":81230000.0,"lengthMeters":1860.0,"ratePesosPerMeter":43672.04301075269,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18230"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0164 + 389 - K0164 + 715, K0176 + 908 - K0178 + 100, K0180 + 529 - K0180 + 546, K0183 + 208 - K0183 + 278, K0192 + 103 - K0192 + 292, K0193 + 940 - K0193 + 950, K0194 + 390 - K0194 + 646, K0194 + 827 - K0195 + 029","amountPesos":35962000.0,"lengthMeters":2262.0,"ratePesosPerMeter":15898.320070733864,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18232"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Manila South Road) - K0051 + 000 - K0051 + 840","amountPesos":59336000.0,"lengthMeters":840.0,"ratePesosPerMeter":70638.09523809524,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18236"},{"year":2026,"category":"Roads","project":"Reconstruction of Maharlika Highway (LZ) - K0142+326 - K0142+945, K0143 + 499 - K0143 + 624, K0145 + 165 - K0145 + 211, K0147 + 190 - K0147 + 440, K0147 + 492 - K0147 + 600, K0147 + 700 - K0148 + 059, K0148 + 249 - K0148 + 412","amountPesos":93703000.0,"lengthMeters":1670.0,"ratePesosPerMeter":56109.58083832335,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18238"},{"year":2026,"category":"Roads","project":"Reconstruction of Maharlika Highway (LZ) - K0155 + 000 - K0155 + 016, K0156 + 883 - K0157 + 020, K0157 + 115 - K0157 + 188","amountPesos":9601000.0,"lengthMeters":226.0,"ratePesosPerMeter":42482.30088495575,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18240"},{"year":2026,"category":"Roads","project":"Reconstruction of Maharlika Highway (LZ) - K0169 + 025 - K0169 + 291","amountPesos":8119000.0,"lengthMeters":266.0,"ratePesosPerMeter":30522.556390977443,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18242"},{"year":2026,"category":"Roads","project":"Reconstruction of Maharlika Highway (LZ) - K0179 + 950 - K0180 + 099, K0180 + 099 - K0180 + 272, K0181 + 134 - K0181 + 987, K0181 + 987 - K0181 + 994, K0182 + 010 - K0182 + 160, K0182 + 160 - K0182 + 175, K0182 + 570 - K0182 + 625, K0182 + 625 - K0183 + 000 , K0183 + 000 - K0183 + 215","amountPesos":49048000.0,"lengthMeters":1992.0,"ratePesosPerMeter":24622.489959839357,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18244"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Puerto Princesa South Rd - K0059 + (-462) - K0062 + 078","amountPesos":52949000.0,"lengthMeters":3540.0,"ratePesosPerMeter":14957.344632768361,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18247"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0337 + 030 - K0337 + 227, K0339 + 817 - K0339 + 974, K0340 + 174 - K0340 + 1019","amountPesos":60015000.0,"lengthMeters":1199.0,"ratePesosPerMeter":50054.21184320267,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18266"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0360 + 111 - K0360 + 253","amountPesos":8329000.0,"lengthMeters":142.0,"ratePesosPerMeter":58654.92957746479,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18268"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0371 + (-001) - K0371 + 159, K0385 + 983 - K0386 + 239, K0394 + 338 - K0394 + 858.8","amountPesos":33687000.0,"lengthMeters":936.8,"ratePesosPerMeter":35959.6498719048,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18270"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0411 + 998 - K0413 + 333.42","amountPesos":93049000.0,"lengthMeters":1335.42,"ratePesosPerMeter":69677.70439262639,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18272"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0434 + (-037) - K0434 + 852, K0434 + 963.70 - K0435 + 054","amountPesos":65668000.0,"lengthMeters":979.3,"ratePesosPerMeter":67056.0604513436,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18274"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0448 + 565 - K0448 + 622","amountPesos":3996000.0,"lengthMeters":57.0,"ratePesosPerMeter":70105.26315789473,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18276"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0458 + 335 - K0458 + 511, K0468 + 177 - K0468 + 326","amountPesos":10594000.0,"lengthMeters":325.0,"ratePesosPerMeter":32596.923076923078,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18278"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0468 + 000 - K0468 + 177, K0468 + 326 - K0468 + 516","amountPesos":13269000.0,"lengthMeters":367.0,"ratePesosPerMeter":36155.31335149864,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18280"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0472 + 556 - K0472 + 700, K0476 + 538 - K0476 + 656","amountPesos":9472000.0,"lengthMeters":262.0,"ratePesosPerMeter":36152.67175572519,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18282"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0488 + 749.30 - K0489 + 000, K489 + 509 - K0489 + 800, K0493 + 820.20 - K0494 + 000, K0505 + 860.20 - K0506 + 013","amountPesos":41469000.0,"lengthMeters":874.3,"ratePesosPerMeter":47431.08772732535,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18284"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0492 + 577 - K0493 + 077, K0493 + 779 - K0493 + 820.20","amountPesos":25382000.0,"lengthMeters":541.2,"ratePesosPerMeter":46899.48263118894,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18286"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0504 + 231 - K0505 + 419, K0505 + 600 - K0505 + 860.20","amountPesos":64990000.0,"lengthMeters":1448.2,"ratePesosPerMeter":44876.39828752899,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18288"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0600 + (-008) - K0600 + 315","amountPesos":23804000.0,"lengthMeters":323.0,"ratePesosPerMeter":73696.59442724458,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18290"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LZ) - K0608 + 901 - K0609 + 064, K0609 + 600 - K0610 + 009","amountPesos":38299000.0,"lengthMeters":572.0,"ratePesosPerMeter":66956.29370629371,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18292"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Secondary Roads - Buenavista-Kawayan Rd - K0039 + 000 - K0040 + 000","amountPesos":56758000.0,"lengthMeters":1000.0,"ratePesosPerMeter":56758.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18294"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Secondary Roads - Aklan East Rd - K0283 + 085 - K0285 + 605","amountPesos":111759000.0,"lengthMeters":2520.0,"ratePesosPerMeter":44348.80952380953,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18297"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Secondary Roads - Aklan West Rd (Kalibo-Nabas) - K0247 + 243 - K0251 + 212","amountPesos":85215000.0,"lengthMeters":3969.0,"ratePesosPerMeter":21470.143613000757,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18299"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Secondary Roads - Iloilo East Coast-Capiz Rd - K0272 + 898 - K0274 + 147","amountPesos":49684000.0,"lengthMeters":1249.0,"ratePesosPerMeter":39779.02321857486,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18301"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bacolod North Rd - K0012 + (-006) - K0017 + 000","amountPesos":98000000.0,"lengthMeters":5006.0,"ratePesosPerMeter":19576.508190171793,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18304"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bacolod North Rd - K0017 + 000 - K0019 + 491, K0022 + 561 - K0023 + 000","amountPesos":70065000.0,"lengthMeters":2930.0,"ratePesosPerMeter":23912.969283276452,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18306"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bacolod North Rd - K0023 + 000 - K0028 + 000","amountPesos":70168000.0,"lengthMeters":5000.0,"ratePesosPerMeter":14033.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18308"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bacolod South Rd (Kabankalan-Hinobaan Section) -  K0105 + 684 - K0111 + 100","amountPesos":90206000.0,"lengthMeters":5416.0,"ratePesosPerMeter":16655.46528803545,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18310"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bacolod South Rd (Kabankalan-Hinobaan Section) -  K0111 + 489 - K0111 + 1870","amountPesos":23630000.0,"lengthMeters":1381.0,"ratePesosPerMeter":17110.789283128168,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18312"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Dumaguete South Rd - K0036 + 000 - K0041 + 016.09","amountPesos":63208000.0,"lengthMeters":5016.09,"ratePesosPerMeter":12601.049821673862,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18314"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Bacolod South Rd - K0025 + 192 - K0027 + 289","amountPesos":95174000.0,"lengthMeters":2097.0,"ratePesosPerMeter":45385.789222699095,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18316"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Bacolod South Rd - K0071 + 844 - K0072 + 134, K0072 + 692 - K0073 + 413","amountPesos":51487000.0,"lengthMeters":1011.0,"ratePesosPerMeter":50926.80514342236,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18318"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Secondary Roads - Bacolod Circumferential Rd - K0010 + (-236) - K0011 + 098","amountPesos":53284000.0,"lengthMeters":1334.0,"ratePesosPerMeter":39943.028485757124,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18320"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along F.E. Zuellig Avenue (Phase 2), Sta. 0+000.00 - Sta. 2+500.00, Mandaue City, Cebu","amountPesos":58185000.0,"lengthMeters":2500.0,"ratePesosPerMeter":23274.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18323"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along N Bacalso Ave (Cebu South Rd) - K0057 + (-845) - K0063 + 352.41","amountPesos":71519000.0,"lengthMeters":7197.41,"ratePesosPerMeter":9936.768921042425,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18325"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Pavement Markings, Road Signs) along Cebu North Hagnaya Wharf Rd - K0089 + 046 - K0109 + 336","amountPesos":145463000.0,"lengthMeters":20290.0,"ratePesosPerMeter":7169.196648595367,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18327"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Cebu North Hagnaya Wharf Rd - K0017 + 811 - K0018 + 000, K0026 + 140 - K0027 + 000, K0029 + 260 - K0029 + 328, K0032 + 427 - K0032 + 538","amountPesos":44064000.0,"lengthMeters":1228.0,"ratePesosPerMeter":35882.73615635179,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18329"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0786 + 000 - K0789 + 000","amountPesos":23973000.0,"lengthMeters":3000.0,"ratePesosPerMeter":7991.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18334"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0789 + 000 - K0792 + 000","amountPesos":24132000.0,"lengthMeters":3000.0,"ratePesosPerMeter":8044.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18336"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0792 + 000 - K0796 + 180","amountPesos":33498000.0,"lengthMeters":4180.0,"ratePesosPerMeter":8013.875598086124,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18338"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LT) - K0915 + 050 - K0915 + 550","amountPesos":42439000.0,"lengthMeters":500.0,"ratePesosPerMeter":84878.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18342"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LT) - K0929 + 000 - K0932 + 185","amountPesos":140933000.0,"lengthMeters":3185.0,"ratePesosPerMeter":44248.97959183674,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18344"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LT) - K0953 + 125 - K0953 + 450","amountPesos":23229000.0,"lengthMeters":325.0,"ratePesosPerMeter":71473.84615384616,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18346"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LT) - K0959 + (-205) - K0959 + 820, K0960 + 187 - K0960 + 355, K0960 + 955 - K0961 + 530, K0966 + 100 - K0966 + 971","amountPesos":134498000.0,"lengthMeters":2639.0,"ratePesosPerMeter":50965.51724137931,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18348"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (LT) - K0968 + 216 - K0969 + 088, K0969 + 121 - K0969 + 266","amountPesos":83625000.0,"lengthMeters":1017.0,"ratePesosPerMeter":82227.13864306785,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18350"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0687 + 000 - K0687 + 032, K0687 + 397 - K0687 + 483","amountPesos":5172000.0,"lengthMeters":118.0,"ratePesosPerMeter":43830.50847457627,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18352"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0687 + 000 - K0688 + 066, K0689 + 647 - K0689 + 933, K0690 + 231 - K0691 + 000","amountPesos":85758000.0,"lengthMeters":2121.0,"ratePesosPerMeter":40432.81471004243,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18354"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0687 + 483 - K0687 + 616, K0689 + 346 - K0689 + 531","amountPesos":25756000.0,"lengthMeters":318.0,"ratePesosPerMeter":80993.7106918239,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18356"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0688 + 500 - K0688 + 739, K0688 + 998 - K0689 +122","amountPesos":14494000.0,"lengthMeters":363.0,"ratePesosPerMeter":39928.374655647385,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18358"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Zamboanga City-Labuan-Limpapa Rd - K1955+321 - K1956 + 519, K1956 + 728 - K1956 + 783, K1956 + 863 - K1957 + 143, K1957 + 357 - K1957 + 360, K1958 + 447 - K1960 + 733, K1962 + 512 - K1964 + 011","amountPesos":53027000.0,"lengthMeters":5321.0,"ratePesosPerMeter":9965.607968426988,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18363"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Guardrails) along Jct Pulauan Port Rd - K1827 + (-322) - K1828 + 562","amountPesos":6110000.0,"lengthMeters":1884.0,"ratePesosPerMeter":3243.099787685775,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18365"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1936 + (-088) - K1936 + 000","amountPesos":14259000.0,"lengthMeters":88.0,"ratePesosPerMeter":162034.0909090909,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18369"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Pagadian City-Zamboanga City Rd)(S01315MN) - K1866 + 000 - K1867 + 469, K1904 + 657 - K1905 + 540, K1906 + 044 - K1907 + 1000, K1909 + 1042 - K1910 + 602, K1923 + 699 - K1924 + 000, K1927 + 000 - K1928 + 000","amountPesos":160000000.0,"lengthMeters":6169.0,"ratePesosPerMeter":25936.132274274598,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18371"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Pagadian City-Zamboanga City Rd)(S01315MN) - K1894 + 000 - K1896 + 905, K1915 + 485 - K1915 + 916.30","amountPesos":105737000.0,"lengthMeters":3336.3,"ratePesosPerMeter":31692.89332494036,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18373"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Pagadian City-Zamboanga City Rd)(S01453MN) - K1678 + 091 - K1680 + 380, K1680 + 603 - K1680 + 945","amountPesos":88253000.0,"lengthMeters":2631.0,"ratePesosPerMeter":33543.519574306345,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18375"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1654 + 1577 - K1656 + 1259","amountPesos":56279000.0,"lengthMeters":1682.0,"ratePesosPerMeter":33459.57193816885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18377"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) (S01113MN) - K1775 + 181 - K1781 + 435, K1783 + 992 - K1784 + 380.03","amountPesos":120152000.0,"lengthMeters":6642.03,"ratePesosPerMeter":18089.650302693528,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18379"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Secondary Roads - Jct Pulauan Port Rd - K1827 + (-319) - K1827 + 000, K1828 + 010.70 - K1828 + 562","amountPesos":51575000.0,"lengthMeters":870.3,"ratePesosPerMeter":59261.17430770682,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18381"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Secondary Roads - Siocon-Sirawai-Sibuco-Limpapa Rd - (S01151MN) Chainage 6980 - Chainage 9378","amountPesos":59910000.0,"lengthMeters":2398.0,"ratePesosPerMeter":24983.319432860717,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18383"},{"year":2026,"category":"Roads","project":"Elevated Walkway along Butuan City-Cagayan de Oro City-Iligan City Road (Jct. CM Recto Ave.-Corrales Ave. to Jct. CM Recto Ave.-Limketkai Drive), Barangay 27-Barangay 24, K1437+540-K1437+690, Cagayan de Oro City","amountPesos":83016000.0,"lengthMeters":150.0,"ratePesosPerMeter":553440.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18388"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Butuan City- Cagayan de Oro City-Iligan City Rd - K1464+000 - K1465+326","amountPesos":53010000.0,"lengthMeters":1326.0,"ratePesosPerMeter":39977.37556561086,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18390"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Butuan City-Cagayan de Oro City-Iligan City Rd - K1356 + 733 - K1357 + 000, K1360 + 990 - K1362 + 000, K1363 + 000 - K1363 + 860","amountPesos":64488000.0,"lengthMeters":2137.0,"ratePesosPerMeter":30176.883481516143,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18392"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Butuan City-Cagayan de Oro City-Iligan City Rd - K1365 + 000 - K1366 + 000, K1370 + 713 - K1372 + 000","amountPesos":65297000.0,"lengthMeters":2287.0,"ratePesosPerMeter":28551.37735024049,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18394"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Butuan City-Cagayan de Oro City-Iligan City Rd - K1373 + 978 - K1375 + 455, K1375 + 507 - K1375 + 607, K1375 + 637 - K1375 + 811","amountPesos":50743000.0,"lengthMeters":1751.0,"ratePesosPerMeter":28979.440319817248,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18396"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Butuan City-Cagayan de Oro City-Iligan City Rd - K1470+826 - K1472+710, K1474+605 - K1475+300","amountPesos":88954000.0,"lengthMeters":2579.0,"ratePesosPerMeter":34491.663435440096,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18398"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway( Malabang-Dobleston-Tukuran Rd) - K1976 + 845 - K1977 + 850","amountPesos":41475000.0,"lengthMeters":1005.0,"ratePesosPerMeter":41268.656716417914,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18400"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway( Malabang-Dobleston-Tukuran Rd) - K1997 + 000 - K1998 + 720","amountPesos":100884000.0,"lengthMeters":1720.0,"ratePesosPerMeter":58653.48837209302,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18402"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (MN) - K1438 + 100 - K1438 + 450","amountPesos":5716000.0,"lengthMeters":350.0,"ratePesosPerMeter":16331.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18409"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (MN) - K1460 + 812 - K1463 + 300","amountPesos":247012000.0,"lengthMeters":2488.0,"ratePesosPerMeter":99281.35048231512,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18411"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway(Davao City-Jct Digos Sect) - K1528 + 719 - K1529 + 333, K1532 + 445 - K1532 + 811.65","amountPesos":78814000.0,"lengthMeters":980.65,"ratePesosPerMeter":80369.14291542087,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18413"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Guardrails, Pavement Markings) along Bukidnon-Cotabato Rd - K1607 + 472 - K1635 + 000","amountPesos":37652000.0,"lengthMeters":27528.0,"ratePesosPerMeter":1367.7709968032548,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18418"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Guardrails, Street lights and Road Signs) along Makilala-Allah Valley Road - K1633 + 000 - K1635 + 000","amountPesos":5000000.0,"lengthMeters":2000.0,"ratePesosPerMeter":2500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18420"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Guardrails, Street lights and Road Signs) along Matalam-Mlang-Bagontapay Rd - K1651 + 000 - K1653 + 000","amountPesos":13817000.0,"lengthMeters":2000.0,"ratePesosPerMeter":6908.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18422"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Cotabato Marbel Rd (S00276MN) - K1740 + 710 - K1742 + 200","amountPesos":14654000.0,"lengthMeters":1490.0,"ratePesosPerMeter":9834.899328859061,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18424"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Maharlika Highway (Marbel-Makar Rd) - K1681 + 152 - K1685 + 585","amountPesos":92746000.0,"lengthMeters":4433.0,"ratePesosPerMeter":20921.72343785247,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18426"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Maharlika Highway (Marbel-Makar Rd) - K1689 + 483 - K1695 + 596","amountPesos":105482000.0,"lengthMeters":6113.0,"ratePesosPerMeter":17255.357434974645,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18428"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Cotabato-Allah Valley-Marbel Rd) - K1849 + 750 - K1850 + 000","amountPesos":33367000.0,"lengthMeters":250.0,"ratePesosPerMeter":133468.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18430"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Digos-Makar Rd) - K1648 + 486 - K1648 + 865","amountPesos":11860000.0,"lengthMeters":379.0,"ratePesosPerMeter":31292.87598944591,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18432"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Digos-Makar Rd) - K1652 + 110 - K1652 + 701","amountPesos":32901000.0,"lengthMeters":591.0,"ratePesosPerMeter":55670.05076142132,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18434"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Marbel-Allah Valley-Cotabato Rd) - K1765 + 829 - K1767 + 228","amountPesos":118008000.0,"lengthMeters":1399.0,"ratePesosPerMeter":84351.67977126519,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18436"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Marbel-Makar Rd) - K1687 + 244 - K1687 + 704","amountPesos":54011000.0,"lengthMeters":460.0,"ratePesosPerMeter":117415.21739130435,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18438"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1795 + 260 - K1796 + 000, K1796 + 152 - K1796 + 690.43","amountPesos":40366000.0,"lengthMeters":1278.43,"ratePesosPerMeter":31574.665801023177,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18440"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Maharlika Highway (Surigao-Agusan Sect) - K1172 + 000 - K1174 + 150.46","amountPesos":28114000.0,"lengthMeters":2150.46,"ratePesosPerMeter":13073.48195269872,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18447"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along NJR Bah-Bah-Talacogon Rd - K1311 + 776 - K1312 + 112, K1314 + 042 - K1316 + 997.10","amountPesos":58800000.0,"lengthMeters":3291.1,"ratePesosPerMeter":17866.366868219848,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18449"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Agusan-Davao Sect) - K1329 + 000 - K1329 + 495","amountPesos":8547000.0,"lengthMeters":495.0,"ratePesosPerMeter":17266.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18451"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Agusan-Davao Sect) - K1338 + 427 - K1338 + 748, K1339 + 000 - K1339 + 490, K1339 + 904 - K1340 + 000, K1343 + 832 - K1344 + 000","amountPesos":12384000.0,"lengthMeters":1075.0,"ratePesosPerMeter":11520.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18453"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Agusan-Davao Sect) - K1347 + 760 - K1347 + 962","amountPesos":5000000.0,"lengthMeters":202.0,"ratePesosPerMeter":24752.47524752475,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18455"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Agusan-Davao Sect) - K1350 + 000 - K1351 + 526","amountPesos":17578000.0,"lengthMeters":1526.0,"ratePesosPerMeter":11519.003931847968,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18457"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Agusan-Davao Sect) - K1368 + 328 - K1369 + 000, K1369 + 300 - K1369 + 700, K1369 + 900 - K1370 + 088","amountPesos":15618000.0,"lengthMeters":1260.0,"ratePesosPerMeter":12395.238095238095,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18459"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Surigao-Agusan Sect) - K1180 + 144 - K1180 + 200, K1180 + 359 - K1181 + 490, K1181 + 970 - K1182 + 800","amountPesos":44990000.0,"lengthMeters":2017.0,"ratePesosPerMeter":22305.404065443727,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18461"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Maharlika Highway (Surigao-Agusan Sect) - K1192 + 975 - K1193 + 900, K1220 + 000 - K1220 + 244, K1220 + 344 - K1220 + 369, K1220 + 706 - K1221 + 560, K1221 + 572 - K1221 + 914.14","amountPesos":85543000.0,"lengthMeters":2390.14,"ratePesosPerMeter":35789.953726561485,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18463"},{"year":2026,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Maharlika Highway (Agusan-Davao Sect) - K1279 + 000 - K1279 + 740","amountPesos":18441000.0,"lengthMeters":740.0,"ratePesosPerMeter":24920.27027027027,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18465"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along PPTA Rd - K0024 + (-416) - K0027 + 450","amountPesos":4388000.0,"lengthMeters":3866.0,"ratePesosPerMeter":1135.0232798758407,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18471"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Quirino Avenue - K0012 + 000 - K0013 + 007","amountPesos":1217000.0,"lengthMeters":1007.0,"ratePesosPerMeter":1208.5402184707052,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18473"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along Zapote-Alabang Rd - K0019 + 050 - K0020 + 057","amountPesos":1217000.0,"lengthMeters":1007.0,"ratePesosPerMeter":1208.5402184707052,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18475"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along EDSA-Ayala Tunnel (North Bound) - (S03462LZ) Chainage 000 - Chainage 500.25","amountPesos":36021000.0,"lengthMeters":500.25,"ratePesosPerMeter":72005.99700149924,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18478"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Aurora Blvd - K0010 + (-408) - K0013 + 079","amountPesos":7200000.0,"lengthMeters":3487.0,"ratePesosPerMeter":2064.812159449383,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18483"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Aurora Blvd - K0013 + (-155) - K0010 + 364","amountPesos":6600000.0,"lengthMeters":2481.0,"ratePesosPerMeter":2660.217654171705,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18485"},{"year":2026,"category":"Bridges","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along EDSA/Kamuning Flyover - (S05597LZ) Chainage 000 - Chainage 735","amountPesos":1900000.0,"lengthMeters":735.0,"ratePesosPerMeter":2585.0340136054424,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18487"},{"year":2026,"category":"Bridges","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along EDSA/Kamuning Flyover (S05598LZ) - Chainage 210 - Chainage 720","amountPesos":1346000.0,"lengthMeters":510.0,"ratePesosPerMeter":2639.2156862745096,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18489"},{"year":2026,"category":"Bridges","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along EDSA/Quezon Ave Flyover - (S05595LZ) Chainage 000 - Chainage 605","amountPesos":2100000.0,"lengthMeters":605.0,"ratePesosPerMeter":3471.0743801652893,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18493"},{"year":2026,"category":"Bridges","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along EDSA/Quezon Ave Flyover - (S05596LZ) Chainage 000 - Chainage 605","amountPesos":2100000.0,"lengthMeters":605.0,"ratePesosPerMeter":3471.0743801652893,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18495"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Manila North Rd - K0471 + 000 - K0474 + 024.32","amountPesos":29988000.0,"lengthMeters":3024.32,"ratePesosPerMeter":9915.617394984634,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18499"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Manila North Rd - K0477 + 480 - K0483 + 000","amountPesos":43297000.0,"lengthMeters":5520.0,"ratePesosPerMeter":7843.659420289855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18501"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Manila North Rd -  K0278 + 492 – K0279 + 107, K0284 + 806 – K0285 + 431","amountPesos":9800000.0,"lengthMeters":1240.0,"ratePesosPerMeter":7903.225806451613,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18504"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Manila North Rd - K0285 + 713 – K0286 + 000, K0286 + 236 – K0286 + 642, K0286 + 804 – K0287 + 300, K0287 + 600 – K0289 + 143","amountPesos":20718000.0,"lengthMeters":2732.0,"ratePesosPerMeter":7583.455344070278,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18506"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Sn Juan-Sn Gabriel Rd - K0278 + 997 – K0279 + 300, K0279 + 600 – K0280 + 274","amountPesos":9800000.0,"lengthMeters":977.0,"ratePesosPerMeter":10030.706243602866,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18508"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Manila North Rd - K0245 + 932 - K0248 + 882","amountPesos":39200000.0,"lengthMeters":2950.0,"ratePesosPerMeter":13288.135593220339,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18511"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Carmen Jct-Bayambang-Manat Rd - K0214 + 015 - K0217 + 482","amountPesos":20462000.0,"lengthMeters":3467.0,"ratePesosPerMeter":5901.93250648976,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18514"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Dagupan-Bonuan-San Fabian Rd - K0385 + 900 - K0387 + 800, K0382 + 010 - K0383 + 600","amountPesos":21691000.0,"lengthMeters":3490.0,"ratePesosPerMeter":6215.186246418338,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18516"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Pangasinan-La Union Inter-Provl Rd - K0379 + (-414) - K0380 + 206, K0381 + 204 - K0381 + 343.70","amountPesos":10831000.0,"lengthMeters":1759.7,"ratePesosPerMeter":6155.026424958759,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18518"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Pangasinan-Zambales Rd - K0360 + 064 - K0360 + 713, K0361 + 379 - K0362 + 183, K0362 + 683 - K0362 + 700, K0364 + 987 - K0367 + 554.90","amountPesos":19269000.0,"lengthMeters":4037.9,"ratePesosPerMeter":4772.034968671806,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18520"},{"year":2026,"category":"Roads","project":"Installation of Solar Lights along Manila-North Road, Rosales,\nPangasinan, K0169+(-813) - K0169+230","amountPesos":20000000.0,"lengthMeters":1043.0,"ratePesosPerMeter":19175.455417066154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18523"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Camiling-Wawa-Bayambang-Malasiqui-Sta Barbara Rd - K0190 + 932 - K0192 + 158, K0192 + 331 - K0194 + 422","amountPesos":41829000.0,"lengthMeters":3317.0,"ratePesosPerMeter":12610.491407898704,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18526"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Villasis-Malasiqui-Sn Carlos Rd - K0194 + (-450) - K0194 + 147","amountPesos":8780000.0,"lengthMeters":597.0,"ratePesosPerMeter":14706.867671691793,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18528"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Outlook Drive - K0253 + (-430) - K0254 + 342.62","amountPesos":12479000.0,"lengthMeters":1772.62,"ratePesosPerMeter":7039.861899335466,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18532"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Western Link Circumferential Rd - K0247 + 681.90 - K0250 + 501","amountPesos":15878000.0,"lengthMeters":2819.1,"ratePesosPerMeter":5632.293994537252,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18534"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Jct. Gattaran Cumao Capissayan Sta. Margarita Bolos Point Rd. - K0544+(-909) - K0552+871","amountPesos":33777000.0,"lengthMeters":9780.0,"ratePesosPerMeter":3453.680981595092,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18541"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0367 + 886 - K0370 + 326","amountPesos":1608000.0,"lengthMeters":2440.0,"ratePesosPerMeter":659.016393442623,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18544"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Cordon-Aurora Bdry Rd (Jct Dumabato-Aurora Bdry) - K0371 + (-677) - K0371 + 590, Dumabato-Balligui Rd - K0371 + (-667) - K0371 + (-386)","amountPesos":2432000.0,"lengthMeters":1267.0,"ratePesosPerMeter":1919.494869771113,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18546"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Gov JJ Linao Rd - K0129 + (-219) - K0135 + 566,  K0137+009-K0140 + 047","amountPesos":6370000.0,"lengthMeters":9823.0,"ratePesosPerMeter":648.4780616919475,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18565"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Mt Samat Rd - K0134 + (-916) - K0140 + 341","amountPesos":2450000.0,"lengthMeters":7257.0,"ratePesosPerMeter":337.6050709659639,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18567"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Roman Expressway - K0120+000 - K0122+505, K0122+838 - K0124 + 850","amountPesos":4900000.0,"lengthMeters":4517.0,"ratePesosPerMeter":1084.790790347576,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18569"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) including Center Island along Roman Expressway - K0133 + 292 - K0133 + 632","amountPesos":17150000.0,"lengthMeters":340.0,"ratePesosPerMeter":50441.17647058824,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18571"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) including Center Island along Roman Expressway - K0135 + 996 - K0136 + 469","amountPesos":24500000.0,"lengthMeters":473.0,"ratePesosPerMeter":51797.04016913319,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18573"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) including Center Island along Roman Expressway - K0139 + 800 - K0140 + 005","amountPesos":11025000.0,"lengthMeters":205.0,"ratePesosPerMeter":53780.48780487805,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18575"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Aliaga - Guimba Diversion Road, Nueva Ecija, Sta. 3+682 - Sta. 4+682","amountPesos":8330000.0,"lengthMeters":1000.0,"ratePesosPerMeter":8330.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18582"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Cabanatuan City-Carmen Rd K0132 + 050 - K0136 + 190, K0137 + 000 - K0138 + 575","amountPesos":36260000.0,"lengthMeters":5715.0,"ratePesosPerMeter":6344.706911636045,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18584"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Sta. Rosa - Tarlac Rd K0120 + 100 - K0120 + 500, K0120 + 800 - K0121 + 200, K0122 + 900 - K0123 + 300, K0123 + 350 - K0123 + 690, K0123 + 900 - K0124 + 000, K0127 + 350 - K0128 + 160","amountPesos":18326000.0,"lengthMeters":2450.0,"ratePesosPerMeter":7480.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18586"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Manila North Rd - K0142 + 400 - K0146 + 450","amountPesos":33770000.0,"lengthMeters":4050.0,"ratePesosPerMeter":8338.271604938273,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18594"},{"year":2026,"category":"Roads","project":"Installation of Road Safety Devices and Solar LED Street Lights along Manila North Road K0118 + 000 - K0123 + 300","amountPesos":29400000.0,"lengthMeters":5300.0,"ratePesosPerMeter":5547.169811320755,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18596"},{"year":2026,"category":"Roads","project":"Installation of Solar LED Street Lights along Secondary Roads, Olongapo - Bugallon Road - K0172 + 025 - K0174 + 491, K0174 + 581 - K0175 + 449, K0175 + 584 - K0176 + 533, K0217 + 806 - K0219 + 000, K0219 + 000 - K0221 + 324, K0221 + 408 - K0224 + 000","amountPesos":35280000.0,"lengthMeters":10393.0,"ratePesosPerMeter":3394.592514192245,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18599"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Secondary Roads - Batangas Port Diversion Rd - K0104 + 370 - K0105 + 056","amountPesos":35298000.0,"lengthMeters":686.0,"ratePesosPerMeter":51454.81049562682,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18607"},{"year":2026,"category":"Bridges","project":"Installation/Application of Road Safety Facilities (Pedestrian Overpass, Barrier) along Noveleta Rosario Diversion Rd - K0028 + 000 - K0029 + 000","amountPesos":28831000.0,"lengthMeters":1000.0,"ratePesosPerMeter":28831.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18613"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Guardrails, Off-Carriageway Improvement) along Juanito R. Remulla, Sr. Rd - K0067 + 632 - K0067 + 792, K0067 + 823 - K0067 + 850","amountPesos":1014000.0,"lengthMeters":187.0,"ratePesosPerMeter":5422.459893048128,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18616"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Guardrails, Off-Carriageway Improvement) along Juanito R. Remulla, Sr. Rd - K0068 + 673 - K0068 + 920, K0069 + 558 - K0069 + 578, K0069 + 638 - K0069 + 700","amountPesos":1937000.0,"lengthMeters":329.0,"ratePesosPerMeter":5887.537993920972,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18618"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Guardrails, Off-Carriageway Improvement) along Ternate-Nasugbu Rd - K0068 + 269 - K0068 + 550","amountPesos":1586000.0,"lengthMeters":281.0,"ratePesosPerMeter":5644.128113879004,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18620"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Secondary Road - Lucena-Tayabas-Lucban-Sampaloc-Mauban Port Rd - K0144 + 240 - K0144 + 880","amountPesos":27352000.0,"lengthMeters":640.0,"ratePesosPerMeter":42737.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18626"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along MSR Jct-Lopez-Catanauan Rd - K0237 + (-744) - K0255 + 199","amountPesos":23129000.0,"lengthMeters":18943.0,"ratePesosPerMeter":1220.978725650636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18629"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs) along P Burgos-Pototanin Jct - K0153 + (-958) - K0158 + 000","amountPesos":2481000.0,"lengthMeters":5958.0,"ratePesosPerMeter":416.4149043303122,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18631"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Road Signs, Pavement Markings) along Abuyon-Buenavista Rd - K0250 + 000 - K0254 + 744.64","amountPesos":3867000.0,"lengthMeters":4744.64,"ratePesosPerMeter":815.024954474942,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18633"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Gumaca-Pitogo-Mulanay-Sn Narciso Rd (R00464LZ) - K0260 + 154 - K0260 + 436, K0260 + 510.90 - K0260 + 982, K0262 + 000 - K0263 + 000","amountPesos":12760000.0,"lengthMeters":1753.1,"ratePesosPerMeter":7278.535166276857,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18635"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Gumaca-Pitogo-Mulanay-Sn Narciso Rd (R00464LZ) - K0273 + 000 - K0274 + 368","amountPesos":9628000.0,"lengthMeters":1368.0,"ratePesosPerMeter":7038.011695906433,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18637"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Sn Francisco-Sn Andres-Sn Narciso Rd - K0311 + (-082) - K0311 + 812","amountPesos":8369000.0,"lengthMeters":894.0,"ratePesosPerMeter":9361.297539149888,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18639"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Sn Francisco-Sn Andres-Sn Narciso Rd - K0368 + 317.70 - K0369 + 662","amountPesos":10166000.0,"lengthMeters":1344.3,"ratePesosPerMeter":7562.300081827038,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18641"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Road Signs, Pavement Markings) along Abuyon-Buenavista Rd - K0250 + (-800) - K0250 + 000","amountPesos":6644000.0,"lengthMeters":800.0,"ratePesosPerMeter":8305.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18643"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Calapan South Rd - K0031 + 000 - K0032 + 000","amountPesos":8889000.0,"lengthMeters":1000.0,"ratePesosPerMeter":8889.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18649"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Calapan South Rd - K0034 + 350 - K0039 + 000","amountPesos":12571000.0,"lengthMeters":4650.0,"ratePesosPerMeter":2703.440860215054,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18651"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Guardrails) along Puerto Princesa North Rd - K0132 + 000 - K0132 + 218.16","amountPesos":2253000.0,"lengthMeters":218.16,"ratePesosPerMeter":10327.282728272661,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18654"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Puerto Princesa South Rd - K0090 + 000 - K0090 + 300","amountPesos":3489000.0,"lengthMeters":300.0,"ratePesosPerMeter":11630.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18657"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Rolando R. Andaya Highway - K0300 + 680 - K0301 + 000","amountPesos":10545000.0,"lengthMeters":320.0,"ratePesosPerMeter":32953.125,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18664"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Rolando R. Andaya Highway - K0301 + 000 - K0301 + 770","amountPesos":26567000.0,"lengthMeters":770.0,"ratePesosPerMeter":34502.5974025974,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18666"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Rolando R. Andaya Highway - K0314 + 592 - K0315 + 030","amountPesos":15096000.0,"lengthMeters":438.0,"ratePesosPerMeter":34465.75342465754,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18668"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Rolando R. Andaya Highway - K0327 + 000 - K0327 + 830","amountPesos":27954000.0,"lengthMeters":830.0,"ratePesosPerMeter":33679.51807228916,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18670"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Guardrails) along Catanduanes Cir Rd - K0008+000-K0008+780, K008+807-K0010+000, K0011+763-K0018+000, 20+000-K0020+682, K0021+821-K0023+033, K0023+058-K0023+403, K0023+425-K0024+167","amountPesos":49000000.0,"lengthMeters":11191.0,"ratePesosPerMeter":4378.518452327763,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18673"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Secondary Roads - Buenavista-Kawayan Rd - K0035 + 200 - K0035 + 600","amountPesos":22658000.0,"lengthMeters":400.0,"ratePesosPerMeter":56645.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18678"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Aklan East Rd - K0276 + (-470) - K0276 + (-210),  (Roadway Lighting) along Aklan West Rd (Kalibo-Nabas) - K0271 + 000 - K0272 + 000","amountPesos":4666000.0,"lengthMeters":1260.0,"ratePesosPerMeter":3703.1746031746034,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18684"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Traffic Signals) along Aklan East Rd - K0316 + 685  - K0316 + 686","amountPesos":14700000.0,"lengthMeters":1.0,"ratePesosPerMeter":14700000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18688"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Secondary Roads - Aklan East Rd - K0285 + 605 - K0286 + 349","amountPesos":27153000.0,"lengthMeters":744.0,"ratePesosPerMeter":36495.967741935485,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18690"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo-Capiz Rd (New Route) - K0113 + 609 - K0113 + 949","amountPesos":4366000.0,"lengthMeters":340.0,"ratePesosPerMeter":12841.176470588236,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18693"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd -K0109 + 883 - K0110 + 843","amountPesos":11258000.0,"lengthMeters":960.0,"ratePesosPerMeter":11727.083333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18695"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo-Capiz Rd (New Route) - K0064 + 040 - K0066 + 000, K0068 + 000 - K0069 + 592, K0070 + 167 - K0072 + 583","amountPesos":39475000.0,"lengthMeters":5968.0,"ratePesosPerMeter":6614.4436997319035,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18698"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0101 + (-524) - K0101 + 460, K0102 + 390 - K0102 + 612.27","amountPesos":15736000.0,"lengthMeters":1206.27,"ratePesosPerMeter":13045.172308023864,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18700"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Secondary Roads - Capiz-Aklan Rd - K0340 + 129 - K0340 + 742.83","amountPesos":13760000.0,"lengthMeters":613.83,"ratePesosPerMeter":22416.630011566125,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18702"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Central Rd (Sn Miguel-Constancia-Cabano-Igcawayan) - K0057 + 096 - K0060 + 325","amountPesos":16168000.0,"lengthMeters":3229.0,"ratePesosPerMeter":5007.122948281201,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18705"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Guimaras Circumferential Rd -  K0096 + (-050) -  K0106 + 000","amountPesos":42630000.0,"lengthMeters":10050.0,"ratePesosPerMeter":4241.79104477612,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18707"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo-Antigue Rd - K0036 + 920 - K0043 + 736","amountPesos":45905000.0,"lengthMeters":6816.0,"ratePesosPerMeter":6734.888497652582,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18710"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Guardrails) along Iloilo-Capiz (New Route) - K0036 + (-390) - K0036 + 850, K0055 + 700 - K0056 + 000, K0056 + 300 - K0056 + 400, K0057 + 500 - K0057 + 600, K0059 + 600 - K0059 + 800, K0060 + 600 - K0060 + 700, K0062 + 500 - K0062 + 600, K0062 + 800 - K0063 + 000","amountPesos":5880000.0,"lengthMeters":2340.0,"ratePesosPerMeter":2512.8205128205127,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18713"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo City-Leganes-Dumangas Coastal Rd -  - K0018 + (-322) - K0018 + 870, K0020 + 400 - K0021 + 900, K0022 + 242 - K0022 + 833, K0023 + 000 - K0023 + 1336","amountPesos":31360000.0,"lengthMeters":4619.0,"ratePesosPerMeter":6789.348343797359,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18715"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo East Coast-Capiz Rd - K0251 + 765 - K0252 + 471, K0266 + 495 - K0267 + 200","amountPesos":9359000.0,"lengthMeters":1411.0,"ratePesosPerMeter":6632.8844790928415,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18717"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo East Coast-Capiz Rd - K0261 + 390  - K0262 + 335, K0263 + 800 - K0264 + 000","amountPesos":7817000.0,"lengthMeters":1145.0,"ratePesosPerMeter":6827.0742358078605,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18719"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo East Coast-Capiz Rd - K0281 + 000 - K0281 + 820","amountPesos":5684000.0,"lengthMeters":820.0,"ratePesosPerMeter":6931.707317073171,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18721"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo-Capiz (New Route) - K0036 + (-390) - K0036 + 065, K0036 + 280 - K0038 + 000, K0047 + 343 - K0051 + 840","amountPesos":43623000.0,"lengthMeters":6672.0,"ratePesosPerMeter":6538.219424460432,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18723"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Passi-Calinog Rd - K0050 + (-765) - K0050 + 450.60","amountPesos":8832000.0,"lengthMeters":1215.6,"ratePesosPerMeter":7265.547877591322,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18725"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Secondary Roads - Iloilo City-Leganes-Dumangas Coastal Rd - K0023 + 1336 - K0025 + 009","amountPesos":24356000.0,"lengthMeters":673.0,"ratePesosPerMeter":36190.19316493314,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18727"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo East Coast-Capiz Rd - K0172 + (-260) - K0176 + 357","amountPesos":39200000.0,"lengthMeters":4617.0,"ratePesosPerMeter":8490.361706735976,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18730"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo East Coast-Capiz Rd - K0231 + 048 - K0235 + 631","amountPesos":39200000.0,"lengthMeters":4583.0,"ratePesosPerMeter":8553.349334497054,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18732"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo East Coast-Capiz Rd - K0241 + 660 - K0245+286","amountPesos":31808000.0,"lengthMeters":3626.0,"ratePesosPerMeter":8772.200772200773,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18734"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo East Coast-Capiz Rd - K0245+286 - K0247 + 400","amountPesos":17192000.0,"lengthMeters":2114.0,"ratePesosPerMeter":8132.450331125828,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18736"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Iloilo City-Leganes-Dumangas Coastal Rd - K0009 + (-567) - K0011 + 436","amountPesos":1960000.0,"lengthMeters":3003.0,"ratePesosPerMeter":652.6806526806527,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18739"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Iloilo-Capiz Rd (New Route) - K0010 + (-845) - K0011 +310","amountPesos":1314000.0,"lengthMeters":2155.0,"ratePesosPerMeter":609.7447795823666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18741"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo City-Leganes-Dumangas Coastal Rd - K0015 + 869 - K0016 + 721","amountPesos":8254000.0,"lengthMeters":852.0,"ratePesosPerMeter":9687.793427230046,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18743"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo-Capiz Rd (New Route) - K0014 + 266 - K0014 + 730.68","amountPesos":3552000.0,"lengthMeters":464.68,"ratePesosPerMeter":7643.970043901175,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18745"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo-Capiz Rd (New Route) - K0015 + 900 - K0018 + 636","amountPesos":33061000.0,"lengthMeters":2736.0,"ratePesosPerMeter":12083.698830409357,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18747"},{"year":2026,"category":"Roads","project":"Road Safety:  Guardrails - Iloilo-Capiz (New Route) - K0022 + 000 - K0022 + 310","amountPesos":4900000.0,"lengthMeters":310.0,"ratePesosPerMeter":15806.451612903225,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18750"},{"year":2026,"category":"Roads","project":"Road Safety: Roadway Lighting - Iloilo-Capiz (New Route) - K0029 + 1217 - K0031 + 000, K0033 + 745 - K0034 + 113","amountPesos":43889000.0,"lengthMeters":1151.0,"ratePesosPerMeter":38131.19026933102,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18752"},{"year":2026,"category":"Roads","project":"Road Safety: Roadway Lighting - Iloilo-Capiz Rd (Old Route) - K0039 + 000 - K0040 + 000, K0040 + 000 - K0040 + 850, K0040 + 900 - K0041 + 000, K0041 + 000 - K0041 + 280","amountPesos":38487000.0,"lengthMeters":2230.0,"ratePesosPerMeter":17258.744394618832,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18754"},{"year":2026,"category":"Roads","project":"Road Safety: Roadway Lighting - Pototan-Mina-Janiuay Rd - K0034 + 000 - K0035 + 000, K0035 + 000 - K0035 + 200","amountPesos":29400000.0,"lengthMeters":1200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18756"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Iloilo City-Leganes-Dumangas Coastal Rd - K0003 + (-321) - K0003 + (-306), K0007 + 704 - K0008 + 148, K0008 + 341 - K0008 + 411, Iloilo-Capiz Rd (Old Route) - K0001 + 686 - K0001 + 723, K0002 + 1002 - K0002 + 1377","amountPesos":4209000.0,"lengthMeters":941.0,"ratePesosPerMeter":4472.9011689691815,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18759"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along President Corazon C. Aquino Ave. - K0006 + (-166) - K0011 + 192, K0007 + (-254) - K0006 + 166","amountPesos":17618000.0,"lengthMeters":5358.0,"ratePesosPerMeter":3288.167226577081,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18763"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Sen. Benigno S. Aquino, Jr. Ave - Chainage 0 - Chainage 760","amountPesos":2841000.0,"lengthMeters":760.0,"ratePesosPerMeter":3738.157894736842,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18765"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting,  Pavement Markings) along President Corazon C. Aquino Ave. - K0018 + (-080) - K0018 + 028, K0018 + 856 - K0019 + 275, K0019 + 276 - K0020 + 315","amountPesos":15379000.0,"lengthMeters":1566.0,"ratePesosPerMeter":9820.561941251597,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18767"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Bacolod Circumferential Rd - K0003 + (-535) - K0011 + 520","amountPesos":1470000.0,"lengthMeters":9055.0,"ratePesosPerMeter":162.34124792932082,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18771"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Bacolod-City Bdry Rd - K0001 + (-482) - K0019 + 586","amountPesos":3430000.0,"lengthMeters":19068.0,"ratePesosPerMeter":179.88252569750367,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18773"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bacolod North Rd - K0009 + (-860) - K0009 + (-665)","amountPesos":1384000.0,"lengthMeters":195.0,"ratePesosPerMeter":7097.4358974358975,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18776"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bacolod North Rd - K0019 + 491 - K0022 + 561","amountPesos":11858000.0,"lengthMeters":3070.0,"ratePesosPerMeter":3862.5407166123778,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18778"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bacolod North Rd - K0028 + 000 - K0028 + 477, K0032 + 353 - K0032 + 737.46","amountPesos":20295000.0,"lengthMeters":861.46,"ratePesosPerMeter":23558.84196596478,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18780"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bacolod North Rd - K0028 + 477 - K0032 + 353","amountPesos":19600000.0,"lengthMeters":3876.0,"ratePesosPerMeter":5056.759545923633,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18782"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bacolod North Rd - K0032 + 738 - K0033 + 649","amountPesos":18620000.0,"lengthMeters":911.0,"ratePesosPerMeter":20439.0779363337,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18784"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bacolod North Rd - K0084 + 000 - K0085 + 000","amountPesos":13936000.0,"lengthMeters":1000.0,"ratePesosPerMeter":13936.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18786"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Silay-Lantawan Rd - K0015 + (-792) - K0015 + 600","amountPesos":18996000.0,"lengthMeters":1392.0,"ratePesosPerMeter":13646.551724137931,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18788"},{"year":2026,"category":"Roads","project":"Installation of Solar Street Lights along Bacolod South Road - K0046 + (-908) - K0050 + 500, Hinigaran, Negros Occidental","amountPesos":49000000.0,"lengthMeters":5408.0,"ratePesosPerMeter":9060.650887573964,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18791"},{"year":2026,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Bacolod South Rd - K0052 + 047 - K0052 + 340","amountPesos":16798000.0,"lengthMeters":293.0,"ratePesosPerMeter":57331.058020477816,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18793"},{"year":2026,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Bacolod South Rd - K0077 + 357 - K0078 + 504","amountPesos":30380000.0,"lengthMeters":1147.0,"ratePesosPerMeter":26486.486486486487,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18795"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bacolod South Rd (Kabankalan-Hinobaan Section) -  K0122 + 999 - K0125 + 010","amountPesos":35053000.0,"lengthMeters":2011.0,"ratePesosPerMeter":17430.631526603676,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18798"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Bacolod South Rd - K0087 + 743 - K0088 + 239","amountPesos":26251000.0,"lengthMeters":496.0,"ratePesosPerMeter":52925.403225806454,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18800"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Kabankalan Bais Rd - K0089 + (-789) - K0089 + 000","amountPesos":42069000.0,"lengthMeters":789.0,"ratePesosPerMeter":53319.39163498099,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18802"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Kabankalan-Bais Rd - K0090 + 973 - K0091 +834","amountPesos":44919000.0,"lengthMeters":861.0,"ratePesosPerMeter":52170.73170731707,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18804"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Kabankalan-Bais Rd - K0091 + 834 - K0092 + 628","amountPesos":41860000.0,"lengthMeters":794.0,"ratePesosPerMeter":52720.40302267003,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18806"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities along Jct Bagonawa-La Castellana-Isabela Rd - K0040 + 137 - K0043 + 537","amountPesos":39200000.0,"lengthMeters":3400.0,"ratePesosPerMeter":11529.411764705883,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18809"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Bacolod South Rd - K0018 + 176 - K0018 + 713","amountPesos":19857000.0,"lengthMeters":537.0,"ratePesosPerMeter":36977.65363128491,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18811"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Road Safety: Roadway Lighting) along Bacolod North Rd - K0137 + 661 - K0138 + 471","amountPesos":8381000.0,"lengthMeters":810.0,"ratePesosPerMeter":10346.913580246914,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18814"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Road Safety: Roadway Lighting) along Bacolod North Rd - K0138 + 501 - K0139 + 640","amountPesos":12039000.0,"lengthMeters":1139.0,"ratePesosPerMeter":10569.798068481125,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18816"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Bais-Kabankalan Rd - K0052 + 000 - K0052 + 177","amountPesos":6086000.0,"lengthMeters":177.0,"ratePesosPerMeter":34384.180790960454,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18819"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Bais-Kabankalan Rd - K0060 + 285 - K0060 + 300, K0060 + 502 - K0060 + 615","amountPesos":4252000.0,"lengthMeters":128.0,"ratePesosPerMeter":33218.75,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18821"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Bais-Kabankalan Rd - K0064 + 209 - K0065 + 430","amountPesos":30269000.0,"lengthMeters":1221.0,"ratePesosPerMeter":24790.33579033579,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18823"},{"year":2026,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Bais-Kabankalan Rd - K0097 + 415 - K0098 + 464","amountPesos":34876000.0,"lengthMeters":1049.0,"ratePesosPerMeter":33246.90181124881,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18825"},{"year":2026,"category":"Roads","project":"Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0048 + 048 - K0048 + 170","amountPesos":4348000.0,"lengthMeters":122.0,"ratePesosPerMeter":35639.34426229508,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18827"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along The President Carlos P. Garcia Circumferential Rd - K0257 + (-274) - K0259 + 852.14","amountPesos":30523000.0,"lengthMeters":3126.14,"ratePesosPerMeter":9763.798166428844,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18833"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Road Signs) along The President Carlos P. Garcia Circumferential Rd - K0156 + 462 - K0157 + 760","amountPesos":9698000.0,"lengthMeters":1298.0,"ratePesosPerMeter":7471.494607087828,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18836"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along N Bacalso Ave (Cebu South Rd) - K0110+000 - K0110 + 376, K0110 + 461 - K0110 + 686","amountPesos":5834000.0,"lengthMeters":601.0,"ratePesosPerMeter":9707.154742096505,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18839"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along N Bacalso Ave (Cebu South Rd) - K0113 + 300 - K0113 + 400","amountPesos":982000.0,"lengthMeters":100.0,"ratePesosPerMeter":9820.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18841"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Santander-Barili-Toledo Rd - K0147 + 992 - K0152 + 588","amountPesos":44851000.0,"lengthMeters":4596.0,"ratePesosPerMeter":9758.703220191472,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18843"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Tertiary Roads - Bogo-Polambato Wharf Rd - K0103 + 224 - K0103 + 756","amountPesos":40962000.0,"lengthMeters":532.0,"ratePesosPerMeter":76996.24060150376,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18848"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Secondary Roads - Cebu North Hagnaya Wharf Rd - K0039 + 000 - K0040 + 700, K0045 + 000 - K0045 + 699","amountPesos":22513000.0,"lengthMeters":2399.0,"ratePesosPerMeter":9384.326802834514,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18851"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Cebu North Hagnaya Wharf Rd - K0005 + 502 - K0005 + 690","amountPesos":14982000.0,"lengthMeters":188.0,"ratePesosPerMeter":79691.48936170213,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18860"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities - Biliran Circumferential Road - K1016 + 726 - K1019 + 550","amountPesos":30000000.0,"lengthMeters":2824.0,"ratePesosPerMeter":10623.229461756375,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18867"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities - Biliran Circumferential Road - K1031 + 000 - K1032 + 000","amountPesos":20000000.0,"lengthMeters":1000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18869"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities - Biliran Circumferential Road - K1047 + 280 - K1049 + 480","amountPesos":25000000.0,"lengthMeters":2200.0,"ratePesosPerMeter":11363.636363636364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18871"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities - Biliran Circumferential Road - K1056 + 740 - K1060 + 300","amountPesos":40000000.0,"lengthMeters":3560.0,"ratePesosPerMeter":11235.955056179775,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18873"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities - Biliran Circumferential Road - K1064 + 500 - K1069 + 000","amountPesos":50000000.0,"lengthMeters":4500.0,"ratePesosPerMeter":11111.111111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18875"},{"year":2026,"category":"Roads","project":"Installation of Solar Street Lights - Palo-Carigara-Ormoc Road - K1002+1231 - K1009+000","amountPesos":50000000.0,"lengthMeters":5769.0,"ratePesosPerMeter":8667.013347200555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18878"},{"year":2026,"category":"Roads","project":"Installation of Solar Street Lights - Palo-Carigara-Ormoc Road - K1000+185 - K1002+1201","amountPesos":25000000.0,"lengthMeters":3016.0,"ratePesosPerMeter":8289.124668435014,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18880"},{"year":2026,"category":"Roads","project":"Installation of Solar Street Lights - Palo-Carigara-Ormoc Road - K0997+216 - K1000+155","amountPesos":25000000.0,"lengthMeters":2939.0,"ratePesosPerMeter":8506.294658046954,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18882"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Off-carriageway Improvement) along Lemon-Leyte-Biliran Rd - K0982 + 973 - K0983 + 517","amountPesos":2678000.0,"lengthMeters":544.0,"ratePesosPerMeter":4922.794117647059,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18885"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Off-carriageway Improvement) along Sambulawan Jct-Calaguise-Calubian Rd - K0984 + 767 - K0984+837, K0986+088 - K0986+098, K0986+875 - K0987+000, K0987+741 - K0988+135, K0989 + 000 - K0989+250, K0989+280 - K0989+786, K0990+000 - K0990 + 434","amountPesos":13147000.0,"lengthMeters":1789.0,"ratePesosPerMeter":7348.798211291224,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18887"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Ormoc-Baybay-Southern Leyte Bdry Rd - K1017 + 046 - K1020+909","amountPesos":1736000.0,"lengthMeters":3863.0,"ratePesosPerMeter":449.3916645094486,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18892"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Palo-Carigara-Ormoc Rd - K0991 + 345 - K0994+230","amountPesos":1323000.0,"lengthMeters":2885.0,"ratePesosPerMeter":458.578856152513,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18894"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Villaba-Palompon Rd - K1061+991 - K1063 + 206.66, K1063 + 207 - K1066 + 085, Palompon-Isabel-Merida-Ormoc Rd - K1129 + 983 - K1130 + 903.60, K1132 + 047 - K1132 + 763","amountPesos":3118000.0,"lengthMeters":5730.26,"ratePesosPerMeter":544.1288876944493,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18896"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Pavement Markings) along Palompon-Isabel-Merida-Ormoc Rd - K1130 + 903.60 - K1132 + 047","amountPesos":12005000.0,"lengthMeters":1143.4,"ratePesosPerMeter":10499.387790800225,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18898"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Pavement Markings) along Villaba-Palompon Rd - K1066 + 085 - K1067 + 367","amountPesos":10495000.0,"lengthMeters":1282.0,"ratePesosPerMeter":8186.427457098284,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18900"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Ormoc-Baybay-Southern Leyte Bdry Rd - K1081 + 436 - K1081 + 463, K1085 + 982 - K1086 + 049, K1086 + 970 - K1090 + 000","amountPesos":23430000.0,"lengthMeters":3124.0,"ratePesosPerMeter":7500.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18905"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Ormoc-Baybay-Southern Leyte Bdry Rd - K1098 + 693.61 - K1098 + 701, K1098 + 759 - K1101 + 167.66","amountPesos":18133000.0,"lengthMeters":2416.05,"ratePesosPerMeter":7505.225471327745,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18907"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Allen-Catarman Rd - K0698 + 118 - K0704 + 544.25","amountPesos":29696000.0,"lengthMeters":6426.25,"ratePesosPerMeter":4621.04648900992,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18910"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Catarman-Calbayog Rd - K0747+000 - K0748 + 636, K0750 + 126 - K0751 + 003, K0751 + 902 - K0752 + 960, K0755 + 549 - K0755 + 873, K0757 + 954 - K0758 + 000, K0758 + 628 - K0758 + 649","amountPesos":20511000.0,"lengthMeters":3962.0,"ratePesosPerMeter":5176.930843008581,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18912"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Catarman-Laoang Rd - K0743 + (-230) - K0743 + 481, K0747+000 - K0755 + 500","amountPesos":47793000.0,"lengthMeters":9211.0,"ratePesosPerMeter":5188.687438931712,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18914"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Bdry  Southern Leyte-Maasin-Macrohon-Sogod-Jct Daang Maharlika - K1188 + 639 - K1193+660","amountPesos":2231000.0,"lengthMeters":5021.0,"ratePesosPerMeter":444.3337980481976,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18917"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Buenavista-Asuncion, Maasin City (Bontoc-Maasin) - Chainage 20792 - Chainage 34229","amountPesos":2955000.0,"lengthMeters":13437.0,"ratePesosPerMeter":219.91515963384683,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18919"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Bdry  Southern Leyte-Maasin-Macrohon-Sogod-Jct Daang Maharlika - K1209 + 000 - K1209 + 027, K1209 + 447 - K1210 + 203, K1212 + 000 - K1213 + 000","amountPesos":15998000.0,"lengthMeters":1783.0,"ratePesosPerMeter":8972.518227706114,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18922"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Zamboanga City-Labuan-Limpapa Rd - K1946+000 - K1952+000, K1973+840 - K1975+074, K1975+193 - K1976+080,","amountPesos":4633000.0,"lengthMeters":8121.0,"ratePesosPerMeter":570.4962443048886,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18926"},{"year":2026,"category":"Roads","project":"Installation of Roadway Lighting along Zamboanga City Bypass Road (S01215MN) - Chainage 000 - Chainage 500","amountPesos":4000000.0,"lengthMeters":500.0,"ratePesosPerMeter":8000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18928"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Zamboanga City-Labuan-Limpapa Rd - K1945 + 263 - K1945 + 597, K1945 + 788 - K1946+000, K1952+000 - K1955+280","amountPesos":29504000.0,"lengthMeters":3826.0,"ratePesosPerMeter":7711.44798745426,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18930"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Secondary Roads - Zamboanga City-Labuan-Limpapa Rd - K1969 + 372 - K1970 + 283","amountPesos":30715000.0,"lengthMeters":911.0,"ratePesosPerMeter":33715.69703622393,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18932"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Guardrails, Road Signs) along Rizal-Dakak-Dapitan Coastal Loop Rd - K1798 + (-900) - K1868 + 852","amountPesos":14739000.0,"lengthMeters":71752.0,"ratePesosPerMeter":205.41587690935444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18935"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Road Signs) along Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1883 + 000 - K1888 + 000","amountPesos":5385000.0,"lengthMeters":5000.0,"ratePesosPerMeter":1077.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18937"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Sindangan-Siayan-Dumingag-Mahayag Rd (Mahayag-Dumingag Sect) - K1670 + 761 - K1672 + 663","amountPesos":14700000.0,"lengthMeters":1902.0,"ratePesosPerMeter":7728.706624605678,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18946"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Lutiman-Guicam-Olutanga Rd - K1768 + 300 - K1781 + 407","amountPesos":49000000.0,"lengthMeters":13107.0,"ratePesosPerMeter":3738.4603646906235,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18949"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Ipil-Liloy-Sindangan Rd - K2011 + 000 - K2011 + 350","amountPesos":2940000.0,"lengthMeters":350.0,"ratePesosPerMeter":8400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18952"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Ipil-Liloy-Sindangan Rd - K2013 + 477 - K2013 + 568","amountPesos":1211000.0,"lengthMeters":91.0,"ratePesosPerMeter":13307.692307692309,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18954"},{"year":2026,"category":"Roads","project":"Installation of Road Safety Devices along Sayre Highway, Barangay Kalasungay, K1500 + 579 - K1501 + 939, Malaybalay City, Bukidnon","amountPesos":28914000.0,"lengthMeters":1360.0,"ratePesosPerMeter":21260.29411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18958"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Sayre Highway - K1475 + 000 - K1476 + 643","amountPesos":16043000.0,"lengthMeters":1643.0,"ratePesosPerMeter":9764.455264759586,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18960"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Off-carriageway Improvement) along Sayre Highway - K1482 + 000 - K1482 + 353.08","amountPesos":9192000.0,"lengthMeters":353.08,"ratePesosPerMeter":26033.760054373117,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18962"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Off-carriageway Improvement) along Sayre Highway - K1485 + 000 - K1486 + 000","amountPesos":25673000.0,"lengthMeters":1000.0,"ratePesosPerMeter":25673.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18964"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Off-carriageway Improvement) along Sayre Highway - K1520 + 000 - K1521 + 011.82","amountPesos":26715000.0,"lengthMeters":1011.82,"ratePesosPerMeter":26402.91751497132,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18966"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Pavement Markings, Guardrails, Road Signs) along Sayre Highway - K1545 + 975 - K1547 + 165","amountPesos":13188000.0,"lengthMeters":1190.0,"ratePesosPerMeter":11082.35294117647,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18971"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Pavement Markings, Guardrails, Road Signs) along Sayre Highway - K1551 + 740 - K1552 + 620","amountPesos":9770000.0,"lengthMeters":880.0,"ratePesosPerMeter":11102.272727272728,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18973"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Devices along Abellanosa Service Road, K1438 + (-135) - K1438 + 499 (Abellanosa St. - Evangelista St.), Cagayan de Oro City","amountPesos":9638000.0,"lengthMeters":634.0,"ratePesosPerMeter":15201.892744479495,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18988"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Devices along Carmen-Patag-Bulua Rd to Misamis Oriental-Agusan By-Pass Rd (Sta. 0+000 to Sta. 1+417), Cagayan de Oro City","amountPesos":28914000.0,"lengthMeters":1417.0,"ratePesosPerMeter":20405.081157374734,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18990"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Devices along Sayre Higway - K1426 + (-928) - K1428+000, Cagayan de Oro City","amountPesos":28914000.0,"lengthMeters":2928.0,"ratePesosPerMeter":9875.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18992"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Iligan City Diversion Rd - Chainage 0 - Chainage 11922","amountPesos":19276000.0,"lengthMeters":11922.0,"ratePesosPerMeter":1616.8428116087905,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 18998"},{"year":2026,"category":"Roads","project":"Installation of Solar Street Lights along Linamon - Zamboanga Road - K1589+600 - K1591+040 R/S","amountPesos":17349000.0,"lengthMeters":1440.0,"ratePesosPerMeter":12047.916666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19001"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Oroquieta City-Calamba Mt Rd - K1743 + (-973) - K1743 + (-961), K1746 + 737 - K1750 + 059","amountPesos":21576000.0,"lengthMeters":3334.0,"ratePesosPerMeter":6471.505698860228,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19007"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Oroquieta City-Plaridel-Calamba-Sapang Dalaga Rd - K1743 + (-1006) - K1743 + (-964), K1743 + (-468) - K1743 + (-394), K1744 + 274 - K1744 + 355, K1746 + 403 - K1746 + 611, K1750 + 481 - K1751 + 699","amountPesos":13543000.0,"lengthMeters":1623.0,"ratePesosPerMeter":8344.423906346272,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19009"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Ozamis City-Oroquieta City Rd - K1722 + (-817) - K1722 + (-255), K1723 + 145 - K1723 + 330, K1731 + 064 - K1731 + 173","amountPesos":4125000.0,"lengthMeters":856.0,"ratePesosPerMeter":4818.92523364486,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19011"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Butuan City-Cagayan de Oro City-Iligan City Rd - K1280 + (-782) - K1280 + (-547), K1293 + 000 - K1294 + 160","amountPesos":38552000.0,"lengthMeters":1395.0,"ratePesosPerMeter":27635.84229390681,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19016"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Butuan City-Cagayan de Oro City-Iligan City Rd - K1389+400 - K1391+260","amountPesos":48191000.0,"lengthMeters":1860.0,"ratePesosPerMeter":25909.139784946237,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19018"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Butuan City-Cagayan de Oro City-Iligan City Rd - K1375 + 847 - K1377 + 301","amountPesos":41926000.0,"lengthMeters":1454.0,"ratePesosPerMeter":28834.93810178817,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19020"},{"year":2026,"category":"Roads","project":"Preventive Maintenance - Primary Roads - Butuan City-Cagayan de Oro City-Iligan City Rd - K1395 + 552 - K1396 + 597.66","amountPesos":30075000.0,"lengthMeters":1045.66,"ratePesosPerMeter":28761.73899738195,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19022"},{"year":2026,"category":"Roads","project":"Installation of Solar Streetlights in the Diversion Road, Laguindingan Airport to the Municipality of Alubijid, Barangay Lanao, Sta. 0+000 - Sta. 1+000, Alubijid, Misamis Oriental","amountPesos":11981000.0,"lengthMeters":1000.0,"ratePesosPerMeter":11981.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19029"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Pavement Markings) along Butuan City-Cagayan de Oro City-Iligan City Rd - K1445 + (-275) - K1446 + 550","amountPesos":1770000.0,"lengthMeters":1825.0,"ratePesosPerMeter":969.8630136986301,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19031"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Butuan City- Cagayan de Oro City-Iligan City Rd - K1406+473 - K1408+909","amountPesos":43371000.0,"lengthMeters":2436.0,"ratePesosPerMeter":17804.18719211823,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19033"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Butuan City- Cagayan de Oro City-Iligan City Rd - K1472+000 - K1473+373","amountPesos":24095000.0,"lengthMeters":1373.0,"ratePesosPerMeter":17549.162418062635,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19035"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Pavement Markings) along Butuan City-Cagayan de Oro City-Iligan City Rd - K1473 + 399 - K1474 + 424.39","amountPesos":24459000.0,"lengthMeters":1025.39,"ratePesosPerMeter":23853.363110623708,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19037"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Davao-Bukidnon Rd -  K1621 + (-315) - K1623 + 558.76","amountPesos":32635000.0,"lengthMeters":2873.76,"ratePesosPerMeter":11356.202327264593,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19041"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Buhangin-Lapanday - K1505 + (-447) - K1506 + 423","amountPesos":9800000.0,"lengthMeters":1870.0,"ratePesosPerMeter":5240.641711229947,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19044"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along JP Cabaguio Ave - K1507 + (-896) - K1507 + 770","amountPesos":9800000.0,"lengthMeters":1666.0,"ratePesosPerMeter":5882.35294117647,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19046"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Montevista-Compostela-Mati Bdry Rd - K1432 + 240 - K1432 + 540","amountPesos":2305000.0,"lengthMeters":300.0,"ratePesosPerMeter":7683.333333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19049"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Montevista-Compostela-Mati Bdry Rd - K1432+ 540 - K1435+ 145","amountPesos":13954000.0,"lengthMeters":2605.0,"ratePesosPerMeter":5356.621880998081,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19051"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Nabunturan-Maragusan Rd - K1445 + 135 -  K1446 + 672, K1448 + 020 - K1448 + 906","amountPesos":11760000.0,"lengthMeters":2423.0,"ratePesosPerMeter":4853.487412298803,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19053"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Banisilan-Guiling-Alamada-Libungan Rd - K1678 + 000 - K1678 + 567.39","amountPesos":4387000.0,"lengthMeters":567.39,"ratePesosPerMeter":7731.895169109064,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19057"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Banisilan-Guiling-Alamada-Libungan Rd - K1686 + 000 - K1686 + 720","amountPesos":12592000.0,"lengthMeters":720.0,"ratePesosPerMeter":17488.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19059"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Pavement Markings) along Banisilan-Guiling-Alamada-Libungan Rd - K1676 + 000 - K1677 + 596","amountPesos":18757000.0,"lengthMeters":1596.0,"ratePesosPerMeter":11752.50626566416,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19061"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Pavement Markings) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1685 + 000 - K1686 + 596","amountPesos":18757000.0,"lengthMeters":1596.0,"ratePesosPerMeter":11752.50626566416,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19063"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1276 + 000 - K1277 + 440","amountPesos":5880000.0,"lengthMeters":1440.0,"ratePesosPerMeter":4083.3333333333335,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19077"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along NJR Bah-Bah-Talacogon Rd - K1301 + 600 - K1302 + 068, K1305 + 000 - K1305 + 504","amountPesos":19600000.0,"lengthMeters":972.0,"ratePesosPerMeter":20164.60905349794,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19080"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Road Signs, Pavement Markings) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1246 + 805 - K1247 + 943","amountPesos":14993000.0,"lengthMeters":1138.0,"ratePesosPerMeter":13174.868189806679,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19085"},{"year":2026,"category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting, Road Signs) along Dapa-Gen Luna Rd - K0001 + (-990) - K0001 + 150","amountPesos":6979000.0,"lengthMeters":1140.0,"ratePesosPerMeter":6121.929824561404,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19088"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage System along C. Adan Street (Chainage 0000 - Chainage 300), District I, Quezon City","amountPesos":53000000.0,"lengthMeters":300.0,"ratePesosPerMeter":176666.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19098"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage at Tiongquiao Road, Sta. 0+538.9 - Sta. 1+152, Las Piñas City","amountPesos":80000000.0,"lengthMeters":613.1,"ratePesosPerMeter":130484.423421954,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19104"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage System along Talayan Road,District I, (Chainage 000 - Chainage 492), Quezon City","amountPesos":80000000.0,"lengthMeters":492.0,"ratePesosPerMeter":162601.62601626015,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19106"},{"year":2026,"category":"Roads","project":"Rehabilitation of Gen Luis Road (Kaybiga Rd) - S02223LZ, K0019+(-328) to K0020+754, Caloocan City","amountPesos":80318000.0,"lengthMeters":2082.0,"ratePesosPerMeter":38577.32949087416,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19110"},{"year":2026,"category":"Roads","project":"Rehabilitation of Katwiran St. (Chainage 0+000 - Chainage 0+330), Arafat St. (Chainage 0+000 - Chainage 0+625), Paris St. (Chainage 0+000 - Chainage 0+475), Doha St. (Chainage 0+000 - Chainage 0+840), Maguindanao St. (Chainage 0+000 - Chainage 2+750), Aliso St. (Chainage 0+000 - Chainage 1+420), Kabuntalan St. (Chainage 0+000 - Chainage 0+264), Earth Road (Chainage 0+000 - Chainage 0+850), Alley 1 (Chainage 0+000 - Chainage 1+405), Alley 2 (Chainage 0+000 - Chainage 0+044), Alley 3 (Chainage 0+000 - Chainage 0+044), Alley 4 (Chainage 0+000 - Chainage 0+044), Alley 5 (Chainage 0+000 - Chainage 0+044), Barangay Napindan, Taguig City","amountPesos":62095000.0,"lengthMeters":2750.0,"ratePesosPerMeter":22580.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19112"},{"year":2026,"category":"Roads","project":"Rehabilitatioin of Road at Alley 1 (Chainage 0+000 - Chainage 0+056), Alley 2 (Chainage 0+000 - 0+130), Banai St. (Chainage 0+000 - 0+140), MLQ Ave. (Chainage 0+000 - 0+115), Paraiso St. (Chainage 0+000 - Chainage 0+506), Pagkakaisa St. (Chainage 0+000 - Chainage 0+300), VP Cruz St. (Chainage 0+000 - Chainage 0+490), Barangay Lower BIcutan, Taguig City","amountPesos":66235000.0,"lengthMeters":506.0,"ratePesosPerMeter":130899.209486166,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19114"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage, Carmen Drive and Diamond Drive, (Chainage 0 + 000 to Chainage 0 + 450), Barangay Kaligayahan, Quezon City","amountPesos":50000000.0,"lengthMeters":450.0,"ratePesosPerMeter":111111.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19118"},{"year":2026,"category":"Roads","project":"Rehabilitation of Roads at East Side (Chainage 0+000.00 to Chainage 0+840.00), Brgy. Commonwealth, Quezon City","amountPesos":44689000.0,"lengthMeters":840.0,"ratePesosPerMeter":53201.19047619047,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19124"},{"year":2026,"category":"Bridges","project":"Construction of Bridge connecting Bolinao to Santiago Island, Sta. 1 + 511 - Sta. 1 + 651, Bolinao, Pangasinan","amountPesos":92702000.0,"lengthMeters":140.0,"ratePesosPerMeter":662157.1428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19129"},{"year":2026,"category":"Roads","project":"Construction of Bucayab-Palugsi-Limmansangan Road, Bauang, La Union, Sta.3+250-Sta.5+350","amountPesos":53900000.0,"lengthMeters":2100.0,"ratePesosPerMeter":25666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19131"},{"year":2026,"category":"Roads","project":"Construction of By-pass and Diversion Road-Laoac-Manaoag-San Jacinto-Mangaldan Road (Manaoag-San Jacinto-Mangaldan Section), Sta. 0 + 400 - Sta. 2 + 000, Pangasinan","amountPesos":96674000.0,"lengthMeters":1600.0,"ratePesosPerMeter":60421.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19135"},{"year":2026,"category":"Roads","project":"Construction of Bypass Road, Sta. 0+000 - Sta. 0+444, in Binmaley, Pangasinan","amountPesos":96674000.0,"lengthMeters":444.0,"ratePesosPerMeter":217734.23423423423,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19137"},{"year":2026,"category":"Roads","project":"Construction of Local Roads, City of San Carlos, Pangasinan, Sta. 0+000 – Sta. 0+500 (Section 1), Sta. 0+000 – Sta. 0+500 (Section 2), Sta. 0+000 – Sta. 0+500 (Section 3), Sta. 0+000 – Sta. 0+500 (Section 4), Sta. 0+000 – Sta. 0+500 (Section 5), Sta. 0+000 – Sta. 0+500 (Section 6), Sta. 0+000 – Sta. 0+500 (Section 7), Sta. 0+000 – Sta. 0+500 (Section 8), Sta. 0+000 – Sta. 0+500 (Section 9), Sta. 0+000 – Sta. 0+500 (Section 10), Sta. 0+000 – Sta. 0+500 (Section 11)","amountPesos":63700000.0,"lengthMeters":500.0,"ratePesosPerMeter":127400.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19141"},{"year":2026,"category":"Roads","project":"Construction of Local Roads, Municipality of Malasiqui, Pangasinan, Sta. 0+000 – Sta. 0+500 (Section 1), Sta. 0+000 – Sta. 0+500 (Section 2), Sta. 0+000 – Sta. 0+500 (Section 3), Sta. 0+000 – Sta. 0+500 (Section 4), Sta. 0+000 – Sta. 0+500 (Section 5), Sta. 0+000 – Sta. 0+500 (Section 6), Sta. 0+000 – Sta. 0+500 (Section 7), Sta. 0+000 – Sta. 0+500 (Section 8), Sta. 0+000 – Sta. 0+500 (Section 9), Sta. 0+000 – Sta. 0+500 (Section 10)","amountPesos":68600000.0,"lengthMeters":500.0,"ratePesosPerMeter":137200.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19143"},{"year":2026,"category":"Roads","project":"Construction of Local Roads, Municipality of Bayambang, Pangasinan, Sta. 0+000 – Sta. 0+500 (Section 1), Sta. 0+000 – Sta. 0+500 (Section 2), Sta. 0+000 – Sta. 0+500 (Section 3), Sta. 0+000 – Sta. 0+500 (Section 4), Sta. 0+000 – Sta. 0+500 (Section 5), Sta. 0+000 – Sta. 0+500 (Section 6), Sta. 0+000 – Sta. 0+500 (Section 7), Sta. 0+000 – Sta. 0+500 (Section 8)","amountPesos":63700000.0,"lengthMeters":500.0,"ratePesosPerMeter":127400.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19145"},{"year":2026,"category":"Roads","project":"Construction of Road, Calmay Road, Sta. 0 + 000 - Sta. 0 + 995, Dagupan City, Pangasinan","amountPesos":56071000.0,"lengthMeters":995.0,"ratePesosPerMeter":56352.763819095475,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19149"},{"year":2026,"category":"Roads","project":"Construction of Road, Carael Road, Sta. 0 + 000 - Sta. 0 + 705.99, Dagupan City, Pangasinan","amountPesos":53171000.0,"lengthMeters":705.99,"ratePesosPerMeter":75314.09793339849,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19151"},{"year":2026,"category":"Roads","project":"Improvement of Zamora Extension Road, Sta. 0 + 000 - Sta. 0 + 433.23, Dagupan City, Pangasinan","amountPesos":29002000.0,"lengthMeters":433.23,"ratePesosPerMeter":66943.65579484338,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19153"},{"year":2026,"category":"Roads","project":"Rehabilitation of Access Road leading to Tondaligan Park, Sta. 2 + 850 - Sta. 3 + 060, Dagupan City, Pangasinan","amountPesos":39127000.0,"lengthMeters":210.0,"ratePesosPerMeter":186319.04761904763,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19155"},{"year":2026,"category":"Bridges","project":"Replacement of Bolosan Bridge, Barangay Bolosan, Sta 0+000 - Sta 0+041.6, Dagupan City, Pangasinan","amountPesos":17565000.0,"lengthMeters":41.6,"ratePesosPerMeter":422235.57692307694,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19157"},{"year":2026,"category":"Bridges","project":"Construction of Apatan-Ballayangon Bridge , Sta. 0 + 000 - Sta 0 + 100, Pinukpuk, Kalinga","amountPesos":98000000.0,"lengthMeters":100.0,"ratePesosPerMeter":980000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19162"},{"year":2026,"category":"Roads","project":"Construction of Bakun-Sugpon-Alilem Road, Sta. 0+000 - Sta. 1+000, Bakun, Benguet","amountPesos":67130000.0,"lengthMeters":1000.0,"ratePesosPerMeter":67130.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19164"},{"year":2026,"category":"Bridges","project":"Construction of Calaba Viaduct, Phase 3, Sta. 0+000 - Sta. 0+570, Calaba, Bangued, Abra","amountPesos":98000000.0,"lengthMeters":570.0,"ratePesosPerMeter":171929.8245614035,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19166"},{"year":2026,"category":"Roads","project":"Construction of Mataragan, Malibcong-Conner, Apayao Road, Sta. 0+000 - Sta. 4+000, Mataragan, Malibcong, Abra","amountPesos":98000000.0,"lengthMeters":4000.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19170"},{"year":2026,"category":"Roads","project":"Construction of Palao-Calaba Bypass Road, Cabuloan Section (Phase II), Sta. 3+680 - Sta. 4+060, Bangued, Abra","amountPesos":112139000.0,"lengthMeters":380.0,"ratePesosPerMeter":295102.63157894736,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19172"},{"year":2026,"category":"Roads","project":"Construction of Palao-Calaba Bypass Road, Palao Section (Phase II), Sta. 1+336 - Sta. 1+888, Bangued, Abra","amountPesos":140760000.0,"lengthMeters":552.0,"ratePesosPerMeter":255000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19174"},{"year":2026,"category":"Roads","project":"Construction of Palao-Calaba Bypass Road, Sitio Pudok Section (Phase II), Sta. 2+480 - Sta. 2+840, Bangued, Abra","amountPesos":93840000.0,"lengthMeters":360.0,"ratePesosPerMeter":260666.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19176"},{"year":2026,"category":"Roads","project":"Construction of Palao-Calaba Bypass Road, Sta. Rosa Section (Phase II), Sta. 2+000 - Sta. 2+360, Bangued, Abra","amountPesos":93840000.0,"lengthMeters":360.0,"ratePesosPerMeter":260666.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19178"},{"year":2026,"category":"Bridges","project":"Construction of Annanuman Bridge (Sta. 2+643 - Sta. 2+868), Phase I, Barangay Annanuman, San Pablo, Isabela","amountPesos":78400000.0,"lengthMeters":225.0,"ratePesosPerMeter":348444.44444444444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19183"},{"year":2026,"category":"Roads","project":"Construction of Apar Road at Ipil (Sta. 0+000 - Sta. 3+000), Gonzaga, Cagayan","amountPesos":272628000.0,"lengthMeters":3000.0,"ratePesosPerMeter":90876.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19185"},{"year":2026,"category":"Bridges","project":"Construction of Bannawag - Bautista Bridge Phase 2, Sta. 0+000 - Sta. 0+300, Jones and San Agustin, Isabela","amountPesos":58800000.0,"lengthMeters":300.0,"ratePesosPerMeter":196000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19187"},{"year":2026,"category":"Roads","project":"Construction of Budad Road at Ipil, Sta 0+000 - Sta 2+450, Gonzaga, Cagayan","amountPesos":36350000.0,"lengthMeters":2450.0,"ratePesosPerMeter":14836.734693877552,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19189"},{"year":2026,"category":"Bridges","project":"Construction of Gucab Bridge, Sta. 0+000 - Sta. 0+090, Barangay Gucab Section, Echague, Isabela","amountPesos":147000000.0,"lengthMeters":90.0,"ratePesosPerMeter":1633333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19191"},{"year":2026,"category":"Bridges","project":"Construction of Gucab Bridge, Sta. 0+000 - Sta. 0+180, Barangay Dammang West Section, Echague, Isabela","amountPesos":147000000.0,"lengthMeters":180.0,"ratePesosPerMeter":816666.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19193"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sta. 0+000 - Sta. 0+200, Barangay Annafunan, Echague, Isabela","amountPesos":294000000.0,"lengthMeters":200.0,"ratePesosPerMeter":1470000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19195"},{"year":2026,"category":"Bridges","project":"Construction (Completion) of Bridge, Sta. 0+000 - Sta. 0+080, Barangay Sinili, City of Santiago, Isabela","amountPesos":58800000.0,"lengthMeters":80.0,"ratePesosPerMeter":735000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19197"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sta. 0+000 - Sta. 0+070, Barangay Abra, City of Santiago, Isabela","amountPesos":102900000.0,"lengthMeters":70.0,"ratePesosPerMeter":1470000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19199"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sta. 0+000 - Sta. 0+050, Sipat Bridge with Slope Protection Structure, City of Cauayan, Isabela","amountPesos":78400000.0,"lengthMeters":50.0,"ratePesosPerMeter":1568000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19203"},{"year":2026,"category":"Bridges","project":"Construction of Bridge (Sta. 0 + 980 - Sta. 1 + 025) , Luna-Aurora Bridge, Aurora and Luna, Isabela","amountPesos":53900000.0,"lengthMeters":45.0,"ratePesosPerMeter":1197777.7777777778,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19207"},{"year":2026,"category":"Bridges","project":"Construction of Macayucayu-Ueg Bridge Approaches, Barangay Macayucayu-Barangay Ueg, San Mariano, Isabela (Approach A : Sta. 0+000 to Sta. 0+720, Approach B : Sta. 0+983.60 to Sta. 1+235.60)","amountPesos":29400000.0,"lengthMeters":972.0,"ratePesosPerMeter":30246.913580246917,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19217"},{"year":2026,"category":"Bridges","project":"Construction of Narra Bridge, Sta. 0+000 - Sta. 0+080, Barangay Narra, Echague, Isabela","amountPesos":78890000.0,"lengthMeters":80.0,"ratePesosPerMeter":986125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19219"},{"year":2026,"category":"Bridges","project":"Construction of Poblacion-Bagunot Bridge (Sta. 0+247.50 - Sta. 0+815.50), Baggao, Cagayan","amountPesos":294000000.0,"lengthMeters":568.0,"ratePesosPerMeter":517605.6338028169,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19221"},{"year":2026,"category":"Roads","project":"Construction of Road of Sitio Bigao to  Barangay Dibuluan, Barangay Bigao & Barangay Dibuluan  (Sta. 0+000.00 - Sta. 4+689) , San Mariano, Isabela","amountPesos":63613000.0,"lengthMeters":4689.0,"ratePesosPerMeter":13566.432075069311,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19223"},{"year":2026,"category":"Bridges","project":"Construction of Simanu Norte Bridge (Sta. 5+258 - Sta. 5+318), Barangay Simanu Norte, San Pablo, Isabela","amountPesos":39200000.0,"lengthMeters":60.0,"ratePesosPerMeter":653333.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19225"},{"year":2026,"category":"Roads","project":"Construction of Sumnanga Diversion Road (Phase II) (Sta. 00+151 - Sta. 00+354.50), Sabtang, Batanes","amountPesos":52399000.0,"lengthMeters":203.5,"ratePesosPerMeter":257488.94348894348,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19227"},{"year":2026,"category":"Roads","project":"Construction of Access Road going to Anao TPLEX, Tarlac (Moncada - Anao Section), Sta 5+197.50 - Sta. 5+432.00, Sta. 1+381.85 - Sta. 1+888.45","amountPesos":147000000.0,"lengthMeters":741.1,"ratePesosPerMeter":198353.7984077722,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19238"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Bridge, Barangay San Juan, Licab, Nueva Ecija, Sta. 0+000 - Sta. 0+046","amountPesos":79968000.0,"lengthMeters":46.0,"ratePesosPerMeter":1738434.7826086956,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19240"},{"year":2026,"category":"Bridges","project":"Replacement of Bridge, Barangay Bulac, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+023.40","amountPesos":51842000.0,"lengthMeters":23.4,"ratePesosPerMeter":2215470.0854700855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19242"},{"year":2026,"category":"Roads","project":"Construction of Access Road going to Anao TPLEX, Tarlac (San Francisco West Baguindoc Section), Sta. 4+456.50 - Sta. 5+197.50","amountPesos":147000000.0,"lengthMeters":741.0,"ratePesosPerMeter":198380.56680161942,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19244"},{"year":2026,"category":"Bridges","project":"Construction of Balsik-Pentor Bridge, Barangay Pentor, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 050","amountPesos":97864000.0,"lengthMeters":50.0,"ratePesosPerMeter":1957280.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19252"},{"year":2026,"category":"Bridges","project":"Construction of Bangal Bridge, Barangay Bangal, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 040","amountPesos":97864000.0,"lengthMeters":40.0,"ratePesosPerMeter":2446600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19258"},{"year":2026,"category":"Bridges","project":"Construction of Bridge at Sitio Nagbaito, Barangay Sabang, Morong, Bataan, Sta. 0 + 000 - Sta. 0 + 045","amountPesos":73398000.0,"lengthMeters":45.0,"ratePesosPerMeter":1631066.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19262"},{"year":2026,"category":"Roads","project":"Construction of Bypass Road along Iba - Botolan, Zambales Sta. 5+971 - Sta. 8+081","amountPesos":141215000.0,"lengthMeters":2110.0,"ratePesosPerMeter":66926.54028436019,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19264"},{"year":2026,"category":"Roads","project":"Construction of Bypass Road, Iba-Botolan-Amungan-San Agustin Section, Iba, Zambales Sta. 14+210.00 - Sta 15+710.00","amountPesos":94143000.0,"lengthMeters":1500.0,"ratePesosPerMeter":62762.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19266"},{"year":2026,"category":"Bridges","project":"Construction of Caragcasan Bridge, Caragsacan, Dingalan, Aurora, Sta. 0+000 - 0+075","amountPesos":112543000.0,"lengthMeters":75.0,"ratePesosPerMeter":1500573.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19268"},{"year":2026,"category":"Roads","project":"Construction of Gabihan-Basuit Bypass Road, San Ildefonso, Bulacan, Sta. 00+000 - Sta. 02+880","amountPesos":141215000.0,"lengthMeters":2880.0,"ratePesosPerMeter":49032.98611111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19300"},{"year":2026,"category":"Roads","project":"Construction of Malolos Diversion Road, City of Malolos, Bulacan, Sta. 0 + 000 - Sta. 1 + 782","amountPesos":94143000.0,"lengthMeters":1782.0,"ratePesosPerMeter":52829.96632996633,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19302"},{"year":2026,"category":"Roads","project":"Construction of Moncada - San Manuel Bypass Road, Tarlac, Sta. 8+116.30 - Sta. 8+594.40","amountPesos":94143000.0,"lengthMeters":478.1,"ratePesosPerMeter":196910.6881405566,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19304"},{"year":2026,"category":"Roads","project":"Construction of Moncada-Paniqui Diversion Road (Ablang Sapang - Burgos Section), Tarlac, Sta. 2+240.00 - Sta. 3+647.00","amountPesos":147000000.0,"lengthMeters":1407.0,"ratePesosPerMeter":104477.6119402985,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19306"},{"year":2026,"category":"Roads","project":"Construction of New Clark City-Tarlac City Diversion Road(Armenia - San Jose de Urquico), Tarlac City, Tarlac, Sta. 2+962.70 - Sta. 2 + 972.3, Sta. 3 + 487.10 - Sta. 4 + 826.80","amountPesos":263601000.0,"lengthMeters":1349.3,"ratePesosPerMeter":195361.2984510486,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19308"},{"year":2026,"category":"Roads","project":"Construction of Paskuhan-Del Carmen Service Road (BarangayDel Carmen-Barangay Bulaon), City of San Fernando, Pampanga, Sta. 0+000 - Sta. 1+412","amountPesos":61740000.0,"lengthMeters":1412.0,"ratePesosPerMeter":43725.21246458923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19310"},{"year":2026,"category":"Roads","project":"Construction of Road Connecting Barangay Townsite to Barangay Alion, Mariveles, Bataan, Sta. 0 + 000 - Sta. 3 + 125","amountPesos":94143000.0,"lengthMeters":3125.0,"ratePesosPerMeter":30125.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19320"},{"year":2026,"category":"Bridges","project":"Construction of San-Ramon – Sta. Isabel Bridge, Barangay Sta. Isabel, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 075","amountPesos":146795000.0,"lengthMeters":75.0,"ratePesosPerMeter":1957266.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19326"},{"year":2026,"category":"Roads","project":"Construction of Silalin Road, Barangay Binuangan, Bagac, Bataan, Sta. 0 + 000 - Sta. 1+723","amountPesos":56486000.0,"lengthMeters":1723.0,"ratePesosPerMeter":32783.51712130006,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19328"},{"year":2026,"category":"Bridges","project":"Construction of Sitio Kanawan Bridge, Barangay Binaritan, Morong, Bataan, Sta. 0 + 000 - Sta. 0 + 050","amountPesos":97864000.0,"lengthMeters":50.0,"ratePesosPerMeter":1957280.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19330"},{"year":2026,"category":"Roads","project":"Construction of Sitio Lower Balandasan to Sitio Crusher Road, Barangay Mt. View, Mariveles, Bataan, Sta. 0 + 000 - Sta. 2 + 005","amountPesos":65900000.0,"lengthMeters":2005.0,"ratePesosPerMeter":32867.83042394015,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19332"},{"year":2026,"category":"Roads","project":"Construction of Tacloban Road, Barangay Lucanin, Mariveles, Bataan, Sta. 0 + 000 - Sta. 2 + 104","amountPesos":65900000.0,"lengthMeters":2104.0,"ratePesosPerMeter":31321.2927756654,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19334"},{"year":2026,"category":"Roads","project":"Construction of Tarlac City Circumferential Road (Balibago II-San Jose), Tarlac City, Tarlac, Sta. 4+060.00 - Sta. 4+504.50","amountPesos":94143000.0,"lengthMeters":444.5,"ratePesosPerMeter":211795.27559055117,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19336"},{"year":2026,"category":"Bridges","project":"Construction of Tulaoc Overpass Bridge, across NLEX, Tulaoc, San Simon, Pampanga, Sta. 000+000 - Sta. 000+400","amountPesos":107800000.0,"lengthMeters":400.0,"ratePesosPerMeter":269500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19338"},{"year":2026,"category":"Bridges","project":"Rehabilitation of Binaritan Bridge, Barangay Binaritan, Morong, Bataan, Sta. 0 + 000 - Sta. 0 + 090","amountPesos":146795000.0,"lengthMeters":90.0,"ratePesosPerMeter":1631055.5555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19340"},{"year":2026,"category":"Bridges","project":"Rehabilitation of Cesar Vergara Bridge, Cabanatuan City, Nueva Ecija, Sta. 1+344 - Sta. 2+145","amountPesos":73500000.0,"lengthMeters":801.0,"ratePesosPerMeter":91760.29962546816,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19342"},{"year":2026,"category":"Roads","project":"Construction of Dingalan-San Luis-Baler Road, San Luis, Aurora, Sta. 21+766 - Sta. 23+566","amountPesos":98000000.0,"lengthMeters":1800.0,"ratePesosPerMeter":54444.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19346"},{"year":2026,"category":"Roads","project":"Construction of Baler-San Luis-Dingalan Road, San Luis, Aurora, Sta. 7+552.80 - Sta. 9+052.80","amountPesos":98000000.0,"lengthMeters":1500.0,"ratePesosPerMeter":65333.33333333337,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19348"},{"year":2026,"category":"Roads","project":"Construction of Baler Bypass Road, Barangay Bacong, San Luis, Aurora to Barangay Buhangin, Baler, Aurora, Sta. 0 + 000 - Sta. 0 + 271.40, Sta. 2 + 460 - 2 + 996","amountPesos":291559000.0,"lengthMeters":807.4,"ratePesosPerMeter":361108.49640822393,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19350"},{"year":2026,"category":"Roads","project":"Rehabilitation of Malolos-Paombong-Hagonoy-Calumpit Road, Bulacan, Sta. 0 + 000 - Sta. 2 + 285","amountPesos":55069000.0,"lengthMeters":2285.0,"ratePesosPerMeter":24100.218818380745,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19352"},{"year":2026,"category":"Roads","project":"Rehabilitation of Ople Road, Malolos City, Bulacan, Sta. 0 + 000 - Sta. 2 + 653","amountPesos":61193000.0,"lengthMeters":2653.0,"ratePesosPerMeter":23065.58612891067,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19354"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage Canal along Bulac - Sapang Palay Proper Road, Sta. 00+000 - Sta. 02+010, City of San Jose Del Monte, Bulacan","amountPesos":98000000.0,"lengthMeters":2010.0,"ratePesosPerMeter":48756.21890547264,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19364"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage Canal along Minuyan - Poblacion Road, Sta. 02+656 - Sta. 04+730, City of San Jose Del Monte, Bulacan","amountPesos":115485000.0,"lengthMeters":2074.0,"ratePesosPerMeter":55682.256509161045,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19366"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage Canal, Barangay Francisco Homes (Mulawin - Guijo), Sta. 00+000 - Sta. 04+061, City of San Jose Del Monte, Bulacan","amountPesos":98000000.0,"lengthMeters":4061.0,"ratePesosPerMeter":24131.9871952721,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19368"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage Canal, Barangay Francisco Homes (Mulawin - Narra), Sta. 00+000 - Sta. 02+392, City of San Jose Del Monte, Bulacan","amountPesos":58800000.0,"lengthMeters":2392.0,"ratePesosPerMeter":24581.939799331103,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19370"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage Canal, Barangay Sapang Palay Proper and San Rafael, Sta. 00+000 - Sta. 02+693, City of San Jose Del Monte, Bulacan","amountPesos":98000000.0,"lengthMeters":2693.0,"ratePesosPerMeter":36390.642406238396,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19374"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Sitio Pagasa Barangay Anupul to Dapdap Resettlement, Bamban, Tarlac, Sta. 0+000.00 - Sta. 4+250.00","amountPesos":98000000.0,"lengthMeters":4250.0,"ratePesosPerMeter":23058.823529411766,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19376"},{"year":2026,"category":"Roads","project":"Casile - Tagaytay Road, Sta. 73 + 295 - Sta. 74 + 220, Cavite","amountPesos":48051000.0,"lengthMeters":925.0,"ratePesosPerMeter":51947.02702702703,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19379"},{"year":2026,"category":"Bridges","project":"Construction (Completion) of Bridge, Barangay Anas, STA. 001+565 - STA. 001+600, Calauag, Quezon","amountPesos":49973000.0,"lengthMeters":35.0,"ratePesosPerMeter":1427800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19381"},{"year":2026,"category":"Roads","project":"Construction of Access Road to Trading Post (Quezon Coffee Belt), Section I: Sta. 0 + 000 - Sta. 3 + 275, Section II: Sta. 0 + 000 - Sta. 0 + 287, Candelaria, Quezon","amountPesos":96102000.0,"lengthMeters":3275.0,"ratePesosPerMeter":29344.12213740458,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19383"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Sumulong Highway - Antipolo Hotel, Bankers Village and, Nuestra Señora, Sta. 0+000 - Sta. 1+090.00 Barangay Dela Paz and Barangay Sta. Cruz, Antipolo City, Rizal","amountPesos":94062000.0,"lengthMeters":1090.0,"ratePesosPerMeter":86295.41284403669,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19385"},{"year":2026,"category":"Bridges","project":"Construction of Batino Bridge including approaches along South Luzon Expressway (SLEX) Westbound, STA. 52 + 583 - STA 52 + 838, Calamba City, Laguna","amountPesos":24055000.0,"lengthMeters":255.0,"ratePesosPerMeter":94333.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19391"},{"year":2026,"category":"Roads","project":"Construction of Buenavista Bypass Road, STA. 0 + 000 - STA. 0 + 792.58, General Trias City, Cavite","amountPesos":80185000.0,"lengthMeters":792.58,"ratePesosPerMeter":101169.5980216508,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19397"},{"year":2026,"category":"Roads","project":"Construction of Dasmarina-General Trias-Tanza Diversion Road, Mayor's Drive, Sta. 1+586 to Sta. 1+643,  General Trias City, Cavite","amountPesos":52856000.0,"lengthMeters":57.0,"ratePesosPerMeter":927298.245614035,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19399"},{"year":2026,"category":"Roads","project":"Construction of Kulasisi-Pantay Road (Phase V) sta. 01+000 - sta. 01+600, Barangay San Luis, Antipolo City, Rizal","amountPesos":48111000.0,"lengthMeters":600.0,"ratePesosPerMeter":80185.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19401"},{"year":2026,"category":"Roads","project":"Construction of Punta - Open Canal Diversion Road, Sta. 00 + 000 - Sta. 01 + 152, Barangay Anabu Section, Imus, Cavite","amountPesos":96102000.0,"lengthMeters":1152.0,"ratePesosPerMeter":83421.875,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19403"},{"year":2026,"category":"Roads","project":"Construction of Punta-Open Canal Diversion Road, Pasong Camachile II Section, Sta. 0 + 000 - Sta. 0 + 280, General Trias, Cavite","amountPesos":49714000.0,"lengthMeters":280.0,"ratePesosPerMeter":177550.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19405"},{"year":2026,"category":"Roads","project":"Construction of R1 - Aguinaldo Shrine and Museum - New Kawit City Hall Access Road, Sta. 0 + 000 - Sta. 0 + 389, Sta. 0 + 429 - Sta. 0 + 763, Kawit, Cavite","amountPesos":96102000.0,"lengthMeters":723.0,"ratePesosPerMeter":132921.16182572613,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19407"},{"year":2026,"category":"Roads","project":"Construction of Real By Pass Road, Sta. 0+000 - Sta. 0+487, Real, Quezon","amountPesos":49403000.0,"lengthMeters":487.0,"ratePesosPerMeter":101443.5318275154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19409"},{"year":2026,"category":"Roads","project":"Construction of Road along M.L. Quezon Ext. Sta 0+000-Sta. 0+600, Barangay Mahabang Parang, Angono, Rizal","amountPesos":40092000.0,"lengthMeters":600.0,"ratePesosPerMeter":66820.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19413"},{"year":2026,"category":"Roads","project":"Construction of Road and drainage at Barangay Lalakay STA 0+000 - STA 0+750, Los Baños, Laguna","amountPesos":78803000.0,"lengthMeters":750.0,"ratePesosPerMeter":105070.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19415"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage at University of the Philippines - Los Baños, Phase II STA 0+430 - STA 1+880, Los Baños, Laguna","amountPesos":117116000.0,"lengthMeters":1450.0,"ratePesosPerMeter":80769.6551724138,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19417"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage from Barangay Sta. Maria to Promenade, Sta. 0+000 - Sta. 0+470, Barangay Burol Main, Dasmariñas City, Cavite","amountPesos":40092000.0,"lengthMeters":470.0,"ratePesosPerMeter":85302.12765957447,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19419"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage, Barangay San Antonio to San Vicente STA 0+000 - STA 0+750, San Pedro City, Laguna","amountPesos":65349000.0,"lengthMeters":750.0,"ratePesosPerMeter":87132.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19421"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Pantok (Phase II) Sta. 0+460 - Sta. 1+300, Binangonan, Rizal","amountPesos":80185000.0,"lengthMeters":840.0,"ratePesosPerMeter":95458.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19423"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage along Overhead Road STA 0+000 - STA 0+900, Sta. Rosa City, Laguna","amountPesos":68232000.0,"lengthMeters":900.0,"ratePesosPerMeter":75813.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19425"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Barangay Ibaba, Malusak and Aplaya STA 0+000 - STA 0+600, Santa Rosa City, Laguna","amountPesos":56191000.0,"lengthMeters":600.0,"ratePesosPerMeter":93651.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19427"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Barangay Kanluran to Barangay Sinalhan STA 0+000 - STA 1+000, Santa Rosa City, Laguna","amountPesos":96102000.0,"lengthMeters":1000.0,"ratePesosPerMeter":96102.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19429"},{"year":2026,"category":"Roads","project":"Construction of Drainage structure along Road at Sitio Maralas, Barangay Santiago,Sta. 0+000 - Sta. 0+242,  General Trias City, Cavite","amountPesos":28831000.0,"lengthMeters":242.0,"ratePesosPerMeter":119136.36363636363,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19431"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage, Barangay Dela Paz Sta. 0+000 - Sta 1+321, Biñan City, Laguna","amountPesos":97818000.0,"lengthMeters":1321.0,"ratePesosPerMeter":74048.44814534443,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19433"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage, Barangay Pacita I STA 0+000 - STA 1+750, San Pedro City, Laguna","amountPesos":144153000.0,"lengthMeters":1750.0,"ratePesosPerMeter":82373.14285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19435"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage, Barangay Pacita II STA 0+000 - STA 1+750, San Pedro City, Laguna","amountPesos":144153000.0,"lengthMeters":1750.0,"ratePesosPerMeter":82373.14285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19437"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage, Barangay San Vicente STA 0+000 - STA 0+600, San Pedro City, Laguna","amountPesos":48432000.0,"lengthMeters":600.0,"ratePesosPerMeter":80720.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19439"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lumil and Barangay Cabangaan, Phase II, Sta. 0+200 - Sta. 0+410, Sta. 0+512 - Sta. 0+850, Sta. 0+979 - Sta. 1+008, Silang, Cavite","amountPesos":104240000.0,"lengthMeters":577.0,"ratePesosPerMeter":180658.5788561525,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19441"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Paliparan III-Barangay Paliparan II, Phase 11, Sta. 2+452 - Sta. 2+514, Sta. 2+668 - Sta. 3+137, Dasmariñas City, Cavite","amountPesos":104240000.0,"lengthMeters":531.0,"ratePesosPerMeter":196308.85122410546,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19443"},{"year":2026,"category":"Roads","project":"Construction of Road Sta 0+000 - Sta. 1+170, Barangay Pantok and Barangay Palangoy, Binangonan, Rizal","amountPesos":80185000.0,"lengthMeters":1170.0,"ratePesosPerMeter":68534.18803418803,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19445"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Santiago, Sta. 0+245 - Sta. 0+590, Baras, Rizal","amountPesos":47309000.0,"lengthMeters":345.0,"ratePesosPerMeter":137127.53623188406,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19447"},{"year":2026,"category":"Roads","project":"Construction of Road, Don Placido Campos Ave., Sta. 04 + 849 - Sta. 05 + 654, Barangay Bucandala, Imus, Cavite","amountPesos":93692000.0,"lengthMeters":805.0,"ratePesosPerMeter":116387.57763975156,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19449"},{"year":2026,"category":"Roads","project":"Construction of Road, Pag-asa-Alapan-Tinabunan, Sta. 00 + 000 - Sta. 00 + 805, Barangay Pag-asa - Barangay Alapan, Imus, Cavite","amountPesos":96102000.0,"lengthMeters":805.0,"ratePesosPerMeter":119381.36645962733,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19451"},{"year":2026,"category":"Roads","project":"Construction of Road, San Mateo-Antipolo Road sta. 00+000 - sta. 03+000 (Antipolo Section), Antipolo City, Rizal","amountPesos":120277000.0,"lengthMeters":3000.0,"ratePesosPerMeter":40092.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19453"},{"year":2026,"category":"Bridges","project":"Construction of Tapayan Bridge Sta. 0+000 - Sta. 0+035 at Barangay San Juan and Barangay Sta. Ana Taytay, Rizal","amountPesos":66468000.0,"lengthMeters":35.0,"ratePesosPerMeter":1899085.7142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19455"},{"year":2026,"category":"Roads","project":"Dasmariñas City - San Pedro - Muntinlupa Link Road, Sta. 2 + 787 - Sta. 3 + 226, San Pedro, Laguna","amountPesos":24986000.0,"lengthMeters":439.0,"ratePesosPerMeter":56915.717539863326,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19457"},{"year":2026,"category":"Roads","project":"Dasmariñas-General Mariano Alvarez-Carmona Bypass Road, Package A, Sta. 44+465 - Sta. 44+561, Carmona, Cavite","amountPesos":93219000.0,"lengthMeters":96.0,"ratePesosPerMeter":971031.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19459"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage Structure, Broadway Pines, Sta. 0+000 - Sta. 0+275.00 Barangay Mayamot, Antipolo City","amountPesos":10961000.0,"lengthMeters":275.0,"ratePesosPerMeter":39858.181818181816,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19461"},{"year":2026,"category":"Roads","project":"Improvement of Road, Sugar Road to San Lazaro Drive, Villa Sorteo, Phase II, Sta. 0+516 - Sta. 1+266, Barangay Milagrosa, Carmona City, Cavite","amountPesos":50115000.0,"lengthMeters":750.0,"ratePesosPerMeter":66820.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19463"},{"year":2026,"category":"Roads","project":"Rehabilitation of Barangay Mataas na Lupa-Pinagbayanan Road, Sta. 3+658 - Sta. 3+721.50, BAT123+000 - BAT123+251.50, Taysan, Batangas","amountPesos":56129000.0,"lengthMeters":63.5,"ratePesosPerMeter":883921.2598425196,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19465"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Drainage along Patiis Road, Sta. 0+000 - Sta. 0+460, San Mateo, Rizal","amountPesos":56129000.0,"lengthMeters":460.0,"ratePesosPerMeter":122019.56521739131,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19467"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at M.L. Quezon Ave. from Shopwise to Boundary sta. 00+000 - sta. 02+290, Antipolo City, Rizal","amountPesos":120277000.0,"lengthMeters":2290.0,"ratePesosPerMeter":52522.70742358079,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19469"},{"year":2026,"category":"Roads","project":"Construction of Malbog, Sta. Fe Road, Sta. 0+000 - Sta. 0+025, Sta. 0+090 - Sta. 0+140, Sta. 0+820 - Sta. 1+600, Sta. 2+000 - Sta. 2+845, Barangay Mat-I to Poblacion, Santa Fe, Romblon","amountPesos":96219000.0,"lengthMeters":1700.0,"ratePesosPerMeter":56599.41176470588,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19474"},{"year":2026,"category":"Roads","project":"Construction of Poblacion - Dalahican - Masudsud Circumferential Road, Sta. 00+000 - Sta. 1+700, Barangay Dalahican, Concepcion, Romblon","amountPesos":96219000.0,"lengthMeters":1700.0,"ratePesosPerMeter":56599.41176470588,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19476"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Marigondon Sur to Barangay Marigondon Norte Access Road, Sta. 00+000 - Sta. 1+700, San Andres, Romblon","amountPesos":96219000.0,"lengthMeters":1700.0,"ratePesosPerMeter":56599.41176470588,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19478"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000.00 - Sta. 1+500.00,  Barangay Silanga, Taytay, Palawan","amountPesos":57732000.0,"lengthMeters":1500.0,"ratePesosPerMeter":38488.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19480"},{"year":2026,"category":"Roads","project":"Construction of Road, Gabawan National High School, Phase II, Sta. 00+000 - Sta. 00+916.19, Sta. 02+832.19 - Sta. 02+949.03, Barangay Gabawan, Odiongan, Romblon","amountPesos":57732000.0,"lengthMeters":1033.03,"ratePesosPerMeter":55886.082688789305,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19482"},{"year":2026,"category":"Roads","project":"Construction of Road - Sta. 1+150 - Sta. 3+400, Sitio Guguyudan to Sitio Pinagurangan, Barangay Taburi, Rizal, Palawan","amountPesos":51934000.0,"lengthMeters":2250.0,"ratePesosPerMeter":23081.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19484"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+430 - Sta. 2+690, Sitio Raket, Barangay Calumpang, Quezon, Palawan","amountPesos":49972000.0,"lengthMeters":2260.0,"ratePesosPerMeter":22111.504424778763,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19486"},{"year":2026,"category":"Bridges","project":"Construction of Tabuk Bridge, Phase II, Sta. 0+140.00 - Sta.0+260.00, Barangay Buenavista, Sablayan, Occidental Mindoro","amountPesos":173195000.0,"lengthMeters":120.0,"ratePesosPerMeter":1443291.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19488"},{"year":2026,"category":"Roads","project":"Construction of Access Road leading to Fatima Seaport, Tabaco City, Albay, Sta. 1+140 - Sta. 1+840","amountPesos":117600000.0,"lengthMeters":700.0,"ratePesosPerMeter":168000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19491"},{"year":2026,"category":"Roads","project":"Construction of Road San Pascual Mabayawas-Calpi with Drainage System Facilities, Libon, Albay, Sta. 4+650 - Sta. 8+150","amountPesos":78400000.0,"lengthMeters":3500.0,"ratePesosPerMeter":22400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19503"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Brgy. Burgos to Brgy. Poblacion District 2, San Jacinto, Masbate, Sta. 0+366 - Sta. 0+384","amountPesos":60000000.0,"lengthMeters":18.0,"ratePesosPerMeter":3333333.3333333335,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19507"},{"year":2026,"category":"Roads","project":"Construction of Road Sitio Gaboc of Barangay Upper Binogsacan to Barangay. Malabnig, Guinobatan, Albay,  Sta. 0+000 - Sta. 2+515","amountPesos":93100000.0,"lengthMeters":2515.0,"ratePesosPerMeter":37017.89264413519,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19511"},{"year":2026,"category":"Roads","project":"Construction of Lanigay - Apad - Santicon - East Matacon Road, Polangui, Albay, Sta. 1+580 – Sta. 3+785","amountPesos":50764000.0,"lengthMeters":2205.0,"ratePesosPerMeter":23022.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19513"},{"year":2026,"category":"Roads","project":"Construction of Macad-Antipolo Road - Sta. 0+000 - Sta. 1+500, Barangay Macad, Pasacao, Camarines Sur","amountPesos":68337000.0,"lengthMeters":1500.0,"ratePesosPerMeter":45558.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19515"},{"year":2026,"category":"Roads","project":"Construction of Malubi - Mataba Road Extension, Aroroy Masbate, Sta. 7+400 - Sta. 7+700","amountPesos":65687000.0,"lengthMeters":300.0,"ratePesosPerMeter":218956.66666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19517"},{"year":2026,"category":"Roads","project":"Construction of Mampili-Mambalite Road, Barangay Mampili Section, Site 1 Sta. 0+530 - Sta. 1+053.29, Site 2 Sta. 0+000 - Sta 0+430.31, Site 3 Sta. 1+570 - Sta. 1+872.08, Site 4 Sta. 0+000 - Sta. 1+080, Basud, Camarines Norte","amountPesos":69801000.0,"lengthMeters":1382.08,"ratePesosPerMeter":50504.31234081963,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19519"},{"year":2026,"category":"Roads","project":"Pili-Ocampo Bypass Road (La Purisima-Del Rosario-Curry Section), Pili, Camarines Sur - Sta. 0+000 - Sta. 1+600","amountPesos":121381000.0,"lengthMeters":1600.0,"ratePesosPerMeter":75863.125,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19525"},{"year":2026,"category":"Roads","project":"Construction of Ponong Road via Mahamot Road, Ponong, Casiguran, Sorsogon, Sta. 0+000 - Sta. 1+102","amountPesos":70560000.0,"lengthMeters":1102.0,"ratePesosPerMeter":64029.038112522685,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19527"},{"year":2026,"category":"Bridges","project":"Construction of Revetment, Minasag Bridge 2nd Approach, Barangay Rizal, Sta. Elena, Camarines Norte, Sta. 5+947 - Sta. 6+592","amountPesos":100000000.0,"lengthMeters":645.0,"ratePesosPerMeter":155038.75968992247,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19529"},{"year":2026,"category":"Roads","project":"Construction of Road leading to (Sitio Pangyawan) Taysan , Barangay Estanza (Sta. 0+217 - Sta. 1+417), Legazpi City, Albay","amountPesos":97624000.0,"lengthMeters":1200.0,"ratePesosPerMeter":81353.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19531"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay San Roque to Barangay San Pascual, Bacon District, Sorsogon Sta. 0+000 - Sta. 1+055","amountPesos":63700000.0,"lengthMeters":1055.0,"ratePesosPerMeter":60379.14691943128,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19533"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Goyodan - Payak, Bato, Camarines Sur, Sta. 3+990.00 - Sta. 7+110.00","amountPesos":68337000.0,"lengthMeters":3120.0,"ratePesosPerMeter":21902.884615384617,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19535"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lourdes. Donsol, Sorsogon, Sta. 0+000 - Sta. 0+952","amountPesos":97624000.0,"lengthMeters":952.0,"ratePesosPerMeter":102546.21848739496,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19537"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pinamanaan, Donsol, Sorsogon, Sta. 0+000 - Sta. 0+609","amountPesos":58574000.0,"lengthMeters":609.0,"ratePesosPerMeter":96180.62397372742,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19539"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Antonio, Iriga City, Camarines Sur, Sta. 2+645.00 - Sta. 3+605.00","amountPesos":29287000.0,"lengthMeters":960.0,"ratePesosPerMeter":30507.291666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19541"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Francisco, Baao, Camarines Sur, Sta. 0+928.00 - Sta. 2+728.00","amountPesos":87861000.0,"lengthMeters":1800.0,"ratePesosPerMeter":48811.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19543"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Suguian, Donsol, Sorsogon, Sta. 0+000 - Sta. 0+872","amountPesos":97624000.0,"lengthMeters":872.0,"ratePesosPerMeter":111954.12844036697,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19545"},{"year":2026,"category":"Roads","project":"Construction of Sto. Domingo-San Juan- Sitio Ubak Gogon-San Rafael Road, Prieto Diaz, Sorsogon, Sta. 0+000 - Sta. 1+150","amountPesos":58574000.0,"lengthMeters":1150.0,"ratePesosPerMeter":50933.913043478264,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19547"},{"year":2026,"category":"Roads","project":"Irosin-Matnog By-Pass Road, Brgy. Carriedo - Brgy. Liang Section, Irosin, Sorsogon, Sta. 1+895 - Sta. 3+495","amountPesos":196000000.0,"lengthMeters":1600.0,"ratePesosPerMeter":122500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19549"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Oras to Barangay Bagong Sirang, Castilla, Sorsogon, Sta. 0+000 - Sta. 1+524","amountPesos":58800000.0,"lengthMeters":1524.0,"ratePesosPerMeter":38582.67716535433,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19551"},{"year":2026,"category":"Bridges","project":"Construction (Completion) of Bridge, Barangay Lus-onan to Barangay Magubilan, Panay, Capiz - Sta. 0+238.50 - Sta. 0+341, Sta. 0+341 - Sta. 0+491.90, Sta. 0+491.90 - Sta. 0+592.50","amountPesos":68910000.0,"lengthMeters":354.0,"ratePesosPerMeter":194661.01694915254,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19556"},{"year":2026,"category":"Roads","project":"Concreting of Brgy. Antalon - Brgy. Camabaan - Brgy Santiago Road including Facilities, Brgy. Antalon, Brgy. Camabaan and Brgy Santiago, San Joaquin, Iloilo - Sta. 0+000 - Sta.02+200","amountPesos":73500000.0,"lengthMeters":2200.0,"ratePesosPerMeter":33409.09090909091,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19558"},{"year":2026,"category":"Roads","project":"Construction of Boracay Circumferential Road, Aklan - Sta. 0+000 - Sta. 0+320","amountPesos":47844000.0,"lengthMeters":320.0,"ratePesosPerMeter":149512.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19560"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 00+000 - Sta. 01+200, Barangay Lacayon to Barangay Tono-an, Bugasong, Antique","amountPesos":69374000.0,"lengthMeters":1200.0,"ratePesosPerMeter":57811.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19562"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sta. 0+000- Sta. 0+080.6, Barangay Jilabangan - Barangay Bago, Tayasan, Negros Oriental","amountPesos":93400000.0,"lengthMeters":80.6,"ratePesosPerMeter":1158808.9330024815,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19565"},{"year":2026,"category":"Roads","project":"Construction of Circumferential Road Sta. 6+840 - Sta. 8+555, Barangay Cubay, Barangay Batuan and Barangay III, La Carlota City, Negros Occidental","amountPesos":196000000.0,"lengthMeters":1715.0,"ratePesosPerMeter":114285.71428571429,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19571"},{"year":2026,"category":"Roads","project":"Construction of Road leading to the New Development Area, Sta. 0+480 - Sta. 0+980, Barangay Igmayaan, Don Salvador Benedicto, Negros Occidental","amountPesos":19600000.0,"lengthMeters":500.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19573"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay II to Barangay V, Sta. 0+000 - Sta. 0+780, San Carlos City, Negros Occidental","amountPesos":29400000.0,"lengthMeters":780.0,"ratePesosPerMeter":37692.307692307695,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19575"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Kansumandig - Barangay Aya, Sta. 0+864 - Sta. 02+564, La Libertad, Negros Oriental","amountPesos":53900000.0,"lengthMeters":1700.0,"ratePesosPerMeter":31705.882352941175,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19577"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+950 - 1+990), Murcia, Negros Occidental","amountPesos":56360000.0,"lengthMeters":1040.0,"ratePesosPerMeter":54192.307692307695,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19579"},{"year":2026,"category":"Bridges","project":"Construction of Bridge leading to Government Facilities, Sta. 000+000 - Sta. 000+030, City of Bogo, Cebu","amountPesos":96975000.0,"lengthMeters":30.0,"ratePesosPerMeter":3232500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19586"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sta. 3+920 - Sta. 3+950, Sitio Dita, Barangay Pulangbato, Cebu City, Cebu","amountPesos":49860000.0,"lengthMeters":30.0,"ratePesosPerMeter":1662000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19588"},{"year":2026,"category":"Roads","project":"Construction of Mowag - Siervas Road, STA. 2 + 705 - STA. 4 + 075, Carcar City, Cebu","amountPesos":62985000.0,"lengthMeters":1370.0,"ratePesosPerMeter":45974.45255474452,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19590"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage Facilities, Humay-Humay-Road, Phase 2, Sta. 0+000.00 - Sta. 1+000.00, Lapu-Lapu City, Cebu","amountPesos":49419000.0,"lengthMeters":1000.0,"ratePesosPerMeter":49419.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19592"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage Facilities, Timpolok Road in Barangay Gun-ob and Babag, Phase 5, Sta. 2+053.00 - Sta. 2+950.00, Lapu-Lapu City, Cebu","amountPesos":70011000.0,"lengthMeters":897.0,"ratePesosPerMeter":78050.16722408027,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19594"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Phase II, Barangay Sacsac, Sta. 0+000.00 - Sta. 0+358.00, Consolacion, Cebu","amountPesos":5814000.0,"lengthMeters":358.0,"ratePesosPerMeter":16240.22346368715,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19596"},{"year":2026,"category":"Roads","project":"Construction of Road with Slope Protection Structure, Sta. 2+700.00 - Sta. 3+120.00 Barangay Buhisan, Cebu City, Cebu","amountPesos":87210000.0,"lengthMeters":420.0,"ratePesosPerMeter":207642.85714285713,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19598"},{"year":2026,"category":"Roads","project":"Construction of Road with Slope Protection Structure, Sta. 6+400.00 - Sta. 6+795.00 Barangay Sudlon I, Cebu City, Cebu","amountPesos":77520000.0,"lengthMeters":395.0,"ratePesosPerMeter":196253.16455696203,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19600"},{"year":2026,"category":"Roads","project":"Construction of Road, Bangag Lapus Cave, Sta. 3+500 - Sta. 4+600, Barili, Cebu","amountPesos":67830000.0,"lengthMeters":1100.0,"ratePesosPerMeter":61663.63636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19602"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Balaygtiki - Barangay Panlaan, Sta. 2 + 345 - Sta. 2 + 565, Dumanjug, Cebu","amountPesos":58140000.0,"lengthMeters":220.0,"ratePesosPerMeter":264272.7272727273,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19604"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 7+200.00 - Sta. 7+700.00 Barangay Kalunasan, Cebu City, Cebu","amountPesos":4845000.0,"lengthMeters":500.0,"ratePesosPerMeter":9690.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19606"},{"year":2026,"category":"Roads","project":"Construction of Road, Dakit-Mayana Road, Sta. 1+548 - Sta. 6+100, Barili, Cebu","amountPesos":140989000.0,"lengthMeters":4552.0,"ratePesosPerMeter":30972.978910369067,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19608"},{"year":2026,"category":"Roads","project":"Construction of Road, Jct. (Bilar-Oac,Dimiao) Subayon – Villa Aurora Rd., Sta.0+000 - Sta.1+760, Bilar, Bohol","amountPesos":48488000.0,"lengthMeters":1760.0,"ratePesosPerMeter":27550.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19610"},{"year":2026,"category":"Roads","project":"Construction of Road, Package 2, Sta. 0+950.00 - 1+520.00 Sta. Barangay Pardo - Toong, Cebu City","amountPesos":116097000.0,"lengthMeters":570.0,"ratePesosPerMeter":203678.94736842104,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19616"},{"year":2026,"category":"Roads","project":"Construction of Road, STA. 0 + 320 - STA. 0 + 410, Sitio Iba, Barangay Lagtang, Talisay City, Cebu","amountPesos":67830000.0,"lengthMeters":90.0,"ratePesosPerMeter":753666.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19618"},{"year":2026,"category":"Roads","project":"Construction of Road, San Fernando - Carcar City Coastal Road, Phase 2 (STA. 0 + 583 - STA. 1 + 508), City of Carcar, Cebu","amountPesos":145350000.0,"lengthMeters":925.0,"ratePesosPerMeter":157135.13513513515,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19620"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 5+800.00 - Sta. 6+080.00 Sitio Lower Mangabon, Barangay Tagbao, Cebu City","amountPesos":60078000.0,"lengthMeters":280.0,"ratePesosPerMeter":214564.2857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19622"},{"year":2026,"category":"Roads","project":"Construction of Road, Valencia, Bohol, Sta.1+144.00-Sta.3+009.00","amountPesos":59593000.0,"lengthMeters":1865.0,"ratePesosPerMeter":31953.351206434316,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19624"},{"year":2026,"category":"Bridges","project":"Construction of Talibon-Bien Unido Bridge, Bien Unido, Bohol Sta. 2+026.32-Sta. 2+061.92","amountPesos":130544000.0,"lengthMeters":35.6,"ratePesosPerMeter":3666966.292134817,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19626"},{"year":2026,"category":"Bridges","project":"Construction of Tigbao Bridge, Sta. 3+750 - Sta. 3+840 Barangay Talamban, Cebu City","amountPesos":131450000.0,"lengthMeters":90.0,"ratePesosPerMeter":1460555.5555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19628"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage Structure along L. Gabuya St., Sta. 0+365 - Sta. 0+2+665, Brgy. Basak San Nicolas to Brgy. Cogon Pardo, Cebu City","amountPesos":198813000.0,"lengthMeters":363.0,"ratePesosPerMeter":547694.214876033,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19634"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage Structure, Sta. 1+611 to Sta. 1+736, Barangay San Jose, Cebu City","amountPesos":9698000.0,"lengthMeters":125.0,"ratePesosPerMeter":77584.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19636"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage Structure, Sta. 0+163 to Sta. 0+288, Barangay T. Padilla, Cebu City, Cebu","amountPesos":9698000.0,"lengthMeters":125.0,"ratePesosPerMeter":77584.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19638"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage System, Phase 3, S. Osmeña Street, Sta. 0+000.00 - Sta. 0+700.00, Lapu-Lapu City, Cebu","amountPesos":53295000.0,"lengthMeters":700.0,"ratePesosPerMeter":76135.71428571429,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19640"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Olango Island, Phase 3, Section 1: Sta. 0+000.00 - Sta. 1+489.00, Section 2: Sta. 0+000.00 - Sta. 0+604.00, Section 3: Sta. 2+135.00 - Sta. 5+312.00, Section 4 : Sta. 0+000.00 - Sta. 1+363.00, Section 5: Sta. 0+000.00 - Sta. 0+546.00, Section 6: Sta. 0+000.00 - Sta. 2+849.00, Lapu-Lapu City, Cebu","amountPesos":145350000.0,"lengthMeters":5312.0,"ratePesosPerMeter":27362.57530120482,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19642"},{"year":2026,"category":"Roads","project":"Road Concreting along Cebu - Toledo Wharf Rd. Linao - Cantabaco Section (STA. 2 + 592 - STA. 2 + 830, STA. 3 + 880 - STA. 4 + 182, and STA. 8 + 608 - STA. 9 + 111), Minglanilla, Cebu","amountPesos":53295000.0,"lengthMeters":1043.0,"ratePesosPerMeter":51097.79482262704,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19644"},{"year":2026,"category":"Roads","project":"Road Concreting at Sitio Telepono (STA. 0 + 328 - STA. 0 + 1465), Brgy. Camp 7, Minglanilla, Cebu","amountPesos":58140000.0,"lengthMeters":1137.0,"ratePesosPerMeter":51134.56464379947,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19646"},{"year":2026,"category":"Roads","project":"Construction of Access Road from Borongan Airport to Barangay Punta Maria, Borongan City, Eastern Samar (Sta. 0+000 - Sta. 0+600)","amountPesos":96480000.0,"lengthMeters":600.0,"ratePesosPerMeter":160800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19649"},{"year":2026,"category":"Bridges","project":"Construction of Canbañez Bridge, Chainage 2 + 410 - Chainage 2 + 500, Brgy. Canbañez, La Paz, Leyte","amountPesos":61244000.0,"lengthMeters":90.0,"ratePesosPerMeter":680488.8888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19651"},{"year":2026,"category":"Roads","project":"Construction of Circumferential Road, Barangay Poblacion - Barangay Biasong I, Sta. 0+000 - Sta. 2+100, Almagro, Samar","amountPesos":113880000.0,"lengthMeters":2100.0,"ratePesosPerMeter":54228.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19653"},{"year":2026,"category":"Roads","project":"Construction of Circumferential Road, Barangay Sevilla - Barangay Pinanangnan, Sta. 0+000 - Sta. 0+1+400, Sto. Niño, Samar","amountPesos":98821000.0,"lengthMeters":1.0,"ratePesosPerMeter":98821000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19655"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Danao to Barangay Del Remedios, Taft, Eastern Samar (Sta. 0+000 - Sta. 0+300)","amountPesos":98000000.0,"lengthMeters":300.0,"ratePesosPerMeter":326666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19657"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Bua-Bua - Brgy. Alog - Brgy. Matarinao, Salcedo, Eastern Samar (Sta. 1+735 - Sta. 2+735)","amountPesos":56840000.0,"lengthMeters":1000.0,"ratePesosPerMeter":56840.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19659"},{"year":2026,"category":"Roads","project":"Construction of Dagum-Hamorawon Diversion Road, Sta. 0+000 - Sta. 0+710, Calbayog City, Samar","amountPesos":56469000.0,"lengthMeters":710.0,"ratePesosPerMeter":79533.80281690141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19661"},{"year":2026,"category":"Roads","project":"Construction of Sto. Niño Circumferential Road, Sta. 0+000 - Sta. 1+000, Sto. Niño, Samar","amountPesos":50470000.0,"lengthMeters":1000.0,"ratePesosPerMeter":50470.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19667"},{"year":2026,"category":"Roads","project":"Construction of Road (Phase III), Barangay Nato - Barangay Bongdo, Taft, Eastern Samar (Sta. 2+783 - Sta. 3+779)","amountPesos":96480000.0,"lengthMeters":996.0,"ratePesosPerMeter":96867.46987951807,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19669"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Batiawan - Barangay Pangabutan, Taft, Eastern Samar (Sta. 2+769.70 - Sta. 3+769.70)","amountPesos":96480000.0,"lengthMeters":1000.0,"ratePesosPerMeter":96480.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19671"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cabarasan to Barangay Dao (Sta. 3+610 - Sta. 4+760), Gamay, Northern Samar","amountPesos":53064000.0,"lengthMeters":1150.0,"ratePesosPerMeter":46142.608695652176,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19673"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sugod - Barangay Cambatutay Viejo to Cambatutay Nuevo, Sta. 0+000 - Sta.2+000, Tarangnan, Samar","amountPesos":115762000.0,"lengthMeters":2000.0,"ratePesosPerMeter":57881.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19675"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tomogbong - Barangay Calundan, Sta. 0+960 - Sta. 3+960, San Jorge, Samar","amountPesos":113409000.0,"lengthMeters":3000.0,"ratePesosPerMeter":37803.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19677"},{"year":2026,"category":"Roads","project":"Construction of Road, Kilim-Sitio Tipay, Package 7 ,Sta. 5+425 - 6+170, Baybay City, Leyte","amountPesos":80079000.0,"lengthMeters":745.0,"ratePesosPerMeter":107488.59060402685,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19679"},{"year":2026,"category":"Roads","project":"Construction of Road, Poblacion 1 to Barangay Camayse, Zumarraga, Samar (Sta. 0+000 - 0+500)","amountPesos":53064000.0,"lengthMeters":500.0,"ratePesosPerMeter":106128.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19681"},{"year":2026,"category":"Bridges","project":"Contruction of Bridge, Barangay Elizabeth, Leyte to Poblacion Leyte, Leyte, Station 4+440 - 4+530","amountPesos":110239000.0,"lengthMeters":90.0,"ratePesosPerMeter":1224877.7777777778,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19685"},{"year":2026,"category":"Roads","project":"Rehabilitation/Reconstruction of Road, Barangay Galego - Barangay Bangon Gote - Barangay Binalayan, Sta. 0+000 - Sta. 1+500, Sta. 2+700 - Sta. 3+100, Sta. 3+310 - Sta. 3+810, Tarangnan, Samar","amountPesos":115762000.0,"lengthMeters":2400.0,"ratePesosPerMeter":48234.166666666664,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19689"},{"year":2026,"category":"Roads","project":"Busay - Lanote - Menzi- Sumagdang Bypass Road Extension Sta. 0+000.00 - Sta. 1+650.00, Isabela City, Basilan","amountPesos":131481000.0,"lengthMeters":1650.0,"ratePesosPerMeter":79685.45454545454,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19692"},{"year":2026,"category":"Bridges","project":"Construction of Antonino Bridge, Barangay Antonino, Sergio Osmeña Sr., Zamboanga del Norte - Sta. 7+145 - Sta. 7+180.84","amountPesos":53900000.0,"lengthMeters":35.84,"ratePesosPerMeter":1503906.249999994,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19694"},{"year":2026,"category":"Bridges","project":"Construction of Bridge at Lower Benembengan, K0080+000 - K0080+016, Sumisip, Basilan","amountPesos":40709000.0,"lengthMeters":16.0,"ratePesosPerMeter":2544312.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19698"},{"year":2026,"category":"Roads","project":"Construction of Camp Andres Romadier National Road pang Section - Tayungan Seit National Road, Sulu Sta. 0+000 - Sta. 5+020","amountPesos":144706000.0,"lengthMeters":5020.0,"ratePesosPerMeter":28825.89641434263,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19702"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Banker-Diampak-Shiolan Sta. 10+520 to Sta. 13+876.50, Kabasalan, Zamboanga Sibugay","amountPesos":77093000.0,"lengthMeters":3356.5,"ratePesosPerMeter":22968.270519886788,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19704"},{"year":2026,"category":"Roads","project":"Construction of Mangal-Mangal - Kan Lagay Road, Kalingalan Caluang, Sulu Sta. 0+000 - Sta. 1+800","amountPesos":98000000.0,"lengthMeters":1800.0,"ratePesosPerMeter":54444.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19708"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Darussalam -Barangay Darul Akram, Languyan, Taw-Tawi Sta. 0+000 - Sta. 1+500","amountPesos":38588000.0,"lengthMeters":1500.0,"ratePesosPerMeter":25725.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19710"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Kauswagan-Barangay Marapong, Sergio Osmeña Sr., Zamboanga del Norte - Sta. 14+040 - Sta. 15+237","amountPesos":54024000.0,"lengthMeters":1197.0,"ratePesosPerMeter":45132.832080200504,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19712"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Maligaya, Polanco - Barangay Sinaad - Barangay San Francisco, Sergio Osmeña Sr., Zamboanga del Norte - Sta. 4+481 - Sta. 5+630.20","amountPesos":53628000.0,"lengthMeters":1149.2,"ratePesosPerMeter":46665.506439262106,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19714"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Macayas, Barangay Mandhi, Sindangan to Sitio Suminugod, Barangay Guibo, Siayan, Zamboanga del Norte - Sta. 11+880 - Sta. 15+030","amountPesos":96471000.0,"lengthMeters":3150.0,"ratePesosPerMeter":30625.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19716"},{"year":2026,"category":"Roads","project":"Construction of Seit- Tayungan National Road - Bud Bawis Road, Luuk Section, Sulu Sta. 0+000 - Sta. 2+720","amountPesos":147000000.0,"lengthMeters":2720.0,"ratePesosPerMeter":54044.117647058825,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19718"},{"year":2026,"category":"Roads","project":"Construction of Seit-Higad-Bulangsih Road, Panamao Section, Sulu Sta. 0+000 - Sta. 2+020","amountPesos":49000000.0,"lengthMeters":2020.0,"ratePesosPerMeter":24257.425742574258,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19720"},{"year":2026,"category":"Roads","project":"Reconstruction to Concrete Road, Brgy. Salaan, Zamboanga City, Sta. 0+000 - Sta. 1+425","amountPesos":27930000.0,"lengthMeters":1425.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19734"},{"year":2026,"category":"Roads","project":"Rehabilitation of Camp Andres Romandier National Road, Patibulan, Panamao Section, Sulu Chainage 13000 - Chainage 15910","amountPesos":98000000.0,"lengthMeters":2910.0,"ratePesosPerMeter":33676.975945017184,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19736"},{"year":2026,"category":"Roads","project":"Rehabilitation of Karundong-Camp Andres Romandier National Road Kulay Kulay Section, Sulu Chainage 3500 - Chainage 6500","amountPesos":147000000.0,"lengthMeters":3000.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19738"},{"year":2026,"category":"Roads","project":"Rehabilitation of Taglibi-Tiptipon Road, Kan Dayok Section, Panamao, Sulu Chainage 0 - Chainage 3600","amountPesos":93100000.0,"lengthMeters":3600.0,"ratePesosPerMeter":25861.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19740"},{"year":2026,"category":"Roads","project":"Rehabilitation of Tayungan, Camp Andres Romandier National Road. Chainage 6500 - Chainage 7000","amountPesos":14700000.0,"lengthMeters":500.0,"ratePesosPerMeter":29400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19742"},{"year":2026,"category":"Roads","project":"Rehabilitation Seit -Tayungan National Road. Chainage 5500 - Chainage 6000","amountPesos":9800000.0,"lengthMeters":500.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19744"},{"year":2026,"category":"Roads","project":"Rehabilitation/Reconstruction of Seit-Tayungan National Road, Tayungan Panamao Section, Sulu Chainage 2728 - Chainage 5130","amountPesos":129208000.0,"lengthMeters":2402.0,"ratePesosPerMeter":53791.840133222315,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19746"},{"year":2026,"category":"Roads","project":"Widening of BCR (Lamitan-Tipo-tipo-Tumahubong Road Section) S000012BL, K0044+000 - K0045+600, (Badja-Lagayas Section)","amountPesos":47271000.0,"lengthMeters":1600.0,"ratePesosPerMeter":29544.375,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19750"},{"year":2026,"category":"Roads","project":"Widening of Camp Andres Romandier National Road - Karungdong Road Sta. 0+000 - Sta. 4+000","amountPesos":98000000.0,"lengthMeters":4000.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19752"},{"year":2026,"category":"Roads","project":"Widening of Lahing-lahing Road, Kan Awah Section, Omar, Sulu Sta. 0+000 - Sta. 1+920","amountPesos":98000000.0,"lengthMeters":1920.0,"ratePesosPerMeter":51041.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19754"},{"year":2026,"category":"Roads","project":"Widening of Romandier National Road, Gaggil Section, Sulu Chainage 4100 - Chainage 6420","amountPesos":147000000.0,"lengthMeters":2320.0,"ratePesosPerMeter":63362.06896551724,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19756"},{"year":2026,"category":"Roads","project":"Bubong (Lanao del Sur) - Kapai (Lanao del Sur) - Tagoloan (Lanao del Norte) Road, Sta. 0+000 - Sta. 1+650, Lanao del Sur","amountPesos":77105000.0,"lengthMeters":1650.0,"ratePesosPerMeter":46730.30303030303,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19759"},{"year":2026,"category":"Bridges","project":"Construction of Bridge from Barangay Benoni, Mahinog to Barangay Maac, Guinsiliban Section, K0017+960 - K0018+060, Camiguin","amountPesos":91645000.0,"lengthMeters":100.0,"ratePesosPerMeter":916450.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19763"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay Kibanban, Sta. 12+273 - Sta. 12+343, Balingasag, Misamis Oriental","amountPesos":91645000.0,"lengthMeters":70.0,"ratePesosPerMeter":1309214.2857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19765"},{"year":2026,"category":"Bridges","project":"Construction of Camuayan Bridge, Sta. 5+015 - Sta. 5+075, Balingasag, Misamis Oriental","amountPesos":91645000.0,"lengthMeters":60.0,"ratePesosPerMeter":1527416.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19767"},{"year":2026,"category":"Roads","project":"Construction of Concepcion to Don Victoriano Road, Concepcion Section, Sta. 18+600 - Sta. 21+600, Misamis Occidental","amountPesos":188769000.0,"lengthMeters":3000.0,"ratePesosPerMeter":62923.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19769"},{"year":2026,"category":"Roads","project":"Construction of Barangay Poblacion - Barangay Lemoncrete Road, Sta. 0+000 - Sta. 5+361, Magsaysay, Lanao del Norte","amountPesos":117981000.0,"lengthMeters":5361.0,"ratePesosPerMeter":22007.274762171237,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19771"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Don Victoriano-Concepcion Road, Barangay Gandawan, Sta. 0+000 - Sta. 1+500, Don Victoriano, Misamis Occidental","amountPesos":144572000.0,"lengthMeters":1500.0,"ratePesosPerMeter":96381.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19773"},{"year":2026,"category":"Roads","project":"Construction of Don Carlos-Kiburiao, Quezon, Bukidnon Bypass Road, Barangay Minsamongan Section, Sta. 6+420 - Sta. 8+220, Bukidnon","amountPesos":62648000.0,"lengthMeters":1800.0,"ratePesosPerMeter":34804.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19775"},{"year":2026,"category":"Roads","project":"Construction of Road Riprap at Ragondongan, Buadipuso Buntong, Sta. 0+000 - Sta. 0+410, Lanao del Sur","amountPesos":9638000.0,"lengthMeters":410.0,"ratePesosPerMeter":23507.317073170732,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19779"},{"year":2026,"category":"Bridges","project":"Construction of Lati Bridge, Sta. 0+000 - Sta. 0+020, Brgy. Lati, Balindong, Lanao del Sur","amountPesos":4819000.0,"lengthMeters":20.0,"ratePesosPerMeter":240950.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19781"},{"year":2026,"category":"Roads","project":"Construction of Jct Sayre Highway (Jct Bukidnon-Davao City Rd (Cotabato Bdry) to Barangay Gutapol-Barangay New Kidapawan-Barangay Bagor Road, Brgy. Gutapol to Brgy. New Kidapawan Section, Sta. 1+650 - Sta. 3+650, Kibawe, Bukidnon","amountPesos":144572000.0,"lengthMeters":2000.0,"ratePesosPerMeter":72286.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19783"},{"year":2026,"category":"Roads","project":"Construction of Jct. Bukidnon-Davao City Road, Barangay Kiuntod-Barangay Minsalagan-Barangay Manlamonay-Barangay Kibatang-Barangay Pinamaloy Road, Brgy. Manlamonay - Brgy. Pinamaloy Section, Sta. 4+480 - Sta. 6+480, Don Carlos, Bukidnon","amountPesos":47192000.0,"lengthMeters":2000.0,"ratePesosPerMeter":23596.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19785"},{"year":2026,"category":"Roads","project":"Construction of Jct. CDO City-Dominorog-Camp Kibaritan Road to Jct SH-Aglayan-Alanib-Ticalaan Road (Aglayan-Basak), Brgy. Baylanan Section, Sta. 14+700 - Sta. 17+700, Talakag, Bukidnon","amountPesos":134934000.0,"lengthMeters":3000.0,"ratePesosPerMeter":44978.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19787"},{"year":2026,"category":"Roads","project":"Construction of Jct. Sayre Highway (Jct. Bukidnon-Davao City Road-Cotabato Bdry) to Jct. Sayre Highway Lourdes-McArthur Road-Barangay Kitaihon Road, Brgy. Mcarthur Section, Sta. 2+000 - Sta. 3+000, Dangcagan, Bukidnon","amountPesos":47192000.0,"lengthMeters":1000.0,"ratePesosPerMeter":47192.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19789"},{"year":2026,"category":"Roads","project":"Construction of Jct. Sayre Highway to Barangay Miaray-Barangay Dolorosa, Dangcagan-Barangay Balocbocan Road, Barangay Balocbocan Section, Sta. 13+100 - Sta. 14+900, Kitaotao, Bukidnon","amountPesos":62648000.0,"lengthMeters":1800.0,"ratePesosPerMeter":34804.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19791"},{"year":2026,"category":"Roads","project":"Construction of Misamis Oriental-Agusan del Sur Alternate Bypass Road connecting Kibungsod-Tama-Kalipay-Eureka-Agusan del Sur, Brgy. Abunda - Brgy. Tinaan - Brgy. Gumabon Section, Sta. 10+400 - Sta. 15+400, Magsaysay, Misamis Oriental","amountPesos":235961000.0,"lengthMeters":5000.0,"ratePesosPerMeter":47192.2,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19793"},{"year":2026,"category":"Roads","project":"Construction of Road along Jct. Kibawe-Kalilangan Rd to Barangay Baroy to Barangay Sibonga Section A: Sta. 0+000 - Sta. 0+831, Section B : Sta. 0+933 - Sta. 1+074, Section C: Sta. 1+263 - Sta. 1+763, Kadingilan, Bukidnon","amountPesos":48891000.0,"lengthMeters":1472.0,"ratePesosPerMeter":33213.99456521739,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19799"},{"year":2026,"category":"Roads","project":"Construction of Road Slope Protection Structure going to Maria Cristina Falls, Barangay Buru-un, Sta. 0+507 - Sta. 1+132, Iligan City","amountPesos":53010000.0,"lengthMeters":625.0,"ratePesosPerMeter":84816.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19801"},{"year":2026,"category":"Roads","project":"Construction of Road along Purok 8 to Purok 7 Sta. 0+000 - 1+500, and Purok 4 to Purok 5 Sta. 0+000 - 1+500, Barangay Jasaan, Cabanglasan, Bukidnon","amountPesos":94384000.0,"lengthMeters":1500.0,"ratePesosPerMeter":62922.666666666664,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19803"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Panalsalan-Barangay Dagumbaan Road, Barangay Dagumbaan Section, Sta. 3+480 - Sta. 6+130, Maramag, Bukidnon","amountPesos":120476000.0,"lengthMeters":2650.0,"ratePesosPerMeter":45462.64150943396,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19805"},{"year":2026,"category":"Roads","project":"Construction of Road, Jct. Provincial Road (Kuya - Dagumbaan Road), Sitio Urduja, Barangay Kuya – Barangay La Roxas – Sitio Bangkal, La Roxas – Jct. (Valencia-Pangantucan Bypass Rd.), Brgy. La Roxas Section, Sta. 5+840 - Sta. 8+340, Maramag, Bukidnon","amountPesos":117981000.0,"lengthMeters":2500.0,"ratePesosPerMeter":47192.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19807"},{"year":2026,"category":"Roads","project":"Construction of Road, Jct. Sayre Highway to Jct. Puntian-Arakan Rd. (Kitaihon-Balangigay-Kitubo Section), Barangay Kitubo Section, Sta. 5+400 - Sta. 7+000, Kitaotao, Bukidnon","amountPesos":62648000.0,"lengthMeters":1600.0,"ratePesosPerMeter":39155.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19809"},{"year":2026,"category":"Roads","project":"Construction of Road, Sayre Highway (Kibawe) Puntian - San Fernando (Jct. Kapalong-Talaingod-Valencia) Alternate Route, Brgy. Laligan Section, Sta. 3+160 - Sta. 4+760, Valencia City, Bukidnon","amountPesos":37754000.0,"lengthMeters":1600.0,"ratePesosPerMeter":23596.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19811"},{"year":2026,"category":"Bridges","project":"Construction of Tugop Bridge along Pulangui River, Barangay Tugop, Sta. 0+000 - Sta. 0+140, San Fernando, Bukidnon","amountPesos":137467000.0,"lengthMeters":140.0,"ratePesosPerMeter":981907.1428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19813"},{"year":2026,"category":"Roads","project":"Construction of Vulcan-Sunken Cemetery Road, Sta. 0+000 - Sta. 3+700, Brgy. Naasag, Mambajao and Brgy. Bonbon, Catarman, Camiguin","amountPesos":96381000.0,"lengthMeters":3700.0,"ratePesosPerMeter":26048.91891891892,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19815"},{"year":2026,"category":"Roads","project":"Mountain Bypass Road (Mitugas - Gala Section), Sta. 0+000 - Sta 3+000, Tudela, Misamis Occidental","amountPesos":141577000.0,"lengthMeters":3000.0,"ratePesosPerMeter":47192.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19817"},{"year":2026,"category":"Roads","project":"Mountain Bypass Road (Penacio Section), Sta. 0+000 - Sta. 0+850, Clarin, Misamis Occidental","amountPesos":28315000.0,"lengthMeters":850.0,"ratePesosPerMeter":33311.76470588235,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19819"},{"year":2026,"category":"Roads","project":"Rehabilitation of Marawi-Malabang National Road with drainage, Chainage 18000 - Chainage 19852, Chainage 19866 - Chainage 20014, Lanao del Sur","amountPesos":93131000.0,"lengthMeters":2000.0,"ratePesosPerMeter":46565.5,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19821"},{"year":2026,"category":"Roads","project":"Mountain Bypass Road (Namut - Liboron Section), Sta. 0+000 - Sta. 1+400, Tudela - Don Victoriano, Misamis Occidental","amountPesos":115657000.0,"lengthMeters":1400.0,"ratePesosPerMeter":82612.14285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19827"},{"year":2026,"category":"Roads","project":"Mountain Bypass Road (Libertad Bajo - Katipunan Section), Sta. 0+000 - Sta. 3+400, Sinacaban, Misamis Occidental","amountPesos":115657000.0,"lengthMeters":3400.0,"ratePesosPerMeter":34016.76470588235,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19829"},{"year":2026,"category":"Roads","project":"Mountain Bypass Road (Stimson Abordo - Trigos - Guimad - Kinuman Norte Section), Sta. 0+000 - Sta. 1+400, Ozamiz City, Misamis Occidental","amountPesos":48191000.0,"lengthMeters":1400.0,"ratePesosPerMeter":34422.142857142855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19831"},{"year":2026,"category":"Roads","project":"Mountain Bypass Road (Taguima - Pan-ay Diot - Pan-ay Section), Sta. 0+000 - Sta. 1+400, Tudela - Clarin, Misamis Occidental","amountPesos":48191000.0,"lengthMeters":1400.0,"ratePesosPerMeter":34422.142857142855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19833"},{"year":2026,"category":"Roads","project":"Mountain Bypass Road (Sinonoc - San Vicente - Dinas - Katipunan - Namut), Sta. 0+000 - Sta. 3+250, Sinacaban - Tudela, Misamis Occidental","amountPesos":125295000.0,"lengthMeters":3250.0,"ratePesosPerMeter":38552.307692307695,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19835"},{"year":2026,"category":"Roads","project":"Construction of Access Road Leading to Mati Fish Port, Sta. 1523+125.000 - Sta. 1523+170.000, Mati City, Davao Oriental","amountPesos":68600000.0,"lengthMeters":45.0,"ratePesosPerMeter":1524444.4444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19838"},{"year":2026,"category":"Roads","project":"Construction of Road Brgy. Sto. Niño to Central Baugan, Talaingod, Davao Del Norte, Sta. 0+000 - Sta. 2+000","amountPesos":75000000.0,"lengthMeters":2000.0,"ratePesosPerMeter":37500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19842"},{"year":2026,"category":"Roads","project":"Construction of Road Jct. Asuncion - San Isidro - Laak - Veruela Road, Concepcion to Kipalili, Asuncion, Davao Del Norte, Sta. 0+000 - Sta. 2+500","amountPesos":75000000.0,"lengthMeters":2500.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19844"},{"year":2026,"category":"Roads","project":"Concreting of Roads, Sulop ( Sta.1+050 - Sta.2+350.0), Davao del Sur \nStart: 6.597759 N,125.359952  E\nEnd: 6.602442 N, 125.363455 E","amountPesos":75000000.0,"lengthMeters":1300.0,"ratePesosPerMeter":57692.307692307695,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19858"},{"year":2026,"category":"Roads","project":"Construction of Aundanao to Tagbaobo Coastal Road, Island Garden City of Samal, Davao del Norte - 0+000 - 3+100","amountPesos":96124000.0,"lengthMeters":3100.0,"ratePesosPerMeter":31007.74193548387,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19860"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Lanca, Mati City, Davao Oriental - (Section 1: Sta. 0+000 - Sta. 0+560.521, Section 2: Sta. 0+000 - Sta. 0+639.479)","amountPesos":76899000.0,"lengthMeters":639.479,"ratePesosPerMeter":120252.58061640804,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19862"},{"year":2026,"category":"Roads","project":"Construction of LAMARISAN Road, Sta. 2+734.16 - Sta. 4+478.66 & Sta. 4+740.00 - Sta. 5+995.50, Malalag, Davao del Sur","amountPesos":70888000.0,"lengthMeters":3000.0,"ratePesosPerMeter":23629.333333333332,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19866"},{"year":2026,"category":"Roads","project":"Construction of Mapawa-Bahi-Langgawisan Road, Sta. 3+057.500 - Sta. 4+872.500, Maragusan, Davao de Oro","amountPesos":144186000.0,"lengthMeters":1815.0,"ratePesosPerMeter":79441.32231404958,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19868"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Panamin (Sta. 0+000 - Sta. 1+667), Mabini, Davao de Oro","amountPesos":96124000.0,"lengthMeters":1667.0,"ratePesosPerMeter":57662.8674265147,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19870"},{"year":2026,"category":"Roads","project":"Construction of Road from Barangay Maganda to Sitio Maitum, Sta. 0+300.000-Sta. 1+680.000, Sta. 2+370.000-Sta. 2+690.000, Sta. 2+775.000-Sta. 3+475.000, Sta.3+760.000-Sta. 5+063.500, Tarragona, Davao Oriental","amountPesos":96124000.0,"lengthMeters":3703.5,"ratePesosPerMeter":25954.907519913595,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19872"},{"year":2026,"category":"Roads","project":"Construction of Road from Barangay San Pedro to Barangay Panaglib, Sta. 0+360.00 - Sta. 3+899.22 (Site 1), Sta. 0+000.00 - Sta. 0+357.51 (Site 2), Kiblawan, Davao del Sur","amountPesos":81058000.0,"lengthMeters":3896.73,"ratePesosPerMeter":20801.54385856859,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19874"},{"year":2026,"category":"Roads","project":"Construction of Road from Barangay Tinuntungan to Barangay Sibayan, Sta. 0+000.00 - Sta. 4+100.00, Bansalan, Davao del Sur","amountPesos":81057000.0,"lengthMeters":4100.0,"ratePesosPerMeter":19770.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19876"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Isidro (Sta. 0+000 - Sta. 2+250), Nabunturan, Davao de Oro","amountPesos":86511000.0,"lengthMeters":2250.0,"ratePesosPerMeter":38449.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19878"},{"year":2026,"category":"Roads","project":"Construction of Road, Camansi-Mayaon, Sta. 3+200.00 - Sta. 5+393.00, Montevista, Davao de Oro","amountPesos":96124000.0,"lengthMeters":2193.0,"ratePesosPerMeter":43832.19334245326,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19880"},{"year":2026,"category":"Roads","project":"Construction of Road, Sasa to New Sibonga (Sta. 0+000 - Sta. 2+425), Nabunturan, Davao de Oro","amountPesos":93240000.0,"lengthMeters":2425.0,"ratePesosPerMeter":38449.48453608248,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19882"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Quarry, Barangay Ngan, Compostela - Upper Ulip, Sta. 4+515.070 - Sta. 6+839.990, Monkayo, Davao de Oro","amountPesos":67767000.0,"lengthMeters":2324.92,"ratePesosPerMeter":29148.099719560243,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19890"},{"year":2026,"category":"Roads","project":"Construction of Tanglaw - Dujali - Carmen - Tagum Road, Santo Tomas and B.E. Dujali, Davao del Norte - Sec. 1: 0+000 - 0+140, 0+193 - 0+379, 2+025 - 2+138, 2+172-2+297, Sec.2: 0+000 - 3+236","amountPesos":73054000.0,"lengthMeters":3236.0,"ratePesosPerMeter":22575.40173053152,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19892"},{"year":2026,"category":"Roads","project":"IGACOS Trunkline Road (Tagbaobo - Pangubatan), Island Garden City of Samal, Davao del Norte - 0+000 - 3+700","amountPesos":124961000.0,"lengthMeters":3700.0,"ratePesosPerMeter":33773.24324324324,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19894"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road leading to Davao Oriental State University, Barangay Dahican, Mati City, Davao Oriental - (Sta. 1713+421.716 – Sta. 1713+691.372, Sta. 1713+879.790 - Sta. 1714+279.790, Sta. 1714+030.790 - Sta. 1714+480.790, Sta. 1714+065.790 - Sta. 1714+515.790, Sta. 1714+098.790 - Sta. 1714+548.790, Sta. 1714+139.790 - Sta. 1714+589.790, Sta. 714+173.790 - Sta. 1714+623.790, Sta. 1714+579.790 - Sta. 1715+911.790)","amountPesos":96124000.0,"lengthMeters":1001738.0,"ratePesosPerMeter":95.95722634062,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19896"},{"year":2026,"category":"Bridges","project":"Construction (Completion) of Bridge, Phase 3 - Sta. 0 +000 - Sta. 0+140, Barangay Kalamongog, Lebak, Sultan Kudarat","amountPesos":25000000.0,"lengthMeters":140.0,"ratePesosPerMeter":178571.42857142858,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19899"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Koronadal-San Jose-Columbio-Matanao By-pass Road, Sta. 0+000-Sta. 3+100, South Cotabato","amountPesos":55000000.0,"lengthMeters":3100.0,"ratePesosPerMeter":17741.935483870966,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19909"},{"year":2026,"category":"Bridges","project":"Construction of (Ligaya-Tokawal) Bridge, Sta. 2+478 - Sta. 2+658, Barangay Ligaya, General Santos City, South Cotabato","amountPesos":234000000.0,"lengthMeters":180.0,"ratePesosPerMeter":1300000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19911"},{"year":2026,"category":"Roads","project":"Construction of Baluan-Kalibuhan-Ned Road, Sta. 0 + 000 - Sta. 4 + 880, Palimbang, Sultan Kudarat","amountPesos":171069000.0,"lengthMeters":4880.0,"ratePesosPerMeter":35055.12295081967,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19913"},{"year":2026,"category":"Roads","project":"Construction of Bolebak - Pansud Alternate Road Sta. 0 + 000 - Sta. 2 + 670, Lebak, Sultan Kudarat","amountPesos":125000000.0,"lengthMeters":2670.0,"ratePesosPerMeter":46816.479400749064,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19915"},{"year":2026,"category":"Roads","project":"Construction of Bolebak - Pansud Alternate Road Sta. 2 + 670 - Sta. 5 + 000, Lebak, Sultan Kudarat","amountPesos":106500000.0,"lengthMeters":2330.0,"ratePesosPerMeter":45708.15450643777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19917"},{"year":2026,"category":"Roads","project":"Construction of Esperanza-Lebak Bypass Road (Lebak Section) - Sta. 59+930 - Sta. 67+340, Lebak, Sultan Kudarat","amountPesos":195387000.0,"lengthMeters":7410.0,"ratePesosPerMeter":26368.016194331984,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19919"},{"year":2026,"category":"Roads","project":"Construction of Esperanza-Lebak Bypass Road, Sta. 0 + 000 - Sta. 2 + 890, Esperanza, Sultan Kudarat","amountPesos":130000000.0,"lengthMeters":2890.0,"ratePesosPerMeter":44982.69896193771,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19921"},{"year":2026,"category":"Roads","project":"Construction of Esperanza-Lebak Bypass Road, Sta. 2 + 890 - Sta. 5 + 550, Esperanza, Sultan Kudarat","amountPesos":120000000.0,"lengthMeters":2660.0,"ratePesosPerMeter":45112.78195488722,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19923"},{"year":2026,"category":"Roads","project":"Construction of Highway Jct. Titulok-Sto. Niño-Monteverde-Daluga Highway Jct. Ned Lake Sebu, Sta. 0 + 000 - Sta. 4 + 320, Bagumbayan, Sultan Kudarat","amountPesos":148005000.0,"lengthMeters":4320.0,"ratePesosPerMeter":34260.416666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19925"},{"year":2026,"category":"Roads","project":"Construction of Poloy-Poloy to Keytodac Road, Sta. 0 + 000 - Sta 3 + 800, Brgy. Poloy-Poloy, Lebak, Sultan Kudarat","amountPesos":167056000.0,"lengthMeters":3800.0,"ratePesosPerMeter":43962.10526315789,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19927"},{"year":2026,"category":"Bridges","project":"Construction of Akbual Bridge, Sta. 0+000 - Sta. 0+040, Upper Suyan, Malapatan, Sarangani","amountPesos":6000000.0,"lengthMeters":40.0,"ratePesosPerMeter":150000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19929"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+800, Barangay Rosary Heights 11, Cotabato City","amountPesos":9769000.0,"lengthMeters":800.0,"ratePesosPerMeter":12211.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19931"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta.0+800, Barangay Libungan, Northern Kabuntalan, Maguindanao del Norte","amountPesos":14654000.0,"lengthMeters":800.0,"ratePesosPerMeter":18317.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19933"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta.1+200,  Barangay Bungabong, Sultan Mastura, Maguindanao del Norte","amountPesos":9769000.0,"lengthMeters":1200.0,"ratePesosPerMeter":8140.833333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19935"},{"year":2026,"category":"Roads","project":"Construction of Alternate Road, Sitio Saban to Paco-Roxas-Arakan Valley Rd Sta. 0 + 000 - Sta. 0 + 940 , Poblacion, Arakan, North Cotabato","amountPesos":28451000.0,"lengthMeters":940.0,"ratePesosPerMeter":30267.021276595744,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19937"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay New Pangasinan (Bo.4), Koronadal City, STA. 0+000-STA. 0+020 South Cotabato","amountPesos":35000000.0,"lengthMeters":20.0,"ratePesosPerMeter":1750000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19939"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Boundary, Barangay Morales and Barangay San Felipe, STA. 0+000-STA. 0+017 South Cotabato","amountPesos":20000000.0,"lengthMeters":17.0,"ratePesosPerMeter":1176470.5882352942,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19941"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road (Provincial Road - High School Campus), Barangay Langayen, Pikit, Cotabato, Sta. 0+000 - Sta. 0+350","amountPesos":6639000.0,"lengthMeters":350.0,"ratePesosPerMeter":18968.571428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19943"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road (Provincial Road - Notre Dame High School Campus) Sta. 0+000 - Sta. 0+350 , Barangay Poblacion, Pikit, Cotabato","amountPesos":6639000.0,"lengthMeters":350.0,"ratePesosPerMeter":18968.571428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19945"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road (Sitio Bangkal - Damalasak), Phase 1, Barangay Damalasak, Pikit, Cotabato, Sta. 0+000 - Sta. 0+850","amountPesos":12329000.0,"lengthMeters":850.0,"ratePesosPerMeter":14504.70588235294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19947"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road leading to NHA/IP Housing Subdivision, Barangay Upper Bulanan, Midsayap, Cotabato, Sta. 0+000 - Sta. 0+850","amountPesos":12329000.0,"lengthMeters":850.0,"ratePesosPerMeter":14504.70588235294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19949"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Gumaga, Libungan, Cotabato, Sta. 0+000 - Sta. 0+850","amountPesos":12329000.0,"lengthMeters":850.0,"ratePesosPerMeter":14504.70588235294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19951"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Impao-Barangay Mapantig-Barangay Kenram Road - Sta. 0 + 000 - Sta. 1 + 739, Isulan, Sultan Kudarat","amountPesos":66385000.0,"lengthMeters":1739.0,"ratePesosPerMeter":38174.23806785509,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19953"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Jose Rizal to Barangay San Vicente Sta. 0 + 000 - Sta. 0 + 800, Makilala, North Cotabato","amountPesos":23709000.0,"lengthMeters":800.0,"ratePesosPerMeter":29636.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19955"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Lanao Sta. 0 + 000 - Sta. 0 + 374, Kidapawan City, North Cotabato","amountPesos":9484000.0,"lengthMeters":374.0,"ratePesosPerMeter":25358.288770053477,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19957"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Manongol Sta. 0 + 000 - Sta. 0 + 400, Kidapawan City, North Cotabato","amountPesos":9484000.0,"lengthMeters":400.0,"ratePesosPerMeter":23710.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19959"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, JCT. National Highway, Socoteco to Purok Hechanova, Barangay Paraiso, Koronadal City, STA. 0+000-STA. 1+136 South Cotabato","amountPesos":23709000.0,"lengthMeters":1136.0,"ratePesosPerMeter":20870.598591549297,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19961"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road Koronadal-San Jose-Columbio-Matanao By-pass Road, STA. 0+000-STA. 3+100 South Cotabato","amountPesos":107463000.0,"lengthMeters":3100.0,"ratePesosPerMeter":34665.48387096774,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19963"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Mopac Avenue to Purok Masagana - Sta. 0 + 920 - Sta. 1 + 760, Barangay Kalawag II, Isulan, Sultan Kudarat","amountPesos":17070000.0,"lengthMeters":840.0,"ratePesosPerMeter":20321.428571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19965"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Narra Park - Sta. 0 + 000 - Sta. 1 + 200, Barangay Kalawag II, Isulan, Sultan Kudarat","amountPesos":23709000.0,"lengthMeters":1200.0,"ratePesosPerMeter":19757.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19967"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Phase 1, Barangay Upper Mingading, Aleosan, Cotabato, Sta. 0+000 - Sta. 0+850","amountPesos":12329000.0,"lengthMeters":850.0,"ratePesosPerMeter":14504.70588235294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19969"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Police Regional Office 12, Sta.0+000 - Sta. 0+700, Tambler, General Santos City","amountPesos":11209000.0,"lengthMeters":700.0,"ratePesosPerMeter":16012.857142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19971"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Purok Paglaum, Barangay Paraiso to Barangay Morales, Koronadal City, STA. 0+000-STA. 0+455 South Cotabato","amountPesos":9484000.0,"lengthMeters":455.0,"ratePesosPerMeter":20843.956043956045,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19973"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, SKPPO - Sta. 0 + 000 - Sta. 0 + 750, Barangay Kalawag II, Isulan, Sultan Kudarat","amountPesos":14225000.0,"lengthMeters":750.0,"ratePesosPerMeter":18966.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19975"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road-Jct. National Highway Tantangan-Norala By-pass Road, STA. 0+000-STA. 1+818 South Cotabato","amountPesos":37934000.0,"lengthMeters":1818.0,"ratePesosPerMeter":20865.786578657866,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19977"},{"year":2026,"category":"Roads","project":"Construction of Datal Dlanag-Tudok Road, Barangay Tudok, T'Boli, STA. 0+000-STA. 0+682 South Cotabato","amountPesos":14225000.0,"lengthMeters":682.0,"ratePesosPerMeter":20857.771260997066,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19979"},{"year":2026,"category":"Roads","project":"Construction of Desawo-Poblacion Road, Barangay Desawo, T'Boli, STA. 0+000-STA. 0+455 South Cotabato","amountPesos":9484000.0,"lengthMeters":455.0,"ratePesosPerMeter":20843.956043956045,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19981"},{"year":2026,"category":"Roads","project":"Construction of Kematu-Sitio Damlas Road, Barangay Kematu, T'Boli, STA. 0+000-STA. 0+455 South Cotabato","amountPesos":9484000.0,"lengthMeters":455.0,"ratePesosPerMeter":20843.956043956045,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19983"},{"year":2026,"category":"Bridges","project":"Construction of Kisandal - Ginatilan (Marbel) Bridge Sta. 1 + 100 - Sta. 1 + 140 , Kidapawan City, North Cotabato","amountPesos":48000000.0,"lengthMeters":40.0,"ratePesosPerMeter":1200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19985"},{"year":2026,"category":"Roads","project":"Construction of Lamfugon Road, Barangay Lamfugon, Sta. 0+500 - Sta. 0+875, Lake Sebu, South Cotabato","amountPesos":14654000.0,"lengthMeters":375.0,"ratePesosPerMeter":39077.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19987"},{"year":2026,"category":"Roads","project":"Construction of Lemsnolon Road, Barangay Lemsnolon, T'Boli, STA. 0+000-STA. 0+500 South Cotabato","amountPesos":9484000.0,"lengthMeters":500.0,"ratePesosPerMeter":18968.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19989"},{"year":2026,"category":"Bridges","project":"Construction of Malaang Bridge Sta. 0 + 800 - Sta. 0+ 840 , Barangay San Vicente, Makilala, North Cotabato","amountPesos":48000000.0,"lengthMeters":40.0,"ratePesosPerMeter":1200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19993"},{"year":2026,"category":"Roads","project":"Construction of Poblacion, Malungon- Sta. Maria Bypass Road, Sta. 19+910 - Sta. 23+910, Malungon, Sarangani","amountPesos":78155000.0,"lengthMeters":4000.0,"ratePesosPerMeter":19538.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19995"},{"year":2026,"category":"Roads","project":"Construction of Purok Moda (Teresita)-Sitio Demacele (Dajay) Road, Barangay Teresita, Sto. Nino, STA. 0+000-STA. 0+500 South Cotabato","amountPesos":9484000.0,"lengthMeters":500.0,"ratePesosPerMeter":18968.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19997"},{"year":2026,"category":"Roads","project":"Construction of Road from Junction NHW to Juanicoville, Sta. 1+437 - Sta. 2+337, Lun Padidu, Malapatan, Sarangani","amountPesos":17070000.0,"lengthMeters":900.0,"ratePesosPerMeter":18966.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 19999"},{"year":2026,"category":"Roads","project":"Construction of Road from Junction Pioneer Street to Junction Kityan, Poblacion, Sta. 0+000 - Sta. 0+331.50, Malungon, Sarangani","amountPesos":4742000.0,"lengthMeters":331.5,"ratePesosPerMeter":14304.675716440423,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20001"},{"year":2026,"category":"Roads","project":"Construction of Road from National Highway Junction to Barangay Sabanal - Sta. 0+000 - Sta. 0+867.5, Kalamansig, Sultan Kudarat","amountPesos":28451000.0,"lengthMeters":867.5,"ratePesosPerMeter":32796.54178674352,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20003"},{"year":2026,"category":"Roads","project":"Construction of Road from National HW Junction to Barangay Takunel, Lake Sebu, STA. 0+000-STA. 0+455 South Cotabato","amountPesos":9484000.0,"lengthMeters":455.0,"ratePesosPerMeter":20843.956043956045,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20005"},{"year":2026,"category":"Roads","project":"Construction of Road from National HW Junction to Barangay T'Bolok, T'Boli, STA. 0+000-STA. 0+863 South Cotabato","amountPesos":17996000.0,"lengthMeters":863.0,"ratePesosPerMeter":20852.838933951334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20007"},{"year":2026,"category":"Roads","project":"Construction of Road from National HW Junction to Sitio Spring Road, Barangay Pobalacion, T'Boli, STA. 0+000-STA. 0+500 South Cotabato","amountPesos":9484000.0,"lengthMeters":500.0,"ratePesosPerMeter":18968.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20009"},{"year":2026,"category":"Roads","project":"Construction of Road from Ned Proper-Sitio Blit Road, Barangay Ned, Lake Sebu, STA. 0+000-STA. 0+455 South Cotabato","amountPesos":9484000.0,"lengthMeters":455.0,"ratePesosPerMeter":20843.956043956045,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20011"},{"year":2026,"category":"Roads","project":"Construction of Road Sitio Tuburan Road, Barangay San Miguel, Norala, STA. 0+000-STA. 0+500 South Cotabato","amountPesos":9484000.0,"lengthMeters":500.0,"ratePesosPerMeter":18968.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20013"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage including Facilities from junction Digos Makar Road to Albert Morrow Blvd. (NLSA Road), Sta. 1+868 - Sta. 6+115, General Santos City, South Cotabato","amountPesos":80611000.0,"lengthMeters":4247.0,"ratePesosPerMeter":18980.692253355308,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20015"},{"year":2026,"category":"Roads","project":"Concreting of Road, Barangay Kulaman - Barangay Kiadsam - Barangay Midtungok - Sta. 0+000 - Sta. 1+000, Senator Ninoy Aquino, Sultan Kudarat","amountPesos":24423000.0,"lengthMeters":1000.0,"ratePesosPerMeter":24423.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20017"},{"year":2026,"category":"Roads","project":"Construction of Drainage Structure along Road - Sta. 0+000 - Sta. 0+650, Barangay Sta. Maria, Kalamansig, Sultan Kudarat","amountPesos":4387000.0,"lengthMeters":650.0,"ratePesosPerMeter":6749.2307692307695,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20021"},{"year":2026,"category":"Roads","project":"Rehabilitation of Cotabato City East Diversion Road, Sta. 0+000 - Sta. 6+500, Sultan Kudarat, Maguindanao del Norte","amountPesos":108440000.0,"lengthMeters":6500.0,"ratePesosPerMeter":16683.076923076922,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20023"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 6+410,Barangay Landan to Sitio Kalyong, Polomolok, South Cotabato","amountPesos":96346000.0,"lengthMeters":6410.0,"ratePesosPerMeter":15030.577223088923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20025"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Poblacion, Pikit, Cotabato, Sta. 0+000 - Sta. 0+350","amountPesos":6639000.0,"lengthMeters":350.0,"ratePesosPerMeter":18968.571428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20027"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Salangsang to Barangay Keytodac - Sta. 5+800 - Sta. 7+375, Lebak, Sultan Kudarat","amountPesos":51686000.0,"lengthMeters":1575.0,"ratePesosPerMeter":32816.50793650794,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20029"},{"year":2026,"category":"Roads","project":"Construction of Salacafe-Datal Dlanag Road, Barangay Salacafe, T'Boli, STA. 0+000-STA. 0+455 South Cotabato","amountPesos":9484000.0,"lengthMeters":455.0,"ratePesosPerMeter":20843.956043956045,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20031"},{"year":2026,"category":"Roads","project":"Construction of Sitio Bacngeb-Sitio Demamis Road, Barangay Laconon, T'Boli, STA. 0+000-STA. 2+295 South Cotabato","amountPesos":47892000.0,"lengthMeters":2295.0,"ratePesosPerMeter":20867.97385620915,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20033"},{"year":2026,"category":"Roads","project":"Construction of Sitio Bakngeb-Sito Salabanog Road, Laconon, T'Boli, STA. 0+000-STA. 0+682 South Cotabato","amountPesos":14225000.0,"lengthMeters":682.0,"ratePesosPerMeter":20857.771260997066,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20035"},{"year":2026,"category":"Roads","project":"Construction of Sitio Lamtlosong Road, Barangay Lamhako, T'Boli, STA. 0+000-STA. 0+682 South Cotabato","amountPesos":14225000.0,"lengthMeters":682.0,"ratePesosPerMeter":20857.771260997066,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20039"},{"year":2026,"category":"Roads","project":"Construction of Tbolok-Basag Road, Barangay T'Bolok, T'Boli, STA. 0+000-STA. 0+682 South Cotabato","amountPesos":14225000.0,"lengthMeters":682.0,"ratePesosPerMeter":20857.771260997066,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20041"},{"year":2026,"category":"Bridges","project":"Rehabilitation/Retrofitting of Quirino Bridge, Phase II, K1855 + (-737)-K1855 + (-574), Cotabato City","amountPesos":115759000.0,"lengthMeters":163.0,"ratePesosPerMeter":710177.9141104295,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20045"},{"year":2026,"category":"Roads","project":"Widening of Road, Jct. National Highway (Marbel – Makar Rd) Bo. 2 to Lutayan – Columbio Road, Sta. 0+048 - Sta. 1+548, South Cotabato","amountPesos":25977000.0,"lengthMeters":1500.0,"ratePesosPerMeter":17318.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20047"},{"year":2026,"category":"Roads","project":"Concreting of Sitio Pudlusan Borbon - New Visayas - Ebro - Bayugan II Road, )0+000 - 3+100), San Francisco, Agusan del Sur","amountPesos":196000000.0,"lengthMeters":3100.0,"ratePesosPerMeter":63225.8064516129,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20052"},{"year":2026,"category":"Roads","project":"Construction of Agusan del Norte / Agusan del Sur North - South Lateral Road, (Las Nieves, Agusan del Norte - Kapalong, Sta. 0+000 - Sta. 1+666, Davao del Norte), Package 1, Las Nieves, Agusan del Norte","amountPesos":49000000.0,"lengthMeters":1666.0,"ratePesosPerMeter":29411.764705882353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20054"},{"year":2026,"category":"Roads","project":"Construction of Ban-as – Payasan Road (SDCR Alternate Route) Sta. 1+460 - Sta. 3+720.31 Lianga, Surigao del Sur","amountPesos":98000000.0,"lengthMeters":2260.31,"ratePesosPerMeter":43356.88467511094,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20056"},{"year":2026,"category":"Roads","project":"Construction of Road, Jct. Marihatag-Lianga Road to San Miguel (Libas Sud - Pobalcion) Road,(0+000 - 2+620), Surigao del Sur","amountPesos":117600000.0,"lengthMeters":2620.0,"ratePesosPerMeter":44885.49618320611,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20058"},{"year":2026,"category":"Roads","project":"Construction of Salvacion - Britania Circumferencial Road (Sta.0+000 - Sta. 2+840), San Agustin, Surigao del Sur","amountPesos":68600000.0,"lengthMeters":2840.0,"ratePesosPerMeter":24154.929577464787,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20060"},{"year":2026,"category":"Roads","project":"Concreting of San Isidro Mahaba Road (Sta. 0+000 - Sta. 2+026.50), Marihatag, Surigao del Sur","amountPesos":49000000.0,"lengthMeters":2026.5,"ratePesosPerMeter":24179.620034542313,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20062"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Nato-Segunda Road, Sta. 0+000 - Sta. 5+700, Barangay Segunda, Municipality of Esperanza, Agusan del Sur","amountPesos":137200000.0,"lengthMeters":5700.0,"ratePesosPerMeter":24070.175438596492,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20066"},{"year":2026,"category":"Roads","project":"Construction of Jct Nueva Estrella-Cantasay Road -Pamosaingan Road, Sta. 1+050 - Sta. 3+950, Socorro, Surigao del Norte","amountPesos":100000000.0,"lengthMeters":2900.0,"ratePesosPerMeter":34482.75862068965,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20070"},{"year":2026,"category":"Roads","project":"Construction of Jct Sering-Sitio-Kapihan Road, Sta.0+000 - Sta. 1+470, Socorro, Surigao del Norte","amountPesos":58000000.0,"lengthMeters":1470.0,"ratePesosPerMeter":39455.78231292517,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20072"},{"year":2026,"category":"Roads","project":"Construction of Lake Mainit Circumferential-Lipata Port By-Pass Road to Wind Power Generation, Package 8, (8+320 -9+820), San Francisco Section, San Francisco, Surigao del Norte","amountPesos":137200000.0,"lengthMeters":1500.0,"ratePesosPerMeter":91466.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20074"},{"year":2026,"category":"Bridges","project":"Construction of NRJ Libertad-Imelda Rd with PSCG Bridge, Sta. 6+650 - Sta. 6+810, Bunawan, Agusan del Sur","amountPesos":84053000.0,"lengthMeters":160.0,"ratePesosPerMeter":525331.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20076"},{"year":2026,"category":"Roads","project":"Construction of NRJ San Francisco - Soriano - Tagbina Road (Surigao del Sur Section), Sta. 0+000 - Sta. 0+340, Sta. 1+571.5 - Sta. 5+324.5, Tagbina, Surigao del Sur","amountPesos":98000000.0,"lengthMeters":4093.0,"ratePesosPerMeter":23943.317859760566,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20080"},{"year":2026,"category":"Roads","project":"Construction of NRJ Santiago - Cantilan Road, Package 2 (Sta. 20+232 - Sta. 22+632), Surigao del Sur","amountPesos":117600000.0,"lengthMeters":2400.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20082"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Nuevo Campo-Barangay Bongdo,(3+687-6+106) San Benito, Surigao del Norte","amountPesos":100000000.0,"lengthMeters":2419.0,"ratePesosPerMeter":41339.39644481191,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20084"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Padiay, Sibagat-Barangay San Juan, Package 1, Sta. 0+000 - Sta. 5+300, Bayugan City, Agusan del Sur","amountPesos":125440000.0,"lengthMeters":5300.0,"ratePesosPerMeter":23667.924528301886,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20086"},{"year":2026,"category":"Roads","project":"Construction of Road, La Purisima-San Juan Road, Package 6,(25+020 - 27+071), Agusan del Sur","amountPesos":147980000.0,"lengthMeters":2051.0,"ratePesosPerMeter":72150.17064846416,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20088"},{"year":2026,"category":"Roads","project":"Construction of Road, NRJ Don Ruben-National Buildings (DOH,BFP,RHU,BFAR & DENR), (0+000 - 0+337, 0+000 - 0+104, 0+000 - 0+040, 0+000 - 0+090), Don Ruben, San Jose, Dinagat Islands","amountPesos":40000000.0,"lengthMeters":337.0,"ratePesosPerMeter":118694.36201780416,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20090"},{"year":2026,"category":"Roads","project":"Construction of Sta. Irene - San Miguel Road, Package 5, (17+840 - 20+340), Surigao del Sur","amountPesos":156800000.0,"lengthMeters":2500.0,"ratePesosPerMeter":62720.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20092"},{"year":2026,"category":"Roads","project":"Construction of Trento - Pangyan Road, Sta. 1+167 - Sta. 4+237, Trento, Agusan del Sur","amountPesos":73500000.0,"lengthMeters":3070.0,"ratePesosPerMeter":23941.368078175896,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20094"},{"year":2026,"category":"Bridges","project":"Construction of Tubay-Cabadbaran Bridge, (0+797.25 - 1+162.75) Tubay, Agusan del Norte","amountPesos":113269000.0,"lengthMeters":365.5,"ratePesosPerMeter":309901.5047879617,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20096"},{"year":2026,"category":"Roads","project":"Las Nieves-Esperanza Road, (Balungagan-Consorcia Section), Sta. 0+000 - Sta. 2+000, Las Nieves, Agusan del Norte","amountPesos":88200000.0,"lengthMeters":2000.0,"ratePesosPerMeter":44100.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20098"},{"year":2026,"category":"Roads","project":"Rehabilitation of Bunawan – Veruela Road, Sta. 4+615 - Sta. 7+238, Barangay Nueva Era, Bunawan, Agusan del Sur","amountPesos":98000000.0,"lengthMeters":2623.0,"ratePesosPerMeter":37361.79946626001,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20100"},{"year":2026,"category":"Bridges","project":"Construction of Bridge at Ohana, Sta. 0+000 to Sta. 0+10, Almanza Uno, Las Piñas City","amountPesos":22513000.0,"lengthMeters":10.0,"ratePesosPerMeter":2251300.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20105"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage at TS Cruz, Station 0+000 to Station 0+450, Almanza 2, Las Piñas City","amountPesos":19000000.0,"lengthMeters":450.0,"ratePesosPerMeter":42222.22222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20107"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Espeleta Pantalan, Sta. 0+000 to Sta. 0+290, Barangay Poblacion, Muntinlupa City","amountPesos":10000000.0,"lengthMeters":290.0,"ratePesosPerMeter":34482.75862068965,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20109"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Cadena De Amor St. (0+000-0+072), Morning Glory (0+000-0+038), Golden Shower (0+000-0+031) and Mirasol St. (0+000- 0+050), Barangay Pamplona 3, Las Piñas City","amountPesos":20000000.0,"lengthMeters":72.0,"ratePesosPerMeter":277777.77777777775,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20111"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Alvarez Compound (0+000-0+128) and Gabriel Compound (0+000 -0+147) , Barangay Pulanglupa 1, Las Piñas City","amountPesos":20000000.0,"lengthMeters":147.0,"ratePesosPerMeter":136054.42176870749,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20113"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at St. Benedict (0+000 - 0+107) and J. Hernandez St. (0+000 -0+185) Barangay Pulanglupa 2, Las Piñas City","amountPesos":10000000.0,"lengthMeters":185.0,"ratePesosPerMeter":54054.05405405405,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20115"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Sampaguita Road (0+000 -0+240), Barangay Talon 4, Las Piñas City","amountPesos":10000000.0,"lengthMeters":240.0,"ratePesosPerMeter":41666.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20117"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at San Eugenio St. (0+000 -0+040) , San Antonio St. (0+000 - 0+080), Delnor St. (0+000-0+075) and Velasquez St. (0+000-0+080), Barangay Talon 5, Las Piñas City","amountPesos":10000000.0,"lengthMeters":80.0,"ratePesosPerMeter":125000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20119"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at CRM Ave (0+000-0+225), Barangay Almanza 1, Las Piñas City","amountPesos":10000000.0,"lengthMeters":225.0,"ratePesosPerMeter":44444.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20121"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Jasmine Street (0+000-0+233), Barangay Almanza 2, Las Piñas City","amountPesos":10000000.0,"lengthMeters":233.0,"ratePesosPerMeter":42918.454935622314,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20123"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at San Jose St. (0+000-0+080), Barangay E. Aldana, Las Piñas City","amountPesos":10000000.0,"lengthMeters":80.0,"ratePesosPerMeter":125000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20127"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at King St. (0+000-0+324) and Genesis St. (0+000-0+345) ,Barangay Manuyo 2, Las Piñas City","amountPesos":20000000.0,"lengthMeters":345.0,"ratePesosPerMeter":57971.014492753624,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20129"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Balagtas St.(0+000-0+118), J. Rizal St. (0+000 -0+291) and Bonifacio St. (0+000-0+299), Barangay Pamplona 1, Las Piñas City","amountPesos":20000000.0,"lengthMeters":299.0,"ratePesosPerMeter":66889.63210702341,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20131"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Philamlife Ave. (0+000 -0+210) , Barangay Pamplona 2, Las Piñas City","amountPesos":10000000.0,"lengthMeters":210.0,"ratePesosPerMeter":47619.04761904762,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20133"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Las Vegas Street (Sta.0+000-Sta.0+680), Barangay Putatan, Muntinlupa City","amountPesos":20000000.0,"lengthMeters":680.0,"ratePesosPerMeter":29411.764705882353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20137"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Golden Acres (0+000-0+265), Barangay Talon 1, Las Piñas City","amountPesos":10000000.0,"lengthMeters":265.0,"ratePesosPerMeter":37735.84905660377,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20139"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Ilang-ilang St. (0+000-0+030), Barangay Talon 3, Las Piñas City","amountPesos":10000000.0,"lengthMeters":30.0,"ratePesosPerMeter":333333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20141"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Dreamland Compound (0+000- 0+063), Vergara Compound (0+000 -0+095), Donato Compound (0+000-0+022) and Sarao Compound (0+000-0+170), Barangay Zapote, Las Piñas City","amountPesos":14000000.0,"lengthMeters":170.0,"ratePesosPerMeter":82352.94117647059,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20143"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Greenheights, Fleurdeliz Street from Sta. 0+000 to Sta. 0+383, Soliven Alvenida Avenue from Sta. 0+000 to Sta. 0+400, Barangay Putatan, Muntinlupa City","amountPesos":13508000.0,"lengthMeters":400.0,"ratePesosPerMeter":33770.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20145"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Soldiers Hills, Sta. 0+000 to Sta. 0+450, Barangay Putatan, Muntinlupa City","amountPesos":18011000.0,"lengthMeters":450.0,"ratePesosPerMeter":40024.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20147"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage at Pulong Eng-eng, Sta. 0+000 to Sta. 0+360, Barangay Poblacion, Muntinlupa City","amountPesos":17000000.0,"lengthMeters":360.0,"ratePesosPerMeter":47222.22222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20149"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage System at Bruger St. corner PNR Road, Sta. 0+000 to Sta. 0+320, Barangay Putatan, Muntinlupa City","amountPesos":10000000.0,"lengthMeters":320.0,"ratePesosPerMeter":31250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20151"},{"year":2026,"category":"Bridges","project":"Replacement of Amparo Bridge (Sta. 0+000 - Sta.0+012) , Barangay Poblacion, Muntinlupa City","amountPesos":21496000.0,"lengthMeters":12.0,"ratePesosPerMeter":1791333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20153"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road along North Bay Blvd. (K0008 + (-288) - K0008 + 254), Navotas City","amountPesos":16250000.0,"lengthMeters":542.0,"ratePesosPerMeter":29981.549815498154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20156"},{"year":2026,"category":"Bridges","project":"Construction of Bridge (Chainage 0+000 - Chainage 0+060) Along Sta. Ana River, Pateros, Metro Manila","amountPesos":17197000.0,"lengthMeters":60.0,"ratePesosPerMeter":286616.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20163"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage from Purok 1 to Purok 3 (Chainage 0+000 - Chainage 0+350), Barangay Central Bicutan, Taguig City","amountPesos":20000000.0,"lengthMeters":350.0,"ratePesosPerMeter":57142.857142857145,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20167"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage System, Barangay San Perfecto (Chainage 000 to Chainage 380), San Juan City","amountPesos":25000000.0,"lengthMeters":380.0,"ratePesosPerMeter":65789.47368421052,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20169"},{"year":2026,"category":"Roads","project":"Construction of Road at Molave St., Mabolo St., and 7th St. (Chainage 0+000 - Chainage 0+154) at Barangay North Signal, Taguig City","amountPesos":20000000.0,"lengthMeters":154.0,"ratePesosPerMeter":129870.12987012987,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20171"},{"year":2026,"category":"Roads","project":"Construction of Road at Mauling Creek Street (Chainage 0+000 - Chainage 0+720), Barangay Lower Bicutan, Taguig City","amountPesos":12419000.0,"lengthMeters":720.0,"ratePesosPerMeter":17248.61111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20173"},{"year":2026,"category":"Roads","project":"Construction of Road at Pigtain St. (Chainage 0+000 - Chainage 0+274), Barangay Ibayo - Tipas, Taguig City","amountPesos":12419000.0,"lengthMeters":274.0,"ratePesosPerMeter":45324.81751824817,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20175"},{"year":2026,"category":"Roads","project":"Construction of Road Going to Alviar Compound (Chainage 0+000 - Chainage 0+247) ,Barangay Sta. Ana, Pateros, Metro Manila","amountPesos":14408000.0,"lengthMeters":247.0,"ratePesosPerMeter":58331.98380566802,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20177"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Drainage System, Balubad Settlement, Phase 2, (22nd ave Chainage 000 - Chainage 140, 24th ave Chainage 000 - Chainage 120, 38th ave Chainage 000 - Chainage 080, 40th ave Chainage 000 - Chainage 060) Barangay Nangka, Marikina City","amountPesos":9935000.0,"lengthMeters":140.0,"ratePesosPerMeter":70964.28571428571,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20179"},{"year":2026,"category":"Roads","project":"Improvement of Roads and Drainage at Southern Police District (SPD) Compound (Chainage 0+000 - Chainage 0+724), Taguig City","amountPesos":40000000.0,"lengthMeters":724.0,"ratePesosPerMeter":55248.61878453039,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20181"},{"year":2026,"category":"Bridges","project":"Reconstruction of Bridge at Tipas River (Sta. 0+000 - Sta. 0+025), Barangay Palingon, Taguig City","amountPesos":25000000.0,"lengthMeters":25.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20183"},{"year":2026,"category":"Roads","project":"Rehabilitation of K-9 Road and Drainage (Chainage 0+000 - Chainage 0+850) , Barangay Lower Bicutan, Taguig City","amountPesos":20000000.0,"lengthMeters":850.0,"ratePesosPerMeter":23529.41176470588,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20185"},{"year":2026,"category":"Roads","project":"Rehabilitation of M.L. Quezon Ave. (PPTA Road) (Chainage 0+000 - \nChainage 2+200), Taguig City","amountPesos":45026000.0,"lengthMeters":2200.0,"ratePesosPerMeter":20466.363636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20187"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Alleys along Paso St. (Chainage 0+000 - Chainage 0+505), Barangay Bagumbayan, Taguig City","amountPesos":27016000.0,"lengthMeters":505.0,"ratePesosPerMeter":53497.0297029703,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20189"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Drainage at Laura Drive Extension (Chainage 0+000 - Chainage 0+218), Barangay Bagumbayan, Taguig City","amountPesos":10000000.0,"lengthMeters":218.0,"ratePesosPerMeter":45871.55963302752,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20195"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Alta Tierra (Chainage 0+000 - Chainage 0+239), Barangay Calzada, Taguig City","amountPesos":6623000.0,"lengthMeters":239.0,"ratePesosPerMeter":27711.297071129706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20197"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at M.L. Quezon Ave (Chainage 0+000 - Chainage 2+100) at Barangay Bagumbayan, Taguig City","amountPesos":41397000.0,"lengthMeters":2100.0,"ratePesosPerMeter":19712.85714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20199"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Alley 1, Alley 2, Alley 3, Alley 4, Tahimik St., Katipunan St., Mastrili St., Bambang St. (Chainage 0+000 - Chainage 0+798), Barangay Bambang, Taguig City","amountPesos":20698000.0,"lengthMeters":798.0,"ratePesosPerMeter":25937.34335839599,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20201"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Batis (Chainage 000 to Chainage 400), San Juan City","amountPesos":16250000.0,"lengthMeters":400.0,"ratePesosPerMeter":40625.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20203"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Delvo Street (Chainage 0+000 - Chainage 0+320), Barangay Central Bicutan, Taguig CIty","amountPesos":12419000.0,"lengthMeters":320.0,"ratePesosPerMeter":38809.375,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20205"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Molave St., Medel Ext., Visayas St., Maria Rodriguez Tinga Ave. and Government I. Rodriguez (Chainage 0+000 - Chainage 0+450), Barangay Central Signal, Taguig City","amountPesos":16559000.0,"lengthMeters":450.0,"ratePesosPerMeter":36797.77777777778,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20207"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at 7123 Langka St. (Chainage 0+000 - Chainage 0+090),7117B Langka St. (Chainage 0+000 - Chainage 0+050), 7115 Langka St. (Chainage 0+000 - Chainage 0+060), Yakal St. (Chainage 0+000 - Chainage 0+040), Talisay Extn. (Chainage 0+000 - Chainage 0+100), Chico St. (Chainage 0+000 - Chainage 0+200) Barangay Comembo, Taguig City","amountPesos":16559000.0,"lengthMeters":200.0,"ratePesosPerMeter":82795.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20209"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Narra St. (Chainage 0+000 - Chainage 0+204) at Barangay Hagonoy, Taguig City","amountPesos":8279000.0,"lengthMeters":204.0,"ratePesosPerMeter":40583.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20211"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at 2nd St. (Chainage 0+000 - Chainage 0+272), 5th St. (Chainage 0+000 - Chainage 0+216) at Barangay Katuparan, Taguig City","amountPesos":20698000.0,"lengthMeters":272.0,"ratePesosPerMeter":76095.58823529411,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20213"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Acacia St., Aguho St., and 9th St. (Chainage 0+000 - Chainage 0+174) at Barangay North Signal, Taguig City","amountPesos":20698000.0,"lengthMeters":174.0,"ratePesosPerMeter":118954.02298850575,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20215"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Sanga St. (Chainage 0+000 - 0+235), Magsalin (Chainage 0+000 - 0+164) at Barangay Palingon, Taguig City","amountPesos":12419000.0,"lengthMeters":235.0,"ratePesosPerMeter":52846.8085106383,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20217"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Gumamela St. (Chainage 0+000 - Chainage 0+155),Dahlia St. (Chainage 0+000 - Chainage 0+125), Jasmin St. (Chainage 0+000 - Chainage 0+115),,Sampaguita St. (Chainage 0+000 - Chainage 0+035), Barangay Pembo, Taguig City","amountPesos":16559000.0,"lengthMeters":155.0,"ratePesosPerMeter":106832.25806451614,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20219"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Penguin St. (Chainage 0+000 - Chainage 0+090),Saracen St. (Chainage 0+000 - Chainage 0+135), P. Herrera St. (Chainage 0+000 - Chainage 0+215),,Quirino St. (Chainage 0+000 - Chainage 0+145), Adahlia St. (Chainage 0+000 - Chainage 0+100), Barangay Rizal, Taguig City","amountPesos":16559000.0,"lengthMeters":215.0,"ratePesosPerMeter":77018.6046511628,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20221"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Drainage along Visitacion Road, Chainage 220 - Chainage 645, Barangay San Joaquin, Pasig City","amountPesos":24838000.0,"lengthMeters":425.0,"ratePesosPerMeter":58442.35294117647,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20223"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Bautista St. (Chainage 0+000 - Chainage 0+218), Barangay San Miguel, Taguig City","amountPesos":8279000.0,"lengthMeters":218.0,"ratePesosPerMeter":37977.064220183485,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20225"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Purok 13 and Purok 14 (Chainage 0+000 - Chainage 0+550), Barangay South Daang Hari, Taguig City","amountPesos":16559000.0,"lengthMeters":550.0,"ratePesosPerMeter":30107.272727272728,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20227"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Tanyag St., Espino St., Ranger St., Sto. Niño St., Aguinaldo St., Garcia St., Espedilla St., Resma St. (Chainage 0+000 - Chainage 2+830)at Barangay South Signal, Taguig City","amountPesos":24838000.0,"lengthMeters":2830.0,"ratePesosPerMeter":8776.678445229682,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20229"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Masagana St., Almeda Compound (Chainage 0+000 - Chainage 0+204 )Barangay Sta. Ana, Pateros","amountPesos":4140000.0,"lengthMeters":204.0,"ratePesosPerMeter":20294.117647058825,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20231"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Maharlika Road, A. Bonifacio Ave. (Chainage 0+000 - Chainage 0+383) at Barangay Upper Bicutan, Taguig City","amountPesos":24838000.0,"lengthMeters":383.0,"ratePesosPerMeter":64851.17493472585,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20235"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at M.L. Quezon (Chainage 0+000 - Chainage 0+420) at Barangay Wawa, Taguig City","amountPesos":8279000.0,"lengthMeters":420.0,"ratePesosPerMeter":19711.904761904763,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20237"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Gumamela St. (Chainage 0+000 - Chainage 0+160), Carnation St. (Chainage 0+000 - Chainage 0+068), Santan St. (Chainage 0+000 - Chainage 0+342), Barangay Wawa, Taguig City","amountPesos":8279000.0,"lengthMeters":342.0,"ratePesosPerMeter":24207.602339181285,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20239"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Cipriano Compound (Chainage 0+000 - Chainage 0+215), Barangay Wawa, Taguig City","amountPesos":12419000.0,"lengthMeters":215.0,"ratePesosPerMeter":57762.79069767442,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20241"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Green Village (Chainage 0+000 - Chainage 0+355), Barangay Lower Bicutan, Taguig City","amountPesos":8279000.0,"lengthMeters":355.0,"ratePesosPerMeter":23321.12676056338,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20243"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at MPC St. (Chainage 0+000 - Chainage 0+480), Reyes St.c, Dinguinbayan St. (Chainage 0+000 - Chainage 0+155), Cotas St. (Chainage 0+000 - Chainage 0+140), and Umali St. (Chainage 0+000 - Chainage 0+100), Barangay Calzada, Taguig City","amountPesos":12419000.0,"lengthMeters":480.0,"ratePesosPerMeter":25872.916666666668,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20245"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at San Carlos Neighborhood Association (Chainage 0+000 - Chainage 0+371), Barangay Napindan, Taguig City","amountPesos":8279000.0,"lengthMeters":371.0,"ratePesosPerMeter":22315.363881401616,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20247"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road Network and Drainage System at Manila Boystown Complex (Chainage 0+000 – Chainage 2+200), Barangay Parang, Marikina City","amountPesos":41849000.0,"lengthMeters":2200.0,"ratePesosPerMeter":19022.272727272728,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20249"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road Network at Dinguinbayan St. (Chainage 0+000 - Chainage 0+419) at Barangay Ibayo-Tipas, Taguig City","amountPesos":20698000.0,"lengthMeters":419.0,"ratePesosPerMeter":49398.56801909308,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20251"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Capco St. (Chaninage 0+000 - Chainage 0+160), Villa Angelina (Chainage 0+000 - Chainage 0+160) , Barangay Ligid, Taguig City","amountPesos":16559000.0,"lengthMeters":160.0,"ratePesosPerMeter":103493.75,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20253"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at A. Mariano St. (Chainage 0+000 - Chainage 0+110), Capt. H. Santos St. Int. (Chainage 0+000 - Chainage 0+150), Capt. Francisco St. (Chainage 0+000 - Chainage 0+080), A. Mariano Looban (Chainage 0+000 - Chainage 0+065) Barangay Sto. Rosario, Kanluran, Pateros, Metro Manila","amountPesos":4140000.0,"lengthMeters":150.0,"ratePesosPerMeter":27600.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20255"},{"year":2026,"category":"Roads","project":"Rehabilitation of Roads at Kamagong St. (Chainage 0+000 - Chainage 0+87.70), Narra St. (Chainage 0+000 - Chainage 0+273), Tanguile St. (Chainage 0+000 - Chainage 0+263.40), Acacia St. (Chainage 0+000 - Chainage 0+193) at BPTHAI Compound, Barangay Calzada, Taguig City","amountPesos":20698000.0,"lengthMeters":273.0,"ratePesosPerMeter":75816.84981684982,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20257"},{"year":2026,"category":"Roads","project":"Rehabilitation of Romantic Road Interior (Chainage 0+000 - Chainage 0+328) at Barangay Sta. Ana, Taguig City","amountPesos":4140000.0,"lengthMeters":328.0,"ratePesosPerMeter":12621.951219512195,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20259"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road along Evangelista Street and its Vicinity (Chainage 0 - Chainage 1050), Barangay Bangkal, Makati City","amountPesos":16250000.0,"lengthMeters":1050.0,"ratePesosPerMeter":15476.190476190477,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20262"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage, Corregidor Street (Chainage 0 - Chainage 324), Barangay Guadalupe Nuevo, Makati City","amountPesos":20000000.0,"lengthMeters":324.0,"ratePesosPerMeter":61728.39506172839,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20274"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage, Nuestra Sra. De Guadalupe Street and its Vicinity (Chainage 0 - Chainage 384), Barangay Guadalupe Nuevo, Makati City","amountPesos":20000000.0,"lengthMeters":384.0,"ratePesosPerMeter":52083.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20276"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage, P. Victor Street (Chainage 0 - Chainage 885), Barangay Guadalupe Nuevo, Makati City","amountPesos":50000000.0,"lengthMeters":885.0,"ratePesosPerMeter":56497.17514124294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20278"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, El Dorado Street Phase 2 (Chainage 0 - Chainage 287), Barangay Don Bosco, Parañaque City","amountPesos":24838000.0,"lengthMeters":287.0,"ratePesosPerMeter":86543.55400696864,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20280"},{"year":2026,"category":"Roads","project":"Construction of Roads and Drainage along Barangay 178 (K0025+243 - K0031+724.50), Camarin, Caloocan City","amountPesos":10000000.0,"lengthMeters":6481.5,"ratePesosPerMeter":1542.8527347064723,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20363"},{"year":2026,"category":"Roads","project":"Rehabilitation of Congressional Road, KM 21+800 - KM 22+ 580, Caloocan City","amountPesos":35751000.0,"lengthMeters":780.0,"ratePesosPerMeter":45834.61538461538,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20385"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Drainage System (Chainage 000 - Chainage 432) along Barangay Bahay Toro, Quezon City","amountPesos":30000000.0,"lengthMeters":432.0,"ratePesosPerMeter":69444.44444444444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20479"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage System along Barangay San Bartolome (Chainage 0 + 000 to Chainage 0 + 430), Quezon City","amountPesos":48250000.0,"lengthMeters":430.0,"ratePesosPerMeter":112209.30232558139,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20481"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage (Chainage 0 + 000 to Chainage 0 + 180) along Barangay Sta. Lucia, Quezon City","amountPesos":19570000.0,"lengthMeters":180.0,"ratePesosPerMeter":108722.22222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20483"},{"year":2026,"category":"Roads","project":"Constructon of Road and Drainage (Chainage 0 + 000 to Chainage 0 + 230) along Barangay Kaligayahan, Quezon City","amountPesos":25500000.0,"lengthMeters":230.0,"ratePesosPerMeter":110869.56521739131,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20485"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Drainage (Chainage 0 + 000 to Chainage 0 + 360) at San Gabriel St., Brgy. Batasan Hills, Quezon City","amountPesos":25000000.0,"lengthMeters":360.0,"ratePesosPerMeter":69444.44444444444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20487"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Drainage  (Chainage 0 + 000 to Chainage 0 + 187) along Republic Avenue, Brgy. Holy Spirit, Quezon City","amountPesos":15000000.0,"lengthMeters":187.0,"ratePesosPerMeter":80213.9037433155,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20489"},{"year":2026,"category":"Roads","project":"Rehabilitation of Roads and Drainage  (Chainage 0 + 000 to Chainage 1 + 094)  at Cluster 6, Brgy. Batasan Hills, Quezon City,","amountPesos":70000000.0,"lengthMeters":1094.0,"ratePesosPerMeter":63985.374771480805,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20491"},{"year":2026,"category":"Roads","project":"Rehabilitation of Roads and Drainage  (Chainage 0 + 000 to Chainage 0 + 756) at Payatas B, Brgy. Payatas, Quezon City","amountPesos":50000000.0,"lengthMeters":756.0,"ratePesosPerMeter":66137.56613756614,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20493"},{"year":2026,"category":"Roads","project":"Rehabilitaiton of Roads and Drainage (Chainage 0 + 000 to Chainage 1 + 258) at Southville, Brgy. Holy Spirit, Quezon City","amountPesos":80000000.0,"lengthMeters":1258.0,"ratePesosPerMeter":63593.00476947536,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20495"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage System along Sabrang Street (Chainage 000 - Chainage 120), District I, Quezon City","amountPesos":25000000.0,"lengthMeters":120.0,"ratePesosPerMeter":208333.33333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20497"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage System (Chainage 0 + 000 to Chainage 0 + 250) along Barangay Lagro, Quezon City","amountPesos":28000000.0,"lengthMeters":250.0,"ratePesosPerMeter":112000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20499"},{"year":2026,"category":"Roads","project":"Improvement of Road and Drainage at Omega Avenue and Lilac Avenue (Chainage 0 + 000 to Chainage 0 + 450), Barangay Fairview, Quezon City","amountPesos":50000000.0,"lengthMeters":450.0,"ratePesosPerMeter":111111.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20501"},{"year":2026,"category":"Roads","project":"Improvement of Road including Drainage along Barangay Gulod (Chainage 0 + 000 to Chainage 0 + 438), Quezon City","amountPesos":49293000.0,"lengthMeters":438.0,"ratePesosPerMeter":112541.09589041096,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20503"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Drainage System (Chainage 000 - Chainage 430) along Barangay Ramon Magsaysay, Quezon City","amountPesos":29585000.0,"lengthMeters":430.0,"ratePesosPerMeter":68802.32558139534,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20505"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Drainage System (Chainage 000 - Chainage 432) along Barangay Talayan, Quezon City","amountPesos":30000000.0,"lengthMeters":432.0,"ratePesosPerMeter":69444.44444444444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20507"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Drainage along Mangga St and Narra St. (Chainage 0 + 000 to Chainage 0 + 300), Brgy. Capri, Quezon City","amountPesos":29600000.0,"lengthMeters":300.0,"ratePesosPerMeter":98666.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20509"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road (Chainage 000 - Chainage 090)at Barangay San Jose, Quezon City","amountPesos":6304000.0,"lengthMeters":90.0,"ratePesosPerMeter":70044.44444444444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20511"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Accibal & Harmony (Chainage 0+000.00 to Chainage 0+346.00), Barangay Batasan Hills, Quezon City","amountPesos":20313000.0,"lengthMeters":346.0,"ratePesosPerMeter":58708.09248554913,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20513"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Payatas B (Chainage 0 + 000.00 to Chainage 0 + 351.00), Barangay Payatas, Quezon City","amountPesos":20313000.0,"lengthMeters":351.0,"ratePesosPerMeter":57871.794871794875,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20515"},{"year":2026,"category":"Roads","project":"Rehabilitation of Roads at Doña Juana (Chainage 0 + 000.00 to Chainage 0 + 516.00), Barangay Holy Spirit, Quezon City","amountPesos":28438000.0,"lengthMeters":516.0,"ratePesosPerMeter":55112.40310077519,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20517"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Mayor Ignacio Santos Diaz Street (Sta. 0 + 000 - Sta. 0 + 878.70), Quezon City","amountPesos":16250000.0,"lengthMeters":878.7,"ratePesosPerMeter":18493.228633208146,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20520"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Makadios St. (Sta. 0 + 000 - Sta. 0 + 366.50), Barangay Botocan, Quezon City","amountPesos":22815000.0,"lengthMeters":366.5,"ratePesosPerMeter":62251.02319236016,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20522"},{"year":2026,"category":"Bridges","project":"Construction of Bridge over Pasig River, (Phase 5) Sta. Ana Market to Barangay 900, Sta. Ana, Manila Chainage 000 - Chainage 116","amountPesos":27016000.0,"lengthMeters":116.0,"ratePesosPerMeter":232896.55172413794,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20527"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage (Box Culvert), (Phase II), Syquia St. Chainage 280 - Chainage 451, Zone 96 and Zone 97, Manila","amountPesos":27523000.0,"lengthMeters":171.0,"ratePesosPerMeter":160953.21637426902,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20529"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage System, Taft Ave. Southbound (from F. Sanchez St. to EDSA) S02948LZ K0007 + 006 - K0007 + 311, Pasay City","amountPesos":40000000.0,"lengthMeters":305.0,"ratePesosPerMeter":131147.54098360657,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20531"},{"year":2026,"category":"Roads","project":"Construction of Road, M. Carreon St. Chainage 000 - Chainage 730, Manila","amountPesos":32501000.0,"lengthMeters":730.0,"ratePesosPerMeter":44521.91780821918,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20533"},{"year":2026,"category":"Roads","project":"Construction of Road, M. Roxas St., (from Suter St. to Delpan St.) Chainage 094 - Chainage 564, Manila","amountPesos":20313000.0,"lengthMeters":470.0,"ratePesosPerMeter":43219.14893617021,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20535"},{"year":2026,"category":"Roads","project":"Improvement of Road along 8th St. Brgy 183 (Near Pasay City South HS) Chainage 1110 - Chainage 1130, Pasay City","amountPesos":4063000.0,"lengthMeters":20.0,"ratePesosPerMeter":203150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20537"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Drainage System along R. Delpan St, Chainage 381 - Chainage 585, Manila City","amountPesos":35000000.0,"lengthMeters":204.0,"ratePesosPerMeter":171568.6274509804,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20539"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Block 7, 8 and 9, Baseco Compound Chainage 000 - Chainage 2140, Manila","amountPesos":41397000.0,"lengthMeters":2140.0,"ratePesosPerMeter":19344.392523364488,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20541"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Bagani Campo, Candon City, Ilocos Sur Sta. 0 + 000 - Sta. 0 + 125","amountPesos":10000000.0,"lengthMeters":125.0,"ratePesosPerMeter":80000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20547"},{"year":2026,"category":"Roads","project":"Construction of Oaig Daya-Calaoaan-Paras Road,, Candon City, Ilocos Sur  Sta. 0 + 000 - Sta. 0 + 500","amountPesos":20000000.0,"lengthMeters":500.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20549"},{"year":2026,"category":"Roads","project":"Construction/Improvement of Road, Brgy. Tamurong, Candon City, Ilocos Sur 0 + 000 - Sta 0 + 600","amountPesos":20000000.0,"lengthMeters":600.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20551"},{"year":2026,"category":"Roads","project":"Construction of Paypayad-Calongbuyan Road, Candon City, Ilocos Sur  0 + 000 - Sta 0 + 500","amountPesos":20000000.0,"lengthMeters":500.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20553"},{"year":2026,"category":"Roads","project":"Construction of Batbato Road, Alilem, Ilocos Sur, Sta. 0 + 000 - Sta. 0 + 750","amountPesos":24168000.0,"lengthMeters":750.0,"ratePesosPerMeter":32224.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20558"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Dili - Villa - Garcia, Sta. Cruz, Ilocos Sur, Sta. 0 + 000 - Sta. 2 + 000","amountPesos":49000000.0,"lengthMeters":2000.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20560"},{"year":2026,"category":"Roads","project":"Construction of Narvacan-Nagbukel-Abra Road, Ilocos Sur, Sta. 0 + 000 - Sta. 2 + 998","amountPesos":48337000.0,"lengthMeters":2998.0,"ratePesosPerMeter":16123.082054703136,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20562"},{"year":2026,"category":"Roads","project":"Construction of Palacapac-Amguid Road, Candon City, Ilocos Sur, Sta. 3+250 - Sta. 4+020","amountPesos":29002000.0,"lengthMeters":770.0,"ratePesosPerMeter":37664.93506493507,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20564"},{"year":2026,"category":"Roads","project":"Construction of Road, Aw-asen Falls Tourism, Sigay, Ilocos Sur, Sta. 0 + 000 - Sta. 1 + 076","amountPesos":29002000.0,"lengthMeters":1076.0,"ratePesosPerMeter":26953.53159851301,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20566"},{"year":2026,"category":"Roads","project":"Construction of Road, Nagtenga - San Antonio, Sta. Cruz, Ilocos Sur, Sta. 0 + 000 - Sta. 1 + 473","amountPesos":48337000.0,"lengthMeters":1473.0,"ratePesosPerMeter":32815.342837746095,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20568"},{"year":2026,"category":"Roads","project":"Construction of Road, Paypayad, Candon City, Ilocos Sur, Sta. 0+000 - Sta. 0+250, Sta. 0+000 - Sta. 0+100","amountPesos":9667000.0,"lengthMeters":250.0,"ratePesosPerMeter":38668.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20570"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Payocpoc Norte Este, Bauang, La Union Sta 1+300-Sta.1+750","amountPesos":9800000.0,"lengthMeters":450.0,"ratePesosPerMeter":21777.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20573"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Payocpoc Norte Oeste, Bauang, La Union, Sta.1+980-Sta.2+980","amountPesos":19335000.0,"lengthMeters":1000.0,"ratePesosPerMeter":19335.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20575"},{"year":2026,"category":"Bridges","project":"Construction of Barangay Magsaysay Bridge, Tubao, La Union, Sta 0+894-Sta.0+912","amountPesos":22295000.0,"lengthMeters":18.0,"ratePesosPerMeter":1238611.111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20577"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Payocpoc Sur, Bauang, La Union , Sta.0+860-Sta1+060, Sta.0+170-Sta.0+270, Sta.0+454-Sta0+695","amountPesos":19335000.0,"lengthMeters":541.0,"ratePesosPerMeter":35739.37153419593,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20579"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pudoc, Bauang, La Union,Sta1+310-Sta1+520, Sta.1+750-Sta2+056, Sta.2+080-Sta2+120","amountPesos":9667000.0,"lengthMeters":556.0,"ratePesosPerMeter":17386.690647482013,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20581"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Santiago, Bauang, La Union, Sta.0+157-Sta 0+757","amountPesos":9667000.0,"lengthMeters":600.0,"ratePesosPerMeter":16111.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20583"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sta. Monica, Bauang, La Union, Sta.5+720-Sta.6+520","amountPesos":14501000.0,"lengthMeters":800.0,"ratePesosPerMeter":18126.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20585"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Baratao, Barangay Acao, Bauang, La Union, Sta.1+190-Sta2+230","amountPesos":19335000.0,"lengthMeters":1040.0,"ratePesosPerMeter":18591.346153846152,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20587"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Dupacpac Barangay Acao, Bauang, La Union,Sta.0+000-Sta.0+170, Sta.0+427-Sta.0+532, Sta.0+620-Sta0+653, Sta0+932-Sta.1+224","amountPesos":19335000.0,"lengthMeters":600.0,"ratePesosPerMeter":32225.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20589"},{"year":2026,"category":"Roads","project":"Construction of Ballag-Dulacac Road(5+883 - 6+563), Barangay Ballag, Bani, Pangasinan","amountPesos":14501000.0,"lengthMeters":680.0,"ratePesosPerMeter":21325.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20592"},{"year":2026,"category":"Roads","project":"Constuction of Road, Barangay Awag(11+222 - 11+512), Anda, Pangasinan","amountPesos":4900000.0,"lengthMeters":290.0,"ratePesosPerMeter":16896.55172413793,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20594"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Naranjeta, Sitio Bacsil, Barangay Cayungnan(0+000 - 0+350), Agno, Pangasinan","amountPesos":4900000.0,"lengthMeters":350.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20596"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Banog Sur(3+335 - 4+031), Bani, Pangasinan","amountPesos":14501000.0,"lengthMeters":696.0,"ratePesosPerMeter":20834.77011494253,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20598"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cabanaetan (Purok 4)(5+604 - 6+554), Mabini, Pangasinan","amountPesos":14501000.0,"lengthMeters":950.0,"ratePesosPerMeter":15264.21052631579,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20600"},{"year":2026,"category":"Roads","project":"Constuction of Road, Barangay Macaboboni(16+438 - 16+761), Agno, Pangasinan","amountPesos":4900000.0,"lengthMeters":323.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20602"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Baybay Norte(11+554 - 11+904), Sual, Pangasinan","amountPesos":4900000.0,"lengthMeters":350.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20604"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bisocol(0+722 - 1+072), Alaminos City, Pangasinan","amountPesos":4900000.0,"lengthMeters":350.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20606"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Palamis(0+350 - 0+950), Alaminos City, Pangasinan","amountPesos":9667000.0,"lengthMeters":600.0,"ratePesosPerMeter":16111.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20608"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sabangan(5+650 - 6+214), Alaminos City, Pangasinan","amountPesos":9667000.0,"lengthMeters":564.0,"ratePesosPerMeter":17140.070921985814,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20610"},{"year":2026,"category":"Roads","project":"Constuction of Road, Barangay Siapar(0+433 - 0+763), Anda, Pangasinan","amountPesos":4900000.0,"lengthMeters":330.0,"ratePesosPerMeter":14848.484848484848,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20612"},{"year":2026,"category":"Roads","project":"Construction of Sitio Maasin Road(5+594 - 6+244), Barangay Cabanaetan, Mabini, Pangasinan","amountPesos":9667000.0,"lengthMeters":650.0,"ratePesosPerMeter":14872.307692307691,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20614"},{"year":2026,"category":"Roads","project":"Rehabilitation of Amandiego-Dulacac Road(5+365 - 6+761), Alaminos City, Pangasinan","amountPesos":14501000.0,"lengthMeters":1396.0,"ratePesosPerMeter":10387.53581661891,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20616"},{"year":2026,"category":"Roads","project":"Rehabilitation of Bolaney-Balayang-Dulacac Road(5+657 - 7+124), Alaminos City, Pangasinan","amountPesos":14501000.0,"lengthMeters":1467.0,"ratePesosPerMeter":9884.798909338786,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20618"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Linmansangan(6+118 - 6+412), Alaminos City, Pangasinan","amountPesos":4900000.0,"lengthMeters":294.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20620"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Maawi(1+959 - 2+234), Alaminos City, Pangasinan","amountPesos":4900000.0,"lengthMeters":275.0,"ratePesosPerMeter":17818.18181818182,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20622"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Magsaysay(0+000 - 0+600), Alaminos City, Pangasinan","amountPesos":9667000.0,"lengthMeters":600.0,"ratePesosPerMeter":16111.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20624"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tupa(8+508 - 8+798), Bolinao, Pangasinan","amountPesos":4900000.0,"lengthMeters":290.0,"ratePesosPerMeter":16896.55172413793,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20626"},{"year":2026,"category":"Bridges","project":"Construction (Completion) of Bridge, Chainage 0 - Chainage 65, Phase 3, Barangay Pacalat, Mangatarem, Pangasinan, Specific Location: 120.2728, 15.7362","amountPesos":9800000.0,"lengthMeters":65.0,"ratePesosPerMeter":150769.23076923078,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20629"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+435, Basista, Pangasinan","amountPesos":9667000.0,"lengthMeters":435.0,"ratePesosPerMeter":22222.988505747126,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20631"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 1+211 - Sta. 1+436, Lingayen, Pangasinan","amountPesos":17607000.0,"lengthMeters":225.0,"ratePesosPerMeter":78253.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20633"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sta.0+000 - Sta. 0+020, Barangay Moreno, Binalonan, Pangasinan","amountPesos":39032000.0,"lengthMeters":20.0,"ratePesosPerMeter":1951600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20636"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Balangobong, STA.194+938 - STA. 195+628, Binalonan, Pangasinan","amountPesos":9667000.0,"lengthMeters":690.0,"ratePesosPerMeter":14010.144927536232,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20638"},{"year":2026,"category":"Roads","project":"Construction of Roads, Barangay Dumayat, Binalonan, Pangasinan Sta. 0+000 - Sta. 1+910","amountPesos":19600000.0,"lengthMeters":1910.0,"ratePesosPerMeter":10261.780104712041,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20640"},{"year":2026,"category":"Roads","project":"Construction of Roads, Barangay Linmansangan, Binalonan, Pangasinan Sta. 0+000 - Sta. 1+910","amountPesos":19600000.0,"lengthMeters":1910.0,"ratePesosPerMeter":10261.780104712041,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20642"},{"year":2026,"category":"Roads","project":"Construction of Roads, Barangay Poponto, Bautista, Pangasinan Sta. 0+000 - Sta. 0+793","amountPesos":9800000.0,"lengthMeters":793.0,"ratePesosPerMeter":12358.13366960908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20644"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Primicias, Bautista, Pangasinan Sta. 0+000 - Sta. 0+793","amountPesos":9800000.0,"lengthMeters":793.0,"ratePesosPerMeter":12358.13366960908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20646"},{"year":2026,"category":"Roads","project":"Construction of Roads, Barangay Villanueva, Bautista, Pangasinan Sta. 0+000 - Sta. 0+793","amountPesos":9800000.0,"lengthMeters":793.0,"ratePesosPerMeter":12358.13366960908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20648"},{"year":2026,"category":"Roads","project":"Construction of Roads, Barangay Caranglaan, Alcala, Pangasinan  Sta. 0+000 - Sta. 0+793","amountPesos":9800000.0,"lengthMeters":793.0,"ratePesosPerMeter":12358.13366960908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20650"},{"year":2026,"category":"Roads","project":"Construction of Roads, Barangay Curareng, Alcala, Pangasinan  Sta. 0+000 - Sta. 0+793","amountPesos":9800000.0,"lengthMeters":793.0,"ratePesosPerMeter":12358.13366960908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20652"},{"year":2026,"category":"Roads","project":"Construction of Roads, Barangay Laoac, Alcala, Pangasinan  Sta. 0+000 - Sta. 0+793","amountPesos":9800000.0,"lengthMeters":793.0,"ratePesosPerMeter":12358.13366960908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20654"},{"year":2026,"category":"Roads","project":"Construction of Roads, Barangay Canarvacanan, Alcala, Pangasinan Sta. 0+000 - Sta. 0+990","amountPesos":12155000.0,"lengthMeters":990.0,"ratePesosPerMeter":12277.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20656"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Poblacion West, Bautista, Pangasinan Sta. 0+000 - Sta 1+600","amountPesos":24500000.0,"lengthMeters":1600.0,"ratePesosPerMeter":15312.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20658"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Baluyot, Bautista, Pangasinan Sta.0+000 - Sta. 1+600","amountPesos":24500000.0,"lengthMeters":1600.0,"ratePesosPerMeter":15312.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20660"},{"year":2026,"category":"Roads","project":"Construction of Roads, Barangay Capas-Barangay San Felipe Sur, Binalonan, Pangasinan Sta. 0+000 - Sta. 1+910","amountPesos":19600000.0,"lengthMeters":1910.0,"ratePesosPerMeter":10261.780104712041,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20662"},{"year":2026,"category":"Bridges","project":"Construction/Rehabilitation of Bridge, Sta. 0+000 - Sta. 0+007, Barangay Mantacdang, San Quintin, Pangasinan","amountPesos":7840000.0,"lengthMeters":7.0,"ratePesosPerMeter":1120000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20664"},{"year":2026,"category":"Bridges","project":"Construction/Rehabilitation of Bridge, Sta. 0+000 - Sta. 0+013, Barangay San Joaquin, Balungao, Pangasinan","amountPesos":4900000.0,"lengthMeters":13.0,"ratePesosPerMeter":376923.07692307694,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20666"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Bugayong, STA. 194+492 - STA. 195+100, Binalonan, Pangasinan","amountPesos":9667000.0,"lengthMeters":608.0,"ratePesosPerMeter":15899.671052631578,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20668"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Camangaan, STA. 195+924 - STA. 196+532, Binalonan, Pangasinan","amountPesos":9667000.0,"lengthMeters":608.0,"ratePesosPerMeter":15899.671052631578,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20670"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Capas, STA. 194+710 - STA. 195+318, Binalonan, Pangasinan","amountPesos":9667000.0,"lengthMeters":608.0,"ratePesosPerMeter":15899.671052631578,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20672"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Cili, STA. 192+994 - STA. 193+684, Binalonan, Pangasinan","amountPesos":9667000.0,"lengthMeters":690.0,"ratePesosPerMeter":14010.144927536232,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20674"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay San Felipe Sur, STA. 194+300 - STA. 194+908, Binalonan, Pangasinan","amountPesos":9667000.0,"lengthMeters":608.0,"ratePesosPerMeter":15899.671052631578,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20676"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Pasileng Sur, STA. 193+895 - STA. 195+215, Binalonan, Pangasinan,","amountPesos":19335000.0,"lengthMeters":1320.0,"ratePesosPerMeter":14647.727272727272,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20678"},{"year":2026,"category":"Roads","project":"Construction of Road at Sitio Bangol-Canit, Barangay Inmalog, STA. 213+467 - STA. 213+907 Sison, Pangasinan","amountPesos":9667000.0,"lengthMeters":440.0,"ratePesosPerMeter":21970.454545454544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20680"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Baluyot, Bautista, Pangasinan Sta. 0+000 - Sta. 0+793","amountPesos":9800000.0,"lengthMeters":793.0,"ratePesosPerMeter":12358.13366960908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20682"},{"year":2026,"category":"Roads","project":"Construction of Road including drainage, Barangay Poblacion, STA. 191+587 - STA 192+220. Binalonan, Pangasinan,","amountPesos":19563000.0,"lengthMeters":633.0,"ratePesosPerMeter":30905.21327014218,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20684"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Pilawan Leading to Sitio Palina, Barangay Sagunto, STA. 212+741 - STA. 213+181, Sison, Pangasinan","amountPesos":9667000.0,"lengthMeters":440.0,"ratePesosPerMeter":21970.454545454544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20686"},{"year":2026,"category":"Bridges","project":"Construction of Bridge Malimpec to Canan Sur, Sta. 0+000 - Sta. 0+006, Malasiqui, Pangasinan","amountPesos":4879000.0,"lengthMeters":6.0,"ratePesosPerMeter":813166.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20691"},{"year":2026,"category":"Roads","project":"Construction of Local Road, Barangay Baloling, Municipality of Mapandan, Pangasinan, Sta 0+000 - Sta 0+750 (Section 1). Sta 0+000 - Sta 0+750 (Section 2), Sta 0+000 - Sta 0+750 (Section 3)","amountPesos":23520000.0,"lengthMeters":750.0,"ratePesosPerMeter":31360.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20693"},{"year":2026,"category":"Roads","project":"Construction of Local Road, Barangay Sonquil, Municipality of Sta. Barbara, Pangasinan, Sta 0+000 - Sta 0+750 (Section 1). Sta 0+000 - Sta 0+750 (Section 2), Sta 0+000 - Sta 0+750 (Section 3)","amountPesos":14700000.0,"lengthMeters":750.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20695"},{"year":2026,"category":"Roads","project":"Construction of Bunaken-Pias Norte Service Road, Sta. 0+000 - Sta. 0+440, Tayum, Abra","amountPesos":10780000.0,"lengthMeters":440.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20701"},{"year":2026,"category":"Roads","project":"Construction of Cabey-Lugit Service Road, Sta. 0+000 - Sta. 1+520, Tayum, Abra","amountPesos":37240000.0,"lengthMeters":1520.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20703"},{"year":2026,"category":"Roads","project":"Construction of Danac, Boliney-Pasil, Kalinga Road, Sta. 0+000 - Sta. 2+000, Danac, Boliney, Abra","amountPesos":49000000.0,"lengthMeters":2000.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20705"},{"year":2026,"category":"Bridges","project":"Construction of Namarabar Bridge (Phase II), Sta. 0+000 - Sta. 0+060, Peñarrubia, Abra","amountPesos":29400000.0,"lengthMeters":60.0,"ratePesosPerMeter":490000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20707"},{"year":2026,"category":"Bridges","project":"Retrofitting of Nabuangan Bridge leading to Conner District Hospital, Sta.0+389.30 - Sta.0+515.14, Ripang, Conner, Apayao","amountPesos":29400000.0,"lengthMeters":125.84,"ratePesosPerMeter":233630.00635727914,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20710"},{"year":2026,"category":"Roads","project":"Construction of Allacapan - Flora Road, Sta. 2+016 - Sta. 2+331, Flora, Apayao","amountPesos":19600000.0,"lengthMeters":315.0,"ratePesosPerMeter":62222.22222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20713"},{"year":2026,"category":"Roads","project":"Construction of Lydia-San Jose Road, Sta. 0+000 - Sta. 0+600, Pudtol, Apayao","amountPesos":19600000.0,"lengthMeters":600.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20715"},{"year":2026,"category":"Roads","project":"Construction of Poblacion West - Balasi - Lower Atok Road, Sta. 0+980 - Sta. 1+430, Flora, Apayao","amountPesos":19600000.0,"lengthMeters":450.0,"ratePesosPerMeter":43555.555555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20717"},{"year":2026,"category":"Roads","project":"Construction of Poblacion East - Bacut Road, Sta. 0+315 - Sta. 0+815, Flora, Apayao","amountPesos":19600000.0,"lengthMeters":500.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20719"},{"year":2026,"category":"Roads","project":"Construction of Quirino-San Isidro Norte - Luyon -Lappa-Marag Circumferential Road, Sta. 0+230 - Sta. 1+530, Luna, Apayao","amountPesos":39200000.0,"lengthMeters":1300.0,"ratePesosPerMeter":30153.846153846152,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20721"},{"year":2026,"category":"Roads","project":"Construction of Road, Payanan Leading to Apayao Police Provincial Office, Sta. 0+000 - Sta. 0+660, Luna, Apayao","amountPesos":19600000.0,"lengthMeters":660.0,"ratePesosPerMeter":29696.969696969696,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20723"},{"year":2026,"category":"Roads","project":"Construction of Tumog - Pasisin -Payanan Road, Sta. 0+000 - Sta. 0+620, Luna, Apayao","amountPesos":19600000.0,"lengthMeters":620.0,"ratePesosPerMeter":31612.90322580645,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20725"},{"year":2026,"category":"Roads","project":"Construction of West Apayao Abulug Irrigation System (WAAIS) Tumog - San Isidro Road, Sta. 0+958 - Sta. 1+158, Luna, Apayao","amountPesos":18768000.0,"lengthMeters":200.0,"ratePesosPerMeter":93840.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20727"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Asin, Sta. 0+000 - Sta. 0+400, Baguio City","amountPesos":24500000.0,"lengthMeters":400.0,"ratePesosPerMeter":61250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20732"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Upper Quezon Hill to Barangay Irisan, Sta. 0+645 - Sta. 0+795, Baguio City","amountPesos":26460000.0,"lengthMeters":150.0,"ratePesosPerMeter":176400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20734"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Fairview, Sta. 0+185 - Sta. 0+265, Baguio City","amountPesos":4900000.0,"lengthMeters":80.0,"ratePesosPerMeter":61250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20736"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road along Kawal to Bisal - 2+442 - 4+137, Bokod, Benguet","amountPesos":29400000.0,"lengthMeters":1695.0,"ratePesosPerMeter":17345.132743362832,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20739"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Ambacuag-Oring-La Trinidad Road - 3+383 - 5+078, Sablan, Benguet","amountPesos":30577000.0,"lengthMeters":1695.0,"ratePesosPerMeter":18039.52802359882,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20741"},{"year":2026,"category":"Roads","project":"Improvement of Bektey-Ampasit Road, Sta. 0+611 - Sta. 1+381 , La Trinidad, Benguet","amountPesos":19600000.0,"lengthMeters":770.0,"ratePesosPerMeter":25454.545454545456,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20743"},{"year":2026,"category":"Roads","project":"Improvement of Road along Anovang Domolpos Itogon - Kayapa, Nueva Vizcaya - 15+377 - 17+072, Itogon, Benguet","amountPesos":29400000.0,"lengthMeters":1695.0,"ratePesosPerMeter":17345.132743362832,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20745"},{"year":2026,"category":"Roads","project":"Improvement of Road along Strawberry Farm at Swamp, Sta. 1+115 - Sta. 1+781, La Trinidad, Benguet","amountPesos":14700000.0,"lengthMeters":666.0,"ratePesosPerMeter":22072.07207207207,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20747"},{"year":2026,"category":"Roads","project":"Improvement of Road along Taloy Sur, Marcos Highway to Tabaan Norte - 0+248 - 1+943, Tuba, Benguet","amountPesos":29400000.0,"lengthMeters":1695.0,"ratePesosPerMeter":17345.132743362832,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20749"},{"year":2026,"category":"Roads","project":"Construction of Kapangan-Bagulin Road, Sta. 6+812 - Sta 8+062, Kapangan, Benguet","amountPesos":49000000.0,"lengthMeters":1250.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20752"},{"year":2026,"category":"Roads","project":"Improvement of Road along Barangay Sagpat to Barangay Badeo, Sta. 0+000 - Sta. 1+000, Kibungan, Benguet","amountPesos":19600000.0,"lengthMeters":1000.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20754"},{"year":2026,"category":"Bridges","project":"Construction of Manaot Bridge, Sta. 6 + 185 - Sta. 6+ 230, Mongayang, Aguinaldo, Ifugao","amountPesos":48203000.0,"lengthMeters":45.0,"ratePesosPerMeter":1071177.7777777778,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20757"},{"year":2026,"category":"Roads","project":"Construction of Access Road to KSU- Rizal Campus Phase II, Sta. 0 + 393 -Sta. 0 + 763, Rizal, Kalinga","amountPesos":4900000.0,"lengthMeters":370.0,"ratePesosPerMeter":13243.243243243243,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20760"},{"year":2026,"category":"Roads","project":"Construction of Cabaritan-Gobgob Road, Sta. 0 + 000 - Sta. 0 + 339 Tabuk City, Kalinga","amountPesos":9800000.0,"lengthMeters":339.0,"ratePesosPerMeter":28908.554572271387,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20762"},{"year":2026,"category":"Roads","project":"Construction of Oben-Sabban Road, Phase II, Sta. 3 + 300 - Sta. 5 + 600, Tabuk City, Kalinga","amountPesos":24500000.0,"lengthMeters":2300.0,"ratePesosPerMeter":10652.173913043478,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20764"},{"year":2026,"category":"Roads","project":"Construction of Road at Sitio Ballasiw, Sta. 0 + 000 - Sta. 0 + 509, Rizal, Kalinga","amountPesos":14700000.0,"lengthMeters":509.0,"ratePesosPerMeter":28880.15717092338,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20766"},{"year":2026,"category":"Roads","project":"Construction of Access Road leading to DENR Building at Banao Protected Landscape, Sta. 1+615 - Sta. 1+775, Kalinga","amountPesos":5000000.0,"lengthMeters":160.0,"ratePesosPerMeter":31250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20772"},{"year":2026,"category":"Roads","project":"Construction of Access Road leading to DPWH-Upper Kalinga District Engineering Office, Sta. 0+000 - Sta. 1+356, Kalinga","amountPesos":39200000.0,"lengthMeters":1356.0,"ratePesosPerMeter":28908.554572271387,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20774"},{"year":2026,"category":"Roads","project":"Construction of Access Road leading to Mt. Chumanchil, Sta. 0+ 828.5 - Sta. 1+506.5, Kalinga","amountPesos":19600000.0,"lengthMeters":678.0,"ratePesosPerMeter":28908.554572271387,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20776"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sta. 2+370 - Sta. 2+521.5, Carumsing, Dangtalan, Pasil, Kalinga","amountPesos":24102000.0,"lengthMeters":151.5,"ratePesosPerMeter":159089.10891089108,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20778"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Sta 0+000 - Sta 0+974,Barangay Adaoag, Baggao, Cagayan","amountPesos":25900000.0,"lengthMeters":974.0,"ratePesosPerMeter":26591.375770020535,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20782"},{"year":2026,"category":"Roads","project":"Construction of Gaspar Sablay Road, Sta 0+000 - Sta 1+704, Tapel, Gonzaga, Cagayan","amountPesos":27263000.0,"lengthMeters":1704.0,"ratePesosPerMeter":15999.413145539906,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20784"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta 0+000 - Sta 1+387.5, Tapel, Gonzaga, Cagayan","amountPesos":22719000.0,"lengthMeters":1387.5,"ratePesosPerMeter":16374.054054054053,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20786"},{"year":2026,"category":"Roads","project":"Construction of San Francisco Road, Sta 0+000 - Sta 1+704, Ipil, Gonzaga, Cagayan","amountPesos":31807000.0,"lengthMeters":1704.0,"ratePesosPerMeter":18666.07981220657,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20788"},{"year":2026,"category":"Roads","project":"Improvement of Road, Sta 0+000 - Sta 0+487, Barangay J. Pallagao to Sitio Blue Waters Road, Baggao, Cagayan","amountPesos":17266000.0,"lengthMeters":487.0,"ratePesosPerMeter":35453.79876796714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20790"},{"year":2026,"category":"Roads","project":"Concreting of Ballesteros to Abulug Sanja Road, Barangay Centro East  Sta. 0+000-Sta. 0+719, Ballesteros, Cagayan","amountPesos":9800000.0,"lengthMeters":719.0,"ratePesosPerMeter":13630.041724617524,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20793"},{"year":2026,"category":"Roads","project":"Concreting of Road Network at Barangay Pinili,Sta. 0+000-Sta. 0+750,Abulug, Cagayan","amountPesos":18175000.0,"lengthMeters":750.0,"ratePesosPerMeter":24233.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20795"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Alinunu - Sta. Filomena Road,Sta. 0+000-Sta. 1+232,Abulug, Cagayan","amountPesos":21810000.0,"lengthMeters":1232.0,"ratePesosPerMeter":17702.922077922078,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20797"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Banguian - Langay Road, Banguian,Sta. 0+000-Sta. 0+915,Abulug, Cagayan","amountPesos":22719000.0,"lengthMeters":915.0,"ratePesosPerMeter":24829.508196721312,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20799"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Banguian - Namayugan Road, Banguian,Sta. 0+000-Sta. 1+438,Abulug, Cagayan","amountPesos":27263000.0,"lengthMeters":1438.0,"ratePesosPerMeter":18958.970792767734,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20801"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Calog Sur,Sta. 0+000-Sta. 0+958,Abulug, Cagayan","amountPesos":18175000.0,"lengthMeters":958.0,"ratePesosPerMeter":18971.816283924843,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20803"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Guiddam - Lagum Road, Guiddam,Sta. 0+000-Sta. 0+719,Abulug, Cagayan","amountPesos":13631000.0,"lengthMeters":719.0,"ratePesosPerMeter":18958.275382475662,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20805"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Guiddam - Pinaron Road, Guiddam,Sta. 0+000-Sta. 1+027,Abulug, Cagayan","amountPesos":18175000.0,"lengthMeters":1027.0,"ratePesosPerMeter":17697.17624148004,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20807"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Lucban,Sta. 0+000-Sta. 1+112,Abulug, Cagayan","amountPesos":14096000.0,"lengthMeters":1112.0,"ratePesosPerMeter":12676.258992805755,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20809"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Sitio Batal - Lebanon Road, Alinunu,Sta. 0+000-Sta. 0+719,Abulug, Cagayan","amountPesos":13631000.0,"lengthMeters":719.0,"ratePesosPerMeter":18958.275382475662,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20811"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Sitio Sawang, Suguiran,Sta. 0+000-Sta. 0+767,Abulug, Cagayan","amountPesos":14540000.0,"lengthMeters":767.0,"ratePesosPerMeter":18956.975228161667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20813"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Sta. Rosa,Sta. 0+000-Sta. 0+770,Abulug, Cagayan","amountPesos":13631000.0,"lengthMeters":770.0,"ratePesosPerMeter":17702.597402597403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20815"},{"year":2026,"category":"Roads","project":"Construction of Road at Sitio Maasin, Barangay Iraga, Solana, Cagayan (Sta. 9+041 - Sta. 9+056, Sta. 9+094 - Sta. 9+109)","amountPesos":4900000.0,"lengthMeters":30.0,"ratePesosPerMeter":163333.33333333334,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20818"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Baliwag, Peñablanca, Cagayan (Sta. 0+000 - Sta. 0+408)","amountPesos":4544000.0,"lengthMeters":408.0,"ratePesosPerMeter":11137.254901960785,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20820"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Carig Sur, Tuguegarao City, Cagayan (Line 1 = Sta. 0+019.50 - Sta. 0+115.50, Line 2 = Sta. 0+000 - Sta. 0+032.45)","amountPesos":4544000.0,"lengthMeters":115.5,"ratePesosPerMeter":39341.99134199134,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20822"},{"year":2026,"category":"Roads","project":"Concreting of Aplaya to Reina Mercedes Road (Sta. 0+400 - Sta. 1+650, Sta. 1+730 - Sta. 2+480), Barangay Aplaya and Barangay Reina Mercedes, Maconacon, Isabela","amountPesos":22719000.0,"lengthMeters":2000.0,"ratePesosPerMeter":11359.5,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20825"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Masipi East Bridge 1 (Sta. 11+180 - Sta. 11+195), Barangay Masipi East, Cabagan, Isabela","amountPesos":19600000.0,"lengthMeters":15.0,"ratePesosPerMeter":1306666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20831"},{"year":2026,"category":"Bridges","project":"Replacement of Bridge, Masipi Bridge and Approaches (Sta 8+801 - Sta. 8+876), Cabagan, Isabela","amountPesos":49000000.0,"lengthMeters":75.0,"ratePesosPerMeter":653333.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20833"},{"year":2026,"category":"Bridges","project":"Construction (Completion) of San Lorenzo Bridge (Sta. 2+890 - Sta. 3+010), Barangay San Lorenzo, City of Ilagan, Isabela","amountPesos":49000000.0,"lengthMeters":120.0,"ratePesosPerMeter":408333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20837"},{"year":2026,"category":"Bridges","project":"Construction of Balete Bridge (Sta. 16+200 - Sta. 16+230) at Barangay Caddangan/Limbauan, San Pablo, Isabela","amountPesos":19600000.0,"lengthMeters":30.0,"ratePesosPerMeter":653333.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20839"},{"year":2026,"category":"Bridges","project":"Construction of Bridge (Sta. 0+550 - Sta. 0+580), Barangay Rugao, City of Ilagan, Isabela","amountPesos":32340000.0,"lengthMeters":30.0,"ratePesosPerMeter":1078000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20841"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road (Section 1: Sta. 0+000 - Sta. 0+174, Section 2: Sta. 0+000 - Sta. 0+300, Section 3: Sta. 0+290 - Sta. 0+316), Barangay Bliss, City of Ilagan, Isabela","amountPesos":4544000.0,"lengthMeters":316.0,"ratePesosPerMeter":14379.746835443038,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20843"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road (Section 1: Sta. 0+000 - Sta 0+400, Section 2: Sta. 0+000 - Sta. 0+660), Barangay Fuyo, City of Ilagan, Isabela","amountPesos":9088000.0,"lengthMeters":660.0,"ratePesosPerMeter":13769.69696969697,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20845"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 1+820 - Sta. 3+405) at Sitio Limbo, Barangay Maui, Delfin Albano, Isabela","amountPesos":18175000.0,"lengthMeters":1585.0,"ratePesosPerMeter":11466.876971608834,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20847"},{"year":2026,"category":"Roads","project":"Rehabilitation of Annanuman to Caddangan/Limbauan Road (Sta. 0+000 - Sta. 2+240), Barangay Annanuman and Barangay Caddagan/Limbauan, San Pablo, Isabela","amountPesos":27263000.0,"lengthMeters":2240.0,"ratePesosPerMeter":12170.982142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20849"},{"year":2026,"category":"Roads","project":"Rehabilitation of Biga Occidental to Biga Oriental Road (Sta. 2+100 - Sta. 2+395, Sta. 2+600 - Sta. 3+100, Sta. 3+500 - Sta. 4+190), Barangay Biga Occidental and Barangay Biga Oriental, Sto. Tomas, Isabela","amountPesos":18175000.0,"lengthMeters":1485.0,"ratePesosPerMeter":12239.05723905724,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20851"},{"year":2026,"category":"Roads","project":"Rehabilitation of Caddangan/Limbauan to Sitio Cabannungan Road (Sta. 3+500 - Sta. 5+585), Barangay Caddangan/Limbauan, San Pablo, Isabela","amountPesos":25445000.0,"lengthMeters":2085.0,"ratePesosPerMeter":12203.836930455636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20853"},{"year":2026,"category":"Roads","project":"Rehabilitation of Colunguan to Barumbung Road (Sta. 0+000 - Sta. 0+270, Sta. 0+581 - Sta. 1+401), Barangay Colunguan and Barangay Barumbung, Sto. Tomas, Isabela","amountPesos":13631000.0,"lengthMeters":1090.0,"ratePesosPerMeter":12505.504587155963,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20855"},{"year":2026,"category":"Roads","project":"Rehabilitation of Concrete Road (Sta. 0+450 - Sta. 1+400), Barangay Fugu, City of Ilagan, Isabela","amountPesos":9088000.0,"lengthMeters":950.0,"ratePesosPerMeter":9566.315789473685,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20857"},{"year":2026,"category":"Roads","project":"Rehabilitation of Provincial Road (Sta. 0+000 - Sta. 1+350) along Barangay Rizal to Barangay Calinaoan Sur, Delfin Albano, Isabela","amountPesos":18175000.0,"lengthMeters":1350.0,"ratePesosPerMeter":13462.962962962964,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20859"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road (Section 1: Sta. 3+100 - Sta. 3+470, Sta. 4+200 - Sta. 4+530, Section 2: Sta. 0+000 - Sta 0+400) at Barangay Annanuman, San Pablo, Isabela","amountPesos":13631000.0,"lengthMeters":1100.0,"ratePesosPerMeter":12391.818181818182,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20861"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road (Sta. 0+000 - Sta. 0 +640, Sta. 0+950 - Sta. 1+890) at Barangay Maligaya to Barangay Arcon, Tumauini, Isabela","amountPesos":19447000.0,"lengthMeters":1580.0,"ratePesosPerMeter":12308.227848101265,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20863"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road (Sta. 0+341 - Sta. 1+251), Barangay Dalena to Barangay San Vicente, San Pablo, Isabela","amountPesos":9088000.0,"lengthMeters":910.0,"ratePesosPerMeter":9986.813186813188,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20865"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road (Sta. 0+000 - Sta. 1+200), Barangay Simanu Norte, San Pablo, Isabela","amountPesos":13631000.0,"lengthMeters":1200.0,"ratePesosPerMeter":11359.166666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20867"},{"year":2026,"category":"Bridges","project":"Replacement of Bagabag-Sitio Lalappang Bridge (Sta. 9+340 - Sta. 9+365), Barangay Bagabag, Sto. Tomas, Isabela","amountPesos":24500000.0,"lengthMeters":25.0,"ratePesosPerMeter":980000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20869"},{"year":2026,"category":"Bridges","project":"Replacement of Bridge (Sta. 11+450 - Sta. 11+462) at Barangay Biga Oriental, Sto. Tomas, Isabela","amountPesos":9800000.0,"lengthMeters":12.0,"ratePesosPerMeter":816666.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20871"},{"year":2026,"category":"Bridges","project":"Construction (Completion) of Bridge (Sta. 3 + 940 - Sta. 3 + 985), Barangay Macañao - Barangay Centro 3, Luna, Isabela","amountPesos":49000000.0,"lengthMeters":45.0,"ratePesosPerMeter":1088888.888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20874"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta 0 + 000 - Sta 0 + 453, Barangay Pisang, San Manuel, Isabela","amountPesos":4900000.0,"lengthMeters":453.0,"ratePesosPerMeter":10816.777041942605,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20880"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road (Sta. 1 + 670 - Sta. 3 + 880), Luna, Isabela","amountPesos":19600000.0,"lengthMeters":2210.0,"ratePesosPerMeter":8868.778280542987,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20882"},{"year":2026,"category":"Roads","project":"Concreting of Barangay Road, Barangay Dialawyao to Alomanay (Sta 1+495.00 -Sta 2+328.00), Palanan, Isabela","amountPesos":18175000.0,"lengthMeters":833.0,"ratePesosPerMeter":21818.7274909964,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20885"},{"year":2026,"category":"Roads","project":"Concreting of Barangay Road, Barangay Bugallon Norte - Barangay Burgos (Sta. 0+000.00 - Sta. 1+080.00), Ramon, Isabela","amountPesos":24500000.0,"lengthMeters":1080.0,"ratePesosPerMeter":22685.185185185186,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20893"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Moreno, Barangay Santo Tomas (Sta 0+000.00 - Sta. 0+335.00) Section 1, (Sta 0+000.00 - Sta. 0+507.00) Section 2, Alicia, Isabela","amountPesos":9800000.0,"lengthMeters":507.0,"ratePesosPerMeter":19329.38856015779,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20895"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay La Paz (Sta. 0+247.50 - Sta. 0+722.00 Section 1, Sta 0+000.00 - Sta. 0+042.00 Section 2), Cabatuan, Isabela","amountPesos":9800000.0,"lengthMeters":516.5,"ratePesosPerMeter":18973.862536302033,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20897"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bagong Sikat (Sta. 0+000.00 - Sta. 0+495.00), San Mateo, Isabela","amountPesos":9800000.0,"lengthMeters":495.0,"ratePesosPerMeter":19797.9797979798,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20899"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Diwadden, Barangay San Jose (Sta. 0+000.00 - Sta. 1+575.00), San Mariano, Isabela","amountPesos":19600000.0,"lengthMeters":1575.0,"ratePesosPerMeter":12444.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20901"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pintor (Sta. 0+000.00 - Sta. 1+140.00) Section 1, (Sta. 0+000.00 - Sta. 0+222.00) Section 2, Gamu, Isabela","amountPesos":14700000.0,"lengthMeters":1140.0,"ratePesosPerMeter":12894.736842105263,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20903"},{"year":2026,"category":"Roads","project":"Construction of Road, Dialawyao-Culasi Road, Barangay Dialawyao and Barangay Culasi (Sta. 0+000.00 - Sta. 0+828.00), Palanan, Isabela","amountPesos":14700000.0,"lengthMeters":828.0,"ratePesosPerMeter":17753.623188405796,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20905"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay District 1 - Barangay Danipa (Sta. 0+000.00 - Sta. 2+742.00 With Exception), Benito Soliven, Isabela","amountPesos":9800000.0,"lengthMeters":2742.0,"ratePesosPerMeter":3574.033552151714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20907"},{"year":2026,"category":"Roads","project":"Construction of Road, with Box Culvert, Barangay Culasi (Sta. 0+000.00 - Sta. 1+300.00), Palanan, Isabela","amountPesos":19600000.0,"lengthMeters":1300.0,"ratePesosPerMeter":15076.923076923076,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20909"},{"year":2026,"category":"Roads","project":"Construction of Road Barangay Dicamay (Sta. 0+000.00 - Sta. 0+789.00), San Mariano, Isabela","amountPesos":9800000.0,"lengthMeters":789.0,"ratePesosPerMeter":12420.785804816223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20911"},{"year":2026,"category":"Roads","project":"Concreting of Barangay Road, Barangay Rizal (Sta. 0+000.00 - Sta. 0+669.00), Gamu Isabela","amountPesos":9088000.0,"lengthMeters":669.0,"ratePesosPerMeter":13584.454409566517,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20913"},{"year":2026,"category":"Roads","project":"Concreting of Dimaluket Road, Barangay Villa Robles (Sta. 0+000.00 - Sta. 0+462.00), Palanan, Isabela","amountPesos":7270000.0,"lengthMeters":462.0,"ratePesosPerMeter":15735.930735930737,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20915"},{"year":2026,"category":"Bridges","project":"Construction of Danipa Bridge, Phase 3, Barangay Danipa, Benito Soliven, Isabela (Sta. 0 + 000 to Sta. 0 + 031)","amountPesos":14700000.0,"lengthMeters":31.0,"ratePesosPerMeter":474193.5483870968,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20917"},{"year":2026,"category":"Roads","project":"Construction of Road Barangay Bitabian - San Francisco Road(Sta. 0+000.00 - Sta. 1+479.00), San Mariano, Isabela","amountPesos":17266000.0,"lengthMeters":1479.0,"ratePesosPerMeter":11674.104124408384,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20921"},{"year":2026,"category":"Roads","project":"Construction of Road Barangay Cabaruan -Manaring Road(Sta. 0+000.00 - Sta. 3+153.00), Naguilian, Isabela","amountPesos":27263000.0,"lengthMeters":3153.0,"ratePesosPerMeter":8646.685696162385,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20923"},{"year":2026,"category":"Roads","project":"Construction of Road Barangay Flores- Rang-Ayan Road (Sta. 0+000.00 - Sta. 1+546.50), Naguilian, Isabela","amountPesos":18175000.0,"lengthMeters":1546.5,"ratePesosPerMeter":11752.344002586486,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20925"},{"year":2026,"category":"Roads","project":"Construction of Road Barangay Minanga - Dibuluan Road(Sta. 0+000.00 - Sta. 3+420.00), San Mariano, Isabela","amountPesos":45438000.0,"lengthMeters":3420.0,"ratePesosPerMeter":13285.964912280702,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20927"},{"year":2026,"category":"Roads","project":"Construction of Road Barangay Sto. Tomas - Placer Road (Sta. 0+000.00 - Sta. 3+044.00), Benito Soliven, Isabela","amountPesos":27263000.0,"lengthMeters":3044.0,"ratePesosPerMeter":8956.307490144547,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20933"},{"year":2026,"category":"Roads","project":"Construction of Road of Barangay Minallo - Burgos Road (Sta. 0+000.00 - Sta. 1+797.00), Naguilian, Isabela","amountPesos":18175000.0,"lengthMeters":1797.0,"ratePesosPerMeter":10114.079020589872,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20941"},{"year":2026,"category":"Roads","project":"Construction of Road of Baranagay Panninan to Barangay Libertad  (Sta. 0+000.00 - Sta. 1+365.00), Barangay Panninan & Barangay Libertad, San Mariano, Isabela","amountPesos":19600000.0,"lengthMeters":1365.0,"ratePesosPerMeter":14358.97435897436,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20943"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mangandingay to Linglingay (Sta. 0+000.00 - Sta. 0+600.00), Barangay Mangandingay, Angadanan, Isabela","amountPesos":9800000.0,"lengthMeters":600.0,"ratePesosPerMeter":16333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20945"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Roque to Sitio Cusipa (Sta. 0+000.00 - Sta. 0+642.00), Barangay San Roque, Angadanan, Isabela","amountPesos":9088000.0,"lengthMeters":642.0,"ratePesosPerMeter":14155.763239875389,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20947"},{"year":2026,"category":"Bridges","project":"Construction of Sinundulan Bridge, Barangay Macayucayu, San Mariano, Isabela (Sta. 0 + 000 to Sta. 0 + 041)","amountPesos":39200000.0,"lengthMeters":41.0,"ratePesosPerMeter":956097.5609756098,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20949"},{"year":2026,"category":"Bridges","project":"Construction of Sitio Villa Miranda Bridge, Phase 1, Barangay Dibuluan, San Mariano, Isabela (Sta. 0 + 000 to Sta. 0 + 101)","amountPesos":44100000.0,"lengthMeters":101.0,"ratePesosPerMeter":436633.6633663366,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20951"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Sta. 0+000 - Sta. 2+435, Barangay San Fermin, Cauayan City, Isabela","amountPesos":45438000.0,"lengthMeters":2435.0,"ratePesosPerMeter":18660.36960985626,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20956"},{"year":2026,"category":"Bridges","project":"Construction (Completion) of Bridge, Sta. 0+000 - Sta. 0+025,Barangay Salvacion, Echague, Isabela","amountPesos":29400000.0,"lengthMeters":25.0,"ratePesosPerMeter":1176000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20962"},{"year":2026,"category":"Bridges","project":"Construction (Completion) of Bridge, Sta. 0+000 - Sta. 0+025, Barangay Aromin, Echague, Isabela","amountPesos":29400000.0,"lengthMeters":25.0,"ratePesosPerMeter":1176000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20964"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay San Pablo (Buduan) - Barangay Gappal Sta. 0+000 - Sta. 0+968, City of Cauayan, Isabela","amountPesos":14700000.0,"lengthMeters":968.0,"ratePesosPerMeter":15185.950413223141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20966"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Pinoma, Sta. 0+000 - Sta. 0+968, City of Cauayan, Isabela","amountPesos":14700000.0,"lengthMeters":968.0,"ratePesosPerMeter":15185.950413223141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20968"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Bacareno, Sta. 0+000 - Sta. 0+646, City of Cauayan, Isabela","amountPesos":9800000.0,"lengthMeters":646.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20970"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Minante I (Research),Sta. 0+000 - Sta. 0+968,City of Cauayan, Isabela","amountPesos":14700000.0,"lengthMeters":968.0,"ratePesosPerMeter":15185.950413223141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20972"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Baculod, Sta. 0+000 - Sta. 0+968,City of Cauayan, Isabela","amountPesos":14700000.0,"lengthMeters":968.0,"ratePesosPerMeter":15185.950413223141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20974"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Minante II,Sta. 0+000 - Sta. 0+968,City of Cauayan, Isabela","amountPesos":14700000.0,"lengthMeters":968.0,"ratePesosPerMeter":15185.950413223141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20976"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Tagaran,Sta. 0+000 - Sta. 0+968, City of Cauayan, Isabela","amountPesos":14700000.0,"lengthMeters":968.0,"ratePesosPerMeter":15185.950413223141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20978"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Buyon - Barangay Dianao,Sta. 0+000 - Sta. 1+291,City of Cauayan, Isabela","amountPesos":19600000.0,"lengthMeters":1291.0,"ratePesosPerMeter":15182.029434546863,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20980"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Antonio - Barangay San Francisco,Sta. 0+000 - Sta. 1+291, City of Cauayan, Isabela","amountPesos":19600000.0,"lengthMeters":1291.0,"ratePesosPerMeter":15182.029434546863,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20982"},{"year":2026,"category":"Roads","project":"Construction of Road,  Sta 0+000 - Sta. 1+334, Barangay San Francisco - Barangay Rizal, City of Cauayan, Isabela","amountPesos":19600000.0,"lengthMeters":1334.0,"ratePesosPerMeter":14692.653673163419,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20984"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Naganacan - Barangay Sillawit, Sta. 0+000 - Sta. 0+968, City of Cauayan, Isabela","amountPesos":14700000.0,"lengthMeters":968.0,"ratePesosPerMeter":15185.950413223141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20986"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Villa Concepcion,Sta. 0+000 - Sta. 0+936, City of Cauayan, Isabela","amountPesos":29400000.0,"lengthMeters":936.0,"ratePesosPerMeter":31410.25641025641,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20988"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Maligaya,Sta. 0+000 - Sta. 0+968, City of Cauayan, Isabela","amountPesos":14700000.0,"lengthMeters":968.0,"ratePesosPerMeter":15185.950413223141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20990"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Villa Luna,Sta. 0+000 - Sta. 0+968, City of Cauayan, Isabela","amountPesos":14700000.0,"lengthMeters":968.0,"ratePesosPerMeter":15185.950413223141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20992"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay San Pablo,Sta. 0+000 - Sta. 0+968, City of Cauayan, Isabela","amountPesos":14700000.0,"lengthMeters":968.0,"ratePesosPerMeter":15185.950413223141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20994"},{"year":2026,"category":"Bridges","project":"Construction (Completion) of Bridge, Sta. 0+000 - Sta. 0+025, Barangay Villa Remedios, San Guillermo, Isabela","amountPesos":19600000.0,"lengthMeters":25.0,"ratePesosPerMeter":784000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20996"},{"year":2026,"category":"Bridges","project":"Construction (Completion) of Bridge, Sta. 0+000 - Sta. 0+080, Barangay Nabbuan, City of Santiago, Isabela","amountPesos":34300000.0,"lengthMeters":80.0,"ratePesosPerMeter":428750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 20998"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Miguel,Sta. 0+000 - Sta. 0+646, Echague, Isabela","amountPesos":9800000.0,"lengthMeters":646.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21000"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Salay,Sta. 0+000 - Sta. 0+646, Echague, Isabela","amountPesos":9800000.0,"lengthMeters":646.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21002"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Benguet,Sta. 0+000 - Sta. 0+323, Echague, Isabela","amountPesos":4900000.0,"lengthMeters":323.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21004"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Aromin,Sta. 0+000 - Sta. 0+646, Echague, Isabela","amountPesos":9800000.0,"lengthMeters":646.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21006"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+646, Barangay Diasan, Echague, Isabela","amountPesos":9800000.0,"lengthMeters":646.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21008"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+323, Barangay Mabbayad, Echague, Isabela","amountPesos":4900000.0,"lengthMeters":323.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21010"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta 0+000 - Sta. 0+334, Barangay Mabuhay, Echague, Isabela","amountPesos":4900000.0,"lengthMeters":334.0,"ratePesosPerMeter":14670.65868263473,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21012"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+646, Barangay Villa Rey to Barangay Magleticia, Echague, Isabela","amountPesos":9800000.0,"lengthMeters":646.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21014"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+968, Barangay Rizal, San Guillermo, Isabela","amountPesos":14700000.0,"lengthMeters":968.0,"ratePesosPerMeter":15185.950413223141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21016"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+646, Barangay San Francisco Norte to Guam, San Guillermo, Isabela","amountPesos":9800000.0,"lengthMeters":646.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21018"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta 0+000 - Sta. 0+667, Barangay San Mariano Norte to San Mariano Sur, San Guillermo, Isabela","amountPesos":9800000.0,"lengthMeters":667.0,"ratePesosPerMeter":14692.653673163419,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21020"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+646, Barangay Burgos to Guam, San Guillermo, Isabela","amountPesos":9800000.0,"lengthMeters":646.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21022"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+646, Barangay Guam, San Guillermo, Isabela","amountPesos":9800000.0,"lengthMeters":646.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21024"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+323, Barangay Rizal West, San Isidro, Isabela","amountPesos":4900000.0,"lengthMeters":323.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21026"},{"year":2026,"category":"Bridges","project":"Construction (Completion) of Bridge and Approaches, Sta. 0+000 - Sta. 0+030, Barangay Guam, San Guillermo, Isabela","amountPesos":49000000.0,"lengthMeters":30.0,"ratePesosPerMeter":1633333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21028"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+646, Barangay Rizal East, San Isidro, Isabela","amountPesos":9800000.0,"lengthMeters":646.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21030"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+323, Barangay Victoria, San Isidro, Isabela","amountPesos":4900000.0,"lengthMeters":323.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21032"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+646, Barangay Cebu, San Isidro, Isabela","amountPesos":9800000.0,"lengthMeters":646.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21034"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+646, Barangay Villaflor, San Isidro, Isabela","amountPesos":9800000.0,"lengthMeters":646.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21036"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+323, Barangay Ramos East, San Isidro, Isabela","amountPesos":4900000.0,"lengthMeters":323.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21038"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+323, Barangay Ramos West, San Isidro, Isabela","amountPesos":4900000.0,"lengthMeters":323.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21040"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+323, Barangay Quezon, San Isidro, Isabela","amountPesos":4900000.0,"lengthMeters":323.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21042"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+323, Barangay Gomez, San Isidro, Isabela","amountPesos":4900000.0,"lengthMeters":323.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21044"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+323, Barangay Camarag, San Isidro, Isabela","amountPesos":4900000.0,"lengthMeters":323.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21046"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+968, Barangay Arabiat, Echague, Isabela","amountPesos":14700000.0,"lengthMeters":968.0,"ratePesosPerMeter":15185.950413223141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21048"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+323, Barangay Tuguegarao (Purok 7), Echague, Isabela","amountPesos":4900000.0,"lengthMeters":323.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21050"},{"year":2026,"category":"Roads","project":"Construction of Road, connecting Ramos West to Ramos East, Sta. 0+000 - Sta. 1+291, Barangay Ramos West, San Isidro, Isabela","amountPesos":19600000.0,"lengthMeters":1291.0,"ratePesosPerMeter":15182.029434546863,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21052"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+517, Brgy. Rosario, Santiago City, Isabela","amountPesos":7840000.0,"lengthMeters":517.0,"ratePesosPerMeter":15164.410058027079,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21054"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+517, Brgy. Dicamay 2, Jones, Isabela","amountPesos":7840000.0,"lengthMeters":517.0,"ratePesosPerMeter":15164.410058027079,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21056"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+581, Brgy. Sta. Isabel, Jones, Isabela","amountPesos":8820000.0,"lengthMeters":581.0,"ratePesosPerMeter":15180.722891566265,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21058"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Sta. 0+000 - Sta. 2+435, Barangay San Luis, Cauayan City, Isabela","amountPesos":45438000.0,"lengthMeters":2435.0,"ratePesosPerMeter":18660.36960985626,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21060"},{"year":2026,"category":"Bridges","project":"Construction of Nabbuan Bridge, Sta. 0+000 - Sta. 0+080, Phase 3, Santiago City, Isabela","amountPesos":24500000.0,"lengthMeters":80.0,"ratePesosPerMeter":306250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21062"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 2+410, Echague-San Guillermo-Cauayan Alternate Route, Isabela","amountPesos":44984000.0,"lengthMeters":2410.0,"ratePesosPerMeter":18665.560165975105,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21064"},{"year":2026,"category":"Bridges","project":"Construction of Sinili Bridge, Sta. 0+000 - Sta. 0+080, Phase 3, Santiago City, Isabela","amountPesos":24500000.0,"lengthMeters":80.0,"ratePesosPerMeter":306250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21066"},{"year":2026,"category":"Roads","project":"Construction of Abuyo Road (Sta. 0+000 - Sta. 0+487), Barangay Abuyo, Alfonso Castañeda, Nueva Vizcaya","amountPesos":9088000.0,"lengthMeters":487.0,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21069"},{"year":2026,"category":"Roads","project":"Construction of Acces Road (Sta. 0+000 - Sta. 0+244), Barangay Kakiduguen, Kasibu, Nueva Vizcaya","amountPesos":4900000.0,"lengthMeters":244.0,"ratePesosPerMeter":20081.967213114753,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21071"},{"year":2026,"category":"Roads","project":"Construction of Acces Road, Makiboy-Ugie Road (Sta. 0+000 - Sta. 0+244), Barangay Bua, Kasibu, Nueva Vizcaya","amountPesos":4900000.0,"lengthMeters":244.0,"ratePesosPerMeter":20081.967213114753,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21073"},{"year":2026,"category":"Roads","project":"Construction of Acces Road (Sta. 0+000 - Sta. 0+244), Sitio Mabiga-O, Barangay Carolotan, Dupax del Sur, Nueva Vizcaya","amountPesos":4900000.0,"lengthMeters":244.0,"ratePesosPerMeter":20081.967213114753,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21075"},{"year":2026,"category":"Roads","project":"Construction of Banao-Binalian Road (Sta. 0+000 - Sta. 0+244), Banao, Kayapa, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":244.0,"ratePesosPerMeter":18622.950819672133,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21077"},{"year":2026,"category":"Bridges","project":"Construction of Bridge at Kulidaw-Sitio Balisyon (Sta. 0+000 - Sta. 0+010), Barangay Nansiakan, Kayapa, Nueva Vizcaya","amountPesos":9800000.0,"lengthMeters":10.0,"ratePesosPerMeter":980000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21079"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sitio Pantal River, Barangay Latbang (Sta. 0+000-Sta. 0+120), Kayapa, Nueva Vizcaya","amountPesos":9800000.0,"lengthMeters":120.0,"ratePesosPerMeter":81666.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21081"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road at Sitio Barrio Site to Proper Biruk (Sta. 0+000 - Sta. 0+487), Biruk, Dupax del Sur, Nueva Vizcaya","amountPesos":9088000.0,"lengthMeters":487.0,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21083"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road (Sta. 0+000 - Sta. 0+244), Barangay Tucanon, Aritao, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":244.0,"ratePesosPerMeter":18622.950819672133,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21085"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Edralin to Centro Antutot (Sta. 0+000 - Sta. 0+487), Barangay Antutot, Kasibu, Nueva Vizcaya","amountPesos":9088000.0,"lengthMeters":487.0,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21087"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, San Fabian-Acacia-Binalian (Sta. 0+000 - Sta. 0+244), Barangay Acacia, Kayapa, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":244.0,"ratePesosPerMeter":18622.950819672133,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21089"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Tamuyan to Buayo (Sta. 0+000 - Sta. 0+244), Binnuangan, Dupax del Norte, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":244.0,"ratePesosPerMeter":18622.950819672133,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21091"},{"year":2026,"category":"Roads","project":"Construction of Road at Purok 7 (Sta. 0+000 - Sta. 0+487), Barangay Bacneng, Sta. Fe, Nueva Vizcaya","amountPesos":9088000.0,"lengthMeters":487.0,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21093"},{"year":2026,"category":"Roads","project":"Rehabilitation of Batumbaket Road (Sta. 0+000 - Sta. 0+244), Purok 7, Barangay Tadji, Kasibu, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":244.0,"ratePesosPerMeter":18622.950819672133,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21095"},{"year":2026,"category":"Roads","project":"Concreting of Tullag Road (Sta. 0+000 - Sta. 0+165), Tuao North, Bagabag, Nueva Vizcaya","amountPesos":2726000.0,"lengthMeters":165.0,"ratePesosPerMeter":16521.21212121212,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21098"},{"year":2026,"category":"Roads","project":"Construction of Access Road from Barangay Kateppangan Murong to Careb (Sta. 0+000 - Sta. 0+275), Bagabag, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":275.0,"ratePesosPerMeter":16523.636363636364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21100"},{"year":2026,"category":"Roads","project":"Construction of Access Road of Barangay Careb (Sta. 0+000 - Sta. 0+275), Bagabag, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":275.0,"ratePesosPerMeter":16523.636363636364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21102"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Hilltop Panantuleng-Bypass Road (Sta. 0+000 - Sta. 0+250), Barangay Calaocan, Quezon, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":250.0,"ratePesosPerMeter":18176.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21104"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Ahoy-Bantawan Road(Sta. 0+000 - Sta. 0+240), Barangay Sawmill, Villaverde, Nueva Vizcaya","amountPesos":4900000.0,"lengthMeters":240.0,"ratePesosPerMeter":20416.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21106"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Baccara Street, Purok 5(Sta. 0+000 - Sta. 0+300), Barangay Osmeña, Solano, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":300.0,"ratePesosPerMeter":15146.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21108"},{"year":2026,"category":"Roads","project":"Construction of Access Road(Sta. 0+000 - Sta. 0+350), Barangay Dadap, Solano, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":350.0,"ratePesosPerMeter":12982.857142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21110"},{"year":2026,"category":"Roads","project":"Construction of Access Road (Sta. 0+000 - Sta. 0+275), Barangay Lactawan , Solano, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":275.0,"ratePesosPerMeter":16523.636363636364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21112"},{"year":2026,"category":"Roads","project":"Construction of Access Road(Sta. 0+000 - Sta. 0+275), Barangay Nangalisan, Bagabag, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":275.0,"ratePesosPerMeter":16523.636363636364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21114"},{"year":2026,"category":"Roads","project":"Construction of Access Road(Sta. 0+000 - Sta. 0+275), Barangay Pogonsino , Bagabag, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":275.0,"ratePesosPerMeter":16523.636363636364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21116"},{"year":2026,"category":"Roads","project":"Construction of Access Road (Sta. 0+000 - Sta. 0+250), Barangay Quirino, Bagabag, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":250.0,"ratePesosPerMeter":18176.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21118"},{"year":2026,"category":"Roads","project":"Construction of Access Road(Sta. 0+000 - Sta. 0+350), Barangay San Luis, Solano, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":350.0,"ratePesosPerMeter":12982.857142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21120"},{"year":2026,"category":"Roads","project":"Construction of Access Road(Sta. 0+000 - Sta. 0+350), Barangay Uddiawan, Solano, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":350.0,"ratePesosPerMeter":12982.857142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21122"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Bergonia Road(Sta. 0+000 - Sta. 0+300), Barangay Bintawan Sur, Villaverde, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":300.0,"ratePesosPerMeter":15146.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21124"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Bintawan Road(Sta. 0+000 - Sta. 0+300), Barangay Poblacion North, Nueva Vizcaya","amountPesos":4900000.0,"lengthMeters":300.0,"ratePesosPerMeter":16333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21126"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Busat-Atan Road(Sta. 0+000 - Sta. 0+200), Barangay Runruno, Quezon, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":200.0,"ratePesosPerMeter":22720.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21128"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Cabuan Road(Sta. 0+000 - Sta. 0+250), Barangay Caliat, Quezon, Nueva Vizcaya","amountPesos":4900000.0,"lengthMeters":250.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21130"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Cadiente Road(Sta. 0+000 - Sta. 0+250), Barangay Aurora, Quezon, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":250.0,"ratePesosPerMeter":18176.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21132"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Cadiente-Sto. Domingo Road(Sta. 0+000 - Sta. 0+250), Barangays Aurora and Malasin, Quezon, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":250.0,"ratePesosPerMeter":18176.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21134"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Camambugan Road(Sta. 0+000 - Sta. 0+250), Barangay Sawmill, Villaverde, Nueva Vizcaya","amountPesos":4900000.0,"lengthMeters":250.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21136"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Carbonel Street to Gannib Road(Sta. 0+000 - Sta. 0+225), Barangay Poblacion, Villaverde, Nueva Vizcaya","amountPesos":4150000.0,"lengthMeters":225.0,"ratePesosPerMeter":18444.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21138"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Dayag Road(Sta. 0+000 - Sta. 0+200), Barangay Maddiangat, Quezon, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":200.0,"ratePesosPerMeter":22720.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21140"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Esso Road(Sta. 0+000 - Sta. 0+200), Barangay Nalubbunan, Quezon, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":200.0,"ratePesosPerMeter":22720.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21142"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Gattac Road(Sta. 0+000 - Sta. 0+200), Barangay Darruba, Quezon, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":200.0,"ratePesosPerMeter":22720.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21144"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Hilltop-Bypass Road(Sta. 0+000 - Sta. 0+250), Barangay Runruno, Quezon, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":250.0,"ratePesosPerMeter":18176.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21146"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Kimmattigid Road(Sta. 0+000 - Sta. 0+250), Barangay Bangaan, Solano, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":250.0,"ratePesosPerMeter":18176.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21148"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Kinalabasa-Batungbaket to Community-Based Forest Managemanet (CBFM)(Sta. 0+000 - Sta. 0+200), Quezon, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":200.0,"ratePesosPerMeter":22720.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21150"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Logpond Road(Sta. 0+000 - Sta. 0+200), Barangay Dagupan, Quezon, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":200.0,"ratePesosPerMeter":22720.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21152"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Mongkol Road(Sta. 0+000 - Sta. 0+250), Barangay Ibung, Villaverde, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":250.0,"ratePesosPerMeter":18176.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21154"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Mustang Road(Sta. 0+000 - Sta. 0+250), Barangay Caliat, Quezon, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":250.0,"ratePesosPerMeter":18176.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21156"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Piduana - Calderon Road(Sta. 0+000 - Sta. 0+250), Barangay Nagbitin, Villaverde, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":250.0,"ratePesosPerMeter":18176.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21158"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Purok 1 and 2 Barangay Lantap (Sta. 0+000 - Sta. 0+275), Bagabag, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":275.0,"ratePesosPerMeter":16523.636363636364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21160"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Purok 2, Tanap Road to Gawad Kalinga(Sta. 0+000 - Sta. 0+250), Barangay Bascaran, Solano, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":250.0,"ratePesosPerMeter":18176.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21162"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Purok 5, Ladao(Sta. 0+000 - Sta. 0+200), Barangay Communal, Solano, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":200.0,"ratePesosPerMeter":22720.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21164"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Purok Little Baguio - Nag-et Road(Sta. 0+000 - Sta. 0+243.5), Barangay Cabuluan, Villaverde, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":243.5,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21166"},{"year":2026,"category":"Roads","project":"Construction of Access Road, San Juan Road(Sta. 0+000 - Sta. 0+250), Barangay Buliwao, Quezon, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":250.0,"ratePesosPerMeter":18176.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21168"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Sisim Road to Don Cecilio Lumauig Road, Barangay San Geronimo (Sta. 0+000 - Sta. 0+275), Bagabag, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":275.0,"ratePesosPerMeter":16523.636363636364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21170"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Sitio Lintungan-Busat-Atan Road(Sta. 0+000 - Sta. 0+200), Barangay Runruno, Quezon, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":200.0,"ratePesosPerMeter":22720.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21172"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Sto. Domingo Road(Sta. 0+000 - Sta. 0+300), Barangay Maasin, Quezon, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":300.0,"ratePesosPerMeter":15146.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21174"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Tengnga Road(Sta. 0+000 - Sta. 0+300), Barangay Tucal, Solano, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":300.0,"ratePesosPerMeter":15146.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21176"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Tutong Tawi-Tawi Road(Sta. 0+000 - Sta. 0+250), Barangay Bonifacio, Quezon, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":250.0,"ratePesosPerMeter":18176.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21178"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road at Sitio Dah-ay(Sta. 0+000 - Sta. 0+150), Ammoweg, Ambaguio, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":150.0,"ratePesosPerMeter":30293.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21180"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road(Sta. 0+000 - Sta. 0+243.5), Almaguer South, Bambang, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":243.5,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21182"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road(Sta. 0+000 - Sta. 0+300), Barangay Bakir, Bagabag, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":300.0,"ratePesosPerMeter":15146.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21184"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road(Sta. 0+000 - Sta. 0+243.5), Barangay Baretbet, Bagabag, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":243.5,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21186"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Diamond - Nag-et(Sta. 0+000 - Sta. 0+243.5), Cabuluan, Villaverde, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":243.5,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21188"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Ducait, Purok 1(Sta. 0+000 - Sta. 0+275), Barangay Aliaga, Bambang, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":275.0,"ratePesosPerMeter":16523.636363636364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21190"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Escoting-Kasamakan(Sta. 0+000 - Sta. 0+300), Barangay Escoting, Diadi, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":300.0,"ratePesosPerMeter":15146.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21192"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Hidalgo to Tabban Nalubbunan(Sta. 0+000 - Sta. 0+243.5), Barangay Nalubbunan, Quezon, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":243.5,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21194"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Purok 1 to Purok 4 Forestry Road(Sta. 0+000 - Sta. 0+275), Magsaysay, Bayombong, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":275.0,"ratePesosPerMeter":16523.636363636364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21196"},{"year":2026,"category":"Roads","project":"Construction of Road(Sta. 0+000 - Sta. 0+350), Barangay Poblacion, Villaverde, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":350.0,"ratePesosPerMeter":12982.857142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21198"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tuao South(Sta. 0+500 - Sta. 0+743.5), Bagabag, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":243.5,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21200"},{"year":2026,"category":"Roads","project":"Construction of Aklan Village Road, Barangay Aklan Village, Diffun, Quirino - Sta. 3+660 - Sta. 3+730, Sta. 2+980 - Sta. 2+988, Sta. 3+240 - Sta. 3+292, Sta. 3+295 - Sta. 3+364, Sta. 3+920 - Sta. 4+073","amountPesos":4544000.0,"lengthMeters":352.0,"ratePesosPerMeter":12909.09090909091,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21203"},{"year":2026,"category":"Roads","project":"Construction of Alicia Road, Barangay Alicia, Aglipay, Quirino - Sta. 1+260 - Sta. 1+600","amountPesos":4544000.0,"lengthMeters":340.0,"ratePesosPerMeter":13364.70588235294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21205"},{"year":2026,"category":"Roads","project":"Construction of San Salvador Road, San Salvador, Maddela, Quirino - Sta. 0+000 - Sta. 0+298","amountPesos":4900000.0,"lengthMeters":298.0,"ratePesosPerMeter":16442.953020134228,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21207"},{"year":2026,"category":"Roads","project":"Construction of San Leonardo Road, San Leonardo, Aglipay, Quirino - Sta. 0+000 - Sta. 0+370","amountPesos":4900000.0,"lengthMeters":370.0,"ratePesosPerMeter":13243.243243243243,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21209"},{"year":2026,"category":"Roads","project":"Construction of Dibibi Road, Dibibi, Cabarroguis, Quirino - Sta. 0+000 - Sta. 0+300","amountPesos":4900000.0,"lengthMeters":300.0,"ratePesosPerMeter":16333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21211"},{"year":2026,"category":"Roads","project":"Construction of Gabriela Silang Road, Gabriela Silang, Diffun, Quirino - Sta. 0+000 - Sta. 0+300","amountPesos":4900000.0,"lengthMeters":300.0,"ratePesosPerMeter":16333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21213"},{"year":2026,"category":"Roads","project":"Construction of Anak Road, Barangay Anak, Nagtipunan, Quirino - Sta. 0+000 - Sta. 0+382","amountPesos":4900000.0,"lengthMeters":382.0,"ratePesosPerMeter":12827.225130890052,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21215"},{"year":2026,"category":"Roads","project":"Construction of Andres Bonifacio Road, Barangay Andres Bonifacio, Diffun, Quirino - Sta. 0+380 - Sta. 0+730","amountPesos":4544000.0,"lengthMeters":350.0,"ratePesosPerMeter":12982.857142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21217"},{"year":2026,"category":"Roads","project":"Construction of Baguio Village Road, Barangay Baguio Village, Diffun, Quirino - Sta. 20+800 - Sta. 21+060","amountPesos":4544000.0,"lengthMeters":260.0,"ratePesosPerMeter":17476.923076923078,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21219"},{"year":2026,"category":"Roads","project":"Construction of Balligui Road, Barangay Balligui, Maddela, Quirino - Sta. 0+000 - Sta. 0+373","amountPesos":4900000.0,"lengthMeters":373.0,"ratePesosPerMeter":13136.729222520107,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21221"},{"year":2026,"category":"Roads","project":"Construction of Bannawag Road, Barangay Bannawag, Diffun, Quirino - Sta. 0+140 - Sta. 0+490","amountPesos":4900000.0,"lengthMeters":350.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21223"},{"year":2026,"category":"Roads","project":"Construction of Banuar Road, Barangay Banuar, Cabarroguis, Quirino - Sta. 2+600 - Sta. 2+949","amountPesos":4544000.0,"lengthMeters":349.0,"ratePesosPerMeter":13020.057306590257,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21225"},{"year":2026,"category":"Roads","project":"Construction of Buenavista Road, Barangay Buenavista, Maddela, Quirino - Sta. 0+000 - Sta. 0+382","amountPesos":4900000.0,"lengthMeters":382.0,"ratePesosPerMeter":12827.225130890052,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21227"},{"year":2026,"category":"Roads","project":"Construction of Burgos Road, Barangay Burgos, Cabarroguis, Quirino - Sta. 0+000 - Sta. 0+367","amountPesos":4900000.0,"lengthMeters":367.0,"ratePesosPerMeter":13351.49863760218,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21229"},{"year":2026,"category":"Roads","project":"Construction of Cabugao Road, Barangay Cabugao, Aglipay, Quirino - Sta. 2+200 - Sta. 2+530","amountPesos":4544000.0,"lengthMeters":330.0,"ratePesosPerMeter":13769.69696969697,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21231"},{"year":2026,"category":"Roads","project":"Construction of Campamento Road, Barangay Campamento, Diffun, Quirino - Sta. 18+408 - Sta. 18+544, \nSta. 23+060 - Sta. 23+172","amountPesos":4544000.0,"lengthMeters":248.0,"ratePesosPerMeter":18322.58064516129,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21233"},{"year":2026,"category":"Roads","project":"Construction of Dagupan Road, Barangay Dagupan, Aglipay, Quirino - Sta. 4+420 - Sta. 4+790","amountPesos":4544000.0,"lengthMeters":370.0,"ratePesosPerMeter":12281.081081081082,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21235"},{"year":2026,"category":"Roads","project":"Construction of Dibibi Road, Barangay Dibibi, Cabarroguis, Quirino - Sta. 15+120 - Sta. 15+420","amountPesos":4544000.0,"lengthMeters":300.0,"ratePesosPerMeter":15146.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21237"},{"year":2026,"category":"Roads","project":"Construction of Diego Silang Road, Barangay Diego Silang, Diffun, Quirino - Sta. 0+900 - Sta. 1+117","amountPesos":4544000.0,"lengthMeters":217.0,"ratePesosPerMeter":20940.09216589862,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21239"},{"year":2026,"category":"Roads","project":"Construction of Dingasan Road, Barangay Dingasan, Cabarroguis, Quirino - Sta. 0+000 - Sta. 0+352","amountPesos":4900000.0,"lengthMeters":352.0,"ratePesosPerMeter":13920.454545454546,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21241"},{"year":2026,"category":"Roads","project":"Construction of Diodol Road, Barangay Diodol, Aglipay, Quirino - Sta. 0+000 - Sta. 0+366","amountPesos":4900000.0,"lengthMeters":366.0,"ratePesosPerMeter":13387.978142076503,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21243"},{"year":2026,"category":"Roads","project":"Construction of Divisoria Norte Road, Barangay Divisoria Norte, Maddela, Quirino - Sta. 0+000 - Sta. 0+382","amountPesos":4900000.0,"lengthMeters":382.0,"ratePesosPerMeter":12827.225130890052,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21245"},{"year":2026,"category":"Roads","project":"Construction of Don Faustino Pagaduan Road, Barangay Don Faustino Pagaduan, Diffun, Quirino - Sta. 11+820 - Sta. 12+100","amountPesos":4544000.0,"lengthMeters":280.0,"ratePesosPerMeter":16228.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21247"},{"year":2026,"category":"Roads","project":"Construction of Don Mariano Perez Road, Don Mariano Perez, Diffun, Quirino - Sta. 0+000 - Sta. 0+720","amountPesos":9800000.0,"lengthMeters":720.0,"ratePesosPerMeter":13611.111111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21249"},{"year":2026,"category":"Roads","project":"Construction of Doña Imelda Road, Barangay Doña Imelda, Diffun, Quirino - Sta. 6+380 - Sta. 6+689","amountPesos":4544000.0,"lengthMeters":309.0,"ratePesosPerMeter":14705.501618122977,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21251"},{"year":2026,"category":"Roads","project":"Construction of Dumanisi Road, Barangay Dumanisi, Diffun, Quirino - Sta. 6+600 - Sta. 6+900","amountPesos":4544000.0,"lengthMeters":300.0,"ratePesosPerMeter":15146.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21253"},{"year":2026,"category":"Roads","project":"Construction of Dungo Road, Barangay Dungo, Aglipay, Quirino - Sta. 0+580 - Sta. 0+940","amountPesos":4544000.0,"lengthMeters":360.0,"ratePesosPerMeter":12622.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21255"},{"year":2026,"category":"Roads","project":"Construction of Eden Road, Barangay Eden, Cabarroguis, Quirino - Sta. 18+260 - Sta. 18+550","amountPesos":4544000.0,"lengthMeters":290.0,"ratePesosPerMeter":15668.965517241379,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21257"},{"year":2026,"category":"Roads","project":"Construction of Gabriela Silang Road, Barangay Gabriela Silang, Diffun, Quirino - Sta. 6+600 - Sta. 6+900","amountPesos":4544000.0,"lengthMeters":300.0,"ratePesosPerMeter":15146.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21259"},{"year":2026,"category":"Roads","project":"Construction of Gomez Road, Barangay Gomez, Cabarroguis, Quirino - Sta. 4+720 - Sta. 5+040","amountPesos":4544000.0,"lengthMeters":320.0,"ratePesosPerMeter":14200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21261"},{"year":2026,"category":"Roads","project":"Construction of Gregorio Pimentel Road, Barangay Gregorio Pimentel, Diffun, Quirino - Sta. 7+680 - Sta. 7+990","amountPesos":4544000.0,"lengthMeters":310.0,"ratePesosPerMeter":14658.064516129032,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21263"},{"year":2026,"category":"Roads","project":"Construction of Gulac Road, Barangay Gulac, Diffun, Quirino - Sta. 0+420 - Sta. 0+725","amountPesos":4544000.0,"lengthMeters":305.0,"ratePesosPerMeter":14898.360655737704,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21265"},{"year":2026,"category":"Roads","project":"Construction of Guribang Road, Barangay Guribang, Diffun, Quirino - Sta. 0+000 - Sta. 0+369","amountPesos":4900000.0,"lengthMeters":369.0,"ratePesosPerMeter":13279.132791327913,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21267"},{"year":2026,"category":"Roads","project":"Construction of Ifugao Village Road, Barangay Ifugao Village, Diffun, Quirino - Sta. 25+121 - Sta. 25+406","amountPesos":4544000.0,"lengthMeters":285.0,"ratePesosPerMeter":15943.859649122807,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21269"},{"year":2026,"category":"Roads","project":"Construction of Keat Road, Barangay Keat, Nagtipunan, Quirino - Sta. 0+000 - Sta. 0+343","amountPesos":4900000.0,"lengthMeters":343.0,"ratePesosPerMeter":14285.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21271"},{"year":2026,"category":"Roads","project":"Construction of Landingan Road, Barangay Landingan, Nagtipunan, Quirino - Sta. 0+000 - Sta. 0+384","amountPesos":4900000.0,"lengthMeters":384.0,"ratePesosPerMeter":12760.416666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21273"},{"year":2026,"category":"Roads","project":"Construction of Liwayway Road, Barangay Liwayway, Diffun, Quirino - Sta. 0+000 - Sta. 0+391","amountPesos":4900000.0,"lengthMeters":391.0,"ratePesosPerMeter":12531.969309462916,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21275"},{"year":2026,"category":"Roads","project":"Construction of Mangandingay Road, Barangay Mangandingay, Cabarroguis, Quirino - Sta. 0+000 - Sta. 0+384","amountPesos":4900000.0,"lengthMeters":384.0,"ratePesosPerMeter":12760.416666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21277"},{"year":2026,"category":"Roads","project":"Construction of Pedlisan Road, Barangay Pedlisan, Maddela, Quirino - Sta. 0+000 - Sta. 0+397","amountPesos":4900000.0,"lengthMeters":397.0,"ratePesosPerMeter":12342.569269521411,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21279"},{"year":2026,"category":"Roads","project":"Construction of Road, Villamor, Cabarroguis, Quirino - Sta. 0+000 - Sta. 0+100","amountPesos":4900000.0,"lengthMeters":100.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21281"},{"year":2026,"category":"Roads","project":"Construction of San Antonio Road, Barangay San Antonio, Aglipay, Quirino - Sta. 2+740 - Sta. 3+082","amountPesos":4544000.0,"lengthMeters":342.0,"ratePesosPerMeter":13286.549707602338,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21283"},{"year":2026,"category":"Roads","project":"Construction of San Benigno Road, Barangay San Benigno, Aglipay, Quirino - Sta. 0+180 - Sta. 0+475","amountPesos":4544000.0,"lengthMeters":295.0,"ratePesosPerMeter":15403.389830508475,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21285"},{"year":2026,"category":"Roads","project":"Construction of San Bernabe Road, Barangay San Bernabe, Maddela, Quirino - Sta. 0+000 - Sta. 0+392","amountPesos":4900000.0,"lengthMeters":392.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21287"},{"year":2026,"category":"Roads","project":"Construction of San Dionisio I Road, Barangay San Dionisio I, Maddela, Quirino - Sta. 0+000 - Sta. 0+394","amountPesos":4900000.0,"lengthMeters":394.0,"ratePesosPerMeter":12436.548223350253,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21289"},{"year":2026,"category":"Roads","project":"Construction of San Manuel Road, Barangay San Manuel, Aglipay, Quirino - Sta. 0+000 - Sta. 0+378","amountPesos":4900000.0,"lengthMeters":378.0,"ratePesosPerMeter":12962.962962962964,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21291"},{"year":2026,"category":"Roads","project":"Construction of San Martin Road, Barangay San Martin, Maddela, Quirino - Sta. 14+360 - Sta. 14+640","amountPesos":4544000.0,"lengthMeters":280.0,"ratePesosPerMeter":16228.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21293"},{"year":2026,"category":"Roads","project":"Construction of San Pedro Road, Barangay San Pedro, Maddela, Quirino - Sta. 0+000 - Sta. 0+408","amountPesos":4900000.0,"lengthMeters":408.0,"ratePesosPerMeter":12009.803921568628,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21295"},{"year":2026,"category":"Roads","project":"Construction of San Ramos Road, Barangay San Ramos, Nagtipunan, Quirino - Sta. 0+000 - Sta. 0+389","amountPesos":4900000.0,"lengthMeters":389.0,"ratePesosPerMeter":12596.401028277634,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21297"},{"year":2026,"category":"Roads","project":"Construction of Sta. Maria Road, Barangay Sta. Maria, Maddela, Quirino - Sta. 0+000 - Sta. 0+402","amountPesos":4900000.0,"lengthMeters":402.0,"ratePesosPerMeter":12189.054726368158,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21299"},{"year":2026,"category":"Roads","project":"Construction of Sta. Maria-Dungo Road, Maddela, Quirino - Sta. 0+000 - Sta. 0+640","amountPesos":7840000.0,"lengthMeters":640.0,"ratePesosPerMeter":12250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21301"},{"year":2026,"category":"Roads","project":"Construction of Sto. Tomas Road, Barangay Sto. Tomas Maddela, Quirino - Sta. 0+000 - Sta. 0+400","amountPesos":4900000.0,"lengthMeters":400.0,"ratePesosPerMeter":12250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21303"},{"year":2026,"category":"Roads","project":"Construction of Tucod Road, Barangay Tucod, Cabarroguis, Quirino - Sta. 20+356 - Sta. 20+656","amountPesos":4544000.0,"lengthMeters":300.0,"ratePesosPerMeter":15146.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21305"},{"year":2026,"category":"Roads","project":"Construction of Villa Hermoza Norte Road, Barangay Villa Hermoza Norte, Maddela, Quirino - Sta. 0+000 - Sta. 0+400","amountPesos":4900000.0,"lengthMeters":400.0,"ratePesosPerMeter":12250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21307"},{"year":2026,"category":"Roads","project":"Construction of Villa Peña Road, Barangay Villa Peña, Cabarroguis, Quirino - Sta. 8+380 - Sta. 8+730","amountPesos":4544000.0,"lengthMeters":350.0,"ratePesosPerMeter":12982.857142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21309"},{"year":2026,"category":"Roads","project":"Construction of Villamor-Sto. Domingo Boundary Road, Cabarroguis, Quirino - Sta. 3+560 - Sta. 3+920","amountPesos":8179000.0,"lengthMeters":360.0,"ratePesosPerMeter":22719.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21311"},{"year":2026,"category":"Roads","project":"Construction of Villarose Road, Barangay Villarose, Cabarroguis, Quirino - Sta. 7+800 - Sta. 8+120","amountPesos":4544000.0,"lengthMeters":320.0,"ratePesosPerMeter":14200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21313"},{"year":2026,"category":"Roads","project":"Construction of Bayanihan-Quirino Provincial Road, Maria Aurora, Aurora, Sta. 7+860 - 10+200","amountPesos":37657000.0,"lengthMeters":2340.0,"ratePesosPerMeter":16092.735042735043,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21317"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay Ura, Dilasag, Aurora, Sta. 0+000 - 0+030","amountPesos":48932000.0,"lengthMeters":30.0,"ratePesosPerMeter":1631066.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21319"},{"year":2026,"category":"Roads","project":"Construction of Diaman-Suguit Road, Maria Aurora, Aurora, Sta. 0+000 - 1+112","amountPesos":28243000.0,"lengthMeters":1112.0,"ratePesosPerMeter":25398.38129496403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21321"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Calabuanan, Baler, Aurora, Sta. 0+000 - 0+220, Sta. 0+000 - 0+220, Sta. 0+000 - 0+220, Sta. 0+000 - 0+158, Sta. 0+000 - 0+118, Sta. 0+000 - 0+060, Sta. 0+000 - 0+302, Sta. 0+000 - 0+097, Sta. 0+000 - 0+097, Sta. 0+000 - 0+094, Sta. 0+000 - 0+242, Sta. 0+000 - 0+082, Sta. 0+000 - 0+060","amountPesos":19844000.0,"lengthMeters":302.0,"ratePesosPerMeter":65708.60927152318,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21323"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Diniog, Dilasag, Aurora, Sta. 0+000 - 0+680","amountPesos":9721000.0,"lengthMeters":680.0,"ratePesosPerMeter":14295.588235294117,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21325"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pingit, Baler, Aurora, Sta. 0+000 - 0+786, Sta. 0+000 - 0+046, Sta. 0+000 - 0+380, Sta. 0+000 - 0+210, Sta. 0+000 - 0+140, Sta. 0+000 - 0+157, Sta. 0+000 - 0+111, Sta. 0+000 - 0+046, Sta. 0+000 - 0+057, Sta. 0+000 - 0+080, Sta. 0+000 - 0+313, Sta. 0+000 - 0+112, Sta. 0+000 - 0+030","amountPesos":18829000.0,"lengthMeters":786.0,"ratePesosPerMeter":23955.470737913485,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21327"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Reserva, Baler, Aurora, Sta. 0+000 - 0+600, Sta. 0+000 - 0+046, Sta. 0+000 - 0+379, Sta. 0+000 - 0+210, Sta. 0+000 - 0+140, Sta. 0+000 - 0+291, Sta. 0+000 - 0+111, Sta. 0+000 - 0+060, Sta. 0+000 - 0+057, Sta. 0+000 - 0+080","amountPesos":18829000.0,"lengthMeters":600.0,"ratePesosPerMeter":31381.666666666668,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21329"},{"year":2026,"category":"Roads","project":"Concreting of Road at Lati Extention Street, Barangay Omboy, Abucay, Bataan, Section 1: Sta. 0+000 - Sta. 0+037, Section 2: Sta. 0+000 -Sta. 0+260, Section 3: Sta. 0+000 - Sta. 0+160","amountPesos":4900000.0,"lengthMeters":260.0,"ratePesosPerMeter":18846.153846153848,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21336"},{"year":2026,"category":"Roads","project":"Upgrading of Road, Sitio Kabukiran, Calaylayan, Abucay, Bataan, Sta 0+000 - Sta 0 +300","amountPesos":4900000.0,"lengthMeters":300.0,"ratePesosPerMeter":16333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21338"},{"year":2026,"category":"Roads","project":"Concreting of Road, Barangay Cataning, Hermosa, Bataan, Section 1: Sta 0+000 - Sta 0+140, Section 2: Sta 0+000 - Sta 0+220","amountPesos":4900000.0,"lengthMeters":220.0,"ratePesosPerMeter":22272.727272727272,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21340"},{"year":2026,"category":"Roads","project":"Concreting of Road Purok 1 and Purok 4, Barangay Tipo, Hermosa, Bataan, Section 1: Sta 0+000 - Sta 0+273, Section 2 Sta 0+000 -Sta 0+220","amountPesos":4900000.0,"lengthMeters":273.0,"ratePesosPerMeter":17948.71794871795,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21342"},{"year":2026,"category":"Roads","project":"Concreting of Road, Purok NVR, Barangay Doña, Orani, Bataan, Sta 0+000 -Sta 0+390","amountPesos":4900000.0,"lengthMeters":390.0,"ratePesosPerMeter":12564.102564102564,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21344"},{"year":2026,"category":"Roads","project":"Concreting of Road, Paroba Street, Barangay East Calaguiman, Samal, Bataan, Sta 0+000 - Sta 0+160","amountPesos":4900000.0,"lengthMeters":160.0,"ratePesosPerMeter":30625.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21346"},{"year":2026,"category":"Roads","project":"Concreting of Road at Tindalo, Lalawigan, Samal, Bataan, Sta 0+000 - Sta 0+473","amountPesos":4900000.0,"lengthMeters":473.0,"ratePesosPerMeter":10359.408033826638,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21348"},{"year":2026,"category":"Roads","project":"Concreting of Road, (near Mang Juan Plaza), Barangay Capitangan, Abucay, Bataan, Section 1: Sta. 0+000 - Sta. 0+055, Section 2: Sta. 0+000 - Sta. 0+138, Section 3: Sta. 0+000 - Sta. 0+145","amountPesos":4707000.0,"lengthMeters":145.0,"ratePesosPerMeter":32462.068965517243,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21350"},{"year":2026,"category":"Roads","project":"Concreting of Road, Manalo Street, Sto. Niño, Barangay Palihan, Hermosa, Bataan, Section 1: Sta. 0+000 - Sta. 0+107, Section 2: Sta. 0+000 - Sta. 0+151","amountPesos":5649000.0,"lengthMeters":151.0,"ratePesosPerMeter":37410.596026490064,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21352"},{"year":2026,"category":"Roads","project":"Construction of Road at Labiña Street, Barangay Talimundoc, Orani, Bataan, Sta. 0+000 -Sta. 0+385","amountPesos":4707000.0,"lengthMeters":385.0,"ratePesosPerMeter":12225.974025974027,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21358"},{"year":2026,"category":"Roads","project":"Construction of Road at Sitio Sampaloc Lake,Barangay Tapulao, Orani, Bataan, Sta. 0+000 - Sta. 0+379","amountPesos":4900000.0,"lengthMeters":379.0,"ratePesosPerMeter":12928.759894459103,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21360"},{"year":2026,"category":"Roads","project":"Construction of Road at Sitio Sta. Maria, Pandatung, Hermosa, Bataan, Section 1: Sta. 0+000 - Sta. 0+191, Section 2: Sta. 0+000 - Sta. 0+210","amountPesos":4707000.0,"lengthMeters":210.0,"ratePesosPerMeter":22414.285714285714,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21362"},{"year":2026,"category":"Roads","project":"Upgrading of Road in Barangay Maria Fe, Orani, Bataan, Section 1 : Sta.0+000 - Sta. 0+165, Section 2: Sta. 0+000 - Sta. 0+054, Section 3: Sta. 0+000 - Sta. 0+045","amountPesos":4707000.0,"lengthMeters":165.0,"ratePesosPerMeter":28527.272727272728,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21364"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Sitio Bani, Brgy Cataning, Balanga City, Bataan, Sta 0+000 - Sta. 0 + 930","amountPesos":19600000.0,"lengthMeters":930.0,"ratePesosPerMeter":21075.2688172043,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21367"},{"year":2026,"category":"Roads","project":"Concreting of Road, Purok 5 Hillcrest Cataning, Balanga City, Bataan, Sta. 0+000 - Sta. 0+580","amountPesos":9800000.0,"lengthMeters":580.0,"ratePesosPerMeter":16896.55172413793,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21369"},{"year":2026,"category":"Roads","project":"Construction of Road, Maluya Road, Central, Balanga City, Bataan, Sta 0+450 - Sta. 1+000","amountPesos":9800000.0,"lengthMeters":550.0,"ratePesosPerMeter":17818.18181818182,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21371"},{"year":2026,"category":"Bridges","project":"Construction of Colo-Liaban Bridge, Barangay Colo, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 014","amountPesos":24466000.0,"lengthMeters":14.0,"ratePesosPerMeter":1747571.4285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21374"},{"year":2026,"category":"Roads","project":"Construction of Duhat Road, Barangay Saysayin, Bagac, Bataan, Sta. 0 + 000 - Sta. 1 + 500","amountPesos":47072000.0,"lengthMeters":1500.0,"ratePesosPerMeter":31381.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21376"},{"year":2026,"category":"Bridges","project":"Construction of Pagasa-Magsaysay Bridge, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 012","amountPesos":14700000.0,"lengthMeters":12.0,"ratePesosPerMeter":1225000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21378"},{"year":2026,"category":"Roads","project":"Construction of Permit Road at Barangay Parang to Barangay Binukawan, Bagac, Bataan, Sta. 0 + 000 - Sta. 1 + 520","amountPesos":47072000.0,"lengthMeters":1520.0,"ratePesosPerMeter":30968.42105263158,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21380"},{"year":2026,"category":"Roads","project":"Construction of Silio Road at Barangay A Ricardo to Barangay Binukawan, Bagac, Bataan, Sta. 0 + 000 - Sta. 1 + 476","amountPesos":47072000.0,"lengthMeters":1476.0,"ratePesosPerMeter":31891.59891598916,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21382"},{"year":2026,"category":"Roads","project":"Construction of Sitio Pinapala to Sitio Maligaya Road, Barangay Townsite, Mariveles, Bataan, Sta. 0 + 000 - Sta. 1 + 485","amountPesos":47072000.0,"lengthMeters":1485.0,"ratePesosPerMeter":31698.316498316497,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21384"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Magdalena St., Barangay San Juan, Balagtas, Bulacan, Sta. 0 + 000 - Sta. 0 + 168","amountPesos":9800000.0,"lengthMeters":168.0,"ratePesosPerMeter":58333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21387"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Rosary Ville, Sta. Cruz to Malis, Malis Guiguinto, Bulacan, Sta. 0 + 000 - Sta. 0 + 19.60","amountPesos":9800000.0,"lengthMeters":19.6,"ratePesosPerMeter":499999.99999999994,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21389"},{"year":2026,"category":"Roads","project":"Concreting of Pandi/Bustos Road, Bagong Barrio, Siling Bata, Pandi, Bulacan, Sta. 0 + 000 - Sta. 0 + 232.50","amountPesos":14700000.0,"lengthMeters":232.5,"ratePesosPerMeter":63225.8064516129,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21393"},{"year":2026,"category":"Roads","project":"Concreting of Pandi/Angat Road Bagong Barrio, Siling Matanda, Pandi, Bulacan, Sta 0+000 - Sta. 0+232.50","amountPesos":14700000.0,"lengthMeters":232.5,"ratePesosPerMeter":63225.8064516129,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21395"},{"year":2026,"category":"Roads","project":"Construction of Road along Purok 3 to Purok 4, A. Luna street, Barangay Bambang, Bocaue, Bulacan, Sta. 0 + 000 - Sta. 0 + 309","amountPesos":14700000.0,"lengthMeters":309.0,"ratePesosPerMeter":47572.81553398058,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21397"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage at Barangay Panginay Balagtas, Bulacan, Sta. 0 + 000 - Sta. 0 + 742","amountPesos":42364000.0,"lengthMeters":742.0,"ratePesosPerMeter":57094.339622641506,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21399"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage at Barangay Panginay, Guiguinto, Bulacan, Sta. 0 + 000 - Sta. 0 + 731","amountPesos":42364000.0,"lengthMeters":731.0,"ratePesosPerMeter":57953.48837209302,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21401"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Matungao, Bulakan, Bulacan, Sta. 0 + 000 - Sta. 0 + 160","amountPesos":9414000.0,"lengthMeters":160.0,"ratePesosPerMeter":58837.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21403"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Panasahan, City of Malolos, Bulacan, Sta. 0 + 000 - Sta. 0 + 094","amountPesos":9800000.0,"lengthMeters":94.0,"ratePesosPerMeter":104255.31914893616,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21405"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay San Marcos, Calumpit, Bulacan, Sta. 0 + 000 - Sta. 0 + 138","amountPesos":9800000.0,"lengthMeters":138.0,"ratePesosPerMeter":71014.49275362318,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21407"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Pulong Gubat, Balagtas, Bulacan, Sta. 0 + 000 - Sta. 0 + 484","amountPesos":29400000.0,"lengthMeters":484.0,"ratePesosPerMeter":60743.801652892565,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21409"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage, Lolomboy, Bocaue, Bulacan, Sta. 0 + 000 - Sta. 0 + 166","amountPesos":9800000.0,"lengthMeters":166.0,"ratePesosPerMeter":59036.14457831325,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21411"},{"year":2026,"category":"Roads","project":"Improvement of Road at Barangay Barihan, City of Malolos, Bulacan, Sta. 0 + 000 - Sta. 0 + 405","amountPesos":9414000.0,"lengthMeters":405.0,"ratePesosPerMeter":23244.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21413"},{"year":2026,"category":"Roads","project":"Rehabilitation of Local Road including Drainage Canal, Barangay Poblacion, Plaridel, Bulacan, Sta. 0 + 000 - Sta. 0 + 232 &  Sta. 0 + 000 - Sta. 0 + 061","amountPesos":11059000.0,"lengthMeters":232.0,"ratePesosPerMeter":47668.10344827586,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21415"},{"year":2026,"category":"Bridges","project":"Rehabilitation of Mambog Bridge (B01725LZ) at City of Malolos, Bulacan (Sta. 0+000-Sta. 0+015)","amountPesos":49000000.0,"lengthMeters":15.0,"ratePesosPerMeter":3266666.6666666665,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21417"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Atlag, City of Malolos, Bulacan, Sta. 0 + 000 - Sta. 1 + 231","amountPesos":28243000.0,"lengthMeters":1231.0,"ratePesosPerMeter":22943.135662063363,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21419"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Bambang, Bulakan, Bulacan, Sta. 0 + 000 - Sta. 0 + 417","amountPesos":9414000.0,"lengthMeters":417.0,"ratePesosPerMeter":22575.539568345324,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21421"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Bulusan, Calumpit, Bulacan, Sta. 0 + 000 - Sta. 0 + 180","amountPesos":9800000.0,"lengthMeters":180.0,"ratePesosPerMeter":54444.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21423"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Calizon, Calumpit, Bulacan, Sta. 0 + 000 - Sta. 0 + 360","amountPesos":9800000.0,"lengthMeters":360.0,"ratePesosPerMeter":27222.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21425"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Dakila, City of Malolos, Bulacan, Sta. 0 + 000 - Sta. 0 + 438","amountPesos":9800000.0,"lengthMeters":438.0,"ratePesosPerMeter":22374.429223744293,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21427"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Frances, Calumpit, Bulacan, Sta. 0 + 000 - Sta. 0 + 394","amountPesos":9800000.0,"lengthMeters":394.0,"ratePesosPerMeter":24873.096446700507,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21429"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Gugo, Calumpit, Bulacan, Sta. 0 + 000 - Sta. 0 + 353","amountPesos":9800000.0,"lengthMeters":353.0,"ratePesosPerMeter":27762.039660056656,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21431"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Iba O'Este, Calumpit, Bulacan, Sta. 0 + 000 - Sta. 0 + 142.4 and Sta. 0 + 000 - Sta. 0 + 071.2","amountPesos":9800000.0,"lengthMeters":142.4,"ratePesosPerMeter":68820.22471910113,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21433"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Kapitangan, Paombong, Bulacan, Sta. 0 + 000 - Sta. 0 + 207","amountPesos":4707000.0,"lengthMeters":207.0,"ratePesosPerMeter":22739.130434782608,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21435"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Longos, Pulilan, Bulacan, Sta. 0 + 000 - Sta. 0 + 549 and Sta. 0 + 000 - Sta. 0 + 076.5","amountPesos":11760000.0,"lengthMeters":549.0,"ratePesosPerMeter":21420.765027322403,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21437"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Lugam and Look 1st, City of Malolos, Bulacan, Sta. 0 + 000 - Sta. 0 + 421","amountPesos":9414000.0,"lengthMeters":421.0,"ratePesosPerMeter":22361.04513064133,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21439"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Lumbac, Pulilan, Bulacan, Sta. 0 + 000 - Sta. 0 + 248","amountPesos":9800000.0,"lengthMeters":248.0,"ratePesosPerMeter":39516.12903225807,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21441"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Matimbo, City of Malolos, Bulacan, Sta. 0 + 000 - Sta. 0 + 201","amountPesos":4707000.0,"lengthMeters":201.0,"ratePesosPerMeter":23417.910447761195,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21443"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Namayan, City of Malolos, Bulacan, Sta. 0 + 000 - Sta. 0 + 126","amountPesos":10780000.0,"lengthMeters":126.0,"ratePesosPerMeter":85555.55555555556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21445"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Panducot, Calumpit, Bulacan, Sta. 0 + 000 - Sta. 0 + 250 and Sta. 0 + 000 - Sta. 0 + 125","amountPesos":14700000.0,"lengthMeters":250.0,"ratePesosPerMeter":58800.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21447"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay San Jose, Calumpit, Bulacan, Sta. 0 + 000 - Sta. 0 + 413","amountPesos":9414000.0,"lengthMeters":413.0,"ratePesosPerMeter":22794.188861985473,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21449"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay San Juan, City of Malolos, Bulacan, Sta. 0 + 000 - Sta. 0 + 164 and Sta. 0 + 000 - Sta. 0 + 082","amountPesos":11760000.0,"lengthMeters":164.0,"ratePesosPerMeter":71707.31707317074,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21451"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Santa Lucia, Calumpit, Bulacan, Sta. 0 + 000 - Sta. 0 + 405","amountPesos":9414000.0,"lengthMeters":405.0,"ratePesosPerMeter":23244.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21453"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Sergio Bayan, Calumpit, Bulacan, Sta. 0 + 000 - Sta. 0 + 303","amountPesos":7531000.0,"lengthMeters":303.0,"ratePesosPerMeter":24854.785478547856,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21455"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Sto. Niño, Hagonoy, Bulacan, Sta. 0 + 000 - Sta. 0 + 786","amountPesos":18829000.0,"lengthMeters":786.0,"ratePesosPerMeter":23955.470737913485,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21457"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Tampok, Hagonoy, Bulacan, Sta. 0 + 000 - Sta. 0 + 591","amountPesos":14121000.0,"lengthMeters":591.0,"ratePesosPerMeter":23893.401015228428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21459"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Maunlad Homes Subdivision, Barangay Mojon, City of Malolos, Bulacan, Sta. 0 + 000 - Sta. 0 + 586","amountPesos":14121000.0,"lengthMeters":586.0,"ratePesosPerMeter":24097.26962457338,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21461"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at San Felipe Subdivision, Barangay Mojon, City of Malolos, Bulacan, Sta. 0 + 000 - Sta. 0 + 398","amountPesos":9414000.0,"lengthMeters":398.0,"ratePesosPerMeter":23653.26633165829,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21463"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at San Gabriel, City of Malolos, Bulacan, Sta. 0 + 000 - Sta. 0 + 144","amountPesos":9800000.0,"lengthMeters":144.0,"ratePesosPerMeter":68055.55555555556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21465"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage Canal, Barangay Bagong Nayon, City of Baliwag, Bulacan, Sta. 0 + 000 - Sta. 0 + 554","amountPesos":14121000.0,"lengthMeters":554.0,"ratePesosPerMeter":25489.169675090252,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21467"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage Canal, Barangay Hinukay, City of Baliwag, Bulacan, Sta. 0 + 000 - Sta. 0 + 375","amountPesos":14121000.0,"lengthMeters":375.0,"ratePesosPerMeter":37656.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21469"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage Canal, Barangay Sabang, City of Baliwag, Bulacan, Sta. 0 + 000 - Sta. 0 + 260","amountPesos":14121000.0,"lengthMeters":260.0,"ratePesosPerMeter":54311.53846153846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21473"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage Canal, Barangay Subic, City of Baliwag, Bulacan, Sta. 0 + 000 - Sta. 0 + 248","amountPesos":14121000.0,"lengthMeters":248.0,"ratePesosPerMeter":56939.51612903226,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21475"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage Canal, Purok 4, Barangay Dampol, Plaridel, Bulacan, Sta. 0 + 000 - Sta. 0 + 255","amountPesos":14121000.0,"lengthMeters":255.0,"ratePesosPerMeter":55376.470588235294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21477"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Barangca, City of Baliwag, Bulacan, Sta. 0 + 000 - Sta. 0 + 426","amountPesos":10356000.0,"lengthMeters":426.0,"ratePesosPerMeter":24309.859154929578,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21479"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Calantipay, City of Baliwag, Bulacan, Sta. 0 + 000 - Sta. 0 + 438","amountPesos":10356000.0,"lengthMeters":438.0,"ratePesosPerMeter":23643.835616438355,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21481"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Paitan, City of Baliwag, Bulacan, Sta. 0 + 000 - Sta. 0 + 446","amountPesos":10356000.0,"lengthMeters":446.0,"ratePesosPerMeter":23219.730941704034,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21483"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Sitio Sulong, Barangay Tilapayong, City of Baliwag, Bulacan, Sta. 0 + 000 - Sta. 0 + 424","amountPesos":10356000.0,"lengthMeters":424.0,"ratePesosPerMeter":24424.528301886792,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21485"},{"year":2026,"category":"Roads","project":"Rehabilitation of San Nicolas - San Sebastian Road, Hagonoy, Bulacan, Sta. 0 + 000 - Sta. 0 + 724","amountPesos":18829000.0,"lengthMeters":724.0,"ratePesosPerMeter":26006.906077348067,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21487"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road along F. Viola Highway Section, Brgy, Pantubig, San Rafael, Bulacan, Sta. 00+000 - Sta. 00+452.65","amountPesos":24500000.0,"lengthMeters":452.65,"ratePesosPerMeter":54125.70418645753,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21493"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage, Barangay District II, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+317.20","amountPesos":4707000.0,"lengthMeters":317.2,"ratePesosPerMeter":14839.218158890291,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21496"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bantug, Cuyapo, Nueva Ecija Sta. 0+000 - Sta. 0+385","amountPesos":5000000.0,"lengthMeters":385.0,"ratePesosPerMeter":12987.012987012988,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21498"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Poblacion Sur, Talavera, Nueva Ecija Sta. 0 + 000 - Sta. 0+545","amountPesos":6300000.0,"lengthMeters":545.0,"ratePesosPerMeter":11559.633027522936,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21500"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Campos, Talavera, Nueva Ecija Sta. 0+000 - Sta. 0+850","amountPesos":7400000.0,"lengthMeters":850.0,"ratePesosPerMeter":8705.882352941177,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21502"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bulala, Cuyapo, Nueva Ecija Sta. 0+000 - Sta. 0+380","amountPesos":5000000.0,"lengthMeters":380.0,"ratePesosPerMeter":13157.894736842105,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21504"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay District VI to Barangay Bentigan, Cuyapo, Nueva Ecija Sta. 0+000 - Sta. 0+385","amountPesos":5000000.0,"lengthMeters":385.0,"ratePesosPerMeter":12987.012987012988,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21506"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Landig, Cuyapo, Nueva Ecija Sta. 0+000 - Sta. 0+390","amountPesos":5000000.0,"lengthMeters":390.0,"ratePesosPerMeter":12820.51282051282,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21508"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sta. Monica, Aliaga, Nueva Ecija Sta. 0+000 - Sta. 0+525","amountPesos":6300000.0,"lengthMeters":525.0,"ratePesosPerMeter":12000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21510"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay District V, Cuyapo, Nueva Ecija Sta. 0+000 - Sta. 0+385","amountPesos":5000000.0,"lengthMeters":385.0,"ratePesosPerMeter":12987.012987012988,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21512"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pulong San Miguel, Talavera, Nueva Ecija Sta. 0+000 - Sta. 0+420","amountPesos":5000000.0,"lengthMeters":420.0,"ratePesosPerMeter":11904.761904761905,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21514"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sicsican Matanda, Talavera, Nueva Ecija Sta. 0+000 - Sta. 0+425","amountPesos":5000000.0,"lengthMeters":425.0,"ratePesosPerMeter":11764.70588235294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21516"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Pascual, Santo Domingo, Nueva Ecija Sta. 0+000 - Sta. 0+890","amountPesos":10000000.0,"lengthMeters":890.0,"ratePesosPerMeter":11235.955056179775,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21518"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Narvacan I, Guimba, Nueva Ecija Sta. 0+000 - Sta. 0+880","amountPesos":10000000.0,"lengthMeters":880.0,"ratePesosPerMeter":11363.636363636364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21520"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pantoc Bulac, Talavera, Nueva Ecija Sta. 0+000 - Sta. 0+915","amountPesos":10000000.0,"lengthMeters":915.0,"ratePesosPerMeter":10928.96174863388,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21522"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Miguel, Quezon, Nueva Ecija Sta. 0+000 - Sta. 0+890","amountPesos":10000000.0,"lengthMeters":890.0,"ratePesosPerMeter":11235.955056179775,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21524"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Caballero to Barangay Triala, Guimba, Nueva Ecija Sta. 0+000 - Sta. 0+880","amountPesos":10000000.0,"lengthMeters":880.0,"ratePesosPerMeter":11363.636363636364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21526"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bagong Barrio, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+432","amountPesos":4707000.0,"lengthMeters":432.0,"ratePesosPerMeter":10895.833333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21530"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Baluga, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+567.78","amountPesos":4707000.0,"lengthMeters":567.78,"ratePesosPerMeter":8290.182817288387,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21536"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Banitan to Catimon, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+547","amountPesos":7061000.0,"lengthMeters":547.0,"ratePesosPerMeter":12908.592321755028,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21538"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Camiing, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+368.61","amountPesos":4707000.0,"lengthMeters":368.61,"ratePesosPerMeter":12769.593879710263,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21542"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Carmen, Zaragoza, Nueva Ecija, Sta. 0+000 - Sta. 0+415","amountPesos":4707000.0,"lengthMeters":415.0,"ratePesosPerMeter":11342.168674698794,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21544"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Concepcion, Zaragoza, Nueva Ecija, Sta. 0+000 - Sta. 0+440","amountPesos":4707000.0,"lengthMeters":440.0,"ratePesosPerMeter":10697.727272727272,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21546"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Dimasalang Norte, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+341","amountPesos":4707000.0,"lengthMeters":341.0,"ratePesosPerMeter":13803.519061583578,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21548"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Dimasalang Sur, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+470","amountPesos":4707000.0,"lengthMeters":470.0,"ratePesosPerMeter":10014.893617021276,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21550"},{"year":2026,"category":"Roads","project":"Construction of Road Aliaga IS Barangay Macabucod, Aliaga, Nueva Ecija, Sta. 0+000 - Sta. 1+120","amountPesos":14700000.0,"lengthMeters":1120.0,"ratePesosPerMeter":13125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21552"},{"year":2026,"category":"Roads","project":"Construction of Road Aliaga IS Barangay San Felipe, Aliaga, Nueva Ecija, Sta. 0+000 - Sta. 1+120","amountPesos":14700000.0,"lengthMeters":1120.0,"ratePesosPerMeter":13125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21554"},{"year":2026,"category":"Roads","project":"Construction of Road Aliaga IS Barangay San Pablo, Aliaga, Nueva Ecija, Sta. 0+000 - Sta. 1+120","amountPesos":14700000.0,"lengthMeters":1120.0,"ratePesosPerMeter":13125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21556"},{"year":2026,"category":"Roads","project":"Construction of Road LTRIS Barangay Caputican, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 1+120","amountPesos":14700000.0,"lengthMeters":1120.0,"ratePesosPerMeter":13125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21558"},{"year":2026,"category":"Roads","project":"Construction of Road MCIS Barangay La Torre, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 1+120","amountPesos":14700000.0,"lengthMeters":1120.0,"ratePesosPerMeter":13125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21560"},{"year":2026,"category":"Roads","project":"Construction of Road MCIS Barangay Mamandil, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 1+120","amountPesos":14700000.0,"lengthMeters":1120.0,"ratePesosPerMeter":13125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21562"},{"year":2026,"category":"Roads","project":"Construction of Road MCIS Barangay San Carlos, Aliaga, Nueva Ecija, Sta. 0+000 - Sta. 1+120","amountPesos":14700000.0,"lengthMeters":1120.0,"ratePesosPerMeter":13125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21564"},{"year":2026,"category":"Roads","project":"Construction of Road PBRIS EXTN Barangay Pantoc, Zaragoza, Nueva Ecija, Sta. 0+000 - Sta. 1+120","amountPesos":14700000.0,"lengthMeters":1120.0,"ratePesosPerMeter":13125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21566"},{"year":2026,"category":"Roads","project":"Construction of Road PBRIS EXTN Barangay San Vicente, Zaragoza, Nueva Ecija, Sta. 0+000 - Sta. 1+120","amountPesos":14700000.0,"lengthMeters":1120.0,"ratePesosPerMeter":13125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21568"},{"year":2026,"category":"Roads","project":"Construction of Road PRIS-SDC Barangay Bantug, Barangay Banitan, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 1+120","amountPesos":14700000.0,"lengthMeters":1120.0,"ratePesosPerMeter":13125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21574"},{"year":2026,"category":"Roads","project":"Construction of Road PRIS-SDC Barangay Culong, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 1+120","amountPesos":14700000.0,"lengthMeters":1120.0,"ratePesosPerMeter":13125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21578"},{"year":2026,"category":"Roads","project":"Construction of Road PRIS-SDC-PH2 Barangay Cabatuan, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 1+120","amountPesos":14700000.0,"lengthMeters":1120.0,"ratePesosPerMeter":13125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21582"},{"year":2026,"category":"Roads","project":"Construction of Road PRIS-SDC-PH2 Barangay Sta. Clara, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 1+120","amountPesos":14700000.0,"lengthMeters":1120.0,"ratePesosPerMeter":13125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21584"},{"year":2026,"category":"Roads","project":"Construction of Road Talavera RIS Lower Barangay Baloc, Sto. Domingo, Nueva Ecija, Sta. 0+000 - Sta. 1+120","amountPesos":14700000.0,"lengthMeters":1120.0,"ratePesosPerMeter":13125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21586"},{"year":2026,"category":"Bridges","project":"Replacement of Bridge, Barangay Loob-Barangay Piglisan-Barangay Calancuasan Sur, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+020","amountPesos":40131000.0,"lengthMeters":20.0,"ratePesosPerMeter":2006550.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21588"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Faigal, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+437","amountPesos":5178000.0,"lengthMeters":437.0,"ratePesosPerMeter":11848.970251716248,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21590"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Homestead I, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+384.70","amountPesos":4707000.0,"lengthMeters":384.7,"ratePesosPerMeter":12235.508188198597,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21592"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Hulo, Sto. Domingo, Nueva Ecija, Sta. 0+000 - Sta. 0+191","amountPesos":5649000.0,"lengthMeters":191.0,"ratePesosPerMeter":29575.916230366493,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21594"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Macapabellag, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+337","amountPesos":4707000.0,"lengthMeters":337.0,"ratePesosPerMeter":13967.359050445104,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21596"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Macarse, Zaragoza, Nueva Ecija, Sta. 0+000 - Sta. 0+379.70","amountPesos":4707000.0,"lengthMeters":379.7,"ratePesosPerMeter":12396.6289175665,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21598"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Maeling, Nampicuan, Nueva Ecija, Sta. 0+000 - Sta. 0+716.50","amountPesos":4707000.0,"lengthMeters":716.5,"ratePesosPerMeter":6569.434752267969,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21600"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Matingkis, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+295.90","amountPesos":4707000.0,"lengthMeters":295.9,"ratePesosPerMeter":15907.401149036838,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21604"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Maybubon, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+356","amountPesos":4707000.0,"lengthMeters":356.0,"ratePesosPerMeter":13221.91011235955,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21606"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Narvacan II, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+310","amountPesos":4707000.0,"lengthMeters":310.0,"ratePesosPerMeter":15183.870967741936,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21608"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Paitan Norte, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+273","amountPesos":5649000.0,"lengthMeters":273.0,"ratePesosPerMeter":20692.30769230769,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21610"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Poblacion Sur, Licab, Nueva Ecija, Sta. 0+000 - Sta. 0+403.17","amountPesos":7588000.0,"lengthMeters":403.17,"ratePesosPerMeter":18820.844804921002,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21612"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pula, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+532","amountPesos":4707000.0,"lengthMeters":532.0,"ratePesosPerMeter":8847.744360902256,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21614"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sagaba, Sto. Domingo, Nueva Ecija, Sta. 0+000 - Sta. 0+476","amountPesos":4707000.0,"lengthMeters":476.0,"ratePesosPerMeter":9888.655462184874,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21616"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Salagusog, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+316.50","amountPesos":4707000.0,"lengthMeters":316.5,"ratePesosPerMeter":14872.037914691944,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21618"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Casimiro, Licab, Nueva Ecija, Sta. 0+000 - Sta. 0+417","amountPesos":4707000.0,"lengthMeters":417.0,"ratePesosPerMeter":11287.769784172662,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21620"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Eustacio, Aliaga, Nueva Ecija, Sta. 0+000 - Sta. 0+337","amountPesos":4707000.0,"lengthMeters":337.0,"ratePesosPerMeter":13967.359050445104,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21622"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Rafael, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+388.40","amountPesos":4707000.0,"lengthMeters":388.4,"ratePesosPerMeter":12118.949536560247,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21624"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sto. Tomas Feria, Quezon, Nueva Ecija, Sta. 0+000 - Sta. 0+433.50","amountPesos":4707000.0,"lengthMeters":433.5,"ratePesosPerMeter":10858.131487889274,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21626"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tampac 2-3, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+313","amountPesos":4707000.0,"lengthMeters":313.0,"ratePesosPerMeter":15038.338658146964,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21630"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tutuloy, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+524.40","amountPesos":4707000.0,"lengthMeters":524.4,"ratePesosPerMeter":8975.972540045766,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21632"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Ungab, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+252","amountPesos":4707000.0,"lengthMeters":252.0,"ratePesosPerMeter":18678.571428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21634"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Villarosa, Licab, Nueva Ecija, Sta. 0+000 - Sta. 0+345","amountPesos":4707000.0,"lengthMeters":345.0,"ratePesosPerMeter":13643.478260869566,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21638"},{"year":2026,"category":"Bridges","project":"Replacement of Bridge, Barangay San Juan, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+012.801","amountPesos":26227000.0,"lengthMeters":12.801,"ratePesosPerMeter":2048824.3106007343,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21642"},{"year":2026,"category":"Bridges","project":"Retrofitting / Strengthening of Bridge, Barangay Sta. Lucia Young Bridge, Zaragoza, Nueva Ecija, Sta. 0+000 - Sta. 0+015.40","amountPesos":9849000.0,"lengthMeters":15.4,"ratePesosPerMeter":639545.4545454546,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21644"},{"year":2026,"category":"Roads","project":"Construction of Access Road Leading to CLLEX, Barangay Bitas, Lourdes, and Bantug Norte, Cabanatuan City, Nueva Ecija, Sta. 0+000 - Sta. 1+150","amountPesos":43306000.0,"lengthMeters":1150.0,"ratePesosPerMeter":37657.391304347824,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21653"},{"year":2026,"category":"Roads","project":"Rehabilitation of San Isidro - Pulo - Bulualto Road, San Isidro, Nueva Ecija, Sta. 3+153.06 - Sta. 5+769.00","amountPesos":49000000.0,"lengthMeters":2615.94,"ratePesosPerMeter":18731.31646750308,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21659"},{"year":2026,"category":"Roads","project":"Rehabilitation of San Leonardo - Jaen - San Isidro Road, San Leonardo, Nueva Ecija, Sta. 0+258.10 - Sta. 1+957.30","amountPesos":49000000.0,"lengthMeters":1699.2,"ratePesosPerMeter":28837.099811676086,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21661"},{"year":2026,"category":"Bridges","project":"Construction of Approaches along Talba-Mesalipit Bridge, Barangay Mesalipit, Bacolor, Pampanga, Sta. 0+000 - Sta. 0+114, Sta. 0+208 - Sta. 0+250","amountPesos":4893000.0,"lengthMeters":156.0,"ratePesosPerMeter":31365.384615384617,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21664"},{"year":2026,"category":"Roads","project":"Construction of Road, along Apalit Sports Leisure and Government (ASLAG) Complex, Barangay Sampaloc, Apalit, Pampanga, Sta. 0+000 - Sta. 1+198","amountPesos":19600000.0,"lengthMeters":1198.0,"ratePesosPerMeter":16360.601001669449,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21668"},{"year":2026,"category":"Bridges","project":"Construction of Cambasi Bridge, Barangay Cambasi, Masantol, Pampanga. Sta. 0+000 - Sta. 0+192.80","amountPesos":29400000.0,"lengthMeters":192.8,"ratePesosPerMeter":152489.6265560166,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21670"},{"year":2026,"category":"Roads","project":"Construction of Del Carmen-Bulaon-Calulut Road, City of San Fernando, Pampanga, Sta. 0+000 - Sta. 1+212","amountPesos":47072000.0,"lengthMeters":1212.0,"ratePesosPerMeter":38838.28382838284,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21672"},{"year":2026,"category":"Roads","project":"Construction of Guemasan Road, Barangay Guemasan, Arayat, Pampanga, Sta. 0+000 - Sta. 0+328","amountPesos":14121000.0,"lengthMeters":328.0,"ratePesosPerMeter":43051.829268292684,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21676"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage Canal, San Carlos, San Luis, Pampanga, Sta. 0+000 - Sta. 0+225","amountPesos":4707000.0,"lengthMeters":225.0,"ratePesosPerMeter":20920.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21678"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage Canal, San Isidro, San Luis, Pampanga, Sta. 0+000 - Sta. 0+225","amountPesos":4707000.0,"lengthMeters":225.0,"ratePesosPerMeter":20920.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21680"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage Canal, Sto. Tomas, San Luis, Pampanga, Sta. 0+000 - Sta. 0+225","amountPesos":4707000.0,"lengthMeters":225.0,"ratePesosPerMeter":20920.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21682"},{"year":2026,"category":"Roads","project":"Construction of Road with Slope Protection, San Sebastian, San Luis, Pampanga, Sta. 0+000 - Sta. 0+200","amountPesos":4707000.0,"lengthMeters":200.0,"ratePesosPerMeter":23535.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21684"},{"year":2026,"category":"Roads","project":"Construction of Road, Alauli, Masantol, Pampanga, Sta. 0+000 - Sta. 0+145","amountPesos":2824000.0,"lengthMeters":145.0,"ratePesosPerMeter":19475.862068965518,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21686"},{"year":2026,"category":"Roads","project":"Construction of Road, Caduang Tete, Macabebe, Pampanga, Sta. 0+000 - Sta. 0+230","amountPesos":4707000.0,"lengthMeters":230.0,"ratePesosPerMeter":20465.217391304348,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21688"},{"year":2026,"category":"Roads","project":"Construction of Road, Cambasi, Masantol, Pampanga, Sta. 0+000 - Sta. 0+245","amountPesos":4707000.0,"lengthMeters":245.0,"ratePesosPerMeter":19212.244897959183,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21690"},{"year":2026,"category":"Roads","project":"Construction of Road, Lourdes and Sta Teresita, City of San Fernando, Pampanga, Sta. 0+000 - Sta. 0+250","amountPesos":11297000.0,"lengthMeters":250.0,"ratePesosPerMeter":45188.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21692"},{"year":2026,"category":"Roads","project":"Construction of Road, Malino and Panipuan, City of San Fernando, Pampanga, Sta. 0+000 - Sta. 0+205","amountPesos":9414000.0,"lengthMeters":205.0,"ratePesosPerMeter":45921.95121951219,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21694"},{"year":2026,"category":"Roads","project":"Construction of Road, Sagrada, Masantol, Pampanga, Sta. 0+000 - Sta. 0+247","amountPesos":4707000.0,"lengthMeters":247.0,"ratePesosPerMeter":19056.68016194332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21696"},{"year":2026,"category":"Roads","project":"Construction of Road, San Agustin, San Luis, Pampanga, Sta. 0+000 - Sta. 0+280","amountPesos":4707000.0,"lengthMeters":280.0,"ratePesosPerMeter":16810.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21698"},{"year":2026,"category":"Roads","project":"Construction of Road, San Francisco, Macabebe, Pampanga, Sta. 0+000 - Sta. 0+400","amountPesos":7531000.0,"lengthMeters":400.0,"ratePesosPerMeter":18827.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21700"},{"year":2026,"category":"Roads","project":"Construction of Road, San Isidro Matua, Masantol, Pampanga, Sta. 0+000 - Sta. 0+245","amountPesos":4707000.0,"lengthMeters":245.0,"ratePesosPerMeter":19212.244897959183,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21702"},{"year":2026,"category":"Roads","project":"Construction of Road, San Isidro, City of San Fernando, Pampanga, Sta. 0+000 - Sta. 0+165","amountPesos":7531000.0,"lengthMeters":165.0,"ratePesosPerMeter":45642.42424242424,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21704"},{"year":2026,"category":"Roads","project":"Construction of Road, San Jose, San Simon, Pampanga, Sta. 0+000 - Sta. 0+250","amountPesos":4707000.0,"lengthMeters":250.0,"ratePesosPerMeter":18828.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21706"},{"year":2026,"category":"Roads","project":"Construction of Road, San Juan, San Luis, Pampanga, Sta. 0+000 - Sta. 0+320","amountPesos":6590000.0,"lengthMeters":320.0,"ratePesosPerMeter":20593.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21708"},{"year":2026,"category":"Roads","project":"Construction of Road, San Nicolas, Minalin, Pampanga, Sta. 0+000 - Sta. 0+295","amountPesos":4707000.0,"lengthMeters":295.0,"ratePesosPerMeter":15955.93220338983,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21710"},{"year":2026,"category":"Roads","project":"Construction of Road, San Roque, San Luis, Pampanga, Sta. 0+000 - Sta. 0+280","amountPesos":4707000.0,"lengthMeters":280.0,"ratePesosPerMeter":16810.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21712"},{"year":2026,"category":"Roads","project":"Construction of Road, Saplad David, Macabebe, Pampanga, Sta. 0+000 - Sta. 0+140","amountPesos":2824000.0,"lengthMeters":140.0,"ratePesosPerMeter":20171.428571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21714"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. Cruz, San Simon, Pampanga, Sta. 0+000 - Sta. 0+250","amountPesos":4707000.0,"lengthMeters":250.0,"ratePesosPerMeter":18828.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21716"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. Monica, San Luis, Pampanga, Sta. 0+000 - Sta. 0+170","amountPesos":2824000.0,"lengthMeters":170.0,"ratePesosPerMeter":16611.764705882353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21718"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. Rita, Minalin, Pampanga, Sta. 0+000 - Sta. 0+290","amountPesos":4707000.0,"lengthMeters":290.0,"ratePesosPerMeter":16231.034482758621,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21720"},{"year":2026,"category":"Roads","project":"Construction of Road, Sto. Niño, San Luis, Pampanga, Sta. 0+000 - Sta. 0+280","amountPesos":4707000.0,"lengthMeters":280.0,"ratePesosPerMeter":16810.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21722"},{"year":2026,"category":"Roads","project":"Construction of Road, Sto. Niño, San Simon, Pampanga, Sta. 0+000 - Sta. 0+320","amountPesos":4707000.0,"lengthMeters":320.0,"ratePesosPerMeter":14709.375,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21724"},{"year":2026,"category":"Roads","project":"Construction of Road, Sto. Rosario, Minalin, Pampanga, Sta. 0+000 - Sta. 0+280","amountPesos":4707000.0,"lengthMeters":280.0,"ratePesosPerMeter":16810.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21726"},{"year":2026,"category":"Roads","project":"Construction of Road, Sua, Masantol, Pampanga, Sta. 0+000 - Sta. 0+195","amountPesos":3766000.0,"lengthMeters":195.0,"ratePesosPerMeter":19312.82051282051,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21728"},{"year":2026,"category":"Roads","project":"Construction of Road, Sulipan, Apalit, Pampanga, Sta. 0+000 - Sta. 0+165","amountPesos":2824000.0,"lengthMeters":165.0,"ratePesosPerMeter":17115.151515151516,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21730"},{"year":2026,"category":"Bridges","project":"Construction of Sagrada Bridge, Barangay Sagrada, Macabebe, Pampanga, Sta. 0+000 - Sta. 0+720.80","amountPesos":29400000.0,"lengthMeters":720.8,"ratePesosPerMeter":40788.01331853496,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21732"},{"year":2026,"category":"Roads","project":"Construction of San Fernando-Lubao road including drainage system, Barangay San Vicente-Barangay Cabetican, Bacolor, Pampanga, Sta. 0+000 - Sta. 0+415","amountPesos":18829000.0,"lengthMeters":415.0,"ratePesosPerMeter":45371.0843373494,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21734"},{"year":2026,"category":"Roads","project":"Rehabilitation of Lacquios Road, Arayat, Pampanga, Sta. 0+000 - Sta. 0+210","amountPesos":9414000.0,"lengthMeters":210.0,"ratePesosPerMeter":44828.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21736"},{"year":2026,"category":"Roads","project":"Rehabilitation of Plazang Luma Road including Drainage System, Arayat, Pampanga, Sta. 0+000 - Sta. 0+169","amountPesos":7531000.0,"lengthMeters":169.0,"ratePesosPerMeter":44562.130177514795,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21738"},{"year":2026,"category":"Roads","project":"Construction of Access Road Leading to Bancal Sinubli, Lubao, Pampanga, Sta. 0 + 000 - Sta. 2 + 432","amountPesos":78400000.0,"lengthMeters":2432.0,"ratePesosPerMeter":32236.842105263157,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21741"},{"year":2026,"category":"Roads","project":"Construction of Road Barangay Sto. Niño, Lubao, Pampanga, Sta. 0 + 000 - Sta. 0 + 500","amountPesos":4900000.0,"lengthMeters":500.0,"ratePesosPerMeter":9800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21743"},{"year":2026,"category":"Bridges","project":"Construction of Sto. Cristo Bridge, Phase II, Lubao, Pampanga, Sta. 0 + 000 - Sta. 0 + 300.96","amountPesos":49000000.0,"lengthMeters":300.96,"ratePesosPerMeter":162812.33386496545,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21745"},{"year":2026,"category":"Roads","project":"Construction of Access Road Leading to Guagua Government Center, San Antonio, Guagua, Pampanga, Sta. 0+000 - Sta. 0 +250","amountPesos":19600000.0,"lengthMeters":250.0,"ratePesosPerMeter":78400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21747"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Sta. Cruz, Porac, Pampanga, Sta. 0+000 - Sta. 0 +500","amountPesos":7840000.0,"lengthMeters":500.0,"ratePesosPerMeter":15680.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21749"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Consuelo, Floridablanca, Pampanga, Sta. 0 + 000 - Sta. 0 + 450 (Section A), Sta. 0 + 000 - Sta. 0 + 500 (Section B)","amountPesos":9800000.0,"lengthMeters":500.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21751"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Ebus, Guagua, Pampanga, Sta. 0 + 000 - Sta. 1 + 000","amountPesos":10000000.0,"lengthMeters":1000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21753"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay San Francisco, Lubao, Pampanga, Sta. 0 + 000 - Sta. 0 + 500","amountPesos":4900000.0,"lengthMeters":500.0,"ratePesosPerMeter":9800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21755"},{"year":2026,"category":"Bridges","project":"Replacement of Del Carmen Bridge, Barangay Del Carmen, Floridablanca, Pampanga, Sta. 0 + 000 - Sta. 0 + 037.00","amountPesos":39200000.0,"lengthMeters":37.0,"ratePesosPerMeter":1059459.4594594594,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21757"},{"year":2026,"category":"Roads","project":"Construction of Road at Marcelo H. Del Pilar, Sta. Cruz, Lubao, Pampanga, Sta. 0 + 000 - Sta. 0 +700","amountPesos":9800000.0,"lengthMeters":700.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21759"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Calantas, Floridablanca, Pampanga, Sta. 0+000 - Sta. 1+000","amountPesos":9800000.0,"lengthMeters":1000.0,"ratePesosPerMeter":9800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21761"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Dampe, Floridablanca, Pampanga, Sta. 0+000 - Sta. 0 + 350","amountPesos":4900000.0,"lengthMeters":350.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21763"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Sapang Uwak, Porac, Pampanga, Sta. 0 + 000 - Sta. 0 + 500","amountPesos":9800000.0,"lengthMeters":500.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21764"},{"year":2026,"category":"Roads","project":"Construction of Road at Manibaug Paralaya Pulu Saba, Porac, Pampanga, Sta. 0 + 000 - Sta. 1 + 000","amountPesos":9800000.0,"lengthMeters":1000.0,"ratePesosPerMeter":9800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21766"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Babo Pangulo, Porac, Pampanga, Sta. 0 + 000 - Sta. 1 + 000","amountPesos":9800000.0,"lengthMeters":1000.0,"ratePesosPerMeter":9800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21768"},{"year":2026,"category":"Roads","project":"Construction of Road with Lined Canal, Barangay Ligaya, Pulung Masle, Guagua, Pampanga, Sta. 0 + 000 - Sta. 0 + 800","amountPesos":9800000.0,"lengthMeters":800.0,"ratePesosPerMeter":12250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21770"},{"year":2026,"category":"Roads","project":"Construction of Road with Lined Canal, Barangay Sinura, Porac, Pampanga, Sta. 0 + 000 - Sta. 0 + 600","amountPesos":6860000.0,"lengthMeters":600.0,"ratePesosPerMeter":11433.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21772"},{"year":2026,"category":"Roads","project":"Construction of Road at Sitio Cutud, Barangay Sta. Monica, Sasmuan, Pampanga, Sta. 0 + 000 - Sta. 0 + 600","amountPesos":6860000.0,"lengthMeters":600.0,"ratePesosPerMeter":11433.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21774"},{"year":2026,"category":"Roads","project":"Construction of Road at Sitio Remedios, Barangay San Nicolas 2nd, Sasmuan, Pampanga,  Sta. 0 + 000 - Sta. 0 + 800","amountPesos":9800000.0,"lengthMeters":800.0,"ratePesosPerMeter":12250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21776"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Valdez, Floridablanca, Pampanga, Sta. 0 + 000 - Sta. 0 + 700","amountPesos":9800000.0,"lengthMeters":700.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21778"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Pandaguirig, Floridablanca, Pampanga, Sta. 0 + 000 - Sta. 0 + 600","amountPesos":9800000.0,"lengthMeters":600.0,"ratePesosPerMeter":16333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21780"},{"year":2026,"category":"Roads","project":"Construction of Road with Canal, San Agustin, Sta. Rita, Pampanga, Sta. 0 + 000 - Sta. 2 +000","amountPesos":29400000.0,"lengthMeters":2000.0,"ratePesosPerMeter":14700.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21782"},{"year":2026,"category":"Bridges","project":"Construction of Dumarais Bridge, La Paz, Tarlac, Sta. 0+000.00 - Sta. 0+025.00","amountPesos":27402000.0,"lengthMeters":25.0,"ratePesosPerMeter":1096080.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21785"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Caramutan, La Paz, Tarlac, Sta. 0+000.00 - Sta. 1+260.00","amountPesos":14121000.0,"lengthMeters":1260.0,"ratePesosPerMeter":11207.142857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21787"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cutcut I, Capas, Tarlac, Sta 0+000.00 - Sta. 1+344","amountPesos":14121000.0,"lengthMeters":1344.0,"ratePesosPerMeter":10506.69642857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21789"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Malupa, Concepcion, Tarlac, Sta. 0+000.00 - Sta. 0+120, Sta. 0+000.00 - Sta. 0+100, Sta. 0+000.00 - Sta. 0+045, Sta. 0+000.00 - Sta. 0+145","amountPesos":4707000.0,"lengthMeters":145.0,"ratePesosPerMeter":32462.068965517243,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21791"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Rafael, Bamban, Tarlac, Sta. 0+000.00 - Sta. 0+133.242, Sta. 0+000.00 - Sta. 0+384.034, Sta. 0+000.00 - Sta. 0+068.847, Sta. 0+000.00 - Sta. 0+067.301, Sta. 0+000.00 - Sta. 0+387.604, Sta. 0+000.00 - Sta. 0+118.611, Sta. 0+000.00 Sta. 0+187.189","amountPesos":14121000.0,"lengthMeters":387.604,"ratePesosPerMeter":36431.51257468963,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21795"},{"year":2026,"category":"Bridges","project":"Construction of Talimundoc Marimla Bridge, Concepcion, Tarlac, Sta. 0+000.00 - Sta. 0+060.00","amountPesos":24466000.0,"lengthMeters":60.0,"ratePesosPerMeter":407766.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21797"},{"year":2026,"category":"Roads","project":"Construction of Barangay Road, Barangay San Pascual, Tarlac City, Tarlac, Segment 1: Sta 0+000 - Sta 0+180.00, Segment 2: Sta 0+000 - Sta 0+180.00, Segment 3: Sta 0+000 - Sta 0+120.00, Segment 4: Sta 0+000 - Sta 0+80.00","amountPesos":9414000.0,"lengthMeters":180.0,"ratePesosPerMeter":52300.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21800"},{"year":2026,"category":"Roads","project":"Construction of Calayaan - Mabini Road, Gerona, Tarlac, Segment 1: Sta. 0+000.00 - Sta. 0+470.00, Segment 2: Sta. 0+326.38 - Sta. 0+364.98","amountPesos":9414000.0,"lengthMeters":470.0,"ratePesosPerMeter":20029.787234042553,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21802"},{"year":2026,"category":"Roads","project":"Construction/Rehabilitation of Road and Drainage Canal, Barangay Alvindia, Tarlac City, Sta. 0+000.00 - Sta. 0+280.00 (L/S), Sta. 0+000.00 - Sta. 0+285.00 (R/S)","amountPesos":9800000.0,"lengthMeters":285.0,"ratePesosPerMeter":34385.9649122807,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21804"},{"year":2026,"category":"Roads","project":"Construction/Rehabilitation of Road and Drainage Canal, Zone 1 to 6 Barangay Bantog, Tarlac City, Sta. 0+000.00 - Sta. 0+127.00","amountPesos":4900000.0,"lengthMeters":127.0,"ratePesosPerMeter":38582.67716535433,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21806"},{"year":2026,"category":"Roads","project":"Construction/Rehabilitation of Road and Drainage Canal, Barangay Dalayap, Tarlac City, Sta. 0+000.00 - Sta. 0+256.00","amountPesos":9800000.0,"lengthMeters":256.0,"ratePesosPerMeter":38281.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21808"},{"year":2026,"category":"Roads","project":"Construction and Rehabilitation of Road and Drainage Canal, Barangay Balete Tarlac City, Sta. 0+000.00 - Sta. 0+128.00","amountPesos":4900000.0,"lengthMeters":128.0,"ratePesosPerMeter":38281.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21810"},{"year":2026,"category":"Roads","project":"Construction/Rehabilitation of Road and Drainage Canal, Barangay Tibag, Tarlac City, Sta. 0+000.00 - Sta. 0+252.00","amountPesos":9800000.0,"lengthMeters":252.0,"ratePesosPerMeter":38888.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21812"},{"year":2026,"category":"Roads","project":"Construction/Rehabilitation of Road and Drainage Canal at Barangay Poblacion I, Gerona, Tarlac, Sta. 0+000.00 - Sta. 0+252.00","amountPesos":9800000.0,"lengthMeters":252.0,"ratePesosPerMeter":38888.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21814"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage Canal at Barangay Ligtasan, Tarlac City, Tarlac, Section 1: Sta. 0+000.00 - Sta. 0+150.00, Section 2: Sta. 0+000.00 - Sta. 0+040.00, Section 3: Sta. 0+150.00 - Sta. 0+217.00","amountPesos":9800000.0,"lengthMeters":217.0,"ratePesosPerMeter":45161.290322580644,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21816"},{"year":2026,"category":"Roads","project":"Construction of Road Phase 2, Barangay Laoang, Tarlac City, Tarlac, Sta. 0+579.00 - 0+933.34","amountPesos":9800000.0,"lengthMeters":354.34,"ratePesosPerMeter":27657.05254839984,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21818"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage Canal, Blk 1, Barangay Dalayap, Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+260.00","amountPesos":9800000.0,"lengthMeters":260.0,"ratePesosPerMeter":37692.307692307695,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21820"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage Canal, Barangay Sepung Calzada, Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+300.00","amountPesos":11760000.0,"lengthMeters":300.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21822"},{"year":2026,"category":"Roads","project":"Rehabilitation of Calayaan- San Agustin Road, Gerona, Tarlac, Sta. 0+000.00 - Sta. 0+514.00","amountPesos":9800000.0,"lengthMeters":514.0,"ratePesosPerMeter":19066.147859922177,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21824"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage Canal at Barangay Villa Aglipay, San Jose, Tarlac, Sta. 0+000.00 - Sta. 0+124.00","amountPesos":4900000.0,"lengthMeters":124.0,"ratePesosPerMeter":39516.12903225807,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21826"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Caturay, Plastado, Gerona, Tarlac, Sta. 0+000.00 - Sta. 0+182.00","amountPesos":4900000.0,"lengthMeters":182.0,"ratePesosPerMeter":26923.076923076922,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21828"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay San Luis, Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+690.00","amountPesos":19600000.0,"lengthMeters":690.0,"ratePesosPerMeter":28405.797101449276,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21830"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Sto. Domingo, Tarlac City, Tarlac, Sta. 0+394.90 - Sta. 1+600.30","amountPesos":29400000.0,"lengthMeters":1205.4,"ratePesosPerMeter":24390.243902439022,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21832"},{"year":2026,"category":"Roads","project":"Construction of Dicolor - Tagumbao Road, Gerona, Tarlac, Sta. 0+000.00 - Sta. 0+776.00, Sta. 0+842.00 -Sta. 0+966.90, Sta.1+160.00 -Sta. 1+372.00","amountPesos":18829000.0,"lengthMeters":1112.9,"ratePesosPerMeter":16918.86063437865,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21834"},{"year":2026,"category":"Roads","project":"Construction of Padapada - Calayaan Road, Gerona, Tarlac, Sta. 0+000.00 - Sta. 0+380.80","amountPesos":9414000.0,"lengthMeters":380.8,"ratePesosPerMeter":24721.638655462186,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21836"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Rafael, Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+978.00","amountPesos":18829000.0,"lengthMeters":978.0,"ratePesosPerMeter":19252.556237218814,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21838"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sapang Maragul, Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+514.00","amountPesos":9414000.0,"lengthMeters":514.0,"ratePesosPerMeter":18315.175097276264,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21840"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sula, San Jose, Tarlac,Section 1: Sta. 0+000.00 - Sta. 0+281.00, Section 2: Sta. 0+000.00 - Sta. 0+040.00","amountPesos":9414000.0,"lengthMeters":281.0,"ratePesosPerMeter":33501.779359430606,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21842"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Ungot, Tarlac City, Tarlac, Segment 1: Sta. 0+000.00 - Sta. 0+240.00, Segment 2: Sta. 0+000.00 - Sta. 0+385.00","amountPesos":18829000.0,"lengthMeters":385.0,"ratePesosPerMeter":48906.493506493505,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21844"},{"year":2026,"category":"Roads","project":"Rehabilitation of Barangay Lourdes Road, Barangay Lourdes, Tarlac City, Tarlac, Segment 1: Sta. 0+000.00 - Sta. 0+473.00, Segment 2: Sta. 0+000.00 - Sta. 0+213.00, Segment 3: Sta. 0+000.00 - Sta. 0+035.00","amountPesos":18829000.0,"lengthMeters":473.0,"ratePesosPerMeter":39807.61099365751,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21846"},{"year":2026,"category":"Roads","project":"Rehabilitation of Gerona Road Network (Tagumbao - Villa Paz Section), Gerona, Tarlac, Sta. 0+000.00 - Sta. 2+766.00","amountPesos":9414000.0,"lengthMeters":2766.0,"ratePesosPerMeter":3403.470715835141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21848"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Care, Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+335.50","amountPesos":9414000.0,"lengthMeters":335.5,"ratePesosPerMeter":28059.612518628914,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21850"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Santo Domingo, Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+394.90","amountPesos":9414000.0,"lengthMeters":394.9,"ratePesosPerMeter":23838.946568751584,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21852"},{"year":2026,"category":"Roads","project":"Construction of Iba-Botolan Bypass Road with Solar Lights, Botolan to Iba, Zambales Sta. 12+460.00 - Sta. 12+710.00","amountPesos":22594000.0,"lengthMeters":250.0,"ratePesosPerMeter":90376.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21855"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage at Barangay Del Pilar, Sta. 0+000 - Sta. 0+454.60, Castillejos, Zambales","amountPesos":10000000.0,"lengthMeters":454.6,"ratePesosPerMeter":21997.360316761988,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21858"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage at Barangay Sto. Tomas, Sta. 0+000 - Sta. 0+600, Subic, Zambales","amountPesos":20000000.0,"lengthMeters":600.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21860"},{"year":2026,"category":"Bridges","project":"Construction (Completion) of Bridge, Sta.0+000 - Sta.0+025, Sitio Piit, Barangay Talumpok Kanluran, Batangas City, Batangas","amountPesos":19220000.0,"lengthMeters":25.0,"ratePesosPerMeter":768800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21864"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sta.0+000 - Sta.0+015, Barangay Padre Castillo, San Pascual, Batangas","amountPesos":19220000.0,"lengthMeters":15.0,"ratePesosPerMeter":1281333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21866"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sta.0+000 - Sta.0+015, Barangay Paharang Kanluran, Batangas City, Batangas","amountPesos":18991000.0,"lengthMeters":15.0,"ratePesosPerMeter":1266066.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21868"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sta.0+000 - Sta.0+040, Barangay Tejero, San Luis, Batangas","amountPesos":40363000.0,"lengthMeters":40.0,"ratePesosPerMeter":1009075.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21870"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta.0+000 - Sta.0+471.5, Barangay Manggahan, San Luis, Batangas","amountPesos":4805000.0,"lengthMeters":471.5,"ratePesosPerMeter":10190.880169671262,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21872"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta.0+000 - Sta.0+208.5, Barangay Tungal, San Luis, Batangas","amountPesos":4805000.0,"lengthMeters":208.5,"ratePesosPerMeter":23045.56354916067,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21874"},{"year":2026,"category":"Roads","project":"Improvement of Road, Sta.0+000 - Sta.0+938, Barangay Haligue Kanluran, Batangas City, Batangas","amountPesos":8018000.0,"lengthMeters":938.0,"ratePesosPerMeter":8547.974413646056,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21878"},{"year":2026,"category":"Roads","project":"Improvement of Road, Sta.0+000 - Sta.0+936, Barangay Maruclap, Batangas City, Batangas","amountPesos":8018000.0,"lengthMeters":936.0,"ratePesosPerMeter":8566.239316239316,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21880"},{"year":2026,"category":"Roads","project":"Improvement of Road, Sta.0+000 - Sta.0+345, Barangay Sorosoro Ibaba, Batangas City, Batangas","amountPesos":9610000.0,"lengthMeters":345.0,"ratePesosPerMeter":27855.072463768116,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21882"},{"year":2026,"category":"Roads","project":"Improvement of Road, Sta.0+000 - Sta.0+385, Barangay Sorosoro Ilaya, Batangas City, Batangas","amountPesos":8018000.0,"lengthMeters":385.0,"ratePesosPerMeter":20825.974025974025,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21884"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Sta.0+000 - Sta.0+490, Barangay Banaba to Balimbing Road, San Pascual, Batangas","amountPesos":4805000.0,"lengthMeters":490.0,"ratePesosPerMeter":9806.122448979591,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21886"},{"year":2026,"category":"Roads","project":"Rehabilitation Of Road, Sta.0+000 - Sta.0+525, Barangay Luya, San Luis, Batangas","amountPesos":5000000.0,"lengthMeters":525.0,"ratePesosPerMeter":9523.809523809523,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21888"},{"year":2026,"category":"Bridges","project":"Construction Of Bridge, Sta.0+000 - Sta.0+060, Barangay Sto. Niño, San Pascual, Batangas","amountPesos":75000000.0,"lengthMeters":60.0,"ratePesosPerMeter":1250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21892"},{"year":2026,"category":"Bridges","project":"Construction Of Bridge, Sta.0+000 - Sta.0+030, Barangay Gelerang Kawayan, San Pascual, Batangas","amountPesos":35000000.0,"lengthMeters":30.0,"ratePesosPerMeter":1166666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21894"},{"year":2026,"category":"Roads","project":"Construction Of Road, Sta.0+000 - Sta.0+471.5, Barangay Manggahan, San Luis, Batangas","amountPesos":5000000.0,"lengthMeters":471.5,"ratePesosPerMeter":10604.453870625663,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21898"},{"year":2026,"category":"Roads","project":"Rehabilitation Of Road, Sta. 0+000 - Sta. 1+752,  Barangay San Antonio To Barangay Sto Niño, San Pascual, Batangas","amountPesos":25000000.0,"lengthMeters":1752.0,"ratePesosPerMeter":14269.406392694063,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21900"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Sta.0+000 - Sta.1+070, Barangay Tulo, Batangas City, Batangas","amountPesos":8018000.0,"lengthMeters":1070.0,"ratePesosPerMeter":7493.457943925234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21902"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage, Barangay San Fernando, Sta. 0+000 - Sta. 0+210, Malvar, Batangas","amountPesos":5766000.0,"lengthMeters":210.0,"ratePesosPerMeter":27457.14285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21915"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Banadero, Sta. 000+023 - Sta. 000+398, Tanauan City, Batangas","amountPesos":4009000.0,"lengthMeters":375.0,"ratePesosPerMeter":10690.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21919"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Maabud North, Section 1: Sta.0+000-Sta.0+072, Section 2: Sta.0+000-Sta.0+085, Section 3: Sta.0+000-Sta.0+067, Section 4: Sta.0+000-Sta.0+070, Section 5: Sta.0+000-Sta.0+037, San Nicolas, Batangas","amountPesos":4009000.0,"lengthMeters":85.0,"ratePesosPerMeter":47164.705882352944,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21921"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Malaking Pulo, Sta. 000+000 - Sta. 000+315, Tanauan City, Batangas","amountPesos":4009000.0,"lengthMeters":315.0,"ratePesosPerMeter":12726.984126984127,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21923"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Pagaspas, Section 1: Sta. 0+070 - Sta. 0+148, Section 2: Sta. 0+000 - Sta. 0+144, Tanauan City, Batangas","amountPesos":4009000.0,"lengthMeters":148.0,"ratePesosPerMeter":27087.837837837837,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21925"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay San Isidro Sur, Sta. 0+000 - Sta. 0+360, Sto Tomas City, Batangas","amountPesos":4009000.0,"lengthMeters":360.0,"ratePesosPerMeter":11136.111111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21927"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay San Joaquin, Section 1: Sta. 0+000 - Sta. 0+152.42, Section 2: Sta. 0+000 - Sta. 0+116.50, Sto. Tomas City, Batangas","amountPesos":5613000.0,"lengthMeters":152.42,"ratePesosPerMeter":36825.87586930849,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21929"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay San Juan, Sta. 0+000 - Sta. 0+207, Sto Tomas City, Batangas","amountPesos":4009000.0,"lengthMeters":207.0,"ratePesosPerMeter":19367.149758454107,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21931"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay San Pioquinto, Sta. 0+000 - Sta. 0+366, Malvar, Batangas","amountPesos":4009000.0,"lengthMeters":366.0,"ratePesosPerMeter":10953.551912568306,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21933"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Zone 6, Section 1: Sta. 0+000 - 0+068, Section 2: Sta. 0+000 - 0+078, Section 3: Sta. 0+000 - 0+150, Talisay, Batangas","amountPesos":4009000.0,"lengthMeters":150.0,"ratePesosPerMeter":26726.666666666668,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21937"},{"year":2026,"category":"Roads","project":"Rehabilitation Of Provincial Road Including Drainage At Sta. 0+000 - Sta. 0+600, Barangay Poblacion, San Nicolas, Batangas","amountPesos":25000000.0,"lengthMeters":600.0,"ratePesosPerMeter":41666.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21941"},{"year":2026,"category":"Roads","project":"Rehabilitation of Slope Protection along Road, Barangay Don Juan, Sta. 0+030 - Sta. 0+080, Cuenca, Batangas","amountPesos":17298000.0,"lengthMeters":50.0,"ratePesosPerMeter":345960.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21945"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Calubcub I, Sta. 0+000 - Sta. 0+450, San Juan, Batangas","amountPesos":4009000.0,"lengthMeters":450.0,"ratePesosPerMeter":8908.888888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21948"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Duhatan, Sta. 0+000 - Sta. 0+068, Sta. 0+000 - Sta. 0+082, Sta. 0+000 - Sta. 0+050, Sta. 0+000 - Sta. 0+707, Lipa City, Batangas","amountPesos":6415000.0,"lengthMeters":707.0,"ratePesosPerMeter":9073.550212164073,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21950"},{"year":2026,"category":"Roads","project":"Improvement of Road along Pangao-Lodlod, Sta. 000+000 - Sta. 001+100, Lipa City, Batangas","amountPesos":19220000.0,"lengthMeters":1100.0,"ratePesosPerMeter":17472.727272727272,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21952"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Halang, Sta. 0+000 - Sta. 0+800, Lipa City, Batangas","amountPesos":8018000.0,"lengthMeters":800.0,"ratePesosPerMeter":10022.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21954"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Natu, Sta. 0+000 - Sta. 0+420, Rosario, Batangas","amountPesos":4009000.0,"lengthMeters":420.0,"ratePesosPerMeter":9545.238095238095,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21956"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Talisay, Sta. 0+000 - Sta. 0+518, Lipa City Batangas","amountPesos":16037000.0,"lengthMeters":518.0,"ratePesosPerMeter":30959.45945945946,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21958"},{"year":2026,"category":"Roads","project":"Construction of Road including Box Culvert at Barangay Colongan Sta. 0+000 - Sta. 0+400, Rosario, Batangas","amountPesos":9610000.0,"lengthMeters":400.0,"ratePesosPerMeter":24025.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21960"},{"year":2026,"category":"Roads","project":"Construction of Road including Box Culvert along Batangas-Quezon Rd K0116 + 289 - K0116 + 294 Barangay Quilib, Rosario, Batangas","amountPesos":4805000.0,"lengthMeters":5.0,"ratePesosPerMeter":961000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21962"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage System at Purok Santol, Barangay Dagatan Sta. 0+000 - Sta. 0+263, San Jose, Batangas","amountPesos":4805000.0,"lengthMeters":263.0,"ratePesosPerMeter":18269.96197718631,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21964"},{"year":2026,"category":"Roads","project":"Construction of Drainage Structure along Road, Barangay Dagatan, Sta. 0+000 - Sta. 0+415, Lipa City, Batangas","amountPesos":24025000.0,"lengthMeters":415.0,"ratePesosPerMeter":57891.56626506024,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21966"},{"year":2026,"category":"Roads","project":"Construction of Drainage Structure along Road, Barangay Lumbang, Sta. 0+000 - Sta. 0+584, Lipa City, Batangas","amountPesos":9610000.0,"lengthMeters":584.0,"ratePesosPerMeter":16455.479452054795,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21968"},{"year":2026,"category":"Roads","project":"Construction of Drainage Structure along Road, Barangay Pagolingin East, Sta.0+000 - Sta. 0+610, Sta. 0+000 - Sta. 0+223, Lipa City, Batangas","amountPesos":8621000.0,"lengthMeters":610.0,"ratePesosPerMeter":14132.786885245901,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21970"},{"year":2026,"category":"Roads","project":"Improvement of Road at Barangay Anilao Labac, Sta. 0+000 - Sta. 0+388, Sta. 0+000 - Sta. 0+120, Sta. 0+000 - Sta. 0+084, Sta. 0+000 - Sta. 0+202, Sta. 0+000 - Sta. 0+064, Sta. 0+000 - Sta. 0+078, Sta. 0+000 - Sta. 0+047, Sta. 0+000 - Sta. 0+086, Sta. 0+000 - Sta. 0+022, Lipa City Batangas","amountPesos":12028000.0,"lengthMeters":388.0,"ratePesosPerMeter":31000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21974"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage System at Barangay Mataas na Lupa, Sta. 0+000 - Sta. 0+100, Lipa City, Batangas","amountPesos":43246000.0,"lengthMeters":100.0,"ratePesosPerMeter":432460.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 21976"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Section 1: Sta. 0+000 - Sta. 0+422, Section 2: Sta. 0+000 - Sta. 0+544, Section 3: Sta. 0+000 - Sta. 0+476, Section 4: Sta. 0+000 - Sta. 1+086, Section 5: Sta. 0+000 - Sta. 0+040, Section 6: Sta. 0+000 - Sta. 1+129, Section 7: Sta. 0+000 - Sta. 0+119, Section 8: Sta. 0+000 - Sta. 0+412, Municipality of Ibaan, Batangas","amountPesos":24055000.0,"lengthMeters":1129.0,"ratePesosPerMeter":21306.465899025687,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22039"},{"year":2026,"category":"Roads","project":"Construction of Malabon Grande-San Juan-Mulawin Diversion Road, 0 + 000 - STA. 0 + 198.145, General Trias City, Cavite","amountPesos":20046000.0,"lengthMeters":198.145,"ratePesosPerMeter":101168.33631936208,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22042"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage at Brgy. Palico 4, Sta. 00 + 000 - Sta. 00 + 038, Sta. 00 + 097 - Sta. 00 + 234, Imus, Cavite","amountPesos":4805000.0,"lengthMeters":175.0,"ratePesosPerMeter":27457.14285714286,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22044"},{"year":2026,"category":"Roads","project":"Construction of Road With Canal Lining, Brgy. Salaban, Sta 0 + 000 to 0 + 150, Amadeo, Cavite","amountPesos":4805000.0,"lengthMeters":150.0,"ratePesosPerMeter":32033.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22046"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Brgy. Amaya I, Sta 0 + 000 to 0 + 186, Tanza, Cavite","amountPesos":4805000.0,"lengthMeters":186.0,"ratePesosPerMeter":25833.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22048"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Brgy. Paradahan I, Sta 0 + 000 to 0 + 186, Tanza, Cavite","amountPesos":4805000.0,"lengthMeters":186.0,"ratePesosPerMeter":25833.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22050"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Brgy. Julugan V, Sta 0 + 000 to 0 + 186, Tanza, Cavite","amountPesos":4805000.0,"lengthMeters":186.0,"ratePesosPerMeter":25833.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22052"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Brgy. Lambingan, Sta 0 + 000 to 0 + 186, Tanza, Cavite","amountPesos":4805000.0,"lengthMeters":186.0,"ratePesosPerMeter":25833.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22054"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Brgy. Banaba Cerca, Sta 0 + 000 to 0 + 186, Indang, Cavite","amountPesos":4805000.0,"lengthMeters":186.0,"ratePesosPerMeter":25833.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22056"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Brgy. Conchu, Sta 0 + 000 to 0 + 510, Trece Martires City, Cavite","amountPesos":9610000.0,"lengthMeters":510.0,"ratePesosPerMeter":18843.13725490196,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22058"},{"year":2026,"category":"Roads","project":"Construction of Box Culvert along Road at Barangay Mulawin, Sta 0 + 000 to 0 + 959, Tanza, Cavite","amountPesos":15376000.0,"lengthMeters":959.0,"ratePesosPerMeter":16033.368091762253,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22060"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage connecting to Imus Integrated School, Sta. 00 + 627 - Sta. 01 + 203, Barangay Maharlika, Imus, Cavite","amountPesos":40092000.0,"lengthMeters":576.0,"ratePesosPerMeter":69604.16666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22062"},{"year":2026,"category":"Roads","project":"Construction of Lined Canal along Road at Barangay Mulawin, Sta 0 + 000 to 0 + 096, Tanza, Cavite","amountPesos":2114000.0,"lengthMeters":96.0,"ratePesosPerMeter":22020.833333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22064"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Navarro, Sta. 0+000 - Sta. 0+214.3, General Trias City, Cavite","amountPesos":8018000.0,"lengthMeters":214.3,"ratePesosPerMeter":37414.83901073261,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22066"},{"year":2026,"category":"Roads","project":"Construction of Road, Carsadang Bago R1 By-Pass, Sta. 0 + 000 - Sta. 0 + 259, Toclong Section, Kawit, Cavite","amountPesos":36519000.0,"lengthMeters":259.0,"ratePesosPerMeter":141000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22068"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Pasong Camachile II, Sta. 0+000 - Sta. 0+481.21, General Trias City, Cavite","amountPesos":8018000.0,"lengthMeters":481.21,"ratePesosPerMeter":16662.164127927517,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22070"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road along Malagasang I-G - Alapan II-B Road, Sta. 02 + 300 - Sta. 02 + 493, Imus, Cavite","amountPesos":7133000.0,"lengthMeters":193.0,"ratePesosPerMeter":36958.54922279793,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22072"},{"year":2026,"category":"Roads","project":"Improvement of Road at Section 1 (0+000 to 0+400) and Section 2 (0+054 to  1+400) , Brgy Galicia 3 to Panungyan I, Mendez, Cavite","amountPesos":28831000.0,"lengthMeters":1400.0,"ratePesosPerMeter":20593.571428571428,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22075"},{"year":2026,"category":"Bridges","project":"Construction (Completion) of Bridge Connecting Barangay Lumil and Barangay Cabangaan, Sta. 0+854.12 - Sta. 0+979.32, Silang, Cavite","amountPesos":41305000.0,"lengthMeters":125.2,"ratePesosPerMeter":329912.1405750798,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22078"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage along Felix Sayos Street, Sta. 0+000 - Sta. 0+130, Dasmariñas City, Cavite","amountPesos":8018000.0,"lengthMeters":130.0,"ratePesosPerMeter":61676.92307692308,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22080"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage at Barangay Burol Main (Road leading to Barangay Salitran I), Sta. 0+000 - Sta. 0+320, Dasmariñas City, Cavite","amountPesos":24055000.0,"lengthMeters":320.0,"ratePesosPerMeter":75171.875,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22082"},{"year":2026,"category":"Roads","project":"Construction of Service Road at Barangay Salinas, Sta. 0+ 000 - Sta. 0+095, Bacoor City, Cavite","amountPesos":9141000.0,"lengthMeters":95.0,"ratePesosPerMeter":96221.05263157895,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22084"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Drainage at San Esteban Street (Sta. 0+000 - Sta. 0+159) and Gain Street (Sta. 0+000 - Sta. 0+231), Barangay San Esteban, Dasmariñas City, Cavite","amountPesos":16037000.0,"lengthMeters":231.0,"ratePesosPerMeter":69424.24242424243,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22086"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Drainage at Barangay San Simon, Sta. 0+000 - Sta. 0+170, Dasmariñas City, Cavite","amountPesos":8018000.0,"lengthMeters":170.0,"ratePesosPerMeter":47164.705882352944,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22088"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Drainage at Barangay Victoria Reyes, Sta. 0+000 - Sta. 0+205, Dasmariñas City, Cavite","amountPesos":8820000.0,"lengthMeters":205.0,"ratePesosPerMeter":43024.39024390244,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22090"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Drainages at Barangay Sampaloc IV, Sta. 0+000 - Sta. 1+164, Dasmariñas City, Cavite","amountPesos":40092000.0,"lengthMeters":1164.0,"ratePesosPerMeter":34443.298969072166,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22096"},{"year":2026,"category":"Bridges","project":"Construction of Hanging Bridge at Sta. 0 + 000 - 0 + 085, Barangay Magdapio, Pagsanjan, Laguna","amountPesos":82647000.0,"lengthMeters":85.0,"ratePesosPerMeter":972317.6470588235,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22101"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage, Barangay Pooc STA 0+000 - STA 0+800, Sta. Rosa, Laguna","amountPesos":25947000.0,"lengthMeters":800.0,"ratePesosPerMeter":32433.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22106"},{"year":2026,"category":"Roads","project":"Rehabilitation of Magsaysay Road STA 0+000 - STA 0+350, San Pedro City, Laguna","amountPesos":10424000.0,"lengthMeters":350.0,"ratePesosPerMeter":29782.85714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22108"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road along Barangay Calendola STA 0+000 - STA 1+700, San Pedro City, Laguna","amountPesos":40092000.0,"lengthMeters":1700.0,"ratePesosPerMeter":23583.529411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22110"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road along Barangay Pacita I STA 0+000 - STA 1+200, San Pedro City, Laguna","amountPesos":32074000.0,"lengthMeters":1200.0,"ratePesosPerMeter":26728.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22112"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road along Barangay San Vicente STA 0+000 - STA 0+600, San Pedro City, Laguna","amountPesos":16037000.0,"lengthMeters":600.0,"ratePesosPerMeter":26728.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22114"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road along Sampaguita Village STA 0+000 - STA 0+900, San Pedro City, Laguna","amountPesos":16337000.0,"lengthMeters":900.0,"ratePesosPerMeter":18152.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22116"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Drainage at Barangay Maharlika STA 0+000 - STA 1+000, San Pedro City, Laguna","amountPesos":37477000.0,"lengthMeters":1000.0,"ratePesosPerMeter":37477.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22118"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road Slope Protection Structure along Mt. Makiling Eco Tourism Road STA 0+000 - STA 0+100, Los Baños, Laguna","amountPesos":9610000.0,"lengthMeters":100.0,"ratePesosPerMeter":96100.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22120"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Brgy. San Gabriel, San Pablo City, Laguna - Sta. 0 + 000 - Sta. 1 + 000","amountPesos":19220000.0,"lengthMeters":1000.0,"ratePesosPerMeter":19220.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22125"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Pagalangan, Victoria, Laguna - Sta. 0 + 000 - Sta. 0 + 785","amountPesos":14415000.0,"lengthMeters":785.0,"ratePesosPerMeter":18363.057324840764,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22127"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay San Buenaventura, San Pablo City, Laguna - Sta. 0 + 000 - Sta. 0 + 886","amountPesos":24025000.0,"lengthMeters":886.0,"ratePesosPerMeter":27116.25282167043,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22131"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Balayong, Nagcarlan, Laguna - Sta. 0 + 000 - Sta. 0 + 450","amountPesos":4805000.0,"lengthMeters":450.0,"ratePesosPerMeter":10677.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22133"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Del Remedio, San Pablo City, Laguna - Sta. 0 + 000 - Sta. 0 + 535","amountPesos":9610000.0,"lengthMeters":535.0,"ratePesosPerMeter":17962.616822429907,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22135"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Alibungbungan, Nagcarlan, Laguna - Sta. 0 + 000 - Sta. 0 + 450","amountPesos":4805000.0,"lengthMeters":450.0,"ratePesosPerMeter":10677.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22137"},{"year":2026,"category":"Roads","project":"Reconstruction of Road, Barangay Antipolo, Rizal, Laguna - Sta. 0 + 000 - Sta. 0 + 535","amountPesos":8018000.0,"lengthMeters":535.0,"ratePesosPerMeter":14986.915887850468,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22139"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Concepcion, San Pablo City, Laguna - Sta. 0 + 000 - Sta. 0 + 500","amountPesos":4805000.0,"lengthMeters":500.0,"ratePesosPerMeter":9610.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22141"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Entablado, Rizal, Laguna - Sta. 0 + 000 - Sta. 0 + 535","amountPesos":8018000.0,"lengthMeters":535.0,"ratePesosPerMeter":14986.915887850468,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22143"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Limao, Calauan, Laguna - Sta. 0 + 000 - Sta. 00 + 186","amountPesos":4805000.0,"lengthMeters":186.0,"ratePesosPerMeter":25833.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22145"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Masiit, Calauan, Laguna - Sta. 0 + 000 - Sta. 00 + 356","amountPesos":17298000.0,"lengthMeters":356.0,"ratePesosPerMeter":48589.88764044944,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22147"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Talaga, Rizal, Laguna - Sta. 0 + 000 - Sta. 0 + 254","amountPesos":4009000.0,"lengthMeters":254.0,"ratePesosPerMeter":15783.464566929133,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22149"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Del Carmen, Alaminos, Laguna - Sta. 0 + 000 - Sta. 0 + 482","amountPesos":9610000.0,"lengthMeters":482.0,"ratePesosPerMeter":19937.759336099585,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22153"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay San Andres to Barangay San Ildefonso, Alaminos, Laguna - Sta. 0 + 000 - Sta. 0 + 964","amountPesos":20000000.0,"lengthMeters":964.0,"ratePesosPerMeter":20746.887966804978,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22155"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Mojon, Liliw, Laguna - Sta. 0 + 000 - Sta. 2 + 285","amountPesos":16037000.0,"lengthMeters":2285.0,"ratePesosPerMeter":7018.380743982494,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22157"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay San Vicente to Barangay Sta. Ana, San Pablo City, Laguna - Sta. 0 + 000 - Sta. 2 + 521","amountPesos":50000000.0,"lengthMeters":2521.0,"ratePesosPerMeter":19833.399444664814,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22159"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay 3D, San Pablo City, Laguna - Sta. 0 + 000 - Sta. 2 + 000","amountPesos":19220000.0,"lengthMeters":2000.0,"ratePesosPerMeter":9610.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22161"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Sto. Cristo, San Pablo City, Laguna - Sta. 0 + 000 - Sta. 3 + 000","amountPesos":28831000.0,"lengthMeters":3000.0,"ratePesosPerMeter":9610.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22163"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Tuy, Rizal, Laguna - Sta.0 + 000 - Sta. 1 + 433","amountPesos":16037000.0,"lengthMeters":1433.0,"ratePesosPerMeter":11191.207257501745,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22165"},{"year":2026,"category":"Bridges","project":"Construction of San Miguel-San Rafael Bridge, Sta. 0+000 - Sta. 0+020, Barangay San Miguel, Mauban, Quezon","amountPesos":19220000.0,"lengthMeters":20.0,"ratePesosPerMeter":961000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22170"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Cotta, Sta. 0 + 000 - Sta. 0 + 290, Lucena City, Quezon","amountPesos":4805000.0,"lengthMeters":290.0,"ratePesosPerMeter":16568.96551724138,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22175"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Sampaloc Sto. Cristo, Sta. 0 + 000 - Sta. 0 + 870, Sariaya, Quezon","amountPesos":14415000.0,"lengthMeters":870.0,"ratePesosPerMeter":16568.96551724138,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22177"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Cabay, Sta. 0 + 000 - Sta. 0 + 580, Tiaong, Quezon","amountPesos":9610000.0,"lengthMeters":580.0,"ratePesosPerMeter":16568.96551724138,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22179"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay 10 to Cawayanin Ibaba, Catanauan, Quezon Sta. 0+000 - Sta. 0+040.00","amountPesos":47477000.0,"lengthMeters":40.0,"ratePesosPerMeter":1186925.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22182"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay Sta. Rosa to Barangay Latangan, Mulanay, Quezon Sta. 0+000 - Sta. 0+040.00","amountPesos":47477000.0,"lengthMeters":40.0,"ratePesosPerMeter":1186925.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22184"},{"year":2026,"category":"Roads","project":"Construction of Road along Barangay Dela Paz to Barangay San Pedro to Barangay Villa Magsaysay to Barangay Rizal, Buenavista, Quezon Sta. 0 + 711 - Sta. 3 + 511","amountPesos":40092000.0,"lengthMeters":2800.0,"ratePesosPerMeter":14318.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22186"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Lipata, Padre Burgos, Quezon, Sta. 0 + 334.00 - Sta. 1 + 334.00","amountPesos":16037000.0,"lengthMeters":1000.0,"ratePesosPerMeter":16037.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22188"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Tulay Buhangin, Padre Burgos, Quezon, Sta. 5 + 038.00 - Sta. 6 + 038.00","amountPesos":16037000.0,"lengthMeters":1000.0,"ratePesosPerMeter":16037.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22190"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Ajos and Barangay Madulao, Catanauan, Quezon, Sta. 0 + 290.50 - Sta. 1 + 400.00","amountPesos":16037000.0,"lengthMeters":1109.5,"ratePesosPerMeter":14454.258675078865,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22192"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bolo to Barangay Cutcutan, Catanauan, Quezon, Sta. 1 + 600.00 - Sta. 3 + 100.00","amountPesos":24055000.0,"lengthMeters":1500.0,"ratePesosPerMeter":16036.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22194"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cabulihan Ibaba to Barangay San Roque, Unisan, Quezon Sta. 0 + 000.00 - Sta. 0 + 200.00, Sta. 0 + 498.00 - Sta. 0 + 920.00, Sta. 1 + 509.00 - Sta. 1 + 887.00","amountPesos":16037000.0,"lengthMeters":1000.0,"ratePesosPerMeter":16037.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22196"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Ilayang Yuni, Mulanay, Quezon, Sta. 0 + 203.00 - Sta. 3 + 003.00","amountPesos":40092000.0,"lengthMeters":2800.0,"ratePesosPerMeter":14318.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22198"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Isidro Ilaya, General Luna, Quezon Sta. 0 + 000 - Sta. 1 + 000","amountPesos":16037000.0,"lengthMeters":1000.0,"ratePesosPerMeter":16037.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22200"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sumag Oeste, Pitogo, Quezon, Sta. 9+580.00 - Sta. 10+080.00","amountPesos":8018000.0,"lengthMeters":500.0,"ratePesosPerMeter":16036.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22202"},{"year":2026,"category":"Bridges","project":"Construction of Barangay Villa Hiwasayan Bridge and Approaches, STA. 007+700 - STA. 007+720, Guinayangan, Quezon","amountPesos":27925000.0,"lengthMeters":20.0,"ratePesosPerMeter":1396250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22205"},{"year":2026,"category":"Bridges","project":"Construction of Bridge and Approaches, Barangay Argosino, STA 005+835 - STA 005+851 Quezon, Quezon","amountPesos":16337000.0,"lengthMeters":16.0,"ratePesosPerMeter":1021062.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22207"},{"year":2026,"category":"Bridges","project":"Construction of Bridge and Approaches, Barangay Duhat, STA 002+362 - STA 002+382, Plaridel, Quezon","amountPesos":11532000.0,"lengthMeters":20.0,"ratePesosPerMeter":576600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22209"},{"year":2026,"category":"Bridges","project":"Construction of Bridge and Approaches, Barangay Pampaaralan, STA 000+190 - STA 000+200, Plaridel, Quezon","amountPesos":4748000.0,"lengthMeters":10.0,"ratePesosPerMeter":474800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22211"},{"year":2026,"category":"Bridges","project":"Construction of Bridge and Approaches, Barangay Poblacion 3 - Barangay Villa Victoria, STA 001+048 - STA 001+088, Alabat, Quezon","amountPesos":7596000.0,"lengthMeters":40.0,"ratePesosPerMeter":189900.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22213"},{"year":2026,"category":"Bridges","project":"Construction of Bridge and Approaches, Barangay Sangirin, K0038+940 - K0038+970, Perez, Quezon","amountPesos":48051000.0,"lengthMeters":30.0,"ratePesosPerMeter":1601700.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22215"},{"year":2026,"category":"Bridges","project":"Construction of Bridge and Approaches, Barangay Villa Gomez, STA 008+005 - STA 008+025, Quezon, Quezon","amountPesos":28486000.0,"lengthMeters":20.0,"ratePesosPerMeter":1424300.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22217"},{"year":2026,"category":"Bridges","project":"Construction of Bridge and Approaches, Sitio Cagalimango, K0034 + 142 - K0034 + 157, Barangay Pinagtubigan Este, Perez, Quezon","amountPesos":14243000.0,"lengthMeters":15.0,"ratePesosPerMeter":949533.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22219"},{"year":2026,"category":"Bridges","project":"Construction of Bridge Connecting Binangonan and Morong Sta. 1+480 - Sta. 1+500, Binangonan, Rizal","amountPesos":47477000.0,"lengthMeters":20.0,"ratePesosPerMeter":2373850.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22222"},{"year":2026,"category":"Roads","project":"Construction of Road along Cable Way Sta. 1+460 - Sta. 1+676, Barangay Darangan, Binangonan, Rizal","amountPesos":20046000.0,"lengthMeters":216.0,"ratePesosPerMeter":92805.55555555556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22224"},{"year":2026,"category":"Roads","project":"Construction of Road at Highway 2000 Pahse II Sta. 1+376 - Sta. 1+573, Taytay, Rizal","amountPesos":38441000.0,"lengthMeters":197.0,"ratePesosPerMeter":195131.97969543148,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22226"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage at Taktak Road Daang bakal to Saidi Compound, Sta. 0+000 - Sta.0+365, Barangay Dela Paz Antipolo City","amountPesos":21719000.0,"lengthMeters":365.0,"ratePesosPerMeter":59504.109589041094,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22228"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage at Everlasting St. Sta. 0+000 - Sta.0+206, Antipolo Valley Subdivision, Barangay Mambugan, Antipolo City","amountPesos":9610000.0,"lengthMeters":206.0,"ratePesosPerMeter":46650.48543689321,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22230"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage at Narra, Loremar Homes, Sta.0+000 - Sta.0+350, Barangay San Isidro, Antipolo City","amountPesos":10141000.0,"lengthMeters":350.0,"ratePesosPerMeter":28974.285714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22232"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage at Baybay Sapa, Sta.0+000-Sta.0+240, Barangay Mayamot, Antipolo City","amountPesos":4805000.0,"lengthMeters":240.0,"ratePesosPerMeter":20020.833333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22236"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage Sta. 0+000 - Sta.0+300, at Emerald Hills Subdivision, Barangay Sta. Cruz, Antipolo City","amountPesos":9610000.0,"lengthMeters":300.0,"ratePesosPerMeter":32033.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22238"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage at Diamond St., Sta. 0+000-Sta.0+200, Teremil Subdivision, Barangay Mambugan, Antipolo City","amountPesos":4805000.0,"lengthMeters":200.0,"ratePesosPerMeter":24025.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22240"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage Sta.0+000-Sta.0+200, at Purok Angela, Barangay Dela Paz, Antipolo City","amountPesos":7015000.0,"lengthMeters":200.0,"ratePesosPerMeter":35075.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22242"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage at Michael St., Sta.0+000 - Sta.0+300, Kingsville Subdivision, Barangay Mambugan, Antipolo City","amountPesos":14415000.0,"lengthMeters":300.0,"ratePesosPerMeter":48050.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22244"},{"year":2026,"category":"Roads","project":"Construction of Road Slope Protection Structure Sta. 0+000 - Sta. 0+182.40, Barangay San Vicente, Angono, Rizal","amountPesos":28108000.0,"lengthMeters":182.4,"ratePesosPerMeter":154100.87719298244,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22246"},{"year":2026,"category":"Roads","project":"Improvement of Road and Drainage System, Botong Francisco Avenue (Phase II) Sta. 1+346 - Sta. 1+750, Barangay San Isidro, Angono, Rizal","amountPesos":40092000.0,"lengthMeters":404.0,"ratePesosPerMeter":99237.62376237624,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22248"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage System, Sitio Dilain, Sta, 0+000 - Sta. 0+140.00 Barangay Muntindilaw, Antipolo City, Rizal","amountPesos":9369000.0,"lengthMeters":140.0,"ratePesosPerMeter":66921.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22250"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage System, Sitio Ondoy, Sta. 0+000 - 0+280.00 Barangay Muntindilaw, Antipolo City, Rizal","amountPesos":9369000.0,"lengthMeters":280.0,"ratePesosPerMeter":33460.71428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22252"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage System, V.V.Soliven Avenue, Sta. 0+700- Sta.0+722, Going to Balanti (Outfall), Barangay Mayamot, Antipolo City","amountPesos":14415000.0,"lengthMeters":22.0,"ratePesosPerMeter":655227.2727272727,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22254"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage System, Village East Executive Homes, Village East Ave. 0+000.00 - 0+213.00 Barangay Muntindilaw, Antipolo City","amountPesos":14054000.0,"lengthMeters":213.0,"ratePesosPerMeter":65981.220657277,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22256"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road Slope Protection along Don Mariano Santos Avenue (DOMSA) Sta. 2+700 - Sta. 2+850, Angono Rizal","amountPesos":18738000.0,"lengthMeters":150.0,"ratePesosPerMeter":124920.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22258"},{"year":2026,"category":"Bridges","project":"Construction (Completion) of Sto. Niño Bridge, Sta. 0+000 - Sta. 0+045, Barangay Sto Niño, Tanay, Rizal","amountPesos":24025000.0,"lengthMeters":45.0,"ratePesosPerMeter":533888.8888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22261"},{"year":2026,"category":"Roads","project":"Construction of Road Barangay Silangan to Barangay Pintong Bukawe, Sta. 0+640 - Sta. 1+150, San Mateo, Rizal","amountPesos":28831000.0,"lengthMeters":510.0,"ratePesosPerMeter":56531.37254901961,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22263"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tandang Kutyo, Sta. 0+000 - Sta. 1+040, Tanay, Rizal","amountPesos":12028000.0,"lengthMeters":1040.0,"ratePesosPerMeter":11565.384615384615,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22265"},{"year":2026,"category":"Roads","project":"Rehabilitation of J.F Diaz Road from Sto. Niño to Buntong Palay, Sta. 0+000 - Sta. 0+936, San Mateo, Rizal","amountPesos":38567000.0,"lengthMeters":936.0,"ratePesosPerMeter":41204.05982905983,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22267"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Drainage along Kambal Road, Sta. 2+042 - Sta. 2+292, San Mateo, Rizal","amountPesos":16037000.0,"lengthMeters":250.0,"ratePesosPerMeter":64148.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22269"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road leading to Sanitary Landfill, Sta. 1+493 - Sta. 2+728, San Mateo, Rizal","amountPesos":40092000.0,"lengthMeters":1235.0,"ratePesosPerMeter":32463.157894736843,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22271"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+390, Sta. 0+000 - Sta. 0+060, Barangay Capayang, Mogpog, Marinduque","amountPesos":16604000.0,"lengthMeters":390.0,"ratePesosPerMeter":42574.35897435898,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22275"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Kasily to Barangay Kalangkang, Sta. 0 + 000 - Sta. 0 + 547.2, Sta. 0 + 875.70 - Sta. 1 + 012.20, Sta.1 + 037.50 - Sta. 1 + 078.50, Sta.1 + 114.90 - Sta. 1 + 262.40, Sta.1 + 309.20 - Sta. 1 + 347.00, Sta.1 + 448.00 - Sta. 1 + 537.00, Sta.1 + 618.00 - Sta. 1 + 723.00, Sta.1 + 764.00 - Sta. 1 +860.00, Santa Cruz, Marinduque","amountPesos":48110000.0,"lengthMeters":1200.0,"ratePesosPerMeter":40091.666666666664,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22277"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+118, Barangay Tambunan,  Boac, Marinduque","amountPesos":16604000.0,"lengthMeters":118.0,"ratePesosPerMeter":140711.86440677967,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22279"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Phase 1, Barangay Cabugao to Barangay Tapuyan, Sta. 0+000 - Sta. 0+325, Gasan, Marinduque","amountPesos":15395000.0,"lengthMeters":325.0,"ratePesosPerMeter":47369.230769230766,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22281"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Phase 1, Barangay Libas to Barangay Bagacay, Sta. 0+000 - Sta. 0+325, Buenavista, Marinduque","amountPesos":15395000.0,"lengthMeters":325.0,"ratePesosPerMeter":47369.230769230766,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22283"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Phase 1, Barangay Libas to Barangay Bicas-bicas, Sta. 0+000 - Sta. 0+325, Buenavista, Marinduque","amountPesos":15395000.0,"lengthMeters":325.0,"ratePesosPerMeter":47369.230769230766,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22285"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Phase 1, Barangay Mendez to Barangay Sayao, Sta. 0+000 - Sta. 0+250, Mogpog, Marinduque","amountPesos":11546000.0,"lengthMeters":250.0,"ratePesosPerMeter":46184.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22287"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Phase 1, Sta. 0+000 - Sta. 0+400, Sitio Sinambahan, Barangay Malibago, Torrijos Marinduque","amountPesos":19244000.0,"lengthMeters":400.0,"ratePesosPerMeter":48110.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22289"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Phase 2, Barangay Maranlig - Barangay Nangka, Sta. 0+000 - Sta. 0+061.50, Sta. 0+232 - Sta. 0+355, Sta. 0+660 - Sta. 0+715, Sta. 2+886 - Sta. 3+064, Sta. 3+290 - Sta. 3+426, Torrijos, Marinduque","amountPesos":19244000.0,"lengthMeters":553.5,"ratePesosPerMeter":34767.841011743454,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22291"},{"year":2026,"category":"Bridges","project":"Replacement of Tabi Bridge, Sta. 0+000 - Sta. 0+020.50, Barangay Tabi, Boac, Marinduque","amountPesos":41218000.0,"lengthMeters":20.5,"ratePesosPerMeter":2010634.1463414633,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22293"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, OMSC, Sta. 000+000 - Sta. 000+400, Mamburao, Occidental Mindoro","amountPesos":8000000.0,"lengthMeters":400.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22296"},{"year":2026,"category":"Roads","project":"Construction of Road, STA. 0+000 - STA. 0+800, Barangay Mangarin, San Jose, Occidental Mindoro","amountPesos":15644000.0,"lengthMeters":800.0,"ratePesosPerMeter":19555.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22298"},{"year":2026,"category":"Roads","project":"Concreting of Road,  Sta.0+000 - Sta.0+346.5, Brgy. Bagong Buhay, Naujan, Oriental Mindoro","amountPesos":4811000.0,"lengthMeters":346.5,"ratePesosPerMeter":13884.559884559885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22301"},{"year":2026,"category":"Roads","project":"Concreting of Road, Sta.0+000 - Sta.0+693, Brgy. Calangatan, San Teodoro, Oriental Mindoro","amountPesos":9622000.0,"lengthMeters":693.0,"ratePesosPerMeter":13884.559884559885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22303"},{"year":2026,"category":"Roads","project":"Concreting of Road, Sta.0+000 - Sta.0+346.5,Brgy. Dulangan, Puerto Galera, Oriental Mindoro","amountPesos":4811000.0,"lengthMeters":346.5,"ratePesosPerMeter":13884.559884559885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22305"},{"year":2026,"category":"Roads","project":"Concreting of Road, Sta.0+000 - Sta.0+346.5, Brgy. Malibago, Pola, Oriental Mindoro","amountPesos":4811000.0,"lengthMeters":346.5,"ratePesosPerMeter":13884.559884559885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22307"},{"year":2026,"category":"Roads","project":"Concreting of Road, Sta.0+000 - Sta.0+346.5, Brgy. Villareal, Socorro, Oriental Mindoro","amountPesos":4811000.0,"lengthMeters":346.5,"ratePesosPerMeter":13884.559884559885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22309"},{"year":2026,"category":"Roads","project":"Concreting of Road, Sta.0+000 - Sta.0+346.5, Brgy. Casiligan, Pola, Oriental Mindoro","amountPesos":4811000.0,"lengthMeters":346.5,"ratePesosPerMeter":13884.559884559885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22311"},{"year":2026,"category":"Roads","project":"Concreting of Road, Sta.0+000 - Sta.0+346.5, So. Sunrise Brgy. Balingayan, Calapan City, Oriental Mindoro","amountPesos":4811000.0,"lengthMeters":346.5,"ratePesosPerMeter":13884.559884559885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22313"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Sta.0+000 - Sta.0+346.5, Brgy. Alag, Baco, Oriental Mindoro","amountPesos":4811000.0,"lengthMeters":346.5,"ratePesosPerMeter":13884.559884559885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22315"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta.0+000 - Sta.0+346.5, Brgy. Pulang Tubig, Baco, Oriental Mindoro","amountPesos":4811000.0,"lengthMeters":346.5,"ratePesosPerMeter":13884.559884559885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22317"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000.00 - Sta. 0+653.50, Barangay Ilian, Dumaran, Palawan","amountPesos":25017000.0,"lengthMeters":653.5,"ratePesosPerMeter":38281.560826319816,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22320"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000.00 - Sta. 0+927.00, Barangay Maurengen, Araceli, Palawan","amountPesos":37526000.0,"lengthMeters":927.0,"ratePesosPerMeter":40481.12189859763,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22322"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000.00 - Sta. 0+242.50, Purok Republic, Barangay 4, Roxas, Palawan","amountPesos":9622000.0,"lengthMeters":242.5,"ratePesosPerMeter":39678.35051546392,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22324"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Alimuto, Barangay Sta. Teresita, Sta. 0+000.00 - Sta. 0+904.00, Dumaran, Palawan","amountPesos":33677000.0,"lengthMeters":904.0,"ratePesosPerMeter":37253.318584070796,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22326"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000.00 - Sta. 0+731.50, Sitio lagpan, Barangay New Ibajay, El Nido, Palawan","amountPesos":28866000.0,"lengthMeters":731.5,"ratePesosPerMeter":39461.38072453862,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22328"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000.00 - Sta. 0+182.50, Sitio Malapajo, Barangay Poblacion, Taytay, Palawan","amountPesos":19244000.0,"lengthMeters":182.5,"ratePesosPerMeter":105446.57534246576,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22330"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Sta. 0+000.00 - Sta. 0+616.00 Miraflores Street, Barangay III, Roxas, Palawan","amountPesos":24055000.0,"lengthMeters":616.0,"ratePesosPerMeter":39050.32467532468,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22332"},{"year":2026,"category":"Roads","project":"Construction of Batang Batang River Irrigation System Lateral F Service Road, Sta. 0+400 - Sta. 1+150, Barangay Malinao, Narra, Palawan","amountPesos":11208000.0,"lengthMeters":750.0,"ratePesosPerMeter":14944.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22335"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sta. 63+890 - Sta. 63+922, Barangay Malaking Ilog, Balabac, Palawan (7.949441, 117.076108)","amountPesos":45798000.0,"lengthMeters":32.0,"ratePesosPerMeter":1431187.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22337"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Ipilan Br., Sta. 0+632 - Sta. 0+680, Barangay Ipilan, Brooke's Point, Palawan (8.851510, 117.887005)","amountPesos":21983000.0,"lengthMeters":48.0,"ratePesosPerMeter":457979.1666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22339"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 3+444 - Sta. 3+894, Barangay Aribungos, Brooke's Point, Palawan","amountPesos":8302000.0,"lengthMeters":450.0,"ratePesosPerMeter":18448.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22341"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Hall of Punang to Tabuan, Sta. 0+000 - Sta. 0+450, Sofronio Española, Palawan","amountPesos":9622000.0,"lengthMeters":450.0,"ratePesosPerMeter":21382.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22343"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 1+608 - Sta. 3+883, Barangay Iraan, Rizal, Palawan","amountPesos":41511000.0,"lengthMeters":2275.0,"ratePesosPerMeter":18246.593406593405,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22345"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+775, Barangay Latud, (Highway to Tagpas), Rizal, Palawan","amountPesos":14114000.0,"lengthMeters":775.0,"ratePesosPerMeter":18211.612903225807,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22347"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 1+580 - Sta. 2+030, Barangay Maasin, Brooke's Point, Palawan","amountPesos":8302000.0,"lengthMeters":450.0,"ratePesosPerMeter":18448.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22349"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+500 - Sta 0+750, Barangay Malihud, Bataraza, Palawan","amountPesos":4151000.0,"lengthMeters":250.0,"ratePesosPerMeter":16604.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22351"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+304 - Sta. 0+610, Barangay Panacan 2, Narra, Palawan","amountPesos":5812000.0,"lengthMeters":306.0,"ratePesosPerMeter":18993.46405228758,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22353"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+450, Barangay Proper of Abo-abo, Sofronio Española, Palawan","amountPesos":8302000.0,"lengthMeters":450.0,"ratePesosPerMeter":18448.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22355"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Pinagusaran-Singcab, Barangay Pulot Interior, Sta. 12+911 - Sta. 13+661, Sofronio Española, Palawan","amountPesos":15876000.0,"lengthMeters":750.0,"ratePesosPerMeter":21168.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22357"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+550, Pulot Shore, Sofronio Española, Palawan","amountPesos":9622000.0,"lengthMeters":550.0,"ratePesosPerMeter":17494.545454545456,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22359"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sandoval to Apo-Aporawan, Sta. 0+215 - Sta. 1+615, Narra, Palawan","amountPesos":24907000.0,"lengthMeters":1400.0,"ratePesosPerMeter":17790.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22361"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+520, Barangay Saraza, Brooke's Point, Palawan","amountPesos":8302000.0,"lengthMeters":520.0,"ratePesosPerMeter":15965.384615384615,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22363"},{"year":2026,"category":"Roads","project":"Construction of Road, Highway RCS Corner L. Usodan to JPRNHS, Sta. 0+000 - Sta. 0+812, Punta Baja, Rizal, Palawan","amountPesos":19244000.0,"lengthMeters":812.0,"ratePesosPerMeter":23699.50738916256,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22365"},{"year":2026,"category":"Roads","project":"Construction of Road, Highway to Sinadayan, Sta. 0+000 - Sta. 0+400, Culasian, Rizal, Palawan","amountPesos":9622000.0,"lengthMeters":400.0,"ratePesosPerMeter":24055.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22367"},{"year":2026,"category":"Roads","project":"Construction of Road, Mariwara, Sta. 1+136 - Sta. 2+676, Barangay Princess Urduja, Narra, Palawan","amountPesos":22416000.0,"lengthMeters":1540.0,"ratePesosPerMeter":14555.844155844155,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22369"},{"year":2026,"category":"Roads","project":"Construction of Road, Palawan Circumferential Road (Highway to Old Site), Sta. 0+692 - Sta. 1+119, Barangay Ransang, Rizal, Palawan","amountPesos":8302000.0,"lengthMeters":427.0,"ratePesosPerMeter":19442.622950819674,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22371"},{"year":2026,"category":"Roads","project":"Construction of Road, Riverside to Suramping, Sta. 0+743 - Sta. 1+685, Barangay Candawaga, Rizal, Palawan","amountPesos":16604000.0,"lengthMeters":942.0,"ratePesosPerMeter":17626.32696390658,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22373"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Malakibay, Sta. 1+000 - Sta. 1+930, Barangay Punta Baja, Rizal, Palawan","amountPesos":16496000.0,"lengthMeters":930.0,"ratePesosPerMeter":17737.63440860215,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22375"},{"year":2026,"category":"Roads","project":"Construction of Upper Lapu-Lapu Road, Sta. 3+280 - Sta. 3+685, Barangay Poblacion, Narra, Palawan","amountPesos":8302000.0,"lengthMeters":405.0,"ratePesosPerMeter":20498.765432098764,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22377"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sta. 06+178 - Sta. 06+208, Barangay Magbabadil, Aborlan, Palawan","amountPesos":33891000.0,"lengthMeters":30.0,"ratePesosPerMeter":1129700.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22380"},{"year":2026,"category":"Roads","project":"Construction of Culandanum Road, Phase 3, Sta. 01+611 - Sta. 02+086, Barangay Culandam, Aborlan, Palawan","amountPesos":14433000.0,"lengthMeters":475.0,"ratePesosPerMeter":30385.263157894737,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22382"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 00+000 - Sta. 00+200, Brgy. Iwahig (Bucana), Puerto Princesa City, Palawan","amountPesos":9622000.0,"lengthMeters":200.0,"ratePesosPerMeter":48110.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22384"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 00+000 - Sta. 00+200, Brgy. Cabayugan, Puerto Princesa City, Palawan","amountPesos":9622000.0,"lengthMeters":200.0,"ratePesosPerMeter":48110.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22386"},{"year":2026,"category":"Roads","project":"Construction of Road with Solar Street Lights, Sta. 00+000 - Sta. 00+120, Brgy. Liwanag, Puerto Princesa City, Palawan","amountPesos":7698000.0,"lengthMeters":120.0,"ratePesosPerMeter":64150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22388"},{"year":2026,"category":"Roads","project":"Construction of Road leading to Mt. Calvary, Phase 2, Sta. 00+415 - Sta. 00+731, Barangay Irawan, Puerto Princesa City, Palawan","amountPesos":9622000.0,"lengthMeters":316.0,"ratePesosPerMeter":30449.367088607596,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22392"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage, Sta. 00+000 - Sta. 00+150, Barangay San Miguel, Puerto Princesa City","amountPesos":10000000.0,"lengthMeters":150.0,"ratePesosPerMeter":66666.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22394"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage, Sta. 00+000 - Sta. 00+200, Barangay Sta. Monica, Puerto Princesa City, Palawan","amountPesos":5500000.0,"lengthMeters":200.0,"ratePesosPerMeter":27500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22396"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 00+000 - Sta. 00+696, Barangay Gogognan, Aborlan, Palawan","amountPesos":18265000.0,"lengthMeters":696.0,"ratePesosPerMeter":26242.816091954024,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22398"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 00+000 - Sta. 00+570, Barangay Luzviminda, Puerto Princesa City, Palawan","amountPesos":12453000.0,"lengthMeters":570.0,"ratePesosPerMeter":21847.36842105263,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22400"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 00+000 - Sta. 00+910, Barangay Manalo, Puerto Princesa City, Palawan","amountPesos":18680000.0,"lengthMeters":910.0,"ratePesosPerMeter":20527.472527472528,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22402"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 00+000 - Sta. 01+280, Barangay Ramon Magsaysay - Plaridel, Aborlan, Palawan","amountPesos":33209000.0,"lengthMeters":1280.0,"ratePesosPerMeter":25944.53125,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22404"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 00+000 - Sta. 00+415, Barangay San Jose, Puerto Princesa City, Palawan","amountPesos":9963000.0,"lengthMeters":415.0,"ratePesosPerMeter":24007.22891566265,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22406"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 00+000 - Sta. 00+520, Barangay San Rafael, Puerto Princesa City, Palawan","amountPesos":9548000.0,"lengthMeters":520.0,"ratePesosPerMeter":18361.53846153846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22408"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta.  00+000 - Sta. 00+410, Barangay Tiniguiban, Puerto Princesa City","amountPesos":9622000.0,"lengthMeters":410.0,"ratePesosPerMeter":23468.29268292683,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22410"},{"year":2026,"category":"Roads","project":"Construction of Road, Bunkhouse, Sta. 00+000 - Sta. 00+470, Barangay Sta. Monica, Puerto Princesa City, Palawan","amountPesos":12453000.0,"lengthMeters":470.0,"ratePesosPerMeter":26495.744680851065,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22412"},{"year":2026,"category":"Roads","project":"Construction of Road, Pardeco, Pag-asa Station, Sta. 00+000 - Sta. 00+260, Barangay Bancao-Bancao, Puerto Princesa City","amountPesos":9622000.0,"lengthMeters":260.0,"ratePesosPerMeter":37007.692307692305,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22414"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Golden Valley, Phase 2, Sta.  00+000 - Sta. 00+380, Barangay Sicsican, Puerto Princesa City","amountPesos":9622000.0,"lengthMeters":380.0,"ratePesosPerMeter":25321.052631578947,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22416"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Pagkakaisa, Forbes Hill, Sta. 00+000 - Sta. 00+320, Barangay Santa Monica, Puerto Princesa City, Palawan","amountPesos":9622000.0,"lengthMeters":320.0,"ratePesosPerMeter":30068.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22418"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Pagkakaisa Phase 2, Sta. 00+000 - Sta. 01+610, Barangay Macarascas, Puerto Princesa City, Palawan","amountPesos":43299000.0,"lengthMeters":1610.0,"ratePesosPerMeter":26893.788819875776,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22420"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Tagaud, Sta. 00+000 - Sta. 00+245, Barangay Irawan, Puerto Princesa City, Palawan","amountPesos":9622000.0,"lengthMeters":245.0,"ratePesosPerMeter":39273.4693877551,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22422"},{"year":2026,"category":"Roads","project":"Construction of Agpanabat- Sablayan Road, Sta. 0+000 - Sta. 0+770, Sta. 0+990 - Sta. 1+010, Barangay Agpanabat, Romblon, Romblon,","amountPesos":48110000.0,"lengthMeters":790.0,"ratePesosPerMeter":60898.73417721519,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22425"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay Sta. Isabel, Sta. 0 + 000.000 - Sta. 0 + 260.00, Pinamalayan, Oriental Mindoro","amountPesos":28866000.0,"lengthMeters":260.0,"ratePesosPerMeter":111023.07692307692,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22438"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sitio Naswak, Sta. 0 + 000.000 - Sta. 0 + 216.00, Barangay Lisap, Bongabong, Oriental Mindoro","amountPesos":19244000.0,"lengthMeters":216.0,"ratePesosPerMeter":89092.5925925926,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22440"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sitio Tagascan, Sta. 0 + 000.000 - Sta. 0 + 032.00, Barangay San Vicente , Roxas, Oriental Mindoro","amountPesos":7698000.0,"lengthMeters":32.0,"ratePesosPerMeter":240562.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22442"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sta Rita - Barangay Maningcol, Station 0 + 000.00- Sta 0 + 250.00, Pinamalayan, Oriental Mindoro","amountPesos":4811000.0,"lengthMeters":250.0,"ratePesosPerMeter":19244.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22444"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Centro, Station 0 + 000.00- Sta 0 + 250, Barangay Tawas, Bongabong, Oriental Mindoro","amountPesos":4811000.0,"lengthMeters":250.0,"ratePesosPerMeter":19244.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22446"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Upper Badiangan,Station 0 + 000.00- Sta 0 + 250.00,Barangay San Mariano, Roxas, Oriental Mindoro","amountPesos":4811000.0,"lengthMeters":250.0,"ratePesosPerMeter":19244.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22448"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, San Mariano - San Jose - Kaligtasan Road,Station 0 + 000.00- Sta 0 + 500.00, Barangay San Mariano, Roxas, Oriental Mindoro","amountPesos":9622000.0,"lengthMeters":500.0,"ratePesosPerMeter":19244.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22450"},{"year":2026,"category":"Roads","project":"Construction of Road, Cabasan - Pongco Bonga - Uson Road, Bacacay, Albay, Sta. 0+000 - Sta. 1+000","amountPesos":44100000.0,"lengthMeters":1000.0,"ratePesosPerMeter":44100.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22454"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Libtong, Tiwi, Albay, Sta. 0+000 - Sta. 0+350","amountPesos":9800000.0,"lengthMeters":350.0,"ratePesosPerMeter":28000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22456"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Salvacion, Malilipot, Albay, Sta. 0+000 - Sta. 0+150","amountPesos":4881000.0,"lengthMeters":150.0,"ratePesosPerMeter":32540.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22458"},{"year":2026,"category":"Roads","project":"Construction of San Carlos - Matagbac- San Vicente Road connecting to Ligao-Tabaco Road leading to Ricemill, Agri-Business Industry & Warehouses, Tabaco City, Albay, Sta. 2+449 - Sta. 2+550","amountPesos":9762000.0,"lengthMeters":101.0,"ratePesosPerMeter":96653.46534653465,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22460"},{"year":2026,"category":"Roads","project":"Rehabilitation of Pili-Bacacay Poblacion Road, Bacacay, Albay, Sta. 1+080 - Sta. 1+562","amountPesos":19525000.0,"lengthMeters":482.0,"ratePesosPerMeter":40508.29875518672,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22462"},{"year":2026,"category":"Roads","project":"Construction of Road along Purok 5, Barangay Manawan (Sta. 0+000 - Sta. 0+617), Camalig, Albay","amountPesos":29287000.0,"lengthMeters":617.0,"ratePesosPerMeter":47466.77471636953,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22465"},{"year":2026,"category":"Roads","project":"Construction of Apad - La Medalla Road, Polangui Albay, Sta. 3+077 – Sta. 3+373(La Medalla Section), Sta. 3+467 – Sta.3+566 (La Medalla Section), Sta. 4+137 – Sta. 4+817 (Apad Section)","amountPesos":26358000.0,"lengthMeters":1075.0,"ratePesosPerMeter":24519.06976744186,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22468"},{"year":2026,"category":"Roads","project":"Construction of Buenavista - Mamlad - Lawinon - Alabangpuro Road, Pioduran, Albay, Sta. 6+585 - Sta. 8+085","amountPesos":26358000.0,"lengthMeters":1500.0,"ratePesosPerMeter":17572.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22470"},{"year":2026,"category":"Roads","project":"Construction of Pistola-Cadawag-Moroponros-Badbad Road, Oas, Albay. Sta. 0+427 - Sta. 1+212","amountPesos":24406000.0,"lengthMeters":785.0,"ratePesosPerMeter":31090.445859872612,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22472"},{"year":2026,"category":"Roads","project":"Construction of Villa Petrona-San Jose - San Antonio- San Ramon-Libon Road, Albay, Sta. 0+000 - Sta. 1+150","amountPesos":24406000.0,"lengthMeters":1150.0,"ratePesosPerMeter":21222.608695652172,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22476"},{"year":2026,"category":"Bridges","project":"Construction of Bridge at Zone 4A Barangay Cagmanaba, Ocampo, Camarines Sur, Sta. 0+335.00 - Sta. 0+350.00","amountPesos":50000000.0,"lengthMeters":15.0,"ratePesosPerMeter":3333333.3333333335,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22479"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay San Francisco - Barangay San Vicente, Ocampo, Camarines Sur, Sta. 0+530.00 - Sta. 0+570.00","amountPesos":10000000.0,"lengthMeters":40.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22481"},{"year":2026,"category":"Roads","project":"Construction of Pawili-Sagrada Road, Barangay Pawili, Pili, Camarines Sur - sta. 0+000 - sta. 0+815","amountPesos":29287000.0,"lengthMeters":815.0,"ratePesosPerMeter":35934.969325153375,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22483"},{"year":2026,"category":"Bridges","project":"Construction of Phase 2 Pagao Bridge, Barangay Pagao, Bombon, Camarines Sur, Sta. 2+000.00 - Sta. 2+042.00","amountPesos":30000000.0,"lengthMeters":42.0,"ratePesosPerMeter":714285.7142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22485"},{"year":2026,"category":"Roads","project":"Construction of Road from Zone 4, San Antonio, Ocampo, Camarines Sur to Zone 7, Santo Niño, Pili, Camarines Sur - Sta. 0+000 - Sta. 1+700","amountPesos":39050000.0,"lengthMeters":1700.0,"ratePesosPerMeter":22970.58823529412,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22487"},{"year":2026,"category":"Roads","project":"Construction of Road Network at Bicol Medical Center Compound (Phase I), Barangay Cadlan, Pili, Camarines Sur - Sta. 0+000 - sta. 0+800","amountPesos":48812000.0,"lengthMeters":800.0,"ratePesosPerMeter":61015.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22489"},{"year":2026,"category":"Roads","project":"Construction of Road, San Juan, Canaman, Camarines Sur - Sta. 0+000 - Sta. 0+450","amountPesos":5857000.0,"lengthMeters":450.0,"ratePesosPerMeter":13015.555555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22491"},{"year":2026,"category":"Roads","project":"Construction of Road, San Nicolas, Canaman, Camarines Sur - Sta. 0+000 - Sta. 0+550","amountPesos":9762000.0,"lengthMeters":550.0,"ratePesosPerMeter":17749.090909090908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22493"},{"year":2026,"category":"Roads","project":"Construction of Road, Zone 3C, Barangay Cagmanaba, Ocampo, Camarines Sur - sta. 0+863 - sta. 1+600","amountPesos":14644000.0,"lengthMeters":737.0,"ratePesosPerMeter":19869.742198100408,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22495"},{"year":2026,"category":"Roads","project":"Magsaysay-Balatas Bypass Road, Naga City, Camarines Sur - Sta. 0+480 - 1+350","amountPesos":48812000.0,"lengthMeters":870.0,"ratePesosPerMeter":56105.747126436785,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22497"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Liwacsa-Bitaogan, Presentacion, Camarines Sur, Sta.10+534 - Sta.12+534","amountPesos":50000000.0,"lengthMeters":2000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22502"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Hanopol - Pagolinan, Caramoan, Camarines Sur, Sta.1+770 - Sta.3+770","amountPesos":50000000.0,"lengthMeters":2000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22504"},{"year":2026,"category":"Roads","project":"Construction of Barangay Road, Antipolo-Tamban (Mabini), Tinambac, Camarines Sur, Sta.0+000 - Sta.2+100","amountPesos":24500000.0,"lengthMeters":2100.0,"ratePesosPerMeter":11666.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22506"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Calawit, San Jose, Camarines Sur, Sta.0+000 - Sta.0+500","amountPesos":4881000.0,"lengthMeters":500.0,"ratePesosPerMeter":9762.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22512"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Catalotoan, San Jose, Camarines Sur, Sta.0+000 - Sta.1+550","amountPesos":4881000.0,"lengthMeters":1550.0,"ratePesosPerMeter":3149.032258064516,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22514"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lupi, Tinambac, Camarines Sur, Zone5-Sta.3+200-Sta.3+600, Zone 6-Sta.3+300 - Sta.3+800","amountPesos":9762000.0,"lengthMeters":600.0,"ratePesosPerMeter":16270.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22516"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Olag Grande, Tinambac, Camarines Sur, Sta.2+300 - Sta.2+800","amountPesos":7810000.0,"lengthMeters":500.0,"ratePesosPerMeter":15620.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22518"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pinamihagan to Barangay Gubat, Lagonoy, Camarines Sur, Sta. 1+400 - Sta.2+100","amountPesos":11715000.0,"lengthMeters":700.0,"ratePesosPerMeter":16735.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22520"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay La Purisima, Siruma, Camarines Sur, Sta.0+400 - Sta.1+050","amountPesos":9800000.0,"lengthMeters":650.0,"ratePesosPerMeter":15076.923076923076,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22522"},{"year":2026,"category":"Roads","project":"Construction of Reinforced Concrete Box Culvert (RCBC) along Barangay Genorangan - Barangay Agosais Road, Lagonoy, Camarines Sur, Sta.1+032.5 - Sta.1+065.8","amountPesos":14700000.0,"lengthMeters":33.3,"ratePesosPerMeter":441441.44144144206,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22526"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sagrada - Barangay Pag-asa, Tinambac, Camarines Sur, Sta.0+286.20 - Sta1+520.20","amountPesos":24500000.0,"lengthMeters":1234.0,"ratePesosPerMeter":19854.132901134522,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22528"},{"year":2026,"category":"Roads","project":"Construcion of Road, Barangay Buenavista, Presentacion, Camarines Sur, Sta. 0+000 - Sta. 0+424","amountPesos":4900000.0,"lengthMeters":424.0,"ratePesosPerMeter":11556.603773584906,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22530"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Antonio, Tigaon, Camarines Sur, Sta. 1+400 - Sta.2+100","amountPesos":9762000.0,"lengthMeters":700.0,"ratePesosPerMeter":13945.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22532"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Rafael to Barangay Catalotoan, San Jose, Camarines Sur, Sta.0+024 - Sta.0+836","amountPesos":4881000.0,"lengthMeters":812.0,"ratePesosPerMeter":6011.083743842364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22534"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Ramon, Siruma, Camarines Sur, Sta. 6+600 - Sta 7+100","amountPesos":9762000.0,"lengthMeters":500.0,"ratePesosPerMeter":19524.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22536"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Santa Cruz to Barangay Palale, San Jose, Camarines Sur, Sta.0+000 - Sta0+071, Sta.0+100 - Sta.0+370, 1+004 - Sta.1+600","amountPesos":4881000.0,"lengthMeters":937.0,"ratePesosPerMeter":5209.178228388474,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22538"},{"year":2026,"category":"Roads","project":"Construction of Road, Coyaoyao to Sitio Lip Ac, Barangay Cabalinadan, Tigaon, Camarines Sur, Sta.0+139 - Sta.0+727","amountPesos":9762000.0,"lengthMeters":588.0,"ratePesosPerMeter":16602.04081632653,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22540"},{"year":2026,"category":"Roads","project":"Constrution of Road, PSU Caramoan Campus, Caramoan, Camarines Sur, Sta. 0+244 - Sta. 0+451","amountPesos":4881000.0,"lengthMeters":207.0,"ratePesosPerMeter":23579.710144927536,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22542"},{"year":2026,"category":"Roads","project":"Construction of Road, NIA Service Road, Barangay San Juan - Barangay Santo Domingo, Iriga City, Camarines Sur, Sta. 4+178.70 - 6+218.80","amountPesos":48812000.0,"lengthMeters":2040.1,"ratePesosPerMeter":23926.27812362139,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22545"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Nasandig, Batuan, Masbate, Sta. 0+000 - Sta. 0+300","amountPesos":9762000.0,"lengthMeters":300.0,"ratePesosPerMeter":32540.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22555"},{"year":2026,"category":"Roads","project":"Rehabilitation of Batuan to Lagundi Road, Batuan, Masbate, Sta. 0+000 - Sta. 0+816, Sta. 1+707 - Sta. 1+880, Sta. 2+960 - Sta. 3+423","amountPesos":48812000.0,"lengthMeters":1452.0,"ratePesosPerMeter":33617.07988980716,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22557"},{"year":2026,"category":"Roads","project":"Construction of Jct National Road-Barangay Villa Alvarez-Barangay Salvacion, Balud, Masbate, Sta. 2+100 - Sta. 3+230","amountPesos":48812000.0,"lengthMeters":1130.0,"ratePesosPerMeter":43196.46017699115,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22560"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Badling, Uson, Masbate, Sta. 2+540 - Sta. 2+800","amountPesos":5369000.0,"lengthMeters":260.0,"ratePesosPerMeter":20650.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22563"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Poblacion to Morocborocan, Uson, Masbate, Sta. 1+260 - Sta. 1+503, Sta. 1+531 - Sta. 2+170","amountPesos":19525000.0,"lengthMeters":882.0,"ratePesosPerMeter":22137.18820861678,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22567"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Purok 7, Barangay Buenavista, Uson, Masbate, Sta. 0+710 - Sta. 0+950","amountPesos":4881000.0,"lengthMeters":240.0,"ratePesosPerMeter":20337.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22569"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, San Mateo-Balantay Road, Uson, Masbate, Sta. 2+694 - Sta. 4+060","amountPesos":39050000.0,"lengthMeters":1366.0,"ratePesosPerMeter":28587.115666178623,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22571"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Sitio Calpi, Barangay Miaga, Uson, Masbate, Sta. 0+190 - Sta. 0+440","amountPesos":4881000.0,"lengthMeters":250.0,"ratePesosPerMeter":19524.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22573"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Monbon, Irosin, Sorsogon, Sta. 0+000 - Sta. 2+200","amountPesos":48812000.0,"lengthMeters":2200.0,"ratePesosPerMeter":22187.272727272728,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22576"},{"year":2026,"category":"Roads","project":"Rehabilitation of Access Road in Sitio Pangdan, Brgy. Macabari, Barcelona, Sorsogon, Section 1 Sta. 0+000 - 0+497, Section 2 Sta. 0+000 - 0+487","amountPesos":19600000.0,"lengthMeters":497.0,"ratePesosPerMeter":39436.619718309856,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22578"},{"year":2026,"category":"Roads","project":"Rehabilitation of Access Road along Brgy. Putiao and Brgy. Sta. Cruz, Barcelona, Sorsogon Sta. 0+000 - Sta. 0+451","amountPesos":4900000.0,"lengthMeters":451.0,"ratePesosPerMeter":10864.745011086474,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22580"},{"year":2026,"category":"Roads","project":"Construction of Road, including Box Culvert, Barangay Bagacay, Barcelona to Barangay Tigkiw, Gubat, Sorsogon Section 1 Sta. 0+000 - Sta. 1+658, Section 2 0+000 - Sta. 0+035","amountPesos":19600000.0,"lengthMeters":1658.0,"ratePesosPerMeter":11821.471652593485,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22582"},{"year":2026,"category":"Roads","project":"Construction of Road at Brgy. Genablan Oriental, Matnog, Sorsogon, Sta. 0+000 - Sta. 0+350","amountPesos":6860000.0,"lengthMeters":350.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22584"},{"year":2026,"category":"Roads","project":"Construction of Road in Brgy. Zone 4, Bulan, Sorsogon, Section 1 Sta.0+000 - Sta. 0+ 108, Section 2 Sta. 0+000 - Sta. 0+ 108, Section 3 Sta. 0+000 - Sta. 0+ 108","amountPesos":4900000.0,"lengthMeters":108.0,"ratePesosPerMeter":45370.37037037037,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22586"},{"year":2026,"category":"Roads","project":"Rehabilitation of Taboc-Catanagan Road with Drainage in Brgys. Taboc and Catanagan, Juban, Sorsogon, Sta. 0+000 – Sta 0+195.8, Sta. 0+286.1 – Sta. 0+442, Sta. 0+464.6 – Sta. 1+023.1, Sta. 1+046.1– Sta. 1+054.6, Sta. 1+059.2 – Sta. 1+072.6, Sta. 1+103.2 – Sta.1+186, Sta. 1+190.6 – Sta.1+195.1, Sta. 1+220.6 – Sta. 1+299.3, Sta. 1+578.5 – Sta. 1+592.2, Sta. 1+619.1 – Sta. 1+688.8, Sta. 1+927.8 – Sta. 1+977.7, Sta. 2+024.7 – Sta. 2+129.6, Sta. 2+256.4 – Sta. 3+012.4","amountPesos":38220000.0,"lengthMeters":2092.3,"ratePesosPerMeter":18266.97892271663,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22590"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Biga, Magallanes, Sorsogon, Sta. 0+000 - Sta. 0+372","amountPesos":23520000.0,"lengthMeters":372.0,"ratePesosPerMeter":63225.8064516129,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22595"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Gatbo - Barangay Canarum, Bacon District, Sorsogon City, Sorsogon, Sta. 0+000 - Sta. 0+780","amountPesos":29287000.0,"lengthMeters":780.0,"ratePesosPerMeter":37547.4358974359,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22597"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Magsaysay to Barangay Siuton, Magallanes, Sorsogon, Sta. 0+000 - Sta. 0+452","amountPesos":19600000.0,"lengthMeters":452.0,"ratePesosPerMeter":43362.83185840708,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22601"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cabiguhan, Pilar-Barangay Banban, Donsol, Sorsogon, Sta. 0+000 - Sta 0+491 (Section 1), Sta. 0+000 - Sta. 0+306 (Section 2), Sta. 0+000 - Sta. 0+300 (Section 3)","amountPesos":48812000.0,"lengthMeters":491.0,"ratePesosPerMeter":99413.44195519348,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22603"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Oras to Barangay Bagong Sirang to Baragay Libtong, Castilla, Sorsogon, Sta. 1+524 - Sta. 2+540","amountPesos":39200000.0,"lengthMeters":1016.0,"ratePesosPerMeter":38582.67716535433,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22605"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Lantic, Barangay Pangpang, Sorsogon City, Sorsogon, Sta. 0+000 - Sta. 1+037","amountPesos":29287000.0,"lengthMeters":1037.0,"ratePesosPerMeter":28242.044358727097,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22607"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cumadcad, Castilla Sorsogon, Sta. 0+000 - Sta. 0+450","amountPesos":24500000.0,"lengthMeters":450.0,"ratePesosPerMeter":54444.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22609"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Macabog, Sorsogon City, Sta. 0+000 - Sta. 0+504","amountPesos":23664000.0,"lengthMeters":504.0,"ratePesosPerMeter":46952.380952380954,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22611"},{"year":2026,"category":"Roads","project":"Construction of Road, OLV Pangpang, Sorsogon City, Sorsogon, Sta. 0+000 - Sta. 0+200","amountPesos":9762000.0,"lengthMeters":200.0,"ratePesosPerMeter":48810.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22613"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay San Roque, Bacon District, Sorsogon City, Sorsogon, Sta. 0+000 - Sta. 0+730","amountPesos":34168000.0,"lengthMeters":730.0,"ratePesosPerMeter":46805.479452054795,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22617"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Alayunan, Sitio Proper-Falls Anhawan, Barangay Alayunan, Ma-ayon, Capiz, Sta.000 + 000 - Sta.000 + 270","amountPesos":4784000.0,"lengthMeters":270.0,"ratePesosPerMeter":17718.51851851852,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22624"},{"year":2026,"category":"Roads","project":"Concreting of Road, Barangay Tabuc, Pontevedra, Capiz, Sta.000 + 000 - Sta.000 + 270","amountPesos":5880000.0,"lengthMeters":270.0,"ratePesosPerMeter":21777.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22626"},{"year":2026,"category":"Roads","project":"Rehabilitation of Drainage System including Road Along Villareal Stadium, Barangay Tiza, Roxas City, Capiz, Sta.000 + 000 - Sta.000 + 700","amountPesos":9800000.0,"lengthMeters":700.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22630"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Agdalipe, Pontevedra, Capiz, Sta.000 + 000 - Sta.000 + 270","amountPesos":4784000.0,"lengthMeters":270.0,"ratePesosPerMeter":17718.51851851852,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22632"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Talasa, Panay, Capiz, Sta.000 + 000 - Sta.000 + 270","amountPesos":4784000.0,"lengthMeters":270.0,"ratePesosPerMeter":17718.51851851852,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22634"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Kapul-an, Barangay Indayagan, Ma-ayon, Capiz, Sta.000+000 - Sta.000+535.50","amountPesos":9569000.0,"lengthMeters":535.5,"ratePesosPerMeter":17869.281045751635,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22636"},{"year":2026,"category":"Roads","project":"Construction of Rosario-Binaobawan Road, Barangay Rosario, Pilar, Capiz, Sta.000+000 - Sta.000+535.50","amountPesos":9569000.0,"lengthMeters":535.5,"ratePesosPerMeter":17869.281045751635,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22640"},{"year":2026,"category":"Roads","project":"Improvement of Access Road leading to DPWH Capiz 1st DEO, Roxas City, Capiz, Sta.000 + 000 - Sta.000 + 423","amountPesos":14353000.0,"lengthMeters":423.0,"ratePesosPerMeter":33931.44208037825,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22642"},{"year":2026,"category":"Bridges","project":"Construction (Completion) of Bridge, Barangay Bungsuan to Barangay Lawaan, Dumarao, Capiz - Sta. 1+820 - Sta. 2+120","amountPesos":19138000.0,"lengthMeters":300.0,"ratePesosPerMeter":63793.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22645"},{"year":2026,"category":"Bridges","project":"Construction (Completion) of Bridge, Barangay Nagsulang to Barangay Lawaan, Dumarao, Capiz - Sta. 0+000 - Sta. 0+700","amountPesos":23922000.0,"lengthMeters":700.0,"ratePesosPerMeter":34174.28571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22647"},{"year":2026,"category":"Bridges","project":"Construction (Completion) of Bridge, Sitio Sinandigan, Barangay Mianay, Sigma, Capiz - Sta. 0+300 - Sta. 0+597","amountPesos":6698000.0,"lengthMeters":297.0,"ratePesosPerMeter":22552.188552188552,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22649"},{"year":2026,"category":"Roads","project":"Rehabilitation of Piña-Suclaran Road, Barangay Piña and Barangay Suclaran, San Lorenzo, Guimaras - Sta. 0 + 000 - Sta. 1 + 000","amountPesos":31920000.0,"lengthMeters":1000.0,"ratePesosPerMeter":31920.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22652"},{"year":2026,"category":"Roads","project":"Construction of Road, Surudlan-Canhawan-Sta. Maria-Salvacion, Barangay Canhawan, Nueva Valencia, Guimaras - Sta. 0 + 200 - Sta. 1 + 400","amountPesos":23520000.0,"lengthMeters":1200.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22654"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sapal, San Lorenzo, Guimaras - Sta. 0 + 396 - Sta. 2 + 396","amountPesos":44100000.0,"lengthMeters":2000.0,"ratePesosPerMeter":22050.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22656"},{"year":2026,"category":"Roads","project":"Construction of Road, New Poblacion, Barangay Poblacion, Buenavista, Guimaras - Sta. 0 + 000 - Sta. 0 + 210, Sta. 0 + 340 - Sta. 0 + 460","amountPesos":14700000.0,"lengthMeters":330.0,"ratePesosPerMeter":44545.454545454544,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22658"},{"year":2026,"category":"Roads","project":"Construction of Road, Alubihod, Barangay Poblacion, Nueva Valencia, Guimaras - Sta. 1 + 399.50 - Sta. 1 + 480, Sta. 1 + 880 - Sta. 1 + 940","amountPesos":29400000.0,"lengthMeters":140.5,"ratePesosPerMeter":209252.6690391459,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22660"},{"year":2026,"category":"Roads","project":"Construction of Road, Stiio Tibwason - Paho, Baragangay Ayangan, Sibunag, Guimaras - Sta. 0 + 000 - Sta. 0 + 800","amountPesos":14700000.0,"lengthMeters":800.0,"ratePesosPerMeter":18375.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22662"},{"year":2026,"category":"Roads","project":"Construction of Road, Malbang-Lamnig, Barangay San Isidro, Sibunag, Guimaras - Sta. 0 + 346 - Sta. 0 + 859, Sta. 1 + 285 - Sta. 1 + 420, Sta. 1 +570 - Sta. 1 +630","amountPesos":14700000.0,"lengthMeters":708.0,"ratePesosPerMeter":20762.71186440678,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22666"},{"year":2026,"category":"Roads","project":"Construction of Road, Balaan Bukid Barangay Hoskyn, Jordan, Guimaras - Sta. 0 + 259 - Sta. 0 + 959","amountPesos":26460000.0,"lengthMeters":700.0,"ratePesosPerMeter":37800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22668"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Poblacion, Jordan, Guimaras - Sta. 0 + 000 - Sta. 0 + 162","amountPesos":29400000.0,"lengthMeters":162.0,"ratePesosPerMeter":181481.4814814815,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22670"},{"year":2026,"category":"Roads","project":"Construction of Crossing David-Biantao Road, Barangay Poblacion, Nueva Valencia, Guimaras - Sta. 0 + 398.5 - Sta. 0 + 600","amountPesos":9800000.0,"lengthMeters":201.5,"ratePesosPerMeter":48635.235732009925,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22672"},{"year":2026,"category":"Bridges","project":"Construction of Phase 2 Cordova-Barosong Bridge, Tigbauan, Iloilo - Sta. 0+228.72 - Sta. 0+333.72 including Bridge Approaches - Sta. 0+000 - Sta. 0+228.72, Sta. 0+333.72 - Sta. 0+391.71","amountPesos":45940000.0,"lengthMeters":391.71,"ratePesosPerMeter":117280.64129075082,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22675"},{"year":2026,"category":"Roads","project":"Improvement of Road, Guimbal, Iloilo - Sta. 0+000 - Sta. 1+500","amountPesos":28706000.0,"lengthMeters":1500.0,"ratePesosPerMeter":19137.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22677"},{"year":2026,"category":"Roads","project":"Improvement of Road, Igbaras, Iloilo - Sta. 0+000 - Sta. 1+500","amountPesos":28706000.0,"lengthMeters":1500.0,"ratePesosPerMeter":19137.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22679"},{"year":2026,"category":"Roads","project":"Improvement of Road, Miagao, Iloilo - Sta. 0+000 - Sta. 1+800","amountPesos":38275000.0,"lengthMeters":1800.0,"ratePesosPerMeter":21263.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22681"},{"year":2026,"category":"Roads","project":"Improvement of Road, Oton, Iloilo - Sta. 0+000 - Sta. 1+500","amountPesos":28706000.0,"lengthMeters":1500.0,"ratePesosPerMeter":19137.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22683"},{"year":2026,"category":"Roads","project":"Improvement of Road, San Joaquin, Iloilo - Sta. 0+000 - Sta. 1+500","amountPesos":28706000.0,"lengthMeters":1500.0,"ratePesosPerMeter":19137.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22685"},{"year":2026,"category":"Roads","project":"Improvement of Road, Tigbauan, Iloilo - Sta. 0+000 - Sta. 1+500","amountPesos":28706000.0,"lengthMeters":1500.0,"ratePesosPerMeter":19137.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22687"},{"year":2026,"category":"Roads","project":"Improvement of Road, Tubungan, Iloilo Sta. 0+000 - Sta. 1+570","amountPesos":30081000.0,"lengthMeters":1570.0,"ratePesosPerMeter":19159.87261146497,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22689"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Poblacion Ilaya, Passi City, Ilollo - Sta. 0 + 000 - Sta. 0 + 355","amountPesos":4751000.0,"lengthMeters":355.0,"ratePesosPerMeter":13383.098591549297,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22692"},{"year":2026,"category":"Roads","project":"Concreting of Concrete Road, Barangay Poblacion, Anilao, Iloilo- Sta. 0 + 000 - Sta. 0 + 300","amountPesos":4900000.0,"lengthMeters":300.0,"ratePesosPerMeter":16333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22694"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bagongbong to Barangay Tinoria-an, Barotac Nuevo, Iloilo - Sta. 0 + 000 - Sta. 0 + 597","amountPesos":9800000.0,"lengthMeters":597.0,"ratePesosPerMeter":16415.41038525963,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22696"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Balud, Dumangas, Iloilo - Sta. 0 + 000 - Sta. 0 + 692","amountPesos":9569000.0,"lengthMeters":692.0,"ratePesosPerMeter":13828.034682080925,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22698"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Barasan, Dumangas, Iloilo - Sta. 0 + 000 - Sta. 0 + 655.74","amountPesos":9569000.0,"lengthMeters":655.74,"ratePesosPerMeter":14592.67392564126,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22700"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Nanding Lopez, Dumangas, Iloilo - Sta. 0 + 000 - Sta. 0 + 550","amountPesos":9569000.0,"lengthMeters":550.0,"ratePesosPerMeter":17398.18181818182,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22702"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Palaciawan, Barotac Nuevo, Iloilo - Sta. 0 + 000 - Sta. 0 + 720, Sta. 1 + 500 - Sta. 2 + 243","amountPesos":19138000.0,"lengthMeters":1463.0,"ratePesosPerMeter":13081.33971291866,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22704"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Paloc Bigcue, Dumangas, Iloilo - Sta. 0 + 000 -  Sta. 0 + 756.79","amountPesos":9800000.0,"lengthMeters":756.79,"ratePesosPerMeter":12949.431149988768,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22706"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Alinsolong, Batad, Iloilo, Sta. 0 + 000 - Sta. 0 + 150","amountPesos":4784000.0,"lengthMeters":150.0,"ratePesosPerMeter":31893.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22709"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Almeñana, Lemery, Iloilo, Sta. 0 + 000 - Sta. 0 + 400","amountPesos":9569000.0,"lengthMeters":400.0,"ratePesosPerMeter":23922.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22711"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bancal, Carles, Iloilo, Sta. 0 + 000 - Sta. 0 + 400","amountPesos":9569000.0,"lengthMeters":400.0,"ratePesosPerMeter":23922.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22713"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bucana Bunglas, Ajuy, Iloilo, Sta. 2 + 824 - Sta. 3 + 224","amountPesos":9569000.0,"lengthMeters":400.0,"ratePesosPerMeter":23922.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22715"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bulaqueña, Estancia, Iloilo, Sta. 0 + 000 - Sta. 0 + 400","amountPesos":9569000.0,"lengthMeters":400.0,"ratePesosPerMeter":23922.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22717"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Manlot, Carles, Iloilo, Sta. 0 + 000 - Sta. 0 + 200","amountPesos":4784000.0,"lengthMeters":200.0,"ratePesosPerMeter":23920.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22719"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Rizal, Barotac Viejo, Iloilo, Sta. 1 + 140 - Sta. 1+ 540","amountPesos":9569000.0,"lengthMeters":400.0,"ratePesosPerMeter":23922.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22721"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tabugon, Carles, Iloilo, Sta. 0 + 000 - Sta. 0 + 200","amountPesos":4784000.0,"lengthMeters":200.0,"ratePesosPerMeter":23920.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22723"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tambaliza, Concepcion, Iloilo, Sta. 0 + 000 - Sta. 0 + 200","amountPesos":4784000.0,"lengthMeters":200.0,"ratePesosPerMeter":23920.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22725"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tamis-ac, Concepcion, Iloilo, Sta. 4 + 030 - Sta. 4 + 630","amountPesos":14353000.0,"lengthMeters":600.0,"ratePesosPerMeter":23921.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22727"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tarong, Carles, Iloilo, Sta. 0 + 000 - Sta. 0 + 400","amountPesos":9569000.0,"lengthMeters":400.0,"ratePesosPerMeter":23922.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22729"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Vista Alegre, Barotac Viejo, Iloilo, Sta. 0 + 000 - Sta. 0 + 400","amountPesos":9569000.0,"lengthMeters":400.0,"ratePesosPerMeter":23922.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22731"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Zaragosa, Balasan, Iloilo, Sta. 7 + 180 - Sta. 7 + 580","amountPesos":9569000.0,"lengthMeters":400.0,"ratePesosPerMeter":23922.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22733"},{"year":2026,"category":"Roads","project":"Construction of Nabitasan Road, Barangay Nabitasan, Pototan, Iloilo - Station 0+000 - Station 0+670","amountPesos":9569000.0,"lengthMeters":670.0,"ratePesosPerMeter":14282.089552238805,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22736"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Acao, Cabatuan, Iloilo - Station 0+000 - Station 1+000","amountPesos":14353000.0,"lengthMeters":1000.0,"ratePesosPerMeter":14353.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22738"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Barangay Poblacion Centro - Barangay Delgado, Calinog, Iloilo -  0+000 - Station 0+340","amountPesos":4900000.0,"lengthMeters":340.0,"ratePesosPerMeter":14411.764705882353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22740"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Barangay Piandaan West, Maasin, Iloilo - Station 0+000 - Station 0+183, Station 0+392 - Station 0+807, Station 0+957 - Station 1+029","amountPesos":9800000.0,"lengthMeters":670.0,"ratePesosPerMeter":14626.865671641792,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22742"},{"year":2026,"category":"Bridges","project":"Construction of Jamabalud Bridge, Barangay Jamabalud, Pototan, Iloilo - Station 0+000 - Station 0+012","amountPesos":14700000.0,"lengthMeters":12.0,"ratePesosPerMeter":1225000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22744"},{"year":2026,"category":"Bridges","project":"Construction of Dongsol Bridge, Barangay Dongsol, Pototan, Iloilo - 0+000 - Station 0+012","amountPesos":9800000.0,"lengthMeters":12.0,"ratePesosPerMeter":816666.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22746"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Agmanaphao, Mina to Barangay Cahaguikican, Pototan, Iloilo - Station 0+000 - Station 1+340","amountPesos":19138000.0,"lengthMeters":1340.0,"ratePesosPerMeter":14282.089552238805,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22748"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Badiangan to Barangay Amiroy, Mina, Iloilo - Station 0+000 - Station 0+670","amountPesos":9569000.0,"lengthMeters":670.0,"ratePesosPerMeter":14282.089552238805,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22750"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Balanac to Barangay Aguingay, Janiuay, Iloilo - Station 0+000 - Station 1+170","amountPesos":16745000.0,"lengthMeters":1170.0,"ratePesosPerMeter":14311.965811965812,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22752"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bansag, Lambunao, Iloilo - Station 0+000 - Station 0+670","amountPesos":9569000.0,"lengthMeters":670.0,"ratePesosPerMeter":14282.089552238805,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22754"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Batuan to Barangay Zarrague, Pototan, Iloilo - Station 0+000 - Station 1+000","amountPesos":14353000.0,"lengthMeters":1000.0,"ratePesosPerMeter":14353.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22756"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Dala to Barangay Singay, Mina, Iloilo - Station 0+630 - Station 1+300","amountPesos":9569000.0,"lengthMeters":670.0,"ratePesosPerMeter":14282.089552238805,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22758"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Fundacion, Pototan, Iloilo - Station 0+000 - Station 0+670","amountPesos":9569000.0,"lengthMeters":670.0,"ratePesosPerMeter":14282.089552238805,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22760"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lay-ahan to Barangay Danao, Pototan, Iloilo - Station 0+000 - Station 0+167,  Station 0+303 - Station 0+402,  Station 1+033 - Station 1+436","amountPesos":9569000.0,"lengthMeters":669.0,"ratePesosPerMeter":14303.437967115096,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22762"},{"year":2026,"category":"Roads","project":"Construction of Road, Jct. Iloilo-Capiz Rd (Old Route) to Barangay Maite Grande to Barangay Lanot Grande, Lambunao, Iloilo - Station 0+000 - Station 1+330","amountPesos":19138000.0,"lengthMeters":1330.0,"ratePesosPerMeter":14389.473684210527,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22764"},{"year":2026,"category":"Roads","project":"Construction of Tipolo Road, Barangay Tipolo, Mina, Iloilo - Station 0+000 - Station 0+670","amountPesos":9569000.0,"lengthMeters":670.0,"ratePesosPerMeter":14282.089552238805,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22766"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bata, Blk 17 Sta. 0+000 - Sta. 0 +600, Bacolod City","amountPesos":41424000.0,"lengthMeters":600.0,"ratePesosPerMeter":69040.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22770"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Estefania, Villa Angeles Rd. Sta. 0+000 - Sta. 0+426, Orchid St. Sta. 0+000 - Sta. 0+525, Bacolod City","amountPesos":29400000.0,"lengthMeters":525.0,"ratePesosPerMeter":56000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22772"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Granada, Gerardo St. Sta. 0+000 - Sta. 0+722, Cosmos St. Sta. 0+000 - Sta. 0+349, Daisy St. Sta. 0+000 - Sta. 0+153, Maria Villa St. Sta. 0+000 - Sta. 0+076, Bacolod City","amountPesos":39690000.0,"lengthMeters":722.0,"ratePesosPerMeter":54972.29916897507,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22774"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mandalagan, Ascona St. Sta. 0+000 - Sta. 0+230, Gatuslao St. Sta. 0+000 - Sta. 0+135 , Bacolod City","amountPesos":34300000.0,"lengthMeters":230.0,"ratePesosPerMeter":149130.4347826087,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22776"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Singcang-Airport, along Prk Grasya Rd. Sta. 0+000 - Sta. 0+275, along Prk. Kabulakan Rd. Sta. 0+000 - Sta. 0+080, Magsaysay Ave. Sta. 0+000 - Sta. 0+145 , Bacolod City","amountPesos":9800000.0,"lengthMeters":275.0,"ratePesosPerMeter":35636.36363636364,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22780"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sum-ag, Purok Kasanagan, Sta. 0+000 - Sta. 0+700, Bacolod City","amountPesos":9800000.0,"lengthMeters":700.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22782"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Taculing, (Dollar St. Sta. 0+000 - Sta. 0+123, Yen St. Sta. 0+000 - Sta. 0+061 ., at Thass II Subd.), (Taurus St. Sta. 0+000 - Sta. 0+112, Virgo St. Sta. 0+000 - Sta. 0+040 at Sharina Heights Subd.), Bacolod City","amountPesos":19600000.0,"lengthMeters":123.0,"ratePesosPerMeter":159349.59349593497,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22784"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Villamonte, Purok Isla Sta. 0+000 - Sta. 0+190, Akishola Village Purok Cubay Sta. 0+000 - Sta. 0+257, Magsaysay St. Sta.0+000 - Sta. 0+205, Banaue St. Sta. 0+000 - Sta. 0+142, Bacolod City","amountPesos":9800000.0,"lengthMeters":257.0,"ratePesosPerMeter":38132.295719844355,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22786"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay 40, Lizares St. Sta. 0+000 - Sta. 1+160, Bacolod City","amountPesos":19600000.0,"lengthMeters":1160.0,"ratePesosPerMeter":16896.55172413793,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22790"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay 7, 10th St. Sta. 0+000 - Sta. 0+455, 11th St. Sta. 0+000 - Sta. 0+135, Bacolod City","amountPesos":29400000.0,"lengthMeters":455.0,"ratePesosPerMeter":64615.38461538462,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22792"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 5+136 - Sta. 6+636), Barangay Andres Bonifacio, Cadiz City, Negros Occidental","amountPesos":32830000.0,"lengthMeters":1500.0,"ratePesosPerMeter":21886.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22795"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road (Sta. 0+000 - Sta. 0+500), Brgy. Guinhalaran, Silay City, Negros Occidental","amountPesos":9800000.0,"lengthMeters":500.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22797"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road (Sta. 0+000 - Sta. 0+500) , Brgy. Canlusong, Municipality of EB Magalona, Negros Occidental","amountPesos":9800000.0,"lengthMeters":500.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22799"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 0+500), Brgy. Consing, Municipality of EB Magalona, Negros Occidental","amountPesos":9800000.0,"lengthMeters":500.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22801"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 2+200), Barangay V.F. Gustilo to Barangay Magsaysay via Nakar, Barangay V.F. Gustilo and Barangay Magsaysay , Cadiz City, Negros Occidental","amountPesos":49000000.0,"lengthMeters":2200.0,"ratePesosPerMeter":22272.727272727272,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22803"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+530 - Sta. 0+678, Sta. 0+761 - Sta. 1+613), Hda. Candelaria to Hda. Old Barrio, Barangay Purisima, Manapla, Negros Occidental","amountPesos":19600000.0,"lengthMeters":1000.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22805"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 1+000), Hda. Rita to Lourdes Javelosa, Barangay San Pablo, Manapla, Negros Occidental","amountPesos":9800000.0,"lengthMeters":1000.0,"ratePesosPerMeter":9800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22807"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 1+250), Purok Siding Villasor, Barangay Lopez Jaena to Purok Constancia, Barangay General Luna, Barangay Lopez Jaena and Barangay General Luna, Sagay City, Negros Occidental","amountPesos":24500000.0,"lengthMeters":1250.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22809"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 2+111 - Sta. 3+361), Sitio Tagnipis, Barangay Taba-ao, Sagay City, Negros Occidental","amountPesos":24500000.0,"lengthMeters":1250.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22811"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Amontay, Binalbagan, Negros Occidental (Sta. 00+000.00 - Sta 00+475.00)","amountPesos":9800000.0,"lengthMeters":475.0,"ratePesosPerMeter":20631.57894736842,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22814"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Cabanbanan, Himamaylan City, Negros Occidental (Sta. 00+460.00 - Sta. 00+900.00)","amountPesos":9800000.0,"lengthMeters":440.0,"ratePesosPerMeter":22272.727272727272,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22816"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+348, Brgy. Pandanon to Brgy. Dahile, Mabinay, Negros Oriental","amountPesos":9800000.0,"lengthMeters":348.0,"ratePesosPerMeter":28160.919540229886,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22818"},{"year":2026,"category":"Roads","project":"Concreting of Road, Sta. 0+000 - Sta. 0+324, Brgy. Azagra, Tanjay City, Negros Oriental","amountPesos":9800000.0,"lengthMeters":324.0,"ratePesosPerMeter":30246.913580246914,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22820"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Inolingan, Moises Padilla, Negros Occidental (Sta 00+515.00 - Sta 01+015)","amountPesos":14700000.0,"lengthMeters":500.0,"ratePesosPerMeter":29400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22822"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Mahalang, Himamaylan City, Negros Occidental (Sta. 00+548.00 - Sta. 01+048.00)","amountPesos":9800000.0,"lengthMeters":500.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22824"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Masulog, La Castellana, Negros Occidental (Sta. 00+000.00 - Sta 00+493.00)","amountPesos":9800000.0,"lengthMeters":493.0,"ratePesosPerMeter":19878.296146044624,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22826"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Puso, La Castellana, Negros Occidental (Sta. 00+000.00 - Sta 00+505.00)","amountPesos":9800000.0,"lengthMeters":505.0,"ratePesosPerMeter":19405.940594059404,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22828"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Robles, La Castellana, Negros Occidental (Sta. 00+000.00 - Sta 00+495.00)","amountPesos":9800000.0,"lengthMeters":495.0,"ratePesosPerMeter":19797.9797979798,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22830"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Sag-ang, La Castellana, Negros Occidental (Sta. 01+134.00 - Sta. 01+919.00)","amountPesos":15190000.0,"lengthMeters":785.0,"ratePesosPerMeter":19350.31847133758,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22832"},{"year":2026,"category":"Roads","project":"Construction of Road at Cadulunan-Tuburan-Proper, Barangay Camba-og, Hinigaran, Negros Occidental (Sta. 00+000.00 - Sta 00+490.00)","amountPesos":9800000.0,"lengthMeters":490.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22834"},{"year":2026,"category":"Roads","project":"Construction of Road at So. Can-amo, Barangay 6, Moises Padilla, Negros Occidental (Sta. 00+000.00 - Sta 00+225.00)","amountPesos":4900000.0,"lengthMeters":225.0,"ratePesosPerMeter":21777.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22836"},{"year":2026,"category":"Roads","project":"Construction of Road at So. Palayan, Barangay Cabadiangan, Himamaylan City, Negros Occidental (Sta. 00+508.00 - Sta. 01+011.00)","amountPesos":9800000.0,"lengthMeters":503.0,"ratePesosPerMeter":19483.1013916501,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22838"},{"year":2026,"category":"Roads","project":"Construction of Road at Upad to Mirasol, Barangay Libacao, Himamaylan City, Negros Occidental (Sta. 00+460.00 - Sta. 00+956.00)","amountPesos":9800000.0,"lengthMeters":496.0,"ratePesosPerMeter":19758.064516129034,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22840"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Banog-Banog, Isabela, Negros Occidental (Sta. 00+000.00 - Sta 00+220.00)","amountPesos":4900000.0,"lengthMeters":220.0,"ratePesosPerMeter":22272.727272727272,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22842"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pilar, Hinigaran, Negros Occidental (Sta. 00+268.00 - Sta. 00+533.00)","amountPesos":9800000.0,"lengthMeters":265.0,"ratePesosPerMeter":36981.1320754717,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22844"},{"year":2026,"category":"Roads","project":"Construction of Road, Had. Naval, Barangay Talaban, Himamaylan City, Negros Occidental (Sta. 00+000.00 - Sta 00+535.00)","amountPesos":9800000.0,"lengthMeters":535.0,"ratePesosPerMeter":18317.757009345794,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22846"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Arum, Barangay Macagahay, Moises Padilla, Negros Occidental (Sta 01+182.00 - Sta 02+122.00)","amountPesos":19600000.0,"lengthMeters":940.0,"ratePesosPerMeter":20851.063829787236,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22848"},{"year":2026,"category":"Bridges","project":"Construction of Bridge at Sitio Pison, Sta 0+000 - Sta. 0+018, Barangay Sagasa, Bago City, Negros Occidental","amountPesos":25500000.0,"lengthMeters":18.0,"ratePesosPerMeter":1416666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22856"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 0+387, SRA-BPI-Philippine Carabao Center, Barangay La Granja, La Carlota City, Negros Occidental","amountPesos":9594000.0,"lengthMeters":387.0,"ratePesosPerMeter":24790.697674418603,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22858"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Budlasan - Trinidad connecting Jct Vallehermoso-Canlaon City-La Castellana Road, Sta. 1+251 - Sta. 1+701, Canlaon City, Negros Oriental","amountPesos":13720000.0,"lengthMeters":450.0,"ratePesosPerMeter":30488.88888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22863"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cangabo - T. Hill Road, Sta. 3+000-Sta. 3+950, La Libertad, Negros Oriental","amountPesos":37892000.0,"lengthMeters":950.0,"ratePesosPerMeter":39886.31578947369,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22865"},{"year":2026,"category":"Roads","project":"Construction of Road, Jct Dumaguete North Road to Barangay Pacuan-Apanangon Road, Sta. 0+000-Sta. 0+500, Jimalalud, Negros Oriental","amountPesos":14700000.0,"lengthMeters":500.0,"ratePesosPerMeter":29400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22867"},{"year":2026,"category":"Roads","project":"Construction of Road from Barangay Banilad going to Negros Oriental State University, Sta. 0+000 - Sta. 1+171, Barangay Bajumpandan, Dumaguete City, Negros Oriental","amountPesos":39360000.0,"lengthMeters":1171.0,"ratePesosPerMeter":33612.29718189582,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22872"},{"year":2026,"category":"Roads","project":"Construction of Road from Barangay Lumbangan to Barangay Dagbasan, Sta. 0+000 - Sta. 0+280.5, Mabinay, Negros Oriental","amountPesos":9800000.0,"lengthMeters":280.5,"ratePesosPerMeter":34937.61140819964,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22874"},{"year":2026,"category":"Roads","project":"Construction of Road from Tadlong leading to Barangay Napasuan, Sta. 0+000 - Sta. 0+603, Mabinay, Negros Oriental","amountPesos":19600000.0,"lengthMeters":603.0,"ratePesosPerMeter":32504.145936981757,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22876"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+261.5, Barangay Agan-an and Barangay Cangmating, Sibulan, Negros Oriental","amountPesos":4900000.0,"lengthMeters":261.5,"ratePesosPerMeter":18738.049713193115,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22878"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+130.5, Barangay Balugo, Dumaguete City, Negros Oriental","amountPesos":4900000.0,"lengthMeters":130.5,"ratePesosPerMeter":37547.89272030651,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22880"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+196.5, Barangay Banawe, Pamplona, Negros Oriental","amountPesos":4900000.0,"lengthMeters":196.5,"ratePesosPerMeter":24936.386768447835,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22882"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+298.5, Barangay Bio-os, Amlan, Negros Oriental","amountPesos":9800000.0,"lengthMeters":298.5,"ratePesosPerMeter":32830.82077051926,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22884"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+285.03, Barangay Cadawinonan, Dumaguete City, Negros Oriental","amountPesos":4900000.0,"lengthMeters":285.03,"ratePesosPerMeter":17191.1728589973,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22886"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+282, Barangay Cantil-e, Dumaguete City, Negros Oriental","amountPesos":4900000.0,"lengthMeters":282.0,"ratePesosPerMeter":17375.886524822694,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22888"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+273, Barangay Daro, Dumaguete City, Negros Oriental","amountPesos":4900000.0,"lengthMeters":273.0,"ratePesosPerMeter":17948.71794871795,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22890"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - 0+127.5, Barangay Inawasan, Pamplona, Negros Oriental","amountPesos":4900000.0,"lengthMeters":127.5,"ratePesosPerMeter":38431.37254901961,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22892"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - 0+130.5, Barangay Mamburao, Pamplona, Negros Oriental","amountPesos":4900000.0,"lengthMeters":130.5,"ratePesosPerMeter":37547.89272030651,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22894"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+333.71, Barangay Mangnao, Dumaguete City, Negros Oriental","amountPesos":4900000.0,"lengthMeters":333.71,"ratePesosPerMeter":14683.407749243355,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22896"},{"year":2026,"category":"Bridges","project":"Construction of Box Culvert Bridge, Sta. 0+000 - Sta. 0+030, Barangay Banawe, Pamplona, Negros Oriental","amountPesos":15000000.0,"lengthMeters":30.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22898"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+127.5, Barangay Poblacion, Pamplona, Negros Oriental","amountPesos":4900000.0,"lengthMeters":127.5,"ratePesosPerMeter":38431.37254901961,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22900"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+271.5, Barangay Talay, Dumaguete City, Negros Oriental","amountPesos":4900000.0,"lengthMeters":271.5,"ratePesosPerMeter":18047.882136279928,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22902"},{"year":2026,"category":"Roads","project":"Construction of Road, leading to Sitio Di-ay, Sta. 0+000 - Sta. 0+595.5, Barangay Pandanon, Mabinay, Negros Oriental","amountPesos":19600000.0,"lengthMeters":595.5,"ratePesosPerMeter":32913.518052057094,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22904"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok 1, Sta. 0+000 - Sta. 1+208.5, Barangay Jantianon, Amlan to Sitio Cabul-anonan, Barangay San Miguel, Tanjay City, Negros Oriental","amountPesos":36260000.0,"lengthMeters":1208.5,"ratePesosPerMeter":30004.137360364086,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22906"},{"year":2026,"category":"Roads","project":"Construction of Road at Sitio Cabonbon, Barangay Bunga, Dauin, Negros Oriental, (Completion), Sta. 1+951.71 - Sta. 3+251.71","amountPesos":39200000.0,"lengthMeters":1300.0,"ratePesosPerMeter":30153.846153846152,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22909"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Inalad to Sitio Camboay and Canaway Elementary School, Siaton, Negros Oriental, (Completion), Sta. 0+947.35 - Sta. 2+747.35","amountPesos":49000000.0,"lengthMeters":1800.0,"ratePesosPerMeter":27222.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22911"},{"year":2026,"category":"Roads","project":"Construction of Road, Buntis-Calangag to Airport, Bacong, Negros Oriental, (Completion), Sta. 0+970.440 - Sta. 1+970.440","amountPesos":39200000.0,"lengthMeters":1000.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22913"},{"year":2026,"category":"Roads","project":"Construction of Road, Candugay-Casalaan, Siaton, Negros Oriental, (Continuation) Sta. 1+660 - Sta. 2+460","amountPesos":33320000.0,"lengthMeters":800.0,"ratePesosPerMeter":41650.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22915"},{"year":2026,"category":"Roads","project":"Construction of Road, Timbao-Liptong, Bacong, Negros Oriental, (Completion), Sta. 0+956.64 - Sta. 2+456.64","amountPesos":39200000.0,"lengthMeters":1500.0,"ratePesosPerMeter":26133.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22917"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Cangclaran -Cangumantong, Barangay Cangclaran, Lazi, Siquijor, Sta. 5+618 - Sta. 6+436","amountPesos":41160000.0,"lengthMeters":818.0,"ratePesosPerMeter":50317.84841075795,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22920"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Kimba - Cang-atuyom - Ponong, Barangay Kimba, Lazi, Siquijor, Sta. 10+505 - Sta. 11+323","amountPesos":41160000.0,"lengthMeters":818.0,"ratePesosPerMeter":50317.84841075795,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22922"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Ponong - Luzong, Barangay Ponong, Siquijor, Siquijor, Sta. 1+609 - Sta. 2+447","amountPesos":42140000.0,"lengthMeters":838.0,"ratePesosPerMeter":50286.39618138425,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22924"},{"year":2026,"category":"Roads","project":"Construction of Road at C.P.G. East Avenue, Bool-Mansasa District, Tagbilaran City connecting Tagbilaran North Road (Sta. 001+950.00 - Sta. 003 + 157.00) ,Tagbilaran City, Bohol","amountPesos":35206000.0,"lengthMeters":1207.0,"ratePesosPerMeter":29168.185584092793,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22928"},{"year":2026,"category":"Roads","project":"Construction of Road at Manlangit Street (Sta. 000 + 000.00 - Sta. 000 + 550.00), Brgy. San Isidro, Tagbilaran City, Bohol","amountPesos":19395000.0,"lengthMeters":550.0,"ratePesosPerMeter":35263.63636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22930"},{"year":2026,"category":"Roads","project":"Construction of Road leading to Momo Beach (Sta. 000 + 000.00 - Sta. 000 + 167.00), Barangay Bil-isan , Panglao, Bohol","amountPesos":4849000.0,"lengthMeters":167.0,"ratePesosPerMeter":29035.928143712576,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22932"},{"year":2026,"category":"Roads","project":"Construction of Road at Timoteo Butalid Drive (Sta. 000+ 000.00 - Sta.000+101.00), Tagbilaran City, Bohol","amountPesos":4849000.0,"lengthMeters":101.0,"ratePesosPerMeter":48009.90099009901,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22934"},{"year":2026,"category":"Roads","project":"Construction of Road leading to Bohol Island State University (Sta. 000+000.00 - Sta. 001 + 200.00), Brgy. Bingag, Dauis, Bohol","amountPesos":34884000.0,"lengthMeters":1200.0,"ratePesosPerMeter":29070.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22936"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Dao (Brunil Drive) Sta. 000+000.00 - Sta. 000+440.00, Tagbilaran City, Bohol","amountPesos":14546000.0,"lengthMeters":440.0,"ratePesosPerMeter":33059.09090909091,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22938"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Libertad to Barangay Dampas Road ( Sta. 000+000.00 - Sta. 000+590.00), Baclayon and Tagbilaran City, Bohol","amountPesos":19395000.0,"lengthMeters":590.0,"ratePesosPerMeter":32872.8813559322,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22940"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bood to Barangay Katarungan, Ubay, Bohol Sta. 1+889.90-Sta. 3+889.90","amountPesos":48450000.0,"lengthMeters":2000.0,"ratePesosPerMeter":24225.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22945"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Poblacion - Barangay Tomoc, San Miguel, Bohol Sec1: Sta. 0+000-Sta.0+540.00\nSec2: Sta. 0+000-Sta. 0+770.76","amountPesos":24225000.0,"lengthMeters":770.76,"ratePesosPerMeter":31430.017125953604,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22947"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sto. Niño, Talibon, Bohol Sta. 0+000-Sta. 1+664.50","amountPesos":46018000.0,"lengthMeters":1664.5,"ratePesosPerMeter":27646.74076299189,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22949"},{"year":2026,"category":"Bridges","project":"Replacement of Bridge, Tapon, Ubay, Bohol Sta. 0+054.80-Sta. 0+064.80","amountPesos":7758000.0,"lengthMeters":10.0,"ratePesosPerMeter":775800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22951"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Villafuerte to Barangay Calatrava, Sta. 0+000 - Sta. 2+000, Carmen, Bohol","amountPesos":48488000.0,"lengthMeters":2000.0,"ratePesosPerMeter":24244.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22954"},{"year":2026,"category":"Roads","project":"Construction of Road, Lungsodaan - Baybayon, Sta.0+000.00 – Sta. 0+782.00, Mabini, Bohol","amountPesos":33941000.0,"lengthMeters":782.0,"ratePesosPerMeter":43402.81329923274,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22958"},{"year":2026,"category":"Roads","project":"Construction of Road, Pilar, Bohol, Sta. 0 + 270 - Sta. 1 + 672","amountPesos":38760000.0,"lengthMeters":1402.0,"ratePesosPerMeter":27646.219686162625,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22960"},{"year":2026,"category":"Roads","project":"Construction of Road, Regional Mobile Force Battalion 7 (STA. 0 + 000 - STA. 0 + 750), Sibonga, Cebu","amountPesos":24225000.0,"lengthMeters":750.0,"ratePesosPerMeter":32300.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22963"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage, Minglanilla Government Center, Poblacion Ward I, Minglanilla, Cebu (STA. 0 + 000 - STA. 0 + 196.00)","amountPesos":10000000.0,"lengthMeters":196.0,"ratePesosPerMeter":51020.4081632653,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22965"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Carrots - Okra, Barangay Poblacion, Talisay City, Cebu (STA. 0  + 000 - STA. 0 + 320)","amountPesos":10000000.0,"lengthMeters":320.0,"ratePesosPerMeter":31250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22967"},{"year":2026,"category":"Roads","project":"Road Concreting at Brgy. Camp 7 to Sitio Lubas II (STA. 0 + 485 - STA. 1 + 025), Brgy. Camp 8, Minglanilla, Cebu","amountPesos":24225000.0,"lengthMeters":540.0,"ratePesosPerMeter":44861.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22969"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bulasa - Barangay Sua Barangay Road, Barangay Bulasa and Barangay Sua, Argao, Cebu, Sta 0+000 - Sta 1+340","amountPesos":17442000.0,"lengthMeters":1340.0,"ratePesosPerMeter":13016.41791044776,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22972"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Canbantug - Barangay Bulak Barangay Road, Barangay Canbantug and Barangay Bulak , Argao, Cebu, Sta 0+000 - Sta 1+094","amountPesos":14507000.0,"lengthMeters":1094.0,"ratePesosPerMeter":13260.511882998171,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22974"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Jampang - Barangay Mabasa Barangay Road, Barangay Jampang and Barangay Mabasa, Argao, Cebu, Sta 0+000 - Sta 1+224","amountPesos":19380000.0,"lengthMeters":1224.0,"ratePesosPerMeter":15833.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22976"},{"year":2026,"category":"Roads","project":"Construction of Road, Nangka Barangay Road, Brgy. Nangka, Boljoon, Cebu. Sta. 0+000- Sta. 1+000","amountPesos":20000000.0,"lengthMeters":1000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22978"},{"year":2026,"category":"Roads","project":"Construction of Road, Balamban (Sta. 10+000 - Sta. 11+000), Cebu","amountPesos":48450000.0,"lengthMeters":1000.0,"ratePesosPerMeter":48450.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22981"},{"year":2026,"category":"Roads","project":"Construction of Access Road leading to Public Buildings, Sta. 000+000 - Sta. 000+350, Barangay Tarong, Madridejos, Cebu","amountPesos":10000000.0,"lengthMeters":350.0,"ratePesosPerMeter":28571.428571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22984"},{"year":2026,"category":"Roads","project":"Construction of Road at New Government Facilities, Sta. 000+000 - Sta. 001+752, City of Bogo, Cebu","amountPesos":48488000.0,"lengthMeters":1752.0,"ratePesosPerMeter":27675.79908675799,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22986"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bungtod - Sitio Tabayjo, Barangay Dakit, Section 2, Sta. 000+000 - Sta. 000+175, City of Bogo, Cebu","amountPesos":4845000.0,"lengthMeters":175.0,"ratePesosPerMeter":27685.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22988"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Bangkal, Barangay Poblacion, Sta. 000+000 - 0001+052, San Remigio, Cebu","amountPesos":29070000.0,"lengthMeters":1052.0,"ratePesosPerMeter":27633.079847908746,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22990"},{"year":2026,"category":"Roads","project":"Road Concreting at Brgy. Lapaz - Guadalupe Road leading to New Bogo Sanitary Landfill, Sta. 000+000 - Sta. 000+324, City of Bogo, Cebu","amountPesos":8989000.0,"lengthMeters":324.0,"ratePesosPerMeter":27743.827160493827,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22992"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay Cabungaan, Catmon, Cebu - Sta. 0+000.00 - Sta. 0+020.00","amountPesos":4849000.0,"lengthMeters":20.0,"ratePesosPerMeter":242450.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22995"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Sitio Lunas, Barangay Cadaruhan - Barangay Bongoyan, Borbon, Cebu - Sta. 0+000.00 - Sta. 0+150.00","amountPesos":4849000.0,"lengthMeters":150.0,"ratePesosPerMeter":32326.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22997"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cantipay, Carmen, Cebu - Sta. 0+000.00 - Sta. 0+150.00","amountPesos":4849000.0,"lengthMeters":150.0,"ratePesosPerMeter":32326.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 22999"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Canamucan, Compostela, Cebu - Sta. 0+000.00 - Sta. 0+150.00","amountPesos":4849000.0,"lengthMeters":150.0,"ratePesosPerMeter":32326.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23001"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Catarman, Liloan, Cebu - Sta. 0+000.00 - Sta. 0+150.00","amountPesos":4849000.0,"lengthMeters":150.0,"ratePesosPerMeter":32326.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23003"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Monsterrat and Barangay Biasong, Pilar, Cebu - Sta. 0+000.00 - Sta. 0+150.00","amountPesos":4849000.0,"lengthMeters":150.0,"ratePesosPerMeter":32326.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23005"},{"year":2026,"category":"Roads","project":"Improvement of Road, Sitio Mahayahay, Barangay Mercedes, Poro, Cebu - Sta. 0+000.00 - Sta. 0+150.00","amountPesos":4849000.0,"lengthMeters":150.0,"ratePesosPerMeter":32326.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23007"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Northern Poblacion, San Francisco, Cebu - Sta. 0+000.00 - Sta. 0+150.00","amountPesos":4849000.0,"lengthMeters":150.0,"ratePesosPerMeter":32326.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23009"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay San Roque, Liloan, Cebu - Sta. 0+000.00 - Sta. 0+020.00","amountPesos":5819000.0,"lengthMeters":20.0,"ratePesosPerMeter":290950.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23011"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cogon, Compostela, Cebu - Sta. 0+000.00 - Sta. 0+150.00","amountPesos":4849000.0,"lengthMeters":150.0,"ratePesosPerMeter":32326.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23013"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Vicente, Liloan, Cebu - Sta. 0+000.00 - Sta. 0+150.00","amountPesos":4849000.0,"lengthMeters":150.0,"ratePesosPerMeter":32326.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23015"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tayud, Liloan, Cebu - Sta. 0+000.00 - Sta. 0+150.00","amountPesos":4849000.0,"lengthMeters":150.0,"ratePesosPerMeter":32326.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23017"},{"year":2026,"category":"Roads","project":"Construction of Road, Catarman, Liloan, Cebu - Sta. 0+000.00 - Sta. 0+150.00","amountPesos":4849000.0,"lengthMeters":150.0,"ratePesosPerMeter":32326.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23019"},{"year":2026,"category":"Roads","project":"Construction of Road, Cotcot, Liloan, Cebu - Sta. 0+000.00 - Sta. 0+150.00","amountPesos":4849000.0,"lengthMeters":150.0,"ratePesosPerMeter":32326.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23021"},{"year":2026,"category":"Roads","project":"Construction of Road, Yati, Liloan, Cebu - Sta. 0+000.00 - Sta. 0+300.00","amountPesos":9698000.0,"lengthMeters":300.0,"ratePesosPerMeter":32326.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23023"},{"year":2026,"category":"Bridges","project":"Construction of Bridge at Barangay Casili, Municipality of Consolacion, Cebu - Sta. 0+000.00 - Sta. 0+200.00","amountPesos":23274000.0,"lengthMeters":200.0,"ratePesosPerMeter":116370.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23026"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage System at Barangay Cogon, Municipality of Cordova, Cebu - Sta. 0+000.00 - Sta. 0+300.00","amountPesos":5819000.0,"lengthMeters":300.0,"ratePesosPerMeter":19396.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23028"},{"year":2026,"category":"Roads","project":"Concreting of Road with Drainage System at Barangay Tilhaong, Municipality of Consolacion, Cebu - Sta. 0+000.00 - Sta. 0+280.00","amountPesos":9698000.0,"lengthMeters":280.0,"ratePesosPerMeter":34635.71428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23038"},{"year":2026,"category":"Roads","project":"Concreting of Road with drainage facilities at Barangay Pajo - Barangay Gun-ob, Sta. 0+000.00 - Sta. 0+400.00, Lapu-Lapu City, Cebu","amountPesos":14535000.0,"lengthMeters":400.0,"ratePesosPerMeter":36337.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23040"},{"year":2026,"category":"Roads","project":"Concreting of Road with drainage facilities at Brgy. Canjulao (Phase 3), Sta. 0+460.00 - Sta. 0+637.00, Lapu-Lapu City","amountPesos":7752000.0,"lengthMeters":177.0,"ratePesosPerMeter":43796.61016949153,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23042"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Tayud, Sta. 0+330.00 - Sta. 0+630.00, Consolacion, Cebu","amountPesos":14535000.0,"lengthMeters":300.0,"ratePesosPerMeter":48450.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23044"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage System, Barangay Poblacion Occidental, Sta. 0+000.00 - Sta. 0+140.00, Consolacion, Cebu","amountPesos":4845000.0,"lengthMeters":140.0,"ratePesosPerMeter":34607.142857142855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23048"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, SB Cabahug Street, Sta. 0+200.00 - Sta. 0+800.00, Mandaue City, Cebu","amountPesos":21318000.0,"lengthMeters":600.0,"ratePesosPerMeter":35530.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23050"},{"year":2026,"category":"Roads","project":"Construction of Cagsing-Anao Road, Sta. 1 + 032 - Sta. 1 + 307, Barangay Cagsing and Barangay Anao, Ginatilan, Cebu","amountPesos":9698000.0,"lengthMeters":275.0,"ratePesosPerMeter":35265.454545454544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23053"},{"year":2026,"category":"Roads","project":"Road Construction of Patong-Basak Road,  Sta. 0+786 - Sta. 0+930, at Brgy. Basak and Patong, Badian, Cebu","amountPesos":29093000.0,"lengthMeters":144.0,"ratePesosPerMeter":202034.72222222222,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23055"},{"year":2026,"category":"Roads","project":"Construction of Campisong-Malatbo Road, Sta. 3 + 823 - Sta. 4 + 142, Barangay Campisong and Barangay Malatbo, Ginatilan, Cebu","amountPesos":9698000.0,"lengthMeters":319.0,"ratePesosPerMeter":30401.2539184953,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23059"},{"year":2026,"category":"Roads","project":"Construction of Mangaco-San Roque Road, Barangay Mangaco and Barangay San Roque, Sta. 0 + 000 - Sta. 0 + 613, Ginatilan, Cebu","amountPesos":19395000.0,"lengthMeters":613.0,"ratePesosPerMeter":31639.4779771615,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23061"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Lombo - Barangay Tolosa (Section 1: 0 + 000 - 0 + 507, Section 2: 0+000 - 0 + 606), Malabuyoc, Cebu","amountPesos":48450000.0,"lengthMeters":606.0,"ratePesosPerMeter":79950.49504950496,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23063"},{"year":2026,"category":"Roads","project":"Construction of Road, Armeña - Sorsogon, Barangay Sorsogon, Sta. 0 + 155 - Sta. 0 + 463, Malabuyoc, Cebu","amountPesos":9690000.0,"lengthMeters":308.0,"ratePesosPerMeter":31461.03896103896,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23065"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Panlaan - Barangay Tubod-Bitoon, Sta. 2 + 235 - Sta. 2 + 345, Dumanjug, Cebu","amountPesos":28585000.0,"lengthMeters":110.0,"ratePesosPerMeter":259863.63636363635,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23067"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Salagmaya, Sta. 0 + 115 - Sta. 0 + 245, Alcantara, Cebu","amountPesos":4845000.0,"lengthMeters":130.0,"ratePesosPerMeter":37269.230769230766,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23069"},{"year":2026,"category":"Bridges","project":"Construction of Concrete Bridge, Sta 0+522 - Sta 0+552, Package 2, Barangay Poblacion Pardo, Cebu City,","amountPesos":36262000.0,"lengthMeters":30.0,"ratePesosPerMeter":1208733.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23072"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sta. 2+330 to Sta. 2+340, Barangay Budla-an, Cebu City, \nCebu","amountPesos":13577000.0,"lengthMeters":10.0,"ratePesosPerMeter":1357700.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23074"},{"year":2026,"category":"Bridges","project":"Construction of Concrete Bridge, Phase 2, Sta. 2+725 - Sta. 2+765, Sitio Campo, Barangay Bonbon, Cebu City, Cebu","amountPesos":40795000.0,"lengthMeters":40.0,"ratePesosPerMeter":1019875.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23076"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 6+700 - Sta. 8+350, Barangay Buot, Cebu City, Cebu","amountPesos":53336000.0,"lengthMeters":1650.0,"ratePesosPerMeter":32324.848484848484,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23078"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+350 - Sta. 1+550, Barangay Tabunan, Cebu City, Cebu","amountPesos":38790000.0,"lengthMeters":1200.0,"ratePesosPerMeter":32325.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23080"},{"year":2026,"category":"Roads","project":"Construction of Road with Slope Protection Structure, Sta. 6+700.00 - Sta. 7+420.00 Barangay Buot, Cebu City, Cebu","amountPesos":38760000.0,"lengthMeters":720.0,"ratePesosPerMeter":53833.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23082"},{"year":2026,"category":"Roads","project":"Construction of Road with Slope Protection Structure, Sta. 9+100.00 - Sta. 9+350.00 Barangay Tagbao, Cebu City, Cebu","amountPesos":29070000.0,"lengthMeters":250.0,"ratePesosPerMeter":116280.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23084"},{"year":2026,"category":"Roads","project":"Construction of Road with Slope Protection, Sta. 7+000.00 - 7+200.00 Barangay Pulangbato, Cebu City","amountPesos":19380000.0,"lengthMeters":200.0,"ratePesosPerMeter":96900.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23086"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 2+000 - Sta. 3+060, Barangay Bacayan to Barangay Pit-os, Cebu City","amountPesos":48450000.0,"lengthMeters":1060.0,"ratePesosPerMeter":45707.54716981132,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23088"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 2+700.00 - Sta. 2+980.00 Barangay Bonbon, Cebu City","amountPesos":9690000.0,"lengthMeters":280.0,"ratePesosPerMeter":34607.142857142855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23090"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 2+600.00 - Sta. 2+870.00 Barangay Sirao - Barangay Guba, Cebu City","amountPesos":23900000.0,"lengthMeters":270.0,"ratePesosPerMeter":88518.51851851853,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23092"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+650.00 - Sta. 0+860.00 Barangay Sirao, Cebu City","amountPesos":19380000.0,"lengthMeters":210.0,"ratePesosPerMeter":92285.71428571429,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23094"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage Structure, Sta. 0+109 - Sta. 0+189, Barangay Kinasang-an Pardo, Cebu City, Cebu","amountPesos":4849000.0,"lengthMeters":80.0,"ratePesosPerMeter":60612.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23096"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage Structure Sta. 0+147 - Sta. 0+396, Brgy. Labangon, Cebu City","amountPesos":14546000.0,"lengthMeters":249.0,"ratePesosPerMeter":58417.670682730924,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23098"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage Structure, Phase 1, Sta. 3+453 to Sta. 3+753, Brgy Pit-os Cebu City, Cebu","amountPesos":19395000.0,"lengthMeters":300.0,"ratePesosPerMeter":64650.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23100"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Naval, Biliran (Sta. 0+000 - Sta. 0+900)","amountPesos":48240000.0,"lengthMeters":900.0,"ratePesosPerMeter":53600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23104"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Inasuyan, Kawayan, Biliran (Sta. 0+000 - Sta. 0+400)","amountPesos":7840000.0,"lengthMeters":400.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23106"},{"year":2026,"category":"Roads","project":"Improvement of Access Road, Barangay Villa Consuelo, Naval, Biliran (Sta. 11+000 - Sta. 11+600)","amountPesos":29400000.0,"lengthMeters":600.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23108"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Balacson, Kawayan, Biliran (Sta. 0+657 - Sta. 1+157)","amountPesos":9800000.0,"lengthMeters":500.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23110"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Sitio Capayas, Barangay Bunga, Cabucgayan, Biliran (Sta. 0+163 - Sta. 0+243, Sta. 1+043 - Sta. 1+713)","amountPesos":14700000.0,"lengthMeters":750.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23112"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lico, Naval, Biliran (Sta. 1+257 - Sta. 1+757)","amountPesos":9800000.0,"lengthMeters":500.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23114"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Salvacion, Culaba, Biliran (Sta. 0+000 - Sta. 0+355, Sta. 0+000 - Sta. 0+145)","amountPesos":9800000.0,"lengthMeters":355.0,"ratePesosPerMeter":27605.6338028169,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23116"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Caraycaray, Naval, Biliran (Sta. 0+100 - Sta. 0+600)","amountPesos":9800000.0,"lengthMeters":500.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23118"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay P.I. Garcia, Naval, Biliran (Sta. 0+000 - Sta. 0+500)","amountPesos":9648000.0,"lengthMeters":500.0,"ratePesosPerMeter":19296.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23120"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Dapdap, Barangay Agpangi, Naval, Biliran (Sta. 1+080 - Sta. 1+580)","amountPesos":9648000.0,"lengthMeters":500.0,"ratePesosPerMeter":19296.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23122"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road along Ibañez Street, Barangay Palanay, Caibiran, Biliran (Sta. 0+639 - Sta. 1+139)","amountPesos":9648000.0,"lengthMeters":500.0,"ratePesosPerMeter":19296.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23124"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Magbangon to Barangay Casiawan, Cabucgayan, Biliran (Sta. 0+251 - Sta. 0+751)","amountPesos":9648000.0,"lengthMeters":500.0,"ratePesosPerMeter":19296.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23126"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Manlabang, Caibiran, Biliran (Sta. 0+000- Sta. 0+410)","amountPesos":9648000.0,"lengthMeters":410.0,"ratePesosPerMeter":23531.70731707317,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23128"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Can-ato to Brgy. Candoros, Llorente, Eastern Samar (Sta. 0+000 - Sta. 0+600)","amountPesos":22295000.0,"lengthMeters":600.0,"ratePesosPerMeter":37158.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23133"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay 13-Barangay 1, Salcedo, Eastern Samar (0+000 - 0+700)","amountPesos":24500000.0,"lengthMeters":700.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23135"},{"year":2026,"category":"Roads","project":"Improvement of Road, Brgy. Tegero St. to San Andres Bukid, Brgy. Bonghon, Dolores, Eastern Samar (Sta. 0+000 - Sta. 0+200)","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23137"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Mabuhay to brgy. Agsaman, Jipapad, Eastern Smar (Sta. 0+000 - 0+600)","amountPesos":19600000.0,"lengthMeters":600.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23141"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Baras, Guiuan, Eastern Samar (Sta. 0+000 - Sta. 0+200)","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23147"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Campoyong, Guiuan, Eastern Samar (Sta. 0+000 - Sta. 0+200)","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23149"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Cantahay, Guiuan, Eastern Samar (Sta. 0+000 - Sta. 0+200)","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23151"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Dalaragan, Guiuan, Eastern Samar (Sta. 0+000 - Sta. 0+200)","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23153"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Lupok, Guiuan, Eastern Samar (Sta. 0+000 - Sta. 0+200)","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23155"},{"year":2026,"category":"Roads","project":"Constuction of Road, Brgy. Pob. 4, Guiuan, Eastern Samar (Sta. 0+000 - Sta. 0+200)","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23157"},{"year":2026,"category":"Roads","project":"Construction of Barangay Road, Brgy. San Pedro, Guiuan, Eastern Samar (Sta. 0+000 - Sta. 0+200)","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23159"},{"year":2026,"category":"Roads","project":"Construction of Access Road from Brgy. Malobago to Poblacion 1, Brgy. Malobago, Maslog, Eastern Samar (Sta. 0+000 - Sta. 0+200)","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23161"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Maputi, Maslog, Eastern Samar (Sta. 0+000 - Sta. 0+200)","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23163"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Pob. 2, Maslog, Eastern Samar (Sta. 0+000 - Sta. 0+200)","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23165"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Poblacion 1, Salcedo, Eastern Samar (Sta. 0+000 - Sta. 0+200)","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23167"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Aet, Sulat Eastern Samar (Sta. 0+000 - Sta. 0+200)","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23169"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. San Juan, Sulat, Eastern Samar (Sta. 0+000 - Sta. 0+200)","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23171"},{"year":2026,"category":"Roads","project":"Construction of Circumferential Road, Poblacion Sulat - Barangay San Francisco -Barangay Del Remedio, Sulat Eastern Samar (Sta. 6+215 - Sta. 7+460)","amountPesos":38592000.0,"lengthMeters":1245.0,"ratePesosPerMeter":30997.590361445782,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23173"},{"year":2026,"category":"Roads","project":"Construction of Road from Barangay 3 - Brgy 5 Poblacion, Taft, Eastern Samar (Sta. 0+000 - Sta. 0+282)","amountPesos":38592000.0,"lengthMeters":282.0,"ratePesosPerMeter":136851.06382978722,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23175"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bacjao - Barangay Cansumangkay - Barangay 6, Balangiga, Eastern Samar (Sta. 0+000 - Sta. 0+900)","amountPesos":39200000.0,"lengthMeters":900.0,"ratePesosPerMeter":43555.555555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23177"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bangon to Barangay Tanauan, San Policarpo, Eastern Samar (Sta. 1+659 - Sta. 2+559)","amountPesos":38592000.0,"lengthMeters":900.0,"ratePesosPerMeter":42880.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23179"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bonghon to Barangay Caglao-an, Dolores, Eastern Samar (Sta. 4+004 - Sta. 4+954)","amountPesos":48240000.0,"lengthMeters":950.0,"ratePesosPerMeter":50778.94736842105,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23181"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Tandang Sora - Brgy Tugop, Gen. MacArthur, Eastern Samar (Sta. 0+000 - Sta. 1+500)","amountPesos":8330000.0,"lengthMeters":1500.0,"ratePesosPerMeter":5553.333333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23183"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Inayawan - Barangay Tawagan, Arteche, Eastern Samar (Sta. 0+000 - Sta. 0+900)","amountPesos":39200000.0,"lengthMeters":900.0,"ratePesosPerMeter":43555.555555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23185"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Magsaysay to Barangay Malvar, Balangkayan, Eastern Samar (Sta. 0+000 - Sta. 0+250)","amountPesos":9648000.0,"lengthMeters":250.0,"ratePesosPerMeter":38592.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23187"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Polangi - Barangay Gayam, Taft, Eastern Samar (Sta. 0+000 - Sta. 0+900)","amountPesos":39200000.0,"lengthMeters":900.0,"ratePesosPerMeter":43555.555555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23189"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Putong - Sitio Palo Uno, San Julian, Eastern Samar (Sta. 0+146 - Sta. 0+796)","amountPesos":29400000.0,"lengthMeters":650.0,"ratePesosPerMeter":45230.769230769234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23191"},{"year":2026,"category":"Roads","project":"Construction of Road, Hernani, Eastern Samar (Sta. 0+000 - Sta. 0+600)","amountPesos":24500000.0,"lengthMeters":600.0,"ratePesosPerMeter":40833.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23193"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Chainage 0 + 156 - Chainage 1 + 256, Brgy. Bugho - Brgy. Jurao, Julita, Leyte","amountPesos":14700000.0,"lengthMeters":1100.0,"ratePesosPerMeter":13363.636363636364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23196"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Chainage 0 + 000 - Chainage 0 + 700, Brgy. Candigahub, Carigara, Leyte","amountPesos":9800000.0,"lengthMeters":700.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23198"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Chainage 1 + 880 - Chainage 2 + 680, Sitio Banhaway - Barangay Doyog, La Paz - Barangay Burgos, Mayorga Road, Leyte","amountPesos":9800000.0,"lengthMeters":800.0,"ratePesosPerMeter":12250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23200"},{"year":2026,"category":"Roads","project":"Construction of Roads with Slope Protection - (Sta. 15+264 - Sta. 15+364), Barangay Agas, Calubian, Leyte","amountPesos":49000000.0,"lengthMeters":100.0,"ratePesosPerMeter":490000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23219"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage Structure Brgy Hinabuyan - (K1041+880 - K1041+980, Sta. 0+000 - Sta. 0+034, Sta. 0+000 - Sta. 0+108), Villaba, Leyte","amountPesos":24500000.0,"lengthMeters":208.0,"ratePesosPerMeter":117788.46153846153,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23221"},{"year":2026,"category":"Roads","project":"Road Concreting, Barangay Abijao - (Sta. 0+000 - Sta. 0+500), Villaba, Leyte","amountPesos":9800000.0,"lengthMeters":500.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23223"},{"year":2026,"category":"Roads","project":"Road Concreting, Barangay Jubay - (Sta. 19+801 - Sta. 19+867, Sta. 20+182 - Sta. 20+716), Calubian, Leyte","amountPesos":19600000.0,"lengthMeters":600.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23225"},{"year":2026,"category":"Roads","project":"Road Concreting, Brgy. Casilion - Brgy. Sambulawan,  (Sta. 2+636 - Sta. 3+636), Villaba Leyte","amountPesos":29400000.0,"lengthMeters":1000.0,"ratePesosPerMeter":29400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23229"},{"year":2026,"category":"Roads","project":"Road Concreting, Brgy. Hibulangan - Brgy Capiñahan - (Sta. 3+075 - Sta. 4+235), Villaba Leyte","amountPesos":29400000.0,"lengthMeters":1160.0,"ratePesosPerMeter":25344.827586206895,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23231"},{"year":2026,"category":"Roads","project":"Road Concreting, Sitio Naga Brgy. Calbugos - Brgy. Capiñahan - (Sta. 1+205 - Sta. 2+135), Villaba Leyte","amountPesos":29400000.0,"lengthMeters":930.0,"ratePesosPerMeter":31612.90322580645,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23233"},{"year":2026,"category":"Roads","project":"Road Concreting, Brgy. Cantonghao - Brgy. Malobago - (Sta. 1+190 - Sta. 2+190), Calubian, Leyte","amountPesos":29400000.0,"lengthMeters":1000.0,"ratePesosPerMeter":29400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23235"},{"year":2026,"category":"Roads","project":"Construction of JNR Barangay-Basud to Barangay Banat I Road,  (Sta. 0+000 - Sta. 0+600) , San Isidro, Leyte","amountPesos":19296000.0,"lengthMeters":600.0,"ratePesosPerMeter":32160.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23237"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bangkal to Sitio Alegria, Villaba, Leyte, Station 0+310 - 0+775","amountPesos":14472000.0,"lengthMeters":465.0,"ratePesosPerMeter":31122.58064516129,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23239"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Canquiason to Barangay Sulpa to Barangay Agob-ob to Barangay Casilion, Villaba, Leyte, Station 0+900 - 1+210","amountPesos":9648000.0,"lengthMeters":310.0,"ratePesosPerMeter":31122.58064516129,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23241"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Linao, San Isidro, Leyte, Station 0+093 - 0+324","amountPesos":14472000.0,"lengthMeters":231.0,"ratePesosPerMeter":62649.35064935065,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23243"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tigbawan to Barangay Parasan to Barangay Palid II, Leyte, Leyte, Station 4+712.5 - 5+962.5","amountPesos":19600000.0,"lengthMeters":1250.0,"ratePesosPerMeter":15680.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23245"},{"year":2026,"category":"Roads","project":"Construction of Road, Phase 2, Barangay Casilion to Barangay New Balanac, Villaba, Leyte, Station 2+038.56 - 2+503.56","amountPesos":14472000.0,"lengthMeters":465.0,"ratePesosPerMeter":31122.58064516129,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23247"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay Sabang Bao, Ormoc City, Leyte Sta. 0+175 - Sta. 0+275","amountPesos":19600000.0,"lengthMeters":100.0,"ratePesosPerMeter":196000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23252"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Sta. 0+000 - Sta. 0+980, Barangay Libungao Junction to Barangay Rizal, Kananga, Leyte","amountPesos":29400000.0,"lengthMeters":980.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23254"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Sta. 0+000 - Sta. 1+980, Barangay Masarayao to Barangay San Ignacio, Kananga, Leyte","amountPesos":49000000.0,"lengthMeters":1980.0,"ratePesosPerMeter":24747.47474747475,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23256"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 1+500 - Sta. 2+400, Barangay Milagro to Barangay Hibunaon, Ormoc City, Leyte","amountPesos":28944000.0,"lengthMeters":900.0,"ratePesosPerMeter":32160.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23258"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - 0+200, Barangay Monterico, Ormoc City, Leyte","amountPesos":3893000.0,"lengthMeters":200.0,"ratePesosPerMeter":19465.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23260"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+300, Barangay Patag, Ormoc City, Leyte","amountPesos":9648000.0,"lengthMeters":300.0,"ratePesosPerMeter":32160.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23262"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Sta. 0+000 - Sta. 0+800, Barangay Tugbong to Barangay Tagaytay, Kananga, Leyte","amountPesos":29400000.0,"lengthMeters":800.0,"ratePesosPerMeter":36750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23264"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Odiongan, Sta. 2+130 - 2+496, Abuyog, Leyte","amountPesos":4824000.0,"lengthMeters":366.0,"ratePesosPerMeter":13180.327868852459,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23267"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. San Francisco, Sta. 1  0+000-0+127, Sta. 2 0+000-0+015, Sta. 3 0+000-0+210, Abuyog, Leyte","amountPesos":4900000.0,"lengthMeters":210.0,"ratePesosPerMeter":23333.333333333332,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23269"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Katipunan, Sta. 0+080 -0+280, Abuyog, Leyte","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23271"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Sta. Paz, Sta. 3+133-3+533, Matalom, Leyte","amountPesos":4900000.0,"lengthMeters":400.0,"ratePesosPerMeter":12250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23273"},{"year":2026,"category":"Roads","project":"Construction of Quezon-Trangue-Mabini Road, Barangay Quezon to Barangay Mabini, Sta. 009+570- Sta. 010+370, Catarman, Northern Samar","amountPesos":19296000.0,"lengthMeters":800.0,"ratePesosPerMeter":24120.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23278"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Erenas to Barangay Acedillo, Sta. 000+460 - Sta. 000+910, Victoria, Northern Samar","amountPesos":9648000.0,"lengthMeters":450.0,"ratePesosPerMeter":21440.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23280"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Liberty to Barangay Maghipid, Sta. 000+000 - Sta. 001+000, Catarman & Lope De Vega, Northern Samar","amountPesos":19296000.0,"lengthMeters":1000.0,"ratePesosPerMeter":19296.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23282"},{"year":2026,"category":"Roads","project":"Construction of Salvacion to San Julian Road, Barangay Salvacion and Barangay San Julian, Sta. 000+000 - Sta. 000+600, Catarman, Northern Samar","amountPesos":23155000.0,"lengthMeters":600.0,"ratePesosPerMeter":38591.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23284"},{"year":2026,"category":"Roads","project":"Construction of Rawis Extension Road, Phase III (Sta. 0+158 - Sta. 0+299), Barangay Rawis, Laoang, Northern Samar","amountPesos":19296000.0,"lengthMeters":141.0,"ratePesosPerMeter":136851.06382978722,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23287"},{"year":2026,"category":"Roads","project":"Construction of Barangay Hangi Road (Sta. 0+000 - Sta. 0+300), Barangay Hangi, Las Navas, Northern Samar","amountPesos":9800000.0,"lengthMeters":300.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23289"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Alang-alang to Barangay Pio del Pilar to Barangay Can Maria (Sta. 2+330 - Sta. 2+900), Lapinig, Northern Samar","amountPesos":28944000.0,"lengthMeters":570.0,"ratePesosPerMeter":50778.94736842105,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23291"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Jose to Barangay Roxas (Sta. 2+190 - Sta. 2+480, Sta. 2+590 - Sta. 2+680), Catubig, Northern Samar","amountPesos":24120000.0,"lengthMeters":380.0,"ratePesosPerMeter":63473.68421052631,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23293"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay Dagum to Barangay Hamorawon, Sta. 0+000 - Sta. 0+050, Calbayog City, Samar","amountPesos":51822000.0,"lengthMeters":50.0,"ratePesosPerMeter":1036440.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23296"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Basud, Sta. 0+000 - Sta. 0+250, Calbayog City, Samar","amountPesos":4900000.0,"lengthMeters":250.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23304"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Poblacion 1 to Barangay Poblacion 3 to Barangay Buenavista to Barangay Soong, Daram, Samar (Sta. 1+675 - 2+000)","amountPesos":46311000.0,"lengthMeters":325.0,"ratePesosPerMeter":142495.38461538462,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23307"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Vicente to Barangay Palanyogon, (Sta. 0+000 - 0+400), Catbalogan Samar","amountPesos":9800000.0,"lengthMeters":400.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23309"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cahayag to Barangay Tinaan, San Francisco, Southern Leyte (STA 0+485.3 - STA 1+108.3 )","amountPesos":19296000.0,"lengthMeters":623.0,"ratePesosPerMeter":30972.71268057785,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23312"},{"year":2026,"category":"Roads","project":"Construction of Brgy.Pandan-Estela-Guintoylan-San Isidro Road, Liloan, Southern Leyte - STA 0+000 - 0+848","amountPesos":24500000.0,"lengthMeters":848.0,"ratePesosPerMeter":28891.509433962263,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23314"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mainit, Pintuyan, Southern Leyte (STA 0+000.0 - STA 0+311.5)","amountPesos":9648000.0,"lengthMeters":311.5,"ratePesosPerMeter":30972.71268057785,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23316"},{"year":2026,"category":"Roads","project":"Construction of Road, Phase 2, Barangay Mahayahay, Saint Bernard, Southern Leyte (STA 1+355.0 - STA 1+575.0, STA 1+755.0 - STA 2+158.0)","amountPesos":19296000.0,"lengthMeters":623.0,"ratePesosPerMeter":30972.71268057785,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23318"},{"year":2026,"category":"Roads","project":"Construction of Road, Phase 2, Barangay Mercedes Cayawan, Silago, Southern Leyte - STA 2+174.0 - STA 2+804.0","amountPesos":19600000.0,"lengthMeters":630.0,"ratePesosPerMeter":31111.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23320"},{"year":2026,"category":"Roads","project":"Construction of Road, Phase 2, Barangay Plaridel to Barangay Manigawong, Hinundayan, Southern Leyte (STA 0+100.0 - STA 1+035.0)","amountPesos":28944000.0,"lengthMeters":935.0,"ratePesosPerMeter":30956.14973262032,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23322"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage, Villa Leoncia, Sta. 1+000 - 1+053, Sta. 2+0000 - 2+038, Sta. 3+000 - 3+053, Sta. 4+000 - 4+037, Sta. 5+000 - 5+053, Sta. 6+000 - 6+034, Sta. 7+000 - 7+053,Sta. 8+000 - 8+032, Sta. 9+000 - 9+053, Sta. 10+000 - 10+029, Sta. 11+000 - 11+053, Sta. 12+000 - 12+053, Sta. 13+000 - 13+021.5, Barangay 83-B, Cogon, Tacloban City, Leyte","amountPesos":9648000.0,"lengthMeters":562.5,"ratePesosPerMeter":17152.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23325"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage, TAMBIS ST. STA. 0+000-0+138, SAPPHIRE 2 ST. STA. 0+000-0+036, SAPPHIRE ST. STA. 0+000-0+158, EMERALD ST. STA. 0+000-0+169, GOLD ST. STA. 0+000-0+129, TOPAZ ST. STA. 0+000-0+208, DIAMOND ST. STA. 0+000-0+210, IVORY ST. STA. 0+000-0+082, EMERALD 2 ST. STA. 0+000-0+092, RUBY ST. STA. 0+000-0+142, PEARL ST. STA. 0+000-0+196, JADE ST. STA. 0+000-0+113, RIMAS ST. STA. 0+000-0+306, PALMERA ST. STA. 0+000-0+146, ATIS ST. STA. 0+000-0+009, GORGONIA ST. STA. 0+000-0+043, GORGONIA 2 ST. STA. 0+000-0+137, TOROBAY ST. STA. 0+000-0+036, Barangay 109, Phase 2, Tacloban City, Leyte","amountPesos":48240000.0,"lengthMeters":306.0,"ratePesosPerMeter":157647.0588235294,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23327"},{"year":2026,"category":"Bridges","project":"Construction of Bridge Connecting Brgy. Landang Laum to Brgy. Busay, Zamboanga City, Sta. 3+725 - Sta. 3+755","amountPesos":20150000.0,"lengthMeters":30.0,"ratePesosPerMeter":671666.6666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23336"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Busay, Zamboanga City, Sta. 4+304 - 5+504","amountPesos":48235000.0,"lengthMeters":1200.0,"ratePesosPerMeter":40195.833333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23338"},{"year":2026,"category":"Roads","project":"Construction of Road, Landang Laum, Zamboanga City, Sta. 1+896 - 3+076","amountPesos":48235000.0,"lengthMeters":1180.0,"ratePesosPerMeter":40877.1186440678,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23340"},{"year":2026,"category":"Roads","project":"Reconstruction to Concrete Pavement, Commander Perez Road to Ramos Drive, Barangay Putik, Zamboanga City, Site 1: Sta. 0+000 - 0+701, Site 2: Sta. 0+000 - 0+430, Site 3: Sta. 0+000 - 0+556","amountPesos":32340000.0,"lengthMeters":701.0,"ratePesosPerMeter":46134.09415121255,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23344"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Talisay-Barangay Sinonoc, Dapitan City, Zamboanga del Norte - Sta. 0+620 - Sta. 1+328.20","amountPesos":29400000.0,"lengthMeters":708.2,"ratePesosPerMeter":41513.69669584863,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23347"},{"year":2026,"category":"Roads","project":"Construction of Road Brgy. Labrador - Brgy. Letapan, Polanco, Zamboanga del Norte - Sta. 1+300 - Sta. 2+240","amountPesos":19600000.0,"lengthMeters":940.0,"ratePesosPerMeter":20851.063829787236,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23349"},{"year":2026,"category":"Bridges","project":"Construction of Sicoco Bridge, Barangay Del Pilar, Piñan, Zamboanga del Norte - Sta. 1+960 - Sta. 1+990.84","amountPesos":49000000.0,"lengthMeters":30.84,"ratePesosPerMeter":1588845.6549935073,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23351"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay Cabong, Tampilisan, Zamboanga del Norte (Sta. 0+000 - Sta. 0+700)","amountPesos":9647000.0,"lengthMeters":700.0,"ratePesosPerMeter":13781.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23354"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay Danao - Barangay Balakan, Salug, Zamboanga del Norte ( Sta. 0+000- Sta. 0+700)","amountPesos":9647000.0,"lengthMeters":700.0,"ratePesosPerMeter":13781.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23356"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay Dipolod, Salug, Zamboanga del Norte ( Sta. 0+000- Sta. 0+800)","amountPesos":11094000.0,"lengthMeters":800.0,"ratePesosPerMeter":13867.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23358"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay Gil Sanchez, Labason, Zamboanga del Norte (Sta. 0+000 - Sta. 0+700)","amountPesos":9647000.0,"lengthMeters":700.0,"ratePesosPerMeter":13781.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23360"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay Lanawan, Salug, Zamboanga del Norte (Sta. 0+000 - Sta. 0+700)","amountPesos":9647000.0,"lengthMeters":700.0,"ratePesosPerMeter":13781.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23362"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay Lawagan, Labason, Zamboanga del Norte (Sta.0+000- Sta. 0+215)","amountPesos":4341000.0,"lengthMeters":215.0,"ratePesosPerMeter":20190.697674418603,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23364"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay Mamawan, Gutalac, Zamboanga del Norte (Sta. 0+000 - Sta. 0+700)","amountPesos":9647000.0,"lengthMeters":700.0,"ratePesosPerMeter":13781.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23366"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay MAP, Gutalac, Zamboanga del Norte (Sta. 0+000 - Sta. 0+700)","amountPesos":9647000.0,"lengthMeters":700.0,"ratePesosPerMeter":13781.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23368"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay New Salvacion - Barangay Immaculada, Labason, Zamboanga del Norte (Sta.0+000- Sta. 0+280)","amountPesos":38588000.0,"lengthMeters":280.0,"ratePesosPerMeter":137814.2857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23370"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay Tugop, Kalawit, Zamboanga del Norte (Sta.0+000- Sta. 0+350)","amountPesos":4824000.0,"lengthMeters":350.0,"ratePesosPerMeter":13782.857142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23372"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bitugan-Culasian, Sirawai, Zamboanga del Norte,\nSta. 0 + 000 - Sta. 0 + 750","amountPesos":14471000.0,"lengthMeters":750.0,"ratePesosPerMeter":19294.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23375"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Jatian, Sibuco, Zamboanga del Norte, Sta. 0 + 000 - Sta. 1 + 000","amountPesos":19294000.0,"lengthMeters":1000.0,"ratePesosPerMeter":19294.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23377"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Macuyon-Balatakan, Sirawai, Zamboanga del Norte,\nSta. 0 + 000 - Sta. 1 + 000","amountPesos":19294000.0,"lengthMeters":1000.0,"ratePesosPerMeter":19294.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23379"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Minanga-Danganon, Sirawai, Zamboanga del Norte,\nSta. 0 + 000 - Sta. 0 + 732","amountPesos":14123000.0,"lengthMeters":732.0,"ratePesosPerMeter":19293.715846994535,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23381"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Panabutan-Sipakit, Sirawai, Zamboanga del Norte,\nSta. 1 + 432 - Sta. 2 + 432","amountPesos":19294000.0,"lengthMeters":1000.0,"ratePesosPerMeter":19294.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23383"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pula Bato-Culasian, Sirawai, Zamboanga del Norte,\nSta. 1 + 110 - Sta. 2 + 110","amountPesos":19294000.0,"lengthMeters":1000.0,"ratePesosPerMeter":19294.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23385"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tangarak, Sibuco, Zamboanga del Norte,\nSta. 0 + 225 - Sta. 1 + 225","amountPesos":19294000.0,"lengthMeters":1000.0,"ratePesosPerMeter":19294.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23387"},{"year":2026,"category":"Roads","project":"Construction of Road, Bongalao, Sibuco, Zamboanga del Norte,\nSta. 0 + 502 - Sta. 1 + 752","amountPesos":24118000.0,"lengthMeters":1250.0,"ratePesosPerMeter":19294.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23389"},{"year":2026,"category":"Roads","project":"Construction of Road, Siocon-San Jose-Siay-Pisawak Road, Siocon, Zamboanga del Norte,\nSta. 0 + 000 - Sta. 1 + 500","amountPesos":28941000.0,"lengthMeters":1500.0,"ratePesosPerMeter":19294.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23391"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Guimba Parang, Malayal, Sibuco, Zamboanga del Norte,\nSta. 0 + 000 - Sta. 0 + 750","amountPesos":14471000.0,"lengthMeters":750.0,"ratePesosPerMeter":19294.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23393"},{"year":2026,"category":"Roads","project":"Construction of Road, Sto. Niño-Lawin Road, Sibuco, Zamboanga del Norte, Sta. 16 + 508 - Sta. 18 + 508","amountPesos":38588000.0,"lengthMeters":2000.0,"ratePesosPerMeter":19294.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23395"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Golictop-Barangay New Katipunan -Barangay Pawan-Barangay Labangon, Midsalip and Dumingag, Zamboanga del Sur 01+092 - Sta. 02+392","amountPesos":38588000.0,"lengthMeters":1300.0,"ratePesosPerMeter":29683.076923076922,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23398"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lantungan-Barangay Resthouse-Barangay Ceboneg, Aurora, Zamboanga del Sur Sta 01+246 - Sta. 02+791.50","amountPesos":36177000.0,"lengthMeters":1545.5,"ratePesosPerMeter":23407.95858945325,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23400"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tulangan to Barangay Bagalupa, Labangan and Pagadian City, Zamboanga del Sur Sta 00+000 - Sta. 00+600","amountPesos":3859000.0,"lengthMeters":600.0,"ratePesosPerMeter":6431.666666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23402"},{"year":2026,"category":"Roads","project":"Construction of Road, NRJ Barangay Bibilop-Barangay Buloron-Barangay Lumpunid-Barangay Datangan-Barangay Sawa, Midsalip, Pagadian City and Sominot, Zamboanga del Sur Sta 00+704 - Sta. 02+004","amountPesos":39200000.0,"lengthMeters":1300.0,"ratePesosPerMeter":30153.846153846152,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23404"},{"year":2026,"category":"Roads","project":"Construction of Road, NRJ Barangay Nemeno-Barangay Moradji-Barangay Dawa-NRJ Mt. Malindang Eco Tourism By Pass Highway, Josefina, Zamboanga del Sur Sta 01+039 - Sta. 02+339","amountPesos":38588000.0,"lengthMeters":1300.0,"ratePesosPerMeter":29683.076923076922,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23406"},{"year":2026,"category":"Roads","project":"Construction of Road, NRJ Barangay Poblacion-Barangay San Fernando-Barangay Bambong Diut -Barangay Opon-Barangay Malating, Ramon Magsaysay, Zamboanga del Sur Sta 2+010 - Sta 3+310","amountPesos":39553000.0,"lengthMeters":1300.0,"ratePesosPerMeter":30425.384615384617,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23408"},{"year":2026,"category":"Roads","project":"Construction of Road, NRJ Litapan-Bag-ong Artiosa-Bag-ong Gutlang, Molave, Zamboanga del Sur Sta 01+017 - Sta. 02+517","amountPesos":44100000.0,"lengthMeters":1500.0,"ratePesosPerMeter":29400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23410"},{"year":2026,"category":"Roads","project":"Construction of Road Maragang to Lourdes, Sta. 0+000 - Sta. 2 + 040, Tigbao, Zamboanga del Sur","amountPesos":43412000.0,"lengthMeters":2040.0,"ratePesosPerMeter":21280.392156862745,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23413"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy Kahayagan to ZPPSU Road, Sta. 0 + 000 - Sta. 0 + 500, Bayog, Zamboanga del Sur","amountPesos":9800000.0,"lengthMeters":500.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23415"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Kagawasan, Sta. 0 + 000 - Sta. 0 + 250, Dimataling, Zamboanga del Sur","amountPesos":4900000.0,"lengthMeters":250.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23417"},{"year":2026,"category":"Roads","project":"Construction of Road,  Brgy. Matin-ao - Purok 7, Brgy. Punta Flecha, Sta. 0 + 000 - Sta. 0 + 500, Pitogo, Zamboanga del Sur","amountPesos":9800000.0,"lengthMeters":500.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23421"},{"year":2026,"category":"Roads","project":"Construction of Road, Guinicolalay-Nian-Tarakan, Sta. 3+900 - Sta. 5+940, Dinas, Zamboanga del Sur","amountPesos":43412000.0,"lengthMeters":2040.0,"ratePesosPerMeter":21280.392156862745,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23423"},{"year":2026,"category":"Roads","project":"Construction of Road, NRJ Molum-Magahis-Binuay-Baluno-Upper Ludiong-Mahayag (Lulutan), Sta. 4+126.65 - Sta. 6+425.29, Dimataling, Zamboanga del Sur","amountPesos":43412000.0,"lengthMeters":2298.64,"ratePesosPerMeter":18885.949953015694,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23425"},{"year":2026,"category":"Roads","project":"Construction of Road, Sumpotan-Proper Dimaya, Sta. 2+289 - Sta. 4+115.80, Dinas, Zamboanga del Sur","amountPesos":43412000.0,"lengthMeters":1826.8,"ratePesosPerMeter":23763.95883512152,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23427"},{"year":2026,"category":"Roads","project":"Construction of Road, Woodland to La Suerte, Sta. 0+000 - Sta. 2+000, Tigbao, Zamboanga del Sur","amountPesos":43412000.0,"lengthMeters":2000.0,"ratePesosPerMeter":21706.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23429"},{"year":2026,"category":"Roads","project":"Concreting of Access Road leading to Agutayan Falls with Tarsier at Barangay Agutayan, Buug, Zamboanga Sibugay (Completion), Sta. 00+000 - Sta. 01 + 400","amountPesos":38588000.0,"lengthMeters":1400.0,"ratePesosPerMeter":27562.85714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23432"},{"year":2026,"category":"Roads","project":"Construction of Road Slope Protection Structure, Barangay Little Baguio to Barangay Sta. Barbara, Imelda, Zamboanga Sibugay, Sta. 00+755 – Sta. 00+785 (RS), Sta. 01+123 – Sta. 01+235 (LS), Sta. 03+040 – Sta. 03+060 (LS), Sta. 03+340 – Sta. 03+420 (RS), Sta. 03+640 – Sta. 03+655 (RS)","amountPesos":28941000.0,"lengthMeters":257.0,"ratePesosPerMeter":112610.89494163424,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23434"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+574.00, Barangay Bacalan, Ipil, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23437"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+574.00, Barangay Buluan, Ipil, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23439"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+861.00, Barangay Cabong, Naga, Zamboanga Sibugay","amountPesos":14471000.0,"lengthMeters":861.0,"ratePesosPerMeter":16807.20092915215,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23441"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+574, Barangay Camanga, Titay, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23443"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+861, Barangay Caparan, Ipil, Zamboanga Sibugay","amountPesos":14471000.0,"lengthMeters":861.0,"ratePesosPerMeter":16807.20092915215,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23445"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+861, Barangay Gacbusan, Kabasalan, Zamboanga Sibugay","amountPesos":14471000.0,"lengthMeters":861.0,"ratePesosPerMeter":16807.20092915215,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23449"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+574, Barangay Gango, R.T Lim, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23451"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+574, Barangay Goodyear, Kabasalan, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23453"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+574, Barangay Lower Tungawan, Tungawan, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23455"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+861, Barangay Maasin, Ipil, Zamboanga Sibugay","amountPesos":14471000.0,"lengthMeters":861.0,"ratePesosPerMeter":16807.20092915215,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23457"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+574, Barangay Mabini, Titay, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23459"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+861, Barangay Namnama, Titay, Zamboanga Sibugay","amountPesos":14471000.0,"lengthMeters":861.0,"ratePesosPerMeter":16807.20092915215,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23461"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+861, Barangay Nazareth, Kabasalan, Zamboanga Sibugay","amountPesos":14471000.0,"lengthMeters":861.0,"ratePesosPerMeter":16807.20092915215,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23463"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 1+148, Barangay Palinta, Kabasalan, Zamboanga Sibugay","amountPesos":19294000.0,"lengthMeters":1148.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23465"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+574, Barangay Peñaranda, Kabasalan, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23467"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+861, Barangay Poblacion, Siay, Zamboanga Sibugay","amountPesos":14700000.0,"lengthMeters":861.0,"ratePesosPerMeter":17073.170731707316,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23469"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+861, Barangay Pulidan, Titay, Zamboanga Sibugay","amountPesos":14471000.0,"lengthMeters":861.0,"ratePesosPerMeter":16807.20092915215,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23471"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+574, Barangay Santo Niño, Tungawan, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23473"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+861, Barangay Sininan, Kabasalan, Zamboanga Sibugay","amountPesos":14471000.0,"lengthMeters":861.0,"ratePesosPerMeter":16807.20092915215,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23475"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+574, Barangay Sisay, Tungawan, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23477"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+574, Barangay Taway, Ipil, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23479"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+574, Barangay Tigbanuang, Tungawan, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23481"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+574, Barangay Tigbucay, Tungawan, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23483"},{"year":2026,"category":"Roads","project":"Concreting of Road Sta. 0+000 to Sta. 0+574, Barangay Upper Pangi, Ipil, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23485"},{"year":2026,"category":"Roads","project":"Construction of Access Road Sta. 0+000 to Sta. 0+574- Barangay Azusano, Titay, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23487"},{"year":2026,"category":"Roads","project":"Construction of Access Road Sta. 0+000 to Sta. 0+574- Barangay Baluno, Naga, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23489"},{"year":2026,"category":"Roads","project":"Construction of Access Road Sta. 0+000 to Sta. 0+574- Barangay Batungan, Tungawan, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23491"},{"year":2026,"category":"Roads","project":"Construction of Access Road Sta. 0+000 to Sta. 0+574- Barangay Cainglet, Kabasalan, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23493"},{"year":2026,"category":"Roads","project":"Construction of Access Road Sta. 0+000 to Sta. 0+574- Barangay Lower Taway, Ipil, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23495"},{"year":2026,"category":"Roads","project":"Construction of Access Road Sta. 0+000 to Sta. 0+574- Prk. African Daisy-Prk. Piña, Barangay Culasian, Titay, Zamboanga Sibugay","amountPesos":9800000.0,"lengthMeters":574.0,"ratePesosPerMeter":17073.170731707316,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23497"},{"year":2026,"category":"Roads","project":"Construction of Access Road Sta. 0+000 to Sta. 0+574-Prk. Centro Barangay Veterans Village, Ipil, Zamboanga Sibugay","amountPesos":9647000.0,"lengthMeters":574.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23499"},{"year":2026,"category":"Roads","project":"Construction of Access Road Sta. 0+000 to Sta. 0+574-Prk. Pines 1 to Prk. Greenfield, Barangay Sanito, Ipil, Zamboanga Sibugay","amountPesos":9800000.0,"lengthMeters":574.0,"ratePesosPerMeter":17073.170731707316,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23501"},{"year":2026,"category":"Roads","project":"Construction of Access Road Sta. 0+000 to Sta. 1+148-Sitio Landing P-4, Barangay Concepcion, Kabasalan, Zamboanga Sibugay","amountPesos":19294000.0,"lengthMeters":1148.0,"ratePesosPerMeter":16806.620209059234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23503"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0+000 to Sta. 0+861, Barangay Bangkerohan, Ipil, Zamboanga Sibugay","amountPesos":14471000.0,"lengthMeters":861.0,"ratePesosPerMeter":16807.20092915215,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23505"},{"year":2026,"category":"Roads","project":"Constructionof Access Road Sta. 0+000 to Sta. 0+287, Ipil National High School, Ipil, Zamboanga Sibugay","amountPesos":4824000.0,"lengthMeters":287.0,"ratePesosPerMeter":16808.362369337978,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23507"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road along Jct. Malaybalay City - Bypass Rd - Purok 1 Sta. Ana Barangay Road, Barangay Casisang, Sta. 0+000 - 0+315, Malaybalay City, Bukidnon","amountPesos":9438000.0,"lengthMeters":315.0,"ratePesosPerMeter":29961.904761904763,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23511"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road along Jct. Aglayan-Zamboanguita Rd - Malilong Road, Barangay Zamboanguita, Sta. 1+385 - 1+825, Malaybalay City, Bukidnon","amountPesos":14158000.0,"lengthMeters":440.0,"ratePesosPerMeter":32177.272727272728,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23513"},{"year":2026,"category":"Roads","project":"Construction of Road, Section A Sta. 0+000 - 0+178, Section B Sta. 0+000 - 0+324, Section C Sta. 0+000 - 0+363, Section D Sta. 0+000 - 0+764, Section E Sta. 0+000 - 0+249, Section F Sta. 0+000 - 0+131, and Section G Sta. 0+000 - 0+195, Barangay Kulasihan, Lantapan, Bukidnon","amountPesos":47192000.0,"lengthMeters":764.0,"ratePesosPerMeter":61769.6335078534,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23515"},{"year":2026,"category":"Roads","project":"Construction of Road along Purok 3 to Purok 6 Sta. 0+000 - 0+970, Purok 3 to Purok 7 Sta. 0+000 - 0+606, Purok 3 to Purok 2 Sta. 0+000 - 0+200, Purok 3 to Purok 4 Sta. 0+157 - 0+357, and Purok 1 to Purok 2 Sta. 0+000 - 0+360, Barangay San Martin, Malaybalay","amountPesos":47192000.0,"lengthMeters":970.0,"ratePesosPerMeter":48651.54639175258,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23517"},{"year":2026,"category":"Roads","project":"Construction of Road along Jct SH-Impasug-ong-Patulangan Bypass Rd - Cawayan-Kibenton Rd Sta. 5+270 - 5+990, Barangay Cawayan, Impasug-ong, Bukidnon","amountPesos":28315000.0,"lengthMeters":720.0,"ratePesosPerMeter":39326.38888888889,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23519"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Danggawan Sta. 0+000 - Sta. 0+500, Maramag, Bukidnon","amountPesos":12289000.0,"lengthMeters":500.0,"ratePesosPerMeter":24578.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23522"},{"year":2026,"category":"Roads","project":"Construction of Access Road leading to DPWH Bukidnon 4th District Engineering Office, Barangay Lourdes, Sta. 0+000-Sta. 0+550, Valencia City, Bukidnon","amountPesos":37754000.0,"lengthMeters":550.0,"ratePesosPerMeter":68643.63636363637,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23525"},{"year":2026,"category":"Roads","project":"Construction of Jct. Sayre (Bagontaas) to (Sinayawan - Kahapunan) Bukidnon - Davao Road, Sta.0+664- Sta. 2+164, Bukidnon","amountPesos":37754000.0,"lengthMeters":1500.0,"ratePesosPerMeter":25169.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23527"},{"year":2026,"category":"Roads","project":"Construction of Road, Jct. Valencia City Terminal (Valencia East Bypass) to Valencia-Kapalong-Talaingod Rd, Sta. 0+000 - Sta. 0+625, Bukidnon","amountPesos":33035000.0,"lengthMeters":625.0,"ratePesosPerMeter":52856.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23529"},{"year":2026,"category":"Roads","project":"Construction of Road, Jct. Valencia - Kapalong - Talaingod (San Isidro - Nabag-o) to Jct. Sayre Bagontaas, Sta. 0+000 - Sta. 1+005, Sta. 0+000 - Sta. 0+245, Bukidnon","amountPesos":37754000.0,"lengthMeters":1005.0,"ratePesosPerMeter":37566.16915422886,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23531"},{"year":2026,"category":"Roads","project":"Construction of Road, Valencia - Pangantucan extension (Portulin to Poblacion), Barangay Poblacion, Sta. 0+733 -  Sta. 0+979, Sta. 0+474 - Sta. 0+729, Sta. 0+940 - Sta. 0+985, Sta. 0+956 - Sta. 1+003, Sta. 1+093 - Sta. 1+142, Sta. 0+985 - Sta. 1+035, Sta. 0+876 - Sta. 0+926, Sta. 0+768 - Sta. 0+819, Sta. 0+543 - Sta. 0+596, Sta. 0+534 - Sta. 0+583, Sta. 0+641 - Sta. 0+688, Pangantucan, Bukidnon","amountPesos":42473000.0,"lengthMeters":606.0,"ratePesosPerMeter":70087.45874587458,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23535"},{"year":2026,"category":"Roads","project":"Construction of Macanhan-Balulang Road (Sta. 0+000 - Sta. 1+000), Cagayan de Oro City, Misamis Oriental","amountPesos":18877000.0,"lengthMeters":1000.0,"ratePesosPerMeter":18877.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23538"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Baikingon (Sta. 0+000 - Sta. 0+200), Cagayan de Oro City, Misamis Oriental","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23540"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Balulang (Sta. 0+000 - Sta. 1+000), Cagayan de Oro City, Misamis Oriental","amountPesos":18877000.0,"lengthMeters":1000.0,"ratePesosPerMeter":18877.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23542"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Bayabas (Sta. 0+000 - Sta. 0+400), Cagayan de Oro City, Misamis Oriental","amountPesos":9438000.0,"lengthMeters":400.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23544"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Bayanga (Sta. 0+000 - Sta. 0+200), Cagayan de Oro City, Misamis Oriental","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23546"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Besigan (Sta. 0+000 - Sta. 0+200), Cagayan de Oro City, Misamis Oriental","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23548"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Bonbon (Sta. 0+000 - Sta. 0+200), Cagayan de Oro City, Misamis Oriental","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23550"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Bulua (Sta. 0+000 - Sta. 1+500), Cagayan de Oro City, Misamis Oriental","amountPesos":28315000.0,"lengthMeters":1500.0,"ratePesosPerMeter":18876.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23552"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Canitoan (Sta. 0+000 - Sta. 2+000), Cagayan de Oro City, Misamis Oriental","amountPesos":37754000.0,"lengthMeters":2000.0,"ratePesosPerMeter":18877.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23554"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Carmen (Sta. 0+000 - Sta. 0+400), Cagayan de Oro City, Misamis Oriental","amountPesos":9438000.0,"lengthMeters":400.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23556"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Dansolihon (Sta. 0+000 - Sta. 1+800), Cagayan de Oro City, Misamis Oriental","amountPesos":33035000.0,"lengthMeters":1800.0,"ratePesosPerMeter":18352.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23558"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Iponan (Sta. 0+000 - Sta. 1+500), Cagayan de Oro City, Misamis Oriental","amountPesos":28315000.0,"lengthMeters":1500.0,"ratePesosPerMeter":18876.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23560"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Kauswagan (Sta. 0+000 - Sta. 0+400), Cagayan de Oro City, Misamis Oriental","amountPesos":9438000.0,"lengthMeters":400.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23562"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Lumbia (Sta. 0+000 - Sta. 1+500), Cagayan de Oro City, Misamis Oriental","amountPesos":28315000.0,"lengthMeters":1500.0,"ratePesosPerMeter":18876.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23564"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Mambuaya (Sta. 0+000 - Sta. 1+000), Cagayan de Oro City, Misamis Oriental","amountPesos":18877000.0,"lengthMeters":1000.0,"ratePesosPerMeter":18877.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23566"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Pagalungan (Sta. 0+000 - Sta. 0+400), Cagayan de Oro City, Misamis Oriental","amountPesos":9438000.0,"lengthMeters":400.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23568"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Pagatpat (Sta. 0+000 - Sta. 2+500), Cagayan de Oro City, Misamis Oriental","amountPesos":47192000.0,"lengthMeters":2500.0,"ratePesosPerMeter":18876.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23570"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Patag (Sta. 0+000 - Sta. 0+500), Cagayan de Oro City, Misamis Oriental","amountPesos":9438000.0,"lengthMeters":500.0,"ratePesosPerMeter":18876.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23572"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Pigsag-an (Sta. 0+000 - Sta. 0+200), Cagayan de Oro City, Misamis Oriental","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23574"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay San Simon (Sta. 0+000 - Sta. 0+200), Cagayan de Oro City, Misamis Oriental","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23576"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Tagpangi (Sta. 0+000 - Sta. 0+200), Cagayan de Oro City, Misamis Oriental","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23578"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Tignapoloan (Sta. 0+000 - Sta. 0+200), Cagayan de Oro City, Misamis Oriental","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23580"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Tuburan (Sta. 0+000 - Sta. 0+200), Cagayan de Oro City, Misamis Oriental","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23582"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Tumpagon (Sta. 0+000 - Sta. 0+200), Cagayan de Oro City, Misamis Oriental","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23584"},{"year":2026,"category":"Roads","project":"Construction of Road (Sentro) , Brgy. Puntod, Sta. 0+000 to Sta. 0+430, , Cagayan de Oro City","amountPesos":7551000.0,"lengthMeters":430.0,"ratePesosPerMeter":17560.46511627907,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23587"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage Zone 5, Sta. 0 + 000 to Sta. 0 + 300, Brgy. Bugo, Cagayan de Oro City","amountPesos":15000000.0,"lengthMeters":300.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23589"},{"year":2026,"category":"Roads","project":"Construction of Road at Sitio Pinikitan, Sta. 0 + 000 to Sta. 0 + 250, Brgy. Camaman-an, Cagayan de Oro City","amountPesos":5000000.0,"lengthMeters":250.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23591"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage, Brgy Macasadig, Sta. 0 + 000 to Sta. 0 + 100, Cagayan de Oro City","amountPesos":5000000.0,"lengthMeters":100.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23593"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage along Sgt. Angelo Velez St. (Sta. 0 + 000 to Sta. 0 + 120), Brgy. 27, Cagayan de Oro City","amountPesos":5000000.0,"lengthMeters":120.0,"ratePesosPerMeter":41666.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23595"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage, Purok 13, Sta. 0 + 000 to Sta. 0 + 150, Brgy. Tablon, Cagayan de Oro City","amountPesos":11000000.0,"lengthMeters":150.0,"ratePesosPerMeter":73333.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23597"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage along Fernandez St. to Joseph Golden Homes Foundation Inc., Sta. 0 + 000 to Sta. 0 + 150, Brgy. 40, Cagayan de Oro City","amountPesos":7000000.0,"lengthMeters":150.0,"ratePesosPerMeter":46666.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23599"},{"year":2026,"category":"Roads","project":"Construction of Road at Migtugsok, Brgy Cugman, Cagayan de Oro City (Sta. 0 + 000 to Sta. 0 + 150)","amountPesos":10000000.0,"lengthMeters":150.0,"ratePesosPerMeter":66666.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23601"},{"year":2026,"category":"Roads","project":"Construction of Roads (Purok 8) Upper Puerto - Sta. 0+000 to Sta. 0+150, Barangay Puerto, Cagayan de Oro City","amountPesos":8000000.0,"lengthMeters":150.0,"ratePesosPerMeter":53333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23603"},{"year":2026,"category":"Roads","project":"Construction of Road (Upper Puerto to PNP Housing), Barangay Puerto, Sta. 0+000 to Sta. 0+268, Cagayan de Oro City","amountPesos":4719000.0,"lengthMeters":268.0,"ratePesosPerMeter":17608.20895522388,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23605"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Agusan - Sta. 0+000 to Sta. 0+803, Cagayan de Oro City","amountPesos":14158000.0,"lengthMeters":803.0,"ratePesosPerMeter":17631.382316313822,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23607"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay FS Catanico - Sta. 0+000 to Sta. 0+268, Cagayan de Oro City","amountPesos":4719000.0,"lengthMeters":268.0,"ratePesosPerMeter":17608.20895522388,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23609"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Gusa - Sta. 0+000 to Sta. 0+535, Cagayan de Oro City","amountPesos":9438000.0,"lengthMeters":535.0,"ratePesosPerMeter":17641.1214953271,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23611"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Macabalan - Sta. 0+000 to Sta. 0+268, Cagayan de Oro City","amountPesos":4719000.0,"lengthMeters":268.0,"ratePesosPerMeter":17608.20895522388,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23613"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Tablon - Sta. 0+000 to Sta. 0+803, Cagayan de Oro City","amountPesos":14158000.0,"lengthMeters":803.0,"ratePesosPerMeter":17631.382316313822,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23615"},{"year":2026,"category":"Roads","project":"Construction of Road at San Lazaro - Sta. 0+000 to Sta. 0+535, Barangay Lapasan, Cagayan de Oro City","amountPesos":9438000.0,"lengthMeters":535.0,"ratePesosPerMeter":17641.1214953271,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23617"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage at Brgy. 23 - Sta. 0+000 to Sta. 0+165, Cagayan de Oro City","amountPesos":4719000.0,"lengthMeters":165.0,"ratePesosPerMeter":28600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23619"},{"year":2026,"category":"Roads","project":"Construction of Road Barangay Consolacion, Sta. 0+000 to Sta. 0+535, Cagayan de Oro City","amountPesos":9438000.0,"lengthMeters":535.0,"ratePesosPerMeter":17641.1214953271,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23621"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Bugo, Sta. 0+000 to Sta. 0+268, Cagayan de Oro City","amountPesos":4719000.0,"lengthMeters":268.0,"ratePesosPerMeter":17608.20895522388,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23623"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Nazareth, Sta. 0+000 to Sta. 1+500, Cagayan de Oro City","amountPesos":26428000.0,"lengthMeters":1500.0,"ratePesosPerMeter":17618.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23625"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Taguanao, Brgy. Indahag, Sta. 0+000 to Sta. 0+165, Cagayan de Oro City","amountPesos":4719000.0,"lengthMeters":165.0,"ratePesosPerMeter":28600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23627"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road along Corrales Avenue (Jct. BCIR - Divisoria) - Sta. 0+000 to Sta. 0+760, Cagayan de Oro City","amountPesos":28914000.0,"lengthMeters":760.0,"ratePesosPerMeter":38044.73684210526,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23629"},{"year":2026,"category":"Roads","project":"Rehabilitation/Upgrading of Road with Drainage,  Barangay 26, Sta. 0 + 270 - 0 + 950, Cagayan de Oro City","amountPesos":9638000.0,"lengthMeters":680.0,"ratePesosPerMeter":14173.529411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23631"},{"year":2026,"category":"Roads","project":"Construction of Tubos-Sitio Banao-Sto. Niño Spring Road,Sta.40.26+680 - Sta.40.27+303, Catarman, Camiguin","amountPesos":38552000.0,"lengthMeters":367.0,"ratePesosPerMeter":105046.32152588556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23634"},{"year":2026,"category":"Roads","project":"Construction of Road at Purok-9, Barangay Upper Hinaplanon, Sta. 0+000 - Sta. 0+200, Iligan City","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23643"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Hinaplanon, Sta. 0+000 - Sta. 0+200, Iligan City","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23645"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Kiwalan, Sta. 0+000 - Sta. 0+200, Iligan City","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23647"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tipanoy, Sta. 0+000 - 0+500, Iligan City","amountPesos":11326000.0,"lengthMeters":500.0,"ratePesosPerMeter":22652.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23649"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tubod, Sta. 0+000 - Sta. 0+200, Iligan City","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23651"},{"year":2026,"category":"Roads","project":"Construction of Road, Emerald Homes Phase I, Barangay San Roque, Section A: Sta. 0+000 - Sta. 0+080, Sta. B: Sta. 0+000 - Sta. 0+081, Section C: Sta. 0+000 - 0+039, Iligan City","amountPesos":4819000.0,"lengthMeters":81.0,"ratePesosPerMeter":59493.82716049383,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23653"},{"year":2026,"category":"Roads","project":"Construction of Perimeter Road of Multi-Purpose Covered Court, Barangay Poblacion, Sta. 0+000 - Sta. 1+060, Tubod, Lanao del Norte","amountPesos":83647000.0,"lengthMeters":1060.0,"ratePesosPerMeter":78912.2641509434,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23656"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road Lutao - Map-an Road, Sta. 0+000 - Sta. 0+658, Panaon, Misamis Occidental","amountPesos":15102000.0,"lengthMeters":658.0,"ratePesosPerMeter":22951.367781155015,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23662"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road Poblacion Road, Sta. 0+350 - Sta. 0+665, Panaon, Misamis Occidental","amountPesos":9438000.0,"lengthMeters":315.0,"ratePesosPerMeter":29961.904761904763,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23664"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Buntawan, Sta. 5+500 - Sta. 6+538, Oroquieta City, Misamis Occidental","amountPesos":28315000.0,"lengthMeters":1038.0,"ratePesosPerMeter":27278.420038535645,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23666"},{"year":2026,"category":"Roads","project":"Construction of Road, Mitacas – Sinian, Sta. 0+014 - Sta. 2+486, Baliangao, Misamis Occidental","amountPesos":40508000.0,"lengthMeters":2472.0,"ratePesosPerMeter":16386.73139158576,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23668"},{"year":2026,"category":"Bridges","project":"Construction of Tubod-Nabuna Bridge (Phase 2), Sta. 3+119 - Sta. 3+419, Sta. 3+449 - Sta. 3+749, Aloran, Misamis Occidental","amountPesos":34483000.0,"lengthMeters":600.0,"ratePesosPerMeter":57471.666666666664,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23670"},{"year":2026,"category":"Roads","project":"Improvement of Road Leading to Caluya Shrine, Sta. 2+825 - Sta. 4+825, Sapang Dalaga, Misasmis Occidental","amountPesos":47192000.0,"lengthMeters":2000.0,"ratePesosPerMeter":23596.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23672"},{"year":2026,"category":"Roads","project":"Mountain Bypass Road (Canicapan - Segatic Diot), Sta. 0+000 - Sta. 0+700, Clarin, Misamis Occidental","amountPesos":24095000.0,"lengthMeters":700.0,"ratePesosPerMeter":34421.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23675"},{"year":2026,"category":"Roads","project":"Mountain Bypass Road (Sitio Sikmad - Katumao River Section), Colambutan Bajo, Sta. 0+000 - Sta. 0+570, Tudela, Misamis Occidental","amountPesos":19276000.0,"lengthMeters":570.0,"ratePesosPerMeter":33817.54385964912,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23677"},{"year":2026,"category":"Roads","project":"Mountain Bypass Road, Tudela Section, (Barangay Camating - Barangay Namut Road), Sta. 0+000 - Sta. 3+400, Tudela, Misamis Occidental","amountPesos":115657000.0,"lengthMeters":3400.0,"ratePesosPerMeter":34016.76470588235,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23681"},{"year":2026,"category":"Roads","project":"Mountain Bypass Road (Brgy. Gandawan Proper - Sitio Maliapa Section), Sta. 0+000 - Sta. 0+600, Don Victoriano, Misamis Occidental","amountPesos":33733000.0,"lengthMeters":600.0,"ratePesosPerMeter":56221.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23683"},{"year":2026,"category":"Roads","project":"Mountain Bypass Road (P2 - P1 Brgy. Buenavista Section), Sta. 0+000 - Sta. 0+570, Tudela, Misamis Occidental","amountPesos":19276000.0,"lengthMeters":570.0,"ratePesosPerMeter":33817.54385964912,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23685"},{"year":2026,"category":"Roads","project":"Mountain Bypass Road (Bagakay - Cogon - Kinuman Norte Section), Sta. 0+000 - Sta. 1+150, Ozamiz City, Misamis Occidental","amountPesos":38552000.0,"lengthMeters":1150.0,"ratePesosPerMeter":33523.47826086957,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23689"},{"year":2026,"category":"Roads","project":"Mountain Bypass Road (P4 Yahong - P3 Canibungan Proper Section), Sta. 0+000 - Sta. 1+400, Tudela, Misamis Occidental","amountPesos":48191000.0,"lengthMeters":1400.0,"ratePesosPerMeter":34422.142857142855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23691"},{"year":2026,"category":"Roads","project":"Mountain Bypass Road (Sitio Casilak Brgy. Duanguican - Purok 5 Balon Section), Sta. 0+000 - Sta. 1+400, Tudela, Misamis Occidental","amountPesos":48191000.0,"lengthMeters":1400.0,"ratePesosPerMeter":34422.142857142855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23693"},{"year":2026,"category":"Roads","project":"Construction of Access Road leading to Regional Rehabilitation Center For Youth (RRCY), Barangay 26, Sta. 0+000 - Sta. 0+484, Gingoog City, Misamis Oriental","amountPesos":7079000.0,"lengthMeters":484.0,"ratePesosPerMeter":14626.03305785124,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23696"},{"year":2026,"category":"Roads","project":"Construction of Barangay Gumabon to Barangay Tama Road, Sta. 8+389 - Sta. 9+019, Magsaysay, Misamis Oriental","amountPesos":18877000.0,"lengthMeters":630.0,"ratePesosPerMeter":29963.492063492064,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23698"},{"year":2026,"category":"Roads","project":"Construction of Barangay Poblacion to Barangay Sindangan Road, Sta. 0+195 - Sta. 0+995, Talisayan, Misamis Oriental","amountPesos":19276000.0,"lengthMeters":800.0,"ratePesosPerMeter":24095.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23700"},{"year":2026,"category":"Bridges","project":"Construction of Bridge connecting Barangay 23 and Barangay 24-A, Sta. 0+240 - Sta. 0+295, Gingoog City, Misamis Oriental (Phase 2)","amountPesos":48191000.0,"lengthMeters":55.0,"ratePesosPerMeter":876200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23702"},{"year":2026,"category":"Roads","project":"Construction of Mabini Road, Barangay Mabini, (Segment A: Sta. 0+572 - Sta. 1+249, Section B: Sta. 0+758 - Sta. 0+875, Section C: Sta. 1+126 - Sta. 1+523, Section D: Sta. 1+344 - Sta. 1+ 473), Binuangan, Misamis Oriental","amountPesos":31147000.0,"lengthMeters":951.0,"ratePesosPerMeter":32751.840168243954,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23704"},{"year":2026,"category":"Bridges","project":"Construction of Odiongan Bridge 2 (Phase III), Sta. 11+605 - Sta. 11+818, Gingoog City, Misamis Oriental","amountPesos":27882000.0,"lengthMeters":213.0,"ratePesosPerMeter":130901.40845070423,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23706"},{"year":2026,"category":"Roads","project":"Construction of Tinagaan Road, Barangay Tinagaan, Sta. 0+000 - Sta. 0+670, Salay, Misamis Oriental","amountPesos":16989000.0,"lengthMeters":670.0,"ratePesosPerMeter":25356.716417910447,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23708"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Aposkahoy, Sta. 0+000 - Sta. 0+265, Claveria, Misamis Oriental","amountPesos":4819000.0,"lengthMeters":265.0,"ratePesosPerMeter":18184.905660377357,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23711"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Nasalaban to Sitio Maribojoc, Barangay Sta. Ana, Sta. 0+000 - Sta. 0+265, Tagoloan, Misamis Oriental","amountPesos":4819000.0,"lengthMeters":265.0,"ratePesosPerMeter":18184.905660377357,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23713"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Aromahon, Sta. 0+000 - Sta. 0+530, Laguindingan, Misamis Orietal","amountPesos":9638000.0,"lengthMeters":530.0,"ratePesosPerMeter":18184.905660377357,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23715"},{"year":2026,"category":"Roads","project":"Construction of Road from Misamis Oriental West Diversion Road (MOWDR) to Brgy. Bagocboc, Sta. 0+000 - Sta. 1+700, Opol, Misamis Oriental","amountPesos":48191000.0,"lengthMeters":1700.0,"ratePesosPerMeter":28347.647058823528,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23717"},{"year":2026,"category":"Roads","project":"Rehabilitation of Damaged Paved Road, from National Road Junction to Brgy. Bonbon and Brgy. Patag, Sta. 0+000 - Sta. 2+000, Opol, Misamis Oriental","amountPesos":48191000.0,"lengthMeters":2000.0,"ratePesosPerMeter":24095.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23719"},{"year":2026,"category":"Roads","project":"Rehabilitation of Damaged Paved Road, Brgy. Igpit, Sta. 0+000 - Sta. 2+000, Opol, Misamis Oriental","amountPesos":48191000.0,"lengthMeters":2000.0,"ratePesosPerMeter":24095.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23721"},{"year":2026,"category":"Roads","project":"Rehabilitation of Damaged Paved Road at Barangay Gracia, Sta. 0+000 - Sta. 0+350, Tagoloan, Misamis Oriental","amountPesos":4819000.0,"lengthMeters":350.0,"ratePesosPerMeter":13768.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23723"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Imelda, Sta. 0+000 - Sta. 0+265, Villanueva, Misamis Oriental","amountPesos":4819000.0,"lengthMeters":265.0,"ratePesosPerMeter":18184.905660377357,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23725"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Lanise, Sta. 0+000 - Sta. 0+265, Claveria, Misamis Oriental","amountPesos":4819000.0,"lengthMeters":265.0,"ratePesosPerMeter":18184.905660377357,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23727"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Madaguing, Sta. 0+000 - Sta. 0+690, Claveria, Misamis Oriental","amountPesos":12530000.0,"lengthMeters":690.0,"ratePesosPerMeter":18159.420289855072,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23729"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Oguis, Sta. 0+000 - Sta. 0+265, Initao, Misamis Oriental","amountPesos":4819000.0,"lengthMeters":265.0,"ratePesosPerMeter":18184.905660377357,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23731"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Panampawan, Sta. 0+000 - Sta. 0+265, Claveria, Misamis Oriental","amountPesos":4819000.0,"lengthMeters":265.0,"ratePesosPerMeter":18184.905660377357,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23733"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Sta. Ana, Sta. 0+000 - Sta. 0+795, Tagoloan, Misamis Oriental","amountPesos":14457000.0,"lengthMeters":795.0,"ratePesosPerMeter":18184.905660377357,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23737"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Taytayan, Sta. 0+000 - Sta. 0+265, Libertad, Misamis Oriental","amountPesos":4819000.0,"lengthMeters":265.0,"ratePesosPerMeter":18184.905660377357,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23739"},{"year":2026,"category":"Roads","project":"Construction of Road at Sitio Daroca, Barangay Poblacion, Sta. 0+000 - Sta. 0+215, Claveria, Misamis Oriental","amountPesos":3855000.0,"lengthMeters":215.0,"ratePesosPerMeter":17930.232558139534,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23741"},{"year":2026,"category":"Roads","project":"Construction of Road at Sitio Limbusan, Barangay Rizal, Sta. 0+000 - Sta. 0+370, Claveria, Misamis Oriental","amountPesos":6747000.0,"lengthMeters":370.0,"ratePesosPerMeter":18235.135135135137,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23743"},{"year":2026,"category":"Roads","project":"Construction of Road at Sitio Tubigan to Sitio Mincalope, Barangay Poblacion, Sta. 0+000 - Sta. 0+265, Claveria, Misamis Oriental","amountPesos":4819000.0,"lengthMeters":265.0,"ratePesosPerMeter":18184.905660377357,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23745"},{"year":2026,"category":"Roads","project":"Improvement of Road at Barangay Apas, Sta. 0+000 - Sta. 0+265, Initao, Misamis Oriental","amountPesos":4819000.0,"lengthMeters":265.0,"ratePesosPerMeter":18184.905660377357,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23747"},{"year":2026,"category":"Roads","project":"Improvement of Road at Barangay Poblacion, Sta. 0+000 - Sta. 0+160, Claveria, Misamis Oriental","amountPesos":2891000.0,"lengthMeters":160.0,"ratePesosPerMeter":18068.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23749"},{"year":2026,"category":"Roads","project":"Construction of Road, De Guzman Street, Sta. 1+260 - Sta. 2+632, Toril Proper, Barangay Toril, Davao City","amountPesos":33643000.0,"lengthMeters":1372.0,"ratePesosPerMeter":24521.137026239066,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23753"},{"year":2026,"category":"Bridges","project":"Construction of Bridge at Barangay Golden Valley (Sta. 0+000 - Sta. 0+030), Mabini, Davao de Oro","amountPesos":29400000.0,"lengthMeters":30.0,"ratePesosPerMeter":980000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23756"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Bawani to Guisok (Sta. 0+000 - Sta. 0+800), Mawab, Davao de Oro","amountPesos":19600000.0,"lengthMeters":800.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23778"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Libudon (Sta. 0+000 - Sta. 0+400), Mabini, Davao de Oro","amountPesos":19600000.0,"lengthMeters":400.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23780"},{"year":2026,"category":"Roads","project":"Construction of Road from National Highway leading to Provincial Rehabilitation Center (Sta. 0+000 - Sta. 0+667), Nabunturan, Davao de Oro","amountPesos":19225000.0,"lengthMeters":667.0,"ratePesosPerMeter":28823.088455772115,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23782"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Slips, Slope Collapse and Landslide along DNAS Road at Tabunan - Tribal, Prosperidad, Sta. 0+093.000 - Sta. 0+234.900, Montevista, Davao de Oro","amountPesos":49000000.0,"lengthMeters":141.9,"ratePesosPerMeter":345313.6011275546,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23793"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Cambanogoy to New Bantayan (Sta. 0+000 - Sta. 0+500 ), Asuncion, Davao del Norte","amountPesos":39200000.0,"lengthMeters":500.0,"ratePesosPerMeter":78400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23804"},{"year":2026,"category":"Roads","project":"Construction of Road from Barangay Camanchilis Matanao to Barangay Bonifacio Managa, Sta. 0+000.00 - Sta. 2+500.00, Bansalan, Davao del Sur","amountPesos":48062000.0,"lengthMeters":2500.0,"ratePesosPerMeter":19224.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23807"},{"year":2026,"category":"Roads","project":"Construction of Road from Barangay Santo Niño to Barangay Marber, Sta. 0+000.00 - Sta. 0+578.494 (Site 1), Sta. 0+000.00 - 1+144.540 (Site 2), Sta. 0+000.00 - Sta. 0+742.240 (Site 3) Bansalan, Davao del Sur","amountPesos":48062000.0,"lengthMeters":1144.54,"ratePesosPerMeter":41992.416167193805,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23809"},{"year":2026,"category":"Roads","project":"Construction of Road from Sitio Kibanban to Barangay Soong, Sta. 0+000.00 - Sta. 1+944.09 (Site 1), Sta. 0+000.00 - Sta. 0+635.91 (Site 2), Digos City, Davao del Sur","amountPesos":48062000.0,"lengthMeters":1944.09,"ratePesosPerMeter":24722.1064868396,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23811"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Aplaya, Sta. 0+000.00 - Sta. 0+188.37 (Site 1), Sta. 0+000.00 - Sta. 0+330.97 (Site 2), Sta. 0+000 - Sta. 0+163.35 (Site 3), Sta. 0+000.00 - Sta. 0+116.69 (Site 4), Sta. 0+000.00 - Sta. 0+195.71 (Site 5), Sta. 0+000.00 - Sta. 0+456.01 (Site 6), Sta. 0+000.00 - Sta. 0+508.20 (Site 7), Sta. 0+000.00 - Sta. 0+370.94 (Site 8), Sta. 0+000.00 - Sta. 0+216.30 (Site 9), Sta. 0+000.00 - Sta. 0+452.34 (Site 10), Sta. 0+499.54 - Sta. 0+655.24 (Site 11), Sta. 0+000.00 - Sta. 0+133.44 (Site 12), Sta. 0+000.00 - Sta. 0+211.98 (Site 13), Digos City, Davao del Sur","amountPesos":48062000.0,"lengthMeters":655.24,"ratePesosPerMeter":73350.2228191197,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23813"},{"year":2026,"category":"Roads","project":"Construction of Road from Junction Highway to Barangay San Alfonso,Sta. 0+000.000-0+468.000, Cateel, Davao Oriental","amountPesos":9800000.0,"lengthMeters":468.0,"ratePesosPerMeter":20940.17094017094,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23816"},{"year":2026,"category":"Roads","project":"Construction of Road from Sitio Mailaya to Sitio Sabangan, Barangay Malibago, Sta. 0+000.000-Sta. 0+702.000, Cateel, Davao Oriental","amountPesos":19225000.0,"lengthMeters":702.0,"ratePesosPerMeter":27386.039886039885,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23818"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay Zaragosa, Sta. 0+000.000-Sta. 0+360.000, Manay, Davao Oriental","amountPesos":7690000.0,"lengthMeters":360.0,"ratePesosPerMeter":21361.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23820"},{"year":2026,"category":"Roads","project":"Construction of Road, from Sitio Arbor to Balete, Sta. 0+000 - 0+360, Barangay Santiago, Caraga, Davao Oriental","amountPesos":7690000.0,"lengthMeters":360.0,"ratePesosPerMeter":21361.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23822"},{"year":2026,"category":"Roads","project":"Rehabilitation of Concrete Road, Barangay Poblacion, Sta. 0+000.000-Sta. 2+088.000, Manay, Davao Oriental","amountPesos":29400000.0,"lengthMeters":2088.0,"ratePesosPerMeter":14080.459770114943,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23824"},{"year":2026,"category":"Bridges","project":"Construction of Dugmanon Bridge (Sta. 0+040 - Sta. 0+070), Barangay Dugmanon, San Isidro, Davao Oriental","amountPesos":49000000.0,"lengthMeters":30.0,"ratePesosPerMeter":1633333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23827"},{"year":2026,"category":"Bridges","project":"Construction of Katipunan Bridge (Sta. 0+240 - Sta. 0+275), Barangay Batobato, San Isidro, Davao Oriental","amountPesos":49000000.0,"lengthMeters":35.0,"ratePesosPerMeter":1400000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23829"},{"year":2026,"category":"Roads","project":"Construction of Lateral B Service Road along Central Katingawan-San Isidro Road, Midsayap, Cotabato Sta. 1+980 - Sta. 4+980","amountPesos":4742000.0,"lengthMeters":3000.0,"ratePesosPerMeter":1580.6666666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23835"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0 + 499.5, Brgy. Bual to Brgy. Damawato, Tulunan, Cotabato","amountPesos":9769000.0,"lengthMeters":499.5,"ratePesosPerMeter":19557.557557557557,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23838"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road with Drainage including Facilities, Dacera Avenue connecting to Silway 8-Upper Labay Bypass Road, Sta. 0+000 - Sta. 2+248, Barangay Mabuhay, General Santos City, South Cotabato,","amountPesos":42676000.0,"lengthMeters":2248.0,"ratePesosPerMeter":18983.985765124555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23841"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Purok 2, Sta.0+000-Sta.2+418, Barangay Buayan, General Santos City","amountPesos":18170000.0,"lengthMeters":2418.0,"ratePesosPerMeter":7514.474772539289,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23849"},{"year":2026,"category":"Roads","project":"Construction of LMT CIS MC Service Road, Sta. 0+000 - Sta. 0+989, Tampakan, South Cotabato,","amountPesos":18778000.0,"lengthMeters":989.0,"ratePesosPerMeter":18986.85540950455,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23851"},{"year":2026,"category":"Roads","project":"Construction of Magsaysay-Polomolok CIS MC Service Road, Sta. 0+000 - Sta. 1+030, Polomolok, South Cotabato,","amountPesos":19560000.0,"lengthMeters":1030.0,"ratePesosPerMeter":18990.29126213592,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23853"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, JCT. National Highway (Marbel-Makar Rd)(Barangay Carpenter Hill – San Roque Section) connecting By-pass Road, Sta. 0+000- Sta. 1+250, Koronadal City, South Cotabato","amountPesos":30994000.0,"lengthMeters":1250.0,"ratePesosPerMeter":24795.2,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23856"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, JCT. National Highway to Salkan Elementary School, Barangay Paraiso, Koronadal City, STA. 0+000-STA. 0+682 South Cotabato","amountPesos":14225000.0,"lengthMeters":682.0,"ratePesosPerMeter":20857.771260997066,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23860"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Baras - Sta. 0 + 280 - Sta. 1 + 780, Tacurong City, Sultan Kudarat","amountPesos":29399000.0,"lengthMeters":1500.0,"ratePesosPerMeter":19599.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23863"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Mapantig - Sta. 0 + 500 - Sta. 1 + 530, Isulan, Sultan Kudarat","amountPesos":18967000.0,"lengthMeters":1030.0,"ratePesosPerMeter":18414.563106796115,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23865"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Polomolok - Sta. 0 + 500 - Sta. 2 + 950, Columbio, Sultan Kudarat","amountPesos":41728000.0,"lengthMeters":2450.0,"ratePesosPerMeter":17031.836734693876,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23867"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Kalanawe II -Bagumbayan Road - Sta. 2 + 430 - Sta. 4 + 930, President Quirino, Sultan Kudarat","amountPesos":42676000.0,"lengthMeters":2500.0,"ratePesosPerMeter":17070.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23869"},{"year":2026,"category":"Roads","project":"Concreting of Road from National Highway to Sitio Minorok, Barangay Limulan, to KM19, Datu Malayat, Barangay Hinalaan, Kalamansig, Sultan Kudarat Sta. 1+070 - Sta. 3+200","amountPesos":50000000.0,"lengthMeters":2130.0,"ratePesosPerMeter":23474.17840375587,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23872"},{"year":2026,"category":"Roads","project":"Concreting of Road from Proper Chua to Spur 6 to Sitio Gold Field, to Sitio Balnan to Sitio Sinagandal, Barangay Chua, Bagumbayan, Sultan Kudarat Sta. 0+000 - Sta. 1+000","amountPesos":15000000.0,"lengthMeters":1000.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23876"},{"year":2026,"category":"Roads","project":"Concreting of Brgy. Paitan to Brgy. Guiamalia Road, Brgy. Paitan, Esperanza, Sultan Kudarat Sta. 0+000 - Sta. 0+800","amountPesos":10000000.0,"lengthMeters":800.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23878"},{"year":2026,"category":"Roads","project":"Construction of Road National Highway Junction to Barangay Gapok Proper, Barangay Gapok, Sen. Ninoy Aquino, Sultan Kudarat Sta. 0+000 - Sta. 0+600","amountPesos":10000000.0,"lengthMeters":600.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23880"},{"year":2026,"category":"Roads","project":"Improvement of Curva-Jagupit-San Isidro Road, Sta. 0+000 - Sta. 1+500, Santiago, Agusan del Norte","amountPesos":39200000.0,"lengthMeters":1500.0,"ratePesosPerMeter":26133.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23884"},{"year":2026,"category":"Roads","project":"Improvement of Amontay-Calonia Provincial Road, Sta. 0+000 - Sta. 1+500, Nasipit, Agusan del Norte","amountPesos":39200000.0,"lengthMeters":1500.0,"ratePesosPerMeter":26133.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23886"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, NRJ Poblacion Sibagat -Villangit Road, Sta. 0+000 - Sta. 1+080, Barangay Villangit, Municipality of Sibagat, Agusan del Sur","amountPesos":29400000.0,"lengthMeters":1080.0,"ratePesosPerMeter":27222.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23889"},{"year":2026,"category":"Roads","project":"Construction of NRJ (Prosperidad) San Rafael - San Roque - San Isidro Road in Support to Wood Plantation Sites, Sta. 0+000 - Sta. 1+000, Prosperidad, Agusan del Sur","amountPesos":29400000.0,"lengthMeters":1000.0,"ratePesosPerMeter":29400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23891"},{"year":2026,"category":"Roads","project":"Construction of Purok 1 to Purok 4 (Sinangkayaw) Road, Sta. 0+000 - Sta. 0+327, Barangay Maug, Prosperidad, Agusan del Sur","amountPesos":9800000.0,"lengthMeters":327.0,"ratePesosPerMeter":29969.41896024465,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23893"},{"year":2026,"category":"Roads","project":"Construction of Road along Napo, Sta. 0+000 - Sta. 1+452, Prosperidad, Agusan del Sur","amountPesos":49000000.0,"lengthMeters":1452.0,"ratePesosPerMeter":33746.5564738292,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23895"},{"year":2026,"category":"Roads","project":"Construction of Road along New Gingoog to Langag, Sta. 0+000 - Sta. 1+000, Esperanza, Agusan del Sur","amountPesos":29400000.0,"lengthMeters":1000.0,"ratePesosPerMeter":29400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23897"},{"year":2026,"category":"Roads","project":"Construction of San Vicente to Napo Road, Sta. 0+000 - Sta. 1+800, San Vicente, Prosperidad, Agusan del Sur","amountPesos":49000000.0,"lengthMeters":1800.0,"ratePesosPerMeter":27222.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23899"},{"year":2026,"category":"Bridges","project":"Rehabilitation of Delta Bridge, Sta. 0+000 - Sta. 0+162.97, Poblacion, San Luis, Agusan del Sur","amountPesos":42434000.0,"lengthMeters":162.97,"ratePesosPerMeter":260379.21089771125,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23901"},{"year":2026,"category":"Roads","project":"Concreting of Barangay 3-Sta. Ana-Ladgadan Road Connecting Oil Palm Planatations Sites and National Road Junction in support to Oil Palm Industry/ies of San Francisco, Sta. 1+362 - Sta. 1+962, Agusan Del Sur","amountPesos":19600000.0,"lengthMeters":600.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23904"},{"year":2026,"category":"Roads","project":"Concreting of NRJ Pulang Lupa-New Visayas-De Oro Boundary Road, Sta. 5+872 - Sta. 6+372, Trento, Agusan del Sur","amountPesos":19600000.0,"lengthMeters":500.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23906"},{"year":2026,"category":"Roads","project":"Concreting of Road, (Sta. 0+000 - Sta. 0+411), Barangay Doongan, Butuan City, Agusan del Norte","amountPesos":9800000.0,"lengthMeters":411.0,"ratePesosPerMeter":23844.282238442822,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23913"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Taguibo going to Barangay Bugsukan (Sta. 0+000 - Sta. 0+630), Butuan City, Agusan del Norte","amountPesos":19600000.0,"lengthMeters":630.0,"ratePesosPerMeter":31111.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23915"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Villa Kananga (Sta. 0+000 - Sta. 0+861), Butuan City, Agusan del Norte","amountPesos":19600000.0,"lengthMeters":861.0,"ratePesosPerMeter":22764.227642276423,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23917"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Banza (Sta. 0+000 - Sta. 0+611), Butuan City, Agusan del Norte","amountPesos":18620000.0,"lengthMeters":611.0,"ratePesosPerMeter":30474.631751227495,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23919"},{"year":2026,"category":"Roads","project":"Concreting of Road, (Sta. 0+000 - Sta. 0+279), Barangay Libertad, Butuan City, Agusan del Norte","amountPesos":6860000.0,"lengthMeters":279.0,"ratePesosPerMeter":24587.813620071684,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23921"},{"year":2026,"category":"Roads","project":"Concreting of Road, Purok 3, (Sta. 0+000 - Sta. 0+198), Barangay Libertad, Butuan City, Agusan del Norte","amountPesos":4900000.0,"lengthMeters":198.0,"ratePesosPerMeter":24747.47474747475,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23923"},{"year":2026,"category":"Roads","project":"Construction of Road, (Sta. 0+000 - Sta. 0+540), Barangay Bancasi, Butuan City, Agusan del Norte","amountPesos":12740000.0,"lengthMeters":540.0,"ratePesosPerMeter":23592.59259259259,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23925"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+000 - 0+600), Barangay Boa to Barangay Valencia, Cagdianao, Dinagat Islands","amountPesos":19600000.0,"lengthMeters":600.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23928"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+000 - 0+300), Barangay Cayetano, Dinagat, Dinagat Islands","amountPesos":9800000.0,"lengthMeters":300.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23930"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+000 - 0+600), Barangay Diaz, Tubajon, Dinagat Islands","amountPesos":19600000.0,"lengthMeters":600.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23932"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+000 - 0+600), Barangay Malinao, Tubajon, Dinagat Islands","amountPesos":19600000.0,"lengthMeters":600.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23934"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+000 - 0+400), Barangay Nueva Estrella to Barangay Del Pilar, Cagdianao, Dinagat Islands","amountPesos":29400000.0,"lengthMeters":400.0,"ratePesosPerMeter":73500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23936"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+000 - 0+600), Barangay Panamaon to Barangay Esperanza, Loreto, Dinagat Islands","amountPesos":19600000.0,"lengthMeters":600.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23938"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+000-0+300), Cabalawan, Libjo, Dinagat Islands","amountPesos":9800000.0,"lengthMeters":300.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23940"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+000-0+340), Purok 5, Barangay Rosita, Libjo, Dinagat Islands","amountPesos":9800000.0,"lengthMeters":340.0,"ratePesosPerMeter":28823.529411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23942"},{"year":2026,"category":"Roads","project":"Construction of Capayahan-Marga-San Pablo Road leading to Tourism Area, (0+268.50 - 2+268.50), Tubod, Surigao del Norte","amountPesos":49000000.0,"lengthMeters":2000.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23945"},{"year":2026,"category":"Roads","project":"Construction of Road from Barangay Anahaw to Barangay San Pedro, Alegria, (0+000 - 0+400), Surigao del Norte","amountPesos":9800000.0,"lengthMeters":400.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23947"},{"year":2026,"category":"Roads","project":"Construction of Sitio Maniuyom Road, (0+000 - 0+400), Brgy. Binga, Mainit, Surigao del Norte","amountPesos":9800000.0,"lengthMeters":400.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23949"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+000 - 0+400), Brgy. Mat-I, Surigao City, Surigao del Norte","amountPesos":9800000.0,"lengthMeters":400.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23951"},{"year":2026,"category":"Roads","project":"Construction of Road from Barangay Cawilan to Barangay Patiño, (0+000 - 1+200), Tagana-an, Surigao del Norte","amountPesos":29400000.0,"lengthMeters":1200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23953"},{"year":2026,"category":"Roads","project":"Construction of Road from Barangay Julio Ouano to Barangay San Pedro, (0+000 - 1+600), Alegria, Surigao del Norte","amountPesos":39200000.0,"lengthMeters":1600.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23955"},{"year":2026,"category":"Roads","project":"Construction of Road leading to Boat Landing, (0+293 - 1+ 093), Barangay Pongtud, Alegria, Surigao del Norte","amountPesos":19600000.0,"lengthMeters":800.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23957"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+000 - 0+400), Barangay Cawilan, Tubod, Surigao del Norte","amountPesos":9800000.0,"lengthMeters":400.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23959"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+000 - 0+400), Barangay Diaz, San Francisco, Surigao del Norte","amountPesos":9800000.0,"lengthMeters":400.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23961"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+000 - 0+200), Barangay San Juan, Alegria, Surigao del Norte","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23963"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+300 - 2+300), Sitio Cabongaan, Purok 6, Barangay Himamaug, Tagana-an, Surigao del Norte","amountPesos":49000000.0,"lengthMeters":2000.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23965"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+000 - 1+200), Sitio Singuilon, Barangay del Rosario, Tubod, Surigao del Norte","amountPesos":29400000.0,"lengthMeters":1200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23967"},{"year":2026,"category":"Roads","project":"Construction of San Pedro-San Isidro-Mayag Road, (0+164 - 1+764), Sison, Surigao del Norte","amountPesos":39200000.0,"lengthMeters":1600.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23969"},{"year":2026,"category":"Roads","project":"Concreting of Barangay Road at Umbay, (0+000 - 1+678), Tago, Surigao del Sur","amountPesos":29400000.0,"lengthMeters":1678.0,"ratePesosPerMeter":17520.858164481524,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23972"},{"year":2026,"category":"Roads","project":"Concreting of Layog – Caras-an Road Sitio Pangian Road Section, (0+000 - 2+755), Tago, Surigao del Sur","amountPesos":49000000.0,"lengthMeters":2755.0,"ratePesosPerMeter":17785.84392014519,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23980"},{"year":2026,"category":"Roads","project":"Concreting of Esperanza to Hinapoyan Barangay Road (Sta. 0+000 - Sta. 1+023), Carmen, Surigao del Sur","amountPesos":24500000.0,"lengthMeters":1023.0,"ratePesosPerMeter":23949.169110459436,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23982"},{"year":2026,"category":"Roads","project":"Concreting of Road, Purok 9 (Sta. 0+000 - Sta. 0+600), Mabahin, Cortes, Surigao del Sur","amountPesos":9800000.0,"lengthMeters":600.0,"ratePesosPerMeter":16333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23984"},{"year":2026,"category":"Roads","project":"Concreting of Road, (0+000 - 1+118.50), Barangay Amontay, Marihatag, Surigao del Sur","amountPesos":19600000.0,"lengthMeters":1118.5,"ratePesosPerMeter":17523.468931604828,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23986"},{"year":2026,"category":"Roads","project":"Concreting of Road, (0+000 - 1+118.50), Barangay Sumo-sumo, Tago, Surigao del Sur","amountPesos":19600000.0,"lengthMeters":1118.5,"ratePesosPerMeter":17523.468931604828,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23988"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, (0+000 - 0+074), Barangay Bitaugan West, Cagwait, Surigao del Sur","amountPesos":24173000.0,"lengthMeters":74.0,"ratePesosPerMeter":326662.1621621622,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23990"},{"year":2026,"category":"Roads","project":"Construction of Circumferential Road, (0+000 - 1+118.50), Barangay Bolhoon, San Miguel, Surigao del Sur","amountPesos":19600000.0,"lengthMeters":1118.5,"ratePesosPerMeter":17523.468931604828,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23992"},{"year":2026,"category":"Roads","project":"Construction of Jct. Cabadbaran - Puting Bato - Lanuza Road to Barangay Pakwan, (0+000 - 2+046.5), Lanuza, Surigao del Sur","amountPesos":49000000.0,"lengthMeters":2046.5,"ratePesosPerMeter":23943.317859760566,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23994"},{"year":2026,"category":"Bridges","project":"Construction of Podlasan Bridge, (0+000 - 0+025), Libas Sud, San Miguel, Surigao del Sur","amountPesos":16115000.0,"lengthMeters":25.0,"ratePesosPerMeter":644600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23996"},{"year":2026,"category":"Roads","project":"Construction of Road Junction Sitio Himatagan Barangay Agsam to Sitio Ibuan Barangay Mampi, (0+000 - 1+500), Lanuza, Surigao del Sur","amountPesos":29400000.0,"lengthMeters":1500.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 23998"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+000 - 0+409.5), Barangay Calatngan, San Miguel, Surigao del Sur","amountPesos":9800000.0,"lengthMeters":409.5,"ratePesosPerMeter":23931.62393162393,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24000"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+000 - 0+818.5), Barangay Libas Sud, San Miguel, Surigao del Sur","amountPesos":19600000.0,"lengthMeters":818.5,"ratePesosPerMeter":23946.243127672573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24002"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+000 - 0+818.5), National Highway to Ganayon, Lianga, Surigao del Sur","amountPesos":19600000.0,"lengthMeters":818.5,"ratePesosPerMeter":23946.243127672573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24004"},{"year":2026,"category":"Roads","project":"Construction Road, (0+855 - 2+083), Cabugo, Bayabas to Tawagan, Cagwait Road, Surigao del Sur","amountPesos":29400000.0,"lengthMeters":1228.0,"ratePesosPerMeter":23941.368078175896,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24006"},{"year":2026,"category":"Roads","project":"Construction of Road Barangay Salvacion, (0+000 - 1+678), San Agustin, Surigao del Sur","amountPesos":29400000.0,"lengthMeters":1678.0,"ratePesosPerMeter":17520.858164481524,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24008"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+000 - 2+026.5), Santa Cruz to San Antonio, Marihatag, Surigao del Sur","amountPesos":49000000.0,"lengthMeters":2026.5,"ratePesosPerMeter":24179.620034542313,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24010"},{"year":2026,"category":"Roads","project":"Construction of Junction Highway-Kauswagan-San Roque-Gamut-Cabacungan Road Section, Sta. 19+658 - Sta. 20+967.5, Barobo, Surigao del Sur","amountPesos":31360000.0,"lengthMeters":1309.5,"ratePesosPerMeter":23948.07178312333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24013"},{"year":2026,"category":"Roads","project":"Construction of Liwang-Ganga-Sengyew Road, Sta. 0+000 - Sta. 0+625, Bauko, Mountain province","amountPesos":58800000.0,"lengthMeters":625.0,"ratePesosPerMeter":94080.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24023"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Maalat to Barangay Talangnan, Sta. 0+000 - Sta. 3+800, Madridejos, Cebu","amountPesos":96900000.0,"lengthMeters":3800.0,"ratePesosPerMeter":25500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24028"},{"year":2026,"category":"Roads","project":"Concreting of Sitio Kamalig - Sitio Linduman Road, Brgy. Vitali, Zamboanga City Sta. 3+000 - Sta. 5+000","amountPesos":112700000.0,"lengthMeters":2000.0,"ratePesosPerMeter":56350.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24031"},{"year":2026,"category":"Roads","project":"Construction of Brgy. Cabaluay - Brgy. Talabaan Road, Zamboanga City Sta. 1+800 - Sta. 4+300","amountPesos":50470000.0,"lengthMeters":2500.0,"ratePesosPerMeter":20188.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24033"},{"year":2026,"category":"Roads","project":"Construction of Brgy. Dulian (Upper Bunguiao) - Brgy. Bunguiao Road, Zamboanga City Sta. 0+000 - Sta. 0+900","amountPesos":49000000.0,"lengthMeters":900.0,"ratePesosPerMeter":54444.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24035"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, along Barangay Lahum Maimbung Barangay Kulasi, Maimbung, Sulu Sta. 0+000 - Sta. 6+500","amountPesos":196000000.0,"lengthMeters":6500.0,"ratePesosPerMeter":30153.846153846152,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24045"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, along Barangay Lahum Maimbung Barangay Patao, Maimbung, Sulu Sta. 0+000 - Sta. 6+500","amountPesos":196000000.0,"lengthMeters":6500.0,"ratePesosPerMeter":30153.846153846152,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24047"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, along Barangay Pagsalipangan to Lahum Maimbung, Maimbung, Sulu Sta. 8+000 - Sta. 14+500","amountPesos":196000000.0,"lengthMeters":6500.0,"ratePesosPerMeter":30153.846153846152,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24049"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Asturias to General Arulas, Walled City, Jolo Sulu Sta. 0+000 - Sta. 3+000","amountPesos":144706000.0,"lengthMeters":3000.0,"ratePesosPerMeter":48235.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24051"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Walled City to Barangay Busbus to Barangay Mauboh, Patikul, Sulu Sta. 0+000 - Sta. 3+000","amountPesos":144706000.0,"lengthMeters":3000.0,"ratePesosPerMeter":48235.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24053"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Chinese Pier, Jolo, Sulu Sta. 0+000 - Sta. 3+000","amountPesos":144706000.0,"lengthMeters":3000.0,"ratePesosPerMeter":48235.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24055"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Maimbung to Parang, Maimbung, Sulu Sta. 17+000 - Sta. 23+500","amountPesos":144706000.0,"lengthMeters":6500.0,"ratePesosPerMeter":22262.46153846154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24057"},{"year":2026,"category":"Roads","project":"Construction of Road at Jct. Davao-Bukidnon Road, Marilog to Gumitan, Sta. 1652+050.000 - Sta. 1654+527.635, Marilog District, Davao City","amountPesos":164727000.0,"lengthMeters":2477.635,"ratePesosPerMeter":66485.57999866783,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24060"},{"year":2026,"category":"Roads","project":"Construction of Road at Pag-asa, Saloy to Sitio Kanacan, Sta. 0+000 - Sta. 9+390, Tamugan going to Lamanan, Davao City","amountPesos":144186000.0,"lengthMeters":9390.0,"ratePesosPerMeter":15355.271565495208,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24062"},{"year":2026,"category":"Roads","project":"Construction of Road at Sitio Darila, Colabol and Masupit, Lamanan going Cabagtukan Elementary School, Dominga, Sta. 0+000 - Sta. 9+360, Calinan District, Davao City","amountPesos":144186000.0,"lengthMeters":9360.0,"ratePesosPerMeter":15404.48717948718,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24064"},{"year":2026,"category":"Roads","project":"Construction of Road, Pag-ibig, New Lety, Saloy, Calinan District to Sitio Cabonbon, Sta. 0+000 - Sta. 3+309, Malabog, Paquibato District, Davao City","amountPesos":96124000.0,"lengthMeters":3309.0,"ratePesosPerMeter":29049.25959504382,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24066"},{"year":2026,"category":"Bridges","project":"Construction of Kanipaan- Napnapon Bridge - Sta. 2+050 - Sta. 2+113, Palimbang, Sultan Kudarat","amountPesos":74250000.0,"lengthMeters":63.0,"ratePesosPerMeter":1178571.4285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24071"},{"year":2026,"category":"Bridges","project":"Construction of Latian Bridge Leading to Indigenous People’s Communities, Sta. 0+730 - Sta. 0+820, Sitio Ihan, Datal Anggas, Alabel, Sarangani","amountPesos":90000000.0,"lengthMeters":90.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24073"},{"year":2026,"category":"Roads","project":"Construction of Road from Junction National Highway Calabanit Leading to Indigenous People’s Community, E. Alegado, Sta. 21+000 - Sta. 23+000, Glan, Sarangani","amountPesos":47418000.0,"lengthMeters":2000.0,"ratePesosPerMeter":23709.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24077"},{"year":2026,"category":"Roads","project":"Construction of Road from Junction National Highway Leading to Indigenous People’s Communities, Sta. 2+045 -Sta. 2+795, Paraiso, Alabel, Sarangani","amountPesos":14225000.0,"lengthMeters":750.0,"ratePesosPerMeter":18966.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24079"},{"year":2026,"category":"Roads","project":"Construction of Road from Junction National Highway Nagpan Leading to Indigenous People’s Community, Sta. 5+100 - Sta. 7+ 100, Sitio Malinis, Tamban, Malungon, Sarangani","amountPesos":37934000.0,"lengthMeters":2000.0,"ratePesosPerMeter":18967.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24081"},{"year":2026,"category":"Roads","project":"Construction of Road from Junction National Highway Nalus Leading to Indigenous People’s Community, Sta. 1+278 - Sta. 2+778, Purok Green Valley, Kiamba, Sarangani","amountPesos":28451000.0,"lengthMeters":1500.0,"ratePesosPerMeter":18967.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24083"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Caglayan-Allangigan, Sta.1+348 - Sta.2+026, Conner, Apayao","amountPesos":13720000.0,"lengthMeters":678.0,"ratePesosPerMeter":20235.98820058997,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24087"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Manag-Katablangan, Sta. 0+000 - Sta. 0+300, Conner, Apayao","amountPesos":14700000.0,"lengthMeters":300.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24089"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Puguin-Mabiga, Sta.0+860 - Sta.1+538, Conner, Apayao","amountPesos":14700000.0,"lengthMeters":678.0,"ratePesosPerMeter":21681.41592920354,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24091"},{"year":2026,"category":"Roads","project":"Construction of Sta. Maria-Upper Atok-Aurora Road (Pudtol Side), Sta. 0+000 - Sta. 0+400, Pudtol, Apayao","amountPesos":24500000.0,"lengthMeters":400.0,"ratePesosPerMeter":61250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24094"},{"year":2026,"category":"Roads","project":"Construction of Sta. Maria-Upper Atok-Aurora Road, Sta. 1+563 - Sta. 2+663, Flora, Apayao","amountPesos":39200000.0,"lengthMeters":1100.0,"ratePesosPerMeter":35636.36363636364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24096"},{"year":2026,"category":"Bridges","project":"Construction (completion) of the Umilag Bridge, Umilag, Lamut, Ifugao Sta. 0+000 - Sta. 0+300","amountPesos":30850000.0,"lengthMeters":300.0,"ratePesosPerMeter":102833.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24101"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Cadel Sports Complex, Lagawe, Ifugao Sta. 0+000 - Sta. 0 + 040","amountPesos":19600000.0,"lengthMeters":40.0,"ratePesosPerMeter":490000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24103"},{"year":2026,"category":"Roads","project":"Construction of Bunog - Pag-ong Kahibanong Access Road, Burnay, Lagawe, Ifugao Sta. 0+000 - Sta. 0+350","amountPesos":4900000.0,"lengthMeters":350.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24105"},{"year":2026,"category":"Roads","project":"Construction of Poblacion, Maggok, Hungduan to Nagacadan, Kiangan Bypass Road, Hungduan and Kiangan, Ifugao Sta. 0+000 - Sta. 1+250","amountPesos":49000000.0,"lengthMeters":1250.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24107"},{"year":2026,"category":"Roads","project":"Construction of Road, Banagao-Mangali, Phase III, Sta. 0 + 960 - Sta. 2 + 656, Tanudan, Kalinga","amountPesos":39200000.0,"lengthMeters":1696.0,"ratePesosPerMeter":23113.20754716981,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24110"},{"year":2026,"category":"Roads","project":"Construction of Betwagan Road Sta. 1+740 - Sta 1+820, Sadanga, Mountain Province","amountPesos":4900000.0,"lengthMeters":80.0,"ratePesosPerMeter":61250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24113"},{"year":2026,"category":"Roads","project":"Construction of Guinzadan Central Road Sta. 0+111 - Sta. 0+211, Bauko, Mountain Province","amountPesos":4900000.0,"lengthMeters":100.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24115"},{"year":2026,"category":"Roads","project":"Construction of Road, Salin-Sadsadan-Balicanao Sta. 3+400 - Sta. 3+680, Bauko, Mountain Province","amountPesos":9800000.0,"lengthMeters":280.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24117"},{"year":2026,"category":"Roads","project":"Construction of Talubin Road Sta. 0+936 - Sta. 1+036, Bontoc, Mountain Province","amountPesos":9800000.0,"lengthMeters":100.0,"ratePesosPerMeter":98000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24119"},{"year":2026,"category":"Roads","project":"Construction of Paracelis-Mallig-Roxas Road, Sta. 8+010 - Sta. 8+810, Paracelis, Mountain Province","amountPesos":24500000.0,"lengthMeters":800.0,"ratePesosPerMeter":30625.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24122"},{"year":2026,"category":"Roads","project":"Construction of Paracelis-Tabuk-Malig Road, Sta. 3+085 - Sta. 4+780, Paracelis, Mountain Province","amountPesos":24500000.0,"lengthMeters":1695.0,"ratePesosPerMeter":14454.277286135693,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24124"},{"year":2026,"category":"Roads","project":"Construction of Perlita Road(Sta. 0+000 - Sta. 0+200), Barangay Caliat, Quezon, Nueva Vizcaya","amountPesos":4544000.0,"lengthMeters":200.0,"ratePesosPerMeter":22720.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24128"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Sitio Labtay to Pag-Asa Road, Sta. 00+000 - Sta. 00+703, Barangay Napsan, Puerto Princesa City, Palawan","amountPesos":16604000.0,"lengthMeters":703.0,"ratePesosPerMeter":23618.77667140825,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24132"},{"year":2026,"category":"Roads","project":"Rehabilitation of Cabibihan-Victory Road (Phase 2), Caibiran, Biliran (Sta. 0+000 - Sta. 0+407, Sta. 0+557 - Sta. 0+915)","amountPesos":19296000.0,"lengthMeters":765.0,"ratePesosPerMeter":25223.529411764706,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24136"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Nangan-Nangan-Barangay Lizon Valley-Barangay Lourdes-Barangay Lower Sibatang-NRJ Barangay Macasing, Tigbao and Pagadian City, Zamboanga Del Sur Sta 01+846 - Sta. 03+146","amountPesos":38588000.0,"lengthMeters":1300.0,"ratePesosPerMeter":29683.076923076922,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24140"},{"year":2026,"category":"Roads","project":"Construction of Road, NRJ Barangay Poblacion-Barangay Libertad-Barangay Santo Nino-Barangay Lumangoy-Barangay Sawa-Barangay Binayan, Labangan and Sominot, Zamboanga del Sur Sta 00+900 - Sta. 02+100","amountPesos":38588000.0,"lengthMeters":1200.0,"ratePesosPerMeter":32156.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24142"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Eday - Sta. 0 + 000 - Sta. 1 + 100, Columbio, Sultan Kudarat","amountPesos":19539000.0,"lengthMeters":1100.0,"ratePesosPerMeter":17762.727272727272,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24146"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Makat - Sta. 0 + 000 - Sta. 1 + 100, Columbio, Sultan Kudarat","amountPesos":19539000.0,"lengthMeters":1100.0,"ratePesosPerMeter":17762.727272727272,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24148"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Mamali - Sta. 0 + 000 - Sta. 1 + 100, Lutayan, Sultan Kudarat","amountPesos":19539000.0,"lengthMeters":1100.0,"ratePesosPerMeter":17762.727272727272,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24150"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Natividad - Sta. 0 + 000 - Sta. 1 + 100, Columbio, Sultan Kudarat","amountPesos":19539000.0,"lengthMeters":1100.0,"ratePesosPerMeter":17762.727272727272,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24152"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay New Bantangan - Sta. 0 + 000 - Sta. 1 + 160, Columbio, Sultan Kudarat","amountPesos":19539000.0,"lengthMeters":1160.0,"ratePesosPerMeter":16843.96551724138,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24154"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Purok Bagong Sikat-Purok Cebuano, Barangay Blingkong - Sta. 0 + 000 - Sta. 2 + 250, Lutayan, Sultan Kudarat","amountPesos":39077000.0,"lengthMeters":2250.0,"ratePesosPerMeter":17367.555555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24156"},{"year":2026,"category":"Bridges","project":"Construction of Kirao Bridge along Aciga River, Sta. 0+000 - Sta. 0+060, Pangaylan-Ip, Santiago, Agusan del Norte","amountPesos":39200000.0,"lengthMeters":60.0,"ratePesosPerMeter":653333.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24160"},{"year":2026,"category":"Roads","project":"San Carlos City Bypass Road, Barangay. Palamig - Barangay. Pagal - Barangay. Manzon - Barangay. Magtaking - Barangay. Mamarlao - Barangay. San Juan - Barangay. Caingal - Barangay. Paitan Section, Sta. 5 + 100 - Sta. 10 + 440, San Carlos City, Pangasinan","amountPesos":392000000.0,"lengthMeters":5340.0,"ratePesosPerMeter":73408.23970037453,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24168"},{"year":2026,"category":"Roads","project":"Construction of Halag, Aguinaldo to Maguitawa, Mayoyao to Dulao-Tupaya, Lagawe to Hapid-Poblacion, Lamut to Bagabag, Nueva Vizcaya Bypass Road, Sta. 0+000 - Sta. 2+220, Aguinaldo and Mayoyao, Ifugao","amountPesos":86730000.0,"lengthMeters":2220.0,"ratePesosPerMeter":39067.56756756757,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24171"},{"year":2026,"category":"Roads","project":"Construction of Alimit - Nattum - Abinuan, Lagawe Road, Sta. 0+000 - Sta. 2+450, Mayoyao, Ifugao","amountPesos":107800000.0,"lengthMeters":2450.0,"ratePesosPerMeter":44000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24173"},{"year":2026,"category":"Roads","project":"Construction of Mongol-Nalbu-Alimit-Nattum-Dulao Road, Sta. 6+090 - Sta. 7+800, Mayoyao, Ifugao","amountPesos":73500000.0,"lengthMeters":1710.0,"ratePesosPerMeter":42982.45614035088,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24175"},{"year":2026,"category":"Roads","project":"Construction of Ilagan-Divilacan Road (Sta. 38+780 - Sta. 41+615), Phase 3, Package 1, Ilagan-Divilacan, Isabela","amountPesos":147000000.0,"lengthMeters":2835.0,"ratePesosPerMeter":51851.851851851854,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24178"},{"year":2026,"category":"Roads","project":"Construction of Bagac-Mariveles By-Pass Road, Bagac and Mariveles, Bataan, Sta. 2 + 530 - Sta. 5 + 960","amountPesos":69666000.0,"lengthMeters":3430.0,"ratePesosPerMeter":20310.78717201166,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24181"},{"year":2026,"category":"Roads","project":"Tarlac City Circumferential Road (Aguso - Balibago II) Tariji Section, Tarlac City, Tarlac, Sta. 1+086.60 - Sta. 1+751.60","amountPesos":137200000.0,"lengthMeters":665.0,"ratePesosPerMeter":206315.7894736842,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24183"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tigbinan, Labo to Barangay Magsaysay, Capalonga, Camarines Norte, Sta. 0+000 - Sta. 3+560","amountPesos":97624000.0,"lengthMeters":3560.0,"ratePesosPerMeter":27422.47191011236,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24189"},{"year":2026,"category":"Roads","project":"Construction of Guimbal-Tigbauan Bypass Road leading to R1 Bypass Road, Iloilo - Sta. 0+000 - Sta.1+800","amountPesos":52628000.0,"lengthMeters":1800.0,"ratePesosPerMeter":29237.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24192"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay Himamara, Sta. 2+790 - 2+910, Mahaplag, Leyte","amountPesos":120604000.0,"lengthMeters":120.0,"ratePesosPerMeter":1005033.3333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24199"},{"year":2026,"category":"Roads","project":"Construction of Maasin City East Bypass Road Extension (Segment 1), Southern Leyte (Sta. 1+100 - 1+215)","amountPesos":105350000.0,"lengthMeters":115.0,"ratePesosPerMeter":916086.9565217391,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24203"},{"year":2026,"category":"Roads","project":"Construction of Palapag Diversion Road (Sta. 0+000 - Sta.1+350), Palapag, Northern Samar","amountPesos":67536000.0,"lengthMeters":1350.0,"ratePesosPerMeter":50026.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24205"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Carolina to Can-avid to Dolores to Maslog to Jipapad, Eastern Samar (Sta. 0+000 - Sta. 0+100, Sta. 0+414 - Sta. 0+454, Sta. 0+960 - Sta. 1+341, Sta. 2+167 - Sta. 3+050, Sta. 5+396 - Sta. 5+592)","amountPesos":72360000.0,"lengthMeters":1600.0,"ratePesosPerMeter":45225.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24207"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Literon to Barangay Antol, Calbiga to Barangay Canlobo to Barangay Layo to Barangay Magdawat to Barangay Pelaon, Pinabacdao to Barangay Mabini, Basey, Samar (Sta. 1+ 836 - 3+000)","amountPesos":57888000.0,"lengthMeters":1164.0,"ratePesosPerMeter":49731.9587628866,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24211"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Malino to Barangay Jidanao to Barangay Nagbac to Barangay Casapa, Jiabong, Samar (Sta. 0+633.5 - 1+333.5)","amountPesos":53064000.0,"lengthMeters":700.0,"ratePesosPerMeter":75805.71428571429,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24213"},{"year":2026,"category":"Roads","project":"Construction of Road, Gandara to Matuguinao to Las Navas Road (Sta. 14+370 - Sta. 16+500), Las Navas, Northern Samar","amountPesos":115776000.0,"lengthMeters":2130.0,"ratePesosPerMeter":54354.92957746479,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24215"},{"year":2026,"category":"Roads","project":"Curuan-Buenavista Diversion Road, Lunday Section, Zamboanga City, Sta. 0+000 to Sta. 1+200","amountPesos":93100000.0,"lengthMeters":1200.0,"ratePesosPerMeter":77583.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24222"},{"year":2026,"category":"Roads","project":"Curuan-Buenavista Diversion Road, Lunday Section, Zamboanga City, Sta. 1+200 to Sta. 2+580","amountPesos":105410000.0,"lengthMeters":1380.0,"ratePesosPerMeter":76384.0579710145,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24224"},{"year":2026,"category":"Roads","project":"Construction of Jct. Camp Kibaritan-Pangantucan - Jct Guinoyoran-Valencia Road, Brgy. Dominorog Section, Sta. 5+200 - Sta. 6+830, Talakag, Bukidnon","amountPesos":134934000.0,"lengthMeters":1630.0,"ratePesosPerMeter":82781.59509202454,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24229"},{"year":2026,"category":"Bridges","project":"Construction of Bridge from Barangay Benoni, Mahinog to Barangay Maac, Guinsiliban Section, K0017+960 - K0018+060, Camiguin","amountPesos":212038000.0,"lengthMeters":100.0,"ratePesosPerMeter":2120380.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24231"},{"year":2026,"category":"Roads","project":"Construction of Jct. Sayre Highway to Jct. Kibawe - Arakan Road (Old Damulog - Migcawayan), Brgy. Migcawayan Section, Sta. 5+300 - Sta. 7+900, Damulog, Bukidnon","amountPesos":120476000.0,"lengthMeters":2600.0,"ratePesosPerMeter":46336.92307692308,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24233"},{"year":2026,"category":"Roads","project":"Construction of By-Pass Road, Barangay Palkan, Polomolok, South Cotabato to Barangay Kablon, Sta. 0+000 - Sta. 3+333, Tupi, South Cotabato","amountPesos":94836000.0,"lengthMeters":3333.0,"ratePesosPerMeter":28453.645364536453,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24236"},{"year":2026,"category":"Roads","project":"Concreting of NRJ Purok 2B, Barangay Consuelo - Purok 9 - Upper Koo - Tinago - Nangka Road, Sta. 4+450 - Sta. 7+520, Bunawan, Agusan del Sur","amountPesos":73500000.0,"lengthMeters":3070.0,"ratePesosPerMeter":23941.368078175896,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24241"},{"year":2026,"category":"Roads","project":"Construction of Barobo - San Francisco Bypass Road, (0+618 - 1+1988), Barobo, Surigao del Sur","amountPesos":98000000.0,"lengthMeters":2370.0,"ratePesosPerMeter":41350.21097046413,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24243"},{"year":2026,"category":"Roads","project":"Construction of Bislig - Trento Bypass Road, (1+480 - 3+480), Surigao del Sur","amountPesos":78400000.0,"lengthMeters":2000.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24245"},{"year":2026,"category":"Roads","project":"Construction of Hinatuan-Bunawan-Rosario Bypass Road, Sta. 5+166.5 - Sta. 9+259.5), Hinatuan, Surigao del Sur","amountPesos":98000000.0,"lengthMeters":4093.0,"ratePesosPerMeter":23943.317859760566,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24251"},{"year":2026,"category":"Roads","project":"Construction of Hinatuan-Bunawan-Rosario Bypass Road, Sta. 3+303 - Sta. 7+398, Rosario, Agusan del Sur","amountPesos":98000000.0,"lengthMeters":4095.0,"ratePesosPerMeter":23931.623931623933,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24253"},{"year":2026,"category":"Roads","project":"Construction of NRJ Daang Maharlika (Sibagat Section) – San Juan Road, (Phase 2), Sta. 0+000 - Sta. 4+380, Sibagat, Agusan del Sur","amountPesos":98000000.0,"lengthMeters":4380.0,"ratePesosPerMeter":22374.429223744293,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24257"},{"year":2026,"category":"Roads","project":"Construction of San Roque, Bislig to Bunawan By-Pass Road, Sta. 14+885 - Sta. 18+978, Bislig City, Surigao del Sur","amountPesos":98000000.0,"lengthMeters":4093.0,"ratePesosPerMeter":23943.317859760566,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24259"},{"year":2026,"category":"Roads","project":"Construction of San Roque, Bislig to Bunawan Bypass Road, Sta. 8+785 - Sta. 8+985, Bunawan, Agusan del Sur","amountPesos":120864000.0,"lengthMeters":200.0,"ratePesosPerMeter":604320.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24261"},{"year":2026,"category":"Roads","project":"Construction of Sta. Irene - San Miguel Road, Sta. 19+631.26 - Sta. 25+572.26, Prosperidad, Agusan del Sur","amountPesos":147000000.0,"lengthMeters":5941.0,"ratePesosPerMeter":24743.309207204173,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24263"},{"year":2026,"category":"Roads","project":"Rehabilitation along Cabadbaran-Puting Bato-Lanuza Road, (5+900 - 7+800), City of Cabadbaran, Agusan del Norte","amountPesos":88200000.0,"lengthMeters":1900.0,"ratePesosPerMeter":46421.05263157895,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24265"},{"year":2026,"category":"Roads","project":"Construction of Padre Burgos By-Pass Road, Chainage 1272 - Chainage 2109","amountPesos":48051000.0,"lengthMeters":837.0,"ratePesosPerMeter":57408.602150537634,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24269"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cabawan - Barangay Carbon Road, Cabawan District (Sta. 000 + 000.00 - Sta. 001 + 000.00) , Tagbilaran City, Bohol","amountPesos":29070000.0,"lengthMeters":1000.0,"ratePesosPerMeter":29070.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24277"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Kauswagan, Trinidad to Barangay Tomoc, San Miguel, Bohol Sta. 0+000 - Sta.1+750","amountPesos":48488000.0,"lengthMeters":1750.0,"ratePesosPerMeter":27707.428571428572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24280"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Don Pedro Rodriguez - Barangay Lawis, Sta. 000+225 - Sta. 001+277, City of Bogo and San Remigio, Cebu","amountPesos":29070000.0,"lengthMeters":1052.0,"ratePesosPerMeter":27633.079847908746,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24283"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Salag to Barangay Odlot, Sta. 001 + 223 - Sta. 001 + 871 - Section 1 and Sta. 000 + 000 - Sta. 000 + 754 - Section 2, Tabogon and City of Bogo, Cebu","amountPesos":38760000.0,"lengthMeters":1402.0,"ratePesosPerMeter":27646.219686162625,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24285"},{"year":2026,"category":"Roads","project":"Construction of San Remigio - Tabuelan - Tabogon Road, Sta. 000+000 - Sta. 001+752.5, Cebu","amountPesos":48450000.0,"lengthMeters":1752.5,"ratePesosPerMeter":27646.219686162625,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24287"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bagacay to Barangay Concord, Hinabangan, Samar (Sta. 1+360-1+840)","amountPesos":27014000.0,"lengthMeters":480.0,"ratePesosPerMeter":56279.166666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24291"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Hinica-an to Barangay Malobago, Motiong, Samar (Sta. 0+745 - 1+500)","amountPesos":43416000.0,"lengthMeters":755.0,"ratePesosPerMeter":57504.6357615894,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24293"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Yabon to Barangay Cabalagnan, Hinabangan, Samar (Sta. 0+760 - 1+260)","amountPesos":27014000.0,"lengthMeters":500.0,"ratePesosPerMeter":54028.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24295"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bagong Oroquieta-Barangay Kabuhi-Barangay Magsaysay-Barangay Katipunan-NRJ Barangay Esperanza, Mahayag and Ramon Magsaysay, Zamboanga del Sur Sta 16+000 - Sta. 17+300","amountPesos":38588000.0,"lengthMeters":1300.0,"ratePesosPerMeter":29683.076923076922,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24299"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tungawan to Barangay Lower Tiparak, Tambulig, Zamboanga del Sur Sta 01+246 - Sta. 01+896","amountPesos":19294000.0,"lengthMeters":650.0,"ratePesosPerMeter":29683.076923076922,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24301"},{"year":2026,"category":"Roads","project":"Construction of Road, NRJ Barangay Ditulan - Barangay Guintananan - Barangay Canibongan - Barangay Malagalad - Barangay Macasing - Barangay Tamurayan - NRJ Valencia Bypass, Dumingag, Zamboanga del Sur Sta 02+253 - Sta. 03+203","amountPesos":29400000.0,"lengthMeters":950.0,"ratePesosPerMeter":30947.36842105263,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24303"},{"year":2026,"category":"Roads","project":"Construction of Jct. Camp Kibaritan-Pangantucan - Jct Guinoyoran-Valencia Road, Brgy. Portulin Section, Sta. 28+500 - Sta. 29+500, Pangantucan, Bukidnon","amountPesos":48191000.0,"lengthMeters":1000.0,"ratePesosPerMeter":48191.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24307"},{"year":2026,"category":"Roads","project":"Construction of Road (Ason Water-Source Section), Barangay Tuno, Sta. 0+000 - Sta. 0+300, Don Victoriano, Misamis Occidental","amountPesos":9438000.0,"lengthMeters":300.0,"ratePesosPerMeter":31460.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24310"},{"year":2026,"category":"Roads","project":"Construction of Road (Barangay Colambutan Settlement Section), Sta. 0+000 - Sta. 1+000, Tudela, Misamis Occidental","amountPesos":18877000.0,"lengthMeters":1000.0,"ratePesosPerMeter":18877.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24312"},{"year":2026,"category":"Roads","project":"Construction of Road (Barangay Lalud - Dawa Section), Sta. 0+000 - Sta. 0+300, Don Victoriano, Misamis Occidental","amountPesos":9438000.0,"lengthMeters":300.0,"ratePesosPerMeter":31460.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24314"},{"year":2026,"category":"Roads","project":"Construction of Road (Dinas - Estrella Section), Sta. 0+000 - Sta. 2+000, Sinacaban, Misamis Occidental","amountPesos":37754000.0,"lengthMeters":2000.0,"ratePesosPerMeter":18877.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24318"},{"year":2026,"category":"Roads","project":"Construction of Road (Kinangay Sur to Embargo Section), Sta. 0+000 - Sta. 0+500, Clarin - Ozamiz City, Misamis Occidental","amountPesos":9438000.0,"lengthMeters":500.0,"ratePesosPerMeter":18876.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24320"},{"year":2026,"category":"Roads","project":"Construction of Road (Kinuman Norte - Gala Section), Sta. 0+000 - Sta. 2+000, Ozamiz City, Misamis Occidental","amountPesos":37754000.0,"lengthMeters":2000.0,"ratePesosPerMeter":18877.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24322"},{"year":2026,"category":"Roads","project":"Construction of Road (National Highway - Bogo Calabat Section), P3 Barangay Petianan, Sta. 0+000 - Sta. 0+300, Don Victoriano, Misamis Occidental","amountPesos":9438000.0,"lengthMeters":300.0,"ratePesosPerMeter":31460.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24324"},{"year":2026,"category":"Roads","project":"Construction of Road (P1 - Sitio Lulungan Section), Barangay Lalud, Sta. 0+000 - Sta. 0+300, Don Victoriano, Misamis Occidental","amountPesos":9438000.0,"lengthMeters":300.0,"ratePesosPerMeter":31460.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24326"},{"year":2026,"category":"Roads","project":"Construction of Road (P1 Canibungan Proper Section), Sta. 0+000 - Sta. 0+250, Tudela, Misamis Occidental","amountPesos":4719000.0,"lengthMeters":250.0,"ratePesosPerMeter":18876.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24328"},{"year":2026,"category":"Roads","project":"Construction of Road (P6 Sitio Placer Section), Balon, Sta. 0+000 - Sta. 1+000, Tudela, Misamis Occidental","amountPesos":18877000.0,"lengthMeters":1000.0,"ratePesosPerMeter":18877.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24330"},{"year":2026,"category":"Roads","project":"Construction of Road (San Isidro Alto - San Isidro Bajo Section), Sta. 0+000 - Sta. 1+000, Sinacaban, Misamis Occidental","amountPesos":18877000.0,"lengthMeters":1000.0,"ratePesosPerMeter":18877.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24332"},{"year":2026,"category":"Roads","project":"Construction of Road (Sitio Ninang - New Municipal Site Section), Barangay Tuno, Sta. 0+000 - Sta. 0+300, Don Victoriano, Misamis Occidental","amountPesos":14158000.0,"lengthMeters":300.0,"ratePesosPerMeter":47193.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24334"},{"year":2026,"category":"Roads","project":"Construction of Road (Sitio Tigbacan - Sitio Moralong Section), Barangay Napangan, Sta. 0+000 - Sta. 0+650, Don Victoriano, Misamis Occidental","amountPesos":18877000.0,"lengthMeters":650.0,"ratePesosPerMeter":29041.53846153846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24336"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Diguan - Labinay - Gala Rd, Sta. 0+000 - Sta. 0+750, Ozamiz City, Misamis Occidental","amountPesos":14158000.0,"lengthMeters":750.0,"ratePesosPerMeter":18877.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24338"},{"year":2026,"category":"Roads","project":"Construction of Road from Barangay G. Pelaez to Barangay Cogon, Sta. 0+000 - Sta. 0+265, Gitagum, Misamis Oriental","amountPesos":4819000.0,"lengthMeters":265.0,"ratePesosPerMeter":18184.905660377357,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24341"},{"year":2026,"category":"Roads","project":"Construction of Road from Barangay Kibaghot to Barangay Gasi, Sta. 0+000 - Sta. 0+265, Laguindingan, Misamis Oriental","amountPesos":4819000.0,"lengthMeters":265.0,"ratePesosPerMeter":18184.905660377357,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24343"},{"year":2026,"category":"Roads","project":"Improvement of Road from Barangay San Pedro to Barangay Tawantawan, Sta. 0+000 - Sta. 0+160, Initao, Misamis Oriental","amountPesos":2891000.0,"lengthMeters":160.0,"ratePesosPerMeter":18068.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24345"},{"year":2026,"category":"Roads","project":"Construction of Coastal Road, Phase 4, (Sta. 0+000 - Sta. 3+120), Leyte to Capoocan, Leyte","amountPesos":115776000.0,"lengthMeters":3120.0,"ratePesosPerMeter":37107.692307692305,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24359"},{"year":2026,"category":"Roads","project":"Construction of Coastal Road from Barangay San Juan to Barangay Carmen, (0+000-0+080, 0+375-0+500), Loreto, Dinagat Islands","amountPesos":39200000.0,"lengthMeters":205.0,"ratePesosPerMeter":191219.51219512196,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24362"},{"year":2026,"category":"Roads","project":"Construction of Coastal Road, Barangay Salvacion, Malilipot, Albay, Sta. 0+000 - 0+350","amountPesos":29400000.0,"lengthMeters":350.0,"ratePesosPerMeter":84000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24366"},{"year":2026,"category":"Roads","project":"Construction of Batuan Coastal Road, Barangay Poblacion, Batuan, Masbate, Sta. 0+000 - Sta. 0+073","amountPesos":9762000.0,"lengthMeters":73.0,"ratePesosPerMeter":133726.02739726027,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24369"},{"year":2026,"category":"Roads","project":"Construction of Milagros Coastal Road, Milagros, Masbate, Sta. 0+447 - Sta. 0+505","amountPesos":49000000.0,"lengthMeters":58.0,"ratePesosPerMeter":844827.5862068966,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24372"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage (Sto. Niño Street - Junction BCIR), Barangay Lapasan, Sta. 0+130 - Sta. 0+530, Cagayan de Oro City","amountPesos":14158000.0,"lengthMeters":400.0,"ratePesosPerMeter":35395.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 24385"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay Paratong, Sta 0+128 - Sta 0+146, Santa Lucia, Ilocos Sur","amountPesos":16589000.0,"lengthMeters":18.0,"ratePesosPerMeter":921611.1111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25883"},{"year":2026,"category":"Roads","project":"Construction of Nangalisan-Nalbo-Tangid Road (Sta. 0+000 - Sta. 1+770), Laoag City, Ilocos Norte","amountPesos":147000000.0,"lengthMeters":1770.0,"ratePesosPerMeter":83050.84745762713,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25885"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Nangalisan (Sta. 0+000 - Sta. 0+681.60), Laoag City, Ilocos Norte","amountPesos":49000000.0,"lengthMeters":681.6,"ratePesosPerMeter":71889.67136150235,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25887"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage Structures, Sta. 0+700 - Sta. 0+925, in Barangay Bogtong Silag, Mangatarem, Pangasinan","amountPesos":9800000.0,"lengthMeters":225.0,"ratePesosPerMeter":43555.555555555555,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25889"},{"year":2026,"category":"Roads","project":"Rehabilitation of Roads, San Jose, San Fermin and Sobredillo Caba, La Union, Sta. 8+050-Sta.10+350","amountPesos":34300000.0,"lengthMeters":2300.0,"ratePesosPerMeter":14913.04347826087,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25891"},{"year":2026,"category":"Roads","project":"Construction of Coastal Road(16+588 - 17+088), Macaboboni, Agno, Pangasinan","amountPesos":9800000.0,"lengthMeters":500.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25893"},{"year":2026,"category":"Roads","project":"Construction of Road, Lucap Boulevard to Mangrove Park Access Road (0+341 - 5+656), Barangay Lucap, City of Alaminos, Pangasinan","amountPesos":147000000.0,"lengthMeters":5315.0,"ratePesosPerMeter":27657.572906867357,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25895"},{"year":2026,"category":"Roads","project":"Concreting of Access Road to Ilocos Norte Agricultural Trading Center, Brgy. Billoca, Batac City, Ilocos Norte, STATION 0+218 - STATION 0+550","amountPesos":60000000.0,"lengthMeters":332.0,"ratePesosPerMeter":180722.89156626505,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25897"},{"year":2026,"category":"Roads","project":"Concreting  of 1.2 km Road at Brgy. Casilian, Bacarra, Ilocos Norte, STATION 0+000 - STATION 1+200","amountPesos":18000000.0,"lengthMeters":1200.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25899"},{"year":2026,"category":"Roads","project":"Concreting of 1.5 km Sitio-Pitpitac Road at Brgy. Sumader, Batac City, Ilocos Norte, STATION 0+000 - STATION 1+500","amountPesos":22000000.0,"lengthMeters":1500.0,"ratePesosPerMeter":14666.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25901"},{"year":2026,"category":"Roads","project":"Concreting of 1.09 km Camara-Napu Road at Brgy. Colo Batac City, Ilocos Norte, STATION 0+000 - STATION 1+090","amountPesos":24000000.0,"lengthMeters":1090.0,"ratePesosPerMeter":22018.34862385321,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25903"},{"year":2026,"category":"Roads","project":"Concreting of 1.3 km Cabaroan Road at Parangopong, Batac City, Ilocos Norte, STATION 0+000 - STATION 1+300","amountPesos":30000000.0,"lengthMeters":1300.0,"ratePesosPerMeter":23076.923076923078,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25905"},{"year":2026,"category":"Roads","project":"Concreting of 2.08 km Road at Brgy. San Lorenzo, San Nicolas, Ilocos Norte, STATION 0+000 - STATION 2+080","amountPesos":31000000.0,"lengthMeters":2080.0,"ratePesosPerMeter":14903.846153846154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25907"},{"year":2026,"category":"Roads","project":"Concreting of 1.06 km Road at Brgy. San Guillermo, San Nicolas, Ilocos Norte,  STATION 0+000 - STATION 1+060","amountPesos":15000000.0,"lengthMeters":1060.0,"ratePesosPerMeter":14150.943396226416,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25909"},{"year":2026,"category":"Roads","project":"Construction of Road, Payac, Bangui - Tadao, Pasuquin, Sta 0+000 - Sta 1+365, Bangui, Ilocos Norte","amountPesos":196000000.0,"lengthMeters":1365.0,"ratePesosPerMeter":143589.7435897436,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25911"},{"year":2026,"category":"Roads","project":"Improvement of Road at Uma dam, Sitio Banneng, Barangay Calacad, Sta. 0 + 000 - Sta. 0 + 300, Tabuk City, Kalinga","amountPesos":4900000.0,"lengthMeters":300.0,"ratePesosPerMeter":16333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25915"},{"year":2026,"category":"Roads","project":"Improvement of Roads at Barangay Tulgao East/Tulgao West, Sta.000+0-Sta.000+160, Tinglayan, Kalinga","amountPesos":5000000.0,"lengthMeters":160.0,"ratePesosPerMeter":31250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25917"},{"year":2026,"category":"Roads","project":"Improvement of Roads at Barangay Lucog, Sta. 0 + 000 - Sta. 0 + 300, City of Tabuk, Kalinga","amountPesos":4900000.0,"lengthMeters":300.0,"ratePesosPerMeter":16333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25919"},{"year":2026,"category":"Roads","project":"Improvement of Roads at Barangay Matucnang, Sta. 0 + 000 - Sta. 0 + 250, City of Tabuk, Kalinga","amountPesos":4900000.0,"lengthMeters":250.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25921"},{"year":2026,"category":"Roads","project":"Improvement of Roads at Sitio Cagaligan, Barangay Bantay, Sta. 0 + 000 - Sta. 0 + 350, City of Tabuk, Kalinga","amountPesos":4900000.0,"lengthMeters":350.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25923"},{"year":2026,"category":"Roads","project":"Road Concreting at Conon St., Sta. 0+000 - Sta. 0+210, Barangay Irisan, Baguio City","amountPesos":4900000.0,"lengthMeters":210.0,"ratePesosPerMeter":23333.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25925"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage Structure, Sta. 0+000 - Sta. 0+173, Bakakeng Central, Baguio City","amountPesos":4900000.0,"lengthMeters":173.0,"ratePesosPerMeter":28323.699421965317,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25927"},{"year":2026,"category":"Roads","project":"Rehabilitation of Roads at Anuling, Nabhingan, Balitang, Hingyon, Sta.0+000 – Sta.0+700, Ifugao","amountPesos":24500000.0,"lengthMeters":700.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25947"},{"year":2026,"category":"Roads","project":"Concreting of Road Brgy Namnama, Sta. 0+000 - Sta. 1+450 Section 1, Sta. 0+000 - Sta. 0+980 Section 2, Sta. 0+000 - Sta. 2+320 Section 3, Sta. 0+000 - Sta. 0+980 Section 4, Cabatuan, Isasbela","amountPesos":96671000.0,"lengthMeters":2320.0,"ratePesosPerMeter":41668.53448275862,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25950"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road (3.3 km Culung-Taribubu Road) in Brgy. Tuao East, Tuao, Cagayan","amountPesos":56100000.0,"lengthMeters":3300.0,"ratePesosPerMeter":17000.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25954"},{"year":2026,"category":"Roads","project":"Construction of Bypass Road, Iba- Botolan Sta. Barbara - Amungan Section, Iba, Zambales Sta. 12+710.00 - Sta. 14+210.00","amountPesos":94143000.0,"lengthMeters":1500.0,"ratePesosPerMeter":62762.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25959"},{"year":2026,"category":"Roads","project":"Construction of Camposanto 1 Norte - Tubectubang Road (Tubectubang Section), Moncada, Tarlac, Sta. 2+668.00 - Sta. 3+765.00","amountPesos":127400000.0,"lengthMeters":1097.0,"ratePesosPerMeter":116134.91340018231,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25961"},{"year":2026,"category":"Roads","project":"Construction of Esplanade Road along Bagac River, Barangay Ibis, Bagac, Bataan, Sta. 0 + 000 - Sta. 1 + 848","amountPesos":98000000.0,"lengthMeters":1848.0,"ratePesosPerMeter":53030.30303030303,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25963"},{"year":2026,"category":"Roads","project":"Construction of Pamonoran-Canaynayan- Maconao-Maconao Road, Sta. Cruz, Zambales Sta. 0+000.00 - Sta. 2+000.00","amountPesos":94143000.0,"lengthMeters":2000.0,"ratePesosPerMeter":47071.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25965"},{"year":2026,"category":"Roads","project":"Construction of Parsolingan - Baculong Diversion Road (Segment 6), Gerona, Tarlac, Sta.3+081.26 - Sta. 3+957.30","amountPesos":78400000.0,"lengthMeters":876.04,"ratePesosPerMeter":89493.63042783435,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25967"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay San Fernando, Sta. Cruz, Zambales Sta. 0+000.00 - Sta. 2+000.00","amountPesos":94143000.0,"lengthMeters":2000.0,"ratePesosPerMeter":47071.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25969"},{"year":2026,"category":"Roads","project":"Construction of Road with Line Canal, Barangay Santo Cristo Sur, City of Gapan, Nueva Ecija, Sta. 0+000 - Sta. 1+000","amountPesos":147000000.0,"lengthMeters":1000.0,"ratePesosPerMeter":147000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25971"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tibag, City of Tarlac, Tarlac, Sta. 0+000.00 - Sta. 1+035.00","amountPesos":56486000.0,"lengthMeters":1035.0,"ratePesosPerMeter":54575.84541062802,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25973"},{"year":2026,"category":"Roads","project":"Construction of Road, Concepcion-Bamban going to New Clark City Bypass Road, Concepcion, Tarlac, Sta. 0+000.00 - Sta. 0+450","amountPesos":93100000.0,"lengthMeters":450.0,"ratePesosPerMeter":206888.88888888888,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25975"},{"year":2026,"category":"Roads","project":"Construction of San Clemente - Mayantoc Diversion Road (Bacsay - Carabaoan Section), Tarlac, Sta. 0+000.00 - Sta. 2+879.00","amountPesos":98000000.0,"lengthMeters":2879.0,"ratePesosPerMeter":34039.59708232025,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25977"},{"year":2026,"category":"Roads","project":"Construction of San Clemente - Mayantoc Diversion Road (Bacsay Section), Tarlac, Sta. 2+879.00 - 5+761.00","amountPesos":98000000.0,"lengthMeters":2882.0,"ratePesosPerMeter":34004.16377515614,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25979"},{"year":2026,"category":"Roads","project":"Construction of Sta. Ignacia - Paniqui Diversion Road, Tarlac, Sta. 0+000.00 - Sta. 2+683.00","amountPesos":98000000.0,"lengthMeters":2683.0,"ratePesosPerMeter":36526.27655609392,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25981"},{"year":2026,"category":"Roads","project":"Improvement of Estipona - Poblacion 1 Road, Pura, Tarlac, Sta. 0+000.00 - Sta. 3+675.00","amountPesos":70607000.0,"lengthMeters":3675.0,"ratePesosPerMeter":19212.789115646257,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25985"},{"year":2026,"category":"Roads","project":"Improvement of Maluid - San Agustin Road, Victoria, Tarlac, Sta. 0+000.00 - Sta. 2+049.00","amountPesos":70607000.0,"lengthMeters":2049.0,"ratePesosPerMeter":34459.24841386042,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25987"},{"year":2026,"category":"Roads","project":"Improvement of Road leading to Tarlac Ecotourism Park (Annex 3), San Jose, Tarlac, Sta. 0+000.00 - Sta. 1+534.00","amountPesos":79080000.0,"lengthMeters":1534.0,"ratePesosPerMeter":51551.499348109515,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25989"},{"year":2026,"category":"Roads","project":"Construction of Camposanto 1 Norte - Tubectubang Road (Tubectubang Section), Moncada, Tarlac, Sta. 3+829.00 - Sta. 4+437.00","amountPesos":98000000.0,"lengthMeters":608.0,"ratePesosPerMeter":161184.2105263158,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25995"},{"year":2026,"category":"Roads","project":"Improvement of Road along Barangay Culis - Sitio Sta. Maria -Tama, Hermosa, Bataan, Sta 0+000 - Sta 3+250","amountPesos":54243000.0,"lengthMeters":3250.0,"ratePesosPerMeter":16690.153846153848,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25997"},{"year":2026,"category":"Roads","project":"Improvement of Road along Barangay Pandatung- Sumalo- Sibul, Hermosa and Orani, Bataan, Sta 0 + 000 -  Sta 3+800","amountPesos":90626000.0,"lengthMeters":3800.0,"ratePesosPerMeter":23848.947368421053,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 25999"},{"year":2026,"category":"Roads","project":"Improvement of Road along Barangay Gugo connecting Roman Expressway to Calaguiman Vicinal Rd., Samal, Bataan, Sta 0+000 - Sta 3+500","amountPesos":87710000.0,"lengthMeters":3500.0,"ratePesosPerMeter":25060.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26001"},{"year":2026,"category":"Roads","project":"Improvement of Road along Barangay Bacong, Hermosa, Bataan, Sta 0+ 000 - Sta 2 + 500","amountPesos":61422000.0,"lengthMeters":2500.0,"ratePesosPerMeter":24568.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26003"},{"year":2026,"category":"Roads","project":"Construction of Road (EGSA Extension) Barangay Tuyo and Munting Batangas, Balanga City, Bataan, Sta. 0+000 - Sta. 1+358","amountPesos":139750000.0,"lengthMeters":1358.0,"ratePesosPerMeter":102908.68924889543,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26011"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Cawag, Subic, Zambales, 6+838 - 6+975 (B/S), 7+320 - 8+994 (L/S), 7+334 - 7+730 (R/S), 7+912 - 7+979 (R/S), 8+200 - 8+344 (R/S), 8+652 - 8+994 (R/S), 9+100 - 9+319 (L/S), 9+328 - 9+420 (L/S), 9+445 - 9+972 (L/S), 9+995 - 10+062 (L/S), 10+220 - 10+337 (L/S), 10+928 - 11+000 (L/S), 9+084 -9+102 (R/S), 9+138 - 9+242 (R/S), 9+671 - 9+954 (R/S), 10+008 - 10+085 (R/S), 10+219 - 10+337 (R/S), 10+928 - 10+998 (R/S), 11+540 - 15+234(B/S)","amountPesos":100000000.0,"lengthMeters":6639.0,"ratePesosPerMeter":15062.509414068383,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26013"},{"year":2026,"category":"Roads","project":"Construction of Road, Tingloy Circumferential Road, Sta.15+140 - Sta.15+445.60, Tingloy, Batangas","amountPesos":80185000.0,"lengthMeters":305.6,"ratePesosPerMeter":262385.4712041882,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26016"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System at the Silangan-Pintong Bukawe Road, Sta. 1+150 - Sta. 2+520, San Mateo, Rizal","amountPesos":96102000.0,"lengthMeters":1370.0,"ratePesosPerMeter":70147.44525547445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26020"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage Canal with Pumping Station, Barangay De La Paz STA 0+000 - STA 0+150, Binan City, Laguna","amountPesos":144153000.0,"lengthMeters":150.0,"ratePesosPerMeter":961020.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26022"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Bignay, Barangay Bugaan West, Sta. 0+000 - Sta. 0+200, Laurel, Batangas","amountPesos":4805000.0,"lengthMeters":200.0,"ratePesosPerMeter":24025.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26026"},{"year":2026,"category":"Roads","project":"Construction of Road Barangay Bukal, Sta. 0+000 - Sta. 0+400, Taysan, Batangas","amountPesos":4805000.0,"lengthMeters":400.0,"ratePesosPerMeter":12012.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26028"},{"year":2026,"category":"Roads","project":"Construction of Barangay Road Sta. 0+000 - Sta 0+350, Barangay San Jose, Tuy, Batangas","amountPesos":4805000.0,"lengthMeters":350.0,"ratePesosPerMeter":13728.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26036"},{"year":2026,"category":"Roads","project":"Construction of Road, Sandoval Proper to Sitio Barak Barakan, Sta. 1+000 - Sta. 3+680, Barangay Sandoval, Bataraza, Palawan","amountPesos":55625000.0,"lengthMeters":2680.0,"ratePesosPerMeter":20755.597014925374,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26039"},{"year":2026,"category":"Roads","project":"Construction of Canarom- Florista (Jovellar) Road (Sta. 0+000 - Sta. 0+940), Daraga, Albay","amountPesos":58574000.0,"lengthMeters":940.0,"ratePesosPerMeter":62312.765957446805,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26046"},{"year":2026,"category":"Roads","project":"Construction of Carayat-San Fernando-San Rafael Road, Prieto Diaz, Sorsogon, Section 1 Sta. 0+000 - Sta. 2+200, Section 2 Sta. 0+000 - Sta. 1+900","amountPesos":97624000.0,"lengthMeters":2200.0,"ratePesosPerMeter":44374.545454545456,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26048"},{"year":2026,"category":"Roads","project":"Construction of Paved Access Road including Drainage System along Barangay Talahib (Sta. 1+640 - 2+296), Daraga, Albay","amountPesos":29400000.0,"lengthMeters":656.0,"ratePesosPerMeter":44817.07317073171,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26050"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Manangle, Camarines Sur, Sta. 4+465 - Sta. 4+965","amountPesos":19600000.0,"lengthMeters":500.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26052"},{"year":2026,"category":"Roads","project":"Construction of Paved Road Comun-Binitayan, Barangay Comun and Barangay Binitayan (Sta. 0+626 - Sta. 1+043), Camalig, Albay","amountPesos":29400000.0,"lengthMeters":417.0,"ratePesosPerMeter":70503.59712230216,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26054"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Masalong - Salong, Sta. 0+000 - Sta. 0+363, Mercedes, Camarines Norte","amountPesos":4881000.0,"lengthMeters":363.0,"ratePesosPerMeter":13446.280991735537,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26056"},{"year":2026,"category":"Roads","project":"Construction of Road, Camp Wenceslao Q. Vinzons (PNP), Barangay Dogongan, Sta. 0+330 - Sta. 0+550.18, Daet, Camarines Norte","amountPesos":5857000.0,"lengthMeters":220.18,"ratePesosPerMeter":26600.96284857844,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26058"},{"year":2026,"category":"Roads","project":"Construction of Road, Mayon Circumferential Road Sta. 0+000 - Sta. 3+200, Package 1, Camalig, Albay","amountPesos":312396000.0,"lengthMeters":3200.0,"ratePesosPerMeter":97623.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26060"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Bayabas, Barangay Gubat, Site 1 Sta. 0+025 - Sta. 0+212, Site 2 Sta. 0+000 - Sta. 0+144, Site 3 Sta. 0+000 - Sta. 0+032.00, Site 4 Sta. 0+000 - Sta. 0+034, Site 5 Sta. 0+000 - Sta. 0+037, Daet, Camarines Norte","amountPesos":4881000.0,"lengthMeters":212.0,"ratePesosPerMeter":23023.584905660377,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26062"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Tuba-Brgy. Malapoc, Donsol, Sorsogon, STA. 0+000 - STA. 0+750","amountPesos":75000000.0,"lengthMeters":750.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26064"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Juan Adre to Barangay Parina, Donsol, Sorsogon, STA. 0+000 - STA. 0+760","amountPesos":75000000.0,"lengthMeters":760.0,"ratePesosPerMeter":98684.21052631579,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26066"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay Bakhaw Sur, Kalibo, Aklan - 0 + 000 - 1 + 500","amountPesos":19600000.0,"lengthMeters":1500.0,"ratePesosPerMeter":13066.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26075"},{"year":2026,"category":"Roads","project":"Concreting of Road, Barangay Libertad, Tapaz, Capiz - Sta. 2+520 - Sta. 2+800","amountPesos":4784000.0,"lengthMeters":280.0,"ratePesosPerMeter":17085.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26077"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Cangumantong Lazi - Luzong - Tebjong - Cantabon Siquijor, Barangay Cangumantong, Lazi, Siquijor, Segment 1: Sta. 1+566 - Sta. 1+792, Segment 2: Sta. 1+936 - Sta. 3+675","amountPesos":98000000.0,"lengthMeters":1965.0,"ratePesosPerMeter":49872.77353689567,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26080"},{"year":2026,"category":"Roads","project":"Construction of Local Access Road, Sta. 0+706 - Sta. 3+706, Barangay Zone 4A to Brgy. Patic, Pulupandan, Negros Occidental","amountPesos":100000000.0,"lengthMeters":3000.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26082"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Camansi, Kabankalan City, Negros Occidental (Sta. 0 + 726 - Sta. 1 + 055)","amountPesos":4900000.0,"lengthMeters":329.0,"ratePesosPerMeter":14893.617021276596,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26084"},{"year":2026,"category":"Roads","project":"Construction of Roads with Drainage System, Barangay Cogon, Barangay Booy and Barangay Taloto, Tagbilaran City, Bohol (Sta. 000+000.00 - Sta. 001+ 500.00)","amountPesos":96975000.0,"lengthMeters":1500.0,"ratePesosPerMeter":64650.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26087"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay Matalao to Barangay Kanyuko Sta. 0+160 - Sta. 2+485, Dumanjug, Cebu","amountPesos":100000000.0,"lengthMeters":2325.0,"ratePesosPerMeter":43010.75268817204,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26093"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay Kanyuko to Barangay Matalao, Sta. 1+512 - Sta. 2+670 & Sta. 3+146 - Sta. 4+313, Dumanjug, Cebu","amountPesos":100000000.0,"lengthMeters":2325.0,"ratePesosPerMeter":43010.75268817204,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26095"},{"year":2026,"category":"Roads","project":"Construction of Jurado Road (w/ Box culvert), Sta. 000+000 - Sta. 001+600, Bogo City, Cebu","amountPesos":65500000.0,"lengthMeters":1600.0,"ratePesosPerMeter":40937.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26103"},{"year":2026,"category":"Roads","project":"Construction of Road at Brgy. Dakit to Guinbiktan to Brgy. Lapaz, Sta. 000+000 - Sta. 002+328, Bogo City, Cebu","amountPesos":72250000.0,"lengthMeters":2328.0,"ratePesosPerMeter":31035.223367697596,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26105"},{"year":2026,"category":"Roads","project":"Construction of Road at Brgy. Lapaz to Sitio Combado, Brgy. Guadalupe, Sta. 000+000 - Sta. 004+108, Bogo City, Cebu","amountPesos":114500000.0,"lengthMeters":4108.0,"ratePesosPerMeter":27872.444011684518,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26107"},{"year":2026,"category":"Roads","project":"Construction of Road at Purok 7, Sitio Mangga to Purok 2, Sitio Lomboy, Sta. 000+000 - Sta. 002+000, Bogo City, Cebu","amountPesos":50750000.0,"lengthMeters":2000.0,"ratePesosPerMeter":25375.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26109"},{"year":2026,"category":"Roads","project":"Improvement of Road in Tindalo Street and Narra Street, Barangay Ubujan, Tagbilaran City, Bohol, Sta.0000+000.000 - Sta.0001+700.000","amountPesos":75000000.0,"lengthMeters":1700.0,"ratePesosPerMeter":44117.64705882353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26113"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Pascual - Barangay San Vicente, Ubay, Bohol Sta. 0+000-Sta. 2+000","amountPesos":48450000.0,"lengthMeters":2000.0,"ratePesosPerMeter":24225.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26115"},{"year":2026,"category":"Roads","project":"Construction of Coastal Road, Barangay Espinosa to Barangay Gutosan (Sta. 0+565 - Sta. 0+765) , Calubian, Leyte","amountPesos":94551000.0,"lengthMeters":200.0,"ratePesosPerMeter":472755.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26118"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Tinghub to Brgy. Poblacion del Norte - (Sta. 0+000 - Sta. 1+200), Villaba, Leyte","amountPesos":52920000.0,"lengthMeters":1200.0,"ratePesosPerMeter":44100.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26120"},{"year":2026,"category":"Roads","project":"Construction of Road, JNR Brgy. A. Tumamak, Brgy. A. Tumamak - (Sta. 0+000 - Sta. 1+200), Villaba, Leyte","amountPesos":51940000.0,"lengthMeters":1200.0,"ratePesosPerMeter":43283.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26124"},{"year":2026,"category":"Roads","project":"Construction of Government Center Bypass Road, Sta. 0+000 - Sta. 1+000, Sta. 1+025 - Sta. 1+314.40, Barangay Pawing to Barangay Baras, Palo, Leyte","amountPesos":90209000.0,"lengthMeters":1289.4,"ratePesosPerMeter":69961.99782844733,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26128"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Agrupacion - Barangay Jolacao - Barangay Campeig, Sta. 0+000 - Sta.2+900, Sta. Margarita, Samar","amountPesos":113847000.0,"lengthMeters":2900.0,"ratePesosPerMeter":39257.58620689655,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26132"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Dagum, Sta. 0+000 - Sta. 0+295, Calbayog City, Samar","amountPesos":95515000.0,"lengthMeters":295.0,"ratePesosPerMeter":323779.66101694916,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26136"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay E. Duran to San Isidro to Lope de Vega Road, Sta. 000+000 - Sta. 001+200, Bobon, Northern Samar","amountPesos":60783000.0,"lengthMeters":1200.0,"ratePesosPerMeter":50652.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26138"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Guintampilan to Barangay Pondang to Barangay Cambuhay, Daram, Samar (Sta. 0+000 - 1+000)","amountPesos":98490000.0,"lengthMeters":1000.0,"ratePesosPerMeter":98490.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26140"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Labangbaybay - Barangay Baguiw, Sta. 0+000 - Sta. 1+150, Tagapul-an, Samar","amountPesos":86832000.0,"lengthMeters":1150.0,"ratePesosPerMeter":75506.08695652174,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26142"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Palencia - Barangay Awang, Tarangnan, Samar to Barangay Sinit-an - Barangay Guadalupe - Barangay Hernandez, Sta. 0+000 - Sta. 2+050, San Jorge, Samar","amountPesos":107762000.0,"lengthMeters":2050.0,"ratePesosPerMeter":52566.829268292684,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26144"},{"year":2026,"category":"Roads","project":"Construction of Barangay Fatima - Jct. Barangay Kauswagan - Barangay Cadaruhan Sur Road, Malitbog, Southern Leyte Section 1 (Sta. 4+143.5 - Sta. 5+270) Section 2 (Sta. 0+000 - Sta. 1+290)","amountPesos":68600000.0,"lengthMeters":2416.5,"ratePesosPerMeter":28388.164701013862,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26148"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mahayag - Barangay Rizal - Barangay Inubod, Sta. 0+000 - Sta. 1+600, Matuguinao, Samar","amountPesos":93590000.0,"lengthMeters":1600.0,"ratePesosPerMeter":58493.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26150"},{"year":2026,"category":"Roads","project":"Construction of Borongan Diversion Road, Borongan City, Eastern Samar (Sta. 0+941.56 - Sta. 2+745.12)","amountPesos":187670000.0,"lengthMeters":1803.56,"ratePesosPerMeter":104055.31282574464,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26152"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Matobato, Sta. 0+355 - Sta. 0+932, Calbayog City, Samar","amountPesos":98980000.0,"lengthMeters":577.0,"ratePesosPerMeter":171542.4610051993,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26154"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Blanca Aurora - Barangay Moboob, Sta. 1+400 - Sta. 3+640, San Jorge, Samar","amountPesos":104860000.0,"lengthMeters":2240.0,"ratePesosPerMeter":46812.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26156"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Lagundi to Barangay Pangdan to Barangay Tagbayaon, (Sta. 0+000 - 1+200), Catbalogan City, Samar","amountPesos":98000000.0,"lengthMeters":1200.0,"ratePesosPerMeter":81666.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26158"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Barangay Canmucat to Barangay Inasudlan, (Sta. 0+000 - 1+100), Villareal, Samar","amountPesos":88200000.0,"lengthMeters":1100.0,"ratePesosPerMeter":80181.81818181818,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26160"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Roque to Barangay Estaka, Catbalogan City, Samar (Sta. 0+000 - 0+500)","amountPesos":97927000.0,"lengthMeters":500.0,"ratePesosPerMeter":195854.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26194"},{"year":2026,"category":"Roads","project":"Construction of San Policarpo - Gadgaran Diversion Road, Sta. 0+220 - Sta. 0+550, Calbayog City, Samar","amountPesos":104199000.0,"lengthMeters":330.0,"ratePesosPerMeter":315754.54545454547,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26196"},{"year":2026,"category":"Roads","project":"Rehabilitation of Simora – Palapag Road (Sta. 10+250 - Sta. 11+015, Sta. 11+568 - Sta. 11+703, Sta. 11+743.50 - Sta. 11+829, Sta. 11+950.50 - Sta.12+409.50, Sta. 13+224 - Sta. 13+273.50, Sta. 14+502 - Sta.14+533.50, Sta. 14+574 - Sta. 14+592, Sta. 14+650.50 - Sta. 14+691, Sta. 14+731.50 - Sta. 14+767.50, Sta. 14+821.50 - Sta.14+862, Sta. 15+123 - Sta. 15+132, Sta. 15+361.50 - Sta.15+384, Sta. 15+561 - Sta. 15+597, Sta. 15+709.50 - Sta. 15+741, Sta. 15+966 - Sta. 16+006.50, Sta. 16+020 - Sta. 16+033.50, Sta. 16+065 - Sta. 16+105.50, Sta. 16+119 - Sta. 16+191, Sta. 16+236 - Sta. 16+254, Sta. 16+281 - Sta. 16+326, Sta. 16+348.50 - Sta. 16+398, Sta. 16+443 - Sta. 16+515, Sta. 16+632 - Sta. 16+641, Sta. 16+654.50 - Sta. 16+681.50, Sta. 16+713 - Sta. 16+785, Sta. 16+812 - Sta. 16+821), Laoang and Palapag, Northern Samar","amountPesos":96480000.0,"lengthMeters":2227.5,"ratePesosPerMeter":43313.131313131315,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26198"},{"year":2026,"category":"Roads","project":"Construction of Road, Bangdayan-Parangan, Barangay Kan Mindus, Luuk, Sulu Sta. 0+000 - Sta. 0+540","amountPesos":28941000.0,"lengthMeters":540.0,"ratePesosPerMeter":53594.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26201"},{"year":2026,"category":"Roads","project":"Concrete Rehabilitation of Kulasi to Poblacion Road, Brgy. Kulasi, Maimbung Sulu Sta. 4+000 - Sta. 5+600","amountPesos":40000000.0,"lengthMeters":1600.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26203"},{"year":2026,"category":"Roads","project":"Concrete Rehabilitation of Kulasi to Lagasan Road, Brgy. Kulasi, Maimbung Sulu Sta. 8+000 - Sta. 9+600","amountPesos":40000000.0,"lengthMeters":1600.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26205"},{"year":2026,"category":"Roads","project":"Concrete Rehabilitation of Kulasi to Kapok Punggol Road, Brgy. Kulasi, Maimbung Sulu Sta. 2+000 - Sta. 3+600","amountPesos":40000000.0,"lengthMeters":1600.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26207"},{"year":2026,"category":"Roads","project":"Concrete Rehabilitation of Kulasi to Bato Ugis Road, Brgy. Kulasi, Maimbung Sulu Sta. 6+000 - Sta. 7+600","amountPesos":30000000.0,"lengthMeters":1600.0,"ratePesosPerMeter":18750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26209"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road of Parang - Maimbung Road, Maimbung, Province of Sulu Sta. 0+000 - Sta. 1+600","amountPesos":20000000.0,"lengthMeters":1600.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26211"},{"year":2026,"category":"Roads","project":"Road Concreting of Barangay Sumilong, Payao, Zamboanga Sibugay, Sta. 00+000 - Sta. 01+120","amountPesos":19600000.0,"lengthMeters":1120.0,"ratePesosPerMeter":17500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26213"},{"year":2026,"category":"Roads","project":"Improvement of La Victoria - New Bataan Road, La Libertad, Zamboanga del Norte - Sta. 0+000 - Sta. 0+575, Sta. 0+859 - Sta. 0+897, Sta. 1+669 - Sta. 2+019","amountPesos":19600000.0,"lengthMeters":963.0,"ratePesosPerMeter":20353.06334371755,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26215"},{"year":2026,"category":"Roads","project":"Construction of Road, Isla Verde-Sitio Cawa-Cawa, Barangay Maligaya, City of Lamitan, Basilan Sta. 0+475 - Sta. 1+346","amountPesos":48235000.0,"lengthMeters":871.0,"ratePesosPerMeter":55378.8748564868,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26217"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Darussalam -Barangay Darul Akram - Barangay Sikullis Road, Languyan, Tawi-Tawi Sta. 0+000 - Sta. 2+000","amountPesos":67530000.0,"lengthMeters":2000.0,"ratePesosPerMeter":33765.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26219"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Upper Sappang- Baobo Road, Barangay Kan-Mindus, Luuk, Sulu Sta. 0+000 - Sta. 1+560","amountPesos":48235000.0,"lengthMeters":1560.0,"ratePesosPerMeter":30919.871794871793,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26221"},{"year":2026,"category":"Roads","project":"Rehabilitation of Damaged Pavement along Cadra New Capitol Road Sta. 0+300 to Sta. 1+800 Sulu","amountPesos":50000000.0,"lengthMeters":1500.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26225"},{"year":2026,"category":"Bridges","project":"Construction of Bridge connecting Barangay Dumarait and Barangay Rosario, Sta. 3+355 - Sta. 3+395, Balingasag, Misamis Oriental","amountPesos":73316000.0,"lengthMeters":40.0,"ratePesosPerMeter":1832900.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26230"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tubod,  Sta. 0+000 - Sta. 0+200, Iligan City","amountPesos":4819000.0,"lengthMeters":200.0,"ratePesosPerMeter":24095.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26232"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Maria Cristina, Sta. 0+000 - Sta. 0+180, Iligan City","amountPesos":4819000.0,"lengthMeters":180.0,"ratePesosPerMeter":26772.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26234"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Adelfa, Barangay San Roque, Sta. 0+000 - Sta. 0+450, Iligan City, Lanao del Norte","amountPesos":9638000.0,"lengthMeters":450.0,"ratePesosPerMeter":21417.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26236"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Dapao, Pualas, Sta. 0+000 - Sta. 0+815, Lanao del Sur","amountPesos":19276000.0,"lengthMeters":815.0,"ratePesosPerMeter":23651.53374233129,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26240"},{"year":2026,"category":"Roads","project":"Construction of Road, Balabagan, Sta. 0+000 - Sta. 0+250, Lanao del Sur","amountPesos":4819000.0,"lengthMeters":250.0,"ratePesosPerMeter":19276.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26242"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Maidan to Brgy Pindolonan 1, Tugaya, Sta. 0+000 - Sta. 0+410, Lanao del Sur","amountPesos":9438000.0,"lengthMeters":410.0,"ratePesosPerMeter":23019.51219512195,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26244"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Poblacion, (Section A: Sta. 0+271 - Sta. 0+846, Section B: Sta. 0+000 - Sta. 0+274, Section C: Sta. 0+000 -  Sta. 0+697.50), Sugbongcogon, Misamis Oriental","amountPesos":38552000.0,"lengthMeters":846.0,"ratePesosPerMeter":45569.73995271868,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26246"},{"year":2026,"category":"Roads","project":"﻿Construction of Road, Sitio Bagalangit to Kalugmanan Proper, Sta. 0+000 to Sta. 3+000, Brgy. Kalugmanan, Manolo Fortich, Bukidnon","amountPesos":90000000.0,"lengthMeters":3000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26248"},{"year":2026,"category":"Roads","project":"Construction of Road, Jct. Sayre Highway (Jct. Bukidnon-Davao City Road-Cotabato Boundary) Barangay Pagompong-Sitio Buluan- Sitio Kinapat-Sitio Kiraon-Sitio Kilaolao-Sitio Migcawayan, Brgy Kinapat - Brgy. Kiraon Section, Sta. 2+780 - Sta. 5+280, Damulog, Bukidnon","amountPesos":100000000.0,"lengthMeters":2500.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26250"},{"year":2026,"category":"Roads","project":"Construction of road, Jct. Sayre Highway (Jct. Bukidnon-Davao City Road-Cotabato Boundary) Barangay Pagompong-Sitio Buluan-Sitio Kinapat-Sitio Kiraon-Sitio Kilaolao-Sitio Migcawayan, Barangay Kiraon-Barangay Migcawayan Section, Sta. 5+280 - Sta. 9+155, Damulog, Bukidnon","amountPesos":155000000.0,"lengthMeters":3875.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26254"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, (Sta. 2+214 - Sta. 2+ 742.6), Barangay Ngingir Kabasaran, Pagayawan, Lanao del Sur","amountPesos":9438000.0,"lengthMeters":528.6,"ratePesosPerMeter":17854.710556186154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26258"},{"year":2026,"category":"Roads","project":"Construction of Road, Baganga Diversion Road to Sitio Tayudong, Sta. 0+000 -Sta. 3+703.5, Barangay Salingcomot, Baganga, Davao Oriental","amountPesos":92731000.0,"lengthMeters":3703.5,"ratePesosPerMeter":25038.74713109221,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26261"},{"year":2026,"category":"Roads","project":"Construction of Road Barangay Semong to Barangay Katipunan, Kapalong (Sta. 0+000 - Sta. 3+650), Davao del Norte","amountPesos":101450000.0,"lengthMeters":3650.0,"ratePesosPerMeter":27794.520547945205,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26263"},{"year":2026,"category":"Roads","project":"Construction of Road Connecting Barangay Calapagan to Barangay Maragatas, Lupon, Davao Oriental - Sta. 1513+898.70 - Sta. 1514+661.20, Sta. 1515+697 - Sta. 1518+134.50","amountPesos":98000000.0,"lengthMeters":3200.0,"ratePesosPerMeter":30625.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26265"},{"year":2026,"category":"Roads","project":"Construction of Datu Balong to Jct. Bukidnon - Compostela Valley Road (via Pinamuno Elementary School), San Isidro (Sta. 0+000 - Sta. 2+480 ) Davao del Norte","amountPesos":99833000.0,"lengthMeters":2480.0,"ratePesosPerMeter":40255.24193548387,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26267"},{"year":2026,"category":"Roads","project":"Construction of San Isidro-Mamangan-Pinamuno-Datu Balong Road, Sawata (Sta. 0+000 - Sta. 2+360 ) Davao del Norte","amountPesos":96167000.0,"lengthMeters":2360.0,"ratePesosPerMeter":40748.72881355932,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26269"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Magangit, Sta. 0+000 - Sta. 2+500, New Bataan, Davao de Oro","amountPesos":97314000.0,"lengthMeters":2500.0,"ratePesosPerMeter":38925.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26271"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bagong Silang, Sta. 0+000 - Sta. 2+300, Maragusan, Davao De Oro","amountPesos":96040000.0,"lengthMeters":2300.0,"ratePesosPerMeter":41756.52173913043,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26273"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Ngan - Barangay San Miguel, Sta. 0+000 - Sta. 1+650, Compostela, Davao De Oro","amountPesos":90650000.0,"lengthMeters":1650.0,"ratePesosPerMeter":54939.393939393936,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26275"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mayaon, Sta. 0+000 - Sta. 2+100, Montevista, Davao De Oro","amountPesos":88200000.0,"lengthMeters":2100.0,"ratePesosPerMeter":42000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26277"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Miguel To Barangay Osmeña, Sta. 0+000 - Sta. 2+500, Compostela, Davao De Oro","amountPesos":48383000.0,"lengthMeters":2500.0,"ratePesosPerMeter":19353.2,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26279"},{"year":2026,"category":"Roads","project":"Contruction of Road Cambanogoy, Asuncion to Mesaoy, New Corella, (Sta. 0+000 - Sta. 3+700), Davao del Norte","amountPesos":103998000.0,"lengthMeters":3700.0,"ratePesosPerMeter":28107.567567567567,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26281"},{"year":2026,"category":"Roads","project":"Contruction of Road New Santiago, Asuncion to Capungagan, (Sta. 0+000 - Sta. 3+540), Kapalong, Davao del Norte","amountPesos":98559000.0,"lengthMeters":3540.0,"ratePesosPerMeter":27841.525423728814,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26283"},{"year":2026,"category":"Roads","project":"Concreting of Road Lagab-Aurora-Siocon, Sta. 0+000 - Sta. 4+905, Compostela, Davao de Oro","amountPesos":94962000.0,"lengthMeters":4905.0,"ratePesosPerMeter":19360.244648318043,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26285"},{"year":2026,"category":"Roads","project":"Concreting of Road, Barangay Bankerohan Norte to Prk. Bandihasan, Sta. 0+000 - Sta. 1+200, Davao de Oro","amountPesos":50176000.0,"lengthMeters":1200.0,"ratePesosPerMeter":41813.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26287"},{"year":2026,"category":"Roads","project":"Concreting of Road, Barangay Mamunga To Barangay Tubo-Tubo, Barangay Mamunga, Sta. 0+000 - Sta. 2+600, Monkayo, Davao De Oro","amountPesos":49980000.0,"lengthMeters":2600.0,"ratePesosPerMeter":19223.076923076922,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26289"},{"year":2026,"category":"Roads","project":"Construction of NRJ Tagum-Panabo Circum Road, Kapalong Section, Kapalong, Davao del Norte to Loreto, Agusan del Sur (Sta. 0+000 - Sta. 2+260), Davao del Norte","amountPesos":96275000.0,"lengthMeters":2260.0,"ratePesosPerMeter":42599.55752212389,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26293"},{"year":2026,"category":"Roads","project":"Construction Of Road Jct. Asuncion - Laak -Veruela Road, Canatan, Asuncion to New Sambog, New Corella (Sta. 0+000 - Sta. 3+360), Davao del Norte","amountPesos":103096000.0,"lengthMeters":3360.0,"ratePesosPerMeter":30683.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26295"},{"year":2026,"category":"Roads","project":"Construction of Road from Juction Highway,Brgy. San Isidro to Barangay Concepcion, Sta. 0+000 - 2+619, Manay, Davao Oriental","amountPesos":71834000.0,"lengthMeters":2619.0,"ratePesosPerMeter":27428.025964108438,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26297"},{"year":2026,"category":"Roads","project":"Rehabilitation/Reconstruction of Tagum - Maco Diversion Road, Tagum City (Sta. 0+000 - Sta. 1+540), Davao del Norte","amountPesos":98960000.0,"lengthMeters":1540.0,"ratePesosPerMeter":64259.74025974026,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26301"},{"year":2026,"category":"Roads","project":"Construction of Road, NHJ Tomoaong to Sitio Nagas, Sta. 3+750 - Sta. 7+453.5, Tarragona, Davao Oriental0","amountPesos":86511000.0,"lengthMeters":3703.5,"ratePesosPerMeter":23359.254759011747,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26303"},{"year":2026,"category":"Roads","project":"Construction of Road, Panganason Road, Barangay Kingking (Sta. 0+000 - Sta. 1+667), Pantukan, Davao de Oro","amountPesos":31721000.0,"lengthMeters":1667.0,"ratePesosPerMeter":19028.79424115177,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26305"},{"year":2026,"category":"Roads","project":"Construction of Road Barangay Manipongol (Sta. 0+000 - Sta. 1+600), Maco, Davao de Oro","amountPesos":78400000.0,"lengthMeters":1600.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26307"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok 4 to Purok 7, Barangay Dumlan (Sta. 0+000 - Sta. 2+250), Maco, Davao de Oro","amountPesos":86511000.0,"lengthMeters":2250.0,"ratePesosPerMeter":38449.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26309"},{"year":2026,"category":"Roads","project":"Construction of Road connecting Luna Extension - Doña Aurora Extension, Sta.0+000 - Sta.0+950 (Site 1), Sta.0+000 - Sta.0+620 (Site 2), Sta.0+000 - Sta.0+220 (Site 3), Sta.0+000 - Sta.0+225 (Site 4), Sta.0+000 - Sta.0+075 (Site 5), Sta.0+000 - Sta.0+490 (Site 6) , Digos City, Davao del Sur","amountPesos":49000000.0,"lengthMeters":950.0,"ratePesosPerMeter":51578.94736842105,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26313"},{"year":2026,"category":"Roads","project":"Construction of Access Road, going to Elementary School, Purok Bagong Sikat, Barangay Maibo, Tantangan, STA. 0+000-STA. 0+200 South Cotabato","amountPesos":3793000.0,"lengthMeters":200.0,"ratePesosPerMeter":18965.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26316"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Purok Daisy, Barangay New Pangasinan, Koronadal City, STA. 0+000-STA. 0+250 South Cotabato","amountPesos":4742000.0,"lengthMeters":250.0,"ratePesosPerMeter":18968.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26318"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Sitio Cabuling to Purok Maunlad, Barangay Saravia, Koronadal City, STA. 0+000-STA. 0+250 South Cotabato","amountPesos":4742000.0,"lengthMeters":250.0,"ratePesosPerMeter":18968.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26320"},{"year":2026,"category":"Roads","project":"Construction of Access Road, Sitio Lamkot, Barangay Malaya, Banga, STA. 0+000-STA. 0+182 South Cotabato","amountPesos":3793000.0,"lengthMeters":182.0,"ratePesosPerMeter":20840.659340659342,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26322"},{"year":2026,"category":"Roads","project":"Construction of Tumbao - Talitay Road (Sta. 0+000 - Sta. 1+154 ) , Barangay Tumbao, Mangudadatu, Maguindanao del Sur","amountPesos":37934000.0,"lengthMeters":1154.0,"ratePesosPerMeter":32871.75043327556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26324"},{"year":2026,"category":"Roads","project":"Improvement of Road from Esperanza to Sitio Gacub, 0+000 - 2+000, Carmen, Surigao del Sur","amountPesos":70000000.0,"lengthMeters":2000.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26327"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, A. Luna Street, Interior Galang, Barangay Pag-Asa, (Chainage 000 - Chainage 085), Mandaluyong City","amountPesos":5000000.0,"lengthMeters":85.0,"ratePesosPerMeter":58823.529411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26330"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road Network, Including Laterals,  (Chainage 0+000 – Chainage 1+200) Barangay Concepcion Uno, Marikina City","amountPesos":21613000.0,"lengthMeters":1200.0,"ratePesosPerMeter":18010.833333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26336"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Pag-Asa Street, Interior Alley 2, Barangay Pag-Asa (Chainage 000 - Chainage 060), Mandaluyong City","amountPesos":5000000.0,"lengthMeters":60.0,"ratePesosPerMeter":83333.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26338"},{"year":2026,"category":"Roads","project":"Improvement of Roads and Drainage System at Barangay 815 Zone 88 Chainage 000 - Chainage 210, Manila","amountPesos":10000000.0,"lengthMeters":210.0,"ratePesosPerMeter":47619.04761904762,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26373"},{"year":2026,"category":"Roads","project":"Improvement of Roads and Drainage System at Barangay 823 Zone 89 Chainage 000 - Chainage 125, Manila","amountPesos":5000000.0,"lengthMeters":125.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26375"},{"year":2026,"category":"Roads","project":"Improvement of Roads and Drainage System at Barangay 721 Zone 78 Chainage 000 - Chainage 237, Manila","amountPesos":12000000.0,"lengthMeters":237.0,"ratePesosPerMeter":50632.91139240506,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26377"},{"year":2026,"category":"Roads","project":"Improvement of Roads and Drainage System at Barangay 824 Zone 89 Chainage 000 - Chainage 85, Manila","amountPesos":3000000.0,"lengthMeters":85.0,"ratePesosPerMeter":35294.117647058825,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26379"},{"year":2026,"category":"Roads","project":"Improvement of Roads and Drainage System at Barangay 704 Zone 77 Chainage 000 - Chainage 312.50, Manila","amountPesos":10000000.0,"lengthMeters":312.5,"ratePesosPerMeter":32000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26381"},{"year":2026,"category":"Roads","project":"Improvement of Roads and Drainage System at Barangay 705 Zone 77 Chainage 000 - Chainage 135, Manila","amountPesos":5000000.0,"lengthMeters":135.0,"ratePesosPerMeter":37037.03703703704,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26383"},{"year":2026,"category":"Roads","project":"Improvement of Roads and Drainage System at Barangay 818 Zone 88 Chainage 000 - Chainage 125, Manila","amountPesos":5000000.0,"lengthMeters":125.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26385"},{"year":2026,"category":"Roads","project":"Improvement of Roads and Drainage System at Barangay 686 Zone 75 Chainage 000 - Chainage 103, Manila","amountPesos":5000000.0,"lengthMeters":103.0,"ratePesosPerMeter":48543.68932038835,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26387"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Kalayaan (Chainage 0 + 000.00 to Chainage 0 + 432.00), Barangay Batasan Hills, Quezon City","amountPesos":24376000.0,"lengthMeters":432.0,"ratePesosPerMeter":56425.92592592593,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26390"},{"year":2026,"category":"Roads","project":"Rehabilitation of Roads with Drainage (Chainage 000 - Chainage 300), Barangay Balingasa, Quezon City","amountPesos":20000000.0,"lengthMeters":300.0,"ratePesosPerMeter":66666.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26392"},{"year":2026,"category":"Roads","project":"Rehabilitation of Roads with Drainage (Chainage 000 - Chainage 300), Barangay Mariblo, Quezon City","amountPesos":20000000.0,"lengthMeters":300.0,"ratePesosPerMeter":66666.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26394"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage System along 2nd Street Chainage 000 - Chainage 120, Barangay 194, Zone 20, Pasay City","amountPesos":9000000.0,"lengthMeters":120.0,"ratePesosPerMeter":75000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26397"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage System along Barangay 183, Zone 20 (21st Street Chainage 000 - Chainage 107, 12th Street Chainage 000 - Chainage 140, Matha St Chainage 000 - Chainage 106), Pasay City","amountPesos":15000000.0,"lengthMeters":140.0,"ratePesosPerMeter":107142.85714285714,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26399"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage System along Kapisanan Street Chainage 000 - Chainage 177.20, Barangay 162, Zone 18, Pasay City","amountPesos":10000000.0,"lengthMeters":177.2,"ratePesosPerMeter":56433.40857787811,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26401"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage System along Natividad Street Chainage 000 - Chainage 163.50, Barangay 63, Zone 8, Pasay City","amountPesos":7000000.0,"lengthMeters":163.5,"ratePesosPerMeter":42813.455657492355,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26403"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage System along Silva Street Chainage 000 - Chainage 103, Barangay 122, Zone 12, Pasay City","amountPesos":8000000.0,"lengthMeters":103.0,"ratePesosPerMeter":77669.90291262136,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26405"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage System along Villareal Street Chainage 000 - Chainage 133, Barangay 59, Zone 7, Pasay City","amountPesos":6000000.0,"lengthMeters":133.0,"ratePesosPerMeter":45112.78195488722,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26407"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Santa Maria - San Antonio (Sta. 0+000 - Sta. 0+051.30), Piddig, Ilocos Norte","amountPesos":48791000.0,"lengthMeters":51.3,"ratePesosPerMeter":951091.6179337233,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26411"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay 33-A (Sta. 0+000 - Sta. 0+300), Laoag City, Ilocos Norte","amountPesos":4834000.0,"lengthMeters":300.0,"ratePesosPerMeter":16113.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26413"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Apaya (Sta. 0+000 - Sta. 0+300), Laoag City, Ilocos Norte","amountPesos":4834000.0,"lengthMeters":300.0,"ratePesosPerMeter":16113.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26415"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Santa Maria (Sta. 0+000 - Sta. 0+300), Laoag City, Ilocos Norte","amountPesos":4834000.0,"lengthMeters":300.0,"ratePesosPerMeter":16113.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26417"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay 21 San Marcos (Sta. 0+000 - Sta. 0+300), Sarrat, Ilocos Norte","amountPesos":4834000.0,"lengthMeters":300.0,"ratePesosPerMeter":16113.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26419"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay 3 (Sta. 0+000 - Sta. 0+300), Laoag City, Ilocos Norte","amountPesos":4834000.0,"lengthMeters":300.0,"ratePesosPerMeter":16113.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26421"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage, Barangay Pantay Daya, Vigan City, Ilocos Sur Sta 0+060 - Sta 0+398","amountPesos":6860000.0,"lengthMeters":338.0,"ratePesosPerMeter":20295.85798816568,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26424"},{"year":2026,"category":"Roads","project":"Improvement of Road, Quezon, Cabugao, Ilocos Sur Sta 0+000 - Sta 0+700","amountPesos":9800000.0,"lengthMeters":700.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26426"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Padu Grande, Sto. Domingo, Ilocos Sur Sta 0+000 - Sta 1+391","amountPesos":10780000.0,"lengthMeters":1391.0,"ratePesosPerMeter":7749.82027318476,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26428"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Purok a Dackel, Vigan City, Ilocos Sur Site 1: Sta 0+296 - Sta 0+353.23, Site 2: Sta 0+246 - Sta 0+359.87, Site 3: Sta 0+000 - Sta 0+213","amountPesos":4900000.0,"lengthMeters":326.87,"ratePesosPerMeter":14990.669073331905,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26430"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Paing, Bantay, Ilocos Sur Sta 0+000 - Sta 0+625","amountPesos":4900000.0,"lengthMeters":625.0,"ratePesosPerMeter":7840.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26432"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Ora, Bantay, Ilocos Sur Sta. 0 + 000 - Sta. 0 + 660","amountPesos":9667000.0,"lengthMeters":660.0,"ratePesosPerMeter":14646.969696969696,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26434"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Villamar, Caoayan, Ilocos Sur Sta. 0 + 421 - Sta. 0 + 866.5","amountPesos":10344000.0,"lengthMeters":445.5,"ratePesosPerMeter":23218.85521885522,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26436"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Bacsil, San Juan, Ilocos Sur Site 1: Sta. 000 + 000 -  Sta. 000 + 567.8, Site 2: Sta. 000 + 000 - Sta. 000 + 136.40","amountPesos":7541000.0,"lengthMeters":567.8,"ratePesosPerMeter":13281.08488904544,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26438"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Baballasioan, Santa Maria, Ilocos Sur, Sta. 0 + 000 - Sta. 0 + 377","amountPesos":4900000.0,"lengthMeters":377.0,"ratePesosPerMeter":12997.3474801061,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26441"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Buliclic, Santa Lucia, Ilocos Sur, Sta. 0 + 000 - Sta. 0 + 900","amountPesos":14501000.0,"lengthMeters":900.0,"ratePesosPerMeter":16112.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26443"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mabilbila Sur, Santa, Ilocos Sur, Sta. Sta. 0 + 000 - Sta. 0 + 343, Sta. 0 + 000 - Sta. 0 + 130, Sta. 0 + 000 - Sta. 0 + 243","amountPesos":9667000.0,"lengthMeters":343.0,"ratePesosPerMeter":28183.673469387755,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26447"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Namitpit, Quirino, Ilocos Sur, Sta. 0 + 000 - Sta. 0 + 288, Sta. 0 + 463 - Sta. 0 + 800","amountPesos":11601000.0,"lengthMeters":625.0,"ratePesosPerMeter":18561.6,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26449"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Santo Rosario, Sigay, Ilocos Sur,  Sta. 0 + 258 - Sta. 0 + 660","amountPesos":11601000.0,"lengthMeters":402.0,"ratePesosPerMeter":28858.20895522388,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26451"},{"year":2026,"category":"Roads","project":"Construction of Road, Danuman West Road, Barangay Danuman West, Santa Maria, Ilocos Sur,  Sta. 0 + 000 - Sta. 0 + 358","amountPesos":4834000.0,"lengthMeters":358.0,"ratePesosPerMeter":13502.793296089385,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26453"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay San Cornelio, Caba, La Union, Sta. 4+320-Sta6+070","amountPesos":26585000.0,"lengthMeters":1750.0,"ratePesosPerMeter":15191.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26466"},{"year":2026,"category":"Roads","project":"Construction of Road (Camil-Bucutan) in Barangay San Fermin, Caba, La Union, Sta. 10+910-Sta.11+320","amountPesos":18851000.0,"lengthMeters":410.0,"ratePesosPerMeter":45978.04878048781,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26468"},{"year":2026,"category":"Roads","project":"Construction of Road (San Cornelio-Bautista) in Brgy. San Cornelio, Caba, La Union, Sta. 3+33-Sta.4+180","amountPesos":17401000.0,"lengthMeters":1147.0,"ratePesosPerMeter":15170.880557977333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26470"},{"year":2026,"category":"Roads","project":"Construction of Road (San Fermin-San Jose) in Barangay San Fermin and San Jose, Caba, La Union, Sta. 9+130-Sta9+530","amountPesos":10151000.0,"lengthMeters":400.0,"ratePesosPerMeter":25377.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26472"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay Ambalite, Pugo, La Union, Sta.0+000-Sta0+400","amountPesos":11601000.0,"lengthMeters":400.0,"ratePesosPerMeter":29002.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26474"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay Bautista, Caba, La Union, Sta.0+000-Sta0+300","amountPesos":5800000.0,"lengthMeters":300.0,"ratePesosPerMeter":19333.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26476"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay Pugo, Bauang, La Union, Sta.1+340-Sta1+920","amountPesos":14501000.0,"lengthMeters":580.0,"ratePesosPerMeter":25001.724137931036,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26478"},{"year":2026,"category":"Roads","project":"Construction of Road in Sitio Canubat, Barangay San Jose, Caba, La Union, Sta.10+866-Sta.11+366","amountPesos":11117000.0,"lengthMeters":500.0,"ratePesosPerMeter":22234.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26480"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pangao-Aoan East, Aringay, La Union, Sta.4+210-Sta4+310, Sta5+350-Sta5+470","amountPesos":4834000.0,"lengthMeters":220.0,"ratePesosPerMeter":21972.727272727272,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26482"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pangao-Aoan West, Aringay, La Union, Sta. 5+950-Sta.6+200","amountPesos":4834000.0,"lengthMeters":250.0,"ratePesosPerMeter":19336.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26484"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Amandiego(0+656 - 0+938), City of Alaminos, Pangasinan","amountPesos":4834000.0,"lengthMeters":282.0,"ratePesosPerMeter":17141.843971631206,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26487"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Amangbangan(4+514 - 4+814), City of Alaminos, Pangasinan","amountPesos":4834000.0,"lengthMeters":300.0,"ratePesosPerMeter":16113.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26489"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Estanza(7+577 - 8+137), Bolinao, Pangasinan","amountPesos":9667000.0,"lengthMeters":560.0,"ratePesosPerMeter":17262.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26491"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lucero(8+543 - 9+103), Bolinao, Pangasinan","amountPesos":9667000.0,"lengthMeters":560.0,"ratePesosPerMeter":17262.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26493"},{"year":2026,"category":"Roads","project":"Construction of Road in Brgy. Bued, Alaminos City, Pangasinan (Sta. 2+025 to 2+350)","amountPesos":5000000.0,"lengthMeters":325.0,"ratePesosPerMeter":15384.615384615385,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26495"},{"year":2026,"category":"Roads","project":"Construction of Road in Brgy. Poblacion, Alaminos City, Pangasinan (Sta. 0+000 to 0+350)","amountPesos":5000000.0,"lengthMeters":350.0,"ratePesosPerMeter":14285.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26497"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road in Banog Sur-Ranom Iloco Road, Bani, Pangasinan (Sta. 3+378 to 4+078)","amountPesos":10000000.0,"lengthMeters":700.0,"ratePesosPerMeter":14285.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26499"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Culang(0+634 - 1+194), Bolinao, Pangasinan","amountPesos":9800000.0,"lengthMeters":560.0,"ratePesosPerMeter":17500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26501"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 1+225 - Sta. 1+374, Barangay Anolid, Mangaldan, Pangasinan","amountPesos":4834000.0,"lengthMeters":149.0,"ratePesosPerMeter":32442.953020134228,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26504"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 1+075 - Sta. 1+271, Barangay Aramal, San Fabian, Pangasinan","amountPesos":4834000.0,"lengthMeters":196.0,"ratePesosPerMeter":24663.26530612245,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26506"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+321, Barangay Bolosan, Dagupan City, Pangasinan","amountPesos":4834000.0,"lengthMeters":321.0,"ratePesosPerMeter":15059.190031152648,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26508"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+178, Barangay Casibong, San Jacinto, Pangasinan","amountPesos":4834000.0,"lengthMeters":178.0,"ratePesosPerMeter":27157.303370786518,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26510"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+071.40, Sta. 0+000 - Sta. 0+056.00, Sta. 0+000 - Sta. 0+055.00, Sta. 0+000 - Sta. 0+062.00, Sta. 0+000 - Sta. 0+056.00, Barangay II and III, Dagupan City, Pangasinan","amountPesos":4834000.0,"lengthMeters":71.4,"ratePesosPerMeter":67703.08123249299,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26512"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+073 - Sta. 0+250, Barangay Lasip Chico, Dagupan City, Pangasinan","amountPesos":4834000.0,"lengthMeters":177.0,"ratePesosPerMeter":27310.734463276836,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26514"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+058 - Sta. 0+294, Barangay Lomboy, Dagupan City, Pangasinan","amountPesos":4834000.0,"lengthMeters":236.0,"ratePesosPerMeter":20483.050847457627,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26516"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+198, Barangay Lucao, Dagupan City, Pangasinan","amountPesos":4834000.0,"lengthMeters":198.0,"ratePesosPerMeter":24414.141414141413,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26518"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 3+039 - Sta. 3+158, Barangay Maasin, Mangaldan, Pangasinan","amountPesos":4834000.0,"lengthMeters":119.0,"ratePesosPerMeter":40621.8487394958,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26520"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+231 - Sta. 0+414, Barangay Mamalingling, Dagupan City, Pangasinan","amountPesos":4834000.0,"lengthMeters":183.0,"ratePesosPerMeter":26415.30054644809,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26522"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+020 - Sta. 0+358, Barangay Oraan East, Manaoag, Pangasinan","amountPesos":4834000.0,"lengthMeters":338.0,"ratePesosPerMeter":14301.775147928995,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26524"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+187 - Sta. 0+327, Sta. 0+070 - Sta. 0+270, Barangay Tebuel, Manaoag, Pangasinan","amountPesos":4834000.0,"lengthMeters":257.0,"ratePesosPerMeter":18809.33852140078,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26526"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay San Vicente West, Asingan, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26529"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay San Joaquin, Balungao, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26531"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Mabini, Balungao, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26533"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Cacandongan, Natividad, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26535"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay San Rafael Centro, San Nicolas, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26537"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay San Rafael West, San Nicolas, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26539"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Sta. Maria West, San Nicolas, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26541"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Sto Tomas, San Nicolas, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26543"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Carayacan, San Quintin, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26545"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Panganiban, Tayug, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26547"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Zamora, Tayug, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26549"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Ariston East, Asingan, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26551"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Macalong, Asingan, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26553"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Sanchez, Asingan, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26555"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Cabalitian, Asingan, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26557"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cabalaoangan Sur, Rosales, Pangasinan Sta. 0+000 - Sta. 4+265","amountPesos":49000000.0,"lengthMeters":4265.0,"ratePesosPerMeter":11488.86283704572,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26559"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Balincanaway, Rosales, Pangasinan Sta. 0+000 - Sta. 0+793","amountPesos":9800000.0,"lengthMeters":793.0,"ratePesosPerMeter":12358.13366960908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26561"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Capitan Tomas, Rosales, Pangasinan Sta. 0+000 - Sta. 0+793","amountPesos":9800000.0,"lengthMeters":793.0,"ratePesosPerMeter":12358.13366960908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26563"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Carmay East, Rosales, Pangasinan Sta. 0+000 - Sta. 0+793","amountPesos":9800000.0,"lengthMeters":793.0,"ratePesosPerMeter":12358.13366960908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26565"},{"year":2026,"category":"Roads","project":"Construction of Road with Slope Protection, Barangay Rizal, Rosales, Pangasinan  Sta. 0+000 - Sta. 1+910","amountPesos":19600000.0,"lengthMeters":1910.0,"ratePesosPerMeter":10261.780104712041,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26569"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Carmen West, Rosales, Pangasinan Sta. 0+000 - Sta. 0+793","amountPesos":9800000.0,"lengthMeters":793.0,"ratePesosPerMeter":12358.13366960908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26571"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Dupac, Asingan, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26573"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay San Vicente East, Asingan, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26575"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Baro, Asingan, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26577"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Poblacion East, Asingan, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26579"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Coldit, Asingan, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26581"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Ariston West, Asingan, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26583"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Calepaan, Asingan, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26585"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay San Miguel, Natividad, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26587"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay San Macario Norte, Natividad, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26589"},{"year":2026,"category":"Roads","project":"Improvement of Road, BarangaySan Maximo, Natividad, Pangasinan  Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26591"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Siblot, San Nicolas, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26593"},{"year":2026,"category":"Roads","project":"Improvement of Road, BarangayLungao, San Nicolas, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26595"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Salingcob, San Nicolas, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26597"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Bolintaguen, San Quintin, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":5000000.0,"lengthMeters":428.0,"ratePesosPerMeter":11682.242990654206,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26599"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Lawak, Tayug, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26601"},{"year":2026,"category":"Roads","project":"Improvement of Road, Barangay Nancalabasaan, Umingan, Pangasinan Sta. 0+000 - Sta. 0+428","amountPesos":4900000.0,"lengthMeters":428.0,"ratePesosPerMeter":11448.598130841121,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26603"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay Caingal, San Carlos City, Pangasinan, Sta. 0+000 - Sta. 0+030","amountPesos":9758000.0,"lengthMeters":30.0,"ratePesosPerMeter":325266.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26606"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Banaban, Bayambang, Pangasinan, Sta. 0+000 - Sta. 0+413","amountPesos":4834000.0,"lengthMeters":413.0,"ratePesosPerMeter":11704.600484261502,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26608"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Beleng, Bayambang, Pangasinan, Sta. 0+000 - Sta. 0+500","amountPesos":4834000.0,"lengthMeters":500.0,"ratePesosPerMeter":9668.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26610"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Calomboyan, San Carlos City, Pangasinan, Sta. 0+000 - Sta. 0+350","amountPesos":4834000.0,"lengthMeters":350.0,"ratePesosPerMeter":13811.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26612"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Gatang, Malasiqui, Pangasinan, Sta. 0+000 - Sta. 0+444","amountPesos":4834000.0,"lengthMeters":444.0,"ratePesosPerMeter":10887.387387387387,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26614"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mangayao, Bayambang, Pangasinan, Sta. 0+811 - Sta. 1+130","amountPesos":4834000.0,"lengthMeters":319.0,"ratePesosPerMeter":15153.605015673982,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26616"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Paragos, Bayambang, Pangasinan, Sta. 0+000 - Sta. 0+643","amountPesos":4834000.0,"lengthMeters":643.0,"ratePesosPerMeter":7517.884914463452,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26618"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Gabriel 1st, Bayambang, Pangasinan, Sta. 0+000 - Sta. 0+350","amountPesos":4834000.0,"lengthMeters":350.0,"ratePesosPerMeter":13811.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26620"},{"year":2026,"category":"Roads","project":"Construction of Road, Malasiqui, Pangasinan, Sta. 0+000 - Sta. 0+230 (Section 1), Sta. 0+000 - Sta. 0+270 (Section 1)","amountPesos":4834000.0,"lengthMeters":270.0,"ratePesosPerMeter":17903.703703703704,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26622"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Bacundao East (Sta. 0+000 - 1+250) and Asin-Tolunguat Roadline (Sta. 0+000 - 1+250) in the Municipality of Malasiqui, Pangasinan","amountPesos":30000000.0,"lengthMeters":1250.0,"ratePesosPerMeter":24000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26624"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Dinalaoan, Calasiao, Pangasinan (Sta. 0+000 - 1+750)","amountPesos":35000000.0,"lengthMeters":1750.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26626"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Cais, Barangay Tanolong, Bayambang, Pangasinan, Sta. 0+000 - Sta. 0+850","amountPesos":9800000.0,"lengthMeters":850.0,"ratePesosPerMeter":11529.411764705883,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26628"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road in Akikian-Landawan, Brgy. Ballay, Sta. 1+221 - Sta. 1+379, Kabayan, Benguet","amountPesos":5000000.0,"lengthMeters":158.0,"ratePesosPerMeter":31645.569620253165,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26632"},{"year":2026,"category":"Roads","project":"Rehabilitaion of Road La Trinidad Vegetable Trading Post (LTVTP) Phase 2, Brgy. Pico, Sta. 0+113 - Sta. 0+192, Trinidad, Benguet","amountPesos":5000000.0,"lengthMeters":79.0,"ratePesosPerMeter":63291.13924050633,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26634"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road in Banao-Aneng, Brgy. Kamog, Sta. 0+ 500 - Sta.0+1000, Sablan, Benguet","amountPesos":5000000.0,"lengthMeters":500.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26636"},{"year":2026,"category":"Roads","project":"Road Concreting of Paoay-Bosleng Rd, Sta. 1+663 - Sta. 2+198, Atok, Benguet (Sakura-Olis Section)","amountPesos":20000000.0,"lengthMeters":535.0,"ratePesosPerMeter":37383.17757009346,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26639"},{"year":2026,"category":"Roads","project":"Road Concreting of Upper Englandad Road, (Diosdado Haight's Residence Upper Englandad Section) Sta. 0+000 - Sta. 0+800, Paoay, Atok, Benguet","amountPesos":30000000.0,"lengthMeters":800.0,"ratePesosPerMeter":37500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26641"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road in Macbas-Botiao Sta. 0+000 - Sta. 0+130, Brgy. Cattubo, Atok, Benguet","amountPesos":5000000.0,"lengthMeters":130.0,"ratePesosPerMeter":38461.53846153846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26643"},{"year":2026,"category":"Roads","project":"Construction of Road in Tacadang Proper to Lingey Sta. 0+000 - 0+200, Kibungan, Benguet","amountPesos":5000000.0,"lengthMeters":200.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26651"},{"year":2026,"category":"Roads","project":"Construction of Road, Oel to Bicok , Sta. 0 + 000 - Sta. 0 + 400, Barangay Magaogao, Pinukpuk, Kalinga","amountPesos":19600000.0,"lengthMeters":400.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26654"},{"year":2026,"category":"Roads","project":"Rehabilitation of Access Road in Brgy. Mabaay Sta. 0+000 - Sta. 0+120, Bauko, Mountain Province","amountPesos":5000000.0,"lengthMeters":120.0,"ratePesosPerMeter":41666.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26661"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road in Brgy. Ankileng-Tap-eo Sta. 0+000 - Sta. 0+120, Sagada, Mountain Province","amountPesos":5000000.0,"lengthMeters":120.0,"ratePesosPerMeter":41666.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26663"},{"year":2026,"category":"Roads","project":"Construction of Access Road in Brgy. Nacawang-Mabalite-Sapid Sta. 0+000 - Sta. 0+120, Tadian, Mountain Province","amountPesos":5000000.0,"lengthMeters":120.0,"ratePesosPerMeter":41666.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26665"},{"year":2026,"category":"Roads","project":"Construction of Banao-Paliwak Road Sta. 0+000 - Sta. 0+120, in Barangay Banao, Bauko, Mountain Province","amountPesos":5000000.0,"lengthMeters":120.0,"ratePesosPerMeter":41666.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26667"},{"year":2026,"category":"Roads","project":"Construction of Road Slope Protection Structure, Chinteb - Chajayan Road (Sta. 00+000 - Sta. 00+105), Barangay San Antonio, Basco, Batanes","amountPesos":9181000.0,"lengthMeters":105.0,"ratePesosPerMeter":87438.09523809524,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26674"},{"year":2026,"category":"Roads","project":"Construction of Road Slope Protection Structure (Sta. 00+690 - Sta. 00+876.50), Sitio Tukon Road, Barangay Chanarian, Basco, Batanes","amountPesos":9181000.0,"lengthMeters":186.5,"ratePesosPerMeter":49227.88203753351,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26676"},{"year":2026,"category":"Roads","project":"Construction of Road, Jihbu - Chawlungan, Phase II (Sta. 00+080 - Sta. 00+124), Barangay Panatayan, Mahatao, Batanes","amountPesos":6427000.0,"lengthMeters":44.0,"ratePesosPerMeter":146068.18181818182,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26678"},{"year":2026,"category":"Roads","project":"Construction of Road, Panenbatan Sea Port (Sta. 01+724 - Sta. 01+783), Barangay Raele, Itbayat, Batanes","amountPesos":4591000.0,"lengthMeters":59.0,"ratePesosPerMeter":77813.55932203389,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26680"},{"year":2026,"category":"Roads","project":"Construction of Road, Payaman to Vachid (Sta. 00+445 - Sta. 00+525), Barangay Kayvaluganan, Uyugan, Batanes","amountPesos":4591000.0,"lengthMeters":80.0,"ratePesosPerMeter":57387.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26682"},{"year":2026,"category":"Roads","project":"Construction of Road, Rakuh Ahsung (Sta. 00+159 - Sta. 00+239), Barangay Itbud, Uyugan, Batanes","amountPesos":4591000.0,"lengthMeters":80.0,"ratePesosPerMeter":57387.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26684"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Katuyan Pangakaramuhan, Oxango to Pukol (Sta. 00+323 - Sta. 00+440), Barangay Santa Rosa, Itbayat, Batanes","amountPesos":9181000.0,"lengthMeters":117.0,"ratePesosPerMeter":78470.08547008547,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26686"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta 0+591.98 - Sta 0+884.127, Barangay Bangatan, Gattaran, Cagayan","amountPesos":5453000.0,"lengthMeters":292.147,"ratePesosPerMeter":18665.260981629115,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26689"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta 0+000 - Sta 0+243.50, Barangay Cabuluan, Alcala, Cagayan","amountPesos":4544000.0,"lengthMeters":243.5,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26691"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta 0+000 - Sta 0+243.50, Barangay Calamegatan, Buguey, Cagayan","amountPesos":4544000.0,"lengthMeters":243.5,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26693"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta 0+000 - Sta 0+487, Barangay Capiddigan, Gattaran, Cagayan","amountPesos":9088000.0,"lengthMeters":487.0,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26695"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cumao, Sta 0+321.50 - Sta 0+619.50, Sta 0+000 - Sta 0+207 Gattaran, Cagayan","amountPesos":9800000.0,"lengthMeters":505.0,"ratePesosPerMeter":19405.940594059404,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26697"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta 0+000 - Sta 0+243.50, Barangay Minanga Weste, Buguey, Cagayan","amountPesos":4544000.0,"lengthMeters":243.5,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26699"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta 0+000 - Sta 0+243.50, Barangay Pussian, Alcala, Cagayan","amountPesos":4544000.0,"lengthMeters":243.5,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26701"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road in Brgy. Buyun, Sta 0+000 Sta 0+180, Santa Teresita,","amountPesos":5000000.0,"lengthMeters":180.0,"ratePesosPerMeter":27777.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26705"},{"year":2026,"category":"Roads","project":"Improvement of Road at Afusing Daga, Sta 0+000 - Sta 0+184.5, Alcala, Cagayan","amountPesos":5000000.0,"lengthMeters":184.5,"ratePesosPerMeter":27100.271002710026,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26707"},{"year":2026,"category":"Roads","project":"Improvement of Sanja-Bisagu Road, Sta 0+000 - Sta 0+306, Aparri, Cagayan","amountPesos":10000000.0,"lengthMeters":306.0,"ratePesosPerMeter":32679.738562091505,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26709"},{"year":2026,"category":"Roads","project":"Construction of Road at Sitio Hotspring, Asinga Via, Sta 0+000 - Sta 0+153, Baggao Cagayan","amountPesos":5000000.0,"lengthMeters":153.0,"ratePesosPerMeter":32679.738562091505,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26711"},{"year":2026,"category":"Roads","project":"Construction of Road in Rambo Drive, Sta 0+000 - Sta 0+396, Santa Teresita, Cagayan","amountPesos":10000000.0,"lengthMeters":396.0,"ratePesosPerMeter":25252.52525252525,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26713"},{"year":2026,"category":"Roads","project":"Construction of Road in Casagan-Dungeg, Sta 0+000 - Sta 0+153, Santa Ana, Cagayan","amountPesos":5000000.0,"lengthMeters":153.0,"ratePesosPerMeter":32679.738562091505,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26715"},{"year":2026,"category":"Roads","project":"Improvement of Road at Barangay Joaquin Dela Cruz, Sta 0+000 - Sta 0+306 , Camalaniugan, Cagayan","amountPesos":10000000.0,"lengthMeters":306.0,"ratePesosPerMeter":32679.738562091505,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26717"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta 0+000 - Sta 0+243.50, Barangay Taytay, Baggao, Cagayan","amountPesos":4544000.0,"lengthMeters":243.5,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26719"},{"year":2026,"category":"Roads","project":"Construction of Access Road, San Agustin,Sta. 0+000-Sta. 1+027,Abulug, Cagayan","amountPesos":18175000.0,"lengthMeters":1027.0,"ratePesosPerMeter":17697.17624148004,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26722"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay San Agustin,Sta. 0+000- Sta. 0+010,Abulug, Cagayan","amountPesos":12000000.0,"lengthMeters":10.0,"ratePesosPerMeter":1200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26724"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sitio Lebanon to Barangay Centro,Sta. 0+000- Sta. 0+020,Abulug, Cagayan","amountPesos":12000000.0,"lengthMeters":20.0,"ratePesosPerMeter":600000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26726"},{"year":2026,"category":"Roads","project":"Rehabilitation of Circumferential Road in the Brgy. Dibay ,Sta. 0+000-Sta. 0+150,Municipality of Calayan, Cagayan","amountPesos":5000000.0,"lengthMeters":150.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26728"},{"year":2026,"category":"Roads","project":"Improvement of Sagpat Road in Calayan,Sta. 0+000-Sta.0+300, Cagayan","amountPesos":10000000.0,"lengthMeters":300.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26732"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sitio Lagum to Sitio Lanao, Barangay Guiddam,Sta. 0+000-Sta. 0+045, Abulug, Cagayan","amountPesos":45000000.0,"lengthMeters":45.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26734"},{"year":2026,"category":"Roads","project":"Rehabilitation of Lattac-Lubo Road, Sta. 0+000-Sta.0+510,Sto. Niño, Cagayan","amountPesos":10000000.0,"lengthMeters":510.0,"ratePesosPerMeter":19607.843137254902,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26736"},{"year":2026,"category":"Bridges","project":"Replacement of Bridge, Barangay Alinunu,Sta. 0+000- Sta. 0+012,Abulug, Cagayan","amountPesos":11760000.0,"lengthMeters":12.0,"ratePesosPerMeter":980000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26738"},{"year":2026,"category":"Roads","project":"Construction of Road connecting Nanguilattan to Guavan, Peñablanca, Cagayan (Sta. 4+360 - Sta. 5+360)","amountPesos":20580000.0,"lengthMeters":1000.0,"ratePesosPerMeter":20580.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26741"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lingu - Nangalisan, Solana, Cagayan (Sta. 0+710 - Sta. 1+717.50)","amountPesos":19600000.0,"lengthMeters":1007.5,"ratePesosPerMeter":19454.09429280397,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26743"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cattaran, Solana, Cagayan (Sta. 0+602 - Sta. 1+250)","amountPesos":19600000.0,"lengthMeters":648.0,"ratePesosPerMeter":30246.913580246914,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26747"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Palao, Solana, Cagayan (Line1: Sta. 0+803 - Sta. 1+123, Line 2: Sta. 0+085 - Sta. 0+175, Line 3: Sta. 0+085 - Sta. 0+420, Line 4: Sta. 0+267 - Sta. 0+617)","amountPesos":19600000.0,"lengthMeters":852.0,"ratePesosPerMeter":23004.69483568075,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26749"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lanna, Solana, Cagayan (Line 1: Sta. 0+135 - Sta. 0+287, Line 2: Sta. 0+165 - Sta. 0+485, Line 3: Sta. 0+177 - Sta. 0+477, Line 4: Sta. 0+210 - Sta. 0+510)","amountPesos":19600000.0,"lengthMeters":375.0,"ratePesosPerMeter":52266.666666666664,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26751"},{"year":2026,"category":"Roads","project":"Construction of Road, Municipality of Solana, Cagayan (Line 1: Sta. 0+065 - Sta. 0+365, Line 2: Sta. 0+522 - Sta. 0+822, Line 3: Sta. 0+299.50 - Sta. 0+529.50, Line 4: Sta. 0+000 - Sta. 0+240, Line 5: Sta. 0+663 - Sta. 0+963, Line 6: Sta. 0+520 - Sta. 0+750)","amountPesos":24500000.0,"lengthMeters":963.0,"ratePesosPerMeter":25441.32917964694,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26753"},{"year":2026,"category":"Roads","project":"Construction of Road, Municipality of Enrile, Cagayan (Line 1: Sta. 0+000 - Sta. 0+355, Line 2: Sta. 0+054 - Sta. 0+189, Line 3: Sta. 0+000 - Sta. 0+100, Line 4: Sta. 0+475 - Sta. 0+625, Sta. 1+590 - Sta. 1+840, Line 5: Sta. 0+000 - Sta. 0+300, Line 6: Sta. 0+300 - Sta. 0+450, Sta. 0+266 - Sta. 0+386)","amountPesos":24500000.0,"lengthMeters":850.0,"ratePesosPerMeter":28823.529411764706,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26755"},{"year":2026,"category":"Roads","project":"Construction of Road, Municipality of Amulung, Cagayan (Line 1: Sta. 3+775 - Sta. 3+993, Line 2: Sta. 0+150 - Sta. 0+440, Line 3: Sta. 0+000 - Sta. 0+175, Line 4: Sta. 0+955 - Sta. 1+725, Line 5: Sta. 0+000 - Sta. 0+125.50, Sta. 0+027 - Sta. 0+176)","amountPesos":24500000.0,"lengthMeters":1428.0,"ratePesosPerMeter":17156.86274509804,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26757"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 0+400), Barangay Aplaya, Maconacon, Isabela","amountPesos":4544000.0,"lengthMeters":400.0,"ratePesosPerMeter":11360.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26766"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 0+530), Barangay Baculod, Ilagan City, Isabela","amountPesos":4544000.0,"lengthMeters":530.0,"ratePesosPerMeter":8573.584905660377,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26768"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+410 - Sta. 1+490), Barangay Garita, Cabagan, Isabela","amountPesos":9088000.0,"lengthMeters":1080.0,"ratePesosPerMeter":8414.814814814816,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26770"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 5+540 - Sta. 6+175), Barangay Mozzozzin Sur-Buenavista-Naganacan, Phase III, Santa Maria, Isabela","amountPesos":9088000.0,"lengthMeters":635.0,"ratePesosPerMeter":14311.811023622047,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26772"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+260 - Sta. 1+260), Barangay Saui to Barangay San Juan, Cabagan, Isabela","amountPesos":9088000.0,"lengthMeters":1000.0,"ratePesosPerMeter":9088.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26774"},{"year":2026,"category":"Roads","project":"Construction of Road (Section 1: Sta. 6+060 - Sta. 6+295, Sta. 6+ 515 - Sta. 6+784, Section 2: Sta. 0+000 - Sta. 0+263, Section 3: Sta. 0+224 - Sta. 0+787), Barangay Simanu Sur, San Pablo, Isabela","amountPesos":13772000.0,"lengthMeters":1291.0,"ratePesosPerMeter":10667.699457784664,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26776"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 0+506), Barangay Tallag, Cabagan, Isabela","amountPesos":4544000.0,"lengthMeters":506.0,"ratePesosPerMeter":8980.237154150198,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26778"},{"year":2026,"category":"Roads","project":"Construction of Road (Section 1: Sta. 0+000-Sta. 0+079, Section 2: Sta. 0+000 - Sta. 0+427, Section 3: Sta. 0+000 - Sta. 0+243, Section 4: Sta. 0+000 - Sta. 0+108), Purok 7, Barangay Alibagu, Ilagan City, Isabela","amountPesos":9181000.0,"lengthMeters":427.0,"ratePesosPerMeter":21501.170960187355,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26780"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road (Section 1: Sta. 0+000 - Sta. 0+080, Section 2: Sta. 0+000 - Sta. 1+560), Barangay Cumabao to Barangay Camasi, Tumauini, Isabela","amountPesos":18175000.0,"lengthMeters":1560.0,"ratePesosPerMeter":11650.641025641025,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26782"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road (Sta. 1+860 - Sta. 1+960, Sta. 2+070-Sta. 2+168, Sta. 2+320 - Sta. 3+012), Barangay Maui-Barangay Aneg, Delfin Albano, Isabela","amountPesos":9088000.0,"lengthMeters":890.0,"ratePesosPerMeter":10211.23595505618,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26784"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road (Sta. 0+000 - Sta. 0+820), Barangay Namnama, Tumauini, Isabela","amountPesos":9800000.0,"lengthMeters":820.0,"ratePesosPerMeter":11951.219512195123,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26786"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road (Sta. 1+800 - Sta. 3+040), Barangay Pilig Alto, Cabagan, Isabela","amountPesos":13631000.0,"lengthMeters":1240.0,"ratePesosPerMeter":10992.741935483871,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26788"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road (Sta. 0+000 - Sta. 0+910), Barangay San Bernardo to Barangay San Juan, Cabagan, Isabela","amountPesos":9088000.0,"lengthMeters":910.0,"ratePesosPerMeter":9986.813186813188,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26790"},{"year":2026,"category":"Roads","project":"Concreting of Road (Sta. 1 + 100 - Sta. 1 + 630), Barangay District 2, San Manuel, Isabela","amountPesos":5880000.0,"lengthMeters":530.0,"ratePesosPerMeter":11094.33962264151,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26793"},{"year":2026,"category":"Roads","project":"Concreting of Road (Sta. 1 + 300 - Sta. 1 + 740) , Barangay Aurora, Quezon, Isabela","amountPesos":4900000.0,"lengthMeters":440.0,"ratePesosPerMeter":11136.363636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26795"},{"year":2026,"category":"Roads","project":"Concreting of Road (Sta. 0 + 000 - Sta. 0 + 040, Sta. 0 + 000 - Sta. 0 + 300, Sta. 0 + 000 - Sta. 0 + 190) Barangay Olango (Purok 2,3,7), Mallig, Isabela","amountPesos":5880000.0,"lengthMeters":300.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26797"},{"year":2026,"category":"Roads","project":"Concreting of Road, Barangay Lepanto (Sta. 4 + 180 - Sta. 4 + 230, Sta. 0 + 000 - Sta. 0 + 390), Quezon, Isabela","amountPesos":5880000.0,"lengthMeters":440.0,"ratePesosPerMeter":13363.636363636364,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26799"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 3 + 860 - Sta. 4 + 300), Barangay Binmonton, Mallig, Isabela","amountPesos":4900000.0,"lengthMeters":440.0,"ratePesosPerMeter":11136.363636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26801"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0 + 268 - Sta. 0 + 708), Barangay Masigun, Burgos, Isabela","amountPesos":4900000.0,"lengthMeters":440.0,"ratePesosPerMeter":11136.363636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26803"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0 + 000 - Sta. 0 + 440), Barangay Villa Miguel, Quirino, Isabela","amountPesos":4900000.0,"lengthMeters":440.0,"ratePesosPerMeter":11136.363636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26805"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0 + 216 - Sta. 0 + 746), Barangay Bagong Tanza, Aurora, Isabela","amountPesos":5880000.0,"lengthMeters":530.0,"ratePesosPerMeter":11094.33962264151,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26811"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Binatug to Barangay Gangalan(Sta. 0+000.00 - Sta. 1+295.00) Section 1, (Sta. 0+000.00 - Sta. 0+312.00) Section 2, (Sta. 0+000.00 - Sta. 0+478.00) Section 3, San Mariano, Isabela","amountPesos":27263000.0,"lengthMeters":1295.0,"ratePesosPerMeter":21052.509652509652,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26814"},{"year":2026,"category":"Roads","project":"Construction of Road at Brgy. Linglingay (Sta. 0+000.00 - Sta. 0+400.00) Section 1, (Sta. 0+000.00 - Sta. 0+220.00 With Exception) Section 2, (Sta. 0+000.00 - Sta. 0+078.00) Section 3, Gamu, Isabela","amountPesos":9800000.0,"lengthMeters":400.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26818"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Disulap to Barangay Disusuan (Sta. 0+000.00 - Sta. 0+684.00), San Mariano, Isabela","amountPesos":9088000.0,"lengthMeters":684.0,"ratePesosPerMeter":13286.549707602338,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26820"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Jose to Sitio Dibihan(Sta. 0+000.00 - Sta. 0+675.00), Barangay San Jose, San Mariano, Isabela","amountPesos":9088000.0,"lengthMeters":675.0,"ratePesosPerMeter":13463.703703703704,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26822"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Ueg(Sta. 0+000.00 - Sta. 0+220.00) Section 1, (Sta. 0+000.00 - Sta. 0+156.00) Section 2, San Mariano, Isabela","amountPesos":5907000.0,"lengthMeters":220.0,"ratePesosPerMeter":26850.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26824"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+731, Barangay Anonang, Cordon, Isabela","amountPesos":13631000.0,"lengthMeters":731.0,"ratePesosPerMeter":18647.058823529413,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26827"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+020, Sta. 0+000 - Sta. 0+035, Sta. 0+000 - Sta. 0+050, Sta. 0+000 - Sta. 0+090,Sta. 0+000 - Sta. 0+130,Sta. 0+000 - Sta. 1+285, Barangay Camarao, Cordon, Isabela","amountPesos":21810000.0,"lengthMeters":1285.0,"ratePesosPerMeter":16972.762645914398,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26829"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+870, Barangay Dicamay 1, Phase 2, Jones, Isabela","amountPesos":11814000.0,"lengthMeters":870.0,"ratePesosPerMeter":13579.310344827587,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26831"},{"year":2026,"category":"Roads","project":"Concreting of Road, Sta. 0+000 - Sta. 0+323, Brgy. Caniguing, Echague, Isabela","amountPesos":4900000.0,"lengthMeters":323.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26833"},{"year":2026,"category":"Roads","project":"Concreting of Road,Sta. 0+000 - Sta. 0+323, Brgy. Dammang East, Echague, Isabela","amountPesos":4900000.0,"lengthMeters":323.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26835"},{"year":2026,"category":"Roads","project":"Concreting of Road, Sta. 0+000 - Sta. 0+323, Brgy. Dammang West, Echague, Isabela","amountPesos":4900000.0,"lengthMeters":323.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26837"},{"year":2026,"category":"Roads","project":"Concreting of Road, Sta. 0+000 - Sta. 0+323, Brgy. Fugu, Echague, Isabela","amountPesos":4900000.0,"lengthMeters":323.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26839"},{"year":2026,"category":"Roads","project":"Concreting of Road, Sta. 0+000 - Sta. 0+646, Brgy. Madadamian, Echague, Isabela","amountPesos":9800000.0,"lengthMeters":646.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26841"},{"year":2026,"category":"Roads","project":"Concreting of Road, Sta. 0+000 - Sta. 0+323, Brgy. Malitao, Echague, Isabela","amountPesos":4900000.0,"lengthMeters":323.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26843"},{"year":2026,"category":"Roads","project":"Concreting of Road, Sta. 0+000 - Sta. 0+323,Brgy. Salay, Echague, Isabela","amountPesos":4900000.0,"lengthMeters":323.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26845"},{"year":2026,"category":"Roads","project":"Concreting of Road, Sta. 0+000 - Sta. 0+323, Brgy. Rumang-ay, Echague, Isabela","amountPesos":4900000.0,"lengthMeters":323.0,"ratePesosPerMeter":15170.278637770898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26847"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+667, Barangay Dingading to Barangay Rizal, San Guillermo, Isabela","amountPesos":9800000.0,"lengthMeters":667.0,"ratePesosPerMeter":14692.653673163419,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26849"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+487, Barangay Nagbukel, San Isidro, Isabela","amountPesos":9088000.0,"lengthMeters":487.0,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26851"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+218, Barangay Palacian - Barangay Sinaoangan Norte, San Agustin, Isabela","amountPesos":22719000.0,"lengthMeters":1218.0,"ratePesosPerMeter":18652.709359605913,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26853"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+487, Barangay Quimalabasa Sur, San Agustin, Isabela","amountPesos":9088000.0,"lengthMeters":487.0,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26855"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+339, Barangay San Sebastian, Jones, Isabela","amountPesos":24991000.0,"lengthMeters":1339.0,"ratePesosPerMeter":18663.928304705005,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26857"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+600, Barangay Sto. Domingo, Phase 2, Jones, Isabela","amountPesos":8179000.0,"lengthMeters":600.0,"ratePesosPerMeter":13631.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26859"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+875, Barangay Usol - Barangay Namnama, Jones, Isabela","amountPesos":34987000.0,"lengthMeters":1875.0,"ratePesosPerMeter":18659.733333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26861"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+300, Barangay Villa Bello Phase 2, Jones, Isabela","amountPesos":17721000.0,"lengthMeters":1300.0,"ratePesosPerMeter":13631.538461538461,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26863"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+731, Barangay Villa Miemban, Cordon, Isabela","amountPesos":13631000.0,"lengthMeters":731.0,"ratePesosPerMeter":18647.058823529413,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26865"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+365, Barangay Villamarso - Barangay Camarao, Cordon, Isabela","amountPesos":6816000.0,"lengthMeters":365.0,"ratePesosPerMeter":18673.972602739726,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26867"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+400, Barangay Virgoneza, San Agustin, Isabela","amountPesos":5453000.0,"lengthMeters":400.0,"ratePesosPerMeter":13632.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26869"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+138, Sta. 0+000 - Sta. 0+160, Sta. 0+000 - Sta. 0+042, Purok 3, Barangay Naggasican, City of Santiago, Isabela","amountPesos":4544000.0,"lengthMeters":160.0,"ratePesosPerMeter":28400.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26871"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 0+330, Sta. 0+000 - Sta. 1+300, Barangay Santos, San Agustin, Isabela","amountPesos":22719000.0,"lengthMeters":1300.0,"ratePesosPerMeter":17476.153846153848,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26873"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 1+290, Phase 1, Barangay Napaliong, Jones, Isabela","amountPesos":18175000.0,"lengthMeters":1290.0,"ratePesosPerMeter":14089.147286821706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26875"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road in Buenavista to Brgy. Ambalatungan, Sta. 0+000 - Sta. 1+930, Santiago City, isabela","amountPesos":30000000.0,"lengthMeters":1930.0,"ratePesosPerMeter":15544.041450777202,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26877"},{"year":2026,"category":"Roads","project":"Concreting of Road, Sta. 0+000 - Sta. 1+000, Brgy. Buneg, Echague, Isabela","amountPesos":15000000.0,"lengthMeters":1000.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26879"},{"year":2026,"category":"Roads","project":"Concreting of Road, Sta. 0+000 - Sta. 0+560, Sta. 0+000 - Sta. 0+110, Brgy. Linamanan, Jones, Isabela","amountPesos":10000000.0,"lengthMeters":560.0,"ratePesosPerMeter":17857.14285714286,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26881"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 0+970, Phase 1, Barangay Fugu, Jones, Isabela","amountPesos":13631000.0,"lengthMeters":970.0,"ratePesosPerMeter":14052.577319587628,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26883"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Munguia-Parai Bridge (Sta. 0+000 - Sta. 0+030), Barangay Parai, Dupax del Norte, Nueva Vizcaya","amountPesos":30000000.0,"lengthMeters":30.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26886"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 1+460.50), Barangay Balite, Aritao, Nueva Vizcaya","amountPesos":27263000.0,"lengthMeters":1460.5,"ratePesosPerMeter":18666.894899007188,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26888"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 1+460.50), Barangay Calitlitan, Aritao, Nueva Vizcaya","amountPesos":27263000.0,"lengthMeters":1460.5,"ratePesosPerMeter":18666.894899007188,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26890"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 0+487), Barangay Yabbi, Dupax del Norte, Nueva Vizcaya","amountPesos":9088000.0,"lengthMeters":487.0,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26892"},{"year":2026,"category":"Roads","project":"Construction of Road, Kaifukal-Belance Road, Barangay Belance, Dupax del Norte to Ganao Road (Sta. 0+000 - Sta. 0+487), Barangay Ganao, Dupax del Sur, Nueva Vizcaya","amountPesos":9088000.0,"lengthMeters":487.0,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26894"},{"year":2026,"category":"Roads","project":"Construction of Access Road in Sitio Dalacquit (Sta. 0+000 - Sta. 0+244), Brgy. Balete, Santa Fe, Nueva Vizcaya","amountPesos":5000000.0,"lengthMeters":244.0,"ratePesosPerMeter":20491.803278688523,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26896"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 0+487), Sitio Sinabing, Barangay Siguem, Kasibu, Nueva Vizcaya","amountPesos":9088000.0,"lengthMeters":487.0,"ratePesosPerMeter":18661.190965092403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26898"},{"year":2026,"category":"Roads","project":"Construction of Access Road in Brgy. San Leonardo, Aglipay, Quirino - Sta. 0+000 - Sta. 0+740","amountPesos":10000000.0,"lengthMeters":740.0,"ratePesosPerMeter":13513.513513513513,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26901"},{"year":2026,"category":"Roads","project":"Construction of Access Road in Brgy. Burgos, Cabarroguis, Quirino - Sta. 0+000 - Sta. 0+734","amountPesos":10000000.0,"lengthMeters":734.0,"ratePesosPerMeter":13623.978201634878,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26903"},{"year":2026,"category":"Roads","project":"Construction of Access Road in Brgy. Dibibi, Cabarroguis, Quirino - Sta. 0+000 - Sta. 0+600","amountPesos":10000000.0,"lengthMeters":600.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26905"},{"year":2026,"category":"Roads","project":"Construction of Access Road in Brgy. Rizal, Saguday, Quirino - Sta. 0+000 - Sta. 0+650","amountPesos":10000000.0,"lengthMeters":650.0,"ratePesosPerMeter":15384.615384615385,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26907"},{"year":2026,"category":"Roads","project":"Construction of Access Road in Brgy. Rizal, Diffun, Quirino - Sta. 0+000 - Sta. 0+600","amountPesos":10000000.0,"lengthMeters":600.0,"ratePesosPerMeter":16666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26909"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Dibayabay, San Luis, Aurora, Sta. 0+000 - Sta. 0+650","amountPesos":4900000.0,"lengthMeters":650.0,"ratePesosPerMeter":7538.461538461538,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26913"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Almacen, Hermosa, Bataan, Section 1: Sta. 0+000 - Sta. 0+151, Section 2: Sta. 0+000 - Sta. 0+060","amountPesos":4707000.0,"lengthMeters":151.0,"ratePesosPerMeter":31172.185430463574,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26916"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Kabalutan, Orani, Bataan, Sta. 0+000 - Sta. 0+259","amountPesos":4707000.0,"lengthMeters":259.0,"ratePesosPerMeter":18173.745173745174,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26918"},{"year":2026,"category":"Roads","project":"Construction of Road, Mars Street, Barangay Apollo, Orani, Bataan, Sta. 0 + 000 - Sta. 0 + 213","amountPesos":4707000.0,"lengthMeters":213.0,"ratePesosPerMeter":22098.591549295776,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26926"},{"year":2026,"category":"Roads","project":"Construction of Road, Narra Street, Barangay Bangkal, Abucay, Bataan, Section 1: Sta. 0+000 - Sta. 0+201, Section 2: Sta. 0+000 - Sta. 0+109","amountPesos":4707000.0,"lengthMeters":201.0,"ratePesosPerMeter":23417.910447761195,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26928"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Bubuyog to Sitio Parang 3, Barangay Ibaba, Samal, Bataan, Section 1: Sta. 0+000 -Sta. 0+223, Section 2: Sta. 0+000 - 0+120","amountPesos":4707000.0,"lengthMeters":223.0,"ratePesosPerMeter":21107.62331838565,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26930"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Petronila, Barangay Kaparangan, Orani, Bataan, Sta. 0+000 - Sta. 0+146","amountPesos":4707000.0,"lengthMeters":146.0,"ratePesosPerMeter":32239.72602739726,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26932"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Riverside, Barangay Bacong, Hermosa, Bataan, Sta. 0+000 - Sta. 0+373","amountPesos":4707000.0,"lengthMeters":373.0,"ratePesosPerMeter":12619.302949061663,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26934"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Suha, Barangay Mabuco, Hermosa, Bataan, Sta. 0+000 - Sta. 0+308","amountPesos":4707000.0,"lengthMeters":308.0,"ratePesosPerMeter":15282.467532467532,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26936"},{"year":2026,"category":"Roads","project":"Construction of Road, Vista Verde, Barangay Bagong Paraiso, Orani, Bataan, Section 1: Sta. 0+000 - Sta 0+247.50, Section 2: Sta 0+000 - Sta 0+114.00","amountPesos":4707000.0,"lengthMeters":247.5,"ratePesosPerMeter":19018.18181818182,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26938"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Laon, Abucay, Bataan, Section1: 0+000 - Sta. 0+105, Section 2: Sta. 0+000 - Sta. 0+186, Section 3: Sta. 0+000 - Sta. 0+070","amountPesos":4707000.0,"lengthMeters":186.0,"ratePesosPerMeter":25306.451612903227,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26942"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay General Lim, Orion, Bataan, Sta. 1+620 - Sta. 2+620","amountPesos":23536000.0,"lengthMeters":1000.0,"ratePesosPerMeter":23536.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26945"},{"year":2026,"category":"Bridges","project":"Replacement of Bridge, Kabilang Ilog Bridge, Barangay Camachile, Orion, Bataan, L = 14.30m","amountPesos":19573000.0,"lengthMeters":14.3,"ratePesosPerMeter":1368741.2587412586,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26949"},{"year":2026,"category":"Roads","project":"Construction of Agape Road, Barangay San Antonio, Bagac, Bataan, Sta. 0 + 000 - Sta. 1 + 250","amountPesos":49000000.0,"lengthMeters":1250.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26952"},{"year":2026,"category":"Roads","project":"Construction of Banawang Road, Barangay Banawang, Bagac, Bataan, Sta. 0 + 000 - Sta. 1 + 505","amountPesos":47072000.0,"lengthMeters":1505.0,"ratePesosPerMeter":31277.076411960134,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26954"},{"year":2026,"category":"Roads","project":"Construction of Biaan Road, Barangay Biaan, Mariveles, Bataan, Sta. 0 + 000 - Sta. 1 + 220","amountPesos":47072000.0,"lengthMeters":1220.0,"ratePesosPerMeter":38583.60655737705,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26956"},{"year":2026,"category":"Roads","project":"Construction of Quinawan Hatchery Road, Barangay Quinawan, Bagac, Bataan, Sta. 0 + 000 - Sta. 1 + 480","amountPesos":49000000.0,"lengthMeters":1480.0,"ratePesosPerMeter":33108.10810810811,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26958"},{"year":2026,"category":"Roads","project":"Construction of Quinawan Proper Road, Barangay Quinawan, Bagac, Bataan, Sta. 0 + 000 - Sta. 1 + 480","amountPesos":49000000.0,"lengthMeters":1480.0,"ratePesosPerMeter":33108.10810810811,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26960"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Colo, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 120","amountPesos":4707000.0,"lengthMeters":120.0,"ratePesosPerMeter":39225.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26962"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Layac, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 260","amountPesos":4707000.0,"lengthMeters":260.0,"ratePesosPerMeter":18103.846153846152,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26964"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Luacan, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 257","amountPesos":4707000.0,"lengthMeters":257.0,"ratePesosPerMeter":18315.175097276264,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26966"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Naparing, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 100","amountPesos":4900000.0,"lengthMeters":100.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26968"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pagasa, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 255","amountPesos":4707000.0,"lengthMeters":255.0,"ratePesosPerMeter":18458.823529411766,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26970"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Payangan, Dinalupihan,Bataan, Sta. 0 + 000 - Sta. 0 + 220","amountPesos":4900000.0,"lengthMeters":220.0,"ratePesosPerMeter":22272.727272727272,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26972"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Paysawan, Bagac, Bataan, Sta. 0 + 000 - Sta. 0 + 265","amountPesos":4707000.0,"lengthMeters":265.0,"ratePesosPerMeter":17762.264150943396,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26974"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pinulot, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 556","amountPesos":9414000.0,"lengthMeters":556.0,"ratePesosPerMeter":16931.654676258993,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26976"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Roosevelt, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 254","amountPesos":4707000.0,"lengthMeters":254.0,"ratePesosPerMeter":18531.496062992126,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26978"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Saguing, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 257","amountPesos":4707000.0,"lengthMeters":257.0,"ratePesosPerMeter":18315.175097276264,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26980"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Carlos, Mariveles, Bataan, Sta. 0 + 000 - Sta. 0 + 343","amountPesos":4707000.0,"lengthMeters":343.0,"ratePesosPerMeter":13723.032069970846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26982"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sapang Balas, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 250","amountPesos":4707000.0,"lengthMeters":250.0,"ratePesosPerMeter":18828.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26984"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sta. Isabel, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220","amountPesos":4707000.0,"lengthMeters":220.0,"ratePesosPerMeter":21395.454545454544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26986"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay Bonga Mayor, Sta. 0+000 to Sta. 0+028, Bustos, Bulacan","amountPesos":29359000.0,"lengthMeters":28.0,"ratePesosPerMeter":1048535.7142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26989"},{"year":2026,"category":"Roads","project":"Construction of Road and Drainage System at Barangay Panasahan, City of Malolos, Bulacan, Sta. 0 + 000 - Sta. 0 +193.50","amountPesos":9800000.0,"lengthMeters":193.5,"ratePesosPerMeter":50645.994832041346,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26991"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Pio Cruzcosa, Calumpit, Bulacan, Sta. 0 + 000 - Sta. 0 + 259.20","amountPesos":9800000.0,"lengthMeters":259.2,"ratePesosPerMeter":37808.641975308645,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26993"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Poblacion, Pulilan, Bulacan, Sta. 0 + 000 - Sta. 0 + 409","amountPesos":9800000.0,"lengthMeters":409.0,"ratePesosPerMeter":23960.88019559902,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26995"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay San Francisco, Bulakan, Bulacan, Sta. 0 + 000 - Sta. 0 + 326","amountPesos":9800000.0,"lengthMeters":326.0,"ratePesosPerMeter":30061.349693251534,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26997"},{"year":2026,"category":"Roads","project":"Construction of Road at San Isidro I, Paombong, Bulacan, Sta. 0 + 000 - Sta. 0 + 198","amountPesos":9800000.0,"lengthMeters":198.0,"ratePesosPerMeter":49494.9494949495,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 26999"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay Bambang Taal, Tambubong-Batia, Bocaue, Bulacan, Sta. 0 + 000 - Sta. 0 + 816","amountPesos":47072000.0,"lengthMeters":816.0,"ratePesosPerMeter":57686.27450980392,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27001"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Anilao, Malolos City, Bulacan, Sta. 0 + 000 - Sta. 0 + 096","amountPesos":5649000.0,"lengthMeters":96.0,"ratePesosPerMeter":58843.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27005"},{"year":2026,"category":"Roads","project":"Construction of Road, Tabe Service Road connecting NLEX and Plaridel-Balagtas Bypass Road, Barangay Tabe, Guiguinto, Bulacan, Sta. 0 + 160 - Sta. 0 + 320","amountPesos":18829000.0,"lengthMeters":160.0,"ratePesosPerMeter":117681.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27007"},{"year":2026,"category":"Roads","project":"Rehabilitation of Barangay Catmon-Barangay Bulihan Road, City of Malolos, Bulacan, Sta. 0 + 000 - Sta. 1 + 012","amountPesos":22594000.0,"lengthMeters":1012.0,"ratePesosPerMeter":22326.08695652174,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27009"},{"year":2026,"category":"Roads","project":"Rehabilitation of Barangay San Pascual - Barangay Santa Cruz - Barangay Santo Rosario - Barangay San Sebastian Road, Hagonoy, Bulacan, Sta. 0 + 000 - Sta. 1 + 178","amountPesos":28243000.0,"lengthMeters":1178.0,"ratePesosPerMeter":23975.382003395585,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27011"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Drainage Canal at Barangay Bangkal, City of Malolos, Bulacan, Sta. 0 + 000 - Sta. 0 + 192","amountPesos":9800000.0,"lengthMeters":192.0,"ratePesosPerMeter":51041.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27013"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Bagumbayan, Bulakan, Bulacan, Sta. 0 + 000 - Sta. 0 +191","amountPesos":9800000.0,"lengthMeters":191.0,"ratePesosPerMeter":51308.90052356021,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27015"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Balatong A, Pulilan, Bulacan, Sta. 0 + 000 - Sta. 0 + 084.375","amountPesos":9800000.0,"lengthMeters":84.375,"ratePesosPerMeter":116148.14814814815,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27017"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Carillo, Hagonoy, Bulacan, Sta. 0 + 000 - Sta. 0 + 164 and Sta. 0 + 000 - Sta. 0 + 097","amountPesos":9800000.0,"lengthMeters":164.0,"ratePesosPerMeter":59756.09756097561,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27019"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Iba, Hagonoy, Bulacan, Sta. 0 + 000 - Sta. 0 + 059 and Sta. 0 + 000 - Sta. 0 + 035.50","amountPesos":6860000.0,"lengthMeters":59.0,"ratePesosPerMeter":116271.18644067796,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27021"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Mojon, City of Malolos, Bulacan, Sta. 0 + 000 - Sta. 0 + 508","amountPesos":12740000.0,"lengthMeters":508.0,"ratePesosPerMeter":25078.740157480315,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27023"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Perez, Bulakan, Bulacan, Sta. 0 + 000 - Sta. 0 + 182.50 and Sta. 0 + 000 - Sta. 0 + 091.25","amountPesos":14700000.0,"lengthMeters":182.5,"ratePesosPerMeter":80547.94520547945,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27025"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Pinalagdan, Paombong, Bulacan, Sta. 0 + 000 - Sta. 0 + 187.50 and Sta. 0 + 000 - Sta. 0 + 097.50","amountPesos":12740000.0,"lengthMeters":187.5,"ratePesosPerMeter":67946.66666666667,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27027"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay San Agustin, Hagonoy, Bulacan, Sta. 0 + 000 - Sta. 0 + 145.50 and Sta. 0 + 000 - Sta. 0 + 072.75","amountPesos":9800000.0,"lengthMeters":145.5,"ratePesosPerMeter":67353.95189003437,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27029"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay San Isidro II, Paombong, Bulacan, Sta. 0 + 000 - Sta. 0 + 112.50 and Sta. 0 + 000 - Sta. 0 + 056.25","amountPesos":9800000.0,"lengthMeters":112.5,"ratePesosPerMeter":87111.11111111111,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27031"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay San Jose, Paombong, Bulacan, Sta. 0 + 000 - Sta. 0 + 230.50","amountPesos":9800000.0,"lengthMeters":230.5,"ratePesosPerMeter":42516.26898047722,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27033"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay San Pedro, Hagonoy, Bulacan, Sta. 0 + 000 - Sta. 0 + 129.50 and Sta. 0 + 000 - Sta. 0 + 059.50","amountPesos":9800000.0,"lengthMeters":129.5,"ratePesosPerMeter":75675.67567567568,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27035"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Santa Ines, Bulakan, Bulacan, Sta. 0 + 000 - Sta. 0 + 055 and Sta. 0 + 000 - Sta. 0 + 033","amountPesos":4900000.0,"lengthMeters":55.0,"ratePesosPerMeter":89090.90909090909,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27037"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Sto. Rosario, Paombong, Bulacan, Sta. 0 + 000 - Sta. 0 + 200","amountPesos":9800000.0,"lengthMeters":200.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27039"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Barangay Sucol, Calumpit, Bulacan, Sta. 0 + 000 - Sta. 0 + 528","amountPesos":9800000.0,"lengthMeters":528.0,"ratePesosPerMeter":18560.60606060606,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27041"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road at Humel Heritage Homes, Barangay Longos, City of Malolos, Bulacan, Sta. 0 + 000 - Sta. 0 + 198","amountPesos":9800000.0,"lengthMeters":198.0,"ratePesosPerMeter":49494.9494949495,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27043"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including drainage at Balatong B, Pulilan, Bulacan, Sta. 0 + 000 - Sta. 0 + 180","amountPesos":9800000.0,"lengthMeters":180.0,"ratePesosPerMeter":54444.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27045"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including drainage at Barangay Buguion, Calumpit, Bulacan, Sta. 0 + 000 - Sta. 0 + 175","amountPesos":9800000.0,"lengthMeters":175.0,"ratePesosPerMeter":56000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27047"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including drainage at Barangay Corazon, Calumpit, Bulacan, Sta. 0 + 000 - Sta. 0 + 189","amountPesos":9800000.0,"lengthMeters":189.0,"ratePesosPerMeter":51851.851851851854,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27049"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including drainage at Barangay Palimbang, Calumpit, Bulacan, Sta. 0 + 000 - Sta. 0 + 098","amountPesos":5880000.0,"lengthMeters":98.0,"ratePesosPerMeter":60000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27051"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including drainage at Barangay Paltao, Pulilan, Bulacan, Sta. 0 + 000 - Sta. 0 + 167","amountPesos":9800000.0,"lengthMeters":167.0,"ratePesosPerMeter":58682.63473053892,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27053"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Bagong Nayon, City of Baliwag, Bulacan, Sta. 0 + 000 - Sta. 0 + 207","amountPesos":4707000.0,"lengthMeters":207.0,"ratePesosPerMeter":22739.130434782608,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27057"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Cambaog, Bustos, Bulacan, Sta. 0 + 000 - Sta. 0 + 196","amountPesos":4707000.0,"lengthMeters":196.0,"ratePesosPerMeter":24015.30612244898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27059"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Catacte, Bustos, Bulacan, Sta. 0 + 000 - Sta. 0 + 206","amountPesos":4707000.0,"lengthMeters":206.0,"ratePesosPerMeter":22849.514563106797,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27061"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Concepcion, City of Baliwag, Bulacan, Sta. 0 + 000 - Sta. 0 + 554","amountPesos":14121000.0,"lengthMeters":554.0,"ratePesosPerMeter":25489.169675090252,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27063"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Meysulao, Calumpit, Bulacan, Sta. 0 + 000 - Sta. 0 + 567","amountPesos":14121000.0,"lengthMeters":567.0,"ratePesosPerMeter":24904.761904761905,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27065"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay San Pedro, Bustos, Bulacan, Sta. 0 + 000 - Sta. 0 + 190","amountPesos":4707000.0,"lengthMeters":190.0,"ratePesosPerMeter":24773.684210526317,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27067"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Sipat, Plaridel, Bulacan, Sta. 0 + 000 - Sta. 0 + 210","amountPesos":4707000.0,"lengthMeters":210.0,"ratePesosPerMeter":22414.285714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27069"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Sulivan, City of Baliwag, Bulacan, Sta. 0 + 000 - Sta. 0 + 196","amountPesos":4707000.0,"lengthMeters":196.0,"ratePesosPerMeter":24015.30612244898,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27071"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Tanawan, Bustos, Bulacan, Sta. 0 + 000 - Sta. 0 + 202","amountPesos":4707000.0,"lengthMeters":202.0,"ratePesosPerMeter":23301.980198019803,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27073"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Tarcan, City of Baliwag, Bulacan, Sta. 0 + 440 - Sta. 0 + 662","amountPesos":4707000.0,"lengthMeters":222.0,"ratePesosPerMeter":21202.702702702703,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27075"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Virgen Delas Flores, City of Baliwag, Bulacan, Sta. 0 + 000 - Sta. 0 + 834","amountPesos":23583000.0,"lengthMeters":834.0,"ratePesosPerMeter":28276.978417266186,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27077"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage Canal, Panghulo, Obando, Bulacan, Sta. 00+000 - Sta. 00+300","amountPesos":9800000.0,"lengthMeters":300.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27082"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage Canal, Barangay Mahabang Parang, Sta. 00+000 – Sta. 00+338, Santa Maria, Bulacan","amountPesos":4900000.0,"lengthMeters":338.0,"ratePesosPerMeter":14497.041420118343,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27084"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bigte, Sta. 00+460 – Sta. 00+760, Norzagaray, Bulacan","amountPesos":4707000.0,"lengthMeters":300.0,"ratePesosPerMeter":15690.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27086"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Parada, Sta. 00+000 - Sta. 00+901, Santa Maria, Bulacan","amountPesos":9414000.0,"lengthMeters":901.0,"ratePesosPerMeter":10448.390677025527,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27090"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pulong Buhangin, Sta. 00+000 – Sta. 00+300, Santa Maria, Bulacan","amountPesos":4707000.0,"lengthMeters":300.0,"ratePesosPerMeter":15690.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27092"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Roque, Sta. 00+000 – Sta. 00+151, Angat, Bulacan","amountPesos":4707000.0,"lengthMeters":151.0,"ratePesosPerMeter":31172.185430463574,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27094"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Santa Clara, Sta. 00+000 – Sta. 00+300, Santa Maria, Bulacan","amountPesos":4707000.0,"lengthMeters":300.0,"ratePesosPerMeter":15690.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27096"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Bato, Barangay Guyong, Sta. 00+000 – Sta. 00+300, Santa Maria, Bulacan","amountPesos":4707000.0,"lengthMeters":300.0,"ratePesosPerMeter":15690.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27100"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Diliman, Sta. 00+280 – Sta. 00+655, Barangay Partida, Norzagaray, Bulacan","amountPesos":4707000.0,"lengthMeters":375.0,"ratePesosPerMeter":12552.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27102"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Kayrumit, Sta. 00+000 – Sta. 00+300, Barangay Guyong, Santa Maria, Bulacan","amountPesos":4707000.0,"lengthMeters":300.0,"ratePesosPerMeter":15690.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27104"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Layong Bato, Sta. 00+540 – Sta. 00+840, Barangay Tumana, Santa Maria, Bulacan","amountPesos":4707000.0,"lengthMeters":300.0,"ratePesosPerMeter":15690.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27106"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Lingunan, Sta. 00+204 – Sta. 00+804, Barangay Partida, Norzagaray, Bulacan","amountPesos":9414000.0,"lengthMeters":600.0,"ratePesosPerMeter":15690.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27108"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bagong Pag-asa, San Miguel, Bulacan, Sta. 00+000 - Sta. 00+198.35","amountPesos":4707000.0,"lengthMeters":198.35,"ratePesosPerMeter":23730.77892614066,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27111"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Baritan, San Miguel, Bulacan, Sta. 00+000 - Sta. 00+201.38","amountPesos":4707000.0,"lengthMeters":201.38,"ratePesosPerMeter":23373.72132287218,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27113"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Basuit, San Ildefonso, Bulacan, Sta. 00+000 - Sta. 00+213.19","amountPesos":4707000.0,"lengthMeters":213.19,"ratePesosPerMeter":22078.89675875979,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27115"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Biak na Bato, San Miguel, Bulacan, Sta. 00+000 - Sta. 00+200.70","amountPesos":4707000.0,"lengthMeters":200.7,"ratePesosPerMeter":23452.91479820628,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27117"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bulualto, San Miguel, Bulacan, Sta. 00+000 - Sta. 00+169.40","amountPesos":4707000.0,"lengthMeters":169.4,"ratePesosPerMeter":27786.30460448642,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27119"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Capihan, San Rafael, Bulacan, Sta. 00+000 - Sta. 00+180","amountPesos":9414000.0,"lengthMeters":180.0,"ratePesosPerMeter":52300.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27121"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pantubig, San Rafael, Bulacan, Sta. 00+000 - Sta. 00+217.50","amountPesos":4707000.0,"lengthMeters":217.5,"ratePesosPerMeter":21641.379310344826,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27123"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Partida, San Miguel, Bulacan, Sta. 00+000 - Sta. 00+212.05","amountPesos":4707000.0,"lengthMeters":212.05,"ratePesosPerMeter":22197.59490686159,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27125"},{"year":2026,"category":"Roads","project":"Rehabilitation of Kalsadang Bago Road, Barangay Caingin, San Rafael, Bulacan, Sta. 00+000 - Sta. 00+377.25","amountPesos":9800000.0,"lengthMeters":377.25,"ratePesosPerMeter":25977.46852220013,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27131"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Buted, Talugtug, Nueva Ecija, Sta. 0+000 - Sta. 0+272.90","amountPesos":2824000.0,"lengthMeters":272.9,"ratePesosPerMeter":10348.11286185416,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27134"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Alemania, Nampicuan, Nueva Ecija, Sta. 0+000 - Sta. 0+355","amountPesos":4900000.0,"lengthMeters":355.0,"ratePesosPerMeter":13802.81690140845,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27138"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Balbalino, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+437.40","amountPesos":6115000.0,"lengthMeters":437.4,"ratePesosPerMeter":13980.338363054414,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27140"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bambanaba, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+590","amountPesos":8428000.0,"lengthMeters":590.0,"ratePesosPerMeter":14284.745762711864,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27144"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bantug, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+355","amountPesos":4900000.0,"lengthMeters":355.0,"ratePesosPerMeter":13802.81690140845,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27146"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Basang Hamog, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+511","amountPesos":7448000.0,"lengthMeters":511.0,"ratePesosPerMeter":14575.342465753425,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27152"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bugtong na Buli, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+332","amountPesos":4900000.0,"lengthMeters":332.0,"ratePesosPerMeter":14759.036144578313,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27154"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bulac, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+355","amountPesos":4900000.0,"lengthMeters":355.0,"ratePesosPerMeter":13802.81690140845,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27156"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bunol, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+466","amountPesos":4900000.0,"lengthMeters":466.0,"ratePesosPerMeter":10515.021459227468,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27158"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cabawangan, Nampicuan, Nueva Ecija, Sta. 0+000 - Sta. 0+355","amountPesos":4900000.0,"lengthMeters":355.0,"ratePesosPerMeter":13802.81690140845,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27162"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Collado, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+772.40","amountPesos":8624000.0,"lengthMeters":772.4,"ratePesosPerMeter":11165.199378560332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27164"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Andal Aliño, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+390","amountPesos":5390000.0,"lengthMeters":390.0,"ratePesosPerMeter":13820.51282051282,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27166"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Doña Lucia, Quezon, Nueva Ecija, Sta. 0+000 - Sta. 0+348","amountPesos":4900000.0,"lengthMeters":348.0,"ratePesosPerMeter":14080.459770114943,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27168"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Ilog Baliwag, Quezon, Nueva Ecija, Sta. 0+000 - Sta. 0+401","amountPesos":4900000.0,"lengthMeters":401.0,"ratePesosPerMeter":12219.451371571073,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27172"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Latap, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+575","amountPesos":7546000.0,"lengthMeters":575.0,"ratePesosPerMeter":13123.478260869566,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27174"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Poblacion to Barangay Cabugao, Santo Domingo, Nueva Ecija, Sta. 0+000 - Sta. 0+628","amountPesos":9800000.0,"lengthMeters":628.0,"ratePesosPerMeter":15605.095541401273,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27176"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Maycaban, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+355","amountPesos":4900000.0,"lengthMeters":355.0,"ratePesosPerMeter":13802.81690140845,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27180"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pinagpanaan, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+355","amountPesos":4900000.0,"lengthMeters":355.0,"ratePesosPerMeter":13802.81690140845,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27184"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Rizal, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+620","amountPesos":8036000.0,"lengthMeters":620.0,"ratePesosPerMeter":12961.290322580646,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27188"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bibiclat, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+390","amountPesos":5390000.0,"lengthMeters":390.0,"ratePesosPerMeter":13820.51282051282,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27190"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Antonio, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+465","amountPesos":6370000.0,"lengthMeters":465.0,"ratePesosPerMeter":13698.924731182795,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27194"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Medico, Nampicuan, Nueva Ecija, Sta. 0+000 - Sta. 0+390","amountPesos":5390000.0,"lengthMeters":390.0,"ratePesosPerMeter":13820.51282051282,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27196"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Santa Cruz, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+390","amountPesos":5488000.0,"lengthMeters":390.0,"ratePesosPerMeter":14071.794871794871,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27198"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Santo Cristo, Quezon, Nueva Ecija, Sta. 0+000 - Sta. 0+437","amountPesos":4900000.0,"lengthMeters":437.0,"ratePesosPerMeter":11212.814645308925,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27200"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Santo Rosario, Aliaga, Nueva Ecija, Sta. 0+000 - Sta. 0+291","amountPesos":4900000.0,"lengthMeters":291.0,"ratePesosPerMeter":16838.487972508592,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27202"},{"year":2026,"category":"Roads","project":"Construction of Road, Bonifacio, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+355","amountPesos":4900000.0,"lengthMeters":355.0,"ratePesosPerMeter":13802.81690140845,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27204"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Curva, Science City of Muñoz, Nueva Ecija, Sta. 0+000 - Sta. 0+286","amountPesos":5649000.0,"lengthMeters":286.0,"ratePesosPerMeter":19751.748251748253,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27206"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Franza, Science City of Muñoz, Nueva Ecija, Sta. 0+000 - Sta. 0+593.80","amountPesos":5649000.0,"lengthMeters":593.8,"ratePesosPerMeter":9513.304142809027,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27208"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Nangabulan, Talugtug, Nueva Ecija, Sta. 0+000 - Sta. 0+185","amountPesos":2824000.0,"lengthMeters":185.0,"ratePesosPerMeter":15264.864864864865,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27210"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Andres, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+401","amountPesos":4707000.0,"lengthMeters":401.0,"ratePesosPerMeter":11738.154613466335,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27212"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage, Barangay Calaocan San Jose City to Barangay Caridad Norte, Llanera, Nueva Ecija, Sta. 0+000 - Sta. 0+550","amountPesos":11760000.0,"lengthMeters":550.0,"ratePesosPerMeter":21381.81818181818,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27218"},{"year":2026,"category":"Roads","project":"Construction of Road with Box Culvert, Barangay Rizal, Bongabon, Nueva Ecija, Sect I: Sta. 0+000 - Sta. 0+200, Sect II: Sta. 0+000 - Sta. 0+037, Sect. III: Sta. 0+000 - Sta. 0+160","amountPesos":9414000.0,"lengthMeters":200.0,"ratePesosPerMeter":47070.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27221"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage, Barangay Mayapyap, Canatuan, Nueva Ecija, Sta. 0+000 - Sta. 0+100","amountPesos":4900000.0,"lengthMeters":100.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27225"},{"year":2026,"category":"Roads","project":"Construction of Road, Saint Joseph Husband of Mary Parish Church Road, Sta. 0+000 - Sta. 0+570, Barangay Bangad, Cabanatuan City, Nueva Ecija","amountPesos":8820000.0,"lengthMeters":570.0,"ratePesosPerMeter":15473.684210526315,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27227"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Siclong-San Fernando Road, Sta. 0+000 - Sta. 0+862.70, Barangay Siclong, Laur, Nueva Ecija","amountPesos":9414000.0,"lengthMeters":862.7,"ratePesosPerMeter":10912.25223136664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27231"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay San Joaquin, Santa Ana, Pampanga, Sta. 0+000 - Sta. 0+198","amountPesos":9414000.0,"lengthMeters":198.0,"ratePesosPerMeter":47545.454545454544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27234"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay San Isidro, San Simon, Pampanga, Sta. 0+000 - Sta. 0+520","amountPesos":9800000.0,"lengthMeters":520.0,"ratePesosPerMeter":18846.153846153848,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27236"},{"year":2026,"category":"Roads","project":"Construction of Road at Purok 1 Barangay Cuayan Bugtong, Candaba, Pampanga, Sta. 0+000 - Sta. 0+550","amountPesos":9414000.0,"lengthMeters":550.0,"ratePesosPerMeter":17116.363636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27244"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Isidro, Lambac, Guagua, Pampanga, Sta. 0 + 000 - Sta. 1 + 000","amountPesos":9414000.0,"lengthMeters":1000.0,"ratePesosPerMeter":9414.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27247"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Maquiapo, Guagua, Pampanga, Sta. 0 + 000 - Sta. 0 + 400","amountPesos":7840000.0,"lengthMeters":400.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27249"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay San Agustin Betis, Guagua, Pampanga, Sta. 0 + 000 - Sta. 0 + 292.91 (Section A) and Sta. 0 + 000 - Sta. 0 + 760","amountPesos":9800000.0,"lengthMeters":760.0,"ratePesosPerMeter":12894.736842105263,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27251"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay San Miguel Betis, Guagua, Pampanga, Sta. 0 + 000 - Sta. 0 + 500","amountPesos":14700000.0,"lengthMeters":500.0,"ratePesosPerMeter":29400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27253"},{"year":2026,"category":"Roads","project":"Construction of Road at Purok 2 Fortuna, Floridablanca, Pampanga, Sta. 0 + 000 - Sta. 0 + 780","amountPesos":9414000.0,"lengthMeters":780.0,"ratePesosPerMeter":12069.23076923077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27255"},{"year":2026,"category":"Roads","project":"Construction of Road at Purok 2 San Vicente (Ebus), Guagua, Pampanga, Sta. 0 + 000 - Sta. 1 + 000","amountPesos":9414000.0,"lengthMeters":1000.0,"ratePesosPerMeter":9414.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27257"},{"year":2026,"category":"Roads","project":"Construction of Road at Purok 7 Barangay San Jose, Floridablanca, Pampanga, Sta. 0 + 000 - Sta. 1 + 000 (Section A) and Sta. 0 + 000 - Sta. 0 + 500 (Section B)","amountPesos":14121000.0,"lengthMeters":1000.0,"ratePesosPerMeter":14121.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27259"},{"year":2026,"category":"Roads","project":"Construction of Road at Purok 9 San Jose, Floridablanca, Pampanga, Sta. 0 + 000 - Sta. 1 + 000","amountPesos":9414000.0,"lengthMeters":1000.0,"ratePesosPerMeter":9414.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27261"},{"year":2026,"category":"Roads","project":"Construction of Road Barangay San Antonio, Lubao, Pampanga, Sta. 0 + 000 - Sta. 1 + 000 (Section A) and Sta. 0 + 000 - Sta. 0 + 500","amountPesos":14121000.0,"lengthMeters":1000.0,"ratePesosPerMeter":14121.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27263"},{"year":2026,"category":"Roads","project":"Construction of Road leading to Bureau of Jail Management and Penology at Barangay Ebus, Guagua, Pampanga, Sta. 0 + 000 - Sta. 0 +700","amountPesos":6590000.0,"lengthMeters":700.0,"ratePesosPerMeter":9414.285714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27265"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Nicolas, Floridablanca, Pampanga, Sta. 0 + 000 - Sta. 0 + 600 (Section A) and Sta. 0 + 000 - Sta. 0 + 600","amountPesos":11119000.0,"lengthMeters":600.0,"ratePesosPerMeter":18531.666666666668,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27267"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Ramon, Floridablanca, Pampanga, Sta. 0 + 000 - Sta. 1 + 500,","amountPesos":19600000.0,"lengthMeters":1500.0,"ratePesosPerMeter":13066.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27269"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Santa Ines, Betis, Guagua, Pampanga Sta. 0 + 000 - Sta. 0 + 490 (Section A) and Sta. 0 + 000 - Sta. 1 + 010","amountPesos":19600000.0,"lengthMeters":1010.0,"ratePesosPerMeter":19405.940594059404,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27271"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Santo Nino, Guagua, Pampanga, Sta. 0 + 000 - Sta. 0 + 120 (Section A) and Sta. 0 + 000 - Sta. 1 + 200 (Section B)","amountPesos":18829000.0,"lengthMeters":1200.0,"ratePesosPerMeter":15690.833333333334,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27273"},{"year":2026,"category":"Roads","project":"Construction of Road, San Nicolas 2nd Lubao, Pampanga, Sta. 0 + 000 - Sta. 0 + 500","amountPesos":9800000.0,"lengthMeters":500.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27275"},{"year":2026,"category":"Roads","project":"Improvement of Road leading to asset school at Barangay San Agustin, Sta Rita, Pampanga, Sta. 0 + 000 - Sta. 0 + 500","amountPesos":9800000.0,"lengthMeters":500.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27283"},{"year":2026,"category":"Roads","project":"Concreting and Upgrading of Road, Barangay Minane, Concepcion, Tarlac, Sta. 0 + 000 - Sta.  1 + 300","amountPesos":24500000.0,"lengthMeters":1300.0,"ratePesosPerMeter":18846.153846153848,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27286"},{"year":2026,"category":"Roads","project":"Concreting and Upgrading of Road, Barangay Sta. Rita, Concepcion, Tarlac, Sta. 0+000.00 to Sta. 0+218.00, Sta. 0+405.00 to Sta. 0+935.00","amountPesos":19600000.0,"lengthMeters":748.0,"ratePesosPerMeter":26203.208556149733,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27288"},{"year":2026,"category":"Roads","project":"Construction of Box Culvert along Road, Barangay Santa Monica, Concepcion, Tarlac, Sta. 0+000.00 - Sta. 0+070.00, Sta. 0+000.00 - Sta. 0+110.00","amountPesos":4900000.0,"lengthMeters":110.0,"ratePesosPerMeter":44545.454545454544,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27290"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Alfonso, Concepcion, Tarlac, Sta. 0+000 - Sta. 0+115.20,Sta. 0+000- Sta. 0+103.80,Sta. 0+000- Sta. 0+062.30,Sta. 0+000-Sta. 0+116.00\"","amountPesos":4900000.0,"lengthMeters":116.0,"ratePesosPerMeter":42241.379310344826,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27292"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bangcu, Bamban, Tarlac, Sta 0+000.00 - Sta 0+400.00","amountPesos":4707000.0,"lengthMeters":400.0,"ratePesosPerMeter":11767.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27294"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cutcut II, Capas, Tarlac, Sta. 0+000.00 - Sta. 1+138.44, Sta. 0+000.00 to 0+196.93","amountPesos":14700000.0,"lengthMeters":1138.44,"ratePesosPerMeter":12912.406450932855,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27296"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Dolores, Capas, Tarlac, Sta. 0+000.00 - Sta. 0+400.00","amountPesos":4707000.0,"lengthMeters":400.0,"ratePesosPerMeter":11767.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27298"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Dutung-A-Matas, Concepcion, Tarlac, Sta. 0+000.00 - Sta. 0+177.91, Sta. 0+000.00 - Sta.0+296.27, Sta. 0+000.00 - Sta.0+124.95, Sta. 0+000.00 - Sta.0+122.15","amountPesos":6590000.0,"lengthMeters":296.27,"ratePesosPerMeter":22243.224086137645,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27300"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Kapanikian, La Paz, Tarlac, Sta. 0+000.00 - Sta. 0+363","amountPesos":4707000.0,"lengthMeters":363.0,"ratePesosPerMeter":12966.94214876033,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27302"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lapurisima, La Paz, Tarlac, Sta. 0+000.00 - Sta. 0+414","amountPesos":4707000.0,"lengthMeters":414.0,"ratePesosPerMeter":11369.565217391304,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27304"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lomboy, La Paz, Tarlac, Sta. 0+000.00 - Sta. 0+295.00","amountPesos":4707000.0,"lengthMeters":295.0,"ratePesosPerMeter":15955.93220338983,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27306"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lourdes, Bamban, Tarlac, Sta.0+000 to Sta. 0+260, Sta. 0+000 to Sta.  0+120, Sta. 0+000 to Sta. 0+280","amountPesos":9800000.0,"lengthMeters":280.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27308"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mabilog, Concepcion, Tarlac, Sta. 0+509.80 - Sta. 0+674.54, Sta. 0+000.00 - Sta. 0+249.02","amountPesos":4707000.0,"lengthMeters":413.76,"ratePesosPerMeter":11376.160092807424,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27310"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Manlapig, Capas, Tarlac, Sta. 0+000.00 - Sta. 0+450","amountPesos":4707000.0,"lengthMeters":450.0,"ratePesosPerMeter":10460.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27312"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Agustin, Concepcion, Tarlac, Sta. 0+000.00 - 0+135.00, Sta. 0+000.00 - 0+205.00, Sta. 0+000.00 - 0+047.50","amountPesos":4707000.0,"lengthMeters":205.0,"ratePesosPerMeter":22960.975609756097,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27314"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Nicolas Balas, Concepcion, Tarlac, Sta. 0+000.00 - Sta. 0+123.26, Sta. 0+000.00 - Sta. 0+134.94, Sta. 0+000.00 - Sta. 0+042.49, Sta. 0+000.00 - Sta. 0+141.01, Sta. 0+000.00 - Sta. 0+075.22, Sta. 0+000.00 - Sta. 0+068.97","amountPesos":4707000.0,"lengthMeters":141.01,"ratePesosPerMeter":33380.61130416283,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27318"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Vicente, Bamban, Tarlac, Sta. 0+000.000 - Sta. 0+373.22","amountPesos":4707000.0,"lengthMeters":373.22,"ratePesosPerMeter":12611.864315953057,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27320"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Vicente, Concepcion, Tarlac, Sta. 0+000.00 - Sta. 0+470.62","amountPesos":5880000.0,"lengthMeters":470.62,"ratePesosPerMeter":12494.1566444265,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27322"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Santo Domingo II, Capas, Tarlac, Sta. 0+000.00 - Sta. 0+094.50, Sta. 0+000.00 - Sta. 0+112.50, Sta. 0+000.00 - Sta. 0+090.00, Sta. 0+000.00 - Sta. 0+150.00","amountPesos":4707000.0,"lengthMeters":150.0,"ratePesosPerMeter":31380.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27324"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Santo Rosario, Capas, Tarlac, Sta. 0+000.00 - Sta. 0+236.82, Sta. 0+000.00 - Sta. 0+028.74, Sta. 0+000.00 - Sta. 0+125.37, Sta. 0+000.00 - Sta. 0+079.55","amountPesos":4707000.0,"lengthMeters":236.82,"ratePesosPerMeter":19875.85507980745,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27326"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Talaga, Capas, Tarlac, Sta. 0+000.00 - Sta. 0+253.22, Sta. 0+000.00 - Sta. 0+154.8","amountPesos":4707000.0,"lengthMeters":253.22,"ratePesosPerMeter":18588.57910117684,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27328"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Talimundoc Marimla, Concepcion, Tarlac, Sta. 0+230.00 - Sta. 0+628.27","amountPesos":4707000.0,"lengthMeters":398.27,"ratePesosPerMeter":11818.61551208979,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27330"},{"year":2026,"category":"Roads","project":"Construction of Anao to Ramos Road (Coral-Iloco-San Jose South Section), Tarlac, Sta. 0+828.74 - Sta. 1+138.20","amountPesos":28243000.0,"lengthMeters":309.46,"ratePesosPerMeter":91265.43010405221,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27335"},{"year":2026,"category":"Roads","project":"Construction of Road with Riprap, Barangay Cayasan, Camiling, Tarlac, Sta. 0+000.00 - Sta. 0+345.00","amountPesos":9414000.0,"lengthMeters":345.0,"ratePesosPerMeter":27286.956521739132,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27337"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Laoang, City of Tarlac, Tarlac, Segment 1: Sta. 0+000.00 - Sta. 0+098.00, Segment 2: Sta. 0+000.00 - 0+104.00, Segment 3: Sta. 0+000.00 - Sta. 0+579.00","amountPesos":18829000.0,"lengthMeters":579.0,"ratePesosPerMeter":32519.86183074266,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27341"},{"year":2026,"category":"Roads","project":"Construction of Access Road going to Anao TPLEX, Anao, Tarlac, Sta. 1+142.00 - Sta. 1+381.85","amountPesos":49000000.0,"lengthMeters":239.85,"ratePesosPerMeter":204294.35063581413,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27343"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Jose de Urquico, City of Tarlac, Tarlac, Sta. 0+000.00 - Sta.0+370.90","amountPesos":9414000.0,"lengthMeters":370.9,"ratePesosPerMeter":25381.504448638447,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27345"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Manuel, City of Tarlac, Tarlac, Sta. 0+000.00 - 0+179.80","amountPesos":4707000.0,"lengthMeters":179.8,"ratePesosPerMeter":26179.087875417128,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27347"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Rang-ay - Purok Nam-ay, Barangay Pada-Pada, Santa Ignacia, Tarlac, Sta. 0+000.00 - Sta. 0+497.00","amountPesos":9414000.0,"lengthMeters":497.0,"ratePesosPerMeter":18941.64989939638,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27349"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Minturot, Purok 2 - Barangay Bacabac Road, Barangay Pindangan 2nd, Camiling, Tarlac, Sta. 0+000.00 - Sta. 0+562.00","amountPesos":7531000.0,"lengthMeters":562.0,"ratePesosPerMeter":13400.35587188612,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27359"},{"year":2026,"category":"Roads","project":"Concreting of Road - Sitio Mabato, Barangay Paite, San Narciso, Zambales Sta. 0+000 - Sta. 0+480.00","amountPesos":9414000.0,"lengthMeters":480.0,"ratePesosPerMeter":19612.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27362"},{"year":2026,"category":"Roads","project":"Concreting of Road, Barangay Dirita, Iba, Zambales Sta. 0+000.00 - Sta. 0+810.00","amountPesos":14121000.0,"lengthMeters":810.0,"ratePesosPerMeter":17433.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27364"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay Tubo-Tubo North, Santa Cruz, Zambales Sta. 0+000.00 - Sta. 0+035.00","amountPesos":29359000.0,"lengthMeters":35.0,"ratePesosPerMeter":838828.5714285715,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27366"},{"year":2026,"category":"Roads","project":"Improvement of Ticub-Cabuyao Road, Barangay Maloma, San Felipe, Zambales Sta. 0+000.00 - Sta. 1+200.00","amountPesos":49000000.0,"lengthMeters":1200.0,"ratePesosPerMeter":40833.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27368"},{"year":2026,"category":"Roads","project":"Concreting of Pamasulungan Road and Panuliangan Road in Barangay Tubo-tubo South, Sta. Cruz, Zambales Sta. 0+000.00 - Sta. 1+000.00","amountPesos":29400000.0,"lengthMeters":1000.0,"ratePesosPerMeter":29400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27370"},{"year":2026,"category":"Roads","project":"Construction of Pagatpat Road, Sta. Cruz, Zambales Sta. 0+000.00 - Sta. 0+640.00, Sta. 0+000.00 - Sta. 0+157.00","amountPesos":29400000.0,"lengthMeters":640.0,"ratePesosPerMeter":45937.5,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27372"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Angeles, San Antonio, Zambales Sta. 0+000 - Sta. 0+570.00, Sta. 0+000 - Sta. 0+200.00","amountPesos":14121000.0,"lengthMeters":570.0,"ratePesosPerMeter":24773.684210526317,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27374"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Babancal, Candelaria, Zambales Sta. 0+000.00 - Sta. 0+900.00","amountPesos":14121000.0,"lengthMeters":900.0,"ratePesosPerMeter":15690.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27376"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Danacbunga, Botolan, Zambales Sta. 0+000.00 - Sta. 1+000.00","amountPesos":29400000.0,"lengthMeters":1000.0,"ratePesosPerMeter":29400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27378"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Esteban, San Antonio, Zambales Sta. 0+000 - Sta. 0+925.00","amountPesos":14121000.0,"lengthMeters":925.0,"ratePesosPerMeter":15265.945945945947,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27380"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lomboy, Sta. Cruz, Zambales Sta. 0+000.00 - Sta. 2+000.00","amountPesos":47072000.0,"lengthMeters":2000.0,"ratePesosPerMeter":23536.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27382"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Malabago, Santa Cruz, Zambales Sta. 0+000.00 - Sta. 0+440.00","amountPesos":4707000.0,"lengthMeters":440.0,"ratePesosPerMeter":10697.727272727272,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27384"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Natividad, San Narciso, Zambales Sta. 0+103.00 - Sta. 0+600.00","amountPesos":6590000.0,"lengthMeters":497.0,"ratePesosPerMeter":13259.557344064386,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27386"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Maymayan to Sitio Buri, Inhobol, Masinloc, Zambales Sta. 0+000.00 - Sta. 0+700.00","amountPesos":16004000.0,"lengthMeters":700.0,"ratePesosPerMeter":22862.85714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27388"},{"year":2026,"category":"Roads","project":"Improvement of Road at Barangay San Juan, Cabangan, Zambales Sta. 0+000.00 - Sta. 0+252.00","amountPesos":6590000.0,"lengthMeters":252.0,"ratePesosPerMeter":26150.79365079365,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27390"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta.0+450.88, Barangay Dalig, Batangas City, Batangas","amountPesos":4009000.0,"lengthMeters":450.88,"ratePesosPerMeter":8891.501064584812,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27394"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta.0+000 - Sta.0+525, Barangay Ilat North, San Pascual, Batangas","amountPesos":4009000.0,"lengthMeters":525.0,"ratePesosPerMeter":7636.190476190476,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27398"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta.0+000 - Sta.0+527.80, Barangay Libjo, Batangas City, Batangas","amountPesos":4009000.0,"lengthMeters":527.8,"ratePesosPerMeter":7595.680181887079,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27400"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta.0+440.39, Barangay Palsahingin to Barangay Santo Niño, San Pascual, Batangas","amountPesos":4009000.0,"lengthMeters":440.39,"ratePesosPerMeter":9103.294806875723,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27402"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta.0+000 - Sta.0+530, Barangay San Francisco to Barangay Santo Niño, Mabini, Batangas","amountPesos":8018000.0,"lengthMeters":530.0,"ratePesosPerMeter":15128.301886792453,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27404"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta.0+000 - Sta.0+372, Barangay San Mariano, San Pascual, Batangas","amountPesos":4009000.0,"lengthMeters":372.0,"ratePesosPerMeter":10776.881720430107,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27406"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta.0+000 - Sta.0+392, Barangay San Pedro, Batangas City, Batangas","amountPesos":40092000.0,"lengthMeters":392.0,"ratePesosPerMeter":102275.51020408163,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27408"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta.0+000 - Sta.1+110.20, Purok 1, Barangay Sorosoro Ibaba, Batangas City, Batangas","amountPesos":8018000.0,"lengthMeters":1110.2,"ratePesosPerMeter":7222.1221401549265,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27410"},{"year":2026,"category":"Roads","project":"Improvement of Road, Sta. 0+000 - Sta. 1+290, Barangay Haligue Silangan, Batangas City, Batangas","amountPesos":9622000.0,"lengthMeters":1290.0,"ratePesosPerMeter":7458.914728682171,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27422"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Sta.0+000 - Sta.1+070, Sitio Mabayabas, Barangay Haligue Silangan, Batangas City, Batangas","amountPesos":8018000.0,"lengthMeters":1070.0,"ratePesosPerMeter":7493.457943925234,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27428"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage Structure, Purok 3 and Purok 4, Barangay III, Sta. 000 + 000 - Sta. 000 + 275, Mataasnakahoy, Batangas","amountPesos":4009000.0,"lengthMeters":275.0,"ratePesosPerMeter":14578.181818181818,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27431"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Calingatan, Sta. 000 + 000 - Sta. 000 + 336, Mataasnakahoy, Batangas","amountPesos":4009000.0,"lengthMeters":336.0,"ratePesosPerMeter":11931.547619047618,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27433"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Loob, Sta. 000 + 000 - Sta. 000 + 403, Mataasnakahoy, Batangas","amountPesos":4009000.0,"lengthMeters":403.0,"ratePesosPerMeter":9947.890818858561,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27435"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lumang Lipa, Sta. 000 + 000 - Sta. 000 + 362, Mataasnakahoy, Batangas","amountPesos":8018000.0,"lengthMeters":362.0,"ratePesosPerMeter":22149.17127071823,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27437"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tambo Ibaba, Sta. 000 + 000 - Sta. 000 + 213, Santa Teresita, Batangas","amountPesos":8018000.0,"lengthMeters":213.0,"ratePesosPerMeter":37643.19248826291,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27439"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Poblacion 1, Sta. 0+000 - Sta. 0+182, Laurel, Batangas","amountPesos":4009000.0,"lengthMeters":182.0,"ratePesosPerMeter":22027.472527472528,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27447"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage Structure, Barangay Lumbang, Sta. 0+000 - Sta. 0+408, Lipa City, Batangas","amountPesos":6816000.0,"lengthMeters":408.0,"ratePesosPerMeter":16705.882352941175,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27450"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Masaya, Sta. 0+000 - Sta. 0+640, Rosario, Batangas","amountPesos":7688000.0,"lengthMeters":640.0,"ratePesosPerMeter":12012.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27452"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bawi, Sta. 0+000 - Sta. 0+400, Padre Garcia, Batangas","amountPesos":4805000.0,"lengthMeters":400.0,"ratePesosPerMeter":12012.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27454"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Salaban and Barangay Lapolapo II, Section 1: Sta. 0+000 - Sta. 0+410, Section 2: Sta. 0+000 - Sta. 0+405, San Jose, Batangas","amountPesos":8018000.0,"lengthMeters":410.0,"ratePesosPerMeter":19556.09756097561,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27456"},{"year":2026,"category":"Roads","project":"Construction of Local Road, Sta. 0+000 - Sta. 0+185, Barangay Lumbangan, Rosario, Batangas","amountPesos":5000000.0,"lengthMeters":185.0,"ratePesosPerMeter":27027.027027027027,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27462"},{"year":2026,"category":"Roads","project":"Construction of Local Road Sta. 0+00 - Sta. 0+185, Barangay Timbugan, Rosario, Batangas","amountPesos":5000000.0,"lengthMeters":185.0,"ratePesosPerMeter":27027.027027027027,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27464"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tipacan, Sta. 0+000 - Sta. 0+400, Lipa City, Batangas","amountPesos":4009000.0,"lengthMeters":400.0,"ratePesosPerMeter":10022.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27466"},{"year":2026,"category":"Roads","project":"Construction of Box Culvert along Kalayaan Road, Sta. 0 + 000 - Sta. 0 + 687, Barangay Magdalo (Putol), Kawit, Cavite","amountPesos":19220000.0,"lengthMeters":687.0,"ratePesosPerMeter":27976.71033478894,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27469"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage Structure, Sta. 00 + 185 - Sta. 00 + 335, Barangay Alapan 2B, Imus City, Cavite","amountPesos":10424000.0,"lengthMeters":150.0,"ratePesosPerMeter":69493.33333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27471"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage Structure, Sta. 00 + 000 - Sta. 00 + 185, Barangay Medicion 1B, Imus City, Cavite","amountPesos":4009000.0,"lengthMeters":185.0,"ratePesosPerMeter":21670.27027027027,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27473"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Halayhay, Sta 0 + 000 - Sta 0 + 186, Tanza, Cavite","amountPesos":4009000.0,"lengthMeters":186.0,"ratePesosPerMeter":21553.763440860213,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27475"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road including Drainage, Sta. 00 + 000 - Sta. 00 + 545, Barangay Medicion 2A, Imus City, Cavite","amountPesos":4805000.0,"lengthMeters":545.0,"ratePesosPerMeter":8816.51376146789,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27477"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Cabuco, Sta 0 + 000 - Sta 0 + 510, Trece Martires City, Cavite","amountPesos":9610000.0,"lengthMeters":510.0,"ratePesosPerMeter":18843.13725490196,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27479"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Lapidario, Sta 0 + 000 - Sta 0 + 510, Trece Martires City, Cavite","amountPesos":9610000.0,"lengthMeters":510.0,"ratePesosPerMeter":18843.13725490196,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27481"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Lancaster Blvd, Sta. 0 + 000 - Sta. 0 + 403, Kawit, Cavite","amountPesos":19220000.0,"lengthMeters":403.0,"ratePesosPerMeter":47692.307692307695,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27483"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Pooc II, Sta. 0+000 - Sta. 0+285, Silang, Cavite","amountPesos":4009000.0,"lengthMeters":285.0,"ratePesosPerMeter":14066.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27490"},{"year":2026,"category":"Bridges","project":"Rehabilitation of Alaska Bridge along Barangay San Antonio (near SLEX Northbound Exit) STA 0+000 - STA 1+337, City of San Pedro, Laguna","amountPesos":9610000.0,"lengthMeters":1337.0,"ratePesosPerMeter":7187.73373223635,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27496"},{"year":2026,"category":"Roads","project":"Improvement of Road including Drainage along Junction Road, Barangay Batong Malake STA 0+000 - STA 0+700, Los Baños, Laguna","amountPesos":38441000.0,"lengthMeters":700.0,"ratePesosPerMeter":54915.71428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27498"},{"year":2026,"category":"Roads","project":"Improvement of Road including Drainage along J. Aquino St., Barangay Mayondon STA 0+380 - STA 1+065, Los Baños, Laguna","amountPesos":38441000.0,"lengthMeters":685.0,"ratePesosPerMeter":56118.24817518248,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27500"},{"year":2026,"category":"Roads","project":"Improvement of Road including Drainage along Villanueva St., Barangay Mayondon STA 1+065 - STA 1+690, Los Baños, Laguna","amountPesos":38441000.0,"lengthMeters":625.0,"ratePesosPerMeter":61505.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27502"},{"year":2026,"category":"Roads","project":"Improvement of Road including Drainage along H. Apolinario St., Barangay Mayondon STA 1+690 - STA 2+210, Los Baños, Laguna","amountPesos":38441000.0,"lengthMeters":520.0,"ratePesosPerMeter":73925.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27504"},{"year":2026,"category":"Roads","project":"Improvement of Road including Drainage along San Luis Road, Barangay Tuntungin Putho STA 0+000 - STA 1+200, Los Baños, Laguna","amountPesos":38441000.0,"lengthMeters":1200.0,"ratePesosPerMeter":32034.166666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27506"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage Canal, Barangay Malaban STA 0+000 - STA 0+750, Binan City, Laguna","amountPesos":24025000.0,"lengthMeters":750.0,"ratePesosPerMeter":32033.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27508"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage Structure, Barangay Narra STA 0+000 - STA 0+400, City of San Pedro, Laguna","amountPesos":18738000.0,"lengthMeters":400.0,"ratePesosPerMeter":46845.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27510"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Caingin STA 0+000 - STA 0+370, City of Santa Rosa, Laguna","amountPesos":10571000.0,"lengthMeters":370.0,"ratePesosPerMeter":28570.27027027027,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27512"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Paciano Rizal STA 0+000 - STA 0+350, Bay, Laguna","amountPesos":8018000.0,"lengthMeters":350.0,"ratePesosPerMeter":22908.571428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27514"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Tagapo STA 0+000 - STA 0+400, City of Santa Rosa, Laguna","amountPesos":9622000.0,"lengthMeters":400.0,"ratePesosPerMeter":24055.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27516"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Culoy, Liliw, Laguna - Sta. 0 + 000 to Sta. 0 + 385","amountPesos":5613000.0,"lengthMeters":385.0,"ratePesosPerMeter":14579.22077922078,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27521"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Ilayang Palina, Liliw, Laguna - Sta. 0 + 000 - Sta. 1 + 926","amountPesos":24055000.0,"lengthMeters":1926.0,"ratePesosPerMeter":12489.615784008307,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27523"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Palayan, Liliw, Laguna - Sta. 0 + 000 - Sta. 1 + 926","amountPesos":24055000.0,"lengthMeters":1926.0,"ratePesosPerMeter":12489.615784008307,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27525"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Rizal, Liliw, Laguna - Sta. 0 + 000 - Sta. 0 + 400","amountPesos":8018000.0,"lengthMeters":400.0,"ratePesosPerMeter":20045.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27527"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Santa Felomina, San Pablo City, Laguna - Sta. 0 + 000 to Sta. 1 + 258","amountPesos":20046000.0,"lengthMeters":1258.0,"ratePesosPerMeter":15934.817170111288,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27529"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Talangan, Nagcarlan, Laguna - Sta. 0 + 000 - Sta. 1 + 925","amountPesos":24055000.0,"lengthMeters":1925.0,"ratePesosPerMeter":12496.103896103896,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27533"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pamatdan, Sta. 0+000 - Sta. 0+300, Polillo, Quezon","amountPesos":4009000.0,"lengthMeters":300.0,"ratePesosPerMeter":13363.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27536"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Poblacion, Sta. 0+000 - Sta. 0+300, Burdeos, Quezon","amountPesos":4009000.0,"lengthMeters":300.0,"ratePesosPerMeter":13363.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27538"},{"year":2026,"category":"Roads","project":"Rehabilitation of Infanta - Nakar Road, Sta. 0+000 - Sta. 7+700, Infanta and General Nakar, Quezon","amountPesos":93000000.0,"lengthMeters":7700.0,"ratePesosPerMeter":12077.922077922078,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27542"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Milawid, Sta. 0+000 - Sta. 0+300, Panukulan, Quezon","amountPesos":4009000.0,"lengthMeters":300.0,"ratePesosPerMeter":13363.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27548"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Buenavista East, Section I: Sta. 0 + 000 - Sta. 0 + 098, Section II: Sta. 0 + 000 - Sta. 0 + 077, Candelaria, Quezon","amountPesos":4009000.0,"lengthMeters":98.0,"ratePesosPerMeter":40908.163265306124,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27551"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Concepcion Banahaw, Section I: Sta. 0 + 000 - Sta. 0 + 047, Section II: Sta. 0 + 000 - Sta. 0 + 076, Section III: Sta. 0 + 000 - Sta. 0 + 218, Section IV: Sta. 0 + 000 - Sta. 0 +118, Section V: Sta. 0 + 000 - Sta. 0 + 043, Sariaya, Quezon","amountPesos":8018000.0,"lengthMeters":218.0,"ratePesosPerMeter":36779.81651376147,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27553"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Concepcion Pinagbakuran, Section I: Sta. 0 + 000 - Sta. 0 + 060.5, Section II: Sta. 0 + 000 - Sta. 0 + 470, Sariaya, Quezon","amountPesos":8018000.0,"lengthMeters":470.0,"ratePesosPerMeter":17059.574468085106,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27555"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Guisguis-San Roque, Section I: Sta. 0 + 000 - Sta. 0 + 145, Section II: Sta. 0 + 000 - Sta.0 + 309, Section III: Sta. 0 + 000 - Sta. 0 + 078.5, Section IV: Sta 0 + 000 - Sta. 0 + 053.5, Sariaya, Quezon","amountPesos":8018000.0,"lengthMeters":309.0,"ratePesosPerMeter":25948.22006472492,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27557"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Janagdong I, Sta. 0 + 000 - Sta. 0 + 435, Sariaya, Quezon","amountPesos":7208000.0,"lengthMeters":435.0,"ratePesosPerMeter":16570.114942528737,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27559"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lutucan Malabag, Section I: Sta. 0 + 000 - Sta. 0 + 530, Section II: Sta. 0 + 000 - Sta. 0 + 055, Sariaya, Quezon","amountPesos":8018000.0,"lengthMeters":530.0,"ratePesosPerMeter":15128.301886792453,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27561"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Montecillo, Sta. 0 + 000 - Sta. 0 + 580, Sariaya, Quezon","amountPesos":8018000.0,"lengthMeters":580.0,"ratePesosPerMeter":13824.137931034482,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27563"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pahinga Norte, Section I: Sta. 0 + 000 - Sta. 0 + 319, Section II: Sta 0 + 000 - Sta. 0 + 229, Candelaria, Quezon","amountPesos":8018000.0,"lengthMeters":319.0,"ratePesosPerMeter":25134.796238244515,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27565"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Jose, Section I: Sta. 0 + 000 - Sta. 0 + 414, Section II: Sta. 0 + 000 - Sta. 0 + 140, Tiaong, Quezon","amountPesos":8018000.0,"lengthMeters":414.0,"ratePesosPerMeter":19367.149758454107,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27567"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Talaan Aplaya, Sta. 0 + 000 - Sta. 0 + 585, Sariaya, Quezon","amountPesos":8018000.0,"lengthMeters":585.0,"ratePesosPerMeter":13705.982905982906,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27586"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Poblacion 2, Mulanay, Quezon, Sta. 0+000 - Sta. 0+150","amountPesos":4009000.0,"lengthMeters":150.0,"ratePesosPerMeter":26726.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27589"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bagong Silang, STA 000+107 - STA 000+397, Guinayangan, Quezon","amountPesos":11532000.0,"lengthMeters":290.0,"ratePesosPerMeter":39765.51724137931,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27594"},{"year":2026,"category":"Roads","project":"Construction of Magsaysay- Villamonte Road in Lopez Quezon, ST 219+806.9 - 218+756.9","amountPesos":50000000.0,"lengthMeters":1050.0,"ratePesosPerMeter":47619.04761904762,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27596"},{"year":2026,"category":"Roads","project":"Construction of Adia Bitaog-Casasahan Ibaba-Piña Ilaya Road, Sta. 0+054 - Sta. 0+764, Gumaca, Quezon","amountPesos":20000000.0,"lengthMeters":710.0,"ratePesosPerMeter":28169.014084507042,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27598"},{"year":2026,"category":"Roads","project":"Construction of Access Roads Leading to Sampitan Beach, Sta. 25+200 - Sta. 26+420, Calauag, Quezon","amountPesos":30000000.0,"lengthMeters":1220.0,"ratePesosPerMeter":24590.16393442623,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27600"},{"year":2026,"category":"Roads","project":"Construction of Access Roads leading to Isla Pulong Pasig, Sta 3+800 - Sta. 4+220, Sta 4+260 - Sta. 4+900, Sta 5+010 - Sta. 5+170, Calauag, Quezon","amountPesos":30000000.0,"lengthMeters":1220.0,"ratePesosPerMeter":24590.16393442623,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27602"},{"year":2026,"category":"Roads","project":"Construction of Local Roads, Calantipayan - Jongo - San Rafael - Cogorin Ibaba Road, Sta. 5+205 - Sta. 6+905, Lopez, Quezon","amountPesos":20000000.0,"lengthMeters":1700.0,"ratePesosPerMeter":11764.70588235294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27604"},{"year":2026,"category":"Roads","project":"Construction of Local Roads, Camohaguin - Biga - San Diego - Villafuerte - Bantad Road, Sta. 6+613- Sta. 7+963, Gumaca, Quezon","amountPesos":20000000.0,"lengthMeters":1350.0,"ratePesosPerMeter":14814.814814814816,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27606"},{"year":2026,"category":"Roads","project":"Construction of Local Roads, Magsaysay-Guihay-Sta. Teresa-Sta. Lucia, Sta. 2+500 - Sta. 4+200, Lopez, Quezon","amountPesos":30000000.0,"lengthMeters":1700.0,"ratePesosPerMeter":17647.058823529413,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27608"},{"year":2026,"category":"Roads","project":"Construction of Guinayangan-Buenavista Road, Sta. 5+154 - Sta. 6+539, Sta. 6+625 - Sta. 6+893, Sta. 7+005 - Sta. 7+357, Sta. 7+497 - Sta. 8+105, Sta. 8+301 - Sta. 9+088, Guinayangan, Quezon","amountPesos":50000000.0,"lengthMeters":3400.0,"ratePesosPerMeter":14705.882352941177,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27612"},{"year":2026,"category":"Roads","project":"Construction of Lopez-Macalelon Road, Sta. 5+000 - Sta. 8+750, Lopez, Quezon","amountPesos":100000000.0,"lengthMeters":3750.0,"ratePesosPerMeter":26666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27614"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage at Anonas St., Phase 2 (Sta. 0+000-0+350), Barangay San Luis, Antipolo City","amountPesos":11532000.0,"lengthMeters":350.0,"ratePesosPerMeter":32948.57142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27633"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage at Poinsettia St. (Sta. 0+000 - Sta.0+420), Barangay San Luis, Antipolo City","amountPesos":14415000.0,"lengthMeters":420.0,"ratePesosPerMeter":34321.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27635"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage at Sitio Inalsan, Sta. 0+000 - Sta.0+150, Barangay San Juan, Antipolo City, Rizal","amountPesos":5000000.0,"lengthMeters":150.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27637"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage Structure, NHA Avenue, 0+000.00-0+740.00 Barangay Dela Paz, City of Antipolo, Rizal","amountPesos":9369000.0,"lengthMeters":740.0,"ratePesosPerMeter":12660.81081081081,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27639"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage system along Boso-Boso Road,Sta. 0+000 - Sta.0+280, Barangay San Jose Antipolo City, Rizal","amountPesos":9610000.0,"lengthMeters":280.0,"ratePesosPerMeter":34321.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27641"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System going to Super Health Center sta. 00+000 - sta. 0+200, Barangay San Roque, City of Antipolo, Rizal","amountPesos":8018000.0,"lengthMeters":200.0,"ratePesosPerMeter":40090.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27643"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System sta. 00+000 - sta. 0+280, Barangay Calawis, City of Antipolo, Rizal","amountPesos":8018000.0,"lengthMeters":280.0,"ratePesosPerMeter":28635.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27645"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System Sta. 0+000 - Sta. 0+270, Barangay Kalayaan, Angono, Rizal","amountPesos":8018000.0,"lengthMeters":270.0,"ratePesosPerMeter":29696.296296296296,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27647"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System Sta 0+000 - Sta. 0+135, Barangay Palangoy, Binangonan, Rizal","amountPesos":4009000.0,"lengthMeters":135.0,"ratePesosPerMeter":29696.296296296296,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27649"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System Sta 0+000 - Sta. 0+540, Barangay San Andres, Cainta, Rizal","amountPesos":16037000.0,"lengthMeters":540.0,"ratePesosPerMeter":29698.14814814815,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27651"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Block 27 Masipag Street and Block 24 Mahinahon Street Sta. 0+000 - Sta. 0+190, Purok 5, Lupang Arenda, Barangay Santa Ana, Taytay, Rizal","amountPesos":5613000.0,"lengthMeters":190.0,"ratePesosPerMeter":29542.105263157893,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27653"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage system, Everlasting, Sta. 0+000 - Sta.0+370, Barangay San Luis, Antipolo City, Rizal","amountPesos":13000000.0,"lengthMeters":370.0,"ratePesosPerMeter":35135.13513513513,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27655"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage system, Nazarene Ville, Sta. 0+000 - Sta. 0+280, Barangay San Roque, Antipolo City, Rizal","amountPesos":9610000.0,"lengthMeters":280.0,"ratePesosPerMeter":34321.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27657"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage system, Panorama, Sta. 0+000 - Sta. 0+140, Barangay Cupang, Antipolo City, Rizal","amountPesos":4805000.0,"lengthMeters":140.0,"ratePesosPerMeter":34321.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27659"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Purok 1 and Road 7, ABNAI from Main Road to Tertiary Road Sta. 0+000 - Sta. 0+135, Barangay Santa Ana, Taytay, Rizal","amountPesos":4009000.0,"lengthMeters":135.0,"ratePesosPerMeter":29696.296296296296,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27661"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Santo Niño, sta. 00+000 - sta. 0+216, Barangay Dalig, City of Antipolo, Rizal","amountPesos":5613000.0,"lengthMeters":216.0,"ratePesosPerMeter":25986.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27663"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Sulit Compound Sta. 0+000 - Sta 0+280, Barangay San Isidro, Angono, Rizal","amountPesos":8018000.0,"lengthMeters":280.0,"ratePesosPerMeter":28635.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27665"},{"year":2026,"category":"Roads","project":"Construction of Road, Block 17 Mapalad Street, Block 14 Maganda Street and Block 15 Mahogany Street Sta. 0+000 - Sta 0+224, Sta. 0+000 - Sta 0+126, Purok 2, Lupang Arenda, Barangay Santa Ana, Taytay, Rizal","amountPesos":10424000.0,"lengthMeters":224.0,"ratePesosPerMeter":46535.71428571428,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27667"},{"year":2026,"category":"Roads","project":"Construction of Road, San Carlos Hills and Sitio Manggahan Sta. 0+000 - Sta 0+270, Barangay San Carlos, Binangonan, Rizal","amountPesos":8018000.0,"lengthMeters":270.0,"ratePesosPerMeter":29696.296296296296,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27669"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage Structure, Edward Street Sta. 0+000-0+660 and Marcus Aurelius Street Sta. 0+000-0+200, Kingsville Subdivision, Barangay Mayamot, Antipolo City","amountPesos":18738000.0,"lengthMeters":660.0,"ratePesosPerMeter":28390.909090909092,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27673"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage Structure, GSIS Avenue, Sta.0+000-0+260, Sta. 0+300-0+780, Barangay Bagong Nayon, City of Antipolo, Rizal","amountPesos":9369000.0,"lengthMeters":740.0,"ratePesosPerMeter":12660.81081081081,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27675"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage System, Talavera Sta. 0+000 - Sta. 0+170, Armada Sta. 0+000 - Sta. 0+160, Silva 0+000 - Sta. 0+160, Almonte Sta. 0+000 - Sta. 0+160 and Reinosa St, Vista Verde, Barangay Muntindilaw, Antipolo City","amountPesos":26234000.0,"lengthMeters":170.0,"ratePesosPerMeter":154317.64705882352,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27677"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage System, Matalino Street, sta. 00+000 - sta. 0+235, Barangay Dalig, City of Antipolo, Rizal","amountPesos":6415000.0,"lengthMeters":235.0,"ratePesosPerMeter":27297.872340425532,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27679"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage System, Sitio Kabisig, Phase II,sta. 00+000 - sta. 0+280, Barangay San Jose, City of Antipolo, Rizal","amountPesos":8018000.0,"lengthMeters":280.0,"ratePesosPerMeter":28635.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27681"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage System, Sitio Pinagminahan,sta. 00+000 - sta. 0+300, Barangay San Luis, City of Antipolo, Rizal","amountPesos":9622000.0,"lengthMeters":300.0,"ratePesosPerMeter":32073.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27683"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Barangay Sampaloc, Sta. 0+000 - Sta. 0+300, Tanay, Rizal","amountPesos":9610000.0,"lengthMeters":300.0,"ratePesosPerMeter":32033.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27686"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Barangay Bagumbong, Sta. 0+180 - Sta. 0+380, Jala-jala, Rizal","amountPesos":4805000.0,"lengthMeters":200.0,"ratePesosPerMeter":24025.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27688"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Barangay Ampid 1, Sta. 0+000 - Sta. 0+220, San Mateo, Rizal","amountPesos":4805000.0,"lengthMeters":220.0,"ratePesosPerMeter":21840.909090909092,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27690"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System at Dulong Bayan 2, Sta. 0+000 - Sta. 0+580, San Mateo, Rizal","amountPesos":20000000.0,"lengthMeters":580.0,"ratePesosPerMeter":34482.75862068965,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27692"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Guitnang Bayan 2, Sta. 0+140 - Sta. 0+280, San Mateo, Rizal","amountPesos":4805000.0,"lengthMeters":140.0,"ratePesosPerMeter":34321.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27694"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Barangay Malanday, Sta. 0+000 - Sta. 0+850, San Mateo, Rizal","amountPesos":28831000.0,"lengthMeters":850.0,"ratePesosPerMeter":33918.82352941176,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27696"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Barangay Maly, Sta. 0+000 - Sta. 0+320, San Mateo, Rizal","amountPesos":9610000.0,"lengthMeters":320.0,"ratePesosPerMeter":30031.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27698"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Barangay Kaybuto, Section I (Sta. 0+000 - Sta. 0+140), Section II (Sta. 0+000 - Sta. 0+130), Tanay, Rizal","amountPesos":4805000.0,"lengthMeters":140.0,"ratePesosPerMeter":34321.42857142857,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27700"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Barangay Mag-Ampon, Sta. 0+165 - Sta. 0+617, Tanay, Rizal","amountPesos":4805000.0,"lengthMeters":452.0,"ratePesosPerMeter":10630.530973451327,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27702"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Barangay Patunhay, Sta. 0+000 - Sta. 0+184, Cardona, Rizal","amountPesos":4805000.0,"lengthMeters":184.0,"ratePesosPerMeter":26114.130434782608,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27704"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage at Barangay San Juan, Section I (Sta. 0+000 - Sta. 0+250), Section II (Sta. 0+000 - Sta. 0+150), Baras, Rizal","amountPesos":4805000.0,"lengthMeters":250.0,"ratePesosPerMeter":19220.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27706"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Barangay Ampid 2, Section I (Sta. 0+000 - Sta. 0+109), Section II (Sta. 0+000 - Sta. 0+034), San Mateo, Rizal","amountPesos":4009000.0,"lengthMeters":109.0,"ratePesosPerMeter":36779.81651376147,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27708"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Barangay Ampid I, Section I (Sta. 0+000 - Sta. 0+086), Section II (Sta. 0+000 - Sta. 0+140), San Mateo, Rizal","amountPesos":4009000.0,"lengthMeters":140.0,"ratePesosPerMeter":28635.714285714286,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27710"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Barangay Banaba, Sta. 0+000 - Sta. 0+600, San Mateo, Rizal","amountPesos":16037000.0,"lengthMeters":600.0,"ratePesosPerMeter":26728.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27712"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Barangay Dulong Bayan 2, Section I (Sta. 0+000 - Sta. 0+129), Section II (Sta. 0+000 - Sta. 0+100), San Mateo, Rizal","amountPesos":4009000.0,"lengthMeters":129.0,"ratePesosPerMeter":31077.51937984496,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27714"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Barangay Dulong Bayan I, Sta. 0+000 - Sta. 0+250, San Mateo, Rizal","amountPesos":4009000.0,"lengthMeters":250.0,"ratePesosPerMeter":16036.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27716"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Barangay Guitnang Bayan 2, Section I (Sta. 0+000 - Sta. 0+250), Section II (Sta. 0+000 - Sta. 0+140), San Mateo, Rizal","amountPesos":8018000.0,"lengthMeters":250.0,"ratePesosPerMeter":32072.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27718"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Barangay Gulod Malaya, Sta. 0+000 - Sta. 0+133, San Mateo, Rizal","amountPesos":4009000.0,"lengthMeters":133.0,"ratePesosPerMeter":30142.85714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27720"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Barangay Halayhayin, Sta. 0+000 - Sta. 0+134, Pililla, Rizal","amountPesos":4009000.0,"lengthMeters":134.0,"ratePesosPerMeter":29917.910447761195,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27722"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Barangay Pintong Bukawe, Sta. 0+000 - Sta. 0+616, San Mateo, Rizal","amountPesos":4009000.0,"lengthMeters":616.0,"ratePesosPerMeter":6508.116883116883,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27724"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Barangay Plaza Aldea, Sta. 0+000 - Sta. 0+358, Tanay, Rizal","amountPesos":12028000.0,"lengthMeters":358.0,"ratePesosPerMeter":33597.76536312849,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27726"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Barangay Santa Ana, Sta. 0+000 - Sta. 0+220, San Mateo, Rizal","amountPesos":4009000.0,"lengthMeters":220.0,"ratePesosPerMeter":18222.727272727272,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27728"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Barangay Santo Niño, Sta. 0+000 - Sta. 0+240, San Mateo, Rizal","amountPesos":4009000.0,"lengthMeters":240.0,"ratePesosPerMeter":16704.166666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27730"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Barangay Silangan, Sta. 0+000 - Sta. 0+580, San Mateo, Rizal","amountPesos":16037000.0,"lengthMeters":580.0,"ratePesosPerMeter":27650.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27732"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bayugo, Sta. 0+000 - Sta. 0+720, Jalajala, Rizal","amountPesos":14415000.0,"lengthMeters":720.0,"ratePesosPerMeter":20020.833333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27734"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cuyambay, Sta. 0+265 - Sta. 0+530, Tanay, Rizal","amountPesos":4009000.0,"lengthMeters":265.0,"ratePesosPerMeter":15128.301886792453,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27736"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Dulumbayan, Sta. 0+000 - Sta. 0+200, Teresa, Rizal","amountPesos":4009000.0,"lengthMeters":200.0,"ratePesosPerMeter":20045.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27738"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lagundi, Sta. 0+000 - Sta. 0+370, Morong, Rizal","amountPesos":4009000.0,"lengthMeters":370.0,"ratePesosPerMeter":10835.135135135135,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27740"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lubo, Sta. 0+000 - Sta. 0+520, Tanay, Rizal","amountPesos":9610000.0,"lengthMeters":520.0,"ratePesosPerMeter":18480.76923076923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27742"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Macabud to Barangay San Isidro, Sta. 0+000 - Sta. 1+200, Rodriguez, Rizal","amountPesos":16037000.0,"lengthMeters":1200.0,"ratePesosPerMeter":13364.166666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27744"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Madilaydilay, Sta. 0+000 - Sta. 0+360, Tanay, Rizal","amountPesos":4009000.0,"lengthMeters":360.0,"ratePesosPerMeter":11136.111111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27746"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mal-Cal, Sta. 0+000 - Sta. 0+066, Cardona, Rizal","amountPesos":4009000.0,"lengthMeters":66.0,"ratePesosPerMeter":60742.42424242424,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27748"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Navotas, Sta. 0+000 - Sta. 0+248, Cardona, Rizal","amountPesos":4009000.0,"lengthMeters":248.0,"ratePesosPerMeter":16165.322580645161,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27750"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Plaza Aldea, Sta. 0+000 - Sta. 0+250, Tanay, Rizal","amountPesos":4805000.0,"lengthMeters":250.0,"ratePesosPerMeter":19220.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27752"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Puray, Sta. 0+000 - Sta. 0+900, Rodriguez, Rizal","amountPesos":12028000.0,"lengthMeters":900.0,"ratePesosPerMeter":13364.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27754"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sampaloc, Sta. 0+000 - Sta. 0+220, Tanay, Rizal","amountPesos":4009000.0,"lengthMeters":220.0,"ratePesosPerMeter":18222.727272727272,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27756"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Isidro, Sta. 0+000 - Sta. 0+900, Rodriguez, Rizal","amountPesos":12028000.0,"lengthMeters":900.0,"ratePesosPerMeter":13364.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27758"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sipsipin to Barangay 1st District, Sta. 0+000 - Sta. 0+800, Jalajala, Rizal","amountPesos":14415000.0,"lengthMeters":800.0,"ratePesosPerMeter":18018.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27760"},{"year":2026,"category":"Roads","project":"Construction of Road, Acacia to Siniguelas Street, Sta. 000+000 - Sta. 000+500, Barangay Mapaya, San Jose, Occidental Mindoro","amountPesos":8302000.0,"lengthMeters":500.0,"ratePesosPerMeter":16604.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27764"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 000+000 - Sta. 000+500, Barangay Kanluran, Looc, Occidental Mindoro","amountPesos":8302000.0,"lengthMeters":500.0,"ratePesosPerMeter":16604.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27766"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 000+000 - Sta. 001+000, Barangay San Roque, San Jose, Occidental Mindoro","amountPesos":16604000.0,"lengthMeters":1000.0,"ratePesosPerMeter":16604.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27768"},{"year":2026,"category":"Roads","project":"Construction of Barangay Road in Barangay Talaotao (Baluga Road), STA. 0+000 - STA. 0+200, Looc, Occidental Mindoro","amountPesos":5000000.0,"lengthMeters":200.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27770"},{"year":2026,"category":"Roads","project":"Construction of Sta. Lucia Roads Network, STA. 0+000 - STA. 1+000, Sablayan, Mindoro Occidental","amountPesos":25000000.0,"lengthMeters":1000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27772"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Malabnig, Sta. 000+000 - Sta. 000+500, Barangay Rumbang, Rizal, Occidental Mindoro","amountPesos":8302000.0,"lengthMeters":500.0,"ratePesosPerMeter":16604.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27774"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta.0+000 - Sta.0+346.5, Barangay Batino, Calapan City, Oriental Mindoro","amountPesos":4151000.0,"lengthMeters":346.5,"ratePesosPerMeter":11979.79797979798,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27777"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta.0+240 - Sta.0+538.5, Barangay Bugtong na Tuog, Socorro, Oriental Mindoro","amountPesos":4151000.0,"lengthMeters":298.5,"ratePesosPerMeter":13906.197654941374,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27779"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta.0+000 - Sta.0+384.50, Barangay Happy Valley,Socorro, Oriental Mindoro","amountPesos":4151000.0,"lengthMeters":384.5,"ratePesosPerMeter":10795.838751625488,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27781"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta.0+000 - Sta.0+355.5, Barangay Ilag, San Teodoro, Oriental Mindoro","amountPesos":4151000.0,"lengthMeters":355.5,"ratePesosPerMeter":11676.511954992968,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27783"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000.00 - Sta. 0+539.00, Sta. 0+236.00 - Sta. 0+311.00, Sta. 0+000 - Sta. 0+800.00, Sta. 0+000.00 - Sta. 0+041.00, Sta. 0+048.00 - Sta. 1+245.00, Barangay Palhi, City of Calapan, Oriental Mindoro","amountPesos":24907000.0,"lengthMeters":1245.0,"ratePesosPerMeter":20005.62248995984,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27785"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta.0+000 - Sta.0+290,Sta.0+000 - Sta.0+290, Barangay Pula, Pola, Oriental Mindoro","amountPesos":4151000.0,"lengthMeters":290.0,"ratePesosPerMeter":14313.793103448275,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27787"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta.0+000 - Sta.0+270, Sta.0+427 - Sta.0+483, Barangay Water, Baco, Oriental Mindoro","amountPesos":4811000.0,"lengthMeters":326.0,"ratePesosPerMeter":14757.668711656443,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27791"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta.0+000 - Sta.0+164, Sitio San Felipe, Barangay Tagumpay, Baco, Oriental Mindoro","amountPesos":4811000.0,"lengthMeters":164.0,"ratePesosPerMeter":29335.365853658535,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27795"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Sta.0+000 - Sta.0+472 Barangay Dulangan 2, ,Baco, Oriental Mindoro","amountPesos":4811000.0,"lengthMeters":472.0,"ratePesosPerMeter":10192.796610169491,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27797"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Sta.0+000 - Sta.0+348.5,Barangay Suqui, City of Calapan, Oriental Mindoro","amountPesos":8302000.0,"lengthMeters":348.5,"ratePesosPerMeter":23822.094691535152,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27799"},{"year":2026,"category":"Roads","project":"Construction of Biriran Road, Sta. 0+000 - Sta. 1+680, Barangay Tarusan, Bataraza, Palawan","amountPesos":35000000.0,"lengthMeters":1680.0,"ratePesosPerMeter":20833.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27802"},{"year":2026,"category":"Roads","project":"Construction of Pangi-Pangi Road, Sta. 0+275 - Sta. 1+275, Barangay Bulalacao, Bataraza, Palawan","amountPesos":20756000.0,"lengthMeters":1000.0,"ratePesosPerMeter":20756.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27804"},{"year":2026,"category":"Roads","project":"Construction of Road, Lapu-Lapu and Tambakol Street to Asgali Beach, Sta. 1+011 - Sta. 2+064, Sta. 1+592 - Sta. 2+339, Barangay Inogbong, Bataraza, Palawan","amountPesos":33209000.0,"lengthMeters":1328.0,"ratePesosPerMeter":25006.777108433736,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27806"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Old Site, Barangay Ransang, Sta. 1+119 - Sta. 1+479, Rizal, Palawan","amountPesos":7698000.0,"lengthMeters":360.0,"ratePesosPerMeter":21383.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27808"},{"year":2026,"category":"Roads","project":"Construction of Road, Tulingan Street, Sta. 0+093 - Sta. 1+229, Barangay Inogbong, Bataraza, Palawan","amountPesos":24907000.0,"lengthMeters":1136.0,"ratePesosPerMeter":21925.176056338027,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27810"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 00+000 - Sta. 00+200, Barangay Apo-aporawan, Aborlan, Palawan","amountPesos":8302000.0,"lengthMeters":200.0,"ratePesosPerMeter":41510.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27813"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 00+000 - Sta. 00+260, Barangay Bancao-Bancao, Puerto Princesa City, Palawan","amountPesos":8302000.0,"lengthMeters":260.0,"ratePesosPerMeter":31930.76923076923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27815"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 00+000 - Sta. 00+310, Barangay Inagawan-Sub, Puerto Princesa City, Palawan","amountPesos":8302000.0,"lengthMeters":310.0,"ratePesosPerMeter":26780.645161290322,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27817"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 00+232 - Sta. 00+646, Barangay San Manuel Phase 2, Puerto Princesa City, Palawan","amountPesos":9622000.0,"lengthMeters":414.0,"ratePesosPerMeter":23241.545893719805,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27819"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 00+000 - Sta. 00+410, Barangay Santa Lourdes, Puerto Princesa City, Palawan","amountPesos":8302000.0,"lengthMeters":410.0,"ratePesosPerMeter":20248.780487804877,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27821"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 00+000 - Sta. 00+390, Barangay Tagburos, Puerto Princesa City, Palawan","amountPesos":6642000.0,"lengthMeters":390.0,"ratePesosPerMeter":17030.76923076923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27823"},{"year":2026,"category":"Roads","project":"Concreting of 1.0 km. Intermittent Road  and Drainage at Headquarters Western Command, Brgy. San Miguel. Puerto Princesa City, Palawan","amountPesos":37883000.0,"lengthMeters":1000.0,"ratePesosPerMeter":37883.0,"lengthMethod":"Explicit length in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27825"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Ilang-Ilang to Purok Anonang, Sta. 00+000 - Sta. 00+410, Barangay Sicsican, Puerto Princesa City, Palawan","amountPesos":9622000.0,"lengthMeters":410.0,"ratePesosPerMeter":23468.29268292683,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27831"},{"year":2026,"category":"Roads","project":"Construction of Access Road to Public Market, Sta. 00+000 - Sta. 00+126, Sitio Malag-alag, Brgy. Concepcion Norte, Sta. Maria, Romblon","amountPesos":5000000.0,"lengthMeters":126.0,"ratePesosPerMeter":39682.53968253968,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27836"},{"year":2026,"category":"Roads","project":"Construction of Barangay Puro-Barangay Lamba Road including Drainage System (Sta. 0+000 - Sta. 1+150), Legazpi City, Albay","amountPesos":49000000.0,"lengthMeters":1150.0,"ratePesosPerMeter":42608.69565217391,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27840"},{"year":2026,"category":"Roads","project":"Construction of Paved Access Road Buyo (Sitio Parong) Barangay Buyo (Sta. 1+020 - 1+540), Manito, Albay","amountPesos":39200000.0,"lengthMeters":520.0,"ratePesosPerMeter":75384.61538461539,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27842"},{"year":2026,"category":"Roads","project":"Construction of Road along Purok 6 Bamban (Sta. 0+000 - Sta. 0+674), Manito, Albay","amountPesos":39050000.0,"lengthMeters":674.0,"ratePesosPerMeter":57937.68545994065,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27844"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay San Roque (Sta. 0+000 - Sta. 0+791), Legazpi City, Albay","amountPesos":39050000.0,"lengthMeters":791.0,"ratePesosPerMeter":49367.88874841972,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27846"},{"year":2026,"category":"Roads","project":"Construction of Road including Drainage System, Barangay 24 Rizal (Sta. 0+000 - 0+972), Legazpi City, Albay","amountPesos":49000000.0,"lengthMeters":972.0,"ratePesosPerMeter":50411.522633744855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27848"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage along Doña Maria Subdivision, Barangay Tagas (Sta. 0+000 - Sta. 0+204), Daraga, Albay","amountPesos":12250000.0,"lengthMeters":204.0,"ratePesosPerMeter":60049.01960784314,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27850"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cawayan (Sta. 0+000 - Sta. 0+351), Manito, Albay","amountPesos":9762000.0,"lengthMeters":351.0,"ratePesosPerMeter":27811.965811965812,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27852"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage System (Section 1: Sta. 0+000 - Sta. 0+390, Section 2: Sta. 0+000 - 0+330, Section 3: Sta 0+120 - Sta. 0+375, Section 4: Sta. 0+000 - Sta. 0+200), Camalig, Albay","amountPesos":39050000.0,"lengthMeters":390.0,"ratePesosPerMeter":100128.20512820513,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27854"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage System (Section 1: Sta. 0+127 - Sta. 0+320, Section 2: Sta 0+000 - Sta. 0+423, Section 3: Sta. 0+120 - Sta. 0+200, Section 4: Sta. 0+026 - Sta. 0+311, Section 5: Sta. 0+000 - Sta. 0+160, Section 6: Sta. 0+000 - Sta. 0+102, Section 7: Sta. 0+000 - Sta. 0+281), Daraga, Albay","amountPesos":48812000.0,"lengthMeters":423.0,"ratePesosPerMeter":115394.79905437352,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27856"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage System (Section 1: Sta. 0+000 - Sta. 0+200, Section 2: Sta. 0+000 - Sta. 0+215, Section 3: Sta. 0+120 - Sta. 0+300, Section 4: Sta. 0+000 - Sta. 0+329), Legazpi City, Albay","amountPesos":34168000.0,"lengthMeters":329.0,"ratePesosPerMeter":103854.10334346505,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27858"},{"year":2026,"category":"Roads","project":"Improvement of Road with Drainage System (Sta. 0+258 - Sta. 0+659), Rapu-Rapu, Albay","amountPesos":14644000.0,"lengthMeters":401.0,"ratePesosPerMeter":36518.70324189526,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27860"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road and Drainage System along Barangay 15 & 18 (Section 1: Sta. 0+338 - Sta. 0+540, Section 2: Sta. 0+040 - Sta. 0+240), Legazpi City, Albay","amountPesos":9762000.0,"lengthMeters":402.0,"ratePesosPerMeter":24283.582089552237,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27862"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangays Pistola and Moroponros, Oas, Albay, Sta. 0+000 - Sta. 0+320 (Moroponros Section), Sta.0+143 - 0+573 (Bangiawon Section), Sta. 1+821 - Sta. 2+619 (Camagong Section)","amountPesos":48812000.0,"lengthMeters":1371.0,"ratePesosPerMeter":35603.20933625091,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27865"},{"year":2026,"category":"Roads","project":"Construction of Road, Polangui Rinconada Road, Barangay San Roque, Barangay Salvacion, Barangay Santa Teresita, Barangay La Medalla, Barangay La Purisima and Barangay Kinuartilan, Polangui, Albay, Sta. 1+375 – Sta. 2+125 (San Roque Section)","amountPesos":14644000.0,"lengthMeters":750.0,"ratePesosPerMeter":19525.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27867"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Balinsayawan-Sitio Tagbac Road, Barangay Macabugos, Libon, Albay, Sta. 0+465 - Sta. 2+615","amountPesos":48812000.0,"lengthMeters":2150.0,"ratePesosPerMeter":22703.25581395349,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27871"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bakal, Paracale, Camarines Norte Sta. 0+000 - Sta. 0+535","amountPesos":14644000.0,"lengthMeters":535.0,"ratePesosPerMeter":27371.96261682243,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27876"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Dancalan, Paracale, Camarines Norte Sta. 0+000 - Sta. 0+535","amountPesos":14644000.0,"lengthMeters":535.0,"ratePesosPerMeter":27371.96261682243,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27878"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Malacbang, Paracale, Camarines Norte Sta. 0+000 - Sta. 0+535","amountPesos":14644000.0,"lengthMeters":535.0,"ratePesosPerMeter":27371.96261682243,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27880"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Antonio, Labo - Fabrica, San Vicente, Camarines Norte Sta. 0+000 - Sta. 0+272","amountPesos":14700000.0,"lengthMeters":272.0,"ratePesosPerMeter":54044.117647058825,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27882"},{"year":2026,"category":"Roads","project":"Construction of Road, Zone 5 & Zone 7, Barangay Bagong Sirang, Pili, Camarines Sur - sta 0+000 - sta. 0+222 and sta. 2+100 - sta. 2+500","amountPesos":14644000.0,"lengthMeters":622.0,"ratePesosPerMeter":23543.40836012862,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27887"},{"year":2026,"category":"Roads","project":"Construction of Road, Zone 6, Barangay Cabanbanan, Calabanga, Camarines Sur - sta. 0+750 - sta. 1+090","amountPesos":4881000.0,"lengthMeters":340.0,"ratePesosPerMeter":14355.882352941177,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27889"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Caroyroyan, Pili, Camarines Sur - Sta. 0+105.30 - Sta. 0+737.30","amountPesos":29287000.0,"lengthMeters":632.0,"ratePesosPerMeter":46340.18987341772,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27891"},{"year":2026,"category":"Roads","project":"Construction of Road, Zone 4, Barangay Dominorog, Calabanga, Camarines Sur - sta. 0+730 - sta. 1+410","amountPesos":14644000.0,"lengthMeters":680.0,"ratePesosPerMeter":21535.29411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27893"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Harobay, Calabanga, Camarines Sur - sta. 1+710 - sta. 2+110","amountPesos":14644000.0,"lengthMeters":400.0,"ratePesosPerMeter":36610.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27895"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Kamuning, Calabnaga, Camarines Sur - Sta. 2+270 - 3+070","amountPesos":15620000.0,"lengthMeters":800.0,"ratePesosPerMeter":19525.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27897"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Salvacion Baybay, Calabanga, Camarines Sur - sta. 0+133 - sta. 0+813","amountPesos":14644000.0,"lengthMeters":680.0,"ratePesosPerMeter":21535.29411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27899"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Isidro, Magarao, Camarines Sur - Sta. 0+000 - Sta. 0+150","amountPesos":2929000.0,"lengthMeters":150.0,"ratePesosPerMeter":19526.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27901"},{"year":2026,"category":"Roads","project":"Construction of Road, Zone 6 to Zone 7, Barangay Sogod-Sabang, Calabanga, Camarines Sur - sta. 1+210 - sta. 2+080","amountPesos":14644000.0,"lengthMeters":870.0,"ratePesosPerMeter":16832.183908045976,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27903"},{"year":2026,"category":"Roads","project":"Construction of Road, Bigaas-Fabrica Rd., Barangay Bigaas, Calabanga, Camarines Sur - Sta. 2+190 - Sta. 2+540","amountPesos":14644000.0,"lengthMeters":350.0,"ratePesosPerMeter":41840.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27905"},{"year":2026,"category":"Roads","project":"Construction of Road, Binanuaanan Pequeño, Calabanga, Camarines Sur - sta. 5+020 - sta. 5+320","amountPesos":4881000.0,"lengthMeters":300.0,"ratePesosPerMeter":16270.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27907"},{"year":2026,"category":"Roads","project":"Construction of Road, Fraternidad St., Barangay Tabuco, Naga City, Camarines Sur - sta. 0+000 - sta. 0+142","amountPesos":5857000.0,"lengthMeters":142.0,"ratePesosPerMeter":41246.47887323944,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27909"},{"year":2026,"category":"Roads","project":"Concreting of Road from Concepcion Pequeña (in front of Carmelite Monastery) to Naga City General Hospital, Naga City, Camarines Sur, Sta. 0+000 - Sta. 0+433","amountPesos":50000000.0,"lengthMeters":433.0,"ratePesosPerMeter":115473.44110854504,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27911"},{"year":2026,"category":"Roads","project":"Construction of Road, Manggayawan, Canaman, Camarines Sur - Sta. 0+560 - Sta. 0+800","amountPesos":7810000.0,"lengthMeters":240.0,"ratePesosPerMeter":32541.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27913"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mampirao-Barangay Bagacay, San Jose, Camarines Sur, Sta.0+000 - Sta.0+706","amountPesos":4881000.0,"lengthMeters":706.0,"ratePesosPerMeter":6913.597733711048,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27916"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Minoro, San Jose, Camarines Sur, Sta.1+916 - Sta.2+260","amountPesos":4881000.0,"lengthMeters":344.0,"ratePesosPerMeter":14188.953488372093,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27918"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Juan-Barangay San Antonio, San Jose, Camarines Sur, Sta.0+000 - Sta.0+151, Sta.0+454 - Sta.0+639, Sta.0+570 - Sta.0+660","amountPesos":4881000.0,"lengthMeters":357.0,"ratePesosPerMeter":13672.268907563026,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27920"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Telegrafo, San Jose, Camarines Sur, Sta.2+342 - Sta. 2+368, Sta.2+511 - Sta.2+574 (Zone 4), Sta.3+406 - Sta.3+650 (zone 6)","amountPesos":4881000.0,"lengthMeters":333.0,"ratePesosPerMeter":14657.657657657657,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27922"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage in San Jose, Camarines Sur, Sta.0+226 - Sta.1+163, Sta.0+730 - Sta.1+763, Sta. 2+243 - Sta2+652","amountPesos":50000000.0,"lengthMeters":1946.0,"ratePesosPerMeter":25693.730729701954,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27924"},{"year":2026,"category":"Roads","project":"Construction of Road, Zone 1 to 7, Barangay Danlog, San Jose, Camarines Sur, Sta.0+000 - Sta.0+350","amountPesos":4881000.0,"lengthMeters":350.0,"ratePesosPerMeter":13945.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27926"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay De La Fe - Barangay Salvacion, Buhi, Camarines Sur, Sta. 1+449.00 - Sta. 2+734.00","amountPesos":48812000.0,"lengthMeters":1285.0,"ratePesosPerMeter":37985.992217898834,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27929"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Ombao Polpog - Barangay San Ramon, Bula, Camarines Sur, Sta. 11+677.00 - 12+307.00","amountPesos":19525000.0,"lengthMeters":630.0,"ratePesosPerMeter":30992.06349206349,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27931"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Isidro - Barangay San Jose (San Jose Pangaraon), Nabua, Camarines Sur, Sta. 0+000.00 - Sta. 0+366.00","amountPesos":19525000.0,"lengthMeters":366.0,"ratePesosPerMeter":53346.99453551912,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27933"},{"year":2026,"category":"Roads","project":"Construction of Road, NIA Service Road, Barangay San Isidro - Barangay San Nicolas, Iriga City, Camarines Sur, Sta. 2+233.70 - Sta. 4+178.70","amountPesos":48812000.0,"lengthMeters":1945.0,"ratePesosPerMeter":25096.143958868895,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27935"},{"year":2026,"category":"Roads","project":"Construction of Road, Santa Eulalia - San Francisco Road - Barangay Santa Eulalia, Baao, Camarines Sur, Sta. 6+093.00 - Sta. 6+478.00","amountPesos":48812000.0,"lengthMeters":385.0,"ratePesosPerMeter":126784.41558441559,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27937"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Ipil to Barangay Lahong, San Fernando, Masbate, Sta. 0+000 - Sta. 1+200","amountPesos":48812000.0,"lengthMeters":1200.0,"ratePesosPerMeter":40676.666666666664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27940"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Progreso to Barangay Del Rosario, San Fernando, Masbate, Sta. 0+052 - Sta. 0+820","amountPesos":24406000.0,"lengthMeters":768.0,"ratePesosPerMeter":31778.645833333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27942"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Ramon, Claveria, Masbate, Sta. 0+000 - Sta. 1+250","amountPesos":48812000.0,"lengthMeters":1250.0,"ratePesosPerMeter":39049.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27944"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Valparaiso to Barangay Buenos Aires, San Fernando, Masbate, Sta. 1+120 - Sta. 1+463, Sta. 1+775 - Sta. 1+832, Sta. 2+230 - Sta. 2+580","amountPesos":24406000.0,"lengthMeters":750.0,"ratePesosPerMeter":32541.333333333332,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27946"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Asid, City of Masbate, Masbate, Sta. 0+000 - Sta. 0+230","amountPesos":9762000.0,"lengthMeters":230.0,"ratePesosPerMeter":42443.47826086957,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27949"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bolo, City of Masbate, Masbate, Sta. 0+000 - Sta. 0+230","amountPesos":14644000.0,"lengthMeters":230.0,"ratePesosPerMeter":63669.565217391304,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27951"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cagay, City of Masbate, Masbate, Sta. 0+000 - Sta. 0+400","amountPesos":14644000.0,"lengthMeters":400.0,"ratePesosPerMeter":36610.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27953"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cawayan Interior, City of Masbate, Masbate, Sta. 0+000 - Sta. 0+300","amountPesos":14644000.0,"lengthMeters":300.0,"ratePesosPerMeter":48813.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27955"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Espinosa, City of Masbate, Masbate, Sta. 0+000 - Sta. 0+200","amountPesos":9762000.0,"lengthMeters":200.0,"ratePesosPerMeter":48810.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27957"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Kinamaligan, City of Masbate, Masbate, Sta. 0+470 - Sta. 0+700","amountPesos":14644000.0,"lengthMeters":230.0,"ratePesosPerMeter":63669.565217391304,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27959"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Malinta, City of Masbate, Masbate, Sta. 0+000 - Sta. 0+230","amountPesos":14644000.0,"lengthMeters":230.0,"ratePesosPerMeter":63669.565217391304,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27961"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mapiña, City of Masbate, Masbate, Sta. 0+480 - 0+710","amountPesos":9762000.0,"lengthMeters":230.0,"ratePesosPerMeter":42443.47826086957,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27963"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Bagumbayan, City of Masbate, Masbate, Sta. 0+000 - Sta. 0+350","amountPesos":9800000.0,"lengthMeters":350.0,"ratePesosPerMeter":28000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27965"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay F. Magallanes, City of Masbate, Masbate, Sta. 0+000 - Sta. 0+475","amountPesos":9800000.0,"lengthMeters":475.0,"ratePesosPerMeter":20631.57894736842,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27967"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Ibingay, City of Masbate, Masbate, Sta. 0+000 - Sta. 0+265","amountPesos":9800000.0,"lengthMeters":265.0,"ratePesosPerMeter":36981.1320754717,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27969"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Kalipay, City of Masbate, Masbate, Sta. 0+000 - Sta. 0+390","amountPesos":14700000.0,"lengthMeters":390.0,"ratePesosPerMeter":37692.307692307695,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27971"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Badiang, Cataingan to Barangay Guindawahan, Pio V. Corpus, Masbate, Sta. 3+560 - Sta. 3+804, Sta. 4+380 - Sta. 5+330","amountPesos":29287000.0,"lengthMeters":1194.0,"ratePesosPerMeter":24528.475711892796,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27974"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Matayum to Aguada Road, Barangay Aguada, Cataingan, Masbate, Sta. 9+940 - Sta. 12+040","amountPesos":29287000.0,"lengthMeters":2100.0,"ratePesosPerMeter":13946.190476190477,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27976"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Rizal, Esperanza to Barangay Bunducan, Pio V. Corpus, Masbate, Sta. 2+800 - 4+000","amountPesos":29287000.0,"lengthMeters":1200.0,"ratePesosPerMeter":24405.833333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27978"},{"year":2026,"category":"Roads","project":"Construction of Road, Poblacion to Sitio Mendoza, Barangay Matayum, Cataingan, Masbate, Sta. 0+185 - Sta. 0+385","amountPesos":4881000.0,"lengthMeters":200.0,"ratePesosPerMeter":24405.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27980"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Rizal, Prieto Diaz, Sorsogon, Section 1 Sta. 0+000 - Sta. 0+100.38, Section 2 Sta. 0+000 - Sta. 1+120, Section 3 Sta. 0+000 - Sta. 0+101.36, Section 4 Sta. 0+000 - Sta. 0+110, Section 5 Sta. 0+000 - Sta. 0+110","amountPesos":4881000.0,"lengthMeters":1120.0,"ratePesosPerMeter":4358.035714285715,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27983"},{"year":2026,"category":"Roads","project":"Construction of San Isidro-San Rafael Road, Prieto Diaz, Sorsogon, Sta.0+000 - Sta. 1+120","amountPesos":43931000.0,"lengthMeters":1120.0,"ratePesosPerMeter":39224.107142857145,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27985"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Baybay to Barangay Tinago, Juban, Sorsogon, Sta. 0+978.36 - Sta. 1+840.92","amountPesos":39200000.0,"lengthMeters":862.56,"ratePesosPerMeter":45446.11389352624,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27987"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Jagusara to Sitio Bilwang, Barangay Lajong, Juban, Sorsogon, Sta. 0+000 – Sta 0+195.8, Sta. 0+286.1 – Sta. 1+054.6, Sta. 1+059.2 – Sta. 1+089.8, Sta. 1+103.2 – Sta. 1+211.5, Sta 1+220.6 – Sta 1+425.6, Sta 1+497.9 – Sta. 1+703.6, Sta. 1+814.8 – Sta. 1+846.8, Sta. 1+887.5 – Sta. 1+977.7, Sta. 2+014 - Sta 2+129.6, Sta. 2+256.4 – Sta. 3+012.4","amountPesos":39200000.0,"lengthMeters":2507.7,"ratePesosPerMeter":15631.853890018747,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27989"},{"year":2026,"category":"Roads","project":"Rehabilitation of San Isidro-Alegria-Lago-Poblacion Norte Road, Barcelona, Sorsogon, Sta. 0+000 – Sta 0+008, Sta. 0+034 – Sta. 0+129.2, Sta. 0+183.4 – Sta. 0+187.9, Sta. 0+406.4 – Sta. 0+428.3, Sta 0+446.3 – Sta 0+459.9, Sta 0+473.5 – Sta. 0+495.9, Sta. 0+495.5 – Sta. 0+554.3, Sta. 0+635.5 – Sta. 0+649, Sta. 0+662.5 - Sta 0+675.5, Sta. 0+793.1 – Sta. 1+083.6, Sta. 1+416.5 – Sta. 1+493.8, Sta. 1+506 – Sta. 1+641.7, Sta. 1+733.8 – Sta. 2+050","amountPesos":46821000.0,"lengthMeters":1070.2,"ratePesosPerMeter":43749.76639880397,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27991"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Vicente, Castilla, Sorsogon, Sta. 0+000 - Sta. 0+255","amountPesos":9762000.0,"lengthMeters":255.0,"ratePesosPerMeter":38282.35294117647,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27994"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0 + 000 - Sta. 0 + 450, Barangay Aglucay, Makato, Aklan","amountPesos":4784000.0,"lengthMeters":450.0,"ratePesosPerMeter":10631.111111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 27998"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Bakhaw Norte, Kalibo, Aklan - 0 + 000 - 3 + 800","amountPesos":49000000.0,"lengthMeters":3800.0,"ratePesosPerMeter":12894.736842105263,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28000"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 490, Barangay Bulwang, Numancia, Aklan","amountPesos":4784000.0,"lengthMeters":490.0,"ratePesosPerMeter":9763.265306122448,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28002"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 380, Barangay Cerrudo, Banga, Aklan","amountPesos":4784000.0,"lengthMeters":380.0,"ratePesosPerMeter":12589.473684210527,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28004"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 810, Barangay Guanko to Barangay Oquendo, Balete, Aklan","amountPesos":9569000.0,"lengthMeters":810.0,"ratePesosPerMeter":11813.58024691358,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28006"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 750, Barangay Kinalangay Viejo, Malinao, Aklan","amountPesos":9569000.0,"lengthMeters":750.0,"ratePesosPerMeter":12758.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28008"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 400, Barangay Lalab, Batan, Aklan","amountPesos":4784000.0,"lengthMeters":400.0,"ratePesosPerMeter":11960.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28010"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 410, Barangay Libas, Banga, Aklan","amountPesos":4784000.0,"lengthMeters":410.0,"ratePesosPerMeter":11668.292682926829,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28012"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 380, Barangay Lumaynay, Altavas, Aklan","amountPesos":4784000.0,"lengthMeters":380.0,"ratePesosPerMeter":12589.473684210527,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28014"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 358, Barangay Magallanes, Nabas, Aklan","amountPesos":4784000.0,"lengthMeters":358.0,"ratePesosPerMeter":13363.128491620111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28016"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 380, Barangay Mantiguib, Makato, Aklan","amountPesos":4784000.0,"lengthMeters":380.0,"ratePesosPerMeter":12589.473684210527,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28018"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 195 (Section 1), Sta. 0 + 000 - Sta. 0 + 166 (Section 2), Barangay New Buswang, Kalibo, Aklan","amountPesos":4784000.0,"lengthMeters":195.0,"ratePesosPerMeter":24533.333333333332,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28020"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 380, Barangay Pinatuad, Nabas, Aklan","amountPesos":4784000.0,"lengthMeters":380.0,"ratePesosPerMeter":12589.473684210527,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28022"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 400, Barangay Poblacion, Libacao, Aklan","amountPesos":4784000.0,"lengthMeters":400.0,"ratePesosPerMeter":11960.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28024"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 380, Barangay Regador, Ibajay, Aklan","amountPesos":4784000.0,"lengthMeters":380.0,"ratePesosPerMeter":12589.473684210527,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28026"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 285, Barangay Solido, Nabas, Aklan","amountPesos":4784000.0,"lengthMeters":285.0,"ratePesosPerMeter":16785.964912280702,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28028"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 307, Barangay Tibiao, Altavas, Aklan","amountPesos":4784000.0,"lengthMeters":307.0,"ratePesosPerMeter":15583.061889250814,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28030"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 +000 - Sta. 0 + 380, Bernardo Tolentino Road, Sitio Ilaya, Barangay Estancia, Kalibo, Aklan","amountPesos":4784000.0,"lengthMeters":380.0,"ratePesosPerMeter":12589.473684210527,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28032"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 483, District 5 and District 6, Barangay Pinamuk-an, New Washington, Aklan","amountPesos":4784000.0,"lengthMeters":483.0,"ratePesosPerMeter":9904.761904761905,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28034"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 380, Poblacion-Sitio Binaliw, Barangay Katipunan, Buruanga, Aklan","amountPesos":4784000.0,"lengthMeters":380.0,"ratePesosPerMeter":12589.473684210527,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28036"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 400, Sitio Marapayao, Barangay Ortega, Libacao, Aklan","amountPesos":4784000.0,"lengthMeters":400.0,"ratePesosPerMeter":11960.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28038"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 380, Sitio Minuro, Barangay Caticlan, Malay, Aklan","amountPesos":4784000.0,"lengthMeters":380.0,"ratePesosPerMeter":12589.473684210527,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28040"},{"year":2026,"category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 380, Tolosa Street, Barangay Caticlan, Malay, Aklan","amountPesos":4784000.0,"lengthMeters":380.0,"ratePesosPerMeter":12589.473684210527,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28042"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Archbishop Gabriel M. Reyes Street to Laserna (Interior), Sta. 0 + 000 - Sta. 0 + 400, Barangay Poblacion, Kalibo, Aklan","amountPesos":4784000.0,"lengthMeters":400.0,"ratePesosPerMeter":11960.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28044"},{"year":2026,"category":"Roads","project":"Construction of Road, Igpasungao Road Sta. 00+000 - Sta. 00+140, Barangay Poblacion, Sebaste, Antique","amountPesos":4784000.0,"lengthMeters":140.0,"ratePesosPerMeter":34171.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28047"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Alipasiawan, Dumarao, Capiz - Sta. 2+000 - Sta. 2+560","amountPesos":9569000.0,"lengthMeters":560.0,"ratePesosPerMeter":17087.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28057"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Calapawan, Dumarao, Capiz - Sta. 3+780 - Sta. 4+340","amountPesos":9569000.0,"lengthMeters":560.0,"ratePesosPerMeter":17087.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28059"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Malonoy, Dumarao, Capiz - Sta. 5+180 - Sta. 5+740","amountPesos":9569000.0,"lengthMeters":560.0,"ratePesosPerMeter":17087.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28061"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Matinabus, Sigma, Capiz - Sta. 0+260 - Sta. 0+820","amountPesos":9569000.0,"lengthMeters":560.0,"ratePesosPerMeter":17087.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28063"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Taslan, Dumarao, Capiz - Sta. 1+200 - Sta. 1+760","amountPesos":9569000.0,"lengthMeters":560.0,"ratePesosPerMeter":17087.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28065"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Malabog, Barangay Santa Monica to Sitio Cabugao, Barangay Santo Rosario, Dumalag, Capiz - Sta. 0+060 - Sta. 1+170","amountPesos":19138000.0,"lengthMeters":1110.0,"ratePesosPerMeter":17241.441441441442,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28067"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Tagbakan, Barangay Concepcion to Sitio Masinalum, Barangay San Roque, Dumalag, Capiz - Sta. 1+800 - Sta. 3+500","amountPesos":28706000.0,"lengthMeters":1700.0,"ratePesosPerMeter":16885.882352941175,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28069"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Utod, Barangay San Miguel, Dumalag, Capiz - Sta. 2+040 - 2+600","amountPesos":9569000.0,"lengthMeters":560.0,"ratePesosPerMeter":17087.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28071"},{"year":2026,"category":"Roads","project":"Construction of Road, Aguilar Proper- Sitio Camansi-Constancia Proper Road, Barangay Aguilar and Barangay Constancia, San Lorenzo, Guimaras - Sta. 2 + 775 - Sta. 3 + 275","amountPesos":12559000.0,"lengthMeters":500.0,"ratePesosPerMeter":25118.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28074"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Bitbit - Santa Teresa Road, Barangay Santa Teresa, Jordan, Guimaras - Sta. 0 + 495 - Sta. 0 + 930","amountPesos":11841000.0,"lengthMeters":435.0,"ratePesosPerMeter":27220.689655172413,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28078"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Ilawod - Public Cemetery, Salvacion - Sitio Badang, Lucmayan, Barangay Salvacion and Barangay Lucmayan, Nueva Valencia, Guimaras - Sta. 1 + 690.50 - Sta. 2 + 240","amountPesos":14927000.0,"lengthMeters":549.5,"ratePesosPerMeter":27164.69517743403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28082"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Lusay Road, Barangay Lawi, Jordan, Guimaras - Sta. 0 + 889 - Sta. 1 + 340","amountPesos":11483000.0,"lengthMeters":451.0,"ratePesosPerMeter":25461.19733924612,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28084"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Proper - Sitio Hacienda - Philippine Science High School, Jct. N.R. Balcon Maravilla, Barangay Balcon Maravilla, Jordan, Guimaras - Sta. 0 + 479 - Sta. 0 + 697, Sta. 0 + 703 - Sta. 1 + 355","amountPesos":23683000.0,"lengthMeters":870.0,"ratePesosPerMeter":27221.83908045977,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28086"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Imbang Grande, City of Passi, Iloilo - Sta. 0 + 000 - Sta. 0 + 355","amountPesos":4784000.0,"lengthMeters":355.0,"ratePesosPerMeter":13476.05633802817,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28091"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Punong, City of Passi, Iloilo - Sta. 0 + 000 - Sta. 0 + 320","amountPesos":4784000.0,"lengthMeters":320.0,"ratePesosPerMeter":14950.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28093"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sablogon, City of Passi, Iloilo - Sta. 0 + 000 - Sta. 0 + 555","amountPesos":9569000.0,"lengthMeters":555.0,"ratePesosPerMeter":17241.441441441442,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28097"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cagamutan Sur and Barangay Cari Minor, Leganes, Iloilo - Sta. 000 + 000 - Sta. 000 + 495.6, Sta. 000 + 566 - Sta. 000 + 806","amountPesos":9569000.0,"lengthMeters":735.6,"ratePesosPerMeter":13008.428493746602,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28103"},{"year":2026,"category":"Roads","project":"Construction of Road of Barangay Pamul-ogan, Cabatuan, Iloilo - Station 0+000 - Station 0+270","amountPesos":3828000.0,"lengthMeters":270.0,"ratePesosPerMeter":14177.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28106"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Calmay, Janiuay, Iloilo - Station 0+000 - Station 1+000","amountPesos":14353000.0,"lengthMeters":1000.0,"ratePesosPerMeter":14353.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28108"},{"year":2026,"category":"Roads","project":"Improvement of Road in Brgy. Tumcon Ilaud, Pototan, Iloilo - Station 0+000 - Station 0+560","amountPesos":10000000.0,"lengthMeters":560.0,"ratePesosPerMeter":17857.14285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28110"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pajo, Lambunao, Iloilo - Station 0+000 - Station 0+141, Station 0+153 - Station 0+500, Station 0+764 - Station 1+276","amountPesos":14353000.0,"lengthMeters":1000.0,"ratePesosPerMeter":14353.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28112"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Tangub, Ramylu Dr Sta. 0+000 - Sta. 1+200, Bacolod City, Negros Occidental","amountPesos":4900000.0,"lengthMeters":1200.0,"ratePesosPerMeter":4083.3333333333335,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28116"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 0+250), Barangay Andres Bonifacio, Sagay City, Negros Occidental","amountPesos":4900000.0,"lengthMeters":250.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28119"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+346 - Sta. 0+596), Barangay Bato, Sagay City, Negros Occidental","amountPesos":4900000.0,"lengthMeters":250.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28121"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+222 - Sta. 0+472), Barangay Burgos, Cadiz City, Negros Occidental","amountPesos":4900000.0,"lengthMeters":250.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28123"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+562 - Sta. 0+812), Barangay Colonia Divina, Sagay City, Negros Occidental","amountPesos":4900000.0,"lengthMeters":250.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28125"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+609 - Sta. 0+859), Barangay Jerusalem, Cadiz City, Negros Occidental","amountPesos":4900000.0,"lengthMeters":250.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28127"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 2+709 - Sta. 2+959), Barangay Malubon, Sagay City, Negros Occidental","amountPesos":4900000.0,"lengthMeters":250.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28129"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+937 - Sta. 1+187), Barangay Poblacion 1, Sagay City, Negros Occidental","amountPesos":4900000.0,"lengthMeters":250.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28131"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 0+250), Barangay Rafaela Barrera, Sagay City, Negros Occidental","amountPesos":4900000.0,"lengthMeters":250.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28133"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+900 - Sta. 1+200), Barangay San Pablo, Manapla, Negros Occidental","amountPesos":4900000.0,"lengthMeters":300.0,"ratePesosPerMeter":16333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28135"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 0+300), Barangay Tiglawigan, Cadiz City, Negros Occidental","amountPesos":4900000.0,"lengthMeters":300.0,"ratePesosPerMeter":16333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28137"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+248 - Sta. 0+498), Barangay Vito, Sagay City, Negros Occidental","amountPesos":4900000.0,"lengthMeters":250.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28139"},{"year":2026,"category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 0+250), Purok Tisa, Barangay Bulanon, Sagay City, Negros Occidental","amountPesos":4900000.0,"lengthMeters":250.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28141"},{"year":2026,"category":"Bridges","project":"Rehabilitation of Bridge (Sta. 1+548 - Sta. 1+588), Purok Campo Negro, Barangay Tadlong, Sagay City to Barangay Magsaysay, Cadiz City, Sagay City, Negros Occidental","amountPesos":4900000.0,"lengthMeters":40.0,"ratePesosPerMeter":122500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28143"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage, Isabela, Negros Occidental (Sta 00+000 - Sta 00+050.00)","amountPesos":26460000.0,"lengthMeters":50.0,"ratePesosPerMeter":529200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28148"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bulad, Isabela, Negros Occidental (Sta. 00+000.00 - Sta 01+000.00)","amountPesos":19600000.0,"lengthMeters":1000.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28150"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cansalongon, Isabela, Negros Occidental (Sta. 00+000.00 - Sta 00+265.00)","amountPesos":4900000.0,"lengthMeters":265.0,"ratePesosPerMeter":18490.56603773585,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28152"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Guintubhan, Isabela, Negros Occidental (Sta. 00+000.00 - Sta 00+265.00)","amountPesos":4900000.0,"lengthMeters":265.0,"ratePesosPerMeter":18490.56603773585,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28154"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Macagahay, Moises Padilla, Negros Occidental (Sta. 00+000.00 - Sta 00+260.00)","amountPesos":4900000.0,"lengthMeters":260.0,"ratePesosPerMeter":18846.153846153848,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28156"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Makilignit, Isabela, Negros Occidental (Sta. 00+000.00 - Sta 00+525.00)","amountPesos":9800000.0,"lengthMeters":525.0,"ratePesosPerMeter":18666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28158"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Manghanoy, La Castellana, Negros Occidental (Sta. 00+000.00 - Sta 00+525.00)","amountPesos":9800000.0,"lengthMeters":525.0,"ratePesosPerMeter":18666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28160"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Maytubig, Isabela, Negros Occidental (Sta. 00+000.00 - Sta 00+525.00)","amountPesos":9800000.0,"lengthMeters":525.0,"ratePesosPerMeter":18666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28162"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Montilla, Moises Padilla, Negros Occidental (Sta. 00+000.00 - Sta 00+260.00)","amountPesos":4900000.0,"lengthMeters":260.0,"ratePesosPerMeter":18846.153846153848,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28164"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sebucauan, Isabela, Negros Occidental (Sta. 00+000.00 - Sta 00+265.00)","amountPesos":4900000.0,"lengthMeters":265.0,"ratePesosPerMeter":18490.56603773585,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28166"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sikatuna, Isabela, Negros Occidental (Sta. 00+000.00 - Sta 00+260.00)","amountPesos":4900000.0,"lengthMeters":260.0,"ratePesosPerMeter":18846.153846153848,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28168"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Cabadiangan to Barangay Camandag, La Castellana, Negros Occidental (Sta 00+000 - Sta 00+250.00)","amountPesos":4900000.0,"lengthMeters":250.0,"ratePesosPerMeter":19600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28174"},{"year":2026,"category":"Roads","project":"Construction of Road, Andulauan to Binicuil, Barangay Andulauan, Ilog, Negros Occidental (Sta. 1 + 446 - Sta. 1 + 961, Sta. 2 + 369 - Sta. 2 + 432)","amountPesos":11760000.0,"lengthMeters":578.0,"ratePesosPerMeter":20346.020761245676,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28177"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay 1, Ilog, Negros Occidental (Sta. 0 + 263 - Sta. 0+ 389, Sta. 0 +416 - Sta. 1 + 090)","amountPesos":12740000.0,"lengthMeters":800.0,"ratePesosPerMeter":15925.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28179"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Abaca to Barangay Tambad, Cauayan, Negros Occidental (Sta. 8 + 115 - Sta. 8 + 950)","amountPesos":14700000.0,"lengthMeters":835.0,"ratePesosPerMeter":17604.790419161676,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28181"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Balicotoc, Ilog, Negros Occidental (Sta. 0 + 000 - Sta. 0 + 230, Sta. 3 + 498 - Sta. 3 + 753)","amountPesos":7840000.0,"lengthMeters":485.0,"ratePesosPerMeter":16164.948453608247,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28183"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Camindangan, Cauayan, Negros Occidental (Sta. 0 + 000 - Sta. 0 + 460)","amountPesos":11760000.0,"lengthMeters":460.0,"ratePesosPerMeter":25565.217391304348,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28185"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Dancalan to Barangay Bocana, Ilog, Negros Occidental (Sta. 0 + 000 - Sta. 3 + 650)","amountPesos":19600000.0,"lengthMeters":3650.0,"ratePesosPerMeter":5369.86301369863,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28187"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sura, Cauayan, Negros Occidental (Sta. 0 + 000 - Sta. 0 + 785)","amountPesos":14700000.0,"lengthMeters":785.0,"ratePesosPerMeter":18726.114649681527,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28189"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+284, Barangay La Granja, La Carlota City, Negros Occidental","amountPesos":4900000.0,"lengthMeters":284.0,"ratePesosPerMeter":17253.521126760563,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28192"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 2+423 - Sta. 2+523 (Section 1), Sta. 4+570 - Sta. 4+700 (Section 2), Sta. 7+523 - Sta. 7+663 (Section 3), Barangay Napoles to Barangay Malingin, Bago City, Negros Occidental","amountPesos":14700000.0,"lengthMeters":370.0,"ratePesosPerMeter":39729.72972972973,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28194"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+099 (Section 1), Sta. 0+000 - Sta. 0+320 (Section 2), Sta. 0+000 - Sta. 0+103 (Section 3), Sta. 0+000 - Sta. 0+100 (Section 4), Barangay Poblacion, Valladolid, Negros Occidental","amountPesos":9800000.0,"lengthMeters":320.0,"ratePesosPerMeter":30625.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28196"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+296, Najalin Relocation Site, Barangay Nagasi, La Carlota City, Negros Occidental","amountPesos":4900000.0,"lengthMeters":296.0,"ratePesosPerMeter":16554.054054054053,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28198"},{"year":2026,"category":"Roads","project":"Construction of Road, Nanas – Batuan, Sta. 0+000 - Sta. 0+260, Barangay Bagonawa and Barangay Batuan, San Enrique, Negros Occidental","amountPesos":4900000.0,"lengthMeters":260.0,"ratePesosPerMeter":18846.153846153848,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28200"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+487 - Sta. 0+918, Purok 1, Barangay General Malvar, Pontevedra, Negros Occidental","amountPesos":4900000.0,"lengthMeters":431.0,"ratePesosPerMeter":11368.909512761022,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28202"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 2+092 - Sta. 2+480, Purok Libertad, Barangay Mailum, Bago City, Negros Occidental","amountPesos":4900000.0,"lengthMeters":388.0,"ratePesosPerMeter":12628.865979381444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28204"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+146 (Section 1), Sta. 0+000 - Sta. 0+236 (Section 2), Purok Melendrez, Barangay Antipolo, Pontevedra, Negros Occidental","amountPesos":4900000.0,"lengthMeters":236.0,"ratePesosPerMeter":20762.71186440678,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28206"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+363 - Sta. 0+785, Purok Nipa, Barangay Busay, Bago City, Negros Occidental","amountPesos":4900000.0,"lengthMeters":422.0,"ratePesosPerMeter":11611.374407582938,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28208"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+396, Sitio Merced Trebol, Barangay Don Salvador Benedicto, Pontevedra, Negros Occidental","amountPesos":4900000.0,"lengthMeters":396.0,"ratePesosPerMeter":12373.737373737375,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28216"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Alangahag Bridge (Sta. 0+000 - Sta. 0+045), Barangay Tamlang, City of Escalante, Negros Occidental","amountPesos":20000000.0,"lengthMeters":45.0,"ratePesosPerMeter":444444.44444444444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28219"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bagonbon (Sta. 0+000 - Sta. 1+330), San Carlos City, Negros Occidental","amountPesos":18620000.0,"lengthMeters":1330.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28221"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bandila (Sta. 3+200 - Sta. 3+880), Toboso, Negros Occidental","amountPesos":9800000.0,"lengthMeters":680.0,"ratePesosPerMeter":14411.764705882353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28223"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bunga (Sta. 0+000 - Sta. 0+735) , Salvador Benedicto, Negros Occidental","amountPesos":9800000.0,"lengthMeters":735.0,"ratePesosPerMeter":13333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28225"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Ilaya (Sta. 0+000 - Sta. 0+700), Calatrava, Negros Occidental","amountPesos":9800000.0,"lengthMeters":700.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28227"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Macasilao to Barangay Camboyobo (Sta. 1+800 - Sta. 2+480), Calatrava, Negros Occidental","amountPesos":9800000.0,"lengthMeters":680.0,"ratePesosPerMeter":14411.764705882353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28229"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pandanon (Sta. 0+675 - Sta. 1+395), Salvador Benedicto, Negros Occidental","amountPesos":9800000.0,"lengthMeters":720.0,"ratePesosPerMeter":13611.111111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28231"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Maragoos, Barangay Nataban (Sta. 0+000 - Sta. 0+710), San Carlos City, Negros Occidental","amountPesos":9800000.0,"lengthMeters":710.0,"ratePesosPerMeter":13802.81690140845,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28233"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cabugan, Sta. 0+000-Sta. 0+700, Bindoy, Negros Oriental","amountPesos":14700000.0,"lengthMeters":700.0,"ratePesosPerMeter":21000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28236"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Guincalaban, Sta. 0+000-Sta. 0+375, Tayasan, Negros Oriental","amountPesos":9800000.0,"lengthMeters":375.0,"ratePesosPerMeter":26133.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28238"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Kauswagan, Sta. 0+000-Sta. 0+680 Manjuyod, Negros Oriental","amountPesos":14700000.0,"lengthMeters":680.0,"ratePesosPerMeter":21617.647058823528,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28240"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Maaslum, Sta. 0+000-Sta. 0+400, Manjuyod, Negros Oriental","amountPesos":9800000.0,"lengthMeters":400.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28242"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Malabago, Sta. 0+000-Sta. 0+375, Jimalalud, Negros Oriental","amountPesos":9800000.0,"lengthMeters":375.0,"ratePesosPerMeter":26133.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28244"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Salong to Barangay Sacsac, Sta. 0+720-Sta. 1+070, Bindoy, Negros Oriental","amountPesos":14700000.0,"lengthMeters":350.0,"ratePesosPerMeter":42000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28246"},{"year":2026,"category":"Roads","project":"Construction of Road, S. Karayon-Olimbo, Barangay Panciao, Sta. 0+000-Sta. 0+340, Manjuyod, Negros Oriental","amountPesos":9800000.0,"lengthMeters":340.0,"ratePesosPerMeter":28823.529411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28248"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Labaylabayan to Sitio Limbo, Barangay Pinucauan, Sta. 0+000-Sta. 0+350 Vallehermoso, Negros Oriental","amountPesos":9800000.0,"lengthMeters":350.0,"ratePesosPerMeter":28000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28250"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sta. 0+000 - Sta. 0+020, Barangay Cambagahan, Bais City, Negros Oriental","amountPesos":6000000.0,"lengthMeters":20.0,"ratePesosPerMeter":300000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28253"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+580.5, Barangay Enrique Villanueva, Sibulan, Negros Oriental","amountPesos":9800000.0,"lengthMeters":580.5,"ratePesosPerMeter":16881.998277347113,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28255"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+390, Barangay Inapoy, Mabinay, Negros Oriental","amountPesos":7840000.0,"lengthMeters":390.0,"ratePesosPerMeter":20102.5641025641,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28257"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+366, Barangay Lonoy, Bais City, Negros Oriental","amountPesos":7840000.0,"lengthMeters":366.0,"ratePesosPerMeter":21420.765027322403,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28259"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+477, Barangay Looc, Bais City, Negros Oriental","amountPesos":14700000.0,"lengthMeters":477.0,"ratePesosPerMeter":30817.610062893084,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28261"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+982.5, Barangay Mansangaban, Bais City, Negros Oriental","amountPesos":29400000.0,"lengthMeters":982.5,"ratePesosPerMeter":29923.664122137405,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28263"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+414.91, Barangay Pal-ew to Barangay Santo Niño, City of Tanjay, Negros Oriental","amountPesos":9800000.0,"lengthMeters":414.91,"ratePesosPerMeter":23619.580149912028,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28265"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+418.11, Barangay Pal-ew, City of Tanjay, Negros Oriental","amountPesos":9800000.0,"lengthMeters":418.11,"ratePesosPerMeter":23438.80796919471,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28267"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+307.5, Barangay Sab-ahan, Bais City, Negros Oriental","amountPesos":8820000.0,"lengthMeters":307.5,"ratePesosPerMeter":28682.926829268294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28269"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+393, Barangay San Isidro, Pamplona, Negros Oriental","amountPesos":9800000.0,"lengthMeters":393.0,"ratePesosPerMeter":24936.386768447835,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28271"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+297, Barangay Santa Cruz Nuevo, City of Tanjay, Negros Oriental","amountPesos":9800000.0,"lengthMeters":297.0,"ratePesosPerMeter":32996.632996632994,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28273"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+228, Barangay Santo Niño, City of Tanjay, Negros Oriental","amountPesos":4900000.0,"lengthMeters":228.0,"ratePesosPerMeter":21491.22807017544,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28275"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Alangilan, Santa Catalina, Negros Oriental, (New), Sta. 0+000 - Sta. 0+250","amountPesos":9800000.0,"lengthMeters":250.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28278"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bonawon, Siaton, Negros Oriental, (New), Sta. 0+000 - Sta. 1+500","amountPesos":49000000.0,"lengthMeters":1500.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28280"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Melagrosa, Santa Catalina, Negros Oriental, (New), Sta. 0+000 - Sta. 0+350","amountPesos":14700000.0,"lengthMeters":350.0,"ratePesosPerMeter":42000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28282"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tabuan, City of Bayawan, Negros Oriental, (New), Sta. 0+000 - Sta. 0+100","amountPesos":4900000.0,"lengthMeters":100.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28284"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Villareal, City of Bayawan, Negros Oriental, (New), Sta. 0+000 - Sta. 0+100","amountPesos":4900000.0,"lengthMeters":100.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28286"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Cantabon - Bandilaan - Cang-apa - Calunasan, Barangay Cantabon, Siquijor, Siquijor, Sta. 0+053 - Sta. 0+969","amountPesos":49000000.0,"lengthMeters":916.0,"ratePesosPerMeter":53493.44978165939,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28289"},{"year":2026,"category":"Roads","project":"Construction of Access Road from main road going to Barangay Elementary School in Barangay New Lourdes, Cortes, Bohol, Sta.0000+000.000 - Sta.0000+150.000","amountPesos":5000000.0,"lengthMeters":150.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28293"},{"year":2026,"category":"Roads","project":"Improvement of Road in Mahogany Street, Barangay Dampas and Barangay Mansasa, Tagbilaran City, Bohol, Sta.0000+000.000 - Sta.0001+000.000","amountPesos":35000000.0,"lengthMeters":1000.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28295"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Villa Aurora, Dagohoy, Bohol Sta. 0+000-Sta. 0+240","amountPesos":4845000.0,"lengthMeters":240.0,"ratePesosPerMeter":20187.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28298"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Canlinte, Inabanga, Bohol Sta. 0+000-Sta. 0+300","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28300"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Datag, Inabanga, Bohol Sta. 0+000-Sta. 0+300","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28302"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Fatima, Inabanga, Bohol Sta. 0+000-Sta. 0+300","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28304"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mabuhay, Inabanga, Bohol Sta. 0+000-Sta. 0+300","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28306"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tungod, Inabanga, Bohol Sta. 0+000-Sta.0+ 250","amountPesos":4845000.0,"lengthMeters":250.0,"ratePesosPerMeter":19380.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28308"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Ubujan, Inabanga, Bohol Sta. 0+000-Sta. 0+ 300","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28310"},{"year":2026,"category":"Roads","project":"Construction of Access Road in Brgy. Sta. Catalina to Brgy. Sagbayan Sur, Sagbayan, Bohol - Sta.0+000 - Sta.0+200","amountPesos":5000000.0,"lengthMeters":200.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28312"},{"year":2026,"category":"Roads","project":"Construction of Lubang-Nueva Montana-Bunga Road connecting Tagbilaran North Road to Danao-Getafe Road, Buenavista, Bohol - Sta.1+071 - Sta.3+071","amountPesos":50000000.0,"lengthMeters":2000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28314"},{"year":2026,"category":"Roads","project":"Construction of Road, Ilihan, Barangay Inabanga, Bohol Sta. 0+000-Sta. 0+300","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28316"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Putlongcam, Alicia, Bohol, Sta. 2+289.64 – Sta. 2+500.14","amountPesos":4849000.0,"lengthMeters":210.5,"ratePesosPerMeter":23035.62945368171,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28319"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Odiong, Jagna, Bohol, Sta. 0+400.00 - Sta.0+575.00","amountPesos":4845000.0,"lengthMeters":175.0,"ratePesosPerMeter":27685.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28321"},{"year":2026,"category":"Roads","project":"Construction of Road, Bilar, Bohol, Sta. 0 + 183 - Sta. 0+503","amountPesos":9690000.0,"lengthMeters":320.0,"ratePesosPerMeter":30281.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28323"},{"year":2026,"category":"Roads","project":"Construction of Road, Candijay, Bohol, Sta. 0+514-Sta. 0+689","amountPesos":4845000.0,"lengthMeters":175.0,"ratePesosPerMeter":27685.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28325"},{"year":2026,"category":"Roads","project":"Construction of Road, Carmen, Bohol, Sta. 0+000 -Sta. 0+200.00, Sta. 0+700.00 - Sta. 1 + 060","amountPesos":14535000.0,"lengthMeters":560.0,"ratePesosPerMeter":25955.35714285714,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28327"},{"year":2026,"category":"Roads","project":"Construction of Road, Guindulman, Bohol, Sta. 0+296.00-Sta. 0+500.00","amountPesos":9690000.0,"lengthMeters":204.0,"ratePesosPerMeter":47500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28349"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Jaguimit, City of Naga, Cebu (STA. 0 + 000 - STA. 0 + 350.5)","amountPesos":9690000.0,"lengthMeters":350.5,"ratePesosPerMeter":27646.219686162625,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28352"},{"year":2026,"category":"Roads","project":"Construction of Road, San Fernando, Cebu (STA. 0 + 000 - STA. 0 + 350.5)","amountPesos":9690000.0,"lengthMeters":350.5,"ratePesosPerMeter":27646.219686162625,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28354"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Mahaway-Tapul Road, City of Talisay, Cebu (STA. 0 + 000 - STA. 0 + 758.5)","amountPesos":29070000.0,"lengthMeters":758.5,"ratePesosPerMeter":38325.64271588662,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28356"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Jampang, Argao, Cebu, Sta 0+000 - Sta 0+340","amountPesos":4845000.0,"lengthMeters":340.0,"ratePesosPerMeter":14250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28359"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Liloan, Santander, Cebu, Sta 0+000 - Sta 0+320","amountPesos":4845000.0,"lengthMeters":320.0,"ratePesosPerMeter":15140.625,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28361"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sua to Barangay Mabasa, Argao, Cebu, Sta 0+000 - Sta 0+315","amountPesos":4845000.0,"lengthMeters":315.0,"ratePesosPerMeter":15380.952380952382,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28363"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tulang, Argao, Cebu, Sta 0+000 - Sta 0+318","amountPesos":4845000.0,"lengthMeters":318.0,"ratePesosPerMeter":15235.849056603774,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28365"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Dalla, Sitio West Apo Road, Barangay Apo, Argao, Cebu, Sta 0+000 - Sta 0+315","amountPesos":4845000.0,"lengthMeters":315.0,"ratePesosPerMeter":15380.952380952382,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28367"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage System, Municipal Access Road, Barangay Poblacion, Samboan, Cebu, Sta 0+000 - Sta 0+150","amountPesos":4845000.0,"lengthMeters":150.0,"ratePesosPerMeter":32300.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28369"},{"year":2026,"category":"Roads","project":"Concreting of Road, Barangay Sto. Niño, Relocation Site (Sta. 3+000 - Sta. 3+300), Tuburan, Cebu","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28372"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Anopog (Sta. 5+300 - Sta. 5+600), Pinamungajan, Cebu","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28376"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Awihao to Barangay Sagay (Sta. 3+300 - Sta. 3+600), Toledo City, Cebu","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28378"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bolocboloc (Sta. 0+000 - Sta. 0+300), Barili, Cebu","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28380"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Butong (Sta. 2+400 - Sta. 2+700), Pinamungajan, Cebu","amountPesos":4849000.0,"lengthMeters":300.0,"ratePesosPerMeter":16163.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28382"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Candugay (Sta. 1+100 - Sta. 1+400), Barili, Cebu","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28384"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Canlumampao (Sta. 5+000 - Sta. 5+300), Toledo City, Cebu","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28386"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Colonia to Barangay Kagbao (Sta. 10+000 - Sta. 10+300), Tuburan, Cebu","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28388"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Guibuangan (Sta. 0+200 - Sta. 0+400), Barili, Cebu","amountPesos":4845000.0,"lengthMeters":200.0,"ratePesosPerMeter":24225.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28390"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Jagbuaya (Sta. 1+000 - Sta. 1+300), Tuburan, Cebu","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28392"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Kawasan (Sta. 0+000 - 0+300), Aloguinsan, Cebu","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28394"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lamac (Sta. 11+300 - Sta. 12+300), Pinamungajan, Cebu","amountPesos":4845000.0,"lengthMeters":1000.0,"ratePesosPerMeter":4845.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28396"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lunas (Sta. 0+290 - Sta. 0+554), Asturias, Cebu","amountPesos":4845000.0,"lengthMeters":264.0,"ratePesosPerMeter":18352.272727272728,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28398"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Luyo (Sta. 3+000 - Sta. 3+200), Barili, Cebu","amountPesos":4845000.0,"lengthMeters":200.0,"ratePesosPerMeter":24225.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28400"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mag-Alwa (Sta. 15+000 - Sta. 15+200), Tuburan, Cebu","amountPesos":4845000.0,"lengthMeters":200.0,"ratePesosPerMeter":24225.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28402"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pandacan (Sta. 2+000 - Sta. 2+300), Pinamungajan, Cebu","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28404"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Paril (Sta. 7+200 - Sta. 7+450), Barili, Cebu","amountPesos":4845000.0,"lengthMeters":250.0,"ratePesosPerMeter":19380.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28406"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Patupat (0+000 - Sta. 0+250), Barili, Cebu","amountPesos":4845000.0,"lengthMeters":250.0,"ratePesosPerMeter":19380.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28408"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Punay (Sta. 5+200 - Sta. 5+500), Aloguinsan, Cebu","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28410"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sagay to Barangay Subayon (Sta. 5+500 - Sta. 6+200), Toledo City, Cebu","amountPesos":9690000.0,"lengthMeters":700.0,"ratePesosPerMeter":13842.857142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28412"},{"year":2026,"category":"Roads","project":"Construction of Road, New Bucao to Casuy Road, Barangay General Climaco (Sta. 10+500 - Sta. 10+800), Toledo City, Cebu","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28414"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok San Jose, Barangay Campangga (Sta. 0+400 - Sta. 0+600), Barili, Cebu","amountPesos":4845000.0,"lengthMeters":200.0,"ratePesosPerMeter":24225.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28416"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Sunflower-Gumamela, Barangay Butong (Sta. 1+400 - Sta. 1+860), Pinamungajan, Cebu","amountPesos":4845000.0,"lengthMeters":460.0,"ratePesosPerMeter":10532.608695652174,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28418"},{"year":2026,"category":"Roads","project":"Construction of Road, San Isidro Proper to Sitio Community, Barangay San Isidro (Sta. 3+563 - Sta. 3+994), Asturias, Cebu","amountPesos":4845000.0,"lengthMeters":431.0,"ratePesosPerMeter":11241.299303944315,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28420"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Buhingtubig, Barangay Binabag (Sta. 4+300 - Sta. 4+600) , Pinamungajan, Cebu","amountPesos":4849000.0,"lengthMeters":300.0,"ratePesosPerMeter":16163.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28422"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Cabal-asan, Barangay Arpili (Sta. 2+700 - Sta. 3+050), Balamban, Cebu","amountPesos":4845000.0,"lengthMeters":350.0,"ratePesosPerMeter":13842.857142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28424"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Candomogdog, Barangay Manguiao (Sta. 6+200 - Sta. 6+460), Asturias, Cebu","amountPesos":4845000.0,"lengthMeters":260.0,"ratePesosPerMeter":18634.615384615383,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28426"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Kalubihan, Barangay Ibo (Sta. 0+500 - Sta. 0+800) , Toledo City, Cebu","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28428"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Metan-agan, Barangay New Bago to Barangay Agtugop (Sta. 2+100 - Sta. 2+442) , Asturias, Cebu","amountPesos":4845000.0,"lengthMeters":342.0,"ratePesosPerMeter":14166.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28430"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Minolo to Sitio Luas, Barangay Matab-ang (Sta. 3+500 - Sta. 3+800), Toledo City, Cebu","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28432"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Sam-ang, Barangay Cantibas (Sta. 3+500 - Sta. 3+850), Balamban, Cebu","amountPesos":4845000.0,"lengthMeters":350.0,"ratePesosPerMeter":13842.857142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28434"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Tapon, Barangay Poblacion (Sta. 1+300 - Sta. 1+697), Asturias, Cebu","amountPesos":4845000.0,"lengthMeters":397.0,"ratePesosPerMeter":12204.030226700252,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28436"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Unidos, Barangay Cabagdalan (Sta. 11+000 - Sta. 11+300), Balamban, Cebu","amountPesos":4845000.0,"lengthMeters":300.0,"ratePesosPerMeter":16150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28438"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Kanlim-ao,  Sta 002+092 - Sta. 002+267, Tabuelan, Cebu","amountPesos":4845000.0,"lengthMeters":175.0,"ratePesosPerMeter":27685.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28441"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Maalat, Sta. 000+000 - Sta. 000+175, Madridejos, Cebu","amountPesos":4845000.0,"lengthMeters":175.0,"ratePesosPerMeter":27685.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28443"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Poblacion, Sta. 000+000 - Sta. 000+175, Tabuelan, Cebu","amountPesos":4849000.0,"lengthMeters":175.0,"ratePesosPerMeter":27708.571428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28445"},{"year":2026,"category":"Roads","project":"Construction of Road, Phase I, Barangay Lo-ong, Sta. 000+000 - Sta. 000+175, Tabogon, Cebu","amountPesos":4845000.0,"lengthMeters":175.0,"ratePesosPerMeter":27685.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28447"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Rose to Purok Adelfa, Barangay Gaway-Gaway, Sta. 001+036 - Sta. 001+211, San Remigio, Cebu","amountPesos":4845000.0,"lengthMeters":175.0,"ratePesosPerMeter":27685.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28449"},{"year":2026,"category":"Roads","project":"Construction of Road at NHA 2, Sta. 001+698 - Sta. 003+396, Bogo City, Cebu","amountPesos":30000000.0,"lengthMeters":1698.0,"ratePesosPerMeter":17667.844522968197,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28463"},{"year":2026,"category":"Roads","project":"Construction of Road at Brgy. Guadalupe to Don Pentenciano National High School Rd., Sta. 000+000 - Sta. 000+940, Bogo City, Cebu","amountPesos":17000000.0,"lengthMeters":940.0,"ratePesosPerMeter":18085.106382978724,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28471"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio San Jose, Barangay Dalid, Sta. 003+884 - Sta. 004+059, Tabuelan, Cebu","amountPesos":4845000.0,"lengthMeters":175.0,"ratePesosPerMeter":27685.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28481"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cogon East, Carmen, Cebu - Sta. 0+000.00 - Sta. 0+150.00","amountPesos":4845000.0,"lengthMeters":150.0,"ratePesosPerMeter":32300.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28484"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay General, Tudela, Cebu - Sta. 0+000.00 - Sta. 0+150.00","amountPesos":4845000.0,"lengthMeters":150.0,"ratePesosPerMeter":32300.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28486"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Teguis, Poro, Cebu - Sta. 0+000.00 - Sta. 0+150.00","amountPesos":4845000.0,"lengthMeters":150.0,"ratePesosPerMeter":32300.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28490"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Tamayon, Barangay Cabangahan, Sogod, Cebu - Sta. 0+000.00 - Sta. 0+150.00","amountPesos":4845000.0,"lengthMeters":150.0,"ratePesosPerMeter":32300.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28492"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Barangay Dapitan, Sta. 0+360.00 - Sta. 0+435.00, Cordova, Cebu","amountPesos":4845000.0,"lengthMeters":75.0,"ratePesosPerMeter":64600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28501"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Barangay Poblacion Oriental, Sta. 0+000.00 - Sta. 0+140.00 , Consolacion, Cebu","amountPesos":4845000.0,"lengthMeters":140.0,"ratePesosPerMeter":34607.142857142855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28505"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Panoypoy, Sta. 0+000.00 - Sta. 0+500.00, Consolacion, Cebu","amountPesos":5814000.0,"lengthMeters":500.0,"ratePesosPerMeter":11628.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28507"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage System, Barangay Tipolo, Mandaue City, Cebu - Sta. 0+000.00 - Sta. 0+382.00","amountPesos":50000000.0,"lengthMeters":382.0,"ratePesosPerMeter":130890.05235602094,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28509"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Tilhaong, Sta. 0+000.00 - Sta. 0+280.00, Consolacion, Cebu","amountPesos":4845000.0,"lengthMeters":280.0,"ratePesosPerMeter":17303.571428571428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28511"},{"year":2026,"category":"Roads","project":"Construction of Road, Bala-Buguil Road, Barangay Bala and Barangay Buguil, Sta. 6+800 - Sta. 7+007, Moalboal, Cebu","amountPesos":6783000.0,"lengthMeters":207.0,"ratePesosPerMeter":32768.115942028984,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28514"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Buguil-Barangay Batadbatad, Sta. 11 + 700 - Sta. 11 + 849, Moalboal, Cebu","amountPesos":6783000.0,"lengthMeters":149.0,"ratePesosPerMeter":45523.4899328859,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28516"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Guadalupe, Sta. 0 + 819 - Sta. 0 + 948, Alegria, Cebu","amountPesos":4845000.0,"lengthMeters":129.0,"ratePesosPerMeter":37558.13953488372,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28518"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Guadalupe-Barangay Valencia, Sta. 0 + 138 - Sta. 0 + 358, Alegria, Cebu","amountPesos":6783000.0,"lengthMeters":220.0,"ratePesosPerMeter":30831.81818181818,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28520"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Kanghumaod, Sta. 0 + 000 - Sta. 0 + 169, Dumanjug, Cebu","amountPesos":4845000.0,"lengthMeters":169.0,"ratePesosPerMeter":28668.63905325444,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28522"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Malatbo-Barangay Campisong, Sta. 3 + 600 - Sta. 3 + 823, Ginatilan, Cebu","amountPesos":6783000.0,"lengthMeters":223.0,"ratePesosPerMeter":30417.040358744394,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28524"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Poblacion-Barangay Palanas, Sta. 1 + 540 - Sta. 1 + 688, Ginatilan, Cebu","amountPesos":6783000.0,"lengthMeters":148.0,"ratePesosPerMeter":45831.08108108108,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28526"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Poblacion-Barangay Palanas,  0 + 000 - 0 + 182, 0 +281 - 0 + 375, Ronda, Cebu","amountPesos":7752000.0,"lengthMeters":276.0,"ratePesosPerMeter":28086.956521739132,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28528"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sanlagan-Barangay Candiis, Sta. 0 + 170 - Sta. 0 + 214, Sta. 0 + 322 - Sta. 0 + 482, Badian, Cebu","amountPesos":6783000.0,"lengthMeters":204.0,"ratePesosPerMeter":33250.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28530"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sorsogon-Barangay Cerdeña, Sta. 7 + 400 - Sta. 7 + 541, Malabuyoc, Cebu","amountPesos":6783000.0,"lengthMeters":141.0,"ratePesosPerMeter":48106.382978723406,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28532"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Talayong, Sta. 0 + 000 - Sta. 0 + 172, Badian, Cebu","amountPesos":4845000.0,"lengthMeters":172.0,"ratePesosPerMeter":28168.60465116279,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28534"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tomonoy-Barangay Agbalanga-Barangay Busay, Sta. 1 + 900 - Sta. 2 + 061, Moalboal, Cebu","amountPesos":6783000.0,"lengthMeters":161.0,"ratePesosPerMeter":42130.434782608696,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28536"},{"year":2026,"category":"Roads","project":"Construction of Road, Bitoon - Tubod - Bitoon Road, Sta. 0 +300 - Sta. 0 + 533, Barangay Tubod and Barangay Bitoon, Dumanjug, Cebu","amountPesos":6783000.0,"lengthMeters":233.0,"ratePesosPerMeter":29111.587982832618,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28538"},{"year":2026,"category":"Roads","project":"Construction of Road, Kambanog - Masa Road,  Sta. 2 +100 - Sta. 2 + 322, Barangay Kambanog, Dumanjug, Cebu","amountPesos":6783000.0,"lengthMeters":222.0,"ratePesosPerMeter":30554.054054054053,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28540"},{"year":2026,"category":"Roads","project":"Construction of Road, Kanguha-Kabalaasnan Road, Sta. 0 + 694 - Sta. 0 + 941, Barangay Kanguha, Dumanjug, Cebu","amountPesos":6783000.0,"lengthMeters":247.0,"ratePesosPerMeter":27461.53846153846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28542"},{"year":2026,"category":"Roads","project":"Construction of Road, Malhiao-Sohoton Road, Sta. 1 + 647 - Sta. 1 + 810, Barangay Malhiao, Badian, Cebu","amountPesos":6783000.0,"lengthMeters":163.0,"ratePesosPerMeter":41613.496932515336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28544"},{"year":2026,"category":"Roads","project":"Construction of Road, Sorsogon-Labrador-Mahanlud Road, Barangay Labrador and Barangay Mahanlud, Sta. 0 + 000 - Sta. 0 + 199, Malabuyoc, Cebu","amountPesos":6783000.0,"lengthMeters":199.0,"ratePesosPerMeter":34085.427135678394,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28546"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 2+600 - Sta. 2+700, Sta. 2+700 - Sta. 2+800, Sta. 2+600 - Sta. 2+800, Barangay Bacayan, Cebu City, Cebu","amountPesos":9690000.0,"lengthMeters":200.0,"ratePesosPerMeter":48450.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28549"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+750 - Sta. 0+950, Barangay Basak San Nicolas, Cebu City, Cebu","amountPesos":9690000.0,"lengthMeters":200.0,"ratePesosPerMeter":48450.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28551"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 9+019 - Sta. 9+189, Barangay Inayawan, Cebu City, Cebu","amountPesos":4845000.0,"lengthMeters":170.0,"ratePesosPerMeter":28500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28553"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+400 - 0+541, Sta. 0+550 - Sta. 0+750, Barangay Labangon, Cebu City, Cebu","amountPesos":19380000.0,"lengthMeters":341.0,"ratePesosPerMeter":56832.84457478006,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28555"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+140.00 - Sta. 0+280.00 Barangay Pahina San Nicolas, Cebu City, Cebu","amountPesos":4845000.0,"lengthMeters":140.0,"ratePesosPerMeter":34607.142857142855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28557"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 2+200.00 - Sta. 2+340.00 Barangay Pung-ol Sibugay, Cebu City, Cebu","amountPesos":4845000.0,"lengthMeters":140.0,"ratePesosPerMeter":34607.142857142855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28559"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 5+300.00 - 5+700.00 Barangay Sapangdaku, Cebu City, Cebu","amountPesos":48450000.0,"lengthMeters":400.0,"ratePesosPerMeter":121125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28561"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 12+800.00 - 12+980.00 Barangay Sinsin, Cebu City, Cebu","amountPesos":4845000.0,"lengthMeters":180.0,"ratePesosPerMeter":26916.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28563"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 2+500.00 - Sta. 2+860.00 Barangay Taptap, Cebu City, Cebu","amountPesos":9690000.0,"lengthMeters":360.0,"ratePesosPerMeter":26916.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28565"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage Structure, Sta. 0+962.00 to Sta. 1+052.00, Barangay Pulangbato, Cebu City, Cebu","amountPesos":9698000.0,"lengthMeters":90.0,"ratePesosPerMeter":107755.55555555556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28567"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage Structure, Sta. 0+230 to Sta. 0+460, Barangay Sambag I, Cebu City","amountPesos":14546000.0,"lengthMeters":230.0,"ratePesosPerMeter":63243.47826086957,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28571"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Bunga, Cabucgayan, Biliran (Sta. 0+000 - Sta. 0+082, Sta. 0+082 - Sta. 0+239, Sta. 0+115 - Sta. 0+230, Sta. 0+000 - Sta. 0+146)","amountPesos":9648000.0,"lengthMeters":239.0,"ratePesosPerMeter":40368.200836820084,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28575"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Ermita - Barangay Binongto-an, Maripipi, Biliran (Sta. 0+030 - Sta. 0+230)","amountPesos":4824000.0,"lengthMeters":200.0,"ratePesosPerMeter":24120.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28577"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Marvel, Culaba, Biliran (Sta. 0+000 - Sta. 0+400)","amountPesos":8683000.0,"lengthMeters":400.0,"ratePesosPerMeter":21707.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28581"},{"year":2026,"category":"Roads","project":"Construction of Road, Cebreros St., Barangay 4, Taft, Eastern Samar (Sta. 0+000 - Sta. 0+500)","amountPesos":19600000.0,"lengthMeters":500.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28586"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tan-awan to Barangay Libertad, Dolores, Eastern Samar (Sta. 0+000 - Sta. 0+500)","amountPesos":19600000.0,"lengthMeters":500.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28588"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Canjaway, Borongan City, Eastern Samar (Sta. 0+000 - Sta. 0+300)","amountPesos":9800000.0,"lengthMeters":300.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28590"},{"year":2026,"category":"Roads","project":"Construction of Road, Del Pilar Street, Poblacion Barangay 5, San Julian, Eastern Samar (Sta. 0+000 - Sta. 0+300)","amountPesos":9800000.0,"lengthMeters":300.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28592"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Hamorawon, Guiuan, Eastern Samar (Sta. 0+000 - Sta. 0+200)","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28594"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Jose, Guiuan, Eastern Samar (Sta. 0+000 - Sta. 0+200)","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28596"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Buenavista, Guiuan, Eastern Samar (Sta. 0+000 - Sta. 0+200)","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28598"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Banaag, Guiuan, Eastern Samar (Sta. 0+000 - Sta. 0+200)","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28600"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Carapdapan, Salcedo, Eastern Samar (Sta. 0+000 - Sta. 0+120)","amountPesos":4824000.0,"lengthMeters":120.0,"ratePesosPerMeter":40200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28604"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tanauan - Barangay Luhang, Dolores, Eastern Samar (Sta. 0+000 - Sta. 0+120)","amountPesos":4900000.0,"lengthMeters":120.0,"ratePesosPerMeter":40833.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28606"},{"year":2026,"category":"Roads","project":"Construction of Road, Bonaventura Street to Montes Street, Balangkayan, Eastern Samar (Sta. 0+000 - Sta. 0+120)","amountPesos":4824000.0,"lengthMeters":120.0,"ratePesosPerMeter":40200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28608"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay Japitan and Sitio Biniyawan, Brgy 15, Dolores, Eastern Samar (Sta. 0+000 - Sta. 0+600)","amountPesos":20000000.0,"lengthMeters":600.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28610"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay Libertad, Dolores, Eastern Samar (Sta. 0+000 - Sta. 0+600)","amountPesos":20000000.0,"lengthMeters":600.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28612"},{"year":2026,"category":"Roads","project":"Construction of Road in Barangay San Miguel to Barangay Carayacay (Phase I), Maslog, Eastern Samar (Sta. 2+890 - Sta. 3+440)","amountPesos":20000000.0,"lengthMeters":550.0,"ratePesosPerMeter":36363.63636363636,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28614"},{"year":2026,"category":"Roads","project":"Construction of Road, Guimbaolibot Avenue to Cotins Drive, Guiuan, Eastern Samar (Sta. 0+000 - Sta. 0+532)","amountPesos":28944000.0,"lengthMeters":532.0,"ratePesosPerMeter":54406.015037593985,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28616"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Chainage 0 + 000 - Chainage 1 + 000, Barangay Alahag, Jaro, Leyte","amountPesos":14700000.0,"lengthMeters":1000.0,"ratePesosPerMeter":14700.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28628"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Chainage 0 + 000 - Chainage 1 + 000, Barangay Batug - Sitio Kabalagnan, Jaro, Leyte","amountPesos":14700000.0,"lengthMeters":1000.0,"ratePesosPerMeter":14700.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28630"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Chainage 0 + 000 - Chainage 0 + 750, Barangay Burabod - Sitio Kasurimahan, Jaro, Leyte","amountPesos":9800000.0,"lengthMeters":750.0,"ratePesosPerMeter":13066.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28632"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Chainage 0 + 000 - Chainage 0 + 750, Barangay Canhandugan – Sitio Kallenahan, Jaro, Leyte","amountPesos":9800000.0,"lengthMeters":750.0,"ratePesosPerMeter":13066.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28634"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Chainage 0 + 000 - Chainage 0 + 700, Barangay Canhandugan – Sitio Kuli-kuli, Jaro, Leyte","amountPesos":9800000.0,"lengthMeters":700.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28636"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Chainage 0 + 000 - Chainage 0 + 662, Barangay Crossing Rubas - Sitio Campagal, Jaro, Leyte","amountPesos":9800000.0,"lengthMeters":662.0,"ratePesosPerMeter":14803.625377643504,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28638"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Chainage 1 + 545 - Chainage 2 + 125, Barangay Kalinawan - Barangay Licod, Jaro, Leyte","amountPesos":9800000.0,"lengthMeters":580.0,"ratePesosPerMeter":16896.55172413793,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28640"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Chainage 0 + 000 - Chainage 0 + 750, Barangay Licod, Jaro, Leyte","amountPesos":9800000.0,"lengthMeters":750.0,"ratePesosPerMeter":13066.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28642"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Chainage 0 + 000 - Chainage 0 + 750, Barangay Macanip - Sitio Kutay, Jaro, Leyte","amountPesos":9800000.0,"lengthMeters":750.0,"ratePesosPerMeter":13066.666666666666,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28644"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Chainage 0 + 000 - Chainage 1 + 100, Sitio Iphag, Barangay Pange - Sitio Gapas, Barangay Sta. Cruz - Sitio Cabalagnan, Barangay Batug, Jaro, Leyte","amountPesos":19600000.0,"lengthMeters":1100.0,"ratePesosPerMeter":17818.18181818182,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28646"},{"year":2026,"category":"Roads","project":"Rehabilitation of Concrete Road, Chainage 0 + 000 - Chainage 3 + 200, Barangay Macanip - Barangay Canhandugan, Jaro, Leyte","amountPesos":19600000.0,"lengthMeters":3200.0,"ratePesosPerMeter":6125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28648"},{"year":2026,"category":"Roads","project":"Rehabilitation of Concrete Road, Chainage 0 + 000 - Chainage 2 + 400, Barangay Malobago - Barangay Macanip, Jaro, Leyte","amountPesos":9800000.0,"lengthMeters":2400.0,"ratePesosPerMeter":4083.3333333333335,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28650"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sambulawan Elementary School to Barangay Basud, San Isidro, Leyte, Station 6+700 - 6+713.10","amountPesos":4711000.0,"lengthMeters":13.1,"ratePesosPerMeter":359618.320610677,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28653"},{"year":2026,"category":"Roads","project":"Construction of Road Barangay Palid-1 to Barangay Palid-2, Leyte, Leyte, Station 3+150 - 4+172.5","amountPesos":48240000.0,"lengthMeters":1022.5,"ratePesosPerMeter":47178.48410757946,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28655"},{"year":2026,"category":"Roads","project":"Concreting of Road of Barangay Jalas - Barangay Buga Buga - (Sta. 4+423 - Sta. 4+923), Villaba, Leyte","amountPesos":19600000.0,"lengthMeters":500.0,"ratePesosPerMeter":39200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28659"},{"year":2026,"category":"Roads","project":"Concreting of Road with Slope Protection, Barangay Balite - (K1048+273 - K1048+473), Villaba, Leyte","amountPesos":9800000.0,"lengthMeters":200.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28661"},{"year":2026,"category":"Roads","project":"Concreting of Road, PUP School, Barangay Calaguise - (Sta. 0+000 - Sta. 0+280, Sta. 0+000 - Sta. 0+171) Leyte, Leyte","amountPesos":29400000.0,"lengthMeters":280.0,"ratePesosPerMeter":105000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28663"},{"year":2026,"category":"Roads","project":"Construction of Connecting Road, Silad Pier - Suba Pier - (Sta. 0+075 - Sta. 0+775), Villaba, Leyte","amountPesos":29400000.0,"lengthMeters":700.0,"ratePesosPerMeter":42000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28665"},{"year":2026,"category":"Roads","project":"Construction of Road with Box Culvert, Barangay Danus, Leyte, Leyte, Station 0+549 - 0+803","amountPesos":4824000.0,"lengthMeters":254.0,"ratePesosPerMeter":18992.12598425197,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28667"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Nipa, Calubian, Leyte, Station 0+140 - 0+295","amountPesos":4824000.0,"lengthMeters":155.0,"ratePesosPerMeter":31122.58064516129,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28671"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+900, Barangay Sumangga, Ormoc City, Leyte","amountPesos":14700000.0,"lengthMeters":900.0,"ratePesosPerMeter":16333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28674"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Binulho, Sta. 0+692.51 - 1+108.51, Javier, Leyte","amountPesos":4824000.0,"lengthMeters":416.0,"ratePesosPerMeter":11596.153846153846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28677"},{"year":2026,"category":"Roads","project":"Junction Himay-angan-Silago-Abuyog Boundary Road (Bagacay-Tib-o) - K1131+985-K1132+375, K1132+669-K1134+956, Abuyog, Leyte","amountPesos":34300000.0,"lengthMeters":2677.0,"ratePesosPerMeter":12812.850205453866,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28679"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Caningag, Sta. 3+175 - 3+475, Matalom, Leyte","amountPesos":4824000.0,"lengthMeters":300.0,"ratePesosPerMeter":16080.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28681"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mabini, Sta. 0+990 - 1+890, Bato, Leyte","amountPesos":9648000.0,"lengthMeters":900.0,"ratePesosPerMeter":10720.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28683"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mabunga, Sta. 0+250 - 0+650, Mahaplag, Leyte","amountPesos":4824000.0,"lengthMeters":400.0,"ratePesosPerMeter":12060.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28685"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pinocawan, Sta. 1+133 - 1+523, Javier, Leyte","amountPesos":4824000.0,"lengthMeters":390.0,"ratePesosPerMeter":12369.23076923077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28687"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Sotero, Sta. 0+228 - 0+355( Section 1), Sta. 0+312 - 0+580 (Section 2), Javier, Leyte","amountPesos":4824000.0,"lengthMeters":352.0,"ratePesosPerMeter":13704.545454545454,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28689"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cawayan, Sta. 000+000 - Sta. 000+312, Catarman, Northern Samar","amountPesos":9648000.0,"lengthMeters":312.0,"ratePesosPerMeter":30923.076923076922,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28692"},{"year":2026,"category":"Roads","project":"Road Concreting from Sitio Mohon, Barangay Libas to Barangay Ocad (Sta. 000+000 - Sta. 000+500), Municipality of Lavezares, Northern Samar","amountPesos":50000000.0,"lengthMeters":500.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28694"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Polangi - Brgy. Paticua - Brgy. San Pascual, Sta. 001+907 - Sta. 002+607, Catarman, Northern Samar","amountPesos":24120000.0,"lengthMeters":700.0,"ratePesosPerMeter":34457.142857142855,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28696"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Balnasan (Sta. 1+445 - Sta. 1+535), San Roque, Northern Samar","amountPesos":4824000.0,"lengthMeters":90.0,"ratePesosPerMeter":53600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28699"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Santa Fe (Sta. 0+000 - Sta. 0+130, Sta. 0+000 - Sta. 0+120, Sta. 0+000 - Sta. 0+052, Sta. 0+000 - Sta. 0+128), Catubig, Northern Samar","amountPesos":24120000.0,"lengthMeters":130.0,"ratePesosPerMeter":185538.46153846153,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28701"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road in Brgy. San Jose - Brgy. Canhumadac, Calbayog City, Samar (Sta. 2+671.00 – Sta. 2+790.00, Sta. 3+925.00 – Sta. 3+938.00, Sta. 4+171.00 – Sta. 4+202.00, Sta. 4+261.00 - Sta. 4+302.00, Sta. 4+689.00 – Sta. 4+728.00, Sta. 5+045.00 – Sta. 5+075.00, Sta. 5+206.00 – Sta. 5+388.00)","amountPesos":50000000.0,"lengthMeters":455.0,"ratePesosPerMeter":109890.10989010989,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28706"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Rizal I-Barangay Guinbaoyan Sur, Calbayog City, Samar ( Sta. 0+000.00 – Sta. 0+526.00)","amountPesos":20000000.0,"lengthMeters":526.0,"ratePesosPerMeter":38022.813688212926,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28708"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Camayse to Barangay Macalunod to Barangay Bublaranan, Zumarraga, Samar (Sta. 0+000 - 0+700)","amountPesos":48240000.0,"lengthMeters":700.0,"ratePesosPerMeter":68914.28571428571,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28711"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Macalpe to Barangay Poso to Barangay Guintampilan, Daram, Samar (Sta. 0+000 - 0+700)","amountPesos":48240000.0,"lengthMeters":700.0,"ratePesosPerMeter":68914.28571428571,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28713"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Poblacion 1 to Barangay Bontod, San Sebastian, Samar (Sta. 0+000 - 0+500)","amountPesos":28944000.0,"lengthMeters":500.0,"ratePesosPerMeter":57888.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28717"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Rizal to Barangay Cabugao to Barangay Parasan, Daram, Samar (Sta. 0+000 - 0+700)","amountPesos":48240000.0,"lengthMeters":700.0,"ratePesosPerMeter":68914.28571428571,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28721"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay Pinaskohan, City of Maasin, Southern Leyte (Sta. 0+000 - Sta. 0+012)","amountPesos":12249000.0,"lengthMeters":12.0,"ratePesosPerMeter":1020750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28724"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pansaan - Barangay Cabadiangan, City of Maasin, Southern Leyte (Sta. 1+828 - Sta. 1+987)","amountPesos":4824000.0,"lengthMeters":159.0,"ratePesosPerMeter":30339.622641509435,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28726"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Agustin - Barangay Nonok Sur, City of Maasin, Southern Leyte (Sta. 0+370 - Sta. 0+681.50)","amountPesos":9648000.0,"lengthMeters":311.5,"ratePesosPerMeter":30972.71268057785,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28730"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Amaga, Hinundayan, Southern Leyte (STA 1+442.0 - STA 1+598.0)","amountPesos":4824000.0,"lengthMeters":156.0,"ratePesosPerMeter":30923.076923076922,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28733"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Balongbalong, Pintuyan, Southern Leyte (STA 0+000.0 - STA 0+170.0)","amountPesos":4824000.0,"lengthMeters":170.0,"ratePesosPerMeter":28376.470588235294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28735"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cahayag, San Francisco, Southern Leyte (STA 0+000.0 - STA 0+156.0)","amountPesos":4824000.0,"lengthMeters":156.0,"ratePesosPerMeter":30923.076923076922,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28737"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Calinao, Hinunangan, Southern Leyte (STA 0+693.0 - STA 0+868.0)","amountPesos":4824000.0,"lengthMeters":175.0,"ratePesosPerMeter":27565.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28739"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Camang, San Ricardo, Southern Leyte (STA 0+599.0 - STA 0+775.0)","amountPesos":4824000.0,"lengthMeters":176.0,"ratePesosPerMeter":27409.090909090908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28741"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Canlawis, Pintuyan, Southern Leyte (STA 0+278.0 - STA 0+454.0)","amountPesos":4824000.0,"lengthMeters":176.0,"ratePesosPerMeter":27409.090909090908,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28743"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Hingatungan, Silago, Southern Leyte (STA 1+162.0 - STA 1+328.0)","amountPesos":4824000.0,"lengthMeters":166.0,"ratePesosPerMeter":29060.24096385542,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28745"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Malinao, Saint Bernard Southern Leyte (STA 2+847.0 - STA 3+007.0)","amountPesos":4824000.0,"lengthMeters":160.0,"ratePesosPerMeter":30150.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28747"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Calugusan, Lamitan, Basilan, Sta. 05+536 - Sta. 06+136","amountPesos":9800000.0,"lengthMeters":600.0,"ratePesosPerMeter":16333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28751"},{"year":2026,"category":"Roads","project":"Construction of Concrete Road, Sitio Berano, Barangay Dulian (Upper Bunguiao), Zamboanga City  Sta. 0+000 - Sta. 0+400","amountPesos":9647000.0,"lengthMeters":400.0,"ratePesosPerMeter":24117.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28757"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage Structure, Barangay Guiwan, Zamboanga City, Zamboanga del Sur, Site 1: Sta. 0+000 - 0+649 , Site 2: Sta. 0+000 - 0+171","amountPesos":19294000.0,"lengthMeters":649.0,"ratePesosPerMeter":29728.813559322032,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28759"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage Structure, Barangay Sangali, Zamboanga City, Zamboanga del Sur, Site 1: Sta. 0+000 - 0+165, Site 2: Sta. 0+000 - 0+040, Site 3: Sta. 0+000 - 0+221","amountPesos":9647000.0,"lengthMeters":221.0,"ratePesosPerMeter":43651.58371040724,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28761"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road with Drainage Structure, Barangay Putik, Zamboanga City, Zamboanga del Sur, Site 1: Sta. 0+000 - 0+193, Site 2: Sta. 0+000 - 0+152, Site 3: Sta. 0+000 - 0+316, Site 4: Sta. 0+000 - 0+065, Site 5: Sta. 0+000 - 0+110, Site 6: Sta. 0+000 - 0+100, Site 7: Sta. 0+000 - 0+142, Site 8: Sta. 0+000 - 0+150","amountPesos":28941000.0,"lengthMeters":316.0,"ratePesosPerMeter":91585.44303797468,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28765"},{"year":2026,"category":"Roads","project":"Construction of Road, San Miguel - San Antonio, Barangay San Miguel and San Antonio, Polanco, Zamboanga del Norte - Sta. 0+000 - Sta. 0+892.10","amountPesos":18272000.0,"lengthMeters":892.1,"ratePesosPerMeter":20482.008743414415,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28768"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sitio Balubohan, Barangay Situbo, Pres. Manuel A. Roxas, Zamboanga del Norte - Sta. 15+660 - Sta. 15+750","amountPesos":5551000.0,"lengthMeters":90.0,"ratePesosPerMeter":61677.77777777778,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28771"},{"year":2026,"category":"Roads","project":"Construction of Road, Bartolome Lira Sr National High School to Dipodog, Brgy. Maras, Sindangan, Zamboanga del Norte - Sta. 0+650 - Sta. 0+850","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28773"},{"year":2026,"category":"Roads","project":"Construction of Road, Brgy. Bantayan, Sindangan, Zamboanga del Norte - Sta. 0+450 - Sta. 0+650","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28775"},{"year":2026,"category":"Roads","project":"Construction of Road, Calubian to Sitio Batugon, Brgy. Calubian, Sindangan, Zamboanga del Norte - Sta. 7+900 - Sta. 8+100","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28777"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok 2 to Purok 5, Barangay Litalip, Jose Dalman, Zamboanga del Norte - Sta. 0+950 - Sta. 1+100, Sta. 1+400 - Sta. 1+500","amountPesos":5788000.0,"lengthMeters":250.0,"ratePesosPerMeter":23152.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28779"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Centro to Mangilay 1 Elementary School, Brgy. Soguilon, Siayan, Zamboanga del Norte - Sta. 0+396 - Sta. 0+596","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28781"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Sugampay, Brgy. Gunyan, Siayan, Zamboanga del Norte - Sta. 0+000 - Sta. 0+200","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28783"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Banuangan, Godod, Zamboanga del Norte (Sta.0+000- Sta. 0+735 )","amountPesos":10129000.0,"lengthMeters":735.0,"ratePesosPerMeter":13780.952380952382,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28786"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Caracol, Salug, Zamboanga del Norte (Sta. 0+000 - Sta. 0+420)","amountPesos":5788000.0,"lengthMeters":420.0,"ratePesosPerMeter":13780.952380952382,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28788"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Limbonga, Godod, Zamboanga del Norte (Sta. 0+000- Sta. 0+700)","amountPesos":9647000.0,"lengthMeters":700.0,"ratePesosPerMeter":13781.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28790"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mauswagon, Godod, Zamboanga del Norte (Sta. 0+000 - Sta.0+350)","amountPesos":4824000.0,"lengthMeters":350.0,"ratePesosPerMeter":13782.857142857143,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28792"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Panabang, Liloy, Zamboanga del Norte (Sta. 0+000 - Sta.0+420)","amountPesos":5788000.0,"lengthMeters":420.0,"ratePesosPerMeter":13780.952380952382,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28794"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Isidro, Labason, Zamboanga del Norte (Sta. 0+000 - Sta.0+700)","amountPesos":9647000.0,"lengthMeters":700.0,"ratePesosPerMeter":13781.42857142857,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28798"},{"year":2026,"category":"Roads","project":"Construction of Road with Box Culvert, Barangay Piña, Sirawai, Zamboanga del Norte,\nSta. 0 + 203 - Sta. 0 + 253","amountPesos":4824000.0,"lengthMeters":50.0,"ratePesosPerMeter":96480.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28801"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lintangan, Sibuco, Zamboanga del Norte,\nSegment 1 - Sta. 0 + 000 - Sta. 0 + 200\nSegment 2 - Sta. 0 + 000 - Sta. 1 + 050","amountPesos":24118000.0,"lengthMeters":1050.0,"ratePesosPerMeter":22969.52380952381,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28803"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Malayal, Sibuco, Zamboanga del Norte,\nSta. 1 + 460 - Sta. 2 + 710","amountPesos":24118000.0,"lengthMeters":1250.0,"ratePesosPerMeter":19294.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28805"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay Dalaon, Molave, Zamboanga del Sur Sta 0+000 - Sta 0+015","amountPesos":18504000.0,"lengthMeters":15.0,"ratePesosPerMeter":1233600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28808"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Camalig - Barangay Upper Sibatang - Barangay Ditoray - Barangay Deborok, Dumalinao and Pagadian City Sta 0+000 - Sta 0+500","amountPesos":14471000.0,"lengthMeters":500.0,"ratePesosPerMeter":28942.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28810"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Dimasangca, Labangan, Zamboanga del Sur Sta 0+000 - Sta 0+412","amountPesos":9647000.0,"lengthMeters":412.0,"ratePesosPerMeter":23415.04854368932,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28812"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Kahayagan to Barangay Kagawasan, Pagadian City, Zamboanga del Sur Sta 0+000 - Sta 0+650","amountPesos":19294000.0,"lengthMeters":650.0,"ratePesosPerMeter":29683.076923076922,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28814"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Maralag to Barangay Lower Timonan, Dumingag, Zamboanga del Sur Sta 0+000 - Sta 0+824.50","amountPesos":19294000.0,"lengthMeters":824.5,"ratePesosPerMeter":23400.848999393573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28816"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Militar to Barangay Libertad, Tukuran, Zamboanga del Sur Sta 0+000 - Sta 0+824.50","amountPesos":19294000.0,"lengthMeters":824.5,"ratePesosPerMeter":23400.848999393573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28818"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Panagaan to Barangay Malubo, Mahayag, Zamboanga del Sur Sta 0+000 - Sta 0+824.50","amountPesos":19294000.0,"lengthMeters":824.5,"ratePesosPerMeter":23400.848999393573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28820"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pawan, Midsalip, Zamboanga del Sur Sta 0+000 - Sta 0+824.50","amountPesos":19294000.0,"lengthMeters":824.5,"ratePesosPerMeter":23400.848999393573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28822"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Isidro, Labangan, Zamboanga del Sur Sta 0+000 - Sta 0+412","amountPesos":9647000.0,"lengthMeters":412.0,"ratePesosPerMeter":23415.04854368932,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28824"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Santo Niño-Brgy, Lumangoy- Barangay Sawa, Sominot, Zamboanga del Sur Sta 0+000 - Sta 0+824.50","amountPesos":19294000.0,"lengthMeters":824.5,"ratePesosPerMeter":23400.848999393573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28826"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sinaguing to Barangay Dipalusan, Ramon Magsaysay, Zamboanga del Sur 0+000 - Sta 0+824.50","amountPesos":19294000.0,"lengthMeters":824.5,"ratePesosPerMeter":23400.848999393573,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28828"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sumalig, Tambulig, Zamboanga del Sur Sta 0+000 - Sta 0+650","amountPesos":19294000.0,"lengthMeters":650.0,"ratePesosPerMeter":29683.076923076922,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28830"},{"year":2026,"category":"Roads","project":"Construction of Road, NRJ  Romarate to Lapaz, Aurora,  Zamboanga del Sur Sta 0+000 - Sta 0+600","amountPesos":19600000.0,"lengthMeters":600.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28832"},{"year":2026,"category":"Roads","project":"Construction of Access Road to Margosatubig Regional Hospital, Sta. 0+000 - Sta. 0+596.39, Margosatubig, Zamboanga del Sur","amountPesos":19294000.0,"lengthMeters":596.39,"ratePesosPerMeter":32351.31373765489,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28835"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Baking - Barangay Dagum, Sta. 5+440 - Sta. 6+740, Lakewood, Zamboanga del Sur","amountPesos":19294000.0,"lengthMeters":1300.0,"ratePesosPerMeter":14841.538461538461,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28837"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lamare, Sta. 0+660 - Sta. 1+110, Bayog, Zamboanga del Sur","amountPesos":9647000.0,"lengthMeters":450.0,"ratePesosPerMeter":21437.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28839"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mahayag - Barangay Libertad, Sta. 0+000 - Sta. 0+900, Dimataling, Zamboanga del Sur","amountPesos":19294000.0,"lengthMeters":900.0,"ratePesosPerMeter":21437.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28841"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Maraya - Barangay Lumbal, Sta. 0+100 - Sta. 0+700, Vincenzo A. Sagun, Zamboanga del Sur","amountPesos":9647000.0,"lengthMeters":600.0,"ratePesosPerMeter":16078.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28843"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Maraya, Vincenzo A. Sagun, Zamboanga del Sur - Barangay Balintawak, Sta. 1+260 - Sta. 1+860, Margosatubig, Zamboanga del Sur","amountPesos":9647000.0,"lengthMeters":600.0,"ratePesosPerMeter":16078.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28845"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tigbao, Sta. 0+180 - Sta. 1+080, Tigbao, Zamboanga del Sur","amountPesos":19294000.0,"lengthMeters":900.0,"ratePesosPerMeter":21437.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28847"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tiguian - Magallopan Road, Sta. 2+800 - Sta. 3+700, Margosatubig, Zamboanga del Sur","amountPesos":19294000.0,"lengthMeters":900.0,"ratePesosPerMeter":21437.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28849"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Tongao - Barangay Panubigan, Sta. 0+620 - Sta. 1+520, Pitogo, Zamboanga del Sur","amountPesos":19294000.0,"lengthMeters":900.0,"ratePesosPerMeter":21437.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28851"},{"year":2026,"category":"Roads","project":"Construction of Road, Phase I, Purok 7, Barangay Depore, Sta. 1+700 - Sta. 2+300, Bayog, Zamboanga del Sur","amountPesos":9647000.0,"lengthMeters":600.0,"ratePesosPerMeter":16078.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28853"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok 1 - Purok 2, Barangay Limonan, Sta. 1+700 - Sta. 2+300, San Miguel, Zamboanga del Sur","amountPesos":9647000.0,"lengthMeters":600.0,"ratePesosPerMeter":16078.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28855"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok 1 - Purok 3, Barangay Lantawan, Sta. 3+080 - Sta. 3+680, San Miguel, Zamboanga del Sur","amountPesos":9647000.0,"lengthMeters":600.0,"ratePesosPerMeter":16078.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28857"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Naga-Naga, Alicia, Zamboanga Sibugay, Sta.00+000-Sta.01+090","amountPesos":24118000.0,"lengthMeters":1090.0,"ratePesosPerMeter":22126.605504587154,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28860"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pandan-pandan, Alicia, Zamboanga Sibugay, Sta. 00+000 - Sta. 00+209.50","amountPesos":4824000.0,"lengthMeters":209.5,"ratePesosPerMeter":23026.252983293554,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28862"},{"year":2026,"category":"Roads","project":"Construction of Road along Jct. Aglayan-Alanib-Ticalaan Rd - Balansag Street Sta. 0+287 - 1+121, and Gahub Street Sta. 0+000 - 0+320, Barangay Balila, Lantapan, Bukidnon","amountPesos":28315000.0,"lengthMeters":1121.0,"ratePesosPerMeter":25258.69759143622,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28869"},{"year":2026,"category":"Roads","project":"Construction of Road, Cawayan Road Sta. 0+000 - 0+387, Barangay Cawayan, Impasug-ong, Bukidnon","amountPesos":9438000.0,"lengthMeters":387.0,"ratePesosPerMeter":24387.596899224805,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28871"},{"year":2026,"category":"Roads","project":"Construction of Road along Jct. Sayre Highway - Damitan Road, Barangay Dalwangan, Sta. 3+644 - 3+940, City of Malaybalay, Bukidnon","amountPesos":9438000.0,"lengthMeters":296.0,"ratePesosPerMeter":31885.135135135137,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28873"},{"year":2026,"category":"Roads","project":"Construction of Road along Jct. Aglayan-Alanib-Ticalaan Rd - Sitio Calamba Road, Barangay Kibangay, Sta. 0+455 - 0+820, Lantapan, Bukidnon","amountPesos":9438000.0,"lengthMeters":365.0,"ratePesosPerMeter":25857.534246575342,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28875"},{"year":2026,"category":"Roads","project":"Construction of Road along Jct. Aglayan-Zamboanguita Rd - Purok 9 Road, Barangay Managok, Sta. 1+788 - 2+155, City of Malaybalay, Bukidnon","amountPesos":9438000.0,"lengthMeters":367.0,"ratePesosPerMeter":25716.621253405996,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28877"},{"year":2026,"category":"Roads","project":"Construction of Road along Jct. Aglayan-Zamboanguita Rd - Matangpatang-Dungis Road Sta. 2+955 - 3+702, Barangay Miglamin, Malaybalay City, Bukidnon","amountPesos":18877000.0,"lengthMeters":747.0,"ratePesosPerMeter":25270.41499330656,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28879"},{"year":2026,"category":"Roads","project":"Construction of Road along Jct. Malaybalay City Bypass Rd - Hagua-on Road Sta. 0+000 - 0+240, Barangay San Jose, Malaybalay City","amountPesos":4719000.0,"lengthMeters":240.0,"ratePesosPerMeter":19662.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28881"},{"year":2026,"category":"Roads","project":"Construction of Road along Sta. Rita Road Sta. 1+400 - 1+796, Barangay Sinanglanan, City of Malaybalay, Bukidnon","amountPesos":9438000.0,"lengthMeters":396.0,"ratePesosPerMeter":23833.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28883"},{"year":2026,"category":"Roads","project":"Construction of Road along Jct. DEPED Malaybalay Rd - Malaybalay City Senior High School Road, Sta. 0+000 - 0+120, Barangay Casisang, City of Malaybalay, Bukidnon","amountPesos":4719000.0,"lengthMeters":120.0,"ratePesosPerMeter":39325.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28885"},{"year":2026,"category":"Roads","project":"Construction of Road leading to Kiburiao National High School, Barangay Kiburiao Sta. 0+000 - Sta. 0+254, Quezon, Bukidnon","amountPesos":4719000.0,"lengthMeters":254.0,"ratePesosPerMeter":18578.740157480315,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28888"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Balintawak Sta. 0+000 - Sta. 0+200, Kibawe, Bukidnon","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28890"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Isidro Sta. 0+000 - Sta. 0+200, Quezon, Bukidnon","amountPesos":4819000.0,"lengthMeters":200.0,"ratePesosPerMeter":24095.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28892"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bukang Liwayway Sta. 0+000 - Sta. 0+200, Kibawe, Bukidnon","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28894"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Cebole Sta.0+000 - Sta. 0+200, Quezon, Bukidnon","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28896"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Kibalagon Sta. 0+000 - Sta. 0+200, Kadingilan, Bukidnon","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28898"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lipa Sta. 0+000 - Sta. 0+259, Quezon, Bukidnon","amountPesos":4719000.0,"lengthMeters":259.0,"ratePesosPerMeter":18220.07722007722,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28900"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mascarinas to Barangay Tumaras Sta. 0+000 - Sta. 0+840, Kibawe, Bukidnon","amountPesos":18877000.0,"lengthMeters":840.0,"ratePesosPerMeter":22472.619047619046,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28902"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Matampay Sta. 0+000 - Sta. 0+200, Kadingilan, Bukidnon","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28904"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mibantang Sta. 0+000 - Sta. 0+200, Quezon, Bukidnon","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28906"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Minongan Sta. 0+000 - Sta. 0+800, Quezon, Bukidnon","amountPesos":28315000.0,"lengthMeters":800.0,"ratePesosPerMeter":35393.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28908"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Palma Sta. 0+210 - Sta. 0+410, Kibawe, Bukidnon","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28910"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pinamula, Sta. 0+000 - Sta. 0+170, Kibawe, Bukidnon","amountPesos":4719000.0,"lengthMeters":170.0,"ratePesosPerMeter":27758.823529411766,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28912"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Poblacion to Barangay San Isidro Sta. 0+000 - Sta. 0+800, Kitaotao, Bukidnon","amountPesos":28315000.0,"lengthMeters":800.0,"ratePesosPerMeter":35393.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28914"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Poblacion Sta. 0+000 - Sta. 0+338, Kitaotao, Bukidnon","amountPesos":9438000.0,"lengthMeters":338.0,"ratePesosPerMeter":27923.076923076922,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28916"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Roque, Sta. 0+000 - Sta. 0+200, Quezon, Bukidnon","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28918"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sanipon Sta. 0+000 - Sta. 0+100, Kibawe, Bukidnon","amountPesos":4719000.0,"lengthMeters":100.0,"ratePesosPerMeter":47190.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28920"},{"year":2026,"category":"Roads","project":"Construction of road, Brgy. Baroy, Sta. 0+000 - Sta. 0+243, Kadingilan, Bukidnon","amountPesos":5000000.0,"lengthMeters":243.0,"ratePesosPerMeter":20576.1316872428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28922"},{"year":2026,"category":"Roads","project":"Construction of road, Brgy. Salvacion, Sta. 0+000 - Sta. 0+261, Kadingilan, Bukidnon","amountPesos":5000000.0,"lengthMeters":261.0,"ratePesosPerMeter":19157.088122605364,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28924"},{"year":2026,"category":"Roads","project":"Concreting of road, Brgy. Balangigay, Sta. 0+255 - Sta. 0+526, Kitaotao, Bukidnon","amountPesos":5000000.0,"lengthMeters":271.0,"ratePesosPerMeter":18450.18450184502,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28926"},{"year":2026,"category":"Roads","project":"Construction of road, Brgy. Cabalantian, Sta. 0+000 to Sta. 0+225, Kitaotao, Bukidnon","amountPesos":5000000.0,"lengthMeters":225.0,"ratePesosPerMeter":22222.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28928"},{"year":2026,"category":"Roads","project":"Construction of road. Brgy. Pagan, Sta. 0+000 - Sta. 0+240, Kitaotao, Bukidnon","amountPesos":5000000.0,"lengthMeters":240.0,"ratePesosPerMeter":20833.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28930"},{"year":2026,"category":"Roads","project":"Construction of road, Brgy. Panganan, Sta. 0+515 - 0+758, Kitaotao, Bukidnon","amountPesos":5000000.0,"lengthMeters":243.0,"ratePesosPerMeter":20576.1316872428,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28932"},{"year":2026,"category":"Roads","project":"Construction of road, Brgy. San Lorenzo, Sta. 0+000 to Sta. 0+250, Kitaotao, Bukidnon","amountPesos":5000000.0,"lengthMeters":250.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28934"},{"year":2026,"category":"Roads","project":"Construction of road, Purok 8, Brgy. San Isidro, Sta. 0+000 - 0+270, Kitaotao, Bukidnon","amountPesos":5000000.0,"lengthMeters":270.0,"ratePesosPerMeter":18518.51851851852,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28938"},{"year":2026,"category":"Roads","project":"Construction of Jct. Bukidnon-Davao City Road, Barangay Kiuntod- Barangay Minsalagan-Barangay Manlamonay-Barangay Kibatang- Barangay Pinamaloy Road, Brgy. Manlamonay - Brgy. Pinamaloy Section, Sta. 7+240 - Sta. 8+750, Don Carlos, Bukidnon","amountPesos":50000000.0,"lengthMeters":1510.0,"ratePesosPerMeter":33112.58278145696,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28940"},{"year":2026,"category":"Roads","project":"Construction of Don Carlos-Kiburiao, Quezon, Bukidnon Bypass Road, Barangay Minsamongan Section, Sta. 8+220 - Sta. 8+730, Quezon, Bukidnon","amountPesos":45000000.0,"lengthMeters":510.0,"ratePesosPerMeter":88235.29411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28942"},{"year":2026,"category":"Roads","project":"Construction of road, Barangay San Miguel, 0+000-0+236 (Section A), 0+000-0+128 (Section B), 0+000-0+082 (Section C), 0+000-0+223 (Section D), 0+000-0+100 (Section E), 0+000-0+049 (Section F), 0+000-0+036 (Section G), 0+000-0+240 (Section H), and 0+000-0+238 (Section I) Maramag, Bukidnon Phase 2","amountPesos":20000000.0,"lengthMeters":240.0,"ratePesosPerMeter":83333.33333333333,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28944"},{"year":2026,"category":"Roads","project":"Construction of Barangay Road, Brgy. Calapaton, Sta. 0+000 to Sta. 0+225, Kitaotao, Bukidnon","amountPesos":5000000.0,"lengthMeters":225.0,"ratePesosPerMeter":22222.222222222223,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28946"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok 3, Barangay San Jose Section A : Sta. 0+000 - 0+084, Section B: 0+000 - 0+084, Section C: Sta. 0+000 - Sta. 0+085, Quezon, Bukidnon","amountPesos":4719000.0,"lengthMeters":85.0,"ratePesosPerMeter":55517.64705882353,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28948"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Gango, Sta. 0+219 - Sta. 0+660, Libona, Bukidnon","amountPesos":9638000.0,"lengthMeters":441.0,"ratePesosPerMeter":21854.875283446712,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28951"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Luis, Sta. 0+000 - Sta. 0+400, Malitbog, Bukidnon","amountPesos":9638000.0,"lengthMeters":400.0,"ratePesosPerMeter":24095.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28953"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Damilag, Sta. 0+288 - Sta. 0+718, Manolo Fortich, Bukidnon","amountPesos":9438000.0,"lengthMeters":430.0,"ratePesosPerMeter":21948.837209302324,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28955"},{"year":2026,"category":"Roads","project":"Improvement of Road (Paving of Shoulders) along Dahilayan Road, Sta. 0+000 to Sta. 2+700, Barangay Dahilayan, Manolo Fortich, Bukidnon","amountPesos":28000000.0,"lengthMeters":2700.0,"ratePesosPerMeter":10370.37037037037,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28957"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Isidro, Sta. 0+000 - Sta. 0+500, Talakag, Bukidnon","amountPesos":9438000.0,"lengthMeters":500.0,"ratePesosPerMeter":18876.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28959"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bagontaas, Sta. 0+000- Sta. 0+898, Sta. 0+275- Sta. 0+575, City of Valencia, Bukidnon","amountPesos":37754000.0,"lengthMeters":898.0,"ratePesosPerMeter":42042.31625835189,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28962"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Barobo, Sta. 2+353 - Sta. 2+803, City of Valencia, Bukidnon","amountPesos":9438000.0,"lengthMeters":450.0,"ratePesosPerMeter":20973.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28964"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Guinoyoran, Sta. 0+000- Sta. 0+345, City of Valencia, Bukidnon","amountPesos":9438000.0,"lengthMeters":345.0,"ratePesosPerMeter":27356.521739130436,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28966"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mt. Nebo, Sta. 0+000- Sta. 0+500, City of Valencia, Bukidnon","amountPesos":9438000.0,"lengthMeters":500.0,"ratePesosPerMeter":18876.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28968"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Payad, Sta. 8+196- Sta. 9+226, Pangantucan, Bukidnon","amountPesos":28315000.0,"lengthMeters":1030.0,"ratePesosPerMeter":27490.29126213592,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28970"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Vicente Ferrer, Sta. 1+110- Sta. 1+910, Kalilangan, Bukidnon","amountPesos":28315000.0,"lengthMeters":800.0,"ratePesosPerMeter":35393.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28972"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Vintar, Sta. 0+000- Sta. 0+471, City of Valencia, Bukidnon","amountPesos":9438000.0,"lengthMeters":471.0,"ratePesosPerMeter":20038.216560509554,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28974"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Olaligan, Barangay Tugaya, Sta. 3+700- Sta. 4+842, City of Valencia, Bukidnon","amountPesos":28315000.0,"lengthMeters":1142.0,"ratePesosPerMeter":24794.220665499124,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28976"},{"year":2026,"category":"Roads","project":"Construction of Road,Barangay Tugaya, Station 0+000 - 0+345,  City of Valencia, Bukidnon","amountPesos":9438000.0,"lengthMeters":345.0,"ratePesosPerMeter":27356.521739130436,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28978"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage Structure, Barangay Nazareth, Sta. 0+000 to Sta. 0+410, Cagayan de Oro City, Misamis Oriental","amountPesos":11798000.0,"lengthMeters":410.0,"ratePesosPerMeter":28775.60975609756,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28981"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage, Barangay Puerto, Sta. 0+000 to Sta. 0+150, Cagayan de Oro City, Misamis Oriental","amountPesos":4819000.0,"lengthMeters":150.0,"ratePesosPerMeter":32126.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28983"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Camaman-an, Sta. 0+000 to Sta. 0+535, Cagayan de Oro City, Misamis Oriental","amountPesos":9438000.0,"lengthMeters":535.0,"ratePesosPerMeter":17641.1214953271,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28985"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Indahag, Sta. 0+000 to Sta. 0+535, Cagayan de Oro City, Misamis Oriental","amountPesos":9438000.0,"lengthMeters":535.0,"ratePesosPerMeter":17641.1214953271,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28987"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lapasan, Sta. 0+000 to Sta. 0+150, Cagayan de Oro City, Misamis Oriental","amountPesos":4719000.0,"lengthMeters":150.0,"ratePesosPerMeter":31460.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28989"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Puerto, Sta. 0+000 to Sta. 0+150, Cagayan de Oro City, Misamis Oriental","amountPesos":4719000.0,"lengthMeters":150.0,"ratePesosPerMeter":31460.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28991"},{"year":2026,"category":"Roads","project":"Construction of Road at Barangay Puntod Sta. 0+000 to Sta. 0+243 (Gaabucayan St.), Cagayan de Oro City, Misamis Oriental","amountPesos":4719000.0,"lengthMeters":243.0,"ratePesosPerMeter":19419.753086419754,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28993"},{"year":2026,"category":"Roads","project":"Construction of Road at MSU-IIT Hinaplanon Campus, Barangay Hinaplanon, Sta. 0+000 - Sta. 0+258, Iligan City","amountPesos":8674000.0,"lengthMeters":258.0,"ratePesosPerMeter":33620.15503875969,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28996"},{"year":2026,"category":"Roads","project":"Construction of Road at Purok 5A, Barangay Tomas Cabili, Sta. 0+000 - Sta. 0+200, Iligan City","amountPesos":4819000.0,"lengthMeters":200.0,"ratePesosPerMeter":24095.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 28998"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Acmac, Section A: Sta. 0+000 - Sta. 0+135, Section B: Sta. 0+000 - Sta. 0+065, Iligan City, Lanao del Norte","amountPesos":4719000.0,"lengthMeters":135.0,"ratePesosPerMeter":34955.555555555555,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29000"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Bunawan, Sta 0+000 - Sta. 0+200, Iligan City, Lanao del Norte","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29002"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Luinab, Sta. 0+000 - Sta. 0+200, Iligan City, Lanao del Norte","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29004"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Puga-an, Sta. 0+000 - Sta. 0+200, Iligan City, Lanao del Norte","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29006"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Rosal, Barangay San Roque, Sta. 0+000 - Sta. 0+150, Iligan City, Lanao del Norte","amountPesos":2891000.0,"lengthMeters":150.0,"ratePesosPerMeter":19273.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29008"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Suarez, Sta. 0+000 - Sta. 0+165, Iligan City, Lanao del Norte","amountPesos":3775000.0,"lengthMeters":165.0,"ratePesosPerMeter":22878.78787878788,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29010"},{"year":2026,"category":"Roads","project":"Construction of Road from Barangay Del Carmen, Iligan City Sta. 0+000 - Sta 0+400","amountPesos":10000000.0,"lengthMeters":400.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29012"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Upper Hinaplanon, Sta. 0+000 - Sta. 0+200, Iligan City, Lanao del Norte","amountPesos":4719000.0,"lengthMeters":200.0,"ratePesosPerMeter":23595.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29014"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage, Barangay Dalama, Sta. 0+000 - Sta. 0+200, Baroy, Lanao del Norte","amountPesos":4819000.0,"lengthMeters":200.0,"ratePesosPerMeter":24095.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29017"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Delabayan West, Sta. 0+000 - Sta. 0+312, Bacolod, Lanao del Norte","amountPesos":9438000.0,"lengthMeters":312.0,"ratePesosPerMeter":30250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29019"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pindolonan, Sta. 0+000 - Sta. 0+390, Baroy, Lanao del Norte","amountPesos":12742000.0,"lengthMeters":390.0,"ratePesosPerMeter":32671.79487179487,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29021"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pualas, Sta. 0+000 - Sta. 0+312, Tubod, Lanao del Norte","amountPesos":9438000.0,"lengthMeters":312.0,"ratePesosPerMeter":30250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29025"},{"year":2026,"category":"Roads","project":"Construction of Malinas Road, Barangay Malinas Section, Sta. 0+000 - Sta. 0+260, Kapatagan, Lanao del Norte","amountPesos":5191000.0,"lengthMeters":260.0,"ratePesosPerMeter":19965.384615384617,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29028"},{"year":2026,"category":"Roads","project":"Construction of Maranding Road, Barangay Maranding Section, Sta. 0+000 - Sta. 0+260, Lala, Lanao del Norte","amountPesos":5191000.0,"lengthMeters":260.0,"ratePesosPerMeter":19965.384615384617,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29030"},{"year":2026,"category":"Roads","project":"Construction of Tunaan Road, Barangay Tunaan Section, Sta. 0+000 - Sta. 0+260, Lala, Lanao del Norte","amountPesos":5191000.0,"lengthMeters":260.0,"ratePesosPerMeter":19965.384615384617,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29032"},{"year":2026,"category":"Roads","project":"Construction of Tipolo Road, Barangay Tipolo Section, Sta. 0+000 - Sta. 1+800, Kapatagan, Lanao del Norte","amountPesos":42473000.0,"lengthMeters":1800.0,"ratePesosPerMeter":23596.11111111111,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29034"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Dalacon, Sta. 1+926- Sta. 2+426, Lopez Jaena, Misamis Occidental","amountPesos":6607000.0,"lengthMeters":500.0,"ratePesosPerMeter":13214.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29037"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Don Andres Soriano, Sta. 2+100 - Sta. 2+700, Lopez Jaena, Misamis Occidental","amountPesos":9438000.0,"lengthMeters":600.0,"ratePesosPerMeter":15730.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29039"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Langub, Sta. 3+285 - Sta. 3+766, Calamba, Misamis Occidental","amountPesos":9438000.0,"lengthMeters":481.0,"ratePesosPerMeter":19621.62162162162,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29043"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mamalad, Sta. Sta. 10+567 - Sta. 11+967, Calamba, Misamis Occidental","amountPesos":28914000.0,"lengthMeters":1400.0,"ratePesosPerMeter":20652.85714285714,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29045"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Isidro, Sta. 3+100 - Sta. 4+900, Calamba, Misamis Occidental","amountPesos":28914000.0,"lengthMeters":1800.0,"ratePesosPerMeter":16063.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29047"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Misom-Barangay Mabini, Sta. 1+540 - Sta. 1+860, Baliangao, Misamis Occidental","amountPesos":5663000.0,"lengthMeters":320.0,"ratePesosPerMeter":17696.875,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29049"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mobod, Sta. 0+959.50 - Sta. 1+367, Oroquieta City, Misamis Occidental","amountPesos":9438000.0,"lengthMeters":407.5,"ratePesosPerMeter":23160.73619631902,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29051"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Santa Ana, Sta. 0+000 - Sta. 0+407.50, Aloran, Misamis Occidental","amountPesos":9438000.0,"lengthMeters":407.5,"ratePesosPerMeter":23160.73619631902,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29053"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sulipat, Sta. 0+510 - Sta. 0+754.50 , Calamba, Misamis Occidental","amountPesos":5663000.0,"lengthMeters":244.5,"ratePesosPerMeter":23161.55419222904,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29055"},{"year":2026,"category":"Roads","project":"Construction of Road, Gawad Kalinga Road, Barangay Bolibol, Sta. 1+205 - Sta. 1+405, Oroquieta City, Misamis Occidental","amountPesos":5663000.0,"lengthMeters":200.0,"ratePesosPerMeter":28315.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29057"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok 3, Barangay Singalat, Sta.13+246 - Sta.13+566, Calamba, Misamis Occidental","amountPesos":9438000.0,"lengthMeters":320.0,"ratePesosPerMeter":29493.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29059"},{"year":2026,"category":"Roads","project":"Improvement of Road in Barangay Poblacion, Sta. 0+000 - Sta. 0+750, Sapang Dalaga, Misamis Occidental","amountPesos":14158000.0,"lengthMeters":750.0,"ratePesosPerMeter":18877.333333333332,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29061"},{"year":2026,"category":"Roads","project":"Construction of Barangay Mandahilag to Barangay Macopa Road, (Section A: Sta. 1+324 - Sta. 1+449, Section B: Sta. 1+686 - Sta. 2+283, Section C: Sta. 2+571 - Sta. 2+621), Talisayan, Misamis Oriental","amountPesos":18877000.0,"lengthMeters":772.0,"ratePesosPerMeter":24452.072538860102,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29064"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Dig-aguyan, Sta. 0+000 - Sta. 0+500, Medina, Misamis Oriental","amountPesos":10854000.0,"lengthMeters":500.0,"ratePesosPerMeter":21708.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29068"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Kibungsod, Sta. 0+000 - Sta. 0+350, Magsaysay, Misamis Oriental","amountPesos":9438000.0,"lengthMeters":350.0,"ratePesosPerMeter":26965.714285714286,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29070"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mangga, (Section A: Sta. 0+000 - Sta. 0+430, Section B: Sta. 0+000 - Sta. 0+170, Section C: Sta. 0+172 - Sta. 0+322), Sugbongcogon, Misamis Oriental","amountPesos":18877000.0,"lengthMeters":430.0,"ratePesosPerMeter":43900.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29072"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sangalan, Sta. 0+000 - Sta. 1+300, Gingoog City, Misamis Oriental","amountPesos":37754000.0,"lengthMeters":1300.0,"ratePesosPerMeter":29041.53846153846,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29074"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Hangaron, Barangay Gasa, Sta. 0+000 - Sta. 0+520, Medina, Misamis Oriental","amountPesos":10854000.0,"lengthMeters":520.0,"ratePesosPerMeter":20873.076923076922,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29082"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Anitapan to Mascareg (Sta. 0+000 - Sta. 1+000), Mabini, Davao de Oro","amountPesos":49000000.0,"lengthMeters":1000.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29091"},{"year":2026,"category":"Roads","project":"Construction of Road leading to Purok 28, Barangay Napnapan (Sta. 0+000 - Sta. 0+500), Pantukan, Davao de Oro","amountPesos":9612000.0,"lengthMeters":500.0,"ratePesosPerMeter":19224.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29093"},{"year":2026,"category":"Roads","project":"Construction of Road leading to Purok 6, Barangay Napnapan (Sta. 0+000 - Sta. 0+500), Pantukan, Davao de Oro","amountPesos":19225000.0,"lengthMeters":500.0,"ratePesosPerMeter":38450.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29095"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Aguinaldo (Sta. 0+000 - Sta. 0+833), Laak, Davao de Oro","amountPesos":48062000.0,"lengthMeters":833.0,"ratePesosPerMeter":57697.47899159664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29097"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Amorcruz (Sta. 0+000 - Sta. 0+833), Laak, Davao de Oro","amountPesos":19225000.0,"lengthMeters":833.0,"ratePesosPerMeter":23079.23169267707,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29099"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Araibo (Sta. 0+000 - Sta. 0+250), Pantukan, Davao de Oro","amountPesos":9612000.0,"lengthMeters":250.0,"ratePesosPerMeter":38448.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29101"},{"year":2026,"category":"Roads","project":"Concreting of Road, Purok-5B Maparat To Purok-4, Sta. 0+000 - Sta. 1+000, Mapaca, Davao De Oro","amountPesos":20149000.0,"lengthMeters":1000.0,"ratePesosPerMeter":20149.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29103"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Inacayan (Sta. 0+000 - Sta. 0+333), Laak, Davao de Oro","amountPesos":13457000.0,"lengthMeters":333.0,"ratePesosPerMeter":40411.41141141141,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29107"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay New Leyte (Sta. 0+000 - Sta. 0+833), Maco, Davao de Oro","amountPesos":48062000.0,"lengthMeters":833.0,"ratePesosPerMeter":57697.47899159664,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29109"},{"year":2026,"category":"Roads","project":"Construction of Road, Homelot to Sitio Bingag, Barangay Kingking (Sta. 0+000 - Sta. 0+500), Pantukan, Davao de Oro","amountPesos":19225000.0,"lengthMeters":500.0,"ratePesosPerMeter":38450.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29113"},{"year":2026,"category":"Roads","project":"Construction of Road, Caballero Street, Barangay Kingking (Sta. 0+000 - Sta. 0+750), Pantukan, Davao de Oro","amountPesos":57674000.0,"lengthMeters":750.0,"ratePesosPerMeter":76898.66666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29115"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Purok 8, Barangay Malinawon (Sta. 0+000 - Sta. 0+075), Mawab, Davao de Oro","amountPesos":98000000.0,"lengthMeters":75.0,"ratePesosPerMeter":1306666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29117"},{"year":2026,"category":"Roads","project":"Construction of Road, National Highway to Purok 2, Barangay Matilo - Barangay Ogao (Sta. 0+000 - Sta. 1+920), Nabunturan, Davao de Oro","amountPesos":47040000.0,"lengthMeters":1920.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29127"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Sasa Nabunturan to Barangay Saosao (Sta. 0+000 - Sta. 1+429), Mawab, Davao de Oro","amountPesos":49000000.0,"lengthMeters":1429.0,"ratePesosPerMeter":34289.713086074174,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29129"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok 4 (Santa Teresa) to Purok 7, Barangay Magnaga (Sta. 0+000 - Sta. 0+500), Pantukan, Davao de Oro","amountPesos":19225000.0,"lengthMeters":500.0,"ratePesosPerMeter":38450.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29131"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok 4, Barangay Anislagan (Sta. 0+000 - Sta. 0+500), Maco, Davao de Oro","amountPesos":28837000.0,"lengthMeters":500.0,"ratePesosPerMeter":57674.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29133"},{"year":2026,"category":"Roads","project":"Construction of Road Slope Protection at Barangay Malamodao (Sta. 0+000 - Sta. 0+571), Maco, Davao de Oro","amountPesos":19600000.0,"lengthMeters":571.0,"ratePesosPerMeter":34325.74430823117,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29135"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Concepcion - Barangay Calabcab - Barangay Limbo (Sta. 0+000 - Sta. 1+600), Maco, Davao de Oro","amountPesos":39200000.0,"lengthMeters":1600.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29137"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Mahogany, Barangay Las Arenas (Sta. 0+000 - Sta. 0+200), Pantukan, Davao de Oro","amountPesos":9800000.0,"lengthMeters":200.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29139"},{"year":2026,"category":"Roads","project":"Construction of Road Barangay Sangab, Maco (Sta. 0+000 - Sta. 0+800), Davao de Oro","amountPesos":39200000.0,"lengthMeters":800.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29141"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Anitapan to Singapore (Sta. 0+000 - Sta. 1+000), Mabini, Davao de Oro","amountPesos":49000000.0,"lengthMeters":1000.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29143"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok 2 to Purok 5, Barangay Taglawig (Sta. 0+000 - Sta. 0+714), Maco, Davao de Oro","amountPesos":24500000.0,"lengthMeters":714.0,"ratePesosPerMeter":34313.72549019608,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29145"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Nangka, Barangay Matiao (Sta. 0+000 - Sta. 0+500), Pantukan, Davao de Oro","amountPesos":19225000.0,"lengthMeters":500.0,"ratePesosPerMeter":38450.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29147"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Santo Niño, Barangay Araibo (Sta. 0+000 - Sta. 0+250), Pantukan, Davao de Oro","amountPesos":19225000.0,"lengthMeters":250.0,"ratePesosPerMeter":76900.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29149"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Poblacion (Sta. 0+000 - Sta. 1+667), Laak, Davao de Oro","amountPesos":48062000.0,"lengthMeters":1667.0,"ratePesosPerMeter":28831.43371325735,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29151"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Dalawinon, Sta.0+000.00 - Sta. 0+300.00, Magsaysay, Davao del Sur","amountPesos":4806000.0,"lengthMeters":300.0,"ratePesosPerMeter":16020.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29157"},{"year":2026,"category":"Roads","project":"Concreting of West Lamidan Barangay Site to Sitio Cabangahan Road, Sta. 0+000 - Sta. 0+500, Barangay Lamidan, Don Marcelino, Davao Occidental","amountPesos":9612000.0,"lengthMeters":500.0,"ratePesosPerMeter":19224.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29160"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Barangay Pinalpalan, Sta. 0+000 - Sta. 0+020, Malita, Davao Occidental","amountPesos":9800000.0,"lengthMeters":20.0,"ratePesosPerMeter":490000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29162"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Barangay Caburan Big, Sta. 0+000 - Sta. 0+501, Jose Abad Santos, Davao Occidental","amountPesos":9612000.0,"lengthMeters":501.0,"ratePesosPerMeter":19185.62874251497,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29164"},{"year":2026,"category":"Roads","project":"Road Concreting from Sitio Centro to Sitio Banahaw, Sta. 0+000 - Sta. 0+500, Barangay Tingolo, Malita, Davao Occidental","amountPesos":9612000.0,"lengthMeters":500.0,"ratePesosPerMeter":19224.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29166"},{"year":2026,"category":"Roads","project":"Road Concreting from Sitio Tamlang to Sitio Latang, Sta. 0+000 - Sta. 0+500, Barangay Kiobog, Don Marcelino, Davao Occidental","amountPesos":9612000.0,"lengthMeters":500.0,"ratePesosPerMeter":19224.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29168"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0 + 000 - Sta. 0 + 440, Sta. 1 + 740 - Sta. 1 + 799.5, Barangay Arakan, Matalam, Cotabato","amountPesos":9484000.0,"lengthMeters":499.5,"ratePesosPerMeter":18986.986986986987,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29175"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0 + 250, Barangay Batang, Tulunan, Cotabato","amountPesos":4742000.0,"lengthMeters":250.0,"ratePesosPerMeter":18968.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29177"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0 + 499.5, Barangay Nabundasan, Tulunan, Cotabato","amountPesos":9484000.0,"lengthMeters":499.5,"ratePesosPerMeter":18986.986986986987,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29179"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 2 + 498, Barangay Pag-asa, M'lang, Cotabato","amountPesos":47418000.0,"lengthMeters":2498.0,"ratePesosPerMeter":18982.38590872698,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29181"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0 + 499.5, Barangay Popoyon,Tulunan, Cotabato","amountPesos":9484000.0,"lengthMeters":499.5,"ratePesosPerMeter":18986.986986986987,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29193"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 2 + 498, from Barangay Tawan-Tawan to Barangay Langkong, M'lang, Cotabato","amountPesos":47418000.0,"lengthMeters":2498.0,"ratePesosPerMeter":18982.38590872698,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29195"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0 + 499.5, Purok 5, Barangay Kilada, Matalam to Barangay Malamote, Kabacan, Cotabato","amountPesos":9484000.0,"lengthMeters":499.5,"ratePesosPerMeter":18986.986986986987,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29197"},{"year":2026,"category":"Roads","project":"Construction of Road, NHW Jct Talus to Talus National High School Road, Sta. 0+000 - Sta. 0+417, Barangay Talus, Malungon, Sarangani","amountPesos":5690000.0,"lengthMeters":417.0,"ratePesosPerMeter":13645.083932853717,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29200"},{"year":2026,"category":"Roads","project":"Construction of Road, NHW Junction to Salakit Road, Sta. 0+000 - Sta. 0+550, Barangay Salakit, Kiamba, Sarangani","amountPesos":10432000.0,"lengthMeters":550.0,"ratePesosPerMeter":18967.272727272728,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29202"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage Structure, Purok Balakayo, Barangay Olympog Road, Sta. 0+000 - Sta. 1+199, General Santos City, South Cotabato,","amountPesos":22761000.0,"lengthMeters":1199.0,"ratePesosPerMeter":18983.319432860717,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29205"},{"year":2026,"category":"Roads","project":"Construction of Road, Lower Labay-Upper Labay Road, Sta. 0+000 - Sta. 0+375, Barangay Upper Labay, General Santos City, South Cotabato","amountPesos":7113000.0,"lengthMeters":375.0,"ratePesosPerMeter":18968.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29207"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+300,  at Brgy. Palkan, Polomolok, South Cotabato","amountPesos":4885000.0,"lengthMeters":300.0,"ratePesosPerMeter":16283.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29209"},{"year":2026,"category":"Roads","project":"Construction  of Road, Sta. 0+000 - Sta. 0+300, Purok 5, Brgy. Crossing Palkan, Polomolok, South Cotabato","amountPesos":4885000.0,"lengthMeters":300.0,"ratePesosPerMeter":16283.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29211"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+650, Purok Esposado, Brgy. Cannery Site, Polomolok, South Coabato","amountPesos":9769000.0,"lengthMeters":650.0,"ratePesosPerMeter":15029.23076923077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29213"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+650, Purok 1 to Purok 3, Brgy. Sulit, Polomolok, South Cotabato","amountPesos":9769000.0,"lengthMeters":650.0,"ratePesosPerMeter":15029.23076923077,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29215"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+000, Purok 7, Brgy. Koronadal Proper, Polomolok, South Cotabato","amountPesos":14654000.0,"lengthMeters":1000.0,"ratePesosPerMeter":14654.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29217"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+510,Arsenio Muninio Road, Brgy. Sta. Cruz, Tampakan South Cotabato","amountPesos":7815000.0,"lengthMeters":510.0,"ratePesosPerMeter":15323.529411764706,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29219"},{"year":2026,"category":"Roads","project":"Construction of  Road with Box Culvert with Downstream,  Sta. 0+000 - Sta. 1+700, Purok 1, Brgy. Polo, Polomolok, South Cotabato","amountPesos":24423000.0,"lengthMeters":1700.0,"ratePesosPerMeter":14366.470588235294,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29221"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+300, Purok Malipayon, Barangay San Isidro, General Santos City","amountPesos":4885000.0,"lengthMeters":300.0,"ratePesosPerMeter":16283.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29223"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Jose Road, City of Koronadal, STA. 0+000-STA. 0+323 South Cotabato","amountPesos":6117000.0,"lengthMeters":323.0,"ratePesosPerMeter":18938.080495356036,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29226"},{"year":2026,"category":"Roads","project":"Construction of Road, Crisologo Street, Barangay Caloocan, City of Koronadal, STA. 0+000-STA. 0+375 South Cotabato","amountPesos":7113000.0,"lengthMeters":375.0,"ratePesosPerMeter":18968.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29228"},{"year":2026,"category":"Roads","project":"Construction of Road, Jct. General Santos-T'Boli-Surallah Road to Barangay Laconon, T'Boli, STA. 0+000-STA. 0+250 South Cotabato","amountPesos":4742000.0,"lengthMeters":250.0,"ratePesosPerMeter":18968.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29230"},{"year":2026,"category":"Roads","project":"Construction of Road, Junction Cotabato-Marbel Road to Barangay Dajay, Surallah, STA. 0+000-STA. 0+375 South Cotabato","amountPesos":7113000.0,"lengthMeters":375.0,"ratePesosPerMeter":18968.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29232"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Tanco 1, Barangay Poblacion, T'Boli, STA. 0+000-STA. 0+500 South Cotabato","amountPesos":9484000.0,"lengthMeters":500.0,"ratePesosPerMeter":18968.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29236"},{"year":2026,"category":"Roads","project":"Concreting of Road from Purok Bliss to Sitio Honorata, Sta. 0+000 - Sta. 1+200, Barangay Kalawag I, Isulan, Sultan Kudarat","amountPesos":18000000.0,"lengthMeters":1200.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29239"},{"year":2026,"category":"Roads","project":"Road Concreting in Brgy. Poblacion III (Sta. 0+000 - Sta. 0+415), Lebak, Sultan Kudarat","amountPesos":10000000.0,"lengthMeters":415.0,"ratePesosPerMeter":24096.385542168675,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29242"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage Structure, Barangay Site, Sta. 0+000 - Sta. 0+290, Barangay 4, City of Cabadbaran, Agusan del Norte","amountPesos":10000000.0,"lengthMeters":290.0,"ratePesosPerMeter":34482.75862068965,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29246"},{"year":2026,"category":"Roads","project":"Construction of Road, Aklan-Alikapawan Road, Sitio Tabon, Sta. 0+000 - Sta. 0+665, Barangay Aclan, Nasipit, Agusan del Norte","amountPesos":19600000.0,"lengthMeters":665.0,"ratePesosPerMeter":29473.684210526317,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29248"},{"year":2026,"category":"Roads","project":"Construction of Road, Anahawan Road, Sta. 0+000 - Sta. 0+600, Barangay Rojales, Carmen, Agusan del Norte","amountPesos":19600000.0,"lengthMeters":600.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29250"},{"year":2026,"category":"Roads","project":"Construction of Road, Tabontabon- Santo Niño Road, Sta. 0+000 - Sta. 0+930, Barangay Santo Niño, Jabonga, Agusan del Norte","amountPesos":27440000.0,"lengthMeters":930.0,"ratePesosPerMeter":29505.37634408602,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29252"},{"year":2026,"category":"Roads","project":"Construction of Road, Taod-oy - Baobaoan Road, Sta. 0+000 - Sta. 0+330, Barangay Taod-oy, Magallanes, Agusan del Norte","amountPesos":9800000.0,"lengthMeters":330.0,"ratePesosPerMeter":29696.969696969696,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29254"},{"year":2026,"category":"Roads","project":"Construction of NRJ (Prosperidad) San Jose - Lucena Circumferential Road (San Joaquin Section), Sta. 0+000 - Sta. 0+600, Brgy. San Joaquin, Prosperidad, Agusan del Sur","amountPesos":20000000.0,"lengthMeters":600.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29257"},{"year":2026,"category":"Roads","project":"Concreting of Brgy. 3 - Sta. Ana - Lagdagan Road Connecting Oil Palm Plantations Sites and National Road Junction in support to Oil Palm Industry/ies of Brgy. Sta. Ana, San Francisco (Sta. 2+858 - Sta 3+500), Agusan Del Sur","amountPesos":40000000.0,"lengthMeters":642.0,"ratePesosPerMeter":62305.29595015576,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29259"},{"year":2026,"category":"Roads","project":"Construction of Road, Package 2, Purok 3A to Purok 7, (Sta. 0+000 - Sta. 0+198), Barangay Tiniwisan, Butuan City, Agusan del Norte","amountPesos":4900000.0,"lengthMeters":198.0,"ratePesosPerMeter":24747.47474747475,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29262"},{"year":2026,"category":"Roads","project":"Concreting of Road with drainage system at Purok 6 and 7 (Sta. 0+000 - Sta. 0+701), Barangay Baan Km. 3, Butuan City","amountPesos":30000000.0,"lengthMeters":701.0,"ratePesosPerMeter":42796.00570613409,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29264"},{"year":2026,"category":"Roads","project":"Concreting of Road with drainage, 1st street extension to 9th street Village 2 (Sta. 0+000 - Sta. 0+175), Barangay Libertad, Butuan City","amountPesos":10000000.0,"lengthMeters":175.0,"ratePesosPerMeter":57142.857142857145,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29266"},{"year":2026,"category":"Roads","project":"Construction of Road with Drainage at Barangay Doongan (Sta. 0+000 - Sta. 0+864), Butuan City","amountPesos":40000000.0,"lengthMeters":864.0,"ratePesosPerMeter":46296.2962962963,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29268"},{"year":2026,"category":"Roads","project":"Concreting of Road with drainage Azucena St. (Sta. 0+000 - Sta. 0+276), Barangay Villakananga, Butuan City","amountPesos":20000000.0,"lengthMeters":276.0,"ratePesosPerMeter":72463.76811594203,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29270"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok 15, 16, 17, 18, 19 and 20 (Sta. 0+000 - Sta. 1+689), Barangay Baan Km 3, Butuan City, Agusan del Norte","amountPesos":44100000.0,"lengthMeters":1689.0,"ratePesosPerMeter":26110.1243339254,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29272"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+340-0+530, 0+650-0+680.38, 0+944.29-1+323.91), Barangay Rosita, Libjo, Dinagat Islands","amountPesos":19600000.0,"lengthMeters":600.0,"ratePesosPerMeter":32666.66666666666,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29275"},{"year":2026,"category":"Bridges","project":"Concreting - Connecting Rizal Bridge to Sitio Calumutan along Socorro Public Cemetery Purok 1, (Sta. 0+000 - Sta. 0+287, Brgy. Rizal, Socorro, Surigao del Norte","amountPesos":5000000.0,"lengthMeters":287.0,"ratePesosPerMeter":17421.602787456446,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29278"},{"year":2026,"category":"Roads","project":"Construction of Local Road, Barangay Santa Fe, (Sta. 0+395 - Sta. 0+685), Surigao del Norte","amountPesos":5000000.0,"lengthMeters":290.0,"ratePesosPerMeter":17241.379310344826,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29280"},{"year":2026,"category":"Roads","project":"Concreting of Road in Barangay Budlingin (0+000 - 0+400), Alegria, Surigao del Norte","amountPesos":10000000.0,"lengthMeters":400.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29283"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, (0+000 - 0+030), Barangay Tigao, Cortes, Surigao del Sur","amountPesos":32230000.0,"lengthMeters":30.0,"ratePesosPerMeter":1074333.3333333333,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29286"},{"year":2026,"category":"Roads","project":"Improvement of Road San Isidro - Log DECK (Sta. 0 + 000 - Sta. 1 + 500) in Barangay San Isidro, Lianga, Surigao del Sur","amountPesos":50000000.0,"lengthMeters":1500.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29288"},{"year":2026,"category":"Roads","project":"Construction of Road, (0+000 - 1+023), Barangay Alegria, Marihatag, Surigao del Sur","amountPesos":24500000.0,"lengthMeters":1023.0,"ratePesosPerMeter":23949.169110459436,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29290"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+409.5, Barangay Santa Fe to Barangay San Jose Road Section, Tagbina, Surigao del Sur","amountPesos":9800000.0,"lengthMeters":409.5,"ratePesosPerMeter":23931.62393162393,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29293"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok III to Purok I, Sta. 0+000 - Sta. 0+409.5, Barangay Magsaysay, Tagbina, Surigao del Sur","amountPesos":9800000.0,"lengthMeters":409.5,"ratePesosPerMeter":23931.62393162393,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29295"},{"year":2026,"category":"Roads","project":"Improvement of Road from Barangay Mahayahay to Barangay Handamayan sta. 2+200- sta. 3+000, sta 3+300- sta. 4+900, Lingig, Surigao del Sur","amountPesos":50000000.0,"lengthMeters":2400.0,"ratePesosPerMeter":20833.333333333332,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29297"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Kaamulan, Sta. 0+000 - Sta. 0+204.5, Barangay Maligaya, Hinatuan, Surigao del Sur","amountPesos":4900000.0,"lengthMeters":204.5,"ratePesosPerMeter":23960.88019559902,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29299"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Eleazar-Barangay Poblacion-Barangay Ferdinand-Barangay Langnao Road, Sta. 1+854 - Sta. 3+654, Calanasan, Apayao","amountPesos":98000000.0,"lengthMeters":1800.0,"ratePesosPerMeter":54444.444444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29307"},{"year":2026,"category":"Roads","project":"Improvement along Dodo-an Banawes Road, Sta. 0+000 - Sta. 0+300, Ampusongan, Bakun, Benguet","amountPesos":4900000.0,"lengthMeters":300.0,"ratePesosPerMeter":16333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29309"},{"year":2026,"category":"Roads","project":"Improvement of Palakad Elengan Inuman Road, Sta. 2+140 - Sta. 2+440, Poblacion, Buguias, Benguet","amountPesos":4900000.0,"lengthMeters":300.0,"ratePesosPerMeter":16333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29313"},{"year":2026,"category":"Roads","project":"Improvement Tupaya Dulao Road, Sta.0+000 – Sta.0+300, Tupaya, Lagawe, Ifugao","amountPesos":4900000.0,"lengthMeters":300.0,"ratePesosPerMeter":16333.333333333334,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29315"},{"year":2026,"category":"Roads","project":"Improvement of Balugan-Angkileng Road, Sta. 0+000 - Sta. 0+100, Barangay Balugan, Sagada, Mountain Province","amountPesos":4900000.0,"lengthMeters":100.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29317"},{"year":2026,"category":"Roads","project":"Improvement of Sitio Mayayat Road, Sta. 0+320 - Sta. 0+420, Barangay Maligcong, Bontoc, Mountain Province","amountPesos":4900000.0,"lengthMeters":100.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29319"},{"year":2026,"category":"Roads","project":"Improvement of Camatagan-Angada Road, Sta. 0+000 - Sta. 0+100, Barangay Camatagan, Sabangan, Mountain Province","amountPesos":4900000.0,"lengthMeters":100.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29321"},{"year":2026,"category":"Roads","project":"Improvement of Sitio Labay Road, Sta. 0+000 - Sta. 0+350, Barangay Bantay, Paracelis, Mt. Province","amountPesos":4900000.0,"lengthMeters":350.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29323"},{"year":2026,"category":"Roads","project":"Improvement of Monamon Proper- Dodowan Road, Sta. 0+000 - Sta. 0+100, Monamon Sur, Bauko, Mountain Province","amountPesos":4900000.0,"lengthMeters":100.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29327"},{"year":2026,"category":"Roads","project":"Improvement of Pampang-Besong-Talecabcab-Ansipsip Road (Sta. 0+000 - Sta. 0+244), Nueva Vizcaya","amountPesos":4900000.0,"lengthMeters":244.0,"ratePesosPerMeter":20081.967213114753,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29330"},{"year":2026,"category":"Roads","project":"Improvement of Lower Sisi Road (Sta. 0+000 - Sta. 0+244), Sisi, Pudi, Kasibu, Nueva Vizaya","amountPesos":4900000.0,"lengthMeters":244.0,"ratePesosPerMeter":20081.967213114753,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29334"},{"year":2026,"category":"Roads","project":"Improvement of Aninto Road (Sta. 0+000 - Sta. 0+244), Aninto, Belance, Dupax Del Norte, Nueva Vizaya","amountPesos":4900000.0,"lengthMeters":244.0,"ratePesosPerMeter":20081.967213114753,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29336"},{"year":2026,"category":"Roads","project":"Improvement of Togtog-Tangib-Galbay Cayatoc Road (Sta. 0+000 - Sta. 0+244), Ogie Ganao, Dupax Del Sur, Nueva Vizaya","amountPesos":4900000.0,"lengthMeters":244.0,"ratePesosPerMeter":20081.967213114753,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29338"},{"year":2026,"category":"Roads","project":"Concreting of Road, Barangay Butod, Maguing, Sta. 0+000 - Sta. 0+410, Lanao del Sur","amountPesos":9638000.0,"lengthMeters":410.0,"ratePesosPerMeter":23507.317073170732,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29341"},{"year":2026,"category":"Roads","project":"Concreting of Road with Solar Street Lights, Barangay Rapasun, Sta. 0+000 - Sta. 0+410, Marawi City, Lanao del Sur","amountPesos":9638000.0,"lengthMeters":410.0,"ratePesosPerMeter":23507.317073170732,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29343"},{"year":2026,"category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 2+392, Barangay Dugong-Barangay Patoc, Bucay, Abra","amountPesos":49000000.0,"lengthMeters":2392.0,"ratePesosPerMeter":20484.94983277592,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29349"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 0+200, Barangay Garreta-Barangay San Diego, Pidigan, Abra","amountPesos":49000000.0,"lengthMeters":200.0,"ratePesosPerMeter":245000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29351"},{"year":2026,"category":"Roads","project":"Rehabilitation of Road, Sinapangan-Santa Rosa-Lipcan Road, Sta. 0+000 - Sta. 2+256, Bangued, Abra","amountPesos":49000000.0,"lengthMeters":2256.0,"ratePesosPerMeter":21719.858156028367,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29353"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Sta. 15+247 - Sta. 15+277, Barangay Karagawan, Kabugao, Apayao","amountPesos":14654000.0,"lengthMeters":30.0,"ratePesosPerMeter":488466.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29356"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Magnao, Sta. 0 + 000 - Sta. 0 + 445, City of Tabuk, Kalinga","amountPesos":7840000.0,"lengthMeters":445.0,"ratePesosPerMeter":17617.977528089887,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29359"},{"year":2026,"category":"Roads","project":"Construction of Alab-Barangay Balili Road Sta. 0+720 - Sta. 0+800, Bontoc, Mountain Province","amountPesos":4900000.0,"lengthMeters":80.0,"ratePesosPerMeter":61250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29364"},{"year":2026,"category":"Roads","project":"Construction of Bagnen Oriente Road Sta. 0+693 - Sta. 0+813, Bauko, Mountain Province","amountPesos":4900000.0,"lengthMeters":120.0,"ratePesosPerMeter":40833.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29366"},{"year":2026,"category":"Roads","project":"Construction Banao-Lagawa Road,Sta. 4+183 - Sta. 4+333 Bauko, Mountain Province","amountPesos":4900000.0,"lengthMeters":150.0,"ratePesosPerMeter":32666.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29368"},{"year":2026,"category":"Roads","project":"Construction of Bayyo Road Sta. 0+992 - Sta. 1+092, Bontoc, Mountain Province","amountPesos":4900000.0,"lengthMeters":100.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29370"},{"year":2026,"category":"Roads","project":"Construction of Fidelisan Road Sta. 4+738 - Sta. 4+812, Sagada, Mountain Province","amountPesos":4900000.0,"lengthMeters":74.0,"ratePesosPerMeter":66216.21621621621,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29372"},{"year":2026,"category":"Roads","project":"Construction of Guinzadan Central Road Sta. 0+000 - Sta. 0+100, Bauko, Mountain Province","amountPesos":4900000.0,"lengthMeters":100.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29374"},{"year":2026,"category":"Roads","project":"Construction of Mount Data Road Sta. 0+700 - Sta. 0+847, Bauko, Mountain Province","amountPesos":4900000.0,"lengthMeters":147.0,"ratePesosPerMeter":33333.333333333336,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29376"},{"year":2026,"category":"Roads","project":"Construction of Sadsadan Road Sta. 4+775 - Sta. 4+976, Bauko, Mountain Province","amountPesos":4900000.0,"lengthMeters":201.0,"ratePesosPerMeter":24378.109452736317,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29378"},{"year":2026,"category":"Roads","project":"Construction of Tue Road Sta. 0+800 - Sta. 0+900, Tadian, Mountain Province","amountPesos":4900000.0,"lengthMeters":100.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29380"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Alunogan, Sta. 0+108 - Sta. 0+200, Natonin, Mountain Province","amountPesos":4900000.0,"lengthMeters":92.0,"ratePesosPerMeter":53260.86956521739,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29385"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Dannal, Barangay Anonat, Sta. 1+627 - Sta. 1+730, Paracelis, Mountain Province","amountPesos":4900000.0,"lengthMeters":103.0,"ratePesosPerMeter":47572.81553398058,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29387"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Brgy. Carupay, Katipunan, Zamboanga del Norte - Sta. 21+802 - Sta. 21+892","amountPesos":29400000.0,"lengthMeters":90.0,"ratePesosPerMeter":326666.6666666667,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29395"},{"year":2026,"category":"Roads","project":"Construction of Road, Boundary Sibatog to Marupay, Brgy. Sibatog, Pres. Manuel Roxas, Zamboanga del Norte - Sta. 16+500 - Sta. 16+700","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29397"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok 1-7, Brgy. Sebod, Pres. Manuel Roxas, Zamboanga del Norte - Sta. 13+640 - Sta. 13+840","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29399"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Mangga, Brgy. Tanayan, Pres. Manuel Roxas, Zamboanga del Norte - Sta. 4+850 - 5+050","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29401"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Orchids to Malinawon, Brgy. Upper Irasan, Pres. Manuel Roxas, Zamboanga del Norte - Sta. 0+710 - Sta. 0+910","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29403"},{"year":2026,"category":"Roads","project":"Construction of Road, Purok Rosal, Brgy. Villahermoso, Pres. Manuel Roxas, Zamboanga del Norte - Sta. 7+830 - Sta. 8+030","amountPesos":4900000.0,"lengthMeters":200.0,"ratePesosPerMeter":24500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29405"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Agusan Canyon, Sta. 0+303.4 - Sta. 0+538.4, Manolo Fortich, Bukidnon","amountPesos":5000000.0,"lengthMeters":235.0,"ratePesosPerMeter":21276.59574468085,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29409"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Baylanan, Sta. 0+000 - Sta. 0+235, Talakag, Bukidnon","amountPesos":5000000.0,"lengthMeters":235.0,"ratePesosPerMeter":21276.59574468085,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29411"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Imbatug, Sta. 0+000 - Sta. 0+185, Baungon, Bukidnon","amountPesos":5000000.0,"lengthMeters":185.0,"ratePesosPerMeter":27027.027027027027,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29413"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Liguron, Sta. 0+000 - Sta. 0+260, Talakag, Bukidnon","amountPesos":5000000.0,"lengthMeters":260.0,"ratePesosPerMeter":19230.76923076923,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29415"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Lirongan, Sta. 0+000 - Sta. 0+170, Talakag, Bukidnon","amountPesos":5000000.0,"lengthMeters":170.0,"ratePesosPerMeter":29411.764705882353,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29417"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Pualas, Sta. 0+000 - Sta. 0+245, Baungon, Bukidnon","amountPesos":5000000.0,"lengthMeters":245.0,"ratePesosPerMeter":20408.163265306124,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29419"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay San Vicente, Sta. 0+000 - Sta. 0+180, Baungon, Bukidnon","amountPesos":5000000.0,"lengthMeters":180.0,"ratePesosPerMeter":27777.777777777777,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29421"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Santiago, Sta. 0+000 - Sta. 0+200, Manolo Fortich, Bukidnon","amountPesos":5000000.0,"lengthMeters":200.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29423"},{"year":2026,"category":"Roads","project":"Construction of Laconon-Denlag Road, Sta. 0 + 000 - Sta. 0 + 217, Barangay Laconon, T'boli, South Cotabato","amountPesos":4885000.0,"lengthMeters":217.0,"ratePesosPerMeter":22511.520737327188,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29429"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Aflek, T'Boli, STA. 0+000-STA. 0+227 South Cotabato","amountPesos":4742000.0,"lengthMeters":227.0,"ratePesosPerMeter":20889.86784140969,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29431"},{"year":2026,"category":"Roads","project":"Construction of Road, D'lanag to Sitio Kule Road (Lake Holon), Barangay Datal D'lanag, T'boli, STA. 0+000-STA. 0+455 South Cotabato","amountPesos":9484000.0,"lengthMeters":455.0,"ratePesosPerMeter":20843.956043956045,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29433"},{"year":2026,"category":"Roads","project":"Construction of Road, Concepcion-Bamban going to New Clark City Bypass Road, Sta. 0 + 000 - Sta. 1 + 380, Bamban, Tarlac","amountPesos":91319000.0,"lengthMeters":1380.0,"ratePesosPerMeter":66173.1884057971,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29441"},{"year":2026,"category":"Roads","project":"Construction of Road, NRJ Pres. Diosdado P. Macapagal Highway via Dawan - Macambol - Magum - Cabuaya - Langka Road to Tibanban - Lavigan Road, City of Mati, Davao Oriental - (Sta. 1746+639.71 - Sta. 1751+639.710)","amountPesos":173023000.0,"lengthMeters":5000.0,"ratePesosPerMeter":34604.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29448"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Poblacion traversing Barangay Popol and Sitio Kalembugen to Barangay Maslabeng Road (Sta. 0+000 - Sta. 1+154 ), Barangay Maslabeng, Buluan, Maguindanao del Sur","amountPesos":37934000.0,"lengthMeters":1154.0,"ratePesosPerMeter":32871.75043327556,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29451"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Damulog Bridge, Sta. 0+000 - Sta. 0+090, Barangay Caupasan, Danglas, Abra","amountPesos":49000000.0,"lengthMeters":90.0,"ratePesosPerMeter":544444.4444444445,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29455"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Soto Bridge, Barangay Agbannawag, Sta. 0 + 000 - Sta. 0 + 025, City of Tabuk, Kalinga","amountPesos":4820000.0,"lengthMeters":25.0,"ratePesosPerMeter":192800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29458"},{"year":2026,"category":"Bridges","project":"Construction of Bridge, Vehicular Bridge, Sta. 0 + 000 - Sta. 0 + 021, Pinukpuk, Kalinga","amountPesos":7713000.0,"lengthMeters":21.0,"ratePesosPerMeter":367285.71428571426,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29460"},{"year":2026,"category":"Roads","project":"Rehabilitation of Mariveles By-Pass Road, Mariveles, Bataan, Sta. 0 + 000 - Sta. 0 + 351","amountPesos":20272000.0,"lengthMeters":351.0,"ratePesosPerMeter":57754.985754985755,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29466"},{"year":2026,"category":"Roads","project":"Construction of Road, Sitio Bulalo - Sitio Tadlok, Barangay Laste and Barangay Alibog, Sta. 000+000 - Sta. 001+000, Magsaysay, Occidental Mindoro","amountPesos":16604000.0,"lengthMeters":1000.0,"ratePesosPerMeter":16604.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29470"},{"year":2026,"category":"Roads","project":"Construction of Road, Barog Pensikan, Millan - Curipao, Constancia Road, Barangay Millan and Barangay Constancia, Sibunag and San Lorenzo, Guimaras - Sta. 3 + 660 - Sta 4 + 200","amountPesos":11483000.0,"lengthMeters":540.0,"ratePesosPerMeter":21264.814814814814,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29474"},{"year":2026,"category":"Roads","project":"Construction of Road, Oracon - Sitio Bankiling- Sitio Casilian Road, Barangay Oracon Sur and Barangay Oracon Norte, Sibunag and Nueva Valencia, Guimaras - Sta. 0 + 000 - Sta. 0 + 600","amountPesos":14353000.0,"lengthMeters":600.0,"ratePesosPerMeter":23921.666666666668,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29476"},{"year":2026,"category":"Roads","project":"Construction of Road Barangay Kagingkingan, Anahawan, Southern Leyte (STA 3+305.0 - STA 3+471.0)","amountPesos":4824000.0,"lengthMeters":166.0,"ratePesosPerMeter":29060.24096385542,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29480"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Concepcion, Sogod, Southern Leyte (STA 0+783.0 - STA 0+939.0)","amountPesos":4824000.0,"lengthMeters":156.0,"ratePesosPerMeter":30923.076923076922,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29482"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Mac, Sogod, Southern Leyte (STA 0+165.0 - STA 0+294.0)","amountPesos":4824000.0,"lengthMeters":129.0,"ratePesosPerMeter":37395.348837209305,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29484"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Malasila to Barangay Buena Vida Sta. 0 + 000 - Sta. 0 + 500, Makilala, North Cotabato","amountPesos":9484000.0,"lengthMeters":500.0,"ratePesosPerMeter":18968.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29488"},{"year":2026,"category":"Roads","project":"Construction of Road, Barangay Saguing to Barangay Indangan Sta. 0+708.20 - Sta. 1 + 208.2 , Makilala, North Cotabato","amountPesos":9484000.0,"lengthMeters":500.0,"ratePesosPerMeter":18968.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29490"},{"year":2026,"category":"Roads","project":"Construction of Causeway, Section 3.13C, (Sta. 1+380 - 1+435), Tacloban City, Leyte","amountPesos":122500000.0,"lengthMeters":55.0,"ratePesosPerMeter":2227272.727272727,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29498"},{"year":2026,"category":"Roads","project":"Construction of Causeway, Section 3.1A and Section 3.13B, (Sta. 0+000 - 0+140, Sta. 1+007 - 1+020), Tacloban City, Leyte","amountPesos":122500000.0,"lengthMeters":153.0,"ratePesosPerMeter":800653.5947712419,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29500"},{"year":2026,"category":"Roads","project":"Construction of Causeway, Sitio Daloy-Daloy(0+545 - 0+645), Barangay Luciente I, Bolinao, Pangasinan","amountPesos":9782000.0,"lengthMeters":100.0,"ratePesosPerMeter":97820.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29504"},{"year":2026,"category":"Roads","project":"Construction of Causeway (Sta. 0+095 - Sta. 0+186), Barangay Chambery, Manapla, Negros Occidental","amountPesos":4545000.0,"lengthMeters":91.0,"ratePesosPerMeter":49945.054945054944,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29508"},{"year":2026,"category":"Roads","project":"Construction of Causeway (Sta. 0+000 - Sta. 0+095), Barangay II, Manapla, Negros Occidental","amountPesos":4545000.0,"lengthMeters":95.0,"ratePesosPerMeter":47842.10526315789,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29510"},{"year":2026,"category":"Roads","project":"Construction of Causeway, Phase II, Barangay Maribago, Sta. 0+220.00 - Sta. 0+320.00, Lapu-Lapu City, Cebu","amountPesos":19380000.0,"lengthMeters":100.0,"ratePesosPerMeter":193800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29517"},{"year":2026,"category":"Roads","project":"Construction of Coastal Road in Barangay Sto. Niño to Barangay Smo. Rosario, Naval, Biliran (Sta. 1+038 - Sta. 1+088)","amountPesos":20000000.0,"lengthMeters":50.0,"ratePesosPerMeter":400000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":"FY2026 parsed DPWH GAA · Excel row 29521"},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rolando R. Andaya Highway - K0296 + 418 - K0311 + 638","amountPesos":2589421000,"lengthMeters":15220.0,"ratePesosPerMeter":170132.79,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rolando R. Andaya Highway - K281+198 - K0296+418","amountPesos":2370485000,"lengthMeters":15220.0,"ratePesosPerMeter":155748.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quirino H-way - K0264 + 968 - K0281 +198","amountPesos":1392209000,"lengthMeters":16230.0,"ratePesosPerMeter":85779.98,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0816 + 000 - K0831 + 000","amountPesos":1000000000,"lengthMeters":15000.0,"ratePesosPerMeter":66666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0831 + 000 - K0846 + 000","amountPesos":1000000000,"lengthMeters":15000.0,"ratePesosPerMeter":66666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0846 + 000 - K0861 + 000","amountPesos":1000000000,"lengthMeters":15000.0,"ratePesosPerMeter":66666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0861 + 000 - K0876 + 000","amountPesos":1000000000,"lengthMeters":15000.0,"ratePesosPerMeter":66666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Dike along Abacan River, San Jose Malino - Tangle, Mexico, Pampanga Sta. 0 + 000 - Sta. 4 + 552","amountPesos":750000000,"lengthMeters":4552.0,"ratePesosPerMeter":164762.74,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mindoro Island Circumferential Road (Puerto Galera - Abra de Ilog), Barangay Udalo, Abra de Ilog, Occidental Mindoro, Sta. 1 + 435 - Sta. 1 + 645, Sta. 7 + 094 - Sta. 7 + 165, Sta. 9 + 560 - Sta. 9 + 916, Sta. 16 + 000 - Sta. 16 + 700","amountPesos":700000000,"lengthMeters":1337.0,"ratePesosPerMeter":523560.21,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of NRJ Tagum - Panabo Circum Road, Barangay Datu Balang - Barangay Gupitan, Sta. 1505+440.000 - Sta. 1517+440.000, Kapalong Section, to Loreto (Agusan del Sur), Davao del Norte","amountPesos":600000000,"lengthMeters":12000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Albay West Coast Rd - K0511+000 - K0511+438","amountPesos":500000000,"lengthMeters":438.0,"ratePesosPerMeter":1141552.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Arteche, Barangay Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 16+103 - Sta. 16+340, Sta. 16+340 - Sta. 16+420, Sta. 16+420 - Sta. 16+425), Northern Samar","amountPesos":448380000,"lengthMeters":322.0,"ratePesosPerMeter":1392484.47,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Metro Cebu Expressway, Sta. 1+387.5 - Sta. 1+700, Cebu","amountPesos":420000000,"lengthMeters":312.5,"ratePesosPerMeter":1344000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Balingasag-Claveria Alternate Road, Sta. 7+870 - Sta. 13+870, Barangay Plaridel to Barangay Hinaplanan Section, Claveria, Misamis Oriental","amountPesos":400000000,"lengthMeters":6000.0,"ratePesosPerMeter":66666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Capas-Botolan Road (Sta. 008+320 - Sta. 009+845, Sta. 009+845 - Sta. 011+495), Tarlac","amountPesos":400000000,"lengthMeters":3175.0,"ratePesosPerMeter":125984.25,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mindoro Island Circumferential Road (Puerto Galera - Abra de Ilog), Barangay Udalo, Abra de Ilog, Occidental Mindoro, Sta. 7 + 400 - Sta. 7 + 710, Sta. 11 + 100 - Sta. 11 + 492.92","amountPesos":400000000,"lengthMeters":702.92,"ratePesosPerMeter":569054.8,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iligan City - Cagayan de Oro City Alternate Road (Digkilaan-Bulua Section), Barangay Nangcaon Section, Sta. 23+806 - Sta. 27+226, Opol, Misamis Oriental","amountPesos":400000000,"lengthMeters":3420.0,"ratePesosPerMeter":116959.06,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City - Agusan del Norte Logistical Highway, Sta. 14+780 - Sta. 15+934.3, Sta. Sta. 16+144.3 - Sta. 17+000, Masao Section, Butuan City","amountPesos":400000000,"lengthMeters":2010.0,"ratePesosPerMeter":199004.98,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0212 + 007 - K0213 + 497, K0215 + (-927) - K0215 + (-837), K0215 + (-808) - K0215 + (-077), K0217 + 1010 - K0218 + 333, K0218 + 655 - K0219 + 076, K0220 + 418 - K0220 + 571, K0220 + 618 - K0220 + 857, K0222 + 000 - K0222 + 661, K0223 + 589 - K0223 + 906, K0225 + 870 - K0226 + 144, K0227 + 994 - K0229 + 753, K0231 + 576 - K0232 + 174, K0233 + 212 - K0233 + 383","amountPesos":377931000,"lengthMeters":7227.0,"ratePesosPerMeter":52294.31,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Bridge & Approaches Sta 0+(-230) to Sta0+000, Sta 0+200 to Sta 0+690, Barangay Annafunan, Echague, Isabela","amountPesos":370000000,"lengthMeters":720.0,"ratePesosPerMeter":513888.89,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 20+680 - Sta. 20+950, Sta. 23+028 - Sta. 23+375, Sta. 23+745 - Sta. 24+245.33, Talisay City, Negros Occidental","amountPesos":360000000,"lengthMeters":1117.33,"ratePesosPerMeter":322196.67,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Metro Cebu Expressway, Sta. 4 + 200 - Sta. 4 + 550, Cebu","amountPesos":360000000,"lengthMeters":350.0,"ratePesosPerMeter":1028571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 5+230 - Sta. 6+113, Sta. 14+450 - Sta. 14+750, Bacolod City","amountPesos":358750000,"lengthMeters":1183.0,"ratePesosPerMeter":303254.44,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Laoag-San Nicolas Bypass Road, Sta 4+237.62 - Sta 5+318.72, San Nicolas, Ilocos Norte","amountPesos":350000000,"lengthMeters":1081.1,"ratePesosPerMeter":323744.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Parian - San Jose - Bucal Diversion Road Sta. 3+270 - Sta. 5+900, Calamba, Laguna","amountPesos":343236000,"lengthMeters":2630.0,"ratePesosPerMeter":130507.98,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Tuguegarao City Boulevard (Pinacanauan Bridge 2 and Approaches) (Sta.0+000 - Sta. 1+632.82) , Tuguegarao City, Cagayan","amountPesos":337000000,"lengthMeters":1632.82,"ratePesosPerMeter":206391.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Alicia-Angadanan-San Guillermo-Cauayan City-Naguilian Alternate Route (Bridge and Approaches) (Sta. 32+321 - Sta. 32+701), Isabela","amountPesos":329153000,"lengthMeters":380.0,"ratePesosPerMeter":866192.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"General Aguinaldo-Magallanes-Nasugbu Rd (East-West Rd), Sta. 71+862.7 - Sta. 72+084.84, Gen. Emilio Aguinaldo Section, Cavite","amountPesos":329000000,"lengthMeters":222.14,"ratePesosPerMeter":1481047.99,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1239 + 382 - K1244 + 299","amountPesos":310000000,"lengthMeters":4917.0,"ratePesosPerMeter":63046.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1244 + 299 - K1246 + 655 - K1246 + 908 - K1250 + (-542)","amountPesos":310000000,"lengthMeters":4906.0,"ratePesosPerMeter":63187.93,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur","amountPesos":301120000,"lengthMeters":3115.85,"ratePesosPerMeter":96641.37,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"San Ildefonso - San Miguel Bypass Road, San Ildefonso and San Miguel, (Sta.005+430 - Sta.005+535, Sta 009+000 - Sta 009+180, Sta 009 + 420 - Sta 010 + 135, Sta 012 + 355 - Sta 015 + 671, Sta 016 + 200 - Sta 017 + 730), Bulacan","amountPesos":300000000,"lengthMeters":5846.0,"ratePesosPerMeter":51317.14,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila-Cavite Bypass Road, Sta. 24 + 685 - Sta. 25 + 555, Cavite","amountPesos":300000000,"lengthMeters":870.0,"ratePesosPerMeter":344827.59,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila-Cavite Bypass Road, Sta. 25 + 555 - Sta. 26 + 425, Cavite","amountPesos":300000000,"lengthMeters":870.0,"ratePesosPerMeter":344827.59,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila-Cavite Bypass Road, Sta. 25+509 - Sta. 26 + 286.16, Cavite","amountPesos":300000000,"lengthMeters":777.16,"ratePesosPerMeter":386020.9,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Parian - San Jose - Bucal Diversion Road, Sta. 5+900 - Sta. 8+100, Laguna","amountPesos":300000000,"lengthMeters":2200.0,"ratePesosPerMeter":136363.64,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Asturias-Danao-Liloan Bypass Road, Danao-Liloan Section, Barangay Lawaan, Danao - Barangay Tag-Ube, Compostela (Sta. 5 + 020 - Sta. 13 + 560), Cebu","amountPesos":300000000,"lengthMeters":8540.0,"ratePesosPerMeter":35128.81,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Asturias-Danao-Liloan Bypass Road, Danao-Liloan Section, Barangay Tag-Ube - Barangay Mulao (Sta. 13 + 560 - Sta. 21 + 420), Compostela, Cebu","amountPesos":300000000,"lengthMeters":7860.0,"ratePesosPerMeter":38167.94,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Basey-Maydolong Road (Sta. 21+676 - Sta. 22+066, Sta. 28+276 - Sta. 30+960.13), Eastern Samar","amountPesos":300000000,"lengthMeters":3074.13,"ratePesosPerMeter":97588.59,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Misamis Oriental West Diversion Road, Sta. 15+900 - Sta.18+900, Barangay Betahon, Lugait to Barangay Upper Malubog, Manticao, Misamis Oriental","amountPesos":300000000,"lengthMeters":3000.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"CDOC-Iligan City Hinterland Road (Jct. CDO Camp Kibaritan Road-Dominorog Road, Dansolihon-Jct. IBR, Rogongon, Iligan City) Alternate Road, Barangay Rogongon, Sta. 2+200-Sta. 5+000, Iligan City","amountPesos":300000000,"lengthMeters":2800.0,"ratePesosPerMeter":107142.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Atimonan-Mauban Road, Sta. 11 + 554 - Sta. 11 + 674 , Mauban, Quezon","amountPesos":300000000,"lengthMeters":120.0,"ratePesosPerMeter":2500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mauban-Tignoan Road, Sta. 0+265 - Sta. 1+745 , Mauban, Quezon","amountPesos":300000000,"lengthMeters":1480.0,"ratePesosPerMeter":202702.7,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sangley Airport Access Road - Sta. 31 + 945 - Sta. 32 + 085, Cavite City","amountPesos":300000000,"lengthMeters":140.0,"ratePesosPerMeter":2142857.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mahaplag Hilongos Road - Sta. 13+510 - Sta. 13+660.4","amountPesos":300000000,"lengthMeters":150.4,"ratePesosPerMeter":1994680.85,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Sitio Magawa Sta. 57+900-Sta. 62+150, Barangay Bulonay, Impasug-ong, Bukidnon","amountPesos":300000000,"lengthMeters":4250.0,"ratePesosPerMeter":70588.24,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Sitio Nanahaw, Sta. 53+650-Sta.57+900, Barangay Bulonay, Impasug-ong, Bukidnon","amountPesos":300000000,"lengthMeters":4250.0,"ratePesosPerMeter":70588.24,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"East-West Lateral Road connecting Agusan Del Sur to Bukidnon, San Miguel Proper (Surigao del Sur) - Calaitan (Bayugan), Sta.19+969.5 - Sta. 22+ 112.5, Barangay Umalag - Castillo Section, Surigao del Sur","amountPesos":300000000,"lengthMeters":2143.0,"ratePesosPerMeter":139990.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Viaduct along Daang Maharlika K0397 + (-192.28) - K0397 + 224.37","amountPesos":300000000,"lengthMeters":416.65,"ratePesosPerMeter":720028.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Gingoog City-Medina Alternate Road, Sta. 0+000 - Sta. 3+500, Barangay Murallon to Barangay Agay-ayan, Gingoog, Misamis Oriental","amountPesos":300000000,"lengthMeters":3500.0,"ratePesosPerMeter":85714.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of San Fernando Alternate Road, Sta. 0+000 - Sta. 3+250, Barangay Little Baguio to Barangay Mabuhay, San Fernando, Bukidnon","amountPesos":300000000,"lengthMeters":3250.0,"ratePesosPerMeter":92307.69,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Laguindingan-Iligan City Alternate Road, Barangay Ayaˇaya Section, Sta. 44+000 - Sta. 46+000, Lugait, Misamis Orienta","amountPesos":300000000,"lengthMeters":2000.0,"ratePesosPerMeter":150000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Bukidnon-Paquibato District Alternate Road, Barangay Sinuda - Barangay Kipilas Section, Sta. 5+290 - Sta. 8+540, Kitaotao, Bukidnon","amountPesos":300000000,"lengthMeters":3250.0,"ratePesosPerMeter":92307.69,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Malaybalay Circumferential Road, Barangay Dalwangan, Sta. 42+000-Sta.46+300, City of Malaybalay, Bukidnon","amountPesos":300000000,"lengthMeters":4300.0,"ratePesosPerMeter":69767.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Malaybalay Circumferential Road, Barangay Imbayao-Barangay Capitan Angel, Sta. 36+500-Sta. 42+000 , City of Malaybalay, Bukidnon","amountPesos":300000000,"lengthMeters":5500.0,"ratePesosPerMeter":54545.45,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manticao - Cabalantian - Mahayahay - Limunda to Misamis Oriental, West Diversion Road (Opol to Lugait), Misamis Oriental, Barangay Limunda, Sta. 24+324 - Sta. 29+724, Opol, Misamis Oriental","amountPesos":300000000,"lengthMeters":5400.0,"ratePesosPerMeter":55555.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 6+770 - Sta. 7+410, Sta. 10+040 - Sta. 10+260, E.B. Magalona, Negros Occidental","amountPesos":299282000,"lengthMeters":860.0,"ratePesosPerMeter":348002.33,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Carsadang Bago - Malagasang Diversion Road - Sta. 03 + 362 - Sta. 03 + 564, Sta. 03 + 641 - Sta. 03 + 763, Sta. 04 + 031.5 - Sta. 04 + 365, Sta. 04 + 603 - Sta. 04 + 684, Sta. 04 + 694 - Sta. 04 + 735, Sta. 09 + 813 - Sta. 09 + 969, Sta. 10 + 699 - Sta. 11 + 445, Imus City, Cavite","amountPesos":298397000,"lengthMeters":1681.5,"ratePesosPerMeter":177458.82,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dagupan-Mangaldan Diversion Road, Dagupan City-Mangaldan, Sta. 0+000 - Sta. 3+500, Pangasinan","amountPesos":295350000,"lengthMeters":3500.0,"ratePesosPerMeter":84385.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0129 + 434 - K0130 + 519, K0133 + 682 - K0135 + 635, K0136 + 627 - K0137 + 420, K0151 + 000 - K0152 + 858, K0156 + 652 - K0159 + 319","amountPesos":288600000,"lengthMeters":8356.0,"ratePesosPerMeter":34538.06,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pasacao-Balatan Tourism Coastal Highway - Sta. 495+800.00 - Sta. 497+600.00, Sta. 501+680.00 - Sta. 502+770.00","amountPesos":287300000,"lengthMeters":2890.0,"ratePesosPerMeter":99411.76,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan","amountPesos":280000000,"lengthMeters":1100.0,"ratePesosPerMeter":254545.45,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cabadbaran - Puting Bato - Lanuza Road, (Sta. 67+223 - Sta. 72+553), Barangay Pakwan Section, Surigao del Sur","amountPesos":280000000,"lengthMeters":5330.0,"ratePesosPerMeter":52532.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1675 + (-337) - K1675 + 000, K1676 + 000 - K1676 + 669, K1676 + 721 - K1676 + 822, K1678 + 000 - K1678 + 091, K1680 + 380 - K1680 + 603, K1680 + 945 - K1681 + 000, K1684 + 018 - K1684 + 028, K1684 + 682 - K1685 + 000, K1687 + 000 - K1688 + 500, K1689 + 961 - K1690 + 508, K1690 + 526 - K1690 + 825, K1694 + 723 - K1694 + 775, K1694 + 812 - K1694 + 870, K1700 + 056 - K1700 + 106, K1714 + 2160 - K1718 + 020, K1718 + 1285 - K1718 + 1305","amountPesos":272000000,"lengthMeters":6190.0,"ratePesosPerMeter":43941.84,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quirino H-way - K0248 + 738 - K0251 +(-511)","amountPesos":265466000,"lengthMeters":1751.0,"ratePesosPerMeter":151608.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct. Maramag-Maradugao Road-Jct. Lampanusan Road Ext. (Jct. Sayre Highway (Damulog)-Kibawe-Jct. Buda (Sinuda), Kitaotao By-Pass/Alternate Road, Barangay Sagundanon, Sta. 50+040 - Sta. 52+540, Kitaotao, Bukidnon","amountPesos":265000000,"lengthMeters":2500.0,"ratePesosPerMeter":106000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Valencia City - Pangantucan Diversion Road, Barangay La Roxas - Barangay Bagong Silang, Sta. 16+600 - Sta. 20+600, Maramag, Bukidnon","amountPesos":265000000,"lengthMeters":4000.0,"ratePesosPerMeter":66250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Himamaylan City - Negros Oriental Boundary - Tayasan Road, Sta. 0+000 - Sta. 5+175","amountPesos":265000000,"lengthMeters":5175.0,"ratePesosPerMeter":51207.73,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Arteche, Barangay Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22 + 783 - Sta. 24 + 733), Eastern Samar","amountPesos":265000000,"lengthMeters":1950.0,"ratePesosPerMeter":135897.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Columbio - Lutayan - Koronadal Road, Sta.13+369 - Sta.13+663, Sultan Kudarat","amountPesos":255780000,"lengthMeters":294.0,"ratePesosPerMeter":870000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1649 + 1000 - K1654 + 100","amountPesos":253406000,"lengthMeters":4100.0,"ratePesosPerMeter":61806.34,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1665 + 000 - K1665 + 500, K1667 + 623 - K1667 + 897, K1667 + 936 - K1669 + 000, K1670 + 000 - K1674 + 000","amountPesos":250000000,"lengthMeters":5838.0,"ratePesosPerMeter":42822.88,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Asturias-Danao-Liloan Bypass Road, Danao-Liloan Section, Barangay Cabadiangan - Barangay Cotcot (Sta. 26 + 620 - Sta. 33 + 170), Liloan, Cebu","amountPesos":250000000,"lengthMeters":6550.0,"ratePesosPerMeter":38167.94,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cagayan de Oro Coastal Road (Puerto-Gusa Section), Barangay Gusa, Sta. 8+137-Sta. 8+177, Cagayan de Oro City","amountPesos":250000000,"lengthMeters":40.0,"ratePesosPerMeter":6250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"General Nakar - Dingalan Road, Sta. 25 + 336.32 - Sta. 27 + 636.32, General Nakar, Quezon","amountPesos":250000000,"lengthMeters":2300.0,"ratePesosPerMeter":108695.65,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Gingoog City-Medina Alternate Road, Sta. 14+000 - Sta. 17+500, Barangay San Vicente to Barangay San Jose, Medina, Misamis Oriental","amountPesos":250000000,"lengthMeters":3500.0,"ratePesosPerMeter":71428.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Impasug-ong - Malaybalay City Hinterland Road, Sta. 0+000 - Sta. 4+000, Impasug-ong, Bukidnon","amountPesos":250000000,"lengthMeters":4000.0,"ratePesosPerMeter":62500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Impasug-ong - Malaybalay City Hinterland Road, Sta. 12+000 - Sta. 16+000, Malaybalay City, Bukidnon","amountPesos":250000000,"lengthMeters":4000.0,"ratePesosPerMeter":62500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Impasug-ong - Malaybalay City Hinterland Road, Sta. 4+000 - Sta. 8+000, Impasug-ong, Bukidnon","amountPesos":250000000,"lengthMeters":4000.0,"ratePesosPerMeter":62500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Impasug-ong - Malaybalay City Hinterland Road, Sta. 8+000 - Sta. 12+000, Impasug-ong, Bukidnon","amountPesos":250000000,"lengthMeters":4000.0,"ratePesosPerMeter":62500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Jct. Kibawe-Arakan – Jct. Puntian-Arakan Alternate Road, Sta. 0+000 - Sta. 3+000, Barangay Migcawayan to Barangay Tumaras, Kibawe, Bukidnon","amountPesos":250000000,"lengthMeters":3000.0,"ratePesosPerMeter":83333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Jct. Kibawe-Arakan – Jct. Puntian-Arakan Alternate Road, Sta. 3+700 - Sta. 6+700, Barangay Liwayway to Barangay Cagawasan, Kibawe, Bukidnon","amountPesos":250000000,"lengthMeters":3000.0,"ratePesosPerMeter":83333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Jct. Kibawe-Arakan – Jct. Puntian-Arakan Alternate Road, Sta. 6+700 - Sta. 9+700, Barangay Cagawasan, Kibawe, Bukidnon","amountPesos":250000000,"lengthMeters":3000.0,"ratePesosPerMeter":83333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Jct. Kibawe-Arakan – Jct. Puntian-Arakan Alternate Road, Sta. 9+700 - Sta. 12+700, Barangay Magsaysay, Kibawe, Bukidnon","amountPesos":250000000,"lengthMeters":3000.0,"ratePesosPerMeter":83333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Laguindingan-Iligan City Alternate Road, Barangay Aya-aya Section, Sta. 40+900 - Sta. 41+000, Lugait, Misamis Oriental","amountPesos":250000000,"lengthMeters":100.0,"ratePesosPerMeter":2500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Laguindingan-Iligan City Alternate Road, Barangay Kamelon Section, Sta. 23+800 - Sta. 23+900, Initao, Misamis Oriental","amountPesos":250000000,"lengthMeters":100.0,"ratePesosPerMeter":2500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Laguindingan-Iligan City Alternate Road, Barangay Tawantawan- Barangay Aluna Section, Sta. 25+000 - Sta. 28+500, Initao, Misamis Oriental","amountPesos":250000000,"lengthMeters":3500.0,"ratePesosPerMeter":71428.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manticao - Cabalantian - Mahayahay - Limunda to Misamis Oriental, West Diversion Road (Opol to Lugait), Misamis Oriental, Barangay Nangcaon, Sta. 29+824 - Sta. 32+404, Opol, Misamis Oriental","amountPesos":250000000,"lengthMeters":2580.0,"ratePesosPerMeter":96899.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manticao - Cabalantian - Mahayahay - Limunda to Misamis Oriental, West Diversion Road (Opol to Lugait), Misamis Oriental, Barangay Nangcaon, Sta. 32+440 - Sta. 34+664, Opol, Misamis Oriental","amountPesos":250000000,"lengthMeters":2224.0,"ratePesosPerMeter":112410.07,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Esperanza-Lebak Bypass Road, Sta. 10 + 715 - Sta. 17 + 737, Esperanza, Sultan Kudarat","amountPesos":250000000,"lengthMeters":7022.0,"ratePesosPerMeter":35602.39,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banisilan-Guiling-Alamada-Libungan Rd - K1636 + 000 - K1640 + 395","amountPesos":249992000,"lengthMeters":4395.0,"ratePesosPerMeter":56881.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 2+497 - Sta. 3+270, Sta. 5+470 - Sta. 6+330, Silay City, Negros Occidental","amountPesos":246500000,"lengthMeters":1633.0,"ratePesosPerMeter":150949.17,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Columbio - Lutayan - Koronadal Road, Sta.20+310 - Sta.29+869, Sultan Kudarat","amountPesos":240000000,"lengthMeters":9559.0,"ratePesosPerMeter":25107.23,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sanga-Sanga-Bato-Bato Rd - Chainage 1445 - Chainage 1566, Chainage 1755 - Chainage 1794, Chainage 2026 - Chainage 2087, Chainage 2132 - Chainage 2185, Chainage 2365 - Chainage 2410, Chainage 2730 - Chainage 11917, Chainage 11956.65 - Chainage 12587, Chainage 12688 - Chainage 12811, Chainage 12841.3 - Chainage 21620","amountPesos":236586000,"lengthMeters":19038.05,"ratePesosPerMeter":12427.01,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0235 + 415 - K0236 + 005, K0236 + 238 - K0236 + 755, K0247 + 523 - K0247 + 588, K0251 + 1014 - K0252 + 147, K0252 + 219 - K0253 + 070, K0253 + 610 - K0253 + 973, K0255 + 403 - K0255 + 688, K0255 + 719 - K0255 + 924, K0256 + 252 - K0256 + 989, K0258 + 715 - K0259 + 460","amountPesos":234959000,"lengthMeters":4491.0,"ratePesosPerMeter":52317.75,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1648 + (-264) - K1648 + 881, K1651 + 000 - K1651 + 263, K1651 + 566 - K1651 + 1023, K1651 + 2111 - K1651 + 2239, K1651 + 2270 - K1651 + 2370, K1659 + 071 - K1659 + 2122, K1659 + 2153 - K1659 + 2795","amountPesos":230000000,"lengthMeters":4786.0,"ratePesosPerMeter":48056.83,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Halsema - Madaymen - Masala - Sagpat Rd - Sta. 16 + 040 - Sta. 21 + 040","amountPesos":228000000,"lengthMeters":5000.0,"ratePesosPerMeter":45600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila-Cavite Bypass Road, Sta. 26 + 286.16 - Sta. 26 + 863.2, Cavite","amountPesos":222751000,"lengthMeters":577.04,"ratePesosPerMeter":386023.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Candoni - Gatuslao - Basay Bdry Road, Sta. 22+550 - Sta. 27+595","amountPesos":222000000,"lengthMeters":5045.0,"ratePesosPerMeter":44003.96,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cabugao-Nueva Era-Danglas Road, Sta. 4+200- Sta. 9+708 Nueva Era, Ilocos Norte","amountPesos":221000000,"lengthMeters":5508.0,"ratePesosPerMeter":40123.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1843 + 561.05 - K1846 + 830, K1846 + 858.05 - K1849 + 300, K1849 + 360 - K1849 + 796, K1850 + 565 - K1851 + 026","amountPesos":220000000,"lengthMeters":6607.9,"ratePesosPerMeter":33293.48,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quezon-Batangas Road - K0097 + 620 - K0099 + 095, K0099 + 150 - K0100 + 511","amountPesos":216200000,"lengthMeters":2836.0,"ratePesosPerMeter":76234.13,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte","amountPesos":215000000,"lengthMeters":10745.0,"ratePesosPerMeter":20009.31,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Rehabilitation of Wawa Bridge, Pilar, Bataan, 0+000 - 0+045, (14.672155, 120.563000)","amountPesos":210000000,"lengthMeters":45.0,"ratePesosPerMeter":4666666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Kibawe - Arakan Road, Barangay Lagandang Section, Sta. 14+300 - Sta. 19+550, Damulog, Bukidnon","amountPesos":210000000,"lengthMeters":5250.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dagupan-Mangaldan-Calasiao Circumferential Road, Dagupan City-Mangaldan, Sta. 6+114.62 - Sta.6+620.48, Pangasinan","amountPesos":208628000,"lengthMeters":505.86,"ratePesosPerMeter":412422.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pasacao-Balatan Tourism Coastal Highway - Sta. 424+669.34 - Sta. 424+960, Sta. 433+842 - Sta. 435+699.02","amountPesos":207096000,"lengthMeters":2147.68,"ratePesosPerMeter":96427.77,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cabadbaran - Puting Bato - Lanuza Road, (Sta. 65+797 - Sta. 67+068, Sta. 72+553 - Sta. 76+652), Barangay Pakwan Section, Surigao del Sur","amountPesos":206160000,"lengthMeters":5370.0,"ratePesosPerMeter":38391.06,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd, Pampanga K0057 +747 -K0058+040, K0058+088.80 - K0058+ 155.54, K0058 + 168.34- K0058 + 291.99, K0062 + 674 - K0063 +742.53, K0063 + 800 - K0064 + 207.2","amountPesos":205000000,"lengthMeters":1959.12,"ratePesosPerMeter":104638.82,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tacloban - Palo Diversion Road, (Sta. 3 + 072 - Sta. 3 + 160.5, Sta. 2 + 711.50 - Sta. 2 + 742, Sta. 1+303 - Sta. 1+357, Sta. 2 + 742 - Sta. 3 + 039), Palo, Leyte","amountPesos":204527000,"lengthMeters":470.0,"ratePesosPerMeter":435163.83,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Replacement of Bridge, Barangay Sta. Rita, Quezon to Barangay Santa Cruz, Guimba, Nueva Ecija Sta. 0+000 - Sta. 0+112","amountPesos":202400000,"lengthMeters":112.0,"ratePesosPerMeter":1807142.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City - Agusan del Norte Logistical Highway, Sta. 2+140 - Sta. 2+646.1, Cabcabon Section, Butuan City","amountPesos":201129000,"lengthMeters":506.1,"ratePesosPerMeter":397409.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Naguilian-Bagulin (La Union) - Kapangan (Benguet) Road, Sta 6+440 - Sta 8+454.54","amountPesos":200866000,"lengthMeters":2014.54,"ratePesosPerMeter":99708.12,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cebu South Coastal Rd - (S00014CB) Chainage 512 - Chainage 1024","amountPesos":200000000,"lengthMeters":512.0,"ratePesosPerMeter":390625.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Guiguinto By-pass Road, Sta.000+000.00 - Sta.000+920.00, Guiguinto, Bulacan","amountPesos":200000000,"lengthMeters":920.0,"ratePesosPerMeter":217391.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lipa City-Padre Garcia Diversion Road - Sta. 88 + 400 - Sta. 99 + 923, Batangas","amountPesos":200000000,"lengthMeters":11523.0,"ratePesosPerMeter":17356.59,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Padre Garcia-Rosario Diversion Road, Sta. 113+000 - Sta. 116+388.99, Padre Garcia, Batangas","amountPesos":200000000,"lengthMeters":3388.99,"ratePesosPerMeter":59014.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Padre Garcia-Rosario Diversion Road - Sta. 116 + 388.99 - Sta. 118 + 434.54, Sta. 118 + 467.04 - Sta. 118 + 580.00, Batangas","amountPesos":200000000,"lengthMeters":2158.51,"ratePesosPerMeter":92656.51,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Metro Cebu Expressway, Sta. 3+560 - Sta. 3+920, Cebu","amountPesos":200000000,"lengthMeters":360.0,"ratePesosPerMeter":555555.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Barangay Taglimao - Barangay Bagocboc, Sta. 8+084 - Sta. 9+620, Cagayan de Oro City","amountPesos":200000000,"lengthMeters":1536.0,"ratePesosPerMeter":130208.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"CDO-Opol-El Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Barangay Patag Section, Sta. 15+512 - Sta. 16+762, Opol, Misamis Oriental","amountPesos":200000000,"lengthMeters":1250.0,"ratePesosPerMeter":160000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Jct. Sayre Highway Dalirig–Kisolon Bypass Road, Barangay San Roque Section, Sta. 1+000 - Sta. 5+000, Sumilao, Bukidnon","amountPesos":200000000,"lengthMeters":4000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sayre Highway Parallel Road II (Impasug-ong - Malaybalay City Section), Barangay Sayawan Section, Sta. 33+020 - Sta. 37+020, Impasug-ong, Bukidnon","amountPesos":200000000,"lengthMeters":4000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"San Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Road (Sta. 02 + 061 - Sta. 02 + 607.32)","amountPesos":200000000,"lengthMeters":546.32,"ratePesosPerMeter":366085.81,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sangley Airport Access Road - Sta. 32 + 085 - Sta. 32 + 178.33, Cavite City","amountPesos":200000000,"lengthMeters":93.33,"ratePesosPerMeter":2142933.68,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Himamaylan City - Negros Oriental Boundary - Tayasan Road, Sta. 9 + 415 - Sta. 9 + 485","amountPesos":200000000,"lengthMeters":70.0,"ratePesosPerMeter":2857142.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iligan City - Cagayan de Oro City Alternate Road (Digkilaan-Bulua Section), Barangay Baikingon, Sta. 49+837 - Sta. 53+187, Cagayan de Oro City","amountPesos":200000000,"lengthMeters":3350.0,"ratePesosPerMeter":59701.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Barangay Canayan, Sta. 18+100 - Sta. 19+806, Malaybalay City, Bukidnon","amountPesos":200000000,"lengthMeters":1706.0,"ratePesosPerMeter":117233.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City - Pianing - Tandag Road - Sta. 45+694 - Sta. 60+614, Barangay Pakwan Section, Surigao del Sur","amountPesos":200000000,"lengthMeters":14920.0,"ratePesosPerMeter":13404.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City - Pianing - Tandag, Boundary Agusan del Sur - Surigao del Sur, Sta. 23+741 - Sta. 23+742.49, Pakwan Section, Surigao del Sur","amountPesos":200000000,"lengthMeters":1.49,"ratePesosPerMeter":134228187.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cabadbaran - Puting Bato - Lanuza, Boundary Agusan del Norte - Lanuza Road, Sta. 47+925 - Sta. 49+120, Sta. 49+220 - Sta. 49+720, Hinapoyan Section, Surigao del Sur","amountPesos":200000000,"lengthMeters":1695.0,"ratePesosPerMeter":117994.1,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Calungbuyan Br. along Santa-Rancho Road, Sta. 388+733.15 - Sta. 388+790.00 Ilocos Sur","amountPesos":200000000,"lengthMeters":56.85,"ratePesosPerMeter":3518029.9,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Nacabuklad - Barangay Namnam, San Fernando, Bukidnon, Sta. 11+000 - Sta. 15+000","amountPesos":200000000,"lengthMeters":4000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Nacabuklad - Barangay Namnam, San Fernando, Bukidnon, Sta. 15+000 - Sta. 19+000","amountPesos":200000000,"lengthMeters":4000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Nacabuklad - Barangay Namnam, San Fernando, Bukidnon, Sta. 7+000 - Sta. 11+000","amountPesos":200000000,"lengthMeters":4000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of CDOC - Iligan Hinterland Road, Jct. CDO - Camp Kibaritan / Dansolihon - Jct. BCIR / Laguindingan Airport Road Extension, Barangay Tugasnon-Barangay Lourdes, Sta. 49+000 - Sta. 52+700, Misamis Oriental","amountPesos":200000000,"lengthMeters":3700.0,"ratePesosPerMeter":54054.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Northern Bukidnon Agri-Industrial Economic Zone Road, Barangay Kalilangan Section, Sta. 3+375 - Sta. 7+075, Baungon, Bukidnon","amountPesos":200000000,"lengthMeters":3700.0,"ratePesosPerMeter":54054.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Esperanza-Lebak Bypass Road, Sta. 5 + 550 - Sta. 7 + 259, Sta. 7 + 449 - Sta. 10 + 715, Esperanza, Sultan Kudarat","amountPesos":200000000,"lengthMeters":4975.0,"ratePesosPerMeter":40201.01,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagaytay-Nasugbu Rd - K0074 + 915 - K0075 + 000, K0085 + 000 - K0087 + 000, K0088 + 000 - K0088 + 777, K0090 + 670 - K0091 + 000, K0093 + 670 - K0094 + 000, K0097 + 000 - K0098 + 434, K0100 + 000 - K0100 + 068, K0100 + 300 - K0101 + 000, K0102 + 000 - K0102 + 365","amountPesos":198629000,"lengthMeters":6089.0,"ratePesosPerMeter":32620.96,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1763 + (-720) - K1764 + 330.01","amountPesos":197130000,"lengthMeters":2050.01,"ratePesosPerMeter":96160.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Itogon-Dalupirip-San Nicolas Road - Sta. 7+771 - Sta. 7+893, Benguet","amountPesos":195000000,"lengthMeters":122.0,"ratePesosPerMeter":1598360.66,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road) - Sta. 0+805 - Sta. 0+937.75","amountPesos":192237000,"lengthMeters":132.75,"ratePesosPerMeter":1448112.99,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Passi Bypass Road, Sta. 3+676.10 - Sta. 4+573.94, Sta. 4+587.34 - Sta. 5+424.34, Iloilo","amountPesos":191627000,"lengthMeters":1734.84,"ratePesosPerMeter":110458.02,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banisilan-Guiling-Alamada-Libungan Rd - K1632 + 320 - K1636 + 000","amountPesos":191370000,"lengthMeters":3680.0,"ratePesosPerMeter":52002.72,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siocon-Sirawai-Sibuco-Limpapa Rd - (S01151MN) Chainage 13315 - Chainage 15237, Chainage 15520 - Chainage 19774","amountPesos":190461000,"lengthMeters":6176.0,"ratePesosPerMeter":30838.89,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Camarines Sur - Albay Diversion Road, 473+895 - 474+700, 474+734 - 478+915.52, Libon, Albay","amountPesos":188137000,"lengthMeters":4986.52,"ratePesosPerMeter":37729.12,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1805 + 000 - K1807 + 167, K1807 + 195.34 - K1811 + 000","amountPesos":188000000,"lengthMeters":5971.66,"ratePesosPerMeter":31482.03,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 11+630.6 - Sta. 18+079, Victorias City, Negros Occidental","amountPesos":185074000,"lengthMeters":6448.4,"ratePesosPerMeter":28700.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sayre Highway Parallel Road II (Impasug-ong - Malaybalay City Section), Barangay San Jose Section, Sta. 90+900 - Sta. 94+550, Malaybalay City, Bukidnon","amountPesos":185000000,"lengthMeters":3650.0,"ratePesosPerMeter":50684.93,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Himamaylan City - Negros Oriental Boundary - Tayasan Road, Sta. 19+510 - Sta. 23+123","amountPesos":185000000,"lengthMeters":3613.0,"ratePesosPerMeter":51203.99,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banisilan-Guiling-Alamada-Libungan Rd - K1659 + 000 - K1663 + 000","amountPesos":184785000,"lengthMeters":4000.0,"ratePesosPerMeter":46196.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0192 + 000 - K0192 + 072, K0192 + 292 - K0193 + 940, K0193 + 950 - K0193 + 1028, K0194 + 201 - K0194 + 390, K0194 + 655 - K0194 + 690, K0195 + 029 - K0196 + 133, K0196 + 180 - K0201 + 712, K0202 + 075 - K0202 + 365, K0202 + 432 - K0203 + 800","amountPesos":184534000,"lengthMeters":10316.0,"ratePesosPerMeter":17888.13,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Matalam-Mlang-Bagontapay Jct Rd - K1659 + 309 - K1661 + 185.30","amountPesos":183490000,"lengthMeters":1876.3,"ratePesosPerMeter":97793.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bislig City-San Isidro-San Antonio-San Jose, Sta. 5+026.735 - Sta. 9+170.735, Barangay San Isidro Section, Surigao del Sur","amountPesos":180000000,"lengthMeters":4144.0,"ratePesosPerMeter":43436.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur","amountPesos":180000000,"lengthMeters":0.587,"ratePesosPerMeter":306643952.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Leading to Science and Technology Park, Barangay Taytayan (Libertad)-Barangay Lagutay (Gitagum), Sta. 1+300-Sta. 4+800, Misamis Oriental","amountPesos":180000000,"lengthMeters":3500.0,"ratePesosPerMeter":51428.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Burauen Bypass Road, Chainage 3+500 - Chainage 3+592.75, Poblacion District VI - San Jose East, Burauen, Leyte","amountPesos":179317000,"lengthMeters":92.75,"ratePesosPerMeter":1933336.93,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0089 + (-689) - K0089 + (-512), K0122 + 024 - K0122 + 999, K0126 + 724 - K0127 + 000, K0139 + 1100 - K0139 + 1904, K0141 + 000 - K0141 + 326, K0144 + 000 - K0145 + 000, K0186 + 332 - K0186 + 966","amountPesos":176257000,"lengthMeters":4192.0,"ratePesosPerMeter":42046.04,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1606 + 190 - K1609 + 758","amountPesos":175183000,"lengthMeters":3568.0,"ratePesosPerMeter":49098.37,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dipolog-Oroquieta National Rd - K1810 + 000 - K1813 + 005","amountPesos":175133000,"lengthMeters":3005.0,"ratePesosPerMeter":58280.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"San Jose City Bypass Road, Sta. 5+200 - Sta. 5+600, Sta. 5+651 - Sta. 6+060, Nueva Ecija","amountPesos":175000000,"lengthMeters":809.0,"ratePesosPerMeter":216316.44,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Esperanza-Lebak Bypass Road (Lebak Section) - Sta. 55 + 860 - Sta. 59+930, Lebak, Sultan Kudarat","amountPesos":175000000,"lengthMeters":4070.0,"ratePesosPerMeter":42997.54,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lutucan-Guisguis Port Road, Quezon - K0116 + 418 - K0117 + 640, K0121 + 037 - K0122 + 151","amountPesos":174200000,"lengthMeters":2336.0,"ratePesosPerMeter":74571.92,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ilagan City Bypass Road (Sta. 3 + 840 - Sta. 4 + 032.5, Sta. 5 + 140 - Sta. 5 + 550), Isabela","amountPesos":172791000,"lengthMeters":602.5,"ratePesosPerMeter":286790.04,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ramon-Cordon-Diadi Bypass Road, Barangay Poblacion Section (Sta. 0+060 - Sta. 0+280, Sta. 0+658.17 - Sta. 0+808.17, Sta. 1+395 - Sta. 2+600, Sta. 2+660 - Sta. 2+730), Diadi, Nueva Vizcaya","amountPesos":171000000,"lengthMeters":1645.0,"ratePesosPerMeter":103951.37,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sta. Cruz - Pagsanjan Diversion Road - Sta. 0 + 000 - Sta.3+084.56, Laguna","amountPesos":170000000,"lengthMeters":3084.56,"ratePesosPerMeter":55113.21,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"San Manuel (Pangasinan)-Itogon (Benguet) Road, Sta 11+760-Sta 13+725, Sta 16+140 - Sta 18+020","amountPesos":170000000,"lengthMeters":3845.0,"ratePesosPerMeter":44213.26,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quezon Eco-Tourism Road, Quezon - K0155 + 000 - K0156 + 095, K0156 + 176 - K0157 + 120","amountPesos":169300000,"lengthMeters":2039.0,"ratePesosPerMeter":83030.9,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Section I: Sta. 12 + 355 - Sta. 16+ 285, Section II: Sta. 16 + 325 - Sta. 16 + 377, Quezon","amountPesos":169000000,"lengthMeters":3982.0,"ratePesosPerMeter":42440.98,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod Negros Occidental Economic Highway (BANOCEH) (Victorias - Sagay), Sta. 3+000 - Sta. 3+500, Manapla, Negros Occidental","amountPesos":168775000,"lengthMeters":500.0,"ratePesosPerMeter":337550.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0724 + 000 - K0724 + 095, K0724 + 280 - K0724 + 316, K0724 + 591 - K0724 + 655, K0724 + 743 - K0724 + 854, K0729 + 320 - K0729 + 437, K0729 + 776 - K0730 + 010, K0732 + 504 - K0732 + 669, K0732 + 780 - K0732 + 896, K0735 + 853 - K0737 + 080, K0738 + 194 - K0740 + 394","amountPesos":168767000,"lengthMeters":4365.0,"ratePesosPerMeter":38663.69,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Aliaga - Guimba Diversion Rd, Replacement of Bridge, Quezon-Guimba Bridge, Nueva Ecija Sta. 14+062.70 - Sta.14+123.70","amountPesos":168500000,"lengthMeters":61.0,"ratePesosPerMeter":2762295.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pontevedra Bypass Road, Sta. 000 + 382 - Sta. 000 + 502, Capiz","amountPesos":166420000,"lengthMeters":120.0,"ratePesosPerMeter":1386833.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Isulan Jct-Ninoy Aquino Rd (S00743MN) - K1826 + 000 - K1826 + 085, K1826 + 400 - K1826 + 520, K1826 + 450 - K1826 + 520, K1826 + 700 - K1826 + 880, K1826 + 700 - K1826 + 940, K1828 + 090 - K1828 + 135, K1828 + 300 - K1828 + 400, K1828 + 770 - K1828 + 920, K1830 + 360 - K1830 + 450, K1831 + 860 - K1831 + 940, K1832 + 200 - K1832 + 336, K1832 + 620 - K1832 + 670, K1834 + 096 - K1834 + 183","amountPesos":165234000,"lengthMeters":1183.0,"ratePesosPerMeter":139673.71,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1686 + 078 - K1689 + 191, K1689 + 275 - K1690 + 459","amountPesos":165000000,"lengthMeters":4297.0,"ratePesosPerMeter":38398.88,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1690 + 642.45 - K1691 + 000, K1695 + 866 - K1700 + 232","amountPesos":165000000,"lengthMeters":4723.55,"ratePesosPerMeter":34931.35,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Doroluman-President Roxas-Kadingilan Road, Sta. 10+354 - Sta. 12+354, Cotabato","amountPesos":165000000,"lengthMeters":2000.0,"ratePesosPerMeter":82500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Vigo - San Antonio Bridge, Laoang, Northern Samar (Sta. 6+600 - Sta. 6+710)","amountPesos":165000000,"lengthMeters":110.0,"ratePesosPerMeter":1500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alicia-Angadanan-San Guillermo-Cauayan City-Naguilian Alternate Route (Sta. 35+799 - Sta. 36+361), Isabela","amountPesos":164577000,"lengthMeters":562.0,"ratePesosPerMeter":292841.64,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Esperanza-Lebak Bypass Road, Sta. 52 + 238 - Sta. 55 + 860, Lebak, Sultan","amountPesos":163000000,"lengthMeters":3622.0,"ratePesosPerMeter":45002.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Columbio - Lutayan - Koronadal Road, Sta.12+501 - Sta.12+687, Sultan Kudarat","amountPesos":161820000,"lengthMeters":186.0,"ratePesosPerMeter":870000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"STAR Tollway-Pinamucan Bypass, Sta. 101 + 778 - Sta. 105 + 200, Batangas","amountPesos":160000000,"lengthMeters":3422.0,"ratePesosPerMeter":46756.28,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod Negros Occidental Economic Highway (BANOCEH) (Victorias - Sagay), Sta. 12+231 - Sta. 12+700 , Cadiz City, Negros Occidental","amountPesos":160000000,"lengthMeters":469.0,"ratePesosPerMeter":341151.39,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sayre Highway Parallel Road II (Impasug-ong - Malaybalay City Section), Barangay Sumpong Section, Sta. 67+500 - Sta. 71+500, Malaybalay City, Bukidnon","amountPesos":160000000,"lengthMeters":4000.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Bukidnon-Paquibato District Alternate Road, Barangay Kipilas Section, Sta. 9+000 - Sta. 12+450, Kitaotao, Bukidnon","amountPesos":160000000,"lengthMeters":3450.0,"ratePesosPerMeter":46376.81,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dipolog-Sindangan-Liloy Rd - K1847 + (-003) - K1847 + 705, K1848 + 897 - K1849 + 000, K1863 + 558 - K1863 + 687, K1866 + 867.23 - K1866 + 871, K1866 + 883 - K1867 + 000, K1868 + 365 - K1869 + 000, K1869 + 139 - K1869 + 312, K1870 + 000 - K1872 + 112","amountPesos":159415000,"lengthMeters":3980.77,"ratePesosPerMeter":40046.27,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Baler Bypass Road, Baler, Aurora, 0 + 000 - 13 + 250","amountPesos":159000000,"lengthMeters":13250.0,"ratePesosPerMeter":12000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Parian - San Jose - Bucal Diversion Road, Sta. 11+068.99 - Sta. 19+327.86, Laguna","amountPesos":158845000,"lengthMeters":8258.87,"ratePesosPerMeter":19233.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Cauayan City Alternate Route (Bridge and Approaches) (Sta. 1+400 - Sta. 1+779.49), Isabela","amountPesos":157447000,"lengthMeters":379.49,"ratePesosPerMeter":414891.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct. Maramag-Maradugao Road-Jct. Lampanusan Road, Adtuyon-Barandias Section, Sta. 7+00 - Sta. 10+198.5, Pangantucan, Bukidnon","amountPesos":155000000,"lengthMeters":3198.5,"ratePesosPerMeter":48460.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bauang-San Fernando-San Juan ByPass Road, Sta. 7+797.87- Sta. 13+461.69, San Fernando, La Union","amountPesos":154989000,"lengthMeters":5663.82,"ratePesosPerMeter":27364.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Barangay Lawit, Sta. 131+851 - Sta. 133+033.69, Gingoog City, Misamis Oriental","amountPesos":153750000,"lengthMeters":1182.69,"ratePesosPerMeter":130000.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Piddig,Carasi (Ilocos Norte)-Calanasan-Langnao-Kabugao Road, Sta.18+783.20 - Sta. 25+350, Kabugao, Apayao","amountPesos":152200000,"lengthMeters":6566.8,"ratePesosPerMeter":23177.19,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lanao-Pagadian-Zamboanga City Rd - K1642 + 000 - K1647 + 738","amountPesos":150000000,"lengthMeters":5738.0,"ratePesosPerMeter":26141.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ozamis - Pagadian Rd, K1660 + (-076) -K1660 + 000, K1660 + 000 - K1660 + 070, K1660 + 812 - K1663 + 519, K1663 + 551 - K1664 + 000, K1670 + 070 - K1670 + 325, K1671 + 444 - K1672 + 000, K1672 + 640 -K1673 + 628, K1677 + 694 - K1678 + 000","amountPesos":150000000,"lengthMeters":5407.0,"ratePesosPerMeter":27741.82,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ozamis - Pagadian Rd, K1680 + 128 - K1680 + 818, K1688 + 000 - K1688 + 081, K1688 + 900 - K1689 + 398, K1689 + 398 - K1689 + 448, K1689 + 459 -K1689 + 509, K1689 + 509 - K1689 + 860, K1689 + 871 - K1690 + 487, K1691 + 324 - K1692 + 129, K1692 + 141 - K1692 + 635, K1692 + 640 - K1692 + 789, K1694 + 193 - K1695 + 000, K1698 + 000 - K1698 + 372","amountPesos":150000000,"lengthMeters":4963.0,"ratePesosPerMeter":30223.66,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Batangas-Quezon Rd - K0108 + 000 - K0108 + 259, K0110 + 000 - K0110 + 259, K0121 + 444 - K0121 + 968, K0122 + 824 - K0122 + 920, K0122 + 931 - K0124 + 198, K0124 + 206 - K0124 + 606, K0124 + 706 - K0125 + 106, K0126 + 700 - K0126 + 885, K0127 + 004 - K0127 + 386, K0127 + 610 - K0127 + 844, K0128 + 000 - K0128 + 940, K0130 + 944 - K0130 + 958, K0131 + 016 - K0131 + 088","amountPesos":150000000,"lengthMeters":5032.0,"ratePesosPerMeter":29809.22,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Along Jolo-Indanan-Parang-Silangkan Roads, Sulu, Chainage 0 + 000 to Chainage 4 + 000","amountPesos":150000000,"lengthMeters":4000.0,"ratePesosPerMeter":37500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bauang-Baguio Road - K0274 + 316 - K0275 + 388, K0275 + 714 - K0278 + 760, K0279 + 070 - K0280 + 170, K0280 + 354 - K0280 + 763,","amountPesos":150000000,"lengthMeters":5627.0,"ratePesosPerMeter":26657.19,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa North Rd - K0022 + 700 - K0023 + 300","amountPesos":150000000,"lengthMeters":600.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod North Rd - K0073 + 290 - K0075 + 109, K0075 + 216 - K0075 + 693","amountPesos":150000000,"lengthMeters":2296.0,"ratePesosPerMeter":65331.01,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod North Rd - K0076 + 388 - K0074 + 199, K0076 + (-194) - K0076 + 283","amountPesos":150000000,"lengthMeters":2189.0,"ratePesosPerMeter":68524.44,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santander-Barili-Toledo Rd - K0163 + 000 - K0163 + 040, K0163 + 053 - K0163 + 080, K0163 + 085 - K0163 + 092","amountPesos":150000000,"lengthMeters":74.0,"ratePesosPerMeter":2027027.03,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1811 + 000 - K1811 + 748, K1811 + 782 - K1812 + 748, K1813 + 160 - K1813 + 817, K1815 + 740 - K1817 + 000, K1817 + 107.70 - K1817 + 711","amountPesos":150000000,"lengthMeters":4234.3,"ratePesosPerMeter":35424.98,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1824 + 714.21 - K1829 + 330","amountPesos":150000000,"lengthMeters":4615.79,"ratePesosPerMeter":32497.15,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Guiguinto By-pass Road, Guiguinto, Bulacan, Sta. 0+000 - 0 + 500.00","amountPesos":150000000,"lengthMeters":500.0,"ratePesosPerMeter":300000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Guiguinto By-pass Road, Guiguinto, Bulacan, Sta. 0+500 - 1 + 000.00","amountPesos":150000000,"lengthMeters":500.0,"ratePesosPerMeter":300000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bangantalinga-Amungan, Iba, Zambales Sta. 0+000 - Sta. 1+500","amountPesos":150000000,"lengthMeters":1500.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bangantalinga-Amungan, Iba, Zambales Sta. 1+500 - Sta. 3+000","amountPesos":150000000,"lengthMeters":1500.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concepcion - Mabalacat Bypass Road (Sta 3+400- Sta 4+115.71), Tarlac","amountPesos":150000000,"lengthMeters":715.71,"ratePesosPerMeter":209582.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija Sta. 2+580 - Sta. 3+805.61","amountPesos":150000000,"lengthMeters":1225.61,"ratePesosPerMeter":122388.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija Sta. 3+805.61 - Sta. 5+031.30","amountPesos":150000000,"lengthMeters":1225.69,"ratePesosPerMeter":122380.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 1+580 - Sta. 2+580","amountPesos":150000000,"lengthMeters":1000.0,"ratePesosPerMeter":150000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 6+395 - Sta. 8+000","amountPesos":150000000,"lengthMeters":1605.0,"ratePesosPerMeter":93457.94,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Luisiana-Mauban Diversion Road, Luisiana Section - Sta. 0 + 625 - Sta. 3+147.5, Laguna","amountPesos":150000000,"lengthMeters":2522.5,"ratePesosPerMeter":59464.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Majayjay Diversion Road - Sta. 106 + 485 - Sta. 107+381, Laguna","amountPesos":150000000,"lengthMeters":896.0,"ratePesosPerMeter":167410.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Guinayangan-Tagkawayan Diversion Road, Sta. 4+600 - Sta. 6+800, Tagkawayan, Quezon","amountPesos":150000000,"lengthMeters":2200.0,"ratePesosPerMeter":68181.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sorsogon City Coastal Bypass Road, Barangay Boton, Sorsogon Sta. 4 + 052 - Sta. 4 + 295","amountPesos":150000000,"lengthMeters":243.0,"ratePesosPerMeter":617283.95,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sorsogon City Coastal Bypass Road, Barangay Boton, Sorsogon Sta. 4 + 295 - Sta. 4 + 538","amountPesos":150000000,"lengthMeters":243.0,"ratePesosPerMeter":617283.95,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Camarines Sur Expressway Project - Irayang Solong Overpass - (Sta. 431 + 950 - Sta. 432 + 100), Camarines Sur","amountPesos":150000000,"lengthMeters":150.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Daang Maharlika-Tagas-Daet Poblacion Road Link, Barangay Camambugan Section, Chainage 500 - Chainage 661, Daet, Camarines Norte","amountPesos":150000000,"lengthMeters":161.0,"ratePesosPerMeter":931677.02,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Legazpi-Sto.Domingo-Tabaco Tramo Road, Sta. 10+166.8 - Sta. 12+481.8, Albay","amountPesos":150000000,"lengthMeters":2315.0,"ratePesosPerMeter":64794.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tabaco City Bypass Road, Sta. 3+883.73 - Sta. 6+198.73, Albay","amountPesos":150000000,"lengthMeters":2315.0,"ratePesosPerMeter":64794.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tiwi By-pass Road (Alternate Route), Sta. 0+000 - Sta. 2+315, Albay","amountPesos":150000000,"lengthMeters":2315.0,"ratePesosPerMeter":64794.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo Circumferential Road 2, Sta. 0+520 - Sta. 2+929, Sta. 3+576 -Sta. 5+100, Sta. 5+627 - Sta. 6+152, Sta. 1+600 - Sta. 2+898, Iloilo","amountPesos":150000000,"lengthMeters":4458.0,"ratePesosPerMeter":33647.38,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo Circumferential Road 3, Sta. 3+330.50 - Sta. 3+993.50, Iloilo","amountPesos":150000000,"lengthMeters":663.0,"ratePesosPerMeter":226244.34,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Roxas City Circumferential Rd (C1), Chainage 7138 - Chainage 7789, Chainage 7996 - Chainage 9482.5, Capiz","amountPesos":150000000,"lengthMeters":2137.5,"ratePesosPerMeter":70175.44,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Barotac Viejo Bypass Road, Sta. 0 + 480 - Sta. 0 + 568.47 & Sta. 0 + 673.47 - Sta. 1 + 455.47, Iloilo","amountPesos":150000000,"lengthMeters":870.47,"ratePesosPerMeter":172320.7,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Catarman Diversion Road, Sta. 000+740 - Sta. 001+470, Northern Samar","amountPesos":150000000,"lengthMeters":730.0,"ratePesosPerMeter":205479.45,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ormoc City Diversion Road, Naungan-Linao-Alegria-Poblacion, Sta. 4+380 - Sta. 4+610.67, Leyte","amountPesos":150000000,"lengthMeters":230.67,"ratePesosPerMeter":650279.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cagayan de Oro Coastal Road (Puerto-Gusa Section), Barangay Gusa, Sta. 8+177- Sta. 8+352.4, Cagayan de Oro City","amountPesos":150000000,"lengthMeters":175.4,"ratePesosPerMeter":855188.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"CDO-Opol-El Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Barangay Bolisong Section, Sta. 23+992 - Sta. 24+992, El Salvador City, Misamis Oriental","amountPesos":150000000,"lengthMeters":1000.0,"ratePesosPerMeter":150000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sayre Highway Parallel Road I (Libona - Manolo Fortich - Impasug-ong Section), Barangay Dalwangan Section, Sta. 59+350 - Sta. 62+600, Malaybalay City, Bukidnon","amountPesos":150000000,"lengthMeters":3250.0,"ratePesosPerMeter":46153.85,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Trento - Lingig Road, (Sta. 12+880 - Sta. 14+548.5), Barangay Bogac - Barangay Rajah Cabungsu-an Section, Surigao del Sur","amountPesos":150000000,"lengthMeters":1668.5,"ratePesosPerMeter":89901.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga","amountPesos":150000000,"lengthMeters":3325.0,"ratePesosPerMeter":45112.78,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banaue-Barlig-Tanudan-Tabuk Road, Sta. 4+160 - Sta. 15+000, Barangay Viewpoint, Banaue, Ifugao","amountPesos":150000000,"lengthMeters":10840.0,"ratePesosPerMeter":13837.64,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Piddig,Carasi (Ilocos Norte)-Calanasan-Langnao-Kabugao Road, Sta.10+783.20 - Sta. 13+783.20, Kabugao, Apayao","amountPesos":150000000,"lengthMeters":3000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Piddig,Carasi (Ilocos Norte)-Calanasan-Langnao-Kabugao Road, Sta.13+783.20 - Sta. 16+783.20, Kabugao, Apayao","amountPesos":150000000,"lengthMeters":3000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Atimonan-Mauban Road, Sta. 8+354 - Sta. 9+857, Mauban, Quezon","amountPesos":150000000,"lengthMeters":1503.0,"ratePesosPerMeter":99800.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lopez-Macalelon Road, Sta. 0 + 000 - Sta. 2 + 700, Lopez, Quezon","amountPesos":150000000,"lengthMeters":2700.0,"ratePesosPerMeter":55555.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lalud-Garchitorena Road, Garchitorena, (Ason Section), Garchitorena, Camarines Sur, Sta. 40+960 - Sta. 42+820, Sta. 49+900 - Sta. 50+765","amountPesos":150000000,"lengthMeters":2725.0,"ratePesosPerMeter":55045.87,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lalud-Garchitorena Road, Garchitorena, (Sagrada Section), Garchitorena, Camarines Sur, Sta. 37+917 - Sta. 40+200","amountPesos":150000000,"lengthMeters":2283.0,"ratePesosPerMeter":65703.02,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tabaco City-Malinao-Buhi-Iriga Road - Chainage 6020 - Chainage 10220, Albay","amountPesos":150000000,"lengthMeters":4200.0,"ratePesosPerMeter":35714.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alegria-Alcoy Road - Sta. 2 + 459 - Sta. 4 + 257","amountPesos":150000000,"lengthMeters":1798.0,"ratePesosPerMeter":83426.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Sitio Nahigit, Sta. 49+400 - Sta. 52+297.73, Barangay Bulonay, Impasug-ong, Bukidnon","amountPesos":150000000,"lengthMeters":2897.73,"ratePesosPerMeter":51764.66,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Muslim-Christian Unity Crossroad, Barangay Dimayon, Sta. 9+350- Sta. 12+850 , Tagoloan, Lanao del Norte","amountPesos":150000000,"lengthMeters":3500.0,"ratePesosPerMeter":42857.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Muslim-Christian Unity Crossroad,Barangay Malimbato, Sta. 5+850- Sta. 9+350, Tagoloan, Lanao del Norte","amountPesos":150000000,"lengthMeters":3500.0,"ratePesosPerMeter":42857.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Datu Paglas - Columbio - Matanao Road, Sta. 0+000 - Sta. 0+165, Sta. 2+030 - Sta. 2+290, Sta. 2+370 - Sta. 4+060, Sta. 7+885 - Sta. 9+065, Sultan Kudarat","amountPesos":150000000,"lengthMeters":3295.0,"ratePesosPerMeter":45523.52,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Completion of Malanday Access Road, Barangay Malanday, Marikina City,Sta. 0 + 000 - Sta. 0 + 892","amountPesos":150000000,"lengthMeters":892.0,"ratePesosPerMeter":168161.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Dao Balbalan - Bullaguian Road, Sta. 1+650 - Sta. 4+650, Balbalan, Kalinga","amountPesos":150000000,"lengthMeters":3000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Kiangan-Asipulo-Ambaguio-Bayombong Road, Sta. 32+514 - Sta. 32+899, Barangay Camandag, Asipulo, Ifugao","amountPesos":150000000,"lengthMeters":385.0,"ratePesosPerMeter":389610.39,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of MNR - Daungan - Libtong - Camalig Road (South Alignment), Meycauayan City, Bulacan Sta. 00+000 - Sta. 01+255 (120.98045000, 14.74881389)","amountPesos":150000000,"lengthMeters":1255.0,"ratePesosPerMeter":119521.91,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of MNR - Lias - Camalig Road (North Alignment), Meycauayan City, Bulacan Sta. 00+000 - Sta. 01+255 (120.99013889, 14.76863056)","amountPesos":150000000,"lengthMeters":1255.0,"ratePesosPerMeter":119521.91,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Rehabilitation of Burol Overpass, Sta. 1+120 - Sta. 1+145, Provincial Road, Borol 2nd, Balagtas, Bulacan","amountPesos":150000000,"lengthMeters":25.0,"ratePesosPerMeter":6000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Malolos - Paombong - Hagonoy - Calumpit Road, Sta. 0+000 - Sta. 2+800, Calumpit, Bulacan","amountPesos":150000000,"lengthMeters":2800.0,"ratePesosPerMeter":53571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, SRP Backroad, Sta. 2+859 - Sta. 3+304, Cebu City","amountPesos":150000000,"lengthMeters":445.0,"ratePesosPerMeter":337078.65,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Jct. CDO City-Dominorog-Camp Kibaritan Road to Jct SH-Aglayan- Alanib-Ticalaan Road (Aglayan-Basak), Barangay Baylanan Section, Sta. 17+700 - Sta. 20+700, Talakag, Bukidnon","amountPesos":150000000,"lengthMeters":3000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of road balindong-piagapo-pantaoragat road, Barangay Pindolonan, Sta. 0+000 - Sta. 7+000, Piagapo, Lanao del Sur","amountPesos":150000000,"lengthMeters":7000.0,"ratePesosPerMeter":21428.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Road, Sinonoc - San Vicente - Dinas - Katipunan - Namut Road on intermittent sections along Sta. 0+000 - Sta. 16+200, Sinacaban, Misamis Occidental","amountPesos":150000000,"lengthMeters":16200.0,"ratePesosPerMeter":9259.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Don Victoriano-Concepcion Road, Sta. 0+000 - Sta. 2+500, Don Victoriano, Misamis Occidental","amountPesos":150000000,"lengthMeters":2500.0,"ratePesosPerMeter":60000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Mountain Bypass Road (Namut - Liboron Section), Sta. 0+000 - Sta. 2+100, Tudela - Don Victoriano, Misamis Occidental","amountPesos":150000000,"lengthMeters":2100.0,"ratePesosPerMeter":71428.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of NPC-Ditucalan Parallel Bridge at Maria Cristina Falls, Barangay Ma. Cristina, Sta. 0 + 000 - Sta. 0 + 082, Iligan City","amountPesos":150000000,"lengthMeters":82.0,"ratePesosPerMeter":1829268.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Bridge, Barangay Anibongan, Carmen, Davao del Norte - Sta. 2+600 - Sta. 2+670","amountPesos":150000000,"lengthMeters":70.0,"ratePesosPerMeter":2142857.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Rizal - Barangay Baylo, Sta. 9+837.50 - Sta. 12+546.50, Monkayo, Davao de Oro","amountPesos":150000000,"lengthMeters":2709.0,"ratePesosPerMeter":55370.99,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Rizal - Barangay Baylo, Sta. 12+546.50 - Sta. 15+246.5, Monkayo, Davao de Oro","amountPesos":150000000,"lengthMeters":2700.0,"ratePesosPerMeter":55555.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Don Victoriano-Concepcion Road, Sta. 2+500 - Sta. 5+000, Don Victoriano, Misamis Occidental","amountPesos":150000000,"lengthMeters":2500.0,"ratePesosPerMeter":60000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Albay West Coast Rd - K0503+763 - K0503+897, K0504+033 - K0504+158","amountPesos":149566000,"lengthMeters":259.0,"ratePesosPerMeter":577474.9,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cauayan - Cabatuan Rd - K0374 + 047 - K0377 + 456","amountPesos":148530000,"lengthMeters":3409.0,"ratePesosPerMeter":43569.96,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alcala-Santo Niño-Lasam Road, Santo Niño Section, (Sta. 4+500 - Sta. 4+590, Sta 4+670 - Sta. 4+760, Sta. 5+140 - Sta. 5+571.63, Sta 10+840 - Sta. 13+040), Cagayan","amountPesos":148000000,"lengthMeters":2811.63,"ratePesosPerMeter":52638.51,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alcala-Santo Niño-Lasam Road, Santo Niño Section, (Sta. 4+590 - Sta. 4+670), Cagayan","amountPesos":148000000,"lengthMeters":80.0,"ratePesosPerMeter":1850000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tago - La Paz Bypass Road, Sta. 3+377 - Sta.3+709, Barangay Poblacion - Barangay La Paz, Surigao del Sur","amountPesos":148000000,"lengthMeters":332.0,"ratePesosPerMeter":445783.13,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Bolinao-Patar Road, Bolinao Pangasinan Sta. 0+000 - Sta. 8+140","amountPesos":147624000,"lengthMeters":8140.0,"ratePesosPerMeter":18135.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Urdaneta Jct - Dagupan Road, K0194+674 - K0194+985, K0198+657 - K0200+853","amountPesos":147344000,"lengthMeters":2507.0,"ratePesosPerMeter":58773.04,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Albay West Coast Rd - K0504+158 - K0504+413","amountPesos":147259000,"lengthMeters":255.0,"ratePesosPerMeter":577486.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0754 + 500 - K0755 + 000, K0760 + 000 - K0760 + 769, K0764 + 200 - K0766 + 860","amountPesos":147172000,"lengthMeters":3929.0,"ratePesosPerMeter":37457.88,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct. Nato-Sabang Coastal Road, Manzana Section, San Jose , Camarines Sur, Sta.8+877 - Sta.9+627","amountPesos":147000000,"lengthMeters":750.0,"ratePesosPerMeter":196000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct. Nato-Sabang Coastal Road, Telegrafo Section, San Jose, Camarines Sur, Sta.8+127 - Sta.8+877","amountPesos":147000000,"lengthMeters":750.0,"ratePesosPerMeter":196000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bayombong-Quezon-Bagabag Road, Barangay Nalubbunan Section (Sta.10+100 - Sta. 12+365), Nueva Vizcaya","amountPesos":146030000,"lengthMeters":2265.0,"ratePesosPerMeter":64472.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct. Nato-Sabang Coastal Road, Dolo Section, San Jose, Camarines Sur, Sta.9+627 - Sta.10+368","amountPesos":145500000,"lengthMeters":741.0,"ratePesosPerMeter":196356.28,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct. Abbag-Guingin Bdry. Rd (Mactol-Bucao Section), San Pugo, Quirino - Sta. 3+380 - Sta. 6+286.96","amountPesos":145348000,"lengthMeters":2906.96,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Naga-Uling Rd - K0024 + 875 - K0024 + 915, K0032 + 260 - K0032 + 330, K0034 + 640 - K0034 + 690, K0034 + 950 - K0035 + 000, K0036 + 000 - K0036 + 150","amountPesos":145000000,"lengthMeters":360.0,"ratePesosPerMeter":402777.78,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kapalong-Talaingod-Valencia (Bukidnon) Rd K1541 + 720 - K1541 + 766, K1543 +863 - K1544 + 025, K1574 + 618 - K1574 + 652, K1574 + 700 - K1574 + 758","amountPesos":145000000,"lengthMeters":300.0,"ratePesosPerMeter":483333.33,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 4+523 – Sta. 4+900","amountPesos":145000000,"lengthMeters":377.0,"ratePesosPerMeter":384615.38,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela","amountPesos":144726000,"lengthMeters":1476.68,"ratePesosPerMeter":98007.69,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Daraga Urban Tourism Eco Route Project, Sta. 525 + 850.70 - Sta. 525 + 991.30, Barangay Tagas - Barangay Kilicao Daraga, Albay","amountPesos":144692000,"lengthMeters":140.6,"ratePesosPerMeter":1029103.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Daraga Urban Tourism Eco Route Project, Sta. 527 + 039.70 - Sta. 527 + 130.3, Barangay Kilicao, Daraga - Barangay Pawa, Legazpi City, Albay","amountPesos":144692000,"lengthMeters":90.6,"ratePesosPerMeter":1597041.94,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dipolog-Oroquieta National Rd - K1839 + 690 - K1841 + 710, K1841 + 742 - K1843 + 260, K1844 + 330 - K1845 + 000","amountPesos":144622000,"lengthMeters":4208.0,"ratePesosPerMeter":34368.35,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Apao, Tineg - Lan-ag Road, Sta. 0+000 - Sta. 5+000, Lacub, Abra","amountPesos":144039000,"lengthMeters":5000.0,"ratePesosPerMeter":28807.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela","amountPesos":143906000,"lengthMeters":531.0,"ratePesosPerMeter":271009.42,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Bacag - Lan-ag Road, Sta. 0+000 - Sta. 5+000, Lacub Abra","amountPesos":142837000,"lengthMeters":5000.0,"ratePesosPerMeter":28567.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Tamac, Villaviciosa - Dalit, Pilar Road, Sta. 0+000 - Sta. 4+000, Villaviciosa and Pilar, Abra","amountPesos":142256000,"lengthMeters":4000.0,"ratePesosPerMeter":35564.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1679 + 000 - K1680 + 000, K1680 + 623 - K1683 + 500","amountPesos":142000000,"lengthMeters":3877.0,"ratePesosPerMeter":36626.26,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1829 + 364 - K1833 + 756","amountPesos":142000000,"lengthMeters":4392.0,"ratePesosPerMeter":32331.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Marbel-Makar Rd) - K1703 + 000 - K1704 + 456.21","amountPesos":141995000,"lengthMeters":1456.21,"ratePesosPerMeter":97509.97,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0233 + 296 - K0234 + 717, K0234 + 800 - K0235 + 984, K0236 + 127 - K0236 + 276, K0236 + 816 - K0236 + 969, K0237 + 217 - K0237 + 528, K0237 + 643 - K0237 + 963, K0239 + 000 - K0239 + 114, K0239 + 347 - K0239 + 611, K0239 + 682 - K0239 + 973, K0240 + 212 - K0240 + 622, K0240 + 778 - K0240 + 978, K0241 + 688 - K0242 + 367, K0242 + 415 - K0242 + 482, K0242 + 895 - K0243 + 028, K0243 + 073 - K0243 + 114, K0243 + 840 - K0244 + 191, K0244 + 451 - K0244 + 489, K0244 + 609 - K0245 + 066, K0245 + 103 - K0245 + 176, K0245 + 820 - K0245 + 916, K0245 + 994 - K0246 + 319, K0246 + 452 - K0246 + 732","amountPesos":141823000,"lengthMeters":7357.0,"ratePesosPerMeter":19277.29,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Managnag(Tigaon-Goa-Sn Jose-Lagonoy via Sn Vicente Rd)-Himanag Road, Lagonoy, Camarines Sur, Sta.13+484 - Sta.15+360.7","amountPesos":141801000,"lengthMeters":1876.7,"ratePesosPerMeter":75558.69,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago-Tuguegarao Rd - K0412 + 422 - K0415 + 461","amountPesos":141550000,"lengthMeters":3039.0,"ratePesosPerMeter":46577.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gumaca Bypass Rd - K0191 + 060 - K0193 + 157","amountPesos":140000000,"lengthMeters":2097.0,"ratePesosPerMeter":66762.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Montevista-Dnas Rd - K1413+(-602) - K1413+000, K1414+535 - K1415+539, K1416+000 - K1422+002, K1431+541 - K1432+966","amountPesos":140000000,"lengthMeters":9033.0,"ratePesosPerMeter":15498.73,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Marikina-Infanta Rd - K0114 + 936 - K0114 + 976, K0118 + 242 - K0118 + 288, K0119 + 815 - K0119 + 858, K0121 + 355 - K0121 + 404","amountPesos":140000000,"lengthMeters":178.0,"ratePesosPerMeter":786516.85,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Pandi By-pass Road, Pandi, Bulacan, Sta. 5+000.00 - Sta. 6+040.00","amountPesos":140000000,"lengthMeters":1040.0,"ratePesosPerMeter":134615.38,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Piddig-Carasi (Ilocos Norte) - Calanasan (Apayao) Connecting Cabugao-Conner (Apayao)-Tuao (Cagayan) Road, Sta. 36+236 - Sta. 38+588, Ilocos Norte","amountPesos":140000000,"lengthMeters":2352.0,"ratePesosPerMeter":59523.81,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Aguinaldo-Toboy-Natonin Road, Sta. 11+286 - Sta. 11+512","amountPesos":140000000,"lengthMeters":226.0,"ratePesosPerMeter":619469.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Barangay Silae, Sta. 20+00 - Sta. 22+863.64, Malaybalay City, Bukidnon","amountPesos":140000000,"lengthMeters":2863.64,"ratePesosPerMeter":48888.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siquijor Circumferential Rd - K0004 + 100 - K0004 + 786, K0009 + 720 - K0012 + 000, K0051 + 330 - K0051 + 731, K0074 + 520 - K0075 + 339","amountPesos":138900000,"lengthMeters":4186.0,"ratePesosPerMeter":33182.04,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cauayan City - Cabatuan Diversion Road, Sta. 0+000 - Sta. 0+027, Sta. 5+800 - Sta. 7+262, Isabela","amountPesos":138682000,"lengthMeters":1489.0,"ratePesosPerMeter":93137.68,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Magpet-Nowa-Doroluman-Greenfield Rd - K1660 + 352 - K1664 + 703","amountPesos":138647000,"lengthMeters":4351.0,"ratePesosPerMeter":31865.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palao-Calaba Bypass Road - Sta. 3+000-Sta. 3+273, Bangued, Abra","amountPesos":137970000,"lengthMeters":273.0,"ratePesosPerMeter":505384.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Babak-Samal-Kaputian Rd - K1507 + 550 - K1509 + 072, K1516 + 460 - K1519 + 343","amountPesos":137001000,"lengthMeters":4405.0,"ratePesosPerMeter":31101.25,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1710 + 046 - K1710 + 780, K1710 + 792.25 - K1711 + 031, K1711 + 049 - K1712 + 493, K1712 + 517 - K1713 + 037","amountPesos":136115000,"lengthMeters":2936.75,"ratePesosPerMeter":46348.86,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sorsogon City Coastal Bypass Road, Barangay Abuyog, Sta. 4 + 211 - Sta. 4 + 265.44, Sorsogon","amountPesos":136092000,"lengthMeters":54.44,"ratePesosPerMeter":2499853.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Juan-Candelaria Jct-Candelaria-Bolboc Road, Quezon - K0147 + 903 - K0149 + 164","amountPesos":135800000,"lengthMeters":1261.0,"ratePesosPerMeter":107692.31,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Montevista-Compostela-Mati Bdry Rd - K1438+627 - K1439+584, K1439+600 - K1441+000, K1475+485 - K1476+548, K1476+564 - K1476+948, K1476+978 - K1477+000, K1483+188 - K1483+605, K1484+044 - K1484+940, K1490+208 - K1490+902","amountPesos":135000000,"lengthMeters":5833.0,"ratePesosPerMeter":23144.18,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Managnag(Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)-Himanag Road, Lagonoy, Camarines Sur, Sta.15+360.70 - Sta.16+980","amountPesos":135000000,"lengthMeters":1619.3,"ratePesosPerMeter":83369.36,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of San Fernando Road, San Fernando, Sta Cruz, Zambales Sta. 0+000.00 - Sta. 1+500.00","amountPesos":135000000,"lengthMeters":1500.0,"ratePesosPerMeter":90000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"General Santos City-T'Boli-Surallah Rd - (S01487MN) Chainage 31284 - Chainage 37800","amountPesos":134857000,"lengthMeters":6516.0,"ratePesosPerMeter":20696.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quezon Eco-Tourism Road, Quezon - K0165 + 127 - K0166 + 258","amountPesos":134300000,"lengthMeters":1131.0,"ratePesosPerMeter":118744.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nueva Ecija - Pangasinan Rd, K0171 + 267 - K0175 + 300","amountPesos":134000000,"lengthMeters":4033.0,"ratePesosPerMeter":33225.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Coron-Busuanga Rd - K0063 + 000 - K0065 + 000","amountPesos":133801000,"lengthMeters":2000.0,"ratePesosPerMeter":66900.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Road K0039 + 442 - K0039 + 982, K0040 + 990 - K0041+ 340, K0041 + 780 - K0042 + 000, K0043 + 127 - K0043 + 497, K0050 +260 - K0050 + 300, Bulacan","amountPesos":133601000,"lengthMeters":1520.0,"ratePesosPerMeter":87895.39,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0078 + 434 - K0078 + 499, K0125 + 719 - K0125 + 815, K0125 + 838 - K0125 + 933, K0129 + 284 - K0131 + 484","amountPesos":131845000,"lengthMeters":2456.0,"ratePesosPerMeter":53682.82,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Section I: Sta. 6 + 992 - Sta. 7 + 156.2, Section II: Sta. 7 + 201.8 - Sta. 9 + 700, San Antonio, Quezon","amountPesos":131500000,"lengthMeters":2662.4,"ratePesosPerMeter":49391.53,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Esperanza - Lebak Bypass Road, Sta. 17 + 737 - Sta. 18 + 446, Sta. 18 + 606 - Sta. 20 + 467, Sta. 20 + 597 - Sta. 21 + 677, Esperanza, Sultan Kudarat","amountPesos":131400000,"lengthMeters":3650.0,"ratePesosPerMeter":36000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cauayan City - Cabatuan Diversion Road, Sta. 3+634 - Sta. 5+800, Isabela","amountPesos":131318000,"lengthMeters":2166.0,"ratePesosPerMeter":60626.96,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dr Damian Reyes Rd (Torrijos Side) - K0042 + 210 - K0049 + 273","amountPesos":131113000,"lengthMeters":7063.0,"ratePesosPerMeter":18563.36,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palo-Carigara-Ormoc Rd - K0996 + 000 - K0998 + 000, K0998 + 507 - K0999 + 000","amountPesos":130558000,"lengthMeters":2493.0,"ratePesosPerMeter":52369.84,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0052 + 650 - K0055 + 000, K0055 + 400 - K0056 + 303","amountPesos":130067000,"lengthMeters":3253.0,"ratePesosPerMeter":39983.71,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sindangan-Siayan-Dumingag-Mahayag Rd (Sindangan-Siayan Sect) - K1933 + 000 - K1936 + 518, K1937 + 000 - K1938 + 000, K1941 + 000 - K1942 + 000, K1943 + 000 - K1944 + 000","amountPesos":130000000,"lengthMeters":6518.0,"ratePesosPerMeter":19944.77,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sindangan-Siayan-Dumingag-Mahayag Rd (Sindangan-Siayan Sect) - K1945 + 000 - K1949 + 774, K1949 + 803 - K1951 + 572","amountPesos":130000000,"lengthMeters":6543.0,"ratePesosPerMeter":19868.56,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Benigno S. Aquino Jr. National Highway - K1414+(-1205) - K1414+256, K1414+408 - K1414+800, K1415+311 - K1417+000, K1425+291 - K1425+867, K1426+574 - K1427+067, K1427+189 - K1427+389","amountPesos":130000000,"lengthMeters":4811.0,"ratePesosPerMeter":27021.41,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nabunturan-Maragusan Rd - K1445+013 - K1445+135, K1447+038 - K1448+000, K1455+563 - K1456+582, K1456+671 - K1457+150, K1457+270 - K1457+886, K1471+265 - K1473+093, K1473+118 - K1474+162","amountPesos":130000000,"lengthMeters":6070.0,"ratePesosPerMeter":21416.8,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1820 + 755 - K1824 + 670","amountPesos":130000000,"lengthMeters":3915.0,"ratePesosPerMeter":33205.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1833 + 784 - K1834 + 140, K1834 + 531 - K1838 + 000","amountPesos":130000000,"lengthMeters":3825.0,"ratePesosPerMeter":33986.93,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Javier By-Pass Road, Sta. 1+188 - 2+374, Barangay Pinocawan, Javier, Leyte","amountPesos":130000000,"lengthMeters":1186.0,"ratePesosPerMeter":109612.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mapawa-Bahi-Langgawisan, (4+872.500 - 6+605.83), Maragusan, Davao de Oro Bypass Road","amountPesos":130000000,"lengthMeters":1733.33,"ratePesosPerMeter":75000.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mauban-Tignoan, Mauban Section, Sta. 16+500 - Sta. 19+750","amountPesos":130000000,"lengthMeters":3250.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rosario-Sn Juan Rd - K0127 + 000 - K0127 + 402, K0127 + 800 - K0128 + 684, K0131 + 324 - K0132 + 000, K0134 + 000 - K0134 + 004, K0136 + 000 - K0136 + 103, K0136 + 394 - K0137 + 000, K0141 + 393 - K0141 + 772, K0141 + 781 - K0142 + 000, K0130 + 000 - K0130 + 439, K0133 + 679 - K0134 + 000, K0134 + 004 - K0134+ 151, K0134 + 237 - K0134 + 591, K0139 + 185 - K0140 + 327, K0140 + 752 - K0140 + 842","amountPesos":128833000,"lengthMeters":5766.0,"ratePesosPerMeter":22343.57,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - Chainage 15210 - Chainage 16869, Camarines Norte","amountPesos":127835000,"lengthMeters":1659.0,"ratePesosPerMeter":77055.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga del Sur Coastal Rd - (S01187MN) Chainage 19002 - Chainage 19008, Chainage 19154 - Chainage 19950, Chainage 21732 - Chainage 22229, Chainage 22344 - Chainage 25118, Chainage 25147 - Chainage 25271, Chainage 29623 - Chainage 29969","amountPesos":127207000,"lengthMeters":4543.0,"ratePesosPerMeter":28000.66,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Ipil - Quirino Bdry Rd - K0359+333 - K0359+423, K0359+468 - K0360+000, K0360+765 - K0361+322, K0372+000 - K0373+000, K0373+053 - K0374+000","amountPesos":127000000,"lengthMeters":3126.0,"ratePesosPerMeter":40627.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Luisiana Diversion Road - Sta. 0 + 000 - Sta. 0+939.07, Laguna","amountPesos":126902000,"lengthMeters":939.07,"ratePesosPerMeter":135135.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - Chainage 13560 - Chainage 15210, Camarines Norte","amountPesos":126750000,"lengthMeters":1650.0,"ratePesosPerMeter":76818.18,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Marbel-Makar Rd) - K1700 + 212 - K1701 + 504","amountPesos":125516000,"lengthMeters":1292.0,"ratePesosPerMeter":97148.61,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"General Santos City - T'Boli - Surallah Road (Surallah Section) K1722 + 668 - K1725 + 868","amountPesos":125500000,"lengthMeters":3200.0,"ratePesosPerMeter":39218.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Dike including groundsill, along Abacan River, San Jose Malino - Tangle, Mexico, Pampanga Sta. 0+000 - Sta. 4 + 552","amountPesos":125000000,"lengthMeters":4552.0,"ratePesosPerMeter":27460.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Suclaban Bridge tranversing NLEX, Mexico, Pampanga, Sta. 0+000 - Sta. 0+62.60","amountPesos":125000000,"lengthMeters":62.6,"ratePesosPerMeter":1996805.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Burauen-Albuera Road (Burauen Side), Chainage 5+418 - Chainage 5+443, Chainage 5+574 - Chainage 5+604, Chainage 7+312 - Chainage 7+430, Chainage 8+869 - Chainage 8+908, Barangay Abuyogon & Barangay Catagbacan, Burauen, Leyte","amountPesos":124700000,"lengthMeters":212.0,"ratePesosPerMeter":588207.55,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0040 + 191 - K0040 + 565, K0040 + 660 - K0041 + 827","amountPesos":124545000,"lengthMeters":1541.0,"ratePesosPerMeter":80820.9,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, San Fernando- San Jacinto- Monreal Road (Piña Section), San Jacinto Masbate Sta. 18 +818 - Sta.20 + 018","amountPesos":124000000,"lengthMeters":1200.0,"ratePesosPerMeter":103333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0213 + 659 - K0213 + 750, K0214 + 000 - K0214 + 679, K0214 + 707 - K0214 + 880, K0215 + 020 - K0215 + 385, K0215 + 536 - K0215 + 954, K0216 + 060 - K0216 + 227, K0216 + 241 - K0216 + 376, K0216 + 450 - K0219 + 306, K0219 + 348 - K0220 + 455, K0221 + 559 - K0221 + 878","amountPesos":123731000,"lengthMeters":6310.0,"ratePesosPerMeter":19608.72,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bugko-Nenita-Mirador-Cagpanit-an-De Maria-Sn Jose Rd - K0779 + 000 - K0779 + 221, K0780 + 446 - K0780 + 500, K0780 + 861 - K0780 + 930, K0781 + 256 - K0781 + 268","amountPesos":123602000,"lengthMeters":356.0,"ratePesosPerMeter":347196.63,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kidapawan-Calunasan-Mlang Rd - K1625 + 000 - K1628 + 906","amountPesos":122492000,"lengthMeters":3906.0,"ratePesosPerMeter":31359.96,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - Chainage 833 - Chainage 2483, Camarines Norte","amountPesos":122250000,"lengthMeters":1650.0,"ratePesosPerMeter":74090.91,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0066 + 000 - K0067 + 605, K0067 + 670 - K0069 + 529","amountPesos":122231000,"lengthMeters":3464.0,"ratePesosPerMeter":35286.09,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palao-Calaba Bypass Road - Sta. 2+000- Sta. 2+480, Bangued, Abra","amountPesos":122190000,"lengthMeters":480.0,"ratePesosPerMeter":254562.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quezon Industrial Highway, Sta. 1 + 195 - Sta. 2 + 060, Lucena City, Quezon","amountPesos":122070000,"lengthMeters":865.0,"ratePesosPerMeter":141121.39,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Marikina-Infanta Rd - K0104 + 650 - K0104 + 715, K0105 + 635 - K0105 + 700","amountPesos":122000000,"lengthMeters":130.0,"ratePesosPerMeter":938461.54,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banga-Tupi-Malungon Road ( Tupi-Malungon Section) Sta. 25+569 - Sta. 25+942, Sta. 25+987 - Sta. 27+317, South Cotabato","amountPesos":122000000,"lengthMeters":1703.0,"ratePesosPerMeter":71638.29,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rizal-Dakak-Dapitan Coastal Loop Rd - K1810 + 000 - K1815 + 000","amountPesos":121865000,"lengthMeters":5000.0,"ratePesosPerMeter":24373.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0138 + 919 - K0139 + 331, K0139 + 366 - K0139 + 400, K0140 + 140 - K0141 + 694, K0141 + 914 - K0142 + 039, K0142 + 495 - K0142 + 945, K0144 + 031 - K0145 + 004","amountPesos":121787000,"lengthMeters":3548.0,"ratePesosPerMeter":34325.54,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - Chainage 2483 - Chainage 4048, Camarines Norte","amountPesos":121725000,"lengthMeters":1565.0,"ratePesosPerMeter":77779.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rizal-Dakak-Dapitan Coastal Loop Rd - K1840 + 000 - K1844 + 000","amountPesos":121629000,"lengthMeters":4000.0,"ratePesosPerMeter":30407.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lanao-Pagadian-Zamboanga City Rd - K1637 + 000 - K1642 + 000","amountPesos":121000000,"lengthMeters":5000.0,"ratePesosPerMeter":24200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kennon Rd - K0237 + 715 - K0237 + 840","amountPesos":121000000,"lengthMeters":125.0,"ratePesosPerMeter":968000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Capiz-Aklan Rd - K0339 + 580 - K0340 + 103, K0343 + 650 - K0345 + 346","amountPesos":120565000,"lengthMeters":2219.0,"ratePesosPerMeter":54333.03,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kapalong-Talaingod-Valencia (Bukidnon) Rd K1561 + 849 - K1561 + 968, K1566 + 031 - K1566 + 189, K1570 + 921 - K1570 + 984","amountPesos":120000000,"lengthMeters":340.0,"ratePesosPerMeter":352941.18,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alcala Bypass Road, Sta. 5+460 - Sta. 5+510, Cagayan","amountPesos":120000000,"lengthMeters":50.0,"ratePesosPerMeter":2400000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dasmarinas-General Trias-Tanza Diversion Road, General Trias Section, Sta. 1 + 948 - Sta. 2 + 415, Cavite","amountPesos":120000000,"lengthMeters":467.0,"ratePesosPerMeter":256959.31,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur","amountPesos":120000000,"lengthMeters":781.0,"ratePesosPerMeter":153649.17,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kalibo Circumferential Road, K0273+307 - K0274 + 756, Aklan","amountPesos":120000000,"lengthMeters":1449.0,"ratePesosPerMeter":82815.73,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Metro Dumaguete Diversion Road, Sta. 0+000 - Sta. 4+286, Barangay Magatas, Sibulan, Negros Oriental","amountPesos":120000000,"lengthMeters":4286.0,"ratePesosPerMeter":27998.13,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur","amountPesos":120000000,"lengthMeters":1071.101,"ratePesosPerMeter":112034.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lalud-Garchitorena Road, Garchitorena, Camarines Sur, Sta. 34+420 - Sta. 34+576, Sta. 35+560 - Sta. 37+200","amountPesos":120000000,"lengthMeters":1796.0,"ratePesosPerMeter":66815.14,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Liwan West-Anonang Road, Rizal, Kalinga, Sta. 0+000 - Sta. 4+088","amountPesos":120000000,"lengthMeters":4088.0,"ratePesosPerMeter":29354.21,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Camayse to Barangay Mualbual, Zumarraga, Samar (Sta. 0+700.00 - Sta. 1+716.00)","amountPesos":120000000,"lengthMeters":1016.0,"ratePesosPerMeter":118110.24,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Coastal Road from Roman Blvd. (Fishport Area) to Lighthouse Bonifacio, Barangay Poblacion, Mariveles, Bataan, Sta. 0 + 000 - Sta. 0 + 112","amountPesos":120000000,"lengthMeters":112.0,"ratePesosPerMeter":1071428.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bauang-San Fernando-San Juan Bypass Road (Bauang Section), Sta 0+000 - Sta 3+003, La Union","amountPesos":119874000,"lengthMeters":3003.0,"ratePesosPerMeter":39918.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Catanduanes Cir Rd - K0012 + 000 - K0014 + 000, K0015 + 000 - K0016 + 000","amountPesos":119600000,"lengthMeters":3000.0,"ratePesosPerMeter":39866.67,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alfonso Lista-San Manuel Diversion Road, Sta. 8+622.5 - Sta. 11+600, Barangay Little Tadian, Ifugao","amountPesos":119100000,"lengthMeters":2977.5,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gov JJ Linao Rd - K0166 + 000 - K0167 + 000","amountPesos":118998000,"lengthMeters":1000.0,"ratePesosPerMeter":118998.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bagac-Mariveles Rd - K0161 + 500 - K0162 + 500","amountPesos":118998000,"lengthMeters":1000.0,"ratePesosPerMeter":118998.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bagac-Mariveles Rd - K0178 + 000 - K0179 + 000","amountPesos":118998000,"lengthMeters":1000.0,"ratePesosPerMeter":118998.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0145 + 564 - K0145 + 800, K0149 + 314 - K0149 + 607, K0149 + 1034 - K0150 + 478, K0151 + 000 - K0152 + 000, K0153 + 003 - K0153 + 100, K0153 + 155 - K0154 + 010, K0155 + 300 - K0155 + 600","amountPesos":118917000,"lengthMeters":3225.0,"ratePesosPerMeter":36873.49,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"PPSR Jct-Napsan-Apurawan Rd K0035+650 - K0035+750","amountPesos":118000000,"lengthMeters":100.0,"ratePesosPerMeter":1180000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Cotabato-Marbel Rd) - K1736 + 136 - K1738 + 462","amountPesos":117873000,"lengthMeters":2326.0,"ratePesosPerMeter":50676.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quezon Eco-Tourism Road, Quezon - K0148 + 426 - K0149 + 851","amountPesos":117800000,"lengthMeters":1425.0,"ratePesosPerMeter":82666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Babak-Samal-Kaputian Rd - K1503 + 015 - K1503 + 143, K1520 + 485 - K1520 + 1391, K1522 + 374 - K1524 + 294, K1524 + 1096 - K1525 + 116","amountPesos":117500000,"lengthMeters":2974.0,"ratePesosPerMeter":39509.08,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Segment A - Sta. 0+000 - Sta. 0+275, Segment B - Sta. 0+000 - Sta. 0+405, Barangay Trinidad, Calbayog City Samar","amountPesos":117000000,"lengthMeters":405.0,"ratePesosPerMeter":288888.89,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway ( Tucuran Jct-Karomatan Jct Rd) - K1648 + 246 - K1650 + 380","amountPesos":116695000,"lengthMeters":2134.0,"ratePesosPerMeter":54683.69,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bagac-Mariveles Rd - K0176 + 020 - K0176 + 800","amountPesos":116619000,"lengthMeters":780.0,"ratePesosPerMeter":149511.54,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Catanduanes Cir Rd - K0045 + 336 - K0046 + 304, K0046 + 376 - K0047 + 000, K0048 + 000 - K0049 + 000, K0050 + 300 - K0050 + 327, K0050 + 760 - K0050 + 765, K0051 + 000 - K0051 + 280","amountPesos":116320000,"lengthMeters":2904.0,"ratePesosPerMeter":40055.1,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"San Isidro-Bahao Road to Bahao Port - Sta. 424+808 to Sta. 426+080, Barangay Villadima, Libmanan, Camarines Sur","amountPesos":114209000,"lengthMeters":1272.0,"ratePesosPerMeter":89786.95,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Olongapo-Bugallon Rd - K0140+000 - K0141+970","amountPesos":114000000,"lengthMeters":1970.0,"ratePesosPerMeter":57868.02,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Olongapo - Bugallon Road - K0162 + 527 - K0164 + 109","amountPesos":114000000,"lengthMeters":1582.0,"ratePesosPerMeter":72060.68,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siquijor - Bolos San Juan Rd - K0064 + 000 - K0065 + 000, K0067 + 000 - K0069 + 518","amountPesos":114000000,"lengthMeters":3518.0,"ratePesosPerMeter":32404.78,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"San Isidro-Bahao Road to Bahao Port - Sta. 423+538 to Sta. 424+808, Barangay Cawayan to Barangay Villadima, Libmanan, Camarines Sur","amountPesos":114000000,"lengthMeters":1270.0,"ratePesosPerMeter":89763.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Highway Jct. Titulok-Sto. Niño-Monteverde-Daluga Highway Jct. Ned Lake Sebu - Sta 6+530 - Sta 9+850, Bagumbayan, Sultan Kudarat","amountPesos":113760000,"lengthMeters":3320.0,"ratePesosPerMeter":34265.06,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ayala-La Paz Rd - (S01495MN) Chainage 006 - Chainage 4023, Chainage 4032 - Chainage 7000","amountPesos":112786000,"lengthMeters":6985.0,"ratePesosPerMeter":16146.89,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lemon-Leyte-Biliran Rd - K0979 + 457 - K0979 + 796, K0979 + 850 - K0981 + 056, K0982 + 931 - K0983 + 102, K0983 + 134 - K0983 + 488, K0983 + 517 - K0983 + 657","amountPesos":112000000,"lengthMeters":2210.0,"ratePesosPerMeter":50678.73,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago-Tuguegarao Rd - K0402 + 623 - K0405 + 000","amountPesos":111199000,"lengthMeters":2377.0,"ratePesosPerMeter":46781.24,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zapote-Alabang Rd - K0015 + 274 - K0016 + 233, K0019 + 804 - K0020 + 364","amountPesos":111140000,"lengthMeters":1519.0,"ratePesosPerMeter":73166.56,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Candelaria Bypass Road, Quezon - K0110 + 236 - K0110 + 592, K0110 + 622 - K0111 + 504","amountPesos":111000000,"lengthMeters":1238.0,"ratePesosPerMeter":89660.74,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gattaran Diversion Road, Sta. 6+000 - Sta. 7+250, Sta. 7+757 - Sta. 8+530, Cagayan","amountPesos":110002000,"lengthMeters":2023.0,"ratePesosPerMeter":54375.68,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ligao-Pio Duran Rd - K0514 + 000 - K0515 + 250","amountPesos":110000000,"lengthMeters":1250.0,"ratePesosPerMeter":88000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ligao-Pio Duran Rd - K0534 + 900 - K0536 + 200","amountPesos":110000000,"lengthMeters":1300.0,"ratePesosPerMeter":84615.38,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao-Davao Coastal Rd - K1162 + 000 - K1166 + 200","amountPesos":110000000,"lengthMeters":4200.0,"ratePesosPerMeter":26190.48,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Guiguinto By-pass Road, Guiguinto, Bulacan, Sta. 2+501.00 - Sta. 3+065.00","amountPesos":110000000,"lengthMeters":564.0,"ratePesosPerMeter":195035.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lalud-Garchitorena Road, Garchitorena, (Olas Section), Lagonoy, Camarines Sur, Sta. 16+721.16 - Sta. 17+086, Sta. 18+445 - Sta. 19+000","amountPesos":110000000,"lengthMeters":919.84,"ratePesosPerMeter":119586.01,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - (S01639MN) Chainage 000 - Chainage 324, Chainage 1048 - Chainage 2603","amountPesos":109729000,"lengthMeters":1879.0,"ratePesosPerMeter":58397.55,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0345 + 222 - K0345 + 486, K0346 + 031.15 - K0347 + 220, K0348 + 339 - K0348 + 568","amountPesos":109203000,"lengthMeters":1681.85,"ratePesosPerMeter":64930.29,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Capiz-Aklan Rd - K0324 + (-740) - K0325 + 000, K0327 + 594 - K0329 + 000","amountPesos":109073000,"lengthMeters":3146.0,"ratePesosPerMeter":34670.38,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calauag - San Felipe By-pass Road, km 0+000 - 1+200, Naga City, Camarines Sur","amountPesos":109000000,"lengthMeters":1200.0,"ratePesosPerMeter":90833.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (MSR Diversion Rd) - K0125 + (-350) - K0126 + 000","amountPesos":108542000,"lengthMeters":1350.0,"ratePesosPerMeter":80401.48,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iligan City - Cagayan de Oro City Alternate Road (Digkilaan-Bulua Section), Barangay Barangay Canitoan, Sta. 53+257 - Sta. 56+349, Cagayan de Oro City","amountPesos":108333000,"lengthMeters":3092.0,"ratePesosPerMeter":35036.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1606 + 117 - K1607 + 710, K1607 + 929 - K1609 + 758","amountPesos":108150000,"lengthMeters":3422.0,"ratePesosPerMeter":31604.32,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan","amountPesos":107687000,"lengthMeters":7282.0,"ratePesosPerMeter":14788.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1666 + 000 - K1667 + 561, K1667 + 839 - K1670 + 171, K1670 + 431 - K1671 + 000","amountPesos":107400000,"lengthMeters":4462.0,"ratePesosPerMeter":24069.92,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kalinga-Abra Rd - K0496 + 850 - K0497 + 859, K0497 + 879 - K0499+015","amountPesos":107160000,"lengthMeters":2145.0,"ratePesosPerMeter":49958.04,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bagac-Mariveles Rd - K0171 + 600 - K0172 + 500","amountPesos":107099000,"lengthMeters":900.0,"ratePesosPerMeter":118998.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0075 + 978 - K0077 + 972","amountPesos":107044000,"lengthMeters":1994.0,"ratePesosPerMeter":53683.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"MSR Jct Tiaong-Dolores Road, Quezon - K0096 + 524 - K0097 + 771","amountPesos":107000000,"lengthMeters":1247.0,"ratePesosPerMeter":85805.93,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1679 + (-305) - K1681 + 000","amountPesos":106693000,"lengthMeters":2305.0,"ratePesosPerMeter":46287.64,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Lingig-Trento Rd - K1482 + 532 - K1482 + 611","amountPesos":106000000,"lengthMeters":79.0,"ratePesosPerMeter":1341772.15,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Budiong to Barangay Canduyong, Sta. 0+000 - Sta. 2+400, Odiongan, Romblon","amountPesos":105600000,"lengthMeters":2400.0,"ratePesosPerMeter":44000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0422 + 360 - K0422 + 415, K0424 + 403 - K0424 + 421, K0424 + 836 - K0424 + 947, K0428 + 450 - K0428 + 500, K0431 + 375 - K0431 + 417, K0432 + 950 - K0432 + 971, K0437 + 098 - K0437 + 140, K0438 + 780 - K0438 + 834, K0439 + 965 - K0439 + 1002, K0441 + 794 - K0441 + 831, K0442 + 362 - K0442 + 412, K0442 + 488 - K0442 + 526, K0444 + 960 - K0445 + 000, K0446 + 919 - K0447 + 115, K0447 + 195 - K0447 + 234, K0448 + 443 - K0448 + 643, K0448 + 909 - K0448 + 945, K0448 + 974 - K0449 + 015, K0449 + 513 - K0449 + 587","amountPesos":105456000,"lengthMeters":1181.0,"ratePesosPerMeter":89293.82,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pangasinan-La Union Inter-Provl Rd - K0386 + 737 - K0389 + 142","amountPesos":105000000,"lengthMeters":2405.0,"ratePesosPerMeter":43659.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cagayan-Apayao Rd (Tuao-Rizal Sect) - K0530 + (-1771) - K0530 + 480","amountPesos":105000000,"lengthMeters":2251.0,"ratePesosPerMeter":46645.94,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610","amountPesos":105000000,"lengthMeters":3000.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715","amountPesos":105000000,"lengthMeters":3000.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Damulog Bridge, Sta. 0+000 - Sta. 0+090,Danglas, Abra","amountPesos":104891000,"lengthMeters":90.0,"ratePesosPerMeter":1165455.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mambusao-Imbug Rd - K0099 + 073 - K0101 + 000","amountPesos":104743000,"lengthMeters":1927.0,"ratePesosPerMeter":54355.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Marbel-Makar Rd) - (S00253MN) Chainage 33078 - Chainage 33564, Chainage 34565 - Chainage 35161","amountPesos":104147000,"lengthMeters":1082.0,"ratePesosPerMeter":96254.16,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Coron - Busuanga Rd K0002 + 900 - K0005 + 510, K0005+575 - K0006+522","amountPesos":104000000,"lengthMeters":3557.0,"ratePesosPerMeter":29238.12,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cauayan City Alternate Route (Sta. 0+000 - Sta. 1+400), Isabela","amountPesos":103724000,"lengthMeters":1400.0,"ratePesosPerMeter":74088.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lopez Bypass Rd - K0219 + 149 - K0219 + 959","amountPesos":103000000,"lengthMeters":810.0,"ratePesosPerMeter":127160.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Natl Rd-Dumarao-Sn Rafael (Iloilo) Rd - K0094 + 000 - K0096 + 000","amountPesos":102847000,"lengthMeters":2000.0,"ratePesosPerMeter":51423.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0070 + 000 - K0071 + 986","amountPesos":102000000,"lengthMeters":1986.0,"ratePesosPerMeter":51359.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mambusao-Imbug Rd - K0097 + 162 - K0099 + 055","amountPesos":101166000,"lengthMeters":1893.0,"ratePesosPerMeter":53442.16,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0100 + 224 - K0100 + 236, K0101 + 985 - K0102 + 408, K0102 + 454 - K0104 + 000","amountPesos":100359000,"lengthMeters":1981.0,"ratePesosPerMeter":50660.78,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Road Connecting Santa-Rancho Road (S00089LZ) and Santa-Caoayan Road, Sta. 1+045.80 - Sta. 1+501.70, Ilocos Sur","amountPesos":100162000,"lengthMeters":455.9,"ratePesosPerMeter":219701.69,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0275 + 000 - K0277 + 508","amountPesos":100000000,"lengthMeters":2508.0,"ratePesosPerMeter":39872.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0283 + 408 - K0283 + 569, K0283 + 708 - K0284 + 000, K0284 + 916 - K0286 + 100, K0286 + 100 - K0286 + 136, K0286 + 247 - K0287 + 425, K0287 + 500 - K0288 + 000","amountPesos":100000000,"lengthMeters":3351.0,"ratePesosPerMeter":29841.84,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Ipil-Quirino Bdry Rd-K0350+157-K0352+902","amountPesos":100000000,"lengthMeters":2745.0,"ratePesosPerMeter":36429.87,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calapan North Road - K0015+964 - K0016+181,K0018+452 - K0019+511, K0026+962 - K0027+311, K0029+000 - K0029+720,K0031+519 - K0032+000, K0037+913 - K0039+181","amountPesos":100000000,"lengthMeters":4094.0,"ratePesosPerMeter":24425.99,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ozamis - Pagadian Rd, K1692 + 789 - K1693 + 903, K1693 + 909 - K1694 + 193","amountPesos":100000000,"lengthMeters":1398.0,"ratePesosPerMeter":71530.76,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ozamis - Oroquieta Rd, K1706 + 720 - K1707 + 000, K1707 + 205 - K1707 + 895, K1711 + 500 - K1712 + 885, K1712 + 915 - K1713 + 320, K1707 + 000 - K1707 + 205, K1718 + 254 - K1718 + 398, K1719 + 585 - K1720 + 000","amountPesos":100000000,"lengthMeters":3524.0,"ratePesosPerMeter":28376.84,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alaminos - Bolinao Rd - K0345+000 - K0352+507","amountPesos":100000000,"lengthMeters":7507.0,"ratePesosPerMeter":13320.9,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alaminos - Bolinao Rd - K0349+577 - K0353+003, K0356+000 - K0358+650","amountPesos":100000000,"lengthMeters":6076.0,"ratePesosPerMeter":16458.2,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pangasinan - Zambales Rd - K0292+542 - K0297+627, K0300+000 - K0300+480","amountPesos":100000000,"lengthMeters":5565.0,"ratePesosPerMeter":17969.45,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pangasinan - Zambales Rd - K0311+463 - K0317+982","amountPesos":100000000,"lengthMeters":6519.0,"ratePesosPerMeter":15339.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pangasinan - Zambales Rd - K0317+982 - K0324+493","amountPesos":100000000,"lengthMeters":6511.0,"ratePesosPerMeter":15358.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0449 + 064 - K0449 + 973, K0450 + 180 - K0451 + 046, K0454 + 665 - K0455 + 678, K0459 + 968 - K0463 + 834","amountPesos":100000000,"lengthMeters":6654.0,"ratePesosPerMeter":15028.55,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gumaca - Pitogo - Mulanay - Sn Narciso Rd - K0302 + (-445) - K0304 + 012","amountPesos":100000000,"lengthMeters":2457.0,"ratePesosPerMeter":40700.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"P Burgos-Pototanin Jct - K0159 + 987 - K0160 + 160, K0188 + 094 - K0189 + 000, K0192 + 437 - K0193 + 045","amountPesos":100000000,"lengthMeters":1687.0,"ratePesosPerMeter":59276.82,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"P Burgos-Pototanin Jct - K0168 + 516 - K0170 + 000, K0192 + 111 - K0192 + 421","amountPesos":100000000,"lengthMeters":1794.0,"ratePesosPerMeter":55741.36,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"P Burgos-Pototanin Jct - K0172 + 000 - K0173 + 043, K0175 + 000 - K0175 + 622, K0181 + 220 - K0181 + 330","amountPesos":100000000,"lengthMeters":1775.0,"ratePesosPerMeter":56338.03,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"P Burgos-Pototanin Jct - K0196 + 875 - K0198 + 174","amountPesos":100000000,"lengthMeters":1299.0,"ratePesosPerMeter":76982.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"P Burgos-Pototanin Jct - K0198 + 190 - K0199 + 100","amountPesos":100000000,"lengthMeters":910.0,"ratePesosPerMeter":109890.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Francisco-Sn Andres-Sn Narciso Rd - K0394 + 000 - K0396 + 000","amountPesos":100000000,"lengthMeters":2000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cagayan de Oro City Coastal Bypass Rd - K1444 + (-655) - K1446 + 356","amountPesos":100000000,"lengthMeters":3011.0,"ratePesosPerMeter":33211.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Balbalan Pinukpuk Rd - K0480 + (-369) - K0483 + 000, K0485 + 000 - K0489 + 000","amountPesos":100000000,"lengthMeters":7369.0,"ratePesosPerMeter":13570.36,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct. Talubin-Barlig-Natonin-Paracelis-Calaccad Rd (S00593LZ) - K0476 + 000 - K0464 + 000","amountPesos":100000000,"lengthMeters":12000.0,"ratePesosPerMeter":8333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Ipil - Quirino Bdry Rd - K0353 + 300 - K0354 + 763, K0357 + 095 - K0355 + 500","amountPesos":100000000,"lengthMeters":3058.0,"ratePesosPerMeter":32701.11,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Victoria -Pura Rd - K0148 + (-758) - K0148 + 870","amountPesos":100000000,"lengthMeters":1628.0,"ratePesosPerMeter":61425.06,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Victoria-Pura Rd - K0148 + 870 - K0150 + 300, K0151 + 562 - K0151 + 757","amountPesos":100000000,"lengthMeters":1625.0,"ratePesosPerMeter":61538.46,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quezon-Batangas Road, Quezon - K0096 + 634 - K0097 + 079","amountPesos":100000000,"lengthMeters":445.0,"ratePesosPerMeter":224719.1,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 3 + 500 to Chainage 7 + 000","amountPesos":100000000,"lengthMeters":3500.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LT) - K0936 + 130 - K0936 + 233","amountPesos":100000000,"lengthMeters":103.0,"ratePesosPerMeter":970873.79,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pangasinan - Zambales Rd - K0336+650 - K0337+000","amountPesos":100000000,"lengthMeters":350.0,"ratePesosPerMeter":285714.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"MSR Jct - Lopez - Catanauan Rd - K0240 + 000 - K0240 + 150, K0243 + 100 - K0243 + 300, K0243 + 700 - K0244 + 170, Quezon","amountPesos":100000000,"lengthMeters":820.0,"ratePesosPerMeter":121951.22,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gumaca Bypass Road - K0193 + 375 - K0193 + 405, K0194 + 027 - K0194 + 094, K0194 + 247 - K0194 + 292, K0194 + 292 - K0194 + 334, K0194 +395 - K0194 + 455, K0195 + 620 - K0195 + 730, Quezon","amountPesos":100000000,"lengthMeters":354.0,"ratePesosPerMeter":282485.88,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bani - Agno Rd - K0348+089 - K0348+439","amountPesos":100000000,"lengthMeters":350.0,"ratePesosPerMeter":285714.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 18900 - Chainage 19007","amountPesos":100000000,"lengthMeters":107.0,"ratePesosPerMeter":934579.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1484 + 650 - K1487 + 172.19","amountPesos":100000000,"lengthMeters":2522.19,"ratePesosPerMeter":39648.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alaminos-Bolinao Rd - K0336 + 110 - K0339 + 510","amountPesos":100000000,"lengthMeters":3400.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alaminos-Bolinao Rd - K0347 + 000 - K0349 + 046","amountPesos":100000000,"lengthMeters":2046.0,"ratePesosPerMeter":48875.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alaminos-Bolinao Rd - K0355 + 340 - K0357 + 300","amountPesos":100000000,"lengthMeters":1960.0,"ratePesosPerMeter":51020.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pangasinan - Zambales Rd - K0283 + 994 - K0286 + 438","amountPesos":100000000,"lengthMeters":2444.0,"ratePesosPerMeter":40916.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pangasinan - Zambales Rd - K0289 + 974 - K0292 + 469","amountPesos":100000000,"lengthMeters":2495.0,"ratePesosPerMeter":40080.16,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pangasinan-Zambales Rd - K0276 + 554 - K0278 + 821","amountPesos":100000000,"lengthMeters":2267.0,"ratePesosPerMeter":44111.16,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sagnay - Nato Rd, K0486 + 073 - K0486 + 193","amountPesos":100000000,"lengthMeters":120.0,"ratePesosPerMeter":833333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mallig Bypass Road (Sta. 0 + 000 - Sta. 1 + 238, Sta. 2 + 738 - Sta. 2+837.39), Isabela","amountPesos":100000000,"lengthMeters":1337.39,"ratePesosPerMeter":74772.5,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Anao To Ramos Road, Barangay Pance, Sta. 0+329.05 - Sta. 0+340.61, Ramos, Tarlac","amountPesos":100000000,"lengthMeters":11.56,"ratePesosPerMeter":8650519.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Balagtas Diversion Road, Sta.0+335.80 - Sta.0+383.80, Balagtas, Bulacan","amountPesos":100000000,"lengthMeters":48.0,"ratePesosPerMeter":2083333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Barretto Bypass Road, Sta. 5+600 - Sta. 6+320, Zambales","amountPesos":100000000,"lengthMeters":720.0,"ratePesosPerMeter":138888.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Barretto Bypass Road, Sta.0+580 - Sta. 1+620, Sta. 2+440 - Sta. 2+800, Zambales","amountPesos":100000000,"lengthMeters":1400.0,"ratePesosPerMeter":71428.57,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Botolan Bypass Road, Botolan, Zambales Sta. 0+000 - Sta. 1+000","amountPesos":100000000,"lengthMeters":1000.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Botolan Bypass Road, Botolan, Zambales Sta. 1+000 - Sta. 2+000","amountPesos":100000000,"lengthMeters":1000.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Guimba - Pura Road, Nueva Ecija STA.4+200- STA. 6+146","amountPesos":100000000,"lengthMeters":1946.0,"ratePesosPerMeter":51387.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tarlac City Northwestern Alternate Route (San Isidro-Aguso) (Sta 000+000- Sta 000+070.23), Tarlac","amountPesos":100000000,"lengthMeters":70.23,"ratePesosPerMeter":1423892.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Macalelon - Lopez Road, Quezon, Sta. 2+100 - Sta. 4+900","amountPesos":100000000,"lengthMeters":2800.0,"ratePesosPerMeter":35714.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Macalelon - Lopez Road, Quezon, Sta. 4 +900 - Sta. 7+700","amountPesos":100000000,"lengthMeters":2800.0,"ratePesosPerMeter":35714.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Macalelon - Lopez Road, Quezon, Sta. 7+700 - Sta. 10+500","amountPesos":100000000,"lengthMeters":2800.0,"ratePesosPerMeter":35714.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Infanta Bypass Road, Sta. 0+000 - Sta. 1+380, Infanta, Quezon","amountPesos":100000000,"lengthMeters":1380.0,"ratePesosPerMeter":72463.77,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal","amountPesos":100000000,"lengthMeters":970.0,"ratePesosPerMeter":103092.78,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mauban Bypass Road, Sta. 1+829 - Sta. 3+829, Mauban, Quezon","amountPesos":100000000,"lengthMeters":2000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Padre Garcia-Ibaan Diversion Road - Sta. 0 + 000 - Sta. 0 + 840, Sta. 1 + 555 - Sta. 1 + 733, Sta. 1 + 768 - Sta. 2 + 040, Sta. 2 + 180 - Sta. 2 + 220, Sta. 2 + 720 - Sta. 2 + 825, Sta. 3 + 332 - Sta. 4 + 432, Padre Garcia, Batangas","amountPesos":100000000,"lengthMeters":2535.0,"ratePesosPerMeter":39447.73,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Padre Garcia-Ibaan Diversion Road - Sta. 121 + 659.34 - Sta. 121 + 781.5, Sta. 122 + 354.5 - Sta. 123 + 038.50, Sta. 123 + 078.5 - Sta. 123 + 177, Sta. 124 + 199.5 – Sta. 124 + 420, Sta. 124 + 719 - Sta. 125 + 000, Ibaan, Batangas","amountPesos":100000000,"lengthMeters":1406.16,"ratePesosPerMeter":71115.66,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Plaridel By-pass Road - Sta 1+197 - Sta 1+747, Sta 3+509 - Sta 4+389, Quezon","amountPesos":100000000,"lengthMeters":1430.0,"ratePesosPerMeter":69930.07,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"San Juan Bypass (Rosario-San Juan-Laiya Tourism Bypass Road), Sta. 141+530 - Sta. 143+770, Sta. 143+830 – Sta. 145+240, Batangas","amountPesos":100000000,"lengthMeters":3650.0,"ratePesosPerMeter":27397.26,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sorsogon City Coastal Bypass Road, Barangay Abuyog, Sta. 3 + 681 - Sta. 3 + 946, Sorsogon","amountPesos":100000000,"lengthMeters":265.0,"ratePesosPerMeter":377358.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sorsogon City Coastal Bypass Road, Barangay Abuyog, Sta. 3 + 946 - Sta. 4 + 211, Sorsogon","amountPesos":100000000,"lengthMeters":265.0,"ratePesosPerMeter":377358.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Balete Bypass Road, Sta. 1+080.00 - Sta. 1+140.00, Aklan","amountPesos":100000000,"lengthMeters":60.0,"ratePesosPerMeter":1666666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Abuyog By-Pass Road, Sta. 0+820 - 1+520, Sta. 3+299 - 3+440, Barangay Barayong and Barangay Balocawe, Abuyog, Leyte","amountPesos":100000000,"lengthMeters":841.0,"ratePesosPerMeter":118906.06,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Naval Diversion Road (Riverside to Provincial Hospital), Biliran (Sta. 1 + 088 - Sta. 1 + 291)","amountPesos":100000000,"lengthMeters":203.0,"ratePesosPerMeter":492610.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ormoc City Diversion Road,Barangay San Juan-Lao-Naungan Section, Sta. 0+000 - Sta. 4+380, Leyte","amountPesos":100000000,"lengthMeters":4380.0,"ratePesosPerMeter":22831.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tacloban City Bypass Road Extension (Sta. 0+910 - Sta. 1+00, Sta. 1+040 - Sta. 1+169.35), Tacloban City","amountPesos":100000000,"lengthMeters":219.35,"ratePesosPerMeter":455892.41,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tacloban-Palo Diversion Road, (Sta. 1+920 - Sta. 2+035.91), Barangay 82 Marasbaras, Tacloban City","amountPesos":100000000,"lengthMeters":115.91,"ratePesosPerMeter":862738.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cagayan de Oro Diversion Road (Jct. Balubal-Sayre Highway-Pueblo de Oro), CDO Old Airport Diversion Road, Barangay Cugman, Sta. 19+700-Sta. 20+768.83, Cagayan de Oro City","amountPesos":100000000,"lengthMeters":1068.83,"ratePesosPerMeter":93560.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"CDO-Opol-El Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Barangay Pagatpat Section, Sta. 2+680 - Sta. 3+330, Cagayan de Oro City","amountPesos":100000000,"lengthMeters":650.0,"ratePesosPerMeter":153846.15,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Panguil Bay Access Road (Ozamiz City - Tangub City Section), Sta. 0+000 - Sta. 0+500, Misamis Occidental","amountPesos":100000000,"lengthMeters":500.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Koronadal City Bypass Road (Segment 2) Sta. 3 + 763 - Sta. 6 + 763, South Cotabato","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Midsayap Diversion Road (Sadaan-Central Glad), Sta. 0+000 - Sta. 2+600, Cotabato","amountPesos":100000000,"lengthMeters":2600.0,"ratePesosPerMeter":38461.54,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao - Agusan West Coastal Road Sta. 2+660 - Sta. 2+768, Barangay Karihatag, Malimono, Surigao del Norte","amountPesos":100000000,"lengthMeters":108.0,"ratePesosPerMeter":925925.93,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Sta. 1+866.5 - Sta. 2+800, Sta. 4+554.5 - Sta. 6+621, Surigao del Sur","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan","amountPesos":100000000,"lengthMeters":7535.0,"ratePesosPerMeter":13271.4,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet","amountPesos":100000000,"lengthMeters":6000.0,"ratePesosPerMeter":16666.67,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Piddig,Carasi (Ilocos Norte)-Calanasan-Langnao-Kabugao Road, Sta. 4+345 - Sta. 5+467.23, Kabugao, Apayao","amountPesos":100000000,"lengthMeters":1122.23,"ratePesosPerMeter":89108.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Piddig-Carasi-Calanasan Road (Calanasan Side), Sta. 17+596 - Sta.19+196, Calanasan, Apayao","amountPesos":100000000,"lengthMeters":1600.0,"ratePesosPerMeter":62500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Capas-Botolan Rd (Zambales Section), Zambales, Baquillan Bridge 1, Sta. 000+045.68 - Sta. 000+562.48","amountPesos":100000000,"lengthMeters":516.8,"ratePesosPerMeter":193498.45,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Atimonan-Mauban Road - STA 002+440 - STA 002 + 615, STA 002 + 815 - STA 003+660","amountPesos":100000000,"lengthMeters":1020.0,"ratePesosPerMeter":98039.22,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quezon - Alabat - Perez Circumferential Road - Sta. 20+110 - Sta. 21+910","amountPesos":100000000,"lengthMeters":1800.0,"ratePesosPerMeter":55555.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"MSR JCT Canda-Hondagua-Roma Point Road, Sta. 228 + 562 - Sta. 229 + 686","amountPesos":100000000,"lengthMeters":1124.0,"ratePesosPerMeter":88967.97,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dr. Damian Reyes Memorial Road, Sta. 29+695.00 - Sta. 30+095.00, Sta. 32+026.00 - Sta. 32+826.00, Sta. 38+880.00 - Sta. 39+380.00, Boac, Marinduque,","amountPesos":100000000,"lengthMeters":1700.0,"ratePesosPerMeter":58823.53,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514","amountPesos":100000000,"lengthMeters":736.0,"ratePesosPerMeter":135869.57,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga del Sur Coastal Road (Liasan - Sagucan Road), Zamboanga del Sur Coastal Rd, Station 1+ 000 - Station 3 + 850, Zamboanga del Sur","amountPesos":100000000,"lengthMeters":2850.0,"ratePesosPerMeter":35087.72,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga del Sur Coastal Road (Margosatubig-Lapuyan Road), Station 0 + 000 - Station 2 + 850, Margosatubig, Zamboanga del Sur","amountPesos":100000000,"lengthMeters":2850.0,"ratePesosPerMeter":35087.72,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Barangay Bal-ason - Barangay Hindangon, Sta. 125+958 - Sta. 127+158, Gingoog City, Misamis Oriental","amountPesos":100000000,"lengthMeters":1200.0,"ratePesosPerMeter":83333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puntian-Arakan Road, Barangay Magsaysay - Barangay Sampaguita Section, Sta. 14+500 - Sta. 19+500, Kibawe, Bukidnon","amountPesos":100000000,"lengthMeters":5000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Datu Paglas - Columbio - Matanao Road, Sta. 0+165 - Sta. 2+030, Sta. 2+290 - Sta. 2+370, Sta. 4+150 - Sta. 7+885, Sultan Kudarat","amountPesos":100000000,"lengthMeters":5680.0,"ratePesosPerMeter":17605.63,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Koronadal - Lutayan - Columbio - Matanao Road, Sta. 9+00 - Sta. 9+114.94","amountPesos":100000000,"lengthMeters":114.94,"ratePesosPerMeter":870019.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ormoc-Baybay-Southern Leyte Bdry Rd - K1122 + 526 - K1123 + 000, K1025 + 87 - K1037 + 246","amountPesos":100000000,"lengthMeters":12633.0,"ratePesosPerMeter":7915.78,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pangasinan - Zambales Rd - K0336+104 - K0340+154 (Road Safety: Roadway Lighting)","amountPesos":100000000,"lengthMeters":4050.0,"ratePesosPerMeter":24691.36,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation / Application of Road Safety Facilities (Roadway Lighting) along Gingoog - Claveria - Villanueva Rd - K1325 + 000 K1329 + 000","amountPesos":100000000,"lengthMeters":4000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) Along Kapalong - Talaingod - Valencia Rd - K1573 + 500 - K1580 + 500, Barangay Magkalungay - Barangay Halapitan, San Fernando, Bukidnon 2nd LD","amountPesos":100000000,"lengthMeters":7000.0,"ratePesosPerMeter":14285.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dapa-General Luna Road (S00001SG), K0001+250-K0015+00 (Road Safety : Roadway Lighting)","amountPesos":100000000,"lengthMeters":13750.0,"ratePesosPerMeter":7272.73,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"MT Villanueva Ave-Magsaysay Rd - K0439+(-869)-K0439+640","amountPesos":100000000,"lengthMeters":1509.0,"ratePesosPerMeter":66269.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Access Road, Sitio Ordonez to Sitio Canaan (Sta. 0+000-Sta.2+000), Barangay Sto. Domingo Proper, Bambang, Nueva Vizcaya","amountPesos":100000000,"lengthMeters":2000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Access Road, Purok 6A to Purok 7, Sitio Faralan-Upper Batu (Sta. 0+000-Sta. 3+000), Barangay Sto Domingo Proper, Bambang, Nueva Vizcaya","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Access Road, Nagasabaran-Balete-Namamparan-Pinya Road (Sta. 0+000-Sta. 2+000), Diadi, Nueva Vizcaya","amountPesos":100000000,"lengthMeters":2000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Access Road, Duruarog-Villa Aurora Road (Sta 0+000-Sta 2+000), Diadi, Nueva Vizcaya","amountPesos":100000000,"lengthMeters":2000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Access Road, Bugnay-San Pablo-Butao Road (Sta. 0+000-Sta. 2+000), Diadi, Nueva Vizcaya","amountPesos":100000000,"lengthMeters":2000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road along Estrada-Navy-New Clark City Bypass Road, Sta. 1+490 to Sta. 2+090, Capas, Tarlac","amountPesos":100000000,"lengthMeters":600.0,"ratePesosPerMeter":166666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of By- Pass Road, Barangay Bangantalinga, Iba, Zambales Sta.9+159.00- Sta.9+999.00","amountPesos":100000000,"lengthMeters":840.0,"ratePesosPerMeter":119047.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Dueg - Labney Diversion Road (Dueg), Barangay Maasin, San Clemente, Tarlac, Sta. 0 + 000.00 - Sta. 1 + 200.00","amountPesos":100000000,"lengthMeters":1200.0,"ratePesosPerMeter":83333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of By-Pass Road, Bangatalinga, Iba, Zambales Sta. 8+319.00-Sta. 9+159.00","amountPesos":100000000,"lengthMeters":840.0,"ratePesosPerMeter":119047.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Clark - Mabalacat Access Road, Mabalacat City, Pampanga (Sta. 0+000 to Sta. 1+100)","amountPesos":100000000,"lengthMeters":1100.0,"ratePesosPerMeter":90909.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Manila North Road to SCTEX Luisita (SCTEX Luisita Access Road ), Balete/Central Sta. 2 + 992.00 - Sta. 3 + 452.00","amountPesos":100000000,"lengthMeters":460.0,"ratePesosPerMeter":217391.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Manila North Road to SCTEX Luisita (SCTEX Luisita Access Road ), Lourdes - Balete/Central - Capehan/Maligaya Sta. 3 + 452.00 - Sta. 3 + 912.00","amountPesos":100000000,"lengthMeters":460.0,"ratePesosPerMeter":217391.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Manila North Road to SCTEX Luisita (SCTEX Luisita Access Road ), Lourdes - Balete/Central Sta. 2 + 531.60 - Sta. 2 + 992.00","amountPesos":100000000,"lengthMeters":460.4,"ratePesosPerMeter":217202.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Manila North Road to SCTEX Luisita (SCTEX Luisita Access Road ), Maligaya/Capehan Sta. 3 + 912.00 - Sta. 4 + 372.00","amountPesos":100000000,"lengthMeters":460.0,"ratePesosPerMeter":217391.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Dike (Baywalk) along Angat River, Barangay Lico - Poblacion - Libis - Talacsan, San Rafael, Bulacan, Sta. 00+000 - Sta. 02+000","amountPesos":100000000,"lengthMeters":2000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage, Productivity Area, Barangay Sapang Palay Proper, City of San Jose del Monte, Bulacan, Sta. 00+000 - Sta. 02+400 (121.045715, 14.839749)","amountPesos":100000000,"lengthMeters":2400.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"New Clark City-Tarlac City Diversion Road Barangay San Pablo, Sta. 8 + 508.00 - Sta. 8 + 967.90","amountPesos":100000000,"lengthMeters":459.9,"ratePesosPerMeter":217438.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Anabu Bypass Road, Sta. 00 + 000 - Sta. 00 + 854, Imus, Cavite","amountPesos":100000000,"lengthMeters":854.0,"ratePesosPerMeter":117096.02,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Access Road to Trading Post (Quezon Coffee Belt), Sta. 11 + 934 - Sta. 12 + 644, Quezon","amountPesos":100000000,"lengthMeters":710.0,"ratePesosPerMeter":140845.07,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Access Road, Barangay Tagabas Ibaba - Barangay Doongan Ilaya, Catanauan, Quezon, Sta. 2+000 - Sta. 5+000","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Ibabang Pacatin - Barangay Ibabang Soliyao, Pitogo, Quezon, Sta. 0 + 000 - Sta. 3 + 000","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Mabini - Barangay Bonifacio, Unisan, Quezon, Sta. 0 + 000 - Sta. 3 + 000","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Mairok Ibaba - Barangay Mairok Ilaya, Unisan, Quezon, Sta. 0 + 000 - Sta. 3 + 000","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Rizal Ilaya - Barangay Rizal Ibaba, Unisan, Quezon, Sta. 3+700 - Sta. 6+700","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Silangang Maligaya-Dayap-Kanlurang Maligaya, Agdangan, Quezon, Sta. 3+000 - Sta. 6+000","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Sildora - Barangay Salvacion, Agdangan, Quezon, Sta. 3 + 900 - Sta. 6 + 900","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of San Francisco - San Andres Road, Barangay Pansoy, San Andres, Quezon, Sta. 8+900 - Sta. 10+300, Sta. 11+200 - Sta. 11+980, Sta. 14+550 - Sta. 15+170","amountPesos":100000000,"lengthMeters":2800.0,"ratePesosPerMeter":35714.29,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of San Francisco - San Andres Road, Barangay Sto. Niño - Barangay Mabunga, San Francisco, Quezon, Sta. 4+400 - Sta. 6+100, Sta. 7+800 - Sta. 8+900","amountPesos":100000000,"lengthMeters":2800.0,"ratePesosPerMeter":35714.29,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Malitlit-Asia Brewery Road (Cabstar), Phase 1, Barangay Malitlit, City of Santa Rosa, Laguna Sta. 0+000 - 1+800","amountPesos":100000000,"lengthMeters":1800.0,"ratePesosPerMeter":55555.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Pag-asa - Alapan - Tinabunan Road, Sta. 00 + 805 - Sta. 01 + 610, Barangay Pag-asa - Barangay Alapan, Imus, Cavite","amountPesos":100000000,"lengthMeters":805.0,"ratePesosPerMeter":124223.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Carsadang Bago R1 By-Pass, Sta. 0 + 259 - Sta. 0 + 871, Kawit, Cavite","amountPesos":100000000,"lengthMeters":612.0,"ratePesosPerMeter":163398.69,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Barangay Marigondon Sur to Barangay Marigondon Norte Access Road, Sta. 1+700 - Sta. 3+000, Barangay Marigondon Sur, San Andres, Romblon","amountPesos":100000000,"lengthMeters":1300.0,"ratePesosPerMeter":76923.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Canapawan, Labo, Camarines Norte Sta. 0 + 000 - Sta. 2 + 200","amountPesos":100000000,"lengthMeters":2200.0,"ratePesosPerMeter":45454.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Guinacutan, Labo, Camarines Norte Sta. 0 + 000 - Sta. 2 + 200","amountPesos":100000000,"lengthMeters":2200.0,"ratePesosPerMeter":45454.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Maot, Labo, Camarines Norte Sta. 0 + 000 - Sta. 2 + 200","amountPesos":100000000,"lengthMeters":2200.0,"ratePesosPerMeter":45454.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sitio Benguet, Barangay Magsaysay, Capalonga, Camarines Norte Sta. 0 + 000 - Sta. 2 + 200","amountPesos":100000000,"lengthMeters":2200.0,"ratePesosPerMeter":45454.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Maabay to Dasal Road, Sta. 4 + 367.50 - Sta. 6 + 564.5, Sta. 6 + 828.5 - Sta. 7 + 156, Barangay Maabay and Barangay Dasal, Sibunag, Guimaras","amountPesos":100000000,"lengthMeters":2524.5,"ratePesosPerMeter":39611.8,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Sta. 1 + 229- Sta. 7+ 759) at Monarch and PLDT Tower, Barangay Canlandog, Murcia, Negros Occidental (10.6092520, 10.6092520)","amountPesos":100000000,"lengthMeters":6530.0,"ratePesosPerMeter":15313.94,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 2+360-Sta. 3+200, Sitio Antuanga, Barangay Quiot to Sitio Badiang, Barangay Toong Cebu City, Cebu","amountPesos":100000000,"lengthMeters":840.0,"ratePesosPerMeter":119047.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Package 3, Sta. 1+520.00 - 2+720.00 Sta. Barangay Pardo - Toong, Cebu City","amountPesos":100000000,"lengthMeters":1200.0,"ratePesosPerMeter":83333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Campacion, Arteche - Barangay Cagpile, Oras, Eastern Samar (Sta. 0+000 - Sta. 1+300)","amountPesos":100000000,"lengthMeters":1300.0,"ratePesosPerMeter":76923.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Dapdap to Barangay Malaintos, Dolores, Eastern Samar (Sta. 3+550 - Sta. 5+050)","amountPesos":100000000,"lengthMeters":1500.0,"ratePesosPerMeter":66666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Quezon to Magsaysay Road (Sta. 2+250 - Sta. 4+500), Mapanas, Northern Samar","amountPesos":100000000,"lengthMeters":2250.0,"ratePesosPerMeter":44444.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Cagpili, Oras - Barangay Campacion, Arteche, Eastern Samar (Sta. 3+483 - Sta. 4+350)","amountPesos":100000000,"lengthMeters":867.0,"ratePesosPerMeter":115340.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Danao - Barangay Beto, Taft, Eastern Samar (Sta. 0+000 - Sta. 0+800)","amountPesos":100000000,"lengthMeters":800.0,"ratePesosPerMeter":125000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Tangbo, Catubig - Abaton - Bawang - San Antonio, Laoang (Sta. 0+000 - Sta. 2+338.75), Catubig and Laoang, Northern Samar","amountPesos":100000000,"lengthMeters":2338.75,"ratePesosPerMeter":42757.88,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Simora – Palapag Road (Sta. 11+015 - Sta. 11+568, Sta. 11+703 - Sta. 11+743.50, Sta. 11+829 - Sta. 11+950.50, Sta. 13+642.50 - Sta. 14+034, Sta. 14+362.50 - Sta. 14+502, Sta. 14+533.50 - Sta. 14+574, Sta. 14+592 - Sta. 14+650.50, Sta. 14+691 - Sta. 14+731.50, Sta. 14+767.50 - Sta. 14+821.50, Sta. 14+862 - Sta. 14+952, Sta. 15+258 - Sta. 15+280.50, Sta. 15+384 - Sta.15+402, Sta. 15+453 - Sta. 15+507, Sta. 16+006.50 - Sta. 16+020, Sta. 16+033.50 - Sta. 16+065, Sta. 16+105.50 - Sta. 16+119, Sta. 16+191 - Sta. 16+236, Sta. 16+254 - Sta. 16+281, Sta. 16+326 - Sta. 16+348.50, Sta. 16+398 - Sta. 16+443, Sta. 16+515 - Sta. 16+632, Sta. 16+641 - Sta. 16+654.50, Sta. 16+681.50 - Sta. 16+713, Sta. 16+785 - Sta. 16+812, Sta. 17+578 - Sta. 17+794), Laoang and Palapag, Northern Samar","amountPesos":100000000,"lengthMeters":2227.0,"ratePesosPerMeter":44903.46,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Replacement of Calaanan Steel Bridge (Sta. 0+000 - Sta. 0+040), Baranagay Canitoan, Cagayan De Oro City, Misamis Oriental","amountPesos":100000000,"lengthMeters":40.0,"ratePesosPerMeter":2500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Poblacion - Barangay Banawag, President Quirino, Sultan Kudarat, Sta. 0 + 000 - Sta. 4+ 737","amountPesos":100000000,"lengthMeters":4737.0,"ratePesosPerMeter":21110.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Bitibut-Sapang Ama-Caluya,Sapang Dalaga, Misamis Occidental, Sta. 0 + 000 - Sta. 3 + 200","amountPesos":100000000,"lengthMeters":3200.0,"ratePesosPerMeter":31250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road Barangay New Cebu to Barangay Solongvale to Barangay Tanwalang, Sta. 0+000.00 - Sta. 0+248.40 & Sta. 0+760.40 - Sta. 4+312.00, Sulop, Davao del Sur","amountPesos":100000000,"lengthMeters":3800.0,"ratePesosPerMeter":26315.79,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road from Bonifacio to Sitio Lamblong to Lamsaging to Centro Barangay Bagong Negros, Sta. 0+000 - Sta. 3+000.00, Kiblawan, Davao del Sur","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road from Purok 6 Balnate to Relocation Site, Barangay Maibo, Sta. 0+000.00 - Sta. 3+500.00, Magsaysay, Davao del Sur","amountPesos":100000000,"lengthMeters":3500.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road, Purok Waling Waling, Barangay Sibayan to Sitio Balagonon, Barangay Managa, Sta. 0+000.00 - Sta. 1+622.60 & Sta. 2+011.70-Sta. 3+889.10, Bansalan, Davao del Sur","amountPesos":100000000,"lengthMeters":3500.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Roads, Purok 5 to Purok 1, Barangay Haguimitan, Monkayo, Davao de Oro Sta. 0+000 - Sta. 3+610","amountPesos":100000000,"lengthMeters":3610.0,"ratePesosPerMeter":27700.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Barangay Poblacion - Barangay Pamintaran, Maragusan, Davao de Oro Section 1: Sta. 0+000 - Sta. 0+151 Section 2: Sta. 0+294 - Sta. 2+408 Section 3: Sta. 0+000 - Sta. 0+400","amountPesos":100000000,"lengthMeters":2408.0,"ratePesosPerMeter":41528.24,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Jct. National Highway (Marbel-Makar Rd) Bo.2 to San Jose - Columbio Road, Sta. 1+548 - Sta. 6+048, South Cotabato","amountPesos":100000000,"lengthMeters":4500.0,"ratePesosPerMeter":22222.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Datu Paglas-Columbio-Matanao Road, Sta. 11+200-Sta. 15+200, Columbio, Sultan Kudarat","amountPesos":100000000,"lengthMeters":4000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Datu Paglas-Columbio-Matanao Road, Sta. 16+637-Sta. 20+637, Columbio, Sultan Kudarat","amountPesos":100000000,"lengthMeters":4000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Koronadal-Lutayan-Columbio-Matanao Road, Sta. 0+000 - Sta. 4+000, Columbio, Sultan Kudarat","amountPesos":100000000,"lengthMeters":4000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Gamut - Unidad - Sua, Unidad Road Section, Sta. 2+980 - Sta. 6+140, Barobo, Surigao del Sur","amountPesos":100000000,"lengthMeters":3160.0,"ratePesosPerMeter":31645.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Jct Sering-Calangugan Road, Socorro, Surigao del Norte 0+000 - 3+000","amountPesos":100000000,"lengthMeters":3000.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Jct. Cabadbaran - Puting Bato - Lanuza Road to Barangay Pakwan (Sta. 2+046.5 -Sta. 6+146.5), Lanuza, Surigao del Sur","amountPesos":100000000,"lengthMeters":4100.0,"ratePesosPerMeter":24390.24,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road from Barangay Mahayahay to Barangay Handamayan, Sta. 4+900 - Sta 6+288, Sta. 6+528.7 - Sta 6+958.2, Sta. 7+078.4 - Sta 8+760.9, Lingig, Surigao del Sur","amountPesos":100000000,"lengthMeters":3500.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, (Barangay Mitugas - Gala Road), Sta. 0+000 - Sta. 1+500, Tudela, Misamis Occidental","amountPesos":100000000,"lengthMeters":1500.0,"ratePesosPerMeter":66666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Mahatao Coastal Road (Sta. 0 + 292 - Sta. 0 + 362), Mahatao, Batanes","amountPesos":100000000,"lengthMeters":70.0,"ratePesosPerMeter":1428571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Coastal Bypass Road Barangay Bug-ong - Poblacion Mambajao, Camiguin, (Bug-ong to Kuguita Section), Sta. 0+000 - Sta. 1+200","amountPesos":100000000,"lengthMeters":1200.0,"ratePesosPerMeter":83333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Coastal Bypass Road Barangay Bug-ong - Poblacion, Mambajao, Camiguin, (Kuguita to Baylao Section), Sta. 1+200 - Sta. 2+400","amountPesos":100000000,"lengthMeters":1200.0,"ratePesosPerMeter":83333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Coastal Bypass Road, Barangay Bug-ong to Poblacion Mambajao, Camiguin (Baylao-Poblacion Section) Sta. 2 + 400 - Sta. 3 + 600","amountPesos":100000000,"lengthMeters":1200.0,"ratePesosPerMeter":83333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palao-Calaba Bypass Road - Sta. 0+000-Sta. 1+780, Bangued, Abra","amountPesos":99945000,"lengthMeters":1780.0,"ratePesosPerMeter":56148.88,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bagong Silang-Capalonga Rd - K0324 + 573 - K0327 + 986","amountPesos":99600000,"lengthMeters":3413.0,"ratePesosPerMeter":29182.54,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bagong Silang-Capalonga Rd - K0327 + 986 - K0331 + 181","amountPesos":99600000,"lengthMeters":3195.0,"ratePesosPerMeter":31173.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Esperanza - Lebak Bypass Road (Lebak Section) - Sta. 47 + 331 - Sta. 50 + 353, Lebak, Sultan Kudarat","amountPesos":99237000,"lengthMeters":3022.0,"ratePesosPerMeter":32838.19,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tuguegarao West Diversion Road (Sta. 1+800 - Sta. 1+989.19), Cagayan","amountPesos":99150000,"lengthMeters":189.19,"ratePesosPerMeter":524076.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tuguegarao West Diversion Road (Sta. 5+520 - Sta. 5+744.04), Tuguegarao City, Cagayan","amountPesos":99150000,"lengthMeters":224.04,"ratePesosPerMeter":442554.9,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0230 + 000 - K0232 + 000","amountPesos":99100000,"lengthMeters":2000.0,"ratePesosPerMeter":49550.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0171 + 000 - K0175 + 194, K0188 + 842 - K0190 + 208","amountPesos":99034000,"lengthMeters":5560.0,"ratePesosPerMeter":17811.87,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Linamon-Zamboanga Rd - K1618 + 000 - K1618 + 665, K1618 + 709 - K1620 + 000","amountPesos":98594000,"lengthMeters":1956.0,"ratePesosPerMeter":50405.93,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1656 + 000 - K1658 + 000","amountPesos":98500000,"lengthMeters":2000.0,"ratePesosPerMeter":49250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Francisco-Sn Andres-Sn Narciso Rd - K0382 + 000 - K0384 + 000","amountPesos":98000000,"lengthMeters":2000.0,"ratePesosPerMeter":49000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage along Barangay San Nicolas II to Barangay San Agustin, Magalang, Pampanga, Sta. 0+000 - Sta. 3+000 & Sta. 0+000 - Sta. 2+800","amountPesos":98000000,"lengthMeters":3000.0,"ratePesosPerMeter":32666.67,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage along Barangay San Roque to Barangay Sto. Rosario, Magalang, Pampanga, Sta. 0+000 - Sta. 1+530, Sta. 0+000 - Sta. 1+340 & Sta. 0+000 - Sta. 1+800","amountPesos":98000000,"lengthMeters":1800.0,"ratePesosPerMeter":54444.44,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road leading to Pantao-Sitio Pentason-Cadawag, Libon and Oas, Albay. Sta 0+000.00 - Sta. 2+300.00","amountPesos":98000000,"lengthMeters":2300.0,"ratePesosPerMeter":42608.7,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Slope Protection Structure, Barangay Mabuhay - Barangay Bana- ao, Sta. 1+260 - Sta. 1+705, Sta. 5+000 - Sta. 5+081, Sta. 5+860 - Sta. 5+977, Sta. 6+071 - Sta. 6+107, Sta. 7+162 - Sta. 7 + 233, Sta. Margarita, Samar","amountPesos":98000000,"lengthMeters":750.0,"ratePesosPerMeter":130666.67,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Jct Sta Cruz to Sitio Buajahan Road, Sta Cruz, Socorro, Surigao del Norte (0+000-3+260)","amountPesos":98000000,"lengthMeters":3260.0,"ratePesosPerMeter":30061.35,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Jct Dagatan to Sitio Inayaran Road, Sudlon, Socorro, Surigao del Norte (0+000-3+260)","amountPesos":98000000,"lengthMeters":3260.0,"ratePesosPerMeter":30061.35,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay San Roque-Tugbungan, Socorro, Surigao del Norte (0+000 - 2+800)","amountPesos":98000000,"lengthMeters":2800.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tacloban-Sta Fe-San Miguel Road (Sta. 3 + 350 - Sta. 3+600, Sta. 9+292 - Sta. 9+712), San Miguel, Leyte","amountPesos":97355000,"lengthMeters":670.0,"ratePesosPerMeter":145305.97,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lopez Bypass Rd - K0219 + 959 - K0220 + 719","amountPesos":97000000,"lengthMeters":760.0,"ratePesosPerMeter":127631.58,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Macabugos-Tambo Road, Libon, Albay, Sta 0+000.00 - Sta. 2+160.000","amountPesos":97000000,"lengthMeters":2160.0,"ratePesosPerMeter":44907.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palo-Carigara-Ormoc Rd - K1004 + 000 - K1006 + 000","amountPesos":96900000,"lengthMeters":2000.0,"ratePesosPerMeter":48450.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Logac-Lasam-Gagabutan Rd - K0716 + 265 - K0717 + 027, K0720 + 028 - K0720 + 682, K0724 + 810 - K0725 + 456, K0729 + 210 - K0733 + 631, K0734 + 000 - K0734 + 700, K0735 + 008 - K0735 + 600 (Off-Carriageway Improvement: Paving of Shoulders)","amountPesos":96718000,"lengthMeters":7775.0,"ratePesosPerMeter":12439.61,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Catanduanes Cir Rd - K0039 + 565 - K0042 + 000","amountPesos":96680000,"lengthMeters":2435.0,"ratePesosPerMeter":39704.31,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dr Damian Reyes Rd (Boac Side) - K0010 + 225 - K0010 + 276, K0010 + 520 - K0010 + 580","amountPesos":96600000,"lengthMeters":111.0,"ratePesosPerMeter":870270.27,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, Sta 5+182 - Sta 17+780, Sta 24+980 - Sta 25+487, La Union","amountPesos":96579000,"lengthMeters":13105.0,"ratePesosPerMeter":7369.63,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago-Tuguegarao Rd - K0328+ (-687) - K0328+000, K0328+956 - K0329+923, K0331+684 - K0331+757","amountPesos":96208000,"lengthMeters":1727.0,"ratePesosPerMeter":55708.16,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"P Burgos-Pototanin Jct - K0153 + (-700) - K0153 + 228","amountPesos":96000000,"lengthMeters":928.0,"ratePesosPerMeter":103448.28,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0271 + 250 - K0271 + 386, K0271 + 831 - K0271 + 931","amountPesos":95900000,"lengthMeters":236.0,"ratePesosPerMeter":406355.93,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gumaca - Pitogo - Mulanay - San Narciso Road, Quezon - K0271 + 250 - K0271 + 386, K0271 + 831 - K0271 + 931","amountPesos":95900000,"lengthMeters":236.0,"ratePesosPerMeter":406355.93,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sibuyan Circumferential Rd - K0050 + 300 - K0050 + 400","amountPesos":95780000,"lengthMeters":100.0,"ratePesosPerMeter":957800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Linamon-Zamboanga Rd - K1600 + 161 - K1602 + 000","amountPesos":95608000,"lengthMeters":1839.0,"ratePesosPerMeter":51989.12,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Catarman-Calbayog Rd - K0752 + 510 - K0752 + 540, K0753 + 200 - K0753 + 366, K0753 + 773 - K0753 + 848, K0762 + 672 - K0762 + 689","amountPesos":95501000,"lengthMeters":288.0,"ratePesosPerMeter":331600.69,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banisilan-Guiling-Alamada-Libungan Rd - K1663 + 000 - K1665 + 000","amountPesos":95471000,"lengthMeters":2000.0,"ratePesosPerMeter":47735.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0124 + (-655) - K0124 + 000, K0125 + 413 - K0126 + 000, K0126 + 360 - K0127 + 000","amountPesos":95349000,"lengthMeters":1882.0,"ratePesosPerMeter":50663.66,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage at Lanzones St. (Chainage 0+000 - Chainage 0+314.50), Macopa St. (Chainage 0+000 - Chainage 0+121), Mabolo St. (Chainage 0+000 - Chainage 0+108) and Langka St. (Chainage 0+000 - Chainage 0+118) at Barangay Sta. Monica, Quezon City","amountPesos":95256000,"lengthMeters":314.5,"ratePesosPerMeter":302880.76,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Catanduanes Cir Rd - K0008 + 000 - K0008 + 780, K0010 + 000 - K0011 + 702, K0011 + 763 - K0012 + 000","amountPesos":95235000,"lengthMeters":2719.0,"ratePesosPerMeter":35025.74,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pangasinan-La Union Inter-Provl Rd - K0390 + 000 - K0391 + 137, K0391 + 420 - K0392 + 000","amountPesos":95000000,"lengthMeters":1717.0,"ratePesosPerMeter":55329.06,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0248 + 790 - K0250 + 600","amountPesos":95000000,"lengthMeters":1810.0,"ratePesosPerMeter":52486.19,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Biliran Circumferential Rd - K1029 + 300 - K1030 + 000","amountPesos":95000000,"lengthMeters":700.0,"ratePesosPerMeter":135714.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Barangay San Juan to Barangay Magsaysay, Agno, Pangasinan (Sta. 4+400 - Sta. 7+994.10)","amountPesos":95000000,"lengthMeters":3594.1,"ratePesosPerMeter":26432.21,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Access Road/Diversion Road, Daang Kalikasan to Candelaria, Yamot, Candelaria, Zambales Sta. 0+000.00-Sta. 1+800.00","amountPesos":95000000,"lengthMeters":1800.0,"ratePesosPerMeter":52777.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Nogpo-Barangay Bariw-Barangay Libtong, Libon, Albay, Sta 0+000.00 - Sta. 2+240.00","amountPesos":95000000,"lengthMeters":2240.0,"ratePesosPerMeter":42410.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Zone 7 - Namo Coastal Road, Ta. 0 +345 - Sta. 0 + 528, Bulan, Sorsogon","amountPesos":95000000,"lengthMeters":183.0,"ratePesosPerMeter":519125.68,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ramon-Cordon-Diadi Bypass Road, Cordon Section, Sta. Sta. 16+543 - Sta. 18+916.85, Isabela","amountPesos":94954000,"lengthMeters":2373.85,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pagbilao-Tayabas-Lucban Diversion Road (Tayabas Section), Sta. 14+032 - Sta. 15+174, Tayabas City, Quezon","amountPesos":94160000,"lengthMeters":1142.0,"ratePesosPerMeter":82451.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Naguilian-Sn Mariano Rd - K0392 + 000 - K0394 + 000","amountPesos":94087000,"lengthMeters":2000.0,"ratePesosPerMeter":47043.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Reconstruction/Improvement of Roads, s. Poblacion Central - Cauringan, Poblacion Sur, Poblacion Central and Asan Norte, Sison, Pangasinan, Sta. 0+000 - Sta. 3+657","amountPesos":94030000,"lengthMeters":3657.0,"ratePesosPerMeter":25712.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"P Burgos - Pototanin Jct, Quezon- K0153 + 246 - K0155 + 000","amountPesos":94000000,"lengthMeters":1754.0,"ratePesosPerMeter":53591.79,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sta. Elena-Capalonga By Pass Coastal Rd - K0282 + 698 – K0285 + 712","amountPesos":93001000,"lengthMeters":3014.0,"ratePesosPerMeter":30856.34,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road from Barangay Darumawang Ilaya - Barangay Matampay Ilaya, Sta. 0+000 - Sta. 3+800, Lala, Lanao del Norte","amountPesos":93000000,"lengthMeters":3800.0,"ratePesosPerMeter":24473.68,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1675 + 000 - K1676 + 516","amountPesos":92981000,"lengthMeters":1516.0,"ratePesosPerMeter":61333.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1660 + 644 - K1661 + 409, K1662 + 000 - K1663 + 235","amountPesos":92650000,"lengthMeters":2000.0,"ratePesosPerMeter":46325.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calauan-Nagcarlan Bdry Rd - K0083 + 000 - K0084 + 196, K0087 + 000 - K0087 + 918","amountPesos":92600000,"lengthMeters":2114.0,"ratePesosPerMeter":43803.22,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Guimbal-Tigbauan Bypass Road - R1 Bypass Road, Iloilo Sta.01 + 480 - Sta. 03 + 780","amountPesos":92330000,"lengthMeters":2300.0,"ratePesosPerMeter":40143.48,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0128 + 000 - K0128 + 450, K0132 + 245 - K0132 + 506, K0132 + 782 - K0133 + 000, K0133 + 976 - K0135 + 193, K0136 + 559 - K0136 + 657, K0145 + 550 - K0145 + 855","amountPesos":92293000,"lengthMeters":2549.0,"ratePesosPerMeter":36207.53,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod North Rd - K0149 + 549 - K0150 + 348, K0150 + 441 - K0151 + 649, K0151 + 675 - K0152 + 000, K0152 + 335 - K0152 + 672","amountPesos":92136000,"lengthMeters":2669.0,"ratePesosPerMeter":34520.79,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago - Tuguegarao Rd - K0376 + 204 - K0378 + 315","amountPesos":92060000,"lengthMeters":2111.0,"ratePesosPerMeter":43609.66,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dipolog-Oroquieta National Rd - K1820 + 234 - K1820 + 343, K1820 + 363 - K1823 + 000","amountPesos":92000000,"lengthMeters":2746.0,"ratePesosPerMeter":33503.28,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Capiz-Aklan Rd - K0335 + 580 - K0335 + 760, K0336 + 200 - K0336 + 880, K0337 + 340 - K0337 + 800, K0338 + 050 - K0338 + 420","amountPesos":91576000,"lengthMeters":1690.0,"ratePesosPerMeter":54186.98,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lagonoy-Caramoan Road, (Salvacion Section) Garchitorena, Camarines Sur, Sta.16+500 - Sta. 19+650","amountPesos":91500000,"lengthMeters":3150.0,"ratePesosPerMeter":29047.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quezon Industrial Highway, Sta. 0 + 484 - Sta. 0 + 825, Sta. 0 + 995 - Sta. 1 + 136, Sta. 2 + 092 - Sta. 2 + 289, Sta. 3 + 882 - Sta. 4 + 138, Lucena City, Quezon","amountPesos":91300000,"lengthMeters":935.0,"ratePesosPerMeter":97647.06,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Roads, Purok 7 to Purok 15, to Purok 14, Barangay. Pasian, Monkayo, Davao de Oro Sta. 0+000 - Sta. 2+000","amountPesos":90500000,"lengthMeters":2000.0,"ratePesosPerMeter":45250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calapan North Road - K0046+570 - K0048+063,K0048+407 - K0049+208, K0053+420 - K0054+066, K0058+534 - K0059+102,K0059+132 - K0060+000","amountPesos":90000000,"lengthMeters":4376.0,"ratePesosPerMeter":20566.73,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Francisco-Sn Andres-Sn Narciso Rd - K0392 + 184 - K0394 + 000","amountPesos":90000000,"lengthMeters":1816.0,"ratePesosPerMeter":49559.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa North Rd - K0083 + 215 - K0083 + 261","amountPesos":90000000,"lengthMeters":46.0,"ratePesosPerMeter":1956521.74,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pandi By-pass Road, Sta.6+040 - Sta.6+640, Pandi, Bulacan","amountPesos":90000000,"lengthMeters":600.0,"ratePesosPerMeter":150000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Opol Diversion Road (Opol-Canito-an), Barangay Baikingon-Barangay Canito-an, Sta. 0+000 - Sta. 2+250, Cagayan de Oro City","amountPesos":90000000,"lengthMeters":2250.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Las Navas - Catubig - Laoang Road (Sta. 1+750 - Sta. 3+250), Northern Samar","amountPesos":90000000,"lengthMeters":1500.0,"ratePesosPerMeter":60000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Leading to Science and Technology Park, Barangay Taytayan (Libertad)-Barangay Lagutay (Gitagum), Sta. 7+300-Sta. 9+000, Misamis Oriental","amountPesos":90000000,"lengthMeters":1700.0,"ratePesosPerMeter":52941.18,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dinagat-Loreto Rd - K0061 + 000 - K0064 + 000","amountPesos":89974000,"lengthMeters":3000.0,"ratePesosPerMeter":29991.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gingoog-Claveria-Villanueva Rd - K1372 + 000 - K1374 + 529","amountPesos":89907000,"lengthMeters":2529.0,"ratePesosPerMeter":35550.42,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1848 + 093 - K1850 + 572","amountPesos":89658000,"lengthMeters":2479.0,"ratePesosPerMeter":36167.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0026 + (-1036) - K0026 + (-120), K0028 + 240 - K0028 + 590, K0029 + 350 - K0030 + 000","amountPesos":89314000,"lengthMeters":1916.0,"ratePesosPerMeter":46614.82,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago-Tuguegarao Rd - K0354 + 991 - K0356 + 026, K0356 + 129 - K0357 + 000","amountPesos":89052000,"lengthMeters":1906.0,"ratePesosPerMeter":46721.93,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0250 + 600 - K0252 + 200","amountPesos":89000000,"lengthMeters":1600.0,"ratePesosPerMeter":55625.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Magpet-Nowa-Doroluman-Greenfield Rd - K1635 + 000 - K1638 + 1000","amountPesos":88910000,"lengthMeters":4000.0,"ratePesosPerMeter":22227.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Cotabato-Marbel Rd) - K1743 + 233 - K1745 + 000","amountPesos":88809000,"lengthMeters":1767.0,"ratePesosPerMeter":50259.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte","amountPesos":88100000,"lengthMeters":1000.56,"ratePesosPerMeter":88050.69,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga del Sur Coastal Rd - (S01510MN) Chainage 8396 - Chainage 10886","amountPesos":87838000,"lengthMeters":2490.0,"ratePesosPerMeter":35276.31,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"San Jose City Bypass Road, Sta. 7+003 - Sta. 7+094, Nueva Ecija","amountPesos":87500000,"lengthMeters":91.0,"ratePesosPerMeter":961538.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1658 + 000 - K1660 + 000","amountPesos":86800000,"lengthMeters":2000.0,"ratePesosPerMeter":43400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Allen-Catarman Rd - K0707 + 813 - K0709 + 250, K0722 + 756 - K0723 + 502","amountPesos":86660000,"lengthMeters":2183.0,"ratePesosPerMeter":39697.66,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0137 + 634 - K0141 + 405","amountPesos":86291000,"lengthMeters":3771.0,"ratePesosPerMeter":22882.79,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kennon Rd - K0222+920 - K0223+210","amountPesos":86050000,"lengthMeters":290.0,"ratePesosPerMeter":296724.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pototan Bypass Road, Sta. 2+415.17 - Sta. 3+115.17, Sta. 4+915 - Sta. 6+105, Iloilo","amountPesos":86000000,"lengthMeters":1890.0,"ratePesosPerMeter":45502.65,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Camp Andres - Tandu Bato Road, Sulu K030 + 207 - K033 + 000","amountPesos":85200000,"lengthMeters":2793.0,"ratePesosPerMeter":30504.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nasugbu-Lian-Calatagan Rd - K0103 + 200 - K0104 + 140, K0108 + 000 - K0108 + 500, K0118 + 167 - K0119 + 000, K0123 + 500 - K0124 + 000","amountPesos":85044000,"lengthMeters":2773.0,"ratePesosPerMeter":30668.59,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sibuyan Circumferential Rd - K0087 + 018 - K0089 + 113, K0089 + 211 - K0093 + 000","amountPesos":85015000,"lengthMeters":5884.0,"ratePesosPerMeter":14448.5,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Digos-Makar Rd) - K1579+831 - K1580+714","amountPesos":85000000,"lengthMeters":883.0,"ratePesosPerMeter":96262.74,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Digos-Makar Rd) - K1586+000 - K1587+040","amountPesos":85000000,"lengthMeters":1040.0,"ratePesosPerMeter":81730.77,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Aramaywan-Berong-Pto Princesa Rd - K0089 + 006 - K0089 + 909, K0092 + 000 - K0093 + 809, K0095 + 000 - K0096 + 000, K0096 + 437 - K0098 + 509","amountPesos":85000000,"lengthMeters":5784.0,"ratePesosPerMeter":14695.71,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Culandanum-Panalingaan Cross Country Rd - K0248 + 000 - K0253 + 548","amountPesos":85000000,"lengthMeters":5548.0,"ratePesosPerMeter":15320.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagum City Diversion Road K1462 + 694 - K1464 + 197","amountPesos":85000000,"lengthMeters":1503.0,"ratePesosPerMeter":56553.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagum City Diversion Road K1461 + 115 - K1462 + 694","amountPesos":85000000,"lengthMeters":1579.0,"ratePesosPerMeter":53831.54,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sambulawan Jct-Calaguise-Calubian Rd - K1000 + 170 - K1000 + 370, K1003 + 903 - K1004 + 000","amountPesos":85000000,"lengthMeters":297.0,"ratePesosPerMeter":286195.29,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Sta. 11 + 640 - Sta. 12 + 159, Tiaong, Quezon","amountPesos":85000000,"lengthMeters":519.0,"ratePesosPerMeter":163776.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tabaco City-Malinao-Buhi-Iriga City Road, Camarines Sur, Sta. 40+300.00 - Sta. 41+100.00","amountPesos":85000000,"lengthMeters":800.0,"ratePesosPerMeter":106250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Roads, s. Flores, Sinabaan, Cabalitian, Tanggal Sawang, San Vicente, Cadiz, Poblacion West, Nancalabasaan, Barat and Esperanza, Umingan, Pangasinan, Sta. 0+000 - Sta. 5+229","amountPesos":85000000,"lengthMeters":5229.0,"ratePesosPerMeter":16255.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Roads, s. Zone I, Zone II, Zone III, Zone IV, Zone V and Casanicolasan, Rosales, Pangasinan, Sta. 0+000 - Sta. 5+229","amountPesos":85000000,"lengthMeters":5229.0,"ratePesosPerMeter":16255.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabiltiation of Odiongan- Kabaliwan Access Road (including Slope Protection, Sta 2+770-3+560, Sta 4+300-4+600, Sta 6+120-6+150, Sta 6+410-6+450, Sta 9+230- 9+270, Sta 11+120-11+320, Barangay Panique, Odiongan & Barangay Bachawan, San Agustin, Romblon","amountPesos":85000000,"lengthMeters":1400.0,"ratePesosPerMeter":60714.29,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Legazpi City Coastal Road, Sta. 0+000.00 – Sta. 0+150.00, Barangay Puro, Legazpi City, Albay","amountPesos":85000000,"lengthMeters":150.0,"ratePesosPerMeter":566666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Barangay Nagerong, Lazi, Siquijor (Segment 1: 1 + 420 - 3 + 148 Segment 2: 1 + 937 - 2 + 947)","amountPesos":85000000,"lengthMeters":1728.0,"ratePesosPerMeter":49189.81,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Malindawag Bridge, Barangay Abuno, Sta. 0+000 - Sta. 0+140, Iligan City","amountPesos":85000000,"lengthMeters":140.0,"ratePesosPerMeter":607142.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of the Access Road, Barangay Poblacion - Pigkalawag Beach & Dive Site, Sta. 0+000 - Sta. 2+340, Sultan Naga Dimaporo, Lanao del Norte","amountPesos":85000000,"lengthMeters":2340.0,"ratePesosPerMeter":36324.79,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo-Capiz Rd (New Route) - K0098 + 1004 - K0100 + 100","amountPesos":84747000,"lengthMeters":1096.0,"ratePesosPerMeter":77323.91,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Sta. 0 + 000 - Sta. 0 + 520, San Antonio, Quezon","amountPesos":84700000,"lengthMeters":520.0,"ratePesosPerMeter":162884.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"International Receiver Rd - K0019 + (-330) - K0019 + 741","amountPesos":84690000,"lengthMeters":1071.0,"ratePesosPerMeter":79075.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"SNA-Lebak-Kalamansig Rd (S00739MN) - K1848 + 857 - K1848 + 917, K1848 + 933.50 - K1849 + 671, K1849 + 921 - K1850 + 040, K1852 + 996 - K1853 + 287","amountPesos":84525000,"lengthMeters":1207.5,"ratePesosPerMeter":70000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0112 + 423 - K0114 + 000","amountPesos":84390000,"lengthMeters":1577.0,"ratePesosPerMeter":53513.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd - K0005 + (-138) - K0005 + 000, K0005 + 298 - K0005 + 305, K0006 + 000 - K0006 + 162, K0006 + 433 - K0007 + 000, K0009 + 154 - K0010 + 000","amountPesos":83961000,"lengthMeters":1720.0,"ratePesosPerMeter":48814.53,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"SNA-Lebak-Kalamansig Rd - K1851 + 170 - K1851 + 210, K1851 + 240 - K1851 + 324, K1851 + 440 - K1851 + 490, K1852 + 110 - K1852 + 200, K1852 + 310 - K1852 + 360, K1852 + 500 - K1852 + 550, K1853 + 000 - K1853 + 210","amountPesos":83920000,"lengthMeters":574.0,"ratePesosPerMeter":146202.09,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0356 + 076.95 - K0357 + 377","amountPesos":83919000,"lengthMeters":1300.05,"ratePesosPerMeter":64550.59,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banisilan-Guiling-Alamada-Libungan Rd - (S00825MN) Chainage 14268 - Chainage 15575","amountPesos":83870000,"lengthMeters":1307.0,"ratePesosPerMeter":64169.85,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0178 + 740 - K0178 + 836, K0178 + 915 - K0179 + 000, K0184 + 509 - K0185 + 560, K0185 + 820 - K0186 + 160, K0186 + 536 - K0187 + 560, K0189 + 1272 - K0191 + 017","amountPesos":83709000,"lengthMeters":3341.0,"ratePesosPerMeter":25055.07,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mambusao-Imbug Rd - K0101 + 000 - K0102 + 539","amountPesos":83394000,"lengthMeters":1539.0,"ratePesosPerMeter":54187.13,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage at Pallmall St. (Chainage 0+000 - Chainage 0+442) and Newport St. (Chainage 0+000 - Chainage 0+136) at Barangay Fairview, Quezon City","amountPesos":83232000,"lengthMeters":442.0,"ratePesosPerMeter":188307.69,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1671 + 000 - K1673 + 755","amountPesos":83055000,"lengthMeters":2755.0,"ratePesosPerMeter":30147.01,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1596 + 759 - K1596 + 958, K1597 + 186 - K1598 + 009, K1598 + 240 - K1598 + 450, K1598 + 470 - K1598 + 550, K1598 + 570 - K1599 + 200, K1599 + 220 - K1599 + 875","amountPesos":83008000,"lengthMeters":2597.0,"ratePesosPerMeter":31963.03,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Section I: Sta. 12 + 159 - Sta. 12 + 355, Section II: Sta. 16 + 377 - Sta. 17 + 962, Tiaong, Quezon","amountPesos":83000000,"lengthMeters":1781.0,"ratePesosPerMeter":46603.03,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road connecting Barangay Siapar, Anda, Pangasinan and Barangay Pilar, Bolinao, Pangasinan (Sta. 0+000 - Sta. 2+480.80)","amountPesos":83000000,"lengthMeters":2480.8,"ratePesosPerMeter":33456.95,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Bukidnon Rd - K1643 + 154 - K1643 + 193","amountPesos":82730000,"lengthMeters":39.0,"ratePesosPerMeter":2121282.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Guimba - Talugtug - Umingan Rd K0153+112 - K0156+000, K0159+000 - K0160+080","amountPesos":82500000,"lengthMeters":3968.0,"ratePesosPerMeter":20791.33,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dualing-New Panay-Midsayap Rd - K1688 + 231 - K1689 + 428","amountPesos":82458000,"lengthMeters":1197.0,"ratePesosPerMeter":68887.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Catanduanes Cir Rd - K0034 + 637 - K0034 + 700, K0036 + 386 - K0036 + 395, K0037 + 000 - K0039 + 000","amountPesos":82320000,"lengthMeters":2072.0,"ratePesosPerMeter":39729.73,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0068 + 591 - K0071 + 674","amountPesos":82245000,"lengthMeters":3083.0,"ratePesosPerMeter":26676.94,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Capitol - Canigaran Rd - K0001+(-1006) - K0001+190","amountPesos":82000000,"lengthMeters":1196.0,"ratePesosPerMeter":68561.87,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0267 + 542 - K0268 + 500, K0269 + 400 - K0271 + 000","amountPesos":81984000,"lengthMeters":2558.0,"ratePesosPerMeter":32050.04,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage at Consul Street (Chainage 0+000 to Chainage 0+565) at Barangay Fairview, Quezon City","amountPesos":81925000,"lengthMeters":565.0,"ratePesosPerMeter":145000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rizal-Dakak-Dapitan Coastal Loop Rd - K1804+000 - K1804+500, K1817+000 - K1820+000","amountPesos":81800000,"lengthMeters":3500.0,"ratePesosPerMeter":23371.43,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cebu North Hagnaya Wharf Rd - K0074 + 050 -K0074 + 490","amountPesos":81800000,"lengthMeters":440.0,"ratePesosPerMeter":185909.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0049+300 - K0052 + 182","amountPesos":81697000,"lengthMeters":2882.0,"ratePesosPerMeter":28347.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0203 + 918 - K0203 + 956, K0204 + 254 - K0205 + 379, K0205 + 627 - K0206 + 062, K0206 + 072 - K0207 + 892, K0207 + 968 - K0208 + 405, K0208 + 795 - K0209 + 093","amountPesos":81457000,"lengthMeters":4153.0,"ratePesosPerMeter":19614.01,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod North Rd - K0107 + 658 - K0109 + 999","amountPesos":81286000,"lengthMeters":2341.0,"ratePesosPerMeter":34722.77,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod North Rd - K0153 + 483 - K0155 + 000, K0155 + 117 - K0156 + 000","amountPesos":80854000,"lengthMeters":2400.0,"ratePesosPerMeter":33689.17,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0073 + 428 - K0074 + 933","amountPesos":80834000,"lengthMeters":1505.0,"ratePesosPerMeter":53710.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0222 + 099 - K0223 + 440, K0224 + 914 - K0225 + 020, K0225 + 212 - K0225 + 420, K0225 + 480 - K0225 + 555, K0225 + 585 - K0225 + 617, K0225 + 636 - K0225 + 659, K0225 + 682 - K0225 + 840, K0226 + 920 - K0226 + 988, K0227 + 052 - K0227 + 362, K0227 + 572 - K0227 + 926, K0228 + 499 - K0228 + 752, K0229 + 002 - K0229 + 183, K0229 + 970 - K0230 + 248, K0230 + 741 - K0230 + 846, K0231 + 205 - K0231 + 479, K0231 + 529 - K0231 + 542, K0231 + 592 - K0231 + 767, K0231 + 987 - K0231 + 1051, K0233 + 112 - K0233 + 167","amountPesos":80339000,"lengthMeters":4073.0,"ratePesosPerMeter":19724.77,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mabinay - Ayungon Rd - K0096 + 000 - K0099 + 778","amountPesos":80300000,"lengthMeters":3778.0,"ratePesosPerMeter":21254.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Biliran Circumferential Rd - K1025 + 448 - K1027 + 544","amountPesos":80000000,"lengthMeters":2096.0,"ratePesosPerMeter":38167.94,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao-Davao Coastal Rd - K1148+403 - K1149 + 000, K1154 + 000 - K1155 + 262, K1156+664 - K1157+814, K1158 + 030 - K1161 + 000","amountPesos":80000000,"lengthMeters":5979.0,"ratePesosPerMeter":13380.16,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jolo-Indanan-Parang-Silangkan Road (S00005SL), Chainage 22 + 000 to Chainage 25 + 000","amountPesos":80000000,"lengthMeters":3000.0,"ratePesosPerMeter":26666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nabunturan-Mainit Park Road (S00137MN) K1428+000 -K1430+240, Davao De Oro","amountPesos":80000000,"lengthMeters":2240.0,"ratePesosPerMeter":35714.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cawag-Philseco Bypass Road, Sta. 1+925 - Sta. 3+600, Zambales","amountPesos":80000000,"lengthMeters":1675.0,"ratePesosPerMeter":47761.19,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Barangay Lumbia Section, Sta. 2+110 - Sta. 2+572.98 (Sec. A), Cagayan de Oro City","amountPesos":80000000,"lengthMeters":462.98,"ratePesosPerMeter":172793.64,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cagayan de Oro Coastal Road (Punta-Macabalan Section), Barangay Macabalan, Sta. 0+000- Sta. 0+072.71, Cagayan de Oro City","amountPesos":80000000,"lengthMeters":72.71,"ratePesosPerMeter":1100261.31,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Eastern Interior Bypass Road (Gusa-Puerto/Jct. Sayre Highway), Barangay Gusa- Barangay Cugman, Sta. 0+000-Sta. 0+365.33, Cagayan de Oro City","amountPesos":80000000,"lengthMeters":365.33,"ratePesosPerMeter":218980.1,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sayre Highway Bypass Road-Carmen Puerto Section (Climbing Lanes), Barangay Puerto, Sta. 1+680-Sta. 2+805.71, Cagayan de Oro City","amountPesos":80000000,"lengthMeters":1125.71,"ratePesosPerMeter":71066.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ozamiz - Oroquieta Road, K1714 + 211 - K1715 + 963, K1716 + 286 - K1717 + 510, K1717 + 736 - K1718 + 540, K1718 + 740 - K1720 + 184, K1720 + 587 - K1721 + 183","amountPesos":80000000,"lengthMeters":5820.0,"ratePesosPerMeter":13745.7,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Reconstruction/Improvement of Roads, s. Poblacion District 1, Poblacion District 2, Talogtog, Amagbagan and Malasin, Pozorrubio, Pangasinan, Sta. 0+000 - Sta. 3+080","amountPesos":80000000,"lengthMeters":3080.0,"ratePesosPerMeter":25974.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Reconstruction/Improvement of Roads, Barangay Cabalaoangan Sur to Barangay Guiling, Rosales, Pangasinan, Sta. 0+000 - Sta. 3+080","amountPesos":80000000,"lengthMeters":3080.0,"ratePesosPerMeter":25974.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road from Barangay Simpak - Barangay Darumawang Ilaya, Sta. 0+000 - Sta. 2+800, Lala, Lanao del Norte","amountPesos":80000000,"lengthMeters":2800.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1038 + 833 - K1040 + 031, K1040 + 069 - K1040 + 400","amountPesos":79700000,"lengthMeters":1529.0,"ratePesosPerMeter":52125.57,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Catarman-Calbayog Rd - K0762 + 802 - K0762 + 886, K0765 + 176 - K0765 + 432, K0771 + 000 - K0771 + 078, K0771 + 751 - K0771 + 837","amountPesos":79366000,"lengthMeters":504.0,"ratePesosPerMeter":157472.22,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage at Orange St. (Chainage 0+000 - Chainage 0+104), Manga St. (Chainage 0+000 - Chainage 0+330), Rambutan St. (Chainage 0+000 - Chainage 0+036), Kamatsile St. (Chainage 0+074 - Chainage 0+149) at Barangay Sta. Monica, Quezon City","amountPesos":79025000,"lengthMeters":330.0,"ratePesosPerMeter":239469.7,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo-Antique Rd - K0018 + 677 - K0018 + 768, K0018 + 768 - K0018 + 802, K0018 + 802 - K0018 + 876, K0018 +921 - K0018 + 951, K0018 + 951 - K0019 + 072, K0019 + 072 - K0019 + 333, K0019 + 333 - K0020 + 000, K0020 + 000 - K0020 + 188","amountPesos":79000000,"lengthMeters":1466.0,"ratePesosPerMeter":53888.13,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Abuyon-Buenavista Rd - K0258 + 300 - K0258 + 600","amountPesos":79000000,"lengthMeters":300.0,"ratePesosPerMeter":263333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0679 + (-056) - K0679 + 100, K0679 + 450 - K0680 + 133, K0680 + 914 - K0681 + 300, K0689 + 330 - K0689 + 933, K0694 + 700 - K0695 + 279, K0695 + 325 - K0696 + 010","amountPesos":78885000,"lengthMeters":3092.0,"ratePesosPerMeter":25512.61,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1644 + 549 - K1647 + 000","amountPesos":78484000,"lengthMeters":2451.0,"ratePesosPerMeter":32021.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Mongol-Nalbu-Alimit-Nattum-Dulao Road, Sta. 15+900 - Sta. 17+600, Mayoyao, Ifugao","amountPesos":78050000,"lengthMeters":1700.0,"ratePesosPerMeter":45911.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sta Rosa-Ulat-Tagaytay Rd - K0040 + (-950) - K0040 + (-705), K0040 + (-578) - K0041 + 000, K0041 + 361 - K0043 + 000","amountPesos":78028000,"lengthMeters":3462.0,"ratePesosPerMeter":22538.42,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Malvar Rd - K0002 + (-665) - K0002+913","amountPesos":78000000,"lengthMeters":1578.0,"ratePesosPerMeter":49429.66,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sta. Elena-Capalonga By Pass Coastal Rd - K0285 + 712 – K0288 + 245","amountPesos":78000000,"lengthMeters":2533.0,"ratePesosPerMeter":30793.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tablas Circumferential Rd - K0005 + 854 - K0006 + 000, K0007 + 000 - K0007 + 083, K0010 + 000 - K0010 + 307.30","amountPesos":77926000,"lengthMeters":536.3,"ratePesosPerMeter":145303.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bongabong-Sagana-Roxas-Sn Aquilino Rd - K0122 + 000 - K0122 + 421, K0124 + 000 - K0125 + 721","amountPesos":77864000,"lengthMeters":2142.0,"ratePesosPerMeter":36351.07,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0451 + 572 - K0451 + 644, K0452 + 086 - K0452 + 106, K0454 + 669 - K0454 + 710, K0455 + 065 - K0455 + 150, K0455 + 252 - K0455 + 287, K0455 + 945 - K0455 + 970, K0456 + 099 - K0456 + 144, K0456 + 175 - K0456 + 195, K0456 + 610 - K0456 + 630, K0459 + 037 - K0459 + 066, K0459 + 1008 - K0459 + 1045, K0459 + 1300 - K0459 + 1363, K0459 + 1851 - K0459 + 1876, K0461 + 390 - K0461 + 432, K0462 + 440 - K0462 + 522, K0462 + 551 - K0462 + 585, K0463 + 510 - K0463 + 571","amountPesos":77605000,"lengthMeters":736.0,"ratePesosPerMeter":105441.58,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cervantes (Ilocos Sur) - Besao-Sagada (Mt. Province) Road via Laylaya, Sta. 12+980 - Sta 14+760","amountPesos":77495000,"lengthMeters":1780.0,"ratePesosPerMeter":43536.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dapa-Jct Cancohoy Rd - K0002 + 000 - K0005 + 000","amountPesos":77472000,"lengthMeters":3000.0,"ratePesosPerMeter":25824.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1667 + 207 - K1668 + 000","amountPesos":77389000,"lengthMeters":793.0,"ratePesosPerMeter":97590.16,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Abinuan - Nattum - Alimit, Sta. 2+450 - Sta. 4+160, Mayoyao, Ifugao","amountPesos":77000000,"lengthMeters":1710.0,"ratePesosPerMeter":45029.24,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Poblacion 1 to Barangay Camayse, Zumarraga, (Sta. 0+500 - Sta.1+738) Samar","amountPesos":77000000,"lengthMeters":1238.0,"ratePesosPerMeter":62197.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Carsadang Bago R1 By-Pass, Sta. 0 + 871- Sta. 1 + 340, Kawit, Cavite","amountPesos":76900000,"lengthMeters":469.0,"ratePesosPerMeter":163965.88,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Makilala-Allah Valley Rd - K1633 + 000 - K1633 + 448, K1638 + 000 - K1638 + 526","amountPesos":76875000,"lengthMeters":974.0,"ratePesosPerMeter":78927.1,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Aklan West Rd (Kalibo-Nabas) – K0251 + 122 – K0252 + 020","amountPesos":76777000,"lengthMeters":898.0,"ratePesosPerMeter":85497.77,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0066+867 - K0067+468, K0069+160 - K0070+000","amountPesos":76730000,"lengthMeters":1441.0,"ratePesosPerMeter":53247.74,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dapa-Jct Cancohoy Rd - K0005 + 000 - K0008 + 000","amountPesos":76683000,"lengthMeters":3000.0,"ratePesosPerMeter":25561.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0077 + 972 - K0079 + 401","amountPesos":76659000,"lengthMeters":1429.0,"ratePesosPerMeter":53645.21,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Guimba - Talugtug - Umingan Rd, K0153 + 112 - K156 + 000","amountPesos":76600000,"lengthMeters":2888.0,"ratePesosPerMeter":26523.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1711 + 301 - K1712 + 712.01","amountPesos":76380000,"lengthMeters":1411.01,"ratePesosPerMeter":54131.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"P Burgos - Pototanin Jct, Quezon - K0157 + 298 - K0158 + 700","amountPesos":76000000,"lengthMeters":1402.0,"ratePesosPerMeter":54208.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Section I: Sta. 2 + 880 - 3 + 760, Secton II: Sta. 10 + 982 - Sta. 11 + 381, Section III: Sta. 11 + 475 - Sta. 11 + 640, Quezon","amountPesos":76000000,"lengthMeters":1444.0,"ratePesosPerMeter":52631.58,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Barangay Morado to Barangay Pasa, City of Ilagan, Isabela (Sta. 0+000 - Sta. 7+100)","amountPesos":76000000,"lengthMeters":7100.0,"ratePesosPerMeter":10704.23,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dinagat-Loreto Rd - K0003 + 000 - K0004 + 769, K0004 + 795 - K0007 + 100, K0007 + 200 - K0007 + 582","amountPesos":75860000,"lengthMeters":4456.0,"ratePesosPerMeter":17024.24,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Pilar South Road, Sta. 0+000-Sta. 1+100, Pilar, Abra","amountPesos":75800000,"lengthMeters":1100.0,"ratePesosPerMeter":68909.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palo-Carigara-Ormoc Rd - K0993 + 000 - K0995 + 000","amountPesos":75000000,"lengthMeters":2000.0,"ratePesosPerMeter":37500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"PPSR Jct (Abo-abo)-Quezon Rd - K0133 + 390 - K0134 + 500, K0134 + 833 - K0136 + 228, K0136 + 253 - K0138 + 550","amountPesos":75000000,"lengthMeters":4802.0,"ratePesosPerMeter":15618.49,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Juan-Sn Gabriel Rd - K0281 + 890 - K0284 + 386","amountPesos":75000000,"lengthMeters":2496.0,"ratePesosPerMeter":30048.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"P Burgos - Pototanin Jct, Quezon - K0184 + 110 - K0185 + 500","amountPesos":75000000,"lengthMeters":1390.0,"ratePesosPerMeter":53956.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0159 + 397 - K0159 + 454 (R/S)","amountPesos":75000000,"lengthMeters":57.0,"ratePesosPerMeter":1315789.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0159 + 454 - K0159 + 511 (R/S)","amountPesos":75000000,"lengthMeters":57.0,"ratePesosPerMeter":1315789.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1598 + 150 - K1598 + 300","amountPesos":75000000,"lengthMeters":150.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 18000 - Chainage 18070","amountPesos":75000000,"lengthMeters":70.0,"ratePesosPerMeter":1071428.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Milagros-Baleno-Lagta Rd - K0080 + 663 - K0081 + 730","amountPesos":75000000,"lengthMeters":1067.0,"ratePesosPerMeter":70290.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Milagros-Baleno-Lagta Rd - K0081 + 730 - K0082 + 786","amountPesos":75000000,"lengthMeters":1056.0,"ratePesosPerMeter":71022.73,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lemon-Leyte-Biliran Rd - K0984 + 645 - K0986 + 137","amountPesos":75000000,"lengthMeters":1492.0,"ratePesosPerMeter":50268.1,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lemon-Leyte-Biliran Rd - K1003 + 280 - K1004 + 778","amountPesos":75000000,"lengthMeters":1498.0,"ratePesosPerMeter":50066.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alcala-Santo Niño-Lasam Road, Alcala Section, (Sta. 0+167.08 - Sta. 0+453.80), Cagayan","amountPesos":75000000,"lengthMeters":286.72,"ratePesosPerMeter":261579.24,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Luisiana-Mauban Diversion Road, Sta. 31+351 - Sta. 31+913.5, Mauban Section, Quezon","amountPesos":75000000,"lengthMeters":562.5,"ratePesosPerMeter":133333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"CDO-New Eastern Diversion Road (Jct. South Diversion Road/Mandumol-Nazareth- Camamaman-an-Justo Ramonal-Jct. J.R Borja-LKKS-BCIR/Lapasan), Barangay Indahag- Barangay Lapasan, Sta. 0+000- Sta. 0+672.75, Cagayan de Oro City","amountPesos":75000000,"lengthMeters":672.75,"ratePesosPerMeter":111482.72,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct. Maramag-Maradugao Road-Jct. Lampanusan Road Ext. (Jct. Sayre Highway (Damulog)-Kibawe-Jct. Buda (Sinuda), Kitaotao By-Pass/Alternate Road), Barangay Tangkulan (Jose Rizal), Sta. 21+700 - Sta. 22+575, Damulog, Bukidnon","amountPesos":75000000,"lengthMeters":875.0,"ratePesosPerMeter":85714.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sayre Highway Parallel Road II (Quezon Section), Barangay Paitan Section, Sta. 140+830 - Sta. 140+855.71, Quezon, Bukidnon","amountPesos":75000000,"lengthMeters":25.71,"ratePesosPerMeter":2917152.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Koronadal City By-pass Road (Paraiso-Mambucal Section), Sta. 0+000 - Sta. 0+500, South Cotabato","amountPesos":75000000,"lengthMeters":500.0,"ratePesosPerMeter":150000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Aguinaldo-Toboy-Natonin Road - Sta. 14+220 - Sta. 15+380","amountPesos":75000000,"lengthMeters":1160.0,"ratePesosPerMeter":64655.17,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Claveria - San Isidro - Peñafrancia Road, Masbate - Sta. 5 + 695 - Sta. 6 + 995","amountPesos":75000000,"lengthMeters":1300.0,"ratePesosPerMeter":57692.31,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Claveria - San Isidro - Peñafrancia Road, Masbate - Sta. 6 + 995 - Sta. 7 + 425, Sta. 9 + 150 - Sta. 10 + 020","amountPesos":75000000,"lengthMeters":1300.0,"ratePesosPerMeter":57692.31,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300","amountPesos":75000000,"lengthMeters":978.0,"ratePesosPerMeter":76687.12,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271","amountPesos":75000000,"lengthMeters":891.0,"ratePesosPerMeter":84175.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468","amountPesos":75000000,"lengthMeters":1197.0,"ratePesosPerMeter":62656.64,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Poblacion-Morocborocan-Guinhadap-Maglambong-Sto. Niño Road, Masbate - Sta. 5+875 - Sta. 6+625","amountPesos":75000000,"lengthMeters":750.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Poblacion-Quintina Road, Masbate - Sta. 5 + 680 - Sta. 6 + 880","amountPesos":75000000,"lengthMeters":1200.0,"ratePesosPerMeter":62500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"San Fernando - San Jacinto - Monreal Road, Masbate - Sta. 20 + 018 - Sta. 21 + 218","amountPesos":75000000,"lengthMeters":1200.0,"ratePesosPerMeter":62500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"San Fernando - San Jacinto - Monreal Road, Masbate - Sta. 21 + 218 - Sta. 22 + 040","amountPesos":75000000,"lengthMeters":822.0,"ratePesosPerMeter":91240.88,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Albuera – Burauen Rd (Albuera Section) - Sta. 7+463.50 - Sta. 7+584.73, Barangay San Pedro, Albuera, Leyte","amountPesos":75000000,"lengthMeters":121.23,"ratePesosPerMeter":618658.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Paracelis-Mallig-Roxas Rd - Chainage 9006 - Chainage 10506","amountPesos":75000000,"lengthMeters":1500.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road at Capitol Hills (Sta.0+000 - 0+779.48), Barangay Old Balara,Quezon City, 14.66325, 121.07438","amountPesos":75000000,"lengthMeters":779.48,"ratePesosPerMeter":96217.99,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Reconstruction/Improvement of Roads, s. Poblacion, Nancalabasaan, Lauren and San Andres, Umingan, Pangasinan, Sta. 0+000 - Sta. 2+888","amountPesos":75000000,"lengthMeters":2888.0,"ratePesosPerMeter":25969.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction (Replacement) of Kayapa Bridge, Sta. 1+220 - Sta. 1+260, Hingyon, Ifugao","amountPesos":75000000,"lengthMeters":40.0,"ratePesosPerMeter":1875000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of By-pass and Diversion Roads along Sto. Domingo Aranguren Bypass Road, Sta. 0+670.00 to Sta. 1+170.00, Capas, Tarlac","amountPesos":75000000,"lengthMeters":500.0,"ratePesosPerMeter":150000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation/Improvement of Sapngan - San Francisco Road, Bulusan, Sorsogon Sta. 0+000 - Sta. 3+000","amountPesos":75000000,"lengthMeters":3000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Sagrada Diversion Road (Daang Maharlika Rd to Baao-Iriga City-Nabua Rd.), Baao, Camarines Sur, Sta. 0 + 000.00 - Sta. 0 + 300.00","amountPesos":75000000,"lengthMeters":300.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Salvacion - Patubayan - Palanas - Lalud - Tinampo - San Bernardo Road, Bulusan, Sorsogon, Sta. 0+000 - Sta. 3+000","amountPesos":75000000,"lengthMeters":3000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, SRP Backroad Extension, Sta. 0+880 - Sta. 1+105, Cebu City","amountPesos":75000000,"lengthMeters":225.0,"ratePesosPerMeter":333333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Manipis - Sinsin Road, Sta. 0+000 - Sta. 0+750, Cebu City","amountPesos":75000000,"lengthMeters":750.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Roads, Barangay Polangi-Paticua-San Pascual, Sta. 002+607 - Sta. 004+607, Catarman, Northern Samar","amountPesos":75000000,"lengthMeters":2000.0,"ratePesosPerMeter":37500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo-Capiz (New Route) - K0057 + 211 - K0057 + 869, K0058 + 239 - K0059+900","amountPesos":74999000,"lengthMeters":2319.0,"ratePesosPerMeter":32341.1,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0092 + (-719) - K0093 + 531","amountPesos":74646000,"lengthMeters":2250.0,"ratePesosPerMeter":33176.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct. - Calot-Pappa-Bagong- Balluay-Tuel Jct. (Section 2 of the BLISTT Outer Ring Circumferential Road) - Sta. 6+913 - Sta. 8+200, Sta. 10+560 - Sta. 10+650, Sta. 19+320 - Sta. 19+400, Sta. 20+500 - Sta. 20+573","amountPesos":74500000,"lengthMeters":1530.0,"ratePesosPerMeter":48692.81,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nueva Ecija - Pangasinan Rd, K0146 + 000 - K0146 + 411, K0146 + 805 - K0147 + 000, K0148 + 012 - K0148 + 950, K0156 + 000 - K0157 + 064","amountPesos":74300000,"lengthMeters":2608.0,"ratePesosPerMeter":28489.26,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calamba-Sta Cruz-Famy Jct Rd - K0074 + 145 - K0075 + 427, K0076 + 114 - K0076 + 558","amountPesos":74229000,"lengthMeters":1726.0,"ratePesosPerMeter":43006.37,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0029 + 1025 - K0030 + 500, K0039 + 000 - K0039 + 478","amountPesos":74127000,"lengthMeters":953.0,"ratePesosPerMeter":77782.79,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Makilala-Allah Valley Rd - K1622 + 265 - K1623 + 874","amountPesos":74117000,"lengthMeters":1609.0,"ratePesosPerMeter":46064.01,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ayaga-Sta. Marcela-Flora-Lasam Rd - K0672 + (-945) - K0673 + 000","amountPesos":74084000,"lengthMeters":1945.0,"ratePesosPerMeter":38089.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bambang-Kasibu-Solano Rd - K0250 + (-119) - K0251 + 000, K0254 + 000 - K0259 + 613","amountPesos":74070000,"lengthMeters":6732.0,"ratePesosPerMeter":11002.67,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Passi-Sn Rafael-Lemery-Sara Rd - K0051+700 - K0053 + 000, K0053 + 257 - K0053 + 343, K0053 + 1047 - K0054 + 000, K0059 + 000 - K0060 + 000","amountPesos":74000000,"lengthMeters":2433.0,"ratePesosPerMeter":30415.13,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Road with Drainage Systems, Palmera 5, Barangay Dela Paz, Antipolo City, Sta.(0+000 - Sta.0+526)","amountPesos":74000000,"lengthMeters":526.0,"ratePesosPerMeter":140684.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1646 + 850 - K1648 + 000","amountPesos":73860000,"lengthMeters":1150.0,"ratePesosPerMeter":64226.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Karkariskis Bridge, Sta. 0+000 - Sta. 0+060, La Paz, Abra","amountPesos":73730000,"lengthMeters":60.0,"ratePesosPerMeter":1228833.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cebu North Hagnaya Wharf Rd - K0025 + 413 - K0025 +928, K0019+000 - K0019+292, K0021+000 - K0021+653, K0021+653 - K0021+819","amountPesos":73710000,"lengthMeters":1626.0,"ratePesosPerMeter":45332.1,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa North Rd - K0187 + 000 - K0188 + 360","amountPesos":73476000,"lengthMeters":1360.0,"ratePesosPerMeter":54026.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Crossing MWCR (Pola)-Casague-Jct Alacaak Rd - K0389 + 000 - K0391 + 570, K0392 + 393 - K0394 + 547","amountPesos":73079000,"lengthMeters":4724.0,"ratePesosPerMeter":15469.73,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Cotabato-Marbel Rd) - K1723 + 243 - K1724 + 000","amountPesos":73057000,"lengthMeters":757.0,"ratePesosPerMeter":96508.59,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road along Phase 3 Lupang Pangako (Chainage 0+000 to Chainage 0+420), Barangay Payatas, Quezon City","amountPesos":73020000,"lengthMeters":420.0,"ratePesosPerMeter":173857.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banisilan-Guiling-Alamada-Libungan Rd - (S00833MN) Chainage 938 - Chainage 3445","amountPesos":72383000,"lengthMeters":2507.0,"ratePesosPerMeter":28872.36,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mindoro West Coastal Rd - K0284 + 000 - K0284 + 218, K0284 + 237 - K0285 + 754, K0285 + 775 - K0286 + 000, K0287 + 783 - K0290 + 212","amountPesos":72276000,"lengthMeters":4389.0,"ratePesosPerMeter":16467.53,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0042 + 834 - K0045 + 000","amountPesos":72234000,"lengthMeters":2166.0,"ratePesosPerMeter":33349.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0036 + 068 - K 0036 + 148, K0051 + 000 - K0052 + 000, K0052 + 251 - K0052 + 539","amountPesos":72041000,"lengthMeters":1368.0,"ratePesosPerMeter":52661.55,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1874 + 687 - K1883 + 420","amountPesos":72000000,"lengthMeters":8733.0,"ratePesosPerMeter":8244.59,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"P Burgos - Pototanin Jct - K0185 + 500 - K0186 + 830","amountPesos":72000000,"lengthMeters":1330.0,"ratePesosPerMeter":54135.34,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banaue-Hungduan-Benguet Bdry Rd - K0400 + 273 - K0400 + 309, K0400 + 476 - K0400 + 544, K0401 + 124 - K0401 + 178, K0401 + 330 - K0401 + 400","amountPesos":72000000,"lengthMeters":228.0,"ratePesosPerMeter":315789.47,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1706 + 000 - K1707 + 711","amountPesos":71986000,"lengthMeters":1711.0,"ratePesosPerMeter":42072.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rizal Natl Rd (Babalag-Kinama-Sn Francisco Sect) - K0527 + (-231) - K0527 + 220, K0528 + 780 - K0528 + 817, K0529 + 152 - K0529 + 209, K0529 + 293 - K0529 + 394, K0529 + 752 - K0529 + 806, K0531 + 300 - K0531 + 344, K0531 + 835 - K0532 + 000, K0532 + 600 - K0532 + 620, K0532 + 700 - K0532 + 732, K0532 + 973 - K0533 + 080, K0533 + 466 - K0533 + 536, K0533 + 597 - K0533 + 897, K0534 + 000 - K0534 + 070, K0535 + 710 - K0536 + 017, K0536 + 259 - K0536 + 345, K0536 + 920 - K0537 + 121, K0539 + 322 - K0539 + 422","amountPesos":71834000,"lengthMeters":2202.0,"ratePesosPerMeter":32622.16,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gapan-Fort Magsaysay Rd - K0099 + 237 - K0099 + 517, K0109 + 216 - K0109 + 846, K0109 + 943 - K0112 + 918, K0114 + 000 - K0115 + 000","amountPesos":71784000,"lengthMeters":4885.0,"ratePesosPerMeter":14694.78,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Pascual-Claveria Rd - K0005 + 101 - K0005 + 351, K0005 + 525 - K0005 + 588, K0005 + 624 - K0006 + 105, K0006 + 210 - K0006 + 648","amountPesos":71677000,"lengthMeters":1232.0,"ratePesosPerMeter":58179.38,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur","amountPesos":71400000,"lengthMeters":1281.35,"ratePesosPerMeter":55722.48,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Isulan Jct-Ninoy Aquino Rd - K1845 + 263 - K1845 + 363, K1845 + 365 - K1845 + 507, K1845 + 627 - K1845 + 695","amountPesos":71392000,"lengthMeters":310.0,"ratePesosPerMeter":230296.77,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod North Rd - K0092+118 - K0094 + 000","amountPesos":71248000,"lengthMeters":1882.0,"ratePesosPerMeter":37857.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calapan South Rd - K0079 + 598 - K0079 + 739, K0079 + 867 - K0081 + 702","amountPesos":71157000,"lengthMeters":1976.0,"ratePesosPerMeter":36010.63,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0172 + (-260) - K0173 + 730","amountPesos":71074000,"lengthMeters":1990.0,"ratePesosPerMeter":35715.58,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maasin Bypass Road, Sta. 0+00 - Sta. 3+316, Iloilo","amountPesos":70484000,"lengthMeters":3316.0,"ratePesosPerMeter":21255.73,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sambulawan Jct-Calaguise-Calubian Rd - K0997 + 160 - K0998 + 545","amountPesos":70350000,"lengthMeters":1385.0,"ratePesosPerMeter":50794.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Preventive Maintenance along Calapan South Road - K0029+690 - K0031+087, K0053+378 - K0053+511, K0054+257 - K0054+582, K0054+589 - K0054+705, K0059+554 - K0059+859","amountPesos":70000000,"lengthMeters":2276.0,"ratePesosPerMeter":30755.71,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palo-Carigara-Ormoc Rd - K1008 + 555 - K1010 + 000","amountPesos":70000000,"lengthMeters":1445.0,"ratePesosPerMeter":48442.91,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1758 + 626 - K1758 + 650, K1759 + 231 - K1759 + 261, K1766 + 096 - K1767 + 000, K1767 + 176 - K1767 + 608, K1767 + 911 - K1768 + 000, K1781 + 849 - K1781 + 850","amountPesos":70000000,"lengthMeters":1480.0,"ratePesosPerMeter":47297.3,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cebu North Hagnaya Wharf Rd - K0015 + 165 - K0015 + 853, K0016 + 019 - K0016 + 836","amountPesos":70000000,"lengthMeters":1505.0,"ratePesosPerMeter":46511.63,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jolo-Taglibi-Tiptipon Road, Sulu 1st District (S00006SL), Chainage 14 + 352 to Chainage 17 + 000","amountPesos":70000000,"lengthMeters":2648.0,"ratePesosPerMeter":26435.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jolo-Indanan-Parang-Silangkan Road (S00005SL), Chainage 19 + 350 to Chainage 22 + 000","amountPesos":70000000,"lengthMeters":2650.0,"ratePesosPerMeter":26415.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 9 + 600 to Chainage 12 + 085","amountPesos":70000000,"lengthMeters":2485.0,"ratePesosPerMeter":28169.01,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manguiring -Cagsao - Cabanbanan Rd- K0461 + 000 - K0461 + 240","amountPesos":70000000,"lengthMeters":240.0,"ratePesosPerMeter":291666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto - Claveria Bypass Road, Barangay Bugo Section, Sta. 0+000 - Sta. 0+780, Cagayan de Oro City","amountPesos":70000000,"lengthMeters":780.0,"ratePesosPerMeter":89743.59,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Abra-Kalinga-Apayao Road (Buluan-Banban-Daga-Puguin-Sacpil-Pinukpuk) - Sta. 3+390 - Sta. 3+790, Sta. 3+810 - Sta.4+410, Apayao","amountPesos":70000000,"lengthMeters":1000.0,"ratePesosPerMeter":70000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Batangas City-San Pascual-Bauan Diversion Rd - (S06170LZ) Chainage 0 - 2495 (Road Safety: Roadway Lighting)","amountPesos":70000000,"lengthMeters":2495.0,"ratePesosPerMeter":28056.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 15+940 – Sta. 16+200","amountPesos":70000000,"lengthMeters":260.0,"ratePesosPerMeter":269230.77,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Ilaor Norte - Busac Road, Oas, Albay Sta 0+000.00 - Sta. 1+270.00","amountPesos":70000000,"lengthMeters":1270.0,"ratePesosPerMeter":55118.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road at Barangay Bonga, Bulan, Sorsogon, Sta. 0+000 - Sta. 2+800","amountPesos":70000000,"lengthMeters":2800.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Barangay Guinsorongan leading to Reclamation Area, Catbalogan City, Samar, Sta. 0+320.00 - Sta. 0+540.00","amountPesos":70000000,"lengthMeters":220.0,"ratePesosPerMeter":318181.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Marinduque Circumferential Rd - K0053 + 000 - K0054 + 000","amountPesos":69999000,"lengthMeters":1000.0,"ratePesosPerMeter":69999.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mindoro West Coastal Rd - K0319 + 712 - K0323 + 1023","amountPesos":69852000,"lengthMeters":4311.0,"ratePesosPerMeter":16203.2,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0072 + 000 - K0073 + 308","amountPesos":69841000,"lengthMeters":1308.0,"ratePesosPerMeter":53395.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa North Rd - K0240 + 262 - K0241 + 600","amountPesos":69836000,"lengthMeters":1338.0,"ratePesosPerMeter":52194.32,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0014 + 000 - K0014 + 800","amountPesos":69728000,"lengthMeters":800.0,"ratePesosPerMeter":87160.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago-Tuguegarao Rd - K0359 + 000 - K0360 + 706","amountPesos":69655000,"lengthMeters":1706.0,"ratePesosPerMeter":40829.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1650 + 785 - K1651 + 000, K1654 + 000 - K1656 + 987","amountPesos":69539000,"lengthMeters":3202.0,"ratePesosPerMeter":21717.36,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Matalam-Lampayan-Antipas Rd - K1653 + 498 - K1653 + 700, K1659 + 000 - K1661 + 000","amountPesos":69530000,"lengthMeters":2202.0,"ratePesosPerMeter":31575.84,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Carmen Jct - Bayambang - Manat Road, K0194+000 - K0196+328","amountPesos":69061000,"lengthMeters":2328.0,"ratePesosPerMeter":29665.38,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gumaca - Pitogo - Mulanay - San Narciso Road. Quezon - K0218 + 000 - K0219 + 000, K0223 + 000 - K0223 + 280","amountPesos":69000000,"lengthMeters":1280.0,"ratePesosPerMeter":53906.25,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0062 + 1324 - K0065 + 898","amountPesos":68865000,"lengthMeters":2574.0,"ratePesosPerMeter":26754.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dr Damian Reyes Rd (Torrijos Side) - K0053 + 192 - K0057 + 000","amountPesos":68765000,"lengthMeters":3808.0,"ratePesosPerMeter":18058.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0712 + 000 - K0712 + 030, K0713 + 000 - K0713 + 200, K0716 + 446 - K0716 + 985, K0717 + 150 - K0717 + 326, K0718 + 000 - K0718 + 535, K0719 + 970 - K0720 + 230, K0721 + 158 - K0721 + 181","amountPesos":68469000,"lengthMeters":1763.0,"ratePesosPerMeter":38836.64,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Guinayangan-Tagkawayan Diversion Road, Sta. 11+000 -Sta. 12+000, Tagkawayan, Quezon","amountPesos":68104000,"lengthMeters":1000.0,"ratePesosPerMeter":68104.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Francisco-Sn Andres-Sn Narciso Rd - K0384 + 641 - K0386 + 000","amountPesos":68000000,"lengthMeters":1359.0,"ratePesosPerMeter":50036.79,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Carcar-Barili-Mantayupan Rd - K0040 + (-197) - K0042 + 000","amountPesos":68000000,"lengthMeters":2197.0,"ratePesosPerMeter":30951.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0488 + 090 - K0488 + 983, K0488 + 996 - K0490 + 000","amountPesos":68000000,"lengthMeters":1897.0,"ratePesosPerMeter":35846.07,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Aliaga-Guimba Diversion Road, Nueva Ecija, Sta. 1+153 - Sta. 1+270, Sta. 1+329 - Sta. 1+334, Sta. 5+167 - Sta. 5+260, Sta. 5+081 - Sta. 5+104, Sta. 6+049 - Sta. 6+210, Sta. 7+988 - Sta. 8+021, Sta. 8+139 - Sta. 9+047, Sta. 9+047 - Sta. 9+169, Sta. 9+200 - Sta. 9+964, Sta. 14+418.70 - Sta. 14+587.70, Sta. 15+150 - Sta. 15+287.60, Sta. 16+258 - Sta. 16+400, Sta. 16+473 - Sta. 16+513, Sta. 16+972 - Sta. 17+300, Sta. 17+330 - Sta. 17+550, Sta. 17+600 - Sta. 17+800","amountPesos":68000000,"lengthMeters":3462.6,"ratePesosPerMeter":19638.42,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sta. Maria-Sn Quintin Rd, K0212 + 737 - K0221 + 237 (Road Safety: Roadway Lighting)","amountPesos":68000000,"lengthMeters":8500.0,"ratePesosPerMeter":8000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0077 + 799 - K0078 + 000, K0079 + 140 - K0080 + 430","amountPesos":67942000,"lengthMeters":1491.0,"ratePesosPerMeter":45568.08,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tablas Circumferential Rd - K0078 + 126 - K0078 + 323, K0078 + 374 - K0079 + 340, K0080 + 300 - K0081 + 360, K0082 + 000 - K0082 + 862, K0084 + 000 - K0084 + 562, K0087 + 490 - K0087 + 869, K0087 + 895 - K0087 + 995, K0096 + 600 - K0097 + 000, K0099 + 000 - K0099 + 214","amountPesos":67746000,"lengthMeters":4740.0,"ratePesosPerMeter":14292.41,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Camiguin Circumferential Rd - K0032 + 182 - K0033 + 059, K0033 + 095.40 - K0034 + 180","amountPesos":67729000,"lengthMeters":1961.6,"ratePesosPerMeter":34527.43,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Aklan West Rd (Kalibo-Nabas) (S00324PN) – K0240 + 739 – K0241 + 248","amountPesos":67723000,"lengthMeters":509.0,"ratePesosPerMeter":133051.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dr Damian Reyes Rd (Torrijos Side) - K0049 + 423 - K0053 + 163","amountPesos":67694000,"lengthMeters":3740.0,"ratePesosPerMeter":18100.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Carmen Jct-Bayambang-Manat Rd - K0203 + (-645) - K0204 + 011, K0204 + 018.60 - K0206 + 315, K0206 + 345.90 - K0206 + 518, K0195 + 610 - K0196 + 328 (Road Safety: Roadway Lighting)","amountPesos":67422000,"lengthMeters":4842.5,"ratePesosPerMeter":13922.97,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa North Rd - K0221 + 000 - K0222 + 300","amountPesos":67392000,"lengthMeters":1300.0,"ratePesosPerMeter":51840.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maspang H-way - K0070 + (-895) - K0071 + 280, K0071 + 613 - K0072 + 045","amountPesos":66998000,"lengthMeters":2607.0,"ratePesosPerMeter":25699.27,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sagbat-Pililla Div Rd - K0047 + 650 - K0048 + 000, K0048 + 312 - K0048 + 574, K0049 + 459 - K0050 + 000","amountPesos":66660000,"lengthMeters":1153.0,"ratePesosPerMeter":57814.4,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0167 + 000 - K0171 + 000","amountPesos":66381000,"lengthMeters":4000.0,"ratePesosPerMeter":16595.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Aklan West Rd (Kalibo-Nabas) - K0266 + 528 - K0267 + 249, K0267 + 282 - K0267 + 580, K0271 + 268 - K0271 + 484","amountPesos":65675000,"lengthMeters":1235.0,"ratePesosPerMeter":53178.14,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0248 + 574 - K0250 + 268","amountPesos":65528000,"lengthMeters":1694.0,"ratePesosPerMeter":38682.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dinagat-Loreto Rd - K0058 + 240 - K0061 + 000","amountPesos":65527000,"lengthMeters":2760.0,"ratePesosPerMeter":23741.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Jct. Cagayan Valley Rd - Sampaguita-Warat-La Suerte-Catarauan-Afusing Rd (Bridge and Approaches) (Sta. 1+116.90 - Sta. 1+152.90)","amountPesos":65500000,"lengthMeters":36.0,"ratePesosPerMeter":1819444.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway(Davao City-Jct Digos Sect) - K1519 + (-760) - K1519 + (-597), K1520 + 701 - K1520 + 904, K1521 + 042 - K1522 + 000","amountPesos":65395000,"lengthMeters":1324.0,"ratePesosPerMeter":49391.99,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago-Tuguegarao Rd - K0350 + 000 - K0351 + 400","amountPesos":65273000,"lengthMeters":1400.0,"ratePesosPerMeter":46623.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ormoc-Baybay-Southern Leyte Bdry Rd - K1034 + 806 - K1035 + 045, K1035 + 806 - K1037 + 124","amountPesos":65200000,"lengthMeters":1557.0,"ratePesosPerMeter":41875.4,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cabutagan-Haluban-Sooc Rd - (S03580LZ) Chainage 1287 - Chainage 2288","amountPesos":65065000,"lengthMeters":1001.0,"ratePesosPerMeter":65000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sta. Elena-Capalonga By Pass Coastal Rd - K0277 + 358 - K0279 + 491","amountPesos":65050000,"lengthMeters":2133.0,"ratePesosPerMeter":30496.95,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Digos-Makar Rd) - K1576+900 - K1577+800","amountPesos":65000000,"lengthMeters":900.0,"ratePesosPerMeter":72222.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Digos-Makar Rd) - K1577+ 800 - K1578+329","amountPesos":65000000,"lengthMeters":529.0,"ratePesosPerMeter":122873.35,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cabutagan-Haluban-Sooc Rd - (S03580LZ) Chainage 287 - Chainage 1287","amountPesos":65000000,"lengthMeters":1000.0,"ratePesosPerMeter":65000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago-Tuguegarao Road - K0384 + 007 - K0385 + 462","amountPesos":65000000,"lengthMeters":1455.0,"ratePesosPerMeter":44673.54,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage System at Daisy Street, Chainage 000 - Chainage 221, Daffodils Street Chainage 000 - Chainage 255, Carnation Street Chainage 000 - Chainage 254 and Aster Street Chainage 000 - Chainage 349 in Barangay Fairview, Quezon City","amountPesos":65000000,"lengthMeters":349.0,"ratePesosPerMeter":186246.42,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1019 + 300 - K1020 + 358","amountPesos":64998000,"lengthMeters":1058.0,"ratePesosPerMeter":61434.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0013 + 253 - K0014 + 000","amountPesos":64935000,"lengthMeters":747.0,"ratePesosPerMeter":86927.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Road -K0027+530 - K0027+652, K0030+400 -K0031+700, K0033+(-123) - K0033+232.8, Bulacan","amountPesos":64913000,"lengthMeters":1777.8,"ratePesosPerMeter":36513.11,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0067 + 468 - K0068 + 674","amountPesos":64850000,"lengthMeters":1206.0,"ratePesosPerMeter":53772.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Looc (Cogon Tulay)-Odiongan Rd - K0103 + 000 - K0103 + 180, K0105 + 000 - K0105 + 400, K0109 + 000 - K0109 + 300, K0109 + 400 - K0110 + 000, K0112 + 600 - K0114 + 000, K0114 + 063 - K0114 + 650, K0118 + 091 - K0118 + 700, K0124 + 600 - K0125 + 000","amountPesos":64815000,"lengthMeters":4476.0,"ratePesosPerMeter":14480.56,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) – K1724+152.50 - K1724+180,K1725+000 - K1725+500, K1738+943 - K1740+145, K1749+700 - K1750+000,K1750+268 - K1751+000, K1755+972 - K1756+236","amountPesos":64603000,"lengthMeters":3025.5,"ratePesosPerMeter":21352.83,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0120 + 000 - K0122+059","amountPesos":64500000,"lengthMeters":2059.0,"ratePesosPerMeter":31325.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1681 + 000 - K1681 + 1000","amountPesos":64170000,"lengthMeters":1000.0,"ratePesosPerMeter":64170.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Prosperidad-Quezon-Cabaron Rd - K0065 + (-125) - K0065 + 225, K0066 + 000 - K0067 + 364, K0067 + 719 - K0067 + 819, K0068 + 000 - K0069 + 1143","amountPesos":64100000,"lengthMeters":3957.0,"ratePesosPerMeter":16199.14,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calasiao Old Road, K0204+965 - K0207+186","amountPesos":64048000,"lengthMeters":2221.0,"ratePesosPerMeter":28837.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao-Davao Coastal Rd - K1192 + 592 - K1197 + 000","amountPesos":64000000,"lengthMeters":4408.0,"ratePesosPerMeter":14519.06,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sta. Elena-Capalonga By Pass Coastal Rd - K0274 + 657 – K0276 + 744","amountPesos":64000000,"lengthMeters":2087.0,"ratePesosPerMeter":30666.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1611 + 850 - K1615 + 000","amountPesos":63984000,"lengthMeters":3150.0,"ratePesosPerMeter":20312.38,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sibuyan Circumferential Rd - K0031 + 349 - K0031 + 421, K0031 + 632 - K0031 + 728, K0032 + 000 - K0032 + 479, K0033 + 612 - K0033 + 744, K0034 + 000 - K0034 + 091, K0041 + 151 - K0042 + 000, K0042 + 439 - K0042 + 605, K0043 + 111 - K0043 + 417, K0043 + 436 - K0044 + 623, K0049 + 552 - K0049 + 730, K0052 + 066 - K0052 + 188, K0052 + 269 - K0053 + 000","amountPesos":63925000,"lengthMeters":4409.0,"ratePesosPerMeter":14498.75,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1610 + 000 - K1611 + 000","amountPesos":63592000,"lengthMeters":1000.0,"ratePesosPerMeter":63592.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0590+(-620) - K0590+(-560)","amountPesos":63499000,"lengthMeters":60.0,"ratePesosPerMeter":1058316.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nueva Ecija - Pangasinan Rd, K0166 + 000 - K167 + 1001","amountPesos":63300000,"lengthMeters":2001.0,"ratePesosPerMeter":31634.18,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa North Rd - K0194 + 569 - K0195 + 500","amountPesos":63284000,"lengthMeters":931.0,"ratePesosPerMeter":67974.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bulalacao-Sn Jose-Jct Mapaya Rd - K0219 + 052 - K0220 + 488, K0220 + 495 - K0220 + 695, K0220 + 704 - K0223 + 375","amountPesos":63000000,"lengthMeters":4307.0,"ratePesosPerMeter":14627.35,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"P Burgos - Pototanin Jct, Quezon - K0200 + 719 - K0201 + 892","amountPesos":63000000,"lengthMeters":1173.0,"ratePesosPerMeter":53708.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"P Burgos - Pototanin Jct, Quezon- K0162 + 698 - K0163 + 000, K0178 + 898 - K0179 + 769","amountPesos":63000000,"lengthMeters":1173.0,"ratePesosPerMeter":53708.44,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sta. Elena-Capalonga By Pass Coastal Rd - K0279 + 868 – K0281 + 893","amountPesos":62820000,"lengthMeters":2025.0,"ratePesosPerMeter":31022.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Milagros Rd - K0011 + 800 - K0012 + 600","amountPesos":62706000,"lengthMeters":800.0,"ratePesosPerMeter":78382.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0062 + 100 - K0062 + 473, K0063 + 000 - K0064 + 289, K0085 + 842 - K0086 + 083","amountPesos":62701000,"lengthMeters":1903.0,"ratePesosPerMeter":32948.5,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Albert Morrow Blvd - K1663 + 000 - K1663 + 684.17","amountPesos":62642000,"lengthMeters":684.17,"ratePesosPerMeter":91559.12,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa North Rd - K0236 + 800 - K0238 + 000","amountPesos":62348000,"lengthMeters":1200.0,"ratePesosPerMeter":51956.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Magpet-Nowa-Doroluman-Greenfield Rd - K1658 + 144 - K1660 + 100","amountPesos":62329000,"lengthMeters":1956.0,"ratePesosPerMeter":31865.54,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lagta-Crossing Malinta Rd - K0102 + 750 - K0103 + 500","amountPesos":62192000,"lengthMeters":750.0,"ratePesosPerMeter":82922.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bato By-Pass Road, Sta. 2+501 - 3+059.01, Barangay Tabunok, Bato, Leyte","amountPesos":62070000,"lengthMeters":558.01,"ratePesosPerMeter":111234.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calamba-Tagaytay Rd - K0051 + (-740) - K0051 + (-564), K0051 + 100 - K0051 + 571, K0051 + 669 - K0051 + 850, K0053 + 000 - K0053 + 150, K0054 + 000 - K0055 + 000, K0055 + 215 - K0056 + 635, K0058 + 840 - K0058 + 870, K0059 + 000 - K0060 + 000, K0062 + 000 - K0063 + 670","amountPesos":62017000,"lengthMeters":6098.0,"ratePesosPerMeter":10170.06,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bukidnon-Cotabato Rd - K1620 + 000 - K1621 + 000, K1642 + (-635) - K1642 + 677","amountPesos":62015000,"lengthMeters":2312.0,"ratePesosPerMeter":26823.1,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Olongapo-Bugallon Rd - K0147+696 - K0148+764","amountPesos":62000000,"lengthMeters":1068.0,"ratePesosPerMeter":58052.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sta. Elena-Capalonga By Pass Coastal Rd – K0270 + 640 - K0272 + 643","amountPesos":62000000,"lengthMeters":2003.0,"ratePesosPerMeter":30953.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sta. Elena-Capalonga By Pass Coastal Rd - K0272 + 643 – K0274 + 657","amountPesos":62000000,"lengthMeters":2014.0,"ratePesosPerMeter":30784.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Bannawag - Bautista Bridge, Sta. 0+000 - Sta. 0+300, Jones and San Agustin, Isabela","amountPesos":62000000,"lengthMeters":300.0,"ratePesosPerMeter":206666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, GPS (Bo.1) to Barangay San Jose (Bo.5), Sta. 0+000 - Sta. 2+400, Koronadal City, South Cotabato","amountPesos":62000000,"lengthMeters":2400.0,"ratePesosPerMeter":25833.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cauayan-Cabatuan Rd - K0378 + 137 - K0380 + 268","amountPesos":61977000,"lengthMeters":2131.0,"ratePesosPerMeter":29083.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage at Barangay Greater Lagro (Chainage 0+000 - Chainage 0+238), Quezon City","amountPesos":61880000,"lengthMeters":238.0,"ratePesosPerMeter":260000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kidapawan-Calunasan-Mlang Rd - K1638 + 008 - K1639 + 080, K1639 + 175 - K1640 + 000","amountPesos":61732000,"lengthMeters":1897.0,"ratePesosPerMeter":32541.91,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0424 + 340 - K0424 + 358, K0426 + 290 - K0426 + 308, K0427 + 680 - K0427 + 699, K0428 + 750 - K0428 + 768, K0430 + 850 - K0430 + 867, K0431 + 700 - K0431 + 728, K0432 + 150 - K0432 + 185, K0438 + 550 - K0438 + 570, K0439 + 910 - K0439 + 950, K0440 + 250 - K0440 + 270, K0441 + 550 - K0441 + 650, K0445+312 - K0445+333, K0449+713 - K0449+740","amountPesos":61649000,"lengthMeters":381.0,"ratePesosPerMeter":161808.4,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ipil-Liloy-Sindangan Rd - K1997 + 000 - K1998 + 266","amountPesos":61617000,"lengthMeters":1266.0,"ratePesosPerMeter":48670.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ipil-Liloy-Sindangan Rd - K2000 + 000 - K2001 + 144.50","amountPesos":61492000,"lengthMeters":1144.5,"ratePesosPerMeter":53728.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0344 + 000 - K0345 + 000","amountPesos":61465000,"lengthMeters":1000.0,"ratePesosPerMeter":61465.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lanot-Loctugan-Panitan Bdry Rd - K0109 + (-241) - K0110 + 709","amountPesos":61400000,"lengthMeters":1950.0,"ratePesosPerMeter":31487.18,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Sta. 0+194 - Sta. 4+569) at Sitio Binintigan, Barangay XI, Victorias City, Negros Occidental (10.7951780, 123.1821790)","amountPesos":61250000,"lengthMeters":4375.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway ( Tucuran Jct-Karomatan Jct Rd) - K1651 + (-212) - K1652 + 000","amountPesos":61149000,"lengthMeters":1212.0,"ratePesosPerMeter":50452.97,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lagta-Crossing Malinta Rd - K0103 + 500 - K0104 + 250","amountPesos":61038000,"lengthMeters":750.0,"ratePesosPerMeter":81384.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Wright-Taft-Borongan Rd - K0855 + 000 - K0855 + 498, K0855 + 521.50 - K0855 + 762, K0855 + 797.75 - K0856 + 166","amountPesos":61000000,"lengthMeters":1106.75,"ratePesosPerMeter":55116.33,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa North Rd - K0234 + 000 - K0235 + 200","amountPesos":60996000,"lengthMeters":1200.0,"ratePesosPerMeter":50830.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Basud-Lanot Rd - (S06300LZ) Chainage 12604 - Chainage 15433","amountPesos":60855000,"lengthMeters":2829.0,"ratePesosPerMeter":21511.13,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Basud-Lanot Rd - (S06300LZ) Chainage 21131 - Chainage 23960","amountPesos":60855000,"lengthMeters":2829.0,"ratePesosPerMeter":21511.13,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Basud-Lanot Rd - (S06300LZ) Chainage 15433 - Chainage 15448, Chainage 15488 - Chainage 18302","amountPesos":60854000,"lengthMeters":2829.0,"ratePesosPerMeter":21510.78,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Linamon-Zamboanga Rd - K1608 + 549 - K1609 + 788","amountPesos":60792000,"lengthMeters":1239.0,"ratePesosPerMeter":49065.38,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd - K0067+200 - K0068 + 760","amountPesos":60762000,"lengthMeters":1560.0,"ratePesosPerMeter":38950.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alilem-Sugpon-Sudipen Rd - K0317 + 647 - K0317 + 677","amountPesos":60750000,"lengthMeters":30.0,"ratePesosPerMeter":2025000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concepcion-Sn Dionisio Rd - K0224 + 000 - K0226 + 201","amountPesos":60512000,"lengthMeters":2201.0,"ratePesosPerMeter":27492.96,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1504 + 790 - K1504 + 910, K1505 + 240 - K1505 + 280, K1505 + 340 - K1505 + 360, K1505 + 540 - K1505 + 600, K1509 + 500 - K1509 + 630, K1512 + 530 - K1512 + 600","amountPesos":60480000,"lengthMeters":440.0,"ratePesosPerMeter":137454.55,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Terminal Bldg Access Rd - K0013 + (-080) - K0013 + 885","amountPesos":60459000,"lengthMeters":965.0,"ratePesosPerMeter":62651.81,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bukidnon-Cotabato Rd - K1607 + 480 - K1608 + 000, K1611 + 620 - K1612 + 258","amountPesos":60397000,"lengthMeters":1158.0,"ratePesosPerMeter":52156.3,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Saturnino R. Silva Rd - K1478 + 560 - K1478 + 656, K1480 + 326 - K1480 + 431, K1481 + 235 - K1482 + 292, K1482 + 479 - K1482 + 940","amountPesos":60345000,"lengthMeters":1719.0,"ratePesosPerMeter":35104.71,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Milagros Rd - K0010 + 1000 - K0011 + 800","amountPesos":60300000,"lengthMeters":800.0,"ratePesosPerMeter":75375.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan","amountPesos":60257000,"lengthMeters":518.24,"ratePesosPerMeter":116272.38,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"MT Villanueva Ave-Magsaysay Rd - K0439 + (-869) - K0439 + 638","amountPesos":60000000,"lengthMeters":1507.0,"ratePesosPerMeter":39814.2,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Toledo-Tabuelan-Sn Remigio Rd - K0080 + 844 - K0081 + 412, K0090 + 202 - K0090 + 309, K0090 + 373 - K0090 + 777, K0092 + 000 - K0093 + 738","amountPesos":60000000,"lengthMeters":2817.0,"ratePesosPerMeter":21299.25,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt Province-N Vizcaya Rd - K0369 + 870 - K0370 + 100","amountPesos":60000000,"lengthMeters":230.0,"ratePesosPerMeter":260869.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0035 + 334 - K0035 + 397","amountPesos":60000000,"lengthMeters":63.0,"ratePesosPerMeter":952380.95,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Logac-Lasam-Gagabutan Rd - K0742 + 470 - K0742 + 660","amountPesos":60000000,"lengthMeters":190.0,"ratePesosPerMeter":315789.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iguig Bypass Road, Sta. 0+100 - Sta. 0+274, Sta. 3+500 - Sta. 3+680, Cagayan","amountPesos":60000000,"lengthMeters":354.0,"ratePesosPerMeter":169491.53,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Talavera-Licab Road, Nueva Ecija, Sta. 0+000 - Sta. 2+739","amountPesos":60000000,"lengthMeters":2739.0,"ratePesosPerMeter":21905.81,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sampaloc By-Pass Rd, Sta. 0+000 - 0+600, Sampaloc, Quezon","amountPesos":60000000,"lengthMeters":600.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Batangas City-San Pascual-Bauan Diversion Road - Chainage 5813 - Chainage 6246, Batangas","amountPesos":60000000,"lengthMeters":433.0,"ratePesosPerMeter":138568.13,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"CDO-New Western Diversion Road (Kauswagan-Bonbon Section), Barangay Bonbon- Barangay Bayabas, Sta. 0+000 - Sta. 0+160, Sta. 0+224 - Sta. 0+271, Sta. 0+400 - Sta. 1+110, Sta. 1+540 - Sta. 1+970, Cagayan de Oro City","amountPesos":60000000,"lengthMeters":1347.0,"ratePesosPerMeter":44543.43,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mindoro Island Circumferential Road (Paluan - Abra de Ilog), Apyas to Mananao, Occidental Mindoro, Sta 000+000 - Sta 001+000","amountPesos":60000000,"lengthMeters":1000.0,"ratePesosPerMeter":60000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0039 + 000 - K0047 + 000 (Road Safety: Roadway Lighting)","amountPesos":60000000,"lengthMeters":8000.0,"ratePesosPerMeter":7500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Reconstruction/Improvement of Roads, Barangay Poblacion, Binalonan, Pangasinan, Sta 0+000 - Sta. 2+310","amountPesos":60000000,"lengthMeters":2310.0,"ratePesosPerMeter":25974.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Bridge, Barangay Dicamay - Barangay Tappa, (Sta.0+000.00 - Sta. 0+121.00), San Mariano, Isabela","amountPesos":60000000,"lengthMeters":121.0,"ratePesosPerMeter":495867.77,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Dingading-Rizal Road, Sta. 0 + 000 - Sta. 4 + 000, Barangay Dingading, San Guillermo, Isabela","amountPesos":60000000,"lengthMeters":4000.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Kastila Road Gomez, Sta. 0 + 000 - Sta. 0 + 930, Sta. 0 + 000 - Sta. 3 + 070, Rizal East, Doña Paulina, Rizal West, San Isidro, Isabela","amountPesos":60000000,"lengthMeters":3070.0,"ratePesosPerMeter":19543.97,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Sitio Villa Miranda Bridge, Barangay Dibuluan, (Sta. 0+000.00 to Sta. 0+101.00) San Mariano, Isabela","amountPesos":60000000,"lengthMeters":101.0,"ratePesosPerMeter":594059.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, F-Rafols Road, Sta. 00+504 - Sta. 00+979, Barangay Sta. Monica, Puerto Princesa City, Palawan","amountPesos":60000000,"lengthMeters":475.0,"ratePesosPerMeter":126315.79,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road, Duran - Coguit Suburban Road, Balatan, Camarines Sur, Sta. 0 + 560.00 - Sta. 1 + 460.00","amountPesos":60000000,"lengthMeters":900.0,"ratePesosPerMeter":66666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road at Sitio San Jose, Calomagon to E. Quirino, Bulan, Sorsogon, Sta. 0+000 - Sta. 2+400","amountPesos":60000000,"lengthMeters":2400.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Bridge, Sta. 0 + 843 - Sta. 0 + 868, Barangay Aguilar, San Lorenzo, Guimaras","amountPesos":60000000,"lengthMeters":25.0,"ratePesosPerMeter":2400000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Cag-abaca - Cularima - General Malvar Road, Sta. 002+584.50 - Sta. 002+972, Catarman, Northern Samar","amountPesos":60000000,"lengthMeters":387.5,"ratePesosPerMeter":154838.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Barangay Yabon to Barangay Cabalagnan, Hinabangan, Samar (Sta. 0+000 - Sta. 0+760)","amountPesos":60000000,"lengthMeters":760.0,"ratePesosPerMeter":78947.37,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Rehabilitation of Santol - Bunsuran II Bridge, Sta. 3+580 - Sta. 3+596, Bunsuran II, Pandi, Bulacan (120.923015, 14.856319)","amountPesos":60000000,"lengthMeters":16.0,"ratePesosPerMeter":3750000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa North Rd - K0224 + 000 - K0225 + 150","amountPesos":59904000,"lengthMeters":1150.0,"ratePesosPerMeter":52090.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alicia-San Mateo Rd - K0354 + 711 - K0356 + 000","amountPesos":59865000,"lengthMeters":1289.0,"ratePesosPerMeter":46442.98,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Milagros Rd - K0012 + 600 - K0013 + 385","amountPesos":59775000,"lengthMeters":785.0,"ratePesosPerMeter":76146.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lipa City - Alaminos Rd - K0083 + (-044) - K0084 + 059","amountPesos":59653000,"lengthMeters":1103.0,"ratePesosPerMeter":54082.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santander-Barili-Toledo Rd - K0162 + 537 - K0163 + 882, K0163 + 973 - K0165 + 411","amountPesos":59322000,"lengthMeters":2783.0,"ratePesosPerMeter":21315.85,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction/Rehabilitation of Del Carmen-Bulaon-Calulut Road, City of San Fernando, Pampanga Sta. 0+000 - Sta. 2+054","amountPesos":59246000,"lengthMeters":2054.0,"ratePesosPerMeter":28844.21,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mindoro West Coastal Rd - K0307 + 000 - K0311 + 000","amountPesos":59231000,"lengthMeters":4000.0,"ratePesosPerMeter":14807.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bais-Kabankalan Rd - K0094 + 000 - K0096 + 000","amountPesos":59200000,"lengthMeters":2000.0,"ratePesosPerMeter":29600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Olongapo - Bugallon Road - K0235 + 005 - K0236 + 000, K0239 + 000 - K0239 + 939","amountPesos":59000000,"lengthMeters":1934.0,"ratePesosPerMeter":30506.72,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao-Davao Coastal Rd, K1812 + 762 - K1814 + 716","amountPesos":59000000,"lengthMeters":1954.0,"ratePesosPerMeter":30194.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Almiñe to Barangay Piña - Sta. 1+800 - Sta. 2+900, San Jacinto, Masbate","amountPesos":59000000,"lengthMeters":1100.0,"ratePesosPerMeter":53636.36,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, San Fernando- San Jacinto- Monreal Road (Bartolabac Section), - Sta. 24 + 040 - Sta. 24 + 600, San Jacinto, Masbate","amountPesos":59000000,"lengthMeters":560.0,"ratePesosPerMeter":105357.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0770 + 325 - K0770 + 745, K0775 + 872 - K0776 + 090, K0779 + 000 - K0779 + 300, K0779 + 700 - K0781 + 000, K0785 + 000 - K0785 + 329","amountPesos":58977000,"lengthMeters":2567.0,"ratePesosPerMeter":22975.07,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banaue-Hungduan-Benguet Bdry Rd - K0406 + 104 - K0406 + 204, K0407 + (-327) - K0407 + (-298), K0408 + 373 - K0408 + 422, K0409 + 730 - K0409 + 778, K0411 + 000 - K0411 + 045, K0414 + 166 - K0414 + 196","amountPesos":58900000,"lengthMeters":301.0,"ratePesosPerMeter":195681.06,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cavite-Batangas Rd - K0040 + 000 - K0040 + 059, K0041 + 061 - K0041 + 122, K0041 + 866 - K0041 + 953, K0044 + 799 - K0044 + 864, K0044 + 896 - K0045 + 375","amountPesos":58825000,"lengthMeters":751.0,"ratePesosPerMeter":78328.89,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Batangas-Quezon Rd - K0111 + 000 - K0111 + 965, K0125 + 717 - K0125 + 831, K0129 + 420 - K0129 + 705, K0129 + 855 - K0129 + 958, K0130 + 464 - K0130 + 944","amountPesos":58819000,"lengthMeters":1947.0,"ratePesosPerMeter":30210.07,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Rd - K1721 + 000 - K1721 + 900, K1721 + 955 - K1723 + 000","amountPesos":58700000,"lengthMeters":1945.0,"ratePesosPerMeter":30179.95,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calapan South Rd - K0090 + 000 - K0090 + 710, K0094 + 424 - K0095 + 300, K0096 + 000 - K0096 + 380","amountPesos":58579000,"lengthMeters":1966.0,"ratePesosPerMeter":29796.03,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0424 + 811 - K0424 + 903, K0425 + 520 - K0425 + 649, K0426 + 242 - K0426 + 400, K0427 + 542 - K0427 + 579, K0427+674 - K0427+721","amountPesos":58506000,"lengthMeters":463.0,"ratePesosPerMeter":126362.85,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Makilala-Allah Valley Rd - K1639 + 000 - K1639 + 495, K1639 + 515 - K1640 + 853","amountPesos":58409000,"lengthMeters":1833.0,"ratePesosPerMeter":31865.25,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Makilala-Allah Valley Rd - K1621 + 000 - K1622 + 265","amountPesos":58404000,"lengthMeters":1265.0,"ratePesosPerMeter":46169.17,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct (TER)-Jagna-Sierra Bullones Rd - K0068 + 000 - K0070 + 439","amountPesos":58387000,"lengthMeters":2439.0,"ratePesosPerMeter":23938.91,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago Bypass Rd - K0325+561 - K0327+081","amountPesos":58225000,"lengthMeters":1520.0,"ratePesosPerMeter":38305.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bayawan-Kabankalan Rd - K0141+121 - K0141+743, K0141+749 - K0142+171","amountPesos":58099000,"lengthMeters":1044.0,"ratePesosPerMeter":55650.38,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct. Ayaga (Abulug)-Ballesteros-Aparri Rd - K0691 + 825 - K0695 + 000","amountPesos":58000000,"lengthMeters":3175.0,"ratePesosPerMeter":18267.72,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacnotan-Luna-Balaoan Rd - K0289 + 060 - K0291 + 000","amountPesos":58000000,"lengthMeters":1940.0,"ratePesosPerMeter":29896.91,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Marikina-Infanta Rd - Lucena-Tayabas-Lucban-Sampaloc-Mauban Port Rd - K0146 + 895 - K0146 + 945","amountPesos":58000000,"lengthMeters":50.0,"ratePesosPerMeter":1160000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1764 + 330 - K1766 + 000","amountPesos":58000000,"lengthMeters":1670.0,"ratePesosPerMeter":34730.54,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Marilag Agoho Road - K0224 + 630 - K0224 + 731, Quezon","amountPesos":58000000,"lengthMeters":101.0,"ratePesosPerMeter":574257.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Junction National Road to Flor Mores Road, Monreal Masbate- Sta. 0 + 000- Sta. 1 + 200","amountPesos":58000000,"lengthMeters":1200.0,"ratePesosPerMeter":48333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ipil-Magdaup Wharf Rd - K2015 + 647.50 - K2016 + 671","amountPesos":57761000,"lengthMeters":1023.5,"ratePesosPerMeter":56434.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage System at Bel Air, Chainage 000 - 274, Biscayne Street Chainage 000 - 249 and Colt Street Chainage 000 - 301 in Barangay Fairview, Quezon City","amountPesos":57750000,"lengthMeters":301.0,"ratePesosPerMeter":191860.47,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alicia-San Mateo Rd - K0359 + 000 - K0360 + 256","amountPesos":57673000,"lengthMeters":1256.0,"ratePesosPerMeter":45917.99,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kidapawan-Magpet-Pangaoan Rd - K1627 + 666 - K1627 + 716, K1627 + 744 - K1627 + 844, K1628 + 375 - K1629 + 264, K1629 + 305.40 - K1629 + 745","amountPesos":57664000,"lengthMeters":1478.6,"ratePesosPerMeter":38999.05,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1636 + 019 - K1636 + 840, K1637 + 706 - K1637 + 858","amountPesos":57559000,"lengthMeters":973.0,"ratePesosPerMeter":59156.22,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calbayog-Catarman Rd - K0802 + 000 - K0802 + 984, K0803 + 160 - K0803 + 950","amountPesos":57536000,"lengthMeters":1774.0,"ratePesosPerMeter":32432.92,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1352 + 189 - K1353 + 494, K1353 + 714 - K1353 + 902, K1355 + (-1103) - K1355 + (-903) (Road Safety: Roadway Lighting)","amountPesos":57528000,"lengthMeters":1688.0,"ratePesosPerMeter":34080.57,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Catarman-Calbayog Rd - K0772 + 413 - K0772 + 463, K0783 + 430 - K0783 + 540","amountPesos":57500000,"lengthMeters":160.0,"ratePesosPerMeter":359375.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Dat-an-Carmen-Sierra Bullones-Pilar-Alicia Rd - K0066 + 500 - K0068 + 800","amountPesos":57430000,"lengthMeters":2300.0,"ratePesosPerMeter":24969.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Moncada-San Manuel Bypass Road, Barangay Legaspi, San Manuel, Sta. 6+088.20 - Sta. 6+131.00, Tarlac","amountPesos":57143000,"lengthMeters":42.8,"ratePesosPerMeter":1335116.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Moncada-San Manuel Bypass Road, Barangay Matarannoc - Pacpaco, Sta. 6 + 222.9 - Sta. 6 + 681.60, Tarlac","amountPesos":57143000,"lengthMeters":458.7,"ratePesosPerMeter":124575.98,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Moncada-San Manuel Bypass Road, Barangay Pacpaco (San Manuel) to Bantog - Sinense (Anao), Sta. 6 + 681.60 - Sta. 7 + 140.30, Tarlac","amountPesos":57143000,"lengthMeters":458.7,"ratePesosPerMeter":124575.98,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Moncada-San Manuel Bypass Road, Barangay Sinense, Sta. 7 + 140.30 - Sta. 7 + 599.00, Tarlac","amountPesos":57143000,"lengthMeters":458.7,"ratePesosPerMeter":124575.98,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Moncada-San Manuel Bypass Road, Barangay Sinense, Sta. 7 + 599.00 - Sta. 8 + 057.70, Tarlac","amountPesos":57143000,"lengthMeters":458.7,"ratePesosPerMeter":124575.98,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tablas Circumferential Rd - K0104 + 000 - K0106 + 392, K0106 + 616 - K0107 + 952, K0107 + 966 - K0108 + 144","amountPesos":57041000,"lengthMeters":3906.0,"ratePesosPerMeter":14603.43,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0157 + 870 - K0159 + 999","amountPesos":57032000,"lengthMeters":2129.0,"ratePesosPerMeter":26788.16,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Sta. 0+000-16+667, Barangay Umiray, Dingalan, Aurora","amountPesos":57000000,"lengthMeters":16667.0,"ratePesosPerMeter":3419.93,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road (Sta. 0+000 - Sta. 1+075) at Barangay Concepcion, Talisay City, Negros Occidental","amountPesos":57000000,"lengthMeters":1075.0,"ratePesosPerMeter":53023.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surallah-Lake Sebu-Maitum Rd - K1803 + 000 - K1805 + 775","amountPesos":56645000,"lengthMeters":2775.0,"ratePesosPerMeter":20412.61,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"MSR Jct-Lopez-Catanauan Rd - K0224+945 - K0225+014, K0225+568 - K0225+626, K0226+835 - K0226+900, K0227+342 - K0227+392, K0227+420 - K0227+491, K0232+840 - K0232+870, K0233+106 - K0233+133, K0234+966 - K0235+069","amountPesos":56500000,"lengthMeters":473.0,"ratePesosPerMeter":119450.32,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Policarpo-Arteche-Lapinig Rd - K0853 + 944.60 - K0854 + 560","amountPesos":56472000,"lengthMeters":615.4,"ratePesosPerMeter":91764.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Carsoan Bridge, Sta. 0+000 - Sta. 0+030, San Quintin, Abra","amountPesos":56405000,"lengthMeters":30.0,"ratePesosPerMeter":1880166.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mayan-Mauyen Port Rd - K0001 + 620 - K0001 + 626, K0002 + 026 - K0003 + 000, K0003 + 051 - K0005 + 053, K0005 + 305 - K0008 + 605 (Off-Carriageway Improvement: Paving of Shoulders)","amountPesos":56403000,"lengthMeters":6282.0,"ratePesosPerMeter":8978.51,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Capiz-Aklan Rd - K0334 + 252 - K0335 + 240","amountPesos":56300000,"lengthMeters":988.0,"ratePesosPerMeter":56983.81,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction Manawis Bridge, Sta. 0+000 - Sta. 0+030, Lagayan, Abra","amountPesos":56264000,"lengthMeters":30.0,"ratePesosPerMeter":1875466.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0154 + 506 - K0156 + 600","amountPesos":56182000,"lengthMeters":2094.0,"ratePesosPerMeter":26829.99,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sindangan-Liloy Rd - K1936 + 000 - K1937 + 071","amountPesos":56135000,"lengthMeters":1071.0,"ratePesosPerMeter":52413.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0613 + 883 - K0615 + 000","amountPesos":56067000,"lengthMeters":1117.0,"ratePesosPerMeter":50194.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 13131 - Chainage 14883","amountPesos":56064000,"lengthMeters":1752.0,"ratePesosPerMeter":32000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calauan-Nagcarlan Bdry Rd - K0081 + 760 - K0082 + 358, K0082 + 494 - K0083 + 000","amountPesos":56000000,"lengthMeters":1104.0,"ratePesosPerMeter":50724.64,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct MWCR (Labangan)-Murtha-Jct Iriron Rd - K0248 + 000 - K0248 + 422, K0248 + 978 - K0251 + 000, K0261 + 000 - K0262 + 404","amountPesos":56000000,"lengthMeters":3848.0,"ratePesosPerMeter":14553.01,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Wright-Taft-Borongan Rd - K0851 + 000 - K0852 + 000","amountPesos":56000000,"lengthMeters":1000.0,"ratePesosPerMeter":56000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Wright-Taft-Borongan Rd - K0853 + 000 - K0854 + 000","amountPesos":56000000,"lengthMeters":1000.0,"ratePesosPerMeter":56000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Biliran Circumferential Rd - K1040 + 744 - K1040 + 900, K1040 + 950 - K1041 + 281, K1042 + 904 - K1043 + 150, K1044 + 810 - K1044 + 935","amountPesos":55999000,"lengthMeters":858.0,"ratePesosPerMeter":65266.9,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Basud-Lanot Rd - (S06300LZ) Chainage 18302 - Chainage 19255, Chainage 19270 - Chainage 19291, Chainage 19307 - Chainage 20032, Chainage 20114 - Chainage 20179, Chainage 20231 - Chainage 20428, Chainage 20446 - Chainage 21131","amountPesos":55854000,"lengthMeters":2646.0,"ratePesosPerMeter":21108.84,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd - K0007 + 000 - K0007 + 604, K0007 + 627 - K0008 + 000, K0008 + 000 - K0008 + 144, K0008 + 819 - K0008 + 980","amountPesos":55843000,"lengthMeters":1282.0,"ratePesosPerMeter":43559.28,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage at Sampaguita St. (Chainage 0+000 - Chainage 0+274) and Dahlia St. (Chainage 0+000 - Chainage 0+110), at Barangay Sta. Monica, Quezon City","amountPesos":55680000,"lengthMeters":274.0,"ratePesosPerMeter":203211.68,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Ipil-Quirino Bdry Rd - K0357 + 095 - K0359 + 000","amountPesos":55500000,"lengthMeters":1905.0,"ratePesosPerMeter":29133.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ramos-Pura Rd - K0155 + 257 - K0156 + 608","amountPesos":55447000,"lengthMeters":1351.0,"ratePesosPerMeter":41041.45,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Passi-Sn Rafael-Lemery-Sara Rd - K0078 + 614 - K0080 + 000","amountPesos":55445000,"lengthMeters":1386.0,"ratePesosPerMeter":40003.61,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banaue-Hungduan-Benguet Bdry Rd - K0393 + 631 - K0393 + 686, K0393 + 746 - K0393 + 800, K0397 + 197 - K0397 + 244","amountPesos":55100000,"lengthMeters":156.0,"ratePesosPerMeter":353205.13,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Batangas-Tabangao-Lobo Rd - K0147 + 012 - K0149 + 000","amountPesos":55030000,"lengthMeters":1988.0,"ratePesosPerMeter":27681.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kapalong-Talaingod-Valencia, Bukidnon Road K1482 + (-672) - K1483 + 128","amountPesos":55000000,"lengthMeters":1800.0,"ratePesosPerMeter":30555.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calauan-Nagcarlan Bdry Rd - K0077 + (-932) - K0077 + 175","amountPesos":55000000,"lengthMeters":1107.0,"ratePesosPerMeter":49683.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Famy-Real-Infanta-Dinahican Port Rd - K0099 + 004 - K0100 + 004, K0100 + 488 - K0100 + 894","amountPesos":55000000,"lengthMeters":1406.0,"ratePesosPerMeter":39118.07,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gumaca - Pitogo - Mulanay - San Narciso Road, Quezon - K0273 + 000 - K0274 + 000","amountPesos":55000000,"lengthMeters":1000.0,"ratePesosPerMeter":55000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0464 + 800 - K0465 + 000, K0465 + 400 - K0466 + 450","amountPesos":55000000,"lengthMeters":1250.0,"ratePesosPerMeter":44000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kapalong-Talaingod-Valencia (Bukidnon) Rd K1528+120 -K1528+500","amountPesos":55000000,"lengthMeters":380.0,"ratePesosPerMeter":144736.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1519 + 750 - K1519 + 860","amountPesos":55000000,"lengthMeters":110.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Logac-Lasam-Gagabutan Rd - K0743 + 805 - K0743 + 975","amountPesos":55000000,"lengthMeters":170.0,"ratePesosPerMeter":323529.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Baliuag Diversion Road - 01+080 - 1+480, Baliuag, Bulacan","amountPesos":55000000,"lengthMeters":400.0,"ratePesosPerMeter":137500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan","amountPesos":55000000,"lengthMeters":175.0,"ratePesosPerMeter":314285.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pawikan - Esperanza Diversion Road, Barangay Esperanza, (Sta. 4+381 - Sta. 4+678), Cabucgayan, Biliran","amountPesos":55000000,"lengthMeters":297.0,"ratePesosPerMeter":185185.19,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sayre Highway Parallel Road II (Impasug-ong - Malaybalay City Section), Barangay Implautao Section, Sta. 49+020 - Sta. 50+084.52, Impasug-ong, Bukidnon","amountPesos":55000000,"lengthMeters":1064.52,"ratePesosPerMeter":51666.48,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Reconstruction/Improvement of Roads, s. Pindangan - Poblacion - San Juan, San Vicente, Laoac and Anulid, Alcala, Pangasinan, K0176+200 - K0186+000","amountPesos":55000000,"lengthMeters":9800.0,"ratePesosPerMeter":5612.24,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Reconstruction/Improvement of Roads, s. Poblacion Zone V, Poblacion Zone II and Poblacion Zone I, Villasis, Pangasinan, Sta. 0+000 - Sta. 2+118","amountPesos":55000000,"lengthMeters":2118.0,"ratePesosPerMeter":25967.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Reconstruction/Improvement of Roads, s. Poblacion, Balligi and Banuar, Laoac, Pangasinan, Sta. 0+000 - Sta. 2+118","amountPesos":55000000,"lengthMeters":2118.0,"ratePesosPerMeter":25967.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Circumferential Road, Sta. 1+000 - Sta. 2+900, Barangay Ilijan - Barangay Baras, Santo Niño, Samar","amountPesos":55000000,"lengthMeters":1900.0,"ratePesosPerMeter":28947.37,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Lavezares By-Pass Road, Sta. 000+250 - Sta. 000+641","amountPesos":55000000,"lengthMeters":391.0,"ratePesosPerMeter":140664.96,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road from Barangay Pacita - Barangay Matampay Bucana, Sta. 0+000 - Sta. 2+250, Lala, Lanao del Norte","amountPesos":55000000,"lengthMeters":2250.0,"ratePesosPerMeter":24444.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road from Barangay Licanan to Barangay Kauswagan Panabo City, Davao Del Norte - Sta. 0+792 - Sta.0+992, Sta.1+250 - Sta.1+361, Sta.1+512 - Sta.1+576, Sta.1+858 - Sta.2+058, Sta.2+965 - Sta.3+246","amountPesos":55000000,"lengthMeters":856.0,"ratePesosPerMeter":64252.34,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0079 + 417 - K0080 + 440","amountPesos":54811000,"lengthMeters":1023.0,"ratePesosPerMeter":53578.69,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ipil-Liloy-Sindangan Rd - K2008 + 000 - K2008 + 467, K2008 + 514 - K2009 + 000","amountPesos":54570000,"lengthMeters":953.0,"ratePesosPerMeter":57261.28,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dr Damian Reyes Rd (Torrijos Side) - K0060 + 000 - K0063 + 000","amountPesos":54538000,"lengthMeters":3000.0,"ratePesosPerMeter":18179.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Sta. 9 + 700 - Sta. 10 + 982, San Antonio, Quezon","amountPesos":54500000,"lengthMeters":1282.0,"ratePesosPerMeter":42511.7,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Camiguin Circumferential Rd - K0053 + 644 - K0055 + 162","amountPesos":54429000,"lengthMeters":1518.0,"ratePesosPerMeter":35855.73,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sambulawan Jct-Calaguise-Calubian Rd - K0989 + 243 - K0989 + 889, K0990 + 000 - K0990 + 550, K0991 + 340 - K0991 + 410, K0991 + 490 - K0991 + 560, K0993 + 100 - K0993 + 500, K0994 + 100 - K0994 + 200, K0994 + 300 - K0994 + 500, K0995 + 000 - K0995 + 150, K0995 + 600 - K0995 + 700, K0998 + 563 - K0998 + 663","amountPesos":54387000,"lengthMeters":2386.0,"ratePesosPerMeter":22794.22,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lagta-Crossing Malinta Rd - K0104 + 250 - K0104 + 907","amountPesos":54191000,"lengthMeters":657.0,"ratePesosPerMeter":82482.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0078 + 603 - K0081 + 000","amountPesos":54181000,"lengthMeters":2397.0,"ratePesosPerMeter":22603.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0143 + 680 - K0145 + 700","amountPesos":54156000,"lengthMeters":2020.0,"ratePesosPerMeter":26809.9,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0063 + 164 - K0066 + 000","amountPesos":54036000,"lengthMeters":2836.0,"ratePesosPerMeter":19053.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Crisanto M de los Reyes Ave - K0054 + (-410) - K0054 + 267, K0057 + 506 - K0058 + 353, K0063 + 389 - K0064 + 000, K0065 + 000 - K0065 + 491","amountPesos":54034000,"lengthMeters":2626.0,"ratePesosPerMeter":20576.54,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Olongapo-Bugallon Rd - K0127 + 224 - K0128 + 158","amountPesos":54000000,"lengthMeters":934.0,"ratePesosPerMeter":57815.85,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0677 + 853 - K0678 + 552","amountPesos":54000000,"lengthMeters":699.0,"ratePesosPerMeter":77253.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Wright-Taft-Borongan Rd - K0852 + 000 - K0852 + 851, K0852 + 880 - K0853 + 000","amountPesos":54000000,"lengthMeters":971.0,"ratePesosPerMeter":55612.77,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Wright-Taft-Borongan Rd - K0854 + 000 - K0854 + 257, K0854 + 291 - K0855 + 000","amountPesos":54000000,"lengthMeters":966.0,"ratePesosPerMeter":55900.62,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tabango-Catmon-La Fortuna-Manlawaan-Gimarco Rd - K1032 + 230 - K1032 + 283, K1033 + 225 - K1033 + 271, K1035 + 060 - K1035 + 130, K1037 + 709 - K1037 + 748","amountPesos":53999000,"lengthMeters":208.0,"ratePesosPerMeter":259610.58,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Candoni-Sipalay Rd - K0132 + 000 - K0132 + 774, K0132 + 823 - K0133 + 000, K0134 + 182 - K0134 + 789, K0135 + 000 - K0135 + 845","amountPesos":53923000,"lengthMeters":2403.0,"ratePesosPerMeter":22439.87,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago-Tuguegarao Rd - K0431 + 070 - K0433 + 241","amountPesos":53906000,"lengthMeters":2171.0,"ratePesosPerMeter":24830.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Fernando North Rd - K0023 + 435 - K0024 + 000, K0028 + 750 - K0029 +116","amountPesos":53835000,"lengthMeters":931.0,"ratePesosPerMeter":57824.92,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dr Damian Reyes Rd (Boac Side) - K0015 + 110 - K0015 + 170","amountPesos":53800000,"lengthMeters":60.0,"ratePesosPerMeter":896666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dr Damian Reyes Rd (Boac Side) - K0015 + 740 - K0015 + 800","amountPesos":53800000,"lengthMeters":60.0,"ratePesosPerMeter":896666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0140 + 000 - K0141 + 000","amountPesos":53790000,"lengthMeters":1000.0,"ratePesosPerMeter":53790.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Catanauan Diversion Road, Chainage 2030 - Chainage 2559, Chainage 3707 - Chainage 4490, Quezon","amountPesos":53750000,"lengthMeters":1312.0,"ratePesosPerMeter":40967.99,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Catanauan Diversion Road, Chainage 3087 - Chainage 3707, Quezon","amountPesos":53750000,"lengthMeters":620.0,"ratePesosPerMeter":86693.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Catanauan Diversion Road, Chainage 5179 - Chainage 6679, Quezon","amountPesos":53750000,"lengthMeters":1500.0,"ratePesosPerMeter":35833.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Catanauan Diversion Road, Chainage 6679 - Chainage 8237, Quezon","amountPesos":53750000,"lengthMeters":1558.0,"ratePesosPerMeter":34499.36,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1891 + 454 - K1893 + 696","amountPesos":53661000,"lengthMeters":2242.0,"ratePesosPerMeter":23934.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siocon-Sirawai-Sibuco-Limpapa Rd - Chainage 13226 - Chainage 15375","amountPesos":53413000,"lengthMeters":2149.0,"ratePesosPerMeter":24854.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Pablo-Rizal-Nagcarlan-Liliw Rd - K0100 + 397 - K0102 + 000","amountPesos":53314000,"lengthMeters":1603.0,"ratePesosPerMeter":33258.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa North Rd - K0202 + 000 - K0203 + 000","amountPesos":53196000,"lengthMeters":1000.0,"ratePesosPerMeter":53196.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mindoro Oriental/Occidental East Coastal Rd - K0215 +000 - K0216 + 662","amountPesos":53100000,"lengthMeters":1662.0,"ratePesosPerMeter":31949.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"San Francisco-San Andres-San Narciso Road, Quezon - K0372 + 564 - K0373 + 559","amountPesos":53000000,"lengthMeters":995.0,"ratePesosPerMeter":53266.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0798 + (-200) - K0798 + 400","amountPesos":53000000,"lengthMeters":600.0,"ratePesosPerMeter":88333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0479 + 799 - K0482 + 000, K0483 + 180 - K0485 + 000","amountPesos":52999000,"lengthMeters":4021.0,"ratePesosPerMeter":13180.55,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage Papaya St. (Chainage 0+000 - Chainage 0+114), Magnolia St. (Chainage 0+000 - Chainage 0+155), Rosal St. (Chainage 0+000 - Chainage 0+098) at Barangay Sta. Monica, Quezon City","amountPesos":52848000,"lengthMeters":155.0,"ratePesosPerMeter":340954.84,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Linao leading to Barangay Talisay Road, Sta. 1+800 - Sta. 3+000, Calatrava, Romblon","amountPesos":52800000,"lengthMeters":1200.0,"ratePesosPerMeter":44000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palompon-Isabel-Merida-Ormoc Rd - K1103 + 504 - K1104 + 908, K1105 + 000 - K1105 + 146","amountPesos":52754000,"lengthMeters":1550.0,"ratePesosPerMeter":34034.84,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Linamon-Zamboanga Rd - K1595 + 000 - K1596 + 000","amountPesos":52716000,"lengthMeters":1000.0,"ratePesosPerMeter":52716.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago-Tuguegarao Rd - K0362 + 050 - K0363 + 753","amountPesos":52687000,"lengthMeters":1703.0,"ratePesosPerMeter":30937.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0130 + 337 - K0133+510","amountPesos":52686000,"lengthMeters":3173.0,"ratePesosPerMeter":16604.48,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0166 + 532 - K0168 + 495","amountPesos":52665000,"lengthMeters":1963.0,"ratePesosPerMeter":26828.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Liloy-Siocon Rd - K2030 + 000 - K2032 + 090, K2034 + 800 - K2035 + 691, K2035 + 711 - K2036 + 200","amountPesos":52515000,"lengthMeters":3470.0,"ratePesosPerMeter":15134.01,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gattaran Diversion Road, Sta. 7+250 - Sta. 7+757, Cagayan","amountPesos":52500000,"lengthMeters":507.0,"ratePesosPerMeter":103550.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Main Road (Concepcion - San Juan Road including Drainage system), Mexico, Pampanga Sta. 0+000 - Sta. 1+665","amountPesos":52500000,"lengthMeters":1665.0,"ratePesosPerMeter":31531.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Antalon to Santiago Road, San Joaquin, Iloilo - Sta. 03+021 - Sta. 04+520","amountPesos":52457000,"lengthMeters":1499.0,"ratePesosPerMeter":34994.66,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0010 + 289 - K0010 + 888","amountPesos":52209000,"lengthMeters":599.0,"ratePesosPerMeter":87160.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jolo -Taglibi -Tiptipon Rd, K021 + 350 - K023 + 000","amountPesos":52200000,"lengthMeters":1650.0,"ratePesosPerMeter":31636.36,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Balbalan-Pinukpuk Rd - K0515 + 347 - K0516 + 000, K0518 + 958 - K0519 + 052, K0520 + 258 - K0523 + 410","amountPesos":51997000,"lengthMeters":3899.0,"ratePesosPerMeter":13335.98,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calbayog Diversion Rd - K0727 + 716 - K0728 + 145, K0728 + 593 - K0728 + 725, K0729 + 403 - K0730 + 000","amountPesos":51971000,"lengthMeters":1158.0,"ratePesosPerMeter":44879.97,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa North Rd - K0184 + 522 - K0185 + 431","amountPesos":51844000,"lengthMeters":909.0,"ratePesosPerMeter":57034.1,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banisilan-Guiling-Alamada-Libungan Rd - K1632 + (-601) - K1632 + (-002), K1640 + 395 - K1640 + 523, K1641 + 013 - K1641 + 278","amountPesos":51784000,"lengthMeters":992.0,"ratePesosPerMeter":52201.61,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0061 + 500 - K0062 + 520","amountPesos":51650000,"lengthMeters":1020.0,"ratePesosPerMeter":50637.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0403 + 690 - K0403 + 709, K0404 + 470 - K0404 + 530, K0404 + 590 - K0404 + 620, K0404+625 - K0404+655, K0404 + 685 - K0404 + 720, K0404 + 870 - K0404 + 915, K0405 + 760 - K0405 + 800, K0406 + 090 - K0406 + 150, K0406 + 200 - K0406 + 240, K0406 + 630 - K0406 + 770","amountPesos":51630000,"lengthMeters":499.0,"ratePesosPerMeter":103466.93,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mogpog-Balanacan Port Rd - K0013 + 584 - K0013 + 634","amountPesos":51400000,"lengthMeters":50.0,"ratePesosPerMeter":1028000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa North Rd - K0245 + 000 - K0246 + 000","amountPesos":51376000,"lengthMeters":1000.0,"ratePesosPerMeter":51376.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Linamon-Zamboanga Rd - K1598 + 000 - K1598 + 383, K1598 + 419 - K1599 + 000","amountPesos":51349000,"lengthMeters":964.0,"ratePesosPerMeter":53266.6,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Noveleta-Naic-Tagaytay Rd - K0043 + 013 - K0043 + 173, K0043 + 193 - K0043 + 303","amountPesos":51310000,"lengthMeters":270.0,"ratePesosPerMeter":190037.04,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Amatong to Barangay Rizal, Sta. 0+000 - Sta. 1+165, Odiongan, Romblon","amountPesos":51260000,"lengthMeters":1165.0,"ratePesosPerMeter":44000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Malilipot Bypass Road, Sta. 0+000 - 1+000, Albay","amountPesos":51190000,"lengthMeters":1000.0,"ratePesosPerMeter":51190.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Socorro-Nueva Estrella-Barangay Pamosaingan Rd - K0001 + 000 - K0003 + 000","amountPesos":51003000,"lengthMeters":2000.0,"ratePesosPerMeter":25501.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagum City Diversion Road K1456 + 135 - K1457 + 000","amountPesos":51000000,"lengthMeters":865.0,"ratePesosPerMeter":58959.54,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gumaca - Pitogo - Mulanay - San Narciso Road, Quezon - K0290 + 000 - K0290 + 306, K0290 + 483 - K0290 + 930","amountPesos":51000000,"lengthMeters":753.0,"ratePesosPerMeter":67729.08,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao-Davao Coastal Rd - K1498 + 364 - K1498 + 403","amountPesos":51000000,"lengthMeters":39.0,"ratePesosPerMeter":1307692.31,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Diversion Road II, Phase II, Sta. 049 + 460 - Sta. 049 +760, Puerto Princesa South Road","amountPesos":51000000,"lengthMeters":300.0,"ratePesosPerMeter":170000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Liloy-Siocon Rd - K1968 + 488 - K1969 + 106, K1971 + 325 - K1971 + 329, K1971 + 344 - K1971 + 346, K1973 + 103 - K1973 + 108, K1973 + 200 - K1973 + 205, K1977 + 002 - K1977 + 988","amountPesos":50999000,"lengthMeters":1620.0,"ratePesosPerMeter":31480.86,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bocaue-Balagtas Diversion Road, Sta. 3+900 - Sta. 3+976.43, Bulacan","amountPesos":50956000,"lengthMeters":76.43,"ratePesosPerMeter":666701.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo-Capiz Rd (New Route) - K0004 + 471 - K0006 + 000","amountPesos":50830000,"lengthMeters":1529.0,"ratePesosPerMeter":33243.95,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0103 + 138 - K0105 + 172","amountPesos":50585000,"lengthMeters":2034.0,"ratePesosPerMeter":24869.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1526 + 190 - K1526 + 300, K1530 + 000 - K1530 + 100, K1536 + 960 - K1537 + 030","amountPesos":50560000,"lengthMeters":280.0,"ratePesosPerMeter":180571.43,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 10118 - Chainage 11698","amountPesos":50518000,"lengthMeters":1580.0,"ratePesosPerMeter":31973.42,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road along Manggahan St., Barangay Manggahan-Lawin, Sta. 0 + 000 - Sta. 0 + 855, Kawit Cavite","amountPesos":50500000,"lengthMeters":855.0,"ratePesosPerMeter":59064.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Coron-Busuanga Rd - K0034 + 500 - K0038 + 000","amountPesos":50423000,"lengthMeters":3500.0,"ratePesosPerMeter":14406.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Liloy-Siocon Rd - K2020 + 138 - K2023 + 118","amountPesos":50412000,"lengthMeters":2980.0,"ratePesosPerMeter":16916.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1610 + 454 - K1610 + 908, K1612 + 700 - K1612 + 750, K1612 + 770 - K1614 + 000","amountPesos":50350000,"lengthMeters":1734.0,"ratePesosPerMeter":29036.91,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0136 + 000 - K0139 + 000","amountPesos":50161000,"lengthMeters":3000.0,"ratePesosPerMeter":16720.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bani - Agno Rd - K0346 + 358 - K0346 + 658","amountPesos":50124000,"lengthMeters":300.0,"ratePesosPerMeter":167080.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0280 + 340 - K0282 + 032","amountPesos":50000000,"lengthMeters":1692.0,"ratePesosPerMeter":29550.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0288 + 245 - K0288 + 445, K0289 + 000 - K0291 + 500","amountPesos":50000000,"lengthMeters":2700.0,"ratePesosPerMeter":18518.52,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1405 + 000 - K1405 + 033, K1405 + 136 - K1405 + 706, K1405 + 830 - K1406 + 414","amountPesos":50000000,"lengthMeters":1187.0,"ratePesosPerMeter":42123.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1406 + 473 - K1406 + 759, K1407 + 456 - K1408 + 909, K1408 + 992 - K1409 + 057, K1410 + 000 - K1410 + 486","amountPesos":50000000,"lengthMeters":2290.0,"ratePesosPerMeter":21834.06,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Victoria-La Paz Rd - K0142 + 574 - K0143 + 773","amountPesos":50000000,"lengthMeters":1199.0,"ratePesosPerMeter":41701.42,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos - Cotabato Sect) - K1618 + 474 - K1618 + 650, K1622 + 600 - K1623 + 000 (6 Lanes)","amountPesos":50000000,"lengthMeters":576.0,"ratePesosPerMeter":86805.56,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos - Cotabato Sect) - K1623+000 - K1623+793 (6 Lanes)","amountPesos":50000000,"lengthMeters":793.0,"ratePesosPerMeter":63051.7,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kidapawan-Magpet-Pangaoan Rd - K1619+(-675) - K1621+115 (2 Lanes, Outer)","amountPesos":50000000,"lengthMeters":2790.0,"ratePesosPerMeter":17921.15,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"San Fernando Bypass Rd - K0267 + (-226) - K0269 + 531","amountPesos":50000000,"lengthMeters":2757.0,"ratePesosPerMeter":18135.65,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"San Fernando Bypass Rd Extension - K0271 + (-701) - K0272 + 000, K0272 + 256 - K0272 + 320, K0273 + 000 - K0274 + 000, K0275 + 000 - K0275 + 104","amountPesos":50000000,"lengthMeters":2869.0,"ratePesosPerMeter":17427.68,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Fernando-Bagulin Rd - K0273 + 0001 - K0273 + 373, K0273 + 394 - K0274 + 000, K0274 + 104 - K0276 + 000, K0276 + 968 - K0277 + 142, K0277 + 438 - K0277 + 518, K0278 + 000 - K0279 + 000","amountPesos":50000000,"lengthMeters":4128.0,"ratePesosPerMeter":12112.4,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"MSR JCT-Lopez-Catanauan Rd - K0232 + 200 - K0232 + 400, K0232 + 450 - K0232 + 600, K0233 + 000 - K0233 + 585, K0233 + 633 - K0233 + 745","amountPesos":50000000,"lengthMeters":1047.0,"ratePesosPerMeter":47755.49,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pili-Tigaon-Albay Bdry Rd - K0454 + (-648) - K0454 + 553","amountPesos":50000000,"lengthMeters":1201.0,"ratePesosPerMeter":41631.97,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagum-Panabo Circum Rd - K1458 + 000 - K1459 + 750","amountPesos":50000000,"lengthMeters":1750.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagum-Panabo Circum Rd - K1476 + 000 - K1477 + 000, K1481 + 205 - K1481 + 935","amountPesos":50000000,"lengthMeters":1730.0,"ratePesosPerMeter":28901.73,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagum - Panabo Circum Road - K1484+728 -K1486+000","amountPesos":50000000,"lengthMeters":1272.0,"ratePesosPerMeter":39308.18,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagum-Panabo Circum Rd - K1483 + 000 - K1484 + 728","amountPesos":50000000,"lengthMeters":1728.0,"ratePesosPerMeter":28935.19,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Juan-Sn Gabriel Rd - K0278 + (-062) - K0281 + 731, K0281 + 502 - K0281 + 860","amountPesos":50000000,"lengthMeters":3922.0,"ratePesosPerMeter":12748.6,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ayala-La Paz Rd - (S01495MN) Chainage 7000 - Chainage 10400","amountPesos":50000000,"lengthMeters":3400.0,"ratePesosPerMeter":14705.88,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gumaca - Pitogo - Mulanay - San Narciso Road, Quezon - K0259 + 900 - K0260 + 714","amountPesos":50000000,"lengthMeters":814.0,"ratePesosPerMeter":61425.06,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Buenavista-Asuncion, Maasin City (Bontoc-Maasin) - K1124 + (-092) - K1125 + 872, K1125 + 897 - K1128 + 000","amountPesos":50000000,"lengthMeters":4067.0,"ratePesosPerMeter":12294.07,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Talisay - Laurel - Agoncillo Rd - K0109 + 090 - K0109 + 205","amountPesos":50000000,"lengthMeters":115.0,"ratePesosPerMeter":434782.61,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gumaca Bypass Road - K0192 + 041 - K192 + 077, K0192 + 315 - K0192 + 427, K0193 + 950 - K0194 + 020","amountPesos":50000000,"lengthMeters":218.0,"ratePesosPerMeter":229357.8,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Milagros-Baleno-Lagta Rd - K0038 + 050 - K0038 + 100","amountPesos":50000000,"lengthMeters":50.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Milagros-Baleno-Lagta Rd - K0038 + 100 - K0038 + 150","amountPesos":50000000,"lengthMeters":50.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 507 - Chainage 552","amountPesos":50000000,"lengthMeters":45.0,"ratePesosPerMeter":1111111.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lumbia-Uguiaban By-Pass Rd - (S00618MN) Chainage 137 - Chainage 864","amountPesos":50000000,"lengthMeters":727.0,"ratePesosPerMeter":68775.79,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Malaybalay Rd - K1253 + 040 - K1253 + 162","amountPesos":50000000,"lengthMeters":122.0,"ratePesosPerMeter":409836.07,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gate - Bulan Airport Rd, Sorsogon - K0636 + 100 - K0637+601","amountPesos":50000000,"lengthMeters":1501.0,"ratePesosPerMeter":33311.13,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tacloban City Bypass Rd - Chainage 4610 - Chainage 5660","amountPesos":50000000,"lengthMeters":1050.0,"ratePesosPerMeter":47619.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Talisay-Laurel-Agoncillo Rd – K0108 + 467 – K0109 + 000","amountPesos":50000000,"lengthMeters":533.0,"ratePesosPerMeter":93808.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Real By-Pass Rd, Sta. 0+487 - Sta. 1+090, Real, Quezon","amountPesos":50000000,"lengthMeters":603.0,"ratePesosPerMeter":82918.74,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagkawayan-Labo Diversion Road (Tagkawayan Section), Sta. 280 + 537 - Sta. 281+607.48, Quezon","amountPesos":50000000,"lengthMeters":1070.48,"ratePesosPerMeter":46708.02,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo R-1 Bypass Road, Oton, Iloilo - Sta. 10+206.35 - Sta. 10+599.59","amountPesos":50000000,"lengthMeters":393.24,"ratePesosPerMeter":127148.81,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maayon-Sara Road, Capiz - Sta. 4+818 - Sta. 4+891, Sta. 6+156 - Sta. 6+483, Sta. 7+876 - Sta. 8+227, Sta. 8+893 - Sta. 9+954, Sta. 10+097 - Sta. 10+598","amountPesos":50000000,"lengthMeters":2313.0,"ratePesosPerMeter":21616.95,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iligan City Circumferential Road Extension to Jct. Sta. Felomina-Bonbonon-Digkilaan- Rogongon Road, Barangay Lanipao, Sta. 11+100 - 11+433, Iligan City","amountPesos":50000000,"lengthMeters":333.0,"ratePesosPerMeter":150150.15,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct. Buda, Quezon-Jct. Valencia-Talaingod Road-Kalagangan, San Fernando Alternate/Bypass Road, Barangay Kalagangan Section, Sta. 1+681 - Sta. 2+200, San Fernando, Bukidnon","amountPesos":50000000,"lengthMeters":519.0,"ratePesosPerMeter":96339.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Magsaysay–Butuan City Coastal Bypass/ Alternate Road (Sta. Cruz, Magsaysay), Sta. 1+550 - Sta. 2+050, Barangay Poblacion, Magsaysay, Misamis Oriental","amountPesos":50000000,"lengthMeters":500.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Daang Maharlika (Alternate Route) (NRJ - Mayor Democrito D. Plaza II Avenue - Las Nieves - Sibagat), Florida - Bilay Section, , Sta. 13+067 - Sta. 13+187.8, Sta. 24+119 - Sta. 24+548.31, Butuan City","amountPesos":50000000,"lengthMeters":550.11,"ratePesosPerMeter":90890.91,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Daang Maharlika (Alternate Route) NRJ Mayor Democrito D. Plaza II Avenue - Las Nieves - Sibagat), Sta. 13+067 - Sta. 13+097.77, Butuan City","amountPesos":50000000,"lengthMeters":30.77,"ratePesosPerMeter":1624959.38,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"NRJ Daang Maharlika (Taguibo Section) - Masao Port, Maug-Lumbocan Section, Sta. 8+866.2 - Sta. 9+057.73, Butuan City","amountPesos":50000000,"lengthMeters":191.53,"ratePesosPerMeter":261055.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Guimba - Pura Road, Nueva Ecija, STA. 6+146 - STA. 7+100","amountPesos":50000000,"lengthMeters":954.0,"ratePesosPerMeter":52410.9,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Botolan Bypass Road, Botolan, Zambales Sta. 2+000 - Sta. 2+500","amountPesos":50000000,"lengthMeters":500.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bangantalinga-Amungan, Iba, Zambales Sta. 3+000 - Sta. 3+500","amountPesos":50000000,"lengthMeters":500.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pagbilao-Tayabas-Mauban-Lucban Diversion Road (Lucban Section), Sta. 3+620 - Sta. 4+120, Lucban, Quezon","amountPesos":50000000,"lengthMeters":500.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Plaridel By-Pass Road - Sta 2 + 050 - Sta 2 + 060, Sta 2 + 282 - Sta 2 + 307, Sta 2+395 - Sta 2+580, Quezon","amountPesos":50000000,"lengthMeters":220.0,"ratePesosPerMeter":227272.73,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagkawayan-Del Gallego Diversion Road, Sta. 1+100 - Sta. 1+950, Tagkawayan, Quezon","amountPesos":50000000,"lengthMeters":850.0,"ratePesosPerMeter":58823.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal","amountPesos":50000000,"lengthMeters":300.0,"ratePesosPerMeter":166666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Malinao-Paraputo-San Antonio Diversion Road, Sta. 3+960 - Sta. 5+000, Albay","amountPesos":50000000,"lengthMeters":1040.0,"ratePesosPerMeter":48076.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0128 + 022 - K0128 + 487, K0137 + 025 - K0137 + 420, K0143 + 416 - K0144 + 143, K0144 + 291 - K0144 + 405, K0144 + 514 - K0144 + 727","amountPesos":50000000,"lengthMeters":1914.0,"ratePesosPerMeter":26123.3,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Panitan By-Pass Road, Barangay Tabuc Norte, Sta. 001 + 020 - Sta. 001 + 152, Capiz","amountPesos":50000000,"lengthMeters":132.0,"ratePesosPerMeter":378787.88,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Hindang By-Pass Road, Sta. 1+602.40 - 1+753.40, Sta. 1+912 - 2+191.68, Barangay Tabok, Hindang, Leyte","amountPesos":50000000,"lengthMeters":430.68,"ratePesosPerMeter":116095.48,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iligan City - Cagayan de Oro City Alternate Road (Digkilaan-Bulua Section), Barangay Mainit Section, Sta. 13+320 - Sta. 13+755 (Sec. A), Sta. 14+855 - Sta. 15+751, Iligan City","amountPesos":50000000,"lengthMeters":1331.0,"ratePesosPerMeter":37565.74,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calauag-Guinayangan-Buenavista-Lopez Road - Sta. 2+275 - Sta. 2+464, Sta. 3+089 - Sta. 3+750","amountPesos":50000000,"lengthMeters":850.0,"ratePesosPerMeter":58823.53,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Atimonan-Mauban Road - STA 003+660 - STA 004+460","amountPesos":50000000,"lengthMeters":800.0,"ratePesosPerMeter":62500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calauag-Guinayangan-Buenavista-Lopez Road - Sta. 11 + 770 - Sta. 12 + 970","amountPesos":50000000,"lengthMeters":1200.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quezon - Alabat - Perez Circumferential Road - Sta. 23 + 920 - Sta. 24 + 920","amountPesos":50000000,"lengthMeters":1000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sayre Highway (S00577MN) - K1426 + 728 - K1426 + 751 (RS), K1426 + 945 - K1426 + 1027 (LS), K1427 + (-070) - K1427 + 000 (LS), K1427 + 640 - K1427 + 775 (RS), K1428 + 300 - K1428 + 550 (LS), Cagayan de Oro City","amountPesos":50000000,"lengthMeters":505.0,"ratePesosPerMeter":99009.9,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Linamon - Zamboanga Road - K1587 + 000 - K1588 + 000, K1591 + 040 - K1593 + 774","amountPesos":50000000,"lengthMeters":3734.0,"ratePesosPerMeter":13390.47,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ozamiz - Pagadian Road, K1668 + 000 - K1669 + 521, K1669 + 541 - K1670 + 325, K1670 + 332 - K1671 + 000","amountPesos":50000000,"lengthMeters":2973.0,"ratePesosPerMeter":16818.03,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Batangas-Quezon Rd - K0134 + (-664) - K0136 + 909 (Solar Roadway Lighting)","amountPesos":50000000,"lengthMeters":3573.0,"ratePesosPerMeter":13993.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) Along Jct Sh Aglayan-Zamboanguita Rd - K1542 + 306 - K1544 + 831, Barangay Poblacion, Cabanglasan, Bukidnon 2nd LD","amountPesos":50000000,"lengthMeters":2525.0,"ratePesosPerMeter":19801.98,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) Along Jct. Sayre Hway-Impasug-ong-Patulangan By-Pass Road - K1478 + 000 - K1481 + 472, Barangay Poblacion, Impasug-ong, Bukidnon 2nd LD","amountPesos":50000000,"lengthMeters":3472.0,"ratePesosPerMeter":14400.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) Along Kapalong - Talaingod - Valencia Rd - K1580 + 500 - K1584 + 000, Barangay Halapitan - Barangay Little Baguio, San Fernando, Bukidnon 2nd LD","amountPesos":50000000,"lengthMeters":3500.0,"ratePesosPerMeter":14285.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"CDO-Airport-Bukidnon Rd - K1440 + (-140) - K1442 + 000","amountPesos":50000000,"lengthMeters":2140.0,"ratePesosPerMeter":23364.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lanao del Norte Interior Circumferential Road (LDNICR), K1527 + (-567) - K1534 + 340","amountPesos":50000000,"lengthMeters":7907.0,"ratePesosPerMeter":6323.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Solar Lights along Iligan City Diversion Road, Barangay Tubod, K1529 + 243 - K1534 + 285, Iligan City","amountPesos":50000000,"lengthMeters":5042.0,"ratePesosPerMeter":9916.7,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation of Road Safety Facilities along Nabunturan-Maragusan Road (S00127MN) K1435 + 840 - K1438 + 946","amountPesos":50000000,"lengthMeters":3106.0,"ratePesosPerMeter":16097.88,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Naga-Carolina-Panicuason Rd - K0438 + (-325) - K0438 + 600","amountPesos":50000000,"lengthMeters":925.0,"ratePesosPerMeter":54054.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juban-Magallanes Rd,Sorsogon - K0620 + 465 - K0620 + 490 (R/S), K0620 + 568 - K0620 + 676 (B/S), K0620 + 676 - K0620 + 772 (R/S), K0620 + 852 - K0621 + 057 (L/S), K0621 + 453 - K0621 + 462 (L/S), K0621 + 462 - K0621 + 582 (B/S), K0621 + 582 - K0621+982 (B/S), K0621+982 - K0622+336 (L/S), K0622+769 - K0622+848 (R/S), K0622+848 - K0622+875 (B/S), K0622+875 - K0622+950 (R/S)","amountPesos":50000000,"lengthMeters":1498.0,"ratePesosPerMeter":33377.84,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cabitoonan-Libertad-Sta Fe-Sta Cruz-Corazon-Consuelo, General Luna Roads (SG00369SG) K0022 + 000 - K0032 + 494","amountPesos":50000000,"lengthMeters":10494.0,"ratePesosPerMeter":4764.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dapa-Union-General Luna Road (SG00364SG), K0001+(961)-K0007+39 (Road Safety: Roadway Lighting)","amountPesos":50000000,"lengthMeters":5078.0,"ratePesosPerMeter":9846.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Danglas Road, Sta. 0+000 - Sta. 1+000, Danglas, Abra","amountPesos":50000000,"lengthMeters":1000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Datu Paglas-Columbio-Matanao Road, Sta. 2+500-Sta. 5+500, Columbio, Sultan Kudarat","amountPesos":50000000,"lengthMeters":3000.0,"ratePesosPerMeter":16666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Montabiong-Banao Road, Sta. 14+000 - Sta. 15+500, Lagawe, Ifugao","amountPesos":50000000,"lengthMeters":1500.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Bulakan - Guiguinto via Balubad Road, Sta. 0+000 - Sta. 1+200, Bulakan, Bulacan","amountPesos":50000000,"lengthMeters":1200.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Pandi-Angat Road, Sta. 0+100 - Sta. 1+100, Pandi, Bulacan","amountPesos":50000000,"lengthMeters":1000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road along Balasing to Catmon Road (Sta. 00+000 - Sta. 02+030), Sta. Maria, Bulacan","amountPesos":50000000,"lengthMeters":2030.0,"ratePesosPerMeter":24630.54,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road along Tigbe - Balasing - Pulong Buhangin Road (Sta. 00+000 - Sta. 02 + 03) Santa Maria, Bulacan","amountPesos":50000000,"lengthMeters":2003.0,"ratePesosPerMeter":24962.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road at Barangay Patag - Barangay Bulac, (Santa Maria - San Jose Road) Santa Maria, Bulacan (Sta. 00+000 - Sta. 02+030)","amountPesos":50000000,"lengthMeters":2030.0,"ratePesosPerMeter":24630.54,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Road Improvement Jct. Olongapo-Bugallon Road to Barangay Balincaguing, San Felipe, Zambales Sta. 0+000 - Sta. 2+000","amountPesos":50000000,"lengthMeters":2000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of access road along Castillejos Market , Sta. 0+ 000 - Sta. 0+322,Sta. 0+ 000 - Sta. 0+350,Barangay San Agustin, Castillejos, Zambales","amountPesos":50000000,"lengthMeters":350.0,"ratePesosPerMeter":142857.14,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage connecting to Imus Integrated School, Sta. 01 + 203 - Sta. 01 + 779, Barangay Pasong Buaya, Imus, Cavite","amountPesos":50000000,"lengthMeters":576.0,"ratePesosPerMeter":86805.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Bocboc, Sta. 0+531 - Sta. 1+101, Lopez, Quezon","amountPesos":50000000,"lengthMeters":570.0,"ratePesosPerMeter":87719.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Kabaliwan-Victoria Access Road, Sta 0+000- 1+120. Barangay Bachawan, San Agustin & Victoria, San Andres, Romblon","amountPesos":50000000,"lengthMeters":1120.0,"ratePesosPerMeter":44642.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Mat - i to Agojo Access Road, Sta. 1+450 - 2+560, Barangay Mat-I, Santa Fe & Barangay Agjo, Looc, Romblon","amountPesos":50000000,"lengthMeters":1110.0,"ratePesosPerMeter":45045.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Ipil to Barangay Lahong, San Fernando, Masbate Sta. 1 +200 - Sta. 1 + 900","amountPesos":50000000,"lengthMeters":700.0,"ratePesosPerMeter":71428.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road at A. Bonifacio to Somagongsong, Bulan, Sorsogon, Sta. 0+000 - Sta. 2+000","amountPesos":50000000,"lengthMeters":2000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Proctol - San Jose - Dancalan Road, Bulusan, Sorsogon, Sta. 0+000 - Sta. 2+000","amountPesos":50000000,"lengthMeters":2000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction og Bacolod - Putting Sapa - Añog - Rangas Road, Juban, Sorsogon Sta. 0+000 - Sta. 2+000","amountPesos":50000000,"lengthMeters":2000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Piña-Suclaran Road, Sta. 1 + 000 - Sta. 3 +500, Barangay Piña, Buenavista and Barangay Suclaran, San Lorenzo, Guimaras","amountPesos":50000000,"lengthMeters":2500.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Balaguiao Bridge, Station 0 + 000 - Station 0 + 075, Barangay Balaguiao, Lambunao, Iloilo","amountPesos":50000000,"lengthMeters":75.0,"ratePesosPerMeter":666666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Sta. 0- Sta. 580, Sta. 3+470 - Sta. 4+738) Jct. Ruins to Banoceh, Talisay, Negros Occidental (10.7150581, 122.9615514)","amountPesos":50000000,"lengthMeters":1268.0,"ratePesosPerMeter":39432.18,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Camias-Sohoton Road connecting Tagbilaran North Road and Ubujan- Camias Provincial Road, Calape, Bohol Sta. 000+000 - Sta. 001+300","amountPesos":50000000,"lengthMeters":1300.0,"ratePesosPerMeter":38461.54,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Bayacabac-Tinibgan (Maribojoc)-Obujan-Tagubaas (Antequera) Provincial Road, Maribojoc and Antequera, Bohol Sta. 000+000 - Sta. 001+300","amountPesos":50000000,"lengthMeters":1300.0,"ratePesosPerMeter":38461.54,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction/Improvement of Road, Barangay Lucsoon to Barangay Imelda, Naval, Biliran (Sta. 0 + 850 - Sta. 2 + 150)","amountPesos":50000000,"lengthMeters":1300.0,"ratePesosPerMeter":38461.54,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Malaintos to Barangay Dapdap, Dolores, Eastern Samar (Sta. 0+000 - Sta. 0+750)","amountPesos":50000000,"lengthMeters":750.0,"ratePesosPerMeter":66666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Sta. 2 + 290 - Sta. 3 + 700, Barangay Montealegre, Isabel, Leyte","amountPesos":50000000,"lengthMeters":1410.0,"ratePesosPerMeter":35460.99,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Sta. 0+130 - Sta. 1+380, Barangay Liberty, Ormoc City, Leyte","amountPesos":50000000,"lengthMeters":1250.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Sta. 0+130 - Sta. 1+630, Barangay Liberty, Ormoc City, Leyte","amountPesos":50000000,"lengthMeters":1500.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Junction Himay-angan-Silago-Abuyog Boundary Road (Kikilo-San Roque-Sta. Lucia), Sta. 0+000 - 4+570, Abuyog, Leyte","amountPesos":50000000,"lengthMeters":4570.0,"ratePesosPerMeter":10940.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Palapag Diversion Road (Sta. 1+350 - Sta.1+600.50), Palapag, Northern Samar","amountPesos":50000000,"lengthMeters":250.5,"ratePesosPerMeter":199600.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Slope Protection Structure along Arteche, Barangay Catumsan-Jipapad- Las Navas-Catubig-Rawis Road (Sta. 9+560 - Sta. 9+640), Barangay Dolores, Las Navas, Northern Samar","amountPesos":50000000,"lengthMeters":80.0,"ratePesosPerMeter":625000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Malino to Barangay Jidanao to Barangay Nagbac to Barangay Casapa, Jiabong Samar (Sta. 1 + 333.5 - Sta. 2+200)","amountPesos":50000000,"lengthMeters":866.5,"ratePesosPerMeter":57703.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Gulangan to Barangay Patao, Maimbung, Sulu, Sta. 00+000 to 01+500","amountPesos":50000000,"lengthMeters":1500.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Lower Tambaking, Maimbung, Sulu Sta. 00+000 to Sta. 01+500","amountPesos":50000000,"lengthMeters":1500.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Upper Tambaking, Maimbung, Sulu Sta. 00+500 to Sta. 02+000","amountPesos":50000000,"lengthMeters":1500.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Darul Jambangan, Maimbung, Sulu Sta 00+000 to Sta. 1+700","amountPesos":50000000,"lengthMeters":1700.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Tandu Patong, Maimbung, Sulu Sta. 00+300 to Sta. 02+000","amountPesos":50000000,"lengthMeters":1700.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Tubig Samin, Maimbung, Sulu Sta. 00+000 to Sta. 01+700","amountPesos":50000000,"lengthMeters":1700.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Purok 2, Labinay to Barangay Villaba), Sta. 0+000 - Sta. 1+700, Ozamiz City, Misamis Occidental","amountPesos":50000000,"lengthMeters":1700.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Mountain Bypass Road, Casilak San Agustin - Namut Section, Sta. 0+000 - Sta. 1+700, Tudela, Misamis Occidental","amountPesos":50000000,"lengthMeters":1700.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Stimson Abordo - Kinuman Norte, Sta. 0+000 - Sta. 1+700, Ozamiz City, Misamis Occidental","amountPesos":50000000,"lengthMeters":1700.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Road, Bagakay - Cogon - Kinuman Norte - Gala Road on intermittent sections along Sta. 0+000 - Sta. 13+300, Ozamiz City, Misamis Occidental","amountPesos":50000000,"lengthMeters":13300.0,"ratePesosPerMeter":3759.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Purok 4 Barangay Colupan Alto - Barangay Tipan), Sta. 0+000 - Sta. 1+700, Sinacaban, Misamis Occidental","amountPesos":50000000,"lengthMeters":1700.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, (Purok 1 Colupan Alto - Barangay Camanse River), Sta. 0+000 - Sta. 1+700, Sinacaban, Misamis Occidental","amountPesos":50000000,"lengthMeters":1700.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, (Purok 3, Capucao P. to Dalapang), Sta. 0+000 - Sta. 1+700, Ozamiz City, Misamis Occidental","amountPesos":50000000,"lengthMeters":1700.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Basak to Barangay Magsaysay (Sta. 0+000 - Sta. 2+800), Nabunturan, Davao de Oro","amountPesos":50000000,"lengthMeters":2800.0,"ratePesosPerMeter":17857.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Manat (Sta. 0+000 - Sta. 0+546, Sta. 0+000 - Sta. 0+232, Sta. 0+000 - Sta. 0+160, Sta. 0+000 - Sta. 0+344, Sta. 0+000 - Sta. 0+196, Sta. 0+000 - Sta. 0+428, Sta. 0+000 - Sta. 0+300, Sta. 0+000 - Sta. 0+315, Sta. 0+000 - Sta. 0+138, Sta. 0+000 - Sta. 0+558, Sta. 0+000 - Sta. 0+530), Nabunturan, Davao de Oro","amountPesos":50000000,"lengthMeters":558.0,"ratePesosPerMeter":89605.73,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Manat to Barangay Ogao (Sta. 0+000 - Sta. 2+800), Nabunturan, Davao de Oro","amountPesos":50000000,"lengthMeters":2800.0,"ratePesosPerMeter":17857.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Matilo to Barangay Kao (Sta. 0+000 - Sta. 1+900), Nabunturan, Davao de Oro","amountPesos":50000000,"lengthMeters":1900.0,"ratePesosPerMeter":26315.79,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Panansalan, (Sta. 5+820 - Sta. 6+620), Compostela, Davao de Oro","amountPesos":50000000,"lengthMeters":800.0,"ratePesosPerMeter":62500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Goma, Digos City-Sitio Bagong Silang, Managa, Sta. 8+841.896 - Sta. 9+841.896, Bansalan, Davao del Sur","amountPesos":50000000,"lengthMeters":1000.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Jct. By-pass Road, Barangay San Roque to Barangay Carpenter Hill connecting Marbel-Makar Road, Sta. 0+000 - Sta. 1+140 South Cotabato","amountPesos":50000000,"lengthMeters":1140.0,"ratePesosPerMeter":43859.65,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road-Jct. National Highway Tantangan-Norala By-pass Road, Sta. 1+818 - Sta. 4+018 South Cotabato","amountPesos":50000000,"lengthMeters":2200.0,"ratePesosPerMeter":22727.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Highway Jct. Cotabato - Marbel Road, Barangay Poblacion - Crossing Kipot - Surralah By-pass Road, Sta. 0+000 - Sta. 2+200 Banga, South Cotabato","amountPesos":50000000,"lengthMeters":2200.0,"ratePesosPerMeter":22727.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Highway Jct. Marbel-Makar Road Barangay Concepcion - New Pangasinan - San Jose Columbio By-pass Road, Sta. 0+000 - Sta. 2+200 Koronadal City, South Cotabato","amountPesos":50000000,"lengthMeters":2200.0,"ratePesosPerMeter":22727.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Barangay Legaspi to Barangay Benglen) Sta. 0 + 000 - Sta. 1 + 500, Barangay Legaspi, Cagdianao, Dinagat Islands","amountPesos":50000000,"lengthMeters":1500.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of NRJ Santiago - Cantilan Road, Sta. 39+635 - Sta. 43+635, Surigao del Sur","amountPesos":50000000,"lengthMeters":4000.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Cauayan City Northeast Alternate Route (Alicaocao Bridge and Approaches) (Sta. 0+687.16 - Sta. 1+228.16), City of Cauayan, Isabela","amountPesos":49959000,"lengthMeters":541.0,"ratePesosPerMeter":92345.66,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Cauayan City Northeast Alternate Route (Bridge and Approaches) (Sta 0+000 - Sta 0+340), Isabela","amountPesos":49959000,"lengthMeters":340.0,"ratePesosPerMeter":146938.24,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Cauayan City Northeast Alternate Route (Bridge and Approaches) (Sta. 1+330.97 - Sta. 3+316), Isabela","amountPesos":49959000,"lengthMeters":1985.03,"ratePesosPerMeter":25167.88,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd - K0065+694 - K0067+200","amountPesos":49926000,"lengthMeters":1506.0,"ratePesosPerMeter":33151.39,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Blancia-Molave-Josefina Rd - K1670 + 644 - K1672 + 341, K1672 + 657 - K1672 + 940","amountPesos":49733000,"lengthMeters":1980.0,"ratePesosPerMeter":25117.68,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao-Davao Coastal Rd - K1431 + 365 - K1432 + 957, K1433 + 027 - K1435 + 365 (Off-Carriageway Improvement: Paving of Shoulders)","amountPesos":49675000,"lengthMeters":3930.0,"ratePesosPerMeter":12639.95,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rizal Bdry-Famy-Quezon Rd - K0085 + 933 - K0087 + 038","amountPesos":49586000,"lengthMeters":1105.0,"ratePesosPerMeter":44874.21,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod North Rd - K0126+627 - K0129 + 440","amountPesos":49574000,"lengthMeters":2813.0,"ratePesosPerMeter":17623.18,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Delfin Albano - Sto. Tomas - Cabagan Provincial Road (Sta. 11+390 - Sta. 11+507, Sta. 11+534 - Sta. 11+610, Sta. 11+682 - Sta. 11+868, Sta. 12+348 - Sta. 13+265, Sta. 13+288 - Sta. 14+224, Sta. 14+239 - Sta. 14+309) at Barangay Calinaoan Malasin to Barangay Bagabag, Santo Tomas, Isabela","amountPesos":49400000,"lengthMeters":2302.0,"ratePesosPerMeter":21459.6,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palompon-Isabel-Merida-Ormoc Rd - K1111 + 417 - K1112 + 338, K1112 + 367 - K1112 + 452, K1112 + 481 - K1113 + 000","amountPesos":49354000,"lengthMeters":1525.0,"ratePesosPerMeter":32363.28,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sindangan-Liloy Rd - K1942 + 000 - K1943 + 499","amountPesos":49255000,"lengthMeters":1499.0,"ratePesosPerMeter":32858.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0811 + 700 - K0811 + 940, K0812 + 533 - K0812 + 850","amountPesos":49000000,"lengthMeters":557.0,"ratePesosPerMeter":87971.27,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0041 + 827 - K0042 + 354","amountPesos":48457000,"lengthMeters":527.0,"ratePesosPerMeter":91948.77,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Asin Rd - K0307 + (-440) - K0310 + 329 (Off-Carriageway Improvement: Construction of Sidewalk)","amountPesos":48395000,"lengthMeters":3769.0,"ratePesosPerMeter":12840.28,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo R-1 Bypass Road, Tigbauan, Iloilo - Sta. 12+137.40 - Sta. 12+517.40","amountPesos":48364000,"lengthMeters":380.0,"ratePesosPerMeter":127273.68,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo-Capiz Rd (Old Route) - K0084 + 490 - K0087 + 000","amountPesos":48343000,"lengthMeters":2510.0,"ratePesosPerMeter":19260.16,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tablas Circumferential Rd - K0102 + 397 - K0103 + 052, K0117 + 067 - K0117 + 188, K0117 + 550 - K0118 + 042, K0118 + 052 - K0118 + 682, K0120 + 000 - K0120 + 562, K0127 + 602 - K0128 + 447","amountPesos":48188000,"lengthMeters":3305.0,"ratePesosPerMeter":14580.33,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod North Rd - K0130 + 919 - K0132 + 233","amountPesos":48100000,"lengthMeters":1314.0,"ratePesosPerMeter":36605.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nueva Ecija - Pangasinan Rd K0173+000 - K0175+276","amountPesos":48100000,"lengthMeters":2276.0,"ratePesosPerMeter":21133.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0522 + 127 - K0523 + 2316","amountPesos":48028000,"lengthMeters":3189.0,"ratePesosPerMeter":15060.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0049 + 000 - K0049 + 440, K0050 + 220 - K0050 + 651","amountPesos":48020000,"lengthMeters":871.0,"ratePesosPerMeter":55132.03,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palico-Balayan-Batangas Rd - K0147 + 520 - K0148 + 219","amountPesos":48000000,"lengthMeters":699.0,"ratePesosPerMeter":68669.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Guimbal-Igbaras-Tubungan-Leon Rd - K0040 + 39 - K0041 + 000, K0043 + 245 - K0043 + 925","amountPesos":48000000,"lengthMeters":1641.0,"ratePesosPerMeter":29250.46,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Biliran Circumferential Rd - K1047 + 750 - K1048 + 435, K1048 + 726 - K1049 + 082, K1049 + 243 - K1049 + 320, K1049 + 370 - K1049 + 479","amountPesos":48000000,"lengthMeters":1227.0,"ratePesosPerMeter":39119.8,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Barili - Aloguinsan Coastal Road - Sta. 0 + 620 - Sta. 0 + 655, Cebu","amountPesos":48000000,"lengthMeters":35.0,"ratePesosPerMeter":1371428.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Bridge, Barangay Concepcion, Sto. Domingo, Nueva Ecija Sta. 0+000 - Sta. 0+035","amountPesos":47850000,"lengthMeters":35.0,"ratePesosPerMeter":1367142.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0178 + 684 - K0180 + 000","amountPesos":47811000,"lengthMeters":1316.0,"ratePesosPerMeter":36330.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LT) - K0991 + 600 - K0992 + 000, K0993 + 000 - K0993 + 500, K0996 + 000 - K0996 + 117, K1000 + 177 - K1000 + 873, K1001 + 200 - K1001 + 261","amountPesos":47765000,"lengthMeters":1774.0,"ratePesosPerMeter":26925.03,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road (Sta. 0+000 - Sta. 0+450, Sta. 1+400 - Sta. 2+560, Sta. 3+330 - Sta. 4+040) including Construction of Drainage Structure (Sta. 0+000 - Sta. 0+450) and Slope Protection Structure (Sta. 2+120 - Sta. 2+440) at Barangay Malalam to Barangay Fugu to Barangay Aggassian, City of Ilagan, Isabela","amountPesos":47750000,"lengthMeters":2320.0,"ratePesosPerMeter":20581.9,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Dasmarinas - General Trias - Tanza Diversion Road, General Trias Section, Cavite (STA.0+000 - STA. 0+747.9)","amountPesos":47750000,"lengthMeters":747.9,"ratePesosPerMeter":63845.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod Circumferential Rd - K0008+634 - K0009 + 750","amountPesos":47682000,"lengthMeters":1116.0,"ratePesosPerMeter":42725.81,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"South Super H-way - K0009 + 572 - K0008 + 296","amountPesos":47600000,"lengthMeters":1276.0,"ratePesosPerMeter":37304.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Lingig-Trento Rd - K1479 + 589 - K1481 + 020","amountPesos":47506000,"lengthMeters":1431.0,"ratePesosPerMeter":33197.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod North Rd - K0133 + 180 - K0134+471","amountPesos":47499000,"lengthMeters":1291.0,"ratePesosPerMeter":36792.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tayabas-Mainit-Mauban Rd - K0156+000 - K0157+334","amountPesos":47403000,"lengthMeters":1334.0,"ratePesosPerMeter":35534.48,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Danlugan-La Dicha Diversion Road (S01219MN), K1733+(-680) to K1734+000","amountPesos":47236000,"lengthMeters":1680.0,"ratePesosPerMeter":28116.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa North Rd - K0070+100 - K0070+160, K0070+200 - K0070+300, K0074+600 - K0074+650, K0075+020 - K0075+080","amountPesos":47200000,"lengthMeters":270.0,"ratePesosPerMeter":174814.81,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Catarman-Laoang Rd - K0785 + 380 - K0786 + 575","amountPesos":47125000,"lengthMeters":1195.0,"ratePesosPerMeter":39435.15,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0069 + 539 - K0070 + 873","amountPesos":47077000,"lengthMeters":1334.0,"ratePesosPerMeter":35290.1,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao-Davao Coastal Rd - K1485 + 634 - K1485 + 675","amountPesos":47000000,"lengthMeters":41.0,"ratePesosPerMeter":1146341.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)- Himanag Road, Lagonoy, Camarines Sur, Sta.11+052 - Sta.12+300","amountPesos":47000000,"lengthMeters":1248.0,"ratePesosPerMeter":37660.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cabagan-Sta Maria Rd - K0455 + 562 - K0458 + 757, K0458 + 797 - K0459 + 016","amountPesos":46924000,"lengthMeters":3414.0,"ratePesosPerMeter":13744.58,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K1964 + 018 - K1964 + 037, K1964 + 059 - K1964 + 082, K1964 + 180 - K1964 + 261, K1964 + 483 - K1964 + 510, K1964 + 580 - K1964 + 655","amountPesos":46856000,"lengthMeters":225.0,"ratePesosPerMeter":208248.89,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palico-Balayan-Batangas Rd - K0138 + 604 - K0139 + 760","amountPesos":46473000,"lengthMeters":1156.0,"ratePesosPerMeter":40201.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1683 + 125 - K1683 + 190, K1704 + 530 - K1704 + 580, K1704 + 843 - K1704 + 860, K1707 + 435 - K1707 + 460","amountPesos":46391000,"lengthMeters":157.0,"ratePesosPerMeter":295484.08,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1724 + (-591) - K1724 + 000, K1725 + 905 - K1726 + 098, K1726 + 441 - K1727 + 819, K1727 + 850 - K1729 + 000, K1749 + 618 - K1749 + 650, K1749 + 695 - K1749 + 700","amountPesos":46309000,"lengthMeters":3349.0,"ratePesosPerMeter":13827.71,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0555 + 849 - K0556 + 552","amountPesos":46058000,"lengthMeters":703.0,"ratePesosPerMeter":65516.36,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Linamon-Zamboanga Rd - K1620 + 000 - K1620 + 909","amountPesos":46031000,"lengthMeters":909.0,"ratePesosPerMeter":50639.16,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0498 + 893 - K0500 + 251","amountPesos":46001000,"lengthMeters":1358.0,"ratePesosPerMeter":33874.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao-Davao Coastal Rd - K1169 + 942 - K1170 + 601, K1179 + 334 - K1181 + 305, K1181 + 767 - K1182 + 000","amountPesos":46000000,"lengthMeters":2863.0,"ratePesosPerMeter":16067.06,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bulalacao-Sn Jose-Jct Mapaya Rd - K0223 + 387 - K0224 + 684, K0224 + 696 - K0226 + 000, K0227 + 607 - K0228 + 147","amountPesos":46000000,"lengthMeters":3141.0,"ratePesosPerMeter":14645.02,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao-Davao Coastal Rd, K1800 + 460 - K1802 + 000","amountPesos":46000000,"lengthMeters":1540.0,"ratePesosPerMeter":29870.13,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road at Hanjin Villlage-Lawin, Sta. 0+000 - Sta. 1+930, Barangay Nagbunga, Castillejos, Zambales","amountPesos":46000000,"lengthMeters":1930.0,"ratePesosPerMeter":23834.2,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 11698 - Chainage 13131","amountPesos":45856000,"lengthMeters":1433.0,"ratePesosPerMeter":32000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palo-Carigara-Ormoc Rd - K0962 + 526 - K0963 + 000","amountPesos":45840000,"lengthMeters":474.0,"ratePesosPerMeter":96708.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lanao del Norte Interior Circum. Rd (LDNICR) - (S00969MN) Chainage 5910 - Chainage 7388","amountPesos":45818000,"lengthMeters":1478.0,"ratePesosPerMeter":31000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Bolodbolod-Albor Rd - K0060 + (-809) - K0060 + (-188), K0060 + 000 - K0060 + 817, K0061 + 000 - K0061 + 168","amountPesos":45806000,"lengthMeters":1606.0,"ratePesosPerMeter":28521.79,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nabua-Bato-Libon (Tandaay-Buluang, Bato) Rd - K0487 + 779 - K0489 + 000","amountPesos":45714000,"lengthMeters":1221.0,"ratePesosPerMeter":37439.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kalinga-Abra Rd - K0469 + 000 - K0472 + 078","amountPesos":45690000,"lengthMeters":3078.0,"ratePesosPerMeter":14844.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calamba-Sta Cruz-Famy Jct Rd - K0072 + 450 - K0072 + 795, K0073 + 961 - K0074 + 300","amountPesos":45667000,"lengthMeters":684.0,"ratePesosPerMeter":66764.62,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K1985 + 090 - K1985 + 170, K1985 + 250 - K1985 + 310, K1985 + 470 - K1985 + 500, K1985 + 560 - K1985 + 600, K1985 + 670 - K1985 + 680, K1988 + 340 - K1988 + 390","amountPesos":45620000,"lengthMeters":270.0,"ratePesosPerMeter":168962.96,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mogpog-Balanacan Port Rd - K0015 + 310 - K0015 + 360","amountPesos":45400000,"lengthMeters":50.0,"ratePesosPerMeter":908000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sibuyan Circumferential Rd - K0004 + 000 - K0005 + 414, K0007 + 200 - K0007 + 313, K0008 + 000 - K0008 + 325, K0008 + 357 - K0009 + 000, K0009 + 135 - K0009 + 365, K0012 + 475 - K0013 + 000","amountPesos":45373000,"lengthMeters":3250.0,"ratePesosPerMeter":13960.92,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sindangan-Bayog-Lakewood Rd - K1718 + 000 - K1721 + 000","amountPesos":45332000,"lengthMeters":3000.0,"ratePesosPerMeter":15110.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0045 + (-699) - K0045 + 000, K0045 + 064 - K0045 + 547","amountPesos":45143000,"lengthMeters":1182.0,"ratePesosPerMeter":38192.05,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0422 + 464 - K0422 + 531, K0422 + 815 - K0422 + 880, K0423 + 066 - K0423 + 098, K0423 + 179 - K0423 + 247, K0423 + 286 - K0423 + 361, K0423 + 969 - K0424 + 144, K0424 + 407 - K0424 + 435","amountPesos":45121000,"lengthMeters":510.0,"ratePesosPerMeter":88472.55,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (MN) - (S0060MN) K1459 + 400 - K1459 + 818, (S01391MN) Chainage 2807 - 3225","amountPesos":45000000,"lengthMeters":836.0,"ratePesosPerMeter":53827.75,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calauan-Nagcarlan Bdry Rd - K0080 + 088 - K0081 + 068","amountPesos":45000000,"lengthMeters":980.0,"ratePesosPerMeter":45918.37,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Oas Poblacion Rd - K0496+(-290) - K0498+333","amountPesos":45000000,"lengthMeters":2623.0,"ratePesosPerMeter":17155.93,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Famy-Real-Infanta-Dinahican Port Rd - K0104 + 923 - K0105 + 204, K0107 + 884 - K0108 + 167, K0108 + 687 - K0109 + 250, K0114 + 080 - K0114 + 338","amountPesos":45000000,"lengthMeters":1385.0,"ratePesosPerMeter":32490.97,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kalinga-Abra Rd - K0478 + 834 - K0478 + 860, K0481 + 187 - K0481 + 234, K0484 + 615 - K0484 + 648, K0486 + 387 - K0486 + 425, K0487 + 136 - K0487 + 163, K0487 + 659 - K0487 + 680, K0492 + 658 - K0492 + 678, K0503 + 025 - K0503 + 050, K0507 + 1879 - K0509 + 030, K0518 + 451 - K0518 + 471, K0520 + 023 - K0520 + 037, K0520 + 646 - K0520 + 670, K0520 + 971 - K0520 + 1002, K0523 + 204 - K0523 + 225, K0524 + 471 - K0524 + 506, K0525 + 210 - K0525 + 246","amountPesos":45000000,"lengthMeters":569.0,"ratePesosPerMeter":79086.12,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa North Rd - K0072 + 183 - K0072 + 230","amountPesos":45000000,"lengthMeters":47.0,"ratePesosPerMeter":957446.81,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Logac-Lasam-Gagabutan Rd - K0741 + 819 - K0741 + 957","amountPesos":45000000,"lengthMeters":138.0,"ratePesosPerMeter":326086.96,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Buenavista-Kawayan Rd - K0052 + 190 - K0052 + 640","amountPesos":45000000,"lengthMeters":450.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0803 + 235 - K0803 + 745.70","amountPesos":45000000,"lengthMeters":510.7,"ratePesosPerMeter":88114.35,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bayawan-Kabankalan Rd - K0101 + 200 - K0104 + 700 (Road Safety: Roadway Lighting)","amountPesos":45000000,"lengthMeters":3500.0,"ratePesosPerMeter":12857.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+014, Barangay Caditaan to Barangay Malbog, Magallanes, Sorsogon","amountPesos":45000000,"lengthMeters":1014.0,"ratePesosPerMeter":44378.7,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Bangon - G.M. Osias - Lonoy (Sta. 1+824 - Sta. 3+024), Gamay, Northern Samar","amountPesos":45000000,"lengthMeters":1200.0,"ratePesosPerMeter":37500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0407 + 284 - K0407 + 300, K0407 + 310 - K0407 + 350, K0407 + 644 - K0407 + 656, K0407 + 712 - K0407 + 806, K0408 + 405 - K0408 + 550, K0408 + 559 - K0408 + 579, K0408 + 753 - K0408 + 786, K0408 + 872 - K0408 + 896, K0409 + 077 - K0409 + 130, K0409 + 157 - K0409 + 184","amountPesos":44955000,"lengthMeters":464.0,"ratePesosPerMeter":96885.78,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Pascual-Claveria Rd - K0000 + 308 - K0000 + 630, K0000 + 762 - K0000 + 855, K0000 + 970 - K0001 + 555","amountPesos":44874000,"lengthMeters":1000.0,"ratePesosPerMeter":44874.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Romblon-Cogon-Sablayan Rd - K0004 + 214 - K0004 + 257","amountPesos":44690000,"lengthMeters":43.0,"ratePesosPerMeter":1039302.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Fernando North Rd - K0020 + 187 - K0020 + 220, K0021 + 326 - K0021 + 420, K0021 + 518 - K0021 + 627, K0021 + 710 - K0021 + 820, K0024 + 140 - K0024 + 238, K0024 + 359 - K0024 + 384, K0024 + 434 - K0024 + 622, K0024 + 750 - K0024 + 836","amountPesos":44267000,"lengthMeters":743.0,"ratePesosPerMeter":59578.73,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Argao-Moalboal Rd - K0072 + 000 - K0074 + 495, K0074 + 554 - K0074 + 724","amountPesos":44180000,"lengthMeters":2665.0,"ratePesosPerMeter":16577.86,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0097 + 371 - K0098 + 100, K0099 + 1475 - K0101 + 551, K0103 + 000 - K0104 + 642","amountPesos":44163000,"lengthMeters":3447.0,"ratePesosPerMeter":12812.01,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0125 + 705 - K0126 + 490, K0127 + 000 - K0127 + 766, K0128 + 993 - K0129 + 921, K0129 + 940 - K0131 + 015","amountPesos":44127000,"lengthMeters":3554.0,"ratePesosPerMeter":12416.15,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway – K0139 + 400 – K0140 + 080","amountPesos":44000000,"lengthMeters":680.0,"ratePesosPerMeter":64705.88,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd-K0498 + 150 - K0498 + 253, K0498 + 450 - K0498 + 475, K0498+660 - K0498 + 705, K0500 +095 - K0500 + 120, K0500+260 - K0500 + 295, K0500+672 - K0500+695","amountPesos":44000000,"lengthMeters":256.0,"ratePesosPerMeter":171875.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calapan South Rd - K0019 + 396 - K0020 + 513","amountPesos":43750000,"lengthMeters":1117.0,"ratePesosPerMeter":39167.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"NRJ Blancia-Alang-alang - Lower Tiparak - Tungawan By-Pass Road Sta. 0+000 - Sta. 0+890, Sta. 2+670 - Sta. 3+048","amountPesos":43750000,"lengthMeters":1268.0,"ratePesosPerMeter":34503.15,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"NRJ Camanga- Tabuan- Manlayag-Navalan By-Pass Rd, Zamboanga del Sur Sta. 0+000 - Sta. 0+256, Sta. 13+705 - Sta. 14+700","amountPesos":43750000,"lengthMeters":1251.0,"ratePesosPerMeter":34972.02,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"NRJ Dipolo - NRJ San Isidro Bypass Road (NRJ Dipolo - Rizal - Miligan - NRJ San Isidro Bypass Road) By-Pass Road Sta. 4+730-Sta. 5+980","amountPesos":43750000,"lengthMeters":1250.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"NRJ Lantian - San Isidro - Balimbingan - Luy-A - Tabuan - NRJ Camanga Diversion Road, Labangan, Zamboanga del Sur Sta. 6+738 - Sta. 7+988","amountPesos":43750000,"lengthMeters":1250.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0475 + 111 - K0475 + 610, K0477 + 840 - K0478 + 014","amountPesos":43736000,"lengthMeters":673.0,"ratePesosPerMeter":64986.63,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ayaga-Sta. Marcela-Flora-Lasam Rd - K0694 + 030 - K0694 + 280","amountPesos":43710000,"lengthMeters":250.0,"ratePesosPerMeter":174840.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banaue-Hungduan-Benguet Bdry Rd - K0384 + (-135) - K0384 + (-102), K0384 + 045 - K0384 + 091, K0384 + 803 - K0384 + 813, K0386 + 780 - K0386 + 853, K0381 + 118 - K0381 + 221, K0381 + 488 - K0381 + 504","amountPesos":43700000,"lengthMeters":281.0,"ratePesosPerMeter":155516.01,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0701 + (-114) - K0701 + 112","amountPesos":43690000,"lengthMeters":226.0,"ratePesosPerMeter":193318.58,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao-Davao Coastal Rd - K1468 + 288 - K1468 + 339","amountPesos":43500000,"lengthMeters":51.0,"ratePesosPerMeter":852941.18,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Matalam-Mlang-Bagontapay Jct Rd - K1650 + 546 - K1651 + 384, K1653 + 103 - K1653 + 138, K1653 + 153 - K1653 + 638, K1654 + 000 - K1654 + 017","amountPesos":43496000,"lengthMeters":1375.0,"ratePesosPerMeter":31633.45,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Pablo-Rizal-Nagcarlan-Liliw Rd - K0083 + 409 - K0085 + 000, K0097 + 429 - K0097 + 440, K0097 + 892 - K0098 + 000, K0098 + 459 - K0098 + 616, K0098 + 654 - K0098 + 672, K0099 + 135 - K0099 + 333, K0099 + 840 - K0100 + 386","amountPesos":43471000,"lengthMeters":2629.0,"ratePesosPerMeter":16535.18,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palompon-Isabel-Merida-Ormoc Rd - K1126 + 000 - K1127 + 180","amountPesos":43400000,"lengthMeters":1180.0,"ratePesosPerMeter":36779.66,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0045 + 300 - K0046 + 155","amountPesos":43400000,"lengthMeters":855.0,"ratePesosPerMeter":50760.23,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd - K0070+250 - K0071+480","amountPesos":43383000,"lengthMeters":1230.0,"ratePesosPerMeter":35270.73,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago - Tuguegarao Rd - K0395 + 000 - K0396 + 052","amountPesos":43353000,"lengthMeters":1052.0,"ratePesosPerMeter":41210.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Burgos-Gen Aguinaldo (NIA) Rd - K0343 + 554 - K0347 + 000","amountPesos":43302000,"lengthMeters":3446.0,"ratePesosPerMeter":12565.87,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Makilala-Allah Valley Rd - K1638 + 526 - K1639 + 000, K1642 + 861 - K1643 + 000","amountPesos":43186000,"lengthMeters":613.0,"ratePesosPerMeter":70450.24,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banisilan-Guiling-Alamada-Libungan Rd - K1689 + 922 - K1692 + 000","amountPesos":43110000,"lengthMeters":2078.0,"ratePesosPerMeter":20745.91,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Tuyo, City of Balanga, Bataan, 0+000-0+610, 0+000- 0+222","amountPesos":43000000,"lengthMeters":610.0,"ratePesosPerMeter":70491.8,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Jct National Road - Barangay Villa Alvarez - Barangay Salvacion, Balud and Mandaon, Masbate, Sta. 4+192 to Sta. 5+122","amountPesos":43000000,"lengthMeters":930.0,"ratePesosPerMeter":46236.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Road, Isidro D. Tan - Manga Road, Sta. 0+000 - Sta. 1+430, Tangub City, Misamis Occidental","amountPesos":42980000,"lengthMeters":1430.0,"ratePesosPerMeter":30055.94,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Coron-Busuanga Rd - K0018 + 000 - K0020 + 926","amountPesos":42699000,"lengthMeters":2926.0,"ratePesosPerMeter":14592.96,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Naguilian-Sn Mariano Rd - K0409 + 297 - K0413 + 000","amountPesos":42685000,"lengthMeters":3703.0,"ratePesosPerMeter":11527.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LT) - K0914 + 000 - K0914 + 770, K0915 + 000 - K0915 + 050","amountPesos":42653000,"lengthMeters":820.0,"ratePesosPerMeter":52015.85,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1564 + 162 - K1564 + 1003","amountPesos":42500000,"lengthMeters":841.0,"ratePesosPerMeter":50535.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sayre Highway Parallel Road I (Libona - Manolo Fortich - Impasug-ong Section), Barangay Kibention Section, Sta. 54+400 - Sta. 54+432.81, Impasug-ong, Bukidnon","amountPesos":42500000,"lengthMeters":32.81,"ratePesosPerMeter":1295336.79,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lubao -Guagaua-Minalin-Sto Tomas Rd, (Sta 000+285-Sta 000+703.64), Pampanga","amountPesos":42250000,"lengthMeters":418.64,"ratePesosPerMeter":100922.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dapawan-Torrel Rd - K0001 + (-828) - K0001 + 863, K0001 + 881 - K0003 + 085","amountPesos":42237000,"lengthMeters":2895.0,"ratePesosPerMeter":14589.64,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0380+1100 - K0380+1170","amountPesos":42100000,"lengthMeters":70.0,"ratePesosPerMeter":601428.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cebu North Hagnaya Wharf Rd - K0057 + 000 - K0057 + 478, K0062 + 342 - K0062 +700 , K0066+000 - K0066 + 433, K0070 + 013 - K0070 +162, K0070 + 600 - K0071 + 000, K0072 + 400 - K0072 + 710 , K0073 + 694 - K0073 + 771","amountPesos":42095000,"lengthMeters":2205.0,"ratePesosPerMeter":19090.7,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Olongapo-Bugallon Rd - K0131 + 582 - K0132 + 168","amountPesos":42000000,"lengthMeters":586.0,"ratePesosPerMeter":71672.35,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Apalit-Macabebe-Masantol Rd - K0055 + (-680) - K0055 + (-105)","amountPesos":42000000,"lengthMeters":575.0,"ratePesosPerMeter":73043.48,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alfonso Lista - Aurora Bdry. Rd - K0455 + 024 - K0455 + 361, K0456 + 007 - K0456 + 257","amountPesos":41881000,"lengthMeters":587.0,"ratePesosPerMeter":71347.53,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1651 + 473 - K1651 + 1070, K1651 + 2121 - K1651 + 2235, K1656 + 2856 - K1659 + 250, K1659 + 2167 - K1659 + 2791","amountPesos":41880000,"lengthMeters":1729.0,"ratePesosPerMeter":24222.09,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gov JJ Linao Rd - K0142 + 000 - K0143 + 330, K0143 + 346.40 - K0144 + 000","amountPesos":41737000,"lengthMeters":1983.6,"ratePesosPerMeter":21041.04,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0209 + 093 - K0209 + 742, K0209 + 764 - K0210 + 261, K0210 + 311 - K0210 + 820, K0210 + 925 - K0211 + 010, K0211 + 070 - K0211 + 126, K0211 + 211 - K0211 + 249, K0211 + 425 - K0211 + 514, K0212 + 132 - K0212 + 149, K0212 + 358 - K0212 + 381, K0212 + 819 - K0212 + 873, K0213 + 050 - K0213 + 100, K0213 + 563 - K0213 + 650","amountPesos":41717000,"lengthMeters":2154.0,"ratePesosPerMeter":19367.22,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gov JJ Linao Rd - K0141 + (-978) - K0142 + 000","amountPesos":41681000,"lengthMeters":1978.0,"ratePesosPerMeter":21072.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Solar Lights along Iligan City Diversion Road, Barangay Del Carmen, K1523+267 - K1525+618, Iligan City","amountPesos":41580000,"lengthMeters":2351.0,"ratePesosPerMeter":17686.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Solar Lights along Iligan City Diversion Road, Barangay Pala-o, K1525+618 - K1527+950, Iligan City","amountPesos":41580000,"lengthMeters":2332.0,"ratePesosPerMeter":17830.19,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Cotabato-Marbel Rd) - K1713 + 452 - K1714 + 275","amountPesos":41578000,"lengthMeters":823.0,"ratePesosPerMeter":50520.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0036 + 1477 - K0039 + 000, K0039 + 567 - K0039 + 702","amountPesos":41509000,"lengthMeters":1658.0,"ratePesosPerMeter":25035.59,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Fernando-Lubao Rd - K0080 + 000 - K0082 + 000","amountPesos":41452000,"lengthMeters":2000.0,"ratePesosPerMeter":20726.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1652 + 311 - K1652 + 909, K1653 + 123 - K1653 + 480, K1653 + 692 - K1654 + 100","amountPesos":41330000,"lengthMeters":1363.0,"ratePesosPerMeter":30322.82,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dipolog-Oroquieta National Rd - K1797 + 010 - K1797 + 681","amountPesos":41324000,"lengthMeters":671.0,"ratePesosPerMeter":61585.69,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1651 + 000 - K1652 + 311","amountPesos":41297000,"lengthMeters":1311.0,"ratePesosPerMeter":31500.38,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0242 + 550 - K0243 + 1048.40","amountPesos":41293000,"lengthMeters":1498.4,"ratePesosPerMeter":27558.06,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0561 + 552 - K0562 + 357","amountPesos":41270000,"lengthMeters":805.0,"ratePesosPerMeter":51267.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"NRJ Daang Maharlika Bunawan Proper - San Isidro - Kiotoy - Mabunao - Kauswagan - Jct. Panabo City Fatima - Malabog Road, Panabo City, Davao del Norte - Sta. 0+000 - Sta. 1+000, Sta. 1+100 - Sta. 1+895","amountPesos":41250000,"lengthMeters":1795.0,"ratePesosPerMeter":22980.5,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dualing-New Panay-Midsayap Rd - K1696 + 016 - K1697 + 272","amountPesos":41229000,"lengthMeters":1256.0,"ratePesosPerMeter":32825.64,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct (LIR) Carmen-Sagbayan-Bacani Rd - K0179 + 000 - K0179 + 100, K0179 + 350 - K0180 + 000","amountPesos":41215000,"lengthMeters":750.0,"ratePesosPerMeter":54953.33,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Batangas-Lobo Rd - K0130 + 074 - K0131 + 114","amountPesos":41120000,"lengthMeters":1040.0,"ratePesosPerMeter":39538.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1673 + 000 - K1675 + 000","amountPesos":41070000,"lengthMeters":2000.0,"ratePesosPerMeter":20535.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kananga-Tungonan Hot Spring Rd - K0993 + 698 - K0995 + 000","amountPesos":41042000,"lengthMeters":1302.0,"ratePesosPerMeter":31522.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Capas-San Jose-Mayantoc-Malacampa Rd - K0141 + 613 - K0142 + 814","amountPesos":41000000,"lengthMeters":1201.0,"ratePesosPerMeter":34138.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0679 + 360 - K0679 + 850","amountPesos":41000000,"lengthMeters":490.0,"ratePesosPerMeter":83673.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Liloy-Siocon Rd (S01330MN) - K2047+180-K2047+207, K2047+465 - K2047+497, K2051+809-K2051+835, K2053+330-K2053+380, K2053+635-K2053+672, K2059+450- K2059+480, K2059+825-K2059+856","amountPesos":40836000,"lengthMeters":233.0,"ratePesosPerMeter":175261.8,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LT) - K0984 + 350 - K0985 + 000, K0988 + 939 - K0989 + 724","amountPesos":40781000,"lengthMeters":1435.0,"ratePesosPerMeter":28418.82,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Candelaria Bypass Rd - K0109 + 911 - K0110 + 236","amountPesos":40750000,"lengthMeters":325.0,"ratePesosPerMeter":125384.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santander-Barili-Toledo Rd - K0159 + 208 - K0159 + 537, K0159 + 589 - K0160 + 252, K0160 + 267 - K0161 + 000","amountPesos":40678000,"lengthMeters":1725.0,"ratePesosPerMeter":23581.45,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0187 + 000 - K0188 + 842","amountPesos":40677000,"lengthMeters":1842.0,"ratePesosPerMeter":22083.06,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0159 + 000 - K0161 + 484","amountPesos":40624000,"lengthMeters":2484.0,"ratePesosPerMeter":16354.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road (Section 1: Sta. 0+000 - Sta. 1+435, Section 2: Sta. 0+000 - Sta. 1+978), Purok 7 to Purok 1, Barangay San Ignacio, City of Ilagan, Isabela","amountPesos":40605000,"lengthMeters":1978.0,"ratePesosPerMeter":20528.31,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Candoni-Sipalay Rd - K0161 + 740 - K0161 + 855 (Off-Carriageway Improvement: Paving of Shoulders)","amountPesos":40600000,"lengthMeters":115.0,"ratePesosPerMeter":353043.48,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kalinga-Abra Rd - K0483 + 264 - K0483 + 279, K0483 + 375 - K0483 + 425, K0483 + 450 - K0483 + 470, K0490 + 382 - K0490 + 397, K0502 + 900 - K0502 + 915, K0505 + 130 - K0505 + 180, K0505 + 770 - K0505 + 795, K0513 + 620 - K0513 + 650","amountPesos":40500000,"lengthMeters":220.0,"ratePesosPerMeter":184090.91,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pasacao-Balatan Tourism Coastal Highway - Sta. 494+600.00 - Sta. 495+800.00","amountPesos":40500000,"lengthMeters":1200.0,"ratePesosPerMeter":33750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Guinhayaan, Sta. 0+100 - Sta. 1+020, Looc, Romblon","amountPesos":40480000,"lengthMeters":920.0,"ratePesosPerMeter":44000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Liloy-Siocon Rd - K2058 + 400 - K2060 + 000","amountPesos":40439000,"lengthMeters":1600.0,"ratePesosPerMeter":25274.38,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siocon-Sirawai-Sibuco-Limpapa Rd - K2105 + 000 - K2107 + 696","amountPesos":40425000,"lengthMeters":2696.0,"ratePesosPerMeter":14994.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bugko-Nenita-Mirador-Cagpanit-an-De Maria-Sn Jose Rd - K0777 + 150 - K0777 + 270, K0777 + 498 - K0777 + 745","amountPesos":40370000,"lengthMeters":367.0,"ratePesosPerMeter":110000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Buenavista-Kawayan Rd - K0058 + 000 - K0058 + 449","amountPesos":40320000,"lengthMeters":449.0,"ratePesosPerMeter":89799.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road at Fort Del Pilar Barangay, Sta. 0+000 - Sta. 0+502, Baguio City","amountPesos":40320000,"lengthMeters":502.0,"ratePesosPerMeter":80318.73,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0053 + 152 - K0053 + 555","amountPesos":40300000,"lengthMeters":403.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagaytay-Batangas via Tuy Rd - K0060 + 167 - K0061 + 291","amountPesos":40178000,"lengthMeters":1124.0,"ratePesosPerMeter":35745.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Babak-Samal-Kaputian Rd - K1512 + 413 - K1513 + 676","amountPesos":40154000,"lengthMeters":1263.0,"ratePesosPerMeter":31792.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cebu South Coastal Rd - K0015 + 007 - K0016 + 372","amountPesos":40152000,"lengthMeters":1365.0,"ratePesosPerMeter":29415.38,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dapa-Jct Cancohoy Rd - K0008 + 556 - K0010 + 250","amountPesos":40087000,"lengthMeters":1694.0,"ratePesosPerMeter":23664.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Anilao Bypass Road, Sta. 0 + 000 - Sta. 2 + 242.73, Iloilo","amountPesos":40057000,"lengthMeters":2242.73,"ratePesosPerMeter":17860.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Naguilian-Sn Mariano Rd - K0415 + 238 - K0419 + 000","amountPesos":40001000,"lengthMeters":3762.0,"ratePesosPerMeter":10632.91,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Camp Lapu-Lapu Rd - (S00041CB) Chainage 000 - Chainage 469","amountPesos":40000000,"lengthMeters":469.0,"ratePesosPerMeter":85287.85,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"PPSR Jct-Poblacion Brookes Pt Rd - K0190 + (-103) - K0191 + 150","amountPesos":40000000,"lengthMeters":1253.0,"ratePesosPerMeter":31923.38,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Talisay-Laurel-Agoncillo Rd - K0083 + 734 - K0084 + 808","amountPesos":40000000,"lengthMeters":1074.0,"ratePesosPerMeter":37243.95,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Lingig-Trento Rd - K1477 + 277 - K1477 + 324","amountPesos":40000000,"lengthMeters":47.0,"ratePesosPerMeter":851063.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Naval-Caibiran Cross Country Road - K1041 + 230 - K1041 + 465","amountPesos":40000000,"lengthMeters":235.0,"ratePesosPerMeter":170212.77,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga City-Labuan-Limpapa Rd., K1974 + 150 - K1974 + 800","amountPesos":40000000,"lengthMeters":650.0,"ratePesosPerMeter":61538.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lopez Bypass Rd - K0216 + (-540) - K0216 + (-163), K0216 + 030 - K0216 + 323, K0217 + 386 - K0217 + 499, K0217 + 725 - K0217 + 775","amountPesos":40000000,"lengthMeters":833.0,"ratePesosPerMeter":48019.21,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago Circumferential Road, Segment 2: Sta. 2+657.9 - Sta. 4+957.27, Isabela","amountPesos":40000000,"lengthMeters":2299.37,"ratePesosPerMeter":17396.07,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago Circumferential Road, Segment 3: Sta. 5+033 - Sta. 6+211.18, Isabela","amountPesos":40000000,"lengthMeters":1178.18,"ratePesosPerMeter":33950.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sayre Highway Parallel Road I (Libona - Manolo Fortich - Impasug-ong Section), Barangay Maambong - Barangay Sil-ipon Section, Sta. 6+000 - Sta. 7+258.53, Libona, Bukidnon","amountPesos":40000000,"lengthMeters":1258.53,"ratePesosPerMeter":31783.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sayre Highway Parallel Road II (Manolo Fortich Section), Barangay Lingion, Sta. 9+800 - Sta. 10+576.47, Manolo Fortich, Bukidnon","amountPesos":40000000,"lengthMeters":776.47,"ratePesosPerMeter":51515.19,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Major Mane to Kennon Road Bypass Road, Sta. 1 + 917 - Sta. 2 + 202","amountPesos":40000000,"lengthMeters":285.0,"ratePesosPerMeter":140350.88,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Malvar-Sto. Tomas Road, Sta. 5+636 - Sta. 5+889, Batangas","amountPesos":40000000,"lengthMeters":253.0,"ratePesosPerMeter":158102.77,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Agdangan By-Pass Road, Chainage 400 - Chainage 1860, Chainage 2400 - Chainage 2724, Quezon","amountPesos":40000000,"lengthMeters":1784.0,"ratePesosPerMeter":22421.52,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Radial Road (NRJ BCIR-NRJ Mayor Democrito D. Plaza II Ave.), (Mahay - Baan) (Sta. 0+289 - Sta. 0+955.67), Butuan City","amountPesos":40000000,"lengthMeters":666.67,"ratePesosPerMeter":59999.7,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road) (Talakag- Baungon Section), Barangay Lacolac Section, Sta. 12+750 - Sta. 13+275.33, Baungon, Bukidnon","amountPesos":40000000,"lengthMeters":525.33,"ratePesosPerMeter":76142.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Impasug-ong Bdry. Bukidnon (Siloo)-Misamis Oriental (Eureka), Siloo Bridge 2, Barangay San Luis, Sta. 0+000 - Sta. 0+195, Malitbog, Bukidnon","amountPesos":40000000,"lengthMeters":195.0,"ratePesosPerMeter":205128.21,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Columbio - Lutayan - Koronadal Road, Sta. 13 + 242 - Sta. 13 + 352, Columbio, Sultan Kudarat","amountPesos":40000000,"lengthMeters":110.0,"ratePesosPerMeter":363636.36,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0085 + 420 - K0089 + 730 (Road Safety:Road Lighting)","amountPesos":40000000,"lengthMeters":4310.0,"ratePesosPerMeter":9280.74,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation of Solar LED (Roadway Lighting) along Zamboanga City Bypass Road (S01215MN), K1953+286 - K1961+536 , Zamboanga City","amountPesos":40000000,"lengthMeters":8250.0,"ratePesosPerMeter":4848.48,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation of Road Safety Facilities along Surigao-Davao Coastal Rd (S01376MN) K 1790 + 426 - K1792 + 748","amountPesos":40000000,"lengthMeters":2322.0,"ratePesosPerMeter":17226.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Aliaga-Guimba Road, STA. 4+682 - STA. 21+402 Road Safety Facilities (Roadway Lighting)","amountPesos":40000000,"lengthMeters":16720.0,"ratePesosPerMeter":2392.34,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete City-Valencia-Bacong Rd - K0003 + (-697) - K0007 + 332 (Road Safety: Roadway Lighting)","amountPesos":40000000,"lengthMeters":5029.0,"ratePesosPerMeter":7953.87,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road at Area B, Chainage 0 + 000 to Chainage 0 + 550, Barangay Batasan Hills, Quezon City","amountPesos":40000000,"lengthMeters":550.0,"ratePesosPerMeter":72727.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road including Drainage Structure, Salud Mitra Barangay, Baguio City (Site 1, Sta. 0+000 - Sta. 0+225), (Site 2, Sta. 0+000 - Sta. 0+095), (Site 3, Sta. 0+000 - Sta. 0+215)","amountPesos":40000000,"lengthMeters":225.0,"ratePesosPerMeter":177777.78,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Replacement of Bridge (Sta. 0+507 - Sta. 0+544) including Bridge Approaches (Sta. 0+487 - Sta. 0+507, Sta. 0+544 - Sta. 0+564), Barangay Bangag, City of Ilagan, Isabela","amountPesos":40000000,"lengthMeters":77.0,"ratePesosPerMeter":519480.52,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Calumpit - Macabebe Road, Sta. 0+000 - Sta. 1+600, City of Malolos, Bulacan","amountPesos":40000000,"lengthMeters":1600.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Malolos - San Marcos via Bulihan Road, Sta. 0+000 - Sta. 0+230, City of Malolos, Bulacan","amountPesos":40000000,"lengthMeters":230.0,"ratePesosPerMeter":173913.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Banga - Hulo - Poblacion Road with Drainage, Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+960 (120.96070833, 14.72641111)","amountPesos":40000000,"lengthMeters":960.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sitio Binbin, Barangay General Luna, Carranglan, Nueva Ecija Sta. 0+000 - Sta. 2+900, Sta. 4+700 - Sta. 5+30","amountPesos":40000000,"lengthMeters":3230.0,"ratePesosPerMeter":12383.9,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage along Pulung Maragul connecting to Abacan River Bypass Road, Angeles City (Sta. 0+000 to Sta 0+500)","amountPesos":40000000,"lengthMeters":500.0,"ratePesosPerMeter":80000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Sto. Domingo Road, Sta. 1 + 622 - Sta. 1 + 862, Sta. 2 + 145 - Sta. 4 + 505, Barangay Sto. Domingo, Nueva Valencia, Guimaras","amountPesos":40000000,"lengthMeters":2600.0,"ratePesosPerMeter":15384.62,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Tubungan - Igtuble - San Remegio Road, Iloilo, 19+416 - 20+198","amountPesos":40000000,"lengthMeters":782.0,"ratePesosPerMeter":51150.9,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Piyok Bridge (Sta. 3+128 - Sta 3+178), Sagay City, Negros Occidental (10.8625, 123.3430556)","amountPesos":40000000,"lengthMeters":50.0,"ratePesosPerMeter":800000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Catagbacan to Barangay Jalas, Villaba, Leyte (Station 0+000 - 1+000)","amountPesos":40000000,"lengthMeters":1000.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Road Concreting, Barangay Tagbubunga to Barangay Abijao, Villaba, Leyte (Station 0+000 - 1+000)","amountPesos":40000000,"lengthMeters":1000.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 2+500 - Sta. 3+880, Barangay Imelda - Barangay Guin- ansan, Almagro, Samar","amountPesos":40000000,"lengthMeters":1380.0,"ratePesosPerMeter":28985.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Pacao - Barangay Banquil, Villareal, Samar (Sta. 0+000.00 - 0+860.00)","amountPesos":40000000,"lengthMeters":860.0,"ratePesosPerMeter":46511.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Purok 5 Barangay Tabid - Barangay Litapan Road, Sta. 0+000 - Sta. 1+350, Ozamiz City, Misamis Occidental","amountPesos":40000000,"lengthMeters":1350.0,"ratePesosPerMeter":29629.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Purok 5 - Purok 6), Barangay Malaubang, Sta. 0+000 - Sta. 1+350, Ozamiz City, Misamis Occidental","amountPesos":40000000,"lengthMeters":1350.0,"ratePesosPerMeter":29629.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Barangay Mintabon to Barangay Sindangan Road, Sta. 0+000 - Sta. 1+240, Talisayan, Misamis Oriental","amountPesos":40000000,"lengthMeters":1240.0,"ratePesosPerMeter":32258.06,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Connecting National Road Junction to Misamis Oriental West Diversion Road, Sta.2+750 - Sta.3+750, Lugait To Manticao, Misamis Oriental","amountPesos":40000000,"lengthMeters":1000.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gingoog-Claveria-Villanueva Rd., K1374+544 - K1376+000","amountPesos":39954000,"lengthMeters":1456.0,"ratePesosPerMeter":27440.93,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Buenavista-Kawayan Rd - K0062 + 195 - K0063 + 000","amountPesos":39950000,"lengthMeters":805.0,"ratePesosPerMeter":49627.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siocon-Sirawai-Sibuco-Limpapa Rd - Chainage 15395 - Chainage 17000","amountPesos":39892000,"lengthMeters":1605.0,"ratePesosPerMeter":24854.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bauan-Mabini Rd - K0152 + 150 - K0152 + 649, K0152 + 667 - K0152 + 827","amountPesos":39875000,"lengthMeters":659.0,"ratePesosPerMeter":60508.35,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Batangas-Lobo Rd - K0119 + (-454) - K0119 + (-310), K0120 + 962 - K0120 + 974, K0121 + 114 - K0121 + 197, K0123 + 343 - K0123 + 1020, K0124 + 000 - K0124 + 637, K0125 + 000 - K0125 + 099, K0125 + 784 - K0126 + 000","amountPesos":39865000,"lengthMeters":1848.0,"ratePesosPerMeter":21571.97,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bukidnon-Cotabato Rd - K1651 + 002 - K1651 + 762","amountPesos":39673000,"lengthMeters":760.0,"ratePesosPerMeter":52201.32,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palico-Balayan-Batangas Rd - K0143 + 878 - K0144 + 450","amountPesos":39581000,"lengthMeters":572.0,"ratePesosPerMeter":69197.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surallah-Lake Sebu-Maitum Rd - K1749 + 668 - K1752 + 000","amountPesos":39560000,"lengthMeters":2332.0,"ratePesosPerMeter":16963.98,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Zabarte Extension's Road and Drainage, Chainage 000 - Chainage 565 at Barangay Kaligayahan, Quezon City","amountPesos":39550000,"lengthMeters":565.0,"ratePesosPerMeter":70000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kidapawan-Ilomavis Tourist Rd - K1632 + 691 - K1634 + 481","amountPesos":39477000,"lengthMeters":1790.0,"ratePesosPerMeter":22054.19,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao-Davao Coastal Rd - K1421 + 260 - K1422 + 131, K1423 + 185 - K1424 + 096","amountPesos":39456000,"lengthMeters":1782.0,"ratePesosPerMeter":22141.41,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Loay Interior Rd - K0182 + 700 - K0184 + 543","amountPesos":39421000,"lengthMeters":1843.0,"ratePesosPerMeter":21389.58,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago-Baluarte-Quirino Bdry Rd - K0330 + 000 - K0331 + 000","amountPesos":39000000,"lengthMeters":1000.0,"ratePesosPerMeter":39000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage System at Elgin Street (Chainage 0+000 to 0+232), Lyric Street (Chainage 0+000 to 0+185), and Bulova Street (Chainage 0+000 to 0+231) in Barangay Fairview, Quezon City","amountPesos":39000000,"lengthMeters":232.0,"ratePesosPerMeter":168103.45,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0095 + 512 - K0096 + 511, K0096 + 627 - K0097 + 000","amountPesos":38919000,"lengthMeters":1372.0,"ratePesosPerMeter":28366.62,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kiangan-Tinoc-Buguias Rd - K0361 + 559 - K0361 + 624, K0362 + 184 - K0362 + 252, K0362 + 922 - K0362 + 955, K0363 + 898 - K0363 + 930, K0366 + 435 - K0366 + 466","amountPesos":38861000,"lengthMeters":229.0,"ratePesosPerMeter":169698.69,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0225 + 918 - K0226 + 231, K0228 + 963 - K0230 + 000","amountPesos":38750000,"lengthMeters":1350.0,"ratePesosPerMeter":28703.7,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dalaguete-Mantalongon Badian Rd - K0093 + 000 - K0095 + 376","amountPesos":38709000,"lengthMeters":2376.0,"ratePesosPerMeter":16291.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - (S06317LZ) Chainage 16869 - Chainage 18752","amountPesos":38690000,"lengthMeters":1883.0,"ratePesosPerMeter":20547.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calamba-Sta Cruz-Famy Jct Rd - K0095 + 028 - K0096 + 000","amountPesos":38570000,"lengthMeters":972.0,"ratePesosPerMeter":39681.07,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dualing-New Panay-Midsayap Rd - K1705 + 673 - K1706 + 911","amountPesos":38501000,"lengthMeters":1238.0,"ratePesosPerMeter":31099.35,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo-Antique Rd - K0044 + 000 - K0044 + 388, K0044 + 500 - K0045 + 217","amountPesos":38500000,"lengthMeters":1105.0,"ratePesosPerMeter":34841.63,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo-Capiz Rd (Old Route) - K0096 + 155 - K0096 + 239, K0096 + 307 - K0097 + 005","amountPesos":38473000,"lengthMeters":782.0,"ratePesosPerMeter":49198.21,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Paniqui-Camiling-Wawa Rd - K0150 + 1852 - K0152 + 226, K0152 + 329 - K0152 + 783","amountPesos":38397000,"lengthMeters":828.0,"ratePesosPerMeter":46373.19,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0109 + 001 - K0110 + 683, K0115 + 879 - K0115 + 996","amountPesos":38283000,"lengthMeters":1799.0,"ratePesosPerMeter":21280.16,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siocon-Sirawai Rd - K2089 + 400 - K2091 + 000","amountPesos":38276000,"lengthMeters":1600.0,"ratePesosPerMeter":23922.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagaytay-Batangas via Tuy Rd - K0064 + 000 - K0064 + 990","amountPesos":38017000,"lengthMeters":990.0,"ratePesosPerMeter":38401.01,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa North Rd - K0070 + 014 - K0070 + 077","amountPesos":38000000,"lengthMeters":63.0,"ratePesosPerMeter":603174.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Jct. National Road to Barangay Manamoc,Milagros, Mandaon and Aroroy, Masbate, Sta. 0+000 - Sta. 0+450","amountPesos":38000000,"lengthMeters":450.0,"ratePesosPerMeter":84444.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Guimbal-Igbaras-Tubungan-Leon Rd - K0060 + 604 - K0061 + 000, K0061 + 000 - K0061 + 550, K0062 + 683 - K0063+030","amountPesos":37777000,"lengthMeters":1293.0,"ratePesosPerMeter":29216.55,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Cotabato-Marbel Rd) - K1715 + 614 - K1716 + 000","amountPesos":37731000,"lengthMeters":386.0,"ratePesosPerMeter":97748.7,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - (S01152MN) Chainage 26741 - Chainage 27341, Chainage 30541 - Chainage 31041, Chainage 31841 - Chainage 33255","amountPesos":37710000,"lengthMeters":2514.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd - K0069+190 - K0070+250","amountPesos":37366000,"lengthMeters":1060.0,"ratePesosPerMeter":35250.94,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siocon-Sirawai-Sibuco-Limpapa Rd - K2098 + 500 - K2100 + 000","amountPesos":37257000,"lengthMeters":1500.0,"ratePesosPerMeter":24838.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0391 + 023 - K0392 + 015","amountPesos":37048000,"lengthMeters":992.0,"ratePesosPerMeter":37346.77,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rizal National Rd (Romualdez-Santor-Calaocan-Sn Pascual Sect) - K0428 + 957 - K0432 + 000","amountPesos":37001000,"lengthMeters":3043.0,"ratePesosPerMeter":12159.38,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Talisay-Laurel-Agoncillo Rd - K0103 + -197 - K0104 + 014","amountPesos":37000000,"lengthMeters":1211.0,"ratePesosPerMeter":30553.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Linamon-Zamboanga Rd - K1606 + 260 - K1606 + 283, K1606 + 299 - K1607 + 000","amountPesos":36916000,"lengthMeters":724.0,"ratePesosPerMeter":50988.95,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1615 + 000 - K1616 + 816","amountPesos":36863000,"lengthMeters":1816.0,"ratePesosPerMeter":20299.01,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0068 + 293 - K0070 + 000","amountPesos":36828000,"lengthMeters":1707.0,"ratePesosPerMeter":21574.69,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Fernando North Rd - K0003+185 - K0003 + 630, K0003 + 693 - K0003+800, K0003+1003 - K0004+024, K0004+123.5 - K0004+205","amountPesos":36811000,"lengthMeters":654.5,"ratePesosPerMeter":56242.93,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Apayao-Ilocos Norte Rd - K0663 + 591 - K0663 + 645","amountPesos":36810000,"lengthMeters":54.0,"ratePesosPerMeter":681666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"M.R. Espinosa Airport Rd - (S00024MT) Chainage 570 - Chainage 846","amountPesos":36800000,"lengthMeters":276.0,"ratePesosPerMeter":133333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - (S01152MN) Chainage 23549 - Chainage 26001","amountPesos":36780000,"lengthMeters":2452.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0058 + 301 - K0059 + 000","amountPesos":36761000,"lengthMeters":699.0,"ratePesosPerMeter":52590.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - K1589 + 270 - K1589 + 861, K1589 + 903 - K1590 + 000, K1590 + 224 - K1591 + 000","amountPesos":36630000,"lengthMeters":1464.0,"ratePesosPerMeter":25020.49,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sindangan-Liloy Rd - K1961 + 031 - K1961 + 492, K1962 + 551 - K1962 + 726, K1963 + 836 - K1965 + 174","amountPesos":36558000,"lengthMeters":1974.0,"ratePesosPerMeter":18519.76,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago-Baluarte-Quirino Bdry - K0333+856 - K0335+640","amountPesos":36498000,"lengthMeters":1784.0,"ratePesosPerMeter":20458.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0069 + 398 - K0070 + 420","amountPesos":36155000,"lengthMeters":1022.0,"ratePesosPerMeter":35376.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0065 + 140.91 - K0065 + 726","amountPesos":36129000,"lengthMeters":585.09,"ratePesosPerMeter":61749.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manuel Roxas Rd - K0252 + (-565) - K0254 + 462 (Off-Carriageway Improvement: Construction of Sidewalk)","amountPesos":36110000,"lengthMeters":3027.0,"ratePesosPerMeter":11929.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calapan South Rd - K0153 + 493 - K0153 + 860, K0154 + 1037 - K0155 + 207, K0157 + 662 - K0158 + 000","amountPesos":36100000,"lengthMeters":875.0,"ratePesosPerMeter":41257.14,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Olongapo-Bugallon Road - K0178 + 797 - K0179 + 007, K0181 + 544 - 182 + 005","amountPesos":36000000,"lengthMeters":671.0,"ratePesosPerMeter":53651.27,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagbac-Lubang-Looc Rd - K0001 + 000 - K0001 + 181, K0001 + 946 - K0002 + 553, K0008 + 318 - K0008 + 826, K0010 + 443 - K0011 + 650","amountPesos":36000000,"lengthMeters":2503.0,"ratePesosPerMeter":14382.74,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacnotan-Luna-Balaoan Rd - K0306 + 261 - K0307 + 714","amountPesos":36000000,"lengthMeters":1453.0,"ratePesosPerMeter":24776.32,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Upper Calawag, Barangay Calawag, Section A Sta. 6+300 - Sta. 6+470, Section B Sta. 7+700 - Sta. 8+700, Balingasag, Misamis Oriental","amountPesos":36000000,"lengthMeters":1170.0,"ratePesosPerMeter":30769.23,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0234 + 984 - K0236 + 512","amountPesos":35994000,"lengthMeters":1528.0,"ratePesosPerMeter":23556.28,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sibuyan Circumferential Rd - K0037 + 287 - K0037 + 886","amountPesos":35940000,"lengthMeters":599.0,"ratePesosPerMeter":60000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod North Rd - K0036 + 952 - K0038 + 203, K0043 + 678 - K0043 + 698, K0061 + 000 - K0061 + 092","amountPesos":35854000,"lengthMeters":1363.0,"ratePesosPerMeter":26305.21,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kalinga-Abra Rd - K0467 + 007 - K0467 + 022, K0468 + 361 - K0468 + 403, K0471 + 581 - K0471 + 647, K0474 + 098 - K0474 + 118, K0475 + 061 - K0475 + 085, K0475 + 273 - K0475 + 319, K0475 + 705 - K0475 + 800","amountPesos":35748000,"lengthMeters":308.0,"ratePesosPerMeter":116064.94,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juban-Magallanes Rd - K0604 + 801 - K0606 + 000, K0611 + 000 - K0612 + 000","amountPesos":35635000,"lengthMeters":2199.0,"ratePesosPerMeter":16205.09,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gov JJ Linao Rd - K0144 + 000 - K0145 + 685","amountPesos":35580000,"lengthMeters":1685.0,"ratePesosPerMeter":21115.73,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ortigas Avenue - K0012+(-529) - K0014+469, Manila East Rd - K0015+(-478) to K0017+131, Pasig City (Off-Carriageway Improvement: Construction of Sidewalk)","amountPesos":35576000,"lengthMeters":5607.0,"ratePesosPerMeter":6344.93,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Palaspas to Barangay San Pablo, Sta. 8 + 015.00 to Sta. 8 + 665.00, Del Gallego, Camarines Sur","amountPesos":35575000,"lengthMeters":650.0,"ratePesosPerMeter":54730.77,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Magpet-Nowa-Doroluman-Greenfield Rd - K1664 + 946 - K1666 + 061","amountPesos":35530000,"lengthMeters":1115.0,"ratePesosPerMeter":31865.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago-Tuguegarao Rd - K0343 + 843 - K0345 + 000","amountPesos":35450000,"lengthMeters":1157.0,"ratePesosPerMeter":30639.59,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palompon-Isabel-Merida-Ormoc Rd - K1117 + 989 - K1119 + 000","amountPesos":35445000,"lengthMeters":1011.0,"ratePesosPerMeter":35059.35,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calapan South Rd - K0051 + 625 - K0051 + 1005","amountPesos":35400000,"lengthMeters":380.0,"ratePesosPerMeter":93157.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Milagros Rd - K0020 + 851 - K0021 + 470","amountPesos":35396000,"lengthMeters":619.0,"ratePesosPerMeter":57182.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maragondon-Magallanes-Amuyong Rd - K0064 + 070 - K0064 + 567","amountPesos":35272000,"lengthMeters":497.0,"ratePesosPerMeter":70969.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0239 + 353 - K0240 + 643","amountPesos":35100000,"lengthMeters":1290.0,"ratePesosPerMeter":27209.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Presentacion-Maligaya Rd-K0529 + (-065) - K0529 + 086, K0535 + 594 - K0535 + 698, K0540 + 678 - K0540 + 900","amountPesos":35000000,"lengthMeters":477.0,"ratePesosPerMeter":73375.26,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0017 + 159 - K0017 + 185, K0020 + 150 - K0020 + 180, Cebu City","amountPesos":35000000,"lengthMeters":56.0,"ratePesosPerMeter":625000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1520 + 080 - K1520 + 150","amountPesos":35000000,"lengthMeters":70.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Logac-Lasam-Gagabutan Rd - K0739 + 575 - K0739 + 675","amountPesos":35000000,"lengthMeters":100.0,"ratePesosPerMeter":350000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Logac-Lasam-Gagabutan Rd - K0741 + 685 - K0741 + 775","amountPesos":35000000,"lengthMeters":90.0,"ratePesosPerMeter":388888.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Malaybalay Rd - K1261 + 535 - K1261 + 585","amountPesos":35000000,"lengthMeters":50.0,"ratePesosPerMeter":700000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cagaluan Bypass Road, Sta. 3+360 - Sta. 4+060, Kalinga","amountPesos":35000000,"lengthMeters":700.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Radial Road (NRJ BCIR - NRJ Mayor Democrito D. Plaza II Ave.), (Libertad-Bonbon Section) (Sta. 0+000 - Sta. 0+481, Sta. 1+940 - Sta. 1+960, Sta. 2+000 - Sta. 2+122, Sta. 2+230 - Sta. 2+637), Butuan City","amountPesos":35000000,"lengthMeters":1030.0,"ratePesosPerMeter":33980.58,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Sulok Bridge, Sta. 1+120 - Sta. 1+145, Florante St., (Sulok), Panginay, Balagtas, Bulacan","amountPesos":35000000,"lengthMeters":25.0,"ratePesosPerMeter":1400000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction (Completion) of Maluid - Cruz Diversion Road, Sta. 3+263 - Sta. 4+900, Victoria, Tarlac","amountPesos":35000000,"lengthMeters":1637.0,"ratePesosPerMeter":21380.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road along NHA Ave., Barangay Dela Paz, Antipolo City (Sta.0+448- 1+430)","amountPesos":35000000,"lengthMeters":982.0,"ratePesosPerMeter":35641.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Joljogon to Barangay Tugawe, Mobo, Masbate, Sta. 3+590 to Sta. 4+390","amountPesos":35000000,"lengthMeters":800.0,"ratePesosPerMeter":43750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Roads, Polangi-Gebulwangan-Quezon-Tranque-Mabini, Sta. 010+400 - Sta. 012+227, Catarman, Northern Samar","amountPesos":35000000,"lengthMeters":1827.0,"ratePesosPerMeter":19157.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Mabini - Palanas - Rufino - Tagan-ayan - San Jose - Epaw - San Isidro - Road (Sta. 0+585 - Sta. 1+320), Las Navas, Northern Samar","amountPesos":35000000,"lengthMeters":735.0,"ratePesosPerMeter":47619.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Tinoblan to Barangay Rombang (Sta. 0+000 - Sta. 1+066), Laoang, Northern Samar","amountPesos":35000000,"lengthMeters":1066.0,"ratePesosPerMeter":32833.02,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Labangan-Sominot Bypass Road, Zamboanga del Sur Sta. 00+794 - Sta. 01+669","amountPesos":35000000,"lengthMeters":875.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road at Farmers Producers Cooperative Nursery Demo and Integrated Farm (Sta. 4+652 - Sta. 8+652), Barangay Tungao, Butuan City","amountPesos":35000000,"lengthMeters":4000.0,"ratePesosPerMeter":8750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K2012 + 240 - K2012 + 320, K2012 + 330 - K2012 + 390, K2012 + 410 - K2012 + 440, K2015 + 030 - K2015 + 110","amountPesos":34960000,"lengthMeters":250.0,"ratePesosPerMeter":139840.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod North Rd - K0009 + (-665) - K0011 + 981, K0011 + (-1008) - K0009 + 777 (Road Safety: Roadway Lighting)","amountPesos":34885000,"lengthMeters":3646.0,"ratePesosPerMeter":9568.02,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0466 + 689 - K0466 + 739, K0467 + 045 - K0467 + 182, K0467 + 604 - K0467 + 711, K0468 + 690 - K0468 + 754","amountPesos":34881000,"lengthMeters":358.0,"ratePesosPerMeter":97432.96,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Roman Expressway - K0143 + (-252) - K0144 + 400","amountPesos":34854000,"lengthMeters":1652.0,"ratePesosPerMeter":21098.06,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alicia-San Mateo Rd - K0349 + (-581) - K0350 + 594","amountPesos":34801000,"lengthMeters":2175.0,"ratePesosPerMeter":16000.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santander-Barili-Toledo Rd - K0155 + 083 - K0156 + 263, K0156 + 398 - K0156 + 436, K0157 + 900 - K0158 + 140","amountPesos":34697000,"lengthMeters":1458.0,"ratePesosPerMeter":23797.67,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gil Puyat Ave - K0008 + (-865) - K0008 + 207","amountPesos":34678000,"lengthMeters":1072.0,"ratePesosPerMeter":32348.88,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0696 + 896 - K0697 + 000, K0697 + 663 - K0698 + 032, K0698 + 877 - K0699 + 039, K0702 + 143 - K0702 + 483, K0703 + 158 - K0703 + 459, K0703 + 853 - K0704 + 000","amountPesos":34565000,"lengthMeters":1423.0,"ratePesosPerMeter":24290.23,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1782 + 200 - K1783 + 000, K1802 + 362 - K1803 + 000, K1806 + 317 - K1806 + 859","amountPesos":34500000,"lengthMeters":1980.0,"ratePesosPerMeter":17424.24,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 2+585, Barangay Wigan, Cordon, Isabela","amountPesos":34500000,"lengthMeters":2585.0,"ratePesosPerMeter":13346.23,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alicia-San Mateo Rd - K0352 + 558 - K0354 + 711","amountPesos":34497000,"lengthMeters":2153.0,"ratePesosPerMeter":16022.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0410 + 092 - K0410 + 117, K0410+806 - K0410+822, K0410+835 - K0411+028, K0411 + 080 - K0411 + 125, K0411 + 525 - K0411 + 580, K0414 + 690 - K0414 + 755, K0415 + 500 - K0415 + 540, K0415 + 780 - K0415 + 820","amountPesos":34466000,"lengthMeters":479.0,"ratePesosPerMeter":71954.07,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt Prov-Cagayan via Tabuk-Enrile Rd - K0400 + 924 - K0400 + 994, K0400 + 427 - K0400 + 523","amountPesos":34400000,"lengthMeters":166.0,"ratePesosPerMeter":207228.92,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1936 + 947 - K1938 + 000","amountPesos":34278000,"lengthMeters":1053.0,"ratePesosPerMeter":32552.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1284 + 370 - K1284 + 850, K1290 + 650 - K1290 + 930, K1300 + 395 - K1300 + 775 (Road Safety: Roadway Lighting)","amountPesos":34273000,"lengthMeters":1140.0,"ratePesosPerMeter":30064.04,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Roman Expressway - K0145 + 623 - K0146 + 904, K0147 + 910 - K0148 + 276","amountPesos":34245000,"lengthMeters":1647.0,"ratePesosPerMeter":20792.35,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bukidnon-Cotabato Rd - K1642 + 677 - K1643 + 809, K1643 + 841 - K1644 + 000","amountPesos":34244000,"lengthMeters":1291.0,"ratePesosPerMeter":26525.17,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lanao del Norte Interior Circum. Rd (LDNICR) - (S00969MN) Chainage 7388 - Chainage 8488","amountPesos":34100000,"lengthMeters":1100.0,"ratePesosPerMeter":31000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Olongapo-Bugallon Rd - K0128 + 922 - K0129 + 982","amountPesos":34000000,"lengthMeters":1060.0,"ratePesosPerMeter":32075.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Olongapo-Bugallon Rd - K0132 + 168 - K0133+166","amountPesos":34000000,"lengthMeters":998.0,"ratePesosPerMeter":34068.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Bukidnon Rd - K1648 + 731 - K1648 + 765","amountPesos":34000000,"lengthMeters":34.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0408 + 428 - K0408 + 490, K0409 + 247 - K0409 + 340, K0409 + 397 - K0409 + 452, K0410 + 434 - K0410 + 614, K0413 + 413 - K0413 + 489, K0422 + 600 - K0422 + 648, K0422 + 685 - K0422 + 758, K0425 + 176 - K0425 + 318","amountPesos":33994000,"lengthMeters":729.0,"ratePesosPerMeter":46631.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lipa City - Alaminos Rd - K0079 + 756 - K0080 + 619","amountPesos":33850000,"lengthMeters":863.0,"ratePesosPerMeter":39223.64,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0093 + 635 - K0094 + 300","amountPesos":33850000,"lengthMeters":665.0,"ratePesosPerMeter":50902.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siocon-Sirawai-Sibuco-Limpapa Rd - (S01151MN) Chainage 20500 - Chainage 21000, Chainage 21400 - Chainage 21800, Chainage 23000 - Chainage 23368, Chainage 29000 - Chainage 29986","amountPesos":33810000,"lengthMeters":2254.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tanauan-Talisay-Tagaytay Rd - K0073 + 606 - K0074 + 396","amountPesos":33805000,"lengthMeters":790.0,"ratePesosPerMeter":42791.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road including Slope Protection Structure (Sta. 0+000 - Sta. 1+920), Barangay Alinguigan 1st to Barangay Cadu, City of Ilagan, Isabela","amountPesos":33800000,"lengthMeters":1920.0,"ratePesosPerMeter":17604.17,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0661 + 795 - K0661 + 860","amountPesos":33770000,"lengthMeters":65.0,"ratePesosPerMeter":519538.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0348 + 187 - K0349 + 900","amountPesos":33744000,"lengthMeters":1713.0,"ratePesosPerMeter":19698.77,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur","amountPesos":33628000,"lengthMeters":455.0,"ratePesosPerMeter":73907.69,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nueva Vizcaya-Ifugao-Mt Province Rd - K0359 + 473 - K0359 + 563, K0360 + 819 - K0360 + 954, K0361 + 077 - K0361 + 172","amountPesos":33600000,"lengthMeters":320.0,"ratePesosPerMeter":105000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ramos-Pura Rd - K0154 + (-379) - K0155 + 257","amountPesos":33572000,"lengthMeters":1636.0,"ratePesosPerMeter":20520.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0218 + 342 - K0219 + 757","amountPesos":33450000,"lengthMeters":1415.0,"ratePesosPerMeter":23639.58,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0464 + 000 - K0464 + 640","amountPesos":33344000,"lengthMeters":640.0,"ratePesosPerMeter":52100.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod-City Bdry Rd - K0001 + 224 - K0001 + 373, K0001 + 373 - K0002 + 000, K0002 + 000 - K0002 + 457","amountPesos":33328000,"lengthMeters":1233.0,"ratePesosPerMeter":27030.01,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Roman Expressway - K0152 + 430 - K0154 + 000","amountPesos":33320000,"lengthMeters":1570.0,"ratePesosPerMeter":21222.93,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Catarman-Laoang Rd - K0765 + (-040) - K0765 + 350","amountPesos":33289000,"lengthMeters":390.0,"ratePesosPerMeter":85356.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sayre Highway - K1428 + 000 - K1428 + 250","amountPesos":33250000,"lengthMeters":250.0,"ratePesosPerMeter":133000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod Silay Airport Access Rd K0009 + 507 - K0014 + 917 (Road Safety: Roadway Lighting)","amountPesos":33240000,"lengthMeters":5410.0,"ratePesosPerMeter":6144.18,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Magpet-Nowa-Doroluman-Greenfield Rd - K1633 + 023 - K1634 + 598","amountPesos":33219000,"lengthMeters":1575.0,"ratePesosPerMeter":21091.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banay-Banay-Mojon-Cuenca Rd - K0092 + 022 - K0093 + 042","amountPesos":33160000,"lengthMeters":1020.0,"ratePesosPerMeter":32509.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago-Tuguegarao Rd - K0348 + 421 - K0349 + 506","amountPesos":33036000,"lengthMeters":1085.0,"ratePesosPerMeter":30447.93,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Argao-Moalboal Rd - K0060 + 000 - K0061 + 521, K0063 + 837 - K0064 + 292","amountPesos":33013000,"lengthMeters":1976.0,"ratePesosPerMeter":16706.98,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Batangas-Lobo Rd - K0117+9.5-K0117+14(LL), K0117+207.9-K0117+212.5(LL), K0117+253.2-K0117+255.6(BL), K0117+257.6-K0117+262.1(LL), K0117+372.2- K0117+398.8(LL), K0117+416.6-K0117+425.5(BL), K0117+443.7-K0117+455.8(BL), K0117+472.8-K0117+477(LL), K0117+477-K0117+481.5(BL), K0117+499.3- K0117+503.6(LL), K0117+521.4-K0117+530.2(BL), K0117+530.2-K0117+539.5(LL), K0117+539.5-K0117+548.5(BL), K0117+576.1-K0117+580.8(LL), K0117+585.4- K0117+604.1(LL), K0117+664-K0117+668.5RL, K0117+682.2-K0117+691.3(BL), K0117+691.3-K0117+700.4(LL), K0117+705-K0117+727.3(BL), K0117+777- K0117+782.5(BL), K0117+846-K0117+855.1(LL), K0117+868.6-K0117+882.2(LL), K0117+980.4-K0118+000(LL), K0118+000-K0118+16(LL), K0118+47-K0118+64.8(LL), K0118+64.8-K0118+81.5(BL), K0118+89.4-K0118+163.2(LL), K0118+163.2- K0118+172.3(BL), K0118+172.3-K0118+249.5(LL), K0118+278.3-K0118+307.5(LL), K0118+328.2-K0118+360.3(LL), K0118+423.4-K0118+445(BL), K0118+525.9- K0118+537.3(BL)","amountPesos":33000000,"lengthMeters":524.8,"ratePesosPerMeter":62881.1,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Batangas-Lobo Rd - K0112+494.1-K0112+503.9(BL), K0112+556.2-K0112+563.8(RL), K0112+577.8-K0112+600.4(LL), K0112+609.4-K0112+614.1(LL), K0112+641- K0112+672.9(LL), K0113+860.4-K0113+865(LL), K0113+865-K0113+878.6(BL), K0114+175.7-K0114+184.9(LL), K0114+184.6-K0114+285.1(LL), K0114+405.7- K0114+447(LL), K0114+454.5-K0114+478.5(LL), K0114+568.3-K0114+577.1(BL), K0114+620-K0114+629(LL), K0114+702.9-K0114+712.1(BL), K0114+712.1- K0114+723(LL), K0114+739-K0114+743.3(BL), K0114+743.3-K0114+802.6(LL), K0114+802.6-K0114+811.5(BL), K0114+811.5-K0114+820.7(LL), K0114+820.7- K0114+825.3(BL), K0114+825.3-K0114+829.9(LL), K0114+829.9-K0114+843.2(BL), K0114+843.2-K0114+852.2(LL), K0114+852.2-K0114+856.8(BL), K0114+856.8- K0115+000(LL), K0115+000-K0115+107.5(LL), K0115+115.3-K0115+119.5(LL), K0115+151.1-K0115+155.6(LL), K0115+164.7-K0115+173.7(LL), K0115+184- K0115+238(LL), K0115+250.9-K0115+255.4(LL), K0115+255-K0115+264(RL), K0115+309.4-K0115+318.3(LL), K0115+318.3-K0115+323.5(BL), K0115+322.9- K0115+332(RL), K0115+401.4-K0115+447.7(RL), K0115+447.7-K0115+454(BL), K0115+479.2-K0115+488.1(LL), K0115+524.2-K0115+542.1(LL), K0115+546.7- K0115+551.3(RL), K0115+551.3-K0115+555.7(LL), K0115+609.8-K0115+618.8(LL), K0115+645.9-K0115+668.5(LL), K0115+771.9-K0115+775.9(LL), K0115+826.1- K0115+830.5(LL), K0115+839.6-K0115+843.9(LL)","amountPesos":33000000,"lengthMeters":916.0,"ratePesosPerMeter":36026.2,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct. Nato-Sabang Coastal Road, San Jose, Camarines, Sta. 7+446.40 - Sta.7+467, Sta.10+368 - Sta.10+504.70","amountPesos":33000000,"lengthMeters":157.3,"ratePesosPerMeter":209790.21,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dinagat-Loreto Rd - K0001 + 000 - K0002 + 426, K0002 + 537 - K0003 + 000","amountPesos":32920000,"lengthMeters":1889.0,"ratePesosPerMeter":17427.21,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0032 + 028 - K0032 + 566","amountPesos":32900000,"lengthMeters":538.0,"ratePesosPerMeter":61152.42,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"The President Carlos P. Garcia Circumferential Rd - K0096 + 262 - K0096 + 869","amountPesos":32895000,"lengthMeters":607.0,"ratePesosPerMeter":54192.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surallah-Lake Sebu-Maitum Rd - K1753 + 000 - K1753 + 1016","amountPesos":32832000,"lengthMeters":1016.0,"ratePesosPerMeter":32314.96,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Fernando-Lubao Rd - K0077 + 419 - K0079 + 000","amountPesos":32763000,"lengthMeters":1581.0,"ratePesosPerMeter":20722.96,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0060 + 901 - K0061 + 500","amountPesos":32750000,"lengthMeters":599.0,"ratePesosPerMeter":54674.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Milagros-Baleno-Lagta Rd - K0052 + 147 - K0052 + 574","amountPesos":32720000,"lengthMeters":427.0,"ratePesosPerMeter":76627.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Milagros-Baleno-Lagta Rd - K0036 + 574 - K0037 + 000","amountPesos":32645000,"lengthMeters":426.0,"ratePesosPerMeter":76631.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0064 + 405 - K0064 + 830.77","amountPesos":32532000,"lengthMeters":425.77,"ratePesosPerMeter":76407.45,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo-Capiz (New Route) - K0054 + 000 - K0054 + 1011","amountPesos":32500000,"lengthMeters":1011.0,"ratePesosPerMeter":32146.39,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bongao-Pahut-Sanga-Sanga Rd - Chainage 1200 - Chainage 2149","amountPesos":32500000,"lengthMeters":949.0,"ratePesosPerMeter":34246.58,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mindoro West Coastal Rd - K0330 + 000 - K0331 + 000","amountPesos":32500000,"lengthMeters":1000.0,"ratePesosPerMeter":32500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Sta. 3+353 - Sta. 5+669) at Barangay Canlusong, E.B. Magalona, Negros Occidental (10.7556040, 123.1613220)","amountPesos":32424000,"lengthMeters":2316.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bukidnon-Cotabato Rd - K1618 + 651 - K1619 + 646","amountPesos":32280000,"lengthMeters":995.0,"ratePesosPerMeter":32442.21,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siocon-Sirawai-Sibuco-Limpapa Rd - (S01151MN) Chainage 30016 - Chainage 30473, Chainage 30498 - Chainage 31400, Chainage 31700 - Chainage 32000, Chainage 32300 - Chainage 32790","amountPesos":32235000,"lengthMeters":2149.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway ( Manila South Road) - K0044 + 553 - K0045 + 000","amountPesos":32117000,"lengthMeters":447.0,"ratePesosPerMeter":71850.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road (Sta. 2+940 - Sta. 5+040), Barangay Annanuman to Barangay San Vicente, San Pablo, Isabela","amountPesos":32100000,"lengthMeters":2100.0,"ratePesosPerMeter":15285.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Matalam-Lampayan-Antipas Rd - K1666 + 000 - K1667 + 000","amountPesos":32085000,"lengthMeters":1000.0,"ratePesosPerMeter":32085.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct. Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd - K0017 + (-386) - K0020 + 000 (Road Safety: Roadway Lighting)","amountPesos":32084000,"lengthMeters":3386.0,"ratePesosPerMeter":9475.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nabua-Bato-Libon (Tandaay-Buluang, Bato) Rd - K0492 + 873 - K0493 + 728.49","amountPesos":32030000,"lengthMeters":855.49,"ratePesosPerMeter":37440.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kidapawan-Calunasan-Mlang Rd - K1629 + 000 - K1629 + 1016","amountPesos":32027000,"lengthMeters":1016.0,"ratePesosPerMeter":31522.64,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Makiling Park Rd - K0063 + (-273) - K0064 + 000","amountPesos":32000000,"lengthMeters":1273.0,"ratePesosPerMeter":25137.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cabanatuan City - Carmen Rd, K0133 + 000 - K0133 + 750","amountPesos":32000000,"lengthMeters":750.0,"ratePesosPerMeter":42666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Guimbal-Igbaras-Tubungan-Leon Rd - K0035 + 115 - K0036 + 000","amountPesos":32000000,"lengthMeters":885.0,"ratePesosPerMeter":36158.19,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Batangas-Lobo Rd - K0131 + 100 - K0131 + 206","amountPesos":32000000,"lengthMeters":106.0,"ratePesosPerMeter":301886.79,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Apayao (Calanasan)-Ilocos Norte Rd - (S00644LZ) Chainage 9172 - Chainage 9209, Chainage 9601 - Chainage 9642","amountPesos":32000000,"lengthMeters":78.0,"ratePesosPerMeter":410256.41,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Jct National Raod to Barangay Managanaga to Barangay Macabug, Aroroy, Masbate, Sta. 3+532 to Sta. 4+282","amountPesos":32000000,"lengthMeters":750.0,"ratePesosPerMeter":42666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siquijor Circumferential Rd - K0034 + 000 - K0035 + 026","amountPesos":31900000,"lengthMeters":1026.0,"ratePesosPerMeter":31091.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Camiguin Circumferential Rd - K0041 + 583 - K0041 + 658, K0041 + 874 - K0042 + 547, K0042 + 794 - K0043 + 003","amountPesos":31836000,"lengthMeters":957.0,"ratePesosPerMeter":33266.46,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Blancia-Molave-Josefina Rd - K1664 + 667 - K1665 + 000, K1665 + 720 - K1666 + 650","amountPesos":31814000,"lengthMeters":1263.0,"ratePesosPerMeter":25189.23,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siquijor Circumferential Rd - K0023 + 000 - K0024 + 000","amountPesos":31800000,"lengthMeters":1000.0,"ratePesosPerMeter":31800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Buenavista-Kawayan Rd - K0033 + (-558) - K0033 + 075","amountPesos":31650000,"lengthMeters":633.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Buenavista-Kawayan Rd - K0061 + 440 - K0062 + 070","amountPesos":31550000,"lengthMeters":630.0,"ratePesosPerMeter":50079.37,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0263 + 951 - K0264 + 088, K0266 + 822 - K0267 + 053, K0267 + 112 - K0267 + 145","amountPesos":31469000,"lengthMeters":401.0,"ratePesosPerMeter":78476.31,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Vallehermoso-Canlaon City-La Castellana Rd - K0149 + 136 - K0149 + 805, K0150 + 000 - K0150 + 769","amountPesos":31435000,"lengthMeters":1438.0,"ratePesosPerMeter":21860.22,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0135 + (-750) - K0135 + (-250), K0135 + 596 - K0135 + 810, K0135 + 818 - K0135 + 832, K0136 + 621 - K0136 + 1002, K0138 + 060 - K0138 + 220, K0138 + 475 - K0138 + 800","amountPesos":31312000,"lengthMeters":1594.0,"ratePesosPerMeter":19643.66,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1361 + 900 - K1363 + 900 (Road Safety: Roadway Lighting)","amountPesos":31234000,"lengthMeters":2000.0,"ratePesosPerMeter":15617.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0682 + 602 - K0682 + 740","amountPesos":31200000,"lengthMeters":138.0,"ratePesosPerMeter":226086.96,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0438 + 336 - K0438 + 370, K0438 + 473 - K0438 + 514, K0440 + 530 - K0440 + 580, K0457 + 868 - K0457 + 983","amountPesos":31138000,"lengthMeters":240.0,"ratePesosPerMeter":129741.67,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1850 + 572 - K1852 + 000","amountPesos":31080000,"lengthMeters":1428.0,"ratePesosPerMeter":21764.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siocon-Sirawai Rd - K2087 + 000 - K2087 + 200, K2088 + 000 - K2090 + 000","amountPesos":31035000,"lengthMeters":2200.0,"ratePesosPerMeter":14106.82,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siquijor Circumferential Rd - K0015 + 000 - K0016 + 000","amountPesos":31000000,"lengthMeters":1000.0,"ratePesosPerMeter":31000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Amungan-Palauig-Banlog Road - K0217 + 467 - K0218 + 083","amountPesos":31000000,"lengthMeters":616.0,"ratePesosPerMeter":50324.68,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Marinduque Circumferential Rd - K0016 + 522 - K0016 + 727","amountPesos":31000000,"lengthMeters":205.0,"ratePesosPerMeter":151219.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Daraga, Placer-Cawayan Rd - (S00035MT) Chainage 22422 - Chainage 23242","amountPesos":30920000,"lengthMeters":820.0,"ratePesosPerMeter":37707.32,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagaytay-Cavite via Mendez Rd - K0062 + 732 - K0063 + 446","amountPesos":30733000,"lengthMeters":714.0,"ratePesosPerMeter":43043.42,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Albay Diversion Rd - K0443 + (-826) - K0443 + 000","amountPesos":30664000,"lengthMeters":826.0,"ratePesosPerMeter":37123.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ayaga-Sta. Marcela-Flora-Lasam Rd - K0680 + 500 - K0681 + 305","amountPesos":30633000,"lengthMeters":805.0,"ratePesosPerMeter":38053.42,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0600 + 315 - K0601 + 000","amountPesos":30525000,"lengthMeters":685.0,"ratePesosPerMeter":44562.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"MSR Jct Lopez-Hondagua Port Rd - K0222 + 489 - K0222 + 546, K0222 + 649 - K0222 + 679, K0224 + 224 - K0224 + 271, K0225 + 020 - K0225 + 144","amountPesos":30500000,"lengthMeters":258.0,"ratePesosPerMeter":118217.05,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - (S01638MN) Chainage 000 - Chainage 505","amountPesos":30380000,"lengthMeters":505.0,"ratePesosPerMeter":60158.42,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagaytay-Taal Lake Rd - K0058 + 000 - K0059 + 762","amountPesos":30371000,"lengthMeters":1762.0,"ratePesosPerMeter":17236.66,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Isaac O. Tolentino Ave. - K0060 + 000 - K0061 + 400","amountPesos":30367000,"lengthMeters":1400.0,"ratePesosPerMeter":21690.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rimando-Ambiong Rd - K0252 + (-223) - K0254 + 179 (Off-Carriageway Improvement: Construction of Sidewalk)","amountPesos":30359000,"lengthMeters":2402.0,"ratePesosPerMeter":12639.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0101 + 830 - K0102 + 390","amountPesos":30345000,"lengthMeters":560.0,"ratePesosPerMeter":54187.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Liloy-Siocon Rd - K2027 + 000 - K2028 + 985","amountPesos":30330000,"lengthMeters":1985.0,"ratePesosPerMeter":15279.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0074 + 795 - K0075 + 274","amountPesos":30150000,"lengthMeters":479.0,"ratePesosPerMeter":62943.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siocon-Sirawai Rd - K2094 + 000 - K2095 + 000","amountPesos":30024000,"lengthMeters":1000.0,"ratePesosPerMeter":30024.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Marikina-Victoria Valley-Antipolo Rd - K0020 + 007 - K0020 + 660, K0021 + 372 - K0021 + 008","amountPesos":30000000,"lengthMeters":1017.0,"ratePesosPerMeter":29498.53,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Liloy-Siocon Rd - K2025 + 011 - K2027 + 000","amountPesos":30000000,"lengthMeters":1989.0,"ratePesosPerMeter":15082.96,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siocon-Sirawai-Sibuco-Limpapa Rd - K2109 + 000 - K2111 + 000","amountPesos":30000000,"lengthMeters":2000.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dapitan St - K0005 + 808 - K0004 + 005","amountPesos":30000000,"lengthMeters":1803.0,"ratePesosPerMeter":16638.94,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Morning-Cataingan-Esperanza-Sorosimbahan Rd - K0084 + 000 - K0085 + 000","amountPesos":30000000,"lengthMeters":1000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 7 + 000 to Chainage 8 + 200","amountPesos":30000000,"lengthMeters":1200.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gov. Mamintal M. Adiong Sr. National Rd (S01708MN) - Chainage 4350 - Chainage 5489","amountPesos":30000000,"lengthMeters":1139.0,"ratePesosPerMeter":26338.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Road - K0443 + 282 - K0443 + 890","amountPesos":30000000,"lengthMeters":608.0,"ratePesosPerMeter":49342.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bongao-Pahut-Sanga-Sanga Rd - Chainage 0 - Chainage 1200","amountPesos":30000000,"lengthMeters":1200.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (MN) - K1443 + 400 - K1443 + 450","amountPesos":30000000,"lengthMeters":50.0,"ratePesosPerMeter":600000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - K1590 + 255 - K1590 + 441","amountPesos":30000000,"lengthMeters":186.0,"ratePesosPerMeter":161290.32,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Francisco - Sn Andres - Sn Narciso Rd - K0312 + 650 - K0312 + 750","amountPesos":30000000,"lengthMeters":100.0,"ratePesosPerMeter":300000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa North Rd - K0081 + 568 - K0081 + 618","amountPesos":30000000,"lengthMeters":50.0,"ratePesosPerMeter":600000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0025 + (-075) - K0025 + (-025)","amountPesos":30000000,"lengthMeters":50.0,"ratePesosPerMeter":600000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Biliran Circumferential Rd - K1046 + 029 - K1046 + 450","amountPesos":30000000,"lengthMeters":421.0,"ratePesosPerMeter":71258.91,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga City Bypass Road (S01215MN) K1941 + 414 - K1941 + 468 (L/S), K1941 + 455 - K1941 + 856 (R/S)","amountPesos":30000000,"lengthMeters":442.0,"ratePesosPerMeter":67873.3,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Asuncion-San Isidro-Laak-Veruela Rd - K1518 + 934 - K1519 + 000","amountPesos":30000000,"lengthMeters":66.0,"ratePesosPerMeter":454545.45,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Asuncion-San Isidro-Laak-Veruela Rd - K1522 + 743 - K1522 + 840","amountPesos":30000000,"lengthMeters":97.0,"ratePesosPerMeter":309278.35,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0379+677 - K0379+753","amountPesos":30000000,"lengthMeters":76.0,"ratePesosPerMeter":394736.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Balabag-Maquina-Cayos-Patlad Rd - K0283 + 120 - K0283 + 699, K0283 + 721 - K0284 + 110, K0284 + 114 - K0284 + 180","amountPesos":30000000,"lengthMeters":1034.0,"ratePesosPerMeter":29013.54,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo River North Bank Road, Sta. 4+700 - Sta. 5+000, Oton, Iloilo","amountPesos":30000000,"lengthMeters":300.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sayre Highway Parallel Road I (Libona - Manolo Fortich - Impasug-ong Section), Lupiagan Br. II, Barangay Lupiagan Section, Sta. 28+600 - Sta. 28+660, Sumilao, Bukidnon","amountPesos":30000000,"lengthMeters":60.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Aliaga-Guimba Diversion Road (Guimba Section), Nueva Ecija Sta. 14+123.70 - Sta. 14+418.70, Sta. 14+587.70 - Sta. 15+150, Sta. 15+287.60 - Sta. 15+582.60, Sta. 15+676.40 - Sta. 16+021.40","amountPesos":30000000,"lengthMeters":1497.3,"ratePesosPerMeter":20036.06,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"NRJ-Bogayo-Kitaan Dagat-Mahayahay Road, Sta. 1719+980 - Sta. 1720+646.5, Zamboanga del Sur","amountPesos":30000000,"lengthMeters":666.5,"ratePesosPerMeter":45011.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tanudan-Barlig - Ifugao Road (Barlig - Banaue Section) - Sta. 3+600 - Sta. 4+000","amountPesos":30000000,"lengthMeters":400.0,"ratePesosPerMeter":75000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jaro-Rubas-Ormoc Road (Ormoc City Side) - Sta. 22 + 708 - Sta. 23 + 208","amountPesos":30000000,"lengthMeters":500.0,"ratePesosPerMeter":60000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0035 + 000 - K0039 + 000 (Road Safety: Roadway Lighting)","amountPesos":30000000,"lengthMeters":4000.0,"ratePesosPerMeter":7500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga City Bypass Road (S01215MN), K1947 + 098.5 - K1953 + 266 (Road Safety: Roadway Lighting)","amountPesos":30000000,"lengthMeters":6167.5,"ratePesosPerMeter":4864.21,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation of Road Safety Facilities along Surigao-Davao Coastal Rd (S01376MN) K1781 + (-536) - K1782 + 1193","amountPesos":30000000,"lengthMeters":2729.0,"ratePesosPerMeter":10993.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Polangui Poblacion Rd - K0491 + (-735) - K0491 + (-135) (Paving of Shoulders)","amountPesos":30000000,"lengthMeters":600.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Balabago Br. along Guimaras Circumferential Road, K0049+159 – K0049+174","amountPesos":30000000,"lengthMeters":15.0,"ratePesosPerMeter":2000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Bagumbayan Br. along Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd, K0027 + 543 - K0027 + 569","amountPesos":30000000,"lengthMeters":26.0,"ratePesosPerMeter":1153846.15,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road San Manuel-Villasis Diversion Road Barangay Mangandingay (San Manuel) Sta.1+748.00- Sta 1+1872.90, Tarlac","amountPesos":30000000,"lengthMeters":1124.9,"ratePesosPerMeter":26669.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Bangdayan - Bual , Barangay, Bual Luuk, Sulu, Sta. 0 + 000 - Sta. 2 + 000","amountPesos":30000000,"lengthMeters":2000.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Road, Payatas A - San Vicente, San Lorenzo Ext. (Chainage 0 + 000 to Chainage 0 + 663.9), Barangay Payatas, Quezon City","amountPesos":30000000,"lengthMeters":663.9,"ratePesosPerMeter":45187.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Panubtuban-Jolowon Road, Sta. 16+000 - Sta. 16+800, Lamut, Ifugao","amountPesos":30000000,"lengthMeters":800.0,"ratePesosPerMeter":37500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of O-ong-Dalligan Road, Sta. 2+250 - Sta. 4+000, Kiangan, Ifugao","amountPesos":30000000,"lengthMeters":1750.0,"ratePesosPerMeter":17142.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sitio Mahat (Sta. 0 + 000 - Sta. 0 + 830), Barangay Savidug, Sabtang, Batanes","amountPesos":30000000,"lengthMeters":830.0,"ratePesosPerMeter":36144.58,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road at Barangay Cabannungan 2nd to Barangay Carrikikan Sur, Ilagan City, Isabela (Sta. 0+000 - Sta. 2+880)","amountPesos":30000000,"lengthMeters":2880.0,"ratePesosPerMeter":10416.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road (Sta. 1+050 - Sta. 3+450), Barangay Sipay to Barangay Fuyo, City of Ilagan, Isabela","amountPesos":30000000,"lengthMeters":2400.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road (Sta. 0+000 - Sta. 2+400), Barangay Sto. Rosario, Delfin Albano, Isabela","amountPesos":30000000,"lengthMeters":2400.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Loria - Barangay Campanario with Box Culvert, Barangay Loria, Angadanan, Isabela (Sta. 0+000 - STA. 1+861.50)","amountPesos":30000000,"lengthMeters":1861.5,"ratePesosPerMeter":16116.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Luzon, Cabatuan, Isabela (Sta. 0+000 - STA. 1+195.50)","amountPesos":30000000,"lengthMeters":1195.5,"ratePesosPerMeter":25094.1,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 2+250, Purok 5, Barangay Dabubu Grande, San Agustin, Isabela","amountPesos":30000000,"lengthMeters":2250.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 2+200 Barangay Salay, San Agustin, Isabela","amountPesos":30000000,"lengthMeters":2200.0,"ratePesosPerMeter":13636.36,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Obligacion-Reserva Road, Baler, Aurora, Sta. 0 + 000 - 1 + 900","amountPesos":30000000,"lengthMeters":1900.0,"ratePesosPerMeter":15789.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Duhat-Bundukan Road, Sta. 0+000 - Sta. 0+500, Bocaue, Bulacan","amountPesos":30000000,"lengthMeters":500.0,"ratePesosPerMeter":60000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Polo - Obando - Bulakan Road, Sta. 0+000 - Sta. 0+700, Bulakan, Bulacan","amountPesos":30000000,"lengthMeters":700.0,"ratePesosPerMeter":42857.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 0+220.27, San Roque, Paombong, Bulacan along PUP Road to Sitio Tinaad","amountPesos":30000000,"lengthMeters":220.27,"ratePesosPerMeter":136196.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 1+320, Bagong Silang, Plaridel, Bulacan","amountPesos":30000000,"lengthMeters":1320.0,"ratePesosPerMeter":22727.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Tuktukan - Panginay Road, Sta. 0+000 - Sta. 0+500, Guiguinto, Bulacan","amountPesos":30000000,"lengthMeters":500.0,"ratePesosPerMeter":60000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage, Barangay Graceville, City of San Jose del Monte, Bulacan, Sta. 00+000 - Sta. 00+720","amountPesos":30000000,"lengthMeters":720.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Matictic Bayan to Barangay Matictic Coral (Junction), Norzagaray, Bulacan, Sta. 00+000 - Sta. 04+860 (121.066754, 14.915913)","amountPesos":30000000,"lengthMeters":4860.0,"ratePesosPerMeter":6172.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Matictic Coral (Junction) to Barangay Baraka, Norzagaray, Bulacan, Sta. 00+000 - Sta. 04+860 (121.096979, 14.910598)","amountPesos":30000000,"lengthMeters":4860.0,"ratePesosPerMeter":6172.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Matictic to Bangkal, Norzagaray, Bulacan, Sta. 00+000 - Sta. 04+860 (121.081933, 14.921938)","amountPesos":30000000,"lengthMeters":4860.0,"ratePesosPerMeter":6172.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road with drainage system, Barangay Muzon South, City of San Jose del Monte, Bulacan, Sta. 00+000 - Sta. 00+720","amountPesos":30000000,"lengthMeters":720.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road with drainage system, Barangay Muzon West, City of San Jose del Monte, Bulacan, Sta. 00+000 - Sta. 00+720","amountPesos":30000000,"lengthMeters":720.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road with drainage, Barangay Muzon Proper, City of San Jose Del Monte, Bulacan, Sta. 00+000 - Sta. 00+720","amountPesos":30000000,"lengthMeters":720.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road with Drainage, Barangay Sto Cristo, City of San Jose del Monte, Bulacan, Sta. 00+000 - Sta. 00+720","amountPesos":30000000,"lengthMeters":720.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Mabellegen to Sitio Nagsabong Road, Barangay San Gregorio, San Antonio, Zambales, Sta. 0+000.00 – Sta. 1+505.00","amountPesos":30000000,"lengthMeters":1505.0,"ratePesosPerMeter":19933.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road going to Government Center, Sta. 0+ 000 - Sta. 0+345, Sta. 0+000 - Sta. 0+127, Sta. 0+000 - Sta. 0+137, Sta. 0+000 - Sta. 0+183,Barangay San Nicolas Castillejos, Zambales","amountPesos":30000000,"lengthMeters":345.0,"ratePesosPerMeter":86956.52,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Jct National Road to Barangay Panique to Barangay Eastern Capsai, Aroroy and Baleno, Masbate, Sta. 5+110 to Sta. 5+810","amountPesos":30000000,"lengthMeters":700.0,"ratePesosPerMeter":42857.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+826, Barangay Siuton to Barangay Malbog, Magallanes, Sorsogon","amountPesos":30000000,"lengthMeters":826.0,"ratePesosPerMeter":36319.61,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Barangay Poo to Barangay Capalasanan, Lazi, Siquijor (Segment 1: 0 + 000 - 0 + 965)","amountPesos":30000000,"lengthMeters":965.0,"ratePesosPerMeter":31088.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+700, Phase III, Barangay San Isidro, Lawaan Eastern Samar","amountPesos":30000000,"lengthMeters":700.0,"ratePesosPerMeter":42857.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Villalon-Bunacan-Daja Road, (Sta. 3+324-3+925, Sta . 5+930-6+329), Calubian and San Isidro, Leyte","amountPesos":30000000,"lengthMeters":1000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Basud-Cadaruhan-Maasin-Palid II Road, (Sta. 5+308-Sta. 6+308), San Isidro, Leyte","amountPesos":30000000,"lengthMeters":1000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of JNR Consuegra-Wague-Butason Road, (Sta. 3+590-Sta. 4+590), Leyte and Tabango, Leyte","amountPesos":30000000,"lengthMeters":1000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Jubay, Calubian, Leyte (Station 21+349.3 - 22+169.3)","amountPesos":30000000,"lengthMeters":820.0,"ratePesosPerMeter":36585.37,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Sta. 4+700 - Sta. 6+700, Barangay Monterico - Barangay Leondoni, Ormoc City, Leyte","amountPesos":30000000,"lengthMeters":2000.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Sta. 1+404 - Sta. 1+969) in Barangay Inamlan, Laoang, Northern Samar","amountPesos":30000000,"lengthMeters":565.0,"ratePesosPerMeter":53097.35,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Duhol Kabbon, Maimbung, Sulu Sta. 00+000 to Sta. 01+000","amountPesos":30000000,"lengthMeters":1000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Bridge, Sta. 11+340 - Sta. 11+370.84, Sta. 11+240 - Sta. 11+480, Barangay Magsaysay, Sibutad, Zamboanga del Norte","amountPesos":30000000,"lengthMeters":240.0,"ratePesosPerMeter":125000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Panabutan-Sipakit, Sirawai, Zamboanga del Norte, Sta. 2 + 432 - Sta. 3 + 432","amountPesos":30000000,"lengthMeters":1000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Maguindanao-Topocon Road, Barangay Maguindanao Section, Sta. 0+000 - Sta. 1+300, Sultan Naga Dimaporo, Lanao del Norte","amountPesos":30000000,"lengthMeters":1300.0,"ratePesosPerMeter":23076.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Submarine Bridge Barangay Pendolonan, Sta. 0+000 - Sta. 0+030, Poona Piagapo, Lanao del Norte","amountPesos":30000000,"lengthMeters":30.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Purok 2 Barangay Camanse - Colupan Alto), Sta. 0+000 - Sta. 1+000, Sinacaban, Misamis Occidental","amountPesos":30000000,"lengthMeters":1000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, (Banglay to Matugnao), Sta. 0+000 - Sta. 1+000, Tangub City, Misamis Occidental","amountPesos":30000000,"lengthMeters":1000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road JNC National Highway-Haguimitan, Sta. 0+000 - Sta. 2+200, Monkayo, Davao de Oro","amountPesos":30000000,"lengthMeters":2200.0,"ratePesosPerMeter":13636.36,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Del Rosario to San Isidro Road, Sta. 0+000 - Sta. 1+000, Barangay San Isidro, Sibagat, Agusan del Sur","amountPesos":30000000,"lengthMeters":1000.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Camiling - Wawa - Bayambang - Malasiqui - Sta. Barbara Road, K0187+000 - K0188+000","amountPesos":29860000,"lengthMeters":1000.0,"ratePesosPerMeter":29860.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Buenavista-Kawayan Rd - K0055 + 203 - K0055 + 800","amountPesos":29850000,"lengthMeters":597.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga Transcentral North Road (S01111MN), K1999+(-610) - K2000+024","amountPesos":29822000,"lengthMeters":1634.0,"ratePesosPerMeter":18250.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Danlugan-La Dicha Diversion Road, K1734+000 to K1735+00","amountPesos":29822000,"lengthMeters":1000.0,"ratePesosPerMeter":29822.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Romulo H-way - K0163 + 436 - K0164 + 113, K0164 + 123 - K0164 + 473","amountPesos":29796000,"lengthMeters":1027.0,"ratePesosPerMeter":29012.66,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lipa City - Alaminos Rd - K0076 + (-849) - K0076 + (-337)","amountPesos":29775000,"lengthMeters":512.0,"ratePesosPerMeter":58154.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 1+869, Sta. 2+323 - Sta. 2+401) at Hda. Maritaldan to Sitio Palje, Barangay Consing, EB Magalona, Negros Occidental (10.8267610, 123.1097660)","amountPesos":29750000,"lengthMeters":1947.0,"ratePesosPerMeter":15279.92,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Curva Hagnaya-Poblacion-Maaswa Rd - K0114 + 044 - K0115 + 402","amountPesos":29722000,"lengthMeters":1358.0,"ratePesosPerMeter":21886.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0398 + 561 - K0398 + 600, K0399 + 450 - K0399 + 485, K0400 + 375 - K0400 + 450, K0400 + 550 - K0400 + 581, K0400 + 645 - K0400 + 695, K0401 + 475 - K0401 + 530, K0402 + 130 - K0402 + 195, K0402 + 340 - K0402 + 420","amountPesos":29701000,"lengthMeters":430.0,"ratePesosPerMeter":69072.09,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sarangani-Sultan Kudarat Coastal Rd - K1725 + 030 - K1726 + 512","amountPesos":29662000,"lengthMeters":1482.0,"ratePesosPerMeter":20014.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Yap Street along Mid-Bal CIS, Sta. 0 + 000 - Sta. 2 + 280, Cotabato","amountPesos":29640000,"lengthMeters":2280.0,"ratePesosPerMeter":13000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Buenavista-Kawayan Rd - K0048 + 988 - K0050 + 000","amountPesos":29580000,"lengthMeters":1012.0,"ratePesosPerMeter":29229.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Famy-Real-Infanta-Dinahican Port Rd - K0100 + 894 - K0101 + 044, K0101 + 074 - K0101 + 622","amountPesos":29579000,"lengthMeters":698.0,"ratePesosPerMeter":42376.79,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - (S01152MN) Chainage 14741 - Chainage 15241, Chainage 21888 - Chainage 22522, Chainage 22624 - Chainage 23457","amountPesos":29505000,"lengthMeters":1967.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0124 + 170 - K0124+949","amountPesos":29500000,"lengthMeters":779.0,"ratePesosPerMeter":37869.06,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Preventive Maintenanance- Tertiary Roads - Talisayan By-Pass Rd - K1350+(-467) - K1350+908","amountPesos":29500000,"lengthMeters":1375.0,"ratePesosPerMeter":21454.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage, Barangay Sapalibutad, Angeles City Pampanga, Sta. 0+000 - Sta. 0+285, Sta. 0+000 - Sta. 0+406, Sta. 0+000 - Sta. 0+396, Sta. 0+000 - Sta. 0+259, Sta. 0+000 - Sta. 0+102, Sta. 0+000 - Sta. 0+181, Sta. 0+000 - Sta. 0+067, Sta. 0+000 - Sta. 0+190, Sta. 0+000 - Sta. 0+200, Sta. 0+000 - Sta. 0+185","amountPesos":29500000,"lengthMeters":406.0,"ratePesosPerMeter":72660.1,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lipa City - Alaminos Rd - K0084 + 680 - K0084 + 820","amountPesos":29490000,"lengthMeters":140.0,"ratePesosPerMeter":210642.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siocon-Sirawai Rd - K2084 + 780 - K2086 + 000","amountPesos":29478000,"lengthMeters":1220.0,"ratePesosPerMeter":24162.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0011 + 275 - K0012 + 589, K0013 + 226 - K0013 + 468 (Off-Carriageway Improvement: Construction of Sidewalk)","amountPesos":29329000,"lengthMeters":1556.0,"ratePesosPerMeter":18848.97,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LT) - K0975 + 162 - K0975 + 494, K0976 + 000 - K0976 + 152, K0977 + 000 - K0977 + 190, K0980 + 936 - K0981 + 005, K0983 + 862 - K0984 + 000","amountPesos":29323000,"lengthMeters":881.0,"ratePesosPerMeter":33283.77,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Replacement of Bridge, Barangay Sinulatan, Guimba, Nueva Ecija Sta. 0+000 - Sta. 0+012","amountPesos":29300000,"lengthMeters":12.0,"ratePesosPerMeter":2441666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road with Drainage Canal, Sta. 0+156 - Sta. 0+946, Purok 1-4, Sta. Monica, Hagonoy, Bulacan","amountPesos":29230000,"lengthMeters":790.0,"ratePesosPerMeter":37000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0513 + 870 - K0514 + 000, K0514 + 585 - K0515 + 248","amountPesos":29169000,"lengthMeters":793.0,"ratePesosPerMeter":36783.1,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surallah-Lake Sebu-Maitum Rd - K1737 + 000 - K1737 + 421, K1737 + 601 - K1738 + 000","amountPesos":29098000,"lengthMeters":820.0,"ratePesosPerMeter":35485.37,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sta Rosa-Ulat-Tagaytay Rd - K0059 + (-373) - K0059 + 100","amountPesos":29070000,"lengthMeters":473.0,"ratePesosPerMeter":61458.77,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sigma-Mambusao-Jamindan Rd - K0094 + 800 - K0095 + 622","amountPesos":29043000,"lengthMeters":822.0,"ratePesosPerMeter":35332.12,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacoor-Dasmariñas National Rd - K0021 + 910 - K0022 +102, K0022 + 397 - K0022 + 601","amountPesos":29028000,"lengthMeters":396.0,"ratePesosPerMeter":73303.03,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0067 + 052 - K0067 + 632","amountPesos":29000000,"lengthMeters":580.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Libon-Bacolod-Sn Vicente-Marocmoc-Buga Rd - K0489 + (-184) - K0489 + 499, K0489 + 516 - K0489 + 673, K0489 + 690 - K0491 + 949","amountPesos":28996000,"lengthMeters":3099.0,"ratePesosPerMeter":9356.57,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Didikon Road along Malu-Ao CIS, Sta. 0 + 000 - Sta. 2 + 220, Cotabato","amountPesos":28860000,"lengthMeters":2220.0,"ratePesosPerMeter":13000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct. Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd - K0020 + 000 - K0023 + 000 (Road Safety: Roadway Lighting)","amountPesos":28845000,"lengthMeters":3000.0,"ratePesosPerMeter":9615.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Noveleta-Naic-Tagaytay Rd - K0044 + 200 - K0044 + 328","amountPesos":28832000,"lengthMeters":128.0,"ratePesosPerMeter":225250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Antalon to Camabaan Road, San Joaquin, Iloilo - Sta. 02+200 - Sta. 03+021","amountPesos":28750000,"lengthMeters":821.0,"ratePesosPerMeter":35018.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road (Sta. 2+696 - Sta. 4+076, Sta. 4+276 - Sta. 4+481), Barangay Naganacan, Santa Maria to Barangay Tallag, Cabagan, Isabela","amountPesos":28700000,"lengthMeters":1585.0,"ratePesosPerMeter":18107.26,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0388 + 190 - K0388 + 258, K0388 + 420 - K0388 + 460, K0391 + 533 - K0391 + 561, K0392 + 236 - K0392 + 276, K0392 + 355 - K0392 + 395, K0392 + 835 - K0392 + 910, K0393 + 430 - K0393 + 495, K0394 + 790 - K0394 + 841, K0395 + 150 - K0395 + 182","amountPesos":28635000,"lengthMeters":439.0,"ratePesosPerMeter":65227.79,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siocon-Sirawai Rd - K2075 + 018 - K2075 + 500, K2079 + 800 - K2080 + 000, K2084 + 200 - K2084 + 700, K2085 + 000 - K2085 + 700","amountPesos":28605000,"lengthMeters":1882.0,"ratePesosPerMeter":15199.26,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1344 + 206 - K1345 + 231, K1358 + 541 - K1358 + 611, K1362 + 746 - K1362 + 764","amountPesos":28577000,"lengthMeters":1113.0,"ratePesosPerMeter":25675.65,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tabuk-Banawe via Tanudan-Barlig Rd - K0511 + 370 - K0511 + 388, K0511 + 641 - K0511 + 669, K0514 + 675 - K0514 + 687, K0521 + 477 - K0521 + 514, K0525 + 510 - K0525 + 528, K0529 + 574 - K0529 + 588, K0530 + 286 - K0530 + 298, K0532 + 302 - K0532 + 325, K0536 + 8077 - K0536 + 8145","amountPesos":28500000,"lengthMeters":230.0,"ratePesosPerMeter":123913.04,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0153 + 069 - K0154 + 130","amountPesos":28490000,"lengthMeters":1061.0,"ratePesosPerMeter":26852.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siocon-Sirawai-Sibuco-Limpapa Rd - K2102 + 300 - K2102 + 900, K2103 + 300 - K2104 + 400, K2104 + 800 - K2105 + 000","amountPesos":28485000,"lengthMeters":1900.0,"ratePesosPerMeter":14992.11,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Duhat Bridge and Approaches, Barangay Duhat, STA 002+362 - STA 002+382, Plaridel, Quezon, Phase II","amountPesos":28400000,"lengthMeters":20.0,"ratePesosPerMeter":1420000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Buenavista-Kawayan Rd - K0056 + 284 - K0056 + 851","amountPesos":28350000,"lengthMeters":567.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Carlos - Calasiao Road, K0209+128 - K0210+080","amountPesos":28340000,"lengthMeters":952.0,"ratePesosPerMeter":29768.91,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0165 + 217 - K0166 + 273","amountPesos":28303000,"lengthMeters":1056.0,"ratePesosPerMeter":26802.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Oton-Buray-Sta Monica-Sn Antonio-Sn Miguel Rd - K0015 + 530 - K0015 + 870, K0015 + 870 - K0016 + 000, K0016 + 000 - K0016 + 340","amountPesos":28245000,"lengthMeters":810.0,"ratePesosPerMeter":34870.37,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 2+013) at Barangay Kapitan Ramon, Silay City, Negros Occidental (10.7665000, 123.1312778)","amountPesos":28182000,"lengthMeters":2013.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0622 + 408 - K0623 + 000","amountPesos":28170000,"lengthMeters":592.0,"ratePesosPerMeter":47584.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Oton-Mambog-Cabolo-an-Abilay-Sn Jose Rd-K0012 + 944 - K0013 + 000, K0013 +000 - K0013 +294, K0016 + 266 - K0016 + 550, K0018 + 389 -K0018 + 463","amountPesos":28000000,"lengthMeters":708.0,"ratePesosPerMeter":39548.02,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road including Slope Protection, Honeymoon-Holyghost Barangay to Holyhghost Extension Barangay, Baguio City (Sta. 0+270 - Sta. 0+465)","amountPesos":28000000,"lengthMeters":195.0,"ratePesosPerMeter":143589.74,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road to Madadamian Elementary School, Sta. 0 + 000 - Sta. 2 + 000, Purok 1 and 2, Madadamian, Echague, Isabela","amountPesos":28000000,"lengthMeters":2000.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Villa Campo to Diasan Road, Sta. 0 + 000 - Sta. 2 + 000, Villa Campo, Echague, Isabela","amountPesos":28000000,"lengthMeters":2000.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Sta. 0 + 200 - Sta. 1 + 200, Sitio Dapia to Sitio Melody, Barangay San Antonio, Libjo, Dinagat Islands","amountPesos":28000000,"lengthMeters":1000.0,"ratePesosPerMeter":28000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mindoro Oriental/Occidental East Coastal Rd - K0223 + 898 - K0224 + 733","amountPesos":27860000,"lengthMeters":835.0,"ratePesosPerMeter":33365.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calapan South Rd - K0075 + 040 - K0075 + 850","amountPesos":27804000,"lengthMeters":810.0,"ratePesosPerMeter":34325.93,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ormoc-Baybay-Southern Leyte Bdry Rd - K1024 + 000 - K1024 + 318, K1024 + 387 - K1024 + 722","amountPesos":27740000,"lengthMeters":653.0,"ratePesosPerMeter":42480.86,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Batangas-Lobo Rd - K0109 + 710 - K0110 + 565","amountPesos":27696000,"lengthMeters":855.0,"ratePesosPerMeter":32392.98,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Barangay Casoon, Monkayo, Davao de Oro, Sta 0 + 000 - Sta. 1 + 050","amountPesos":27679000,"lengthMeters":1050.0,"ratePesosPerMeter":26360.95,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga City-Labuan-Limpapa Rd - K1954 + 000 - K1954 + 622","amountPesos":27607000,"lengthMeters":622.0,"ratePesosPerMeter":44384.24,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tanza-Trece Martires City-Indang Rd - K0044 + 000 - K0044 + 783","amountPesos":27591000,"lengthMeters":783.0,"ratePesosPerMeter":35237.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alicia-San Mateo Rd - K0360 + 256 - K0362 + 000","amountPesos":27525000,"lengthMeters":1744.0,"ratePesosPerMeter":15782.68,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manguiring-Tomagodtod Rd, K0459 + 460 - K0460 + 333","amountPesos":27500000,"lengthMeters":873.0,"ratePesosPerMeter":31500.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct (TER)-Jagna-Sierra Bullones Rd - K0080 + 364 - K0080 + 514, K0081 + 000 - K0082 + 000","amountPesos":27476000,"lengthMeters":1150.0,"ratePesosPerMeter":23892.17,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0015 + 000 - K0015 + 429","amountPesos":27456000,"lengthMeters":429.0,"ratePesosPerMeter":64000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct DS Benedicto-Spur 16-Calatrava Rd - K0075 + 174 - K0076 + 512","amountPesos":27346000,"lengthMeters":1338.0,"ratePesosPerMeter":20437.97,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siquijor Circumferential Rd - K0020 + 137 - K021 + 000","amountPesos":27300000,"lengthMeters":863.0,"ratePesosPerMeter":31633.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Tawad-Balud Rd - K0040 + 019 - K0040 + 503","amountPesos":27280000,"lengthMeters":484.0,"ratePesosPerMeter":56363.64,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dipolog-Oroquieta National Rd - K1846 + 000 - K1846 + 256","amountPesos":27183000,"lengthMeters":256.0,"ratePesosPerMeter":106183.59,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City - Cagayan de Oro City - Iligan City Rd - K1364 + 870 - K1366 + 392 (Road Safety: Roadway Lighting)","amountPesos":27000000,"lengthMeters":1522.0,"ratePesosPerMeter":17739.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road at Marine (Chainage 0+000 to Chainage 0+338), Barangay Holy Spirit, Quezon City","amountPesos":26980000,"lengthMeters":338.0,"ratePesosPerMeter":79822.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod-City Bdry Rd - K0009+306 - K0009+953, K0009+953 - K0010+024","amountPesos":26968000,"lengthMeters":718.0,"ratePesosPerMeter":37559.89,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iriga City-Masoli Rd - K0474 + 000 - K0474 + 050, K0474 + 182 - K0475 + 150","amountPesos":26887000,"lengthMeters":1018.0,"ratePesosPerMeter":26411.59,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0307 + 900 - K0308 + 383","amountPesos":26879000,"lengthMeters":483.0,"ratePesosPerMeter":55650.1,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Albay West Coast Rd - K0498 + 150 - K0499 + 660","amountPesos":26835000,"lengthMeters":1510.0,"ratePesosPerMeter":17771.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dobleston-Butadon Rd - K2008 + 000 - K2008 + 924","amountPesos":26800000,"lengthMeters":924.0,"ratePesosPerMeter":29004.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - (S06317LZ) Chainage 19452 - Chainage 20752","amountPesos":26712000,"lengthMeters":1300.0,"ratePesosPerMeter":20547.69,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ubao-Taang Road - K0399 + (-179) - K0399 + (-120), K0399 + (-034) - K0399 + 000, K0416 + 751 - K0416 + 819, K0416 + 915 - K0416 + 945, K0418 + 826 - K0418 + 859, K0425 + (-008) - K0425 + 066, K0425 + 087 - K0425 + 123, K0425 + 134 - K0425 + 184, K0425 + 205 - K0425 + 387","amountPesos":26700000,"lengthMeters":566.0,"ratePesosPerMeter":47173.14,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0020 + 352 - K0020 + 885","amountPesos":26650000,"lengthMeters":533.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Aklan West Rd (Kalibo-Nabas) (S00324PN) - K0240 + 739 - K0241 + 248","amountPesos":26650000,"lengthMeters":509.0,"ratePesosPerMeter":52357.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bagong Silang-Capalonga Rd - K0309 + 776 - K0310 + 1034.55","amountPesos":26615000,"lengthMeters":1258.55,"ratePesosPerMeter":21147.35,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Albay West Coast Rd - K0557 + 855 - K0559 + 249","amountPesos":26609000,"lengthMeters":1394.0,"ratePesosPerMeter":19088.24,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"PPTA Rd - K0025 + 000 - K0025 + 510, K0028 + 532 - K0028 + 960.70","amountPesos":26590000,"lengthMeters":938.7,"ratePesosPerMeter":28326.41,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, from Barangay Abaga (Purok Camanse) to Barangay Maranding, Sta. 0+000 - Sta. 1+300, Lala, Lanao del Norte","amountPesos":26500000,"lengthMeters":1300.0,"ratePesosPerMeter":20384.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sta Rosa-Ulat-Tagaytay Rd - K0062 + 671 - K0062 + 761, K0063 + 831 - K0063 + 878, K0069 + 027 - K0069 + 077, K0069 + 167 - K0069 + 238, K0069 + 240 - K0069 + 370, K0069 + 561 - K0069 +584","amountPesos":26302000,"lengthMeters":411.0,"ratePesosPerMeter":63995.13,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0420 + 883 - K0420 + 933, K0421 + 055 - K0421 + 091, K0421 + 269 - K0421 + 357, K0421 + 880 - K0421 + 910","amountPesos":26220000,"lengthMeters":204.0,"ratePesosPerMeter":128529.41,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Asin Rd - K0305 + (-564) - K0306 + 508 (Off-Carriageway Improvement: Construction of Sidewalk)","amountPesos":26175000,"lengthMeters":2072.0,"ratePesosPerMeter":12632.72,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kiangan-Tinoc-Buguias Rd - K0343 + 757 - K0343 + 804, K0346 + 547 - K0346 + 566, K0348 + 117 - K0348 + 191","amountPesos":26125000,"lengthMeters":140.0,"ratePesosPerMeter":186607.14,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banaue-Hungduan-Benguet Bdry Rd -K0364+631-K0364+647, K0372 + 511 - K0372 + 536, K0376 + 549 - K0376 + 570, K0376 + 652 - K0376 + 670, K0376 + 694 - K0376 + 724","amountPesos":26100000,"lengthMeters":110.0,"ratePesosPerMeter":237272.73,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road including Drainage Structure, Barangay District 3, Tumauini, Isabela (Sta. 0+000 - Sta. 0+980)","amountPesos":26100000,"lengthMeters":980.0,"ratePesosPerMeter":26632.65,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0016 + 066 - K0016 + 416, K0016 + 644 - K0016 + 722","amountPesos":26057000,"lengthMeters":428.0,"ratePesosPerMeter":60880.84,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Loay Interior Rd - K0187 + 000 - K0188 + 200","amountPesos":26050000,"lengthMeters":1200.0,"ratePesosPerMeter":21708.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sta. Rosa - Tarlac Rd - K0120+296 - K0121+510 Start: 15.4469474, 120.8193798 End: 15.4482286, 120.8081534","amountPesos":26000000,"lengthMeters":1214.0,"ratePesosPerMeter":21416.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Olongapo-Bugallon Rd - K0153+691 - K0154+643","amountPesos":26000000,"lengthMeters":952.0,"ratePesosPerMeter":27310.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dancalan-Candoni-Damutan Valley Rd - K0147 + 715 - K0147 + 775","amountPesos":26000000,"lengthMeters":60.0,"ratePesosPerMeter":433333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kalinga-Abra Rd - K0465 + 736 - K0465 + 772, K0467 + 432 - K0467 + 463, K0468 + 403 - K0468 + 419, K0468+912 - K0468+976, K0476 + 221 - K0476 + 244, K0476 + 502 - K0476 + 526","amountPesos":26000000,"lengthMeters":194.0,"ratePesosPerMeter":134020.62,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Fernando-Bagulin Rd - K0284 + 770 - K0284 + 822","amountPesos":26000000,"lengthMeters":52.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0925 + 1078 - K0925 + 1208","amountPesos":26000000,"lengthMeters":130.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Biliran Circumferential Rd - K1068 + 159 - K1068 + 585","amountPesos":26000000,"lengthMeters":426.0,"ratePesosPerMeter":61032.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Paved Road including Construction of Drainage Structure along Road and Construction of Road Slope Protection Structure, Barangay Naguilian Sur to Barangay Lullutan, City of Ilagan, Isabela (Sta. 0+000 - Sta. 0+970)","amountPesos":26000000,"lengthMeters":970.0,"ratePesosPerMeter":26804.12,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+950, Barangay Mapalad - Barangay Bautista, San Agustin, Isabela","amountPesos":26000000,"lengthMeters":1950.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+930, Barangay Sagana - Barangay Nabbuan, Santiago City, Isabela","amountPesos":26000000,"lengthMeters":1930.0,"ratePesosPerMeter":13471.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Dampol Old Road, Sta. 0+000 - Sta. 1+000, Pulilan, Bulacan","amountPesos":26000000,"lengthMeters":1000.0,"ratePesosPerMeter":26000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, from Barangay Maranding to Barangay Rebe, Sta. 0+260 - Sta. 1+050, Lala, Lanao del Norte","amountPesos":26000000,"lengthMeters":790.0,"ratePesosPerMeter":32911.39,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"South Drive - K0251 + (-297) - K0252 + 766 (Off-Carriageway Improvement: Construction of Sidewalk)","amountPesos":25998000,"lengthMeters":2063.0,"ratePesosPerMeter":12602.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Fernando North Rd - K0014 + 855 - K0015 + 077","amountPesos":25930000,"lengthMeters":222.0,"ratePesosPerMeter":116801.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Daraga Urban Tourism Eco Route Project, Sta. 525+991.30 - Sta. 526+131.90, Barangay Tagas - Barangay Kilicao Daraga, Albay","amountPesos":25905000,"lengthMeters":140.6,"ratePesosPerMeter":184246.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct (LIR) Buenavista-Carmen-Danao-Jetafe Rd - K0174 + 000 - K0174 + 468","amountPesos":25890000,"lengthMeters":468.0,"ratePesosPerMeter":55320.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0060 + 000 - K0060 + 692, K0061 + 193 - K0061 + 660","amountPesos":25813000,"lengthMeters":1159.0,"ratePesosPerMeter":22271.79,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod North Road (S00406NR) K0042 + 280 - K0045 + 000 (Road Safety: Roadway Lighting)","amountPesos":25800000,"lengthMeters":2720.0,"ratePesosPerMeter":9485.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Balagtas Blvd - (S05782LZ) Chainage 000 - Chainage 727","amountPesos":25770000,"lengthMeters":727.0,"ratePesosPerMeter":35447.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siquijor Circumferential Rd - K0014 + 174 - K0015 + 000","amountPesos":25700000,"lengthMeters":826.0,"ratePesosPerMeter":31113.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0056 + 500 - K0057 + 000","amountPesos":25700000,"lengthMeters":500.0,"ratePesosPerMeter":51400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Barangay Argosino Bridge and Approaches, STA 005+835 - STA 005+851, Quezon, Quezon, Phase II","amountPesos":25600000,"lengthMeters":16.0,"ratePesosPerMeter":1600000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1852 + 000 - K1853 + 580","amountPesos":25512000,"lengthMeters":1580.0,"ratePesosPerMeter":16146.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Linamon-Zamboanga Rd - K1604 + 000 - K1604 + 502","amountPesos":25421000,"lengthMeters":502.0,"ratePesosPerMeter":50639.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra","amountPesos":25284000,"lengthMeters":860.0,"ratePesosPerMeter":29400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palo-Carigara-Ormoc Rd - K0973 + 612 - K0974 + 543","amountPesos":25245000,"lengthMeters":931.0,"ratePesosPerMeter":27116.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road (Sta. 3+170 - Sta. 5+270) at Barangay Villa Imelda, City of Ilagan, Isabela","amountPesos":25200000,"lengthMeters":2100.0,"ratePesosPerMeter":12000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Loay Interior Rd - K0179 + 737 - K0181 + 000","amountPesos":25123000,"lengthMeters":1263.0,"ratePesosPerMeter":19891.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tapaz-Jamindan-Altavaz Rd - K0091+008 - K0092 + 000, K0097 + 000 - K0097+452","amountPesos":25119000,"lengthMeters":1444.0,"ratePesosPerMeter":17395.43,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0062 + 000 - K0063 + 000","amountPesos":25000000,"lengthMeters":1000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lipa City - Alaminos Rd - K0088 + 779 - K0089 + 673","amountPesos":25000000,"lengthMeters":894.0,"ratePesosPerMeter":27964.21,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway – K0135 + 596 – K0135 + 990","amountPesos":25000000,"lengthMeters":394.0,"ratePesosPerMeter":63451.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Baguio-Bontoc Rd K0322+800 - K0323+300","amountPesos":25000000,"lengthMeters":500.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0217+017 - K0217 + 840","amountPesos":25000000,"lengthMeters":823.0,"ratePesosPerMeter":30376.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gov. T. Santiago (S02206LZ) K0018 + 819 - K0017 + 083","amountPesos":25000000,"lengthMeters":1736.0,"ratePesosPerMeter":14400.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pili-Tigaon-Albay Rd, K0454 + (-1044) - K0454 + (-663)","amountPesos":25000000,"lengthMeters":381.0,"ratePesosPerMeter":65616.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0035 + 861 - K0035 + 912","amountPesos":25000000,"lengthMeters":51.0,"ratePesosPerMeter":490196.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0025 + 010 - K0025 + 060","amountPesos":25000000,"lengthMeters":50.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0030 + (-840) - K0030 + (-800)","amountPesos":25000000,"lengthMeters":40.0,"ratePesosPerMeter":625000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lemon-Leyte-Biliran Rd - K0996 + 050 - K0996 + 115, K1002 + 600 - K1002 + 740","amountPesos":25000000,"lengthMeters":205.0,"ratePesosPerMeter":121951.22,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Asuncion-San Isidro-Laak-Veruela Rd - K1513 + 000 - K1513 + 050","amountPesos":25000000,"lengthMeters":50.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Logac-Lasam-Gagabutan Rd - K0742 + 318 - K0742 + 378","amountPesos":25000000,"lengthMeters":60.0,"ratePesosPerMeter":416666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0057 + 000 - K0057 + 500","amountPesos":25000000,"lengthMeters":500.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0043 + 000 - K0045 + 000 (Road Safety: Roadway Lighting)","amountPesos":25000000,"lengthMeters":2000.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd., K1460 + 000 - K1461 + 885l (Road Safety: Roadway Lighting)","amountPesos":25000000,"lengthMeters":1885.0,"ratePesosPerMeter":13262.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo- Antique Rd - K0033 + 493 - K0033 + 758, K0033 + 788 - K0035 + 117, K0035 + 125 - K0035 + 832, K0047 + 944 - K0049 + 976, K0049 + 1026 - K0050 + 136","amountPesos":25000000,"lengthMeters":4443.0,"ratePesosPerMeter":5626.83,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo- Antique Rd - K0051+273 - K0053+680","amountPesos":25000000,"lengthMeters":2407.0,"ratePesosPerMeter":10386.37,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo- Antique Rd - K0016 +833 - K0018 + 876, K0018 + 921 - K0021 + 000, K0022 + 926 - K0023 + 790","amountPesos":25000000,"lengthMeters":4986.0,"ratePesosPerMeter":5014.04,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo- Antique Rd - K0056+125-K0058+551","amountPesos":25000000,"lengthMeters":2426.0,"ratePesosPerMeter":10305.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo- Antique Rd - K0058+551 - K0060+956","amountPesos":25000000,"lengthMeters":2405.0,"ratePesosPerMeter":10395.01,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo- Antique Rd - K0060+956 - K0063+381","amountPesos":25000000,"lengthMeters":2425.0,"ratePesosPerMeter":10309.28,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gingoog- Claveria- Villanueva Rd- K1339 + 884 - K1341 + 283 (Road Safety: Roadway Lighting)","amountPesos":25000000,"lengthMeters":1399.0,"ratePesosPerMeter":17869.91,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal- Igbaras-Tubungan-Leon Rd - K0043 + 262 - K0046 + 638","amountPesos":25000000,"lengthMeters":3376.0,"ratePesosPerMeter":7405.21,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal- Tubungan Rd - K0029+000 - K0032 + 087","amountPesos":25000000,"lengthMeters":3087.0,"ratePesosPerMeter":8098.48,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal- Tubungan Rd - K0032+087 - K0037+589","amountPesos":25000000,"lengthMeters":5502.0,"ratePesosPerMeter":4543.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal- Tubungan Rd - K0037+589 - K0040+674","amountPesos":25000000,"lengthMeters":3085.0,"ratePesosPerMeter":8103.73,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal- Igbaras-Tubungan-Leon Rd - K0058 + 000 - K0063 + 000","amountPesos":25000000,"lengthMeters":5000.0,"ratePesosPerMeter":5000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Tigbauan-Cordova-Leon Rd - K0024 + 862 - K0031 + 403","amountPesos":25000000,"lengthMeters":6541.0,"ratePesosPerMeter":3822.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road, Barangay Bagoaingud to Barangay Buenavista, Sta. 0+000 - Sta. 1+000, Balabagan, Lanao del Sur","amountPesos":25000000,"lengthMeters":1000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Bialan - Binidayan (Pagayawan) Road, Sta. 0+000 - Sta. 1+250, Barangay Bialan, Pagayawan, Lanao del Sur","amountPesos":25000000,"lengthMeters":1250.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Barangay Ballacong - Barangay Rang-Ayan, City of Ilagan, Isabela (Sta. 0+000 - Sta. 2+660)","amountPesos":25000000,"lengthMeters":2660.0,"ratePesosPerMeter":9398.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road including Drainage Structure, Barangay Mozzozzin Sur, Santa Maria, Isabela (Sta. 0+128 - Sta. 0+653)","amountPesos":25000000,"lengthMeters":525.0,"ratePesosPerMeter":47619.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road (Sta. 0+000 - Sta. 2+000), Barangay Poblacion to Barangay Minanga Sur, San Pablo, Isabela","amountPesos":25000000,"lengthMeters":2000.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Bridge Quinalabasa Bridge, Barangay Quinalabasa,(Sta. 0+000.00 - Sta. 0+061.00), Naguilian, Isabela","amountPesos":25000000,"lengthMeters":61.0,"ratePesosPerMeter":409836.07,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+875, Barangay Baluarte, Santiago City, Isabela","amountPesos":25000000,"lengthMeters":1875.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+875, Barangay Villa Gonzaga, Santiago City, Isabela","amountPesos":25000000,"lengthMeters":1875.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+875, Barangay Bautista, San Agustin, Isabela","amountPesos":25000000,"lengthMeters":1875.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+875, Barangay Lacab, Jones, Isabela","amountPesos":25000000,"lengthMeters":1875.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+875, Barangay Santos, San Agustin, Isabela","amountPesos":25000000,"lengthMeters":1875.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Sta. Isabel- Minuri Bridge, Sta. 0+000-Sta.0+150, Jones, Isabela","amountPesos":25000000,"lengthMeters":150.0,"ratePesosPerMeter":166666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Pagalanggang, Dinalupihan, Bataan Sta.0+588- Sta.1+588","amountPesos":25000000,"lengthMeters":1000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage Canal, Salem St., Cognac St., Kingfisher St., Rand St., Barangay Pandayan, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+600 (120.96486944, 14.74937500)","amountPesos":25000000,"lengthMeters":600.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with drainage of Barasoain Street, Sulok, Barangay Saluysoy, Meycauayan Bulacan, Sta. 00+000 - Sta. 00+600 (120.95424167, 14.74428056)","amountPesos":25000000,"lengthMeters":600.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Casindolan Road (Apostol-Manglicmot), San Felipe, Zambales Sta. 0+000 - Sta. 1+000","amountPesos":25000000,"lengthMeters":1000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Omaya, San Narciso, Zambales Sta. 0+000 - Sta. 0+700","amountPesos":25000000,"lengthMeters":700.0,"ratePesosPerMeter":35714.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Bridge, Sta. 06+178 - Sta. 06+208, Phase II, Barangay Magbabadil, Aborlan, Palawan","amountPesos":25000000,"lengthMeters":30.0,"ratePesosPerMeter":833333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Jct. National Road to Barangay Asid to Barangay Cagay, Masbate City, Masbate, Sta. 0+000 to Sta. 0+560","amountPesos":25000000,"lengthMeters":560.0,"ratePesosPerMeter":44642.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Jct National Road to Barangay Pamampangon, Milagros, Masbate, Sta. 6+922 to Sta 7+502","amountPesos":25000000,"lengthMeters":580.0,"ratePesosPerMeter":43103.45,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Badiang, Cataingan to Barangay Guindawahan, Pio V. Corpuz, Masbate, Sta. 5+330 - Sta. 6+163","amountPesos":25000000,"lengthMeters":833.0,"ratePesosPerMeter":30012.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Gaban to Agsanayan Road (Sitio Pandan), Sta. 1 + 988 - Sta. 3 + 220, Barangay Gaban, San Lorenzo and Barangay Agsanayan, Buenavista, Guimaras","amountPesos":25000000,"lengthMeters":1232.0,"ratePesosPerMeter":20292.21,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Sitio Carazan - Canatbo - Paho Road, Barangay Avila, Buenavista, Guimaras, Sta. 0 + 000 - Sta. 1 + 100","amountPesos":25000000,"lengthMeters":1100.0,"ratePesosPerMeter":22727.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Aguilar Proper- Sitio Camansi-Constancia Proper Road, Sta. 3 + 275 - Sta. 4 + 539, Barangay Aguilar and Barangay Constancia, San Lorenzo, Guimaras","amountPesos":25000000,"lengthMeters":1264.0,"ratePesosPerMeter":19778.48,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Road Concreting, PUP Access Road, Barangay Calaguise, Leyte, Leyte (Station 0+280 - 0+750)","amountPesos":25000000,"lengthMeters":470.0,"ratePesosPerMeter":53191.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Road Concreting, Sitio Simborio Barangay Fatima, Villaba, Leyte (Station 0+170 - 0+670)","amountPesos":25000000,"lengthMeters":500.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Quezon to Magsaysasy Road (Sta. 1+700 - Sta. 2+250), Mapanas, Northern Samar","amountPesos":25000000,"lengthMeters":550.0,"ratePesosPerMeter":45454.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Alang-alang - Pio del Pilar - Can Maria Road (Sta. 2+900 - Sta. 3+395), Lapinig, Northern Samar","amountPesos":25000000,"lengthMeters":495.0,"ratePesosPerMeter":50505.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+862, Barangay Tarabucan – Barangay Jacinto, Calbayog City, Samar","amountPesos":25000000,"lengthMeters":862.0,"ratePesosPerMeter":29002.32,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 0+862, Barangay Dagum, Calbayog City, Samar","amountPesos":25000000,"lengthMeters":862.0,"ratePesosPerMeter":29002.32,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Macuyon to Barangay Balatakan, Sirawai, Zamboanga del Norte, Sta. 02 + 000 - Sta. 03+ 000","amountPesos":25000000,"lengthMeters":1000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Purok 2 - Purok 3), Barangay Balintawak, Sta. 0+000 - Sta. 0+850, Ozamiz City, Misamis Occidental","amountPesos":25000000,"lengthMeters":850.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Purok 6 Pulot to Balintawak), Sta. 0+000 - Sta. 0+850, Ozamiz City, Misamis Occidental","amountPesos":25000000,"lengthMeters":850.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Purok 4 to Purok 5), Barangay Pantaon, Sta. 0+000 - Sta. 0+850, Ozamiz City, Misamis Occidental","amountPesos":25000000,"lengthMeters":850.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of LAMARISAN Road, Sta. 1+884.16 - Sta. 2+734.16, Malalag, Davao del Sur","amountPesos":25000000,"lengthMeters":850.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Barangay Coring to Barangay Columbos) Sta. 0 + 000 - Sta. 1 + 000, Barangay Coring, Basilisa, Dinagat Islands","amountPesos":25000000,"lengthMeters":1000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Circumferential Road Sta. 0 + 000 - Sta. 1 + 000 (Liberty to Magsaysay), Barangay Liberty, Loreto, Dinagat Islands","amountPesos":25000000,"lengthMeters":1000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 1 + 000 (Bojo to Carmen), Barangay Carmen, Loreto, Dinagat Islands","amountPesos":25000000,"lengthMeters":1000.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Causeway, Barangay Caohagan, Caohagan Island, Sta. 0+060.00 - Sta. 0+150.00, Lapu-Lapu City, Cebu","amountPesos":25000000,"lengthMeters":90.0,"ratePesosPerMeter":277777.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct. Pinagpanaan-Rizal-Pantabangan Road, K0127+644 - K0128+800, K0131+105 - K0132+190","amountPesos":24970000,"lengthMeters":2241.0,"ratePesosPerMeter":11142.35,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siocon-Sirawai-Sibuco-Limpapa Rd - K2102 + 000 - K2103 + 000","amountPesos":24853000,"lengthMeters":1000.0,"ratePesosPerMeter":24853.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siocon-Sirawai-Sibuco-Limpapa Rd - K2103 + 000 - K2104 + 000","amountPesos":24829000,"lengthMeters":1000.0,"ratePesosPerMeter":24829.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0525 + 187 - K0525 + 242, K0527 + 000 - K0527 + 123, K0527 + 191 - K0527 + 210, K0527 + 399 - K0527 + 472, K0527 + 567 - K0527 + 709, K0527 + 823 - K0528 + 066, K0528 + 192 - K0528 + 300, K0528 + 460 - K0528 + 537, K0528 + 565 - K0528 + 895","amountPesos":24810000,"lengthMeters":1170.0,"ratePesosPerMeter":21205.13,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1684 + 598 - K1684 + 682, K1718 + 020 - K1718 + 991","amountPesos":24800000,"lengthMeters":1055.0,"ratePesosPerMeter":23507.11,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0616 + 066 - K0616 + 120","amountPesos":24690000,"lengthMeters":54.0,"ratePesosPerMeter":457222.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0623 + 557 - K0623 + 598, K0623 + 767 - K0623 + 786.5, K0625 + 185 - K0625 + 233.5","amountPesos":24600000,"lengthMeters":109.0,"ratePesosPerMeter":225688.07,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Pascual-Claveria Rd - K0003 + 000 - K0003 + 100, K0003 + 141 - K0003 + 157, K0003 + 195 - K0003 + 407, K0003 + 701 - K0003 + 928","amountPesos":24586000,"lengthMeters":555.0,"ratePesosPerMeter":44299.1,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila-Batangas Rd - K0068 + 239 - K0068 + 284, K0068 + 567 - K0068 + 716, K0068 + 731 - K0068 + 909","amountPesos":24500000,"lengthMeters":372.0,"ratePesosPerMeter":65860.22,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Balbalan-Pinukpuk Rd - K0495 + 535 - K0495 + 559, K0498 + 523 - K0498 + 557, K0500 + 296 - K0500 + 313, K0509 + 913 - K0509 + 935, K0511 + 379 - K0511 + 395, K0511 + 438 - K0511 + 450, K0511 + 685 - K0511 + 706, K0517 + 209 - K0517 + 275","amountPesos":24500000,"lengthMeters":212.0,"ratePesosPerMeter":115566.04,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod North Rd - K0052 + 000 - K0052 + 245, K0059 + 485 - K0059 + 700, K0066 + 308 - K0066 + 801, K0069 + 585 - K0070 + 043","amountPesos":24463000,"lengthMeters":1411.0,"ratePesosPerMeter":17337.35,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Camarines Sur- Albay Diversion Rd - K0435 + 748 - K0436 + 538","amountPesos":24424000,"lengthMeters":790.0,"ratePesosPerMeter":30916.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road (Sta. 0+800 - Sta. 3+300) along Barangay Colunguan to Barangay Bubug, Santo Tomas, Isabela","amountPesos":24400000,"lengthMeters":2500.0,"ratePesosPerMeter":9760.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Aklan West Rd (Kalibo-Nabas) - K0235+282 - K0235 + 352, K0236+240 - K0236+430, K0240 + 998 - K0241 + 248, K0241 + 273 - K0241 + 610, K0250+100 - K0250+250, K0250 + 344 - K0250 + 390","amountPesos":24348000,"lengthMeters":1043.0,"ratePesosPerMeter":23344.2,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dalaguete-Mantalongon Badian Rd - K0095 + 407 - K0096 + 470","amountPesos":24310000,"lengthMeters":1063.0,"ratePesosPerMeter":22869.24,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Antonio Arnaiz Ave - K0007 + 800 - K0008 + 246","amountPesos":24233000,"lengthMeters":446.0,"ratePesosPerMeter":54334.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lanao del Norte Interior Circum. Rd (LDNICR) - (S00972MN) Chainage 14183 - Chainage 14443","amountPesos":24180000,"lengthMeters":260.0,"ratePesosPerMeter":93000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Antonio Arnaiz Ave - K0007 + 000 - K0007 + 800","amountPesos":24159000,"lengthMeters":800.0,"ratePesosPerMeter":30198.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0631 + 000 - K0631 + 500","amountPesos":24121000,"lengthMeters":500.0,"ratePesosPerMeter":48242.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0101 + (-509) - K0101 + 100","amountPesos":24108000,"lengthMeters":609.0,"ratePesosPerMeter":39586.21,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0077 + 530 - K0078 + 000","amountPesos":24050000,"lengthMeters":470.0,"ratePesosPerMeter":51170.21,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dipolog-Polanco-Piñan-Jct Oroquieta Rd - K1813+073 - K1813+541, K1819+912 - K1820+077","amountPesos":24034000,"lengthMeters":633.0,"ratePesosPerMeter":37968.4,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santander-Barili-Toledo Rd - K0153 + 000 - K0154 + 054","amountPesos":24020000,"lengthMeters":1054.0,"ratePesosPerMeter":22789.37,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Capas-San Jose-Mayantoc-Malacampa Rd - K0141 + 000 - K0141 + 613","amountPesos":24000000,"lengthMeters":613.0,"ratePesosPerMeter":39151.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sayre Highway (S00577MN) - K1429 + 300 - K1429 + 535","amountPesos":24000000,"lengthMeters":235.0,"ratePesosPerMeter":102127.66,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway – K0138 + 060 – K0138 + 800","amountPesos":24000000,"lengthMeters":740.0,"ratePesosPerMeter":32432.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Batangas-Lobo Rd - K0116+000-K0116+4.5(LL), K0116+13-K0116+31.6(LL), K0116+31.6-K0116+44.5(LL), K0116+62-K0116+99.1(BL), K0116+201.3- K0116+205.7(LL), K0116+246-K0116+255(BL), K0116+255-K0116+277.5(LL), K0116+277.5-K0116+286.5(BL), K0116+286.5-K0116+300.2(LL), K0116+304.6- K0116+313.7(LL), K0116+304.6-K0116+313.7(LL), K0116+313-K0116+322.6(BL), K0116+322.6-K0116+331.7(LL), K0116+347-K0116+351.5(LL), K0116+363- K0116+376.5(LL), K0116+385-K0116+388.5RL, K0116+388.5-K0116+409.2(LL), K0116+418.3-K0116+427.2(LL), K0116+445.2-K0116+449.5(LL), K0116+485.8- K0116+490.5(LL), K0116+495.1-K0116+508.7(LL), K0116+526.2-K0116+530.8(LL), K0116+535.3-K0116+539.7(LL), K0116+548.9-K0116+562.3(LL), K0116+575.8- K0116+580.3(LL)K0116+607-K0116+611.5(BL), K0116+611.5-K0116+616(LL), K0116+634.3-K0116+697.5(LL), K0116+706.5-K0116+710.7(LL), K0116+742.1- K0116+755.6(LL), K0116+817.4-K0116+821.8(LL), K0116+845-K0116+885.9(LL), K0116+953.9-K0116+967.3(LL), K0116+971.8-K0116+976.2(LL), K0116+985.3- K0116+1005.4(LL), K0116+1008-K0116+1012.5(LL), K0116+1135.2- K0116+1139.8(LL), K0116+1213-K0116+1217.5(LL)","amountPesos":24000000,"lengthMeters":446.1,"ratePesosPerMeter":53799.6,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Baybay City Diversion Road, Sta. 3+839 - 5+180 (RS), Barangay Hipusngo - Barangay Palhi, Baybay City, Leyte","amountPesos":24000000,"lengthMeters":1341.0,"ratePesosPerMeter":17897.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Barangay Sta. Victoria to Barangay Fuyo, City of Ilagan, Isabela (Sta. 0+000 - Sta. 2+800)","amountPesos":24000000,"lengthMeters":2800.0,"ratePesosPerMeter":8571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Contruction of Road, Sta. 0+000 - Sta. 1+800, Barangay Rizaluna - Barangay Villamarzo, Cordon Isabela","amountPesos":24000000,"lengthMeters":1800.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay San Pedro, Sta. 2 + 141.00 to Sta. 2 + 826.00, Lupi, Camarines Sur","amountPesos":24000000,"lengthMeters":685.0,"ratePesosPerMeter":35036.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0089 + 000 - K0089 + 320","amountPesos":23962000,"lengthMeters":320.0,"ratePesosPerMeter":74881.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Liloy-Siocon Rd - K2059 + 011 - K2059 + 800, K2061 + 000 - K2061 + 470, K2061 + 670 - K2062 + 000","amountPesos":23925000,"lengthMeters":1589.0,"ratePesosPerMeter":15056.64,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Asuncion-San Isidro-Laak-Veruela Rd - K1528 + 000 - K1530 + 000","amountPesos":23795000,"lengthMeters":2000.0,"ratePesosPerMeter":11897.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siocon-Sirawai Rd - K2081 + 000 - K2081 + 957","amountPesos":23786000,"lengthMeters":957.0,"ratePesosPerMeter":24854.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Paniqui-Camiling-Wawa Rd - K0164 + 837 - K0166 + 000","amountPesos":23656000,"lengthMeters":1163.0,"ratePesosPerMeter":20340.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0684 + 565 - K0685 + 165, K0687 + 268 - K0687 + 332, K0687 + 968 - K0689 + 000","amountPesos":23652000,"lengthMeters":1696.0,"ratePesosPerMeter":13945.75,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"JP Rizal St - K0005 + 797 - K0006 + 372","amountPesos":23550000,"lengthMeters":575.0,"ratePesosPerMeter":40956.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0096 + 000 - K0096 + 016, K0096 + 208 - K0096 + 630.592","amountPesos":23457000,"lengthMeters":438.592,"ratePesosPerMeter":53482.51,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cavite-Batangas Rd - K0020 + 270 - K0021 + 231","amountPesos":23448000,"lengthMeters":961.0,"ratePesosPerMeter":24399.58,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tejero-Gen Trias-Amadeo-Tagaytay Rd - K0036 + 643 - K0037 + 000, K0037 + 337 - K0039 + 000","amountPesos":23384000,"lengthMeters":2020.0,"ratePesosPerMeter":11576.24,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0103 + 537 - K0104+638","amountPesos":23268000,"lengthMeters":1101.0,"ratePesosPerMeter":21133.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Replacement of Bridge, Barangay Camiing, Guimba, Nueva Ecija Sta. 0+000 - Sta. 0+015","amountPesos":23250000,"lengthMeters":15.0,"ratePesosPerMeter":1550000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road along Bisita St., Barangay Balsahan-Bisita, Sta. 0 + 000 - Sta. 0 + 323, Kawit Cavite","amountPesos":23200000,"lengthMeters":323.0,"ratePesosPerMeter":71826.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Libon-Bacolod-Sn Vicente-Marocmoc-Buga Rd - K0491 + 949 - K0492 + 457, K0492 + 590 - K0492 + 816, K0492 + 856 - K0493 + 551, K0493 + 568 - K0494 + 622","amountPesos":23199000,"lengthMeters":2483.0,"ratePesosPerMeter":9343.13,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Cotabato-Marbel Rd) - K1722 + 774 - K1723 + 006","amountPesos":23197000,"lengthMeters":232.0,"ratePesosPerMeter":99987.07,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calamba-Tagaytay Rd - K0051 + (-564) - K0051 + (-120), K0051 + 571 - K0051 + 669, K0051 + 850 - K0052 + 543, K0053 + 150 - K0053 + 553, K0055 + 000 - K0055 + 215, K0064 + 115 - K0064 + 218","amountPesos":23138000,"lengthMeters":1956.0,"ratePesosPerMeter":11829.24,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lagta-Crossing Malinta Rd - K0099 + 925 - K0100 + 243","amountPesos":23091000,"lengthMeters":318.0,"ratePesosPerMeter":72613.21,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Batangas-Lobo Rd - K0131 + 925 - K0131 + 1275","amountPesos":23083000,"lengthMeters":350.0,"ratePesosPerMeter":65951.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0632 + 470 - K0633 + 600","amountPesos":23070000,"lengthMeters":1130.0,"ratePesosPerMeter":20415.93,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod North Road (S00406NR) K0045 + 000 - K0048 + 245 (Road Safety: Roadway Lighting)","amountPesos":23070000,"lengthMeters":3245.0,"ratePesosPerMeter":7109.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Lucban-Luisiana Rd - K0130 + 000 - K0130 + 650","amountPesos":23000000,"lengthMeters":650.0,"ratePesosPerMeter":35384.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"MSR Jct-Lopez-Buenavista Rd - K0230 + 900 - K0230 + 940, K0235 + 546 - K0235 + 591, K0235 + 874 - K0235 + 910","amountPesos":23000000,"lengthMeters":121.0,"ratePesosPerMeter":190082.64,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Demoloc-Little Baguio-Alabel Rd - K1668 + 150 - K1668 + 165, K1668 + 670 - K1668 + 690","amountPesos":23000000,"lengthMeters":35.0,"ratePesosPerMeter":657142.86,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tarlac-Guimba Rd via Victoria - K0129 + 752 - K0130 + 375","amountPesos":23000000,"lengthMeters":623.0,"ratePesosPerMeter":36918.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road at Sitio Maasin, Barangay Iraga, Solana, Cagayan (0+000 - 1+250)","amountPesos":23000000,"lengthMeters":1250.0,"ratePesosPerMeter":18400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of access road, Sta. 2+790 - Sta. 3+790, from sitio Camansi,Bgy Fatima,Tobias Fornier to Bgy. Tagaytay,Anini-y,Antique","amountPesos":23000000,"lengthMeters":1000.0,"ratePesosPerMeter":23000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Barangay Cang-asagan leading to Cang-asagan Elementary School, San Juan, Siquijor (0 + 000 - 0 + 600)","amountPesos":23000000,"lengthMeters":600.0,"ratePesosPerMeter":38333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mintac Port Rd - K0085 + (-065) - K0086 + 000","amountPesos":22909000,"lengthMeters":1065.0,"ratePesosPerMeter":21510.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Barangay Calamcam to Barangay Magkarila Road, Sta. 0+000 - Sta. 0+850, Talisayan, Misamis Oriental","amountPesos":22900000,"lengthMeters":850.0,"ratePesosPerMeter":26941.18,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concepcion-Sn Dionisio Rd - K0223 + 126 - K0224 + 000","amountPesos":22870000,"lengthMeters":874.0,"ratePesosPerMeter":26167.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tanza-Trece Martires City-Indang Rd - K0036 + 380 - K0037 + 018","amountPesos":22696000,"lengthMeters":638.0,"ratePesosPerMeter":35573.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagaytay-Manila via Silang Rd - K0057 + (-576) - K0057 + 000","amountPesos":22694000,"lengthMeters":576.0,"ratePesosPerMeter":39399.31,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0052 + (-120) - K0052 + 450","amountPesos":22629000,"lengthMeters":570.0,"ratePesosPerMeter":39700.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sibuyan Circumferential Rd - K0053 + 800 - K0054 + 000, K0055 + 600 - K0055 + 700","amountPesos":22620000,"lengthMeters":300.0,"ratePesosPerMeter":75400.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Constructin of Road, Sta. 0+000 - Sta. 1+695, Barangay 2, Jones, Isabela","amountPesos":22600000,"lengthMeters":1695.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Judge Jose De Venecia Sr. Avenue Road, K0207+617 - K0207+996","amountPesos":22588000,"lengthMeters":379.0,"ratePesosPerMeter":59598.94,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0666 + 740 - K0666 + 790","amountPesos":22545000,"lengthMeters":50.0,"ratePesosPerMeter":450900.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810","amountPesos":22540000,"lengthMeters":614.0,"ratePesosPerMeter":36710.1,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacnotan-Luna-Balaoan Rd - K0306 + 007 - K0307 + 704","amountPesos":22536000,"lengthMeters":1697.0,"ratePesosPerMeter":13279.91,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sibuyan Circumferential Rd - K0002 + 834 - K0002 + 974, K0003 + 845 - K0004 + 000","amountPesos":22500000,"lengthMeters":295.0,"ratePesosPerMeter":76271.19,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Buenavista-Kawayan Rd - K0063 + 000 - K0063 + 450","amountPesos":22500000,"lengthMeters":450.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Campesao, Borongan City, Eastern Samar (Sta. 0+000 - Sta. 0+433)","amountPesos":22500000,"lengthMeters":433.0,"ratePesosPerMeter":51963.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Leonard Wood Rd - K0250 + (-375) - K0251 + 398 (Off-Carriageway Improvement: Construction of Sidewalk)","amountPesos":22459000,"lengthMeters":1773.0,"ratePesosPerMeter":12667.23,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Pulauan Port Rd - K1827 + 450 - K1828 + 000","amountPesos":22439000,"lengthMeters":550.0,"ratePesosPerMeter":40798.18,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Replacement of Bolosan Bridge, Barangay Bolosan, Sta 0+000 - Sta 0+041.6, Dagupan City, Pangasinan","amountPesos":22415000,"lengthMeters":41.6,"ratePesosPerMeter":538822.12,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lipa City - Alaminos Rd - K0077 + 000 - K0079 + 756, K0079 + 915 - K0080 + 059, K0081 + 389 - K0082 + 262 (Off-Carriageway Improvement: Construction of Sidewalk)","amountPesos":22401000,"lengthMeters":3773.0,"ratePesosPerMeter":5937.19,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Candelaria Bypass Rd - K0105 + (-446) - K0105 + (-289), K0105 + (-259) - K0105 + 307","amountPesos":22399000,"lengthMeters":723.0,"ratePesosPerMeter":30980.64,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0082 + 000 - K0083 + 000","amountPesos":22390000,"lengthMeters":1000.0,"ratePesosPerMeter":22390.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0127 + 231 - K0128 + 224","amountPesos":22390000,"lengthMeters":993.0,"ratePesosPerMeter":22547.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Parpagoha (Marigondon)-Binoog Rd - K0017 + (-272) - K0017 + (-112), K0019 + 500 - K0020 + 000, K0022 + 000 - K0022 + 500, K0023 + 000 - K0023 + 383","amountPesos":22286000,"lengthMeters":1543.0,"ratePesosPerMeter":14443.29,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nueva Vizcaya-Ifugao-Mt Province Rd - K0343 + 740 - K0343 + 763, K0344 + 670 - K0344 + 697, K0345 + 049 - K0345 + 094, K0348 + 287 - K0348 + 350, K0348 + 434 - K0348 + 446, K0349 + 223 - K0349 + 251, K0349 + 289 - K0349 + 341, K0350 + 192 - K0350 + 228, K0350 + 582 - K0350 + 595, K0351 + 462 - K0351 + 479, K0360 + 400 - K0360 + 424","amountPesos":22214000,"lengthMeters":340.0,"ratePesosPerMeter":65335.29,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gapan-Fort Magsaysay Rd - K0095 + 093 - K0096 + 000, K0097 + 073 - K0099 + 237","amountPesos":22203000,"lengthMeters":3071.0,"ratePesosPerMeter":7229.89,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Poblacion-Mahayahay Port Rd - (S00036MT) Chainage 008 - Chainage 743","amountPesos":22050000,"lengthMeters":735.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quezon-Alabat-Perez Rd - K0003 + 230 - K0003 + 275, K0017 + 670 - K0017 + 800, K0220 + 328 - K0020 + 513","amountPesos":22005000,"lengthMeters":199990.0,"ratePesosPerMeter":110.03,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nueva Ecija-Pangasinan Rd - K0165 + 000 - K0166 + 000","amountPesos":22000000,"lengthMeters":1000.0,"ratePesosPerMeter":22000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"MC Briones St - (S00122CB) Chainage 000 - Chainage 290","amountPesos":22000000,"lengthMeters":290.0,"ratePesosPerMeter":75862.07,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Baguio-Bontoc Rd - K0358 + 700 - K0358 + 803","amountPesos":22000000,"lengthMeters":103.0,"ratePesosPerMeter":213592.23,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1549 + 140 - K1549 + 212","amountPesos":22000000,"lengthMeters":72.0,"ratePesosPerMeter":305555.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1+594 - Sta. 2+012.19, Baguio City","amountPesos":22000000,"lengthMeters":418.19,"ratePesosPerMeter":52607.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of of Concrete Road (Sta.5+900-Sta.7+100) at Sito Bating, Barangay Namnama, City of Ilagan, Isabela","amountPesos":22000000,"lengthMeters":1200.0,"ratePesosPerMeter":18333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of of Concrete Road (Sta.5+900-Sta.7+100) at Sito Bating, Barangay Namnama, Cit of Ilagan, Isabela","amountPesos":22000000,"lengthMeters":1200.0,"ratePesosPerMeter":18333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Oracon - Sitio Bankiling - Sitio Casilian Road, Sta. 0 + 600 - Sta. 1 + 800, Barangay Oracon Sur and Barangay Oracon Norte, Sibunag and Nueva Valencia, Guimaras","amountPesos":22000000,"lengthMeters":1200.0,"ratePesosPerMeter":18333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sitio Tibwason - Paho, Sta. 1 + 350 - Sta. 2 + 450, Barangay Ayangan, Sibunag, Guimaras","amountPesos":22000000,"lengthMeters":1100.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maragondon-Magallanes-Amuyong Rd - K0056 + 000 - K0056 + 545, K0057 + 833 - K0058 + 000","amountPesos":21974000,"lengthMeters":712.0,"ratePesosPerMeter":30862.36,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palico-Balayan-Batangas Rd - K0141 + 330 - K0141 + 644","amountPesos":21936000,"lengthMeters":314.0,"ratePesosPerMeter":69859.87,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Batangas-Quezon Rd - K0134 + (-439) - K0134 + (-216)","amountPesos":21887000,"lengthMeters":223.0,"ratePesosPerMeter":98147.98,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Blancia-Molave-Josefina Rd - K1659 + 000 - K1659 + 340","amountPesos":21871000,"lengthMeters":340.0,"ratePesosPerMeter":64326.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 1+560) at Kauswagan - Esperanza Circumferential Road, Sagay City, Negros Occidental","amountPesos":21840000,"lengthMeters":1560.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Sta. 2+753 - Sta. 4+309) Barangay X, Victorias City, Negros Occidental (10.8278732, 123.1661662)","amountPesos":21784000,"lengthMeters":1556.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Ramon Penal Colony Rd - (S01195MN) Chainage 000 - Chainage 1349","amountPesos":21782000,"lengthMeters":1349.0,"ratePesosPerMeter":16146.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dobleston-Butadon Rd - K1994+376 - K1994+520, K2002+280 - K2002+347, K2006+047 - K2006+097, K2007+503 - K2007+546","amountPesos":21774000,"lengthMeters":304.0,"ratePesosPerMeter":71625.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Switch-Jct Monte Alegre Rd - K1642 + 624 - K1643 + 296, K1645 + 000 - K1645 + 1071, K1646 + 909 - K1647 + 000","amountPesos":21736000,"lengthMeters":1834.0,"ratePesosPerMeter":11851.69,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siocon-Sirawai-Sibuco-Limpapa Rd - K2108 + (-448) - K2109 + 000","amountPesos":21720000,"lengthMeters":1448.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nabua-Bato-Libon (Tandaay-Buluang, Bato) Rd - K0492 + 170 - K0492 + 750","amountPesos":21715000,"lengthMeters":580.0,"ratePesosPerMeter":37439.66,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0056 + 431.73 - K0056 + 525, K0056 + 602 - K0056 + 690, K0058 + 040 - K0058 + 088.80","amountPesos":21694000,"lengthMeters":230.07,"ratePesosPerMeter":94293.04,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nasugbu-Lian-Calatagan Rd - K0122 + 000 - K0123 + 000","amountPesos":21613000,"lengthMeters":1000.0,"ratePesosPerMeter":21613.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Balayan-Balibago Rd - K0116 + 000 - K0117 + 000","amountPesos":21592000,"lengthMeters":1000.0,"ratePesosPerMeter":21592.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Balayan-Balibago Rd - K0109 + 309 - K0110 + 306","amountPesos":21527000,"lengthMeters":997.0,"ratePesosPerMeter":21591.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagaytay-Batangas via Tuy Rd - K0062 + 380 - K0062 + 930","amountPesos":21505000,"lengthMeters":550.0,"ratePesosPerMeter":39100.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0380+2173 - K0380+2250","amountPesos":21500000,"lengthMeters":77.0,"ratePesosPerMeter":279220.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rizal National Rd (Romualdez-Santor-Calaocan-Sn Pascual Sect) - K0424 + 721 - K0424 + 874, K0424 + 922 - K0424 + 961, K0425 + 538 - K0425 + 541, K0425 + 852 - K0425 + 862, K0426 + 022 - K0426 + 059, K0426 + 178 - K0426 + 238, K0426 + 252 - K0426 + 287, K0426 + 412 - K0426 + 441, K0426 + 473 - K0426 + 515, K0428 + 056 - K0428 + 079, K0428 + 127 - K0428 + 172, K0432 + 000 - K0432 + 543","amountPesos":21443000,"lengthMeters":1019.0,"ratePesosPerMeter":21043.18,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Fernando-Bagulin Rd - K0276 + 139 - K0276 + 262","amountPesos":21400000,"lengthMeters":123.0,"ratePesosPerMeter":173983.74,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1426 + 000 - K1426 + 980, K1427 + 080 - K1427 + 333, K1427 + 411 - K1428 + 000 (Road Safety: Roadway Lighting)","amountPesos":21359000,"lengthMeters":1822.0,"ratePesosPerMeter":11722.83,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 1+520) at Barangay XII, Victorias City, Negros Occidental (10.8711260, 123.1132960)","amountPesos":21280000,"lengthMeters":1520.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maragondon-Magallanes-Amuyong Rd - K0084 + 016 - K0084 + 552","amountPesos":21268000,"lengthMeters":536.0,"ratePesosPerMeter":39679.1,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0464 + 640 - K0465 + 260","amountPesos":21256000,"lengthMeters":620.0,"ratePesosPerMeter":34283.87,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"General Aguinaldo-Magallanes-Nasugbu Rd (East-West Rd), Sta. 71+817 - Sta. 71+862.7, Sta. 72+084.84 - Sta. 72+300, Gen. Emilio Aguinaldo Section, Cavite","amountPesos":21200000,"lengthMeters":260.86,"ratePesosPerMeter":81269.65,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0071 + 230 - K0072 + 411","amountPesos":21168000,"lengthMeters":1181.0,"ratePesosPerMeter":17923.79,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sta Rosa-Ulat-Tagaytay Rd - K0060 + 000 - K0060 + 978","amountPesos":21138000,"lengthMeters":978.0,"ratePesosPerMeter":21613.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0311+721 - K0312+000","amountPesos":21100000,"lengthMeters":279.0,"ratePesosPerMeter":75627.24,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ternate-Nasugbu Rd - K0073 + 000 - K0074 + 171.72","amountPesos":21091000,"lengthMeters":1171.72,"ratePesosPerMeter":18000.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1684 + 993 - K1685 + 990, K1686 + 240 - K1686 + 285","amountPesos":21049000,"lengthMeters":1042.0,"ratePesosPerMeter":20200.58,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Natl Rd-Ayuyan-Tinaytayan Rd - K0094 + 148 - K0094 + 596, K0094 + 731 - K0095 + 175","amountPesos":21008000,"lengthMeters":892.0,"ratePesosPerMeter":23551.57,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pres Quirino Ave - K0007 + 475 - K0006 + 000","amountPesos":21000000,"lengthMeters":1475.0,"ratePesosPerMeter":14237.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mayapa-Canlubang Cadre Rd - K0050 + (-690) - K0050 + 000","amountPesos":21000000,"lengthMeters":690.0,"ratePesosPerMeter":30434.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Sta. 0+000 - Sta. 1+575, Barangay Quimalabasa Norte - Barangay Mapalad, San Agustin, Isabela","amountPesos":21000000,"lengthMeters":1575.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 0+525, Sitio Cagdagat, Boton, Casiguran, Sorsogon","amountPesos":21000000,"lengthMeters":525.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Guinobatan Poblacion Rd - K0511 + 159 - K0511 + 783","amountPesos":20990000,"lengthMeters":624.0,"ratePesosPerMeter":33637.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0107 + 000 - K0108 + 000","amountPesos":20972000,"lengthMeters":1000.0,"ratePesosPerMeter":20972.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calamba-Sta Cruz-Famy Jct Rd - K0105 + 740 - K0105 + 970, K0105 + 973 - K0106 + 299, K0106 + 305 - K0106 + 465","amountPesos":20919000,"lengthMeters":716.0,"ratePesosPerMeter":29216.48,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Camiguin Circumferential Rd - K0034 + 180 - K0034 + 615, K0057 + 197 - K0057 + 543, K0057 + 553 - K0057 + 700","amountPesos":20919000,"lengthMeters":928.0,"ratePesosPerMeter":22542.03,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Fernando-Lubao Rd - K0082 + 000 - K0083 + 153","amountPesos":20891000,"lengthMeters":1153.0,"ratePesosPerMeter":18118.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0051 + 000 - K0051 + 355","amountPesos":20828000,"lengthMeters":355.0,"ratePesosPerMeter":58670.42,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0650 + 061 - K0650 + 095, K0650 + 162 - K0650 + 194.5","amountPesos":20810000,"lengthMeters":66.5,"ratePesosPerMeter":312932.33,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0244 + 053 - K0244 + 900","amountPesos":20800000,"lengthMeters":847.0,"ratePesosPerMeter":24557.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagaytay-Manila via Silang Rd - K0057 + 000 - K0057 + 512","amountPesos":20793000,"lengthMeters":512.0,"ratePesosPerMeter":40611.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagbac-Lubang-Looc Rd - K0015 + 765 - K0016 + 451","amountPesos":20782000,"lengthMeters":686.0,"ratePesosPerMeter":30294.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Albay Diversion Rd - K0450 + 770 - K0452 + 000","amountPesos":20772000,"lengthMeters":1230.0,"ratePesosPerMeter":16887.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Indang-Alfonso via Luksuhin Rd - K0066 + 1397 - K0067 + 919","amountPesos":20767000,"lengthMeters":522.0,"ratePesosPerMeter":39783.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Carlos - Calasiao Road, K0204+(-1000) - K0204+(-040)","amountPesos":20700000,"lengthMeters":960.0,"ratePesosPerMeter":21562.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"C-5 Road - K0011 + (-975) - K0011 + 420","amountPesos":20573000,"lengthMeters":1395.0,"ratePesosPerMeter":14747.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+520, Barangay Nemmatan, San Agustin, Isabela","amountPesos":20500000,"lengthMeters":1520.0,"ratePesosPerMeter":13486.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Fernando-Lubao Rd - K0079 + 000 - K0080 + 000","amountPesos":20377000,"lengthMeters":1000.0,"ratePesosPerMeter":20377.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0460 + 000 - K0460 + 509","amountPesos":20360000,"lengthMeters":509.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maragondon-Magallanes-Amuyong Rd - K0080 + 830 - K0081 + 302","amountPesos":20340000,"lengthMeters":472.0,"ratePesosPerMeter":43093.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Chainage 1 + 104.20 - Chainage 2 + 132, Sitio Iphag, Barangay Pange - Sitio Gapas, Barangay Sta. Cruz - Sitio Cabalagnan, Barangay Batug, Jaro, Leyte","amountPesos":20300000,"lengthMeters":1027.8,"ratePesosPerMeter":19750.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0123 + 045 - K0123 + 121, K0123 + 221 - K0124 + 000","amountPesos":20286000,"lengthMeters":855.0,"ratePesosPerMeter":23726.32,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0486 + 830 - K0488 + 090","amountPesos":20282000,"lengthMeters":1260.0,"ratePesosPerMeter":16096.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lanao del Norte Interior Circum. Rd (LDNICR) - K1580+020 - K1580+115, K1580+676 - K1580+740, K1583+327 - K1583+392, K1584+703 - K1584+808","amountPesos":20202000,"lengthMeters":329.0,"ratePesosPerMeter":61404.26,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0053 + 367 - K0054 + 000","amountPesos":20143000,"lengthMeters":633.0,"ratePesosPerMeter":31821.48,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bongabong-Sagana-Roxas-Sn Aquilino Rd - K0104 + 000 - K0105 + 000, K0105 + 772 - K0106 + 195","amountPesos":20101000,"lengthMeters":1423.0,"ratePesosPerMeter":14125.79,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - (S01152MN) Chainage 2548 - Chainage 3065, Chainage 13521 - Chainage 14341","amountPesos":20055000,"lengthMeters":1337.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Olongapo-Bugallon Rd - K0147+392 - K0147+713","amountPesos":20012000,"lengthMeters":321.0,"ratePesosPerMeter":62342.68,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pangasinan-La Union Inter-Provl Road K0383 + 400 - K0384 + 700","amountPesos":20000000,"lengthMeters":1300.0,"ratePesosPerMeter":15384.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila-Batangas Rd - K0082 + 154 - K0082 + 645","amountPesos":20000000,"lengthMeters":491.0,"ratePesosPerMeter":40733.2,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Marikina-Victoria Valley-Antipolo Rd - K0027 + 179 - K0027 + 251, K0027 + 252 - K0027 + 587","amountPesos":20000000,"lengthMeters":407.0,"ratePesosPerMeter":49140.05,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Carmen Jct - Bayambang - Manat Road, K0204+928 - K0206+000","amountPesos":20000000,"lengthMeters":1072.0,"ratePesosPerMeter":18656.72,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1669 + 349 - K1670 + 000","amountPesos":20000000,"lengthMeters":651.0,"ratePesosPerMeter":30721.97,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lucena-Tayabas-Lucban-Sampaloc-Mauban Port Rd - K0132 + 334 - K0132 + 800","amountPesos":20000000,"lengthMeters":466.0,"ratePesosPerMeter":42918.45,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0019+956 - K0020+150","amountPesos":20000000,"lengthMeters":194.0,"ratePesosPerMeter":103092.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (MN) - K1442 + 500 - K1442 + 593","amountPesos":20000000,"lengthMeters":93.0,"ratePesosPerMeter":215053.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Apayao-Kalinga-Abra Rd (Buluan-Sacpil-Wagud-Tawang-Salegseg Sect.) (S00695LZ) - Chainage 750 - Chainage 830, Chainage 1201- Chainage 1239, Chainage 1343.80 - Chainage 1384.80, Chainage 1388.80 - Chainage 1414.80, Chainage 1415 - Chainage 1476.80, Chainage 1743.70 - Chainage 1769.90, Chainage 2832.30 - Chainage 2846.30, Chainage 3044.10 - Chainage 3084.40 (LS), Chainage 3051.20 - Chainage 3084.40 (RS), Chainage 3279.90 - Chainage 3322.90, Chainage 3350.50 - Chainage 3395.50, Chainage 3438.40 - Chainage 3463.40, Chainage 3550.40 - Chainage 3584.40","amountPesos":20000000,"lengthMeters":474.3,"ratePesosPerMeter":42167.4,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Apayao-Kalinga-Abra Rd (Buluan-Sacpil-Wagud-Tawang-Salegseg Sect.) (S00695LZ) - Chainage 8458 - Chainage 8465, Chainage 8465 - Chainage 8571, Chainage 8851 - Chainage 8946","amountPesos":20000000,"lengthMeters":208.0,"ratePesosPerMeter":96153.85,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calapan South Rd - K0047 + 1053 - K0048 + 000","amountPesos":20000000,"lengthMeters":53.0,"ratePesosPerMeter":377358.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Biliran Circumferential Rd - K1060 + 800 - K1060 + 900","amountPesos":20000000,"lengthMeters":100.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Biliran Circumferential Rd - K1109 + 784 - K1110 + 032","amountPesos":20000000,"lengthMeters":248.0,"ratePesosPerMeter":80645.16,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1570 + 660 - K1570 + 723","amountPesos":20000000,"lengthMeters":63.0,"ratePesosPerMeter":317460.32,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Asuncion-San Isidro-Laak-Veruela Rd - K1518 + 605 - K1518 + 635","amountPesos":20000000,"lengthMeters":30.0,"ratePesosPerMeter":666666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cagayan-Apayao Rd (Tuao-Rizal Sect) - K0535 + 737 - K0535 + 802","amountPesos":20000000,"lengthMeters":65.0,"ratePesosPerMeter":307692.31,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1572 + 500 - K1573 + 023","amountPesos":20000000,"lengthMeters":523.0,"ratePesosPerMeter":38240.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nambaran-Isabela Rd - K0511 + 251 - K0511 + 581","amountPesos":20000000,"lengthMeters":330.0,"ratePesosPerMeter":60606.06,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 10+178 - Sta. 10+861, Bacolod City","amountPesos":20000000,"lengthMeters":683.0,"ratePesosPerMeter":29282.58,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alternate Road from Region X to Region XI (Jct. Diversion Road Catalunan Grande- Talandang-Sumimao-Pañalum-Tapak-Cabanlasan-Aplaya, Malaybalay), Barangay Sumimao Section, Sta. 1512+100.000 - Sta. 1512+650.81, Davao City","amountPesos":20000000,"lengthMeters":550.81,"ratePesosPerMeter":36310.16,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"NRJ Agusan-Malaybalay Road-Barangay Ambacon-Barangay Malicato-NRJ Daang Maharlika, (Sta. 7+630 - Sta. 7+852.29), Agusan del Norte","amountPesos":20000000,"lengthMeters":222.29,"ratePesosPerMeter":89972.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rosario-Marfil-Tagbina Road, (Rosario Section), Barangay Marfil to Ugoban, Sta. 13+923.5 - Sta. 14+214.21, Rosario, Agusan del Sur","amountPesos":20000000,"lengthMeters":290.71,"ratePesosPerMeter":68797.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao-Agusan West Coastal Road, (Sta. 9+825 - Sta. 9+981.47), Barangay Binuangan - Barangay La Fraternidad, Tubay, Agusan del Norte","amountPesos":20000000,"lengthMeters":156.47,"ratePesosPerMeter":127820.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Trento-Lingig Road, Trento, Sta. 9+665 - Sta. 10+481.67, Agusan del Sur","amountPesos":20000000,"lengthMeters":816.67,"ratePesosPerMeter":24489.7,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Camarines Sur Expressway Project - Catanusan Overpass - (Sta. 436 + 690 - Sta. 436 + 710), Camarines Sur","amountPesos":20000000,"lengthMeters":20.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Milaor-Pili Bypass Road - Sta. 433+978 - Sta. 434+062.3, Barangay Cabugao, Milaor, Camarines Sur","amountPesos":20000000,"lengthMeters":84.3,"ratePesosPerMeter":237247.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Naga-Jct. Magarao-Canaman- Libmanan Jct. PPH Road (Skybridge) - Sta. 418+490 - Sta. 418+762, Barangay Umalo Section, Libmanan, Camarines Sur","amountPesos":20000000,"lengthMeters":272.0,"ratePesosPerMeter":73529.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pamplona-San Fernando Bypass Road - Sta. 426+526 - Sta. 426+620.53, Barangay Del Pilar, San Fernando, Camarines Sur","amountPesos":20000000,"lengthMeters":94.53,"ratePesosPerMeter":211573.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Barili - Aloguinsan Coastal Road - Sta. 0 + 000 - Sta. 0 + 620, Cebu","amountPesos":20000000,"lengthMeters":620.0,"ratePesosPerMeter":32258.06,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Barili - Aloguinsan Coastal Road - Sta. 4 + 400 - Sta. 4 + 415, Cebu","amountPesos":20000000,"lengthMeters":15.0,"ratePesosPerMeter":1333333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gingoog Bypass Road, Barangay 26 Section, Sta. 4+278 - Sta. 4+348, Gingoog City, Misamis Oriental","amountPesos":20000000,"lengthMeters":70.0,"ratePesosPerMeter":285714.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City","amountPesos":20000000,"lengthMeters":379.1,"ratePesosPerMeter":52756.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tanudan-Barlig - Ifugao Road (Tanudan-Barlig Section) - Sta. 1+396 - Sta. 1+796","amountPesos":20000000,"lengthMeters":400.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0096 + 000 - K0098 + 000 (Road Safety: Roadway Lighting)","amountPesos":20000000,"lengthMeters":2000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao-Davao Coastal Rd (S01376MN) K1817 + 648 - K1819 + 156 (Road Safety: Roadway Lighting)","amountPesos":20000000,"lengthMeters":1508.0,"ratePesosPerMeter":13262.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Solar Lights along Iligan City Diversion Road, Barangay Ubaldo Laya, K1527 + 950 - K1529 + 243, Iligan City","amountPesos":20000000,"lengthMeters":1293.0,"ratePesosPerMeter":15467.9,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagum - Panabo Circumferential Road K1482+500 - K1484+ 500","amountPesos":20000000,"lengthMeters":2000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rizal National Rd (Romualdez-Santor-Calaocan-Sn Pascual Sect) K0420 + (-370) - K0423 + 233 (Road Safety: Roadway Lighting)","amountPesos":20000000,"lengthMeters":3603.0,"ratePesosPerMeter":5550.93,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Guimba-Pura Road, Chainage 0 - Chainage 8109 Road Safety Facilities (Roadway Lighting)","amountPesos":20000000,"lengthMeters":8109.0,"ratePesosPerMeter":2466.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation of Solar LED (Roadway Lighting) along Ayala - La Paz Rd (S01495MN) Rd Chainage 000 - Chainage 3000","amountPesos":20000000,"lengthMeters":3000.0,"ratePesosPerMeter":6666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Bridge Approach - Piao Br. (Parallel Bridge) - K1854+160 - K1854+299.78, K1854+378.62 - K1854+540","amountPesos":20000000,"lengthMeters":301.16,"ratePesosPerMeter":66409.88,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Malagaw Br. (K0023 + 302 - K0023 + 308) along San Vicente-Savidug-Chavayan- Sumnanga-Nakanmuan Rd","amountPesos":20000000,"lengthMeters":6.0,"ratePesosPerMeter":3333333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road, Barangay Baya to Barangay Balintad, Sta. 0+000 - Sta. 0+800, Ganassi, Lanao del Sur","amountPesos":20000000,"lengthMeters":800.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Linindingan, Sta. 0+000 - Sta. 0+800, Pagayawan, Lanao del Sur","amountPesos":20000000,"lengthMeters":800.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Sitio Codongan to Sitio Camalig, Barangay Pantaon, Sta. 0+000 - Sta. 0+800, Calanogas, Lanao del Sur","amountPesos":20000000,"lengthMeters":800.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage at Espeleta Pantalan (Sta.0+000 - Sta. 0+200), Barangay Poblacion, Muntinlupa City","amountPesos":20000000,"lengthMeters":200.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage at Pulong Eng Eng (Sta. 0+000 - Sta. 0+200), Barangay Poblacion, Muntinlupa City","amountPesos":20000000,"lengthMeters":200.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road and Drainage System at Villa Socorro Street (Chainage 0+000 - Chainage 0+221, Barangay Bahay Toro, Quezon City","amountPesos":20000000,"lengthMeters":221.0,"ratePesosPerMeter":90497.74,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Drainage Structure including Road, Sta. 0+000 - Sta. 0+225, Barangay Poliwes, Baguio City","amountPesos":20000000,"lengthMeters":225.0,"ratePesosPerMeter":88888.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road Including Drainage Structure, Sta. 0+000 - Sta. 0+235, Sta. 0+000 - Sta. 0+070, Barangay Brookside, Baguio City","amountPesos":20000000,"lengthMeters":235.0,"ratePesosPerMeter":85106.38,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Access Road leading to Mt. Chumanchil, Sta. 1+506.5 - Sta. 2+006.5, Kalinga","amountPesos":20000000,"lengthMeters":500.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road at Barangay Centro, Solana, Cagayan (Sta. 0+700 - Sta. 0+856)","amountPesos":20000000,"lengthMeters":156.0,"ratePesosPerMeter":128205.13,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Paved Road, Barangay Cumabao, Tumauini, Isabela (Sta. 0+000 - Sta. 1+700)","amountPesos":20000000,"lengthMeters":1700.0,"ratePesosPerMeter":11764.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Paved Road, Barangay Dy-Abra, Tumauini, Isabela (Sta. 0+000 - Sta. 1+700)","amountPesos":20000000,"lengthMeters":1700.0,"ratePesosPerMeter":11764.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Barangay Fuyo to Barangay Sta. Catalina, City of Ilagan, Isabela (Sta. 0+000 - Sta. 1+900)","amountPesos":20000000,"lengthMeters":1900.0,"ratePesosPerMeter":10526.32,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Purok 1-5 (NIA Road), Barangay Rizaluna, Alicia, Isabela (Sta. 0+000 - STA. 0+867.00)","amountPesos":20000000,"lengthMeters":867.0,"ratePesosPerMeter":23068.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay General Aguinaldo, Ramon, Isabela (0+000.00- 1+843.00)","amountPesos":20000000,"lengthMeters":1843.0,"ratePesosPerMeter":10851.87,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Bacarreña - Mapuroc Road, Barangay Bacarreña and Mapuroc, San Mateo, Isabela (0+000.00-0+687.00)","amountPesos":20000000,"lengthMeters":687.0,"ratePesosPerMeter":29112.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Access road from Bgy. Sto. Domingo to Bgy Dumawig, Jones, Isabela (0+000 -1+500)","amountPesos":20000000,"lengthMeters":1500.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Sinaoangan Norte-Salay Road, Sta. 0+000 - Sta. 1+500, Barangay Sinaongan Norte and Barangay Salay, San Agustin, Isabela","amountPesos":20000000,"lengthMeters":1500.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+480, Barangay San Juan - Barangay Villa Marzo, Cordon, Isabela","amountPesos":20000000,"lengthMeters":1480.0,"ratePesosPerMeter":13513.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road from Landing to Kitang, Barangay Kitang, Limay, Bataan, Sta. 0+000 - Sta. 0+800","amountPesos":20000000,"lengthMeters":800.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage, Sta. 0+075 - Sta. 0+145, Sta. 0+120 - Sta. 0+245, & Sta. 0+120 - Sta. 0+360, St. Peter Compound, Borol 2nd, Balagtas, Bulacan","amountPesos":20000000,"lengthMeters":285.0,"ratePesosPerMeter":70175.44,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road including Drainage Canal, Sta. 0+000 - Sta. 1+003.62, Lopez Jaena St., Baliwag, Bulacan","amountPesos":20000000,"lengthMeters":1003.62,"ratePesosPerMeter":19927.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 0+135, Lolomboy, Bocaue, Bulacan","amountPesos":20000000,"lengthMeters":135.0,"ratePesosPerMeter":148148.15,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 0+513.28, Sitio Kulis, San Jose, Paombong, Bulacan","amountPesos":20000000,"lengthMeters":513.28,"ratePesosPerMeter":38965.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 0+897.91, Sikad Road, Kapitangan, Paombong, Bulacan","amountPesos":20000000,"lengthMeters":897.91,"ratePesosPerMeter":22273.95,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 1+059.26, NIA Road, Pinagbarilan, Baliwag, Bulacan","amountPesos":20000000,"lengthMeters":1059.26,"ratePesosPerMeter":18881.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road California Avenue, Barangay Encanto, Angat, Bulacan, Sta. 00+000 - Sta. 00+735","amountPesos":20000000,"lengthMeters":735.0,"ratePesosPerMeter":27210.88,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage of Requino Street, Sulok, Barangay Saluysoy, Meycauayan Bulacan, Sta. 00+000 - Sta. 00+480 (120.95575556, 14.74309167)","amountPesos":20000000,"lengthMeters":480.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Poblacion II, Marilao, Bulacan Sta. 00+000 - Sta. 00+810 (120.94205, 14.75783)","amountPesos":20000000,"lengthMeters":810.0,"ratePesosPerMeter":24691.36,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Purok 8, Barangay Capihan, San Rafael, Bulacan, Sta. 00+000 - Sta. 00+685","amountPesos":20000000,"lengthMeters":685.0,"ratePesosPerMeter":29197.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay San Andres, Muñoz, Nueva Ecija Sta. 0+000 - Sta. 1+700","amountPesos":20000000,"lengthMeters":1700.0,"ratePesosPerMeter":11764.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage Canal at Barangay Sta Maria, Minalin, Pampanga 0+000 - STA. 0+303","amountPesos":20000000,"lengthMeters":303.0,"ratePesosPerMeter":66006.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of San Rafael Road with Slope Protection works at Barangay San Rafael, Macabebe, Pampanga, 0+000 - STA. 0+410","amountPesos":20000000,"lengthMeters":410.0,"ratePesosPerMeter":48780.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Barangay Road with Lined Canal at Sta. Ursula, Betis, Guagua, Pampanga, Sta.0+000 - Sta.0+930","amountPesos":20000000,"lengthMeters":930.0,"ratePesosPerMeter":21505.38,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Slope Protection Structure along Porac River, Mabical Section, Floridablanca, Pampanga, Sta. 0 + 000 - Sta. 0 + 182.46","amountPesos":20000000,"lengthMeters":182.46,"ratePesosPerMeter":109613.07,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Slope Protection Structure along Porac River, Valdez Section, Floridablanca, Pampanga, Sta. 0 + 000 - Sta. 0 + 182.35","amountPesos":20000000,"lengthMeters":182.35,"ratePesosPerMeter":109679.19,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay San Agustin, Iba, Zambales Sta. 0+000 - Sta. 1+000","amountPesos":20000000,"lengthMeters":1000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road including Drainage, Liwliwa, Barangay Sto. Niño, San Felipe, Zambales Sta. 0+000 - Sta 0+750","amountPesos":20000000,"lengthMeters":750.0,"ratePesosPerMeter":26666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Drainage at Mangan-Vaca Road, Sta. 0 + 000 - Sta. 0 + 880, Barangay Mangan-Vaca, Subic, Zambales","amountPesos":20000000,"lengthMeters":880.0,"ratePesosPerMeter":22727.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage at Higher Agusuhin, Sta. 0 + 000 - Sta. 0 + 910, Barangay Cawag, Subic, Zambales","amountPesos":20000000,"lengthMeters":910.0,"ratePesosPerMeter":21978.02,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Calumpang - Baguio Road, Sta. 0+000 - Sta. 0+050, Sta. 1+270 - Sta. 1+350, Sta. 2+740 - Sta. 2+745, Sta. 2+830 - Sta. 2+900, Sta. 3+150 - Sta. 3+495, Barangay Calumpang to Barangay Baguio, Tayabas City, Quezon","amountPesos":20000000,"lengthMeters":550.0,"ratePesosPerMeter":36363.64,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of A. Mabini - Sta. Maria Road, Sta. 0+083 - Sta. 0+617, Guinayangan, Quezon","amountPesos":20000000,"lengthMeters":534.0,"ratePesosPerMeter":37453.18,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Capuluan Tulon to San Isidro Road, Sta. 0+120 - Sta. 0+652, Guinayangan, Quezon","amountPesos":20000000,"lengthMeters":532.0,"ratePesosPerMeter":37593.98,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Cogorin Ilaya to Binahian B. Barangay Road, Sta. 0+400 - Sta. 1+000, Lopez, Quezon","amountPesos":20000000,"lengthMeters":600.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Bahay Serena, Sta. 0+000 - Sta. 0+310, Gumaca, Quezon","amountPesos":20000000,"lengthMeters":310.0,"ratePesosPerMeter":64516.13,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Sto. Niño-Cagascas-Del Rosario Road, Sta. 0+650 - Sta. 0+750, Sta. 3+250 - Sta. 3+385, Sta. 5+520 -Sta. 5+655, Sta. 4+600 - Sta. 4+735, Tagkawayan, Quezon","amountPesos":20000000,"lengthMeters":505.0,"ratePesosPerMeter":39603.96,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Mat-I - Agojo Access Road, Sta 01+020 - Sta 01+450, Barangay Mat-I, Santa Fe & Barangay Agojo, Looc, Romblon","amountPesos":20000000,"lengthMeters":430.0,"ratePesosPerMeter":46511.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Agol-Barangay Basicao Interior-Barangay Malapay- Barangay Nablangbulod Road including Drainage Facilities, Pio Duran, Albay. STA. 0+600-STA.1+300","amountPesos":20000000,"lengthMeters":700.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Kinamaligan Settlement Road, Masbate City, Masbate, Sta. 0+700 to Sta. 1+350","amountPesos":20000000,"lengthMeters":650.0,"ratePesosPerMeter":30769.23,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Access Road, Sta. 2+680 - Sta. 3+680, in Bgy. Tamayok to Sitio Panacawon, Patnongon Antique","amountPesos":20000000,"lengthMeters":1000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Access road, Sta. 0+000 - Sta. 1+000, From National road to Bgy Igbonglo, San jose, Antique","amountPesos":20000000,"lengthMeters":1000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Baran, Nazaret -Cagay, East Valencia Road,Barangay Nazaret and BarangayEast Valencia, Buenavista,Guimaras, Sta. 0 + 972 - Sta. 1 +102, Sta. 1 + 117 - Sta. 1 + 630,Sta. 1 + 645 - Sta. 2 + 102","amountPesos":20000000,"lengthMeters":1100.0,"ratePesosPerMeter":18181.82,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Pin-as-Malbag-Fundacion Road, Sta. 0 + 500 - Sta. 1 + 600, Barangay Sebaste, Sibunag, Guimaras","amountPesos":20000000,"lengthMeters":1100.0,"ratePesosPerMeter":18181.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Balaan Bukid, Sta. 0 + 959 - Sta. 1 + 259, Barangay Hoskyn, Jordan, Guimaras","amountPesos":20000000,"lengthMeters":300.0,"ratePesosPerMeter":66666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Surudlan-Canhawan-Sta. Maria-Salvacion, Sta. 1 + 400 - Sta. 2 + 500, Barangay Canhawan, Nueva Valencia, Guimaras","amountPesos":20000000,"lengthMeters":1100.0,"ratePesosPerMeter":18181.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0 + 000 - Sta. 1 + 200, Barangay Macatunao - Barangay Tambaliza, Concepcion, Iloilo","amountPesos":20000000,"lengthMeters":1200.0,"ratePesosPerMeter":16666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road at Barangay Riverside, Isabela, Negros Occidental, Sta. 08+648 to Sta. 09+648","amountPesos":20000000,"lengthMeters":1000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Casiawan to Barangay Caanibongan, Cabucgayan, Biliran (Sta. 3+921 - Sta. 4+921)","amountPesos":20000000,"lengthMeters":1000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Paypayon to Barangay San Roque, Oras, Eastern Samar (Sta. 0+000 - Sta. 0+690)","amountPesos":20000000,"lengthMeters":690.0,"ratePesosPerMeter":28985.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sitio Pasak, Barangay Aroganga, Dolores, Eastern Samar (Sta. 0+000 - Sta. 0+478)","amountPesos":20000000,"lengthMeters":478.0,"ratePesosPerMeter":41841.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of JNR bangkal-Sitio Alegria Road, (Sta. 0+775-Sta. 1+774(, Villaba, Leyte","amountPesos":20000000,"lengthMeters":999.0,"ratePesosPerMeter":20020.02,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Calbugos-Sitio Naga-Capiñahan Road, (Sta. 2+135-Sta.2+885), Villaba Leyte","amountPesos":20000000,"lengthMeters":750.0,"ratePesosPerMeter":26666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of JNR Consuegra Consuegra-Tapol Road, (Sta. 1+680- 2+680), Leyte, Leyte","amountPesos":20000000,"lengthMeters":1000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Kawayanan to Barangay Tuburan, Calubian, Leyte (Station 0+000 - 0+600)","amountPesos":20000000,"lengthMeters":600.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Labtic to Barangay Bunacan, San Isidro, Leyte (Station 3+326 - 3+926)","amountPesos":20000000,"lengthMeters":600.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+510, Barangay Sumangga, Ormoc City, Leyte","amountPesos":20000000,"lengthMeters":510.0,"ratePesosPerMeter":39215.69,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road Sta. 0+000 - Sta. 1+150, Barangay Monte Alegre, Isabel, Leyte","amountPesos":20000000,"lengthMeters":1150.0,"ratePesosPerMeter":17391.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Bulao, Las Navas - Barangay Bonifacio, Catubig, (Sta. 0+000 - Sta. 1+049), Northern Samar","amountPesos":20000000,"lengthMeters":1049.0,"ratePesosPerMeter":19065.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Access Road leading to Sports Complex in Catbalogan City, Samar , Sta. 0+000.00 - Sta. 0+230.00","amountPesos":20000000,"lengthMeters":230.0,"ratePesosPerMeter":86956.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Malayal, Sibuco, Zamboanga del Norte, Sta. 2 + 710 - Sta. 3 + 710","amountPesos":20000000,"lengthMeters":1000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Minanga-Danganon, Sirawai, Zamboanga del Norte, Sta. 01+732 - Sta. 02+732","amountPesos":20000000,"lengthMeters":1000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Mabini to Saay, Quipasa Road (Sta. 0+000 - Sta. 2 +000), Barangay Poblacion, Mambajao, Camiguin","amountPesos":20000000,"lengthMeters":2000.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Barangay Estrella - Barangay Katipunan), Sta. 0+000 - Sta. 0+670, Sinacaban, Misamis Occidental","amountPesos":20000000,"lengthMeters":670.0,"ratePesosPerMeter":29850.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Purok 4, Barangay San Isidro Alto, Sta. 0+000 - Sta. 0+670, Sinacaban, Misamis Occidental","amountPesos":20000000,"lengthMeters":670.0,"ratePesosPerMeter":29850.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road Sta. 0 + 000 - Sta. 1 + 000, Sitio Cabalawan, Barangay Garcia, Libjo, Dinagat Islands","amountPesos":20000000,"lengthMeters":1000.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 800, Barangay Malinao, Tubajon, Dinagat Islands","amountPesos":20000000,"lengthMeters":800.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction (Improvement) of Road Sta. 0 + 000 - Sta. 0 + 500, Sitio Maraging to Barangay Gen. Aguinaldo, Libjo, Dinagat Islands","amountPesos":20000000,"lengthMeters":500.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road from Barangay Sani-Sani to Barangay Lakandula to Barangay Lakandula to Barangay Ellaperal, (0+000 - 0+600), Placer, Surigao del Norte","amountPesos":20000000,"lengthMeters":600.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0505 + 979 - K0506 + 922","amountPesos":19975000,"lengthMeters":943.0,"ratePesosPerMeter":21182.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1651 + 663 - K1652 + 813","amountPesos":19962000,"lengthMeters":1150.0,"ratePesosPerMeter":17358.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sibuyan Circumferential Rd - K0019 + 000 - K0019 + 120, K0019 + 380 - K0019 + 592","amountPesos":19920000,"lengthMeters":332.0,"ratePesosPerMeter":60000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palao-Calaba Bypass Road , Sta. 4+600- Sta. 5+330, Bangued, Abra","amountPesos":19910000,"lengthMeters":730.0,"ratePesosPerMeter":27273.97,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pagadian City Airport Rd - K1664 + (-953.30) - K1664 + (-373)","amountPesos":19639000,"lengthMeters":580.3,"ratePesosPerMeter":33842.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0021 + 257 - K0021 + 898","amountPesos":19530000,"lengthMeters":641.0,"ratePesosPerMeter":30468.02,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Apayao (Calanasan)-Ilocos Norte Rd - K0616 + 870 - K0616 + 924.5","amountPesos":19520000,"lengthMeters":54.5,"ratePesosPerMeter":358165.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Lunao, Sta. 0 + 180 - Sta. 1 + 180 , Gingoog City, Misamis Oriental","amountPesos":19500000,"lengthMeters":1000.0,"ratePesosPerMeter":19500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tablas Circumferential Rd - K0044 + 000 - K0044 + 216","amountPesos":19476000,"lengthMeters":216.0,"ratePesosPerMeter":90166.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Ariman to Tabi Road, Gubat, Sorsogon, Sta. 0+000 - 0+800","amountPesos":19460000,"lengthMeters":800.0,"ratePesosPerMeter":24325.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Apayao (Calanasan)-Ilocos Norte Rd - K0611 + 480 - K0611 + 522","amountPesos":19410000,"lengthMeters":42.0,"ratePesosPerMeter":462142.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Ilagan-Gamu Road (Sta. 0+000 - Sta. 0+454, Sta. 1+973 - Sta. 2+415, Sta. 2+905 - Sta. 3+569, Sta. 3+928 - Sta. 4+042, Sta. 4+920 - Sta. 5+178), Barangay Lullutan to Barangay Cabannungan 1st to Barangay Cabannungan 2nd to Barangay Arusip, City of Ilagan, Isabela","amountPesos":19300000,"lengthMeters":1932.0,"ratePesosPerMeter":9989.65,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0087 + 000 - K0087 + 395, K0087 + 480 - K0087 + 928","amountPesos":19280000,"lengthMeters":843.0,"ratePesosPerMeter":22870.7,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tejero-Gen Trias Amadeo-Tagaytay Rd - K0043 + 761 - K0043 + 900, K0043 + 913 - K0043 + 969, K0043 + 979 - K0043 +994, K0044 + 005 - K0044 + 538","amountPesos":19250000,"lengthMeters":743.0,"ratePesosPerMeter":25908.48,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calbayog Diversion Rd - K0727 + 142 - K0727 + 640","amountPesos":19209000,"lengthMeters":498.0,"ratePesosPerMeter":38572.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo-Capiz Rd (Old Route) - K0001 + (-463) - K0001 + 274.31","amountPesos":19170000,"lengthMeters":737.31,"ratePesosPerMeter":25999.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tanza-Trece Martires City-Indang Rd - K0056 + 713 - K0057 + 121, K0057 + 185 - K0057 + 528","amountPesos":19167000,"lengthMeters":751.0,"ratePesosPerMeter":25521.97,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Camiguin Circumferential Rd - K0043 + 003 - K0043 + 967, K0044 + 047 - K0044 + 190","amountPesos":19091000,"lengthMeters":1107.0,"ratePesosPerMeter":17245.71,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maragondon-Magallanes-Amuyong Rd - K0066 + 000 - K0067 + 000","amountPesos":19000000,"lengthMeters":1000.0,"ratePesosPerMeter":19000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maragondon-Magallanes-Amuyong Rd - K0079 + 000 - K0080 + 000","amountPesos":19000000,"lengthMeters":1000.0,"ratePesosPerMeter":19000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road (Sta. 0+000 - Sta. 1+500), Barangay Bungad, San Pablo, Isabela","amountPesos":19000000,"lengthMeters":1500.0,"ratePesosPerMeter":12666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Drainage Structure along Road, Barangay Mintabon, Sta. 0 + 000 - Sta. 0 + 680, Talisayan, Misamis Oriental","amountPesos":19000000,"lengthMeters":680.0,"ratePesosPerMeter":27941.18,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0470 + 526 - K0471 + 000","amountPesos":18920000,"lengthMeters":474.0,"ratePesosPerMeter":39915.61,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0057 + 315 - K0057 + 782","amountPesos":18911000,"lengthMeters":467.0,"ratePesosPerMeter":40494.65,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dipolog-Sindangan-Liloy Rd - K1855 + 408 - K1856 + 216","amountPesos":18910000,"lengthMeters":808.0,"ratePesosPerMeter":23403.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 1+350) at Prk. Wawa Sta. Rosa - Nabalian Minoyan Road, Barangay Sta. Rosa, Murcia, Negros Occidental (10.5623561, 123.1147955)","amountPesos":18900000,"lengthMeters":1350.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Del Carmen-Sta Monica-Sn Isidro Rd - K0028 + 439 - K0029 + 175","amountPesos":18796000,"lengthMeters":736.0,"ratePesosPerMeter":25538.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lipa City - Alaminos Rd - K0085 + 934 - K0086 + 287","amountPesos":18717000,"lengthMeters":353.0,"ratePesosPerMeter":53022.66,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0051 + 640 - K0052 + 000","amountPesos":18700000,"lengthMeters":360.0,"ratePesosPerMeter":51944.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagaytay-Manila via Silang Rd - K0055 + 000 - K0055 + 467","amountPesos":18695000,"lengthMeters":467.0,"ratePesosPerMeter":40032.12,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0365 + 154 - K0365 + 182, K0365 + 284 - K0365 + 317, K0365 + 580 - K0365 + 665, K0366 + (-020) - K0366 + 052, K0369 + 715 - K0369 + 752, K0371 + 111 - K0371 + 137","amountPesos":18546000,"lengthMeters":281.0,"ratePesosPerMeter":66000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calapan South Rd - K0045 + 462 - K0046 + 000","amountPesos":18539000,"lengthMeters":538.0,"ratePesosPerMeter":34459.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Aklan West Rd (Kalibo-Nabas) (S00324PN) - K0241 + 890 - K0242 + 233","amountPesos":18530000,"lengthMeters":343.0,"ratePesosPerMeter":54023.32,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Aklan West Rd (Kalibo-Nabas) (S00324PN) - K0234 + 583 - K0234 + 763, K0235 + 690 - K0235 + 708, K0242 + 363 - K0242 + 382, K0252 + 350 - K0252 + 411, K0253 + 263 - K0253 + 328","amountPesos":18530000,"lengthMeters":343.0,"ratePesosPerMeter":54023.32,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"A Rivera St - K0004 + (-154) - K0004 + 351","amountPesos":18500000,"lengthMeters":505.0,"ratePesosPerMeter":36633.66,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"M Roxas Service Rd - (S02371LZ) Chainage 000 - Chainage 222","amountPesos":18500000,"lengthMeters":222.0,"ratePesosPerMeter":83333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tanauan-Talisay-Tagaytay Rd - K0078 + 344 - K0079 + 339","amountPesos":18434000,"lengthMeters":995.0,"ratePesosPerMeter":18526.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cabutagan-Haluban-Sooc Rd - (S03580LZ) Chainage 004 - Chainage 287","amountPesos":18395000,"lengthMeters":283.0,"ratePesosPerMeter":65000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Buenavista-Kawayan Rd - K0054 + 135 - K0054 + 500","amountPesos":18250000,"lengthMeters":365.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0125 + 448 - K0126 + 274","amountPesos":18244000,"lengthMeters":826.0,"ratePesosPerMeter":22087.17,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Albay West Coast Rd - K0545 + 568 - K0546 + 677","amountPesos":18187000,"lengthMeters":1109.0,"ratePesosPerMeter":16399.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct. Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd - K0023 + 000 - K0024 + 1026 (Road Safety: Roadway Lighting)","amountPesos":18164000,"lengthMeters":2026.0,"ratePesosPerMeter":8965.45,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0105 + 1513 - K0105+1952, K0108 + 588 - K0108 + 1013","amountPesos":18144000,"lengthMeters":864.0,"ratePesosPerMeter":21000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0060 + 428 - K0060 + 790","amountPesos":18100000,"lengthMeters":362.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Noveleta-Naic-Tagaytay Rd - K0046 + 000 - K0046 + 748","amountPesos":18063000,"lengthMeters":748.0,"ratePesosPerMeter":24148.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0311 + 000 - K0312 + 348","amountPesos":18000000,"lengthMeters":1348.0,"ratePesosPerMeter":13353.12,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road (Sta. 0+339 - Sta. 0+778) including Construction of Drainage Structure, Barangay Baculod, City of Ilagan, Isabela","amountPesos":18000000,"lengthMeters":439.0,"ratePesosPerMeter":41002.28,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+350, Barangay Dallao, Cordon, Isabela","amountPesos":18000000,"lengthMeters":1350.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road including Drainage Canal, Sta. 0+000 - Sta. 0+732.37, P. De Guzman St., Baliwag, Bulacan","amountPesos":18000000,"lengthMeters":732.37,"ratePesosPerMeter":24577.74,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 0+895.41, NIA Road, Bagong Nayon, Baliwag, Bulacan","amountPesos":18000000,"lengthMeters":895.41,"ratePesosPerMeter":20102.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage, Barangay Francisco Homes - Yakal, City of San Jose del Monte, Bulacan, Sta. 00+000 - Sta. 00+430","amountPesos":18000000,"lengthMeters":430.0,"ratePesosPerMeter":41860.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction (Completion) of Barangay Villa Hiwasayan Bridge and Approaches, STA. 007+700 - STA. 007+725, Guinayangan, Quezon","amountPesos":18000000,"lengthMeters":25.0,"ratePesosPerMeter":720000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction (Completion) of Bridge and Approaches, Barangay Villa Gomez, STA 008+005 - STA 008+030, Quezon, Quezon","amountPesos":18000000,"lengthMeters":25.0,"ratePesosPerMeter":720000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dalaguete-Mantalongon Badian Rd - K0100 + 612 - K0100 + 900, K0101 + 000 - K0101 + 807","amountPesos":17991000,"lengthMeters":1095.0,"ratePesosPerMeter":16430.14,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0068 + 000 - K0069 + 000","amountPesos":17964000,"lengthMeters":1000.0,"ratePesosPerMeter":17964.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LT) - K0960 + 750 - K0960 + 955, K0962 + 013 - K0962 + 300, K0965 + 130 - K0965 + 600, K0966 + 971 - K0967 + 820, K0974 + 505 - K0974 + 700","amountPesos":17942000,"lengthMeters":2006.0,"ratePesosPerMeter":8944.17,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Columbio - Lutayan - Koronadal Road, Sta. 10 + 085 - Sta. 10 + 135, Lutayan, Sultan Kudarat","amountPesos":17937000,"lengthMeters":50.0,"ratePesosPerMeter":358740.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila-Batangas Rd - K0097 + 788 - K0098 + 000","amountPesos":17917000,"lengthMeters":212.0,"ratePesosPerMeter":84514.15,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0098 + 000 - K0098 + 468, K0099 + 512 - K0099 + 735, K0099 + 1014 - K0099 + 1085","amountPesos":17912000,"lengthMeters":762.0,"ratePesosPerMeter":23506.56,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mindoro West Coastal Rd - K0404 + 822 - K0405 + 390","amountPesos":17870000,"lengthMeters":568.0,"ratePesosPerMeter":31461.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cavite-Batangas Rd - K0049 + 450 - K0050 + 000, K0051 + 661 - K0051 + 726","amountPesos":17855000,"lengthMeters":615.0,"ratePesosPerMeter":29032.52,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0079 + 493 - K0079 + 850","amountPesos":17850000,"lengthMeters":357.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Consolacion-Tayud-Liloan Rd - K0017 + (-653) - K0017 + (-418), K0019 + 614 - K0019 + 668, K0019 + 703 - K0019 + 800, K0019 + 900 - K0020 + 058","amountPesos":17795000,"lengthMeters":544.0,"ratePesosPerMeter":32711.4,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road (Sta. 1+251 - Sta. 2+951), Barangay Dalena to Barangay San Vicente, San Pablo, Isabela","amountPesos":17700000,"lengthMeters":1700.0,"ratePesosPerMeter":10411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road including Slope Protection Structure (Sta. 0+000 - Sta. 0+410), Barangay Rizal to Barangay Ragan Almacen, Delfin Albano, Isabela","amountPesos":17600000,"lengthMeters":410.0,"ratePesosPerMeter":42926.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pototan-Tabugon Rd - K0041+060 - K0041+260, K0042+364.20 - K0042+391.20, K0042+400.40 - K0042+422.90, K0042+423.00 - K0042+441.00","amountPesos":17566000,"lengthMeters":267.5,"ratePesosPerMeter":65667.29,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Makar-Marbel Rd - (S00243MN) Chainage 299 - Chainage 505","amountPesos":17556000,"lengthMeters":206.0,"ratePesosPerMeter":85223.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0118 + 565 - K0119 + 022","amountPesos":17500000,"lengthMeters":457.0,"ratePesosPerMeter":38293.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Sta. 0+000 - Sta. 1+310, Barangay Capirpirwan - Barangay Wigan, Cordon, Isabela","amountPesos":17500000,"lengthMeters":1310.0,"ratePesosPerMeter":13358.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, CARBDP Levee Service Road, Barangay Maon to Barangay Pangabugan (Sta. 0 + 000.00 - Sta. 0 + 760.00), Butuan City, Agusan del Norte","amountPesos":17480000,"lengthMeters":760.0,"ratePesosPerMeter":23000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0417 + 520 - K0417 + 550, K0417 + 570 - K0417 + 620, K0417 + 682 - K0417 + 706, K0418 + 155 - K0418 + 200, K0418 + 992 - K0418 + 1027, K0420 + 536 - K0420 + 562","amountPesos":17463000,"lengthMeters":210.0,"ratePesosPerMeter":83157.14,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0066 + 000 - K0066 + 970","amountPesos":17460000,"lengthMeters":970.0,"ratePesosPerMeter":18000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Paniqui-Camiling-Wawa Rd - K0166 + 000 - K0166 + 425","amountPesos":17442000,"lengthMeters":425.0,"ratePesosPerMeter":41040.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Camuning, Mexico, Pampanga, Sta. 0 + 000 - Sta. 0 + 300","amountPesos":17400000,"lengthMeters":300.0,"ratePesosPerMeter":58000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0189 + 926 - K0190 + 643","amountPesos":17380000,"lengthMeters":717.0,"ratePesosPerMeter":24239.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagudin-Cervantes Rd - K0328 + 000 - K0328 + 500","amountPesos":17300000,"lengthMeters":500.0,"ratePesosPerMeter":34600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cabanatuan City - Carmen Rd, K0135 + 439 - K0135 + 492, K0135 + 941 - K0136 + 000, K0139 + 613 - K0139 + 736, K0140 + 471 - K0141 + 043","amountPesos":17300000,"lengthMeters":807.0,"ratePesosPerMeter":21437.42,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road including Slope Protection (Sta. 0+000 - Sta. 0+385) going to Malasi Lakes, Barangay San Antonio, Cabagan, Isabela","amountPesos":17300000,"lengthMeters":385.0,"ratePesosPerMeter":44935.06,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maragondon-Magallanes-Amuyong Rd - K0073 + 200 - K0073 + 455","amountPesos":17290000,"lengthMeters":255.0,"ratePesosPerMeter":67803.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Bukidnon Rd - K1643 + 504 - K1646 + 000 (Off-Carriageway Improvement: Paving of Shoulders)","amountPesos":17283000,"lengthMeters":2496.0,"ratePesosPerMeter":6924.28,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Suso Road, Barangay Suso Section, Sta. 0+260 - Sta. 1+175, Kapatagan, Lanao del Norte","amountPesos":17250000,"lengthMeters":915.0,"ratePesosPerMeter":18852.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Oton-Buray-Sta Monica-Sn Antonio-Sn Miguel Rd - K0020 + 000 - K0020 + 489","amountPesos":17200000,"lengthMeters":489.0,"ratePesosPerMeter":35173.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1199 + 600 - K1199 + 737","amountPesos":17173000,"lengthMeters":137.0,"ratePesosPerMeter":125350.36,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maragondon-Magallanes-Amuyong Rd - K0088 + 000 - K0088 + 914","amountPesos":17152000,"lengthMeters":914.0,"ratePesosPerMeter":18765.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tanza-Trece Martires City-Indang Rd - K0048 + 000 - K0048 + 470","amountPesos":17119000,"lengthMeters":470.0,"ratePesosPerMeter":36423.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Fernando-Bagulin Rd - K0275 + 372 - K0275 + 410","amountPesos":17100000,"lengthMeters":38.0,"ratePesosPerMeter":450000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Aklan West Rd (Kalibo-Nabas) - K0257 + 368 - K0258 + 006, K0258 + 058 - K0258 + 145","amountPesos":17041000,"lengthMeters":725.0,"ratePesosPerMeter":23504.83,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Olongapo-Bugallon Rd - K0130+000 - K0130+300","amountPesos":17000000,"lengthMeters":300.0,"ratePesosPerMeter":56666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Juan-Sn Gabriel Rd - K0280 + 421 - K0280 + 751 (Road Safety: Roller Barrier)","amountPesos":17000000,"lengthMeters":330.0,"ratePesosPerMeter":51515.15,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Sta. 2+540 - Sta. 4+040), Barangay Dicatian, Divilacan, Isabela","amountPesos":17000000,"lengthMeters":1500.0,"ratePesosPerMeter":11333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+825 - Sta. 2+100, Barangay Quimalabasa Sur - Barangay San Antonio, San Agustin, Isabela","amountPesos":17000000,"lengthMeters":1275.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road of San Carlos, Sta. 0 + 000 - Sta. 1 + 200, Barangay San Carlos, Echague, Isabela","amountPesos":17000000,"lengthMeters":1200.0,"ratePesosPerMeter":14166.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Roman Expressway - K0154 + 000 - K0154 + 557, K0154 + 753 - K0155 + 000","amountPesos":16975000,"lengthMeters":804.0,"ratePesosPerMeter":21113.18,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0346 + 646 - K0346 + 652, K0349 + 835 - K0349 + 891, K0349 + 908 - K0349 + 971, K0352 + 284 - K0352 + 322, K0358 + 110 - K0358 + 137, K0360 + 188 - K0360 + 213, K0360 + 855 - K0360 + 932","amountPesos":16911000,"lengthMeters":292.0,"ratePesosPerMeter":57914.38,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0700 + 1115 - K0700 + 1151.5","amountPesos":16890000,"lengthMeters":36.5,"ratePesosPerMeter":462739.73,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calamba-Sta Cruz-Famy Jct Rd - K0053 + 000 - K0053 + 700, K0053 + 820 - K0055 + 972","amountPesos":16858000,"lengthMeters":2852.0,"ratePesosPerMeter":5910.94,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kiangan-Asipulo-Ambaguio-Bayombong Road - Sta. 32+514 - Sta. 32+551.21, Ifugao","amountPesos":16845000,"lengthMeters":37.21,"ratePesosPerMeter":452700.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Daraga, Placer-Cawayan Rd - (S00035MT) Chainage 15454 - Chainage 16453","amountPesos":16837000,"lengthMeters":999.0,"ratePesosPerMeter":16853.85,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surallah-Lake Sebu-Maitum Rd - K1758 + 000 - K1759 + 000","amountPesos":16803000,"lengthMeters":1000.0,"ratePesosPerMeter":16803.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road (Sta. 3+350 - Sta. 4+449) at Barangay Fugu Sur to Barangay Fugu Norte, Tumauini, Isabela","amountPesos":16750000,"lengthMeters":1099.0,"ratePesosPerMeter":15241.13,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga del Sur Coastal Rd - (S01186MN) Chainage 14708 - Chainage 15300","amountPesos":16576000,"lengthMeters":592.0,"ratePesosPerMeter":28000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"JP Rizal St - K0005 + (-109) - K0005 + 411","amountPesos":16540000,"lengthMeters":520.0,"ratePesosPerMeter":31807.69,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Unisan Diversion Road, Chainage 860 - Chainage 1492, Quezon","amountPesos":16500000,"lengthMeters":632.0,"ratePesosPerMeter":26107.59,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road (Sta. 2+690 - Sta. 4+060) at Barangay Sta. Isabel Sur to Barangay Carikkikan Norte, City of Ilagan, Isabela","amountPesos":16500000,"lengthMeters":1370.0,"ratePesosPerMeter":12043.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Estipona Subdivision Road, Barangay Libertad (Sta. 0 + 000.00 - Sta. 0 + 715.00), Butuan City, Agusan del Norte","amountPesos":16445000,"lengthMeters":715.0,"ratePesosPerMeter":23000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0039 + 885 - K0040 + 064","amountPesos":16273000,"lengthMeters":179.0,"ratePesosPerMeter":90910.61,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Paranaque-Sucat Rd - K0018 + 238 - K0018 + 483","amountPesos":16250000,"lengthMeters":245.0,"ratePesosPerMeter":66326.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Asuncion-San Isidro-Laak-Veruela Rd - K1531 + 163 - K1531 + 213, K1531 + 949 - K1532 + 176, K1540 + 822 - K1540 + 882, K1543 + 930 - K1544 + 000, K1552 + 127 - K1552 + 196","amountPesos":16205000,"lengthMeters":476.0,"ratePesosPerMeter":34044.12,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Marinduque Circumferential Rd - K0017 + 500 - K0017 + 577","amountPesos":16150000,"lengthMeters":77.0,"ratePesosPerMeter":209740.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mahogany Ave - K0059 + 000 - K0059 + 375","amountPesos":16145000,"lengthMeters":375.0,"ratePesosPerMeter":43053.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Paved Road, Barangay Lingaling, Tumauini, Isabela (Sta. 0+000 - Sta. 1+140)","amountPesos":16100000,"lengthMeters":1140.0,"ratePesosPerMeter":14122.81,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Sta. 0+000 - Sta. 1+235, Barangay Dumawing, Jones, Isabela","amountPesos":16100000,"lengthMeters":1235.0,"ratePesosPerMeter":13036.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Liloy-Siocon Rd - K2072 + 000 - K2073 + 000","amountPesos":16050000,"lengthMeters":1000.0,"ratePesosPerMeter":16050.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bais-Kabankalan Rd - K0100 + 201 - K0100 + 666","amountPesos":16043000,"lengthMeters":465.0,"ratePesosPerMeter":34501.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0303 + 111.5 - K0303 + 837","amountPesos":16000000,"lengthMeters":725.5,"ratePesosPerMeter":22053.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dipolog-Oroquieta National Rd - K1837 + 845 - K1838 + 284","amountPesos":16000000,"lengthMeters":439.0,"ratePesosPerMeter":36446.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+200, Barangay Calaocan, San Agustin, Isabela","amountPesos":16000000,"lengthMeters":1200.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Betes, Aliaga, Nueva Ecija, Sta. 0+000 - Sta. 1+424","amountPesos":16000000,"lengthMeters":1424.0,"ratePesosPerMeter":11235.96,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage, Barangay Pulung Cacutud, Angeles City Pampanga, Sta. 0+000 - Sta. 0+300, Sta. 0+000 - Sta. 0+295, Sta. 0+000 - Sta. 0+560, Sta. 0+000 - Sta. 0+392","amountPesos":16000000,"lengthMeters":560.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mayapa-Canlubang Cadre Rd - K0050 + 260 - K0050 + 420, K0050 + 580 - K0050 + 800, K0051 + 000 - K0051 + 205, K0051 + 727 - K0051 + 863","amountPesos":15874000,"lengthMeters":721.0,"ratePesosPerMeter":22016.64,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Arayat-Magalang Rd - K0094 + 220 - K0094 + 459.52","amountPesos":15862000,"lengthMeters":239.52,"ratePesosPerMeter":66224.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road going to Chinese Cemetery, Barangay Bancasi (Sta. 0 + 000.00 - Sta. 0 + 458.00, Sta. 0 + 000.00 - Sta. 0 + 230.00), Butuan City, Agusan del Norte","amountPesos":15824000,"lengthMeters":458.0,"ratePesosPerMeter":34550.22,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Tawad-Balud Rd - K0033 + 252 - K0034 + 060","amountPesos":15821000,"lengthMeters":808.0,"ratePesosPerMeter":19580.45,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Baguio-Bontoc Rd - K0362 + 985 - K0363 + 018, K0364 + 255 - K0364 + 264, K0364 + 657 - K0364 + 705","amountPesos":15800000,"lengthMeters":90.0,"ratePesosPerMeter":175555.56,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0078 + 858 - K0079 + 150","amountPesos":15800000,"lengthMeters":292.0,"ratePesosPerMeter":54109.59,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Albert Morrow Blvd - K1663 + 729 - K1664 + 711.95","amountPesos":15660000,"lengthMeters":982.95,"ratePesosPerMeter":15931.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sto Domingo Poblacion Rd - K0541 + (-074) - K0541 + 777","amountPesos":15622000,"lengthMeters":851.0,"ratePesosPerMeter":18357.23,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lipa City - Alaminos Rd - K0080 + 756 - K0081 + 261","amountPesos":15606000,"lengthMeters":505.0,"ratePesosPerMeter":30902.97,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Juan-Laiya Rd - K0142 + 919 - K0143 + 327, K0151 + 815 - K0152 + 000","amountPesos":15580000,"lengthMeters":593.0,"ratePesosPerMeter":26273.19,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0090 + 158 - K0090 + 836","amountPesos":15506000,"lengthMeters":678.0,"ratePesosPerMeter":22870.21,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Ab-abaan Access Road, Sta. 15+006 - Sta. 16+256 Barangay Ab- abaan, Balbalan, Kalinga","amountPesos":15500000,"lengthMeters":1250.0,"ratePesosPerMeter":12400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+140, Barangay Nabbuan - Barangay Naggasican, Santiago City, Isabela","amountPesos":15500000,"lengthMeters":1140.0,"ratePesosPerMeter":13596.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Barangay San Francisco, Magalang, Pampanga, Sta. 0+000 - Sta. 1+030, Sta. 0+000 - Sta. 0+300","amountPesos":15500000,"lengthMeters":1030.0,"ratePesosPerMeter":15048.54,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Libon-Bacolod-Sn Vicente-Marocmoc-Buga Rd - K0503 + 000 - K0503 + 606, K0503 + 615 - K0504 + 669","amountPesos":15491000,"lengthMeters":1660.0,"ratePesosPerMeter":9331.93,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bayawan-Mabinay Rd - K0131 + 500 - K0133 + 205 (Off-Carriageway Improvement: Paving of Shoulders)","amountPesos":15471000,"lengthMeters":1705.0,"ratePesosPerMeter":9073.9,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Isaac O. Tolentino Ave. - K0057 + (-1060) - K0057 + (-762)","amountPesos":15453000,"lengthMeters":298.0,"ratePesosPerMeter":51855.7,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Fairview Ave - K0024 + 678 - K0025 + 111","amountPesos":15400000,"lengthMeters":433.0,"ratePesosPerMeter":35565.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+155, Barangay Virgoneza, San Agustin, Isabela","amountPesos":15400000,"lengthMeters":1155.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0055 + 755 - K0056 + 239","amountPesos":15389000,"lengthMeters":484.0,"ratePesosPerMeter":31795.45,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod North Rd - K0146+901 - K0147 + 336","amountPesos":15340000,"lengthMeters":435.0,"ratePesosPerMeter":35264.37,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0055 + 170 - K0055 + 578","amountPesos":15313000,"lengthMeters":408.0,"ratePesosPerMeter":37531.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mindoro West Coastal Rd - K0387 + 982 - K0388 + 459","amountPesos":15300000,"lengthMeters":477.0,"ratePesosPerMeter":32075.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0652 + 373 - K0652 + 450","amountPesos":15280000,"lengthMeters":77.0,"ratePesosPerMeter":198441.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mahogany Ave - K0059 + (-300) - K0059 + 000","amountPesos":15259000,"lengthMeters":300.0,"ratePesosPerMeter":50863.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Cotabato-Marbel Rd) - K1713 + 000 - K1713 + 452","amountPesos":15205000,"lengthMeters":452.0,"ratePesosPerMeter":33639.38,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate Circumferential Rd - K0003 + 979 - K0004 + 000, K0004 + 175 - K0004 + 439","amountPesos":15168000,"lengthMeters":285.0,"ratePesosPerMeter":53221.05,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0707 + 557 - K0707 + 952","amountPesos":15070000,"lengthMeters":395.0,"ratePesosPerMeter":38151.9,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sta. Rosa - Tarlac Rd - K0120+296 - K0121+510","amountPesos":15000000,"lengthMeters":1214.0,"ratePesosPerMeter":12355.85,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nueva Ecija - Pangasinan Rd K0168+889 - K0169+596","amountPesos":15000000,"lengthMeters":707.0,"ratePesosPerMeter":21216.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Diversion Rd - K0036+196 - K0037+353","amountPesos":15000000,"lengthMeters":1157.0,"ratePesosPerMeter":12964.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sogod-Tabuelan Rd - K0120 + 950 - K0121 + 460, K0122 + 704 - K0122 + 867","amountPesos":15000000,"lengthMeters":673.0,"ratePesosPerMeter":22288.26,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sogod-Tabuelan Rd - K0123 + 097 - K0123 + 724","amountPesos":15000000,"lengthMeters":627.0,"ratePesosPerMeter":23923.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cebu-Balamban Transcentral Highway - K0011 + 274 - K0011 + 405","amountPesos":15000000,"lengthMeters":131.0,"ratePesosPerMeter":114503.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Biliran Circumferential Rd - K1015 + 889 - K1015 + 995","amountPesos":15000000,"lengthMeters":106.0,"ratePesosPerMeter":141509.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Biliran Circumferential Rd - K1070 + 925 - K1070 + 975","amountPesos":15000000,"lengthMeters":50.0,"ratePesosPerMeter":300000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Biliran Circumferential Rd - K1111 + 735 - K1111 + 785","amountPesos":15000000,"lengthMeters":50.0,"ratePesosPerMeter":300000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa North Rd - K0071 + 114 - K0071 + 141","amountPesos":15000000,"lengthMeters":27.0,"ratePesosPerMeter":555555.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Juan-Sn Gabriel Rd - K0280 + 833 - K0280 + 858","amountPesos":15000000,"lengthMeters":25.0,"ratePesosPerMeter":600000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Talisay-Laurel-Agoncillo Rd K0088 + 892 - K0089+119","amountPesos":15000000,"lengthMeters":227.0,"ratePesosPerMeter":66079.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1 + 594 - Sta. 1+844.04, Baguio City","amountPesos":15000000,"lengthMeters":250.04,"ratePesosPerMeter":59990.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Marcos Hi-way to Kennon Road Diversion Road, Sta. 0 + 600 - Sta. 0 + 717, Baguio City","amountPesos":15000000,"lengthMeters":117.0,"ratePesosPerMeter":128205.13,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Marcos Hi-way to Kennon Road Diversion Road, Sta. 0+600 - Sta. 0+843.75, Baguio City","amountPesos":15000000,"lengthMeters":243.75,"ratePesosPerMeter":61538.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Quezon Hill Road 1 to Magsaysay West Service Bypass Road, Sta. 1+524 - Sta. 1+742, Baguio City","amountPesos":15000000,"lengthMeters":218.0,"ratePesosPerMeter":68807.34,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Licab - Victoria Diversion Road, Nueva Ecija Sta. 4+067.00 - Sta. 4+554.95","amountPesos":15000000,"lengthMeters":487.95,"ratePesosPerMeter":30740.85,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Road (Calanan-Pinukpuk Junction Section), K0519+000 -K0523+000 (Road Safety: Roadway Lighting)","amountPesos":15000000,"lengthMeters":4000.0,"ratePesosPerMeter":3750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd., K1476 + 880 - K1478 + 068 (Road Safety: Roadway Lighting)","amountPesos":15000000,"lengthMeters":1188.0,"ratePesosPerMeter":12626.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Pedestrian Overpass along Masbate-Cataingan-Placer Rd - K0046 + 634 - K0046 + 784","amountPesos":15000000,"lengthMeters":150.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Pedestrian Overpass along Masbate-Cataingan-Placer Rd - K0074 + 446 - K0074 + 641","amountPesos":15000000,"lengthMeters":195.0,"ratePesosPerMeter":76923.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Rancho Road Network, at Starlight St. (Chainage 0+000 - Chainage 0+271), Jersey St. (Chainage 0+000 - Chainage 0+333), Panorama St. (Chainage 0+000 - Chainage 1+160) Barangay Concepcion Dos, Marikina City","amountPesos":15000000,"lengthMeters":1160.0,"ratePesosPerMeter":12931.03,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Tungngod-Boliwong Road, Sta. 2+260 - Sta. 2+690, Lagawe, Ifugao","amountPesos":15000000,"lengthMeters":430.0,"ratePesosPerMeter":34883.72,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Bridge (Sta. 3+000 - Sta. 3+015), Barangay Angancasilian, Cabagan, Isabela","amountPesos":15000000,"lengthMeters":15.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Barangay Annafunan to Barangay Sta. Catalina, Tumauini, Isabela (Sta. 0+985 - Sta. 2+475)","amountPesos":15000000,"lengthMeters":1490.0,"ratePesosPerMeter":10067.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Barangay Bliss to Barangay Baligatan, City of Ilagan, Isabela (Sta. 0+000 - Sta. 1+500)","amountPesos":15000000,"lengthMeters":1500.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Raniag - Sitio Bayabat, Barangay Raniag, Ramon, Isabela (Sta. 0+000 -Sta. 1+033.50)","amountPesos":15000000,"lengthMeters":1033.5,"ratePesosPerMeter":14513.79,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay San Roque, San Mateo, Isabela (Sta. 0+000 - Sta. 0+923.50","amountPesos":15000000,"lengthMeters":923.5,"ratePesosPerMeter":16242.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road including Drainage Dist. Albano, Sta. 0 + 000 - Sta. 0 + 450, Barangay Quezon, San Isidro, Isabela","amountPesos":15000000,"lengthMeters":450.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road including Drainage, Sta. 0+000- Sta. 0+618, Bolacan, Bocaue, Bulacan","amountPesos":15000000,"lengthMeters":618.0,"ratePesosPerMeter":24271.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+432, Batia, Bocaue, Bulacan","amountPesos":15000000,"lengthMeters":432.0,"ratePesosPerMeter":34722.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Cawayang Bugtong, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 1+223","amountPesos":15000000,"lengthMeters":1223.0,"ratePesosPerMeter":12264.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Gen. Luna, Llanera, Nueva Ecija Sta. 0+000 - Sta. 1+500","amountPesos":15000000,"lengthMeters":1500.0,"ratePesosPerMeter":10000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Malbang, Pantabangan, Nueva Ecija Sta. 0+000 - Sta. 1+340","amountPesos":15000000,"lengthMeters":1340.0,"ratePesosPerMeter":11194.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Victoria, Llanera, Nueva Ecija Sta. 0+000 - Sta. 1+790","amountPesos":15000000,"lengthMeters":1790.0,"ratePesosPerMeter":8379.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage Canal at Barangay San Nicolas, Minalin, Pampanga 0+000 - STA. 0+304","amountPesos":15000000,"lengthMeters":304.0,"ratePesosPerMeter":49342.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage Canal at Barangay Sta Rita, Minalin, Pampanga STA. 0+000 - STA. 0+303","amountPesos":15000000,"lengthMeters":303.0,"ratePesosPerMeter":49504.95,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage Canal at Barangay Dela Paz, San Simon, Pampanga STA. 0+000 - STA. 0+305","amountPesos":15000000,"lengthMeters":305.0,"ratePesosPerMeter":49180.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage Canal at Barangay San Isidro, San Simon, Pampanga 0+000 - STA. 0+305","amountPesos":15000000,"lengthMeters":305.0,"ratePesosPerMeter":49180.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Barangay Access Road at Purok 5 and 6, Pabanlag, Floridablanca, Pampanga, Sta. 0+000 - Sta. 1+400","amountPesos":15000000,"lengthMeters":1400.0,"ratePesosPerMeter":10714.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road at VDLR Home Owners at Phase 1, 2 Zone 4, Brgy. Diladila, Sta.Rita, Pampanga, Sec. A: Sta.0+000 - Sta.0+450, Sec. B: Sta.0+000 - Sta.0+250","amountPesos":15000000,"lengthMeters":450.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Barangay Road, Brgy. San Agustin, Lubao, Pampanga, Sta.0+000 - Sta.0+980","amountPesos":15000000,"lengthMeters":980.0,"ratePesosPerMeter":15306.12,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Barangay Road, Brgy. Sta. Cruz, Lubao, Pampanga, Sta.0+000 - Sta.0+426","amountPesos":15000000,"lengthMeters":426.0,"ratePesosPerMeter":35211.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Lined Canal at Purok 1 and Purok 2, Barangay Jalung, Porac, Pampanga, Sec. A: Sta.0+000 - Sta.0+553, Sec. B: Sta.0+000 - Sta.0+481","amountPesos":15000000,"lengthMeters":553.0,"ratePesosPerMeter":27124.77,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Barangay Service Road at Barangay Maliwalo, Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+904.60","amountPesos":15000000,"lengthMeters":904.6,"ratePesosPerMeter":16581.91,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Banaba Lejos, Indang, Cavite, Sta. 0+000 - Sta. 0+210","amountPesos":15000000,"lengthMeters":210.0,"ratePesosPerMeter":71428.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Mahabang Kahoy Lejos, Indang, Cavite, Sta. 0+000 - Sta. 0+210","amountPesos":15000000,"lengthMeters":210.0,"ratePesosPerMeter":71428.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Bridge, Sitio Naswak, Sta. 0 + 000.000 - Sta. 0 + 216.00, Barangay Lisap, Bongabong, Oriental Mindoro","amountPesos":15000000,"lengthMeters":216.0,"ratePesosPerMeter":69444.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Reconstruction of Gainza Main Road, - Sta. 0+000 - Sta. 0+350, Barangay District I to Barangay District II, Gainza, Camarines Sur","amountPesos":15000000,"lengthMeters":350.0,"ratePesosPerMeter":42857.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, NIA Service Road, Barangay Sto. Domingo - Barangay Santiago, Iriga City, Camarines Sur, Sta. 6+223.80 - Sta. 6+741.80","amountPesos":15000000,"lengthMeters":518.0,"ratePesosPerMeter":28957.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Proper -Putat - Sto. Niño - Banaba Road,Barangay Cabano, San Lorenzo,Guimaras, Sta. 0 + 000 - Sta. 0 +800","amountPesos":15000000,"lengthMeters":800.0,"ratePesosPerMeter":18750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Sto. Domingo Road, Sta. 4 + 505 - Sta. 5 + 253, Barangay Sto. Domingo, Nueva Valencia, Guimaras","amountPesos":15000000,"lengthMeters":748.0,"ratePesosPerMeter":20053.48,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Hinabuyan, Villaba, Leyte (Station 0+340 - 0+690)","amountPesos":15000000,"lengthMeters":350.0,"ratePesosPerMeter":42857.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Hangi - Barangay Tagab-iran, (Sta. 0+300 - Sta. 0+615), Las Navas, Northern Samar","amountPesos":15000000,"lengthMeters":315.0,"ratePesosPerMeter":47619.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Perez - Barangay San Miguel, (Sta. 5+160 - Sta. 5+475), Las Navas, Northern Samar","amountPesos":15000000,"lengthMeters":315.0,"ratePesosPerMeter":47619.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Quirino - Barangay Imelda (Sta. 0+500 - Sta. 0+815), Las Navas, Northern Samar","amountPesos":15000000,"lengthMeters":315.0,"ratePesosPerMeter":47619.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Purok 9), Stimson Abordo, Sta. 0+000 - Sta. 0+500, Ozamiz City, Misamis Occidental","amountPesos":15000000,"lengthMeters":500.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Purok 3 to Purok 7), Barangay Trigos, Sta. 0+000 - Sta. 0+500, Ozamiz City, Misamis Occidental","amountPesos":15000000,"lengthMeters":500.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Purok 3), Barangay Sangay Diot, Sta. 0+000 - Sta. 0+500, Ozamiz City, Misamis Occidental","amountPesos":15000000,"lengthMeters":500.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Purok 1), Barangay Sinuza, Sta. 0+000 - Sta. 0+500, Ozamiz City, Misamis Occidental","amountPesos":15000000,"lengthMeters":500.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road, Sta. 0+000 - Sta. 0+525, Purok 17, Barangay Maguinda, Butuan City","amountPesos":15000000,"lengthMeters":525.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road, Sta. 0+000 - Sta. 0+525, Purok 6, Barangay De Oro, Butuan City","amountPesos":15000000,"lengthMeters":525.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction (Improvement) of Road Sta. 0 + 000 - Sta. 0 + 300, Purok 1, Barangay Wadas, Dinagat, Dinagat Islands","amountPesos":15000000,"lengthMeters":300.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Paterno St - (S06050LZ) Chainage 000 - Chainage 274","amountPesos":14856000,"lengthMeters":274.0,"ratePesosPerMeter":54218.98,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gen Luna Rd - K0251 + (-866) - K0251 + 307 (Off-Carriageway Improvement: Construction of Sidewalk)","amountPesos":14826000,"lengthMeters":1173.0,"ratePesosPerMeter":12639.39,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Guimba - Talugtug - Umingan Road K0153+850 - K0155+670","amountPesos":14800000,"lengthMeters":1820.0,"ratePesosPerMeter":8131.87,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga City-Labuan-Limpapa Rd - K1951 + 735 - K1952 + 000, K1964 + 722 - K1964 + 757, K1964 + 971 - K1965 + 021","amountPesos":14756000,"lengthMeters":350.0,"ratePesosPerMeter":42160.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Bukidnon Rd - K1665 + 688 - K1665 + 707","amountPesos":14750000,"lengthMeters":19.0,"ratePesosPerMeter":776315.79,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Regidor St - (S05816LZ) Chainage 000 - Chainage 264","amountPesos":14679000,"lengthMeters":264.0,"ratePesosPerMeter":55602.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 1+046) at Damsite Proper - Prk. Cabarles Road, Barangay Damsite, Murcia, Negros Occidental (10.5479109, 123.0072410)","amountPesos":14644000,"lengthMeters":1046.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0401 + 161 - K0401 + 212, K0401 + 225 - K0401 + 408, K0401 + 429 - K0401 + 469","amountPesos":14607000,"lengthMeters":274.0,"ratePesosPerMeter":53310.22,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sara-Concepcion Rd - K0217 + 391 - K0217 + 800","amountPesos":14593000,"lengthMeters":409.0,"ratePesosPerMeter":35679.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Midsayap-Marbel Rd (S00275MN) - K1781 + 393 - K1782 + 000","amountPesos":14500000,"lengthMeters":607.0,"ratePesosPerMeter":23887.97,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of access road at Bgy Sinaoangan Sur to Bgy. Salay, San Agustin, Isabela, Sta. 0+000 Sta. 1+220","amountPesos":14500000,"lengthMeters":1220.0,"ratePesosPerMeter":11885.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lipa City - Alaminos Rd - K0076 + (-011) - K0076 + 255","amountPesos":14455000,"lengthMeters":266.0,"ratePesosPerMeter":54342.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Eastern Bulacan Rd - K0077 + 294 - K0078 + 027","amountPesos":14446000,"lengthMeters":733.0,"ratePesosPerMeter":19708.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0068 + 856 - K0069 + 081","amountPesos":14400000,"lengthMeters":225.0,"ratePesosPerMeter":64000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Isaac O. Tolentino Ave. - K0057 + 385 - K0057 + 730, K0057 + 975 - K0057 + 1051","amountPesos":14394000,"lengthMeters":421.0,"ratePesosPerMeter":34190.02,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Paracelis-Mallig-Roxas Rd - Chainage 3345 - Chainage 3590","amountPesos":14300000,"lengthMeters":245.0,"ratePesosPerMeter":58367.35,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Talisay-Laurel-Agoncillo Rd - K0085 + 642 - K0086 + 168, K0086 + 736 - K0086 + 811","amountPesos":14258000,"lengthMeters":601.0,"ratePesosPerMeter":23723.79,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0526 + 331 - K0527 + 010","amountPesos":14229000,"lengthMeters":679.0,"ratePesosPerMeter":20955.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao-Davao Coastal Rd - K1495 + 775 - K1496 + 350","amountPesos":14224000,"lengthMeters":575.0,"ratePesosPerMeter":24737.39,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Paved Road, Barangay Bantug, Tumauini, Isabela (Sta. 0+000 - Sta. 1+510)","amountPesos":14160000,"lengthMeters":1510.0,"ratePesosPerMeter":9377.48,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0142 + (-625) - K0142 + (-006)","amountPesos":14157000,"lengthMeters":619.0,"ratePesosPerMeter":22870.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Marikina-Infanta Rd - K0071 + 389 - K0071 + 793","amountPesos":14118000,"lengthMeters":404.0,"ratePesosPerMeter":34945.54,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage, Barangay Sta Lucia, Magalang, Pampanga, Sta. 0+000 - Sta. 0+937, Sta. 0+000 - Sta. 0+371","amountPesos":14100000,"lengthMeters":937.0,"ratePesosPerMeter":15048.03,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1667 + 207 - K1668 + 369 (Off- Carriageway Improvement: Paving of Shoulders)","amountPesos":14076000,"lengthMeters":1162.0,"ratePesosPerMeter":12113.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maragondon-Magallanes-Amuyong Rd - K0090 + 783 - K0091 + 116","amountPesos":14070000,"lengthMeters":333.0,"ratePesosPerMeter":42252.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1708 + 951 - K1709 + 249","amountPesos":14047000,"lengthMeters":298.0,"ratePesosPerMeter":47137.58,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Indang-Alfonso via Luksuhin Rd - K0072 + 1001 - K0073 + 608","amountPesos":14005000,"lengthMeters":607.0,"ratePesosPerMeter":23072.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0127 + 808 - K0128 + 000","amountPesos":14000000,"lengthMeters":192.0,"ratePesosPerMeter":72916.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sindangan-Siayan-Dumingag-Mahayag Rd (Mahayag-Dumingag Sect) - K1672 + 000 - K1672 + 350","amountPesos":14000000,"lengthMeters":350.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt Prov-Cagayan via Tabuk-Enrile Rd - K0394 + 384 - K0394 + 398, K0395 + 941 - K0395 + 954, K0396 + 100 - K0396 + 155, K0396 + 524 - K0396 + 541","amountPesos":14000000,"lengthMeters":99.0,"ratePesosPerMeter":141414.14,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calapan South Rd - K0051 + 445 - K0051 + 595","amountPesos":14000000,"lengthMeters":150.0,"ratePesosPerMeter":93333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Passi-Sn Rafael-Lemery-Sara Rd - K0053 + 460 - K0053 + 611, K0062 + 180 - K0062 + 220, K0062 + 380 - K0062 + 420, K0062 + 740 - K0062 + 780, K0063 + 600 - K0063 + 654, K0063 + 754 - K0063 + 808, K0065 + 480 - K0065 + 520","amountPesos":14000000,"lengthMeters":419.0,"ratePesosPerMeter":33412.89,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1799 + 1182 - K1800 + 166, K1800 + 370 - K1800 + 598","amountPesos":14000000,"lengthMeters":244.0,"ratePesosPerMeter":57377.05,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Claveria Diversion Road, Sta 14 + 500 - Sta. 14 + 960, Cagayan","amountPesos":14000000,"lengthMeters":460.0,"ratePesosPerMeter":30434.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct. Ayaga (Abulug)-Ballesteros-Aparri Rd - K0691 + 000 - K0692 + 000 (Off- Carriageway Improvement: Paving of Shoulders)","amountPesos":14000000,"lengthMeters":1000.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Don A Velez St - K1438 + (-140) - K1439 + 168 (Road Safety: Roadway Lighting)","amountPesos":14000000,"lengthMeters":1308.0,"ratePesosPerMeter":10703.36,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of SMMH Community Road Network, Including Laterals, at Park 23 Alleys (Chainage 0+000 - Chainage 0+235) Barangay Marikina Heights, Marikina City","amountPesos":14000000,"lengthMeters":235.0,"ratePesosPerMeter":59574.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+050, Barangay Minuri, Jones, Isabela","amountPesos":14000000,"lengthMeters":1050.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Chainage 4 + 002.60 - Chainage 5 + 120.60, Sitio Maitom Barangay San Agustin - Barangay San Pedro, Jaro, Leyte","amountPesos":14000000,"lengthMeters":1118.0,"ratePesosPerMeter":12522.36,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Fernando-Bagulin Rd - K0282 + 000 - K0283 + 000","amountPesos":13945000,"lengthMeters":1000.0,"ratePesosPerMeter":13945.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0552 + 334 - K0553 + 000","amountPesos":13934000,"lengthMeters":666.0,"ratePesosPerMeter":20921.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway ( Tucuran Jct-Karomatan Jct Rd) - K1648 + (-258) - K1648 + 246","amountPesos":13900000,"lengthMeters":504.0,"ratePesosPerMeter":27579.37,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0692 + 230 - K0692 + 307","amountPesos":13860000,"lengthMeters":77.0,"ratePesosPerMeter":180000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sto Niño-Banago Rd (North) - K0001 + (-422) - K0001 + (-181), K0001 + (-018) - K0001 + 464","amountPesos":13838000,"lengthMeters":723.0,"ratePesosPerMeter":19139.7,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Session Rd #2 - K0251 + (-127) - K0252 + 047 (Off-Carriageway Improvement: Construction of Sidewalk)","amountPesos":13802000,"lengthMeters":1174.0,"ratePesosPerMeter":11756.39,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage, Barangay San Pablo, Magalang, Pampanga, Sta. 0+000 - Sta. 0+415","amountPesos":13800000,"lengthMeters":415.0,"ratePesosPerMeter":33253.01,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palo-Carigara-Ormoc Rd - K0974 + 000 - K0974 + 543","amountPesos":13798000,"lengthMeters":543.0,"ratePesosPerMeter":25410.68,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calapan South Rd - K0033 + 181 - K0033 + 545","amountPesos":13737000,"lengthMeters":364.0,"ratePesosPerMeter":37739.01,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Noveleta-Naic-Tagaytay Rd - K0065 + 313 - K0065 + 939","amountPesos":13727000,"lengthMeters":626.0,"ratePesosPerMeter":21928.12,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"A Maceda St - K0005 + 304 - K0006 + 000","amountPesos":13700000,"lengthMeters":696.0,"ratePesosPerMeter":19683.91,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0070 + 497 - K0071 + 230","amountPesos":13698000,"lengthMeters":733.0,"ratePesosPerMeter":18687.59,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Luyang-Poo-Lazi Rd - K0010 + 411 - K0010 + 631, K0016 + 814 - K0016 + 852, K0017 + 309 - K0017 + 378","amountPesos":13679000,"lengthMeters":327.0,"ratePesosPerMeter":41831.8,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation/Improvement of Drainage System at Bacayo-Mercy Road, Barangay Tubod, Sta. 0+000 - 0+343, Iligan City","amountPesos":13660000,"lengthMeters":343.0,"ratePesosPerMeter":39825.07,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0607 + 700 - K0608 + 000","amountPesos":13620000,"lengthMeters":300.0,"ratePesosPerMeter":45400.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kisad Rd - K0249 + (-745) - K0249 + 330 (Off-Carriageway Improvement: Construction of Sidewalk)","amountPesos":13587000,"lengthMeters":1075.0,"ratePesosPerMeter":12639.07,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Prosperidad-Quezon-Cabaron Rd - K0067 + 364 - K0067 + 680, K0071 + 659 - K0072 + 000","amountPesos":13574000,"lengthMeters":657.0,"ratePesosPerMeter":20660.58,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Buenavista-Kawayan Rd - K0048 + 230 - K0048 + 500","amountPesos":13500000,"lengthMeters":270.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road (Sta. 0+080 - Sta. 1+005) at Barangay Santa, Tumauini, Isabela","amountPesos":13500000,"lengthMeters":925.0,"ratePesosPerMeter":14594.59,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod North Rd - K0100+125 - K0100 + 404, K0106+027 - K0106 + 330","amountPesos":13386000,"lengthMeters":582.0,"ratePesosPerMeter":23000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Bukidnon Rd - K1655 + 895 - K1658 + 000","amountPesos":13367000,"lengthMeters":2105.0,"ratePesosPerMeter":6350.12,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Albay Diversion Rd - K0444 + 310 - K0444 + 667","amountPesos":13366000,"lengthMeters":357.0,"ratePesosPerMeter":37439.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0074 + 1188 - K0074 + 1387.26","amountPesos":13330000,"lengthMeters":199.26,"ratePesosPerMeter":66897.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maragondon-Magallanes-Amuyong Rd - K0087 + 300 - K0088 + 000","amountPesos":13300000,"lengthMeters":700.0,"ratePesosPerMeter":19000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0608 + 654 - K0608 + 901, K0609 + 064 - K0609 + 095","amountPesos":13261000,"lengthMeters":278.0,"ratePesosPerMeter":47701.44,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Edwin Andrews Airbase Rd - (S01211MN) Chainage 300 - Chainage 837, Chainage 1021 - Chainage 1304","amountPesos":13240000,"lengthMeters":820.0,"ratePesosPerMeter":16146.34,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road including Drainage Structure, Barangay District 4, Tumauini, Isabela (Sta. 0+163 - Sta. 0+483)","amountPesos":13240000,"lengthMeters":320.0,"ratePesosPerMeter":41375.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Liloy-Siocon Rd - K2064 + 000 - K2064 + 400, K2065 + 000 - K2065 + 480","amountPesos":13200000,"lengthMeters":880.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Barangay San Antonio, Magalang, Pampanga, Sta. 0+000 - Sta. 0+910, Sta. 0+000 - Sta. 0+218","amountPesos":13200000,"lengthMeters":910.0,"ratePesosPerMeter":14505.49,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Labanan sa Binakayan Div Rd - K0022 + 868 - K0023 + 256","amountPesos":13151000,"lengthMeters":388.0,"ratePesosPerMeter":33894.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0028+729 - K0029 + 071","amountPesos":13001000,"lengthMeters":342.0,"ratePesosPerMeter":38014.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0268 + 347 - K0268 + 700, K0279 + 522 - K0279 + 612","amountPesos":13000000,"lengthMeters":443.0,"ratePesosPerMeter":29345.37,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Laoag-Airport Rd - K0489 + 316 - K0490 + 574","amountPesos":13000000,"lengthMeters":1258.0,"ratePesosPerMeter":10333.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Olongapo-Bugallon Rd - K0133 + 241 - K0133+476","amountPesos":13000000,"lengthMeters":235.0,"ratePesosPerMeter":55319.15,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lapu-Lapu St - (S00113CB) Chainage 000 - Chainage 261","amountPesos":13000000,"lengthMeters":261.0,"ratePesosPerMeter":49808.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road, Barangay Pantaon, Sta. 0+000 - Sta. 0+500, Madamba, Lanao del Sur","amountPesos":13000000,"lengthMeters":500.0,"ratePesosPerMeter":26000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road and Drainage System at Dona Carmen Street (Chainage 0+000 - Chainage 0+187, Barangay Pag-Ibig sa Nayon, Quezon City","amountPesos":13000000,"lengthMeters":187.0,"ratePesosPerMeter":69518.72,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage, Barangay San Isidro, Magalang, Pampanga, Sta. 0+000 - Sta. 0+420, Sta. 0+000 - Sta. 0+158, Sta. 0+000 - Sta. 0+585","amountPesos":13000000,"lengthMeters":585.0,"ratePesosPerMeter":22222.22,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Basilan Circumferential Rd (Isabela-Lamitan Rd) - K0025 + 1586 - K0027 + 143","amountPesos":12996000,"lengthMeters":557.0,"ratePesosPerMeter":23332.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ormoc-Albuera Div Rd - K1012 + (-515) - K1012 + 195","amountPesos":12946000,"lengthMeters":710.0,"ratePesosPerMeter":18233.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maragondon-Magallanes-Amuyong Rd - K0090 + 108 - K0090 + 783","amountPesos":12825000,"lengthMeters":675.0,"ratePesosPerMeter":19000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road (Sta. 0+000 - Sta. 1+000) including Construction of Slope Protection Structure (Sta. 0+396 - Sta. 0+477) at Barangay Ugad, Tumauini, Isabela","amountPesos":12800000,"lengthMeters":1000.0,"ratePesosPerMeter":12800.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Military Cut-off Rd - K0249 + (-830) - K0249 + 182 (Off-Carriageway Improvement: Construction of Sidewalk)","amountPesos":12791000,"lengthMeters":1012.0,"ratePesosPerMeter":12639.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0624 + 489 - K0625 + 000","amountPesos":12742000,"lengthMeters":511.0,"ratePesosPerMeter":24935.42,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila-Batangas Rd - K0104 + 166 - K0104 + 332","amountPesos":12686000,"lengthMeters":166.0,"ratePesosPerMeter":76421.69,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Isaac O. Tolentino Ave. - K0062 + 146 - K0062 + 850","amountPesos":12672000,"lengthMeters":704.0,"ratePesosPerMeter":18000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Aklan East Rd - K0285 + 605 - K0285 + 714, K0285 + 877 - K0286 + 071","amountPesos":12652000,"lengthMeters":303.0,"ratePesosPerMeter":41755.78,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Noveleta-Naic-Tagaytay Rd - K0049 + 621 - K0050 + 043","amountPesos":12636000,"lengthMeters":422.0,"ratePesosPerMeter":29943.13,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0093+934 - K0094 + 533","amountPesos":12621000,"lengthMeters":599.0,"ratePesosPerMeter":21070.12,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage, Barangay San Roque, Magalang, Pampanga, Sta. 0+000 - Sta. 0+400, Sta. 0+000 - Sta. 0+755","amountPesos":12600000,"lengthMeters":755.0,"ratePesosPerMeter":16688.74,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Fernando-Bagulin Rd - K0274 + 1044 - K0276 + 000","amountPesos":12593000,"lengthMeters":956.0,"ratePesosPerMeter":13172.59,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calamba-Sta Cruz-Famy Jct Rd - K0057 + 939 - K0058 + 400, K0059 + 599 - K0059 + 712","amountPesos":12558000,"lengthMeters":574.0,"ratePesosPerMeter":21878.05,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Batangas-Quezon Rd - K0134 + 683 - K0134 + 854","amountPesos":12514000,"lengthMeters":171.0,"ratePesosPerMeter":73181.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"AH Lacson Ave - K0010 + (-337.40) - K0010 + 077","amountPesos":12500000,"lengthMeters":414.4,"ratePesosPerMeter":30164.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Paved Road (Sta. 0+000 -Sta. 0+647. Sta. 0+668 - Sta. 1+021), Brarangay Carmencita, Delfin Albano, Isabela","amountPesos":12500000,"lengthMeters":1000.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage, Barangay Ayala, Magalang, Pampanga, Sta. 0+000 - Sta. 0+568","amountPesos":12500000,"lengthMeters":568.0,"ratePesosPerMeter":22007.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagaytay-Manila via Silang Rd - K0054 + 600 - K0054 + 876","amountPesos":12492000,"lengthMeters":276.0,"ratePesosPerMeter":45260.87,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tanza-Trece Martires City-Indang Rd - K0040 + 701 - K0041 + 056","amountPesos":12471000,"lengthMeters":355.0,"ratePesosPerMeter":35129.58,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LT) - K0952 + 400 - K0953 + 138, K0955 + 383.15 - K0955 + 550","amountPesos":12431000,"lengthMeters":904.85,"ratePesosPerMeter":13738.19,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0055 + 000 - K0055 + 170, K0055 + 587 - K0055 + 737","amountPesos":12427000,"lengthMeters":320.0,"ratePesosPerMeter":38834.38,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Oracon - Sitio Bankiling- Sitio Casilian Road, Sta. 1 + 800 - Sta. 2 + 420, Barangay Oracon Sur and Barangay Oracon Norte, Sibunag and Nueva Valencia, Guimaras","amountPesos":12400000,"lengthMeters":620.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Indang-Alfonso via Luksuhin Rd - K0065 + 239 - K0065 + 796","amountPesos":12312000,"lengthMeters":557.0,"ratePesosPerMeter":22104.13,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road (Sta. 0+820 - Sta. 2+158), Barangay Alinguigan 2nd to Barangay Alinguigan 1st, City of Ilagan, Isabela","amountPesos":12250000,"lengthMeters":1338.0,"ratePesosPerMeter":9155.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Catarman-Laoang Rd - K0778 + 765 - K0778 + 1000","amountPesos":12224000,"lengthMeters":235.0,"ratePesosPerMeter":52017.02,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road (Section 1: Sta. 0+017 - Sta. 0+592, Section 2: Sta. 0+370 - Sta. 0+820) at Barangay Fugu Abajo, Tumauini, Isabela","amountPesos":12210000,"lengthMeters":803.0,"ratePesosPerMeter":15205.48,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gamu-Roxas Rd - K0391 + 1130 - K0393 + 000","amountPesos":12200000,"lengthMeters":870.0,"ratePesosPerMeter":14022.99,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod-City Bdry Rd - K0005 + 652.12 - K0006 + 000","amountPesos":12160000,"lengthMeters":347.88,"ratePesosPerMeter":34954.58,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mindoro Oriental/Occidental East Coastal Rd - K0218 + 000 - K0218 + 380","amountPesos":12150000,"lengthMeters":380.0,"ratePesosPerMeter":31973.68,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - (S01152MN) Chainage 030 - Chainage 839","amountPesos":12135000,"lengthMeters":809.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Paniqui-Ramos Rd - K0149 + 904 - K0150 + 562","amountPesos":12107000,"lengthMeters":658.0,"ratePesosPerMeter":18399.7,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road (Section 1: Sta. 11+360 - Sta. 11+560, Section 2: Sta. 0+000 - Sta. 0+445) including Construction of Slope Protection Structure (Section 2: Sta. 0+000 - Sta. 0+100, Sta. 0+200 - Sta. 0+445) at Barangay Caligayan, Tumauini, Isabela","amountPesos":12100000,"lengthMeters":645.0,"ratePesosPerMeter":18759.69,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Catarman-Calbayog Rd - K0763 + 106 - K0763 + 503, K0763 + 642 - K0764 + 000, K0764 + 667 - K0765 + 145","amountPesos":12094000,"lengthMeters":1233.0,"ratePesosPerMeter":9808.6,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Solar Lights along Iligan City Diversion Road, Barangay Hinaplanon, K1523 + (-820) - K1523 + 267, Iligan City","amountPesos":12080000,"lengthMeters":1087.0,"ratePesosPerMeter":11113.16,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0519 + 000 - K0519 + 249, K0536 + 120 - K0536 + 190","amountPesos":12074000,"lengthMeters":319.0,"ratePesosPerMeter":37849.53,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Balasan-Carles Rd - K0176 + 683 - K0177 + 067","amountPesos":12034000,"lengthMeters":384.0,"ratePesosPerMeter":31338.54,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zapote-Alabang Rd - K0023 + 408 - K0023 + 538","amountPesos":12030000,"lengthMeters":130.0,"ratePesosPerMeter":92538.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Coron-Busuanga Rd - K0007 + 932 - K0008 + 009, K0008 + 187 - K0008 + 250, K0008 + 427 - K0008 + 548","amountPesos":12006000,"lengthMeters":261.0,"ratePesosPerMeter":46000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0058+293 - K0076+883 (Intermittent)","amountPesos":12000000,"lengthMeters":18590.0,"ratePesosPerMeter":645.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ma. Clara St. (S02454LZ) K0008 + 421 - K0008 + 749","amountPesos":12000000,"lengthMeters":328.0,"ratePesosPerMeter":36585.37,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1015 + 160 - K1015 + 196","amountPesos":12000000,"lengthMeters":36.0,"ratePesosPerMeter":333333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Midsayap-Marbel Rd (S00275MN) - K1788 + 849 - K1789 + 246","amountPesos":12000000,"lengthMeters":397.0,"ratePesosPerMeter":30226.7,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Roads, Barangay Fortune Road Network at Sunnyville 3 Subdivision (Chainage 0+000 - Chainage 0+426), El Rosario Village (Chainage 0+000 - Chainage 0+316), Barangay Fortune, Marikina City","amountPesos":12000000,"lengthMeters":426.0,"ratePesosPerMeter":28169.01,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of San Isidro Village 1 Road Network, Including Laterals, at Cardinal St. (Chainage 0+000 - Chainage 0+054), Galatians St. (Chainage 0+000 - Chainage 0+165), Colossians St. (Chainage 0+000 - Chainage 0+188), Spring St. (Chainage 0+000 - Chainage 0+300), Corinthians St. (Chainage 0+000 - Chainage 0+080), Barangay Concepcion Uno, Marikina City","amountPesos":12000000,"lengthMeters":300.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Sta. 6+175 - Sta. 6+975), Barangay Mozzozzin Sur-Buenavista- Naganacan, Santa Maria, Isabela","amountPesos":12000000,"lengthMeters":800.0,"ratePesosPerMeter":15000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+860, Barangay Bannawag - Barangay San Jose, Santiago City, Isabela","amountPesos":12000000,"lengthMeters":860.0,"ratePesosPerMeter":13953.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+560 - Sta. 1+460, Barangay Diarao - Barangay San Sebastian, Jones, Isabela","amountPesos":12000000,"lengthMeters":900.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Aliaga IS, Barangay Santiago, Aliaga Nueva Ecija (KATUBIGAN- Kalsada Tungo sa Patubigan), Sta. 0+000 - Sta. 1+068","amountPesos":12000000,"lengthMeters":1068.0,"ratePesosPerMeter":11235.96,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Road with Drainage Canal at Purok 1 to 6, Brgy. Rizal, Guagua, Pampanga, Sta.0+000 - Sta.0+850","amountPesos":12000000,"lengthMeters":850.0,"ratePesosPerMeter":14117.65,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Road with Drainage Canal at Purok 1 to 6, Brgy. Rizal, Guagua, Pampanga, Sta.0+000 - Sta.0+850","amountPesos":12000000,"lengthMeters":850.0,"ratePesosPerMeter":14117.65,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of San Jose - San Antonio - Bonifacio Road (Sta. 0+370 - Sta. 0+850) Catubig, Northern Samar","amountPesos":12000000,"lengthMeters":480.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 0+414, Purok 3, Barangay Payahan, Calbayog City, Samar","amountPesos":12000000,"lengthMeters":414.0,"ratePesosPerMeter":28985.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road, Sta. 0+000 - Sta. 0+420, Purok 1A, Barangay Ampayon, Butuan City","amountPesos":12000000,"lengthMeters":420.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Argao-Moalboal Rd - K0064 + 404 - K0064 + 995","amountPesos":11999000,"lengthMeters":591.0,"ratePesosPerMeter":20302.88,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banga-Tupi-Malungon Road (Banga-Tupi Section) - Sta. 17+285 - Sta. 17+316.5, South Cotabato","amountPesos":11970000,"lengthMeters":31.5,"ratePesosPerMeter":380000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Albay Diversion Rd - K0446 + 621 - K0446 + 807, K0448 + 926.50 - K0449 + 323","amountPesos":11968000,"lengthMeters":582.5,"ratePesosPerMeter":20545.92,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Romblon-Cogon-Sablayan Rd - K0014 + 701 - K0014 + 775, K0015 + 000 - K0015 + 125","amountPesos":11940000,"lengthMeters":199.0,"ratePesosPerMeter":60000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0085 + 500 - K0086 + 000","amountPesos":11870000,"lengthMeters":500.0,"ratePesosPerMeter":23740.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nasugbu-Lian-Calatagan Rd - K0112 + 361 - K0112 + 910","amountPesos":11866000,"lengthMeters":549.0,"ratePesosPerMeter":21613.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Indang-Alfonso via Luksuhin Rd - K0072 + 349 - K0072 + 885","amountPesos":11866000,"lengthMeters":536.0,"ratePesosPerMeter":22138.06,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Naguilian-Sn Mariano Rd - K0384 + (-155) - K0384 + 611","amountPesos":11800000,"lengthMeters":766.0,"ratePesosPerMeter":15404.7,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0528 + 656 - K0528 + 664, K0530 + 627 - K0530 + 654, K0533 + 222 - K0533 + 241, K0533 + 508 - K0533 + 525","amountPesos":11800000,"lengthMeters":71.0,"ratePesosPerMeter":166197.18,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage Barangay San Ildefonso, Magalang, Pampanga, Sta. 0+000 - Sta. 0+592, Sta. 0+000 - Sta. 0+220","amountPesos":11800000,"lengthMeters":592.0,"ratePesosPerMeter":19932.43,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage, Barangay Capaya, Angeles City Pampanga, Sta. 0 + 000 - Sta. 1 + 038, Sta. 0 + 000 - Sta. 0 + 105","amountPesos":11800000,"lengthMeters":1038.0,"ratePesosPerMeter":11368.02,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage, Barangay Duquit, Mabalacat City, Pampanga, Sta. 0+000 - Sta. 0+138, Sta. 0+000 - Sta. 0+120, Sta. 0+000 - Sta. 0+260, Sta. 0+000 - Sta. 0+234, Sta. 0+000 - Sta. 0+285","amountPesos":11800000,"lengthMeters":285.0,"ratePesosPerMeter":41403.51,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage, Barangay La Paz, Magalang, Pampanga, Sta. 0+000 - Sta. 0+608","amountPesos":11800000,"lengthMeters":608.0,"ratePesosPerMeter":19407.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage, Barangay Paralayunan, Mabalacat City, Pampanga, Sta. 0+000.00 - Sta. 0+457.00","amountPesos":11800000,"lengthMeters":457.0,"ratePesosPerMeter":25820.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage, Barangay San Jose, Magalang, Pampanga, Street 1 Sta. 0+000- Sta. 0+400, Street 2 Sta. 0+000- Sta. 0+305","amountPesos":11800000,"lengthMeters":400.0,"ratePesosPerMeter":29500.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage, Barangay San Vicente, Magalang, Pampanga, Sta. 0+000 - Sta. 0+618","amountPesos":11800000,"lengthMeters":618.0,"ratePesosPerMeter":19093.85,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage, Barangay Sapangbato, Angeles City Pampanga, Sta. 0+000 - Sta. 1+111","amountPesos":11800000,"lengthMeters":1111.0,"ratePesosPerMeter":10621.06,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage, Barangay Sto. Cristo, Angeles City Pampanga, Sta. 0+000 - Sta. 0+191, Sta. 0+000 - Sta. 0+130, Sta. 0+000 - Sta. 0+285","amountPesos":11800000,"lengthMeters":285.0,"ratePesosPerMeter":41403.51,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage, Barangay Sto. Rosario, Mabalacat City, Pampanga, Sta. 0+000.00 - Sta. 0+482.00","amountPesos":11800000,"lengthMeters":482.0,"ratePesosPerMeter":24481.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Barangay Navaling, Magalang, Pampanga, Sta. 0+000 - Sta.0+890.00","amountPesos":11800000,"lengthMeters":890.0,"ratePesosPerMeter":13258.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Barangay Sapangbalen, Mabalacat City, Pampanga, Sta. 0+000.00 - Sta. 1+010.00","amountPesos":11800000,"lengthMeters":1010.0,"ratePesosPerMeter":11683.17,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0227 + 569 - K0227 + 849","amountPesos":11760000,"lengthMeters":280.0,"ratePesosPerMeter":42000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0035 + 233 - K0035 + 687, K0036 + 467 - K0036 + 542","amountPesos":11759000,"lengthMeters":529.0,"ratePesosPerMeter":22228.73,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Irosin-Sn Roque-Bulusan Lake Rd - K0624 + (-492) - K0624 + 197","amountPesos":11636000,"lengthMeters":689.0,"ratePesosPerMeter":16888.24,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road (Sta. 0+040 - Sta. 1+140) at Barangay San Mateo, Tumauini, Isabela","amountPesos":11600000,"lengthMeters":1100.0,"ratePesosPerMeter":10545.45,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - (S01632MN) Chainage 000 - Chainage 110, Chainage 140 - Chainage 270, Chainage 300 - Chainage 436","amountPesos":11595000,"lengthMeters":376.0,"ratePesosPerMeter":30837.77,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Midsayap-Makar Rd - K1695 + 260 - K1695 + 440","amountPesos":11550000,"lengthMeters":180.0,"ratePesosPerMeter":64166.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0318+131 - K0318+600","amountPesos":11538000,"lengthMeters":469.0,"ratePesosPerMeter":24601.28,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 0+824) at Barangay E. Lopez, Silay City, Negros Occidental (10.8190271, 123.0395456)","amountPesos":11536000,"lengthMeters":824.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nueva Ecija - Pangasinan Rd K0149 + 444 - K0150 + 000","amountPesos":11500000,"lengthMeters":556.0,"ratePesosPerMeter":20683.45,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Bukidnon Rd - K1658 + 762 - K1658 + 782","amountPesos":11500000,"lengthMeters":20.0,"ratePesosPerMeter":575000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+860, Barangay San Juan, Cordon, Isabela","amountPesos":11500000,"lengthMeters":860.0,"ratePesosPerMeter":13372.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Dahilig, Sta. 0 + 000 - Sta. 0 + 400, Balingoan, Misamis Oriental","amountPesos":11500000,"lengthMeters":400.0,"ratePesosPerMeter":28750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Apayao (Calanasan)-Ilocos Norte Rd - (S00644LZ) Chainage 2488 - Chainage 2523","amountPesos":11430000,"lengthMeters":35.0,"ratePesosPerMeter":326571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Camiling - Wawa - Bayambang - Malasiqui - Sta. Barbara Rd, K0201+(-200) - K0201+050","amountPesos":11400000,"lengthMeters":250.0,"ratePesosPerMeter":45600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0120 + 517 - K0121 + 000","amountPesos":11367000,"lengthMeters":483.0,"ratePesosPerMeter":23534.16,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palo-Carigara-Ormoc Rd - K0957 + (-118) - K0957 + 000","amountPesos":11364000,"lengthMeters":118.0,"ratePesosPerMeter":96305.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kiangan-Tinoc-Buguias Rd - K0354 + 740 - K0354 + 776, K0355 + 309 - K0355 + 360","amountPesos":11295000,"lengthMeters":87.0,"ratePesosPerMeter":129827.59,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Carmen Jct - Bayambang - Manat Road, K0207+008 - K0207+612","amountPesos":11275000,"lengthMeters":604.0,"ratePesosPerMeter":18667.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0087 + 276 - K0087 + 512, K0090 + 898 - K0090 + 915, K0093 + 755 - K0093 + 761","amountPesos":11224000,"lengthMeters":259.0,"ratePesosPerMeter":43335.91,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0389 + 780 - K0389 + 810, K0398 + 620 - K0398 + 820","amountPesos":11200000,"lengthMeters":230.0,"ratePesosPerMeter":48695.65,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Hernan Cortes St - (S00367CB) Chainage 1602 - Chainage 2342","amountPesos":11105000,"lengthMeters":740.0,"ratePesosPerMeter":15006.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pasong Tamo - K0006 + 244 - K0006 + 561","amountPesos":11100000,"lengthMeters":317.0,"ratePesosPerMeter":35015.77,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bais-Kabankalan Rd - K0098+464 - K0098 + 805","amountPesos":11050000,"lengthMeters":341.0,"ratePesosPerMeter":32404.69,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bais-Kabankalan Rd - K0096 + 000 - K0096 + 350","amountPesos":11020000,"lengthMeters":350.0,"ratePesosPerMeter":31485.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dancalan-Candoni-Damutan Valley Rd - K0099 + (-247) - K0099 + (-190)","amountPesos":11000000,"lengthMeters":57.0,"ratePesosPerMeter":192982.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Juan-Sn Gabriel Rd - K0281 + 300 - K0281 + 510 (Road Safety: Roller Barrier)","amountPesos":11000000,"lengthMeters":210.0,"ratePesosPerMeter":52380.95,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road including Drainage Structure, Bado Dangwa Road at Cresencia Village Barangay, Baguio City (Sta. 0+000 - Sta. 0+395)","amountPesos":11000000,"lengthMeters":395.0,"ratePesosPerMeter":27848.1,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Bridge (Sta. 1+000 - Sta. 1+012) at Sitio Callueng, Barangay Barumbong, Santo Tomas, Isabela","amountPesos":11000000,"lengthMeters":12.0,"ratePesosPerMeter":916666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+825, Barangay Quimalabasa Sur - Barangay San Antonio, San Agustin, Isabela","amountPesos":11000000,"lengthMeters":825.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+675 - Sta. 1+500, Barangay Papan Este, Jones, Isabela","amountPesos":11000000,"lengthMeters":825.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Sto. Tomas Feria, Quezon, Nueva Ecija, Sta. 0+000 - Sta. 0+977","amountPesos":11000000,"lengthMeters":977.0,"ratePesosPerMeter":11258.96,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Sta. Lucia Young, Zaragoza, Nueva Ecija, Sta. 0+000 - Sta. 0+977","amountPesos":11000000,"lengthMeters":977.0,"ratePesosPerMeter":11258.96,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road with Lined Canal along Santiago, Tolentino, Palad, Lejarde and Serrano Street, Pandaguirig, Floridablanca, Pampanga, Sta.0+000 - Sta.0+460","amountPesos":11000000,"lengthMeters":460.0,"ratePesosPerMeter":23913.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Lined Canal at Gasak 1 and 2, Brgy. Valdez, Floridablanca, Pampanga, Sta.0+000 - Sta.1+600","amountPesos":11000000,"lengthMeters":1600.0,"ratePesosPerMeter":6875.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Barangay Service Road at Barangay Tariji, Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+490.6.00","amountPesos":11000000,"lengthMeters":490.6,"ratePesosPerMeter":22421.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Surudlan-Canhawan-Sta. Maria-Salvacion, Sta. 2 + 500 - Sta. 2 + 900, Sta. 3 + 020 - Sta. 3 + 100, Sta. 3 + 150 - Sta.3 + 200, Barangay Canhawan, Nueva Valencia, Guimaras","amountPesos":11000000,"lengthMeters":530.0,"ratePesosPerMeter":20754.72,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road Barangay Ramain, Sta. 0+000 - Sta. 0 + 500, Sultan Naga Dimaporo, Lanao del Norte","amountPesos":11000000,"lengthMeters":500.0,"ratePesosPerMeter":22000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road at Sumile Zoological and Botanical Park, Barangay Sumile, Butuan City Sta. 7+611.5 - Sta. 8+022.564","amountPesos":11000000,"lengthMeters":411.064,"ratePesosPerMeter":26759.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alicia-San Mateo Rd - K0362 + 472 - K0363 + 211","amountPesos":10999000,"lengthMeters":739.0,"ratePesosPerMeter":14883.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Mabuhay, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+975","amountPesos":10978000,"lengthMeters":975.0,"ratePesosPerMeter":11259.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Balayan-Balibago Rd - K0110 + 491.70 - K0111 + 000","amountPesos":10943000,"lengthMeters":508.3,"ratePesosPerMeter":21528.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Roman Expressway - K0103 + 095 - K0103 + 311","amountPesos":10922000,"lengthMeters":216.0,"ratePesosPerMeter":50564.81,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mayan-Mauyen Port Rd - K0001 + 806 - K0002 + 026 (Off-Carriageway Improvement: Paving of Shoulders)","amountPesos":10912000,"lengthMeters":220.0,"ratePesosPerMeter":49600.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo-Capiz Rd (New Route) - K0098 + 803 - K0098 + 1004","amountPesos":10892000,"lengthMeters":201.0,"ratePesosPerMeter":54189.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1430 + 433 - K1431 + 207, K1431 + 285 - K1431 + 365, K1431 + 366 - K1432 + 000 (Road Safety: Roadway Lighting)","amountPesos":10891000,"lengthMeters":1488.0,"ratePesosPerMeter":7319.22,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tanza-Trece Martires City-Indang Rd - K0055 + 000 - K0055 + 467","amountPesos":10842000,"lengthMeters":467.0,"ratePesosPerMeter":23216.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0035 + (-768) - K0035 + (-617), K0035 + 687 - K0035 + 792","amountPesos":10839000,"lengthMeters":256.0,"ratePesosPerMeter":42339.84,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Camiling - Wawa - Bayambang - Malasiqui - Sta. barbara Road, K0196+000 - K0196+577","amountPesos":10800000,"lengthMeters":577.0,"ratePesosPerMeter":18717.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0291+331 - K0291+631","amountPesos":10800000,"lengthMeters":300.0,"ratePesosPerMeter":36000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo-Capiz (New Route) - K0051 + 950 - K0052 + 395","amountPesos":10800000,"lengthMeters":445.0,"ratePesosPerMeter":24269.66,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ayaga-Sta. Marcela-Flora-Lasam Rd - K0699 + 146 - K0699 + 251","amountPesos":10800000,"lengthMeters":105.0,"ratePesosPerMeter":102857.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+800, Barangay Minuri, Jones, Isabela","amountPesos":10800000,"lengthMeters":800.0,"ratePesosPerMeter":13500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lipa City - Alaminos Rd - K0077 + (-548) - K0077 + 000","amountPesos":10764000,"lengthMeters":548.0,"ratePesosPerMeter":19642.34,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nabua-Bato-Libon (Tandaay-Buluang, Bato) Rd - K0490 + 717 - K0491 + 239","amountPesos":10726000,"lengthMeters":522.0,"ratePesosPerMeter":20547.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 0+678, Sta. 0+905 - Sta. 0+993), Sitio Tison to Sitio Buncio, Barangay XI, Victorias City, Negros Occidental (10.8160070, 123.1479170)","amountPesos":10724000,"lengthMeters":766.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage Barangay San Nicolas II, Magalang, Pampanga, Sta. 0+000 - Sta. 0+400 Sta. 0+000 - Sta. 0+294","amountPesos":10700000,"lengthMeters":400.0,"ratePesosPerMeter":26750.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0288 + 306 - K0288 + 803","amountPesos":10691000,"lengthMeters":497.0,"ratePesosPerMeter":21511.07,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"AS Fortuna St - K0008 + 966 - K0009 + 419","amountPesos":10674000,"lengthMeters":453.0,"ratePesosPerMeter":23562.91,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Bukidnon Rd - K1642 + 862 - K1642 + 882","amountPesos":10640000,"lengthMeters":20.0,"ratePesosPerMeter":532000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nueva Ecija-Aurora Rd - K0118 + 000 - K0118 + 516","amountPesos":10625000,"lengthMeters":516.0,"ratePesosPerMeter":20591.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LT) - K0945 + 910 - K0946 + 000, K0953 + 450 - K0953 + 552","amountPesos":10612000,"lengthMeters":192.0,"ratePesosPerMeter":55270.83,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Pangabugan to Barangay San Vicente (Sta. 0 + 000.00 - Sta. 0 + 460.00), Butuan City, Agusan del Norte","amountPesos":10580000,"lengthMeters":460.0,"ratePesosPerMeter":23000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0508 + 655 - K0508 + 760.50, K0508 + 769 - K0508 + 828, K0517 + 039 - K0517 + 092, K0517 + 577 - K0517 + 641","amountPesos":10578000,"lengthMeters":281.5,"ratePesosPerMeter":37577.26,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod North Rd - K0004 + 000 - K0004 + 267","amountPesos":10573000,"lengthMeters":267.0,"ratePesosPerMeter":39599.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Roman Expressway - K0113 + 700 - K0114 + 048","amountPesos":10566000,"lengthMeters":348.0,"ratePesosPerMeter":30362.07,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0628 + 672 - K0629 + 163","amountPesos":10563000,"lengthMeters":491.0,"ratePesosPerMeter":21513.24,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road (Sta. 0+000 - Sta. 0+870) at Sitio Tubo, Barangay San Ignacio, City of Ilagan, Isabela","amountPesos":10500000,"lengthMeters":870.0,"ratePesosPerMeter":12068.97,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Sta. 0+000 - Sta. 0+785, Barangay Sto. Domingo, Jones, Isabela","amountPesos":10500000,"lengthMeters":785.0,"ratePesosPerMeter":13375.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage Barangay Turu, Magalang, Pampanga, Sta. 0+000 - Sta. 0+150, Sta. 0+000 - Sta. 0+290","amountPesos":10500000,"lengthMeters":290.0,"ratePesosPerMeter":36206.9,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacoor-Dasmariñas National Rd - K0031 + 000 - K0031 + 125","amountPesos":10470000,"lengthMeters":125.0,"ratePesosPerMeter":83760.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod Circumferential Rd - K0003 + (-222) - K0004 + 046","amountPesos":10469000,"lengthMeters":1268.0,"ratePesosPerMeter":8256.31,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0054 + 903 - K0055 + 110","amountPesos":10450000,"lengthMeters":207.0,"ratePesosPerMeter":50483.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Digos-Makar Rd) - K1652 + 750 - K1652 + 950","amountPesos":10440000,"lengthMeters":200.0,"ratePesosPerMeter":52200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tiaong Bypass Rd - K0094 + (-320) - K0094 + (-274), K0094 + 360 - K0094 + 432, K0094 + 463 - K0094 + 484, K0094 + 821 - K0094 + 931","amountPesos":10381000,"lengthMeters":249.0,"ratePesosPerMeter":41690.76,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nueva Vizcaya-Ifugao-Mt Province Rd - K0336 + 695 - K0336 + 772, K0338 + (-010) - K0338 + 045, K0340 + 1073 - K0340 + 1111","amountPesos":10373000,"lengthMeters":170.0,"ratePesosPerMeter":61017.65,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Flores St (Region 4-A) - (S06049LZ) Chainage 000 - Chainage 189","amountPesos":10350000,"lengthMeters":189.0,"ratePesosPerMeter":54761.9,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Luyang-Poo-Lazi Rd - K0020 + 850 - K0021 + 669 (Off-Carriageway Improvement: Paving of Shoulders)","amountPesos":10350000,"lengthMeters":819.0,"ratePesosPerMeter":12637.36,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Noveleta-Rosario Div Rd - K0029 + 533 - K0030 + 012, K0030 + 083 - K0030 + 491","amountPesos":10333000,"lengthMeters":887.0,"ratePesosPerMeter":11649.38,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Del Carmen-Sta Monica-Sn Isidro Rd - K0032 + 702 - K0033 + 100","amountPesos":10302000,"lengthMeters":398.0,"ratePesosPerMeter":25884.42,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Road - K0552 + 000 - K0553 + 000","amountPesos":10200000,"lengthMeters":1000.0,"ratePesosPerMeter":10200.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Barangay Camias, Magalang, Pampanga, Sta. 0+000 - Sta. 0+677 Sta. 0+000 - Sta. 0+360","amountPesos":10195000,"lengthMeters":677.0,"ratePesosPerMeter":15059.08,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Prosperidad-Quezon-Cabaron Rd - K0078 + 224 - K0078 + 540, K0078 + 666 - K0078 + 812","amountPesos":10164000,"lengthMeters":462.0,"ratePesosPerMeter":22000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1432 + 000 - K1432 + 892, K1432 + 969.10 - K1433 + 000 (Road Safety: Roadway Lighting)","amountPesos":10160000,"lengthMeters":922.9,"ratePesosPerMeter":11008.78,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1425 + 000 - K1425 + 276, K1425 + 425 - K1426 + 000 (Road Safety: Roadway Lighting)","amountPesos":10159000,"lengthMeters":851.0,"ratePesosPerMeter":11937.72,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Roadway lighting, Badiangon (Sta. 0+000 - Sta. 0+180), Barangay Ampayon, Butuan City","amountPesos":10074000,"lengthMeters":180.0,"ratePesosPerMeter":55966.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Carmona Div Rd - K0047 + (-720) - K0047 + (-628)","amountPesos":10047000,"lengthMeters":92.0,"ratePesosPerMeter":109206.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Catarman-Laoang Rd - K0782 + 946 - K0783 + 135","amountPesos":10039000,"lengthMeters":189.0,"ratePesosPerMeter":53116.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway ( Tucuran Jct-Karomatan Jct Rd) - (S01637MN) Chainage 000 - Chainage 504","amountPesos":10000000,"lengthMeters":504.0,"ratePesosPerMeter":19841.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1669 + 000 - K1669 + 349","amountPesos":10000000,"lengthMeters":349.0,"ratePesosPerMeter":28653.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Talisay-Laurel-Agoncillo Rd - K0114 + 100 - K0114 + 168","amountPesos":10000000,"lengthMeters":68.0,"ratePesosPerMeter":147058.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palompon-Isabel-Merida-Ormoc Rd - K1113 + 838 - K1114 + 000","amountPesos":10000000,"lengthMeters":162.0,"ratePesosPerMeter":61728.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Asuncion-San Isidro-Laak-Veruela Rd - K1523 + 510 - K1523 + 530","amountPesos":10000000,"lengthMeters":20.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Claveria-Calanasan-Kabugao Rd - K0667 + 014 - K0667 + 286","amountPesos":10000000,"lengthMeters":272.0,"ratePesosPerMeter":36764.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nabunturan-Mainit Park Rd - K1440 + 800 - K1440 + 830","amountPesos":10000000,"lengthMeters":30.0,"ratePesosPerMeter":333333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Sta. 10+216 - Sta. 10+220.67 Barangay Bagocboc, Opol, Misamis Oriental","amountPesos":10000000,"lengthMeters":4.67,"ratePesosPerMeter":2141327.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Opol Diversion Road (Opol-Canito-an), Barangay Igpit-Barangay Taboc, Sta. 2+500 - Sta. 2+900, Opol, Misamis Oriental","amountPesos":10000000,"lengthMeters":400.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto - Claveria Bypass Road,Barangay Natumolan Section, Sta. 5+400 - Sta. 5+645, Tagoloan, Misamis Oriental","amountPesos":10000000,"lengthMeters":245.0,"ratePesosPerMeter":40816.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Minalwang Br. 3, Sta. 0+230 - Sta. 0+310, Barangay Minalwang, Claveria, Misamis Oriental","amountPesos":10000000,"lengthMeters":80.0,"ratePesosPerMeter":125000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0024 + 000 - K0024 + 700 (Road Safety: Roadway Lighting)","amountPesos":10000000,"lengthMeters":700.0,"ratePesosPerMeter":14285.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd., K1455 + 417 - K1456 + 243 (Road Safety: Road Lighting)","amountPesos":10000000,"lengthMeters":826.0,"ratePesosPerMeter":12106.54,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd., K1454+984 - K1455+386, (Road Safety: Roadway Lighting)","amountPesos":10000000,"lengthMeters":402.0,"ratePesosPerMeter":24875.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao-Davao Coastal Rd (S01376MN) K1816 + 849 – K1817 + 280 (Road Safety: Roadway Lighting)","amountPesos":10000000,"lengthMeters":431.0,"ratePesosPerMeter":23201.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pangasinan-Nueva Ecija Rd - K0176 + 337 - K0179 + 785 (Installation of Solar Street Lights)","amountPesos":10000000,"lengthMeters":3448.0,"ratePesosPerMeter":2900.23,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao - Davao Coastal Rd. (S00313MN) K1298 + 396 - K1302 + 696 (Road Safety: Roadway Lighting)","amountPesos":10000000,"lengthMeters":4300.0,"ratePesosPerMeter":2325.58,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Muñoz-Lupao Rd - K0162 + 833 - K0163 + 000, K0164 + 000 - K0164 + 377","amountPesos":10000000,"lengthMeters":544.0,"ratePesosPerMeter":18382.35,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mountain Province-Cervantes, Ilocos Sur via Dacudac-Pilipil Rd - Chainage 21539 - Chainage 21759","amountPesos":10000000,"lengthMeters":220.0,"ratePesosPerMeter":45454.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lanao del Norte Interior Circum. Rd (LDNICR) - K1562 + 474 - K1562 + 794","amountPesos":10000000,"lengthMeters":320.0,"ratePesosPerMeter":31250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Barangay Concepcion Uno Road Network at Padre Burgos St. San Isidro Village 1 (Chainage 0+000 - Chainage 0+303), Padre Zamora St. San Isidro Village 1 (Chainage 0+000 - Chainage 0+130), Sampaguita St. San Isidro Village 2 (Chainage 0+000 - Chainage 0+116), Jasmin St. San Isidro Village 2 (Chainage 0+000 - Chainage 0+323) Camia St. San Isidro Village 2 (Chainage 0+000 - Chainage 0+068), Rosal St. San Isidro Village 2 (Chainage 0+000 - Chainage 0+039), Santan St. San Isidro Village 2 (Chainage 0+000 - Chainage 0+072), Barangay Concepcion Uno, Marikina City","amountPesos":10000000,"lengthMeters":323.0,"ratePesosPerMeter":30959.75,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road Network Including Laterals at La Colina, Orchids St. (Chainage 0+000 - Chainage 0+194), Dama de Noche St. (Chainage 0+000 - Chainage 0+620), Carnation St. (Chainage 0+000 - Chainage 0+570), Magnolia St. (Chainage 0+000 - Chainage 0+180), Barangay Fortune, Marikina City","amountPesos":10000000,"lengthMeters":620.0,"ratePesosPerMeter":16129.03,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of East Humilde Road, Barangay San Roque, Alaminos City, Pangasinan, Sta 0+000 - Sta 0+600","amountPesos":10000000,"lengthMeters":600.0,"ratePesosPerMeter":16666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Olo Cacamposan - Barangay Pampano, Sta 0+000 - Sta 0+843 , Mangatarem, Pangasinan","amountPesos":10000000,"lengthMeters":843.0,"ratePesosPerMeter":11862.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Alacan - Barangay Mabilao, Sta 0+000 - Sta 0+843 , San Fabian, Pangasinan,","amountPesos":10000000,"lengthMeters":843.0,"ratePesosPerMeter":11862.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0 + 000 - Sta. 0 + 818, Barangay Carosucan Norte, Asingan, Pangasinan","amountPesos":10000000,"lengthMeters":818.0,"ratePesosPerMeter":12224.94,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Colony Road, Sta. 0+000 - Sta. 0+350, Barangay Libertad, Abulug, Cagayan","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road including, Barangay Osmeña, City of Ilagan, Isabela (Sta. 0+000 - Sta. 0+316)","amountPesos":10000000,"lengthMeters":316.0,"ratePesosPerMeter":31645.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"� Construction of Concrete Road (Section 1: Sta. 0+000 - Sta. 0+292, Section 2: Sta. 0+114 - Sta. 0+497, Section 3: Sta. 0+000 - Sta. 0+132) at Barangay Paliueg, City of Ilagan, Isabela","amountPesos":10000000,"lengthMeters":497.0,"ratePesosPerMeter":20120.72,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Pagrang-ayan, Ramon, Isabela (Sta. 0+000 - Sta. 0+537)","amountPesos":10000000,"lengthMeters":537.0,"ratePesosPerMeter":18621.97,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Victoria, San Mateo, Isabela (Sta. 0+000 - Sta. 0+633.00)","amountPesos":10000000,"lengthMeters":633.0,"ratePesosPerMeter":15797.79,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Gaddanan - Pinoma Road, Barangay Gaddanan, San Mateo, Isabela (Sta. 0+000 - Sta. 0+564.00)","amountPesos":10000000,"lengthMeters":564.0,"ratePesosPerMeter":17730.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Paddad - Linglingay Road, Barangay Paddad, Alicia, Isabela (Sta. 0+000 - Sta. 0+736.50)","amountPesos":10000000,"lengthMeters":736.5,"ratePesosPerMeter":13577.73,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Planas, Ramon, Isabela (0+000.00 - 0+249.00)","amountPesos":10000000,"lengthMeters":249.0,"ratePesosPerMeter":40160.64,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Concrete Road, Barangay Bella Luz, San Mateo, Isabela Sta. (0+000 - 0+325.00)","amountPesos":10000000,"lengthMeters":325.0,"ratePesosPerMeter":30769.23,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - 0+750, Barangay Sinaoangan Norte, San Agustin, Isabela","amountPesos":10000000,"lengthMeters":750.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+750, Barangay Dicamay 2, Jones, Isabela","amountPesos":10000000,"lengthMeters":750.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0 + 000 - Sta. 0 + 750, Barangay Sinabbaran, Echague, Isabela","amountPesos":10000000,"lengthMeters":750.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0 + 000 - Sta. 0 + 800, Barangay Busilelao, Echague, Isabela","amountPesos":10000000,"lengthMeters":800.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0 + 000 - Sta. 0 + 800, Barangay Pangal Norte, Echague, Isabela","amountPesos":10000000,"lengthMeters":800.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Sta. 0+000 - Sta. 0+216.03, Sta. 0+000 - Sta. 0+060.80, & Sta. 0+000 - Sta. 0+102.17, including Drainage Canal, Pinagkaisahan, Sta. Barbara, Baliwag, Bulacan","amountPesos":10000000,"lengthMeters":216.03,"ratePesosPerMeter":46289.87,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage, Sta. 0+000- Sta. 0+495, Divine Grace Village II, Pulong Gubat, Balagtas, Bulacan","amountPesos":10000000,"lengthMeters":495.0,"ratePesosPerMeter":20202.02,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+435, Palapat, Hagonoy, Bulacan","amountPesos":10000000,"lengthMeters":435.0,"ratePesosPerMeter":22988.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 1+238, Tambubong, Bocaue, Bulacan","amountPesos":10000000,"lengthMeters":1238.0,"ratePesosPerMeter":8077.54,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+763 - Sta. 2+013, Abulalas, Hagonoy, Bulacan","amountPesos":10000000,"lengthMeters":1250.0,"ratePesosPerMeter":8000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 1+727 - Sta. 1+877, Iba Este, Calumpit, Bulacan","amountPesos":10000000,"lengthMeters":150.0,"ratePesosPerMeter":66666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 1+994 - Sta. 2+294, Balite, Calumpit, Bulacan","amountPesos":10000000,"lengthMeters":300.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road Including Drainage Canal, Sta. 0+000 - Sta. 1+880, Bulihan, Plaridel, Bulacan","amountPesos":10000000,"lengthMeters":1880.0,"ratePesosPerMeter":5319.15,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road with Drainage, Sta. 0+000 - Sta. 0+200, Ronlyn Subd., Panginay, Balagtas, Bulacan","amountPesos":10000000,"lengthMeters":200.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 0+142.60, San Vicente, Paombong, Bulacan","amountPesos":10000000,"lengthMeters":142.6,"ratePesosPerMeter":70126.23,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 1+092, Iba-Ibayo, Hagonoy, Bulacan","amountPesos":10000000,"lengthMeters":1092.0,"ratePesosPerMeter":9157.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Sta. 2+627 - Sta. 2+927, Iba O' Este, Calumpit, Bulacan","amountPesos":10000000,"lengthMeters":300.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road at Barangay Bulac (Sitio Linawan), Sta. Maria, Bulacan, Sta. 00+000 - Sta. 00+400","amountPesos":10000000,"lengthMeters":400.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage, Barangay Longos, City of Meycauayan, Sta. 00+000 - Sta. 00+240 (120.94953889, 14.73491667)","amountPesos":10000000,"lengthMeters":240.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage, Kingsville, Barangay Lawa, Obando, Sta. 00+000 - Sta. 00+240 (120.936036, 14.72594)","amountPesos":10000000,"lengthMeters":240.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage, Liliesville, Barangay Lawa, City of Meycauayan, Sta. 00+000 - Sta. 00+240 (120.97563611, 14.73606944)","amountPesos":10000000,"lengthMeters":240.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage, Sitio Mapayapa, Barangay Sta. Cruz, Sta. Maria, Bulacan, Sta. 00+000 - Sta. 00+240","amountPesos":10000000,"lengthMeters":240.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Road at Pire, Barangay Sta. Lucia, Angat, Bulacan (Sta. 00+000 - Sta. 00+205)","amountPesos":10000000,"lengthMeters":205.0,"ratePesosPerMeter":48780.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Road with Drainage Canal, Barangay Banga, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+240 (120.96135556, 14.72910278)","amountPesos":10000000,"lengthMeters":240.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Road with Drainage Canal, Barangay Camalig, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+240 (120.99552778, 14.77342222)","amountPesos":10000000,"lengthMeters":240.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Road with Drainage Canal, Barangay Poblacion, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+240 (120.95767222, 14.73638889)","amountPesos":10000000,"lengthMeters":240.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Road with Drainage Canal, Barangay Zamora, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+240 (120.95456944, 14.73543889)","amountPesos":10000000,"lengthMeters":240.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Road with Drainage Canal, Mark St., Sto Nino, Barangay Perez, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+240 (120.99446944, 14.76070278)","amountPesos":10000000,"lengthMeters":240.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Road with Drainage Canal, San Diego St., Barangay Bancal, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+240 (120.95906944, 14.72302500)","amountPesos":10000000,"lengthMeters":240.0,"ratePesosPerMeter":41666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Bagong Barrio, San Ildefonso, Bulacan, Sta. 00+000 - 00+400","amountPesos":10000000,"lengthMeters":400.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Bubulong Malaki, San Ildefonso, Bulacan, Sta. 00+000 - 00+400","amountPesos":10000000,"lengthMeters":400.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Bulusukan, San Ildefonso, Bulacan Sta. 00+000 - 00+400","amountPesos":10000000,"lengthMeters":400.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Calawitan, San Ildefonso, Bulacan, Sta. 00+000 - 00+200","amountPesos":10000000,"lengthMeters":200.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Nabaong Garlang, San Ildefonso, Bulacan Sta. 00+000 - 00+400","amountPesos":10000000,"lengthMeters":400.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Pacalag, San Miguel. Bulacan Sta. 00+000 - 00+400","amountPesos":10000000,"lengthMeters":400.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Pinambaran, San Miguel, Bulacan Sta. 00+000 - 00+400","amountPesos":10000000,"lengthMeters":400.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Pinaod, San Ildefonso, Bulacan, Sta. 00+000 - 00+400","amountPesos":10000000,"lengthMeters":400.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Pulong Bayabas, San Miguel, Bulacan Sta. 00+000 - 00+400","amountPesos":10000000,"lengthMeters":400.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Pulong Duhat, San Miguel, Bulacan Sta. 00+000 - 00+230","amountPesos":10000000,"lengthMeters":230.0,"ratePesosPerMeter":43478.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay San Juan, San Ildefonso, Bulacan, Sta. 00+000 - 00+300","amountPesos":10000000,"lengthMeters":300.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Sapang Dayap, San Ildefonso, Bulacan Sta. 00+000 - 00+400","amountPesos":10000000,"lengthMeters":400.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Sapang Pahalang, San Rafael, Bulacan Sta. 00+000 - 00+400","amountPesos":10000000,"lengthMeters":400.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Sapang Putik, San Ildefonso, Bulacan, Sta. 00+000 - 00+420","amountPesos":10000000,"lengthMeters":420.0,"ratePesosPerMeter":23809.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Sta. Rita Matanda, San Miguel, Bulacan Sta. 00+000 - 00+400","amountPesos":10000000,"lengthMeters":400.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Tibagan, San Miguel, Bulacan Sta. 00+000 - 00+400","amountPesos":10000000,"lengthMeters":400.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Umpucan, San Ildefonso, Bulacan Sta. 00+000 - 00+400","amountPesos":10000000,"lengthMeters":400.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay San Antonio, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+798","amountPesos":10000000,"lengthMeters":798.0,"ratePesosPerMeter":12531.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Curva, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+798","amountPesos":10000000,"lengthMeters":798.0,"ratePesosPerMeter":12531.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay H. Romero, Zaragoza, Nueva Ecija, Sta. 0+000 - Sta. 0+798","amountPesos":10000000,"lengthMeters":798.0,"ratePesosPerMeter":12531.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Lamorito, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+798","amountPesos":10000000,"lengthMeters":798.0,"ratePesosPerMeter":12531.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Tutuloy, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+798","amountPesos":10000000,"lengthMeters":798.0,"ratePesosPerMeter":12531.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Balingog East, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+798","amountPesos":10000000,"lengthMeters":798.0,"ratePesosPerMeter":12531.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Doña Lucia, Quezon, Nueva Ecija, Sta. 0+000 - Sta. 0+798","amountPesos":10000000,"lengthMeters":798.0,"ratePesosPerMeter":12531.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Bicos to Barangay Maligaya, Rizal, Nueva Ecija Sta. 0+000 - Sta. 0+780","amountPesos":10000000,"lengthMeters":780.0,"ratePesosPerMeter":12820.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Gen. Luna, Rizal, Nueva Ecija Sta. 0+000 - Sta. 0+900","amountPesos":10000000,"lengthMeters":900.0,"ratePesosPerMeter":11111.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Macatcatuit, Guimba, Nueva Ecija Sta. 0+000 - Sta. 0+993","amountPesos":10000000,"lengthMeters":993.0,"ratePesosPerMeter":10070.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Portal, Rizal, Nueva Ecija Sta. 0+000 - Sta. 0+883","amountPesos":10000000,"lengthMeters":883.0,"ratePesosPerMeter":11325.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay San Antonio Este, Lupao, Nueva Ecija Sta. 0+000 - Sta. 0+883","amountPesos":10000000,"lengthMeters":883.0,"ratePesosPerMeter":11325.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay San Antonio Weste, Sitio Caraelan, Lupao, Nueva Ecija Sta. 0+000 - Sta. 0+883","amountPesos":10000000,"lengthMeters":883.0,"ratePesosPerMeter":11325.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay San Vicente, Llanera, Nueva Ecija Sta. 0+000 - Sta. 0+883","amountPesos":10000000,"lengthMeters":883.0,"ratePesosPerMeter":11325.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Sta. Monica, Rizal, Nueva Ecija Sta. 0+000 - Sta. 0+883","amountPesos":10000000,"lengthMeters":883.0,"ratePesosPerMeter":11325.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Sto Domingo, Lupao, Nueva Ecija Sta. 0+000 - Sta. 0+883","amountPesos":10000000,"lengthMeters":883.0,"ratePesosPerMeter":11325.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Brgy. Natividad to Brgy. San Jose, Guagua, Pampanga, Sta.0+000 - Sta.0+900","amountPesos":10000000,"lengthMeters":900.0,"ratePesosPerMeter":11111.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road at Sanchez St., Brgy. Valdez, Floridablanca, Pampanga, Sta.0+000 - Sta.0+550","amountPesos":10000000,"lengthMeters":550.0,"ratePesosPerMeter":18181.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Purok 1 Local Road Brgy. San Jose, Floridablanca, Pampanga, Sta.0+000 - Sta.0+245","amountPesos":10000000,"lengthMeters":245.0,"ratePesosPerMeter":40816.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road at Purok 8 Brgy. San Jose, Floridablanca, Pampanga, Sta.0+000 - Sta.0+620","amountPesos":10000000,"lengthMeters":620.0,"ratePesosPerMeter":16129.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road in Purok 1 & 6 Brgy. Natividad, Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+340, Sec. B: Sta.0+000 - Sta.0+200, Sec. C: Sta.0+000 - Sta.0+160, Sec. D: Sta.0+000 - Sta.0+170, Sec. E: Sta.0+000 - Sta.0+030","amountPesos":10000000,"lengthMeters":340.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road including Drainage Canal, Brgy. San Nicolas 1st, Sasmuan, Pampanga, Sta.0+000 - Sta.0+345","amountPesos":10000000,"lengthMeters":345.0,"ratePesosPerMeter":28985.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road including Drainage Canal, Brgy. Malusac, Sasmuan, Pampanga, Sta.0+000 - Sta.0+420","amountPesos":10000000,"lengthMeters":420.0,"ratePesosPerMeter":23809.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Lined Canal, Brgy. San Nicolas 2nd, Sasmuan, Pampanga, Sta.0+000 - Sta.0+310","amountPesos":10000000,"lengthMeters":310.0,"ratePesosPerMeter":32258.06,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Lined Canal, Brgy. San Nicolas 1st, Sasmuan, Pampanga, Sta.0+000 - Sta.0+290","amountPesos":10000000,"lengthMeters":290.0,"ratePesosPerMeter":34482.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Lined Canal, Brgy. Sta. Lucia, Sasmuan, Pampanga, Sta.0+000 - Sta.0+200","amountPesos":10000000,"lengthMeters":200.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage Canal, Brgy. San Antonio, Sasmuan, Pampanga, Sta.0+000 - Sta.0+217","amountPesos":10000000,"lengthMeters":217.0,"ratePesosPerMeter":46082.95,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Line Canal in Purok 2, Brgy. Paguiruan, Floridablanca, Pampanga, Sta.0+000 - Sta.0+593","amountPesos":10000000,"lengthMeters":593.0,"ratePesosPerMeter":16863.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Canal at Zone 4 to Zone 6, Brgy. San Basilio, Sta.Rita, Pampanga, Sta.0+000 - Sta.0+430","amountPesos":10000000,"lengthMeters":430.0,"ratePesosPerMeter":23255.81,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Canal with Cover at Zone 1 to Zone 3, Brgy. Diladila, Sta.Rita, Pampanga, Sta.0+000 - Sta.1+200","amountPesos":10000000,"lengthMeters":1200.0,"ratePesosPerMeter":8333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Road with Line Canal, Brgy. Baruya, Lubao, Pampanga, Sta.0+000 - Sta.0+220","amountPesos":10000000,"lengthMeters":220.0,"ratePesosPerMeter":45454.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Barangay Road, Brgy. Sta. Catalina, Lubao, Pampanga, Sta.0+000 - Sta.0+409","amountPesos":10000000,"lengthMeters":409.0,"ratePesosPerMeter":24449.88,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Barangay Road with Lined Canal, Brgy. Sta. Niño, Lubao, Pampanga, Sta.0+000 - Sta.0+650","amountPesos":10000000,"lengthMeters":650.0,"ratePesosPerMeter":15384.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Road with Lined Canal at Zone 1, Brgy. Diladila, Sta.Rita, Pampanga, Sec A: Sta.0+000 - Sta.0+485, Sec B: Sta.0+000 - Sta.0+115","amountPesos":10000000,"lengthMeters":485.0,"ratePesosPerMeter":20618.56,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Barangay Road, Brgy. Pulungmasle,Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+090, Sec. B: Sta.0+000 - Sta.0+110, Sec. C: Sta.0+000 - Sta.0+380, Sec. D: Sta.0+000 - Sta.0+270, Sec. E: Sta.0+000 - Sta.0+050","amountPesos":10000000,"lengthMeters":380.0,"ratePesosPerMeter":26315.79,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Barangay Service Road at Barangay Capehan, Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+477.30","amountPesos":10000000,"lengthMeters":477.3,"ratePesosPerMeter":20951.18,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage Canal at Barangay Villa Bacolor, Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+500.00","amountPesos":10000000,"lengthMeters":500.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation/Improvement of Barangay Road at Purok 7, Barangay Sta. Maria, Tarlac City, Tarlac, Sta. 0+000 - Sta. 0+700.00","amountPesos":10000000,"lengthMeters":700.0,"ratePesosPerMeter":14285.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Jct National Road to Sitio Imbudo, Barangay Jamorawon, Milagros Masbate, Sta. 2+003 to Sta. 2+233","amountPesos":10000000,"lengthMeters":230.0,"ratePesosPerMeter":43478.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+355, Barangay Del Rosario, Bacon District, Sorsogon City, Sorsogon","amountPesos":10000000,"lengthMeters":355.0,"ratePesosPerMeter":28169.01,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Access road, Sta. 0+680 - Sta. 1+180, in Bgy Binanoan,Barbaza Antique","amountPesos":10000000,"lengthMeters":500.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Maabay to Dasal Road, Sta. 0 + 000 - Sta. 0 + 605, Barangay Maabay and Barangay Dasal, Sibunag, Guimaras","amountPesos":10000000,"lengthMeters":605.0,"ratePesosPerMeter":16528.93,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sitio Tibwason - Paho, Sta. 0 + 800 - Sta. 1 + 350, Barangay Ayangan, Sibunag, Guimaras","amountPesos":10000000,"lengthMeters":550.0,"ratePesosPerMeter":18181.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sitio Ansay, Barangay Union, Caibiran, Biliran (Sta. 2 + 142 - Sta. 2 + 492)","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Pili, Almeria Biliran (Sta. 1 + 463 - Sta. 1 + 563, Sta. 1 + 516 - Sta. 1 + 616, Sta. 2 + 179 - Sta. 2 + 359, Sta. 2 + 235 - Sta. 2 + 315)","amountPesos":10000000,"lengthMeters":333.0,"ratePesosPerMeter":30030.03,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Bato to Sitio Bantilan, Biliran, Biliran (Sta. 0+000 - Sta. 0+500)","amountPesos":10000000,"lengthMeters":500.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Haguikhikan, Naval, Biliran (Sta. 1+796 - Sta. 2+296)","amountPesos":10000000,"lengthMeters":500.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Kawayanon, Caibiran, Biliran (Sta. 0+198 - Sta. 0+698)","amountPesos":10000000,"lengthMeters":500.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road, Sta. 2+500 - Sta. 3+100, Sitio Macalpe, Barangay Cangag, Isabel, Leyte","amountPesos":10000000,"lengthMeters":600.0,"ratePesosPerMeter":16666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Tabok, Sta. 0+000 - 0+765, Hindang, Leyte","amountPesos":10000000,"lengthMeters":765.0,"ratePesosPerMeter":13071.9,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Roads - Junction Highway (Sitio Kalangkaan) - Osmeña - Sampaguita - San Jose - San Francisco Road, Sta. 002+720 - Sta. 003+000, Lope de Vega, Northern Samar","amountPesos":10000000,"lengthMeters":280.0,"ratePesosPerMeter":35714.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Slope Protection Structure, Sta. 0+000 - Sta. 0+051.73, Barangay Burabod II, Gandara, Samar","amountPesos":10000000,"lengthMeters":51.73,"ratePesosPerMeter":193311.42,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road at Sitio Panadtaran, Barangay Gumagamot, Sta. 0+000 - Sta. 0+500, Lala, Lanao del Norte","amountPesos":10000000,"lengthMeters":500.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Nailon - Barangay Dela Paz, Sta. 0+000 - Sta. 0+350, Tudela, Misamis Occidental","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Purok 1 to Purok 4), Barangay Bolinsong, Sta. 0+000 - Sta. 0+350, Bonifacio, Misamis Occidental","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Purok 3 to Purok 4), Barangay Lower Usugan, Sta. 0+000 - Sta. 0+350, Bonifacio, Misamis Occidental","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Purok 7), Barangay Lower Usugan, Sta. 0+000 - Sta. 0+350, Bonifacio, Misamis Occidental","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Purok 5), Barangay Demetrio Fernan, Sta. 0+000 - Sta. 0+350, Bonifacio, Misamis Occidental","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Purok 6 to Adorable Road), Barangay San Vicente, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Purok 5 - Purok 6), Barangay Camanse, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Purok 3 Barangay Colupan Alto, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Purok 2 Casoy, Barangay Libertad Bajo, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Purok 1 - Purok 7), Barangay Dinas, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Purok Gumamela), Barangay Señor, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Purok San Jose), Barangay Poblacion, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Purok 6 - Purok 3), Barangay Tipan, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Purok 3), Cogon, Sta. 0+000 - Sta. 0+350 Ozamiz City, Misamis Occidental","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Purok 2), Gotocan Daku, Sta. 0+000 - Sta. 0+350, Ozamiz City, Misamis Occidental","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Purok 8), Stimson Abordo, Sta. 0+000 - Sta. 0+350, Ozamiz City, Misamis Occidental","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Capucao C - Gotocan Diot Purok 2), Sta. 0+000 - Sta. 0+350, Ozamiz City, Misamis Occidental","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Purok 2C), Barangay Kinuman Sur, Sta. 0+000 - Sta. 0+350, Ozamiz City, Misamis Occidental","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Purok 2 to Purok 4), Barangay Embargo, Sta. 0+000 - Sta. 0+350, Ozamiz City, Misamis Occidental","amountPesos":10000000,"lengthMeters":350.0,"ratePesosPerMeter":28571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 300, Barangay Arellano, Libjo, Dinagat Islands","amountPesos":10000000,"lengthMeters":300.0,"ratePesosPerMeter":33333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road Barangay Caltayan - Barangay Bagacay West, Chainage 1+118.34 - Chainage 1+432.00, La Paz, Leyte","amountPesos":9960000,"lengthMeters":313.66,"ratePesosPerMeter":31754.13,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0106 + 520 - K0107 + 000","amountPesos":9949000,"lengthMeters":480.0,"ratePesosPerMeter":20727.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1718 + 549 - K1718 + 766, K1718 + 796 - K1719 + 000","amountPesos":9918000,"lengthMeters":421.0,"ratePesosPerMeter":23558.19,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0082 + 831 - K0083 + 280","amountPesos":9916000,"lengthMeters":449.0,"ratePesosPerMeter":22084.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo-Capiz Rd (Old Route) - K0094 + 453 - K0094 + 473, K0095 + 121 - K0095 + 145, K0095 + 171 - K0095 + 206, K0095 + 681 - K0095 + 735, K0095 + 754 - K0095 + 804","amountPesos":9916000,"lengthMeters":183.0,"ratePesosPerMeter":54185.79,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road and Drainage System at UPS 5 (Sta. 0+000 - Sta. 0+127) and its Vicinity (Sta. 0+000 - Sta. 0+100), Area 6, Barangay San Isidro, Parañaque City","amountPesos":9800000,"lengthMeters":127.0,"ratePesosPerMeter":77165.35,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Imus-Bacoor Link Rd - (S06100LZ) Chainage 009 - Chainage 192","amountPesos":9730000,"lengthMeters":183.0,"ratePesosPerMeter":53169.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banaue-Hungduan-Benguet Bdry Rd - K0350 + 282 - K0350 + 321, K0350 + 376 - K0350 + 409","amountPesos":9700000,"lengthMeters":72.0,"ratePesosPerMeter":134722.22,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kabankalan-Bais Rd - K0092+628 - K0093 + 041","amountPesos":9676000,"lengthMeters":413.0,"ratePesosPerMeter":23428.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sagbat-Pililla Div Rd - K0056 + 000 - K0057 + 000, K0058 + 194 - K0058 + 407","amountPesos":9661000,"lengthMeters":1213.0,"ratePesosPerMeter":7964.55,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0338 + 731 - K0338 + 918","amountPesos":9659000,"lengthMeters":187.0,"ratePesosPerMeter":51652.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0329 + 750 - K0329 + 811, K0331 + 000 - K0331 + 168","amountPesos":9644000,"lengthMeters":229.0,"ratePesosPerMeter":42113.54,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay 18-A, (Segment A: Sta. 0 + 000 - Sta. 0 + 280, Segment B: Sta. 0 + 000 - Sta. 0 + 350, Segment C: Sta. 0 + 000 - Sta. 0 + 074), Gingoog City, Misamis Oriental","amountPesos":9602000,"lengthMeters":350.0,"ratePesosPerMeter":27434.29,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Camiling-Wawa-Bayambang-Malasiqui-Sta. Barbara Rd (S05942LZ), K0175+336 - K0175+941","amountPesos":9596000,"lengthMeters":605.0,"ratePesosPerMeter":15861.16,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Candoni-Sipalay Rd - K0159 + 150 - K0159 + 600","amountPesos":9590000,"lengthMeters":450.0,"ratePesosPerMeter":21311.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Natl Rd-Mi-anay-Duyoc-Calaan-Panitan Rd - K0109 + 700 - K0109 + 905","amountPesos":9541000,"lengthMeters":205.0,"ratePesosPerMeter":46541.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway ( Tucuran Jct-Karomatan Jct Rd) - K1656 + 000 - K1656 + 201","amountPesos":9537000,"lengthMeters":201.0,"ratePesosPerMeter":47447.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"San Jose City-Rizal Rd via Pinili-Porais-Villa Joson (Palarilla) Rd - K0168 + 000 - K0168 + 565","amountPesos":9524000,"lengthMeters":565.0,"ratePesosPerMeter":16856.64,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga City-Labuan-Limpapa Rd - K1949 + 000 - K1949 + 701.10","amountPesos":9500000,"lengthMeters":701.1,"ratePesosPerMeter":13550.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+715, Barangay Balintocatoc, Santiago City, Isabela","amountPesos":9500000,"lengthMeters":715.0,"ratePesosPerMeter":13286.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road (Sta. 0+000 - Sta.0+980), Barangay Baligatan, City of Ilagan, Isabela","amountPesos":9420000,"lengthMeters":980.0,"ratePesosPerMeter":9612.24,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga City Bypass Rd - (S01215MN) Chainage 4589 - Chainage 4779","amountPesos":9352000,"lengthMeters":190.0,"ratePesosPerMeter":49221.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0062 + 473 - K0062 + 609, K0072 + 390 - K0072+630","amountPesos":9306000,"lengthMeters":376.0,"ratePesosPerMeter":24750.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Fernando-Bagulin Rd - K0275 + 259 - K0275 + 296","amountPesos":9250000,"lengthMeters":37.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao-Davao Coastal Rd - K1479 + 500 - K1479 + 604, K1479 + 639 - K1479+758","amountPesos":9189000,"lengthMeters":223.0,"ratePesosPerMeter":41206.28,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago-Tuguegarao Rd - K0349 + 506 - K0350 + 000, K0361 + 506 - K0362 + 050 (Off-Carriageway Improvement: Paving of Shoulders)","amountPesos":9159000,"lengthMeters":1038.0,"ratePesosPerMeter":8823.7,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Marinduque Circumferential Rd - K0093 + 930 - K0094 + 285","amountPesos":9152000,"lengthMeters":355.0,"ratePesosPerMeter":25780.28,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Masbate-Cataingan-Placer Rd - K0044 + 717 - K0044 + 900","amountPesos":9150000,"lengthMeters":183.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago - Tuguegarao Rd - K0365 + (-338) - K0365 + 000","amountPesos":9130000,"lengthMeters":338.0,"ratePesosPerMeter":27011.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0310 + 950 - K0311 + 100, K0311 + 880 - K0312 + 145","amountPesos":9099000,"lengthMeters":415.0,"ratePesosPerMeter":21925.3,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jose Abad Santos Ave (JASA) - K0073 + 862 - K0074 + 026.56","amountPesos":9042000,"lengthMeters":164.56,"ratePesosPerMeter":54946.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sagada-Besao-Quirino (via Laylaya) Road, Sta.27+665 - Sta.27+880, Besao, Mountain Province","amountPesos":9000000,"lengthMeters":215.0,"ratePesosPerMeter":41860.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Juan-Sn Gabriel Rd - K0281 + 354 - K0281 + 540 (Road Safety: Roller Barrier)","amountPesos":9000000,"lengthMeters":186.0,"ratePesosPerMeter":48387.1,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Barangay Marikina Heights Road Network at Ladislaw Diwa St. (Chainage 0+000 - Chainage 0+276), Narra St. (Chainage 0+000 - Chainage 0+023), Barangay Marikina Heights, Marikina City","amountPesos":9000000,"lengthMeters":276.0,"ratePesosPerMeter":32608.7,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road (Sta. 0+098 - Sta. 0+895), Barangay Centro-San Antonio to Barangay Cabeseria 8, City of Ilagan, Isabela","amountPesos":9000000,"lengthMeters":797.0,"ratePesosPerMeter":11292.35,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road (Sta. 0+096 - Sta. 0+276, Sta. 0+359 - Sta. 1+004) at Core Shelter, Barangay Carmencita, Delfin Albano, Isabela","amountPesos":9000000,"lengthMeters":825.0,"ratePesosPerMeter":10909.09,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+675, Barangay Sinaoangan Sur, San Agustin, Isabela","amountPesos":9000000,"lengthMeters":675.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+675, Barangay Papan Este, Jones, Isabela","amountPesos":9000000,"lengthMeters":675.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Yuson, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+718","amountPesos":9000000,"lengthMeters":718.0,"ratePesosPerMeter":12534.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Palmayo-San Jose, Palmayo, Floridablanca, Pampanga, Sta.0+000 - Sta.0+810","amountPesos":9000000,"lengthMeters":810.0,"ratePesosPerMeter":11111.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Isaac O. Tolentino Ave. - K0057 + (-762) - K0057 + (-537), K0057 + (-122) - K0057 + 385, K0057 + 1051 - K0059 + 000","amountPesos":8982000,"lengthMeters":1681.0,"ratePesosPerMeter":5343.25,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Balabag-Maquina-Cayos-Patlad Rd - K0283 + (-324) - K0283 + (-281.20), K0283 + (-272.20) - K0283 + (-215.80), K0283 + (-211.30) - K0283 + (-185.00), K0283 + 023.30 - K0283 + 120, K0283 + 496.40 - K0283 + 534.20, K0286 + 263.00 - K0286 + 375.50, K0286 + 390.00 - K0286 + 521.00, K0286 + 534.50 - K0286 + 629.00, K0288 + 090.00 - K0288 + 108.00, K0288+1050 - K0288+1262.50","amountPesos":8980000,"lengthMeters":828.5,"ratePesosPerMeter":10838.87,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calbayog Diversion Rd - K0732 + (-667) - K0732 + (-570)","amountPesos":8970000,"lengthMeters":97.0,"ratePesosPerMeter":92474.23,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0468 + 310 - K0468 + 495","amountPesos":8932000,"lengthMeters":185.0,"ratePesosPerMeter":48281.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palo-Carigara-Ormoc Rd - K0966 + 272 - K0966 + 510","amountPesos":8923000,"lengthMeters":238.0,"ratePesosPerMeter":37491.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road (Section 1: Sta. 0+410 - Sta. 0+910, Section 2: Sta. 0+100 - Sta. 0+600) at Barangay Paragu, Tumauini, Isabela","amountPesos":8900000,"lengthMeters":810.0,"ratePesosPerMeter":10987.65,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"IBP-San Mateo Rd - K0020 + 131 - K0020 + 747","amountPesos":8880000,"lengthMeters":616.0,"ratePesosPerMeter":14415.58,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Buenavista-Kawayan Rd - K0050 + 190 - K0050 + 221","amountPesos":8840000,"lengthMeters":31.0,"ratePesosPerMeter":285161.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacnotan-Luna-Balaoan Rd - K0291 + 680 - K0292 + 243","amountPesos":8837000,"lengthMeters":563.0,"ratePesosPerMeter":15696.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0288+000 - K0288+245","amountPesos":8820000,"lengthMeters":245.0,"ratePesosPerMeter":36000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LT) - K1004 + 109 - K1004 +330","amountPesos":8778000,"lengthMeters":221.0,"ratePesosPerMeter":39719.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage, Barangay San Miguel, Magalang, Pampanga, Sta. 0+000 - Sta. 0+616","amountPesos":8700000,"lengthMeters":616.0,"ratePesosPerMeter":14123.38,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Sta. 0+000 - Sta. 0+621) at Barangay XIII, Victorias City, Negros Occidental (10.9017200, 123.0562070)","amountPesos":8694000,"lengthMeters":621.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1053 + 609 - K1055 + 400","amountPesos":8666000,"lengthMeters":1791.0,"ratePesosPerMeter":4838.64,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0065 + 567 - K0065 + 642, K0065 + 747 - K0066 + 052","amountPesos":8622000,"lengthMeters":380.0,"ratePesosPerMeter":22689.47,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Besao-Tubo (via Tamboan) Road, Sta.11+387 - Sta.11+567, Besao, Mountain Province","amountPesos":8600000,"lengthMeters":180.0,"ratePesosPerMeter":47777.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage, Barangay Pandan, Angeles City Pampanga, Sta. 0+000 - Sta. 0+850, Sta. 0+000 - Sta. 0+071, Sta. 0+000 - Sta. 0+248","amountPesos":8580000,"lengthMeters":850.0,"ratePesosPerMeter":10094.12,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Vito Port Rd - K0097 + 000 - K0097 + 500","amountPesos":8500000,"lengthMeters":500.0,"ratePesosPerMeter":17000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road including Slope Protection Structure (Sta. 0+212 - Sta. 0+462) at Purok 3, Barangay Moldero, Tumauini, Isabela","amountPesos":8500000,"lengthMeters":250.0,"ratePesosPerMeter":34000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+635, Barangay Laoag, San Agustin, Isabela","amountPesos":8500000,"lengthMeters":635.0,"ratePesosPerMeter":13385.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+635, Barangay Plaridel, Santiago City, Isabela","amountPesos":8500000,"lengthMeters":635.0,"ratePesosPerMeter":13385.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+635, Barangay Namnama - Barangay Villa Bello, Jones, Isabela","amountPesos":8500000,"lengthMeters":635.0,"ratePesosPerMeter":13385.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Caballero to Barangay Triala, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+693","amountPesos":8500000,"lengthMeters":693.0,"ratePesosPerMeter":12265.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Barangay San Agustin, Magalang, Pampanga, Sta. 0+000 - Sta. 0+130, Sta. 0+000 - Sta. 0+147, Sta. 0+000 - Sta. 0+135, Sta. 0+000 - Sta. 0+132, Sta. 0+000 - Sta. 0+150","amountPesos":8500000,"lengthMeters":150.0,"ratePesosPerMeter":56666.67,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+130, at Peñafrancia - Kiwalo, Daraga, Albay","amountPesos":8500000,"lengthMeters":130.0,"ratePesosPerMeter":65384.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Argao-Moalboal Rd - K0058 + (-399) - K0058 + (-005)","amountPesos":8497000,"lengthMeters":394.0,"ratePesosPerMeter":21565.99,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0066 + 970 - K0068 + 000","amountPesos":8424000,"lengthMeters":1030.0,"ratePesosPerMeter":8178.64,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tejero-Gen Trias-Amadeo-Tagaytay Rd - K0033 + 000 - K0033 + 728, K0034 + 588 - K0035 + 000","amountPesos":8423000,"lengthMeters":1140.0,"ratePesosPerMeter":7388.6,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Candaba-Sn Miguel Rd - K0082 + 380 - K0082 + 614.27","amountPesos":8416000,"lengthMeters":234.27,"ratePesosPerMeter":35924.36,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Merida-Lundag-Puting Bato-Consolacion-Isabel Rd - K1114 + 915 - K1114 + 952.5","amountPesos":8400000,"lengthMeters":37.5,"ratePesosPerMeter":224000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sta Rita-Biak-na-Bato via Pulong Bayabas Rd - K0084 + 000 - K0085 + 000","amountPesos":8390000,"lengthMeters":1000.0,"ratePesosPerMeter":8390.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0014 + 755 - K0015 + 000","amountPesos":8300000,"lengthMeters":245.0,"ratePesosPerMeter":33877.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road (Sta. 0+000-Sta. 0+800) at Barangay Catabayungan, Cabagan, Isabela","amountPesos":8300000,"lengthMeters":800.0,"ratePesosPerMeter":10375.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"South Super H-way - K0007 + 081 - K0007 + 200","amountPesos":8200000,"lengthMeters":119.0,"ratePesosPerMeter":68907.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0221 + 945 - K0222 + 000, K0227 + 480 - K0227 + 569, K0227 + 849 - K0227 + 903, K0227 + 935 - K0227 + 994, K0242 + 717 - K0243 + 061","amountPesos":8196000,"lengthMeters":601.0,"ratePesosPerMeter":13637.27,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1433 + 000 - K1433 + 660 (Road Safety: Roadway Lighting)","amountPesos":8193000,"lengthMeters":660.0,"ratePesosPerMeter":12413.64,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Marbel-Makar Rd) - K1699 + 400 - K1700 + 038","amountPesos":8182000,"lengthMeters":638.0,"ratePesosPerMeter":12824.45,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0035 + (-617) - K0035 + (-525), K0035 + (-485) - K0035 + (-397), K0036 + 615 - K0037 + 239","amountPesos":8132000,"lengthMeters":804.0,"ratePesosPerMeter":10114.43,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0226 + 144 - K0226 + 177, K0226 + 196 - K0226 + 550","amountPesos":8127000,"lengthMeters":387.0,"ratePesosPerMeter":21000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Julian Felipe Blvd - K0032 + (-099) - K0032 + (-008)","amountPesos":8104000,"lengthMeters":91.0,"ratePesosPerMeter":89054.95,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1704 + 600 - K1704 + 800, K1708 + 800 - K1709 + 000","amountPesos":8040000,"lengthMeters":400.0,"ratePesosPerMeter":20100.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1936 + 840 - K1936 + 947, K1938 + 000 - K1938 + 056","amountPesos":8009000,"lengthMeters":163.0,"ratePesosPerMeter":49134.97,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0116 + 595 - K0116 + 752","amountPesos":8000000,"lengthMeters":157.0,"ratePesosPerMeter":50955.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nueva Ecija-Pangasinan Rd - K0154 + 975 - K0155 + 265","amountPesos":8000000,"lengthMeters":290.0,"ratePesosPerMeter":27586.21,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt Prov-Cagayan via Tabuk Enrile Rd - K0394+029 - K0394+137, K0397+224 - K0397+304","amountPesos":8000000,"lengthMeters":188.0,"ratePesosPerMeter":42553.19,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Candoni-Sipalay Rd - K0144 + 165 - K0144 + 206","amountPesos":8000000,"lengthMeters":41.0,"ratePesosPerMeter":195121.95,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dancalan-Candoni-Damutan Valley Rd - K0138 + 480 - K0138 + 525","amountPesos":8000000,"lengthMeters":45.0,"ratePesosPerMeter":177777.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Conner - Kabugao Rd - K0601+820 - K0601+926","amountPesos":8000000,"lengthMeters":106.0,"ratePesosPerMeter":75471.7,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"PPSR Jct-Napsan-Apurawan Rd - K0051+250 - K0051+280","amountPesos":8000000,"lengthMeters":30.0,"ratePesosPerMeter":266666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Padre Burgos By-Pass Road, Chainage 1272 - Chainage 2109, Chainage 3218 - Chainage 3338, Quezon","amountPesos":8000000,"lengthMeters":957.0,"ratePesosPerMeter":8359.46,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+600, Barangay Dabubu Pequeno, San Agustin, Isabela","amountPesos":8000000,"lengthMeters":600.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road including Drainage Canal, Sta. 0+000 - Sta. 0+414, Javier St. and San Diego St., Poblacion, Plaridel, Bulacan","amountPesos":8000000,"lengthMeters":414.0,"ratePesosPerMeter":19323.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Sta. 0+373 - Sta. 0+954, Purok 1-4, Rueda, Plaridel, Bulacan","amountPesos":8000000,"lengthMeters":581.0,"ratePesosPerMeter":13769.36,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road at Barangay Culipat Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+316.70","amountPesos":8000000,"lengthMeters":316.7,"ratePesosPerMeter":25260.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Slope Protection Structure, Sta. 0+000 – Sta. 0+320, Barangay Olo-olo, Lobo, Batangas","amountPesos":8000000,"lengthMeters":320.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Road with Drainage Systems, Purok Angela, Barangay Dela Paz, Antipolo City, Sta.(0+000 - Sta.0+220)","amountPesos":8000000,"lengthMeters":220.0,"ratePesosPerMeter":36363.64,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Pin-as-Malbag-Fundacion Road, Sta. 1 + 600 - Sta. 2 + 000, Barangay Sebaste, Sibunag, Guimaras","amountPesos":8000000,"lengthMeters":400.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sitio Proper - Sitio Hacienda - Philippine Science High School, Jct. N.R. Balcon Maravilla, Sta. 1 + 355 - Sta. 1 + 790, Barangay Balcon Maravilla, Jordan, Guimaras","amountPesos":8000000,"lengthMeters":435.0,"ratePesosPerMeter":18390.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+891 - Sta. 1+219, Sta. 1+445 - Sta. 1+767, Barangay Burgos - Barangay Mabini, Mayorga, Leyte","amountPesos":8000000,"lengthMeters":650.0,"ratePesosPerMeter":12307.69,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Concrete Road (Dike Site), District 1 Poblacion - District 2 Poblacion, Jaro, Leyte, Chainage 0+000 - Chainage 0+629.40","amountPesos":8000000,"lengthMeters":629.4,"ratePesosPerMeter":12710.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Cabarasan - Barangay Dao (Sta. 4+760 - Sta. 4+900), Gamay, Northern Samar","amountPesos":8000000,"lengthMeters":140.0,"ratePesosPerMeter":57142.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sogod-Tabuelan Rd - K0110 + 604 - K0110 + 705.66","amountPesos":7969000,"lengthMeters":101.66,"ratePesosPerMeter":78388.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sta Cruz-Pob Rd - K0088 + 2014 - K0088 + 2380","amountPesos":7910000,"lengthMeters":366.0,"ratePesosPerMeter":21612.02,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Slope Protection Structure (Sta. 0+514 - Sta. 0+910), Purok 1, Barangay Lanna, Tumauini, Isabela","amountPesos":7900000,"lengthMeters":396.0,"ratePesosPerMeter":19949.49,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Marikina-Infanta Rd - K0041 + 501 - K0042 + 000","amountPesos":7896000,"lengthMeters":499.0,"ratePesosPerMeter":15823.65,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Romulo H-way - K0142 + 982 - K0143 + 299","amountPesos":7873000,"lengthMeters":317.0,"ratePesosPerMeter":24835.96,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tanza-Trece Martires City-Indang Rd - K0054 + 678 - K0055 + 000","amountPesos":7776000,"lengthMeters":322.0,"ratePesosPerMeter":24149.07,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road (Section 1: Sta. 0+000 - Sta. 0+800, Section 2: Sta. 0+060 - Sta. 0+358), Barangay Cabeseria 8, City of Ilagan, Isabela","amountPesos":7750000,"lengthMeters":800.0,"ratePesosPerMeter":9687.5,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gate-Bulan Airport Rd - K0634 + 690 - K0635 + 000","amountPesos":7725000,"lengthMeters":310.0,"ratePesosPerMeter":24919.35,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jaro-Dagami-Burauen-Lapaz Rd - K0973 + 070 - K0973 + 360","amountPesos":7700000,"lengthMeters":290.0,"ratePesosPerMeter":26551.72,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road (Sta. 0+000 - Sta. 0+635) at Barangay Fuyo, City of Ilagan, Isabela","amountPesos":7700000,"lengthMeters":635.0,"ratePesosPerMeter":12125.98,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0234 + 570 - K0234 + 899","amountPesos":7680000,"lengthMeters":329.0,"ratePesosPerMeter":23343.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sta Rita-Biak-na-Bato via Pulong Bayabas Rd - K0080 + 297 - K0081 + 215 (Off- Carriageway Improvement: Paving of Shoulders)","amountPesos":7632000,"lengthMeters":918.0,"ratePesosPerMeter":8313.73,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Libungao-Matag-ob-Palompon Rd - K1009 + 473 - K1009 + 503","amountPesos":7600000,"lengthMeters":30.0,"ratePesosPerMeter":253333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Antipolo Circumferential Rd A - K0025 + (-142) - K0025 + 000","amountPesos":7550000,"lengthMeters":142.0,"ratePesosPerMeter":53169.01,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Laoag-Airport Rd - K0486 + (-627) - K0486 + 060","amountPesos":7500000,"lengthMeters":687.0,"ratePesosPerMeter":10917.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ayaga-Sta. Marcela-Flora-Lasam Rd - K0670 + (-806) - K0670 + (-394)","amountPesos":7500000,"lengthMeters":412.0,"ratePesosPerMeter":18203.88,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Metro Iloilo Radial Rd (R4 Bypass Rd) - K0020 + 421 - K0020 + 807","amountPesos":7500000,"lengthMeters":386.0,"ratePesosPerMeter":19430.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palo-Carigara-Ormoc Rd - K0971 + 255.80 - K0971 + 290.80","amountPesos":7500000,"lengthMeters":35.0,"ratePesosPerMeter":214285.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Conner-Kabugao Rd - K0584 + 530 - K0584 + 565","amountPesos":7500000,"lengthMeters":35.0,"ratePesosPerMeter":214285.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road from Bgy Diarao to Bgy San Sebastian ,Jones, Isabela (Sta. 0+000- Sta.0+560)","amountPesos":7500000,"lengthMeters":560.0,"ratePesosPerMeter":13392.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+560, Barangay Linamanan, Jones, Isabela","amountPesos":7500000,"lengthMeters":560.0,"ratePesosPerMeter":13392.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+560, Barangay Napaliong, Jones, Isabela","amountPesos":7500000,"lengthMeters":560.0,"ratePesosPerMeter":13392.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Purok 6), Barangay Liloan, Sta. 0+000 to Sta. 0+250, Bonifacio, Misamis Occidental","amountPesos":7500000,"lengthMeters":250.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Purok 5), Barangay Liloan, Sta. 0+000 to Sta. 0+250, Bonifacio, Misamis Occidental","amountPesos":7500000,"lengthMeters":250.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Fairview Ave - K0024 + 385.30 - K0024 + 637.40","amountPesos":7489000,"lengthMeters":252.1,"ratePesosPerMeter":29706.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LT) - K1041 + 462 - K1041 + 542","amountPesos":7440000,"lengthMeters":80.0,"ratePesosPerMeter":93000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Paranaque-Sucat Rd - K0019 + 795 - K0018 + 000","amountPesos":7431000,"lengthMeters":1795.0,"ratePesosPerMeter":4139.83,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calamba-Sta Cruz-Famy Jct Rd - K0072 + 299 - K0072 + 456, K0072 + 806 - K0072 + 1015, K0077 + 367 - K0078 + 000, K0078 + 300 - K0078 + 482 (Off-Carriageway Improvement: Construction of Sidewalk)","amountPesos":7403000,"lengthMeters":1181.0,"ratePesosPerMeter":6268.42,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Batangas-Lobo Rd - K0110+768 - K0110 + 839 (L/S), K0110 + 858 - K0110 + 944 (L/S), K0111 + 724 - K0111 + 744 (L/S), K0111 + 763 - K0111 + 771 (L/S), K0112 + 445 - K0112 + 455 (L/S), K0112 + 466 - K0112 + 473 (BL)","amountPesos":7396000,"lengthMeters":202.0,"ratePesosPerMeter":36613.86,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surallah-Lake Sebu-Maitum Rd - K1752 + 231 - K1752 + 450","amountPesos":7367000,"lengthMeters":219.0,"ratePesosPerMeter":33639.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd (Kabankalan-Hinobaan Section) - K0182 + 007 - K0182+149, K0182+407 - K0182 + 614","amountPesos":7329000,"lengthMeters":349.0,"ratePesosPerMeter":21000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alfonso Lista - Aurora Bdry Rd - K0445 + 005 - K0445 + 082, K0445 + 082 - K0445 + 089, K0445 + 117 - K0445 + 305, K0449 + 216 - K0449 + 668","amountPesos":7223000,"lengthMeters":724.0,"ratePesosPerMeter":9976.52,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"MSR Jct-Lopez-Buenavista Rd - K0226 + 095 - K0226 + 162, K0226 + 527 - K0226 + 576","amountPesos":7150000,"lengthMeters":116.0,"ratePesosPerMeter":61637.93,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Solar Lights along H-way Secondary Div Rd, Barangay San Roque, Chainage 0 - Chainage 1428, Iligan City","amountPesos":7100000,"lengthMeters":1428.0,"ratePesosPerMeter":4971.99,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Palo-Carigara-Ormoc Rd - K0975 + (-256) - K0975 + 060","amountPesos":7092000,"lengthMeters":316.0,"ratePesosPerMeter":22443.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"The President Carlos P. Garcia Circumferential Rd - K0209 + 1000 - K0209 + 1400","amountPesos":7011000,"lengthMeters":400.0,"ratePesosPerMeter":17527.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"P Casal St - K0002 + (-087) - K0002 + 174","amountPesos":7000000,"lengthMeters":261.0,"ratePesosPerMeter":26819.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (MN) - K1438 + 900 - K1438 + 930","amountPesos":7000000,"lengthMeters":30.0,"ratePesosPerMeter":233333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Conner-Kabugao Rd - K0588 + 400 - K0588 + 445","amountPesos":7000000,"lengthMeters":45.0,"ratePesosPerMeter":155555.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Baguio-Bontoc Rd - K0348 + 000 - K0348 + 076","amountPesos":7000000,"lengthMeters":76.0,"ratePesosPerMeter":92105.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"PPSR Jct-Napsan-Apurawan Rd - K0037+006 -K0037+021","amountPesos":7000000,"lengthMeters":15.0,"ratePesosPerMeter":466666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1555 + 546 - K1555 + 578","amountPesos":7000000,"lengthMeters":32.0,"ratePesosPerMeter":218750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road, Barangay Lumbaca Ingud, Sta. 0+000 - Sta. 0+280, Madamba, Lanao del Sur","amountPesos":7000000,"lengthMeters":280.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitaiton of Road and Drainage System at Mauban Street (Chainage 0+000 - Chainage 0+78, Barangay Masambong, Quezon City","amountPesos":7000000,"lengthMeters":78.0,"ratePesosPerMeter":89743.59,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+375- Sta. 0+900, Barangay Papan Weste, Jones, Isabela","amountPesos":7000000,"lengthMeters":525.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 0+466, Sitio Pulong Bato, San Jose, Plaridel, Bulacan","amountPesos":7000000,"lengthMeters":466.0,"ratePesosPerMeter":15021.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road 1 and Road 3 Pajo, Meycauayan City, Bulacan, Sta. 00+000 - Sta. 00+285 (121.00260278, 14.77600000)","amountPesos":7000000,"lengthMeters":285.0,"ratePesosPerMeter":24561.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay San Juan, Aliaga, Nueva Ecija, Sta. 0+000 - Sta. 0+622","amountPesos":7000000,"lengthMeters":622.0,"ratePesosPerMeter":11254.02,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Bakal III, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+622","amountPesos":7000000,"lengthMeters":622.0,"ratePesosPerMeter":11254.02,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Inanama, Llanera, Nueva Ecija Sta. 0+000 - Sta. 0+883","amountPesos":7000000,"lengthMeters":883.0,"ratePesosPerMeter":7927.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Piut, Carranglan, Nueva Ecija Sta. 0+000 - Sta. 0+620","amountPesos":7000000,"lengthMeters":620.0,"ratePesosPerMeter":11290.32,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road at Espeleta st. Zone 7, Brgy. Diladila, Sta.Rita, Pampanga, Sta.0+000 - Sta.0+220","amountPesos":7000000,"lengthMeters":220.0,"ratePesosPerMeter":31818.18,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road Lansang Cayanan at Zone 1, Brgy. Diladila, Sta.Rita, Pampanga, Sta.0+000 - Sta.0+180","amountPesos":7000000,"lengthMeters":180.0,"ratePesosPerMeter":38888.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Cag-anibong, Sta. 0+000 - Sta. 0+350.69, Calbayog City, Samar","amountPesos":7000000,"lengthMeters":350.69,"ratePesosPerMeter":19960.65,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Hindang, Sta. 0+000 - Sta. 0+177, Iligan City","amountPesos":7000000,"lengthMeters":177.0,"ratePesosPerMeter":39548.02,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Sta. 0 + 000 - Sta. 0 + 200 (Sitio Dapya to Sitio Melody), Barangay San Antonio, Libjo, Dinagat Islands","amountPesos":7000000,"lengthMeters":200.0,"ratePesosPerMeter":35000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bauang-Baguio Rd - K0275 + 383 - K0275 + 714","amountPesos":6951000,"lengthMeters":331.0,"ratePesosPerMeter":21000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calamba-Sta Cruz-Famy Jct Rd - K0102 + 585 - K0102 + 910","amountPesos":6938000,"lengthMeters":325.0,"ratePesosPerMeter":21347.69,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Balintawak-Old Escalante Rd - K0101+775 - K0102 + 153","amountPesos":6913000,"lengthMeters":378.0,"ratePesosPerMeter":18288.36,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tablas Circumferential Rd - K0021 + 438 - K0021 + 576","amountPesos":6900000,"lengthMeters":138.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road including Drainage Structure (Sta. 0+000 - Sta. 0+319), Purok 7, Barangay Lanna, Tumauini, Isabela","amountPesos":6800000,"lengthMeters":319.0,"ratePesosPerMeter":21316.61,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Catimon, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+554","amountPesos":6800000,"lengthMeters":554.0,"ratePesosPerMeter":12274.37,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Candaba-Sn Miguel Rd - K0084 + 355 - K0084 + 557.54","amountPesos":6787000,"lengthMeters":202.54,"ratePesosPerMeter":33509.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - (S01634MN) Chainage 000 - Chainage 116, Chainage 197 - Chainage 301","amountPesos":6786000,"lengthMeters":220.0,"ratePesosPerMeter":30845.45,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Eastern Bobongan-Sominot-Midsalip-Dumingag Rd - K1691 + 384 - K1692 + 266","amountPesos":6782000,"lengthMeters":882.0,"ratePesosPerMeter":7689.34,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Marikina-Victoria Valley-Antipolo Rd - K0028 + (-155) - K0028 + 036","amountPesos":6770000,"lengthMeters":191.0,"ratePesosPerMeter":35445.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0046 + 577 - K0046 + 864","amountPesos":6746000,"lengthMeters":287.0,"ratePesosPerMeter":23505.23,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dipolog-Oroquieta National Rd - K1846 + 328 - K1846 + 420","amountPesos":6729000,"lengthMeters":92.0,"ratePesosPerMeter":73141.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sibuyan Circumferential Rd - K0072 + 509 - K0072 + 567, K0079 + 299 - K0079 + 352","amountPesos":6660000,"lengthMeters":111.0,"ratePesosPerMeter":60000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calapan South Rd - K0052 + 601 - K0052 + 658","amountPesos":6600000,"lengthMeters":57.0,"ratePesosPerMeter":115789.47,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road (Sta. 0+000 - Sta.0+600) at Barangay Magassi, Cabagan, Isabela","amountPesos":6600000,"lengthMeters":600.0,"ratePesosPerMeter":11000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Buenavista-Kawayan Rd - K0063 + 450 - K0064 + 065","amountPesos":6582000,"lengthMeters":615.0,"ratePesosPerMeter":10702.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mactan Circumferential Rd - K0031 + 787 - K0032 + 000","amountPesos":6578000,"lengthMeters":213.0,"ratePesosPerMeter":30882.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Burnay, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+582","amountPesos":6550000,"lengthMeters":582.0,"ratePesosPerMeter":11254.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Noveleta-Naic-Tagaytay Rd - K0037 + 000 - K0037 + 176, K0038 + 967 - K0039 + 184, K0041 + 000 - K0042 + 000, K0042 + 415 - K0042 + 545","amountPesos":6522000,"lengthMeters":1523.0,"ratePesosPerMeter":4282.34,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"VG Cruz St. (S02472LZ) K0005 + 520 - K0005 + 662","amountPesos":6500000,"lengthMeters":142.0,"ratePesosPerMeter":45774.65,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete Airport Rd - K0002+340 - K0002 + 590","amountPesos":6500000,"lengthMeters":250.0,"ratePesosPerMeter":26000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+485, Barangay Abra, Santiago City, Isabela","amountPesos":6500000,"lengthMeters":485.0,"ratePesosPerMeter":13402.06,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Overflow Bridge (Sta. 0+335 - Sta. 0+348) Barangay E. Lopez, Silay City, Negros Occidental (10.7935166, 123.0691141)","amountPesos":6500000,"lengthMeters":13.0,"ratePesosPerMeter":500000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road at Purok Dalamas to Purok Olambog, Barangay Pugaan, Sta. 0+000 - Sta. 0+350, Iligan City","amountPesos":6500000,"lengthMeters":350.0,"ratePesosPerMeter":18571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Fernando North Rd - K0021 + 114 - K0021 + 244","amountPesos":6467000,"lengthMeters":130.0,"ratePesosPerMeter":49746.15,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Buenavista-Kawayan Rd - K0053 + 153 - K0053 + 282","amountPesos":6450000,"lengthMeters":129.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage along R. Colina Ext Street, Sitio Abbrai to Sitio Liong, Barangay Alang-Alang, Mandaue City, Cebu Sta. 0+256.00 to Sta. 0+538.00","amountPesos":6400000,"lengthMeters":282.0,"ratePesosPerMeter":22695.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Apayao-Ilocos Norte Rd - K0620 + 800 - K0621 + 100","amountPesos":6398000,"lengthMeters":300.0,"ratePesosPerMeter":21326.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagaytay-Batangas via Tuy Rd - K0066 + 000 - K0067 + 000","amountPesos":6338000,"lengthMeters":1000.0,"ratePesosPerMeter":6338.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kiangan-Tinoc-Buguias Rd - K0324 + 646 - K0324 + 748, K0329 + 517 - K0329 + 532","amountPesos":6320000,"lengthMeters":117.0,"ratePesosPerMeter":54017.09,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road (Sta. 0+000 - Sta. 0+550), Barangay Garita, Cabagan, Isabela","amountPesos":6300000,"lengthMeters":550.0,"ratePesosPerMeter":11454.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Marikina-Infanta Rd - K0019 + (-072) - K0019 + 000, K0019 + 605 - K0019 + 794, K0021 + 434 - K0021 + 774, K0022 + 188 - K0023 + 109, K0024 + 000 - K0025 + 000","amountPesos":6274000,"lengthMeters":2522.0,"ratePesosPerMeter":2487.71,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rizal Shrine Rd - K0052 + (-1073) - K0052 + (-595), K0052 + 000 - K0052 + 169, K0052 + 506 - K0052 + 584","amountPesos":6259000,"lengthMeters":725.0,"ratePesosPerMeter":8633.1,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road at Napilas 2 (Sta. 0+000 - Sta. 0+051, Sta. 1+617 - Sta. 2+013) Barangay E. Lopez, Silay City, Negros Occidental (10.7933233, 123.0658352)","amountPesos":6258000,"lengthMeters":447.0,"ratePesosPerMeter":14000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Catarman-Laoang Rd - K0771 + 080 - K0771 + 280","amountPesos":6252000,"lengthMeters":200.0,"ratePesosPerMeter":31260.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Villasis - Malasiqui - Sn Carlos Road, K0186+607 - K0186+903","amountPesos":6216000,"lengthMeters":296.0,"ratePesosPerMeter":21000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Access Road, Barangay Pisong-A to Barangay Pisong-B, Maria, Siquijor, Segment 1: Sta. 1+783 - Sta. 1 + 860 - Segment 2: Sta. 2+144 - Sta. 2+265","amountPesos":6200000,"lengthMeters":198.0,"ratePesosPerMeter":31313.13,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bauang-Baguio Rd - K0278 + 760 - K0279 + 070","amountPesos":6195000,"lengthMeters":310.0,"ratePesosPerMeter":19983.87,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Daganas, Sta. 000+000 - Sta. 000+260, Catarman, Northern Samar","amountPesos":6168000,"lengthMeters":260.0,"ratePesosPerMeter":23723.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1651 + 284 - K1651 + 426, K1651 + 450 - K1651 + 566","amountPesos":6121000,"lengthMeters":258.0,"ratePesosPerMeter":23724.81,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Muntinlupa-Railroad Station Rd - K0028 + (-018) - K0028 + 152","amountPesos":6100000,"lengthMeters":170.0,"ratePesosPerMeter":35882.35,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Blumentritt St (LZ) - K0006 + (-1186) - K0006 + (-784)","amountPesos":6000000,"lengthMeters":402.0,"ratePesosPerMeter":14925.37,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (MN) - K1426 + 372 - K1426 + 390","amountPesos":6000000,"lengthMeters":18.0,"ratePesosPerMeter":333333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Abbut-Conner Rd - K0564 + 150 - K0564 + 200","amountPesos":6000000,"lengthMeters":50.0,"ratePesosPerMeter":120000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagum - Panabo Circumferential Road K1480 + 729 - K1480 + 897, K1481 + 267 - K1481 + 391,","amountPesos":6000000,"lengthMeters":292.0,"ratePesosPerMeter":20547.95,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation of Solar LED (Roadway Lighting) along Airport Road (S01208MN) Chainage 000 - Chainage 670","amountPesos":6000000,"lengthMeters":670.0,"ratePesosPerMeter":8955.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+450, Barangay Villa Gonzaga - Barangay San Isidro, Santiago City, Isabela","amountPesos":6000000,"lengthMeters":450.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Rehabilitation of Bridge, Sta. 0+193 - Sta. 0+210, Lipana St., Parulan, Plaridel, Bulacan","amountPesos":6000000,"lengthMeters":17.0,"ratePesosPerMeter":352941.18,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay San Pascual, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+533","amountPesos":6000000,"lengthMeters":533.0,"ratePesosPerMeter":11257.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Sta. Cruz Purok 1, Zaragoza, Nueva Ecija, Sta. 0+000 - Sta. 0+500","amountPesos":6000000,"lengthMeters":500.0,"ratePesosPerMeter":12000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road and Drainage near Sto. Niño Chapel, Sta. 0 + 000 - Sta. 0 + 300, Barangay Matain, Subic, Zambales","amountPesos":6000000,"lengthMeters":300.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barog Pensikan, Millan - Curipao, Constancia Road, Sta. 4 + 200 - Sta. 4 + 460, Barangay Millan and Barangay Constancia, Sibunag and San Lorenzo, Guimaras","amountPesos":6000000,"lengthMeters":260.0,"ratePesosPerMeter":23076.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage at 3rd - 2nd Street, Palmspring, Barangay San Miguel, Sta. 0+000 - Sta. 0+200, Iligan City","amountPesos":6000000,"lengthMeters":200.0,"ratePesosPerMeter":30000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gen V Alvarez St - (S01204MN) Chainage 000 - Chainage 369","amountPesos":5958000,"lengthMeters":369.0,"ratePesosPerMeter":16146.34,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maitum-Lake Sebu Rd - K1780 + 045 - K1780 + 117, K1780 + 304 - K1780 + 341, K1780 + 685 - K1780 + 718, K1780 + 922 - K1780 + 941, K1781 + 045 - K1781 + 104, K1781 + 540 - K1781 + 604","amountPesos":5878000,"lengthMeters":284.0,"ratePesosPerMeter":20697.18,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rizal St - (S01202MN) Chainage 000 - Chainage 362","amountPesos":5845000,"lengthMeters":362.0,"ratePesosPerMeter":16146.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Del Carmen-Sta Monica-Sn Isidro Rd - K0042 + 485 - K0042 + 697","amountPesos":5812000,"lengthMeters":212.0,"ratePesosPerMeter":27415.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Indang-Alfonso via Luksuhin Rd - K0057 + 000 - K0057 + 157","amountPesos":5805000,"lengthMeters":157.0,"ratePesosPerMeter":36974.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd - K0487 + 000 - K0487 + 278.10","amountPesos":5702000,"lengthMeters":278.1,"ratePesosPerMeter":20503.42,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0606 + 063 - K0606 + 090","amountPesos":5700000,"lengthMeters":27.0,"ratePesosPerMeter":211111.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sta Maria-Norzagaray Rd - K0033+849 - K0033+1008, K0034+000 - K0034+130","amountPesos":5676000,"lengthMeters":281.0,"ratePesosPerMeter":20199.29,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sumulong Highway - K0022 + 453 - K0023 + 000, K0024 + 000 - K0025 + 000","amountPesos":5663000,"lengthMeters":1547.0,"ratePesosPerMeter":3660.63,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road (Sta. 0+000 - Sta. 0+400) at Barangay Magassi, Cabagan, Isabela","amountPesos":5650000,"lengthMeters":400.0,"ratePesosPerMeter":14125.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagaytay-Talisay Rd - K0060 + 800 - K0060 + 900, K0061 + 395 - K0061 + 608","amountPesos":5634000,"lengthMeters":313.0,"ratePesosPerMeter":18000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage, Barangay Cabancalan, Mandaue City, Cebu - Sta. 0+000.00 - Sta. 0+450.00","amountPesos":5625000,"lengthMeters":450.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bagong Silang-Capalonga Rd - K0317 + 500 - K0317 + 650","amountPesos":5617000,"lengthMeters":150.0,"ratePesosPerMeter":37446.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0475 + 947 - K0475 + 974","amountPesos":5590000,"lengthMeters":27.0,"ratePesosPerMeter":207037.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calamba-Sta Cruz-Famy Jct Rd - K0107 + 726 - K0107 + 906, K0108 + 500 - K0108 + 990","amountPesos":5577000,"lengthMeters":670.0,"ratePesosPerMeter":8323.88,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Conner-Kabugao Rd - K0591 + 370 - K0591 + 390","amountPesos":5500000,"lengthMeters":20.0,"ratePesosPerMeter":275000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Allacapan Bypass Road, Sta. 0 + 220 - Sta. 0 + 300, Cagayan","amountPesos":5500000,"lengthMeters":80.0,"ratePesosPerMeter":68750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road (Sta.0+0000-Sta. 0+237, Sta. 0+343 - Sta. 0+646), Barangay Alinguigan 3rd, City of Ilagan, Isabela","amountPesos":5500000,"lengthMeters":540.0,"ratePesosPerMeter":10185.19,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sitio Comian - Sitio Dulit, San Roque - Sitio Cali-an - Sitio Proper - JCT. Circumferential Road, Sta. 2 + 178 - Sta. 2 + 468, Barangay San Roque and Barangay Salvacion, Nueva Valencia, Guimaras","amountPesos":5500000,"lengthMeters":290.0,"ratePesosPerMeter":18965.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road at Barangay Pigkalawag, Sta. 0 + 000 - Sta. 0 + 250, Sultan Naga Dimaporo, Lanao del Norte","amountPesos":5500000,"lengthMeters":250.0,"ratePesosPerMeter":22000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo-Capiz Rd (New Route) - K0068 + 621 - K0068 + 722","amountPesos":5473000,"lengthMeters":101.0,"ratePesosPerMeter":54188.12,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0059 + (-1672) - K0059 + (-1467)","amountPesos":5463000,"lengthMeters":205.0,"ratePesosPerMeter":26648.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago - Tuguegarao Rd - K0365 + (-1440) - K0365 + (-1268)","amountPesos":5457000,"lengthMeters":172.0,"ratePesosPerMeter":31726.74,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga del Sur Coastal Rd - K1708 + 935 - K1709 + 040, K1711 + 120 - K1711 + 128, K1711 + 997 - K1712 + 006, K1712 + 748 - K1712 + 811, K1725 + 078 - K1725 + 083","amountPesos":5404000,"lengthMeters":190.0,"ratePesosPerMeter":28442.11,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0599+430 - K0599+464","amountPesos":5400000,"lengthMeters":34.0,"ratePesosPerMeter":158823.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Manggang Marikit, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+500","amountPesos":5400000,"lengthMeters":500.0,"ratePesosPerMeter":10800.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0283 + 227 - K0283 + 266, K0284 + 359 - K0284 + 575","amountPesos":5280000,"lengthMeters":255.0,"ratePesosPerMeter":20705.88,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bais-Kabankalan Rd - K0060 + 145 - K0060 + 285","amountPesos":5215000,"lengthMeters":140.0,"ratePesosPerMeter":37250.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Villasis-Malasiqui-Sn Carlos Rd (S00026LZ), K0192+018 - K0192+283","amountPesos":5078000,"lengthMeters":265.0,"ratePesosPerMeter":19162.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Policarpo-Arteche-Lapinig Rd - K0853 + 900 - K0853 + 944.60","amountPesos":5000000,"lengthMeters":44.6,"ratePesosPerMeter":112107.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"JNR Compayan-JNR Pantud-Fabrica Rd - Chainage 0 - Chainage 1555","amountPesos":5000000,"lengthMeters":1555.0,"ratePesosPerMeter":3215.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mabini-Lopez Jaena St - (S00098CB) Chainage 000 - Chainage 063","amountPesos":5000000,"lengthMeters":63.0,"ratePesosPerMeter":79365.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0283+569 - K0283+708","amountPesos":5000000,"lengthMeters":139.0,"ratePesosPerMeter":35971.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bais-Kabankalan Rd - K0067 + 160 - K0067 + 277","amountPesos":5000000,"lengthMeters":117.0,"ratePesosPerMeter":42735.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Lemery-Taal Diversion Rd - K0128 + (-957) - K0128 + (-838.41)","amountPesos":5000000,"lengthMeters":118.59,"ratePesosPerMeter":42162.07,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tablas Circumferential Rd - K0043 + 284 - K0043 + 320","amountPesos":5000000,"lengthMeters":36.0,"ratePesosPerMeter":138888.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Merida-Lundag-Puting Bato-Consolacion-Isabel Rd - K1122 + 550 - K1122 + 572","amountPesos":5000000,"lengthMeters":22.0,"ratePesosPerMeter":227272.73,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LZ) - K0322+179 - K0322+193","amountPesos":5000000,"lengthMeters":14.0,"ratePesosPerMeter":357142.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Caiguit-Cabungaan Diversion Road, (Sta.0+423 - Sta.0+507, Sta.0+816 - Sta.0+921, Sta.1+073 - Sta.1+203), Villaba, Leyte","amountPesos":5000000,"lengthMeters":319.0,"ratePesosPerMeter":15673.98,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (MN) K1462 + 792 - K1462 + 880","amountPesos":5000000,"lengthMeters":88.0,"ratePesosPerMeter":56818.18,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dancalan-Candoni-Damutan Valley Rd - K0120 + 770 - K0120 + 790 (Off-Carriageway Improvement: Paving of Shoulders)","amountPesos":5000000,"lengthMeters":20.0,"ratePesosPerMeter":250000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - (S01633MN) Chainage 067 - Chainage 102, Chainage 243 - Chainage 253","amountPesos":5000000,"lengthMeters":45.0,"ratePesosPerMeter":111111.11,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Imporvement of Road and Drainage, Chainage 000 - Chainage 050 at Bagbag Elementary School at Barangay Bagbag, Quezon City","amountPesos":5000000,"lengthMeters":50.0,"ratePesosPerMeter":100000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Roads, Barangay Pacac Grande, Amulung, Cagayan (Sta. 0+000 - Sta. 0+365)","amountPesos":5000000,"lengthMeters":365.0,"ratePesosPerMeter":13698.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Concrete Road (Sta. 1+250 - Sta. 1+673) at Sitio Alibagu, Barangay Tallag, Cabagan, Isabela","amountPesos":5000000,"lengthMeters":423.0,"ratePesosPerMeter":11820.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+375, Barangay Aguinaldo, Cordon, Isabela","amountPesos":5000000,"lengthMeters":375.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+375, Barangay San Antonio, Jones, Isabela","amountPesos":5000000,"lengthMeters":375.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Sta. 0+000 - Sta. 0+345, Barangay Dallao - Barangay Taliktik, Cordon, Isabela","amountPesos":5000000,"lengthMeters":345.0,"ratePesosPerMeter":14492.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+375, Barangay Sta. Isabel, Jones, Isabela","amountPesos":5000000,"lengthMeters":375.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Kitang I, Limay, Bataan (0+00-0+170)","amountPesos":5000000,"lengthMeters":170.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","project":"Construction of Bridge, Barangay Sisiman, Mariveles, Bataan, Sta. 0 + 000 - Sta. 0 + 005","amountPesos":5000000,"lengthMeters":5.0,"ratePesosPerMeter":1000000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Bangal, Dinalupihan, Bataan, Sta. 0+ 000 - Sta. 0 + 200","amountPesos":5000000,"lengthMeters":200.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Bayan-Bayanan, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 210","amountPesos":5000000,"lengthMeters":210.0,"ratePesosPerMeter":23809.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Binaritan, Morong, Bataan, Sta. 0 + 000 - Sta. 0 + 200","amountPesos":5000000,"lengthMeters":200.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Cabcaben, Mariveles, Bataan, Sta. 0 + 000 - Sta. 0 + 220","amountPesos":5000000,"lengthMeters":220.0,"ratePesosPerMeter":22727.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Colo, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220","amountPesos":5000000,"lengthMeters":220.0,"ratePesosPerMeter":22727.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Happy Valley, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220","amountPesos":5000000,"lengthMeters":220.0,"ratePesosPerMeter":22727.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay JC Payumo, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220","amountPesos":5000000,"lengthMeters":220.0,"ratePesosPerMeter":22727.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Kataasan, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 230","amountPesos":5000000,"lengthMeters":230.0,"ratePesosPerMeter":21739.13,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Maligaya, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220","amountPesos":5000000,"lengthMeters":220.0,"ratePesosPerMeter":22727.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Mt. View, Mariveles, Bataan, Sta. 0 + 000 - Sta. 0 + 220","amountPesos":5000000,"lengthMeters":220.0,"ratePesosPerMeter":22727.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay New San Jose, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 230","amountPesos":5000000,"lengthMeters":230.0,"ratePesosPerMeter":21739.13,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Old San Jose, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 240","amountPesos":5000000,"lengthMeters":240.0,"ratePesosPerMeter":20833.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Payangan, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 210","amountPesos":5000000,"lengthMeters":210.0,"ratePesosPerMeter":23809.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Pentor, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220","amountPesos":5000000,"lengthMeters":220.0,"ratePesosPerMeter":22727.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Pinulot, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220","amountPesos":5000000,"lengthMeters":220.0,"ratePesosPerMeter":22727.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Poblacion, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 100","amountPesos":5000000,"lengthMeters":100.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Roosevelt, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220","amountPesos":5000000,"lengthMeters":220.0,"ratePesosPerMeter":22727.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay San Antonio, Bagac, Bataan, Sta. 0 + 000 - Sta. 0 + 220","amountPesos":5000000,"lengthMeters":220.0,"ratePesosPerMeter":22727.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay San Isidro, Mariveles, Bataan, Sta. 0 + 000 - Sta. 0 + 220","amountPesos":5000000,"lengthMeters":220.0,"ratePesosPerMeter":22727.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay San Ramon, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 230","amountPesos":5000000,"lengthMeters":230.0,"ratePesosPerMeter":21739.13,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Bagumbayan, Bagac, Bataan, Sta. 0 + 000 - Sta. 0 + 220","amountPesos":5000000,"lengthMeters":220.0,"ratePesosPerMeter":22727.27,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Daang Bago, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 210","amountPesos":5000000,"lengthMeters":210.0,"ratePesosPerMeter":23809.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay San Pablo, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 200","amountPesos":5000000,"lengthMeters":200.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Sto. Niño, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 230","amountPesos":5000000,"lengthMeters":230.0,"ratePesosPerMeter":21739.13,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+239, Igulot, Bocaue, Bulacan","amountPesos":5000000,"lengthMeters":239.0,"ratePesosPerMeter":20920.5,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+302.82, Sta. 0+000 - Sta. 0+196.69, & Sta. 0+000 - Sta. 0+089.29, Catulinan, Baliwag, Bulacan","amountPesos":5000000,"lengthMeters":302.82,"ratePesosPerMeter":16511.46,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+688, Lalangan, Plaridel, Bulacan","amountPesos":5000000,"lengthMeters":688.0,"ratePesosPerMeter":7267.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road including Drainage Canal, Sta. 0+000 - Sta. 0+405.25, T. Bugallion St., Subic, Baliwag, Bulacan","amountPesos":5000000,"lengthMeters":405.25,"ratePesosPerMeter":12338.06,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road including Drainage Canal, Sta. 0+000 - Sta. 0+420, M. Ponce St., Poblacion, Baliwag, Bulacan","amountPesos":5000000,"lengthMeters":420.0,"ratePesosPerMeter":11904.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road including Drainage Canal, Sta. 0+000 - Sta. 0+466.22, Aldama St., Virgen Delas Flores, Baliwag, Bulacan","amountPesos":5000000,"lengthMeters":466.22,"ratePesosPerMeter":10724.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road including Drainage System, Sta. 0+000 - Sta. 0+125, Gregorio del Pilar St., Poblacion, Calumpit, Bulacan","amountPesos":5000000,"lengthMeters":125.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 0+110, E. Bautista St., Dampol, Plaridel, Bulacan","amountPesos":5000000,"lengthMeters":110.0,"ratePesosPerMeter":45454.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 0+640.53, Sulivan, Baliuag, Bulacan","amountPesos":5000000,"lengthMeters":640.53,"ratePesosPerMeter":7806.04,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Sta. 0+000 - Sta. 0+779.14, P. Angeles St., Sto. Cristo, Baliwag, Bulacan","amountPesos":5000000,"lengthMeters":779.14,"ratePesosPerMeter":6417.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Poblacion, San Ildefonso, Bulacan Sta. 00+000 - 00+400","amountPesos":5000000,"lengthMeters":400.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Valle, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+444","amountPesos":5000000,"lengthMeters":444.0,"ratePesosPerMeter":11261.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Guiset, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+444","amountPesos":5000000,"lengthMeters":444.0,"ratePesosPerMeter":11261.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Bulakid, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+444","amountPesos":5000000,"lengthMeters":444.0,"ratePesosPerMeter":11261.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Alemania, Nampicuan, Nueva Ecija, Sta. 0+000 - Sta. 0+444","amountPesos":5000000,"lengthMeters":444.0,"ratePesosPerMeter":11261.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Escaño, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+444","amountPesos":5000000,"lengthMeters":444.0,"ratePesosPerMeter":11261.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Cabawangan, Nampicuan, Nueva Ecija, Sta. 0+000 - Sta. 0+444","amountPesos":5000000,"lengthMeters":444.0,"ratePesosPerMeter":11261.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Sabit, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+444","amountPesos":5000000,"lengthMeters":444.0,"ratePesosPerMeter":11261.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Paitan Sur, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+444","amountPesos":5000000,"lengthMeters":444.0,"ratePesosPerMeter":11261.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Pag-asa, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+416","amountPesos":5000000,"lengthMeters":416.0,"ratePesosPerMeter":12019.23,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with lined canal, Brgy. Maquiapo, Guagua, Pampanga, Sec. A: Sta.0+350 - Sta.0+482, Sec. B: Sta.0+000 - Sta.0+078, Sec. C: Sta.0+000 - Sta.0+145","amountPesos":5000000,"lengthMeters":277.0,"ratePesosPerMeter":18050.54,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road at San Jose, Riles Fortuna side road from Purok2 to Purok6, San Jose, Floridablanca, Pampanga, Sta.0+000 - Sta.0+580","amountPesos":5000000,"lengthMeters":580.0,"ratePesosPerMeter":8620.69,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement and Rehabilitation of Barangay Road at Sta. Maria St., Poblacion, Floridablanca, Pampanga, Sta.0+000 - Sta.0+350","amountPesos":5000000,"lengthMeters":350.0,"ratePesosPerMeter":14285.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road in Purok 5, Brgy. San Roque, Floridablanca, Pampanga, Sta.0+000 - Sta.0+540","amountPesos":5000000,"lengthMeters":540.0,"ratePesosPerMeter":9259.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road at Purok 8, Biglang Sibul, Brgy. Bodega, Floridablanca, Pampanga, Sta.0+000 - Sta.0+540","amountPesos":5000000,"lengthMeters":540.0,"ratePesosPerMeter":9259.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Brgy. Siran, Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+150, Sec. B: Sta.0+000 - Sta.0+050, Sec. C: Sta.0+000 - Sta.0+165","amountPesos":5000000,"lengthMeters":165.0,"ratePesosPerMeter":30303.03,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Brgy. Ligaya, Pulungmasle, Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+240, Sec. B: Sta.0+000 - Sta.0+100, Sec. C: Sta.0+000 - Sta.0+140, Sec. D: Sta.0+000 - Sta.0+175","amountPesos":5000000,"lengthMeters":240.0,"ratePesosPerMeter":20833.33,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Project at Purok 6 Rosal St., San Nicolas, Floridablanca, Pampanga, Sta. 0+000 - Sta. 0+270","amountPesos":5000000,"lengthMeters":270.0,"ratePesosPerMeter":18518.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Lined Canal, Purok 5, Sto. Rosario, Floridablanca, Pampanga, Sta. 0+000 - Sta. 0+180","amountPesos":5000000,"lengthMeters":180.0,"ratePesosPerMeter":27777.78,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Barangay Road in Purok 5 Brgy. Anon, Floridablanca, Pampanga, Sta. 0+000 - Sta. 0+350","amountPesos":5000000,"lengthMeters":350.0,"ratePesosPerMeter":14285.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Located at Purok 4 Brgy. San Pablo, Guagua, Pampanga, Sta.0+000 - Sta.0+290","amountPesos":5000000,"lengthMeters":290.0,"ratePesosPerMeter":17241.38,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road in Purok 3 Brgy. Natividad, Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+150, Sec. B: Sta.0+000 - Sta.0+200, Sec. C: Sta.0+000 - Sta.0+190","amountPesos":5000000,"lengthMeters":200.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Brgy. Magsaysay, Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+340, Sec. B: Sta.0+000 - Sta.0+200","amountPesos":5000000,"lengthMeters":340.0,"ratePesosPerMeter":14705.88,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road at Langka St., Brgy. Calantas, Floridablanca, Pampanga, Sta.0+000 - Sta.0+337","amountPesos":5000000,"lengthMeters":337.0,"ratePesosPerMeter":14836.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Brgy. Batang 2nd, Sasmuan, Pampanga, Sta.0+000 - Sta.0+195","amountPesos":5000000,"lengthMeters":195.0,"ratePesosPerMeter":25641.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Lined Canal at Telagunting St., Brgy. Valdez, Floridablanca, Pampanga, Sta.0+000 - Sta.0+350","amountPesos":5000000,"lengthMeters":350.0,"ratePesosPerMeter":14285.71,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Canal at Zone 1, Brgy. Becuran, Sta.Rita, Pampanga, Sta.0+000 - Sta.0+200","amountPesos":5000000,"lengthMeters":200.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road at Manuali, Brgy. San Basilio, Sta.Rita, Pampanga, Sta.0+000 - Sta.0+450","amountPesos":5000000,"lengthMeters":450.0,"ratePesosPerMeter":11111.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Barangay Babo Sacan, Porac, Pampanga, Section A: Sta. 0+000 - Sta. 0+070, Section B: Sta. 0+000 - Sta. 0+130, Section C: Sta. 0+000 - Sta. 0+100","amountPesos":5000000,"lengthMeters":130.0,"ratePesosPerMeter":38461.54,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Villa Carmela Purok 2 Barangay San Agustin, Betis, Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+290, Sec. B: Sta.0+000 - Sta.0+110, Sec. C: Sta.0+000 - Sta.0+050","amountPesos":5000000,"lengthMeters":290.0,"ratePesosPerMeter":17241.38,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road Slope Protection Structure along Batangas - Lobo Road (Lobo Section) K0128+(-270) - K0128+(-350)","amountPesos":5000000,"lengthMeters":80.0,"ratePesosPerMeter":62500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road, Barangay Pooc - Malaking Tatiao, Silang, Cavite, (Sta. 0 + 000 - Sta. 0 + 325)","amountPesos":5000000,"lengthMeters":325.0,"ratePesosPerMeter":15384.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Road With Drainage Systems Narcissus St. Antipolo Valley, Barangay Mambugan, Antipolo City (Sta.0+000-Sta.0+140)","amountPesos":5000000,"lengthMeters":140.0,"ratePesosPerMeter":35714.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road, Sta. 0+000 - Sta. 0+505, at Barangay Katwiran I, Baco, Oriental Mindoro","amountPesos":5000000,"lengthMeters":505.0,"ratePesosPerMeter":9900.99,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road, Sta. 0+000 - Sta. 0+490, at Barangay Mangangan I, Baco, Oriental Mindoro","amountPesos":5000000,"lengthMeters":490.0,"ratePesosPerMeter":10204.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta 0 + 000- Sta 0 + 250, Sitio Amihan, Barangay San Aquilino, Roxas, Oriental Mindoro","amountPesos":5000000,"lengthMeters":250.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay San Pablo, Sta. 8 + 925.00 to Sta. 9 + 015.00, Del Gallego, Camarines Sur","amountPesos":5000000,"lengthMeters":90.0,"ratePesosPerMeter":55555.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay San Pablo, Sta. 9 + 015.00 to Sta. 9 + 105.00, Del Gallego, Camarines Sur","amountPesos":5000000,"lengthMeters":90.0,"ratePesosPerMeter":55555.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Tabion, Sta. 6 + 800.00 to Sta. 6 + 890.00, Del Gallego, Camarines Sur","amountPesos":5000000,"lengthMeters":90.0,"ratePesosPerMeter":55555.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Tabion, Sta. 6 + 890.00 to Sta. 6 + 980.00, Del Gallego, Camarines Sur","amountPesos":5000000,"lengthMeters":90.0,"ratePesosPerMeter":55555.56,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Zone 5, Barangay Poblacion, Sta. 0 + 888.00 to Sta. 1 + 088.00, Lupi, Camarines Sur","amountPesos":5000000,"lengthMeters":200.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Tambangan to Barangay Manzana, San Jose-Partido, Camarines Sur Section 1: Sta. 1+400 - Sta. 1+540 Section 2 : Sta. 0+000 - Sta. 0+024, Section 3: Sta. 0+000 - Sta. 0+028, Section 4: Sta. 0+000 - Sta. 0+050","amountPesos":5000000,"lengthMeters":190.0,"ratePesosPerMeter":26315.79,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road with Drainage, Barangay Salogon, San Jose, Camarines Sur Sta. 0+000 - Sta. 0+400","amountPesos":5000000,"lengthMeters":400.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Salogon - Barangay Ponglon, San Jose, Camarines Sur Sta. 0+000 - Sta. 0+730","amountPesos":5000000,"lengthMeters":730.0,"ratePesosPerMeter":6849.32,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Danlog, San Jose-Partido, Camarines Sur Sta. 0+350 - Sta. 0+765","amountPesos":5000000,"lengthMeters":415.0,"ratePesosPerMeter":12048.19,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Bagacay, San Jose-Partido, Camarines Sur Sta. 0+706 - Sta. 1+256","amountPesos":5000000,"lengthMeters":550.0,"ratePesosPerMeter":9090.91,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sitio Bitbit -Santa Teresa Road, BarangaySanta Teresa, Jordan, Guimaras,Sta. 0 + 930 - Sta. 1 + 088","amountPesos":5000000,"lengthMeters":158.0,"ratePesosPerMeter":31645.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road (Sta. 0+706 - Sta. 1+033) Barangay Alegria, Murcia, Negros Occidental (10.6380030, 123.0632850)","amountPesos":5000000,"lengthMeters":327.0,"ratePesosPerMeter":15290.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+170, at Purok Sta. Maria, Barangay Himoga- an Baybay, Sagay City, Negros Occidental","amountPesos":5000000,"lengthMeters":170.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+170, at Purok Tisa Barangay Bulanon, Sagay City, Negros Occidental","amountPesos":5000000,"lengthMeters":170.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage along A.G. Cabahug, Sitio Centro, Barangay Looc, Mandaue City, Cebu. Sta. 0+000.00 to Sta. 0+122.00","amountPesos":5000000,"lengthMeters":122.0,"ratePesosPerMeter":40983.61,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Calumpang, Naval, Biliran (Sta. 0 + 000 - Sta. 0 + 115, Sta. 0 + 060 - Sta. 0 + 142, Sta. 0 + 146 - Sta. 0 + 196)","amountPesos":5000000,"lengthMeters":192.0,"ratePesosPerMeter":26041.67,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Manlabang, Caibiran, Biliran (Sta. 0+000 - Sta. 0+177)","amountPesos":5000000,"lengthMeters":177.0,"ratePesosPerMeter":28248.59,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Ungale, Kawayan, Biliran (Sta. 1+030 - Sta. 1+280)","amountPesos":5000000,"lengthMeters":250.0,"ratePesosPerMeter":20000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+200, Barangay Cansumangkay, Balangiga Eastern Samar","amountPesos":5000000,"lengthMeters":200.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+185, Barangay Bagua, Guiuan Eastern Samar","amountPesos":5000000,"lengthMeters":185.0,"ratePesosPerMeter":27027.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+205 - Sta. 0+590, Barangay Aringit, Pastrana, Leyte","amountPesos":5000000,"lengthMeters":385.0,"ratePesosPerMeter":12987.01,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Baco, Leyte Leyte (Station 0+000 - 0+200)","amountPesos":5000000,"lengthMeters":200.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sitio San Vicente, Barangay Daja Daku, San Isidro, Leyte (Station 0+000 - 0+200)","amountPesos":5000000,"lengthMeters":200.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Abuyogay, Sta. 0+000 - 0+355, Javier, Leyte","amountPesos":5000000,"lengthMeters":355.0,"ratePesosPerMeter":14084.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Alangilan, Sta. 0+000 - 0+375, Abuyog, Leyte","amountPesos":5000000,"lengthMeters":375.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Alegria, Sta. 0+000 - 0+374, Bato, Leyte","amountPesos":5000000,"lengthMeters":374.0,"ratePesosPerMeter":13368.98,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Amagos, Sta. 0+000 - 0+376, Bato, Leyte","amountPesos":5000000,"lengthMeters":376.0,"ratePesosPerMeter":13297.87,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Atabay, Sta. 0+000 - 0+371, Hilongos, Leyte","amountPesos":5000000,"lengthMeters":371.0,"ratePesosPerMeter":13477.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Cancayang, Sta. 0+000 - 0+357, Javier, Leyte","amountPesos":5000000,"lengthMeters":357.0,"ratePesosPerMeter":14005.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Gacat, Sta. 0+000 - 0+380, Baybay City, Leyte","amountPesos":5000000,"lengthMeters":380.0,"ratePesosPerMeter":13157.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Hitoog, Sta. 0+000 - 0+342, Matalom, Leyte","amountPesos":5000000,"lengthMeters":342.0,"ratePesosPerMeter":14619.88,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Itum, Sta. 0+450 - 0+821, Matalom, Leyte","amountPesos":5000000,"lengthMeters":371.0,"ratePesosPerMeter":13477.09,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Mabunga, Sta. 0+000 - 0+355, Mahaplag, Leyte","amountPesos":5000000,"lengthMeters":355.0,"ratePesosPerMeter":14084.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Malitbogay, Sta. 0+000 - 0+365, Javier, Leyte","amountPesos":5000000,"lengthMeters":365.0,"ratePesosPerMeter":13698.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Old Taligue, Sta. 0+500 - 0+875, Abuyog, Leyte","amountPesos":5000000,"lengthMeters":375.0,"ratePesosPerMeter":13333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Pinocawan, Sta. 1+390 - 1+750, Javier, Leyte","amountPesos":5000000,"lengthMeters":360.0,"ratePesosPerMeter":13888.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Pomponan, Sta. 0+000 - 0+372, Baybay City, Leyte","amountPesos":5000000,"lengthMeters":372.0,"ratePesosPerMeter":13440.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Punta, Sta. 0+000 - 0+374, Baybay City, Leyte","amountPesos":5000000,"lengthMeters":374.0,"ratePesosPerMeter":13368.98,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Rivilla, Sta. 0+800 - 1+156, Bato, Leyte","amountPesos":5000000,"lengthMeters":356.0,"ratePesosPerMeter":14044.94,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay San Francisco, Sta. 0+000 - 0+300, Abuyog, Leyte","amountPesos":5000000,"lengthMeters":300.0,"ratePesosPerMeter":16666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay San Isidro, Sta. 0+000 - 0+367, Mahaplag, Leyte","amountPesos":5000000,"lengthMeters":367.0,"ratePesosPerMeter":13623.98,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Santo Rosario, Sta. 0+000 - 0+362, Baybay City, Leyte","amountPesos":5000000,"lengthMeters":362.0,"ratePesosPerMeter":13812.15,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Tagaytay, Sta. 0+000 - 0+365, Mahaplag, Leyte","amountPesos":5000000,"lengthMeters":365.0,"ratePesosPerMeter":13698.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Tuy-a, Sta. 0+600 - 0+968, Abuyog, Leyte","amountPesos":5000000,"lengthMeters":368.0,"ratePesosPerMeter":13586.96,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Villa Mag-aso, Sta. 0+000 - 0+370, Baybay City, Leyte","amountPesos":5000000,"lengthMeters":370.0,"ratePesosPerMeter":13513.51,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Cababto-an (Sta. 0+214.50 - Sta. 0+274.50), Pambujan, Northern Samar","amountPesos":5000000,"lengthMeters":60.0,"ratePesosPerMeter":83333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Cabulaloan (Sta. 0+000 - Sta. 0+125), Laoang, Northern Samar","amountPesos":5000000,"lengthMeters":125.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Lawaan (Sta. 0+000 - Sta. 0+125), Laoang, Northern Samar","amountPesos":5000000,"lengthMeters":125.0,"ratePesosPerMeter":40000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Cagmanipis Norte, Sta. 0+000 - Sta. 0+225, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":225.0,"ratePesosPerMeter":22222.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Carayman, Sta. 0+000 - Sta. 0+172, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":172.0,"ratePesosPerMeter":29069.77,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Lonoy, Sta. 0+000 - Sta. 0+220.69, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":220.69,"ratePesosPerMeter":22656.21,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Guin-on, Sta. 0+000 - Sta. 0+504, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":504.0,"ratePesosPerMeter":9920.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Nijaga, Sta. 0+000 - Sta. 0+300, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":300.0,"ratePesosPerMeter":16666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Barangay Payahan, Sta. 0+000 - Sta. 0+247, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":247.0,"ratePesosPerMeter":20242.91,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Begaho, Sta. 0+000 - Sta. 0+227.96, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":227.96,"ratePesosPerMeter":21933.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Cabacungan, Sta. 0+000 - Sta. 0+400, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":400.0,"ratePesosPerMeter":12500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Cagbilwang, Sta. 0+000 - Sta. 0+140, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":140.0,"ratePesosPerMeter":35714.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Cagnipa, Sta. 0+000 - Sta. 0+472, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":472.0,"ratePesosPerMeter":10593.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Cag-olango, Sta. 0+000 - Sta. 0+458, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":458.0,"ratePesosPerMeter":10917.03,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Carmen, Sta. 0+000 - Sta. 0+235, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":235.0,"ratePesosPerMeter":21276.6,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Danao I, Sta. 0+000 - Sta. 0+200, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":200.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Dinagan, Sta. 0+000 - Sta. 0+210, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":210.0,"ratePesosPerMeter":23809.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Jimautan, Sta. 0+000 - Sta. 0+225, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":225.0,"ratePesosPerMeter":22222.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay La Paz, Sta. 0+000 - Sta. 0+227.41, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":227.41,"ratePesosPerMeter":21986.72,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Malayog, Sta. 0+000 - Sta. 0+460, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":460.0,"ratePesosPerMeter":10869.57,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Migara, Sta. 0+000 - Sta. 0+200, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":200.0,"ratePesosPerMeter":25000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Palanas Cara, Sta. 0+000 - Sta. 0+231.10, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":231.1,"ratePesosPerMeter":21635.66,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Patong, Sta. 0+000 - Sta. 0+272, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":272.0,"ratePesosPerMeter":18382.35,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Sinidman Occidental, Sta. 0+000 - Sta. 0+352, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":352.0,"ratePesosPerMeter":14204.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Sinidman Oriental, Sta. 0+000 - Sta. 0+348, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":348.0,"ratePesosPerMeter":14367.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Tomaligues, Sta. 0+000 - Sta. 0+347, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":347.0,"ratePesosPerMeter":14409.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Rehabilitation of Road, Barangay Victory, Sta. 0+000 - Sta. 0+236, Calbayog City, Samar","amountPesos":5000000,"lengthMeters":236.0,"ratePesosPerMeter":21186.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road, Sta. 0+000 - Sta. 0+240, from Jct. National Highway Leading to Disud Barangay Hall, Disud, Sindangan, Zamboanga del Norte","amountPesos":5000000,"lengthMeters":240.0,"ratePesosPerMeter":20833.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Road with Drainage, Purok Abigail, Barangay Del Carmen, Sta. 0+000 - Sta. 0+140, Iligan City","amountPesos":5000000,"lengthMeters":140.0,"ratePesosPerMeter":35714.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road with Drainage, Barangay Acmac, Sta. 0+000 -Sta. 0+133, Iligan City","amountPesos":5000000,"lengthMeters":133.0,"ratePesosPerMeter":37593.98,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Purok Makugihon and Purok Masidlakon, Barangay Sta. Felomina, Section A: Sta. 0+000 - Sta. 0+080, Section B: Sta. 0+000 - Sta. 0+230, Iligan City","amountPesos":5000000,"lengthMeters":230.0,"ratePesosPerMeter":21739.13,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Purok 4), Barangay Poblacion, Sta. 0+000 - Sta. 0+170, Bonifacio, Misamis Occidental","amountPesos":5000000,"lengthMeters":170.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Barangay Road, Barangay Pangabuan, Sta. 0+000 - Sta. 0+170, Tangub City, Misamis Occidental","amountPesos":5000000,"lengthMeters":170.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Purok 7), Barangay Linconan, Sta. 0+000 - Sta. 0+170, Bonifacio, Misamis Occidental","amountPesos":5000000,"lengthMeters":170.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Purok 2), Barangay Demetrio Fernan, Sta. 0+000 - Sta. 0+170, Bonifacio, Misamis Occidental","amountPesos":5000000,"lengthMeters":170.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Purok 3), Doña Consuelo, Sta. 0+000 - Sta. 0+170, Ozamiz City, Misamis Occidental","amountPesos":5000000,"lengthMeters":170.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Purok 4 - Paustino Decena Integrated School), Barangay Carangan, Sta. 0+000 - Sta. 0+170, Ozamiz City, Misamis Occidental","amountPesos":5000000,"lengthMeters":170.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Concreting of Road (Segment D Purok 7), Barangay Bagakay, Sta. 0+000 - Sta. 0+170, Ozamiz City, Misamis Occidental","amountPesos":5000000,"lengthMeters":170.0,"ratePesosPerMeter":29411.76,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Improvement of Roads including Facilities along Purok Rizal to Purok Bonifacio, Barangay Bacolod, Sta. 0+000 - Sta. 0+100, Ozamiz City, Misamis Occidental","amountPesos":5000000,"lengthMeters":100.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction (Improvement) Sta. 0 + 000 - Sta. 0 + 100 of Road, Barangay Carmen, Loreto, Dinagat Islands","amountPesos":5000000,"lengthMeters":100.0,"ratePesosPerMeter":50000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, (0+000 - 0+300), Purok 5, Barangay Togbongon, Surigao City, Surigao del Norte","amountPesos":5000000,"lengthMeters":300.0,"ratePesosPerMeter":16666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Alicia - Angadanan - San Guillermo - Cauayan City - Naguilian Alternate Route (Sta. 4+224 - Sta. 4+423), Isabela","amountPesos":4865000,"lengthMeters":199.0,"ratePesosPerMeter":24447.24,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Pablo-Rizal-Nagcarlan-Liliw Rd - K0086 + 290 - K0086 + 303, K0087 + 382 - K0087 + 491, K0087 + 518 - K0088 + 163, K0088 + 500 - K0088 + 527, K0088 + 568 - K0088 + 585, K0091 + 000 - K0091 + 045, K0098 + 221 - K0098 + 296, K0098 + 527 - K0098 + 534, K0100 + 513 - K0100 + 572, K0102 + 189 - K0102 + 330 (Off- Carriageway Improvement: Construction of Sidewalk)","amountPesos":4781000,"lengthMeters":1138.0,"ratePesosPerMeter":4201.23,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tungusong-Tubig Indangan Rd - Chainage 9616 - Chainage 10000","amountPesos":4772000,"lengthMeters":384.0,"ratePesosPerMeter":12427.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Indang-Alfonso via Luksuhin Rd - K0068 + 529 - K0068 + 664","amountPesos":4731000,"lengthMeters":135.0,"ratePesosPerMeter":35044.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Balbalan-Pinukpuk Rd - K0480 + 155 - K0480 + 260, K0488 + 947 - K0489 + 000","amountPesos":4650000,"lengthMeters":158.0,"ratePesosPerMeter":29430.38,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga del Sur Coastal Rd - (S01511MN) Chainage 2376 - Chainage 2466","amountPesos":4648000,"lengthMeters":90.0,"ratePesosPerMeter":51644.44,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mondragon-Bantayan Old Rd - K0758 + 960 - K0759 + 000","amountPesos":4590000,"lengthMeters":40.0,"ratePesosPerMeter":114750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zapote-Alabang Rd - (S03496LZ) Chainage 000 - Chainage 134","amountPesos":4570000,"lengthMeters":134.0,"ratePesosPerMeter":34104.48,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"South Super H-way East Service Rd - K0018 + 759 - K0019 + 057","amountPesos":4561000,"lengthMeters":298.0,"ratePesosPerMeter":15305.37,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0592 + 060 - K0592 + 087","amountPesos":4500000,"lengthMeters":27.0,"ratePesosPerMeter":166666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct. Ayaga (Abulug)-Ballesteros-Aparri Rd - K0680 + 280 - K0680 + 700 (Off- Carriageway Improvement: Paving of Shoulders)","amountPesos":4500000,"lengthMeters":420.0,"ratePesosPerMeter":10714.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation of Solar LED (Roadway Lighting) along Mayor CA Fernandez (S01496MN) Rd Chainage 000 - Chainage 500","amountPesos":4500000,"lengthMeters":500.0,"ratePesosPerMeter":9000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Aklan East Rd - K0296 + 1017 - K0296 + 1019, K0302 + 476 - K0302 + 528, K0302 + 557 - K0302 + 631, K0311 + 969 - K0311 + 984, K0312 + 692 - K0312 + 712, K0313 + 406 - K0313 + 427","amountPesos":4499000,"lengthMeters":184.0,"ratePesosPerMeter":24451.09,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0043 + 537 - K0043 + 615","amountPesos":4488000,"lengthMeters":78.0,"ratePesosPerMeter":57538.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0213 + 809 - K0214 + 017","amountPesos":4473000,"lengthMeters":208.0,"ratePesosPerMeter":21504.81,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1392 + 725 - K1392 + 792.50, K1395 + 471 - K1395 + 497, K1399 + 310 - K1399 + 378","amountPesos":4471000,"lengthMeters":161.5,"ratePesosPerMeter":27684.21,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Ipil-Quirino Bdry Rd - K0338 + 018 - K0339 + 000","amountPesos":4410000,"lengthMeters":982.0,"ratePesosPerMeter":4490.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Guinhayaan-Malbog Port Rd - K0100 + 725 - K0100 + 798","amountPesos":4380000,"lengthMeters":73.0,"ratePesosPerMeter":60000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Candoni-Sipalay Rd - K0149 + 400 - K0149 + 600","amountPesos":4262000,"lengthMeters":200.0,"ratePesosPerMeter":21310.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod North Rd - K0119 + 718 - K0119+823, K0120+132 - K0120+210","amountPesos":4209000,"lengthMeters":183.0,"ratePesosPerMeter":23000.0,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mindanao Ave - K0019 + (-893) - K0019 + 217 (Off-Carriageway Improvement: Construction of Sidewalk)","amountPesos":4039000,"lengthMeters":1110.0,"ratePesosPerMeter":3638.74,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mabini St - (S05825LZ) Chainage 000 - Chainage 238","amountPesos":4034000,"lengthMeters":238.0,"ratePesosPerMeter":16949.58,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Cabunga-an-Tabunok-Consuegra Rd - K1024 + 000 - K1024 + 460","amountPesos":4016000,"lengthMeters":460.0,"ratePesosPerMeter":8730.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zapote-Alabang Rd - (S03274LZ) Chainage 260 - Chainage 383","amountPesos":4006000,"lengthMeters":123.0,"ratePesosPerMeter":32569.11,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0593 + 450 - K0593 + 475","amountPesos":4000000,"lengthMeters":25.0,"ratePesosPerMeter":160000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation of Solar LED (Roadway Lighting) along Veterans Ave (S01207MN) Chainage 000 - Chainage 456","amountPesos":4000000,"lengthMeters":456.0,"ratePesosPerMeter":8771.93,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Antipolo Div Rd 2 - K0024 + (-093) - K0024 + 250","amountPesos":3969000,"lengthMeters":343.0,"ratePesosPerMeter":11571.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Larena-Basac-Maria Rd - (S00005SJ) Chainage 10488 - Chainage 10687","amountPesos":3870000,"lengthMeters":199.0,"ratePesosPerMeter":19447.24,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bauang-Baguio Rd - K0280 + 170 - K0280 + 354","amountPesos":3864000,"lengthMeters":184.0,"ratePesosPerMeter":21000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao-Davao Coastal Rd - K1417 + 637 - K1417 + 795","amountPesos":3842000,"lengthMeters":158.0,"ratePesosPerMeter":24316.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Candoni-Sipalay Rd - K0162 + 120 - K0163 + 300","amountPesos":3836000,"lengthMeters":1180.0,"ratePesosPerMeter":3250.85,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tejero-Gen Trias-Amadeo-Tagaytay Rd - K0042 + 328 - K0042 + 512, K0043 + 579 - K0043 + 725","amountPesos":3818000,"lengthMeters":330.0,"ratePesosPerMeter":11569.7,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Isaac O. Tolentino Ave. - K0059 + 377 - K0059 + 589","amountPesos":3816000,"lengthMeters":212.0,"ratePesosPerMeter":18000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Conner-Kabugao Rd - K0598 + 015 - K0598 + 038","amountPesos":3800000,"lengthMeters":23.0,"ratePesosPerMeter":165217.39,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway ( Manila South Road) - K0031 + (-780) - K0031 + (-684)","amountPesos":3771000,"lengthMeters":96.0,"ratePesosPerMeter":39281.25,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Paracelis-Mallig-Roxas Rd - (S04031LZ) Chainage 4282 - Chainage 4318","amountPesos":3686000,"lengthMeters":36.0,"ratePesosPerMeter":102388.89,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mindanao Ave - K0019 + (-309) - K0019 + 684 (Off-Carriageway Improvement: Construction of Sidewalk)","amountPesos":3636000,"lengthMeters":993.0,"ratePesosPerMeter":3661.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maragondon-Magallanes-Amuyong Rd - K0058 + 834 - K0058 + 932","amountPesos":3588000,"lengthMeters":98.0,"ratePesosPerMeter":36612.24,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Tagaytay-Taal Lake Rd - K0057 + (-191) - K0057 + 000","amountPesos":3584000,"lengthMeters":191.0,"ratePesosPerMeter":18764.4,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"San Juan-Santolan Rd - K0009 + (-182) - K0010 + 403","amountPesos":3562000,"lengthMeters":1585.0,"ratePesosPerMeter":2247.32,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sindangan-Siayan-Dumingag-Mahayag Rd (Mahayag-Dumingag Sect) - K1671 + 992 - K1672 + 000","amountPesos":3520000,"lengthMeters":8.0,"ratePesosPerMeter":440000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Paracelis-Mallig-Roxas Rd - Chainage 1890 - Chainage 2010","amountPesos":3500000,"lengthMeters":120.0,"ratePesosPerMeter":29166.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dancalan-Candoni-Damutan Valley Rd - K0138 + 050 - K0138 + 100","amountPesos":3500000,"lengthMeters":50.0,"ratePesosPerMeter":70000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Iloilo East Coast-Capiz Rd - K0263 + 110 - K0263 + 130, K0263 + 609 - K0263 + 623","amountPesos":3500000,"lengthMeters":34.0,"ratePesosPerMeter":102941.18,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mabini St - (S06052LZ) Chainage 000 - Chainage 200","amountPesos":3494000,"lengthMeters":200.0,"ratePesosPerMeter":17470.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dipolog-Sindangan-Liloy Rd - K1869 + 000 - K1869 + 139","amountPesos":3455000,"lengthMeters":139.0,"ratePesosPerMeter":24856.12,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga City-Labuan-Limpapa Rd - K1947 + 326 - K1947 + 340, K1947 + 562 - K1947 + 571.40, K1954 + 915 - K1954 + 929, K1960 + 374.20 - K1960 + 413.30","amountPesos":3397000,"lengthMeters":76.5,"ratePesosPerMeter":44405.23,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0038 + 315 - K0038 + 604","amountPesos":3344000,"lengthMeters":289.0,"ratePesosPerMeter":11570.93,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"N Bacalso Ave (Cebu South Rd) - K0065 + 438 - K0065 + 567","amountPesos":3308000,"lengthMeters":129.0,"ratePesosPerMeter":25643.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Matalam-Mlang-Bagontapay Jct Rd - K1653 + 779 - K1653 + 877","amountPesos":3297000,"lengthMeters":98.0,"ratePesosPerMeter":33642.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Baras-Gigmoto-Viga Rd - K0031 + 821 - K0032 + 261, K0032 + 914 - K0033 + 000, K0050 + 860 - K0051 + 000, K0083 + 000 - K0084 + 000, K0088 + 577 - K0088 + 906","amountPesos":3280000,"lengthMeters":1995.0,"ratePesosPerMeter":1644.11,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maragondon-Magallanes-Amuyong Rd - K0085 + 949 - K0086 + 120","amountPesos":3249000,"lengthMeters":171.0,"ratePesosPerMeter":19000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway ( Manila South Road) - K0042 + 336 - K0042 + 410","amountPesos":3199000,"lengthMeters":74.0,"ratePesosPerMeter":43229.73,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sindangan-Liloy Rd - K1941 + 923 - K1942 + 000","amountPesos":3178000,"lengthMeters":77.0,"ratePesosPerMeter":41272.73,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa North Rd - K0169 + 573 - K0169 + 595.50, K0169 + 758.20 - K0169 + 804","amountPesos":3142000,"lengthMeters":68.3,"ratePesosPerMeter":46002.93,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Surigao-Agusan Sect) - K1229 + 680 - K1229 + 773","amountPesos":3087000,"lengthMeters":93.0,"ratePesosPerMeter":33193.55,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mayapa-Canlubang Cadre Rd - K0050 + 855 - K0051 + 000","amountPesos":3084000,"lengthMeters":145.0,"ratePesosPerMeter":21268.97,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga City-Labuan-Limpapa Rd - K1969 + 054 - K1969 + 099.10, K1969 + 182.50 - K1969 + 213.10","amountPesos":3081000,"lengthMeters":75.7,"ratePesosPerMeter":40700.13,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Ormoc-Baybay-Southern Leyte Bdry Rd - K1014 + 000 - K1014 + 175","amountPesos":3005000,"lengthMeters":175.0,"ratePesosPerMeter":17171.43,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - (S01633MN) Chainage 130 - Chainage 243","amountPesos":3000000,"lengthMeters":113.0,"ratePesosPerMeter":26548.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dumaguete South Rd - K0052 + 539 - K0052 + 619","amountPesos":3000000,"lengthMeters":80.0,"ratePesosPerMeter":37500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dancalan-Candoni-Damutan Valley Rd - K0134 + 115 - K0134 + 165","amountPesos":3000000,"lengthMeters":50.0,"ratePesosPerMeter":60000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calapan South Rd - K0052 + 175 - K0052 + 207","amountPesos":3000000,"lengthMeters":32.0,"ratePesosPerMeter":93750.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calapan South Rd - K0069 + 303 - K0069 + 406","amountPesos":3000000,"lengthMeters":103.0,"ratePesosPerMeter":29126.21,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd K0000+000 - K0001+402 (Pavement Marking)","amountPesos":3000000,"lengthMeters":1402.0,"ratePesosPerMeter":2139.8,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Wharf Rd - K0001+(-1075) - K0001+647 (Pavement Marking)","amountPesos":3000000,"lengthMeters":1722.0,"ratePesosPerMeter":1742.16,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Installation/Application of Road Safety Facilities (Roadway Lighting) along Nueva Ecija - Pangasinan Road (Y Road) Chainage 0 - Chainage 127","amountPesos":3000000,"lengthMeters":127.0,"ratePesosPerMeter":23622.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Luyang-Poo-Lazi Rd - K0025 + 942 - K0026 + 035","amountPesos":2973000,"lengthMeters":93.0,"ratePesosPerMeter":31967.74,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Harrison Rd No 2 - (S00453LZ) Chainage 0 – Chainage 235 (Off-Carriageway Improvement: Construction of Sidewalk)","amountPesos":2970000,"lengthMeters":235.0,"ratePesosPerMeter":12638.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Marikina-Infanta Rd - K0075 + 366 - K0075 + 620","amountPesos":2939000,"lengthMeters":254.0,"ratePesosPerMeter":11570.87,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Wharf Rd - (S01206MN) Chainage 004 - Chainage 135","amountPesos":2907000,"lengthMeters":131.0,"ratePesosPerMeter":22190.84,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calaguiman Vicinal Rd - K0118 + 745 - K0118 + 921","amountPesos":2854000,"lengthMeters":176.0,"ratePesosPerMeter":16215.91,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0720 + (-575) - K0720 + (-533)","amountPesos":2840000,"lengthMeters":42.0,"ratePesosPerMeter":67619.05,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Zamboanga City-Labuan-Limpapa Rd - (S01521MN) Chainage 000 - Chainage 069, Chainage 090 - Chainage 118","amountPesos":2722000,"lengthMeters":97.0,"ratePesosPerMeter":28061.86,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1801 + 037 - K1801 + 072, K1801 + 136 - K1801 + 163","amountPesos":2700000,"lengthMeters":62.0,"ratePesosPerMeter":43548.39,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Muntinlupa-Insular Prison Rd - K0029 + 408 - K0029 + 465","amountPesos":2634000,"lengthMeters":57.0,"ratePesosPerMeter":46210.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Surigao-Davao Coastal Rd - K1464 + 832 - K1465 + 147","amountPesos":2614000,"lengthMeters":315.0,"ratePesosPerMeter":8298.41,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Butuan City-Cagayan de Oro City-Iligan City Rd - K1428 + 000 - K1428 + 217 (Road Safety: Roadway Lighting)","amountPesos":2574000,"lengthMeters":217.0,"ratePesosPerMeter":11861.75,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0022 + 139 - K0022 + 424","amountPesos":2542000,"lengthMeters":285.0,"ratePesosPerMeter":8919.3,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siquijor Circumferential Rd - K0004 + 909 - K0005 + 000","amountPesos":2534000,"lengthMeters":91.0,"ratePesosPerMeter":27846.15,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gov Pack Rd - (S00409LZ) Chainage 000 - Chainage 200 (Off-Carriageway Improvement: Construction of Sidewalk)","amountPesos":2528000,"lengthMeters":200.0,"ratePesosPerMeter":12640.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct. Ayaga (Abulug)-Ballesteros-Aparri Rd - K0671 + 300 - K0672 + 020","amountPesos":2500000,"lengthMeters":720.0,"ratePesosPerMeter":3472.22,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Malvar Rd - K0002+(-656) - K0002+(-175), K0002+955 - K0003+778","amountPesos":2500000,"lengthMeters":1304.0,"ratePesosPerMeter":1917.18,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+170, Barangay Usol - Barangay Namnama, Jones, Isabela","amountPesos":2500000,"lengthMeters":170.0,"ratePesosPerMeter":14705.88,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Construction of Road, Sta. 0+000 - Sta. 0+170, Barangay Papan Weste, Jones, Isabela","amountPesos":2500000,"lengthMeters":170.0,"ratePesosPerMeter":14705.88,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Pagsanjan-Lucban Rd - K0094 + 990 - K0095 + 400, K0095 + 911 - K0096 + 230","amountPesos":2477000,"lengthMeters":729.0,"ratePesosPerMeter":3397.81,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Marikina-Victoria Valley-Antipolo Rd - K0026 + (-209) - K0026 + 000","amountPesos":2418000,"lengthMeters":209.0,"ratePesosPerMeter":11569.38,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Gen Evangelista Rd - (S01836LZ) Chainage 000 - Chainage 061","amountPesos":2400000,"lengthMeters":61.0,"ratePesosPerMeter":39344.26,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Juanito R. Remulla, Sr. Rd - K0040 + 916 - K0041 + 232, K0042 + 000 - K0042 + 118, K0042 + 388 - K0042 + 778, K0043 + 059 - K0043 + 146","amountPesos":2205000,"lengthMeters":911.0,"ratePesosPerMeter":2420.42,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nueva Ecija - Pangasinan Rd Chainage 8 - Chainage 104","amountPesos":2200000,"lengthMeters":96.0,"ratePesosPerMeter":22916.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd - K0005 + (-915) - K0005 + (-470) (Off-Carriageway Improvement: Construction of Sidewalk)","amountPesos":2200000,"lengthMeters":445.0,"ratePesosPerMeter":4943.82,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Paranaque-Sucat Rd - K0020 + 233 - K0020 + 271","amountPesos":2183000,"lengthMeters":38.0,"ratePesosPerMeter":57447.37,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nabua-Balatan Rd - K0490 + 900 - K0490 + 970","amountPesos":2157000,"lengthMeters":70.0,"ratePesosPerMeter":30814.29,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Muntinlupa-Insular Prison Rd - (S03292LZ) Chainage 090 - Chainage 146","amountPesos":2057000,"lengthMeters":56.0,"ratePesosPerMeter":36732.14,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Antonio y De Pio H-way - K0124 + 940 - K0125 + 002 (Off-Carriageway Improvement: Paving of Shoulders)","amountPesos":2040000,"lengthMeters":62.0,"ratePesosPerMeter":32903.23,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0302 + 950 - K0303 + 042.5","amountPesos":2000000,"lengthMeters":92.5,"ratePesosPerMeter":21621.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Conner-Kabugao Rd - K0602 + 248 - K0602 + 260","amountPesos":2000000,"lengthMeters":12.0,"ratePesosPerMeter":166666.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"MSR Jct-Lopez-Catanauan Rd - K0226 + 425 - K0226 + 444","amountPesos":1964000,"lengthMeters":19.0,"ratePesosPerMeter":103368.42,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0017 + 044 - K0017 + 149","amountPesos":1946000,"lengthMeters":105.0,"ratePesosPerMeter":18533.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Puerto Princesa South Rd - K0101 + 715 - K0101 + 788","amountPesos":1946000,"lengthMeters":73.0,"ratePesosPerMeter":26657.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Mayan-Mauyen Port Rd - K0008 + 485 - K0008 + 593","amountPesos":1927000,"lengthMeters":108.0,"ratePesosPerMeter":17842.59,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Jct Del Carmen-Sta Monica-Sn Isidro Rd - K0032 + 346 - K0032 + 418","amountPesos":1836000,"lengthMeters":72.0,"ratePesosPerMeter":25500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bonifacio Drive - K0001 + 589 - K0001 + 650","amountPesos":1812000,"lengthMeters":61.0,"ratePesosPerMeter":29704.92,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Santiago-Tuguegarao Rd - K0429 + 000 - K0429 + 068, K0429 + 117 - K0429 + 349, K0429 + 397 - K0429 + 541 (Off-Carriageway Improvement: Paving of Shoulders)","amountPesos":1711000,"lengthMeters":444.0,"ratePesosPerMeter":3853.6,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Calamba-Sta Cruz-Famy Jct Rd - K0051 + 000 - K0052 + 000, K0057 + 187 - K0057 + 413, K0057 + 494 - K0057 + 707","amountPesos":1687000,"lengthMeters":1439.0,"ratePesosPerMeter":1172.34,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"South Super H-way East Service Rd - K0022 + 212 - K0022 + 252","amountPesos":1680000,"lengthMeters":40.0,"ratePesosPerMeter":42000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Bacolod South Rd - K0080+788 - K0080 + 858","amountPesos":1645000,"lengthMeters":70.0,"ratePesosPerMeter":23500.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maragondon-Magallanes-Amuyong Rd - K0067 + 710 - K0069 + 000, K0069 + 597 - K0069 + 661, K0071 + 810 - K0072 + 548, K0072 + 559 - K0073 + 200, K0075 + 000 - K0075 + 299, K0085 + 100 - K0085 + 949","amountPesos":1627000,"lengthMeters":3881.0,"ratePesosPerMeter":419.22,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dinagat-Loreto Rd - K0005 + 400 - K0005 + 480","amountPesos":1618000,"lengthMeters":80.0,"ratePesosPerMeter":20225.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dipolog-Sindangan-Liloy Rd - K1888 + 948 - K1888 + 1002","amountPesos":1600000,"lengthMeters":54.0,"ratePesosPerMeter":29629.63,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nabua-Balatan Rd - K0490 + 400 - K0490 + 445","amountPesos":1587000,"lengthMeters":45.0,"ratePesosPerMeter":35266.67,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Basilan Circumferential Rd (Isabela-Lamitan Rd) - K0012 + (-2453) - K0012 + (-2331)","amountPesos":1516000,"lengthMeters":122.0,"ratePesosPerMeter":12426.23,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Banga-Tupi-Malungon Road (Malungon-Tupi Section), Sta. 77+170 - Sta. 77+183 , Sarangani","amountPesos":1500000,"lengthMeters":13.0,"ratePesosPerMeter":115384.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maayon By-Pass Road, Sta. 0+230 - Sta.0+365, Capiz","amountPesos":1420000,"lengthMeters":135.0,"ratePesosPerMeter":10518.52,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Paranaque-Sucat Rd - (S03450LZ) Chainage 004 - Chainage 200","amountPesos":1400000,"lengthMeters":196.0,"ratePesosPerMeter":7142.86,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0020 + 346 - K0020 + 500","amountPesos":1374000,"lengthMeters":154.0,"ratePesosPerMeter":8922.08,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0006 + 441 - K0006 + 592","amountPesos":1347000,"lengthMeters":151.0,"ratePesosPerMeter":8920.53,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Siquijor Circumferential Rd - K0018 + 891 - K0018 + 930","amountPesos":1328000,"lengthMeters":39.0,"ratePesosPerMeter":34051.28,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Barleta St - (S05818LZ) Chainage 005 - Chainage 060","amountPesos":1273000,"lengthMeters":55.0,"ratePesosPerMeter":23145.45,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nabua-Balatan Rd - K0489 + 430 - K0489 + 443, K0489 + 525 - K0489 + 535","amountPesos":1243000,"lengthMeters":23.0,"ratePesosPerMeter":54043.48,"lengthMethod":"Complete chainage range in title · overlapping intervals merged","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Roman Expressway - K0107 + 000 - K0107 + 024.21","amountPesos":1224000,"lengthMeters":24.21,"ratePesosPerMeter":50557.62,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Isaac O. Tolentino Ave. - K0061 + 727 - K0062 + 146","amountPesos":1203000,"lengthMeters":419.0,"ratePesosPerMeter":2871.12,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Manila North Rd - K0487 + 032 - K0487 + 084","amountPesos":1094000,"lengthMeters":52.0,"ratePesosPerMeter":21038.46,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Noveleta-Naic-Tagaytay Rd - (S06092LZ) Chainage 188 - Chainage 212","amountPesos":1088000,"lengthMeters":24.0,"ratePesosPerMeter":45333.33,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Maharlika Highway (LT) - K1019 + 325 - K1019 + 375","amountPesos":1068000,"lengthMeters":50.0,"ratePesosPerMeter":21360.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Dra Salamanca Rd - K0034 + 886 - K0034 + 941","amountPesos":1032000,"lengthMeters":55.0,"ratePesosPerMeter":18763.64,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","project":"Nabunturan-Mainit Park Rd - K1432 + 050 - K1432 + 055","amountPesos":1000000,"lengthMeters":5.0,"ratePesosPerMeter":200000.0,"lengthMethod":"Complete chainage range in title","lengthStatus":"Usable stated segment length","source":null}],"annual":[{"year":2016,"stage":"Enacted GAA","category":"Roads","usableRecords":168,"medianPesosPerMeter":20844.195342370524,"p25PesosPerMeter":10563.093717015721,"p75PesosPerMeter":33448.97785349234,"minLengthMeters":10},{"year":2016,"stage":"Enacted GAA","category":"Bridges","usableRecords":1,"medianPesosPerMeter":184207.54716981133,"p25PesosPerMeter":184207.54716981133,"p75PesosPerMeter":184207.54716981133,"minLengthMeters":10},{"year":2016,"stage":"Enacted GAA","category":"Mixed roads / bridges","usableRecords":6,"medianPesosPerMeter":24612.907592929252,"p25PesosPerMeter":17078.471826977802,"p75PesosPerMeter":55719.053398058255,"minLengthMeters":10},{"year":2017,"stage":"Enacted GAA","category":"Roads","usableRecords":187,"medianPesosPerMeter":24511.062551215517,"p25PesosPerMeter":11775.252525252525,"p75PesosPerMeter":38490.85551726449,"minLengthMeters":10},{"year":2017,"stage":"Enacted GAA","category":"Bridges","usableRecords":2,"medianPesosPerMeter":109746.61503380301,"p25PesosPerMeter":58324.98404550111,"p75PesosPerMeter":161168.24602210493,"minLengthMeters":10},{"year":2017,"stage":"Enacted GAA","category":"Mixed roads / bridges","usableRecords":6,"medianPesosPerMeter":88214.60308056872,"p25PesosPerMeter":53389.72843863096,"p75PesosPerMeter":123636.49764150943,"minLengthMeters":10},{"year":2018,"stage":"Enacted GAA","category":"Roads","usableRecords":174,"medianPesosPerMeter":16128.497037290546,"p25PesosPerMeter":7563.154773287575,"p75PesosPerMeter":30000.0,"minLengthMeters":10},{"year":2018,"stage":"Enacted GAA","category":"Bridges","usableRecords":13,"medianPesosPerMeter":100806.45161290323,"p25PesosPerMeter":59259.25925925926,"p75PesosPerMeter":114285.71428571429,"minLengthMeters":10},{"year":2018,"stage":"Enacted GAA","category":"Mixed roads / bridges","usableRecords":5,"medianPesosPerMeter":117801.04712041885,"p25PesosPerMeter":19655.555555555555,"p75PesosPerMeter":117801.04712041885,"minLengthMeters":10},{"year":2019,"stage":"Enacted GAA","category":"Roads","usableRecords":108,"medianPesosPerMeter":27879.811440008427,"p25PesosPerMeter":15749.881738343514,"p75PesosPerMeter":49523.75,"minLengthMeters":10},{"year":2019,"stage":"Enacted GAA","category":"Bridges","usableRecords":21,"medianPesosPerMeter":132142.85714285713,"p25PesosPerMeter":90171.32551848512,"p75PesosPerMeter":190114.06844106465,"minLengthMeters":10},{"year":2019,"stage":"Enacted GAA","category":"Mixed roads / bridges","usableRecords":8,"medianPesosPerMeter":687500.0,"p25PesosPerMeter":510620.9150326798,"p75PesosPerMeter":891666.6666666667,"minLengthMeters":10},{"year":2020,"stage":"Enacted GAA","category":"Roads","usableRecords":395,"medianPesosPerMeter":47619.04761904762,"p25PesosPerMeter":20288.325471698114,"p75PesosPerMeter":220769.23076923075,"minLengthMeters":10},{"year":2020,"stage":"Enacted GAA","category":"Bridges","usableRecords":18,"medianPesosPerMeter":105555.55555555556,"p25PesosPerMeter":59304.51127819549,"p75PesosPerMeter":179023.79513715205,"minLengthMeters":10},{"year":2020,"stage":"Enacted GAA","category":"Mixed roads / bridges","usableRecords":11,"medianPesosPerMeter":29375.0,"p25PesosPerMeter":9680.677067324392,"p75PesosPerMeter":886113.6363636364,"minLengthMeters":10},{"year":2021,"stage":"Enacted GAA","category":"Roads","usableRecords":610,"medianPesosPerMeter":32970.9609043806,"p25PesosPerMeter":12066.34477825465,"p75PesosPerMeter":187980.76923076925,"minLengthMeters":10},{"year":2021,"stage":"Enacted GAA","category":"Bridges","usableRecords":24,"medianPesosPerMeter":117688.33333333333,"p25PesosPerMeter":37593.02630047718,"p75PesosPerMeter":200766.25,"minLengthMeters":10},{"year":2021,"stage":"Enacted GAA","category":"Mixed roads / bridges","usableRecords":6,"medianPesosPerMeter":23875.60661764706,"p25PesosPerMeter":18149.35625,"p75PesosPerMeter":245972.64705882355,"minLengthMeters":10},{"year":2022,"stage":"Enacted GAA","category":"Roads","usableRecords":358,"medianPesosPerMeter":76923.07692307692,"p25PesosPerMeter":24672.528032619775,"p75PesosPerMeter":418741.02870813396,"minLengthMeters":10},{"year":2022,"stage":"Enacted GAA","category":"Bridges","usableRecords":32,"medianPesosPerMeter":142857.14285714287,"p25PesosPerMeter":97500.0,"p75PesosPerMeter":210000.0,"minLengthMeters":10},{"year":2022,"stage":"Enacted GAA","category":"Mixed roads / bridges","usableRecords":4,"medianPesosPerMeter":122023.80952380953,"p25PesosPerMeter":102423.63095238096,"p75PesosPerMeter":156250.0,"minLengthMeters":10},{"year":2023,"stage":"Enacted GAA","category":"Roads","usableRecords":364,"medianPesosPerMeter":40211.782232757796,"p25PesosPerMeter":16666.666666666668,"p75PesosPerMeter":174260.73131955485,"minLengthMeters":10},{"year":2023,"stage":"Enacted GAA","category":"Bridges","usableRecords":17,"medianPesosPerMeter":65359.47712418301,"p25PesosPerMeter":38541.666666666664,"p75PesosPerMeter":175000.0,"minLengthMeters":10},{"year":2023,"stage":"Enacted GAA","category":"Mixed roads / bridges","usableRecords":9,"medianPesosPerMeter":14000.0,"p25PesosPerMeter":12632.908727234446,"p75PesosPerMeter":59031.87721369539,"minLengthMeters":10},{"year":2024,"stage":"Enacted GAA","category":"Roads","usableRecords":471,"medianPesosPerMeter":28344.67120181406,"p25PesosPerMeter":10091.649694501019,"p75PesosPerMeter":61862.244897959186,"minLengthMeters":10},{"year":2024,"stage":"Enacted GAA","category":"Bridges","usableRecords":20,"medianPesosPerMeter":201663.63732811465,"p25PesosPerMeter":185155.35874439462,"p75PesosPerMeter":250000.0,"minLengthMeters":10},{"year":2024,"stage":"Enacted GAA","category":"Mixed roads / bridges","usableRecords":4,"medianPesosPerMeter":4925247.166613372,"p25PesosPerMeter":4165393.4300993127,"p75PesosPerMeter":5581343.943383684,"minLengthMeters":10},{"year":2025,"stage":"Enacted GAA","category":"Roads","usableRecords":1079,"medianPesosPerMeter":33704.07819346143,"p25PesosPerMeter":13990.881325176742,"p75PesosPerMeter":67784.34000545752,"minLengthMeters":10},{"year":2025,"stage":"Enacted GAA","category":"Bridges","usableRecords":10,"medianPesosPerMeter":333333.3333333333,"p25PesosPerMeter":37476.19047619047,"p75PesosPerMeter":333333.3333333333,"minLengthMeters":10},{"year":2025,"stage":"Enacted GAA","category":"Mixed roads / bridges","usableRecords":0,"medianPesosPerMeter":null,"p25PesosPerMeter":null,"p75PesosPerMeter":null,"minLengthMeters":10},{"year":2026,"stage":"Enacted GAA","category":"Roads","usableRecords":7655,"medianPesosPerMeter":32072.0,"p25PesosPerMeter":19542.52992368806,"p75PesosPerMeter":56000.0,"minLengthMeters":10},{"year":2026,"stage":"Enacted GAA","category":"Bridges","usableRecords":250,"medianPesosPerMeter":816666.6666666666,"p25PesosPerMeter":288946.51639344264,"p75PesosPerMeter":1305000.0,"minLengthMeters":10},{"year":2026,"stage":"Enacted GAA","category":"Mixed roads / bridges","usableRecords":0,"medianPesosPerMeter":null,"p25PesosPerMeter":null,"p75PesosPerMeter":null,"minLengthMeters":10},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Roads","usableRecords":3324,"medianPesosPerMeter":34575.11,"p25PesosPerMeter":21000.0,"p75PesosPerMeter":62500.0,"minLengthMeters":10},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Bridges","usableRecords":63,"medianPesosPerMeter":866192.11,"p25PesosPerMeter":455379.405,"p75PesosPerMeter":1703571.4300000002,"minLengthMeters":10},{"year":2027,"stage":"HGAB 3rd reading · proposed","category":"Mixed roads / bridges","usableRecords":0,"medianPesosPerMeter":null,"p25PesosPerMeter":null,"p75PesosPerMeter":null,"minLengthMeters":10}],"sourceNotes":[{"years":[2016,2017,2018],"source":"DPWH classified project-family lines · FY2016–FY2018","sourceUrl":"https://budget-assets.bettergov.ph/gaa-explorer/manifest.json","sourceRows":31855,"rateRows":564,"limit":"Retained classified DPWH project-family extract; not a fresh reparse of the complete GAA workbook."},{"years":[2019],"source":"FY2019 DPWH Technical GAA","sourceUrl":"https://www.dbm.gov.ph/wp-content/uploads/GAA/GAA2019/TechGAA2019/DPWH/A.pdf","sourceRows":18091,"rateRows":137,"limit":"Technical GAA PDF text extraction; only project-title candidates with recoverable lengths are included."},{"years":[2020],"source":"ODV budget_2020.parquet","sourceRows":6731,"rateRows":433,"limit":"Hierarchy-expanded DPWH GAA descriptions; amounts converted from thousands of pesos. Only rows with a recoverable title-stated length enter the rate series."},{"years":[2021],"source":"ODV budget_2021.parquet","sourceRows":9615,"rateRows":641,"limit":"Hierarchy-expanded DPWH GAA descriptions; amounts converted from thousands of pesos. Only rows with a recoverable title-stated length enter the rate series."},{"years":[2022],"source":"ODV budget_2022.parquet","sourceRows":8293,"rateRows":395,"limit":"Hierarchy-expanded DPWH GAA descriptions; amounts converted from thousands of pesos. Only rows with a recoverable title-stated length enter the rate series."},{"years":[2023],"source":"ODV budget_2023.parquet","sourceRows":7399,"rateRows":390,"limit":"Hierarchy-expanded DPWH GAA descriptions; amounts converted from thousands of pesos. Only rows with a recoverable title-stated length enter the rate series."},{"years":[2024],"source":"ODV budget_2024.parquet","sourceRows":8085,"rateRows":495,"limit":"Hierarchy-expanded DPWH GAA descriptions; amounts converted from thousands of pesos. Only rows with a recoverable title-stated length enter the rate series."},{"years":[2025],"source":"ODV budget_2025.parquet","sourceRows":9506,"rateRows":1093,"limit":"Hierarchy-expanded DPWH GAA descriptions; amounts converted from thousands of pesos. Only rows with a recoverable title-stated length enter the rate series."},{"years":[2026],"source":"Parsed DPWH FY2026 GAA leaf-node schedule","rateRows":7910,"limit":"Parsed DPWH leaf-node comparison source; its eligible scope is narrower than a complete DPWH GAA hierarchy."}],"method":"Allocation divided by title-stated segment length using the same length parser as the current cost-per-meter screen. Only rates with at least 10 stated meters are summarized. Annual medians and quartiles are descriptive, unadjusted distributions; rows are not matched contracts or constant-scope price observations.","limits":["The available annual project-level series begins in FY2016. FY2015 local technical-GAA records are PAP-grouped rather than uniquely identified project records, so they are excluded; earlier annual project-level DPWH GAA sources are not present in this workspace.","Historical source grain and completeness vary by year. FY2016–FY2018 use the retained DPWH project-family extract; FY2019 uses DBM technical-GAA text candidates; FY2020–FY2025 use hierarchy-expanded GAA budget descriptions; FY2026 uses parsed DPWH leaf nodes.","The FY2020–FY2025 sources identify project-like rows through a recoverable stated length in the DPWH road/bridge description. This is not a complete project denominator and annual source coverage is not directly comparable.","FY2027 HGAB is a proposed budget-stage comparator, not an enacted GAA year. Different project mix, scope, dimensions, quality, location and funded quantities remain uncontrolled.","Rates are whole line-item allocations divided by title-stated segment length, not verified construction unit costs. FMR is excluded from this series."],"sources":[{"years":[2016,2017,2018],"source":"DPWH classified project-family lines · FY2016–FY2018","sourceUrl":"https://budget-assets.bettergov.ph/gaa-explorer/manifest.json","sourceRows":31855,"rateRows":564,"limit":"Retained classified DPWH project-family extract; not a fresh reparse of the complete GAA workbook."},{"years":[2019],"source":"FY2019 DPWH Technical GAA","sourceUrl":"https://www.dbm.gov.ph/wp-content/uploads/GAA/GAA2019/TechGAA2019/DPWH/A.pdf","sourceRows":18091,"rateRows":137,"limit":"Technical GAA PDF text extraction; only project-title candidates with recoverable lengths are included."},{"years":[2020],"source":"ODV budget_2020.parquet","sourceRows":6731,"rateRows":433,"limit":"Hierarchy-expanded DPWH GAA descriptions; amounts converted from thousands of pesos. Only rows with a recoverable title-stated length enter the rate series."},{"years":[2021],"source":"ODV budget_2021.parquet","sourceRows":9615,"rateRows":641,"limit":"Hierarchy-expanded DPWH GAA descriptions; amounts converted from thousands of pesos. Only rows with a recoverable title-stated length enter the rate series."},{"years":[2022],"source":"ODV budget_2022.parquet","sourceRows":8293,"rateRows":395,"limit":"Hierarchy-expanded DPWH GAA descriptions; amounts converted from thousands of pesos. Only rows with a recoverable title-stated length enter the rate series."},{"years":[2023],"source":"ODV budget_2023.parquet","sourceRows":7399,"rateRows":390,"limit":"Hierarchy-expanded DPWH GAA descriptions; amounts converted from thousands of pesos. Only rows with a recoverable title-stated length enter the rate series."},{"years":[2024],"source":"ODV budget_2024.parquet","sourceRows":8085,"rateRows":495,"limit":"Hierarchy-expanded DPWH GAA descriptions; amounts converted from thousands of pesos. Only rows with a recoverable title-stated length enter the rate series."},{"years":[2025],"source":"ODV budget_2025.parquet","sourceRows":9506,"rateRows":1093,"limit":"Hierarchy-expanded DPWH GAA descriptions; amounts converted from thousands of pesos. Only rows with a recoverable title-stated length enter the rate series."},{"years":[2026],"source":"Parsed DPWH FY2026 GAA leaf-node schedule","rateRows":7910,"limit":"Parsed DPWH leaf-node comparison source; its eligible scope is narrower than a complete DPWH GAA hierarchy."},{"years":[2026],"source":[{"file":"open-data-visualization/data/parquet/parsed_dpwh_2026.parquet","sha256":"8c9248c793911081cdd30b403fefa1efac20b98c681231b751efe2c0af3a90f2"},{"file":"cost_per_km.json","sha256":"9f689329ab0bbfb546111c937646767af49e906fd38c4566d0d526f5283ff9d3"}]},{"years":[2027],"source":[{"file":"hb_nep_comparison_3rd.csv","sha256":"6358f901c9416f7c6cde9328e5a65ac05f6d8962f0bdf6bab3c5f0ef124d36c9"},{"file":"hgab_3rd_editions.json","sha256":"829c1b028913a5865884944e793955e948dbe8a4902d69f9131b6a58d4cbf5b6"},{"file":"hgab_fmr_coordinates_normalized.json","sha256":"c8c360514ad9ac908f435c7782bca879cfda01d26b102c97f2348f58dd7243c0"}]}]}
